DEPARTMENT OF ENERGY

Western Area Power Administration

Salt Lake City Area/Integrated Projects Notice of Rate Order No.

WAPA-63

AGENCY: Western Area Power Administration, DOE.

ACTION: Notice of Rate Order''Salt Lake City Area/Integrated Projects

(Integrated Projects) Firm Electric Service Rate Adjustment.

-----------------------------------------------------------------------

SUMMARY: Notice is given of the confirmation and approval by the Deputy

Secretary of the Department of Energy (DOE) of Rate Order No. WAPA-63

and Rate Schedule SLIP-F5 placing firm power rates for capacity and

energy from the Integrated Projects of the Western Area Power

Administration (Western) into effect on an interim basis. The

provisional rates will remain in effect on an interim basis until the

Federal Energy Regulatory Commission (FERC) confirms, approves, and

places them into effect on a final basis or until they are replaced by

other rates.

The provisional firm power rates to be effective from December 1,

1994, through November 30, 1999, consist of an energy charge of 8.90

mills per kilowatthour (mills/kWh) and a capacity charge of $3.83 per

kilowatt month (kW-month), which result in a composite rate of 20.17

mills/kWh. This is a 7.9-percent increase over the current energy

charge of 8.40 mills/kWh and the current capacity charge of $3.54/kW-

month which results in a composite rate of 18.70 mills/kWh. A

comparison of existing and provisional rates follows:

Salt Lake City Area/Integrated Projects Comparison of Existing and

Provisional Firm Power Rates

------------------------------------------------------------------------

Existing Provisional

rates rates

(effective 10/ (effective 12/

92) 94)

------------------------------------------------------------------------

Firm Power Service Rate Schedule.......... SLIP-F4 SLIP-F5

Firm Capacity Charge ($/kW/month)......... $3.54 $3.83

Firm Energy Charge (mills/kWh)............ 8.40 8.90

Composite Rate (mills/kWh)................ \1\18.70 20.17

------------------------------------------------------------------------

\1\The rates calculated at a 58.2-percent load factor can be expressed

as a Combined Rate of 16.72 mills/kWh.

DATES: Rate Schedule SLIP-F5 will be placed into effect on an interim

basis on the first day of the first full billing period beginning on/or

after December 1, 1994, and will be in effect until FERC confirms,

approves, and places the rate schedule in effect on a final basis

through November 30, 1999, or until the rate schedule is superseded.

FOR FURTHER INFORMATION CONTACT:

Mr. Kenneth G. Maxey, Area Manager, Salt Lake City Area Office, Western

Area Power Administration, 275 East 200 South, Suite 475, Salt Lake

City, UT 84111, (801) 524-6372

Ms. Deborah M. Linke, Chief, Rates and Statistics Branch, Western Area

Power Administration, P.O. Box 3402, Golden, CO 80401-0098, (303) 275-

1618

Mr. Joel Bladow, Assistant Administrator for Washington Liaison,

Western Area Power Administration, Room 8G-027, Forrestal Building,

1000 Independence Avenue SW., Washington, DC 20585-0001, (202) 586-5581

SUPPLEMENTARY INFORMATION: By Amendment No. 3 to Delegation Order No.

0204-108, published November 10, 1993 (58 FR 59716), the Secretary of

Energy (Secretary) delegated (1) the authority to develop long-term

power and transmission rates on a nonexclusive basis to the

Administrator of Western; (2) the authority to confirm, approve, and

place such rates into effect on an interim basis to the Deputy

Secretary; and (3) the authority to confirm, approve, and place into

effect on a final basis, to remand, or to disapprove such rates to

FERC. Existing DOE procedures for public participation in power rate

adjustments (10 CFR Part 903) became effective on September 18, 1985

(50 FR 37835).

These power rates are established pursuant to section 302(a) of the

DOE Organization Act, 42 U.S.C. 7152(a), through which the power

marketing functions of the Secretary of the Interior and the Bureau of

Reclamation (Reclamation) under the Reclamation Act of 1902, 43 U.S.C.

371 et seq., as amended and supplemented by subsequent enactments;

particularly section 9(c) of the Reclamation Project Act of 1939, 43

U.S.C. 485h(c); and other acts specifically applicable to the project

system involved, were transferred to and vested in the Secretary.

The main issues raised at public meetings and in written comments

included (1) cost projections used in the Power Repayment Study (PRS),

(2) water depletion schedules assumed for future power projections, and

(3) estimated future prices for purchased power. Western has considered

all comments in preparation of the provisional rates.

Rate Order No. WAPA-63, confirming, approving, and placing the

proposed Integrated Projects rate adjustment into effect on an interim

basis, is issued, and the new Rate Schedule SLIP-F5 will be promptly

submitted to FERC for confirmation and approval on a final basis.

Issued in Washington, D.C. October 24, 1994.

William H. White,

Deputy Secretary.

Order Confirming, Approving, and Placing the Salt Lake City Area/

Integrated Projects Firm Power Service Rates Into Effect on an Interim

Basis

In the Matter of Western Area Power Administration Rate

Adjustment for Salt Lake City Area/Integrated Projects

October 24, 1994.

[Rate Order No. WAPA-63]

These power rates are established pursuant to section 302(a) of the

Department of Energy (DOE) Organization Act, 42 U.S.C. 7152(a), through

which the power marketing functions of the Secretary of the Interior

and the Bureau of Reclamation (Reclamation) under the Reclamation Act

of 1902, 43 U.S.C. 371 et seq., as amended and supplemented by

subsequent enactments, particularly section 9(c) of the Reclamation

Project Act of 1939, 43 U.S.C. 485h(c), and other acts specifically

applicable to the project system involved, were transferred to and

vested in the Secretary of Energy (Secretary).

By Amendment No. 3 to Delegation Order No. 0204-108, published

November 10, 1993 (58 FR 59716), the Secretary delegated (1) the

authority to develop long-term power and transmission rates on a

nonexclusive basis to the Administrator of Western Area Power

Administration (Western); (2) the authority to confirm, approve, and

place such rates into effect on an interim basis to the Deputy

Secretary; and (3) the authority to confirm, approve, and place into

effect on a final basis, to remand, or to disapprove such rates to the

Federal Energy Regulatory Commission (FERC). Existing DOE procedures

for public participation in power rate adjustments (10 CFR Part 903)

became effective on September 18, 1985 (50 FR 37835).

Acronyms and Definitions

As used in this rate order, the following acronyms and definitions

apply:

$/kW/month: Monthly charge for capacity (i.e., $ per kilowatt (kW)

per month).

AF: Acre-foot. The amount of water necessary to cover 1 acre of

land to a depth of 1 foot.

Basin Fund: That account in the U.S. Department of the Treasury,

established by the Colorado River Storage Project (CRSP) Act.

Billing Demand: The greater of (1) the highest 30-minute demand

measured during the month up to, but not in excess of, the delivery

obligation under the power sales contract or (2) the contract rate of

delivery.

Capacity Component: Part of a firm power rate; shown in the power

repayment study (PRS) as a dollar per kW per year charge. Billed on a

dollar per kW per month basis. Applied each billing period to each kW

which each contractor is entitled by contract.

Categorical Exclusion: Characterizes an action which does not

individually or cumulatively have a significant effect on the human

environment and which has been found to have no such effect in

procedures adopted by a Federal agency and for which, therefore,

neither an environmental assessment nor an environmental impact

statement is required.

CME: Capitalized movable equipment.

Collbran: Collbran Project.

CREDA: Colorado River Energy Distributors Association.

CROD: Contract rate of delivery. Capacity the supplier of electric

service agrees to have available for delivery. It may or may not be

accompanied by energy.

CRSM: Colorado River Simulation Model.

CRSP: Colorado River Storage Project.

CRSP Act: Act of April 11, 1956, ch. 203, 70 Stat. 105, as amended,

43 U.S.C. 620-620o.

CWIP: Construction work in progress.

Customer Brochure: A document prepared for public distribution

explaining the background of the rate proposal.

Demand: The rate at which electric capacity is delivered to or by a

system over any designated period of time.

DOE: U.S. Department of Energy.

DOE Order RA 6120.2: An order dealing with power marketing

administration financial reporting.

EA: Environmental assessment.

EIS: Environmental impact statement.

Energy Component: Part of a firm power rate; expressed in mills per

kilowatthour (kWh). Applied to each kWh made available to each

customer.

Exception Criteria: An agreement between Reclamation and Western

setting forth conditions for operating the Glen Canyon Dam outside of

test flows and subsequent interim operating criteria, including system

regulation, emergency situations, and for the specific purpose of

avoiding high-cost replacement power purchases.

FERC: Federal Energy Regulatory Commission.

FPOD: Federal point of delivery.

FY: Fiscal year.

Glen Canyon Dam: The dam on the Colorado River which forms Lake

Powell.

Glen Canyon Dam EIS: Glen Canyon Dam Environmental Impact

Statement.

GCPA: Grand Canyon Protection Act of 1992.

IDC: Interest during construction.

