Energy Conservation Program for Consumer Products: Granting of NORDYNE's Application for Interim Waiver from the Department of Energy's Central Air Conditioner and Central Air Conditioning Heat Pump Test Procedure and Publication of the Petition for Waiver. (Case No. CAC-007)

Federal RegisterAug 8, 1995

Ask Donna

What actually matters in this document.

Text

DEPARTMENT OF ENERGY

Office of Energy Efficiency and Renewable Energy

Energy Conservation Program for Consumer Products: Granting of

NORDYNE's Application for Interim Waiver from the Department of

Energy's Central Air Conditioner and Central Air Conditioning Heat Pump

Test Procedure and Publication of the Petition for Waiver. (Case No.

CAC-007)

AGENCY: Office of Energy Efficiency and Renewable Energy, Department of

Energy.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: Today's notice publishes a letter granting an Interim Waiver

to NORDYNE from the existing Department of Energy central air

conditioner and central air conditioning heat pump test procedure for

the company's Powermiser line of heat pumps with integrated domestic

water heating.

Today's notice also publishes a ``Petition for Waiver'' from

NORDYNE. The Petition for Waiver requests the Department to modify the

heat pump test procedure for the NORDYNE Powermiser line of heat pumps

which include special design characteristics to incorporate domestic

water heating. The Department is soliciting comments, data, and

information respecting the Petition for Waiver.

DATES: The Department will accept comments, data, and information not

later than September 7, 1995.

ADDRESSES: Written comments and statements shall be sent to: Department

of Energy, Office of Energy Efficiency and Renewable Energy, Case No.

CAC-007, Mail Stop EE-43, Room 1J-018, Forrestal Building, 1000

Independence Avenue, SW, Washington, DC 20585, (202) 586-7574.

FOR FURTHER INFORMATION CONTACT:

Michael G. Raymond, U.S. Department of Energy, Office of Energy

Efficiency and Renewable Energy, Mail Station EE-431, Forrestal

Building, 1000 Independence Avenue, SW., Washington, DC 20585, (202)

586-9611

Eugene Margolis, Esq., U.S. Department of Energy, Office of General

Counsel, Mail Station GC-72, Forrestal Building, 1000 Independence

Avenue, SW., Washington, DC 20585, (202) 586-9507

SUPPLEMENTARY INFORMATION: The Energy Conservation Program for Consumer

Products (other than automobiles) was established pursuant to the

Energy Policy and Conservation Act (EPCA), Public Law 94-163, 89 Stat.

917, as amended by the National Energy Conservation Policy Act (NECPA),

Public Law 95-619, 92 Stat. 3266, the National Appliance Energy

Conservation Act of 1987 (NAECA), Public Law 100-12, the National

Appliance Energy Conservation Amendments of 1988 (NAECA 1988), Public

Law 100-357, and the Energy Policy Act of 1992 (EPACT), Public Law 102-

486, 106 Stat. 2776, which requires the Department to prescribe

standardized test procedures to measure the energy consumption of

certain consumer products, including heat pumps. The intent of the test

procedures is to provide a comparable measure of energy consumption

that will assist consumers in making purchasing decisions. The test

procedures for central air conditioners and central air conditioning

heat pumps appear at 10 CFR Part 430, Subpart B, Appendix M.

The Department amended the prescribed test procedures by adding 10

CFR 430.27 on September 26, 1980, creating the waiver process. 45 FR

64108. The Department further amended the appliance test procedure

waiver process to allow the Assistant Secretary for Energy Efficiency

and Renewable Energy (Assistant Secretary) to grant an Interim Waiver

from test procedure requirements to manufacturers that have petitioned

the Department for a waiver of such prescribed test procedures. 51 FR

42823, November 26, 1986.

The waiver process allows the Assistant Secretary to temporarily

waive test procedures for a particular basic model when a petitioner

shows that the basic model contains one or more design characteristics

which prevent testing according to the prescribed test procedures, or

when the prescribed test procedures may evaluate the basic model in a

manner so unrepresentative of its true energy consumption as to provide

materially inaccurate comparative data. Waivers generally remain in

effect until final test procedure amendments become effective,

resolving the problem that is the subject of the waiver.

The Interim Waiver provisions added by the 1986 amendment allow the

Secretary to grant an Interim Waiver when it is determined that the

applicant will experience economic hardship if the Application for

Interim Waiver is denied, if it appears likely that the Petition for

Waiver will be granted, and/or the Assistant Secretary determines that

it would be desirable for public policy reasons to grant immediate

relief pending a determination on the Petition for Waiver. An Interim

Waiver remains in effect for a period of 180 days, or until the

Department issues its determination on the Petition for Waiver,

whichever is sooner, and may be extended for an additional 180 days, if

necessary.

On January 24, 1995, NORDYNE filed a Petition for Waiver and an

Application for Interim Waiver regarding the heat pump tests. NORDYNE's

Petition seeks a Waiver from the Department's test procedure because,

using the test procedure, the company cannot account for the energy

savings associated with integrated water heating. NORDYNE has submitted

a modified test procedure to be used for rating its Powermiser heat

pumps. NORDYNE proposes to calculate, in addition to the standard SEER

and HSPF, a Combined Cooling Performance Factor (CCPF) and a Combined

Heating Performance Factor (CHPF). These performance factors reflect

the energy efficiency of the heat pump when providing both space

conditioning and domestic water heating. The heating and cooling mode

test procedures are essentially the same as the current Department

central air conditioner test procedures found in 10 CFR Part 430,

Subpart B, Appendix M. The NORDYNE test procedures for the heating and

cooling modes differ from the Department's in their use of a bin

analysis for SEER, and the use of seasonal hours rather than fractional

hours for HSPF. NORDYNE states in its Petition that the modified test

procedure for SEER and HSPF ``yields a nearly identical result and

provides a directly comparable base for use in determining

[[Page 40359]]

energy savings associated with water heating.'' In addition, NORDYNE

submitted tests and a rating procedure to determine the performance of

the heat pump when it heats domestic water (whether or not space

heating or cooling is also being provided).

