DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. ER93-712-000, et al.]

PSI Energy, Inc., et al.; Electric Rate and Corporate Regulation

Filings

January 5, 1994.

Take notice that the following filings have been made with the

Commission:

1. PSI Energy, Inc.

[Docket No. ER93-712-000]

Take notice that PSI Energy, Inc. (PSI) and the City of Logansport,

Indiana on December 17, 1993, tendered for filing additional supporting

information to the FERC Filing in Docket No. ER93-712-000 to comply

with a FERC staff request.

Copies of the filing were served on the City of Logansport Indiana

and the Indiana Utility Regulatory Commission.

Comment date: January 20, 1994, in accordance with Standard

Paragraph E at the end of this notice.

2. Madison Gas Electric Co.

[Docket No. ER94-66-000]

Take notice that on December 17, 1994, Madison Gas and Electric

Company (MGE) tendered for filing with the Federal Energy Regulatory

Commission revised pages from the Interchange Agreements it and

Heartland Energy Services, Inc. (HES). The revision caps the price of

the daily rate for Negotiated Capacity and General Purpose Energy at

the rate for weekly service. MGE and HES respectfully request an

effective date of December 31, 1993.

MGE states that a copy of the filing has been provided to HES and

the Public Service Commission of Wisconsin.

Comment date: January 20, 1994, in accordance with Standard

Paragraph E at the end of this notice.

3. Florida Power Corp.

[Docket No. ER94-275-000]

Take notice that on December 16, 1993, Florida Power Corporation

(Florida Power) requested the Commission to disclaim jurisdiction over

agreements under which Florida Power rents distribution facilities to

the City of Mount Dora, Florida, and Reedy Creek Utilities Company,

respectively, or, if the Commission asserts jurisdiction, to accept the

agreements for filing to become effective September 1, 1988 and June 5,

1978, respectively.

Comment date: January 20, 1994, in accordance with Standard

Paragraph E at the end of this notice.

4. Arizona Public Service Co.

[Docket No. ER94-276-000]

Take notice that on December 16, 1993, Arizona Public Service

Company (APS) tendered for filing the Interconnection Agreement

(Agreement) between The United States of America on Behalf of The

Colorado River Indian Irrigation Project (CRIP) and APS and Service

Schedules A and B to the Agreement.

The Agreement provides a means by which the Parties will develop

and operate their respective electric systems in a coordinated manner.

The Service Schedules allow for various reciprocal transmission related

services.

Copies of this filing have been served upon CRIP and the Arizona

Corporation Commission.

Comment date: January 20, 1994, in accordance with Standard

Paragraph E at the end of this notice.

5. PacifiCorp

[Docket No. ER94-283-000]

Take notice that PacifiCorp, on December 17, 1993, tendered for

filing in accordance with the Commission's Order pertaining to

agreements involving final amnesty for jurisdictional service and

waiver of notice, issued July 30, 1993 under Docket No. PL93-2-002,

(Final Order) the Western Systems Coordinating Council (WSCC)

Agreement, as amended, dated August 4, 1967 and the Western Systems

Coordinating Council Agreement, dated November 18, 1993.

Copies of this filing were supplied to all parties to the WSCC

Agreement, the Public Utility Commission of Oregon and the Utah Public

Service Commission.

PacifiCorp requests that the Commission disclaim jurisdiction of

the WSCC Agreements or if the Commission does assert jurisdiction

PacifiCorp requests in accordance with the Final Order and 18 CFR 35.11

of the Commission's Rules and Regulations and that a waiver of prior

notice requirements be granted.

Comment date: January 20, 1994, in accordance with Standard

Paragraph E at the end of this notice.

6. Wisconsin Public Service Corp.

[Docket No. ER94-284-000]

Take notice that on December 17, 1993, Wisconsin Public Service

Corporation (WPSC) tendered for filing an executed Transmission Service

Agreement between WPS and Heartland Energy Services Inc. The Agreement

provides for transmission service under the T-1 Transmission Tariff,

FERC Original Volume No. 4.

WPS asks that the agreement become effective January 1, 1994.

Comment date: January 20, 1994, in accordance with Standard

Paragraph E at the end of this notice.

