INTERSTATE COMMERCE COMMISSION

[Finance Docket No. 32549]

Burlington Northern Inc. and Burlington Northern Railroad

Company--Control and Merger--Santa Fe Pacific Corporation and The

Atchison, Topeka and Santa Fe Railway Company

AGENCY: Interstate Commerce Commission.

ACTION: Decision No. 5; Notice of Acceptance of Application.

-----------------------------------------------------------------------

SUMMARY: The Commission is accepting for consideration the application

filed October 13, 1994, by Burlington Northern Inc. (BNI), Burlington

Northern Railroad Company (BN), Santa Fe Pacific Corporation (SFP), and

The Atchison, Topeka and Santa Fe Railway Company (Santa Fe)

(collectively applicants), seeking Commission approval and

authorization under 49 U.S.C. 11343-45 for: (1) BNI's acquisition of,

control of, and merger with SFP; (2) the resulting common control of BN

and Santa Fe by the merged company; and (3) the merger of the two

railroad entities. Applicants are directed to provide certain

additional information.

DATES: The effective date of this decision is November 10, 1994.

Written comments on the primary application, including initial lists of

protective conditions, must be filed with the Commission no later than

December 27, 1994, and second lists of protective conditions must be

filed by January 24, 1995. Responsive applications must be filed by

February 8, 1995. For further information, see the attached procedural

schedule.1

\1\The procedural schedule set forth below was adopted in

Decision No. 4 in this proceeding, served October 5, 1994.

---------------------------------------------------------------------------

ADDRESSES: An original and 20 copies of all documents must refer to

Finance Docket No. 32549 and be sent to Office of the Secretary, Case

Control Branch, Attn: Finance Docket No. 32549, Interstate Commerce

Commission, 1201 Constitution Avenue, NW, Washington, DC 20423.

In addition, one copy of all documents in this proceeding must be

sent to each of applicants' representatives: (1) Betty Jo Christian,

Esq., Steptoe & Johnson, 1330 Connecticut Avenue, N.W., Washington, DC

20036-1795; and (2) Erika Z. Jones, Esq., Mayer, Brown & Platt, 2000

Pennsylvania Avenue, N.W., Suite 6500, Washington, DC 20006.

FOR FURTHER INFORMATION CONTACT: Beryl Gordon or Chris Oehrle (202)

927-5610. [TDD for the hearing impaired: (202) 927-5721.]

SUPPLEMENTARY INFORMATION: On October 13, 1994, pursuant to 49 U.S.C.

11343-45 and our rules at 49 CFR 1180.4, applicants filed an

application for approval of BNI's acquisition of, control of, and

merger with SFP, the resulting common control of BN and Santa Fe by the

merged company, the consolidation of BN and Santa Fe railroad

operations and the merger of BN and Santa Fe. Applicants are also

seeking exemption from regulation under 49 U.S.C. 10505 for the merged

holding company and merged railroad to control The Wichita Union

Terminal Railway Company (WUTR) [Finance Docket No. 32549 (Sub-No. 1)]

and for eleven construction projects related to the primary application

[Finance Docket No. 32549 (Sub-No. 2 through Sub-No. 12)].2 We are

accepting for consideration the control and merger application filed in

this proceeding.

---------------------------------------------------------------------------

\2\ Under 49 CFR 1180.4(c)(2)(vi), all directly related

applications, petitions, and notices of exemption must be filed

concurrently with the primary control and merger application. We

note that there are two pending proceedings that may be related to

the proposed merger. The question is whether these proceedings are

directly related to the merger within the meaning of 49 CFR

1180.4(c)(2)(vi).

The first proceeding is Docket No. AB-423 (Sub-No. 1X), which

involves a petition for exemption to discontinue the lease and

operation of a rail yard in Houston filed by the Houston Belt &

Terminal Railway Company (HBT). Although HBT is not an applicant

carrier in the merger proceeding, BN has a 24% interest and Santa Fe

has a 25% interest in HBT. See the waiver decision in Finance Docket

No. 32549, Decision No. 3, served Oct. 4, 1994. The petition in

Docket No. AB-423 (Sub-No. 1X) was filed on July 8, 1994, which was

the same day that applicants filed their notice of intent to file

the merger application in Finance Docket No. 32549. A separate

decision is being issued in Docket No. AB-423 (Sub-No. 1X) directing

petitioner to clarify the relationship, if any, between the subject

matter of the petition for exemption and the merger transaction in

Finance Docket No. 32549.