Integrated Projects: The Salt Lake City Area/Integrated Projects,

which encompass the combined sales and resources of the CRSP, Collbran,

and Rio Grande Projects.

Interior: U.S. Department of the Interior.

kW: Kilowatt; 1,000 watts.

kWh: Kilowatthour; the common unit of electric energy, equal to one

kW taken for a period of 1 hour.

Load: The amount of capacity or energy delivered or required at any

specified point or points on a system. Load originates primarily with a

customer's energy-consuming equipment.

M&I: Municipal and industrial.

Mill: Unit of monetary value equal to .001 of a U.S. dollar; i.e.,

1/10th of a cent. Used to express wholesale energy and composite

electric rates.

Mills/kWh: Mills per kilowatthour.

MW: Megawatt; 1,000 kW; 1,000,000 watts.

NEPA: National Environmental Policy Act of 1969.

OMB: Office of Management and Budget.

O&M: Operation and maintenance. Pinch-Point: The FY in which the

level of the rate is set as dictated by a revenue requirement in some

future year to meet relatively large annual costs or to repay

investments which come due.

PMA: Power marketing administration.

PRS: Power repayment study.

Reclamation: Bureau of Reclamation, U.S. Department of the

Interior.

Regional Office: Bureau of Reclamation's Regional Office.

RGP: Rio Grande Project.

SLCA: Salt Lake City Area.

SLCAO: Salt Lake City Area Office.

Upper Basin States: Colorado, New Mexico, Utah, and Wyoming.

UCRC: Upper Colorado River Commission.

Watt: The electrical unit of power or rate of doing work. It is

analogous to horsepower or foot-pounds per minute of mechanical power.

One horsepower is equivalent to approximately 746 watts.

Western: Western Area Power Administration, U.S. Department of

Energy.

WSCC: Western Systems Coordinating Council.

Effective Date

The new rates will become effective on an interim basis on the

first day of the first full billing period beginning on or after

December 1, 1994, and will be in effect pending FERC's approval of them

or substitute rates on a final basis through November 30, 1999, or

until superseded.

Public Notice and Comment

The Procedures for Public Participation in Power and Transmission

Rate Adjustments and Extensions, 10 CFR Part 903, have been followed by

Western in the development of this firm power rate. The provisional

firm power rate represents an increase of more than 1 percent in total

Integrated Projects revenues; therefore, it is a major rate adjustment

as defined at 10 CFR Secs. 903.2(e) and 903.2(f)(1). The distinction

between a minor and a major rate adjustment is used only to determine

the public procedures for the rate adjustment.

The following summarizes the steps Western took to ensure

involvement of interested parties in the rate process:

1. A preliminary Federal Register notice (FRN), published July 1,

1993 (58 FR 35449), invited interested parties to participate in the

determination of whether an Integrated Projects' firm power rate

increase was necessary. Western also invited participation in deciding

the issues that should be addressed in the process.

2. Several informal meetings were held between the publication of

the July 1, 1993, FRN and the beginning of the public rate adjustment

process. These meetings, involving personnel from Western, Reclamation,

and represen- tatives from organizations of interested parties,

produced many issue papers that identified and discussed the items

which should be considered in a firm power rate adjustment. Agreement

as to how to approach many of the issues was reached during this time,

considerably reducing the number of unresolved issues and easing the

later formal public process.

3. On December 27, 1993, letters were mailed from Western's

Loveland, Phoenix, and Salt Lake City Area Offices to all Integrated

Projects customers and other interested parties announcing an informal

public meeting to be held on January 31, 1994.

4. At the informal meeting held on January 31, 1994, Western and

Reclamation representatives explained the need for a rate increase and

answered questions.

5. An FRN was published on April 21, 1994 (59 FR 19008), officially

announc- ing the proposed firm-power rate adjustment, initiating the

public consultation and comment period, announcing the public

information and public comment forums, and presenting procedures for

public participation.

6. On April 22, 1994, a rate announcement package was mailed from

Western's Salt Lake City Area Office to all Integrated Projects

customers and other interested parties announcing the publication of

the FRN of April 21, 1994, and the beginning of the formal public

process to adjust firm power rates. The package contained (1) a letter

announcing the upcoming public information and comment forums, (2) a

copy of the April 21 FRN, and (3) a copy of the April 1994 Integrated

Projects Firm Power Rate Adjustment brochure. Rate announcement

packages were mailed to customers served by Western's Loveland and

Phoenix Area Offices on April 25, 1994.

7. At the public information forum held on May 24, 1994, Western

and Reclamation representatives explained the need for the rate

increase in greater detail and answered questions.

8. The comment forum was held on June 30, 1994, to give the public

an opportunity to comment for the record. Four persons representing

customers and customer groups made oral comments.

9. Nine comment letters were received during the 97-day

consultation and comment period. The consultation and comment period

was originally scheduled to end on July 20, 1994. A letter was sent to

all interested parties from the SLCAO on July 19, 1994, stating that

Western would continue to accept written comments through July 27,

1994. Letters were mailed from the Loveland and Phoenix Area Offices on

July 20, 1994. All comments submitted by the end of the comment period

have been considered in the preparation of this rate order.

Project History

The Integrated Projects consist of the CRSP and the Rio Grande and

Collbran Projects. The projects were integrated for marketing and

ratemaking purposes on October 1, 1987. The goals of integration were

to increase marketable resources, simplify contract and rate

development and project administration, assure repayment of Collbran

and Rio Grande Projects' costs, and create a common rate. The projects

maintain their individual identities for financial accounting and

repayment purposes, but their revenue requirements are integrated into

one PRS for ratemaking.

Power Repayment Studies

PRSs are prepared each FY to determine if power revenues will be

sufficient to pay, within the prescribed time periods, all costs

assigned to power. Repayment criteria are based on law, policies,

authorizing legislation, and DOE Order RA 6120.2.

Existing and Provisional Rates

A comparison of the existing and provisional rates follows:

Salt Lake City Area Integrated Projects Comparison of Existing and

Provisional Firm Power Rates

------------------------------------------------------------------------

Existing Provisional

rates rates

(effective 10/ (effective 12/

92) 94)

------------------------------------------------------------------------

Firm power service rate schedule.......... SLIP-F4 SLIP-F5

Firm capacity charge ($/kW/month)......... $3.54 $3.83

Firm energy charge (mills/kWh)............ 8.40 8.90

Composite rate (mills/kWh)................ 18.70\1\ 20.17

------------------------------------------------------------------------

\1\The rates calculated at a 58.2-percent load factor can be expressed

as a combined rate of 16.72 mills/kWh.

Certification of Rate

Western's Administrator has certified that the Integrated Projects

firm power rate placed into effect on an interim basis herein is the

lowest possible consistent with sound business principles. The rate has

been developed in accordance with agency administrative policies and

applicable laws.

Discussion

Many factors influenced this rate adjustment. The items having an

impact upon the proposed Integrated Projects firm power rates are

summarized in the table below. Because rates must earn sufficient

revenues to pay for estimated future costs, the table compares the

change in the average annual projections used in the FY 1991 Rate Order

PRS (which set the rate effective October 1, 1992) and the ratesetting

PRS prepared for this rate adjustment.

Major Factors Affecting the Integrated Projects' Firm Power Rate

------------------------------------------------------------------------

Change in

average

annual Estimated

Event revenue rate effect

requirement (mills/kWh)

($000,000)

------------------------------------------------------------------------

Increase in Colorado River Storage Project

(CRSP) Transmission and Other Miscellaneous

Revenues: primarily, compensation for new

Phase-Shifter services (for Western System

Coordinating Council loop-flow mitigation). $-2.6 -0.33

Increase in CRSP Operation & Maintenance

(O&M) Expense: $2.8 million per year due to

inclusion of CME interest (inadvertently

omitted from current rate); Remainder due

to shifting of field crews from

construction to maintenance work........... 8.2 1.05

Increase in Small Project O&M Expense: Rio

Grande Project is one of Western's oldest

projects, and O&M increases with age;

Collbran has many small irrigation dams

needing repair............................. 1.1 0.14

Increase in Purchased Power and Transmission

Expense: The environmentally-related flow

restrictions already in place at CRSP

powerplants require Western to purchase

additional power to meet contractual

delivery obligations....................... 1.6 0.20

$51.2 million in historical environmental

expenses made nonreimbursable by Grand

Canyon Protection Act (plus $9.1 million

associated with deferred interest expense);

Applied to outstanding deficits............ -0.5 -0.06

Passage of Grand Canyon Protection Act made

certain future environmental costs

nonreimbursable............................ -1.0 -0.13

Increase in Interest on Project Investment:

The increase in power investment and unpaid

deficits since the October 1992 rate

adjustment resulted in an increase in

annual interest due........................ 2.1 0.27

Increase in Project Additions and

Replacements: As noted on page 13 of Rate

Brochure, $80.5 million was omitted from

CWIP in the October 1992 rate adjustment... 1.2 0.15

Increase in aid to CRSP irrigation and

participating projects: Investment is very

similar to October 1992 rate adjustment;

however, there are 63 total years to pay

for the investment, rather than the 65

years used previously since both studies

have the pinch-point year of 2057. The

change in the divisor results in the annual

increase................................... 1.4 0.18

---------------------------

Totals.................................. $11.5 1.47

------------------------------------------------------------------------

The existing and proposed revenue requirements for the Integrated

Projects are as follows:

Integrated Projects Average Annual Firm-Power Revenue Requirements

------------------------------------------------------------------------

Estimated average

annual FY 1995-99 firm

power revenue ($000)

-----------------------

SLIP-F4 SLIP-F5

------------------------------------------------------------------------

Firm power revenue.............................. \1\$109,26

5 \2\$122,41

3

------------------------------------------------------------------------

\1\From FY 1991 Rate Order PRS.

