Guidelines for Implementation of the Applied Research and Technology Program
Federal RegisterJan 19, 1994
Ask Donna
What actually matters in this document.
Text
DEPARTMENT OF TRANSPORTATION
Federal Highway Administration
Guidelines for Implementation of the Applied Research and
Technology Program
AGENCY: Federal Highway Administration (FHWA), DOT.
ACTION: Notice and request for applications.
-----------------------------------------------------------------------
SUMMARY: The FHWA announces guidelines to carry out the Applied
Research and Technology (ART) Program as required in section 6005(a) of
the Intermodal Surface Transportation Efficiency Act (ISTEA) of 1991.
FOR FURTHER INFORMATION CONTACT: Mr. Richard A. McComb, Office of
Technology Applications (HTA-2), (202) 366-2792; or Ms. Vivian Philbin,
Office of the Chief Counsel, (202) 366-0780, Federal Highway
Administration, 400 Seventh Street, SW., Washington, DC 20590. Office
hours are from 7:45 a.m. to 4:15 p.m., e.t., Monday through Friday,
except legal Federal holidays.
SUPPLEMENTARY INFORMATION: The Applied Research and Technology Program,
authorized under section 6005(a) of the ISTEA, Pub. L. 102-240, 105
Stat. 1914, 2170, was established for the purpose of accelerating
testing, evaluation, and implementation of technologies which are
designed to improve the durability, efficiency, environmental impact,
productivity, and safety of highway, transit, and intermodal
transportation systems.
The attached guidelines were developed for the selection and
funding of field Test and Evaluation (T&E) projects under the ART
Program which utilize the Highway Innovative Technology Evaluation
Center (HITEC) for the development of evaluation plans. HITEC, an
independent non-profit organization, was created by the American
Society of Civil Engineer's (ASCE) Civil Engineering Research
Foundation (CERF), in conjunction with the American Association of
State Highway and Transportation Officials (AASHTO) and the FHWA. HITEC
provides a process for the impartial evaluation of new products,
materials, equipment, and services for which industry standards do not
exist. Selection of T&E projects for ART Program funding will be made
by the FHWA on the basis of evaluation plans developed by HITEC.
Authority Sec. 6005(a), Pub. L. 102-240, 105 Stat. 1914, 2170;
23 U.S.C. 307(e) and 315; 49 CFR 1.48.
Issued on January 10, 1994.
Rodney E. Slater,
Federal Highway Administrator.
Purpose and Scope
The Applied Research and Technology (ART) Program, authorized under
section 6005 of the Intermodal Surface Transportation Efficiency Act
(ISTEA) of 1991, Pub. L. 102-240, 105 Stat. 1914, 2170, was established
to accelerate the testing and evaluation of technologies, both domestic
and foreign, which are designed to improve the physical and/or
operating characteristics of highways and transit and intermodal
systems. These guidelines have been developed in direct response to
section 6005(a) of the ISTEA (codified at 23 U.S.C. 307(e)(2)) and
apply to the field Test and Evaluation (T&E) projects. The purpose of
these guidelines is to set forth the FHWA's selection criteria of field
T&E projects for State highway agency construction projects.
The field T&E projects are but one element of the FHWA's Applied
Research and Technology Program. The other elements include (1) the
Applied Research Element, and (2) the Priority Technologies Element.
The former includes support for the development of research and
development (R&D) products, the implementation of new technologies,
international activities, and the funding of the operation of HITEC.
The latter includes the testing and evaluation of the designated
technologies that are specified in section 6005(e) (4)-(8) of ISTEA,
and the other new and innovative technologies identified by the FHWA
and proposed for partnerships.
Proposals for field T&E projects for ART Program funding are
invited from State highway agencies, private entities, individuals, and
other organizations. All proposals will be routed through the Highway
Innovative Technology Evaluation Center (HITEC). HITEC, an independent
non-profit organization, was created by the American Society of Civil
Engineers' (ASCE) Civil Engineering Research Foundation (CERF), in
conjunction with the American Association of State Highway and
Transportation Officials (AASHTO), and the Federal Highway
Administration (FHWA). HITEC provides a process for the impartial
evaluation of new products, materials, equipment, and services for
which industry standards do not exist. Proposals for funding R&D and
other activities not associated with the testing and evaluation of new
technologies will not be evaluated by HITEC.
