Environmental Impact Statements and Regulations; Availability of EPA Comments
Federal RegisterMay 27, 1994
Ask Donna
What actually matters in this document.
Text
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-4711-7]
Environmental Impact Statements and Regulations; Availability of
EPA Comments
Availability of EPA comments prepared May 9, 1994, through May 13,
1994, pursuant to the Environmental Review Process (ERP), under Section
309 of the Clean Air Act and Section 102(2)(C) of the National
Environmental Policy Act as amended. Requests for copies of EPA
comments can be directed to the Office of Federal Activities AT (202)
260-5076.
An explanation of the ratings assigned to draft environmental
impact statements (EISs) was published in FR dated April 8, 1994 (59 FR
16807).
Draft EISs
ERP No. D-AFS-L60099-ID Rating EC2, Upper Swiftwater Timber Sale
and Road Construction, Implementation, Selway Rangers District, Nez
Perce National Forest, Idaho County, ID.
Summary: EPA expressed environmental concerns based on the
potential adverse effects to aquatic habitat. EPA requested additional
information about: Whether water quality standards would be met and
beneficial uses maintained; water yield and sediment delivery;
attainment of the fish habitat potential, riparian protection; air
quality effects; and detailed monitoring plans.
ERP No. D-COE-E01002-NC Rating EC2, Texasgulf Open Pit Mine
Continuation, Construction and Operation, Permits Approval, Pamlico
River, Aurora, Beaufort County, NC.
Summary: EPA expressed environmental concerns regarding the impacts
of the proposed action on 190 acres of wetlands of ``special concern''.
EPA suggested that the wetlands be excluded from all mining activity,
and recommended that specific off-site mitigation and adequate buffer
zones be provided.
ERP No. D-GSA-L81009-WA Rating EC2, Seattle Federal Courthouse
Building (Project # ZWA 81061), Implementation, Site Selection,
Construction and Operation, King County, WA.
Summary: EPA expressed environmental concerns based on potential
air and water quality impacts, noise impacts and mitigation measures.
EPA requested that these issues be addressed in the final EIS.
ERP No. D-IBR-J31023-UT Rating EC2, Narrows Multi-Purpose Water
Development Project, Construction and Operation, Funding, Gooseberry
Creek, Manti-La Sal National Forest, Sanpete County, UT.
Summary: EPA expressed environmental concerns regarding water
quality impact and requested that the final EIS contain specific
mitigation plans.
ERP No. D-UAF-G11026-TX Rating EC2, Carswell Air Force Base (AFB)
Disposal and Reuse, Implementation, Tarrant County, TX.
Summary: EPA expressed environmental concerns regarding air quality
issues and requested that the final EIS include clarifying information.
ERP No. DS-BLM-L67032-WA Rating EC2, Kettle River Key Project
Expansion, Lamefoot Mine Site Mining and Milling Operations, Plan of
Operations Approval, Ferry County, WA.
Summary: EPA expressed environmental concerns based on the
potential adverse effects to surface water and groundwater. EPA
requested additional information about: required discharge permits,
regulatory category for discharges, waste rock pile drainage control,
and a site specific drainage control plan.
Final EISs
ERP No. F-AFS-G65056-NM La Manga Timber Sales, Implementation,
Carson National Forest, EL Rito Ranger District, Rio Arriba County, NM.
Summary: EPA had no objections to the proposed project.
ERP No. F-COE-L32009-OR, Coos Bay Channel Deepening Project,
Navigation Improvements and Ocean Disposal Sites Designation, OR.
Summary: EPA expressed environmental concerns that the Corps of
Engineers' underestimated the pollution problems within Coos Bay
estuary. EPA was also concerned that the final EIS did not discuss how/
if the proposed dredging in the navigation channel would contribute to
the contamination or increased bioavailability of contaminants, notably
tributyltin (TBT).
ERP No. F-IBR-J31022-UT, Price-San Rafael Rivers Unit of the
Colorado River Water Quality Improvement Program (CRWQIP) and the on-
farm Colorado River Salinity Control Program (CRSC), Improvements,
Funding and Possible COE Section 404 Permit, Carbon and Emery Counties,
UT.
Summary: EPA expressed environmental concerns regarding the wetland
and wildlife replacement program. EPA requested that these issues be
addressed in the Record of Decision.
Dated: May 24, 1994.
Richard E. Sanderson,
Director, Office of Federal Activities.
[FR Doc. 94-13096 Filed 5-26-94; 8:45 am]
BILLING CODE 6560-50-U
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.