The second proceeding is Finance Docket No. 32593, which is a

notice of a corporate family reorganization filed by Santa Fe under

the class exemption procedures at 49 CFR 1180.2(d)(3). The

reorganization involves the purchase by Santa Fe of all of the real

estate and improvements now owned by four of its subsidiary

railroads. According to the notice filed by Santa Fe, the purpose of

the reorganization is to concentrate Santa Fe's railroad real estate

holdings in a single corporation and to reduce administrative

expenses. There is no mention of the proposed merger application

which was filed 10 days after the filing of the notice in Finance

Docket No. 32593. Notice of the transaction in Finance Docket No.

32593 will be published separately in the Federal Register. Santa Fe

is directed in that proceeding to explain the relationship, if any,

between the corporate family reorganization in Finance Docket No.

32593 and the proposed merger in Finance Docket No. 32549. Comments

from other parties on Santa Fe's corporate family reorganization

(including any comments alleging that the reorganization is directly

related to the application in Finance Docket No. 32549) should be

addressed in Finance Docket No. 32593.

---------------------------------------------------------------------------

Upon receipt of Commission approval and authorization and

satisfaction of other conditions to closing under an Agreement and Plan

of Merger dated June 29, 1994, SFP will merge with and into BNI, which

will change its name to Burlington Northern Santa Fe Corporation. Each

share of SFP common stock will be exchanged for 0.34 shares of newly

issued BNI common stock. Upon the BNI-SFP merger, BNI will acquire and

exercise control of Santa Fe in common with its existing control of

BN.3 The operations of BN and Santa Fe will be consolidated and

fully integrated following the holding company merger. Applicants also

seek Commission approval to merge the BN and Santa Fe legal entities,

although the timing of the railroad merger will depend on tax, legal

and other considerations.

---------------------------------------------------------------------------

\3\ Santa Fe and its majority-owned railroad subsidiaries--The

Dodge City and Cimarron Valley Railway Company, The Gulf and Inter-

State Railway Company of Texas, Los Angeles Junction Railway

Company, Oklahoma City Junction Railway Company, Rio Grande, El Paso

and Santa Fe Railway Company and Star Lake Railroad Company--are an

integrated single system railroad. Santa Fe Pacific Railroad

Company, a non-operating rail carrier entity, likewise is part of

Santa Fe's single system. As such, the acquisition of control of

Santa Fe by BNI involves the control of a single carrier within the

meaning of 49 U.S.C. 11343. See Robert W. Bethge & Raymond K.

Wilson--Control Exemption--Canal Cartage Co., Finance Docket No. MC-

F-19525 (served Nov. 29, 1989); Burlington Northern, Inc.--Control

and Merger--St. Louis-San Francisco Ry., 366 I.C.C. 862, 865, aff'd

sub nom. Brotherhood of Ry. & Airline Clerks v. Burlington Northern

Inc., 722 F.2d 380 (8th Cir. 1983); Katy Indus., Inc.--Control--

Missouri-Kansas-Texas R.R., 331 I.C.C. 405, 410-411 (1967); Kansas

City Southern Indus. Inc.--Control--Kansas City S. Ry., 317 I.C.C.

1, 4 (1962); Woods Indus., Inc.--Control--United Transports, Inc.,

85 M.C.C. 672, 675 (1960); Louisville & Jeffersonville B. & R. Co.

Merger, 295 I.C.C. 11, 17-18 (1955), aff'd sub nom. Alleghany Corp.

v. Breswick & Co., 353 U.S. 151 (1957).

---------------------------------------------------------------------------

As a result of the proposed transaction, the merged company will

also acquire control of WUTR, in which BN and Santa Fe each own a one-

third stock interest. A petition for exemption under 49 U.S.C. 10505

from the prior approval requirements of 49 U.S.C. 11343-47 for the

acquisition and exercise of control of WUTR was filed concurrently with

the primary application [Finance Docket No. 32549 (Sub-No. 1)].

