SUMMARY: The Forest Service will prepare an Environmental Impact
Statement (EIS) to analyze and disclose the environmental impacts of a
Proposed Action in the South Fork Yaak Physiographic Area located about
24 air miles northeast of Troy, Montana. This EIS will tier to the
Kootenai National Forest Land and Resource Management Plan and EIS,
which provide overall guidance for achieving the desired forest
condition of the area.
The Proposed Action was developed in response to the major fire
events that burned over 3,000 acres in the Pink Mt. and Fowler Creek
areas in August 1994. The proposal is to salvage timber, construct and
reconstruct roads, reduce fuel concentrations, improve riparian and
wildlife habitat, reforest timber stands, and improve wildlife
security. These are being considered together because they represent
either connected or cumulative actions as defined by the Council on
Environmental Quality (40 CFR 1508.25). Part of the proposed project's
activities lie within an Inventoried Roadless Area (IRA), Zulu #166.
The Proposed Action was developed using various principles of
Ecosystem Management. In doing so, the post-fire conditions were
characterized at a broad scale with consideration to natural processes
that historically shaped this ecosystem. A Forest Plan exception to
certain Management Area standards may be needed to implement this
alternative.
DATES: Writen comments should be received on or before March 9, 1995.
ADDRESSES: The Responsible Official is Robert L. Schrenk, Forest
Supervisor, Kootenai National Forest. Send written comments and
suggestions on the proposed management activities or a request to be
placed on the project mailing list to Michael L. Balboni, District
Ranger, Three Rivers Ranger District, Kootenai National Forest, 1437
North Highway 2, Troy, Montana, 59935.
FOR FURTHER INFORMATION CONTACT:
Jack Zearfoss, South Fork Yaak EIS Team Leader, Three Rivers Ranger
District (406) 295-4693.
SUPPLEMENTARY INFORMATION: The timber salvage activities under
consideration would occur within the 45,197 acre South Fork Yaak
Physiographic Area. The specific areas considered are the Fowler Creek,
Zulu Creek, and Clay Mt. areas. Primary salvage activities would occur
in two specific fire-affected areas: the Fowler Fire (2,589 acres) and
the Pink Mt. Fire (475 acres). Previous planning efforts (Zulu Smoot
Environmental Impact Statement) have identified other salvage
opportunities outside of the fire-affected areas which are included in
this Proposed Action.
The project area lies within all or portions of T35N, R31W,
Sections 10, 11, 14, 15, 21, 22, 23, 26, 27, 33, and 34, T34N, R31W,
Sections 3 and 4, T35N, R32W, Sections 36, T34N, R32W, Sections 1, and
12 and Sections 6, and 7 T43N, R31W, PMM, Lincoln County, Montana.
The Proposed Action would harvest about 16.2 million board feet.
Ninety-seven percent of this would be dead or high-risk trees. Three
percent would be live trees. Conventional cable and ground-based
logging systems would be utilized for harvest operations. This would
occur from 33 harvest units totalling 1156 acres. Fuel reduction
accomplished in conjunction with harvest includes grapple piling and
prescribed burning. Reforestation is proposed on approximately 1383
acres of which 227 are burned plantations. Approximately 3.51 miles of
new road would be constructed and 6.99 miles of existing road would be
reconstructed. Road maintenance would occur on about 25.61 miles of
existing road. Planting for wildlife forage would occur on 94 acres.
Revegetation in riparian areas would occur on 35 acres. Placement of
large woody debris would occur along 5.0 miles of stream channel.
Existing roads would be rehabilitated through a variety of methods
including the removal of approximately 25 in-stream culverts,
recontouring of 3.44 miles of road, ripping and seeding of 22.65 miles
of road and seeding of 3.12 miles of road.
Approximately 218 acres proposed for harvest lie within the Zulu
#166 IRA. Approximately 1.41 miles of road construction would occur
within the area.
The primary purposes of the Proposed Action are:
(1) To revegetate the fire-affected areas as quickly as possible
(2) To reduce the potential for future high intensity wildfires
(3) To salvage fire and insect killed trees
(4) To contribute to the supply of timber to local mills
(5) To facilitate watershed recovery
(6) To accelerate the recovery of some wildlife habitat.
The purpose of road construction and reconstruction is to facilitate
access to the areas to be harvested and treated.
The decision to be made is, what action (if any) should be taken in
the South Fork Yaak Physiographic Area to:
(1) Recover the fire affected areas using Ecosystem Management
principles
(2) Provide goods and services to the local economy and U.S.
citizens
(3) Reduce the risk for high-intensity wildfire in the future
(4) Develop and manage the road system to facilitate the removal of
timber, post harvest treatments, reduce sedimentation, restore stream
channel equilibrium, and maintain or improve wildlife habitat.
The Kootenai Forest Plan provides guidance for management
activities within the potentially affected area through its goals,
objectives, standards and guidelines, and management area direction.
The areas of proposed activities would occur within Management Areas
12, 13, 14, 15, 17 and 19. Timber harvest would occur in all Management
Areas. Road construction would occur in Management Areas 12, 13, 14,
15, and 17. Below is a brief description of the applicable management
direction.
Management Area 12.--These are areas that contain productive timber
[[Page 7158]] lands which are suitable for timber harvest, provided
that big game summer habitat objectives are met.