NORDYNE also applied for an Interim Waiver, stating:

The current test procedure does not account for the total

energy savings of the Powermiser;

Carrier Corporation has been granted a similar waiver for

its Hydrotech product;

For public policy reasons, the widespread use of this type

of integrated appliance would be in direct support of the President's

Climate Change Action Plan, which lists heating and cooling and home

appliances as key targets for improvement; and

Absent a favorable determination on the Application for

Interim Waiver, NORDYNE would experience an economic hardship, as

discussed in the confidential statement filed simultaneously.

The Department agrees that the current test procedure does not

account for the total energy savings of the Powermiser. A previous

waiver for this type of equipment was granted by the Department to

Carrier Corporation for its HydroTech 2000, 55 FR 13607, April 11,

1990. Thus, it appears likely that the Petition for Waiver will be

granted.

In those instances where the likely success of the Petition for

Waiver has been demonstrated based upon the Department having granted a

waiver for a similar product design, it is in the public interest to

have similar products tested and rated for energy consumption on a

comparable basis.

Further, NORDYNE has supplied evidence of economic hardship if the

Interim Waiver is not granted. NORDYNE's confidential statement claims

a substantial investment in the Powermiser for research and

development, tooling, production, sales and marketing. The Powermiser

investment represents a large fraction of NORDYNE's annual income.

Until the Interim Waiver is granted, NORDYNE is not able to realize any

return on its investment.

Based on the statements above, the Department is granting an

Interim Waiver to NORDYNE for its Powermiser series integrated heat

pumps. Pursuant to paragraph (e) of Section 430.27 of the Code of

Federal Regulations part 430, the following letter granting the

Application for Interim Waiver to NORDYNE was issued.

Pursuant to paragraph (b) of 10 CFR Part 430.27, the Department is

hereby publishing the ``Petition for Waiver.'' The Petition contains

confidential company information; thus, the confidential attachment

submitted by NORDYNE is not being published. Due to its length (39

pages), NORDYNE's proposed alternate test procedure is not being

published in the Federal Register. It is, however, available upon

request at the address provided at the beginning of today's notice.

NORDYNE has sent a copy of the Petition for Waiver and a copy of the

Application for Interim Waiver to all known manufacturers of

domestically marketed units of the same product type . A summary of the

NORDYNE alternate test procedure is included in the letter to NORDYNE

granting the Application for Interim Waiver, which is published with

this Federal Register Notice.

The Department solicits comments, data, and information respecting

the Petition.

Issued in Washington, DC., July 10, 1995.

Christine A. Ervin,

Assistant Secretary, Energy Efficiency and Renewable Energy.

July 10, 1995.

Mr. Wayne R. Reedy, Vice President--Engineering

NORDYNE, 1801 Park 270 Drive, P.O. Box 46911, St. Louis, MO 63146-

6911.

Dear Mr. Reedy: This is in response to your letter of January

24, 1995, submitting an Application for Interim Waiver and Petition

for Waiver from the Department of Energy's central air conditioner

and central air conditioning heat pump test procedure for NORDYNE's

Powermiser line of heat pumps, which include special design

characteristics to incorporate domestic water heating.

The current test procedure does not account for the energy

savings associated with integrated water heating. A previous waiver

for this type of equipment has been granted to Carrier Corporation,

55 FR 13607, April 11, 1990. Thus, it appears likely that the

Petition for Waiver will be granted.

In those instances where the likely success of the Petition for

Waiver has been demonstrated based upon the Department having

granted a waiver for a similar product design, it is in the public

interest to have similar products tested and rated for energy

consumption on a comparable basis.

Further, NORDYNE's Application for Interim Waiver provides

sufficient information to determine that NORDYNE has and will

continue to experience a severe negative economic impact absent a

favorable determination on its Application. NORDYNE's confidential

statement claims a substantial investment in the Powermiser for

research and development, tooling, production, sales and marketing.

The Powermiser investment represents a large fraction of NORDYNE's

annual income, and NORDYNE is not able to realize any return on this

investment until the Interim Waiver is granted.

Therefore, based on the above, NORDYNE's Application for an

Interim Waiver to modify the Department's test procedure for its

Powermiser line of heat pumps with integrated domestic water heating

is granted.

NORDYNE shall be required to test its Powermiser line of heat

pumps on the basis of the test procedures specified in 10 CFR Part

430, Subpart B, Appendix M, as modified by additional tests and

ratings described in its proposed alternate test procedure, to

determine the performance of the heat pump when it operates for the

heating of domestic water, either concurrently with or separate from

the space heating and cooling modes.

The alternate test procedure is summarized in Attachment A,

attached hereto.

This Interim Waiver is based upon the presumed validity of

statements and all allegations submitted by the company. This

Interim Waiver may be removed or modified at any time upon a

determination that the factual basis underlying the application is

incorrect.

The Interim Waiver shall remain in effect for a period of 180

days, or until the Department acts on the Petition for Waiver,

whichever is sooner, and may be extended for an additional 180-day

period, if necessary.

Best regards,

Christine A. Ervin,

Assistant Secretary, Energy Efficiency and Renewable Energy.

