AES Power, Inc., et al.; Electric Rate and Corporate Regulation Filings

Federal RegisterAug 29, 1995

Ask Donna

What actually matters in this document.

Text

DEPARTMENT OF ENERGY

[Docket No. ER94-890-006, et al.]

AES Power, Inc., et al.; Electric Rate and Corporate Regulation

Filings

August 23, 1995.

Take notice that the following filings have been made with the

Commission:

1. AES Power, Inc.

[Docket No. ER94-890-006]

Take notice that on August 3, 1995, AES Power, Inc. tendered for

filing certain information as required by the Commission's letter order

dated April 8, 1994. Copies of the informational filing are on file

with the Commission and are available for public inspection.

2. United States Department of Energy--Western Area Power

Administration (Central Valley Project)

[Docket No. EF95-5011-000]

Take notice that on August 10, 1995, the Deputy Secretary of

Energy, on behalf of the Western Area Power Administration, tendered

for filing an amended Rate Schedule CV-F7 pursuant to the authority

delegated to the Deputy Secretary by the Secretary's Amendment No. 3 to

Delegation Order No. 0204-108. The amended rate schedule is for

commercial firm power from the Central Valley Project.

[[Page 44866]]

Comment date: September 7, 1995, in accordance with Standard

Paragraph E at the end of this notice.

3. Public Service Company of New Hampshire v. New Hampshire Electric

Cooperative, Inc.

[Docket No. EL95-71-000]

Take notice that on August 14, 1995, the Public Service Company of

New Hampshire (PSNH) tendered for filing a complaint against the New

Hampshire Electric Cooperative, Inc. (NHEC) with respect to NHEC's

anticipatory breach of its wholesale partial requirements agreement

with PSNH.

Comment date: September 22, 1995, in accordance with Standard

Paragraph E at the end of this notice.

4. Citizens Lehman Power Sales

[Docket No. ER94-1685-004]

Take notice that on August 14, 1995, Citizens Lehman Power Sales

filed certain information as required by the Commission's February 2,

1995, order in Docket No. ER94-1685. Copies of Citizens Lehman Power

Sales' informational filing are on file with the Commission and are

available for public inspection.

5. American Electric Power Service Corporation

[Docket No. ER95-497-001]

Take notice that on August 15, 1995, American Electric Power

Service Corporation (AEPSC) amended its filing in the above referenced

docket to clarify its policy regarding return-in-kind of emission

allowances.

A copy of this amendment to filing was served upon the affected

parties and state regulatory commissions.

Comment date: September 6, 1995, in accordance with Standard

Paragraph E at the end of this notice.

6. Northern States Power Company (Minnesota) Northern States Power

Company (Wisconsin)

[Docket No. ER95-503-000]

Take notice that on August 17, 1995, Northern States Power Company

(Minnesota) and Northern States Power Company (Wisconsin) tendered for

filing revisions to its January 30, 1995, emission allowance filing to

comply with the Final Rule issued on April 26, 1995, and to be

consistent with the Commission's order issued on June 2, 1995.

NSP Companies request that the Commission grant waiver of its Part

35 notice provisions and accept this amended filing effective January

1, 1995, subject to refund.

Comment date: September 6, 1995, in accordance with Standard

Paragraph E at the end of this notice.

7. Southern Indiana Gas and Electric Company

[Docket No. ER95-600-000]

Take notice that on August 2, 1995, Southern Indiana Gas and

Electric Company (Southern Indiana) tendered for filing Revised

Amendments to Coordination Rates in its Interconnection Agreement with

Alcoa Generating Corporation to Reflect the Costs of Emissions

Allowances for FERC Rate Schedule No. 0029. A copy of the filing has

been sent to Alcoa Generating Corporation.

The proposed Revised Amendment to the Rate Schedule is being made

by an abbreviated filing under Section 205 and pursuant to the

Commission's Interim Rule issued in Docket No. PL95-1-000, Regarding

Ratemaking Treatment of the Cost of Emissions Allowances in

Coordination Rates and provides for cost recover of SO2 emissions

allowances in energy sales. These revised amendments are limited to

coordination sales tariffs contained in the Agreement and are intended

to clarify provisions for the ratemaking treatment of the cost of

emissions allowances under the aforementioned rate schedule.

Comment date: September 6, 1995, in accordance with Standard

Paragraph E at the end of this notice.

