NUCLEAR REGULATORY COMMISSION
10 CFR Part 32
[Docket No. PRM-32-3]
Advanced Medical Systems, Inc; Denial of Petition for Rulemaking
AGENCY: Nuclear Regulatory Commission.
ACTION: Denial of petition for rulemaking.
-----------------------------------------------------------------------
SUMMARY: The Nuclear Regulatory Commission (NRC) is denying a petition
for rulemaking (PRM-32-3) from Advanced Medical Systems, Inc. The
petitioner requested that the NRC amend its regulations because it
believed that the requirements of part 32, which are applicable to
original manufacturers and suppliers, were not equally applicable to
manufacturers and suppliers of replacement parts. The petition is being
denied because current regulations apply equally to manufacturers and
suppliers of both original and replacement parts, ensuring the
integrity of these parts; therefore, no additional requirements
addressing the regulation of manufacturers and suppliers of replacement
parts are necessary. Further, current regulations address service and
maintenance of sources and devices possessed and used under an NRC
license, including replacement parts, whether manufactured or supplied
by the original manufacturer or supplier or some other manufacturer or
supplier. Therefore the amendments suggested by the petitioner are not
necessary.
ADDRESSES: Copies of the petition for rulemaking, the public comments
received, and the NRC's letter to the petitioner are available for
public inspection or copying in the NRC Public Document Room, 2120 L
Street NW., (Lower Level), Washington, DC.
FOR FURTHER INFORMATION CONTACT:
Naiem S. Tanious, Office of Nuclear Regulatory Research, U.S. Nuclear
Regulatory Commission, Washington, DC 20555, telephone (301) 492-3878.
SUPPLEMENTARY INFORMATION:
The Petition
In a letter dated June 28, 1991, Advanced Medical Systems, Inc.
(AMS) filed a petition for rulemaking with the NRC. The petition was
docketed by the Commission on July 19, 1991, and was assigned Docket
No. PRM-32-3. The petitioner requested that the NRC amend its
regulations because it believed that the requirements of part 32, which
are applicable to original manufacturers and suppliers, were not
equally applicable to manufacturers and suppliers of replacement parts.
The petitioner has suggested two alternatives for accomplishing this
objective. The first alternative is to insert the necessary language
regarding manufacturers and suppliers of replacement parts into each
appropriate section of part 32. The second alternative would revise the
purpose and scope provisions of Sec. 32.1 to include manufacturers and
suppliers of replacement parts.
Basis for Petitioner's Request
The petitioner identified itself as an original teletherapy
equipment manufacturer. As such, it has a definite and direct interest
in the health and safety of the public who may use or be treated by
equipment it manufactures.
According to the petitioner, it appears that the requirements of
part 32 are being interpreted as applying only to manufacturers and
suppliers of original equipment and not to manufacturers and suppliers
of replacement parts, devices, products, or sources designated for
units originally manufactured or transferred by others. In the
petitioner's view, lack of specific requirements applicable to
manufacturers and suppliers of replacement parts, devices, products, or
sources, can lead to use of inferior quality replacement parts which in
turn can cause malfunction or failure of devices, in particular
teletherapy equipment, and thereby risk of overexposure. Advanced
Medical Systems cited two incidents as examples of this problem: Access
No. M49250, Anderson Memorial Hospital, Anderson, South Carolina; and
Access No. M49324, St. Mary's Medical Center, Saginaw, Michigan.
Public Comments on the Petition
A notice of receipt of the petition for rulemaking was published in
the Federal Register on October 10, 1991 (56 FR 51182). Interested
persons were invited to submit written comments concerning the
petition. The comment period closed December 9, 1991. The NRC received
comments from the State of Illinois, Department of Nuclear Safety, and
the Department of the Air Force, Headquarters Air Force Office of
Medical Support.