\2\From Ratesetting PRS.

The rate increase is necessary to satisfy the cost-recovery

criteria set forth in DOE Order No. RA 6120.2. This rate schedule,

which will be effective on an interim basis beginning December 1, 1994,

replaces Rate Schedule SLIP/F4 which FERC approved through September

30, 1996 at 62 FERC 61,159 (February 18, 1993).

Statement of Revenue and Related Expenses

The following table provides a summary of revenue and expense data

through the 5-year proposed rate approval period.

Salt Lake City Area/Integrated Projects Comparison of 5-Year Rate Period

Revenues and Expenses ($1,000)

------------------------------------------------------------------------

Ratesetting FY 1991 rate

Revenues PRS 1995- order PRS Difference

1999 1995-1999

------------------------------------------------------------------------

Revenue Distribution:

O&M......................... $237,483 $218,540 $18,943

Environmental............... 19,295 37,223 -17,928

Net purchased power\2\...... 972 -1,953 2,925

Transmission................ 35,785 31,695 4,090

Interest.................... 229,029 188,103 40,926

Miscellaneous expenses\3\... 45,976 20,430 25,546

Investment repayment........ 102,255 99,189 3,066

-----------------------------------------

Total\4\.................. \1\670,795 \5\593,227 \6\77,568

------------------------------------------------------------------------

\1\To be comparable with the FY 1991 Rate order PRS, the ratesetting

PRS' ``Other Miscellaneous Revenues'' (from sales of surplus off-peak

energy) were deducted from the total revenues and were combined with

total purchased power expense.

\2\Net Purchased Power Expenses (Ibid.). Negative net purchase power

expense figures imply surplus sales in excess of total purchase power

expenses. Likewise, positive net purchase power expense figures imply

total purchase power expenses in excess of total power sales.

\3\Interest on undepreciated CME, annual liability for the Civil Service

Retirement System, and annual gross power-related requirements for the

Collbran, Provo River, Rio Grande, and Seedskadee Projects.

\4\Includes repayment of capitalized deficits.

\5\Does not equal Total Revenues due to rounding.

\6\Ibid.

Basis for Rate Development

The provisional Integrated Projects rate was designed to continue

to maintain an approximate 50/50 split between revenue earned from

demand charges and that earned from energy charges. The cost to

individual customers will vary because of differences in the amounts of

capacity and energy they purchase from the Integrated Projects.

The provisional rate contains a $3.83/kW/month firm-capacity charge

and an 8.90 mills/kWh firm-energy charge in FY 1995. The necessary

composite rate is 20.17 mills/kWh, which is an increase of 7.9 percent

above the existing rate. The rate terminates on November 30, 1999.

Comments

During the 97-day comment period, Western received nine letters

commenting on the rate adjustment. One letter was received after the

close of the comment period. Additionally, four persons commented

during the June 30, 1994, public comment forum. All comments received

by the end of the comment period were reviewed and considered in the

preparation of this rate order. Written comments were received before

the comment deadline from the following sources:

Bountiful City Light and Power (Utah)

Bridger Valley Electric Association (Wyoming)

Colorado River Energy Distributors Association (Arizona, Colorado,

Nevada, New Mexico, Utah, and Wyoming)

Energy Strategies, Inc. (Utah)

Garkane Power Association, Inc. (Arizona and Utah)

Intermountain Consumer Power Association (Nevada and Utah)

Irrigation and Electrical Districts Association of Arizona (Arizona)

Upper Colorado River Commission (Colorado, New Mexico, Utah, and

Wyoming)

Utah Municipal Power Agency (Utah)

Representatives of the following organizations made oral comments:

Colorado River Energy Distributors Association (Arizona,

Colorado, Nevada, New Mexico, Utah, and Wyoming)

Intermountain Consumer Power Association (Nevada and Utah)

Irrigation and Electrical Districts Association of Arizona

(Arizona)

Platte River Power Authority (Colorado)

Most of the comments received at the public meetings and in

correspondence dealt with cost, purchased power, and water depletion

projections.

The comments and responses, paraphrased for brevity when it does

not affect the meaning of the statement(s), are discussed below. Direct

quotes from comment letters are used for clarification where necessary.

The issues discussed are: (1) Depletion-related issues, (2)

purchased power expense, (3) future flow restrictions at Glen Canyon

Dam, (4) O&M-related issues, (5) construction-related projections, (6)

environmentally-related expenses, (7) miscellaneous comments, and (8)

issue paper resolution.

1. Depletion-Related Issues

Extensive comments were made regarding the deferred recognition of

water depletions for water projects in the Colorado River Basin after

FY 2010. Western's responses are listed sequentially:

a. Comment: Western is being guided solely by RA 6120.2 in the

rate-setting process without paying sufficient attention to the CRSP

Act of 1956 and other relevant legislation. The rate does not

accurately reflect the intent of the CRSP Act, which is to produce

rates that result in full repayment of the power system costs.

Response: Western disagrees. Western complies with requirements of

the CRSP Act of 1956, other relevant legislation, and DOE Order RA

6120.2 in assuring repayment of all CRSP costs assigned to power.

Legislation takes precedence when there is conflict with DOE Order RA

6120.2.

Treatment of depletions in the same manner has been approved by

FERC twice prior to the present rate adjustment. Two of FERC's criteria

for rate approval are whether the proposed rate will repay all

obligations assigned to power in full and on time consistent with

requirements of the CRSP Act and whether the methodology which achieves

this result is in compliance with DOE Order RA 6120.2. The requested FY

1995 rate adjustment meets these criteria and satisfies all repayment

requirements.

b. Comment: If power rates are set without providing for future

depletions, it will affect Upper Basin development under the (Colorado

River and Upper Colorado River Basin) compacts. Every time someone

wants to build a project or open a business that will deplete water,

the power rates will have to go up if those increased depletions have

not already been factored into the rates.

Can full repayment be truly represented by rates derived assuming

water is available for release through powerplants when that water will

not be available because of depletions by the Upper Division States

above the powerplants?

Response: Total depletions forecasted by the Basin States for the

use of Colorado River water have been included in the proposed rate.

The water has been allocated by compacts for use by the Upper Basin

States. Furthermore, Western is obligated to assure that funds are

available on schedule to meet repayment requirements regardless of

depletion schedules.

In its proposed treatment (deferral) of uncertain depletions,

Western assumes that greater amounts of Colorado River water will be

available for release through CRSP powerplants than would be suggested

by current rapid-growth forecasts of water development projects and

their associated depletions.

Western's experience has been that out-year depletion estimates are

subject to frequent revision. It is reasonable, therefore, to give more

weight to near-term projections. Western prepares an annual PRS for

every project to assure that repayment is proceeding satisfacto- rily.

Thus, there will be many future opportunities to revise the Integrated

Projects rate appropriately as the near-term projections are changed

and more accurate long-term estimates are made available.

Western has determined that depletions affect the firm power rate,

at most, by 0.32 mills/kWh (composite). The impact is small enough so

that power rates could (and would) be adjusted to assure full

repayment, if more rapid depletions take place in the Upper Basin

States. It is not likely that this small impact on power rates would

constrain water depletions.

c. Comment: By its own terms the 1983 Agreement between Reclamation

and Western does not apply to State and private projects or

developments and that the agreement reveals the parties' intent to use

full depletion levels in setting rates under the terms of the

Agreement.

Response: Western disagrees that the intent of the 1983 Agreement

was for Western to use ``full'' (or ultimate) depletion levels in

setting rates. Rather, a provision of the agreement that addresses

depletions only requires that water depletion schedules used for power

repayment studies ``. . . be consistent with construction schedules for

participating projects.''

Western agrees that provisions of the 1983 Agreement between

Western and Reclamation did not explicitly address State and private

projects or developments. In defining a ``reasonable expectation

standard,'' the 1983 Agreement establishes necessary steps by

Reclamation to demonstrate the potential for construction of future

Federal participating projects before the costs of these projects would

be included in the ratesetting years. This reasonable expectation

standard has been applied to the future development of all water

development projects for ratesetting purposes by Western in setting the

lowest possible rates consistent with sound business principles.

