Texas Permanent Regulatory Program

Federal RegisterJun 30, 1994

Ask Donna

What actually matters in this document.

Text

DEPARTMENT OF THE INTERIOR

Office of Surface Mining Reclamation and Enforcement

30 CFR Part 943

Texas Permanent Regulatory Program

AGENCY: Office of Surface Mining Reclamation and Enforcement (OSM),

Interior.

ACTION: Proposed rule; public comment period and opportunity for public

hearing on proposed amendment.

-----------------------------------------------------------------------

SUMMARY: OSM is announcing receipt of a proposed amendment to the Texas

permanent regulatory program (hereinafter, the ``Texas program'') under

the Surface Mining Control and Reclamation Act of 1977 (SMCRA). The

proposed amendment consists of revisions to the Texas regulations and

statute pertaining to ownership and control. The amendment is intended

to revise the Texas program to be consistent with and no less effective

than the corresponding Federal regulations and no less stringent than

SMCRA.

DATES: Written comments must be received by 4:00 p.m., c.d.t., August

1, 1994. If requested, a public hearing on the proposed amendment will

be held on July 25, 1994. Requests to present oral testimony at the

hearing must be received by 4:00 p.m., c.d.t., July 15, 1994. Any

disabled individual who has need for a special accommodation to attend

a public hearing should contact the individual listed under FOR FURTHER

INFORMATION CONTACT.

ADDRESSES: Written comments should be mailed or hand delivered to James

H. Moncrief at the address listed below.

Copies of the Texas program, the proposed amendment, and all

written comments received in response to this document will be

available for public review at the addresses listed below during normal

business hours, Monday through Friday, excluding holidays. Each

requester may receive one free copy of the proposed amendment by

contacting OSM's Tulsa Field Office.

James H. Moncrief, Director, Tulsa Field Office, Office of Surface

Mining Reclamation and Enforcement, 5100 East Skelly Drive, Suite 550,

Tulsa, OK 74135

Railroad Commission of Texas, Surface Mining and Reclamation Division,

Capitol Station, P.O. Drawer 12967, Austin, TX 78711, Telephone: (512)

463-6900

FOR FURTHER INFORMATION CONTACT: James H. Moncrief, Telephone: (918)

581-6430.

SUPPLEMENTARY INFORMATION:

I. Background on the Texas Program

On February 16, 1980, the Secretary of the Interior conditionally

approved the Texas program. General background information on the Texas

program, including the Secretary's findings, the disposition of

comments, and the conditions of approval of the Texas program can be

found in the February 27, 1980 Federal Register (45 FR 12998).

Subsequent actions concerning Texas' program and program amendments can

be found at 30 CFR 943.15 and 943.16.

II. Proposed Amendment

By letter dated May 24, 1994, (Administrative Record No. TX-576),

Texas submitted a proposed amendment to its program pursuant to SMCRA.

Texas submitted the proposed amendment in response to required program

amendments at 30 CFR 943.16(c) (1) and (2), (d), (f), (j) (1), (2),

(3), and (4), (r), and (s) (59 FR 13200, March 21, 1994). The

provisions of the Texas Administrative Code (TAC) at 16 TAC 11.221 and

the Texas Surface Coal Mining and Reclamation Act that Texas proposes

to amend are:

1. Texas Coal Mining Regulations (TCMR) 778.116(m), Identification

of interests and compliance information.

Texas proposes to add language to require a permit application to

include information on violations received pursuant to SMCRA's

implementing Federal regulations, all SMCRA-approved Federal programs

(OSM-administered Indian lands program and Federal programs for

States), and all SMCRA-approved State programs, not just the Texas

program, and information on air or water environmental protection

violations received pursuant to any State laws, rules or regulations

enacted pursuant to Federal laws, rules, or regulations and incurred by

the applicant in any State, not just Texas.

2. TCMR 786.215 (e) and (f), Review of permit applications.

(a) Texas proposes at TCMR 786.215(e)(1) to require the Commission

to consider, as a basis for permit denial, information on cessation

orders issued by States other than Texas, and

(b) Texas proposes at TCMR 786.215(f) to require that issuance of

permits is specifically prohibited whenever the Commission makes a

determination that the applicant, anyone who owns or controls the

applicant, or the operator specified in the application controls or has

controlled surface coal mining and reclamation operations with a

demonstrated pattern of willful violations of the Texas Surface Coal

Mining and Reclamation Act (TSCMRA), SMCRA, SMCRA's implementing

Federal regulations, SMCRA-approved Federal programs, and all SMCRA-

approved State programs, not just the Texas program, of such nature,

duration, and with such resulting irreparable damage to the

environment, as to indicate an intent not to comply with these laws,

rules, and regulations.

3. TCMR 786.216 (i) through (n), Criteria for permit approval or

denial.

Texas proposes to delete TCMR 786.216(i) and to recodify paragraphs

(j) through (o), accordingly. Existing TCMR 786.216(i) prohibits permit

approval unless the Commission finds, in writing, that the applicant or

the operator, if other than the applicant, does not control and has not

controlled mining operations with a demonstrated pattern of willful

violations of TSCMRA.

4. TCMR 788.225 (f), (g) and (h), Commission review of outstanding

permits.

