Notice of Intent

Federal RegisterMay 25, 1995

Ask Donna

What actually matters in this document.

Text

DEPARTMENT OF AGRICULTURE

Forest Service

Notice of Intent

AGENCY: Forest Service, USDA.

ACTION: Revision of notice of intent to prepare an Environmental Impact

Statement.

-----------------------------------------------------------------------

SUMMARY: On May 13, 1992, the Forest Service filed a notice of intent

in the Federal Register to prepare an environmental impact statement

(EIS) to analyze revision of management guidelines for the Desolation

Wilderness on the Pacific and Placerville Ranger Districts of the

Eldorado National Forest and the Lake Tahoe Basin Management Unit, El

Dorado County, California. A subsequent notice was filed on May 2,

1994, because the draft EIS was delayed more than 6 months. This notice

is being filed because the EIS has been delayed more than 6 months and

because the responsible official has been changed.

ADDRESSES: John Phipps, Forest Supervisor, Eldorado National Forest,

ATTN: Desolation Wilderness EIS, 100 [[Page 27716]] Forni Rd.

Placerville, CA 95667, phone 916-622-5061.

FOR FURTHER INFORMATION CONTACT:

Direct questions about the proposed action and EIS to Karen Leyse,

Interdisciplinary Team Leader, Eldorado National Forest, 100 Forni Rd.

Placerville, CA 95667, phone 916-622-5061.

SUPPLEMENTARY INFORMATION: The Eldorado National Forest Land and

Resource Management Plan (1989), the Lake Tahoe Basin Management Unit

Land and Resource Management Plan (1988), and the 1964 Wilderness Act

have provided general management direction for Desolation Wilderness.

The current Desolation Wilderness Management Plan was completed in

1978; both Forest Plans indicate the need to review the existing

Desolation Wilderness Plan and to revise it as needed. The decision may

result in amendment to the Forest Plans.

A great deal of scoping has been completed since the original

notice of intent was filed. Through scoping, the following issues have

been identified:

1. Fire. Fire suppression has affected the development and

maintenance of natural plant communities and the resulting ecosystems.

Current fire management policy and suppression techniques are not

consistent with maintaining natural processes and wilderness

characteristics.

2. Fisheries. Stocking of fish in wilderness lakes provides

recreational opportunities for the public, but this practice affects

naturally occurring biodiversity and ecosystems, which are protected by

wilderness designation.

3. Range. Current grazing practices may impact water quality,

vegetation, meadow and riparian areas, wildlife, and archaeological

sites. Grazing is a historical use; however, the presence of cattle

disturbs some visitors.

4. Water quality. Current use and management practices may be

creating unacceptable water quality conditions in the wilderness.

5. Wood fires. Many wilderness users value campfires as part of the

wilderness experience; however, collection of firewood and presence of

firerings, ashes, and other campfire debris degrades campsites and

eliminates down, woody debris, an important part of the ecosystem.

6. Visitor impacts. Some areas of the wilderness, especially

lakeshores and easily accessed sites, are being damaged by visitor use.

Users, including recreational stock users, may impact the vegetation,

soils, wildlife, and cultural sites.

7. Quotas and group size. The number and distribution of users and

the size of groups (including stock) affect the values and character of

the wilderness and the quality of the wilderness experience.

8. Aircraft overflights. Overflights are common and intrude on the

wilderness experience.

9. Dogs. The presence of dogs disturbs some visitors, adds to

sanitation problems, and may harass wildlife.

10. Recreational shooting. Some visitors feel that the responsible

use of guns should be allowed. Others are disturbed by the noise and

the harassment of wildlife and have expressed concern for their own

safety.

11. Trails. Management and development of trailheads and trails may

affect the amounts and patterns of use and the quality of the

wilderness experience.

In preparing the EIS, the Forest Service will be considering a

range of alternatives for future management of the wilderness. The

Forest Service is in the process of developing these alternatives,

which range from maximum recreational use of the wilderness to maximum

wilderness protection. These preliminary alternatives may be revised

before the draft EIS is issued as new information is developed or new

comments are received:

Maximum Opportunity. This alternative would increase the use of the

wilderness by expanding the trail system and signing, maintaining all

trails, and upgrading unimproved trails. Camping would be allowed in

all zones. Fisheries opportunities would be increased. Campfires would

be permitted in designated firings, back country toilets would be

installed, group sizes of 25 would be permitted, and quotas for

overnight camping would be raised. There would be no limits on

recreational shooting. There would be no group size limits for

recreational stock. No fees would be charged.

No Action. The current situation would continue unchanged. There

would continue to be unlimited day use with quotas on overnight use in

the 3-month summer period. Camping would be permitted in all zones.

Maintenance and reconstruction of existing trails would continue. Fish

stocking of lakes and operation of stream flow management dams would

continue. Wood fires would continue to be prohibited. All fires,

including lightening caused fires, would be suppressed. Sanitation

recommendations would continue to include a 100-foot setback from

water. There would be no limits on recreational shooting or

recreational stock. The forests would continue to pursue charging a

permit reservation fee.