Therefore, Western has included total depletions forecasted by the

Upper Basin States for the use of Colorado River water for all

projects, with deferral of less-certain water developments (depletions)

beyond the ratesetting period in the proposed rate. Future rate

adjustments will allow for movement of depletions into the rate-

setting years.

d. Comment: Western arbitrarily suppressed depletions from 2010

through 2090 only justified by the fact that such a method of

suppression (capping) was utilized in the 1990 study and did so without

adequate consultation with Reclamation.

Response: The decision by Western to defer uncertain depletions

beyond the ratesetting period is not arbitrary. In the 1990 rate

process, Western gave considerable attention to the reasonableness of

the then-proposed depletion deferral and to the associated rate effect

when applied. Further, Western has given renewed and height- ened

attention to the treatment of depletions in the proposed rate through

preparation of numerous issue papers, informal discussions with both

customer and water user representatives, and in Western's April 1994

rate brochure.

Figure 1, on page 12-5 of the rate brochure, shows that Western

presently assumes full development (full depletions) of all Upper Basin

water projects by FY 2090.

Projects with uncertain schedules have been placed in the PRS so

that they do not impact the rate at this time, in accordance with

Western's practice to set the lowest possible rate consistent with

sound business principles.

Western also disagrees with the claim that inadequate consultation

occurred with Reclamation in the past on this deferral treatment.

Reclamation, along with other interested parties, has either

participated in or has attended many of the public forums scheduled in

the development of all Integrated Projects rate proposals. In these

public forums, Western has detailed the components of the rate

adjustment, including the treatment of depletions. Reclamation and

interested parties have been and will continue to be afforded ample

notice and opportunity to comment on future rate proposals.

e. Comment: Five comments said: DOE RA 6120.2 seems to require the

use of operation studies based on historical streamflows including

hydrologic data current to within 5 years.

Response: Western believes that it is in compliance with DOE RA

6120.2. This requirement is valid for most projects. However,

exceptions, as discussed in DOE RA 6120.2, Section 10.e.(4), are

provided for those projects which are anticipated to have extensive

water development in the future. CRSP operation studies are based on

historic streamflows, which are then reduced by projected water

depletions supplied by the Upper Basin States and modified by

Reclamation.

f. Comment: Western suggests that its departure from the 1990

depletion schedule represents better data than utilized by Reclamation

in its energy and capacity studies.

Response: Both Reclamation and UCRC staff have told Western infor-

mally that the depletion schedule used in this process is a more

accurate reflection of the current situation than the earlier ``Energy

and Capacity Studies'' which was available when the ratesetting PRS was

prepared.

g. Comment: The 1990 cap at 2010 resulted in an approximate 11-

percent reduction of Basin States' depletions and an artificially low

power rate. The proposed super-imposition of a 1990 mentality beginning

in 2010 to a substantially revised 1992 unofficial depletion schedule

results in excess of 20-percent reduction of depletions and does not

even fully recognize the future depletions of projects currently under

construction.

Response: Western agrees that the deferral of some estimated deple-

tion effects until 2060 suggests a significant (20-percent) reduction

from the 1992 depletion schedule contained in the CRSM demand data.

Western believes there should be greater certainty of development

regarding this 20-percent prior to including the associated reduction

in hydrogeneration in the PRS in a way that affects the firm power

rates. Also, Western agrees that its deferral postpones future

depletions of projects currently under construction, based on the

principles of the 1983 agreement. Again, because the timing of the

development of the associated consumptive use is uncertain, Western

chooses to not include future depletions within the ratesetting years.

As more current information is supplied by the UCRC to Reclamation,

Western will apply the ``reasonable expectation'' standard to these

updated depletions.

h. Comment: Western did not use the depletion schedule dated July

1994 which was received in draft form in April 1994.

Response: Western was provided a draft work-in-progress depletion

schedule by UCRC representatives in April 1994. This latest unofficial

schedule demonstrated a reduced and delayed schedule for development of

Upper Basin projects. However, the schedule had yet to be approved by

the Basin States and, once received by Reclamation, would still have

required considerable work by Reclamation staff to modify depletion

(demand) data used by the CRSM. In addition, subsequent analysis by

Western's power resources and rates staff would have taken considerable

time and effort before new information could be verified and supported

for inclusion in any revised PRS for this proposed rate process. For

example, the final PRS used for the April 1994 rate brochure was

created in March of 1994. Its power projections were the end result of

several months of work by Western and Reclamation resources staff. An

official depletion schedule ready for use in July of 1994 would have

delayed the public process for the current rate adjustment by several

additional months.

Western is responsible for seeing that the Integrated Projects earn

sufficient revenues to pay all of their obligations on time. Such a

lengthy delay in implementing the rate adjustment would have resulted

in increased interest cost to customers, lost revenues, and, as a

result, higher firm power rates.

Western has assured UCRC that when official depletion information

is available, has been incorporated into Reclamation's CRSM data files,

and there is a common understanding of the reasonable certainty of

future water projects, the associated generation effects will be

weighed and a decision made by Western regarding their inclusion in any

future PRS.

i. Comment: The attorney for a customer stated:

. . . the treatment of depletions in this rate case has nothing to

do with the water rights of the Upper Basin States. Nor does it have

anything to do with how those rights will be exercised in the future.

Western has no power over the water rights of the Upper Basin States.

Conversely, the power users should not be punished because of delays in

Upper Basin water use development and fears of Upper Basin water users

that such development may ultimately not occur.

Response: Western agrees with this comment.

2. Purchased Power Expense

Four large customer organizations all commented extensively on

purchased power expense:

a. Comment: A customer organization stated:

The assumed lower prices for surplus energy sales are, in fact, at

odds with recent experience for the SLCA/IP.

It is clear that experience does not support Western's pricing

assumptions, which were based on combining various pricing and cost

data in an inconsistent and somewhat arbitrary fashion. (The commentor)

recommends that Western modify its pricing assumptions by setting

prices for surplus sales at the same levels as those used for

purchases.

Response: Western agrees, in part, with comments that assumed

nonfirm surplus sales pricing in the estimation of future-year net

purchased power expenses does not reflect an extension of historic

pricing trends. This fact is supported in documentation prepared by

Western on the methodology and assumptions developed in previous rate

proceedings and consistently applied again in this proposed rate

adjustment. The imposed restrictions at Glen Canyon Dam have caused

Western to sell off-peak surplus energy. The impact of these sales is

based upon the market conditions. Western has explained that the basis

for assumptions of future surplus sales pricing is based upon

consideration of the potential market conditions. Western assumes that

there will be a need to dispose of limited onpeak surpluses in southern

markets, which will mean competing against low-cost sales from the

Navajo Generating Station. Western will also try to sell significant

surpluses in northern markets, competing against low-cost sales from

regional northern utilities. Certain general conclusions may be drawn:

(1) average nonfirm surplus energy prices, both offpeak and onpeak,

will be less than historic conditions, this also implies that period

pricing (onpeak or offpeak) will be less than recent experience, (2)

historic pricing differentials, onpeak versus offpeak, winter versus

summer season, will continue, and (3) Western's hourly modeling of

constrained operations at Glen Canyon is reasonable.

Though the method developed is believed to be a reasonable tool for

forecasting future surplus sales pricing, Western acknowledges that

some merit exists in comments that suggest a closer link to recent

historic trends is reasonable. Western will continue to refine the

methods for forecasting future market conditions, both purchases and

surplus sales, and will continue to give greater weight to recent

historic pricing trends in future pricing projections.

Western disagrees with the comment which suggests that surplus

sales and purchase pricing should be identical, without consideration

of the nature of the constraint condition at Glen Canyon. The methods

developed by Western for assessment of conditions with and without

interim release constraints at Glen Canyon currently predict (a) that

higher, but acceptable, average purchase prices will result in the near

future from deliveries under several long-term purchase agreements and

(b) lower average surplus sale prices will occur due to significant

``forced sales'' during offpeak and shoulder onpeak hours. However,

should additional operation experience suggest modification to this

base assumption, Western will consider future improvements in the

methods used.

b. Comment: Western applied the hourly modeling of net purchased

power expense to only 3 years. The other years between and beyond the 3

years modeled were estimated based on a regression analysis of the 3

years' results . . . regression analysis using three data points to

interpolate and extrapolate results may be unreliable and is certainly

less than ideal. (The commentor) recommends that the hourly model be

used to calculate annual net expense at least through the year 2002,

when the recovery of the hydrosystem and increases in firm load . . .

have stabilized.

Response: Western disagrees with the suggestion that additional

years of hourly modeling in its current form would significantly

improve the reliability of forecasted net purchase power expenses.

The methodology developed by Western to forecast the net purchase

power expense considers several significant variables such as hourly

firm load and available hourly hydrogeneration in determination of

hourly deficits or surpluses. The method then considers seasonal

variation in purchase and surplus sales pricing structures in

estimation of the net purchase power expense. Given the simplifying

assumptions made in the methods, Western recognizes a significant

correlation between deficit (or surplus) hydrogeneration and the

associated net purchase power expense.