Applications will be processed by HITEC under its standard
procedures for assessment, planning, evaluation, and reporting on
products, materials, equipment, services, and other technologies. HITEC
will act as the central point of screening of new technologies by the
public and private sectors. Highway agencies are encouraged to have
private individuals submit their ideas and proprietary products
directly to HITEC for screening and possible evaluation. If the
technology requires a full scale field T&E project, HITEC, by working
with the States, will assist applicants in developing and submitting
evaluation plans for T&E projects to the FHWA for possible funding
under the ART Program. State highway agencies may also submit
applications to HITEC for non-commercial technologies. The FHWA will
determine the acceptability of the project for funding.
For those technologies that result in State highway agency
construction projects approved by the FHWA, the program provides for
ART funding of up to 80 percent to State highway agencies for the cost
of installing (constructing) the new technologies as part of a T&E
project. In addition, the costs for testing, data collection,
evaluation, and report preparation associated with the T&E construction
project are eligible for 100 percent ART funds. State highway agencies
conducting T&E projects are required to submit annual interim reports
and a final report to document the project, the data collected, and the
testing and evaluation results. If the technology fails on an operating
highway, a pro rata share of the repair and/or replacement costs to
restore the highway to useable condition may be financed with Federal-
aid funds for that system of highways.
Applications
Applications for technology testing and evaluation and possible ART
T&E funding shall be submitted directly to HITEC. Application
requirements are intended to be simple, brief, and straightforward to
encourage participation by private innovators and others who are
unfamiliar with the highway market.
HITEC has developed an Information and Application Booklet that has
been designed to be a comprehensive, self-explanatory document. It
includes an Application Form as well as a description of the technical
protocols and HITEC operating policies. Written inquiries and
applications should be addressed to: HITEC, 1015 15th Street, NW.,
Washington, DC 20005. The phone number is (202) 842-0555.
Technologies
The definition of new technologies for testing and evaluation
includes those that represent significant changes in the performance or
other relevant characteristics of an existing product, but not the
minor upgrading of a product or the use of the evaluation process to
promote new interest in an existing product. Technologies should be
sufficiently developed to provide a specific product, system, or
process (at least in a prototype stage) for evaluation without further
development. In addition, technologies should employ new materials,
designs, manufactured products, construction procedures, functional
components, or other features that may provide improved service and/or
operating or physical characteristics in the highway or transit system.
Both domestic and foreign technologies are eligible for testing and
evaluation in the program. Note that Intelligent Vehicle Highway
Systems (IVHS) technologies are not eligible for this program. IVHS
technologies are specifically covered under IVHS programs administered
by the Department of Transportation and other agencies; IVHS
technologies will be referred to those programs. T&E projects eligible
for consideration in the program will include (but will not be limited
to) the following categories of technology:
1. Accelerated Construction Materials and Procedures. Projects
under this category will test and evaluate innovative uses and
modifications of concrete, steel, plastics, composites, and other
materials, and innovative procedures for accelerating construction,
including specifications and equipment for pavements, structures,
geotechnical works, and drainage facilities. Rapid-curing materials,
prefabricated components, plug-in replacement modules, automated
construction equipment, robots, and sensors are examples of
technologies that will be considered in this category.
2. Environmentally Beneficial Materials and Procedures. Projects
under this category will test and evaluate the environmental benefits
of alternative materials and procedures used in the planning, design,
construction, rehabilitation, operation, and maintenance of highways.
Air quality improvements and noise abatement systems for construction,
maintenance, and operations; environmentally benign materials for
vegetation control and snow and ice removal; and environmentally safe
paint removal, cleaning, and application are among the hazard-free or
beneficial environmental technologies covered in this category.
3. Materials and Techniques That Enhance Serviceability and
Longevity Under Adverse Climatic, Environmental, and Load Effects. This
category of projects will include projects using materials and
techniques, including design and construction, seeking to enhance the
serviceability and durability of pavements, structures, and
appurtenances under adverse environmental conditions and severe
loadings. Strength enhancing additives or reinforcements, coatings,
sealers, composite designs, in situ supplements, and alternative design
or construction technologies are examples of candidates to be included
in this category.
