Commission Requirements for Cost Support Material To Be Filed With Virtual Collocation Tariffs for Special Access and Switched Transport

Federal RegisterAug 2, 1994

Ask Donna

What actually matters in this document.

Text

FEDERAL COMMUNICATIONS COMMISSION

[CC Docket No. 91-141; DA 94-819]

Commission Requirements for Cost Support Material To Be Filed

With Virtual Collocation Tariffs for Special Access and Switched

Transport

AGENCY: Federal Communications Commission.

SUMMARY: On July 25, 1994, the Commission adopted a separate Memorandum

Opinion and Order modifying its rules governing provision of expanded

interconnection service. Specifically, the Commission lifted the

requirement that local exchange carriers provide physical collocation,

but required certain local exchange carriers to provide virtual

collocation. In this Order, the Common Carrier Bureau (Bureau), under

delegated authority, establishes specific requirements for the cost

support information that must accompany the local exchange carriers'

virtual collocation tariffs.

FOR FURTHER INFORMATION CONTACT:

Charles Needy, Tariff Division, Common Carrier Bureau, (202) 418-1529.

SUPPLEMENTARY INFORMATION: This is a summary of the Bureau's Tariff

Review Plan Order adopted July 25, 1994, and released July 25, 1994.

The full text of this Commission decision is available for inspection

and copying during normal business hours in the FCC Public Reference

Room (Room 230), 1919 M Street NW., Washington, DC. The complete text

of this decision may also be purchased from the Commission's copy

contractor, International Transcription Service, Suite 140, 2100 M

Street NW., Washington, DC 20037. The Federal Communications Commission

has submitted the following information collection requirement to OMB

for review and clearance under the Paperwork Reduction Act of 1980, 44

U.S.C. 3507. Persons wishing to comment on this information should

contact Timothy Fain, Office of Management and Budget, Room 10236, New

Executive Office Building, Washington, DC 20503, (202) 395-3561. For

further information, contact Judy Boley, Federal Communications

Commission, (202) 418-0214.

Please note: The Commission has requested expedited review of

this collection by August 1, 1994 under the provisions of 5 CFR

1320.18.

Title: Commission Requirements for Cost Support Material to be

Filed with Virtual Collocation Tariffs for Special Access and Switched

Transport.

Respondents: Business or other for profit.

Frequency of Response: One time collection.

Estimated Annual Burden: 16 respondents; 1 response per respondent;

194 hours per response; 3104 hours total annual burden.

Needs and Uses: The information required is necessary for efficient

review of the required revisions of the local telephone companies'

expanded interconnection tariffs. The information collected will be

used to determine whether the charges offered are just and reasonable

as the Act requires.

Regulatory Flexibility Analysis: The Commission has determined that

Section 605(b) of the Regulatory Flexibility Act of 1980, 5 U.S.C.

605(b), does not apply to these rules because they do not have a

significant economic impact on a substantial number of small entities.

The definition of a ``small entity'' in Section 3 of the Small Business

Act excludes any business that is dominant in its field of operation.

Although some of the local exchange carriers that will be affected are

very small, local exchange carriers do not qualify as small entities

because each of them has a monopoly on ubiquitous access to the

subscribers in their service area. The Commission has also found all

exchange carriers to be dominant in its competitive carrier proceeding.

See 85 FCC 2d 1, 23-24 (1980). To the extent that small telephone

companies will be affected by these rules, the Commission hereby

certifies that these rules will not have a significant effect on a

substantial number of ``small entities.''

Summary of Report and Order: In Memorandum Opinion and Order in

this Docket adopted on July 14, 1994, the Commission required all Tier

1 local exchange carriers (LECs) other than participants in National

Exchange Carrier Association (NECA) pools to offer virtual collocation.

Those tariffs must be filed on or before September 1, 1994, to become

effective on December 15, 1994. In the Tariff Review Plan Order

released concurrently with the Memorandum Opinion and Order, the Common

Carrier Bureau, under delegated authority, adopted requirements for

cost support information which LECs must submit with their virtual

collocation tariffs.

The Tariff Review Plan (TRP) disaggregates expanded interconnection

service, by basic service function, into the following seven

categories: (1) Provisioning Function, (2) Entrance Function, (3)

Termination Function, (4) Cross-Connection Function, (5) Equipment

Installation Function, (6) Maintenance and Repair Function, and (7)

Technician Training Function. The Bureau recognized that the Commission

did not mandate a detailed rate structure, but required LECs to

categorize their rate elements into these functions for purposes of the

TRP. For each function, the TRP requires a complete list of plant and

equipment, including the name of the plant or equipment item, the

associated Part 32 account numbers, gross investment amounts, and

estimated depreciable lives. The TRP also requires detailed expense and

tax information, including the name of the expense or tax, the Part 32

account numbers, and the expense or tax amount.

In addition to the TRP, LECs must provide documentation supporting

their entries in the TRP form, submit cost support information for the

overhead loading factors used to develop their expanded interconnection

rates, and overhead loading factors on a service-by-service basis for

all point-to-point special access services they offer. Finally, LECs

are also required to provide a sample price out for the provision of

100 DS1s, assuming that nonrecurring costs will be amortized over a

five year period at an 11.25 percent discount rate.

Federal Communications Commission.

William F. Caton,

Acting Secretary.

Approved by OMB, 3060-xxxx, Expires 10/31/94

See below for information regarding public burden estimate.

NOTICE: This tariff review plan (TRP) contains requirements for

summary cost support material that certain local exchange carriers

(LECs) must file to support their tariff filings in partial fulfillment

of Section 61.38 or Sections 61.44 through 61.49 of the Commission's

Rules. TRPs specify basic cost and demand information in a consistent

format and are essential components of the Commission's access tariff

review process. The information in the TRPs is used by the FCC to

evaluate rates. Your response is mandatory. Public reporting burden for

this collection of information is estimated to average 194 hours per

response, including the time for reviewing instructions, searching

existing data sources, gathering and maintaining the data needed, and

completing and reviewing the collection of information. Send comments

regarding this burden estimate or any other aspect of this collection

of information, including suggestions for reducing the burden, to the

Federal Communications Commission, Office of the Managing Director,

Washington, DC 20554, and to the Office of Management and Budget,

Office of Information and Regulatory Affairs, Washington, DC 20503.

Appendix A--Instructions for Tariff Review Plan

ROW INSTRUCTIONS:

(1) LECs may add more rows, if needed.

(2) Row 1: total of Rows 2 through 20.

(3) Row 23: Find Cost of Money (Percentage)=i by substituting i into

the following equation: Row #[email protected] (Row #1, i, Row #1/Row #21)-Row

#21.

(4) Row 26: Total of Rows 27 through 32.

(5) Row 34: Total of Rows 35 through 50.

(6) Row 51: Sum of Rows 21, 22, 24, 25, 26, 33, 34 for Recurring TRP

chart.

(7) Row 52: Row 51/12 for Recurring TRP chart. For Nonrecurring TRP,

sum rows as in (6) above.

(8) Row 55: (Row 53* 12)/Sum (Rows 21, 22, 24, 25, 33).

(9) Row 56: Row 53/Row 52.

DS1 Provisioning Function

[Nonrecurring Rate]

----------------------------------------------------------------------------------------------------------------

Rate Element Rate element Rate element Rate element

Name #1 name #2 name #3 name #4

----------------------------------------------------------------------------------------------------------------

Total Investment: List Plant & Equip... $ $ $ $

2List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

3List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

4List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

5List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

6List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

7List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

8List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

9List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

10List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

11List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

12List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

13List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

14List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

15List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

16List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

17List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

18List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

19List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

20List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

21 Depreciation expense................. $ $ $ $

22 Cost of money ($ Amount)............. $ $ $ ................

23 Cost of money (Percentage)........... % % % %

24 Federal income tax................... $ $ $ $

25 State and local income tax........... $ $ $ $

26 Other tax: List Taxes................ $ $ $ $

27List: Property Tax.................... $ $ $ $

28List:................................. $ $ $ $

29List:................................. $ $ $ $

30List:................................. $ $ $ $

31List:................................. $ $ $ $

32List:................................. $ $ $ $

33 Maintenance expense.................. $ $ $ $

34 ADMIN AND OTHER EXPENSE: List Expense $ $ $ $

35List: Name--Pt. 32 Acct No............ $ $ $ $

36List: Name--Pt. 32 Acct No............ $ $ $ $

37List: Name--Pt. 32 Acct No............ $ $ $ $

38List: Name--Pt. 32 Acct No............ $ $ $ $

39List: Name--Pt. 32 Acct No............ $ $ $ $

40List: Name--Pt. 32 Acct No............ $ $ $ $

41List: Name--Pt. 32 Acct No............ $ $ $ $

42List: Name--Pt. 32 Acct No............ $ $ $ $

43List: Name--Pt. 32 Acct No............ $ $ $ $

44List: Name--Pt. 32 Acct No............ $ $ $ $

45List: Name--Pt. 32 Acct No............ $ $ $ $

46List: Name--Pt. 32 Acct No............ $ $ $ $

47List: Name--Pt. 32 Acct No............ $ $ $ $

48List: Name--Pt. 32 Acct No............ $ $ $ $

49List: Name--Pt. 32 Acct No............ $ $ $ $

50List: Name--Pt. 32 Acct No............ $ $ $ $

51 ................ ................ ................ ................

