Energy Conservation Program for Consumer Products: Granting of the Application for Interim Waiver and Publishing of the Petition for Waiver of the Department of Energy Furnace Test Procedures From York International
Federal RegisterAug 28, 1995
Ask Donna
What actually matters in this document.
Text
DEPARTMENT OF ENERGY
Office of Energy Efficiency and Renewable Energy
[Case No. F-078]
Energy Conservation Program for Consumer Products: Granting of
the Application for Interim Waiver and Publishing of the Petition for
Waiver of the Department of Energy Furnace Test Procedures From York
International
AGENCY: Office of Energy Efficiency and Renewable Energy, Department of
Energy.
ACTION: Notice.
-----------------------------------------------------------------------
SUMMARY: Today's notice publishes a letter granting an Interim Waiver
to York International (York) from the existing Department of Energy
(the Department) test procedure regarding blower time delay for the
company's P2UR and PBLU lines of condensing furnaces.
Today's notice also publishes a ``Petition for Waiver'' from York.
York's Petition for Waiver requests the Department to grant relief from
its furnace test procedure relating to the blower time delay
specification. York seeks to test using a blower delay time of 30
seconds for its P2UR, and PBLU lines of condensing furnaces instead of
the specified 1.5-minute delay between burner on-time and blower on-
time. The Department is soliciting comments, data, and information
respecting the Petition for Waiver.
DATES: The Department will accept comments, data, and information not
later than September 27, 1995.
ADDRESSES: Written comments and statements shall be sent to: U.S.
Department of Energy, Office of Energy Efficiency and Renewable Energy,
Case No. F-078, Mail Stop EE-43, Room 1J-108, Forrestal Building, 1000
Independence Avenue, SW., Washington, DC 20585, (202) 586-7574.
FOR FURTHER INFORMATION CONTACT:
Cyrus H. Nasseri, U.S. Department of Energy, Office of Energy
Efficiency and Renewable Energy, Mail Station EE-431, Forrestal
Building, 1000 Independence Avenue, SW., Washington, DC 20585, (202)
586-9138
Eugene Margolis, Esq., U.S. Department of Energy, Office of General
Counsel, Mail Station GC-72, Forrestal Building, 1000 Independence
Avenue, SW., Washington, DC 20585, (202) 586-9507
SUPPLEMENTARY INFORMATION: The Energy Conservation Program for Consumer
Products (other than automobiles) was established pursuant to the
Energy Policy and Conservation Act (EPCA), Public Law 94-163, 89 Stat.
917, as amended by the National Energy Conservation Policy Act (NECPA),
Public Law 95-619, 92 Stat. 3266, the National Appliance Energy
Conservation Act of 1987 (NAECA), Public Law 100-12, the National
Appliance Energy Conservation Amendments of 1988 (NAECA 1988), Public
Law 100-357, and the Energy Policy Act of 1992 (EPAct), Public Law 102-
486, 106 Stat. 2776, which requires the Department to prescribe
standardized test procedures to measure the energy consumption of
certain consumer products, including furnaces. The intent of the test
procedures is to provide a comparable measure of energy consumption
that will assist consumers in making purchasing decisions. These test
procedures appear at 10 CFR Part 430, Subpart B.
The Department amended the prescribed test procedures by adding 10
CFR 430.27 on September 26, 1980, creating the waiver process. 45 FR
64108. Thereafter, the Department further amended the appliance test
procedure waiver process to allow the Assistant Secretary for Energy
Efficiency and Renewable Energy (Assistant Secretary) to grant an
Interim Waiver from test procedure requirements to manufacturers that
have petitioned the Department for a waiver of such prescribed test
procedures. 51 FR 42823, November 26, 1986.
The waiver process allows the Assistant Secretary to waive
temporarily, test procedures for a particular basic model when a
petitioner shows that the basic model contains one or more design
characteristics which prevent testing according to the prescribed test
procedures, or when the prescribed test procedures may evaluate the
basic model in a manner so unrepresentative of its true energy
consumption as to provide materially
[[Page 44482]]
inaccurate comparative data. Waivers generally remain in effect until
final test procedure amendments become effective, resolving the problem
that is the subject of the waiver.
