Incorporation of Amendments to the International Convention for Safety of Life at Sea, 1974

Federal RegisterMay 10, 1995

Ask Donna

What actually matters in this document.

Text

DEPARTMENT OF TRANSPORTATION

Coast Guard

33 CFR Part 164

46 CFR Parts 50, 52, 56, 58, 61, and 111

[CGD 83-043]

RIN 2115-AB41

Incorporation of Amendments to the International Convention for

Safety of Life at Sea, 1974

Agency: Coast Guard, DOT.

Action: Final rule.

-----------------------------------------------------------------------

SUMMARY: The Coast Guard is modifying its regulations on navigational

safety and marine engineering to harmonize them with the International

Convention for the Safety of Life at Sea, 1974 (SOLAS 74), as amended,

and to allow the use of current technology. This final rule is

necessary because changes have been made to SOLAS 74 and new technology

has become available. The incorporation of SOLAS 74 as amended will

enhance the safety of personnel and vessels, protect the natural

environment, and contribute to domestic carriers' improved

competitiveness in the global market.

DATES: This final rule is effective on June 9, 1995. The Director of

the Federal Register approves as of June 9, 1995 the incorporation by

reference of certain materials listed in this rule.

FOR FURTHER INFORMATION CONTACT: Lieutenant Commander R.K. Butturini,

Engineering Branch, Marine Technical and Hazardous Materials Division,

Office of Marine Safety, Security and Environmental Protection, (202)

267-2206.

SUPPLEMENTARY INFORMATION:

Drafting Information: The principal persons involved in drafting

this final rule are Lieutenant Commander R.K. Butturini, Project

Manager, and Mr. Patrick J. Murray, Project Counsel, Office of Chief

Counsel. Regulatory History.

On September 28, 1990, the Coast Guard published a notice of

proposed rulemaking (NPRM) entitled ``Incorporation of Amendments to

the International Convention for Safety of Life at Sea, 1974'' (55 FR

39638). The Coast Guard received three letters commenting on the NPRM.

No public hearing was requested, and none was held.

Background and Purpose

On November 1, 1974, the Assembly of the Inter-Governmental

Maritime Consultative Organization (IMCO) adopted SOLAS 74. In May 1982

IMCO was renamed the International Maritime Organization (IMO).

Invoking Article VIII of SOLAS 74, which contained procedures for

amending SOLAS 74, IMO adopted further resolutions; these resolutions

recommended areas of SOLAS 74 in need of improvement. The United States

was instrumental in the development of SOLAS 74 and its amendments.

To date, three sets of amendments have been adopted. The first set

of amendments was approved by the Maritime Safety Committee (MSC) of

IMO on November 20, 1981, and became effective on September 1, 1984.

These amendments deal primarily with subdivision and stability,

machinery and electrical installations, periodically unattended

machinery spaces, and measures for fire safety. The second set of

amendments was approved by the MSC on June 17, 1983, and became

effective on July 1, 1986. These amendments deal primarily with

appliances and arrangements for lifesaving and with the carriage of

dangerous goods. The third set of amendments was approved by the MSC on

April 11, 1989, and became effective on February 1, 1992. These

amendments address amendments to SOLAS 74 that could not be included in

the 1983 SOLAS amendments, and include [[Page 24768]] changes to

requirements for bilge systems and fuel systems for machinery.

Since the U.S. is signatory to this international treaty, periodic

upgrades of domestic regulations for the safety of personnel, and of

vessels inspected by the Coast Guard, are necessary to align our

regulations with SOLAS 74, as amended. Through such upgrades, these

regulations will come to comprise the international standards for the

safety of personnel and vessels at large. Generally, the amendments to

SOLAS 74 impose higher standards than our current regulations, and

these standards should lead to fewer casualties among vessels.

Therefore, the Coast Guard is applying the standards to all new

inspected vessels subject to Subchapter F, regardless of size or type

of voyage, except as otherwise specified in this final rule.

This final rule adopts standards from Chapters II-1, II-2, and V of

SOLAS 74 contained in the first set of amendments (1981) and third set

of amendments (1989). This rule does not adopt standards contained in

the second set of amendments (1983), because they are the subject of a

separate rulemaking. When discussing SOLAS 74, as amended, this rule

will cite the applicable numbers of paragraph and regulation. For

example, SOLAS II-1/29.6 is the reference for Paragraph 6 of Regulation

29 of SOLAS Chapter II-1.

The Coast Guard compared the SOLAS 74 amendments to 46 CFR

subchapter F, ``Marine Engineering''. The results appear in the

following table. An asterisk (*) in the table means that a requirement

appearing in SOLAS 74, as amended, is not now covered by subchapter F

but is addressed in this final rule. Since certain requirements of

SOLAS 74, as amended, tabulated below have already been adopted into 46

CFR part 62--VITAL SYSTEM AUTOMATION, they are not included in this

final rule.

------------------------------------------------------------------------

1981 SOLAS

amendments Corresponding U.S. regulation

------------------------------------------------------------------------

Chapter II-1. (Cites to Title 46, Code of Federal Regulations, unless

otherwise specified).

3............ Secs. 58.25*, 62.30-5.

20.2......... Sec. 56.50-85*.

21........... Secs. 56.50-50, 56.50-55, 62.30-5.

26.1......... Parts 52, 54, 56; Secs. 58.01-20, 58.05-1, 62.25-30.

26.2......... Secs. 58.01-35, 62.25-1, 62.30-5.

26.3......... Secs. 52.01-10, 56.50-30, 56.50-35, 56.50-45, 56.50-65,

56.50-80, 58.05-1, 58.01-35, 62.25-1, 62.30-5, 111.10-3,

111.10-5, 111.35-1, 112.05-1.

26.4......... Secs. 58.01-35, 62.30-5, 111.10-76.

26.5......... Secs. 52.01-135, 54.10, 56.95, 56.97.

26.6......... Secs. 58.01-40*, 62.20-5, 62.25-30.

26.8......... Sec. 58.05-1.

27.1......... Secs. 58.05-1, 58.10-15, 62.25-1, 62.25-15, 111.12-1.

27.2......... Secs. 52.01-120, 54.15, 56.07-10, 58.05-1.

27.3......... Sec. 58.05-1.

27.4......... Sec. 58.05-1.

27.5......... Secs. 56.50-80, 58.05-1, 58.05-10*, 58.10-15, 62.25-1,

62.25-15, 62.30-5, 62.35-5, 111.12-1.

28.1......... Sec. 58.05-5.

28.2-28.4.... 33 CFR 164.35; 46 CFR 35.20-40, 78.21, 97.19.

29 & 30...... 33 CFR 164.11*, 33 CFR 164.39*; 46 CFR Sec. 58.25*.

31........... Secs. 61.40-1, 62.01-1, 62.01-3, 62.01-5, 62.20-1, 62.20-

3, 62.25-1, 62.25-5, 62.25-10, 62.25-20, 62.30-5, 62.30-

15, 62.35-5, 62.35-10, 62.50-1, 62.50-20.

32.1......... Sec. 52.01-120.

32.2......... Secs. 62.25-1, 62.35-20.

32.3......... Sec. 52.01-110*.

32.4......... Sec. 56.50-30.

32.5......... Secs. 52.01-115, 56.50-30.

32.6......... Sec. 52.01-110.

33.1......... Sec. 56.07-10.

33.2......... Sec. 56.50-15*.

33.3......... Secs. 56.07-10, 56.50-10, 56.50-15.

34.1......... Sec. 58.30-5.

34.2......... Secs. 58.05-1, 58.30-534.3 Sec. 58.05-1.

34.4......... Sec. 58.30-5*.

35........... Sec. 58.01-45*.

36........... Sec. 58.01-50*.

37........... Secs. 62.35-5, 113.30-5, 113.35-3.

38........... Sec. 113.27-1.

39........... Sec. 56.50-55.

46--54....... Secs. 61.40-1, 62.01-1, 62.01-3, 62.20-1, 62.20-3, 62.25-

1, 62.25-15, 62.25-20, 62.30-1, 62.30-5, 62.30-15, 62.35-

5, 62.35-10, 62.50-1, 62.50-20, 62.50-30.

Chapter II-2:

15.1....... Secs. 58.01-10*, 58.01-15*, 112.50-1.

15.2....... Secs. 56.10, 56.15, 56.20, 56.25, 56.30, 56.50-60*, 56.50-

65, 56.50-70, 56.50-75, 56.50-85*, 56.50-90*, 58.01-55*.

15.3....... Secs. 56.50-60*, 56.50-90*, 58.01-55*.

15.4....... Sec. 56.50-60*.

15.5....... Secs. 62.35-40, 62.50-30.

15.6....... 33 CFR 155.470.

18.1 & 18.2 Secs. 56.50-1, 56.50-5, 56.50-95.

51......... Sec. 58.16.

54.2.5..... Sec. 56.50-50*.

59.1.6..... Sec. 56.50-85*.

Chapter V:

19......... Sec. 58.25-85*.

------------------------------------------------------------------------

------------------------------------------------------------------------

1989 SOLAS

amendments Corresponding U.S. regulation

------------------------------------------------------------------------

Chapter II-1. (Cites to Title 46, Code of Federal Regulations, unless

otherwise specified).

21.1.6....... Sec. 56.50-50*.

21.2.9....... Sec. 56.50-50*.

Chapter II-2:

15.2.6..... Secs. 56.50-60*, 56.50-90*.

15.3....... Secs. 56.50-80*, 56.50-90*.

Chapter V:

12......... 33 CFR 164.35*.

------------------------------------------------------------------------

A final rule concerning Intervals for Drydocking and Tailshaft

Examination on Inspected Vessels [CGD 84-024] went into effect on

September 23, 1988. It changed the interval for drydocking vessels from

one inspection every two years to inspections in multiples of thirty

months (i.e., two inspections within any five-year period, except that

no more than three years may elapse between any inspection and its

immediate predecessor). But it left the interval for inspecting major

machinery at two years. Because of this continued misalignment of

inspection intervals for drydockings and major machinery, that rule

causes a hardship for owners of some vessels. The most opportune time

for inspecting major machinery--boilers and pressure vessels--is during

drydocking, when the machinery is secured. This final rule allows

intervals for inspecting major machinery to coincide with those for

drydocking. The inspection interval has not been changed for those

cases where inspection of machinery does not depend on the vessels'

being drydocked.

There have been continuing proposals by designers of vessels, by

shipyards, and by shipowners for the use of nonmetallic piping in

concealed spaces aboard ship. Current domestic regulations prohibit

this use of nonmetallic piping unless the piping is within trunks

completely surrounded by ``A'' class divisions. SOLAS 74, as amended,

does not preclude this use of nonmetallic piping, while classification

societies, as well as the International Association of Classification

Societies, permit it. Therefore, this final rule provides alternative

requirements for piping in concealed spaces and permits the

installation of nonmetallic piping under certain restrictions. The

change [[Page 24769]] will reduce the costs of constructing vessels.

Current domestic regulations require certain cargo ships to have

three powered bilge pumps. SOLAS 74, as amended, and many

classification societies have successfully permitted these ships to

have only two powered bilge pumps. This final rule aligns domestic

regulations with SOLAS 74. The change will reduce the costs of

outfitting U.S.-flag vessels.