52 Nonrecurring cost per unit........... $ $ $ $

53 Nonrecurring rate per unit........... $ $ $ $

54 Unit of measurement.................. ................ ................ ................ ................

55 Ratio: Rate Per Unit/Direct Cost..... ................ ................ ................ ................

56 Ratio: Rate Per Unit/Unit Cost....... ................ ................ ................ ................

----------------------------------------------------------------------------------------------------------------

Notes:

(1) Provisioning Function includes all costs associated with service order processing and design engineering for

equipment dedicated to the interconnector.

(2) Row 54: Unit of measurement is the unit on which the rate is being assessed, e.g., per DS1 arrangement, per

additional DS1 arrangement, etc.

DS3 Provisioning Function

[Nonrecurring Rate]

----------------------------------------------------------------------------------------------------------------

Rate element Rate element Rate element Rate element

name #1 name #2 name #3 name #4

----------------------------------------------------------------------------------------------------------------

1 Total investment: List Plant & Equip.. $ $ $ $

2List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

3List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

4List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

5List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

6List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

7List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

8List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

9List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

10List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

11List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

12List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

13List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

14List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

15List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

16List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

17List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

18List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

19List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

20List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

21 Depreciation expense................. $ $ $ $

22 Cost of money ($Amount).............. $ $ $ $

23 Cost of money (Percentage)........... % % % %

24 Federal income tax................... $ $ $ $

25 State and local income tax........... $ $ $ $

26 Other tax: List Taxes................ $ $ $ $

27List: Property Tax.................... $ $ $ $

28List.................................. $ $ $ $

29List.................................. $ $ $ $

30List.................................. $ $ $ $

31List.................................. $ $ $ $

32List.................................. $ $ $ $

33 MAINTENENCE EXPENSE.................. $ $ $ $

34 ADMIN and OTHER EXPENSE: List Expense $ $ $ $

35List: Name--Pt. 32 Acct No............ $ $ $ $

36List: Name--Pt. 32 Acct No............ $ $ $ $

37List: Name--Pt. 32 Acct No............ $ $ $ $

38List: Name--Pt. 32 Acct No............ $ $ $ $

39List: Name--Pt. 32 Acct No............ $ $ $ $

40List: Name--Pt. 32 Acct No............ $ $ $ $

41List: Name--Pt. 32 Acct No............ $ $ $ $

42List: Name--Pt. 32 Acct No............ $ $ $ $

43List: Name--Pt. 32 Acct No............ $ $ $ $

44List: Name--Pt. 32 Acct No............ $ $ $ $

45List: Name--Pt. 32 Acct No............ $ $ $ $

46List: Name--Pt. 32 Acct No............ $ $ $ $

47List: Name--Pt. 32 Acct No............ $ $ $ $

48List: Name--Pt. 32 Acct No............ $ $ $ $

49List: Name--Pt. 32 Acct No............ $ $ $ $

50List: Name--Pt. 32 Acct No............ $ $ $ $

51 ................ ................ ................ ................

52 Nonrecurring cost per unit........... $ $ $ $

53 Nonrecurring rate per unit........... $ $ $ $

54 Unit of measurement.................. $ $ $ $

55 Ratio: Rate Per Unit/Direct Cost..... ................ ................ ................ ................

56 Ratio: Rate Per Unit/Unit Cost....... ................ ................ ................ ................

----------------------------------------------------------------------------------------------------------------

Notes:

(1) Provisioning Function includes all costs associated with service order processing and design engineering for

equipment dedicated to the interconnector.

(2) Row 54: Unit of measurement is the unit on which the rate is being assessed, e.g., per DS1 arrangement, per

additional DS1 arrangement, etc.

DS1 Entrance Function

[Recurring Rate]

----------------------------------------------------------------------------------------------------------------

Rate element Rate element Rate element Rate element

name #1 name #2 name #3 name #4

----------------------------------------------------------------------------------------------------------------

1 Total Investment: List Plant & Equip.. $ $ $ $

2List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

3List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

4List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

5List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

6List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

7List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

8List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

9List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

10List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

11List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

12List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

13List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

14List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

15List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

16List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

17List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

18List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

19List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

20List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

21 Depreciation expense................. $ $ $ $

22 Cost of money ($ Amount)............. $ $ $ $

23Cost of money (Percentage)............ % % % %

24 Federal income tax................... $ $ $ $

25 State and local income tax........... $ $ $ $

26 Other tax: List Taxes................ $ $ $ $

27List: Property Tax.................... $ $ $ $

28List:................................. $ $ $ $

29List:................................. $ $ $ $

30List:................................. $ $ $ $

31List:................................. $ $ $ $

32List:................................. $ $ $ $

33 Maintenance expense.................. $ $ $ $

34 Admin and other expense: List Expense $ $ $ $

35List: Name--Pt. 32 Acct No............ $ $ $ $

36List: Name--Pt. 32 Acct No............ $ $ $ $

37List: Name--Pt. 32 Acct No............ $ $ $ $

38List: Name--Pt. 32 Acct No............ $ $ $ $

39List: Name--Pt. 32 Acct No............ $ $ $ $

40List: Name--Pt. 32 Acct No............ $ $ $ $

41List: Name--Pt. 32 Acct No............ $ $ $ $

42List: Name--Pt. 32 Acct No............ $ $ $ $

43List: Name--Pt. 32 Acct No............ $ $ $ $

44List: Name--Pt. 32 Acct No............ $ $ $ $

45List: Name--Pt. 32 Acct No............ $ $ $ $

46List: Name--Pt. 32 Acct No............ $ $ $ $

47List: Name--Pt. 32 Acct No............ $ $ $ $

48List: Name--Pt. 32 Acct No............ $ $ $ $

49List: Name--Pt. 32 Acct No............ $ $ $ $

50List: Name--Pt. 32 Acct No............ $ $ $ $

51 Annual cost per unit................. $ $ $ $

52 Monthly cost per unit................ $ $ $ $

53 Monthly rate per unit................ $ $ $ $

54 Unit of measurement.................. ................ ................ ................ ................

55 Ratio: Rate/Direct Cost.............. ................ ................ ................ ................

56 Ratio: Rate/Unit Cost................ ................ ................ ................ ................

----------------------------------------------------------------------------------------------------------------

Notes:

(1) The Entrance Function includes the costs of conduit, vault, riser, and similar space required to connect the

point of interconnection of the interconnector's and the LEC's networks to the point of termination, i.e., to

the central office terminating equipment dedicated to the interconnector.

(2) Row 54: Unit of measurement is the unit on which the rate is being assessed, e.g., cable placement per first

and additional foot, cable splicing, etc.

DS1 Entrance Function

[Nonrecurring Rate]

----------------------------------------------------------------------------------------------------------------

Rate element Rate element Rate element Rate element

name #1 name #2 name #3 name #4

----------------------------------------------------------------------------------------------------------------

1 Total Investment: List Plant & Equip.. $ $ $ $

2List: Name--Pt 32 Acct No.--Dep. Life.. $ $ $ $

3List: Name--Pt 32 Acct No.--Dep. Life.. $ $ $ $

4List: Name--Pt 32 Acct No.--Dep. Life.. $ $ $ $

5List: Name--Pt 32 Acct No.--Dep. Life.. $ $ $ $

6List: Name--Pt 32 Acct No.--Dep. Life.. $ $ $ $

7List: Name--Pt 32 Acct No.--Dep. Life.. $ $ $ $

8List: Name--Pt 32 Acct No.--Dep. Life.. $ $ $ $

9List: Name--Pt 32 Acct No.--Dep. Life.. $ $ $ $

10List: Name--Pt 32 Acct No.--Dep. Life. $ $ $ $

11List: Name--Pt 32 Acct No.--Dep. Life. $ $ $ $

12List: Name--Pt 32 Acct No.--Dep. Life. $ $ $ $

13List: Name--Pt 32 Acct No.--Dep. Life. $ $ $ $

14List: Name--Pt 32 Acct No.--Dep. Life. $ $ $ $

15List: Name--Pt 32 Acct No.--Dep. Life. $ $ $ $

16List: Name--Pt 32 Acct No.--Dep. Life. $ $ $ $

17List: Name--Pt 32 Acct No.--Dep. Life. $ $ $ $

18List: Name--Pt 32 Acct No.--Dep. Life. $ $ $ $

19List: Name--Pt 32 Acct No.--Dep. Life. $ $ $ $

20List: Name--Pt 32 Acct No.--Dep. Life. $ $ $ $

21 Depreciation expense................. $ $ $ $

22 Cost of money ($ Amount)............. $ $ $ $

23 Cost of money (Percentage)........... % % % %

24 Federal income tax................... $ $ $ $

25 State and local income tax........... $ $ $ $

26 Other tax: List Taxes................ $ $ $ $

27List: Property Tax.................... $ $ $ $

28List:................................. $ $ $ $

29List:................................. $ $ $ $

30List:................................. $ $ $ $

31List:................................. $ $ $ $

32List:................................. $ $ $ $

33 Maintenance expense.................. $ $ $ $

34 Admin and other expense: List Expense $ $ $ $

35List: Name--Pt 32 Acct No............. $ $ $ $

36List: Name--Pt 32 Acct No............. $ $ $ $

37List: Name--Pt 32 Acct No............. $ $ $ $

38List: Name--Pt 32 Acct No............. $ $ $ $

39List: Name--Pt 32 Acct No............. $ $ $ $

40List: Name--Pt 32 Acct No............. $ $ $ $

41List: Name--Pt 32 Acct No............. $ $ $ $

42List: Name--Pt 32 Acct No............. $ $ $ $

43List: Name--Pt 32 Acct No............. $ $ $ $

44List: Name--Pt 32 Acct No............. $ $ $ $

45List: Name--Pt 32 Acct No............. $ $ $ $

46List: Name--Pt 32 Acct No............. $ $ $ $

47List: Name--Pt 32 Acct No............. $ $ $ $

48List: Name--Pt 32 Acct No............. $ $ $ $

49List: Name--Pt 32 Acct No............. $ $ $ $

50List: Name--Pt 32 Acct No............. $ $ $ $

51 ................ ................ ................ ................