The Interim Waiver provisions added by the 1986 amendment allow the
Secretary to grant an Interim Waiver when it is determined that the
applicant will experience economic hardship if the Application for
Interim Waiver is denied, if it appears likely that the Petition for
Waiver will be granted, and/or the Assistant Secretary determines that
it would be desirable for public policy reasons to grant immediate
relief pending a determination on the Petition for Waiver. An Interim
Waiver remains in effect for a period of 180 days or until the
Department issues its determination on the Petition for Waiver,
whichever is sooner, and may be extended for an additional 180 days, if
necessary.
On June 26, 1995, York filed an Application for Interim Waiver
regarding blower time delay. York's Application seeks an Interim Waiver
from the Department's test provisions that require a 1.5-minute time
delay between the ignition of the burner and starting of the
circulating air blower. Instead, York requests the allowance to test
using a 30-second blower time delay when testing its P2UR, and PBLU
lines of condensing furnaces. York states that the 30-second delay is
indicative of how these furnaces actually operate. Such a delay results
in an overall furnace AFUE of approximately 1.5 percent points
improvement. Since the Department's current test procedures do not
address this variable blower time delay, York asks that the Interim
Waiver be granted.
The Department has published a Notice of Proposed Rulemaking on
August 23, 1993, (58 FR 44583) to amend the furnace test procedure,
which addresses the above issue.
Previous waivers for this type of time blower delay control have
been granted by the Department to Coleman Company, 50 FR 2710, January
18, 1985; Magic Chef Company, 50 FR 41553, October 11, 1985; Rheem
Manufacturing Company, 53 FR 48574, December 1, 1988, 56 FR 2920,
January 25, 1991, 57 FR 10166, March 24, 1992, 57 FR 34560, August 5,
1992; 59 FR 30577, June 14, 1994, and 59 FR 55470, November 7, 1994;
Trane Company, 54 FR 19226, May 4, 1989, 56 FR 6021, February 14, 1991,
57 FR 10167, March 24, 1992, 57 FR 22222, May 27, 1992, and 58 FR
68138, December 23, 1993; Lennox Industries, 55 FR 50224, December 5,
1990, 57 FR 49700, November 3, 1992, 58 FR 68136, December 23, 1993,
and 58 FR 68137, December 23, 1993; Inter-City Products Corporation, 55
FR 51487, December 14, 1990, and 56 FR 63945, December 6, 1991; DMO
Industries, 56 FR 4622, February 5, 1991, and 59 FR 30579, June 14,
1994; Heil-Quaker Corporation, 56 FR 6019, February 14, 1991; Carrier
Corporation, 56 FR 6018, February 14, 1991, 57 FR 38830, August 27,
1992, 58 FR 68131, December 23, 1993, 58 FR 68133, December 23, 1993
and 59 FR 14394, March 28, 1994; Amana Refrigeration Inc., 56 FR 27958,
June 18, 1991, 56 FR 63940, December 6, 1991, 57 FR 23392, June 3,
1992, and 58 FR 68130, December 23, 1993; Snyder General Corporation,
56 FR 54960, September 9, 1991; Goodman Manufacturing Corporation, 56
FR 51713, October 15, 1991, 57 FR 27970, June 23, 1992 and 59 FR 12586,
March 17, 1994; The Ducane Company Inc., 56 FR 63943, December 6, 1991,
57 FR 10163, March 24, 1992, and 58 FR 68134, December 23, 1993;
Armstrong Air Conditioning, Inc., 57 FR 899, January 9, 1992, 57 FR
10160, March 24, 1992, 57 FR 10161, March 24, 1992, 57 FR 39193, August
28, 1992, 57 FR 54230, November 17, 1992, and 59 FR 30575, June 14,
1994; Thermo Products, Inc., 57 FR 903, January 9, 1992; Consolidated
Industries Corporation, 57 FR 22220, May 27, 1992; Evcon Industries,
Inc., 57 FR 47847, October 20, 1992, and 59 FR 46968, September 13,
1994; Bard Manufacturing Company, 57 FR 53733, November 12, 1992, and
59 FR 30578, June 14, 1994; and York International Corporation, 59 FR
46969, September 13, 1994, and 60 FR 100, January 3, 1995. Thus, it
appears likely that the Petition for Waiver will be granted for blower
time delay.
In those instances where the likely success of the Petition for
Waiver has been demonstrated based upon the Department having granted a
waiver for a similar product design, it is in the public interest to
have similar products tested and rated for energy consumption on a
comparable basis.
Therefore, based on the above, the Department is granting York an
Interim Waiver for its P2UR and PBLU lines of condensing furnaces.