No new securities will be issued by any company subject to

Commission regulation under 49 U.S.C. 11301 to effect the merger of BNI

and SFP or the common control of BN and Santa Fe. To the extent BN's

succession to then-outstanding debt obligations of Santa Fe in the

merger of the railroad entities may be deemed to require Commission

authorization under 49 U.S.C. 11301, applicants seek such

authorization, and provide the relevant information in accordance with

49 CFR 1180.6(a)(1)(iv).

In connection with the transaction, applicants propose to construct

new railroad lines that are or may be subject to the jurisdiction of

the Commission under 49 U.S.C. 10901. Petitions for exemption under 49

U.S.C. 10505 from the prior approval requirements of 49 U.S.C. 10901

for the construction of those railroad lines were filed concurrently

with the primary application [Finance Docket No. 32549 (Sub-No. 2

through Sub-No. 12)].

BN operates approximately 25,000 miles of road and second main

track in the United States and Canada. BN's principal routes are as

follows: a route that extends from the Pacific Northwest (Washington,

Oregon, Idaho, and southern British Columbia) across Montana, North

Dakota, Minnesota, and the western edge of Wisconsin to Chicago; a

route extending from the Powder River Basin in Wyoming in a

southeasterly direction through Lincoln to Chicago and Kansas City; a

second route extending from the Powder River Basin in Wyoming south to

Denver and Fort Worth; a route extending from the Powder River Basin in

Montana to Bismarck and Minneapolis/St. Paul, with an auxiliary line to

the Head of the Lakes; a route from Denver to Chicago with a junction

at Lincoln; a route from Avard, Oklahoma east to Memphis and

Birmingham; and a route from Chicago to Houston through Kansas City and

Dallas, with an auxiliary line from St. Louis to a junction point east

of Tulsa. BN's principal termini are at Seattle, Tacoma, and Spokane,

Washington; Portland, Oregon; Bieber, California; Vancouver, British

Columbia; Winnipeg, Manitoba; Billings, Montana; Cheyenne, Wyoming;

Denver, Colorado; Duluth, Minnesota/Superior, Wisconsin; Fargo, North

Dakota/Moorhead, Minnesota; Minneapolis/St. Paul, Minnesota; Chicago,

Illinois; Omaha and Lincoln, Nebraska; Des Moines, Iowa; Wichita and

Kansas City, Kansas; Kansas City, Springfield, and St. Louis, Missouri;

Tulsa, Oklahoma; Fort Worth, Dallas, Houston, and Galveston, Texas;

Memphis, Tennessee; Birmingham and Mobile, Alabama; and Pensacola,

Florida. BN's principal points of interchange are at those termini and

at Avard, Oklahoma.

As of December 31, 1993, BN operated approximately 22,506 miles of

road track, 2,134 miles of second main track and 39 miles of other main

tracks in the United States and Canada.

Santa Fe operates approximately 10,400 miles of road and secondary

main tracks, creating a system of 8,500 route miles. Santa Fe's

principal routes are as follows: a route from Chicago across Illinois,

Iowa, Missouri, Kansas, Oklahoma, Texas, New Mexico, and Arizona to

California; a second route from Kansas City to Colorado and New Mexico

with an auxiliary line to Superior, Nebraska; and a route from Chicago

to Dallas/Fort Worth and Houston with an auxiliary line to East Texas

and Louisiana. Santa Fe's principal termini are at San Francisco/

Oakland, Los Angeles, San Diego, and Barstow, California; Phoenix,

Arizona; Albuquerque and Clovis, New Mexico; Denver, Colorado; El Paso,

Dallas, and Houston, Texas; Kansas City, Kansas; and Chicago, Illinois.

As of December 31, 1993, Santa Fe operated approximately 8,536

miles of road track, 1,812 miles of second main track and 45 miles of

other main tracks, including the lines of its wholly owned subsidiaries

and leased lines.

According to applicants, the consolidation of BN and Santa Fe would

be almost entirely an end-to-end transaction, which would create new

single-line routes and increase, not reduce, competition. In terms of

both geographic configuration and commodities handled, applicants

indicate that their existing rail operations are essentially

complementary to one another. BN's routes are concentrated in the Upper

Midwest, the Northern Plains and the Pacific Northwest. From this

defining core, BN's lines extend into the south central region of the

country, but with much less market coverage than in the North. Santa Fe

serves the area from California through the Southwest, reaching up

through the Midwest to Chicago. The principal commodities handled by BN

are coal and grain. A primary focus of Santa Fe's business is

intermodal traffic.

