Proposed Agency Information Collection Activities; Comment Request

Federal RegisterMar 21, 2025

Ask Donna

What actually matters in this document.

Text

DEPARTMENT OF TRANSPORTATION

Federal Railroad Administration

[Docket No. FRA-2025-0011]

Proposed Agency Information Collection Activities; Comment Request

AGENCY:

Federal Railroad Administration (FRA), Department of Transportation (DOT).

ACTION:

Notice of information collection; request for comment.

SUMMARY:

Under the Paperwork Reduction Act of 1995 (PRA) and its implementing regulations, FRA seeks approval of the Information Collection Request (ICR) summarized below. Before submitting this ICR to the Office of Management and Budget (OMB) for approval, FRA is soliciting public comment on specific aspects of the activities identified in the ICR.

DATES:

Interested persons are invited to submit comments on or before May 20, 2025.

ADDRESSES:

Written comments and recommendations for the proposed ICR should be submitted on

www.regulations.gov

to the docket, Docket No. FRA-2025-0011. All comments received will be posted without change to the docket, including any personal information provided. Please refer to the assigned OMB control number (2130-0544) in any correspondence submitted. FRA will summarize comments received in response to this notice in a subsequent 30-day notice, made available to the public, and include them in its information collection submission to OMB for approval.

FOR FURTHER INFORMATION CONTACT:

Ms. Arlette Mussington, Information Collection Clearance Officer, at email:

arlette.mussington@dot.gov

or telephone: (571) 609-1285 or Ms. Joanne Swafford, Information Collection Clearance Officer, at email:

joanne.swafford@dot.gov

or telephone: (757) 897-9908.

SUPPLEMENTARY INFORMATION:

The PRA, 44 U.S.C. 3501-3520, and its implementing regulations, 5 CFR part 1320, require Federal agencies to provide 60 days' notice to the public to allow comment on information collection activities before seeking OMB approval of the activities.

See

44 U.S.C. 3506, 3507; 5 CFR 1320.8 through 1320.12. Specifically, FRA invites interested parties to comment on the following ICR regarding: (1) whether the information collection activities are necessary for FRA to properly execute its functions, including whether the activities will have practical utility; (2) the accuracy of FRA's estimates of the burden of the information collection activities, including the validity of the methodology and assumptions used to determine the estimates; (3) ways for FRA to enhance the quality, utility, and clarity of the information being collected; and (4) ways for FRA to minimize the burden of information collection activities on the public, including the use of automated collection techniques or other forms of information technology.

See

44 U.S.C. 3506(c)(2)(A); 5 CFR 1320.8(d)(1).

FRA believes that soliciting public comment may reduce the administrative and paperwork burdens associated with the collection of information that Federal regulations mandate. In summary, comments received will advance three objectives: (1) reduce reporting burdens; (2) organize information collection requirements in a “user-friendly” format to improve the use of such information; and (3) accurately assess the resources expended to retrieve and produce information requested.

See

44 U.S.C. 3501.

The summary below describes the ICR that FRA will submit for OMB clearance as the PRA requires:

Title:

Passenger Equipment Safety Standards.

OMB Control Number:

2130-0544.

Abstract:

FRA's Passenger Equipment Safety Standards (49 CFR part 238) are used by FRA to promote passenger train safety by ensuring requirements are met for structural design and performance, fire safety, emergency systems, inspection, testing, and maintenance, and other provisions for the safe operation of railroad passenger equipment. For instance, the information collected from daily inspections is used to detect and correct equipment problems in order to prevent, to the extent that they can be prevented, collisions, derailments, and other occurrences involving railroad passenger equipment that cause injury or death to railroad employees, railroad passengers, or to the general public.

In this 60-day notice, FRA has adjusted the estimated paperwork burden. FRA's estimate of the burden hours under this ICR has increased from 95,946 hours to 95,947 hours.

Under §§ 238.133(c), En route failure safety briefing and 238.21(f), Comment on petitions, after further review, FRA determined that these requirements are not considered information collection under 5 CFR 1320.3(b) and (c). Therefore, the burden hour estimates associated with these requirements were removed.

A small increase in the estimated number of submissions under § 238.111, Pre-revenue service acceptance testing plans for Tier III resulted in the overall increase in burden of one (1) hour.

Type of Request:

Extension without change (with changes in estimates) of a currently approved collection.