For many years domestic regulations have also required each

individual bilge suction to be led from one or more manifolds located

within the same space as the bilge pump. In the early 1970s, the Coast

Guard developed regulations permitting common-rail bilge and ballast

systems for cargo spaces on multi-purpose bulk carriers that can lift

combinations of both liquid and dry bulk cargoes (O/B/O) and that ply

the Great Lakes. Since then, several designers of vessels have asked to

install common-rail bilge systems on cargo and passenger vessels. The

Coast Guard has, by policy, accepted all of these systems provided they

satisfied certain other design restrictions. The main concern with

accepting any of them is the risk of losing suction for the entire

system if the common line fails or leaks. The additional criteria

reduce that risk and make the system equivalent to the conventional

manifold system. Such a common-rail system is acceptable under SOLAS

74, as amended. This final rule permits these systems on all vessels as

an equivalent alternative to the existing requirements for manifold

systems.

Until now, domestic regulations have required, for all vessels

subject to 46 CFR subchapter F and not fitted with an auxiliary means

of steering, dual-power hydraulic steering apparatus having two

independent pumps and connections. Each independent steering-gear power

unit must be capable of meeting the rudder-movement standard of 35 deg.

on one side to 30 deg. on the other side in not more than 28 seconds.

These regulations are not consistent with the 1981 amendments to SOLAS

74. For passenger vessels without auxiliary steering systems, SOLAS 74,

as amended, requires that main steering gear, consisting of two or more

identical power units, be capable of meeting the same rudder-movement

standard with any one unit out of service. For cargo vessels without

auxiliary steering systems, SOLAS 74, as amended, requires that main

steering gear be capable of meeting the same rudder-movement standard

with all power units in service. The Coast Guard does not consider the

1981 amendments to SOLAS 74 to compromise the safety of the vessel, and

therefore, by this final rule, modifies current regulations for dual-

power hydraulic steering apparatus to coincide with SOLAS 74, as

amended.

Discussion of Comments and Changes

A total of three comment letters were received. The letters were

supportive of the efforts by the Coast Guard to incorporate industry

standards by reference. Two letters also offered specified comments on

individual sections of the proposed rule. The third letter simply

endorsed the comments of one of the first two letters. Additionally,

the Coast Guard received recommendations from the National

Transportation Safety Board (NTSB) asking for clarification of one of

the regulations modified in the proposed rules. The sections of the

proposed rule to which comments were addressed are discussed below, as

are each comment and the Coast Guard's response.

1. 33 CFR 164.11(t)

The proposed rule implements the standards of SOLAS 74 II-1/29.6

and II-1/29.15. Current paragraph (t) requires that, while a vessel is

under way on the navigable waters of the U.S., except the St. Lawrence

Seaway, at least two of the steering-gear power units be in operation

when the units are capable of simultaneous operation. That paragraph

embodies SOLAS 74 V/19-1. SOLAS 74 II-1/29.6 and II-1/29.15 impose a

performance standard on steering-gear systems. A combination of power

units may be operated simultaneously to meet the performance standard

of moving the rudder from 35 deg. on one side to 30 deg. on the other

side in not more than 28 seconds.

The NTSB's recommendations arose from the grounding of the MOBILOIL

in 1985 and the collision of the MANDAN with moored barges in 1990.

Both casualties involved loss of steering. The recommendations called

for clarification of current Sec. 164.11(t).

The Coast Guard agrees with the need for clarity and therefore both

revises proposed Sec. 164.11(t) and adds Sec. 164.11(u). Revised

Sec. 164.11(t) applies to both foreign and domestic vessels and

requires the operation of at least two steering-gear power units when

the power units are designed for simultaneous operation. Excepted from

this requirement are vessels on the Great Lakes and vessels covered by

Sec. 164.11(u). New Sec. 164.11(u) applies to newer foreign and

domestic vessels and, consistent with SOLAS 74, as amended, imposes a

standard of performance instead of a specification of design.

2. 46 CFR 56.50-50

This section was intended by the proposed rule to implement the

standards of SOLAS 74 II-2/54.2.5. Paragraph (a)(4) requires that bilge

systems, when they serve enclosed cargo spaces carrying flammable or

toxic liquids, be designed to prevent the inadvertent pumping of

flammable or toxic liquids through machinery-space piping or pumps.

One comment suggested that the final rule also address Class 8

dangerous goods because SOLAS 74 II-2/54.2.5 applies to these goods as

well.

The Coast Guard agrees with the comment as consistent with the

intent of the proposed rule and has included the reference to Class 8

dangerous liquids with a flashpoint below 23 deg.C (74 deg.F) in this

final rule. In addition, since SOLAS applies the flashpoint limit to

the Class 3 flammable liquids, the Coast Guard also applies it to them.

One comment suggested stipulating a specific minimal quantity of

dangerous goods, which would require invoking the proposed change to

this section.

The Coast Guard disagrees with this comment since there is no

similar approach in the standard of SOLAS on which it is based.

Further, it would be difficult to stipulate a specific minimal quantity

of dangerous goods that would not need regulation.

One comment suggested calling the machinery space the ``main

machinery'' space.

The Coast Guard disagrees with the comment since this would change

the applicability of the section. Such a narrow interpretation of SOLAS

74 in this regard is unwarranted. The rules will continue to use the

terminology of SOLAS 74.

3. 46 CFR 56.60-25

This section was intended by the proposed rule to codify current

Coast Guard policy. Paragraph (a) allows the use of nonmetallic piping

for nonvital freshwater and saltwater service, to run in concealed

spaces. The Coast Guard has allowed this use, considering further

design criteria, such as the fire integrity of bulkheads, the proper

maintenance of decks and draft stops, or the installation in the

concealed space of an approved smoke-detection system. Current

regulations require this piping to be of metallic construction or to be

nonmetallic piping surrounded by ``A'' class divisions. SOLAS 74, as

amended, does not preclude nonmetallic piping for this use.

One comment suggested recognizing CPVC and polybutylene as

acceptable materials under this section because of their extensive use

elsewhere. [[Page 24770]]

The Coast Guard agrees that much progress is being made in the

evaluation and testing of plastic materials for piping and that

expanding the acceptance of these materials in Coast Guard regulations

should be addressed. The Coast Guard feels, however, that this comment

goes beyond the scope of this final rule. CPVC and polybutylene will be

further evaluated, and addressed in a future rulemaking. Moreover, IMO

is currently working on specific guidelines for the acceptance of these

materials, and further developments on the topic will affect Coast

Guard policy on these materials. Current regulations do not preclude

the use of materials not meeting ASTM F1173. The requirements for the

use of these materials appear in current Sec. 56.60-25(a)(10).

One comment suggested that the use, along with plastic piping, of

metallic spool pieces at all bulkhead penetrations would be equivalent

to requiring a smoke-detection system in concealed accommodation or

service spaces.

The Coast Guard disagrees with this comment. The early detection of

fires or smoke in concealed spaces is vital, and metallic spool pieces

do not enable it.

One comment suggested clarification of Sec. 56.60-25(a)(3)(i) to

clearly allow the use of plastic piping outside trunks or ducts if

inside a concealed space within ``A'' class boundaries.

The Coast Guard disagrees with this comment. Under the comment's

definition, a concealed space spanning several ``B'' class boundaries

could have plastic piping as long as ``A'' class boundaries surround

the overall space. The wording in the proposed rule has not been

changed.

One comment suggested allowing smoke detectors, located adjacent to

but not in the concealed space, to replace required detectors in the

space.

The Coast Guard disagrees with this comment, which assumes that a

fire would never start in a concealed space with plastic piping but

that any fire would come from the adjacent space. The burning of the

plastic piping in a concealed space is the concern, and the sensors

should be located so as to most readily detect the concealed fire. The

requirement for sensors in the concealed space as stated in the

proposed rule remains.

4. 46 CFR 58.25-65

This section was intended by the proposed rule to move, from

subchapter J to subchapter F, requirements applicable to steering

systems. Paragraphs (a) through (d) simply restate requirements from

current 46 CFR 111.93-7 that cover feeder circuits serving electric-

driven steering-gear power units. This section reflects interpretations

by the Coast Guard of applicable requirements in SOLAS 74 II-1/29.14

and II-1/30.2.

One comment suggested that use of the size of the rudder stock as a

criterion for determining whether one of the electrical feeders should

be supplied from an alternative source of power was ambiguous. The

comment further suggested use of some other, more definite criterion,

such as number of passengers or gross tonnage.

The size of the rudder stock closely correlates with the overall

size and speed of the vessel, and use of it as a criterion comes from

SOLAS 74 II-1/29.14. Because this regulation applies to both cargo and

passenger vessels, making the number of passengers the criterion would

be inappropriate.

The Coast Guard has found gross tonnage to be unreliable when used

for drawing regulatory lines. Besides, the intent of the final rule is

to harmonize regulations of the Coast Guard with standards of SOLAS,

not to impose requirements that exceed those of SOLAS. Since this part

of the proposed rule does not deviate from current regulations and will

not cause a burden on industry, it has not been changed.

5. 46 CFR 61.05-10

This section was intended by the proposed rule to change Table

61.05-10 and Sec. Sec. 61.05-10, 61.05-15, 61.05-20, 61.10-5, and

61.15-5, aligning intervals for inspections and tests of major

machinery with new intervals for drydockings of vessels. Generally,

current regulations require inspections of major machinery, such as

pressure vessels and boilers, in two-year multiples, to coincide with a

vessel's regular inspection for certification. Numerous owners and

operators have insisted that such scheduling creates an economic

hardship since an inspection for certification is not always the

appropriate time for an inspection of a boiler or a pressure vessel.

Rather, these owners and operators suggest, the intervals for

drydockings are more appropriate as the intervals also for such

inspections and tests of major machinery. The Coast Guard agrees and

has proposed that inspections of major machinery occur, like

drydockings, at a rate of two inspections in any five-year period, with

no more than three years between any inspection and its immediate

predecessor. Also, a new Table 61.05-10 collects into a single table

the intervals for all inspections and tests of boilers, except of

automation controls. Since this should decrease a vessel's time out of

service, the owners and operators should realize economic savings.

One comment suggested defining ``hybrid boilers'' as used in Note 3

to Table 61.05-10.

The Coast Guard defines ``hybrid boilers'' as boilers that employ

design features from both traditional watertube and firetube boilers.

This final rule defines them so in Sec. 52.01-3.

Incorporation by Reference

The Director of the Federal Register has approved the materials

listed in 33 CFR 164.03 and 46 CFR 58.03-1(b) for incorporation by

reference under 5 U.S.C. 552 and 1 CFR part 51. The materials are

available as indicated in those sections.

Regulatory Evaluation

This final rule is not a significant regulatory action under

section 3(f) of Executive Order 12866 and does not require an

assessment of potential costs and benefits under section 6(a)(3) of

that Order. It has not been reviewed by the Office of Management and

Budget under that Order. It is not significant under the regulatory

policies and procedures of the Department of Transportation (44 FR

11034 (February 26, 1979)). The Coast Guard expects the economic impact

of this final rule to be so minimal that a full Regulatory Assessment

is unnecessary. The net benefits due to savings from this rule should

outweigh the burden.