7. New England Power Co.

[Docket No. ER94-286-000]

Take notice that on December 20, 1993, New England Power Company

(NEP) submitted for filing executed Amendments to its Service

Agreements with Granite State Electric Company, New Hampshire Electric

Cooperative, and the Town of Littleton, New Hampshire (hereinafter

Customers) under NEP's FERC Electric Tariff, Original Volume No. 1.

NEP states that the proposed Amendments provide a monthly credit to

its New Hampshire Customers based on a portion of the savings received

by NEP through the issuance of tax-exempt financing authorized by the

State of New Hampshire.

NEP requests waiver of the Commission's notice requirements so that

the Amendments may become effective on January 1, 1994.

Comment date: January 20, 1994, in accordance with Standard

Paragraph E at the end of this notice.

8. Green Mountain Power Corp.

[Docket No. ER94-287-000]

Take notice that on December 20, 1993, Green Mountain Power

Corporation (GMP) tendered for filing a Service Agreement and

Certificate of Concurrence for Montaup Electric Company under FERC

Electric Tariff No. 2, known as GMP's Opportunity Transaction Tariff

(Tariff). The Service Agreement is intended to supersede the unexecuted

Service Agreement for Eastern Utilities Associates. The Service

Agreement and Certificate of Concurrence will allow Montaup to enter

into transactions, including exchange unit transactions, in accordance

with the Tariff. No terms or conditions of the Tariff are affected by

the form of Service Agreement.

Comment date: January 20, 1994, in accordance with Standard

Paragraph E at the end of this notice.

9. Midwest Power Systems Inc.

[Docket No. ER94-288-000]

Take notice that on December 20, 1993, Midwest Power Systems Inc.

(MPSI) tendered for filing a ``Construction and Financing Agreement''

(Financing Agreement) dated March 5, 1990, and a ``First Amendment to

Financing Agreement'' (Amendment) dated December 10, 1992, between

Associated Electric Cooperative, Inc. (AEC) and Iowa Power Inc., n/k/a

MPSI. The Financing Agreement and the Amendment provide for the

financing of MPSI's portion of certain MINT Line project facilities by

AEC. MPSI received no financial gain from the Financing Agreement and

the Amendment.

On July 30, 1993, the Commission issued its ``Final Order'' in

Docket No. PL93-2-002, ``Prior Notice and Filing Requirement'',

clarifying that agreements for joint ownership of transmission

facilities must be filed. The Final Order also established an amnesty

period during which such filings can be brought up to date. This filing

falls within the provisions of the amnesty period.

MPSI requests a waiver of the Commission's rules so that the

Financing Agreement may be approved retroactive to March 5, 1990, and

the Amendment may be approved retroactive to October 1, 1992.

MPSI states that copies of this filing were served on Associated

Electric and the Iowa Utilities Board.

Comment date: January 20, 1994, in accordance with Standard

Paragraph E at the end of this notice.

10. Midwest Power Systems Inc.

[Docket No. ER94-289-000]

Take notice that on December 20, 1993, Midwest Power Systems, Inc.

(MPSI) tendered for filing a Peaking Capacity Sales Agreement

(Agreement) dated June 6, 1991, between Corn Belt Power Cooperative

(Corn Belt) and Iowa Public Service Company, n/k/a MPSI. This

Agreement's principle purpose is to establish terms for MPSI to

purchase capacity and energy from Corn Belt from June 1, 1994, through

September 30, 2000. Paragraph 12 of the Agreement allows for MPSI to

sell capacity and energy to Corn Belt, at Corn Belt's sole option, in

the months of October and November of each respective year.

On July 30, 1993, the Commission issued its ``Final Order'' in

Docket No. PL93-2-002, ``Prior Notice and Filing Requirements'',

clarifying that agreements for ``the sale of electric power and energy

to any person'' must be filed. The Final Order also established an

amnesty period during which such filings can be brought up to date.

This filing falls within the provisions of the amnesty period.

MPSI requests that the Peaking Capacity Sales Agreement be approved

effective June 1, 1994.

MPSI states that copies of this filing were served on Corn Belt and

the Iowa Utilities Board.

Comment date: January 20, 1994, in accordance with Standard

Paragraph E at the end of this notice.

11. Midwest Power Systems Inc.

[Docket No. ER94-290-000]

Take notice that on December 20, 1993, Midwest Power Systems Inc.