In balancing the limited time required to complete the analysis and

the precision required for the net expense estimate, Western determined

that modeling all hours within each month for 3 years (i.e., 36 months)

would be adequate and that hourly modeling for additional years would

not significantly improve the reliability of the forecasted net

purchase power expense.

Western continues to support the general application of these

methods to express the causal relationship between deficit (or surplus)

hydrogeneration and annual net purchase power expenses. However,

Western acknowledges that some future modifications may be beneficial,

such as (1) additional refinements of the model, (2) validation of key

assumptions, and (3) application of refined methods and assumptions to

additional future periods (i.e., months, years) to increase the sample

size. Such changes will be considered in future net purchase power

expense forecasts.

c. Comment: A large customer organization says that it has been

unable to understand or replicate Western's results.

Response: Western has made a conscientious effort to provide all of

the information needed to develop the purchased power expense analysis

in a timely manner. Western's staff has provided explanations to

customers and their consultants and are available and willing to

provide additional clarification as needed.

3. Future Flow Restrictions at Glen Canyon Dam

a. Comment: A large customer organization expressed concern that

Western has overstated revenues of $3 to $8 million per year from

short-term capacity sales through 2004.

Response: It is improbable that flows restricted for environmental

reasons will ever again provide enough firm power from the Glen Canyon

Unit to reach levels used in past power projections. Western does not

know which of many possible flow regimes will finally be imposed at the

Glen Canyon Unit. The treatment of short-term sales has been consistent

with the firm power assumptions. Therefore, it is impossible to modify

power projections for the proposed rate adjustment to recognize the

reduced power output. The only course of action Western is able to

follow is to stay with historic power projection figures, using the

methodology already used in previous processes, until the Glen Canyon

regime is finally determined.

Western will evaluate the firm power rate then in place when the

new flow regimes from the Glen Canyon Dam are decided. If it is needed,

a firm power rate adjustment will be proposed then.

b. Comment: An organization of several customers stated: While it

is understood that a degree of uncertainty surrounds the exact level of

flows at Glen Canyon, Western should conduct a sensitivity analysis

predicated on the alternative flow assumptions identified in the

Operation of Glen Canyon Dam Environmental Impact Statement. Such

sensitivity analysis (sic) would give customers a range of possible

replacement power costs.

Response: Western has done extensive analyses of the power and rate

impact of every flow regime identified for study in the GCD-EIS.

Detailed descriptions of the studies and their results are reported in

the draft GCD-EIS, and will be contained in the final GCD-EIS when it

is published.

In the meantime, Western is specifically required, by law and by

regulation, to use known or statistically probable estimates of future

activity in creating rates. The level of uncertainty still existing

with the GCD-EIS prevents the use of any of its data at this time. As

is noted above, when a decision about environmentally related flows

through Glen Canyon Dam is made, a revised PRS will be prepared, and a

new rate will be proposed, if needed.

4. O&M-Related Issues

a. Western O&M: CREDA signed an agreement with Western and

Reclamation dated September 24, 1992, which states:

Western shall utilize the Work Program Information made available

to its Customers by Western and Reclamation (including adjustments

thereof which may result from reviews, from internal corrections or the

dispute resolution process provided for in these Joint Procedures but

excluding the costs of future transmission system additions in a

Planning Year or Out Year which are conceptual in nature), to prepare

the power repayment studies upon which it relies to promulgate any

interim or final rates proposed or adopted for SLCAIP firm power or

transmission services.

Several customers and their member organizations are concerned

about the implementation of the 1992 Agreement.

(1) Comment: (One commentor) continues to be concerned with

Western's inconsistent use of budgeted information in the preparation

of the PRS . . . (the commentor) has been some-what frustrated in its

attempts in this rate adjustment process to reconcile certain

information used in the 1994 Rate Brochure PRS with the information

previously provided in the Work Program review process.

Response: The FY 1995 Work Program is merely a copy of the proposed

FY 1994 Congressional Budget Submission. It was used as the starting

point in planning expenditures for the FY 1995 congressional budget.

CREDA's September 1992 agreement with Western and Reclamation

allows power customers to have meaningful input to the new

congressional budget. However, this work program document is prepared

too early in the planning process for either customers or Western to

say that no further changes will be made. Western feels that the timing

and use of documents stated in the agreement should be revisited.

Western is willing to continue to work with the customers in improving

the budget and work plan review process in the future.

To illustrate the process, the transformation of the FY 1995 Work

Program into the final FY 1995 Budget is outlined below:

(a) (The commentor) reviewed the FY 1995 Work Program and had

opportunity to make suggested changes.

(b) The revised FY 1995 Work Program became the FY 1995 Internal

Review Budget. At this point, more changes were made. Those changes

then were reviewed by Western. Further changes, usually a lowering of

spending projections, are common in this stage of budget preparation.

(c) The FY 1995 Internal Review Budget was then sent to Washington

to be approved by DOE. There are usually reductions in spending

estimates at this stage, as well, dictated by DOE's spending

priorities. The DOE-approved budget was called the FY 1995 OMB Budget

Request and was sent to that agency for review and approval. Any

changes were then incorporated into a document called the FY 1995

Congressional Budget Submission.

(d) Finally, the FY 1995 Congressional Budget Submission went

before Congress, where any final changes desired by the legislative

branch of Government were made. Only after it was approved by Congress

after public debate was the final FY 1995 Budget determined.

The FY 1994 Congressional Budget Submission was officially sent to

Congress in January 1993. When the April 1994 rate brochure PRSs were

being prepared, the data in the FY 1994 Congressional Budget

Submission/1995 Work Program was already more than 2 years old (having

begun as the FY 1994 Work Program in early 1992). Because of this

timing, most of the information was outdated.

Western had completed turning the FY 1995 Work Program into the FY

1995 Congressional Budget Submission by that time. As is usually the

case, some of the planned expenditures had been deleted in the process.

Further, because of extra impetus to keep costs down, a Western-wide

decision was made in which O&M costs would be allowed to rise only 2-

percent per year between FYs 1994 and 1996.

In keeping with Western's policy to set rates at the lowest

possible level consistent with sound business principles, Western used

data from the lower-cost (and more current) FY 1995 Congressional

Budget Submission rather than that in the customer-reviewed FY 1995

Work Program in the Rate Brochure PRS.

When Reclamation, Western, and CREDA entered into the September

1992 agreement, the parties did not anticipate that expenditure plans

would change significantly between the Work Program review and the

congressional budget submission. Events have proved otherwise.

Comparison of FY 1995 Work Plan With FY 1995 Congressional Budget Submission O&M Expenses $000

----------------------------------------------------------------------------------------------------------------

FY 1994 FY 1995 FY 1996 FY 1997 FY 1998 Totals

----------------------------------------------------------------------------------------------------------------

1995 Work Plan:

Reclamation................................. $17,898 $18,408 $17,403 $17,884 $16,739 $88,332

Western..................................... 30,894 30,379 30,743 31,481 33,905 157,402

-----------------------------------------------------------------

Total....................................... 48,792 48,787 48,146 49,365 50,644 245,734

1995 Budget:

Reclamation................................. $15,856 $15,925 $16,041 $16,262 $16,631 $80,715

Western..................................... 29,307 27,635 27,971 28,724 28,984 142,621

-----------------------------------------------------------------

Total..................................... 45,163 43,560 44,012 44,986 45,615 223,336

-----------------------------------------------------------------

Decreased Cost to Customers............. -3,629 -5,227 -4,134 -4,379 -5,029 -22,398

----------------------------------------------------------------------------------------------------------------

(2) Comment: Two comments expressed concern that: Western's

projected O&M expenses for 1994 are more than 25-percent higher than

actual O&M expenses in 1993 and more than 20-percent higher than the

1994 O&M expenses included in the 1995 Work Program documents.

Response: Western has been unable to duplicate the analysis in this

comment. Some of the figures in the commentor's table are incorrect.

This gives the impression of a problem where Western believes none

exists. Most significantly, Western's actual FY 1993 CRSP O&M expense

of $17.964 million shown in the commentor's tables is incorrect. The

proper amount, from the Results of Operations (financial statements) as

shown below, is $21.418 million. This should be the basis for the

commentor's percentage calculations.

Below is a table comparing the table submitted by the commentors,

the FY 1995 Work Program, and the amounts used in the PRS.

Western's CRSP O&M ($000)

----------------------------------------------------------------------------------------------------------------

1993 1994 1995 1996 1997 1998

----------------------------------------------------------------------------------------------------------------

Commentor's Table \1\..................................... 17,964 18,628 20,888 21,070 21,437 21,923

Annual Change (%)......................................... 0 4 12 1 2 2

FY 1995 Work Program\2\................................... 26,449 24,555 23,898 24,202 24,882 27,245

Annual Change (%)......................................... 0 -7 -3 1 3 10

Rate Brochure PRS \3\..................................... 21,418 22,530 20,888 21,070 21,437 21,993

Annual Change (%)......................................... 0 5 -7 1 2 3

----------------------------------------------------------------------------------------------------------------

\1\ From comment letter dated July 27, 1994; source of data identified as FY 1995 Work Program.