As discussed in Background and Purpose, above, the main purpose of

this final rule is to incorporate into domestic regulations amendments

to the International Convention for Safety of Life at Sea, 1974,

addressing issues of marine engineering. U.S.-flag cargo and tank

vessels of 500 gross tons and more, and passenger vessels carrying more

than twelve passengers and engaged on international voyages, already

must comply with SOLAS 74, as amended. Thus, this rule will have no

economic impact on these vessels. This rule does, however, affect

vessels that need not yet comply with SOLAS 74, as amended, as such,

since the Coast Guard, in general, is applying the standards of the

treaty to all new domestic vessels subject to subchapter F.

Although some of the changes due to SOLAS 74 will result in minor

increases in cost, others will result in savings that more than offset

these increases. Many of the changes reflect current practice of the

marine industry or can be integrated readily into the design of the

vessel before construction and will place no direct burden on the

industry. The changes that will place the greatest

[[Page 24771]] economic burden upon the industry affect steering gear.

However, the increase in cost associated with accomplishing the changes

represents a small fraction of the total cost for a steering system and

should be offset by the savings anticipated from the reduction in the

number and cost of casualties.

The remaining changes in this final rule are not due to SOLAS 74:

Greater use of common-rail bilge systems, an increase in the inspection

interval for major machinery, and greater use of plastic piping in

concealed spaces. These changes will bring only savings to the marine

industry. On the bilge system and on plastic piping, this rule permits,

without reducing safety, attractive alternatives to the expensive means

required by the current regulations. Also, by enlarging the interval

for inspection of major machinery, to make the inspection coincide with

the vessel's drydocking, this rule will reduce the number of

inspections over a vessel's life and reduce the vessel's time out of

service, all resulting in long-term savings to the owner.

Small Entities

This final rule will apply to owners and operators of commercial

vessels registered in the U.S. Few of these, if any, qualify as small

entities. Again, the economic impact of this rule on individual owners

and operators should be minimal. Therefore, the Coast Guard certifies

under section 605 of the Regulatory Flexibility Act (5 U.S.C. 601 et

seq.) that this rule will not have a significant economic impact on a

substantial number of small entities.

Collection of Information

This final rule imposes on the public no new or added requirements

for collecting information under the Paperwork Reduction Act (44 U.S.C.

3501 et seq.). In particular, it does not change any such requirements

in 33 CFR part 164 or 46 CFR part 50, 52, 56, 58, 61, or 111.

Environment

The Coast Guard has considered the environmental impact of this

final rule and concluded that, under section 2.B.2.c of Commandant

Instruction M16475.1B, this rule is categorically excluded from further

treatment in environmental documents. A Categorical-Exclusion

Determination is available in the docket for inspection or copying

where indicated under addresses.

Federalism

The Coast Guard has analyzed this final rule in accordance with the

principles and criteria of Executive Order 12612 and has determined

that this rule does not have sufficient implications for federalism to

warrant the preparation of a Federalism Assessment. The authority to

issue regulations on the navigational safety of the vessels covered by

this rule is committed to the Coast Guard by Federal statute.

Therefore, the Coast Guard intends to preempt State or local laws on

the navigational safety of these vessels.

List of Subjects

33 CFR Part 164

Incorporation by reference, Marine safety, Navigation (water),

Reporting and recordkeeping requirements, Waterways.

46 CFR Part 50

Reporting and recordkeeping requirements, Vessels.

46 CFR Part 52

Reporting and recordkeeping requirements, Vessels.

46 CFR Part 56

Reporting and recordkeeping requirements, Vessels.

46 CFR Part 58

Incorporation by reference, Reporting and recordkeeping

requirements, Vessels.

46 CFR Part 61

Reporting and recordkeeping requirements, Vessels.

46 CFR Part 111

Reporting and recordkeeping requirements, Vessels.

For the reasons set out in the preamble, the Coast Guard amends

Title 33, part 164, and Title 46, parts 50, 52, 56, 58, 61, and 111, of

the Code of Federal Regulations, as follows:

Title 33--[Amended]

PART 164--NAVIGATION SAFETY REGULATIONS

1. The authority citation for part 164 continues to read as

follows:

Authority: 33 U.S.C. 1223, 46 U.S.C. 3703; 49 CFR 1.46(n). Sec.

164.61 also issued under 46 U.S.C. 6101.

2. Section 164.03 is amended by revising paragraph (b) to read as

follows:

Sec. 164.03 Incorporation by reference.

* * * * *

(b) The materials approved for incorporation by reference in this

part, and the sections affected, are:

Radio Technical Commission for Marine Services, P.O. Box 19087,

Washington, DC 20036, Paper 12/78/DO-100 Minimum Performance

Standards, Loran C Receiving Equipment, 1977--164.41

International Maritime Organization, 4 Albert Embankment, London SE1

7SR U.K., IMO Resolution A.342(IX), Recommendation on Performance

Standards for Automatic Pilots, adopted November 12, 1975--164.13.

3. Section 164.11 is amended by revising its heading and paragraph

(t) and by adding paragraph (u) to read as follows:

Sec. 164.11 Navigation under way: General.

* * * * *

(t) At least two of the steering-gear power units on the vessel are

in operation when such units are capable of simultaneous operation,

except when the vessel is sailing on the Great Lakes and their

connecting and tributary waters, and except as required by paragraph

(u) of this section.

(u) On each passenger vessel meeting the requirements of the

International Convention for the Safety of Life at Sea, 1960 (SOLAS 60)

and on each cargo vessel meeting the requirements of SOLAS 74 as

amended in 1981, the number of steering-gear power units necessary to

move the rudder from 35 deg. on either side to 30 deg. on the other in

not more than 28 seconds must be in simultaneous operation.

4. Section 164.35 is amended by adding paragraph (o) to read as

follows:

Sec. 164.35 Equipment: All vessels.

* * * * *

(o) A telephone or other means of communication for relaying

headings to the emergency steering station. Also, each vessel of 500

gross tons and over and constructed on or after June 9, 1991 must be

provided with arrangements for supplying visual compass-readings to the

emergency steering station.

5. Section 164.39 is revised to read as follows:

Sec. 164.39 Steering gear: Foreign tankers.

(a) This section applies to each foreign tanker of 10,000 gross

tons or more, except a public vessel, that--

(1) Transfers oil at a port or place subject to the jurisdiction of

the United States; or

(2) Otherwise enters or operates in the navigable waters of the

United States, except a vessel described by Sec. 164.02 of this part.

(b) Definitions. The terms used in this section are as follows:

[[Page 24772]]

Constructed means the same as in Chapter II-1, Regulations 1.1.2

and 1.1.3.1, of SOLAS 74.

Existing tanker means a tanker--

(1) For which the building contract is placed on or after June 1,

1979;

(2) In the absence of a building contract, the keel of which is

laid or which is at a similar stage of construction on or after January

1, 1980;

(3) The delivery of which occurs on or after June 1, 1982; or

(4) That has undergone a major conversion contracted for on or

after June 1, 1979; or construction of which was begun on or after

January 1, 1980, or completed on or after June 1, 1982.

Public vessel, oil, hazardous materials, and foreign vessel mean

the same as in 46 U.S.C. 2101.

SOLAS 74 means the International Convention for the Safety of Life

at Sea, 1974, as amended.

Tanker means a self-propelled vessel defined as a tanker by 46

U.S.C. 2101(38) or as a tank vessel by 46 U.S.C. 2101(39).

(c) Each tanker constructed on or after September 1, 1984, must

meet the applicable requirements of Chapter II-1, Regulations 29 and

30, of SOLAS 74.

(d) Each tanker constructed before September 1, 1984, must meet the

requirements of Chapter II-1, Regulation 29.19, of SOLAS 74.

(e) Each tanker of 40,000 gross tons or more, constructed before

September 1, 1984, that does not meet the single-failure criterion of

Chapter II-1, Regulation 29.16, of SOLAS 74, must meet the requirements

of Chapter II-1, Regulation 29.20, of SOLAS 74.

(f) Each tanker constructed before September 1, 1984, must meet the

applicable requirements of Chapter II-1, Regulations 29.14 and 29.15,

of SOLAS 74.

Title 46--[Amended]

PART 50--GENERAL PROVISIONS

6. The authority citation for part 50 is revised to read as

follows:

Authority: 43 U.S.C. 1333; 46 U.S.C. 2103, 3306, 3703; E.O.

12234, 45 FR 58801, 3 CFR, 1980 Comp., p. 277; 49 CFR 1.45, 1.46.

Section 50.01-20 also issued under the authority of 44 U.S.C. 3507.

7. Subpart 50.10 is amended by adding Sec. 50.10-35 to read as

follows:

Sec. 50.10-35 Constructed.

The term constructed means the keel has been laid or, for vessels

with no keel, assembly of at least 50 tons or 1% of the estimated mass

of all structural material, whichever is less, has been completed.

PART 52--POWER BOILERS

8. The authority citation for part 52 continues to read as follows:

Authority: 46 U.S.C. 3306, 2103, 3703; E.O. 12234, 45 FR 58801,

3 CFR, 1980 Comp., p. 277; 49 CFR 1.46.

9. Section 52.01-3 is amended by adding paragraph (a)(10) to read

as follows:

Sec. 52.01-3 Definitions of terms used in this part.

(a) * * *

(10) Hybrid boiler. A hybrid boiler is a steam boiler whose design

employs features from both watertube and firetube boilers.

* * * * *

10. Section 52.01-110 is amended by revising its heading and adding

paragraph (h) to read as follows:

Sec. 52.01-110 Water-level indicators, water columns, gauge-glass

connections, gauge cocks, and pressure gauges (modifies PG-60).

* * * * *

(h) High-water-level alarm. Each watertube boiler for propulsion

must have an audible and a visible high-water-level alarm. The alarm

indicators must be located where the boiler is controlled.

PART 56--PIPING SYSTEMS AND APPURTENANCES

11. The authority citation for part 56 is revised to read as

follows:

Authority: 33 U.S.C. 1321(j), 1509; 43 U.S.C. 1333; 46 U.S.C.

2103, 3306, 3703; E.O. 12234, 45 FR 58801, 3 CFR, 1980 Comp., p.

277; E.O. 12777, 56 FR 54757; 49 CFR 1.46.

12. Section 56.15-5 is amended by revising its heading and

paragraph (c)(1)(ii) to read as follows:

Sec. 56.15-5 Fluid-conditioner fittings.

* * * * *

(c) * * *

(1) * * *

(ii) Nonstandard fluid-conditioner fittings that have an internal

diameter exceeding 15 centimeters (6 inches) and that are rated for

temperatures and pressures exceeding those specified as minimums for

Class I piping systems.

* * * * *

13. Section 56.30-25 is amended by adding a note after paragraph

(f)(2) to read as follows:

Sec. 56.30-25 Flared, flareless, and compression joints.

* * * * *

(f) * * *

(2) * * *

Note--See Sec. 58.25-20(d) of this subchapter for limitations on

the use of compression fittings in hydraulic systems for steering

gear.

14. Section 56.50-15 is amended by adding paragraph (k) to read as

follows:

Sec. 56.50-15 Steam and exhaust piping.

* * * * *

(k) Means must be provided for draining every steam pipe in which

dangerous water hammer might otherwise occur.