(MPSI) tendered for filing a Transmission Line Terminal Facilities

Agreement (Facilities Agreement) dated March 5, 1990, between Nebraska

Public Power District (NPPD); Omaha Public Power District (OPPD), City

of Lincoln, Nebraska (Lincoln); and Iowa Power Inc., n/k/a MPSI. The

primary purpose of the Facilities Agreement is to provide for the

construction, finance, maintenance, and ownership responsibilities of

the Cooper Terminal Facilities. MPSI, OPPD, and Lincoln shall make

payments to NPPD for the right to use the Cooper Substation, including

the Cooper Terminal Facilities, for the purpose of scheduling power and

energy transactions pursuant to the MINT Line Coordinating Agreement.

On July 30, 1993, the Commission issued its ``Final Order'' in

Docket No. PL93-2-002, ``Prior Notice and Filing Requirements'',

clarifying that agreements for the joint ownership of transmission

facilities must be filed. The Final Order also established an amnesty

period during which such filings can be brought up to date. This filing

falls within the provisions of the amnesty period.

MPSI respectfully requests a waiver of the Commission's rules so

that the Transmission Line Facilities Agreement may be approved

retroactive to March 5, 1990.

MPSI states that copies of this filing were served on NPPD, OPPD,

and Lincoln and the Iowa Utilities Board.

Comment date: January 20, 1994, in accordance with Standard

Paragraph E at the end of this notice.

12. Northeast Utilities Service Co.

[Docket No. ER94-291-000]

Take notice that on December 20, 1993, Northeast Utilities Service

Company (NUSCO) tendered for filing a Service Agreement to provide non-

firm transmission service to Massachusetts Municipal Wholesale Electric

Company (MMWEC) under the NU System Companies' Transmission Service

Tariff No. 2. NUSCO states that a copy of this information has been

mailed to MMWEC.

Comment date: January 20, 1994, in accordance with Standard

Paragraph E at the end of this notice.

13. PacifiCorp

[Docket No. ER94-292-000]

Take notice that PacifiCorp, on December 20, 1993, tendered for

filing in accordance with Commission's Order pertaining to agreements

involving final amnesty for jurisdictional service and waiver of

notice, issued July 30, 1993 under Docket No. PL93-2-002, agreements

which contain provisions involving a return of energy losses associated

with the purchase of Formula Power Transmission service from the

Bonneville Power Administration (Bonneville).

Copies of this filing were supplied to Bonneville, the Public

Utility Commission of Oregon and the Utah Public Service Commission.

PacifiCorp requests in accordance with 18 CFR 35.11 of the Commission's

Rules and Regulations and that a waiver of prior notice requirements be

granted and that the filed agreements be accepted for filing effective

as indicated for each of the agreements.

Comment date: January 20, 1994, in accordance with Standard

Paragraph E at the end of this notice.

14. PacifiCorp

[Docket No. ER94-293-000]

Take notice that PacifiCorp, on December 20, 1993, tendered for

filing a Draft Harrison Interconnection and Transmission Facilities

Conveyance Agreements between PacifiCorp and Portland General Electric

Company (Portland General), dated September 9, 1993 which provide for

an interconnection between PacifiCorp's and Portland's systems at

PacifiCorp's Harrison Substation.

PacifiCorp requests that a waiver of prior notice be granted

pursuant to the Commission's Final Order in Docket No. PL93-2-002 and

that an effective date of October 31, 1990 be assigned to the filed

agreement.

Copies of this filing were supplied to Portland and the Public

Utility Commission of Oregon.

Comment date: January 20, 1994, in accordance with Standard

Paragraph E at the end of this notice.

15. PacifiCorp

[Docket No. ER94-294-000]

Take notice that on December 20, 1993, PacifiCorp tendered for

filing, Amendment No. 2 to Contract No. 14-06-100-1152, Contract

Between The United States of America and PacifiCorp For Use of

Facilities For The Transmission of Electrical Power and Energy whereby

PacifiCorp provides transfers to the Bureau of Reclamation (BuRec)

Burbank Pumping Plants No. 2 and No. 3.

PacifiCorp requests a waiver of the Commission's prior notice

requirements.

Copies of this filing have been supplied to BuRec, the South

Columbia Basin Irrigation District, the Washington Utilities and

Transportation Commission, the Public Utility Commission of Oregon and

the Utah Public Service Commission.