According to applicants, both BN and Santa Fe operate in a highly

competitive environment and face pervasive competition from other rail

carriers as well as from trucks and barges in many markets. Applicants

contend that, with only a few limited exceptions, the proposed

transaction does not threaten any reduction in the vigor of intramodal

competition. Applicants contend that the bulk of the BN and Santa Fe

systems do not overlap in horizontal competition. Applicants also

indicate that no horizontal overlap exists in the three major corridors

from the mid-continent to the west coast. BN operates in the Northern

Corridor; Santa Fe operates in the Southern Corridor. Where overlap is

present, applicants indicate that it almost always occurs in the

presence of extensive competition with other providers of freight

transportation services. Applicants' analyses, however, indicate the

possibility for some limited reduction in competition in the areas of

Amarillo and Lubbock, Texas. Concerning this area, applicants say that

they are prepared to negotiate ameliorative arrangements to address any

such reductions in competition.

Applicants state that there will be few basic changes in the

existing route structure. Applicants find that the Avard, OK gateway

route will experience the most pronounced change. Applicants also

project that California-Southeast traffic will increase significantly

and that traffic on the route east of Avard to Tulsa will approximately

double due to a combination of growth and internal reroutes.

Applicants' traffic projections also involve increases in intermodal,

merchandise, and grain traffic.

BN and Santa Fe routes between Denver and Texas and between Chicago

and Texas also possess some parallel characteristics. Applicants,

however, find that each route is generally far removed from its

counterpart and each serves other different, but important, traffic

lanes and, therefore, no major change in overall uses and traffic

density is planned.

We are accepting the application for consideration because it

complies with the applicable regulations, waivers, and requirements.

See 49 U.S.C. 11343-45; 49 CFR Part 1180. We reserve the right,

however, to require the filing of supplemental information from

applicants or any other party or individual, as necessary to complete

the record in this matter.

Although applicants have provided sufficient market analysis under

49 CFR 1180.7 for us to accept their application for consideration, we

find that additional information will be necessary for us to analyze

the effect of this transaction on certain other railroads.

Specifically, we are concerned about railroads which have interests in

either WUTR or HBT.

In our decision served October 3, 1994 [Decision No. 3], we waived

our regulations at 49 CFR 1180.3(b) pertaining to WUTR and HBT by not

considering either of them an ``applicant carrier.'' Consequently, we

are lacking certain information that we believe is necessary to conduct

our market analysis. Therefore, applicants are directed to provide us

with additional information concerning WUTR and HBT.

In Finance Docket No. 32549 (Sub-No. 1), applicants seek an

exemption for their control of WUTR. In their petition, applicants

indicate that the Missouri Pacific Railroad Company (MP) owns the other

one-third stock interest in WUTR. Applicants state in the petition that

they expect MP will continue to participate in WUTR's management and

that applicants' control will not impair MP's ability to obtain service

from WUTR. Applicants are directed to provide copies of any agreement

concerning use of that property.

Although BN and Santa Fe currently own only 24% and 25% of HBT,

respectively, in the event of consolidation, their combined interests

may constitute control of HBT. Therefore, we will direct applicants to

provide us with the following information:

1. Identify the owners of HBT and their respective ownership

percentages.

2. Identify any railroads dependent on HBT in order to interchange

with other carriers (specify which carriers) or to connect their own

lines through the city. Explain each dependent circumstance.

3. Explain whether the agreement or agreements governing the use of

the property held or owned by HBT protect any other owners of HBT from

adverse effects in the event of consolidation. Provide copies of any

agreement concerning use of that property.

Because of the expedited procedural schedule, additional

information will be necessary to assist us in preparing prompt and

complete analysis of the transaction. Therefore, applicants are

directed to provide us with a current complete set of employee

operating timetables for both BN and Santa Fe.

In our Decision No. 4, served October 5, 1994, we adopted an

expedited procedural schedule, and we have attached it here to give

notice to all interested persons. All of the filing deadlines are in

accordance with the statute and governing regulations, as modified by

the expedited procedural schedule. We advise applicants and all other

parties to this proceeding that, particularly because of the

accelerated schedule we have adopted, they must strictly comply with

all requirements.4 If questions arise concerning an interpretation

of a requirement, they may contact the Commission's Office of

Proceedings at 202-927-5610 for assistance. See 49 CFR

1180.4(c)(6)(iii).

