DEPARTMENT OF DEFENSE
Department of the Navy
Record of Decision To Upgrade the Wastewater Treatment System at
Marine Corps Base, Camp Lejeune, NC
Pursuant to Section 102(c) of the National Environmental Policy Act
(NEPA) of 1969, and the Council of Environmental Quality Regulations
(40 CFR parts 1500-1508), the Department of the Navy announces its
decision to upgrade the wastewater treatment system at Marine Corps
Base (MCB), Camp Lejeune, North Carolina. The upgrade involves the
elimination of six treated effluent discharges (three from the most
nutrient sensitive waters of the upper New River, two of which are in
proximity to high quality shellfishing waters of the lower New River,
and one discharge to the Atlantic Intracoastal Waterway). The existing
wastewater treatment plants will be replaced with an advanced
wastewater treatment facility to be constructed north of Frenchs Creek
that will have a design capacity of 15 million gallons per day (MGD)
and be capable of a high degree of nutrient removal. The new advanced
wastewater treatment plant will be in operation by December 31, 1998,
and will process all MCB Camp Lejeune wastewater, except for flows from
Onslow Beach which will be processed at a new rapid infiltration
facility to be constructed at that location.
Upgrade of the wastewater treatment facilities will be divided into
three phases. The first phase will require construction of
approximately 35 miles of new wastewater transmission pipeline, and
will consolidate flows from six treatment plants to an outfall located
in the New River near the existing Hadnot Point treatment plant. The
new pipeline will be constructed mostly along existing right-of-way and
will require construction of seven new pump stations. During Phase I,
the Hadnot Point Plant will be upgraded to include additional
chlorination facilities to accommodate the increased flows. Shutdown of
the Courthouse Bay and Rifle Range treatment plants will be
incorporated into Phase I of the Project as well as construction of
rapid infiltration facilities at Onslow Beach. Phases II and III will
involve construction of a new advanced wastewater treatment plant north
of Frenchs Creek, a new outfall diffuser pipe located approximately 13
miles upstream from the mouth of the New River, and shutdown of
existing treatment plants at Camp Geiger, Camp Johnson, Tarawa Terrace,
and Hadnot Point.
The North Carolina Division of Environmental Management determined
that the New River is no longer able to absorb all of the nutrients
being discharged to it. Thus, the State has established a goal to
upgrade water quality in the region and is implementing a policy that
will reduce the number of point source discharges and substantially
limit the nutrient loading of effluent streams entering the New River.
As a result of this policy initiative, the Marine Corps entered into a
Special Order by Consent with the State agreeing to reduce the number
of its outfalls and improve the quality of its treated waste
discharges.
A Wastewater Treatment Master Plan was prepared to identify
alternatives for reducing the number of outfalls and improving treated
outfall water quality. The analysis gathered information on existing
treatment plants, base operations, future development, available
treatment and disposal options, and environmental concerns. From this
effort eight options were closely examined for the development of
alternatives at each plant. From the evaluation of the eight options
came the development of five scenarios that were evaluated over a
twenty year life cycle. They were evaluated based on costs, land use
impacts that could affect the MCB Camp Lejeune military mission, and
environmental concerns. This analysis lead to the development of three
build alternatives and the ``No Action'' alternative, which were
addressed in the Draft Environmental Impact Statement (DEIS). These
alternatives were (1) a new 15 MGD advanced treatment plant with a
river discharge to accommodate all flows, (2) a new 15 MGD secondary
treatment plant with an ocean outfall to accommodate all flows and (3)
a combination of land application for the plants currently discharging
to the lower New River (Rifle Range and Courthouse Bay Plants) and the
Intracoastal Waterway (Onslow Beach Plant), and construction of a new
13.7 MGD advanced wastewater treatment plant with river discharge for
the remaining flows.
Based on socio-economic, environmental and operational impacts of
the three wastewater treatment system upgrade alternatives, the DEIS
concluded that the alternative which combined river discharge and land
application was the least desirable option from an environmental and
operations perspective. This option would eliminate large tracts of
critical training area on the Base (750 acres ) and would
have potential adverse impacts to endangered species, floodplains and
sites contaminated with hazardous materials. The advanced wastewater
treatment of all effluent with river discharge and the ocean outfall
options were determined to have comparable environmental impacts. With
regard to nutrient loads to the New River system, the ocean outfall
alternative would contribute the smallest amount. However, the
potential permitting difficulties for an ocean outfall; the strict
schedule of compliance outlined in the Special Order by Consent between
MCB Camp Lejeune and the State of North Carolina; U.S. Environmental
Protection Agency Region IV's general policy to discourage new ocean
outfalls (as stated in their scoping response); and the lack of any
North Carolina Division of Environmental Management policy regarding
ocean outfalls resulted in the advanced wastewater treatment with river
discharge alternative being identified as the preferred option in the
DEIS.