Comment date: January 20, 1994, in accordance with Standard

Paragraph E at the end of this notice.

16. PacifiCorp

[Docket No. ER94-295-000]

Take notice that PacifiCorp on December 20, 1993, tendered for

filing a Letter Agreement between PacifiCorp and the City of Idaho

Falls, Idaho (Idaho Falls), dated January 16, 1989 for reciprocal

emergency backup electrical service.

PacifiCorp requests a waiver of prior notice be granted and that an

effective date of February 28, 1989 be assigned to the Letter

Agreement. This date is the date Idaho Falls executed the Letter

Agreement.

Copies of this filing were supplied to Idaho Falls and the

Bonneville Power Administration.

Comment date: January 20, 1994, in accordance with Standard

Paragraph E at the end of this notice.

17. Wisconsin Power and Light Co.

[Docket No. ER94-296-000]

Take notice that on December 17, 1993, Wisconsin Power and Light

Company tendered for filing with the Federal Energy Regulatory

Commission four Letter Agreements between Wisconsin Power and Light

Company (WP&L) and Manitowoc Public Utilities (MPU). Under the

Negotiated Capacity Agreement, WP&L will make capacity and associated

energy available to MPU and negotiated degrees of firmness, variable

capacity charges, and variable time duration. Under the General Purpose

Energy Agreement, WP&L will make non-firm energy available to MPU, with

terms and quantities to be arranged by mutual agreement. Under the

Emergency Energy Agreement, WP&L will make non-firm emergency energy

available to MPU in quantities that, in WP&L's sole judgement, it can

supply. Under the Negotiated Capacity Sub-Agreement, WP&L will supply

MPU with 10 MW of firm power and energy from June 1, 1994 through May

31, 1995.

Wisconsin Power and Light respectfully requests an effective date

sixty (60) days from the date of filing.

A copy of the filing has been served on the Public Service

Commission of Wisconsin.

Comment date: January 20, 1994, in accordance with Standard

Paragraph E at the end of this notice.

18. Commonwealth Edison Co.

[Docket No. ER94-297-000]

Take notice that on December 20, 1993, Commonwealth Edison Company

(Edison) submitted a Service Agreement, dated November 16, 1993,

establishing PSI Energy, Inc. (PSI) as a customer under the terms of

Edison's Power Sales Tariff PS-1 (PS-1 Tariff). The Commission has

previously designated the PS-1 Tariff as FERC Electric Tariff, Original

Volume No. 2.

Edison requests an effective date of December 1, 1993, and

accordingly seeks waiver of the Commission's notice requirements.

Copies of this filing were served upon PSI and the Illinois Commerce

Commission.

Comment date: January 20, 1994, in accordance with Standard

Paragraph E at the end of this notice.

19. Jersey Central Power & Light Co., et al.

[Docket No. ER94-298-000]

Take notice that on December 20, 1993, Jersey Central Power & Light

Company, Metropolitan Edison Company, Pennsylvania Electric Company and

GPU Nuclear Corporation, (the GPU Companies) tendered for filing rate

schedules relating to the provision of operating and maintenance

services for five generating stations located in New Jersey and

Pennsylvania, namely, the Yards Creek and Kinzua (Seneca) pumped

storage hydroelectric stations, the Homer City coal-fired generating

station, and the Three Mile Island Oyster Creek nuclear generating

stations. The subject rate schedules were filed in response to the

Orders of the Federal Energy Regulatory Commission issued July 30, 1993

and October 19, 1993.

Copies of the filing have been furnished to the Pennsylvania Public

Utility Commission of New Jersey Board of Regulatory Commissioners.

Comment date: January 20, 1994, in accordance with Standard

Paragraph E at the end of this notice.

20. Jersey Central Power & Light Co.

[Docket No. ER94-299-000]

Take notice that on December 20, 1993, in response to the Orders of

the Commission, dated July 30, 1993 and October 19, 1993, relating to

the Prior Notice and Filing Requirements of the Federal Power Act in

FERC Docket No. PL93-2, Jersey Central Power & Light Company (JCP&L)

tendered for filing a proposed rate schedule supplement showing JCP&L's

charges to Atlantic City Electric Company (ACE) to defray JCP&L's cost

of operation and maintenance of certain interconnection facilities

during the years 1982-1993 and proposed for 1994 relating to JCP&L's

Interconnection Agreement with Atlantic City Electric Company (ACE)

dated as of March 1, 1978.

