Northeast Nuclear Energy Company; Millstone Nuclear Power Station, Unit No. 3 Environmental Assessment and Finding of No Significant Impact
Federal RegisterMay 5, 1995
Ask Donna
What actually matters in this document.
Text
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-423]
Northeast Nuclear Energy Company; Millstone Nuclear Power
Station, Unit No. 3 Environmental Assessment and Finding of No
Significant Impact
The U.S. Nuclear Regulatory Commission (the Commission) is
considering issuance of an exemption from Facility Operating License
No. NPF-49 issued to Northeast Nuclear Energy Company (the licensee)
for operation of the Millstone Nuclear Power Station, Unit No. 3
located in New London County, Connecticut.
Environmental Assessment
Identification of the Proposed Action
The proposed action would exempt the licensee from the requirements
of 10 CFR Part 50, Appendix J, Paragraph III.D.1.(a), to the extent
that a partial exemption and a schedular exemption from the
requirements of Section III.D.1.(a) of 10 CFR Part 50, Appendix J would
be granted. This Environmental Assessment has been prepared to address
potential environmental issues related to the licensee's application of
September 28, 1994, as supplemented on February 24, 1995.
The Need for the Proposed Action
The proposed action is needed to permit the licensee to perform the
third Type A test for the first 10-year Appendix J service period
during the sixth refueling outage, instead of the fifth refueling
outage. The exemption would permit a more flexible schedule for
containment leakage testing and resulting in a significant cost savings
to the licensee. The fifth refueling outage began in April 1995, and
the sixth refueling outage will be in 1997. Therefore, the exemption
would (1) permit the third and last Type A tests of the 10-year
inservice inspection period to not correspond with the end of the
current American Society of Mechanical Engineers Boiler and Pressure
Vessel Code (ASME Code) inservice inspection interval, and (2) to
extend the 10 year Appendix J Type A test interval to refueling outage
6, currently scheduled for April 1997, which would be an extension of
12 months.
Environmental Impacts of the Proposed Action
The Commission has completed its evaluation of the proposed action
and concludes that the proposed partial exemption and schedular
exemption would not increase the probability or consequences of
accidents previously analyzed and the proposed partial and schedular
exemptions would not affect facility radiation levels or facility
radiological effluents. The licensee states that the existing Type B
and C testing programs are not being modified by this request and will
continue to effectively detect containment leakage caused by the
degradation of active containment isolation components as well as
containment penetrations. It has been the consistent and uniform
experience at the facility during the two Type A tests conducted on
July 5, 1989 and October 12, 1993, that any significant containment
leakage paths are detected by the Type B and C testing. The Type A test
results have only been confirmatory of the results of the Type B and C
test results. Therefore, application of the regulation in this
particular circumstance would not serve, nor is it necessary to
achieve, the underlying purpose of the rule. The licensee has stated to
the NRC Project Manager that the general containment inspection will be
performed during refueling outage 5 although it is only required by
Appendix J (Section V.A) to be performed in conjunction with Type A
tests.
The NRC staff considers that these inspections, though limited in
scope, provide an important added level of confidence in the continued
integrity of the containment boundary.
The proposed change will not increase the probability or
consequences of accidents, no changes are being made in the types of
any effluents that may be released offsite, and there is no significant
increase in the allowable individual or cumulative occupational
radiation exposure. Accordingly, the Commission concludes that there
are no significant radiological environmental impacts associated with
the proposed action.
With regard to potential nonradiological impacts, the proposed
action does involve features located entirely within the restricted
area as defined in 10 CFR Part 20. It does not affect nonradiological
plant effluents and has no other environmental impact. Accordingly, the
Commission concludes that there are no significant nonradiological
environmental impacts associated with the proposed action.
Alternatives to the Proposed Action
Since the Commission has concluded there is no measurable
environmental impact associated with the proposed action, any
alternatives with equal or greater environmental impact need not be
evaluated. As an alternative to the proposed action, the staff
considered denial of the proposed action. Denial of the application
would result in no change in current environmental impacts. The
environmental impacts of the proposed action and the alternative action
are similar.
Alternative Use of Resources
This action does not involve the use of any resources not
previously considered in the Final Environmental Statement for the
Millstone Nuclear Power Station, Unit No. 3.
Agencies and Persons Consulted
In accordance with its stated policy, on March 24, 1995, the staff
consulted with the Connecticut State official, Mr. Kevin McCarthy,
Department of Environmental Protection, regarding the environmental
impact of the proposed action. The State official had no comments.
Finding of No Significant Impact
Based upon the environmental assessment, the Commission concludes
that the proposed action will not have a significant effect on the
quality of the human environment. Accordingly, the Commission has
determined not to prepare an environmental impact statement for the
proposed action. [[Page 22416]]
For further details with respect to the proposed action, see the
licensee's letter dated September 28, 1994, as supplemented by letter
dated February 24, 1995, which are available for public inspection at
the Commission's Public Document Room, The Gelman Building, 2120 L
Street, NW., Washington, DC, and at the local public document room
located at the Learning Resource Center, Three Rivers Community-
Technical College, Thames Valley Campus, 574 New London Turnpike,
Norwich, CT 06360.
Dated at Rockville, Maryland, this 28th day of April 1995.
For the Nuclear Regulatory Commission.
Phillip F. McKee,
Director, Project Director I-3, Division of Reactor Projects--I/II,
Office of Nuclear Reactor Regulation.
[FR Doc. 95-11137 Filed 5-4-95; 8:45 am]
BILLING CODE 7590-01-M
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.