52 Nonrecurring cost per unit........... $ $ $ $

53 Nonrecurring rate per unit........... $ $ $ $

54 Unit of measurement.................. ................ ................ ................ ................

55 Ratio: Rate Per Unit/Direct Cost..... ................ ................ ................ ................

56 Ratio: Rate Per Unit/Unit Cost....... ................ ................ ................ ................

----------------------------------------------------------------------------------------------------------------

Notes:

(1) The Entrance Function includes the costs of conduit, vault, riser, and similar space required to connect the

point of interconnection of the interconnector's and the LEC's networks to the point of termination, i.e., to

the central office terminating equipment dedicated to the interconnector.

(2) Row 54: Unit of measurement is the unit on which the rate is being assessed, e.g., cable placement per first

and additional foot, cable splicing, etc.

DS3 Entrance Function

[Recurring Rate]

----------------------------------------------------------------------------------------------------------------

Rate element Rate element Rate element Rate element

name #1 name #2 name #3 name #4

----------------------------------------------------------------------------------------------------------------

1 Total investment: List Plant & Equip.. $ $ $ $

2List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

3List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

4List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

5List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

6List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

7List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

8List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

9List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

10List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

11List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

12List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

13List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

14List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

15List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

16List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

17List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

18List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

19List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

20List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

21 Depreciation expense................. $ $ $ $

22 Cost of money ($ Amount)............. $ $ $ $

23 Cost of money (Percentage)........... % % % %

24 Federal income tax................... $ $ $ $

25 State and local income tax........... $ $ $ $

26 Other tax: List Taxes................ $ $ $ $

27List: Property Tax.................... $ $ $ $

28List.................................. $ $ $ $

29List.................................. $ $ $ $

30List.................................. $ $ $ $

31List.................................. $ $ $ $

32List.................................. $ $ $ $

33 Maintenance expense.................. $ $ $ $

34 Admin and other expense: List Expense $ $ $ $

35List: Name--Pt. 32 Acct No............ $ $ $ $

36List: Name--Pt. 32 Acct No............ $ $ $ $

37List: Name--Pt. 32 Acct No............ $ $ $ $

38List: Name--Pt. 32 Acct No............ $ $ $ $

39List: Name--Pt. 32 Acct No............ $ $ $ $

40List: Name--Pt. 32 Acct No............ $ $ $ $

41List: Name--Pt. 32 Acct No............ $ $ $ $

42List: Name--Pt. 32 Acct No............ $ $ $ $

43List: Name--Pt. 32 Acct No............ $ $ $ $

44List: Name--Pt. 32 Acct No............ $ $ $ $

45List: Name--Pt. 32 Acct No............ $ $ $ $

46List: Name--Pt. 32 Acct No............ $ $ $ $

47List: Name--Pt. 32 Acct No............ $ $ $ $

48List: Name--Pt. 32 Acct No............ $ $ $ $

49List: Name--Pt. 32 Acct No............ $ $ $ $

50List: Name--Pt. 32 Acct No............ $ $ $ $

51 Annual cost per unit................. $ $ $ $

52 Monthly cost per unit................ $ $ $ $

53 Monthly rate per unit................ $ $ $ $

54 Unit of measurement.................. ................ ................ ................ ................

55 Ratio: Rate/Direct Cost.............. ................ ................ ................ ................

56 Ratio: Rate/Unit Cost................ ................ ................ ................ ................

----------------------------------------------------------------------------------------------------------------

Notes:

(1) The Entrance Function includes the costs of conduit, vault, riser, and similar space required to connect the

point of interconnection of the interconnector's and the LEC's networks to the point of termination, i.e., to

the central office terminating equipment dedicated to the interconnector.

(2) Row 54: Unit of measurement is the unit on which the rate is being assessed, e.g., cable placement per first

and additional foot, cable splicing, etc.

DS3 Entrance Function

[Nonrecurring Rate]

----------------------------------------------------------------------------------------------------------------

Rate element Rate element Rate element Rate element

name #1 name #2 name #3 name #4

----------------------------------------------------------------------------------------------------------------

1 Total investment: List Plant & Equip.. $ $ $ $

2List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

3List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

4List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

5List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

6List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

7List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

8List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

9List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

10List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

11List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

12List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

13List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

14List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

15List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

16List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

17List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

18List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

19List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

20List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

21 Depreciation expense................. $ $ $ $

22 Cost of money ($ Amount)............. $ $ $ $

23 Cost of money (Percentage)........... % % % %

24 Federal income tax................... $ $ $ $

25 State and local income tax........... $ $ $ $

26 Other tax: List Taxes................ $ $ $ $

27List: Property Tax.................... $ $ $ $

28List.................................. $ $ $ $

29List.................................. $ $ $ $

30List.................................. $ $ $ $

31List.................................. $ $ $ $

32List.................................. $ $ $ $

33 Maintenance expense.................. $ $ $ $

34 Admin and other expense: List Expense $ $ $ $

35List: Name--Pt. 32 Acct No............ $ $ $ $

36List: Name--Pt. 32 Acct No............ $ $ $ $

37List: Name--Pt. 32 Acct No............ $ $ $ $

38List: Name--Pt. 32 Acct No............ $ $ $ $

39List: Name--Pt. 32 Acct No............ $ $ $ $

40List: Name--Pt. 32 Acct No............ $ $ $ $

41List: Name--Pt. 32 Acct No............ $ $ $ $

42List: Name--Pt. 32 Acct No............ $ $ $ $

43List: Name--Pt. 32 Acct No............ $ $ $ $

44List: Name--Pt. 32 Acct No............ $ $ $ $

45List: Name--Pt. 32 Acct No............ $ $ $ $

46List: Name--Pt. 32 Acct No............ $ $ $ $

47List: Name--Pt. 32 Acct No............ $ $ $ $

48List: Name--Pt. 32 Acct No............ $ $ $ $

49List: Name--Pt. 32 Acct No............ $ $ $ $

50List: Name--Pt. 32 Acct No............ $ $ $ $

51 ................ ................ ................ ................

52 Nonrecurring cost per unit........... $ $ $ $

53 Nonrecurring rate per unit........... $ $ $ $

54 Unit of measurement.................. ................ ................ ................ ................

55 Ratio: Rate Per Unit/Direct Cost..... ................ ................ ................ ................

56 Ratio: Rate Per Unit/Unit Cost....... ................ ................ ................ ................

----------------------------------------------------------------------------------------------------------------

Notes:

(1) The Entrance Function includes the costs of conduit, vault, riser, and similar space required to connect the

point of interconnection of the interconnector's and the LEC's networks to the point of termination, i.e., to

the central office terminating equipment dedicated to the interconnector.

(2) Row 54: Unit of measurement is the unit on which the rate is being assessed, e.g., cable placement per first

and additional foot, cable splicing, etc.

DS1 Equipment Installation Function

[Nonrecurring Rate]

----------------------------------------------------------------------------------------------------------------

Rate element Rate element Rate element Rate element

name #1 name #2 name #3 name #4

----------------------------------------------------------------------------------------------------------------

1 Total investment: List Plant & Equip.. $ $ $ $

2List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

3List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

4List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

5List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

6List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

7List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

8List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

9List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

10List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

11List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

12List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

13List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

14List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

15List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

16List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

17List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

18List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

19List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

20List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

21 Depreciation expense................. $ $ $ $

22 Cost of money ($ Amount)............. $ $ $ $

23 Cost of money (Percentage)........... % % % %

24 Federal income tax................... $ $ $ $

25 State and local income tax........... $ $ $ $

26 Other tax: List Taxes................ $ $ $ $

27List: Property Tax.................... $ $ $ $

28List.................................. $ $ $ $

29List.................................. $ $ $ $

30List.................................. $ $ $ $

31List.................................. $ $ $ $

32List.................................. $ $ $ $

33 Maintenance expense.................. $ $ $ $

34 Admin and other expense: List Expense $ $ $ $

35List: Name--Pt. 32 Acct No............ $ $ $ $

36List: Name--Pt. 32 Acct No............ $ $ $ $

37List: Name--Pt. 32 Acct No............ $ $ $ $

38List: Name--Pt. 32 Acct No............ $ $ $ $

39List: Name--Pt. 32 Acct No............ $ $ $ $

40List: Name--Pt. 32 Acct No............ $ $ $ $

41List: Name--Pt. 32 Acct No............ $ $ $ $

42List: Name--Pt. 32 Acct No............ $ $ $ $

43List: Name--Pt. 32 Acct No............ $ $ $ $

44List: Name--Pt. 32 Acct No............ $ $ $ $

45List: Name--Pt. 32 Acct No............ $ $ $ $

46List: Name--Pt. 32 Acct No............ $ $ $ $

47List: Name--Pt. 32 Acct No............ $ $ $ $

48List: Name--Pt. 32 Acct No............ $ $ $ $

49List: Name--Pt. 32 Acct No............ $ $ $ $

50List: Name--Pt. 32 Acct No............ $ $ $ $

51 ................ ................ ................ ................