Several commentors on the DEIS suggested the Marine Corps did not
fully study land application of wastewater flows, including off-base
land application options. In response to these comments a Land
Application Feasibility Study was undertaken to examine the potential
for large-scale land application of wastewater flows. The study
concluded that land application is not an economically feasible
alternative for disposal of all MCB Camp Lejeune wastewater. An
individual land application treatment facility was also studied for
disposal of wastewater from the Rifle Range plant and was also
determined not to be cost effective. However, the study did recommend
that treated effluent from Onslow Beach be disposed of via rapid
infiltration rather than being pumped to the new plant for treatment
and discharge to the New River. As a result, the preferred alternative
was modified, and as identified in the Final Environmental Impact
Statement (FEIS), is a combination of a new advanced wastewater
treatment facility located in the Frenchs Creek area of MCB Camp
Lejeune with diffused discharge into the New River, and a new rapid
infiltration facility at Onslow Beach. Under this alternative, a
significant length of pipeline from Onslow Beach to the Frenchs Creek
site will not be needed, and impacts to terrestrial vegetation,
wildlife, wetlands and the Intracoastal Waterway will be minimized or
eliminated.
Construction of a new 15 MGD advanced wastewater treatment plant
with river discharge and a rapid infiltration system at Onslow Beach
will result in minor socio-economic and land use impacts. About 35
miles of existing road right-of-way will be temporarily disturbed for
placement of transmission lines, and approximately 25 acres
will be used for the treatment plant site in the Frenchs Creek area.
Construction of treatment facilities is not expected to impact
population growth, but the local economy will benefit from the
$80 million construction project through job stimulation.
No impact to regional transportation systems will be felt, but traffic
on MCB Camp Lejeune will likely experience delays during pipeline
construction. Parks and recreation facilities on Base will not be
impacted; however, there will be minor disruption at several picnic
areas on MCB Camp Lejeune during pipeline construction. Proper site
layout, engineering design and operation will minimize odor impacts to
MCB Camp Lejeune recreational beaches. Existing utilities are adequate
to support the proposed action.
No cultural resources will be affected at the new plant site. Ten
archaeological sites were located during the intensive survey of the
proposed wastewater transmission line. Four sites required further
testing to determine their National Register eligibility status. One of
the sites was determined to be eligible. While pipeline construction
impact to this site cannot be avoided, mitigation through data recovery
will ensure no adverse effects occur to the site. Additional
archeological testing will also be conducted at one other site which
the North Carolina Department of Cultural Resources believes has the
potential for being eligible. The Onslow Beach rapid infiltration
facility site is located on a barrier island and has been frequently
disturbed by training exercises and tracked vehicular movement;
therefore, the probability of this site containing cultural resources
is low. Consultation with the North Carolina Department of Cultural
Resources is being completed to assure full compliance with the
National Historic Preservation Act.
Impact to topography, soils, geology, and groundwater will be
minimal. Sedimentation and erosion control plans will be submitted to
the North Carolina Division of Land Resources, Land Quality Section for
review and approval. Floodplains will be crossed at several locations
by transmission lines, but subsurface placement will eliminate any
risks of increased flooding. Proper design and operation of the rapid
infiltration system at Onslow Beach will minimize any potential impact
to groundwater quality. The project will not encroach on any sites
contaminated with hazardous materials.
Water quality in the New River will be minimally impacted by
constituents commonly found in treated domestic wastewater effluent.
The Wasteload Allocation Study prepared by the North Carolina Division
of Environmental Management indicates that dilution and dispersion of
treated domestic wastewater effluent will be rapid. Concentration of
various constituents anticipated in the treated wastewater effluent
will pose only a minor impact on ambient conditions at the point of
discharge and decrease quickly from that point. A multi-port diffuser
will be used to achieve maximum initial dilution and other engineering
techniques will improve plume velocity and mixing. Details of the
diffuser design will be coordinated with the North Carolina Division of
Environmental Management during the National Pollutant Discharge
Elimination System (NPDES) permitting process. The impact of a fresh
water discharge to the saline environment of the New River will be
minimal and will not adversely affect the movement of aquatic life
within the New River estuary. Water quality in the New River will be
beneficially impacted since the discharged treated domestic wastewater
effluent from the new advanced wastewater treatment plant will be of a
higher quality than the effluent from existing MCB Camp Lejeune
wastewater treatment plants. The much higher level of treatment will
result in a 78 percent reduction of oxygen consuming substances as
compared to the current situation. Nitrogen and phosphorus will be
reduced by 87 percent and 80 percent, respectively, from existing
conditions. Dechlorination facilities being constructed in Phase II
will eliminate chlorine residuals in the effluent. Monitoring programs
for influent and effluent will be established as part of the NPDES
permit. Potential impacts to sediments will be mitigated through a
monitoring program to address pre- and post-construction level of
contaminants around the diffuser. Parameters for this testing (i.e.,
sample period, sample size, and toxicants monitored) will be
established during the NPDES permitting process.