\2\ From FY 1995 Work Program (i.e., FY Congressional Budget submission), according to CRSP records.

\3\ Using the FY 1995 Congressional Budget submission.

The average annual growth rate in the rate brochure PRS from 1993

through 1996 is a negative 0.33 percent. This is considerably below the

2-percent maximum annual growth rate which is Western's goal.

5. Reclamation O&M

a. Comment: Reclamation explained the increase in Regional Office

expense in 1995 O&M expenses over the level shown in the 1995 Work

Program (which was $564,000) as the inclusion of the Dolores Project

O&M expense. The O&M expenses for the Dolores Project are shown in the

1995 Work Program as $301,000 for 1995, leaving $263,000 of the

increase in this account category unexplained.

Response: The statement that the Regional Office expense in 1995

included the Dolores Project is incorrect. The Regional Office expense

category applies only to the initial CRSP units (i.e., Aspinall,

Flaming Gorge, Glen Canyon, and Navajo), and not to the Dolores

Project. Dolores Project costs are shown in their own, separate PF-3

budget document.

Regional Office expenses shown in the initial units (CRSP) work

plan differ from those included in the PRS because Western

inadvertently used an unofficial version of Reclamation's PF-3. This

document did not differ from the official budget in total costs for the

CRSP initial units. An adjustment within the program was made, which

increased the Regional Office expense by $564,000. This was made to

balance to the FY 1995 Budget Submission funding amount.

b. Comment. The O&M figures (for the Rio Grande Project) in the PRS

appear to double count capitalized moveable equipment (CME) expenses

for the years 1995, 1997, and 1998 . . . .

Response: Western agrees with the comment and has rerun the RGP

study to eliminate this error.

c. Comment: For 1994, the difference in expenses between the Work

Program and the PRS appears to be comprised of the $35,000 for CME less

a $20,500 expense reduction, which is unex- plained.

Response: Western's numbers were correct and have been used in the

PRS. The commentor's table shows a difference of $28,885. There are

four reasons for the difference: (1) O&M expenditures planned for FY

1993 on the Elephant Butte Dam of $67,548 (portion assigned to power =

$67,548 X 20.8% = $14,050) were not spent in FY 1993, but were

obligated and actually spent in 1994; (2) expenditures planned on the

Elephant Butte Powerplant ($30,854, of which 100-percent is repayable

by power revenues) were not spent in FY 1993, but were obligated and

actually spent in FY 1994; (3) the $35,000 referred to as CME for FY

1994 is not CME, but miscellaneous tools which is charged off to O&M

and is properly includable in the total O&M for the year; and (4) item

number (2) was further complicated by the fact that both the Work

Program and the FY 1995 Budget Congressional Submission are based on an

incorrect version of the summarized report. A line item (which should

be included in the Other Expense line) which appears on the detailed

report was coded incorrectly so that it does not appear on the

summarized reports, but is included in the totals of both reports.

Thus, the totals are $40,000 higher in the Work Program than the total

of the numbers shown and $23,921 higher than the total of the numbers

shown in the FY 1995 Congressional Budget Submission. The $40,000

budgeted Other Expense item was later reduced to $23,921, which matches

the $1,141,775 figure shown in the FY 1995 Congressional Budget

Submission. Following is a table which recaps the above information

starting with the figures shown in the commentor's table:

Elephant Butte Powerplant

------------------------------------------------------------------------

1995

1995 Work congressional

Program budget

submission

------------------------------------------------------------------------

Salaries.................................... $532,000 $532,000

Office General Expense...................... 262,000 262,000

CPA......................................... 173,000 173,000

---------------------------

Other Expense\1\............................ 120,000 150,854\2\

Subtotal\3\............................. 1,087,000 1,117,854

Missing Line Item\4\ (other expenses)....... 40,000 23,921

--------------

Total\5\................................ 1,127,000 1,141,775

------------------------------------------------------------------------

\1\Other expenses should have been higher by $40,000 in both the FY 1995

Work Program and the FY 1995 Congressional Budget Submission.

\2\When summed, includes $30,850 carryover from FY 1993.

\3\Actual summation of figure shown.

\4\This amount should have been included in the ``other expense'' line

of both the FY 1995 work program and the FY 1995 Budget

Justifications.

\5\As displayed in the FY 1995 Work Program and the FY 1995

Congressional Budget Submission.

Subtotal--Elephant Butte Powerplant O&M.................... $1,141,775

Less amount shown on commentor's table..................... 1,127,000

------------

Subtotal............................................... 14,775

Add allocated carry-over amount from item (1) above........ 14,050

------------

Total difference shown on commentor's table............ 28,825

------------

The average annual increase in projected O&M expenses which

results in a $8.2 million annual revenue requirement is

troublesome. How this figure was obtained in the modeling

effort undertaken at Western is not explained in detail in

the brochure. If the projected figure is based upon an

extrapolation of historical data adjusted for inflation,

the cost figure may not reflect all of the possible areas

of cost reduction available to both Western and the Bureau

of Reclamation.

Response. Only two projections used in the Integrated

Projects and/or CRSP PRS are based on computer modeling:

the water available for power production and the ultimate

power-related revenue requirements for the participating

projects. Estimates for future O&M expenses are taken

directly from official budgets; the budgets include modest

approximations of labor cost increases. All equipment

spending in the 5-year budget window is made up of actual

projections received from workers in the field, reporting

which equipment is likely to need replacement and when.

Miscellaneous revenue and expense projections are based on

historical averages and known future commitments.

b. Comment. A customer organization said:

The Energy Policy Act of 1992 (EPACT) has served as the

catalyst for increasing competition in wholesale

generation. They would anticipate that Western begin to

streamline its operations in order that it position itself

competitively in the new electricity market.

Response. Western's management is presently looking for

ways to improve customer service while cutting costs

through Western's Strategic Planning initiative. Some of

the decisions made to date include:

(1) Delayering. This is a reduction in the number of

supervisory employees, to reduce red tape and inertia

while increasing customer service. The emphasis will be on

empowering the employees. The initiative is already under

way.4703

(2) Western will limit increases in annual operating

expenses to less than 2-percent per project per year

through FY 1996. Thereafter, increases in annual operating

expenses will not exceed the annual rate of inflation.

(3) As the marketing agent for Federal power, Western will

participate in the decision making process with other

resource agencies whose operating decisions significantly

affect Federal power rate and repayment obligations

whenever possible.

(4) Proposals for construction of new facilities will be

assessed using integrated resource planning principles and

must meet at least one of three criteria before

construction may begin:

(a) Increased revenues from new facilities must exceed

their annual cost over the cost-evaluation period.

(b) Customers must benefit sufficiently to support new

facilities in spite of a possible rate increase.

(c) The new facilities will be funded by non-Western

sources.

A customer organization has a series of questions about

construction-related cost projections.

a. Comment: Some of the commentators said: ... they have

been unable to find support in the 1995 Work Program for a

majority of the significant (>$100,000) additions and

replacements included in the 1994 rate brochure and rate

brochure PRS....

Response: For a detailed outline of the budget process,

Western refers the reader to earlier replies to questions

about O&M. To reiterate, the FY 1995 Work Program had, in

many instances, higher cost projections than the FY 1995

Congressional Budget Submission. Western has used the

lower figures in the ratesetting PRS.

In the case of CRSP construction, this change dramatically

reduced the cost projections. Table VI on pages 12 and 13

of the April 1994 Rate Brochure shows a $276 million

decrease in budgeted power-related construction costs

through FY 1998 between the FY 1995 Work Program (referred

to in the brochure as the FY 1994 Congressional Budget

Submission) and the FY 1995 Congressional Budget

Submission. Western has used the lower figure where it is

considered reliable.

b. Comment: (The commentor) has been unable to find support

for the investments included in the Collbran/Rate Brochure

PRS.

Response: It is not possible to find the correlation

between the investments in a budget document or work

program and those in a PRS without some intermediate

steps.

The annual figures in the 1995 Work Program are only

planned cash expenditures. Investments are large items,

often taking more than 1 year to complete. The total spent

on any one investment, then, is the sum of the annual

expenditures shown in the work programs, plus any

applicable IDC.

Western is required to record an investment in a PRS in the

year that it becomes operational. This permits the

establishment of the proper repayment period and begins

the annual payment of interest on investment (due until

the investment's cost is completely repaid). Future

investments appear in a PRS in the year they are planned

to be in-service, if that is within the 5-year budget

window. Future investments (excluding future replacements)

planned for completion at some time after the 5-year

window are normally excluded from a PRS, unless

legislation directs otherwise (as is the case with the

CRSP's participating projects). Annual cash outlays for an

investment that takes more than 1 year to complete have no

counterpart in a PRS. Indeed, there may be several years

of investment costs shown in work programs and budgets

which do not appear in PRSs. However, the total sum, plus

IDC, will appear in the PRS in the year when the item is

anticipated to be operational.

