Energy Conservation Program for Consumer Products; Granting of the Application for Interim Waiver and Publishing of the Petition for Waiver of DOE Furnace Test Procedures From York International; Case No. F-077

Federal RegisterNov 10, 1994

Ask Donna

What actually matters in this document.

Text

DEPARTMENT OF ENERGY

Office of Energy Efficiency and Renewable Energy

Energy Conservation Program for Consumer Products; Granting of

the Application for Interim Waiver and Publishing of the Petition for

Waiver of DOE Furnace Test Procedures From York International; Case No.

F-077

AGENCY: Office of Energy Efficiency and Renewable Energy, Department of

Energy.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: Today's notice publishes a letter granting an Interim Waiver

to York International (York) from the existing Department of Energy

(DOE) test procedure regarding blower time delay for the company's

P2LN, and PBNL lines of condensing furnaces.

Today's notice also publishes a ``Petition for Waiver'' from York.

York's Petition for Waiver requests DOE to grant relief from the DOE

furnace test procedure relating to the blower time delay specification.

York seeks to test using a blower delay time of 30 seconds for its

P2LN, and PBNL lines of condensing furnaces instead of the specified

1.5-minute delay between burner on-time and blower on-time. The

Department is soliciting comments, data, and information respecting the

Petition for Waiver.

DATES: DOE will accept comments, data, and information not later than

December 12, 1994.

ADDRESSES: Written comments and statements shall be sent to: Department

of Energy, Office of Energy Efficiency and Renewable Energy, Case No.

F-077, Mail Stop EE-43, Room 5E-066, Forrestal Building, 1000

Independence Avenue, SW., Washington, DC 20585, (202) 586-7574.

FOR FURTHER INFORMATION CONTACT:

Cyrus H. Nasseri, U.S. Department of Energy, Office of Energy

Efficiency and Renewable Energy, Mail Station EE-431, Forrestal

Building, 1000 Independence Avenue, SW., Washington, DC 20585, (202)

586-9138

Eugene Margolis, Esq., U.S. Department of Energy, Office of General

Counsel, Mail Station GC-72, Forrestal Building, 1000 Independence

Avenue, SW., Washington, DC 20585, (202) 586-9507.

SUPPLEMENTARY INFORMATION: The Energy Conservation Program for Consumer

Products (other than automobiles) was established pursuant to the

Energy Policy and Conservation Act (EPCA), Public Law 94-163, 89 Stat.

917, as amended by the National Energy Conservation Policy Act (NECPA),

Public Law 95-619, 92 Stat. 3266, the National Appliance Energy

Conservation Act of 1987 (NAECA), Public Law 100-12, the National

Appliance Energy Conservation Amendments of 1988 (NAECA 1988), Public

Law 100-357, and the Energy Policy Act of 1992 (EPAct), Public Law 102

486, 106 Stat. 2776, which requires DOE to prescribe standardized test

procedures to measure the energy consumption of certain consumer

products, including furnaces. The intent of the test procedures is to

provide a comparable measure of energy consumption that will assist

consumers in making purchasing decisions. These test procedures appear

at 10 CFR Part 430, Subpart B.

The Department amended the prescribed test procedures by adding 10

CFR 430.27 on September 26, 1980, creating the waiver process. 45 FR

64108. Thereafter, DOE further amended the appliance test procedure

waiver process to allow the Assistant Secretary for Energy Efficiency

and Renewable Energy (Assistant Secretary) to grant an Interim Waiver

from test procedure requirements to manufacturers that have petitioned

DOE for a waiver of such prescribed test procedures. 51 FR 42823,

November 26, 1986.

The waiver process allows the Assistant Secretary to waive

temporarily, test procedures for a particular basic model when a

petitioner shows that the basic model contains one or more design

characteristics which prevent testing according to the prescribed test

procedures, or when the prescribed test procedures may evaluate the

basic model in a manner so unrepresentative of its true energy

consumption as to provide materially inaccurate comparative data.

Waivers generally remain in effect until final test procedure

amendments become effective, resolving the problem that is the subject

of the waiver.