8. Maine Public Service Company

[Docket No. ER95-836-003]

Take notice that on August 9, 1995, Maine Public Service Company

tendered for filing its compliance filing in the above-referenced

docket.

Comment date: September 6, 1995, in accordance with Standard

Paragraph E at the end of this notice.

9. CL Power Sales One, Two, Three, Four, Five, L.L.C.

[Docket No. ER95-892-001]

Take notice that on August 14, 1995, CL Power Sales One, Two,

Three, Four, Five, L.L.C. filed certain information as required by the

Commission's June 8, 1995, order in Docket No. ER95-892. Copies of CL

Power Sales One, Two, Three, Four, and Five, L.L.C.'s informational

filing are on file with the Commission and are available for public

inspection.

10. IES Utilities Inc.

[Docket No. ER95-1244-000]

Take notice that IES Utilities Inc. (IES) on August 14, 1995,

tendered for filing proposed changes to amend its previous June 19,

1995 filing relating to the IES and Central Iowa Power Cooperative

(CIPCO) Operating and Transmission Agreement (Agreement), Appendices 13

& 14.

The proposed changes relate to modifications of the Appendix 13

Availability Charge, Effective Date and Account Numbers.

Copies of the filing were served upon CIPCO and the Iowa Utilities

Board.

Comment date: September 6, 1995, in accordance with Standard

Paragraph E at the end of this notice.

11. Consolidated Edison Company of New York, Inc.

[Docket No. ER95-1283-000]

Take notice that on August 15, 1995, Consolidated Edison Company of

New York, Inc. (Con Edison) tendered for filing a Revised Supplement to

its Rate Schedule, Con Edison Rate Schedule FERC No. 127, a facilities

agreement with the New York Power Authority (NYPA). The Supplement

provides for a decrease in the monthly carrying charges. Con Edison has

requested that this decrease take effect as of July 1, 1995.

Con Edison states that a copy of this filing has been served by

mail upon NYPA.

Comment date: September 6, 1995, in accordance with Standard

Paragraph E at the end of this notice.

12. Central Power and Light Company

[Docket No. ER95-1300-000]

Take notice that on August 4, 1995, Central Power and Light Company

(CPL) submitted an amended Service Agreement, dated July 6, 1995,

establishing the City of Robstown (Texas) Utility System as a customer

under the terms of CPL's Coordination Sales Tariff CST-1 (``CST-1

Tariff).

CPL requests an effective date of July 6, 1995, to coincide with

the date of the amended Service Agreement. Copies of this filing were

served upon the City of Robstown Utility System and the Public Utility

Commission of Texas.

Comment date: September 6, 1995, in accordance with Standard

Paragraph E at the end of this notice.

13. Niagara Mohawk Power Corporation

[Docket No. ER95-1409-000]

Take notice that on July 26, 1995, Niagara Mohawk Power Corporation

tendered for filing an amendment in the above referenced docket.

Comment date: September 6, 1995, in accordance with Standard

Paragraph E at the end of this notice.

[[Page 44867]]

14. Northeast Utilities Service Company

[Docket No. ER95-1411-000]

Take notice that Northeast Utilities Service Company (NUSCO) on

August 16, 1995, tendered an amendment to its filing in the above

referenced docket. The amendment provides for an earlier requested

effective date for a Service Agreement with New York Power Authority

(NYPA) under the NU System Companies' Power Sales/Exchange Tariff No.

6.

NUSCO states that a copy of this filing has been mailed to NYPA.

NUSCO requests that the Service Agreement become effective on

August 1, 1995.

Comment date: September 6, 1995, in accordance with Standard

Paragraph E at the end of this notice.

15. Wisconsin Electric Power Company

[Docket No. ER95-1474-000]

Take notice that Wisconsin Electric Power Company (Wisconsin

Electric) on August 1, 1995, tendered for filing two transmission

tariffs modeled after the Commission's pro forma tariffs appended to

the Notice of Proposed Rulemaking in Docket No. RM95-8-000. Wisconsin

Electric also submitted unexecuted transmission service agreements for

firm and non-firm service to The Wisconsin Public Power Inc. System

(WPPI). Wisconsin Electric also requests that a previous unexecuted

agreement with WPPI covering two firm transactions that commenced June

1, 1995 be converted from Network Contract Demand Transmission Service

under the present tariff to Firm Point-to-Point Transmission Service

under the applicable pro forma tariff.