15. Section 56.50-50 is amended by adding paragraphs (a)(4),

(a)(5), and (c)(4), revising paragraphs (c)(1), (c)(2), and the

definition for ``D'' and adding a Note 6 in paragraph (d)(2), and

revising the last sentence of paragraph (h) to read as follows:

Sec. 56.50-50 Bilge and ballast piping.

(a) * * *

(4) Where the vessel is to carry Class 3 flammable liquids with a

flashpoint below 23 deg.C (74 deg.F), Class 6, Division 6.1, poisonous

liquids, or Class 8 corrosive liquids with a flashpoint below 23 deg.C

(74 deg.F) as defined in 49 CFR part 173, in enclosed cargo spaces, the

bilge-pumping system must be designed to ensure against inadvertent

pumping of such liquids through machinery-space piping or pumps.

(5) For each vessel constructed on or after June 9, 1995, and on an

international voyage, arrangements must be made to drain the enclosed

cargo spaces on either the bulkhead deck of a passenger vessel or the

freeboard deck of a cargo vessel.

(i) If the deck edge, at the bulkhead deck of a passenger vessel or

the freeboard deck of a cargo vessel, is immersed when the vessel heels

5 deg. or less, the drainage of the enclosed cargo spaces must

discharge to a space, or spaces, of adequate capacity, each of which

has a high-water-level alarm and a means to discharge overboard. The

number, size and arrangement of the drains must prevent unreasonable

accumulation of water. The pumping arrangements must take into account

the requirements for any fixed manual or automatic sprinkling system.

In enclosed cargo spaces fitted with carbon-dioxide extinguishing

systems, the drains must have traps or other means to prevent escape of

the smothering gas. The enclosed cargo spaces must not drain to

machinery spaces or other spaces where sources of ignition may be

present if water may be contaminated with Class 3 flammable liquids;

Class 6, Division 6.1, poisonous liquids; or Class 8 corrosive liquids

with a flashpoint below 23 deg.C (74 deg.F).

(ii) If the deck edge, at the bulkhead deck of a passenger vessel

or the [[Page 24773]] freeboard deck of a cargo vessel, is immersed

only when the vessel heels more than 5 deg., the drainage of the

enclosed cargo spaces may be by means of a sufficient number of

scuppers discharging overboard. The installation of scuppers must

comply with Sec. 42.15-60 of this chapter.

* * * * *

(c)(1) Each bilge suction must lead from a manifold except as

otherwise approved by the Commanding Officer, Marine Safety Center. As

far as practicable, each manifold must be in, or be capable of remote

operation from, the same space as the bilge pump that normally takes

suction on that manifold. In either case, the manifold must be capable

of being locally controlled from above the floorplates and must be

easily accessible at all times. As far as practicable, each overboard-

discharge valve for a bilge system must comply with the requirements

governing location and accessibility for suction manifolds. Except as

otherwise permitted by paragraph (c)(4) of this section for a vessel

employing a common-rail bilge system, each bilge-manifold valve

controlling a bilge suction from any compartment must be of the stop-

check type.

(2) Each passenger vessel on an international voyage must have

manifolds, where installed, and valves in the bilge-pumping system

arranged so that, in case of flooding, one of the bilge pumps can take

suction from any compartment and, further, so that damage to a pump or

its piping connecting to the bilge main outboard of a line drawn at

one-fifth of the beam of the vessel will not render the bilge system

inoperative.

* * * * *

(4) A common-rail bilge system may be installed as an acceptable

alternative to the system required by paragraph (c)(1) of this section,

provided it satisfies all of the following criteria:

(i) The common-rail main runs inboard at least one-fifth of the

beam of the vessel.

(ii) A stop-check valve or both a stop valve and a check valve are

provided in each branch line and located inboard at least one-fifth of

the beam of the vessel.

(iii) The stop valve or the stop-check valve is power-driven, is

capable of remote operation from the space where the pump is, and,

regardless of the status of the power system, is capable of manual

operation to both open and close the valve.

(iv) The stop valve or the stop-check valve is accessible for both

manual operation and repair under all operating conditions, and the

space used for access contains no expansion joint or flexible coupling

that, upon failure, would cause flooding and prevent access to the

valve.

(v) A port and a starboard suction serve each space protected

unless, under the worst conditions of list and trim and with liquid

remaining after pumping, the vessel's stability remains acceptable, in

accordance with subchapter S of this chapter.

(vi) For each vessel designed for the carriage of combinations of

both liquid and dry bulk cargoes (O/B/O), no bilge pump or piping is

located in a machinery space other than in a pump room for cargo, and

no liquid and other cargoes are carried simultaneously.

(vii) For each cargo vessel in Great Lakes service, each common-

rail piping for the bilge and ballast system serving cargo spaces, if

installed and if connected to a dedicated common-rail bilge system,

must lead separately from a valved manifold located at the pump.

* * * * *

(d) * * *

D=Molded depth (in feet) to the bulkhead deck.(6)

* * * * *

Note 6--For each passenger vessel constructed on or after June

9, 1995, and being on an international voyage, D must be measured to

the next deck above the bulkhead deck if an enclosed cargo space on

the bulkhead deck that is internally drained in accordance with

paragraph (a)(4) of this section extends the entire length of the

vessel. Where the enclosed cargo space extends a lesser length, D

must be taken as the sum of the molded depth (in feet) to the

bulkhead deck plus lh/L where l and h are the aggregate length and

height (in feet) of the enclosed cargo space.

* * * * *

(h) Except as allowed by paragraph (c)(4)(vii) of this section,

piping for draining a cargo hold or machinery space must be separate

from piping used for filling or emptying any tank where water or oil is

carried. Piping for bilge and ballast must be arranged so as to

prevent, by the appropriate installation of stop and non-return valves,

oil or water from the sea or ballast spaces from passing into a cargo

hold or machinery space, or from passing from one compartment to

another, regardless of the source. The bilge and ballast mains must be

fitted with separate control valves at the pumps.

* * * * *

16. Section 56.50-55 is amended by revising paragraph (a) and Table

56.50-55(a) to read as follows:

Sec. 56.50-55 Bilge pumps.

(a) Self-propelled vessels. (1) Each self-propelled vessel must be

provided with a power-driven pump or pumps connected to the bilge main

as required by Table 56.50-55(a).

Table 56.50-55(a).--Power Bilge Pumps Required for Self-Propelled Vessels

----------------------------------------------------------------------------------------------------------------

Passenger vessels\1\ Dry-cargo vessels\2\ Tank Mobile

----------------------------------------------------------- vessels offshore

Ocean, Ocean, ----------- drilling

Vessel length, in feet coast- coast- units

International wise and All other wise and All All ----------

voyages\3\ Great waters Great waters waters All

Lakes Lakes waters

----------------------------------------------------------------------------------------------------------------

180' or more................... \4\3 \4\3 2 2 2 2 2

Below 180' and exceeding 65'... \4\3 \5\2 \5\2 \5\2 \5\2 2 2

65' or less.................... 3 1 1 1 1 1 .........

----------------------------------------------------------------------------------------------------------------

\1\Small passenger vessels under 100 gross tons refer to Subpart 182.25 of Subchapter T (Small Passenger Vessel)

of this chapter.

\2\Dry-bulk carriers having ballast pumps connected to the tanks outside the engineroom and to the cargo hold

may substitute the appropriate requirements for tank vessels.

\3\Not applicable to passenger vessels which do not proceed more than 20 mile from the nearest land, or which

are employed in the carriage of large numbers of unberthed passengers in special trades.

\4\When the criterion numeral exceeds 30, an additional independent power-driven pump is required. (See Part 171

of this chapter for determination of criterion numeral.)

\5\Vessels operating on lakes (including Great Lakes), bays, sounds, or rivers where steam is always available,

or where a suitable water supply is available from a power-driven pump of adequate pressure and capacity, may

substitute siphons or eductors for one of the required power-driven pumps, provided a siphon or eductor is

permanently installed in each hold or compartment.

[[Page 24774]] * * * * *

17. Section 56.50-60 is amended by revising paragraphs (b) and (l)

and by adding paragraphs (d)(1) (i), (m), and (n) to read as follows:

Sec. 56.50-60 Systems containing oil.

* * * * *

(b) When oil needs to be heated to lower its viscosity, heating

coils must be properly installed in each tank.

(1) Each drain from a heating coil as well as each drain from an

oil heater must run to an open inspection tank or other suitable oil

detector before returning to the feed system.

(2) As far as practicable, no part of the fuel-oil system

containing heated oil under pressure exceeding 180 KPa (26 psi) may be

placed in a concealed position so that defects and leakage cannot be

readily observed. Each machinery space containing a part of the system

must be adequately illuminated.

* * * * *

(d) * * *

(1) * * *

(i) In the special case of a deep tank in any shaft tunnel, piping

tunnel, or similar space, one or more valves must be fitted on the

tank, but control in the event of fire may be effected by means of an

additional valve on the piping outside the tunnel or similar space. Any

such additional valve installed inside a machinery space must be

capable of being operated from outside this space.

(ii) [Reserved]

* * * * *

(l) Where oil piping passes through a non-oil tank without stop

valves complying with paragraph (d) of this section installed at all

tank penetrations, the piping must comply with Sec. 56.50-50(k).

(m) Each arrangement for the storage, distribution, and use of oil

in a pressure-lubrication system must--

(1) As well as comply with Sec. 56.50-80, be such as to ensure the

safety of the vessel and all persons aboard; and

(2) In a machinery space, meet the applicable requirements of

Secs. 56.50-60 (b)(2) and (d), 56.50-85(a)(11), 56.50-90 (c) and (d),

and 58.01-55(f) of this subchapter. No arrangement need comply with

Sec. 58.50-90 (c)(1) and (c)(3) of this subchapter if the sounding pipe

is fitted with an effective means of closure, such as a threaded cap or

plug or other means acceptable to the Officer in Charge, Marine

Inspection. The use of flexible piping or hose is permitted in

accordance with the applicable requirements of Secs. 56.35-10, 56.35-

15, and 56.60-25(c).

(n) Each arrangement for the storage, distribution, and use of any

other flammable oil employed under pressure in a power transmission-

system, control and activating system, or heating system must be such

as to ensure the safety of the vessel and all persons aboard by--

(1) Complying with Subpart 58.30 of this subchapter; and,

(2) Where means of ignition are present, meeting the applicable

requirements of Secs. 56.50-85(a)(11), 56.50-90 (c) and (d), and 58.01-

55(f) of this subchapter. Each pipe and its valves and fittings must be

of steel or other approved material, except that the use of flexible

piping or hose is permitted in accordance with the applicable

requirements of Secs. 56.35-10, 56.35-15, and 56.60-25(c).

18. Section 56.50-65 is amended by revising its heading and

paragraph (h) to read as follows:

Sec. 56.50-65 Burner fuel-oil service systems.

* * * * *

(h) Each fuel-oil service pump must be equipped with controls as

required by Sec. 58.01-25 of this subchapter.

19. Section 56.50-70 is amended by revising paragraph (j) to read

as follows:

Sec. 56.50-70 Gasoline fuel systems.

* * * * *

(j) Fuel pumps. Each fuel pump must be equipped with controls as

required by Sec. 58.01-25 of this subchapter.

20. Section 56.50-80 is amended by revising its heading and

paragraph (h) to read as follows:

Sec. 56.50-80 Lubricating-oil systems.