Attachment A

Type of Equipment To Be Covered

The test procedure described herein applies to electrically-driven,

single-speed compressor air-to-air heat pumps having a nominal cooling

capacity of 65,000 BTU/Hr or less that include an integral heat

exchanger and water pump for the heating of domestic water, either

concurrent with or separate from the space heating and cooling modes.

Test Points and Procedures

Standard ratings shall be established in accordance with 10 CFR

Part 430, Subpart B, Appendix M, ``Uniform Test Method for Measuring

the Energy Consumption of Central Air Conditioners.'' Procedures will

also be compatible with ``Methods of Testing for Efficiency of Space-

Conditioning Water Heating Appliances that include a Desuperheater

Water Heater'' ASHRAE Standards Project Committee 137P (under

development).

In addition to the standard ratings, tests and a rating procedure

are described to determine the performance of the heat pump when it

operates for the heating of domestic water, either concurrently with or

separate from the space heating and cooling modes.

Table 1 specifies the operating conditions for all of the tests

covered by

[[Page 40360]]

the present test plan, along with their operating and water draw

schedules as Tables 2, 3 and 4. These tests are summarized as follows:

Space Cooling Mode, Tests 1, 5, 6 and 7

Test 1 (required) is identical to the Department Test A, Test 5

(required) is identical to Department Test B, Test 6 (optional) is

identical to Department Test C, and Test 7 (optional) is identical to

Department Test D, except for the following: The refrigerant-to-water

heat exchanger is filled with water. In order to not have the water

pump cycle on during tests 1 and 5, it may be necessary to disable the

water pump. If natural convection within the water system proves

significant, it will be necessary to close an isolation valve between

the heat pump and the water heater tank.

Space Heating Mode, Tests 11, 12, 13 and 15

Test 11 (required) is identical to the Department High Temperature

Test, Test 12 (optional) is identical to the Department Cyclic Test,

Test 13 (required) is identical to Department Frost Accumulation Test,

and Test 15 (required) is identical to the Department Low Temperature

Test, except for the following: the refrigerant-to-water heat exchanger

is filled with water. In order to not have the water pump cycle on

during tests 11, 13 and 15, it may be necessary to disable the water

pump. If natural convection within the water system proves significant,

it will be necessary to close an isolation valve between the heat pump

and the water heater tank.

Space Cooling/Domestic Water Heating Mode, Tests 2 and 4

Test 2 is the Department Test A, combined with water heating. Air

side conditions are held constant and the system runs continuously,

while a series of water draws are imposed as outlined in Table 2.

Test 4 is the Department Test D, which involves cyclic operation of

the heat pump, with a series of water draws imposed as outlined in

Table 3.

The system cyclic schedule is for energizing of the compressor and

indoor blower control terminal. Actual system operation will be

controlled by the system internal controls. Depending on internal

controls, the compressor and one of the system fans may start or

continue to run irrespective of the compressor terminal being

energized. There shall be no air flow through the coil with the idle

fan. When the indoor blower is off, the duct shall be blocked.

Space Heating/Domestic Water Heating Mode, Tests 10 and 14

Test 10 is the Department Cyclic Test with a series of water draws

imposed, as outlined in Table 3.

Test 14 is the Department Low Temperature Test combined with water

heating. Air side conditions are held constant and the system runs

continuously, while a series of water draws are imposed, as outlined in

Table 2.

The system cyclic schedule is for energizing of the compressor and

indoor blower control terminal. Actual system operation will be

controlled by the system internal controls. Depending on internal

controls, the compressor and one of the system fans may start or

continue to run irrespective of the compressor terminal being

energized. There shall be no air flow through the coil with the idle

fan. When the indoor blower is off, the duct shall be blocked.

Domestic Water Heating Modes, Tests 3, 8 and 9

Tests 3, 8 and 9 involve cyclic operation of the heat pump in self-

controlled response to a series of water draws, as outlined in Table 4.

Test 3 (required) uses the same conditions as the Department Test

D, and will result in a cooling effect on the indoor room.

The conditions of Tests 8 and 9 (both required) are specified in

Table 1. Their temperatures do not correspond to any Department tests,

but, with the exception of the temperatures specified in Table 1, they

shall follow the requirements of Department Test D.

Tests 8 and 9 will result in a cooling effect on the outdoor room

(``O'' terminal de-energized). When the indoor blower is off, the

ductwork shall be blocked.

In addition to the normal components required for indoor space

heating and cooling, the unit shall be connected, as specified by the

heat pump manufacturer, to a conventional electric domestic hot water

storage tank. The hot water storage tank shall have a nominal rated

volume of 52 gallons, with an actual internal volume of 471

gallons. The hot water storage tank shall have an Energy Factor (EF)

rating that is within .02 of the EF specified as the

Federal Energy Conservation Standard for 52 gallon electric water

heaters, (presently 0.87), as determined by the Department test and

rating standards, contain two electric heater elements each rated at

nominal 4500 Watts and be connected to a source of supply water having

a temperature of 582 deg.F. The electrical voltage

supplied to the water heater shall be adjusted such that the measured

electrical power input is 427575W when the lower resistive

element is heating water. The water heater instrumentation: six

internal thermocouples plus entering and leaving water temperature

measurements and energy use, is to be installed according to the

standard Department test and rating procedure. The water heater

thermostats are to be replaced with manual controls operated to turn

off the upper element at 135 deg.F and on at 115 deg.F based on the

internal thermocouple located closest to the upper thermostat location.