The Interim Waiver provisions added by the 1986 amendment allow the

Secretary to grant an Interim Waiver when it is determined that the

applicant will experience economic hardship if the Application for

Interim Waiver is denied, if it appears likely that the Petition for

Waiver will be granted, and/or the Assistant Secretary determines that

it would be desirable for public policy reasons to grant immediate

relief pending a determination on the Petition for Waiver. An Interim

Waiver remains in effect for a period of 180 days or until DOE issues

its determination on the Petition for Waiver, whichever is sooner, and

may be extended for an additional 180 days, if necessary.

On September 22, 1994, York filed an Application for Interim Waiver

regarding blower time delay. York's Application seeks an Interim Waiver

from the DOE test provisions that require a 1.5-minute time delay

between the ignition of the burner and starting of the circulating air

blower. Instead, York requests the allowance to test using a 30-second

blower time delay when testing its P2LN, and PBNL lines of condensing

furnaces. York states that the 30-second delay is indicative of how

these furnaces actually operate. Such a delay results in an overall

furnace AFUE improvement of approximately 1.5 percent points. Since

current DOE test procedures do not address this variable blower time

delay, York asks that the Interim Waiver be granted.

The Department has published a Notice of Proposed Rulemaking on

August 23, 1993, (58 FR 44583) to amend the furnace test procedure,

which addresses the above issue.

Previous waivers for this type of time blower delay control have

been granted by DOE to Coleman Company, 50 FR 2710, January 18, 1985;

Magic Chef Company, 50 FR 41553, October 11, 1985; Rheem Manufacturing

Company, 53 FR 48574, December 1, 1988, 56 FR 2920, January 25, 1991,

57 FR 10166, March 24, 1992, 57 FR 34560, August 5, 1992, and 59 FR

30577, June 14, 1994; Trane Company, 54 FR 19226, May 4, 1989, 56 FR

6021, February 14, 1991, 57 FR 10167, March 24, 1992, 57 FR 22222, May

27, 1992, and 58 FR 68138, December 23, 1993; Lennox Industries, 55 FR

50224, December 5, 1990, 57 FR 49700, November 3, 1992, 58 FR 68136,

December 23, 1993, and 58 FR 68137, December 23, 1993; Inter-City

Products Corporation, 55 FR 51487, December 14, 1990, and 56 FR 63945,

December 6, 1991; DMO Industries, 56 FR 4622, February 5, 1991, and 59

FR 30579, June 14, 1994; Heil-Quaker Corporation, 56 FR 6019, February

14, 1991; Carrier Corporation, 56 FR 6018, February 14, 1991, 57 FR

38830, August 27, 1992, 58 FR 68131, December 23, 1993, 58 FR 68133,

December 23, 1993 and 59 FR 14394, March 28, 1994; Amana Refrigeration

Inc., 56 FR 27958, June 18, 1991, 56 FR 63940, December 6, 1991, 57 FR

23392, June 3, 1992, and 58 FR 68130, December 23, 1993; Snyder General

Corporation, 56 FR 54960, September 9, 1991; Goodman Manufacturing

Corporation, 56 FR 51713, October 15, 1991, 57 FR 27970, June 23, 1992

and 59 FR 12586, March 17, 1994; The Ducane Company Inc., 56 FR 63943,

December 6, 1991, 57 FR 10163, March 24, 1992, and 58 FR 68134,

December 23, 1993; Armstrong Air Conditioning, Inc., 57 FR 899, January

9, 1992, 57 FR 10160, March 24, 1992, 57 FR 10161, March 24, 1992, 57

FR 39193, August 28, 1992, 57 FR 54230, November 17, 1992, and 59 FR

30575, June 14, 1994; Thermo Products, Inc., 57 FR 903, January 9,

1992; Consolidated Industries Corporation, 57 FR 22220, May 27, 1992;

Evcon Industries, Inc., 57 FR 47847, October 20, 1992, and 59 FR 46968,

September 13, 1994; Bard Manufacturing Company, 57 FR 53733, November

12, 1992, and 59 FR 30578, June 14, 1994; and York International

Corporation, 59 FR 46969, September 13, 1994. Thus, it appears likely

that the Petition for Waiver will be granted for blower time delay.

In those instances where the likely success of the Petition for

Waiver has been demonstrated based upon DOE having granted a waiver for

a similar product design, it is in the public interest to have similar

products tested and rated for energy consumption on a comparable basis.