* * * * *

(h) Sight-flow glasses may be used in lubricating-oil systems

provided it has been demonstrated, to the satisfaction of the

Commanding Officer, Marine Safety Center, that they can withstand

exposure to a flame at a temperature of 927 deg.C (1700 deg.F) for one

hour, without failure or appreciable leakage.

* * * * *

21. Section 56.50-85 is amended by removing paragraphs (a)(7) (iii)

and (iv), by redesignating paragraph (a)(7)(v) as (a)(7)(iii), and by

revising the heading and paragraph (a)(7)(ii), newly redesignated

paragraph (a)(7)(iii), and paragraph (a)(11) to read as follows:

Sec. 56.50-85 Tank-vent piping.

(a) * * *

(7) * * *

* * * * *

(ii) A hinged closure normally open on the outlet of the return

bend, which must close automatically by the force of a submerging wave;

or

(iii) Another suitable device acceptable to the Commanding Officer,

Marine Safety Center.

* * * * *

(11)(i) If a tank may be filled by a pressure head exceeding that

for which the tank is designed, the aggregate cross-sectional area of

the vents in each tank must be not less than the cross-sectional area

of the filling line unless the tank is protected by overflows, in which

case the aggregate cross-sectional area of the overflows must be not

less than the cross-sectional area of the filling line.

(ii) Provision must be made to guard against liquids rising in the

venting system to a height that would exceed the design head of a cargo

tank or fuel-oil tank. It may be made by high-level alarms or overflow-

control systems or other, equivalent means, together with gauging

devices and procedures for filling cargo tanks.

* * * * *

22. Section 56.50-90 is amended by revising paragraph (a),

redesignating existing paragraphs (c) and (d) as paragraphs (e) and

(f), and adding paragraphs (c) and (d) to read as follows:

Sec. 56.50-90 Sounding devices.

(a) Each tank must be provided with a suitable means of determining

liquid level. Except for a main cargo tank on a tank vessel, each

integral hull tank and compartment, unless at all times accessible

while the vessel is operating, must be fitted with a sounding pipe.

* * * * *

(c) Except as allowed by this paragraph, on each vessel constructed

on or after June 9, 1995, no sounding pipe used in a fuel-oil tank may

terminate in any space where the risk of ignition of spillage from the

pipe might arise. None may terminate in a space for passengers or crew.

When practicable, none may terminate in a machinery space. When the

Commanding Officer, Marine Safety Center, determines it impracticable

to avoid terminating a pipe in a machinery space, a sounding pipe may

terminate in a machinery space if all the following requirements are

met:

(1) In addition to the sounding pipe, the fuel-oil tank has an oil-

level gauge complying with paragraph (d) of this section.

(2) The pipe terminates in a place remote from ignition hazards

unless precautions are taken such as fitting an effective screen

(shield) to prevent the fuel oil, in case of spillage through the end

of the pipe, from coming into contact with a source of ignition.

(3) The end of the pipe is fitted with a self-closing blanking

device and a small-diameter, self-closing control cock located below

the blanking device for the purpose of ascertaining before the blanking

device is opened that no fuel [[Page 24775]] oil is present. Provision

must be made to ensure that no spillage of fuel oil through the control

cock involves an ignition hazard.

(d) On each vessel constructed on or after June 9, 1995, other oil-

level gauges may be used instead of sounding pipes if all the following

requirements are met:

(1) In a passenger vessel, no such gauge may require penetration

below the top of the tank, and neither the failure of a gauge nor an

overfilling of the tank may permit release of fuel into the space.

(2) In a cargo vessel, neither the failure of such a gauge nor an

overfilling of the tank may permit release of fuel into the space. The

use of cylindrical gauge-glasses is prohibited. The use of oil-level

gauges with flat glasses and self-closing valves between the gauges and

fuel tanks is acceptable.

* * * * *

23. Section 56.50-105 is amended by revising its heading and

paragraphs (a)(5) and (b)(5) to read as follows:

Sec. 56.50-105 Low-temperature piping.

(a) * * *

(5) Other requirements. All other requirements of this part for

Class I piping apply to Class I-L piping. Pressure testing must comply

with subpart 56.97 of this part, and nondestructive testing of

circumferentially welded joints must comply with Sec. 56.95-10.

Seamless tubular products must be used except that, when the service

pressure does not exceed 1724 KPa (250 psi), the Commanding Officer,

Marine Safety Center, may give special consideration to appropriate

grades of piping and tubing that are welded without the addition of

filler metal in the root pass. Each production procedure and quality-

control program for welded products must be acceptable to the Officer

in Charge, Marine Inspection.

(b) * * *

(5) Pressure testing must comply with Subpart 56.97, and

nondestructive testing of welded joints must comply with Sec. 56.95-10.

* * * * *

24. Section 56.60-25 is amended by revising paragraphs (a)(3) and

(b)(1) and by adding paragraph (a)(11) to read as follows:

Sec. 56.60-25 Nonmetallic materials.

(a) * * *

(3) No use of plastic piping within a concealed space in an

accommodation or service area is permitted unless--

(i) Each trunk or duct containing such piping is completely

surrounded by ``A'' class divisions; or

(ii) An approved smoke-detection system is fitted in the concealed

space, and each penetration of a bulkhead or deck, and each

installation of a draft stop, is made in accordance with paragraph

(a)(2) of this section to maintain the integrity of fire divisions.

* * * * *

(11) Plastic piping intended for an accommodation area, a service

area, or a control station must comply with the standard for the spread

of flame or smoke established by Commandant (G-MTH).

(b) * * *

(1) Vital machinery served by plastic piping must be duplicated by

equivalent machinery served entirely by conventional metallic piping

unless allowed otherwise by this section. When such machinery is in

separate watertight compartments, or is located or insulated so that

damage to both by a single localized fire is unlikely, both may be

fitted with plastic piping. (The Marine Inspector will make the final

determination as to the adequacy of the separation between duplicate

machinery installed in the same watertight compartment.) In no case may

failure of plastic piping on one set of machinery affect the operation

of the other machinery. Alternatively, a single set of machinery may be

installed with parallel, but independent, piping systems, one of

plastic and the other of metallic materials. Where metallic piping is

required to duplicate or parallel plastic piping, failure of the

plastic piping must not interfere with the proper operation of the

metallic piping or of the machinery it serves.

* * * * *

PART 58--MAIN AND AUXILIARY MACHINERY AND RELATED SYSTEMS

25. The authority citation for part 58 is revised to read as

follows:

Authority: 43 U.S.C. 1333; 46 U.S.C. 2103, 3306, 3703; E.O.

12234, 45 FR 58801, 3 CFR, 1980 Comp., p. 277; 49 CFR 1.46.

26. Section 58.01-10 is revised to read as follows:

Sec. 58.01-10 Fuel oil.

(a) The following limits apply to the use of oil as fuel:

(1) Except as otherwise permitted by this section, no fuel oil with

a flashpoint of less than 60 deg.C (140 deg.F) may be used.

(2) Except as otherwise permitted by Sec. 58.50-1(b), fuel oil with

a flashpoint of not less than 43 deg.C (110 deg.F) may be used in

emergency generators.

(3) Subject to such additional precautions as the Commanding

Officer, Marine Safety Center, considers necessary, and provided that

the ambient temperature of the space in which such fuel oil is stored

or used does not rise to within 10 deg.C (50 deg.F) below the

flashpoint of the fuel oil, fuel oil having a flashpoint of less than

60 deg.C (140 deg.F) but not less than 43 deg.C (110 deg.F) may be used

in general.

(4) In a cargo vessel, fuel having a lower flashpoint than

otherwise specified in this section--for example, crude oil--may be

used provided that such fuel is not stored in any machinery space and

that the Commanding Officer, Marine Safety Center, approves the

complete installation.

(b) The flashpoint of oil must be determined by the Pensky-Martens

Closed Tester, ASTM-D93-80.

Sec. 58.01-15 [Removed]

27. Section 58.01-15 is removed.

28. Section 58.01-25 is revised to read as follows:

Sec. 58.01-25 Means of stopping machinery.

Machinery driving forced-draft and induced-draft fans, fuel-oil

transfer pumps, fuel-oil unit and service pumps, and similar fuel-oil

pumps must be fitted with remote controls from a readily accessible

position outside the space concerned so that the fans or pumps may be

stopped in case of fire in the compartment in which they are located.

The controls must be suitably protected against accidental operation

and against tampering and must be suitably marked.

29. Sections 58.01-40, 58.01-45, 58.01-50, and 58.01-55 are added

to read as follows:

Sec. 58.01-40 Machinery, angles of inclination.

(a) Propulsion machinery and all auxiliary machinery essential to

the propulsion and safety of the vessel must be designed to operate

when the vessel is upright, when the vessel is inclined under static

conditions at any angle of list up to and including 15 deg., and when

the vessel is inclined under dynamic conditions (rolling) at any angle

of list up to and including 22.5 deg. and, simultaneously, at any angle

of trim (pitching) up to and including 7.5 deg. by bow or stern.

(b) Deviations from these angles of inclination may be permitted by

the Commanding Officer, Marine Safety Center, considering the type,

size, and service of the vessel.

Sec. 58.01-45 Machinery space, ventilation.

Each machinery space must be ventilated to ensure that, when

machinery or boilers are operating at full power in all weather

including heavy weather, an adequate supply of air is maintained for

the operation of the [[Page 24776]] machinery and for the safety,

efficiency, and comfort of the crew.

Sec. 58.01-50 Machinery space, noise.

(a) Each machinery space must be designed to minimize the exposure

of personnel to noise in accordance with IMO Assembly Resolution

A.468(XII), Code on Noise Levels on Board Ships, 1981. No person may

encounter a 24-hour effective noise level greater than 82 dB(A) when

noise is measured using a sound-level meter and an A-weighting filter.

(b) Except as allowed by paragraph (c) of this section, no

machinery space may exceed the following noise levels:

(1) Machinery control room--75 dB(A)

(2) Manned machinery space--90 dB(A)

(3) Unmanned machinery space--110 dB(A)

(4) Periodically unattended machinery space--110 dB(A)

(5) Workshop--85 dB(A)

(6) Any other work space around machinery--90 dB(A)

(c) If adding a source of noise would cause a machinery space to

exceed the noise level permitted by paragraph (b) of this section, the

new source must be suitably insulated or isolated so that the space

does not exceed that noise level. If the space is manned, a refuge from

noise must be provided within the space.

(d) Ear protection must be provided for any person entering any

space with a noise level greater than 85 dB(A).

(e) Each entrance to a machinery space with a noise level greater

than 85 dB(A) must have a warning sign stating that each person

entering the space must wear ear protection.

Sec. 58.01-55 Tanks for flammable and combustible oil.

(a) For the purposes of this section, a machinery space of category

A is a space that contains any of the following:

(1) Internal-combustion machinery used for main propulsion.

(2) Internal-combustion machinery used for other than main

propulsion, whose power output is equal to or greater than 500 HP (375

kw).

(3) Any oil-fired boiler.

(4) Any equipment used to prepare fuel oil for delivery to an oil-

fired boiler, or equipment used to prepare heated oil for delivery to

an internal-combustion engine, including any oil-pressure pumps,

filters, and heaters dealing with oil pressures above 26 psi.