The potential for spills will be minimized through operation of
modern state-of-the-art monitoring equipment which allows early
detection of abnormal conditions at remote sites. Additionally, a
state-of-the-art advanced wastewater treatment facility with dual-path
treatment systems, as required by North Carolina regulations, will
mitigate the potential for spills more effectively than the existing
facilities.
Steps are being taken by MCB Camp Lejeune to reduce the wastewater
flow requiring treatment. Construction and renovation projects are
required to include water conservation devices. Studies have been
undertaken to identify opportunities to recycle and reclaim wastewater.
MCB Camp Lejeune has also recently conducted several Infiltration and
Inflow studies of the base wastewater collection system. Improvements
to the wastewater collection system underway and those planned in the
near term, along with water conservation methods, will provide MCB Camp
Lejeune the opportunity to eliminate unnecessary flows to the
wastewater system.
This action will have no impact upon ambient air quality or noise
levels.
A small amount of terrestrial habitat will be displaced by
transmission line construction and vegetation will be removed from the
25 acres needed for treatment plant construction and the two acres
required for the rapid infiltration system at Onslow Beach. The tract
at Onslow Beach to be used for the rapid infiltration system has been
cleared for some time, therefore there will be minimal impact to the
natural vegetation community.
No permanent displacement of wetlands will occur at the plant site,
rapid infiltration system site, or wetland crossings by the pipeline.
By selecting pipeline routes along existing rights-of-way, impacts to
wetlands have been minimized. Section 404 Nationwide Permit Numbers 12
and 26 will apply for these crossings. Pipeline crossings of the New
River near Camp Geiger, Northeast Creek, Bearhead Creek, and Wallace
Creek will be accomplished using directional drilling techniques that
will pass under these waterbodies and not disturb aquatic habitats or
wetlands.
No federally protected threatened or endangered species will be
affected. Limiting construction of the underwater component of the
project to certain months (1 September through 1 April) will further
reduce the short-term impacts to primary nursery areas and alligator
habitat.
The proposed action has been evaluated with respect to
environmental and social impacts, as well as access to public
information and an opportunity for public participation in the NEPA
process as mandated by Executive Order 12898, ``Federal Actions to
Address Environmental Justices in Minority Populations and Low-Income
Populations.'' The project is consistent with the goals and provisions
of that Executive Order.
A Coastal Consistency Determination was prepared for this project
and it concluded that the proposed action is being carried out in a
manner consistent, to the maximum extent practicable, with the
enforceable policies of the North Carolina Coastal Management Plan. The
North Carolina Division of Coastal Management concurs with this
determination. Coordination will continue with the North Carolina
Division of Coastal Management for pipeline crossings of wetlands.
Preparation of the Environmental Impact Statement began with a
public scoping process to identify issues that should be addressed in
the document. Involvement in scoping was offered through a combination
of documented public announcements and a meeting with State of North
Carolina agencies. Public announcements were handled through scoping
letters sent to Federal, State, and local governmental agencies,
citizen groups and associations and the general public. Also, a Notice
of Intent to prepare an Environmental Impact Statement was published in
local newspapers and the Federal Register. Scoping took place between
December 1991 and January 1992.
The Notice of Availability of the DEIS appeared in the Federal
Register on June 18, 1993. The DEIS was distributed to agencies and
officials of Federal, State and local governmental agencies, citizens
groups and associations, public libraries, and to other interested
parties. The public review period for the DEIS was from June 13, 1993
through August 2, 1993. During this period a public hearing was held on
July 13, 1993 at Jacksonville Senior High School, Jacksonville, North
Carolina. The FEIS was distributed to agencies and officials of
Federal, State and local governmental agencies, citizens groups and
associations, public libraries, and to other interested parties on June
3, 1994.
The Department of the Navy believes that there are no outstanding
issues to be resolved with respect to this project. Questions regarding
the Environmental Impact Statement prepared for this action may be
directed to Mr. Robert Warren, Environmental Management Department, MCB
Camp Lejeune, NC 28542, telephone (910) 451-5003.
August 2, 1994.
Elsie L. Munsell,
Deputy Assistant Secretary of the Navy (Environmental and Safety).
[FR Doc. 94-19192 Filed 8-5-94; 8:45 am]
BILLING CODE 3810-AE-P
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.