The lower element shall be operated, as specified by the heat pump

manufacturer, but to turn off and on at not lower than 110 deg.F and

100 deg.F respectively (unless a new thermostat is supplied

specifically for the purpose) based on the internal thermocouple

located closest to the lower thermostat. The lower element shall also

be controlled to not operate coincident with the upper element. The

purpose of the manual controls is to simulate the normal thermostats,

but with improved repeatability. The heat pump system shall be

installed per the manufacturers installation instructions. Unless

otherwise specified by the manufacturer, the water heater is to be

installed in the indoor room, as is the compressor section, if it is

separate from the outdoor unit. The water heater is to be connected to

the compressor section with 15 feet of interconnecting tubing (30 feet

total for two lines), insulated (both) with R4 insulation. The

refrigerant sections are to be connected with a total of 25 feet of \3/

4\'' insulated vapor line and 25 feet of \3/8\'' uninsulated liquid

line. The line lengths between the compressor section and the indoor

coil shall be between 5 and 10 feet, with the balance of the 25 feet

connected between the compressor section and the outdoor unit, with 10

feet located in the outdoor room.

Calculation of Seasonal Performance Factors

The overall performance of the integrated heat pump system shall be

expressed in terms of seasonal performances. In addition to the

Seasonal Energy Efficiency Ratio (SEER) and Heating Seasonal

Performance Factor (HSPF) currently required by the Department, a

Combined Cooling Performance Factor (CCPF) shall be calculated for the

cooling season and a Combined Heating Performance Factor (CHPF) shall

be calculated for the heating season. These two combined performance

factors reflect the energy efficiency of the heat pump when providing

both space conditioning and

[[Page 40361]]

domestic water heating. The CCPF reflects the system's performance

during the portion of the year that the outdoor air temperature is

above 65 deg.F and the system will be providing space cooling and/or

water heating. CHPF deals with the other portion of the year when the

outdoor air temperature is below 65 deg.F and the system will be

providing space heating and/or water heating. Both combined performance

factors shall be calculated by means of a bin analysis as used for

calculating the Heating Seasonal Performance Factor as described in 10

CFR Part 430, Subpart B, Appendix M, para. 5.2. The only changes to the

actual referenced bin analysis are to extend it to account for the

water heating functions, and to have it reflect calendar hours in

addition to cooling and heating load hours, so that the water heating

load can be fully accounted for.

The Seasonal Energy Efficiency Ratio (SEER) shall also be

calculated by means of the bin analysis used for the Heating Seasonal

Performance Factor, the CCPF and the CHPF. This is a slight departure

from the referenced procedures method for calculating a SEER for units

with single-speed compressors, but yields a nearly identical result and

provides a directly comparable base for use in determining energy

savings associated with water heating.

The Heating Seasonal Performance Factor (HSPF) shall also be

calculated in the manner referenced above, with the exception that it

is based on seasonal hours as opposed to fractional hours.

The Combined Cooling Performance Factor (CCPF) shall be calculated

using the same general approach as presented in the Department/ARI/

ASHRAE standards for non-water-heating equipment. The procedure relates

the space cooling and water heating loads and the performance of the

heat pump to outdoor air temperature. The output of the heat pump is

balanced against the building and water heating load at each outdoor

temperature bin above 65 deg.F to determine: (a) The fractional heat

pump operating time spent in each temperature bin performing space

cooling only; (b) the fractional heat pump operating time spent in each

temperature bin performing combined space cooling and water heating;

(c) the fractional heat pump operating time spent in each temperature

bin performing dedicated water heating; and (d) the heat pump energy

consumption rate for each mode of operation for each temperature bin.

The energy input to the domestic water is assumed to be distributed

by temperature bin in proportion to the total hours of occurrence per

bin. The performance of the heat pump by bin, and by mode of operation,

is based on interpolation of test data taken at representative

operating conditions. The total energy consumption of the heat pump

will be increased as a result of the domestic water heating load. There

will, however, be a net energy savings, which is expressed in terms of

a Combined Cooling Performance Factor for space cooling and water

heating, designated CCPF. CCPF is the sum of the total space cooling

load and the total domestic water heating load during the cooling

season, divided by the sum of the total energy consumption used for

space cooling and water heating over the same period, expressed in Btu/

Wh.

The Combined Cooling Performance Factor for space cooling and water

heating shall be calculated similarly to the SEER:

[GRAPHIC][TIFF OMITTED]TN08AU95.000

The terms Q(Tj) and E(Tj) are the system energy outputs and inputs

respectively for the jth outdoor temperature bin as defined in the

cited Department regulations, and are composed of the various building

and water heating loads and system energy inputs as follows:

[GRAPHIC][TIFF OMITTED]TN08AU95.001

Where BL(Tj) is the building space cooling load at the jth outdoor

bin temperature. Qhw(Tj) is the water heating load in Btu/hr

at the jth outdoor bin temperature and is calculated from the hot

water drawn from the water heater tank. It does not include the tank

standby losses. The term ndwcj is the number of extra hours for

dedicated water heating with the outdoor temperature above 65 deg.F,

distributed among the first three outdoor temperature bins inversely

proportional to the building load. In equation form:

[GRAPHIC][TIFF OMITTED]TN08AU95.002

where Ndwc is the number of extra hours for dedicated water

heating with the outdoor temperature above 65 deg.F. E(Tj) is the

total system energy input for the jth outdoor bin temperature, and

is made up of the individual energy inputs for the applicable operating

modes as follows:

[GRAPHIC][TIFF OMITTED]TN08AU95.003

where:

[[Page 40362]]

Ec(Tj) = Heat pump steady-state power input in the space

cooling only mode for outdoor temperature bin j.

Eccw(Tj) = Heat pump steady-state power input in the combined

cooling and water heating mode for outdoor temperature bin j.

Ewdc(Tj) = Heat pump steady-state power input in the

dedicated water heating mode during the cooling season for outdoor

temperature bin j.

Eauxw = Auxiliary energy input for water heating.

