DEPARTMENT OF ENERGY
Federal RegisterJun 16, 1994
Ask Donna
What actually matters in this document.
Text
DEPARTMENT OF EDUCATION
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP94-292-000]
Riverside Gas Storage Co.; Intent To Prepare an Environmental
Assessment for the Proposed Riverside Gas Storage Field Project and
Request for Comments on Environmental Issues
June 10, 1994.
The staff of the Federal Energy Regulatory Commission (FERC or the
Commission) will prepare an environmental assessment (EA) that will
discuss environmental impacts of the construction and operation of
facilities proposed in the Riverside Gas Storage Field Project.\1\ This
EA will be used by the Commission in its decision-making process to
determine whether an environmental impact statement is necessary and
whether or not to approve the project.
---------------------------------------------------------------------------
\1\Riverside Gas Storage Company's (Riverside) application was
filed with the Commission under section 7 of the Natural Gas Act and
Part 157 of the Commission's regulations.
---------------------------------------------------------------------------
Summary of the Proposed Project
Riverside Gas Storage Company (Riverside) wants Commission
authorization to construct and operate a new underground natural gas
storage field in Greene and Fayette Counties, Pennsylvania. Riverside
proposes to convert a nearly depleted gas field to gas storage use. The
proposed storage facility would have 5.1 billion cubic feet (BCF) of
storage capacity (3.1 BCF working gas capacity). To develop the
Riverside Gas Storage Field, Riverside would:
Recomplete 21 existing wells as injection/withdrawal
wells;
Recomplete one existing well as an observation well;
Plug and abandon 9 existing gas wells (all remaining wells
in field);
Construct 3.42 miles of 12-inch-diameter gathering
pipeline;
Construct 2.44 miles of 6-inch-diameter pipeline (22
segments of various lengths to attach wells to the gathering pipeline);
Construct a new 3,150-horsepower compressor station; and
Construct ancillary facilities at the compressor station
including meters, dehydrator trains, storage tanks for oil and glycol,
access roads, and water and electric utilities.
The general location of these facilities is shown in appendix 1.\2\
---------------------------------------------------------------------------
\2\The appendices referenced in this notice are not being
printed in the Federal Register. Copies are available from the
Commission's Public Reference Branch, room 3104, 941 North Capitol
Street NE., Washington, DC 20426, or call (202) 208-1371. Copies of
the appendices were sent to all those receiving this notice in the
mail.
---------------------------------------------------------------------------
Land Requirements for Construction
Riverside would use 101.3 acres of land for the Riverside Gas
Storage Field Project. Of this total, 10 acres would be used for the
compressor station, 43.4 acres would be associated with well pads (1.4
acres per well) and 47.9 acres would be associated with the right-of-
way for the storage pipelines.
Following completion of construction, approximately 12.6 acres
associated with the nine plugged and abandoned wells would be allowed
to revert to the land use desired by the property owner.
Riverside proposes to use a an 85-foot-wide construction right-of-
way for its 12-inch-diameter pipeline and a 50-foot-wide construction
right-of-way for its 6-inch-diameter pipeline. Riverside proposes to
use an 85 to 100-foot-wide right-of-way for construction across
streams.
The EA Process
The National Environmental Policy Act (NEPA) requires the
Commission to take into account the environmental impacts that could
result from an action whenever it considers the issuance of a
Certificate of Public Convenience and Necessity. NEPA also requires us
to discover and address concerns the public may have about proposals.
We call this ``scoping''. The main goal of the scoping process is to
focus the analysis in the EA on the important environmental issues. By
this Notice of Intent, the Commission requests public comments on the
scope of the issues it will address in the EA. All comments received
are taken into account during the preparation of the EA.
The EA will discuss impacts that could occur as a result of the
construction and operation of the proposed project under these general
headings:
Geology and soils;
Water resources;
Vegetation and wildlife;
Pipeline safety;
Land use;
Cultural resources;
Air quality and noise.
We will also evaluate possible alternatives to the proposed project
or portions of the project, and make recommendations on how to lessen
or avoid impacts on the various resource areas.
Our independent analysis of the issues will be in the EA. Depending
on the comments received during the scoping process, the EA may be
published and mailed to Federal, state, and local agencies, public
interest groups, interested individuals, affected landowners,
newspapers, libraries, and the Commission's official service list for
this proceeding. A comment period will be allotted for review if the EA
is published. We will consider all comments on the EA before we
recommend that the Commission approve or not approve the project.
Currently Identified Environmental Issues
We have already identified several environmental issues that we
think deserve attention based on a preliminary review of the proposed
facilities and the information provided by Riverside. Keep in mind that
this is a preliminary list. The list of issues will be added to,
subtracted from, or changed based on your comments and our analysis.
The list of environmental issues:
Riverside would recomplete 22 existing wells in Greene and
Fayette Counties, Pennsylvania: one observation well and 21 injection/
withdrawal wells. These wells and drilling operations have potential
groundwater impacts.
Riverside may affect up to five wetlands in the project
area while constructing its pipelines.
There may be noise concerns at residences surrounding
Riverside's new compressor station.
There may be federally listed threatened or endangered
species in the project area.
The Pennsylvania State Historic Preservation Officer
indicated there is potential cultural resources sites in the project
area and requested a survey.
Existing and future coal mining operations and the
Riverside Gas Storage Field Project may affect each other.
Public Participation
You can make a difference by sending a letter addressing your
specific comments or concerns about the project. You should focus on
the potential environmental effects of the proposal, alternatives to
the proposal (including alternative routes), and measures to avoid or
lessen environmental impact. The more specific your comments, the more
useful they will be.
Please follow the instructions below to ensure that your comments
are received and properly recorded:
Address your letter to: Lois Cashell, Secretary, Federal
Energy Regulatory Commission, 825 North Capitol St. NE., Washington, DC
20426;
Reference Docket No. CP94-292-000;
Send a copy of your letter to: Mr. Steven G. Grape, EA
Project Manager, Federal Energy Regulatory Commission, 825 North
Capitol St. NE., room 7312, Washington, DC 20426; and
Mail your comments so that they will be received in
Washington, DC on or before July 11, 1994.
If you wish to receive a copy of the EA, you should request one
from Mr. Grape at the above address.
Becoming an Intervenor
In addition to involvement in the EA scoping process, you may want
to become an official party to the proceeding or become an
``intervenor''. Among other things, intervenors have the right to
receive copies of case-related Commission documents and filings by
other intervenors. Likewise, each intervenor must provide copies of its
filings to all other parties. If you want to become an intervenor you
must file a Motion to Intervene according to Rule 214 of the
Commission's Rules of Practice and Procedure (18 CFR 385.214) attached
as appendix 2.
The date for filing timely motions to intervene in this proceeding
has passed. Therefore, parties now seeking to file late interventions
must show good cause, as required by Section 385.214(b)(3), why this
time limitation should be waived. Environmental issues have been viewed
as good cause for late intervention. You do not need intervenor status
to have your scoping comments considered.
Additional Questions?
Additional information about the proposed project is available from
Mr. Steven G. Grape, EA Project Manager, at (202) 208-1046.
Lois D. Cashell,
Secretary.
[FR Doc. 94-14650 Filed 6-15-94; 8:45 am]
BILLING CODE 6717-01-P
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.