Copies of the filing have been furnished to the New Jersey Board of

Regulatory Commissioners.

Comment date: January 20, 1994, in accordance with Standard

Paragraph E at the end of this notice.

21. Central Vermont Public Service Corp.

[Docket No. ER94-300-000]

Take notice that Central Vermont Public Service Corporation (CVPS)

on December 20, 1993, tendered for filing Borderline Agreement between

New York State Electric & Gas Corporation and CVPS.

CVPS requests the Commission to waive its notice of filing

requirements to permit the original contracts to become effective

according to their respective terms.

Comment date: January 20, 1994, in accordance with Standard

Paragraph E at the end of this notice.

22. Central Hudson Gas & Electric Corp.

[Docket No. ER94-302-000]

Take notice that on December 20, 1993, Central Hudson Gas and

Electric Corporation (CHG&E) tendered for filing an amendment to FERC

Docket No. ER85-648-000 dated May 4, 1990 between CHG&E and New York

Power Authority (NYPA). The amended agreement expands the firm

transmission service provided by CHG&E for NYPA to include service on

behalf of Economic Development Customers located in Orange & Rockland

Utilities, Inc. service territory. In addition, the point of delivery

of NYPA power and energy to CHG&E will be changed to CHG&E's Rock

Tavern substation.

All other provisions of Docket ER85-648-000 shall remain in effect.

CHG&E states that copies of the subject filing were served upon NYPA.

Comment date: January 20, 1994, in accordance with Standard

Paragraph E at the end of this notice.

23. Central Hudson Gas & Electric Corp.

[Docket No. ER94-303-000]

Take notice that on December 20, 1993, Central Hudson Gas &

Electric Corporation (CHG&E) tendered for filing an amendment to FERC

Contract No. 73 dated March 11, 1991 between CHG&E and Orange &

Rockland Utilities, Inc. (O&R). The amended contract expands the

transmission wheeling service provided by CHG&E to O&R to include the

purchase of capacity and energy from the various sources of the New

York Power Authority.

All other provisions including the rate that will be charged, of

the existing contract remain in effect. CHG&E states that copies of the

subject filing were served upon O&R.

Comment date: January 20, 1994, in accordance with Standard

Paragraph E at the end of this notice.

24. Central Hudson Gas & Electric Corp.

[Docket No. ER94-304-000]

Take notice that on December 20, 1993, Central Hudson Gas &

Electric Corporation (CHG&E) tendered for filing an amendment to FERC

Contract No. 26 dated August 26, 1993 between CHG&E and New York State

Electric and Gas Corporation (NYSEG). The amended contract provides for

an increase in the facilities charge associated with investment at the

Smithfield Substation due to the replacement of a motor-operated

manually controlled air break switch with a supervisory controlled

circuit breaker.

The facilities charge increases from $57.00 per month to $2,415.00

per month and is retroactive to August 16, 1991 the date on which the

circuit breaker was placed in service.

All other provisions of FERC Contract No. 26 shall remain in

effect. CHG&E states that copies of the subject filing were served upon

NYSEG.

Comment date: January 20, 1994, in accordance with Standard

Paragraph E at the end of this notice.

25. Nevada Power Co.

[Docket No. ER94-305-000]

Take notice that on December 20, 1993, Nevada Power Company (NPC),

tendered for filing the Participation Agreement Reid Gardner Unit 4

(Agreement) between NPC and the California Department of Water

Resources (CDWR) and subsequent changes to the transmission rate

included in this Agreement. This Agreement provides for the Terms and

Conditions for participation in the operation of the Reid Gardner Unit

4, a coal-fired steam generation unit of approximately 250 MW located

at NPC's Reid Gardner generating station site in Clark County, Nevada.

Pursuant to 18 CFR 35.11, NPC requests waiver of the Commission's

notice requirements, 18 CFR 35.3, to allow for an effective date of May

10, 1983. Additionally, pursuant to the Commission's findings in FERC

docket No. PL93-2-002, NPC requests that all amnesty provisions be

allowed.

Copies of this filing were served on CDWR and the Nevada Public

Service Commission.