4. Technologies That Increase Efficiency and Productivity of
Vehicular Travel. This category will include projects, both in the
vehicle and on the roadway, such as traffic control devices and
systems; traffic management systems, strategies, and communications;
information systems; computer-based tools that permit analysis of area-
wide surface transportation needs and operational plans; and other
technologies and procedures that increase the efficiency and
productivity of vehicular travel. Technologies to be explored may
include innovative sensing and information transfer technologies,
operational systems, software, and other technologies affecting
vehicular travel and demand management.
5. Technologies That Enhance Safety and Accessibility of Vehicular
Transportation Systems. Projects under this category will test and
evaluate hardware, software, materials, equipment, and systems that
address improved safety and accessibility of vehicular transportation
systems. Also included will be design, construction, and operational
concepts for improved safety or accessibility of vehicular
transportation systems, such as guidance and control systems,
visibility and traction improvements, and network operations monitoring
and control systems.
Field Locations
T&E projects under the ART Program are required to be incorporated
in projects constructed on highways eligible for Federal-aid. Project
sites for the testing and evaluation of new technologies will be chosen
to insure that an appropriate range of traffic and operations,
cultural, geographic, topographic, climatic, and other necessary site
characteristics are included in the program.
Cost-Sharing
The Federal share of funding for acquiring, installing, or
constructing an approved T&E project will not exceed 80 percent of the
costs of the technology incorporated into the project. Non-Federal
funds for the matching portion of the technologies incorporated into
the project may be provided by cash payments or an equivalent value in
the form of construction services, equipment, materials, or other
services or tangible goods required and used directly for purchasing,
constructing, installing, or otherwise obtaining the approved
technology. In addition, the costs for testing, data collection,
evaluation, and report preparation associated with the T&E construction
project are eligible for 100 percent ART funds.
Cost-sharing using ART funds is not available to assist small
business entrepreneurs, private sector businesses, individuals, and
other private organizations in offsetting standard HITEC fees for
processing and evaluation plan development. The processing fee and
evaluation plan development fees for applications submitted to HITEC by
State highway agencies are eligible for 100 percent ART funding. Funds
are not available under these guidelines for general R&D or for any
technology development costs.
Eligible Construction Costs
Construction features and costs of T&E projects eligible for
Federal cost-sharing are those found to be additional to or different
from the features and costs associated exclusively with conventional
projects or technologies. The additional costs, hereafter referred to
as Delta Costs, are eligible for up to 80 percent Federal funds.
Examples of three basic categories of features which may generate Delta
Costs are as follows:
1. A replacement or substitute for a conventional technology. The
Delta Costs would be the costs for the replacement or substitute, minus
the cost of the conventional technology. An example would be a new
binder used as a substitute for asphalt or portland cement.
2. A new addition to or modification of an existing technology. In
this case the Delta Costs would be the costs of the additional
technology and its incorporation in the project. An example would be
the use of an asphalt modifier for which the material cost of the
modifier and the labor or equipment cost incurred in adding the
modifier would constitute the Delta Costs. If the modification of the
existing technology also required an increase in the preparation,
handling, or placement costs over conventional costs, those increased
costs also would be a part of the Delta Costs.
3. An entirely new technology added to a project. The Delta Costs
in this category would be all of the costs for the new technology to be
incorporated into the project. Examples would be the installation of a
system for heating a bridge deck or the installation of a cathodic
protection system for a bridge structure. In general, Delta Costs will
not include those costs associated with the normal construction of the
project that are not a direct part of the new technology. Examples of
features that normally would not be included in Delta Costs include:
restriping surfaces after overlays, redecking in conjunction with the
installation of a bridge deck heating system, improvement of subsurface
and/or roadside drainage systems in conjunction with a pavement overlay
project, and traffic control during construction (unless it is unique
to the installation or changed in character and cost by the
installation, in which cases the increased costs specifically
attributable to the portions of the project would be included in the
Delta Costs).
Costs for data collection, data analysis, and information
dissemination are eligible for 100 percent ART funding on approved T&E
projects.