The State of Illinois, Department of Nuclear Safety, stated that
the Department fully supports development of the rule proposed in the
petition. The Department further stated that the integrity of NRC
evaluated devices (NRC or an Agreement State evaluate for safety any
devices containing radioactive materials) may be compromised
significantly if nonstandard replacement parts are used during the life
of the device. While the Department agreed that the issue of
replacement components needs to be addressed, it was concerned with the
use of the term ``replacement sources and devices'' in the wording of
Secs. 32.74, 32.110 and 32.210 as suggested by the petitioner. The
Department believed that all sources and devices must be evaluated by
the NRC or an Agreement State, whether or not they are considered
``original'' or ``replacement'' equipment. Therefore, the Department
did not believe it is necessary to distinguish between original or
replacement sources or devices. The Department was in favor of the
petitioner's suggested alternative to modify Sec. 32.1, Purpose and
Scope.
The Headquarters Air Force Office of Medical Support, Department of
the Air Force, opposed the rule language proposed by the petitioner, as
written, although it agreed with the petitioner's intent to ensure that
the safety and effectiveness of devices not be compromised because
original parts are replaced by inferior ones. They did not agree that
all replacement parts should be subject to the requirements of 10 CFR
part 32. They stated that NRC review and approval should apply to
replacements of parts or components that are essential to the proper
and safe operations of a device. The Air Force gave examples of parts
(such as panel screws and covers) that conform to industry standards.
These, the Air Force stated, should not be subject to the proposed
requirements. The Air Force voiced concern that the petition, as
written, may serve to restrict competition and would lead to greater
expense which would have to be recouped through higher medical costs
from patients, or, in the case of the Air Force, from taxpayers.
NRC Action on the Petition
The NRC reviewed the petition, the public comments, and the two
cases (incidents) cited by the petitioner as supporting evidence for
filing this petition. The NRC also reviewed its regulations pertinent
to the petition.
Shortly after the NRC received correspondence\1\ from AMS about the
two cases, the NRC advised\2\ AMS of its intention to investigate these
incidents, especially with regard to the quality of service and
replacement parts used in servicing the teletherapy units. From October
to December 1989, the NRC conducted a thorough investigation which
included three onsite inspections: Atom Mechanical Company, Cleveland,
Ohio (The servicing company that conducted the maintenance and
replacement of parts in the two cases), St. Mary's Medical Center,
Saginaw, Michigan, and Picker International, Highland Heights, Ohio
(The company that manufactured the teletherapy units at Anderson
Memorial Hospital and at St. Mary's Medical Center). The NRC also
referred the case of Anderson Memorial to the State of Maryland,
because the company that serviced the teletherapy unit there, Atom
Mechanical Company, is an authorized user on the Neutron Products, Inc.
license, and Neutron Products is located in the State of Maryland, an
Agreement State.
---------------------------------------------------------------------------
\1\Three letters dated June 20, August 8, and August 25, 1989,
to Hugh L. Thompson, Jr., Deputy Executive for Nuclear Materials
Safety and Safeguards & Operations Support, NRC, from Sherry Stein,
Director, Regulatory Affairs, Advanced Medical Systems, Inc.
\2\By a letter dated September 15, 1989 from Robert M. Bernero,
Director, Office of Nuclear Material Safety and Safeguards, NRC, to
Sherry Stein, Director, Regulatory Affairs, Advanced Medical
Systems, Inc.
---------------------------------------------------------------------------
The incident at Anderson Memorial Hospital was caused by a broken
spring in a teletherapy unit which failed to retract the source into
the OFF position following a cobalt-60 cancer treatment. The hospital
technologist promptly retracted the source manually. According to the
hospital report, the technologist received very little additional
exposure over expected monthly exposure, as evidenced by the
individual's radiation film badge reading. Moreover, according to the
same report the delivered daily dose to the patient was less than the
prescribed daily dose, i.e., no patient overexposure for that
treatment, because the technologist acted promptly. In its
communication with NRC (prior to filing the petition), AMS stated that
it was concerned about the quality of the replacement springs used in
the teletherapy machine.