It is not unusual for the first future year in a budget

document to show projections higher than those shown in

the previous budget document for that same year. It is

common to have obligated amounts at the end of the year

just closed that do not get paid in that year. They are

then carried over and added to the next year. Also, CWIP

that has been completed, but that did not get moved to

plant-in-service in the financial records, is carried over

to the next year (with the assumption that it will be

moved to plant-in-service at that time). This also adds to

the total amount shown in the subsequent year.

c. Comment: (The commentor's) Table 7 below uses

information provided in response to WAPA/CREDA-76 to

illustrate the differences between the 1995 Work Program

and the PRS.4703

(The commentor) believes that some or all of the decrease

may result from elimination or reduction of dam repair

work described in Reclamation's response to (the

commentor's) comments on the 1995 Work Program review. The

increases (i.e., increases over and above the amounts

shown in the 1995 Work Program) are unexplained, however,

by changes presented in the 1995 Work Program. Therefore,

(the commentor) recommends use of the investments shown in

line 31 of table 7 in the Collbran/Rate PRS.

Response: Table 7 in the commentor's July 27 comment letter

displays Collbran investment as shown in the FY 1995 Work

Program. Western agrees with the commentor's figures for

FY 1994 through FY 1998, except that carry-over from FY

1993 must also be added to FY 1994's total number.

Western's brochure study also contained some figures from

the FY 1995 Congressional Budget Submission. There have

since been changes to that budget that have reduced some

of those costs by approximately $450,000. Western has

rerun the Collbran ratesetting PRS using these changes.

The following table illustrates how incremental investment

in budget figures is transformed into a PRS entry. Figures

from Reclamation's FY 1995 Work Program are used. The

Collbran Project was used for this example because it

contains no IDC or multipurpose investment, thereby

simplifying the

illustration.47038,L2,i1,s100,4,4,4,4,4,5,5

Per FY 1995 Work Plan:

Big Meadows Dam.......................................... 200

Cottonwood Dam #2........................................ 72

Atkinson Dam............................................. ...........

Big Creek Dam............................................ 69

Lambert Dam.............................................. ...........

------------

Total.................................................. 341

Per PRS/Financial Statement Entries

Big Meadows Dam.......................................... ...........

Cottonwood Dam #2........................................ ...........

Atkinson Dam............................................. ...........

Big Creek Dam............................................ ...........

Lambert Dam.............................................. ...........

------------

Total.................................................. 0

d. Comment: All years in the (Rio Grande) PRS except 1994 match the

values from the 1995 Work Program. In 1994, the difference is $619,806.

(The values shown in line 14 of Table 9 should be used in the PRS.)

Response: The commentor is correct. An additional $619,806 has

been added to the work program amount shown in FY 1994. Not all of the

work in the Work Program for FY 1993 was completed or posted in that

year. The amounts not completed, including those obligated but not

spent in 1993, were carried over into FY 1994. This was the case with

the $619,806 noted by the commentor. This is necessitated because of

Western and Reclamation's accounting procedures (as explained in the

previous section on the Collbran Project), which require the total

investment (including IDC) to be moved to the plant-in-service account

in the year it becomes operational, rather than recording incremental

amounts of annual spending.

Western has used the figures recommended by the commentor. The

figures are the basis for the projected investment through the cost

evaluation period (FY 1994-98). However, these amounts do not appear in

the PRS in those years. As previously explained (see the example of the

Collbran Project above), these amounts (plus IDC, where applicable) are

shown in the PRS in the year the particular investment is scheduled to

go into service.

e. Comment: Commentor stated that:

The intent of the work program review was to provide a less formal

process through which customers could receive information and provide

input regarding Western's and Reclamation's programs, allowing for this

same information to then be used in determining the adequacy of rates.

In departing in the rate process from data developed in the FY 1995

Work Program, the principal benefit of the process is effectively

undone. Moreover, the departures were not trivial. For Western's O&M

expenses, the 1994 figure used in the Rate Brochure PRS exceeds that

contained in the FY 1995 Work Program by almost $4 million, or 20

percent.

In new construction projects, the commentor identified over $45

million in additional investment included in the PRS that was not

identified or had been excluded in the work program review.

Response: Western has given a detailed explanation of the changes

in the 1994 O&M figures between the FY 1995 Work Program and the 1993

ratesetting PRS earlier in this Rate Order. Construction cost

modifications are also listed in detail.

Western disagrees with the thrust of the commentor's statement. As

Western follows its policy to develop the lowest rate to consumers

consistent with sound business principles, all power customers,

including the commentor's members benefit.

For example, the FY 1995 Work Program includes over $527 million in

construction costs for the SLCAO alone. Deducting what would normally

be excluded from the PRS because it is not planned for completion by FY

1998 leaves $284 million. This figure ($284 million) is still more than

double what Western finally included in the Rate Brochure PRS as new

investment $131 million. The difference between these two figures (the

$284 million in the FY 1995 Work Program and the $131 million in the

Rate Brochure PRS) equals approximately 0.75 mills/kWh in the composite

rate. In other words, following the commentor's instructions would have

resulted in a \3/4\ mills/kWh higher firm power rate than Western is

proposing. Finally, Western will continue to work with its customers to

identify and correct problems with the work program review process.

8. Environmentally Related Expenses

a. Comment: The sum of environmental costs in the 1994 Rate

Brochure is more than $0.5 million greater in 1993 and 1994 than

contained in the FY 1995 Work Program. Western's response to CREDA's

information request (WAPA/CREDA 67) indicated that the additional costs

in 1994 were explained by about $6.0 million in ``unliquidated

obligation'' in 1993. While actual costs were indeed lower than planned

in 1993, the reduction does not explain the still greater increase

indicated in the 1994 rate brochures. Environmental study costs should

be limited to the amounts (with some allowance for carryover from prior

years) developed in the work program process.

Response: To compare environmental costs spent and budgeted for FYs

1993 and 1994 in the 1995 budget and work plan, the unliquidated

obligations must be taken into consideration, as shown below:

Environmental Expenses ($000)

------------------------------------------------------------------------

New

FY 1993 FY 1994 Total Total

------------------------------------------------------------------------

1994 Rate Brochure Appendix..... $11,885 $20,935 $32,820 $32,820

Adjustment...................... 0 490 490 33,310

FY 93 Unliquidated Obligations.. -2,391 0 -2,391 30,919

FY 94 Unliquidated Obligations.. 6,005 -6,005 0 30,919

---------------------------------------

Total Obligations........... 15,499 15,420 30,919 30,919

FY 1995 Work Program............ 16,788 15,463 32,251 32,251

FY 93 Unliquidated Obligations.. -2,391 0 -2,391 29,860

---------------------------------------

Total Obligations........... 14,397 15,463 29,860 29,860

---------------------------------------

Difference................ 1,102 -43 1,059 1,059

------------------------------------------------------------------------

b. Comment: A customer organization says:

It is clear that environmental expenses associated with Glen Canyon

Dam have gotten out of hand, are not under control, and are not being

subjected to any sort of cost-control analysis or audit. They urge

Western to do what it can to urge the Bureau of Reclamation to limit

environmental study expenditures to those that are calculated to

produce necessary, credible information.

Response: As a part of Western's Strategic Planning initiative:

Western will, as the marketing agent for Federal power, participate in

the decision making process whenever possible with other resource

agencies whose operating decisions significantly affect Federal power

rate and repayment obligations. Western will do so to sustain the

marketability of the Federal hydroelectric resource.

9. Miscellaneous Comments

Long-term Capacity Sales:

(1) Comment: (The commentor) notes that there is a discrepancy

between the projection of capacity sales shown in Western's ``1993

Power Projections'' and the values in the PRS. Upon inspection of the

two set of values, it appears that the values used in the PRS may have

been misentered 1 year below the proper year. This causes the amount of

capacity sales to be slightly understated in several years.

Response: Western agrees. Western has checked these data and has

found a disconnect between the kW of capacity sales estimate found in

the work papers and that in the PRS. It appears that the data from FYs

1993 through 2003 in the work papers were put into the PRS in FYs 1994

through 2004. The error has been corrected.

(2) Comment: Western calculates the PRS for Integrated Projects

such that replacements are repaid up to the rate-setting year. In part,

this is due to the assignment of a lower repayment priority (to

irrigation) in the PRS. Assigning the lower priority (to irrigation)

causes a less than optimal rate calculation, since the rate could be

lowered by allowing for some replacements to remain unpaid beginning 9-

10 years prior to the ratesetting year.

Response: Western recognizes that some replacements have been paid

earlier in the PRS than required. Western conducted a test to determine

if forcing payments to irrigation obligations would postpone early

payment of replacements, thus lowering the rate. Forcing payments

reduces the composite rate 0.13 mills/kWh. This change has been made in

the ratesetting PRS.

10. Untimely Responses to Data Requests

a. Comment: Three commentors stated that their consultant did not

receive all the information needed to reconcile certain key portions of

the proposed rate and did not have adequate time to verify all the data

underlying the rate adjustment.

Response: The consultant submitted five official data requests.