In those instances where the technology used on an approved T&E
project fails and the State is required to repair the roadway to
restore it to full standards, a pro rata share of the repair or
replacement costs can be eligible for Federal-aid funds for that system
where the installation took place. Such repair of the roadway will not
be considered maintenance.
Technical Assistance
State highway agencies with approved T&E projects shall be provided
with technical assistance to carry out projects.
Evaluation Plans
When an evaluation plan that includes the construction of a full
scale field T&E project has been developed by HITEC, it will be
submitted to the FHWA for review and proposed ART Program funding. The
following sections shall be included in the evaluation plan for the
proposed T&E project. This information does not have to be submitted
with the application to HITEC, but will be developed as a part of the
HITEC evaluation process.
Project Plan
The specific purpose and objectives of the T&E project must be
delineated, followed by a description of:
1. The components of the technology to be evaluated,
2. The proposed installations, and
3. Planned observations, including qualitative and quantitative
requirements for the term of the project.
A time/phase chart or time line for the complete project must be
included. If the T&E project is to be a part of a larger construction
project, the entire construction project must be described in general
detail, and the new technology described in specific detail within the
project.
Data Collection
The design of each data collection element must be based on the
principles of scientific inquiry and structured so that both the
internal and external validity of the data are fully addressed and the
results can be applied to other situations. A detailed plan for the
collection of data must accompany the proposal for the project. The
plan must, as a minimum, include:
1. The type of data to be collected and the reasons for collecting
it,
2. Criteria and procedures for locating and placing the new
technology and for selecting data collection locations,
3. Instrumentation to be used for each set of data to be obtained,
4. Timing of the data collection (e.g., calendar time, clock time,
environmental conditions if limiting, and the interval between
readings),
5. Procedures for collecting the data, and
6. Frequency and quantity of data to be obtained during the testing
period.
Data collection will be directed toward the determination of
functional performance and life cycle costs and, where applicable, will
include:
1. Design, construction, maintenance, and operations criteria and
cost data,
2. Relevant environmental and operational characteristics and data
at the test site,
3. Interim maintenance and repair history,
4. Assessment of safety in both construction or installation and in
operations,
5. Measures of the impact on traffic operations,
6. Measures of the impact on contiguous property and occupants,
7. Performance data (e.g., visibility, reflectivity, riding
quality, deflection, skid resistance, traffic capacity, and flow
characteristics), and
8. Other data as needed to fully meet the project objectives.
Cost and Budget
Detailed information on the estimated total costs and annual costs
of the proposed project must be presented, with a breakdown of capital
costs for equipment, instruments, and special materials; payroll costs
for labor for installation and operation of the new technology; payroll
costs, travel, and other expenses for observations, data collection,
and analysis; costs for information storage and data retrieval; and
costs for publication and distribution of reports and other proposed
technology transfer activities. The proposed source, amount, and
allocation of funds for the non-Federal portion of the costs must be
described in the cost and budget data section of the proposal. Up to 80
percent of the costs of construction for the T&E project may be
provided by Federal funds; however, the level of cost-sharing offered
by the proposing agency will be a factor considered in the selection of
the projects to be funded under the ART Program.
Reporting Requirements
An annual progress report will be required of each public agency
for each T&E project for which the testing, data collection, and
evaluation is underway. In order to meet Congressional deadlines, the
report must be received by the FHWA no later than September 30 each
year. The report should include:
1. A brief description of the plan for the T&E project, including a
description of the technology being evaluated, the scope and objectives
of the project, the evaluation procedures being used, and the time
period and location(s) for the full program;
2. A detailed description of the activities conducted during the
report period, including the tests performed, the equipment being used,
all test location characteristics, and a compilation of the data
collected to date;
3. A detailed description of any changes or modifications in the
plan that were made or proposed to be made in the project during the
report period, the warrants for the changes, and the expected results
of the changes;
4. If an interim report, a summary of the trends, both short term
and long term, and results to date of the testing and evaluation
program; and
5. If a final report, a detailed summary of the results of the
tests and evaluations and the conclusions drawn from the project,
including the long term prospects of the technology, the intended use
of the results, and the technology transfer plans to be implemented by
the agency conducting the project and those recommended for execution
by the FHWA and others.