The incident at St. Mary's Medical Center was caused by the failure
of a microswitch. The failure of the switch prevented a timing device
from operating properly, to automatically terminate the treatment. No
misadministration occurred because the subsequent treatment times were
adjusted and the total delivered dose did not differ from the total
prescribed dose. Neutron Products, Inc. was called to repair the
machine.
The NRC investigation and subsequent inspections revealed several
violations. Enforcement action was taken by the NRC against Atom
Mechanical for violation of part 21 requirements, and against St.
Mary's Hospital and Picker International for violations of part 35 and
part 30 requirements, respectively.3 Moreover, the State of
Maryland determined from its own investigation that the incident at
Anderson Memorial Hospital resulted from a failure of the part, i.e.,
breakage of the return spring. No enforcement action was taken by the
State of Maryland.
---------------------------------------------------------------------------
\3\Specifically, Atom Mechanical Company was found to be in
violation of 10 CFR 21.21 (October 16, 1989), St. Mary Medical
Center was found to be in violation of 10 CFR 35.59(g), 10 CFR
35.605, 10 CFR 35.630(a), 10 CFR 35.615(d)(4), 10 CFR 35.632(a), and
10 CFR 35.634(a) (October 17 and 26, 1989), and Picker
International, Inc. was found to be in violation of 10 CFR 30.3
(subsequent to inspections that occurred on October 26 and November
9, 1989). Inspection reports are available for review in the NRC
Public document room.
---------------------------------------------------------------------------
Under current NRC regulations, persons authorized under a specific
license to use devices containing byproduct material (e.g., use of
teletherapy equipment under a part 35 specific license) ultimately are
responsible for the safe use of these devices, and for assuring that
such devices are properly maintained. Suppliers of sources or devices
containing byproduct material, whether they are an original
manufacturer or a manufacturer of replacement sources or devices, must
be licensed under parts 30 or 32 or an appropriate Agreement State
license, and also have responsibility for the safety of the sources or
devices that they supply or replace. Service or repair, which would
include the replacement of parts or components of medical or industrial
sources or devices that present a risk of radiation exposure from the
failure of certain parts, such as the teletherapy devices discussed as
examples in this petition, may be performed only by qualified persons
authorized under an NRC or Agreement State license (cf. Secs. 35.605,
and 39.43(e)). Some generally licensed devices may be serviced by
general licensees who are authorized to perform limited service work if
sufficient information about the service work (e.g., procedures,
training, expected dose, etc.) is submitted by manufacturer or initial
distributor and accepted by the NRC. However, these devices typically
are not mechanically complex and do not present the same risk of
significant radiation exposure. Moreover, the NRC has no record of
failure of these devices leading to a radiation exposure attributable
to defective replacement parts or improper servicing. Finally, under
the provisions of part 21, the supplier of any basic component,4
whether or not a licensee of NRC or an Agreement State, is also
responsible for the quality of the component, whether it is original or
replacement.
---------------------------------------------------------------------------
\4\A ``basic component'' is defined in part 21 as one, ``* * *
in which a defect could create a substantial safety hazard.''
---------------------------------------------------------------------------
Reasons for Denial
The NRC has examined the petition (1) in light of its regulations
and policies for both general and specific licensees, and (2) in view
of the cases cited by the petitioner in support of the petition. The
NRC is denying the petition because current regulations apply equally
to manufacturers and suppliers of both original and replacement parts,
ensuring the integrity of these parts; therefore, no additional
requirements addressing the regulation of manufacturers and suppliers
of replacement parts are necessary. Further, current regulations
address service and maintenance of sources and devices possessed and
used under an NRC license, including replacement parts, whether
manufactured or supplied by the original manufacturer or supplier or
some other manufacturer or supplier.
Accordingly, the petition for rulemaking is denied.
Dated at Rockville, Maryland this 28th day of March, 1994.
For the Nuclear Regulatory Commission.
James M. Taylor,
Executive Director for Operations.