(b) As far as practicable, each fuel-oil tank must be part of the

vessel's structure and be located outside a machinery space of category

A.

(c) If a fuel-oil tank, other than a double-bottom tank, must be

located adjacent to or within a machinery space of category A--

(1) At least one of its vertical sides must be contiguous to the

boundary of the machinery space;

(2) The tank must have a common boundary with the double-bottom

tanks; and

(3) The area of the tank boundary common with the machinery spaces

must be kept as small as practicable.

(d) If a fuel-oil tank must be located within a machinery space of

category A, it must not contain fuel oil with a flashpoint of less than

60 deg.C (140 deg.F).

(e) In general, no freestanding fuel-oil tank is permitted in any

machinery space of Category A on a passenger vessel. A freestanding

fuel-oil tank is permitted in other spaces only if authorized by the

Commanding Officer, Marine Safety Center. If so authorized, each

freestanding fuel-oil tank must--

(i) Comply with Subpart 58.50 of this subchapter; and

(ii) Be placed in an oil-tight spill tray with a drain pipe leading

to a spill-oil tank.

(f) No fuel-oil tank may be located where spillage or leakage from

it can constitute a hazard by falling on heated surfaces. The design

must also prevent any oil that may escape under pressure from any pump,

filter, or heater from coming into contact with heated surfaces.

Sec. 58.03-1 [Amended]

30. Section 58.03-1(b) is amended by adding, in alphabetical order,

two publications of the International Maritime Organization to read as

follows:

* * * * *

(b) * * *

International Maritime Organization (IMO) 4 Albert Embankment,

London SE1 7SR, England

A.467(XII), Guidelines for Acceptance of Non-Duplicated Rudder

Actuators for Tankers, Chemical Tankers and Gas Carriers of 10,000

Tons Gross Tonnage and Above But Less Than 100,000 Tonnes

Deadweight, 1981--58.25-60

A.468(XII), Code on Noise Levels on Board Ships, 1981--58.01-50

* * * * *

Subpart 58.05--Main Propulsion Machinery

31-32. Subpart 58.05 is amended by revising paragraph (a) of

Sec. 58.05-1 and adding Sec. 58.05-10 to read as follows:

Sec. 58.05-1 Material, design, and construction.

(a) The material, design, construction, workmanship, and

arrangement of main propulsion machinery and of each auxiliary,

directly connected to the engine and supplied as such, must be at least

equivalent to the standards established by the American Bureau of

Shipping or other recognized classification society, except as

otherwise provided by this subchapter.

* * * * *

Sec. 58.05-10 Automatic shut-off.

Main propulsion machinery must be provided with automatic shut-off

controls in accordance with part 62 of this subchapter. These controls

must shut down main propulsion machinery in case of a failure, such as

failure of the lubricating-oil supply, that could lead rapidly to

complete breakdown, serious damage, or explosion.

Sec. 58.10-15 [Amended]

33. Section 58.10-15 is amended by removing paragraph (e) and by

redesignating paragraphs (f), (g), (h), (i), and (j), respectively, as

(e), (f), (g), (h), and (i).

34. Subpart 58.25 is revised to read as follows:

Subpart 58.25--Steering Gear

Sec.

58.25-1 Applicability.

58.25-5 General.

58.25-10 Main and auxiliary steering gear.

58.25-15 Voice communications.

58.25-20 Piping for steering gear.

58.25-25 Indicating and alarm systems.

58.25-30 Automatic restart.

58.25-35 Helm arrangements.

58.25-40 Arrangement of the steering-gear compartment.

58.25-45 Buffers.

58.25-50 Rudder stops.

58.25-55 Overcurrent protection for steering-gear systems.

58.25-60 Non-duplicated hydraulic rudder actuators.

58.25-65 Feeder circuits.

58.25-70 Steering-gear control systems.

58.25-75 Materials.

58.25-80 Automatic pilots and ancillary steering gear.

58.25-85 Special requirements for tank vessels.

Subpart 58.25--Steering Gear

Sec. 58.25-1 Applicability.

(a) Except as specified otherwise, this subpart applies to--

(1) Each vessel or installation of steering gear contracted for on

or after June 9, 1995; and

(2) Each vessel on an international voyage with an installation of

steering gear contracted for on or after September 1, 1984.

(b) Each vessel not on an international voyage with an installation

of steering gear contracted for before June 9, 1995, and each vessel on

an international voyage with such an installation

[[Page 24777]] contracted for before September 1, 1984, may meet either

the requirements of this subpart or those in effect on the date of the

installation.

Sec. 58.25-5 General.

(a) Definitions.

Ancillary steering equipment means steering equipment, other than

the required control systems and power actuating systems, that either

is not required, such as automatic pilot or non-followup control from

the pilothouse, or is necessary to perform a specific required

function, such as the automatic detection and isolation of a defective

section of a tanker's hydraulic steering gear.

Auxiliary steering gear means the equipment, other than any part of

the main steering gear, necessary to steer the vessel in case of

failure of the main steering gear, not including a tiller, quadrant, or

other component serving the same purpose. Control system means the

equipment by which orders for rudder movement are transmitted from the

pilothouse to the steering-gear power units. A control system for

steering gear includes, but is not limited to, one or more--

(1) Transmitters;

(2) Receivers;

(3) Feedback devices;

(4) Hydraulic servo-control pumps, with associated motors and motor

controllers;

(5) Differential units, hunting gear, and similar devices;

(6) All gearing, piping, shafting, cables, circuitry, and ancillary

devices for controlling the output of power units; and

(7) Means of bringing steering-gear power units into operation.

Fast-acting valve, as used in this subpart, means a ball, plug,

spool, or similar valve with a handle connected for quick manual

operation.

Followup control means closed-loop (feedback) control that relates

the position of the helm to a specific rudder angle by transmitting the

helm-angle order to the power actuating system and, by means of

feedback, automatically stopping the rudder when the angle selected by

the helm is reached.

Main steering gear means the machinery, including power actuating

systems, and the means of applying torque to the rudder stock, such as

a tiller or quadrant, necessary for moving the rudder to steer the

vessel in normal service.

Maximum ahead service speed means the greatest speed that a vessel

is designed to maintain in service at sea at the deepest loadline

draft.

Maximum astern speed means the speed that it is estimated the

vessel can attain at the maximum designed power astern at the deepest

loadline draft.

Power actuating system means the hydraulic equipment for applying

torque to the rudder stock. It includes, but is not limited to--

(1) Rudder actuators;

(2) Steering-gear power units; and

(3) Pipes, valves, fittings, linkages, and cables for transmitting

power from the power unit or units to the rudder actuator or actuators.

Speedily regained, as used in this subpart, refers to the time it

takes one qualified crewmember, after arriving in the steering-gear

compartment, and without the use of tools, to respond to a failure of

the steering gear and take the necessary corrective action.

Steering capability means steering equivalent to that required of

auxiliary steering gear by Sec. 58.25-10(c)(2).

Steering gear means the machinery, including power actuating

systems, control systems, and ancillary equipment, necessary for moving

the rudder to steer the vessel.

Steering-gear power unit means:

(1) In the case of electric steering gear, an electric motor and

its associated electrical equipment, including motor controller,

disconnect switch, and feeder circuit.

(2) In the case of an electro-hydraulic steering gear, an electric

motor, connected pump, and associated electrical equipment such as the

motor controller, disconnect switch, and feeder circuit.

(3) In the case of hydraulic steering gear, the pump and its prime

mover.

Tank vessel, as used in this subpart, means a self-propelled

vessel, including a chemical tanker or a gas carrier, defined either as

a tanker by 46 U.S.C. 2101(38) or as a tank vessel by 46 U.S.C.

2101(39).

(b) Unless it otherwise complies with this subpart, each self-

propelled vessel must be provided with a main steering gear and an

auxiliary steering gear. These gear must be arranged so that--

(1) The failure of one will not render the other inoperative; and

(2) Transfer from the main to the auxiliary can be effected

quickly.

(c) Each substantial replacement of steering-gear components or

reconfiguration of steering-gear arrangements on an existing vessel

must comply with the requirements of this subpart for new installations

to the satisfaction of the cognizant Officer in Charge, Marine

Inspection.

(d) Each non-pressure-containing steering-gear component and each

rudder stock must be of sound and reliable construction, meet the

minimum material requirements of Sec. 58.25-75, and be designed to

standards at least equal to those established by the American Bureau of

Shipping or other recognized classification society.

(e) The suitability of any essential steering-gear component not

duplicated must be specifically approved by the Commanding Officer,

Marine Safety Center. Where a steering-gear component is shared by--

(1) A control system (e.g., a control-system transfer switch

located in the steering-gear compartment);

(2) The main and auxiliary steering gear (e.g., an isolation

valve); or

(3) A power actuating system and its control system (e.g., a

directional control valve)--the requirements for both systems apply, to

provide the safest and most reliable arrangement.

(f) Steering gear must be separate and independent of all other

shipboard systems, except--

(1) Electrical switchboards from which they are powered;

(2) Automatic pilots and similar navigational equipment; and

(3) Propulsion machinery for an integrated system of propulsion and

steering.

(g) Except on a vessel with an integrated system of propulsion and

steering, no thruster may count as part of a vessel's required steering

capability.

(h) Except for a tank vessel subject to Sec. 58.25-85(e), each

oceangoing vessel required to have power-operated steering gear must be

provided with arrangements for steadying the rudder both in an

emergency and during a shift from one steering gear to another. On

hydraulic steering gear, a suitable arrangement of stop valves in the

main piping is an acceptable means of steadying the rudder.

(i) General arrangement plans for the main and auxiliary steering

gear and their piping must be submitted for approval in accordance with

subpart 50.20 of this subchapter.

Sec. 58.25-10 Main and auxiliary steering gear.

(a) Power-operated main and auxiliary steering gear must be

separate systems that are independent throughout their length. Other

systems and arrangements of steering gear will be acceptable if the

Commanding Officer, Marine Safety Center, determines that they comply

with, or exceed the requirements of, this subpart.

(b) The main steering gear and rudder stock must be--

(1) Of adequate strength for and capable of steering the vessel at

[[Page 24778]] maximum ahead service speed, which must be demonstrated

to the satisfaction of the cognizant Officer in Charge, Marine

Inspection;

(2) Capable of moving the rudder from 35 deg. on either side to

35 deg. on the other with the vessel at its deepest loadline draft and

running at maximum ahead service speed, and from 35 deg. on either side

to 30 deg. on the other in not more than 28 seconds under the same

conditions;

(3) Operated by power when necessary to comply with paragraph

(b)(2) of this section or when the diameter of the rudder stock is over

12 centimeters (4.7 inches) in way of the tiller, excluding

strengthening for navigation in ice; and

(4) Designed so that they will not be damaged when operating at

maximum astern speed; however, this requirement need not be proved by

trials at maximum astern speed and maximum rudder angle.

(c) The auxiliary steering gear must be--

(1) Of adequate strength for and capable of steering the vessel at

navigable speed and of being brought speedily into action in an

emergency;

(2) Capable of moving the rudder from 15 deg. on either side to

15 deg. on the other in not more than 60 seconds with the vessel at its

deepest loadline draft and running at one-half maximum ahead service

speed or 7 knots, whichever is greater; and

(3) Operated by power when necessary to comply with paragraph

(c)(2) of this section or when the diameter of the rudder stock is over

23 centimeters (9 inches) in way of the tiller, excluding strengthening

for navigation in ice.