Affected Public:

Businesses.

Form(s):

N/A.

Respondent Universe:

35 Railroads.

Frequency of Submission:

On occasion.

Reporting Burden

CFR section

Respondent

universe

Total annual

responses

Average time

per response

Total annual burden in hours

Wage rate

1

Total cost

equivalent

(A)

(B)

(C) = A * B

(D)

(E) = C * D

229.47 Emergency brake valve:

—(a) through (b) “Emergency Brake Valve” shall be legibly stenciled or marked near each valve or shall be shown on an adjacent badge plate

FRA anticipates zero submissions for this regulatory requirement over the next three-years.

238.7 Waivers:

—(a) through (c) Petition for waiver of compliance under this section

34 railroads

12

6 hours

72

$89.13

$6,417.36

238.15 Movement of passenger equipment with power brake defects:

2

—(b)(1)(iii) Passenger equipment with a power brake defect at the time a Class I or IA brake test is performed must be tagged before it is moved

34 railroads

1,000

3 minutes

50

89.13

4,456.50

—(c)(2) Limitations on movement of passenger equipment in passenger service that becomes defective en route after a Class I or IA brake test—Tagging of defective equipment

34 railroads

288

3 minutes

14.40

89.13

1,283.48

238.17 Movement of passenger equipment with other than power brake defects:

—(c)(4) and (e)(3) Tagging of defective equipment

34 railroads

200

3 minutes

10

89.13

891.30

238.19 Reporting and tracking of repairs to defective passenger equipment:

238.19(b) and (c) Retention or availability of records

For Tier I trainsets, FRA determined that since the 1990s railroads retain and make available records for reporting and tracking defective passenger equipment as part of their normal business operations.

—(d) List of repair points—Railroads operating long-distance intercity and long-distance Tier II passenger equipment

FRA anticipates zero submissions under this paperwork requirement over the next three years.

238.21 Special approval procedure:

—(b) Petitions for special approval of alternative standard

34 railroads

1

16 hours

16

89.13

1,426.08

—(c) Petitions for special approval of alternative compliance

34 railroads

1

40 hours

40

89.13

3,565.20

238.103 Fire safety:

—(c) Fire safety analysis for procuring new passenger cars and locomotives

1 new railroad

1

150 hours

150

89.13

13,369.50

—(d)(4) New fire safety analysis prior to transferring existing passenger cars and locomotives to a new category of rail service

34 railroads

1

10 hours

10

89.13

891.30

238.105 Train electronic hardware and software safety:

Train electronic hardware and software safety program plans

1 new railroad

1

150 hours

150

89.13

13,369.50

238.107 Inspection, testing and maintenance plan (ITM):

—(b) Development of ITM plan for new railroads

1 new railroad

1

150 hours

150

89.13

13,369.50

—(d) ITM plan annual review

34 railroads

34

20 hours

680

89.13

60,608.40

238.109 Training, qualification, and designation program:

—(a) Development of training program/curriculum for new railroads

1 new railroad

1

160 hours

160

89.13

14,260.80

—(b)(13) Recordkeeping—Employees and trainers—Training qualifications

34 railroads

488

3 minutes

24.40

89.13

2,174.78

238.111 Pre-revenue service acceptance testing plan:

3

—(a) Passenger equipment that has previously been used in service in the U.S.—New and modified plans

35 railroads

1.33

16 hours

21.28

89.13

1,896.69

—(b)(1) and (2) Passenger equipment that has not been previously used in revenue service in the U.S

35 railroads

1

192 hours

192

89.13

17,112.96

—(b)(4) Documenting in writing the results of the tests

35 railroads

1 letter

4 hours

4

89.13

356.52

—(b)(7) and (c) Plan submitted to FRA for Tier II or Tier III equipment before being placed in service

1 railroad

0.33

3 hours

1

89.13

89.13

238.131 Exterior side door safety systems—new passenger cars and locomotives used in passenger service:

—(a)(2)—Failure Modes, Effects, Criticality Analysis (FMECA)

1 new railroad

1

80 hours

80

89.13

7,130.40

238.133 Exterior side door safety systems—all passenger cars and locomotives used in a passenger service:

—(a)(2) Functional test plans

1 new railroad

1

4 hours

4

89.13

356.52

—(d) Records of door by-pass activation, unintended opening, and exterior side door safety system inspections

34 railroads

100

2 minutes

3.33

89.13

296.81

238.135 Operating practices for exterior side door safety systems:

—(c) Railroads' request to FRA for special consideration to operate passenger trains with exterior side doors or trap doors, or both, open between stations

The estimated paperwork burden for this regulatory requirement is covered above under § 238.7 or § 238.21.