Therefore, based on the above, DOE is granting York an Interim

Waiver for its P2LN, and PBNL lines of condensing furnaces. Pursuant to

paragraph (e) of Section 430.27 of the Code of Federal Regulations Part

430, the following letter granting the Application for Interim Waiver

to York was issued.

Pursuant to paragraph (b) of 10 CFR Part 430.27, DOE is hereby

publishing the ``Petition for Waiver'' in its entirety. The petition

contains no confidential information. The Department solicits comments,

data, and information respecting the petition.

Issued in Washington, DC, November 2, 1994.

Christine A. Ervin,

Assistant Secretary, Energy Efficiency and Renewable Energy.

September 22, 1994.

Assistant Secretary, Conservation & Renewable Energy, U.S.

Department of Energy, 1000 Independence Avenue, SW., Washington, DC

20585

Subject: Petition for Waiver and Application for Interim Waiver.

Gentlemen: This is a Petition for Waiver and Application for

Interim Waiver submitted pursuant to Title 10 CFR 430.27, as amended

14 November 1986. Waiver is requested from the test procedures for

measuring the Energy Consumption of Furnaces found in Appendix N of

Subpart B to Part 430, specifically the section requiring a 1.5

minute delay between burner ignition and start-up of the circulating

air blower.

York International requests a waiver from the specified 1.5

minute delay, and seeks authorization in its furnace efficiency test

procedures and calculations to utilize a fixed timing control that

will energize the circulating air blower 30 seconds after the gas

valve opens. A control of this type with a fixed 30 second blower

on-time will be utilized in our P2LN and PBNL lines of condensing

furnaces.

The current test procedure does not credit York for additional

energy savings that occur when a shorter blower on-time is utilized.

Test data for these furnaces with a 30 second delay indicate that

the overall furnace AFUE will increase approximately 1.5 percentage

points compared to the same furnace when tested with the 1.5 minute

delay. Copies of the confidential test data conforming these energy

savings will be forwarded to you upon request.

York International is confident that this waiver will be

granted, as similar waivers have been granted in the past to Coleman

Company, Magic Chef Company, Rheem Manufacturing, the Trane Company,

Carrier Corporation, Lennox Industries, Amana Refrigeration, Goodman

Manufacturing Company and others.

Manufacturers that domestically market similar products are

being sent a copy of this Petition for Waiver and Application for

Interim Waiver.

Sincerely,

Michael B. Eberlein, P.E.,

Engineering Manager--Furnace Products, Unitary Products Group,

York Central Environmental Systems, York International.

Mr. Michael B. Eberlein, P.E., Engineering Manager--Furnace

Products, Unitary Products Group, York International, P.O. Box 4022,

Elyria, OH 44036

Dear Mr. Eberlein: This is in response to your September 22,

1994, Application for Interim Waiver and Petition for Waiver from

the Department of Energy (DOE) test procedure regarding blower time

delay for York International (York) P2LN, and PBNL lines of

condensing furnaces.

Previous waivers for this type of timed blower delay control

have been granted by DOE to Coleman Company, 50 FR 2710, January 18,

1985; Magic Chef Company, 50 FR 41553, October 11, 1985; Rheem

Manufacturing Company, 53 FR 48574, December 1, 1988, 56 FR 2920,

January 25, 1991, 57 FR 10166, March 24, 1992, 57 FR 34560, August

5, 1992, and 59 FR 30577, June 14, 1994; Trane Company, 54 FR 19226,

May 4, 1989, 56 FR 6021, February 14, 1991, 57 FR 10167, March 24,

1992, 57 FR 22222, May 27, 1992, and 58 FR 68138, December 23, 1993;

Lennox Industries, 55 FR 50224, December 5, 1990, 57 FR 49700,

November 3, 1992, 58 FR 68136, December 23, 1993, and 58 FR 68137,

December 23, 1993; Inter-City Products Corporation, 55 FR 51487,

December 14, 1990, and 56 FR 63945, December 6, 1991; DMO

Industries, 56 FR 4622, February 5, 1991, and 59 FR 30579, June 14,

1994; Heil-Quaker Corporation, 56 FR 6019, February 14, 1991;