Wisconsin Electric respectfully requests an effective date for each

tariff of August 1, 1995, in order to replace its previous submittal in

Docket No. ER95-1084-000, which was accepted for filing by order dated

July 13, 1995. Wisconsin Electric authorized to state that WPPI joins

in the requested effective date. Because the instant filing replaces

the tariff filed in ER95-1084-000, Wisconsin Electric requests waiver

of the requirements of Ordering Paragraphs A and B of that order.

Copies of the filing have been served on all parties to Dockets.

ER94-1625 et al., the Michigan Public Service Commission, and the

Public Service Commission of Wisconsin.

Comment date: September 6, 1995, in accordance with Standard

Paragraph E at the end of this notice.

16. Georgia Power Company

[Docket No. ER95-1513-000]

Take notice that on August 9, 1995, Georgia Power Company (Georgia

Power) submitted for filing Amendment No. 1 to the Interchange Contract

between Georgia Power and Crisp County Power Commission dated June 1,

1995. The purpose of this filing is to amend energy rates contained in

the foregoing interchange contract to reflect the energy-related costs

incurred by Georgia Power to ensure compliance with the Phase I sulfur

dioxide emissions limitations of the Clean Air Act Amendment of 1990.

Comment date: September 6, 1995, in accordance with Standard

Paragraph E at the end of this notice.

17. UtiliCorp United Inc.

[Docket No. ER95-1565-000]

Take notice that on August 17, 1995, UtiliCorp United Inc. tendered

for filing on behalf of its operating division, WestPlains Energy-

Kansas, a Service Agreement under its Power Sales Tariff, FERC Electric

Tariff Original Volume No. 12, with NorAm Energy Services. The Service

Agreement provides for the sale of capacity and energy by WestPlains

Energy-Kansas to NorAm Energy Services pursuant to the tariff, and for

the sale of capacity and energy by NorAm Energy Services to WestPlains

Energy-Kansas pursuant to NorAm Energy Services' Rate Schedule No. 1.

UtiliCorp also has tendered for filing a Certificate of Concurrence

by NorAm Energy Services.

UtiliCorp requests waiver of the Commission's Regulations to permit

the Service Agreement to become effective in accordance with its terms.

Comment date: September 6, 1995, in accordance with Standard

Paragraph E at the end of this notice.

18. UtiliCorp United Inc.

[Docket No. ER95-1566-000]

Take notice that on August 17, 1995, UtiliCorp United Inc. tendered

for filing on behalf of its operating division, WestPlains Energy--

Colorado, a Service Agreement under its Power Sales Tariff, FERC

Electric Tariff Original Volume No. 11, with NorAm Energy Services. The

Service Agreement provides for the sale of capacity and energy by

WestPlains Energy--Colorado to NorAm Energy Services pursuant to the

tariff, and for the sale of capacity and energy by NorAm Energy

Services to WestPlains Energy--Colorado pursuant to NorAm Energy

Services' Rate Schedule No. 1.

UtiliCorp also has tendered for filing a Certificate of Concurrence

by NorAm Energy Services.

UtiliCorp requests waiver of the Commission's Regulations to permit

the Service Agreement to become effective in accordance with its terms.

Comment date: September 6, 1995, in accordance with Standard

Paragraph E at the end of this notice.

19. Pacific Gas and Electric Company

[Docket No. ER95-1567-000]

Take notice that on August 17, 1995, Pacific Gas and Electric

Company (PG&E) tendered for filing a contract for the sale of capacity

between PG&E and the City of Seattle, City Light Department (Seattle).

Under this agreement, Seattle will sell PG&E 50 megawatts of capacity

over two summer seasons. PG&E will return energy supplied to Seattle

under that capacity within the same week, unless the parties agree that

it will be purchased.

Copies of this filing have been served upon Seattle and the

California Public Utilities Commission.

Comment date: September 6, 1995, in accordance with Standard

Paragraph E at the end of this notice.

20. Montana Power Company

[Docket No. ER95-1568-000]

Take notice that on August 17, 1995, the Montana Power Company

(Montana) tendered for filing with the Federal Energy Regulatory

Commission pursuant to 18 CFR 35.13, a Form of Service Agreement with

Koch Power Services, Inc. (KPSI) under FERC Electric Tariff, Second

Revised Volume No. 1, a revised Index of Purchasers under said Tariff,

and a Certificate of Concurrence from KPSI.

