Proposed Flood Elevation Determinations

Federal RegisterFeb 8, 1994

Ask Donna

What actually matters in this document.

Text

FEDERAL EMERGENCY MANAGEMENT AGENCY

44 CFR Part 67

[Docket No. FEMA-7082]

Proposed Flood Elevation Determinations

AGENCY: Federal Emergency Management Agency (FEMA).

ACTION: Proposed rule.

-----------------------------------------------------------------------

SUMMARY: Technical information or comments are requested on the

proposed base (100-year) flood elevations and proposed base flood

elevation modifications for the communities listed below. The base

(100-year) flood elevations are the basis for the floodplain management

measures that the community is required either to adopt or to show

evidence of being already in effect in order to qualify or remain

qualified for participation in the National Flood Insurance Program

(NFIP).

DATES: The comment period is ninety (90) days following the second

publication of this proposed rule in a newspaper of local circulation

in each community.

ADDRESSES: The proposed base flood elevations for each community are

available for inspection at the office of the Chief Executive Officer

of each community. The respective addresses are listed in the following

table.

FOR FURTHER INFORMATION CONTACT: Michael K. Buckley, P.E., Chief,

Hazard Identification Branch, Mitigation Directorate, 500 C Street,

SW., Washington, DC 20472, (202) 646-2756.

SUPPLEMENTARY INFORMATION: The Federal Emergency Management Agency

(FEMA or Agency) proposes to make determinations of base (100-year)

flood elevations and modified base flood elevations for each community

listed below, in accordance with section 110 of the Flood Disaster

Protection Act of 1973, 42 U.S.C. 4104, and 44 CFR 67.4(a).

These proposed base flood and modified base flood elevations,

together with the floodplain management criteria required by 44 CFR

60.3, are the minimum that are required. They should not be construed

to mean that the community must change any existing ordinances that are

more stringent in their floodplain management requirements. The

community may at any time enact stricter requirements of its own, or

pursuant to policies established by other Federal, state or regional

entities. These proposed elevations are used to meet the floodplain

management requirements of the NFIP and are also used to calculate the

appropriate flood insurance premium rates for new buildings built after

these elevations are made final, and for the contents in these

buildings.

National Environmental Policy Act

This proposed rule is categorically excluded from the requirements

of 44 CFR Part 10, Environmental Consideration. No environmental impact

assessment has been prepared.

Regulatory Flexibility Act

The Federal Emergency Management Agency certifies that this

proposed rule is exempt from the requirements of the Regulatory

Flexibility Act because proposed or modified base flood elevations are

required by the Flood Disaster Protection Act of 1973, 42 U.S.C. 4104,

and are required to establish and maintain community eligibility in the

National Flood Insurance Program. As a result, a regulatory flexibility

analysis has not been prepared.

Regulatory Impact Analysis

This proposed rule is not a major rule under Executive Order 12291,

February 17, 1981. No regulatory impact analysis has been prepared.

Executive Order 12612, Federalism

This proposed rule involves no policies that have federalism

implications under Executive Order 12612, Federalism, dated October 26,

1987.

Executive Order 12778, Civil Justice Reform

This proposed rule meets the applicable standards of section

2(b)(2) of Executive Order 12778.

List of Subjects in 44 CFR Part 67

Administrative practice and procedure, Flood insurance, Reporting

and recordkeeping requirements.

Accordingly, 44 CFR part 67 is proposed to be amended as follows:

PART 67--[AMENDED]

1. The authority citation for part 67 continues to read as follows:

Authority: 42 U.S.C. 4001 et seq.; Reorganization Plan No. 3 of

1978, 3 CFR, 1978 Comp., p. 329; E.O. 12127, 44 FR 19367, 3 CFR,

1979 Comp., p. 376.

Sec. 67.4 [Amended]

2. The tables published under the authority of Sec. 67.4 are

proposed to be amended as follows:

--------------------------------------------------------------------------------------------------------------------------------------------------------

#Depth in feet above

ground. *Elevation in

State City/town/county Source of flooding Location feet (NGVD).

-------------------------

Existing Modified

--------------------------------------------------------------------------------------------------------------------------------------------------------

Texas.............. Carrollton (City), Stream 6D-5..................... Approximately 300 feet upstream of the confluence *495 *494

Dallas, Denton, with Hutton Branch.

and Collin

Counties.

Approximately 0.6 mile upstream of Carmel Drive... None *546

Elm Fork of Trinity River....... Just downstream of Beltline Road.................. *441 *440

Approximately 200 feet upstream of the confluence *445 *446

of Denton Creek.

Maps available for inspection at the City Engineering Department, 1945 Jackson Road, Carrollton, Texas.

Send comments to The Honorable Milburn R. Gravely, Mayor of the City of Carrollton, Dallas, Denton, and Collin Counties, 1945 Jackson Road,

Carrollton, Texas 75011-0535.

--------------------------------------------------------------------------------------------------------------------------------------------------------

--------------------------------------------------------------------------------------------------------------------------------------------------------

(Catalog of Federal Domestic Assistance No. 83.100, ``Flood

Insurance.'')

Dated: January 14, 1994.

Robert H. Volland,

Acting Deputy Associate Director, Mitigation Directorate.

[FR Doc. 94-2855 Filed 2-7-94; 8:45 am]

BILLING CODE 6718-03-P