(a) Texas proposes to revise TCMR 788.225(f)(3) to allow the

Commission, when it finds that a permit was improvidently issued, to

suspend the permit until the outstanding violation is abated or the

penalty or fee is paid, and to add TCMR 788.225(f)(4) to allow the

Commission to rescind such permit under the provisions of proposed TCMR

788.225(g).

(b) Texas proposes to add TCMR 788.225(g) to provide that the

Commission shall, for a permit found to have been improvidently issued,

(1) serve the permittee with notice of the proposed suspension and

rescission, and include in the notice the reasons for the Commission's

findings, and (2) specify the conditions that must be met in order to

prevent suspension or rescission of such improvidently issued permit.

(c) Texas proposes to add TCMR 788.25(h) to specify that upon

permit suspension or rescission, the permittee shall cease all surface

coal mining and reclamation operations, except for specific abatement,

reclamation, and other environmental protection measures required by

the Commission.

(d) Texas proposes to recodify existing paragraph (h) as TCMR

788.225(i).

5. Article 5920-11, (TSMCRA), section 21(c), Reporting notices of

violations in permit applications.

Texas proposes to delete from the first sentence of section 21(c)

the words ``within the state'' from the phrase ``in connection with any

surface coal mining operation within the state during the three-year

period.''

III. Public Comment Procedures

In accordance with the provisions of 30 CFR 732.17(h), OSM is

seeking comments on whether the proposed amendment satisfies the

applicable program approval criteria of 30 CFR 732.15. If the amendment

is deemed adequate, it will become part of the Texas program.

1. Written Comments

Written comments should be specific, pertain only to the issues

proposed in this rulemaking, and include explanations in support of the

commenter's recommendations. Comments received after the time indicated

under DATES or at locations other than the Tulsa Field Office will not

necessarily be considered in the final rulemaking or included in the

administrative record.

2. Public Hearing

Persons wishing to testify at the public hearing should contact the

person listed under FOR FURTHER INFORMATION CONTACT by 4 p.m., c.d.t.,

July 15, 1994. The location and time of the hearing will be arranged

with those persons requesting the hearing. If no one requests an

opportunity to testify at the public hearing, the hearing will not be

held.

Filing of a written statement at the time of the hearing is

requested as it will greatly assist the transcriber. Submission of

written statements in advance of the hearing will allow OSM officials

to prepare adequate responses and appropriate questions.

The public hearing will continue on the specified date until all

persons scheduled to testify have been heard. Persons in the audience

who have not been scheduled to testify, and who wish to do so, will be

heard following those who have been scheduled. The hearing will end

after all persons scheduled to testify and persons present in the

audience who wish to testify have been heard.

3. Public Meeting

If only one person requests an opportunity to testify at a hearing,

a public meeting, rather than a public hearing, may be held. Persons

wishing to meet with OSM representatives to discuss the proposed

amendment may request a meeting by contacting the person listed under

FOR FURTHER INFORMATION CONTACT. All such meetings will be open to the

public and, if possible, notices of meetings will be posted at the

locations listed under ADDRESSES. A written summary of each meeting

will be made a part of the administrative record.

IV. Procedural Determinations

1. Executive Order 12866

This rule is exempted from review by the Office of Management and

Budget (OMB) under Executive Order 12866 (Regulatory Planning and

Review).

2. Executive Order 12778

The Department of the Interior has conducted the reviews required

by section 2 of Executive Order 12778 (Civil Justice Reform) and has

determined that this rule meets the applicable standards of subsections

(a) and (b) of that section. However, these standards are not

applicable to the actual language of State regulatory programs and

program amendments since each such program is drafted and promulgated

by a specific State, not by OSM. Under sections 503 and 505 of SMCRA

(30 U.S.C. 1253 and 12550) and the Federal regulations at 30 CFR

730.11, 732.15, and 732.17(h)(10), decisions on proposed State

regulatory programs and program amendments submitted by the States must

be based solely on a determination of whether the submittal is

consistent with SMCRA and its implementing Federal regulations and

whether the other requirements of 30 CFR Parts 730, 731, and 732 have

been met.

3. National Environmental Policy Act

No environmental impact statement is required for this rule since

section 702(d) of SMCRA (30 U.S.C. 1292(d)) provides that agency

decisions on proposed State regulatory program provisions do not

constitute major Federal actions within the meaning of section

102(2)(C) of the National Environmental Policy Act (42 U.S.C.

4332(2)(C)).

4. Paperwork Reduction Act

This rule does not contain information collection requirements that

require approval by OMB under the Paperwork Reduction Act (44 U.S.C.

3507 et seq.).

5. Regulatory Flexibility Act

The Department of the Interior has determined that this rule will

not have a significant economic impact on a substantial number of small

entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq.).

The State submittal which is the subject of this rule is based upon

counterpart Federal regulations for which an economic analysis was

prepared and certification made that such regulations would not have a

significant economic effect upon a substantial number of small

entities. Accordingly, this rule will ensure that existing requirements

previously promulgated by OSM will be implemented by the State. In

making the determination as to whether this rule would have a

significant economic impact, the Department relied upon the data and

assumptions for the counterpart Federal regulations.

List of Subjects in 30 CFR Part 943

Intergovernmental relations, Surface mining, Underground mining.

Dated: June 24, 1994.

Russell F. Price,

Acting Assistant Director, Western Support Center.

[FR Doc. 94-15861 Filed 6-29-94; 8:45 am]

BILLING CODE 4310-05-M

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

Texas Permanent Regulatory Program | Frix