---------------------------------------------------------------------------

\4\ By petition filed October 28, 1994, The National Industrial

Transportation League (NITL) requests that the procedural schedule

adopted in and attached to our decision served October 5, 1994,

Decision No. 4, be extended by adding 30 days to each of the time

periods specified. NITL's primary concern is the possibility that

the application will be modified or withdrawn as a result of the

actions of SFP's shareholders at their meeting scheduled for

November 18, 1994.

Under 49 CFR 1180.4(b)(7)(i), our decision to accept the

application cannot be extended . Further, comments by parties and

interested persons are not due until December 27, 1994. We see no

reason to extend the procedural schedule at this time. Accordingly

petitioner's request is denied.

---------------------------------------------------------------------------

The application and accompanying exhibits are available for

inspection in the Public Docket Room, room 1221, at the offices of the

Interstate Commerce Commission in Washington, DC.

Any interested persons, including government parties, may

participate in this proceeding by submitting written comments regarding

the application. Comments must be filed no later than December 27,

1994. An original and 20 copies must be filed with the Secretary,

Interstate Commerce Commission, Washington, DC 20423.

Written comments must be concurrently served by first class mail on

the United States Secretary of Transportation (DOT), the Attorney

General of the United States (DOJ), and applicants' representatives.

Written comments must also be served upon all parties of record within

10 days of service of the service list by the Commission. We plan to

issue the service list shortly after comments have been received. Any

person who files timely written comments shall be considered a party of

record if he, she, or it so indicates in their comments. In this event,

no petition for leave to intervene need be filed. Written comments

shall include:

1. The docket number and title of the proceeding;

2. The name, address, and telephone number of the commenting party

and its representative upon whom service shall be made;

3. The commenting party's position, i.e., whether it supports or

opposes the proposed transaction;

4. A statement on whether the commenting party intends to

participate formally in the proceeding or merely comment upon the

proposal;

5. A list of all information sought to be discovered from applicant

carriers;

6. An initial list of specific protective conditions sought;

7. An analysis of the issues the Commission must consider in this

proceeding. Particular attention should be given to our general policy

statement for the merger or control of at least two class I railroads,

49 CFR 1180.1, the statutory criteria, and antitrust policy.

Because we have determined that this proceeding constitutes a major

transaction within the meaning of our rail consolidation rules, 49 CFR

Part 1180, railroads filing written comments must also submit at that

time a statement of whether the commenting railroad intends to file

inconsistent applications, petitions for inclusion, trackage rights, or

any other affirmative relief requiring an application to be filed with

the Commission and a general statement of what that application is

expected to include. THIS WILL BE CONSIDERED A PREFILING NOTICE WITHOUT

WHICH THE COMMISSION WILL NOT ENTERTAIN APPLICATIONS FOR THIS TYPE OF

RELIEF.

Comments from the Secretary of Transportation and Attorney General

must be filed by January 11, 1995. Parties seeking to modify any

protective conditions specified in their initial comments must file a

second list of protective conditions no later than January 24, 1995.

Parties shall not be permitted to seek any protective conditions other

than those requested in their final list.

Parties seeking to file responsive applications must do so no later

than February 8, 1995. Responsive applications include inconsistent

applications, petitions for inclusion, or any other affirmative relief

that requires an application to be filed with the Commission (such as

trackage rights, purchase, purchase of a portion, acquisition,

extension, construction, operation, pooling, terminal operations,

abandonment, etc.). Parties should contact Chris Oehrle (202) 927-6288

to obtain docket numbers for their responsive applications.

Petitions for waiver or clarification by responsive applicants

shall be filed no later than December 27, 1994. Each responsive

application filed and accepted will be consolidated with the primary

application in this proceeding.5

---------------------------------------------------------------------------

\5\ In addition to submitting an original and 20 copies of all

documents filed with the Commission, the parties are encouraged to

submit all pleadings and attachments as computer data contained on a

3.5-inch floppy diskette which is formatted for WordPerfect 5.1 (or

formatted so that it can be converted by WordPerfect 5.1). The

computer data contained on the computer diskettes submitted are

subject to the protective order attached to the Commission's

decision served July 15, 1994, and are for the exclusive use of

Commission employees working directly with review of substantive

matters in this proceeding. The flexibility provided by such

computer file data will facilitate expedited review by the

Commission and its staff.