Esav = Energy saved due to cooling effect during dedicated water

heating.

Edwehc = Energy input for water heating during the dedicated water

heating extra hours period above 65 deg.F.

X1(Tj) = Load factor for space conditioning only mode for outdoor

temperature bin j.

X2(Tj) = Load factor for combined space conditioning/water heating

mode for outdoor temperature bin j.

X3(Tj) = Load factor for dedicated water heating mode for outdoor

temperature bin j.

PLF(Tj) = 1 - Cd x (1-X1(Tj) x X2(Tj)

- X3(Tj)) = the overall part-load factor for outdoor

temperature bin j.

Cd = the coefficient of cyclic degradation for cooling.

nj = the number of hours in the jth outdoor temperature bin.

The steady-state electrical power input to the heat pump in the

space cooling only mode is determined according to:

[GRAPHIC][TIFF OMITTED]TN08AU95.004

The steady-state heat pump space cooling capacity in the space

cooling only mode is determined according to:

[GRAPHIC][TIFF OMITTED]TN08AU95.005

The steady-state heat pump space cooling capacity and water heating

capacity in the combined cooling/water heating mode is determined

according to:

[GRAPHIC][TIFF OMITTED]TN08AU95.006

The total steady-state electrical power input to the heat pump in

the combined cooling/water heating mode is determined according to:

[GRAPHIC][TIFF OMITTED]TN08AU95.007

where:

[GRAPHIC][TIFF OMITTED]TN08AU95.008

with:

Cd = the cooling season coefficient of cyclic degradation.

LF(Test 4) = 0.5 = the load factor during the 82 deg.F combined

cooling/water heating cyclic test.

The electrical power input to the heat pump at the 82 deg.F cyclic

test point is corrected (decreased) by the actual test part load factor

(PLF) in order to make it consistent with the 95 deg.F test point which

is steady-state. Later bin analysis of energy use will interpolate

between the 82 deg.F and 95 deg.F points and have the energy use for

each bin increased by that bins' calculated PLF. This approach of the

95 deg.F test being continuous compressor operation and the 82 deg.F

test being cyclic is most representative of actual field operation and

provides the most representative water side conditions.

The steady-state heat pump water heating capacity in the dedicated

water heating mode during the cooling season is determined according

to:

[GRAPHIC][TIFF OMITTED]TN08AU95.009

The steady-state electrical power input to the heat pump in the

dedicated water heating mode during the cooling season is determined

according to:

[GRAPHIC][TIFF OMITTED]TN08AU95.010

[[Page 40363]]

The performance of the heat pump in dedicated water heating during

the cooling season is assumed constant because the heat source is the

constant temperature indoor air. Because the test is cyclic, the actual

test results are again corrected from the PLF of the test to the PLF of

each temperature bin in the analysis.

[GRAPHIC][TIFF OMITTED]TN08AU95.011

with:

Cd=the cooling season coefficient of cyclic degradation.

ton82 deg.F=the total compressor on time during the 82 deg.F

dedicated water heating cyclic test.

ttotal82 deg.F=the total time to conclusion of the 82 deg.F

dedicated water heating cyclic test.

The load factors for each mode of operation are determined as

follows:

[GRAPHIC][TIFF OMITTED]TN08AU95.012

Following determination of X2(Tj),X1(Tj) and X3(Tj)

are determined as follows:

[GRAPHIC][TIFF OMITTED]TN08AU95.013

The auxiliary energy input for water heating is then determined

from:

[GRAPHIC][TIFF OMITTED]TN08AU95.014

Because the dedicated water heating mode during the cooling season

removes heat from the space, there is a beneficial cooling effect. The

energy saved by this cooling is calculated as:

[GRAPHIC][TIFF OMITTED]TN08AU95.015

Lastly, the energy input for water heating during the dedicated

water heating extra hours period above 65 deg.F is calculated as:

[[Page 40364]]

[GRAPHIC][TIFF OMITTED]TN08AU95.016

where:

[GRAPHIC][TIFF OMITTED]TN08AU95.017

=Load factor for dedicated water heating mode for outdoor temperature

bin j.

Ewdc(Tj)=heat pump steady-state power input in the dedicated

water heating mode during the cooling season for outdoor temperature

bin j.

ndwcj=the number of hours in the jth outdoor temperature bin for

the dedicated water heating extra hours period above 65 deg.F.

PLF(Tj)=1-Cd x (1-X4(Tj))=the part-load factor for

outdoor temperature bin j.

Cd=the coefficient of cyclic degradation for cooling.

[GRAPHIC][TIFF OMITTED]TN08AU95.018

=the auxiliary energy input for water heating during the extra hours

period above 65 deg.F.

Qwdc(Tj)=the cyclic heat pump water heating capacity in the

dedicated water heating mode during the cooling season.

The Combined Heating Performance Factor (CHPF) shall be calculated

utilizing the same approach as for the CCPF. For the CHPF the building

and water heating loads and heat pump performance are evaluated at each

outdoor temperature bin below 65 deg.F. CHPF is the sum of the total

space heating load and the domestic water heating load during the

heating season, divided by the sum of the total energy consumption used

for space heating and water heating over the same period, expressed in

Btu/Wh.

The Combined Heating Performance Factor for space heating and water

heating is calculated as follows:

[GRAPHIC][TIFF OMITTED]TN08AU95.019

The terms Q(Tj) and E(Tj) are the system energy outputs

and inputs, respectively, for the jth outdoor temperature bin as

defined in the cited Department regulations and are composed of the

various building and water heating loads and system energy inputs as

follows:

[GRAPHIC][TIFF OMITTED]TN08AU95.020

where BL(Tj) is the building space heating load at the jth outdoor

bin temperature and evaluated for each heating temperature bin Tj, as

described in subsection 10.2.2 of ASHRAE Standard 116-83.