Pursuant to paragraph (e) of Section 430.27 of the Code of Federal
Regulations Part 430, the following letter granting the Application for
Interim Waiver to York was issued.
Pursuant to paragraph (b) of 10 CFR Part 430.27, the Department is
hereby publishing the ``Petition for Waiver'' in its entirety. The
petition contains no confidential information. The Department solicits
comments, data, and information respecting the petition.
Issued in Washington, DC, August 20, 1995.
Christine A. Ervin,
Assistant Secretary, Energy Efficiency and Renewable Energy.
Department of Energy
August 21, 1995.
Mr. Michael B. Eberlein, P.E.,
Engineering Manager--Furnace Products, Unitary Products Group, York
International, P.O. Box 4022, Elyria, OH 44036.
Dear Mr. Eberlein: This is in response to your June 26, 1995,
Application for Interim Waiver and Petition for Waiver from the
Department of Energy (the Department) test procedure regarding
blower time delay for York International (York) P2UR and PBLU lines
of condensing furnaces.
Previous waivers for this type of timed blower delay control
have been granted by the Department to Coleman Company, 50 FR 2710,
January 18, 1985; Magic Chef Company, 50 FR 41553, October 11, 1985;
Rheem Manufacturing Company, 53 FR 48574, December 1, 1988, 56 FR
2920, January 25, 1991, 57 FR 10166, March 24, 1992, 57 FR 34560,
August 5, 1992, 59 FR 30577, June 14, 1994, and 59 FR 55470,
November 7, 1994; Trane Company, 54 FR 19226, May 4, 1989, 56 FR
6021, February 14, 1991, 57 FR 10167, March 24, 1992, 57 FR 22222,
May 27, 1992, and 58 FR 68138, December 23, 1993; Lennox Industries,
55 FR 50224, December 5, 1990, 57 FR 49700, November 3, 1992, 58 FR
68136, December 23, 1993, and 58 FR 68137, December 23, 1993; Inter-
City Products Corporation, 55 FR 51487, December 14, 1990, and 56 FR
63945, December 6, 1991; DMO Industries, 56 FR 4622, February 5,
1991, and 59 FR 30579, June 14, 1994; Heil-Quaker Corporation, 56 FR
6019, February 14, 1991; Carrier Corporation, 56 FR 6018, February
14, 1991, 57 FR 38830, August 27, 1992, 58 FR 68131, December 23,
1993, 58 FR 68133, December 23, 1993 and 59 FR 14394, March 28,
1994; Amana Refrigeration Inc., 56 FR 27958, June 18, 1991, 56 FR
63940, December 6, 1991, 57 FR 23392, June 3, 1992, and 58 FR 68130,
December 23, 1993; Snyder General Corporation, 56 FR 54960,
September 9, 1991; Goodman Manufacturing Corporation, 56 FR 51713,
October 15, 1991, 57 FR 27970, June 23, 1992 and 59 FR 12586, March
17, 1994; The Ducane Company Inc., 56 FR 63943, December 6, 1991, 57
FR 10163, March 24, 1992, and 58 FR 68134, December 23, 1993;
Armstrong Air Conditioning, Inc., 57 FR 899, January 9, 1992, 57 FR
10160, March 24, 1992, 57 FR 10161, March 24, 1992, 57 FR 39193,
August 28, 1992, 57 FR 54230, November 17, 1992, and 59 FR 30575,
June 14, 1994; Thermo Products, Inc., 57 FR 903, January 9, 1992;
Consolidated Industries Corporation, 57 FR 22220, May 27, 1992;
Evcon Industries, Inc., 57 FR 47847, October 20, 1992, and 59 FR
46968, September 13, 1994; Bard Manufacturing Company, 57 FR 53733,
November 12, 1992, and 59 FR 30578, June 14, 1994; and York
International Corporation, 59 FR 46969, September 13, 1994, and 60
FR 100, January 3, 1995. Thus, it appears likely that the Petition
for Waiver will be granted for blower time delay.
[[Page 44483]]
York's Application for Interim Waiver does not provide
sufficient information to evaluate what, if any, economic impact or
competitive disadvantage York will likely experience absent a
favorable determination on its application.
However, in those instances where the likely success of the
Petition for Waiver has been demonstrated, based upon the Department
having granted a waiver for a similar product design, it is in the
public interest to have similar products tested and rated for energy
consumption on a comparable basis.