Carrier Corporation, 56 FR 6018, February 14, 1991, 57 FR 38830,

August 27, 1992, 58 FR 68131, December 23, 1993, 58 FR 68133,

December 23, 1993 and 59 FR 14394, March 28, 1994; Amana

Refrigeration Inc., 56 FR 27958, June 18, 1991, 56 FR 63940,

December 6, 1991, 57 FR 23392, June 3, 1992, and 58 FR 68130,

December 23, 1993; Snyder General Corporation, 56 FR 54960,

September 9, 1991; Goodman Manufacturing Corporation, 56 FR 51713,

October 15, 1991, 57 FR 27970, June 23, 1992 and 59 FR 12586, March

17, 1994; The Ducane Company Inc., 56 FR 63943, December 6, 1991, 57

FR 10163, March 24, 1992, and 58 FR 68134, December 23, 1993;

Armstrong Air Conditioning, Inc., 57 FR 899, January 9, 1992, 57 FR

10160, March 24, 1992, 57 FR 10161, March 24, 1992, 57 FR 39193,

August 28, 1992, 57 FR 54230, November 17, 1992, and 59 FR 30575,

June 14, 1994; Thermo Products, Inc., 57 FR 903, January 9, 1992;

Consolidated Industries Corporation, 57 FR 22220, May 27, 1992;

Evcon Industries, Inc., 57 FR 47847, October 20, 1992, and 59 FR

46968, September 13, 1994; Bard Manufacturing Company, 57 FR 53733,

November 12, 1992, and 59 FR 30578, June 14, 1994; and York

International Corporation, 59 FR 46969, September 13, 1994. Thus, it

appears likely that the Petition for Waiver will be granted for

blower time delay.

York's Application for Interim Waiver does not provide

sufficient information to evaluate what, if any, economic impact or

competitive disadvantage York will likely experience absent a

favorable determination on its application.

However, in those instances where the likely success of the

Petition for Waiver has been demonstrated, based upon DOE having

granted a waiver for a similar product design, it is in the public

interest to have similar products tested and rated for energy

consumption on a comparable basis.

Therefore, York's Application for an Interim Waiver from the DOE

test procedure for its P2LN, and PBNL lines of condensing furnaces

regarding blower time delay is granted.

York shall be permitted to test its P2LN, and PBNL lines of

condensing furnaces on the basis of the test procedures specified in

10 CFR Part 430, Subpart B, Appendix N, with the modification set

forth below:

(i) Section 3.0 in Appendix N is deleted and replaced with the

following paragraph:

3.0 Test Procedure. Testing and measurements shall be as

specified in Section 9 in ANSI/ASHRAE 103-82 with the exception of

Sections 9.2.2, 9.3.1, and 9.3.2, and the inclusion of the following

additional procedures:

(ii) Add a new paragraph 3.10 in Appendix N as follows:

3.10 Gas- and Oil-Fueled Central Furnaces. After equilibrium

conditions are achieved following the cool-down test and the

required measurements performed, turn on the furnace and measure the

flue gas temperature, using the thermocouple grid described above,

at 0.5 and 2.5 minutes after the main burner(s) comes on. After the

burner start-up, delay the blower start-up by 1.5 minutes (t-)

unless: (1) the furnace employs a single motor to drive the power

burner and the indoor air circulation blower, in which case the

burner and blower shall be started together; or (2) the furnace is

designed to operate using an unvarying delay time that is other than

1.5 minutes, in which case the fan control shall be permitted to

start the blower; or (3) the delay time results in the activation of

a temperature safety device which shuts off the burner, in which

case the fan control shall be permitted to start the blower. In the

latter case, if the fan control is adjustable, set it to start the

blower at the highest temperature. If the fan control is permitted

to start the blower, measure time delay (t-) using a stop watch.

Record the measured temperatures. During the heat-up test for oil-

fueled furnaces, maintain the draft in the flue pipe within

0.01 inch of water column of the manufacturer's

recommended on-period draft.

This Interim Waiver is based upon the presumed validity of

statements and all allegations submitted by the company. This

Interim Waiver may be removed or modified at any time upon a

determination that the factual basis underlying the application is

incorrect.

The Interim Waiver shall remain in effect for a period of 180

days or until DOE acts on the Petition for Waiver, whichever is

sooner, and may be extended for an additional 180-day period, if

necessary.

Sincerely,

Christine A. Ervin,

Assistant Secretary, Energy Efficiency and Renewable Energy.

[FR Doc. 94-27782; Filed 11-9-94; 8:45 am]

BILLING CODE 6450-01-P