Enhanced Wilderness Experience. The quality of the wilderness

experience would be improved by restricting the number of day users in

heavily used areas and by slightly reducing the number of overnight

users permitted over a 5-month summer period. Group sizes would be

reduced in remote areas. The number of stock permitted per group would

be limited, and recreational shooting would be limited during the heavy

use season. There would be a leash requirement for dogs. Fish stocking

would continue at reduced levels. Overnight wilderness permits would be

issued by zone or by destination, with no camping in heaviest use

areas. ``No trace'' wood fires would be allowed in designated areas.

Several trails could be removed. Other trails would be made more

primitive. Directional signing would be found only at major trail

intersections. Prescribed natural fire would be allowed in areas of the

wilderness where fire hazard is low.

Physical Restoration. The number of day and overnight users would

be further reduced from the Enhanced Wilderness Experience alternative

during a 5-month summer quota period. Group sizes for users and stock

would be reduced. Grazing would be permitted only where appropriate

based on wilderness resource conditions. Recreational shooting would be

prohibited. Camping and outfitter/guide use would be regulated by zone.

Dogs would be required to be on a leash. Fish stocking would be

reduced, and riparian areas would be revegetated. Some trails could be

removed and others would be re-routed in sensitive areas. Planned and

natural prescribed fire would be used to return areas of the wilderness

to pre-historical conditions. Reservation and permit fees (if legal)

would be collected.

Enhanced Ecosystem. Group sizes for users and stock would be

further reduced from the other alternatives, and the numbers of overall

visitors would be reduced. Grazing would be permitted only where

appropriate based on wilderness resources conditions. Stocking of non-

indigenous fish species would be allowed only if the fish populations

were adversely influenced by humans. Dogs would be required to be on a

leash. Recreational shooting and campfires would be prohibited. The

number of signs, stream maintenance dams, and trails would be reduced.

Trails would be re-routed away from sensitive areas; stream crossings

would be repaired; riparian areas would be revegetated. Planned and

natural [[Page 27717]] prescribed fire would be used throughout the

wilderness. Reservation and permit fees (if legal) would be collected.

Maximum Wilderness Preservation. The wilderness would be managed

for very primitive to pristine conditions. Stock and human use levels

would be reduced. Dogs, shooting, and campfires would be prohibited.

Signing, streamflow maintenance dams, some campsites, and many trails

would be removed. Fish stocking would cease. Reservation and permit

fees (if legal) would be collected.

John Phipps, Forest Supervisor, Eldorado National Forest, and

Robert E. Harris, Forest Supervisor, Lake Tahoe Basin Management Unit,

are the responsible officials.

The draft EIS is expected to be filed with the Environmental

Protection Agency (EPA) and to be available for public review by August

1995. At that time the EPA will publish a notice of availability of the

draft EIS in the Federal Register.

The comment period on the draft EIS will be 45 days from the date

EPA's notice of availability appears in the Federal Register. It is

very important that reviewers participate at that time. To be the most

helpful, comments on the draft EIS should be as specific as possible

and may address the adequacy of the statement or the merits of the

alternatives discussed (see The Council on Environmental Quality

Regulations for implementing the procedural provisions of the National

Environmental Policy Act at 40 CFR 1503.3). In addition, Federal court

decisions have established that reviewers of draft EIS's must structure

their participation in the environmental review of the proposal so that

it is meaningful and alerts an agency to the reviewers' position and

contentions, Vermont Yankee Nuclear Power Corp. v. NRDC, 435 U.S. 519,

553 (1978), and that environmental objections that could have been

raised at the draft stage may be waived if not raised until after

completion of the final EIS. Wisconsin Heritages, Inc. v. Harris, 490

F. Supp. 1334, 1338 (E.D. Wis. 1980). The reason for this is to ensure

that substantive comments and objectives are made available to the

Forest Service at a time when it can meaningfully consider them and

respond to them in the final EIS.

After the comment period ends on the draft EIS, the comments will

be analyzed and considered by the Forest Service in preparing the final

EIS. The final EIS is scheduled to be completed by January 1996. The

Forest Service is required to respond in the final EIS to the comments

received (40 CFR 1503.4). The responsible officials will consider the

comments, responses, disclosure of environmental consequences, and

applicable laws, regulations, and policies in making a decision

regarding this proposal. The responsible officials will document the

decision and rationale in the Record of Decision. That decision will be

subject to appeal.

Dated: May 15, 1995.

Robert E. Harris,

Forest Supervisor, Lake Tahoe Basin Management Unit.

Dated: May 15, 1995.

John Phipps,

Forest Supervisor, Eldorado National Forest.

[FR Doc. 95-12857 Filed 5-24-95; 8:45 am]

BILLING CODE 3410-11-M

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.