—(c)(4) Railroads' response to FRA request for additional information concerning special consideration request

The estimated paperwork burden for this regulatory requirement is covered above under § 238.7 or § 238.21.

—(d) Operating rules on how to safely override a door summary circuit or no-motion system, or both, in the event of an en route exterior side door failure or malfunction on a passenger train (

Note:

Includes burden under § 238.137)

1 new railroad

1

8 hours

8

89.13

713.04

—(e) Railroads' training of train crewmembers on requirements of this section

The estimated paperwork burden associated with training recordkeeping for crewmembers per this requirement is covered under § 238.109 and under OMB control numbers, 2130-0596 Conductor Certification and 2130-0533, Locomotive Engineer Certification.

238.229 Safety appliances—general:

—(c) Welded safety appliances—Written lists submitted to FRA by the railroads

1 new railroad

1

1 hour

1

89.13

89.13

—(d) Defective welded safety appliance or welded safety appliance bracket or support—Tagging

34 railroads

4

3 minutes

0.20

69.60

13.92

—(d) Notification to crewmembers about non-compliant equipment

34 railroads

2

1 minute

0.03

89.13

2.68

—(g) Inspection plans

1 new railroad

1

16 hours

16

89.13

1,426.08

—(k) Records of the inspection and repair of the welded safety appliance brackets

The estimated paperwork burden for this requirement is covered under OMB control number 2130-0004 (§ 229.21).

238.230 Safety appliances—new equipment:

—(b)(1)(ix) Inspection record of welded equipment by qualified employee

FRA estimates zero submissions for this paperwork requirement for this 3-year ICR period.

—(b)(3) Welded safety appliances: Documentation for equipment impractically designed to mechanically fasten safety appliance support

FRA estimates zero submissions for this paperwork requirement for this 3-year ICR period.

238.231 Brake System:

—(h)(3) Inspection and repair of hand/parking brake: Records (under FRA Form 6180.49A)

The estimated paperwork burden for this requirement is covered under § 238.303(g) and under OMB control number 2130-0004.

—(h)(4)(iv) Procedures verifying hold of hand/parking brakes

1 new railroad

1

2 hours

2

89.13

178.26

238.237 Automated monitoring:

—(b) Documentation for alerter/deadman control timing

1 new railroad

1

2 hours

2

89.13

178.26

—(d)(2)(i) Defective alerter/deadman control: Tagging

34 railroads

25

3 minutes

1.25

69.60

87.00

238.303 Exterior calendar day mechanical inspection of passenger equipment:

—(b)(2) Notice of previous inspection

FRA anticipates zero railroad submissions for this 3-year ICR period.

—(e)(15)(i)(A) & (ii)(A) Tagging of inoperative dynamic brakes

34 railroads

50.00 tags

3 minutes

2.50

69.60

174.00

—(e)(17) Multiple unit (MU) passenger equipment found with inoperative/ineffective air compressors at exterior calendar day inspection: Documents

FRA anticipates zero railroad submissions for this 3-year ICR period.

—(e)(17)(v) Written notice to train crew about inoperative/ineffective air compressors

The estimated paperwork burden for this regulatory requirement is covered above under § 238.303(e)(15).

—(g) Record of exterior calendar daily mechanical inspections (Other than locomotives) (*

Note:

Includes burden for records of inoperative air compressors under § 238.303(e)(18)(iv))

34 railroads

1,734,115

1 minute

28,901.92

89.13

2,576,028.13

238.305 Interior calendar day mechanical inspection of passenger cars:

—(c)(10) Tagging of defective end/side doors

34 railroads

540.00

3 minutes

27

89.13

2,406.51

—(f) Records of interior calendar day inspection

34 railroads

3,102,865

1 minute

51,714.42

89.13

4,609,306.26

238.307 Periodic mechanical inspection of passenger cars and unpowered vehicles used in passenger trains:

—(a)(2) Alternative inspection intervals: Notifications

34 railroads

2

5 hours

10

89.13

891.30

—(c)(1) Notice of seats and seat attachments broken or loose

34 railroads

200

2 minutes

6.67

69.60

464.24

—(e)(1) Records of each periodic mechanical inspection

34 railroads

5,184

1 hour

5,184

69.60

360,806.40

—(e)(2) Detailed documentation of reliability assessments as basis for alternative inspection interval