Comment date: January 20, 1994, in accordance with Standard

Paragraph E at the end of this notice.

26. Keystone Energy Service Co.

[Docket No. ER94-306-000]

Take notice that on December 20, 1993, Keystone Energy Service

Company, L.P. (Keystone) tendered for filing, pursuant to Section 205

of the Federal Power Act and Rule 207 of the Rules of Practice and

Procedure of the Federal Energy Regulatory Commission (the

``Commission'') a ``Petition for Acceptance of Initial Rate Schedule

and Waiver of Certain Commission Regulations'' and an Initial Rate

Schedule requesting the Commission approve, on a market basis, an

Agreement for the Purchase of Electric Power between Keystone and

Atlantic City Electric Company (ACE), as amended for the sale of

capacity and associated from Keystone's cogeneration facility located

in Logan Township, New Jersey. Keystone has requested a waiver of the

notice requirements to permit filing of the Initial Rate Schedule more

than 120 days prior to the proposed effective date.

Keystone has served a copy of the Petition on ACE.

Comment date: January 20, 1994, in accordance with Standard

Paragraph E at the end of this notice.

27. Central Vermont Public Service Corp.

[Docket No. ER94-307-000]

Take notice that on December 20, 1993, Central Vermont Public

Service Corporation Inc. (CVPS), tendered for filing six

Interconnections Agreements with the following Vermont facilities:

Comtu Falls Corporation, Hydro Energies Corporation, Emerson Falls

Hydro, Inc., Killington Hydroelectric Inc., Martinsville Hydro

Corporation, and Springfield Hydroelectric Company as provided for

pursuant to PL93-2-002.

CVPS requests the Commission to waive its notice of filing

requirements to permit the original contracts to become effective

according to their respective terms.

Comment date: January 20, 1994, in accordance with Standard

Paragraph E at the end of this notice.

28. Illinois Power Co.

[Docket No. ER94-311-000]

Take notice that on December 20, 1993, Illinois Power Company (IP)

tendered for filing changes to Appendix A to the Interconnection

Agreement between Central Illinois Power Service Company (CIPS),

Illinois Power Company (IP), and Union Electric Company (UE). The

changes provide for an additional point of interconnection between CIPS

and IP, CIPS-IP Connection 39 - Sidney - West Kansas. IP proposes an

effective date of October 1, 1983, and therefore, requests waiver of

the Commission's notice requirements. The other changes to Appendix A

include minor revisions to existing connection point working and the

deletion of four connection points.

IP also tenders for filing a Reserve and Emergency Interchange

Agreement and appendices ``G'', ``H'', ``I'', and ``J'' dated December

15, 1993.

Finally, IP tenders for filing a revised Appendix ``Q'' to the

Facility Use Agreement between IP and CIPS dated January 17, 1956.

Copies of the filing have been served on CIPS, UE, and the Illinois

Commerce Commission.

Comment date: January 20, 1994, in accordance with Standard

Paragraph E at the end of this notice.

29. PacifiCorp

[Docket No. ER94-312-000]

Take notice that on December 20, 1993, PacifiCorp, tendered for

filing in accordance with the Commission's Order pertaining to

agreements involving final amnesty for jurisdictional service and

waiver of notice, issued July 30, 1993 under Docket No. PL93-2-003

(Final Order). Agreement Limiting Liability Among Western

Interconnection Systems and related materials entitled Western

Interconnected Electric Systems Blackout/Brownout Insurance Program

(Related Materials).

Copies of this filing were supplied to all parties to WIES, the

Public Utility Commission of Oregon and the Utah Public Service

Commission.

PacifiCorp requests that the Commission disclaim jurisdiction of

the Agreement Limiting Liability Among Western Interconnected Systems

and/or Related Materials or, in the alternative, grant a waiver of

prior notice pursuant to 18 CFR 35.11 of the Commission's Rules and

Regulations to allow the Agreement to become effective as of the date

that each jurisdictional party executed the Agreement.

Comment date: January 20, 1994, in accordance with Standard

Paragraph E at the end of this notice.

30. San Diego Gas & Electric Co.

[Docket No. ER94-317-000]

Take notice that on December 21, 1993, San Diego Gas & Electric

Company (SDG&E) tendered for filing and acceptance, pursuant to 18 CFR

35.12, an Interchange Agreement (Agreement) between SDG&E and the City

of Riverside (Riverside).