Therefore, York's Application for an Interim Waiver from the
Department test procedure for its P2UR and PBLU lines of condensing
furnaces regarding blower time delay is granted.
York shall be permitted to test its P2UR, and PBLU lines of
condensing furnaces on the basis of the test procedures specified in
10 CFR Part 430, Subpart B, Appendix N, with the modification set
forth below:
(i) Section 3.0 in Appendix N is deleted and replaced with the
following paragraph:
3.0 Test Procedure. Testing and measurements shall be as
specified in Section 9 in ANSI/ASHRAE 103-82, with the exception of
Sections 9.2.2, 9.3.1, and 9.3.2, and the inclusion of the following
additional procedures:
(ii) Add a new paragraph 3.10 in Appendix N as follows:
3.10 Gas- and Oil-Fueled Central Furnaces. After equilibrium
conditions are achieved following the cool-down test and the
required measurements performed, turn on the furnace and measure the
flue gas temperature, using the thermocouple grid described above,
at 0.5 and 2.5 minutes after the main burner(s) comes on. After the
burner start-up, delay the blower start-up by 1.5 minutes (t-)
unless: (1) The furnace employs a single motor to drive the power
burner and the indoor air circulation blower, in which case the
burner and blower shall be started together; or (2) the furnace is
designed to operate using an unvarying delay time that is other than
1.5 minutes, in which case the fan control shall be permitted to
start the blower; or (3) the delay time results in the activation of
a temperature safety device which shuts off the burner, in which
case the fan control shall be permitted to start the blower. In the
latter case, if the fan control is adjustable, set it to start the
blower at the highest temperature. If the fan control is permitted
to start the blower, measure time delay (t-) using a stop watch.
Record the measured temperatures. During the heat-up test for oil-
fueled furnaces, maintain the draft in the flue pipe within
0.01 inch of water column of the manufacturer's
recommended on-period draft.
This Interim Waiver is based upon the presumed validity of
statements and all allegations submitted by the company. This
Interim Waiver may be removed or modified at any time upon a
determination that the factual basis underlying the application is
incorrect.
The Interim Waiver shall remain in effect for a period of 180
days, or until the Department acts on the Petition for Waiver,
whichever is sooner, and may be extended for an additional 180-day
period, if necessary.
Sincerely,
Christine A. Ervin,
Assistant Secretary, Energy Efficiency and Renewable Energy.
York Central Environmental Systems; York International
June 26, 1995.
Assistant Secretary, Conservation & Renewable Energy
United States Department of Energy, 1000 Independence Avenue, SW.,
Washington, DC 20585.
Subject: Petition for Waiver and Application for Interim Waiver.
Gentlemen: This is a Petition for Waiver and Application for
Interim Waiver submitted pursuant to Title 10 CFR 430.27, as amended
14 November 1986. Waiver is requested from the test procedures for
measuring the Energy Consumption of Furnaces found in Appendix N of
Subpart B to Part 430, specifically the section requiring a 1.5
minute delay between burner ignition and start-up of the circulating
air blower.
York International requests a waiver from the specified 1.5
minute delay, and seeks authorization in its furnace efficiency test
procedures and calculations to utilize a fixed timing control that
will energize the circulating air blower 30 seconds after the gas
valve opens. A control of this type with a fixed 30 second blower
on-time will be utilized in our P2UR an PBLU lines of condensing
furnaces.
The current test procedure does not credit York for additional
energy savings that occur when a shorter blower on-time is utilized.
Test data for these furnaces with a 30 second delay indicate that
the overall furnace AFUE will increase approximately 1.5 percentage
points compared to the same furnace when tested with the 1.5 minute
delay. Copies of the confidential test data confirming these energy
savings will be forwarded to you upon request.
York International is confident that this waiver will be
granted, as similar waivers have been granted in the past to Coleman
Company, Magic Chef Company, Rheem Manufacturing, the Trane Company,
Carrier Corporation, Lennox Industries, Amana Refrigeration, Goodman
Manufacturing Company and others.
Manufacturers that domestically market similar products are
being sent a copy of this Petition for Waiver and Application for
Interim Wavier.
Sincerely,
Michael B. Eberlein, P.E.
Engineering Manager--Furnace Products, Unitary Products Group.
[FR Doc. 95-21284 Filed 8-25-95; 8:45 am]
BILLING CODE 6450-01-P-M
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.