Qhw(Tj) is the water heating load for the jth outdoor bin

temperature.

E(Tj) is the total system energy input for the jth

outdoor bin temperature and is made up of the individual energy inputs

for the applicable operating modes as follows:

[GRAPHIC][TIFF OMITTED]TN08AU95.021

where:

Eh(Tj) = Heat pump steady-state power input in the space

heating only mode for outdoor temperature bin j.

Ehcw(Tj) = Heat pump steady-state power input in the combined

space heating and water heating mode for outdoor temperature bin j.

Ewdh(Tj) = Heat pump steady-state power input in the

dedicated water heating mode during the heating season for outdoor

temperature bin j.

Eauxw = Auxiliary energy input for water heating.

Eauxs = Auxiliary energy input for space heating.

Edwehh = Energy input for water heating during the dedicated water

heating extra hours period below 65 deg.F

X1(Tj) = Load factor for space conditioning only mode for outdoor

temperature bin j.

X2(Tj) = Load factor for combined space conditioning/water heating

mode for outdoor temperature bin j.

X3(Tj) = Load factor for dedicated water heating mode for outdoor

temperature bin j.

[[Page 40365]]

PLF(Tj) = 1 - Cd x (1 - X1(Tj) - X2(Tj)

- X3(Tj)) = the overall part-load factor for outdoor

temperature bin j.

Cd = the coefficient of cyclic degradation for heating.

nj = the number of hours in the jth outdoor temperature bin.

The steady-state heat pump space heating capacity in the space

heating only mode is determined according to:

[GRAPHIC][TIFF OMITTED]TN08AU95.022

The steady-state electrical power input to the heat pump in the

space heating only mode is determined according to:

[GRAPHIC][TIFF OMITTED]TN08AU95.023

The steady-state heat pump space heating capacity and water heating

capacity in the combined heating/water heating mode is determined

according to:

[GRAPHIC][TIFF OMITTED]TN08AU95.024

[GRAPHIC][TIFF OMITTED]TN08AU95.025

Where:

[GRAPHIC][TIFF OMITTED]TN08AU95.026

and:

[GRAPHIC][TIFF OMITTED]TN08AU95.027

The total steady-state electrical power input to the heat pump in

the combined heating/waterheating mode is determined according to:

[GRAPHIC][TIFF OMITTED]TN08AU95.028

[[Page 40366]]

where:

[GRAPHIC][TIFF OMITTED]TN08AU95.029

and:

PLF (Test10) = 1 - (Cd x (1 - LF (Test10)))

With:

Cd = the heating season cyclic degradation coefficient.

LF (Test 10) = 0.5 = the load factor during the 47 deg.F combined

heating/water heating cyclic test.

The electrical power input to the heat pump at the 47 deg.F cyclic

test point is corrected (decreased) by the actual test part load factor

(PLF) in order to make it consistent with the 17 deg.F test point

which is steady-state.

Later bin analysis of energy use will interpolate between the 17

deg.F and 47 deg.F points and have the energy use for each bin

increased by that bins calculated PLF. This approach of the 17 deg.F

test being continuous compressor operation and the 47 deg.F test being

cyclic is most representative of actual field operation and provides

the most representative water side conditions.

The cyclic heat pump water heating capacity in the dedicated water

heating mode during the heating season is determined according to:

[GRAPHIC][TIFF OMITTED]TN08AU95.030

The steady-state electrical power input to the heat pump in the

dedicated water heating mode during the heating season is determined

according to:

[GRAPHIC][TIFF OMITTED]TN08AU95.031

Because the tests are cyclic, the actual test results are again

corrected from the PLF of the specific test to the PLF of each

temperature bin in the analysis, where:

[GRAPHIC][TIFF OMITTED]TN08AU95.032

with:

Cd = the heating season cyclic degradation coefficient.

ton47 deg.F = the total compressor on time during the 47 deg.F

dedicated water heating cyclic test.

ttotal47 deg.F = the total time to conclusion of the 47 deg.F

dedicated water heating cyclic test.

ton67 deg.F = the total compressor on time during the 67 deg.F

dedicated water heating cyclic test.

ttotal67 deg.F = the total time to conclusion of the 67 deg.F

dedicated water heating cyclic test.

The load factors for each mode of operation are determined as

follows:

[GRAPHIC][TIFF OMITTED]TN08AU95.033

or

[[Page 40367]]

[GRAPHIC][TIFF OMITTED]TN08AU95.034

Following determination of X2(Tj), X1(Tj) and

X3(Tj) are determined as follows:

[GRAPHIC][TIFF OMITTED]TN08AU95.035

[GRAPHIC][TIFF OMITTED]TN08AU95.036

The auxiliary energy input for water heating is then determined

from:

[GRAPHIC][TIFF OMITTED]TN08AU95.037

The auxiliary energy input for space heating is then determined

from:

[GRAPHIC][TIFF OMITTED]TN08AU95.038

Lastly, the energy input for water heating during the dedicated

water heating extra hours period below 65 deg.F is calculated as:

[GRAPHIC][TIFF OMITTED]TN08AU95.039

where:

[GRAPHIC][TIFF OMITTED]TN08AU95.040

= Load factor for dedicated water heating mode for outdoor temperature

bin j.

Ewdh(Tj) = heat pump steady-state power input in the

dedicated water heating mode during the heating season for outdoor

temperature bin j.

ndwhj = the number of hours in the jth outdoor temperature

bin for the dedicated water heating extra hours period below 65 deg.F.