52 Nonrecurring cost per unit........... $ $ $ $

53 Nonrecurring rate per unit........... $ $ $ $

54 Unit of measurement..................

55 Ratio: Rate Per Unit/Direct Cost.....

56 Ratio: Rate Per Unit/Unit Cost.......

----------------------------------------------------------------------------------------------------------------

Notes:

(1) The Equipment Installation Function includes costs of installing and testing the central office equipment

dedicated to the interconnector.

(2) Row 54: Unit of measurement is the unit on which the rate is being assessed, e.g., per DS1 arrangement, etc.

DS3 Equipment Installation Function

[Nonrecurring Rate]

----------------------------------------------------------------------------------------------------------------

Rate element Rate element Rate element Rate element

name #1 name #2 name #3 name #4

----------------------------------------------------------------------------------------------------------------

1 Total investment: List Plant & Equip.. $ $ $ $

2List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

3List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

4List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

5List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

6List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

7List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

8List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

9List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

10List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

11List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

12List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

13List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

14List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

15List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

16List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

17List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

18List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

19List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

20List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

21 Depreciation expense................. $ $ $ $

22 Cost of money ($ Amount)............. $ $ $ $

23 Cost of money (Percentage)........... % % % %

24 Federal income tax................... $ $ $ $

25 State and local income tax........... $ $ $ $

26 Other tax: List Taxes................ $ $ $ $

27List: Property Tax.................... $ $ $ $

28List.................................. $ $ $ $

29List.................................. $ $ $ $

30List.................................. $ $ $ $

31List.................................. $ $ $ $

32List.................................. $ $ $ $

33 Maintenance expense.................. $ $ $ $

34 Admin and other expense: List Expense $ $ $ $

35List: Name--Pt. 32 Acct No............ $ $ $ $

36List: Name--Pt. 32 Acct No............ $ $ $ $

37List: Name--Pt. 32 Acct No............ $ $ $ $

38List: Name--Pt. 32 Acct No............ $ $ $ $

39List: Name--Pt. 32 Acct No............ $ $ $ $

40List: Name--Pt. 32 Acct No............ $ $ $ $

41List: Name--Pt. 32 Acct No............ $ $ $ $

42List: Name--Pt. 32 Acct No............ $ $ $ $

43List: Name--Pt. 32 Acct No............ $ $ $ $

44List: Name--Pt. 32 Acct No............ $ $ $ $

45List: Name--Pt. 32 Acct No............ $ $ $ $

46List: Name--Pt. 32 Acct No............ $ $ $ $

47List: Name--Pt. 32 Acct No............ $ $ $ $

48List: Name--Pt. 32 Acct No............ $ $ $ $

49List: Name--Pt. 32 Acct No............ $ $ $ $

50List: Name--Pt. 32 Acct No............ $ $ $ $

51 ................ ................ ................ ................

52 Nonrecurring cost per unit........... $ $ $ $

53 Nonrecurring cost per unit........... $ $ $ $

54 Unit of measurement.................. ................ ................ ................ ................

55 Ratio: Rate Per Unit/Direct Cost..... ................ ................ ................ ................

56 Ratio: Rate Per Unit/Unit Cost....... ................ ................ ................ ................

----------------------------------------------------------------------------------------------------------------

Notes:

(1) The Equipment Installation Function includes costs of installing and testing the central office equipment

dedicated to the interconnector.

(2) Row 54: Unit of measurement is the unit on which the rate is being assessed, e.g., per DS1 arrangement, etc.

DS1 Cross--Connection Function

[Recurring Rate]

----------------------------------------------------------------------------------------------------------------

Rate element Rate element Rate element Rate element

name #1 name #2 name #3 name #4

----------------------------------------------------------------------------------------------------------------

1 Total investment: List Plant & Equip.. $ $ $ $

2List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

3List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

4List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

5List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

6List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

7List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

8List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

9List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

10List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

11List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

12List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

13List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

14List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

15List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

16List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

17List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

18List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

19List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

20List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

21 Depreciation expense................. $ $ $ $

22 Cost of money ($Amount).............. $ $ $ $

23 Cost of money (Percentage)........... % % % %

24 Federal income tax................... $ $ $ $

25 State and local income tax........... $ $ $ $

26 Other tax: List Taxes................ $ $ $ $

27List Property Tax..................... $ $ $ $

28List.................................. $ $ $ $

29List.................................. $ $ $ $

30List.................................. $ $ $ $

31List.................................. $ $ $ $

32List.................................. $ $ $ $

33 Maintenance expense.................. $ $ $ $

34 Admin and other expense: List Expense $ $ $ $

35List: Name-Pt. 32 Account No.......... $ $ $ $

36List: Name-Pt. 32 Account No.......... $ $ $ $

37List: Name-Pt. 32 Account No.......... $ $ $ $

38List: Name-Pt. 32 Account No.......... $ $ $ $

39List: Name-Pt. 32 Account No.......... $ $ $ $

40List: Name-Pt. 32 Account No.......... $ $ $ $

41List: Name-Pt. 32 Account No.......... $ $ $ $

42List: Name-Pt. 32 Account No.......... $ $ $ $

43List: Name-Pt. 32 Account No.......... $ $ $ $

44List: Name-Pt. 32 Account No.......... $ $ $ $

45List: Name-Pt. 32 Account No.......... $ $ $ $

46List: Name-Pt. 32 Account No.......... $ $ $ $

47List: Name-Pt. 32 Account No.......... $ $ $ $

48List: Name-Pt. 32 Account No.......... $ $ $ $

49List: Name-Pt. 32 Account No.......... $ $ $ $

50List: Name-Pt. 32 Account No.......... $ $ $ $

51 Annual cost per unit................. $ $ $ $

52 Monthly cost per unit................ $ $ $ $

53 Monthly rate per unit................ $ $ $ $

54 Unit of measurement.................. ................ ................ ................ ................

55 Ratio: Rate/Direct Cost.............. ................ ................ ................ ................

56 Ratio: Rate/Unit Cost................ ................ ................ ................ ................

----------------------------------------------------------------------------------------------------------------

Notes:

(1) Cross--Connection Function includes costs for all cabling and cable support structures between and LEC's

main distribution frame (MDF) and the central office terminating equipment dedicated to the interconnector.

(2) Row 54: Unit of measurement is the unit on which the rate is being assessed, e.g., per ft., per DS1

arrangement, etc.

DS1 Cross--Connection Function

[Nonrecurring Rate]

----------------------------------------------------------------------------------------------------------------

Rate element Rate element Rate element Rate element

name #1 name #2 name #3 name #4

----------------------------------------------------------------------------------------------------------------

1 Total investment: List Plant & Equip.. $ $ $ $

2List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

3List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

4List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

5List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

6List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

7List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

8List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

9List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

10List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

11List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

12List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

13List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

14List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

15List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

16List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

17List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

18List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

19List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

20List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

21 Depreciation expense................. $ $ $ $

22 Cost of money ($ Amount)............. $ $ $ $

23 Cost of money (Percentage)........... % % %

24 Federal income tax................... $ $ $ $

25 State and local income tax........... $ $ $ $

26 Other tax: List Taxes................ $ $ $ $

27List: property Tax.................... $ $ $ $

28List.................................. $ $ $ $

29List.................................. $ $ $ $

30List.................................. $ $ $ $

31List.................................. $ $ $ $

32List.................................. $ $ $ $

33 Maintenance expense.................. $ $ $ $

34 Admin and other expense: List Expense

35List: Name--Pt. 32 Acct No............ $ $ $ $

36List: Name--Pt. 32 Acct No............ $ $ $ $

37List: Name--Pt. 32 Acct No............ $ $ $ $

38List: Name--Pt. 32 Acct No............ $ $ $ $

39List: Name--Pt. 32 Acct No............ $ $ $ $

40List: Name--Pt. 32 Acct No............ $ $ $ $

41List: Name--Pt. 32 Acct No............ $ $ $ $

42List: Name--Pt. 32 Acct No............ $ $ $ $

43List: Name--Pt. 32 Acct No............ $ $ $ $

44List: Name--Pt. 32 Acct No............ $ $ $ $

45List: Name--Pt. 32 Acct No............ $ $ $ $

46List: Name--Pt. 32 Acct No............ $ $ $ $

47List: Name--Pt. 32 Acct No............ $ $ $ $

48List: Name--Pt. 32 Acct No............ $ $ $ $

49List: Name--Pt. 32 Acct No............ $ $ $ $

50List: Name--Pt. 32 Acct No............ $ $ $ $

51 ................ ................ ................ ................

52 Nonrecurring cost per unit........... $ $ $ $

53 Nonrecurring rate per unit........... $ $ $ $

54 Unit of measurement.................. $ $ $ $

55 Ratio: Rate Per Unit/Direct Cost..... $ $ $ $

56 Ratio: Rate Per Unit/Unit Cost....... $ $ $ $

----------------------------------------------------------------------------------------------------------------

Notes:

(1) Cross--Connection Function includes costs for all cabling and cable support structures between and LEC's

main distribution frame (MDF) and the central office terminating equipment dedicated tot he interconnector.

(2) Row 54: Unit of measurement is the unit on which the rate is being assessed, e.g., per ft., per DS 1

arrangement, etc.