---------------------------------------------------------------------------

Discovery may begin immediately. The Commission will not tolerate

dilatory tactics in response to discovery requests designed to elicit

relevant evidence. A refusal voluntarily to supply information will be

treated as an objection to the request for discovery. Responses must be

served upon all parties of record, and five copies of those responses

must be concurrently filed with the Commission.

We plan to conclude the evidentiary phase of this proceeding by

January 2, 1996. The initial decision will be waived, and the

determination of the merits of the application(s) will be made in the

first instance by the entire Commission under 49 U.S.C. 11345.

Any traffic studies and data submitted in opposition to the primary

application must use calendar year 1993 data and, where relevant, use

depreciation accounting, in order to be comparable with the evidence

submitted by applicants. Evidence supporting protestants' responsive

applications must use 1993 as the base year and the depreciation

accounting system, and applicants' evidence in opposition to the

responsive applications must use 1993 and depreciation accounting.

We advise protestants that, if they seek to have the primary

application denied, or seek conditions if approved, because they

contend their ability to provide essential service and/or competition

will be harmed, they must present substantial evidence in support of

their positions. See Lamoille Valley R.R. Co. v. ICC, 711 F.2d 295

(D.C. Cir. 1983).

This action will not significantly affect either the quality of the

human environment or the conservation of energy resources.

It is ordered:

1. The application in Finance Docket No. 32549 is accepted for

consideration.

2. The parties shall comply with all provisions as stated above.

3. Applicants are directed to provide the Commission's Office of

Compliance and Enforcement with a current complete set of employee

operating timetables for both BN and Santa Fe within 30 days of the

effective date of this decision.

4. Applicants are directed to provide copies of any agreement

concerning use of property operated by WUTR within 10 days of the

effective date of this decision.

5. Applicants are directed to provide the following information

within 10 days of the effective date of this decision:

a. Identify the owners of HBT and their respective ownership

percentages.

b. Identify any railroads dependent on HBT in order to interchange

with other carriers (specify which carriers) or to connect their own

lines through the city. Explain each dependent circumstance.

c. Explain whether the agreement or agreements governing the use of

the property held or owned by HBT could adversely affect any other

owners of HBT in the event of consolidation. Provide copies of any

agreement concerning use of that property.

6. This decision is effective on November 10, 1994.

Decided: November 3, 1994.

By the Commission, Chairman McDonald, Vice Chairman Phillips,

and Commissioners Simmons, Morgan, and Owen. Vice Chairman Phillips

recused herself in this proceeding.

Vernon A. Williams,

Secretary.

Procedural Schedule

October 13, 1994--Primary application filed.

November 10, 1994--Commission notice of acceptance of primary

application published.

December 27, 1994--Comments on primary application (except DOJ, DOT)

due, including initial list of protective conditions; petitions for

waiver or clarification by responsive applicants due.

January 11, 1995--DOJ, DOT comments on primary application due.

January 24, 1995--Second lists of protective conditions due.

February 8, 1995--Responsive applications due; opposition to primary

application due.

March 10, 1995--Commission notice of acceptance of responsive

applications published.

June 8, 1995--Government parties' evidence due; opposition to

responsive applications due; rebuttal in support of primary application

due.

July 24, 1995--Responses to government parties' evidence due; rebuttal

in support of responsive applications due.

August 14, 1995-August 18, 1995--Hearing on all evidence; witnesses to

be to cross-examined only to the extent specific need is shown in order

to resolve material issues of disputed fact.

October 2, 1995--Opening briefs due.

November 16, 1995--Reply briefs due.

January 2, 1996 Oral argument.

February 16, 1996 Voting Conference.

April 1, 1996 Final decision.

Notes: Immediately upon each evidentiary filing, the filing party

will place all documents relevant to the filing (other than documents

that are privileged or otherwise protected from discovery) in a

depository open to all parties, and will make its witnesses available

for discovery depositions. Access to documents subject to protective

order will be appropriately restricted. Parties seeking discovery

depositions may proceed by agreement. Relevant excerpts of transcripts

will be received in lieu of cross-examination at the hearing, unless

cross-examination is needed to resolve material issues of disputed

fact. Discovery on responsive applications will begin immediately upon

their filing. The Administrative Law Judge assigned to this proceeding

will have the authority initially to resolve any discovery disputes.

The dates for filing post-hearing briefs and for oral argument before

the Commission will be set upon completion of oral hearings.

[FR Doc. 94-27903 Filed 11-9-94; 8:45 am]

BILLING CODE 7035-01-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.