PLF(T) = 1 - Cd x (1 - X4(Tj)) = the part-load factor

for outdoor temperature bin j.

Cd = the heating season cyclic degradation coefficient.

[GRAPHIC][TIFF OMITTED]TN08AU95.041

[[Page 40368]]

= the auxiliary energy input for water heating during the extra hours

period below 65 deg.F.

Qwdh(Tj) = the cyclic heat pump water heating capacity in the

dedicated water heating mode during the heating season.

Table 1.--Test Summary--Integrated Heat Pump System Tests

--------------------------------------------------------------------------------------------------------------------------------------------------------

Air temperatures (F) Data

Test Description Test type -------------------------------------------- Water draw reduction

ODDB ODWB IDDB IDWB notes

--------------------------------------------------------------------------------------------------------------------------------------------------------

1....... COOLING.............. STEADY-STATE......... REQUIRED............ 95 ......... 80 67 ................ 1

2....... COOLING + WH......... STEADY-STATE......... REQUIRED............ 95 ......... 80 67 TABLE 2......... 1,2,3,6

3....... WH (COOLING)......... CYCLIC............... REQUIRED............ 82 ......... 80 67 TABLE 4......... 1,2,5,6

4....... COOLING + WH......... CYCLIC............... REQUIRED............ 82 ......... 80 67 TABLE 3......... 1,2,4,6

5....... COOLING.............. STEADY-STATE......... REQUIRED............ 82 ......... 80 67 ................ 1

6....... COOLING.............. STEADY-STATE......... OPTIONAL............ 82 ......... 80 57 ................ 1

7....... COOLING CYCLIC....... CYCLIC............... OPTIONAL............ 82 ......... 80 57 ................ 1

8....... WH (HEATING)......... CYCLIC............... REQUIRED............ 67 61 70 ......... TABLE 4......... 1,2,7

9....... WH (HEATING)......... CYCLIC............... REQUIRED............ 47 43 70 ......... TABLE 4......... 1,2,7

10...... HEATING + WH......... CYCLIC............... REQUIRED............ 47 43 70 ......... TABLE 3......... 1,2,4,6

11...... HEATING.............. STEADY-STATE......... REQUIRED............ 47 43 70 ......... ................ 1

12...... HEATING CYCLIC....... CYCLIC............... OPTIONAL............ 47 43 70

13...... HEATING DEFROST...... STEADY-STATE......... REQUIRED............ 35 33 70 ......... ................ 1

14...... HEATING + WH......... STEADY-STATE......... REQUIRED............ 17 15 70 ......... TABLE 2......... 1,2,3,6

15...... HEATING.............. STEADY-STATE......... REQUIRED............ 17 15 70 ......... ................ 1

--------------------------------------------------------------------------------------------------------------------------------------------------------

Data Reduction Notes for Table 1

1. Data recorded per ASHRAE Standard 116-83.

2. Water heating capacity is calculated as the net water energy

withdrawn plus the tank standby loss during the test duration, divided

by the length of time that the water pump and/or auxiliary water heater

elements operate and expressed as BTU/hr. Test duration is defined as

starting at t=0 and ending at the conclusion of water heating from all

sources. Makeup and supply water temperatures are to be recorded every

5 seconds during water draws.

3. The steady-state cooling or heating capacity coincident with

water heating is calculated as the total air side capacity delivered

during the period of time that the water pump and/or auxiliary water

heater elements operate, divided by the length of time that the water

pump and/or auxiliary water heater elements operate and expressed as

BTU/hr.

4. The cyclic cooling or heating capacity coincident with water

heating is calculated as the air side capacity delivered during the

period of time that both the water pump and indoor blower and/or both

the auxiliary water heater elements and indoor blower operate, divided

by the length of time that both the water pump and indoor blower and/or

both the auxiliary water heater elements and indoor blower operate and

expressed as Btu/hr.

5. The cyclic cooling capacity associated with dedicated water

heating is calculated as the air side capacity delivered during the

period of time that the indoor blower operates, divided by the length

of time that the indoor blower operates, and expressed as Btu/hr.

6. The power used with the cooling or heating capacity associated

with water heating is calculated as the total energy consumed by all

components, including the heat pump, water pump, and auxiliary water

heater elements, etc., during the length of time that the air side

capacity is integrated, divided by the same length of time, and

expressed as Watts.

7. The power used with the dedicated water heating capacity is

calculated as the total energy consumed by all components, including

the heat pump, water pump, and auxiliary water heater elements, etc.,

during the duration of the test, divided by the period of time used in

determining the associated water heating capacity determination.

Table 2.--Steady-State Combined Operation & Water Draw Schedule

------------------------------------------------------------------------

Sequence

------------------------------------------------------------------------

1............... FILL WATER HEATER (or draw until both upper and lower

thermostat water temperatures are below their turn on

points).

2............... RESISTIVE OPERATION TO CONCLUSION.

3............... HEAT PUMP OPERATION TO CONCLUSION OF WATER HEATING

(heat pump continues to operate in space conditioning

mode).

4............... CONDITION WITH 11 GALLON DRAW.

5............... HEAT PUMP AND/OR RESISTIVE OPERATION TO CONCLUSION OF

WATER HEATING.

6............... HEAT PUMP CONTINUES TO OPERATE IN SPACE CONDITIONING

MODE FOR 10 MINUTES.

7............... t=0 , DRAW 5.4 GALLONS.

[[Page 40369]]

8............... HEAT PUMP AND RESISTIVE OPERATE ON INTERNAL CONTROLS

(heat pump continues to operate in space conditioning

mode).

9............... t=68 MINUTES, DRAW 16.1 GALLONS.