(d) No auxiliary means of steering is required on a double-ended

ferryboat with independent main steering gear fitted at each end of the

vessel.

(e) When the main steering gear includes two or more identical

power units, no auxiliary steering gear need be fitted, if--

(1) In a passenger vessel, the main steering gear is capable of

moving the rudder as required by paragraph (b)(2) of this section while

any one of the power units is not operating;

(2) In a cargo vessel, the main steering gear is capable of moving

the rudder as required by paragraph (b)(2) of this section while all

the power units are operating;

(3) In a vessel with an installation completed on or after

September 1, 1984, and on an international voyage, and in any other

vessel with an installation completed after June 9, 1995, the main

steering gear is arranged so that, after a single failure in its piping

system (if hydraulic), or in one of the power units, the defect can be

isolated so that steering capability can be maintained or speedily

regained in less than ten minutes; or

(4) In a vessel with an installation completed before September 1,

1986, and on an international voyage, with steering gear not complying

with paragraph (e)(3) of this section, the installed steering gear has

a proved record of reliability and is in good repair.

Note.--The place where isolation valves join the piping system,

as by a flange, constitutes a single-failure point. The valve itself

need not constitute a single-failure point if it has a double seal

to prevent substantial loss of fluid under pressure. Means to purge

air that enters the system as a result of the piping failure must be

provided, if necessary, so that steering capability can be

maintained or speedily regained in less than ten minutes.

(f) In each vessel of 70,000 gross tons or over, the main steering

gear must have two or more identical power units complying with

paragraph (e) of this section.

Sec. 58.25-15 Voice communications.

Each vessel must be provided with a sound-powered telephone system,

complying with subpart 113.30 of this chapter, to communicate between

the pilothouse and the steering-gear compartment, unless an alternative

means of communication between them has been approved by the Commanding

Officer, Marine Safety Center.

Sec. 58.25-20 Piping for steering gear.

(a) Pressure piping must comply with subpart 58.30 of this part.

(b) Relief valves must be fitted in any part of a hydraulic system

that can be isolated and in which pressure can be generated from the

power units or from external forces such as wave action. The valves

must be of adequate size, and must be set to limit the maximum pressure

to which the system may be exposed, in accordance with Sec. 56.07-10(b)

of this subchapter.

(c) Each hydraulic system must be provided with--

(1) Arrangements to maintain the cleanliness of the hydraulic

fluid, appropriate to the type and design of the hydraulic system; and

(2) For a vessel on an ocean, coastwise, or Great Lakes voyage, a

fixed storage tank having sufficient capacity to recharge at least one

power actuating system including the reservoir. The storage tank must

be permanently connected by piping so that the hydraulic system can be

readily recharged from within the steering-gear compartment and must be

fitted with a device to indicate liquid level that complies with

Sec. 56.50-90 of this subchapter.

(d) Neither a split flange nor a flareless fitting of the grip or

bite type, addressed by Sec. 56.30-25 of this subchapter, may be used

in hydraulic piping for steering gear.

Sec. 58.25-25 Indicating and alarm systems.

(a) Indication of the rudder angle must be provided both at the

main steering station in the pilothouse and in the steering-gear

compartment. The rudder-angle indicator must be independent of control

systems for steering gear.

(b) Each electric-type rudder-angle indicator must comply with

Sec. 113.40-10 of this chapter and, in accordance with Sec. 112.15-5(h)

of this chapter, draw its power from the source of emergency power.

(c) On each vessel of 1,600 gross tons or over, a steering-failure

alarm must be provided in the pilothouse in accordance with

Secs. 113.43-3 and 113.43-5 of this chapter.

(d) An audible and a visible alarm must activate in the pilothouse

upon--

(1) Failure of the electric power to the control system of any

steering gear;

(2) Failure of that power to the power unit of any steering gear;

or

(3) Occurrence of a low oil level in any oil reservoir of a

hydraulic, power-operated steering-gear system.

(e) An audible and a visible alarm must activate in the machinery

space upon--

(1) Failure of any phase of a three-phase power supply;

(2) Overload of any motor described by Sec. 58.25-55(c); or

(3) Occurrence of a low oil level in any oil reservoir of a

hydraulic, power-operated steering-gear system.

Note.--See Sec. 62.50-30(f) of this subchapter regarding

extension of alarms to the navigating bridge on vessels with

periodically unattended machinery spaces.

(f) Each power motor for the main and auxiliary steering gear must

have a ``motor running'' indicator light in the pilothouse, and in the

machinery space, that activates when the motor is energized.

Sec. 58.25-30 Automatic restart.

Each control system for main and auxiliary steering gear and each

power actuating system must restart automatically when electrical power

is restored after it has failed.

Sec. 58.25-35 Helm arrangements.

(a) The arrangement of each steering station, other than in the

steering-gear [[Page 24779]] compartment, must be such that the

helmsman is abaft the wheel. The rim of the wheel must be plainly

marked with arrows and lettering for right and left rudder, or a

suitable notice indicating these directions must be posted directly in

the helmsman's line of sight.

(b) Each steering wheel must turn clockwise for ``right rudder''

and counterclockwise for ``left rudder.'' When the vessel is running

ahead, after clockwise movement of the wheel the vessel's heading must

change to the right.

(c) If a lever-type control is provided, it must be installed and

marked so that its movement clearly indicates both the direction of the

rudder's movement and, if followup control is also provided, the amount

of the rudder's movement.

(d) Markings in the pilothouse must not interfere with the

helmsman's vision, but must be clearly visible at night.

Note.--See Sec. 113.40-10 of this chapter for the arrangement of

rudder-angle indicators at steering stations.

Sec. 58.25-40 Arrangement of the steering-gear compartment.

(a) The steering-gear compartment must--

(1) Be readily accessible and, as far as practicable, separated

from any machinery space;

(2) Ensure working access to machinery and controls in the

compartment; and

(3) Include handrails and either gratings or other non-slip

surfaces to ensure a safe working environment if hydraulic fluid leaks.

Note.--Where practicable, all steering gear should be located in

the steering-gear compartment.

(b) [Reserved]

Sec. 58.25-45 Buffers.

For each vessel on an ocean, coastwise, or Great Lakes voyage,

steering gear other than hydraulic must be designed with suitable

buffering arrangements to relieve the gear from shocks to the rudder.

Sec. 58.25-50 Rudder stops.

(a) Power-operated steering gear must have arrangements for cutting

off power to the gear before the rudder reaches the stops. These

arrangements must be synchronized with the rudder stock or with the

gear itself rather than be within the control system for the steering

gear, and must work by limit switches that interrupt output of the

control system or by other means acceptable to the Commanding Officer,

Marine Safety Center.

(b) Strong and effective structural rudder stops must be fitted;

except that, where adequate positive stops are provided within the

steering gear, such structural stops need not be fitted.

Sec. 58.25-55 Overcurrent protection for steering-gear systems.

(a) Each feeder circuit for steering must be protected by a circuit

breaker on the switchboard that supplies it and must have an

instantaneous trip set at a current of at least--

(1) 300% and not more than 375% of the rated full-load current of

one steering-gear motor for a direct-current motor; or

(2) 175% and not more than 200% of the locked-rotor current of one

steering-gear motor for an alternating-current motor.

(b) No feeder circuit for steering may have any overcurrent

protection, except that required by paragraph (a) of this section.

(c) Neither a main or an auxiliary steering-gear motor, nor a motor

for a steering-gear control system, may be protected by an overload

protective device. The motor must have a device that activates an

audible and a visible alarm at the main machinery-control station if

there is an overload that would cause overheating of the motor.

(d) No control circuit of a motor controller, steering-gear control

system, or indicating or alarm system may have overcurrent protection

except short-circuit protection that is instantaneous and rated at 400%

to 500% of--

(1) The current-carrying capacity of the conductor; or

(2) The normal load of the system.

(e) The short-circuit protective device for each steering-gear

control system must be in the steering-gear compartment and in the

control circuit immediately following the disconnect switch for the

system.

(f) When, in a vessel of less than 1,600 gross tons, an auxiliary

steering gear, which Sec. 58.25-10(c)(3) requires to be operated by

power, is not operated by electric power or is operated by an electric

motor primarily intended for other service, the main steering gear may

be fed by one circuit from the main switchboard. When such an electric

motor is arranged to operate an auxiliary steering gear, neither

Sec. 58.25-25(e) nor paragraphs (a) through (c) of this section need be

complied with if both the overcurrent protection and compliance with

Secs. 58.25-25(d), 58.25-30, and 58.25-70 (j) and (k) satisfy the

Commanding Officer, Marine Safety Center.

Sec. 58.25-60 Non-duplicated hydraulic rudder actuators.

Non-duplicated hydraulic rudder actuators may be installed in the

steering-gear control systems on each vessel of less than 100,000

deadweight tons. These actuators must meet IMO Assembly Resolution

A.467(XII), Guidelines for Acceptance of Non-Duplicated Rudder

Actuators for Tankers, Chemical Tankers, and Gas Carriers of 10,000

Tons Gross Tonnage and Above But Less Than 100,000 Tonnes Deadweight,

1981, and be acceptable to the Commanding Officer, Marine Safety

Center. Also, the piping for the main gear must comply with Sec. 58.25-

10(e)(3).

Sec. 58.25-65 Feeder circuits.

(a) Each vessel with one or more electric-driven steering-gear

power units must have at least two feeder circuits, which must be

separated as widely as practicable. One or more of these circuits must

be supplied from the vessel's service switchboard. On a vessel where

the rudder stock is over 23 centimeters (9 inches) in diameter in way

of the tiller, excluding strengthening for navigation in ice, and where

a final source of emergency power is required by Sec. 112.05-5(a) of

this chapter, one or more of these circuits must be supplied from the

emergency switchboard, or from an alternative source of power that--

(1) Is available automatically within 45 seconds of loss of power

from the vessel's service switchboard;

(2) Comes from an independent source of power in the steering-gear

compartment;

(3) Is used for no other purpose; and

(4) Has a capacity for one half-hour of continuous operation, to

move the rudder from 15 deg. on either side to 15 deg. on the other in

not more than 60 seconds with the vessel at its deepest loadline draft

and running at one-half maximum ahead service speed or 7 knots,

whichever is greater.

(b) Each vessel that has a steering gear with multiple electric-

driven power units must be arranged so that each power unit is supplied

by a separate feeder.

(c) Each feeder circuit must have a disconnect switch in the

steering-gear compartment.

(d) Each feeder circuit must have a current-carrying capacity of--

(1) 125% of the rated full-load current rating of the electric

steering-gear motor or power unit; and

(2) 100% of the normal current of one steering-gear control system

including all associated motors. [[Page 24780]]

Sec. 58.25-70 Steering-gear control systems.

(a) Each power-driven steering-gear system must be provided with at

least one steering-gear control system.

(b) The main steering gear must be operable from the pilothouse by

mechanical, hydraulic, electrical, or other means acceptable to the

Commanding Officer, Marine Safety Center. This gear and its components

must give full followup control of the rudder. Supplementary steering-

gear control not giving full followup may also be provided from the

pilothouse.