DS3 Cross--Connection Function

[Recurring Rate]

----------------------------------------------------------------------------------------------------------------

Rate element Rate element Rate element Rate element

name #1 name #2 name #3 name #4

----------------------------------------------------------------------------------------------------------------

1Total investment: List Plant & Equip... $ $ $ $

2List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

3List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

4List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

5List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

6List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

7List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

8List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

9List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

10List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

11List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

12List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

13List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

14List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

15List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

16List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

17List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

18List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

19List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

20List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

21Depreciation expense.................. $ $ $ $

22Cost of money ($ Amount).............. $ $ $ $

23Cost of money (Percentage)............ % % % %

24Federal income tax.................... $ $ $ $

25State and local income tax............ $ $ $ $

26Other tax: List Taxes................. $ $ $ $

27List: Property Tax.................... $ $ $ $

28List.................................. $ $ $ $

29List.................................. $ $ $ $

30List.................................. $ $ $ $

31List.................................. $ $ $ $

32List.................................. $ $ $ $

33Maintenance expense................... $ $ $ $

34Admin and other expense: List Expense. $ $ $ $

35List: Name--Pt. 32 Acct No............ $ $ $ $

36List: Name--Pt. 32 Acct No............ $ $ $ $

37List: Name--Pt. 32 Acct No............ $ $ $ $

38List: Name--Pt. 32 Acct No............ $ $ $ $

39List: Name--Pt. 32 Acct No............ $ $ $ $

40List: Name--Pt. 32 Acct No............ $ $ $ $

41List: Name--Pt. 32 Acct No............ $ $ $ $

42List: Name--Pt. 32 Acct No............ $ $ $ $

43List: Name--Pt. 32 Acct No............ $ $ $ $

44List: Name--Pt. 32 Acct No............ $ $ $ $

45List: Name--Pt. 32 Acct No............ $ $ $ $

46List: Name--Pt. 32 Acct No............ $ $ $ $

47List: Name--Pt. 32 Acct No............ $ $ $ $

48List: Name--Pt. 32 Acct No............ $ $ $ $

49List: Name--Pt. 32 Acct No............ $ $ $ $

50List: Name--Pt. 32 Acct No............ $ $ $ $

51Annual cost per unit.................. $ $ $ $

52Monthly cost per unit................. $ $ $ $

53Monthly rate per unit................. $ $ $ $

54Unit of measurement................... ................ ................ ................ ................

55Ratio: Rate/Direct Cost............... ................ ................ ................ ................

56Ratio: Rate/Unit Cost................. ................ ................ ................ ................

----------------------------------------------------------------------------------------------------------------

Notes:

(1) Cross-Connection Function includes costs for all cabling and cable support structures between and LEC's main

distribution frame (MDF) and the central office terminating equipment dedicated to the interconnector.

(2) Row 54: Unit of measurement is the unit on which the rate is being assessed, e.g., per ft., per DS3

arrangement, etc.

DS3 Cross--Connection Function

[Nonrecurring Rate]

----------------------------------------------------------------------------------------------------------------

Rate element Rate element Rate element Rate element

name #1 name #2 name #3 name #4

----------------------------------------------------------------------------------------------------------------

1Total investment: List Plant & Equip... $ $ $ $

2List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

3List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

4List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

5List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

6List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

7List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

8List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

9List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

10List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

11List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

12List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

13List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

14List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

15List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

16List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

17List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

18List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

19List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

20List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

21Depreciation expense.................. $ $ $ $

22Cost of money ($ Amount).............. $ $ $ $

23Cost of money (Percentage)............ % % % %

24Federal income tax.................... $ $ $ $

25State and local income tax............ $ $ $ $

26Other tax: List Taxes................. $ $ $ $

27List: Property Tax.................... $ $ $ $

28List.................................. $ $ $ $

29List.................................. $ $ $ $

30List.................................. $ $ $ $

31List.................................. $ $ $ $

32List.................................. $ $ $ $

33Maintenance expense................... $ $ $ $

34Admin and other expense: List Expense. $ $ $ $

35List: Name--Pt. 32 Acct No............ $ $ $ $

36List: Name--Pt. 32 Acct No............ $ $ $ $

37List: Name--Pt. 32 Acct No............ $ $ $ $

38List: Name--Pt. 32 Acct No............ $ $ $ $

39List: Name--Pt. 32 Acct No............ $ $ $ $

40List: Name--Pt. 32 Acct No............ $ $ $ $

41List: Name--Pt. 32 Acct No............ $ $ $ $

42List: Name--Pt. 32 Acct No............ $ $ $ $

43List: Name--Pt. 32 Acct No............ $ $ $ $

44List: Name--Pt. 32 Acct No............ $ $ $ $

45List: Name--Pt. 32 Acct No............ $ $ $ $

46List: Name--Pt. 32 Acct No............ $ $ $ $

47List: Name--Pt. 32 Acct No............ $ $ $ $

48List: Name--Pt. 32 Acct No............ $ $ $ $

49List: Name--Pt. 32 Acct No............ $ $ $ $

50List: Name--Pt. 32 Acct No............ $ $ $ $

51 ................ ................ ................ ................

52Nonrecurring cost per unit............ $ $ $ $

53Nonrecurring rate per unit............ $ $ $ $

54Unit of measurement................... ................ ................ ................ ................

55Ratio: Rate Per Unit/Direct Cost...... ................ ................ ................ ................

56Ratio: Rate Per Unit/Unit Cost........ ................ ................ ................ ................

----------------------------------------------------------------------------------------------------------------

Notes:

(1) Cross--Connection Function includes costs for all cabling and cable support structures between and LEC's

main distribution frame (MDF) and the central office terminating equipment dedicated to the interconnector.

(2) Row 54: Unit of measurement is the unit on which the rate is being assessed, e.g., per ft., per DS3

arrangement, etc.

DS1 Termination Function

[Recurring Rate]

----------------------------------------------------------------------------------------------------------------

Rate element Rate element Rate element Rate element

name #1 name #2 name #3 name #4

----------------------------------------------------------------------------------------------------------------

1Total investment: List Plant & Equip... $ $ $ $

2List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

3List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

4List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

5List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

6List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

7List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

8List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

9List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

10List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

11List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

12List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

13List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

14List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

15List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

16List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

17List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

18List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

19List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

20List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

21Depreciation expense.................. $ $ $ $

22Cost of money ($ Amount).............. $ $ $ $

23Cost of money (Percentage)............ % % % %

24Federal income tax.................... $ $ $ $

25State and local income tax............ $ $ $ $

26Other tax: List Taxes................. $ $ $ $

27List: Property Tax.................... $ $ $ $

28List.................................. $ $ $ $

29List.................................. $ $ $ $

30List.................................. $ $ $ $

31List.................................. $ $ $ $

32List.................................. $ $ $ $

33Maintenance expense................... $ $ $ $

34Admin and other expense: List Expense. $ $ $ $

35List: Name--Pt. 32 Acct No............ $ $ $ $

36List: Name--Pt. 32 Acct No............ $ $ $ $

37List: Name--Pt. 32 Acct No............ $ $ $ $

38List: Name--Pt. 32 Acct No............ $ $ $ $

39List: Name--Pt. 32 Acct No............ $ $ $ $

40List: Name--Pt. 32 Acct No............ $ $ $ $

41List: Name--Pt. 32 Acct No............ $ $ $ $

42List: Name--Pt. 32 Acct No............ $ $ $ $

43List: Name--Pt. 32 Acct No............ $ $ $ $

44List: Name--Pt. 32 Acct No............ $ $ $ $

45List: Name--Pt. 32 Acct No............ $ $ $ $

46List: Name--Pt. 32 Acct No............ $ $ $ $

47List: Name--Pt. 32 Acct No............ $ $ $ $

48List: Name--Pt. 32 Acct No............ $ $ $ $

49List: Name--Pt. 32 Acct No............ $ $ $ $

50List: Name--Pt. 32 Acct No............ $ $ $ $

51Annual cost per unit.................. $ $ $ $

52Monthly cost per unit................. $ $ $ $

53Monthly rate per unit................. $ $ $ $

54Unit of measurement................... ................ ................ ................ ................

55Ratio: Rate Per Unit/Direct Cost...... ................ ................ ................ ................

56Ratio: Rate Per Unit/Unit Cost........ ................ ................ ................ ................

----------------------------------------------------------------------------------------------------------------

Notes:

(1) The Termination Function includes all costs of equipment, for example, the optical line terminating mux

(OLTM) unit and equipment bay, that are used in terminating the entrance cable dedicated to the

interconnector.

(2) Row 54: Unit of measurement is the unit on which the rate is being assessed, e.g., per POT frame, per 100

square foot arrangement.

DS1 Termination Function

[Nonrecurring Rate]

----------------------------------------------------------------------------------------------------------------

Rate element Rate element Rate element Rate element

name #1 name #2 name #3 name #4

----------------------------------------------------------------------------------------------------------------

1 Total investment: List Plant & Equip.. $ $ $ $

2List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

3List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

4List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

5List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

6List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

7List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

8List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

9List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

10List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

11List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

12List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

13List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

14List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

15List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

16List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

17List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

18List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

19List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

20List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

21Depreciation expense.................. $ $ $ $

22Cost of money ($ Amount).............. $ $ $ $

23Cost of money (Percentage)............ % % % %

24Federal income tax.................... $ $ $ $

25State and local income tax............ $ $ $ $

26Other tax: List Taxes................. $ $ $ $

27List: Property Tax.................... $ $ $ $

28List.................................. $ $ $ $

29List.................................. $ $ $ $

30List.................................. $ $ $ $

31List.................................. $ $ $ $

32List.................................. $ $ $ $

33Maintenance expense................... $ $ $ $

34Admin and other expense: List Expense. $ $ $ $

35List: Name--Pt. 32 Acct No............ $ $ $ $

36List: Name--Pt. 32 Acct No............ $ $ $ $

37List: Name--Pt. 32 Acct No............ $ $ $ $

38List: Name--Pt. 32 Acct No............ $ $ $ $

39List: Name--Pt. 32 Acct No............ $ $ $ $

40List: Name--Pt. 32 Acct No............ $ $ $ $

41List: Name--Pt. 32 Acct No............ $ $ $ $

42List: Name--Pt. 32 Acct No............ $ $ $ $

43List: Name--Pt. 32 Acct No............ $ $ $ $

44List: Name--Pt. 32 Acct No............ $ $ $ $

45List: Name--Pt. 32 Acct No............ $ $ $ $

46List: Name--Pt. 32 Acct No............ $ $ $ $

47List: Name--Pt. 32 Acct No............ $ $ $ $

48List: Name--Pt. 32 Acct No............ $ $ $ $

49List: Name--Pt. 32 Acct No............ $ $ $ $

50List: Name--Pt. 32 Acct No............ $ $ $ $

51 ................ ................ ................ ................