10.............. HEAT PUMP AND RESISTIVE OPERATE ON INTERNAL CONTROLS

(heat pump continues to operate in space conditioning

mode).

11.............. t=118 MINUTES, DRAW 10.7 GALLONS.

12.............. HEAT PUMP AND RESISTIVE OPERATE ON INTERNAL CONTROLS

TO CONCLUSION OF WATER HEATING.

------------------------------------------------------------------------

Table 3.--Cyclic Combined Operation & Water Draw Schedule

------------------------------------------------------------------------

Sequence

------------------------------------------------------------------------

1............... FILL WATER HEATER (or draw until both upper and lower

thermostat water temperatures are below their turn on

points).

2............... RESISTIVE OPERATION TO CONCLUSION.

3............... HEAT PUMP OPERATION TO CONCLUSION OF WATER HEATING.

4............... CONDITION WITH 11 GALLON DRAW.

5............... HEAT PUMP AND/OR RESISTIVE OPERATION TO CONCLUSION OF

WATER HEATING.

6............... COMPRESSOR OFF FOR 10 MINUTES.

7............... t=0 , DRAW 5.4 GALLONS.

8............... t=10 MINUTES, Tstat ON; @ t=20 MINUTES, Tstat OFF.

9............... t=30 MINUTES, Tstat ON; @ t=40 MINUTES, Tstat OFF.

10.............. t=50 MINUTES, Tstat ON; @ t=60 MINUTES, Tstat OFF.

11.............. t=68 MINUTES, DRAW 16.1 GALLONS.

12.............. t=70 MINUTES, Tstat ON; @ t=80 MINUTES, Tstat OFF.

13.............. t=90 MINUTES, Tstat ON; @ t=100 MINUTES, Tstat OFF.

14.............. t=110 MINUTES, Tstat ON.

15.............. t=118 MINUTES, DRAW 10.7 GALLONS.

16.............. t=120 MINUTES, Tstat OFF.

17.............. t=130 MINUTES, Tstat ON; @ t=140 MINUTES, Tstat OFF.

18.............. t=150 MINUTES, Tstat ON; @ t=160 MINUTES, Tstat OFF.

19.............. t=170 MINUTES, Tstat ON TO CONCLUSION OF WATER

HEATING.

------------------------------------------------------------------------

Note: Tstat refers to indoor space thermostat.

Table 4.--Dedicated Water Heating Operation & Water Draw Schedule

------------------------------------------------------------------------

Sequence

------------------------------------------------------------------------

1............... FILL WATER HEATER (or draw until both upper and lower

thermostat water temperatures are below their turn on

points).

2............... RESISTIVE OPERATION TO CONCLUSION.

3............... HEAT PUMP OPERATION TO CONCLUSION OF WATER HEATING.

4............... CONDITION WITH 11 GALLON DRAW.

5............... HEAT PUMP AND/OR RESISTIVE OPERATION TO CONCLUSION OF

WATER HEATING.

6............... COMPRESSOR OFF FOR 10 MINUTES.

7............... t=0 , DRAW 5.4 GALLONS.

8............... HEAT PUMP AND RESISTIVE OPERATE ON INTERNAL CONTROLS.

9............... t=68 MINUTES, DRAW 16.1 GALLONS.

10.............. HEAT PUMP AND RESISTIVE OPERATE ON INTERNAL CONTROLS.

11.............. t=118 MINUTES, DRAW 10.7 GALLONS.

12.............. HEAT PUMP AND RESISTIVE OPERATE ON INTERNAL CONTROLS

TO CONCLUSION OF WATER HEATING.

------------------------------------------------------------------------

January 24, 1995.

The Assistant Secretary for Conservation and Renewable Energy,

United States Department of Energy, 1000 Independence Avenue, S.W.,

Washington, DC 20585.

Subject: Petition For Waiver and Application for Interim Waiver.

Gentlemen: This is a Petition for Waiver and Application for

Interim Waiver submitted pursuant to Title 10 CFR 430.27, as amended

November 14, 1986. Waiver is requested from the existing Test Method

for Measuring the Energy Consumption of Central Air Conditioners,

including heat pumps as found in Appendix M to Subpart B of Part

430.

Under the existing Test Procedure, heat pump energy consumption

is measured relative only to space heating and cooling. NORDYNE

requests a waiver to the existing test procedure as detailed in the

attached ``Requested Test and Rating Procedure Modifications for

Electrically Driven, Single-Speed Compressor, Air-to-Air Heat Pumps

With Integrated Water Heating'', for use in the testing and rating

of its Powermiser line of heat pumps which include special design

characteristics to incorporate domestic water heating.

The current test procedure clearly cannot account for the energy

savings associated with integrated water heating.

NORDYNE is confident that a waiver will be granted and requests

that an interim waiver be granted. NORDYNE's confidence is based on:

(1) The current test procedure does not account for the total

energy savings of the Powermiser.

(2) Carrier Corporation has been granted a similar waiver for

its Hydrotech product.

(3) For public policy, the widespread use of this type of

integrated appliance would be in direct support of the President's

Climate Change Action Plan, which lists heating and cooling and home

appliances as key targets for improvement.

(4) Absent a favorable determination on the Application for

Interim Waiver, NORDYNE would experience an economic hardship, as

discussed in the confidential attachment.

[[Page 40370]]

Known manufacturers of domestically marketed units of the same

product type are being notified in writing of this Petition for

Waiver and Application for Interim Waiver. A list of the names and

addresses of each person to whom a notice is being sent is attached.

Sincerely,

Wayne Reedy,

Vice President Engineering.

WRR:pdr

Enclosure

[FR Doc. 95-19203 Filed 8-7-95; 8:45 am]

BILLING CODE 6450-01-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.