SDG&E requests that the Commission allow the Agreement to become

effective on the 1st of March, 1994 or at the earliest possible date.

Copies of this filing were served upon the Public Utilities

Commission of the State of California and Riverside.

Comment date: January 20, 1994, in accordance with Standard

Paragraph E at the end of this notice.

31. Tucson Electric Power Co.

[Docket No. ER94-322-000]

Take notice that on December 21, 1993, Tucson Electric Power

Company (Tucson) tendered for filing an Amendment No. 1 to an Economy

Energy Agreement between Tucson and Arizona Power Authority (APA). The

Amendment was executed in response to a Staff request for more specific

definition of certain terms contained in the Agreement.

The parties request an effective date of November 22, 1993, and

therefore request waiver of the Commission's regulations with respect

to notice of filing.

Copies of this filing have been served upon all parties affected by

this proceeding.

Comment date: January 20, 1994, in accordance with Standard

Paragraph E at the end of this notice.

32. Montaup Electric Co.

[Docket No. ER94-324-000]

Take notice that on December 21, 1993, Montaup Electric Company

filed an Exhibit A designated Series No. 11, Newport No. 5, specifying

electric power to be transmitted under the Service Agreement No. 6 with

Newport Electric Corporation dated September 30, 1989 on file with the

Commission under Docket No. ER85-391-000. Under the Amnesty Order

issued July 30, 1993 in Docket No. PL93-2-002, Montaup requests waiver

of the 60-day notice requirement to permit the service to become

effective on March 1, 1985.

Comment date: January 20, 1994, in accordance with Standard

Paragraph E at the end of this notice.

33. New England Power Co. and Granite State Electric Co.

[Docket No. ER94-326-000]

Take notice that on December 21, 1993, New England Power Company

(NEP) and Granite State Electric Company, tendered for filing a

Property Sharing Agreement.

Pursuant to the Commission's Final Order in Docket No. PL93-2-000,

dated July 31, 1993, the two companies request waiver of the

Commission's notice requirements so that the Agreement may be made

effective November 2, 1993.

Comment date: January 20, 1994, in accordance with Standard

Paragraph E at the end of this notice.

34. Niagara Mohawk Power Corp.

[Docket No. ER94-328-000]

Take notice that on December 21, 1993, Niagara Mohawk Power

Corporation (Niagara Mohawk), tendered for filing an agreement between

Niagara Mohawk and the New York Power Authority (NYPA) dated December

13, 1993 providing for the terms and conditions of loss compensation

for control area transactions.

The effective date of January 1, 1988 is requested by Niagara

Mohawk.

Copies of this filing were served upon NYPA and the New York State

Public Service Commission.

Comment date: January 20, 1994, in accordance with Standard

Paragraph E at the end of this notice.

35. Niagara Mohawk Power Corp.

[Docket No. ER94-329-000]

Take notice that on December 21, 1993, Niagara Mohawk Power

Corporation (Niagara Mohawk), tendered for filing an agreement between

Niagara Mohawk and Lockport Energy Associates, L.P. (Lockport) dated

April 24, 1992 providing for the terms and conditions of an

interconnect between Lockport's cogeneration facility and Niagara

Mohawk's transmission system.

The effective date of April 24, 1992 is requested by Niagara

Mohawk.

Copies of this filing were served upon Lockport and the New York

State Public Service Commission.

Comment date: January 20, 1994, in accordance with Standard

Paragraph E at the end of this notice.

Standard Paragraphs

E. Any person desiring to be heard or to protest said filing should

file a motion to intervene or protest with the Federal Energy

Regulatory Commission, 825 North Capitol Street, NE., Washington, DC

20426, in accordance with Rules 211 and 214 of the Commission's Rules

of Practice and Procedure (18 CFR 385.211 and 18 CFR 385.214). All such

motions or protests should be filed on or before the comment date.

Protests will be considered by the Commission in determining the

appropriate action to be taken, but will not serve to make protestants

parties to the proceeding. Any person wishing to become a party must

file a motion to intervene. Copies of this filing are on file with the

Commission and are available for public inspection.

Lois D. Cashell.

Secretary.

[FR Doc. 94-685 Filed 1-11-94; 8:45 am]

BILLING CODE 6717-01-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.