(c) Each steering-gear control system must have in the pilothouse a

switch arranged so that one operation of the switch's lever

automatically supplies power to a complete system and its associated

power unit or units. This switch must be--

(1) Operated by one lever;

(2) Arranged so that not more than one control system and its

associated power unit or units can be energized from the pilothouse at

any one time;

(3) Arranged so that the lever passes through ``off'' during

transfer of control from one control system to another; and

(4) Arranged so that the switches for each control system are in

separate enclosures or are separated by fire-resistant barriers.

(d) Each steering-gear control system must receive its power from--

(1) The feeder circuit supplying power to its steering-gear power

unit or units in the steering-gear compartment; or

(2) A direct connection to the busbars supplying the circuit for

its steering-gear power unit or units from a point on the switchboard

adjacent to that supply.

(e) Each steering-gear control system must have a switch that--

(1) Is in the steering-gear compartment; and

(2) Disconnects the system from its power source and from the

steering gear that the system serves.

(f) Each motor controller for a steering gear must be in the

steering-gear compartment.

(g) A means of starting and stopping each motor for a steering gear

must be in the steering-gear compartment.

(h) When the main steering gear is arranged in accordance with

Sec. 58.25-10(e), two separate and independent systems for full

followup control must be provided in the pilothouse; except that--

(1) The steering wheel or lever need not be duplicated; and

(2) If the system consists of a hydraulic telemotor, no second

separate and independent system need be provided other than on each

tank vessel subject to Sec. 58.25-85.

(i) When only the main steering gear is power-driven, two separate

and independent systems for full followup control must be provided in

the pilothouse; except that the steering wheel or lever need not be

duplicated.

(j) When the auxiliary steering gear is power-driven, a control

system for the auxiliary steering gear must be provided in the

pilothouse that is separate and independent from the control system for

the main steering gear; except that the steering wheel or lever need

not be duplicated.

(k) On a vessel of 500 gross tons or above, each main steering gear

and auxiliary steering gear must be arranged so that its power unit or

units are operable by controls from the steering-gear compartment.

These controls must not be rendered inoperable by failure of the

controls in the pilothouse.

Sec. 58.25-75 Materials.

(a) Materials used for the mechanical or hydraulic transmission of

power to the rudder stock must have an elongation of at least 15% in 5

centimeters (2 inches); otherwise, components used for this purpose

must be shock-tested in accordance with subpart 58.30 of this part.

(b) No materials with low melting-points, including such materials

as aluminum and nonmetallic seals, may be used in control systems for

steering gear or in power actuating systems unless--

(1) The materials are within a compartment having little or no risk

of fire;

(2) Because of redundancy in the system, damage by fire to any

component would not prevent immediate restoration of steering

capability; or

(3) The materials are within a steering-gear power actuating

system.

Sec. 58.25-80 Automatic pilots and ancillary steering gear.

(a) Automatic pilots and ancillary steering gear, and steering-gear

control systems, must be arranged to allow immediate resumption of

manual operation of the steering-gear control system required in the

pilothouse. A switch must be provided, at the primary steering position

in the pilothouse, to completely disconnect the automatic equipment

from the steering-gear controls.

(b) Automatic pilots and ancillary steering gear must be arranged

so that no single failure affects proper operation and independence of

the main or auxiliary steering gear, required controls, rudder-angle

indicators, or steering-failure alarm.

Sec. 58.25-85 Special requirements for tank vessels.

(a) Each tank vessel must meet the applicable requirements of

Secs. 58.25-1 through 58.25-80.

(b) On each tank vessel of 10,000 gross tons or over, the main

steering gear must comprise two or more identical power units that

comply with Sec. 58.25-10(e)(2).

(c) Each tank vessel of 10,000 gross tons or over constructed on or

after September 1, 1984, must comply with the following:

(1) The main steering gear must be arranged so that, in case of

loss of steering capability due to a single failure in any part of the

power actuating system of the main steering gear, excluding seizure of

a rudder actuator or failure of the tiller, quadrant, or components

serving the same purpose, steering capability can be regained not more

than 45 seconds after the loss of one power actuating system.

(2) The main steering gear must include either--

(i) Two separate and independent power actuating systems, complying

with Sec. 58.25-10(b)(2); or

(ii) At least two identical hydraulic-power actuating systems,

which, acting simultaneously in normal operation, must comply with

Sec. 58.25-10(b)(2). (When they must so comply, these systems must be

connected. Loss of hydraulic fluid from one system must be capable of

being detected, and the defective system automatically isolated, so the

other system or systems remain fully operational.)

(3) Steering gear other than hydraulic must meet equivalent

standards to the satisfaction of the Commanding Officer, Marine Safety

Center.

(d) On each tank vessel of 10,000 gross tons or over, but less than

100,000 deadweight tons, the main steering gear need not comply with

paragraph (c) of this section if the rudder actuator or actuators

installed are non-duplicated hydraulic and if--

(1) The actuators comply with Sec. 58.25-60; and

(2) In case of loss of steering capability due to a single failure

either of any part of the piping systems or in one of the power units,

steering capability can be regained in not more than 45 seconds.

(e) On each tank vessel of less than 70,000 deadweight tons,

constructed before, and with a steering-gear installation before,

September 1, 1986, and on an international voyage, the steering gear

not complying with paragraph (c) (1), (2), or (3) of this section, as

applicable, may continue in service if the steering gear has a proved

[[Page 24781]] record of reliability and is in good repair.

(f) Each tank vessel of 10,000 gross tons or over, constructed

before, and with a steering-gear installation before, September 1,

1984, must--

(1) Meet the applicable requirements in Secs. 58.25-15, 58.25-

20(c), 58.25-25 (a), (d), and (e), and 58.25-70 (e), (h), (i), and (j);

(2) Ensure working access to machinery and controls in the

steering-gear compartment (which must include handrails and either

gratings or other non-slip surfaces to ensure a safe working

environment in case hydraulic fluid leaks);

(3) Have two separate and independent steering-gear control

systems, each of which can be operated from the pilothouse; except that

it need not have separate steering wheels or steering levers;

(4) Arrange each system required by paragraph (f)(3) of this

section so that, if the one in operation fails, the other can be

operated from the pilothouse immediately; and

(5) Supply each system required by paragraph (f)(3) of this

section, if electric, with power by a circuit that is--

(i) Used for no other purpose; and either--

(ii) Connected in the steering-gear compartment to the circuit

supplying power to the power unit or units operated by that system; or

(iii) Connected directly to the busbars supplying the circuit for

its steering-gear power unit or units at a point on the switchboard

adjacent to that supply.

(g) Each tank vessel of 40,000 gross tons or over, constructed

before, and with a steering-gear installation before, September 1,

1984, and on an international voyage, must have the steering gear

arranged so that, in case of a single failure of the piping or of one

of the power units, either steering capability equivalent to that

required of the auxiliary steering gear by Sec. 58.25-10(c)(2) can be

maintained or the rudder's movement can be limited so that steering

capability can be speedily regained in less than 10 minutes. This

arrangement must be achieved by--

(1) An independent means of restraining the rudder;

(2) Fast-acting valves that may be manually operated to isolate the

actuator or actuators from the external hydraulic piping, together with

a means of directly refilling the actuators by a fixed, independent,

power-operated pump and piping; or

(3) An arrangement such that, if hydraulic-power actuating systems

are connected, loss of hydraulic fluid from one system must be detected

and the defective system isolated either automatically or from within

the pilothouse so that the other system remains fully operational.

Note.--The term ``piping or * * * one of the power units'' in

paragraph (g) of this section refers to the pressure-containing

components in hydraulic or electro-hydraulic steering gear. It does

not include rudder actuators or hydraulic-control servo piping and

pumps used to stroke the pump or valves of the power unit, unless

their failure would result in failure of the unit or of the piping

to the actuator.

35. Section 58.30-5 is amended by adding paragraph (d) to read as

follows:

Sec. 58.30-5 Design requirements.

* * * * *

(d) Each pneumatic system must minimize the entry of oil into the

system and must drain the system of liquids.

PART 61--PERIODIC TESTS AND INSPECTIONS

36. The authority citation for part 61 is revised to read as

follows:

Authority: 43 U.S.C. 1333; 46 U.S.C. 2103, 3306, 3703; E.O.

12234, 45 FR 58801, 3 CFR, 1980 Comp., p. 277; 49 CFR 1.46.

37. Section 61.05-10 is amended by revising paragraphs (a) and (b),

removing current Table 61.05-10, and adding new Table 61.05-10 after

current paragraph (g) to read as follows:

Sec. 61.05-10 Boilers in service.

(a) Each boiler, including superheater, reheater, economizer,

auxiliary boiler, low-pressure heating boiler, and unfired steam

boiler, must be available for examination by the marine inspector at

intervals specified by Table 61.05-10, and more often if necessary, to

determine that the complete unit is in a safe and satisfactory

condition. When a hydrostatic test is required, the marine inspector

may examine all accessible parts of the boiler while it is under

pressure.

(b) The owner, master, or person in charge of the vessel shall give

ample notice to the cognizant Officer in Charge, Marine Inspection, so

that a marine inspector may witness the tests and make the required

inspections.

* * * * *

Table 61.05-10.--Inspection Intervals for Boilers123

----------------------------------------------------------------------------------------------------------------

Firetube Any

boiler 150 boiler boiler for boiler 2 for use aboard a vessel as a fire-

extinguishing agent shall be subjected to a hydrostatic test of 1\1/2\

times the maximum allowable working pressure in the tenth year of the

installation and at ten-year intervals thereafter. After the test, the

tank should be drained and an internal examination made. Parts of the

jacket and lagging on the underside of the tank designated by the

marine inspector must be removed at the time of the test so the marine

inspector may determine the external condition of the tank.

* * * * *

41. Section 61.15-5 is amended by revising paragraph (b) to read as

follows:

Sec. 61.15-5 Steam piping.

* * * * *

(b) All steam piping subject to pressure from the main boiler

should be subjected to a hydrostatic test at a pressure of 1\1/4\ times

the maximum allowable working pressure of the boiler after every five

years of service except as otherwise provided for in paragraph (a) of

this section. Unless the covering of the piping is removed, the test

pressure must be maintained on the piping for ten minutes. If any

evidence of moisture or leakage is detected, the covering should be

removed and the piping thoroughly examined. No piping with a nominal

size of 3 inches or less need be hydrostatically tested.

* * * * *

PART 111--ELECTRIC SYSTEMS--GENERAL REQUIREMENTS

42. The authority citation for part 111 is revised to read as

follows:

Authority: 46 U.S.C. 2103, 3306, 3703; 49 CFR 1.46.

43. Subpart 111.93 (consisting of Secs. 111.93-1, 111.93-3, 111.93-

5, 111.93-7, 111.93-9, 111.93-11, and 111.93-13) is removed.

Secs. 111.93-1, 111.93-3, 111.93-5, 111.93-7, 111.93-9, 111.93-11, and

111.93-13 (Subpart 111.93) [Removed]

Dated: April 13, 1995.

G.N. Naccara,

Acting Chief, Office of Marine Safety, Security and Environmental

Protectoin.

[FR Doc. 95-10921 Filed 5-9-95; 8:45 am]

BILLING CODE 4910-14-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

Incorporation of Amendments to the International Convention for Safety of Life at Sea, 1974 · 60 FR 24767 | Frix