A copy of the filing was served upon KPSI.

Comment date: September 6, 1995, in accordance with Standard

Paragraph E at the end of this notice.

21. Entergy Power, Inc.

[Docket No. ER95-1569-000]

Take notice that Entergy Power, Inc. (EPI) on August 17, 1995,

tendered for filing an Interchange Agreement with Alabama Electric

Cooperative, Inc.

EPI requests an effective date for the Interchange Agreement that

is one (1) day after the date of filing, and respectfully requests

waiver of the notice requirements specified in Section 35.11 of the

Commission's Regulations.

Comment date: September 6, 1995, in accordance with Standard

Paragraph E at the end of this notice.

[[Page 44868]]

22. Entergy Power, Inc.

[Docket No. ER95-1570-000]

Take notice that Entergy Power, Inc. (EPI) on August 17, 1995

tendered for filing a contract with the Southeastern Power

Administration.

EPI requests an effective date for the Contract that is one (1) day

after the date of filing, and respectfully requests waiver of the

notice requirements specified in Section 35.11 of the Commission's

Regulations.

Comment date: September 6, 1995, in accordance with Standard

Paragraph E at the end of this notice.

23. Boyd Rosene & Associates, Inc.

[Docket No. ER95-1572-000]

Take notice that on August 17, 1995, Boyd Rosene & Associates, Inc.

(Boyd Rosene) petitioned the Commission for (1) blanket authorization

to sell electricity at market-based rates; (2) a disclaimer of

jurisdiction over Boyd Rosene's power brokering activities; (3)

acceptance of Boyd Rosene's Rate Schedule FERC No. 1; (4) waiver of

certain Commission Regulations; and (5) such other waivers and

authorizations as have been granted to other power marketers, all as

more fully set forth in Boyd Rosene's petition on file with the

Commission.

Boyd Rosene states that it intends to engage in electric power

transactions as a broker and as a marketer. In transactions where Boyd

Rosene acts as a marketer, it proposes to make such sales on rates,

terms and conditions to be mutually agreed to with purchasing parties.

Comment date: September 8, 1995, in accordance with Standard

Paragraph E at the end of this notice.

24. Citizens Lehman Power Sales

[Docket No. ER95-1573-000]

Take notice that on August 17, 1995, Citizens Lehman Power Sales

(CL Sales) submitted for filing its amended electric service tariff,

FERC Rate Schedule No. 1. The amendment would authorize sales to any

affiliate having a FERC rate schedule permitting sales for resale by

such affiliate at rates established by agreement between the purchaser

and the affiliate. CL Sales requests an effective date of September 1,

1995.

Comment date: September 8, 1995, in accordance with Standard

Paragraph E at the end of this notice.

25. Central Power and Light Company West Texas Utilities Company

[Docket No. ER95-1574-000]

Take notice that on August 17, 1995, Central Power and Light

Company (CPL) and West Texas Utilities Company (WTU), submitted for

filing an executed Transmission Service Agreement between CPL and Lower

Colorado River Authority (LCRA) and an executed Transmission Service

Agreement between WTU and LCRA (Service Agreement). Under the Service

Agreements, CPL and WTU will transmit power and energy purchased by

LCRA from the Texas Wind Power Project. CPL and WTU request that the

Service Agreements be accepted to become effective as of August 18,

1995, and have therefore asked the Commission to waive its notice

requirements.

Copies of the filing were served on LCRA and the Public Utility

Commission of Texas.

Comment date: September 8, 1995, in accordance with Standard

Paragraph E at the end of this notice.

Standard Paragraph

E. Any person desiring to be heard or to protest said filing should

file a motion to intervene or protest with the Federal Energy

Regulatory Commission, 825 North Capitol Street, N.E., Washington, D.C.

20426, in accordance with Rules 211 and 214 of the Commission's Rules

of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such

motions or protests should be filed on or before the comment date.

Protests will be considered by the Commission in determining the

appropriate action to be taken, but will not serve to make protestants

parties to the proceeding. Any person wishing to become a party must

file a motion to intervene. Copies of this filing are on file with the

Commission and are available for public inspection.

Lois D. Cashell,

Secretary.

[FR Doc. 95-21364 Filed 8-28-95; 8:45 am]

BILLING CODE 6717-01-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.