52Nonrecurring cost per unit............ $ $ $ $

53Nonrecurring rate per unit............ $ $ $ $

54Unit of measurement................... ................ ................ ................ ................

55Ratio: Rate Per Unit/Direct Cost...... ................ ................ ................ ................

56Ratio: Rate Per Unit/Unit Cost........ ................ ................ ................ ................

----------------------------------------------------------------------------------------------------------------

Notes:

(1) The Termination Function includes all costs of equipment, for example, the optical line terminating mux

(OLTM) unit and equipment bay, that are used in terminating the entrance cable dedicated to the

interconnector.

(2) Row 54: Unit of measurement is the unit on which the rate is being assessed, e.g., per POT frame, per 100

square foot arrangement.

DS3 Termination Function

[Recurring Rate]

----------------------------------------------------------------------------------------------------------------

Rate element Rate element Rate element Rate element

name #1 name #2 name #3 name #4

----------------------------------------------------------------------------------------------------------------

1Total investment: List Plant & Equip... $ $ $ $

2List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

3List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

4List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

5List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

6List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

7List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

8List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

9List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

10List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

11List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

12List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

13List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

14List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

15List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

16List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

17List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

18List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

19List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

20List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

21Depreciation expense.................. $ $ $ $

22Cost of money ($ Amount).............. $ $ $ $

23Cost of money (Percentage)............ % % % %

24Federal income tax.................... $ $ $ $

25State and local income tax............ $ $ $ $

26Other tax: List Taxes................. $ $ $ $

27List: Property Tax.................... $ $ $ $

28List.................................. $ $ $ $

29List.................................. $ $ $ $

30List.................................. $ $ $ $

31List.................................. $ $ $ $

32List.................................. $ $ $ $

33Maintenance expense................... $ $ $ $

34Admin and other expense: List Expense. $ $ $ $

35List: Name--Pt. 32 Acct No............ $ $ $ $

36List: Name--Pt. 32 Acct No............ $ $ $ $

37List: Name--Pt. 32 Acct No............ $ $ $ $

38List: Name--Pt. 32 Acct No............ $ $ $ $

39List: Name--Pt. 32 Acct No............ $ $ $ $

40List: Name--Pt. 32 Acct No............ $ $ $ $

41List: Name--Pt. 32 Acct No............ $ $ $ $

42List: Name--Pt. 32 Acct No............ $ $ $ $

43List: Name--Pt. 32 Acct No............ $ $ $ $

44List: Name--Pt. 32 Acct No............ $ $ $ $

45List: Name--Pt. 32 Acct No............ $ $ $ $

46List: Name--Pt. 32 Acct No............ $ $ $ $

47List: Name--Pt. 32 Acct No............ $ $ $ $

48List: Name--Pt. 32 Acct No............ $ $ $ $

49List: Name--Pt. 32 Acct No............ $ $ $ $

50List: Name--Pt. 32 Acct No............ $ $ $ $

51Annual cost per unit.................. $ $ $ $

52Monthly cost per unit................. $ $ $ $

53Monthly rate per unit................. $ $ $ $

54Unit of measurement................... ................ ................ ................ ................

55Ratio: Rate/Direct Cost............... ................ ................ ................ ................

56Ratio: Rate/Direct Cost............... ................ ................ ................ ................

----------------------------------------------------------------------------------------------------------------

Notes:

(1) The Termination Function includes all costs of equipment, for example, the optical line terminating mux

(OLTM) unit and equipment bay, that are used in terminating the entrance cable dedicated to the

interconnector.

(2) Row 54: Unit of measurement is the unit on which the rate is being assessed, e.g., per POT frame, per 100

square foot arrangement.

DS3 Termination Function

[Nonrecurring Rate]

----------------------------------------------------------------------------------------------------------------

Rate element Rate element Rate element Rate element

name #1 name #2 name #3 name #4

----------------------------------------------------------------------------------------------------------------

1 Total investment: List Plant & Equip.. $ $ $ $

2List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

3List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

4List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

5List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

6List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

7List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

8List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

9List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

10List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

11List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

12List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

13List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

14List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

15List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

16List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

17List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

18List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

19List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

20List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

21 Depreciation expense................. $ $ $ $

22 Cost of money ($ Amount)............. $ $ $ ................

23 Cost of money (Percentage)........... % % % %

24 Federal income tax................... $ $ $ $

25 State and local income tax........... $ $ $ $

26 Other tax: List Taxes................ $ $ $ $

27List: Property Tax.................... $ $ $ $

28List:................................. $ $ $ $

29List:................................. $ $ $ $

30List:................................. $ $ $ $

31List:................................. $ $ $ $

32List:................................. $ $ $ $

33 Maintenance expense.................. $ $ $ $

34 Admin and other expense: List Expense $ $ $ $

35List: Name--Pt. 32 Acct No............ $ $ $ $

36List: Name--Pt. 32 Acct No............ $ $ $ $

37List: Name--Pt. 32 Acct No............ $ $ $ $

38List: Name--Pt. 32 Acct No............ $ $ $ $

39List: Name--Pt. 32 Acct No............ $ $ $ $

40List: Name--Pt. 32 Acct No............ $ $ $ $

41List: Name--Pt. 32 Acct No............ $ $ $ $

42List: Name--Pt. 32 Acct No............ $ $ $ $

43List: Name--Pt. 32 Acct No............ $ $ $ $

44List: Name--Pt. 32 Acct No............ $ $ $ $

45List: Name--Pt. 32 Acct No............ $ $ $ $

46List: Name--Pt. 32 Acct No............ $ $ $ $

47List: Name--Pt. 32 Acct No............ $ $ $ $

48List: Name--Pt. 32 Acct No............ $ $ $ $

49List: Name--Pt. 32 Acct No............ $ $ $ $

50List: Name--Pt. 32 Acct No............ $ $ $ $

51 ................ ................ ................ ................

52 Nonrecurring cost per unit........... $ $ $ $

53 Nonrecurring rate per unit........... $ $ $ $

54 Unit of measurement.................. ................ ................ ................ ................

55 Ratio: Rate Per Unit/Direct Cost..... ................ ................ ................ ................

56 Ratio: Rate Per Unit/Unit Cost....... ................ ................ ................ ................

----------------------------------------------------------------------------------------------------------------

Notes:

(1) The Termination Function includes all costs of equipment, for example, the optical line terminating mux

(OLTM) unit and equipment bay, that are used in terminating the entrance cable dedicated to the

interconnector.

(2) Row 54: Unit of measurement is the unit on which the rate is being assessed, e.g., per POT frame, per 100

square foot arrangement.

DS1 Maintenance and Repair Function

[Recurring Rate]

----------------------------------------------------------------------------------------------------------------

Rate element Rate element Rate element Rate element

name #1 name #2 name #3 name #4

----------------------------------------------------------------------------------------------------------------

1 Total investment: List Plant & Equip.. $ $ $ $

2List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

3List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

4List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

5List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

6List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

7List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

8List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

9List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

10List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

11List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

12List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

13List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

14List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

15List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

16List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

17List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

18List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

19List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

20List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

21 Depreciation expense................. $ $ $ $

22 Cost of money ($ Amount)............. $ $ $ $

23 Cost of money (Percentage)........... % % % %

24 Federal income tax................... $ $ $ $

25 State and local income tax........... $ $ $ $

26 Other tax: List Taxes................ $ $ $ $

27List: Property Tax.................... $ $ $ $

28List.................................. $ $ $ $

29List.................................. $ $ $ $

30List.................................. $ $ $ $

31List.................................. $ $ $ $

32List.................................. $ $ $ $

33 Maintenance expense.................. $ $ $ $

34 Admin and other expense: List Expense $ $ $ $

35List: Name--Pt. 32 Acct No............ $ $ $ $

36List: Name--Pt. 32 Acct No............ $ $ $ $

37List: Name--Pt. 32 Acct No............ $ $ $ $

38List: Name--Pt. 32 Acct No............ $ $ $ $

39List: Name--Pt. 32 Acct No............ $ $ $ $

40List: Name--Pt. 32 Acct No............ $ $ $ $

41List: Name--Pt. 32 Acct No............ $ $ $ $

42List: Name--Pt. 32 Acct No............ $ $ $ $

43List: Name--Pt. 32 Acct No............ $ $ $ $

44List: Name--Pt. 32 Acct No............ $ $ $ $

45List: Name--Pt. 32 Acct No............ $ $ $ $

46List: Name--Pt. 32 Acct No............ $ $ $ $

47List: Name--Pt. 32 Acct No............ $ $ $ $

48List: Name--Pt. 32 Acct No............ $ $ $ $

49List: Name--Pt. 32 Acct No............ $ $ $ $

50List: Name--Pt. 32 Acct No............ $ $ $ $

51 Annual cost per unit................. $ $ $ $

52 Monthly cost per unit................ $ $ $ $

53 Monthly rate per unit................ $ $ $ $

54 Unit of measurement.................. ................ ................ ................ ................

55 Ratio: Rate/Direct Cost.............. ................ ................ ................ ................

56 Ratio: Rate/Unit Cost................ ................ ................ ................ ................

----------------------------------------------------------------------------------------------------------------

Notes:

(1) The Maintenance and Repair Function includes the costs of maintaining and repairing all central office

equipment dedicated to the interconnector.