Technology Transfer
A discussion of the plans for use of the information derived from
the project must be included in the proposal. Plans for the
implementation of new technologies resulting from the experiment must
include a discussion of the intended development of specifications,
reports, technical papers, training courses, conferences,
demonstrations, or other means of disseminating the useful results
throughout the transportation community.
Selection Criteria
Evaluation plans for the proposed T&E projects prepared by HITEC
and submitted to the FHWA for funding under the ART Program will be
reviewed annually on a fiscal year basis. Selection will be based on
specific characteristics of the projects as presented in the proposals.
The selection criteria to be used by the FHWA in evaluating and rating
proposals are listed below in descending order of priority:
1. Applicability of the proposed project to the categories of
general technologies. Does the project specifically address one or more
of the general categories of technologies covered in the legislation
and discussed above in these guidelines?
2. Timeliness of the proposed project as a part of an approved and
funded construction project of new construction, rehabilitation,
upgrading, or replacement. Does the proposed project fit into an
activity that has been approved and funded for early construction and
that will likely proceed with or without the new technology component?
Is the opportunity for the technology limited to the proposed project
or are there frequent opportunities to fit the technology into similar
projects? Are there unique characteristics of the project (such as
location) that make it especially appropriate for testing and
evaluating the proposed technology?
3. Clarity of focus and applicability of the new technology being
evaluated to areas of need in the national transportation program. Does
the proposed project clearly address a technology of recognized
importance in the national transportation program? Does the proposed
technology offer the potential for solving a major problem in current
highway programs or systems (such as bridge deck deterioration,
pavement failures, snow and ice control, or urban network capacity and
safety)?
4. Level of funding to be provided by the applicant for the T&E
project. While ART funds are available for up to 80 percent of the cost
of construction of the T&E project and up to 100 percent of the
testing, data collection, and reporting, extra consideration will be
given to projects with higher-than-minimum levels of participation by
the applicant agencies. Non-Federal funding may include, in addition to
a monetary match, the furnishing of materials and/or equipment,
specially trained workers used in installing or performing the new
technology, and other tangible contributions of goods or labor
specifically related to the project.
5. Appropriateness of the costs and budget for the project to the
potential return on investment in terms of future increases in safety,
serviceability, productivity, durability, economy, environmental
quality, and other benefits to the national transportation systems.
What is the anticipated cost-benefit ratio for the proposed project?
What are the potential benefits to the nation's transportation system
of the new technology, if successful, in terms of direct cost savings
in construction and/or operations or indirect savings through improved
safety, efficiency, capacity, or other relevant characteristics?
6. Completeness and technical quality of the project plan and
design. The caliber of the plan as a well-designed project will be
assessed. Are the objectives of the project well defined? Are they
specific, realistic, and achievable? Do the steps in the plan focus on
those objectives? Are the installation and evaluation procedures,
including instrumentation and data collection, carefully planned and
described? Is the proposed plan statistically sound? Have the relevant
variables been accommodated in the plan?
7. Suitability of the proposed project location(s) for providing
the needed environmental and operational conditions for the evaluation
of the technology being studied, the required geographic diversity of
locations, and the convenience and accessibility of the proposed
site(s). Is the proposed site for the project suitable to the needs of
the technology and practical for performance of the observations and
data collection?
8. Quality, clarity, comprehensiveness, and applicability of the
proposed technology transfer program. The plan for the use of the
results must be included in the evaluation of the proposal. That plan
must address the following issues: How are the results of the
technology to be used at the completion of the project, if successful?
If unsuccessful? What technology transfer procedures will be followed
for implementation of the new technology in the applicant's agency and
nationally?
Post Selection
On a fiscal year basis, the FHWA will announce the selection of
approved T&E projects for funding under the ART Program from the
candidates submitted by HITEC. This will take place early in the first
quarter of each fiscal year. The FHWA will notify the States of the
approved project(s) and the funding amount(s). The States will be
requested to develop Plans, Specifications, and Estimates (PS&E) for
the construction of the projects. Allocation of Federal funds for
construction will be based on the approved PS&E. Funding of the
approved projects will be through the normal Federal-aid procedures
with the selected States and funding will be processed through the FHWA
field offices.
[FR Doc. 94-1212 Filed 1-18-94; 8:45 am]
BILLING CODE 4910-22-P
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.