Responses were as follows:

------------------------------------------------------------------------

Items of

Data request received by western's data Information mailed by

SLCAO requested western's SLCAO

------------------------------------------------------------------------

May 13, 1994....................... 18 May 20, 1994.

June 3, 1994....................... 9 June 23, 1994.

June 24, 1994...................... 9 June 30, 1994.

July 1, 1994....................... 38 July 19, 1994.

July 8, 1994....................... 8 July 14, 1994.

Total............................ 82

------------------------------------------------------------------------

Customers originally had 97 days to submit comments and request

information; 56 of those days were after the public information forum.

The largest and most detailed request for data was received by Western

on July 1, 1994, which was 19 days before the original close of the

comment period. The final response to this request was faxed to the

consulting firm, on July 19, 1994, 1 day before the original end of the

comment period. Western then extended the date it would accept comments

to July 27, 1994, to provide commentors extra time to prepare a reply.

Western believes that ample time has been allowed for public comment

and that information was furnished to requestors in a timely manner.

However, Western also recognizes that there could be confusion and

misunderstanding regarding the information needed by the commentators

and that some of the information received may not be what was needed.

Western will continue to work with customers and interested parties to

find a more efficient and acceptable process to respond to data

requests and meet the commentors' needs.

b. Comment: A customer organization said:

Given the backdrop of structural changes in the industry and

increasing environmental concerns over hydro power generation, it would

seem that Western should develop a pricing policy based upon a firm

understanding of price sensitivity. The lack of any such analysis is a

major omission.

Response: One of Western's primary concerns is the impact the

prices for its products have on possible sales. Based on knowledge of

the electrical power market, Western's proposed combined rates for firm

power are below other sources of firm electrical power available to

Integrated Projects customers. For this reason, Western has not

undertaken a specific study to analyze price effects on the electrical

power purchased by Western's Integrated Projects customers.

There may be reductions of Integrated Projects energy usage in the

short-term by Western's customers as a result of the proposed increase

in the energy rate. Some of Western's Integrated Projects customers

with their own electrical power generating resources may be faced with

variable costs that allow them to produce energy more cheaply than

purchasing from Western at the proposed new rate. Information on the

cost of generation is considered sensitive and is not available to

Western. However, published sources of information which relate to coal

prices and other components of the variable costs of power generation

indicate that the proposed energy rate is less than Western's estimate

of their cost of generating thermal energy. Western has received no

comments to indicate otherwise.

c. Comment: To help customers respond more completely to Western's

proposals, a customer organization suggests that, in the future, when

Western entertains the thought of extending the time for commenting as

done here, tie the extension to a period of time following completion

of responses to requests for information.

Response: Western believes that the existing customer review

process and the public rate process sufficiently provide for both

flexibility for input and measurability of the progress toward the

completion of a rate.

d. Comment: Several customers concur with changing the expression

of the firm power rate from a `combined rate' to a `composite rate'.

Response: Western agrees with the customer comment and believes

that the composite rate will make the price of Integrated Projects

power more easily comparable with that from other sources.

e. Issue: A customer states that they believe it is very unfair to

continue to increase the burden on the ratepayers to fund

(environmental) studies which will result in further increases in costs

and/or reductions in the amount of power available.

Response: As noted earlier, Western is working with Reclamation to

more closely monitor these costs.

11. Issue Papers Resolution: Several issues which Western believes

would have caused considerable protracted comment were discussed in

detail during the pre-rate-adjustment process of informal meetings

between various stakeholders and the exchange of issue papers. The

stakeholders liked the process. The issues which were resolved in this

process are summarized below:

a. Identifying historic expenses related to the CRSP's Glen Canyon

Unit that became nonreimbursable with the passage of the Grand Canyon

Protection Act of 1992 (GCPA).

b. Agreement about which future Glen Canyon Dam environmental costs

have the potential to become nonreimbursable.

c. General understanding of the functioning of the budget

neutrality stipulations in the GCPA, stating that environmentally

related expenses will be nonreimbursable for FY 1993 through FY 1997

only to the extent that offsetting revenues are received by the

Treasury from other GCPA provisions.

d. The timing of the reallocation of the construction costs of the

Glen Canyon Unit.

e. Identification of those costs of the Central Utah

(participating) Project which are properly excluded from influencing

the Integrated Projects firm power rate.

f. Implementation of a procedure to assure that the Basin Fund has

sufficient cash on hand to pay all operating costs for the CRSP.

Environmental Evaluation

In compliance with the National Environmental Policy Act of 1969,

42 U.S.C. 4321 et seq.; Council on Environmental Quality Regulations

(40 CFR Parts 1500-1508); and DOE NEPA Regulations (10 CFR Part 1021),

Western has determined that this action is categorically excluded from

the preparation of an environmental assessment or an environmental

impact statement.

Executive Order 12866

DOE has determined that this is not a significant regulatory action

because it does not meet the criteria of Executive Order 12866, 58 FR

51735. Western has an exemption from centralized regulatory review

under Executive Order 12866; accordingly, no clearance of this notice

by OMB is required.

Availability of Information

Information regarding this rate adjustment, including PRSs,

comments, letters, memoranda, and other supporting material made or

kept by Western for the purpose of developing the power rates, is

available for public review in the following locations.

Salt Lake City Area Office, Western Area Power Administration, Office

of the Assistant Area Manager for Power Marketing, 257 East 200 South,

Suite 475, Salt Lake City, UT 84111

Western Area Power Administration, Division of Marketing and Rates,

1627 Cole Boulevard, Golden, CO 80401

Western Area Power Administration, Office of the Assistant

Administrator for Washington Liaison, Room 8G-027, Forrestal Building,

1000 Independence Avenue SW., Washington, DC 20585

Submission to Federal Energy Regulatory Commission

The rate herein confirmed, approved, and placed into effect on an

interim basis, together with supporting documents, will be submitted to

FERC for confirmation and approval on a final basis.

Order

In view of the foregoing and pursuant to the authority delegated to

me by the Secretary of Energy, I confirm and approve on an interim

basis, effective December 1, 1994, Rate Schedule SLIP-F5. The rate

schedule shall remain in effect on an interim basis, pending FERC

confirmation and approval of it or a substitute rate on a final basis,

through November 30, 1999.

Issued in Washington, D.C., October 24, 1994.

William H. White,

Deputy Secretary.

Salt Lake City Area Integrated Projects; Arizona, Colorado, Nevada, New

Mexico, Utah, Wyoming; Schedule of Rates for Firm Power Service

Effective

Beginning December 1, 1994, through November 30, 1999, or until

superseded by another rate schedule, whichever occurs earlier.

Available

In the area served by the Salt Lake City Area Integrated Projects.

Applicable

To the wholesale power customers for firm power service supplied

through one meter at one point of delivery, or as otherwise established

by contract.

Character

Alternating current, 60 hertz, three-phase, delivered and metered

at the voltages and points established by contract.

Monthly Rate

Demand Charge: $3.83 per kilowatt of billing demand.

Energy Charge: 8.90 mills per kilowatthour of use.

Billing Demand

The billing demand will be the greater of:

1. The highest 30-minute integrated demand measured during the

month up to, but not more than, the delivery obligation under the power

sales contract, or

2. The contract rate of delivery.

Adjustment for Transformer Losses

If delivery is made at transmission voltage but metered on the low-

voltage side of the substation, the meter readings will be increased to

compensate for transformer losses as provided for in the contract.

Adjustment for Power Factor

The customer will be required to maintain a power factor at all

points of measurement between 95-percent lagging and 95-percent

leading.

Adjustment for Purchased Resources

Purpose of Adjustment

To ensure that Western Area Power Administration (Western) has

sufficient revenues to support resource purchases made necessary

because of restricted generation from Glen Canyon Dam as the result of

restrictions on water releases from the dam.

Applicability

To those contractors who are not receiving service under an Interim

Purchase Amendment to the firm power sales contract.

Adjustment

If Western finds it necessary to purchase resources to replace

generation lost at Glen Canyon Dam because of the above-listed

restrictions, Western will, beginning on the first month that such

purchases are made, include in the contractor's monthly power bill an

estimate of that contractor's proportionate share of net capacity

purchase costs. The cost of purchasing these resources will be offset

by the revenue that Western receives for the sale of energy, if any,

associated with the purchased resources.

In its October bill each year, Western will reconcile the previous

fiscal year's actual purchased power expenses and the monthly estimated

costs paid by the contractor. If the contractor has paid more than its

proportionate share of actual purchased power expenses, the excess

amount will be shown as a credit to the contractor's October power

bill. If the contractor has paid less than its proportionate share of

actual power purchase expenses, Western will add such amount to the

contractor's October power bill.

Notification

If Western finds it necessary to implement this adjustment, it will

give a one-time notification to the contractor and the Federal Energy

Regulatory Commission at least 10 days before initially adding

purchased power cost to the contractor's monthly bill.

[FR Doc. 94-27306 Filed 11-2-94; 8:45 am]

BILLING CODE 6450-01-P