(2) Row 54: Unit of measurement is the unit on which the rate is being assessed.

DS1 Maintenance and Repair Function

[Nonrecurring Rate]

----------------------------------------------------------------------------------------------------------------

Rate element Rate element Rate element Rate element

name #1 name #2 name #3 name #4

----------------------------------------------------------------------------------------------------------------

1Total investment: List Plant & Equip... $ $ $ $

2List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

3List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

4List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

5List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

6List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

7List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

8List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

9List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

10List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

11List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

12List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

13List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

14List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

15List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

16List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

17List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

18List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

19List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

20List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

21 Depreciation expense................. $ $ $ $

22 Cost of money ($ Amount)............. $ $ $ $

23 Cost of money (Percentage)........... % % % %

24 Federal income tax................... $ $ $ $

25 State and local income tax........... $ $ $ $

26 Other tax: List Taxes................ $ $ $ $

27List: Property Tax.................... $ $ $ $

28List:................................. $ $ $ $

29List:................................. $ $ $ $

30List:................................. $ $ $ $

31List:................................. $ $ $ $

32List:................................. $ $ $ $

33 Maintenance expense.................. $ $ $ $

34 Admin and other expense: List Expense $ $ $ $

35List: Name--Pt. 32 Acct No............ $ $ $ $

36List: Name--Pt. 32 Acct No............ $ $ $ $

37List: Name--Pt. 32 Acct No............ $ $ $ $

38List: Name--Pt. 32 Acct No............ $ $ $ $

39List: Name--Pt. 32 Acct No............ $ $ $ $

40List: Name--Pt. 32 Acct No............ $ $ $ $

41List: Name--Pt. 32 Acct No............ $ $ $ $

42List: Name--Pt. 32 Acct No............ $ $ $ $

43List: Name--Pt. 32 Acct No............ $ $ $ $

44List: Name--Pt. 32 Acct No............ $ $ $ $

45List: Name--Pt. 32 Acct No............ $ $ $ $

46List: Name--Pt. 32 Acct No............ $ $ $ $

47List: Name--Pt. 32 Acct No............ $ $ $ $

48List: Name--Pt. 32 Acct No............ $ $ $ $

49List: Name--Pt. 32 Acct No............ $ $ $ $

50List: Name--Pt. 32 Acct No............ $ $ $ $

51

52 Nonrecurring cost per unit........... $ $ $ $

53 Nonrecurring rate per unit........... $ $ $ $

54 Unit of measurement.................. ................ ................ ................ ................

55 Ratio: Rate Per Unit/Direct Cost..... ................ ................ ................ ................

56 Ratio: Rate Per Unit/Direct Cost..... ................ ................ ................ ................

----------------------------------------------------------------------------------------------------------------

Notes:

(1) The Maintenance and Repair Function includes the costs of maintaining and repairing all central office

equipment dedicated to the interconnector.

(2) Row 54: Unit of measurement is the unit on which the rate is being assessed.

DS3 Maintenance and Repair Function

[Recurring Rate]

----------------------------------------------------------------------------------------------------------------

Rate element Rate element Rate element Rate element

name #1 name #2 name #3 name #4

----------------------------------------------------------------------------------------------------------------

1 Total investment: List Plant & Equip.. $ $ $ $

2List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

3List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

4List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

5List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

6List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

7List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

8List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

9List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

10List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

11List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

12List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

13List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

14List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

15List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

16List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

17List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

18List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

19List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

20List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

21 Depreciation expense................. $ $ $ $

22 Cost of money ($ Amount)............. $ $ $ $

23 Cost of money (Percentage)........... % % % %

24 Federal income tax................... $ $ $ $

25 State and local income tax........... $ $ $ $

26 Other tax: List Taxes................ $ $ $ $

27List: Property Tax.................... $ $ $ $

28List.................................. $ $ $ $

29List.................................. $ $ $ $

30List.................................. $ $ $ $

31List.................................. $ $ $ $

32List.................................. $ $ $ $

33 Maintenance expense.................. $ $ $ $

34 Admin and other expense: List Expense $ $ $ $

35List: Name--Pt. 32 Acct No............ $ $ $ $

36List: Name--Pt. 32 Acct No............ $ $ $ $

37List: Name--Pt. 32 Acct No............ $ $ $ $

38List: Name--Pt. 32 Acct No............ $ $ $ $

39List: Name--Pt. 32 Acct No............ $ $ $ $

40List: Name--Pt. 32 Acct No............ $ $ $ $

41List: Name--Pt. 32 Acct No............ $ $ $ $

42List: Name--Pt. 32 Acct No............ $ $ $ $

43List: Name--Pt. 32 Acct No............ $ $ $ $

44List: Name--Pt. 32 Acct No............ $ $ $ $

45List: Name--Pt. 32 Acct No............ $ $ $ $

46List: Name--Pt. 32 Acct No............ $ $ $ $

47List: Name--Pt. 32 Acct No............ $ $ $ $

48List: Name--Pt. 32 Acct No............ $ $ $ $

49List: Name--Pt. 32 Acct No............ $ $ $ $

50List: Name--Pt. 32 Acct No............ $ $ $ $

51 Annual cost per unit................. $ $ $ $

52 Monthly cost per unit................ $ $ $ $

53 Monthly rate per unit................ $ $ $ $

54 Unit of measurement.................. ................ ................ ................ ................

55 Ratio: Rate/Direct Cost.............. ................ ................ ................ ................

56 Ratio: Rate/Direct Cost.............. ................ ................ ................ ................

----------------------------------------------------------------------------------------------------------------

Notes:

(1) The Maintenance and Repair Function includes the costs of maintaining and repairing all central office

equipment dedicated to the interconnector.

(2) Row 54: Unit of measurement is the unit on which the rate is being assessed.

DS3 Maintenance and Repair Function

[Nonrecurring Rate]

----------------------------------------------------------------------------------------------------------------

Rate element Rate element Rate element Rate element

name #1 name #2 name #3 name #4

----------------------------------------------------------------------------------------------------------------

1Total investment: List Plant & Equip... $ $ $ $

2List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

3List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

4List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

5List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

6List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

7List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

8List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

9List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

10List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

11List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

12List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

13List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

14List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

15List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

16List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

17List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

18List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

19List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

20List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

21 Depreciation expense................. $ $ $ $

22 Cost of money ($ Amount)............. $ $ $ ................

23 Cost of money (Percentage)........... % % % %

24 Federal income tax................... $ $ $ $

25 State and local income tax........... $ $ $ $

26 Other tax: List Taxes................ $ $ $ $

27List: Property Tax.................... $ $ $ $

28List:................................. $ $ $ $

29List:................................. $ $ $ $

30List:................................. $ $ $ $

31List:................................. $ $ $ $

32List:................................. $ $ $ $

33 Maintenance expense.................. $ $ $ $

34 Admin and other expense: List Expense $ $ $ $

35List: Name--Pt. 32 Acct No............ $ $ $ $

36List: Name--Pt. 32 Acct No............ $ $ $ $

37List: Name--Pt. 32 Acct No............ $ $ $ $

38List: Name--Pt. 32 Acct No............ $ $ $ $

39List: Name--Pt. 32 Acct No............ $ $ $ $

40List: Name--Pt. 32 Acct No............ $ $ $ $

41List: Name--Pt. 32 Acct No............ $ $ $ $

42List: Name--Pt. 32 Acct No............ $ $ $ $

43List: Name--Pt. 32 Acct No............ $ $ $ $

44List: Name--Pt. 32 Acct No............ $ $ $ $

45List: Name--Pt. 32 Acct No............ $ $ $ $

46List: Name--Pt. 32 Acct No............ $ $ $ $

47List: Name--Pt. 32 Acct No............ $ $ $ $

48List: Name--Pt. 32 Acct No............ $ $ $ $

49List: Name--Pt. 32 Acct No............ $ $ $ $

50List: Name--Pt. 32 Acct No............ $ $ $ $

51 ................ ................ ................ ................

52 Nonrecurring cost per unit........... $ $ $ $

53 Nonrecurring rate per unit........... $ $ $ $

54 Unit of measurement.................. ................ ................ ................ ................

55 Ratio: Rate Per Unit/Direct Cost..... ................ ................ ................ ................

56 Ratio: Rate Per Unit/Unit Cost....... ................ ................ ................ ................

----------------------------------------------------------------------------------------------------------------

Notes:

(1) The Maintenance and Repair Function includes the costs of maintaining and repairing all central office

equipment dedicated to the interconnector.

(2) Row 54: Unit of measurement is the unit on which the rate is being assessed.