Management Area 13.--These are areas that contain special habitat
characteristics which are allocated as Old-Growth. Local road
construction is permitted, providing that they are restricted following
use to protect snag characteristics.
Management Area 14.--These are areas that contain productive timber
lands which are suitable for timber harvest, provided that grizzly bear
habitat objectives are met.
Management Area 15.--These are areas that contain productive timber
lands which are suitable for timber harvest while providing for other
resource values.
Management Area 17.--These are areas that contain productive timber
lands which are suitable for timber harvest while achieving scenery
management objectives in major travel routes.
Management Area 19.--These are areas that contain steep slopes
requiring only activities which minimize surface disturbance and
maintain a health vegetative cover.
The Forest Service will consider a range of alternatives, One of
these will be the ``No Action'' alternative, in which none of the
proposed activities will be implemented. Additional alternatives will
examine varying levels and locations for the proposed activities to
achieve the desired conditions, as well as to respond to the issues and
other resource values.
The EIS will analyze the direct, indirect, and cumulative
environmental effects of the alternatives. Past, present, and projected
activities on National Forest Lands will be considered. The EIS will
disclose the analysis of site-specific mitigation measures and their
effectiveness.
Public participation is an important part of the analysis. It will
start with the initial scoping process (40 CFR 1501.7) which will begin
with the publication of the notice. In addition, the public is
encouraged to visit with Forest Service officials at any time during
the analysis and prior to the decision. The Forest Service will be
seeking information, comments, and assistance from Federal, State and
local agencies and other individuals or organizations who may be
interested in or affected by the Proposed Action. Public meetings are
scheduled for February 28th in Troy, Montana, and March 1st at the
Upper Ford Work Center on the Kootenai National Forest. Comments from
the public and other agencies will be used in preparation of the Draft
EIS. The scoping process will be used to:
1. Identify potential issues.
2. Identify major issues to be analyzed in depth.
3. Eliminate minor issues or those which have been covered by a
previous environmental analysis, such as the Kootenai Forest Plan EIS.
4. Identify alternatives to the proposed action.
5. Identify potential environmental effects of the Proposed Action
and alternatives (i.e. direct, indirect, and cumulative effects).
6. Determine potential cooperating agencies and task assignments.
The principle environmental issues identified to date are related
to:
1. Revegetation for wildlife habitat and watershed recovery.
2. Security for Threatened, Endangered, and Sensitive species.
3. Reallocation of designated Old-Growth.
4. Protection of fish habitat and water quality.
5. Sustaining natural processes.
6. Entry into Roadless areas.
Other issues commonly associated with salvage harvesting and road
construction include: heritage resources, soils, and scenery
management. The list may be verified, expanded, or modified based on
public scoping for this proposal.
Consultation with the U.S. Fish and Wildlife Service has been
ongoing with regard to listed species. The Montana Department of Health
and Welfare-Division of Environmental Quality, Montana Department of
Fish and Game, and the Kootensai Salish Indian Tribe will also be
consulted.
While public participation in this analysis is welcome at any time,
comments received within 30 days of the publication of this notice will
be especially useful in the preparation of the Draft EIS, which is
expected to be filed with the EPA and available for public review in
June, 1995. A 45-day comment period will follow publication of a Notice
of Availability of the draft EIS in the Federal Register. The comments
received will be analyzed and considered in preparation of a final EIS,
which will be accompanied by a Record of Decision. The final EIS is
expected to the filed in September, 1995.
The Forest Service believes it is important at this early stage to
give reviewers notice of several court rulings related to public
participation in the environmental review process. First, reviewers of
draft EIS's must structure their participation in the environmental
review of the proposal so that it is meaningful and alerts an agency to
the reviewer's position and contentions Vermont Yankee Nuclear Power
Corp. v. NRDC, 435 U.S. 519, 513 (1978). Also, environmental objections
that could be raised at the draft EIS stage but that are not raised
until after completion of the final EIS may be waived or dismissed by
the courts City of Angoon v. Hodel, 803 F.2d 1016, 1022 (9th Cir, 1986)
and Wisconsin Heritages Inc. v. Harris, 490 F.Supp. 1334, 1338 (E.D.
Wis., 1980). Because of these court rulings, it is very important that
those interested in this Proposed Action participate by the close of
the 30 day comment period so that substantive comments and objections
are available to the Forest Service at a time when it can meaningfully
consider them and respond to them in the final EIS.
To assist the Forest Service in identifying and considering issues
and concerns on the proposed action, comments should be as specific as
possible. Reviewers may wish to refer to the Council on Environmental
Quality Regulations for implementing the procedural provisions of the
National Environmental Policy Act at 40 CFR 1503.3 in addressing these
points.
I have the final authority for issuing a decision regarding this
proposal. I have delegated the responsibility of preparing the EIS to
Three Rivers District Ranger, Michael Balboni. My address is Kootenai
National Forest, Supervisor's Office, 506 Hwy 2 West, Libby, MT 59923.
Dated: January 30, 1995.
Robert L. Schrenk
Forest Supervisor.
[FR Doc. 95-2953 Filed 2-6-95; 8:45 am]
BILLING CODE 3410-11-M
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.