DS1 Technician Training Function

[Nonrecurring Rate]

----------------------------------------------------------------------------------------------------------------

Rate element Rate element Rate element Rate element

name #1 name #2 name #3 name #4

----------------------------------------------------------------------------------------------------------------

1 Total investment: List Plant & Equip.. $ $ $ $

2List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

3List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

4List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

5List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

6List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

7List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

8List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

9List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

10List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

11List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

12List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

13List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

14List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

15List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

16List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

17List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

18List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

19List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

20List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

21 Depreciation expense................. $ $ $ $

22 Cost of money ($ Amount)............. $ $ $ $

23 Cost of money (Percentage)........... % % % %

24 Federal income tax................... $ $ $ $

25 State and local income tax........... $ $ $ $

26 Other tax: List Taxes................ $ $ $ $

27List: Property Tax.................... $ $ $ $

28List.................................. $ $ $ $

29List.................................. $ $ $ $

30List.................................. $ $ $ $

31List.................................. $ $ $ $

32List.................................. $ $ $ $

33 Maintenance expense.................. $ $ $ $

34 Admin and other expense: List Expense $ $ $ $

35List: Name--Pt. 32 Acct No............ $ $ $ $

36List: Name--Pt. 32 Acct No............ $ $ $ $

37List: Name--Pt. 32 Acct No............ $ $ $ $

38List: Name--Pt. 32 Acct No............ $ $ $ $

39List: Name--Pt. 32 Acct No............ $ $ $ $

40List: Name--Pt. 32 Acct No............ $ $ $ $

41List: Name--Pt. 32 Acct No............ $ $ $ $

42List: Name--Pt. 32 Acct No............ $ $ $ $

43List: Name--Pt. 32 Acct No............ $ $ $ $

44List: Name--Pt. 32 Acct No............ $ $ $ $

45List: Name--Pt. 32 Acct No............ $ $ $ $

46List: Name--Pt. 32 Acct No............ $ $ $ $

47List: Name--Pt. 32 Acct No............ $ $ $ $

48List: Name--Pt. 32 Acct No............ $ $ $ $

49List: Name--Pt. 32 Acct No............ $ $ $ $

50List: Name--Pt. 32 Acct No............ $ $ $ $

51 ................ ................ ................ ................

52 Nonrecurring cost per unit........... $ $ $ $

53 Nonrecurring rate per unit........... $ $ $ $

54 Unit of measurement..................

55 Ratio: Rate Per Unit/Direct Cost.....

56 Ratio: Rate Per Unit/Direct Cost.....

----------------------------------------------------------------------------------------------------------------

Notes:

(1) The Technician Training Function includes the LEC's costs of training its technicians to install, repair and

maintain the interconnector--designated electronic equipment with which the technicians are unfamiliar.

(2) Row 54: Unit of measurement is the unit on which the rate is being assessed.

DS3 Technician Training Function

[Nonrecurring Rate]

----------------------------------------------------------------------------------------------------------------

Rate element Rate element Rate element Rate element

name #1 name #2 name #3 name #4

----------------------------------------------------------------------------------------------------------------

1 Total investment: List Plant & Equip.. $ $ $ $

2List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

3List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

4List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

5List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

6List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

7List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

8List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

9List: Name--Pt. 32 Acct No.--Dep. Life. $ $ $ $

10List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

11List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

12List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

13List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

14List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

15List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

16List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

17List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

18List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

19List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

20List: Name--Pt. 32 Acct No.--Dep. Life $ $ $ $

21 Depreciation expense................. $ $ $ $

22 Cost of money ($ Amount)............. $ $ $ $

23 Cost of money (Percentage)........... % % % %

24 Federal income tax................... $ $ $ $

25 State and local income tax........... $ $ $ $

26 Other tax: List Taxes................ $ $ $ $

27List: Property Tax.................... $ $ $ $

28List.................................. $ $ $ $

29List.................................. $ $ $ $

30List.................................. $ $ $ $

31List.................................. $ $ $ $

32List.................................. $ $ $ $

33 Maintenance expense.................. $ $ $ $

34 Admin and other expense: List Expense $ $ $ $

35List: Name--Pt. 32 Acct No............ $ $ $ $

36List: Name--Pt. 32 Acct No............ $ $ $ $

37List: Name--Pt. 32 Acct No............ $ $ $ $

38List: Name--Pt. 32 Acct No............ $ $ $ $

39List: Name--Pt. 32 Acct No............ $ $ $ $

40List: Name--Pt. 32 Acct No............ $ $ $ $

41List: Name--Pt. 32 Acct No............ $ $ $ $

42List: Name--Pt. 32 Acct No............ $ $ $ $

43List: Name--Pt. 32 Acct No............ $ $ $ $

44List: Name--Pt. 32 Acct No............ $ $ $ $

45List: Name--Pt. 32 Acct No............ $ $ $ $

46List: Name--Pt. 32 Acct No............ $ $ $ $

47List: Name--Pt. 32 Acct No............ $ $ $ $

48List: Name--Pt. 32 Acct No............ $ $ $ $

49List: Name--Pt. 32 Acct No............ $ $ $ $

50List: Name--Pt. 32 Acct No............ $ $ $ $

51 ................ ................ ................ ................

52 Nonrecurring cost per unit........... $ $ $ $

53 Nonrecurring rate per unit........... $ $ $ $

54 Unit of measurement.................. ................ ................ ................ ................

55 Ratio: Rate per unit/Direct Cost..... ................ ................ ................ ................

56 Ratio: Rate per unit/Unit Cost....... ................ ................ ................ ................

----------------------------------------------------------------------------------------------------------------

Notes:

(1) The Technician Training Function includes the LEC's costs of training its technicians to install, repair and

maintain the interconnector--designated electronic equipment with which the technicians are unfamiliar.

(2) Row 54: Unit of measurement is the unit on which the rate is being assessed.

Appendix B

(LEC Name) EIS Overhead Analysis

----------------------------------------------------------------------------------------------------------------

Overhead

Virtual EIS rate elements Proposed rate Direct cost factor(c)=(a/

(a) (b) b)

----------------------------------------------------------------------------------------------------------------

1DS1 X-Connect.................................................. $0.00 $0.00 0.00

2DS3 X-Connect.................................................. $0.00 $0.00 0.00

3Rate Element Name.............................................. $0.00 $0.00 0.00

4Rate Element Name.............................................. $0.00 $0.00 0.00

5Rate Element Name.............................................. $0.00 $0.00 0.00

6Rate Element Name.............................................. $0.00 $0.00 0.00

7Rate Element Name.............................................. $0.00 $0.00 0.00

8Rate Element Name.............................................. $0.00 $0.00 0.00

9Rate Element Name.............................................. $0.00 $0.00 0.00

10Rate Element Name............................................. $0.00 $0.00 0.00

11Rate Element Name............................................. $0.00 $0.00 0.00

12DS1 X-ConnectNRC.............................................. $0.00 $0.00 0.00

13DS3 X-ConnectNRC.............................................. $0.00 $0.00 0.00

14Rate Element NameNRC.......................................... $0.00 $0.00 0.00

15Rate Element NameNRC.......................................... $0.00 $0.00 0.00

16Rate Element NameNRC.......................................... $0.00 $0.00 0.00

17Rate Element NameNRC.......................................... $0.00 $0.00 0.00

18Rate Element NameNRC.......................................... $0.00 $0.00 0.00

19Rate Element NameNRC.......................................... $0.00 $0.00 0.00

20Rate Element NameNRC.......................................... $0.00 $0.00 0.00

21Rate Element NameNRC.......................................... $0.00 $0.00 0.00

22Rate Element NameNRC.......................................... $0.00 $0.00 0.00

----------------------------------------------------------------------------------------------------------------

NOTES:

Appendix C.--Sample Price Out Chart

(Virtual Expanded Interconnection)

ABC COMPANY MODEL OFFICE--Cost of Providing 100 DS1s

----------------------------------------------------------------------------------------------------------------

Rate Req/100-DS1 Total Non rec.

----------------------------------------------------------------------------------------------------------------

1. Non-recurring Charges

Service Order Processing/Design Eng............................. $0.00 1 $0.00

Equipment Installation--Total................................... $0.00 100 $0.00

Entrance (e.g., cable and cable pull)....................... $0.00 .............. $0.00

Termination Equipment (e.g., OLTM).......................... $0.00 .............. $0.00

DS1 Cross-connect........................................... .............. .............. ..............

Training........................................................ $0.00 .............. $0.00

-----------------------------------------------

Total NRC's............................................... .............. .............. $0.00

Equivalent Monthly Payment...................................... .............. .............. $0.00

Over 5 Years @ 11.25% Interest.................................. .............. .............. $0.00

2. Recurring Charges Rate Req/100-DS1 Total Monthly

Entrance Space (e.g. conduit, riser)............................ $0.00 .............. $0.00

DS1 Cross-connect............................................... $0.00 100 $0.00

Maintenance and Repair--Total................................... $0.00 .............. $0.00

Entrance (e.g., cable and cable pull)....................... $0.00 .............. $0.00

Termination Equipment (e.g., OLTM).......................... $0.00 .............. $0.00

DS1 Cross-connect........................................... $0.00 100 $0.00

-----------------------------------------------

Total Recurring........................................... .............. .............. $0.00

===============================================

Total Monthly Cost........................................ .............. .............. $0.00

Monthly Cost per DS1............................................ .............. .............. $0.00

----------------------------------------------------------------------------------------------------------------

[FR Doc. 94-18588 Filed 8-1-94; 8:45 am]

BILLING CODE 6712-01-M

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

Commission Requirements for Cost Support Material To Be Filed With Virtual Collocation Tariffs for Special Access and Switched Transport | Frix