34 railroads

2

100 hours

200

89.13

17,826.00

238.311 Single car test:

—(f) Tagging to indicate need for single car test

34 railroads

50.00 tags

3 minutes

2.50

69.60

174.00

238.313 Class I brake test:

—(h) Record for additional inspection for passenger equipment that does not comply with § 238.231(b)(1)

34 railroads

15,600

30 minutes

7,800

69.60

542,880.00

238.321 Out-of-service credit:

Passenger car: Out-of-use notation

The estimated paperwork burden for this regulatory requirement is covered in this ICR under § 238.307 and under OMB control number 2130-0004 under § 229.23(d) through (g).

238.703 Quasi-static compression load requirements:

—(b)(3) Document to FRA on Tier III trainset compliance

1 new railroad

0.33

40 hours

13.20

89.13

1,176.52

238.705 Dynamic collision scenario:

—(a)(10) Dynamic collision scenario—Model validation document to FRA for review and approval

1 new railroad

0.33

40 hours

13.20

89.13

1,176.52

238.707 Override protection:

—Anti-climbing performance evaluation for Tier III trainsets

1 new railroad

0.33

40 hours

13.20

89.13

1,176.52

238.709 Fluid entry inhibition:

—(b) Information to demonstrate compliance with this section of a Tier III trainset

1 new railroad

0.33

20 hours

6.60

89.13

588.26

238.721 Glazing:

—(3)(i) Cab glazing; end facing—Documentation containing technical justification

3 glass manufacturers

0.33

60 hours

19.80

89.13

1,764.78

—(b) Cab glazing; side-facing exterior windows in Tier III cab—Each end-facing exterior window in a cab shall, at a minimum, provide ballistic penetration resistance that meets the requirements of appendix A to part 223 (Certification of Glazing Materials)

3 glass manufacturers

0.33

10 hours

3.30

89.13

294.13

—(c) Non-cab glazing; side-facing exterior windows—Tier III—compliance document for Type II glazing

3 glass manufacturers

0.33

20 hours

6.60

89.13

588.26

—(c)(2) Alternative standard to FRA for side-facing exterior window intended to be breakable and serve as an emergency window exit (option to comply with an alternative standard)

3 glass manufacturers

0.67

5 hours

3.35

89.13

298.59

238.731 Brake system:

—(d)(1) Tier III trainsets' passenger brake alarm—Legible stenciling/marking of devices with words “Passenger Brake Alarm” (including the design of the sticker)

1 new railroad

53.33 stenciling

1 hour (design) + 2 minutes (marking)

55.11

69.60

3,835.66

—(f) Main reservoir test/certification

1 new railroad

0.33

6 hours

1.98

69.60

137.81

—(h) Main reservoir tests—Inspection, testing and maintenance program

1 railroad

0.33

10 hours

3.30

89.13

294.13

—(j) Brake application/release—Brake actuator design with approved brake cylinder pressure as part of design review process

1 railroad

0.33

40 hours

13.20

89.13

1,176.52

—(o) Train securement—Tier III equipment: demonstrated securement procedure

1 railroad

0.33

8 hours

2.64

89.13

235.31

238.733 Interior fixture attachment:

—Analysis for FRA approval (Tier III)

1 railroad

0.33

20 hours

6.60

89.13

588.26

238.735 Seat crashworthiness standard (passenger & cab crew):

—Analysis for FRA approval (Tier III)

1 railroad

0.33

40 hours

13.20

89.13

1,176.52

238.737 Luggage racks:

—Analysis for FRA approval (Tier III)

1 railroad

0.33

20 hours

6.60

89.13

588.26

238.741 Emergency window egress and rescue access:

—Plan to FRA for passenger cars in Tier III trainsets not in compliance with § 238.113 or § 238.114

1 railroad

0.33

60 hours

19.80

89.13

1,764.78

238.743 Emergency Lighting:

—Analysis for FRA approval (Tier III)

1 railroad

0.33 analysis/test

60 hours

19.80

89.13

1,764.78

238.751 Alerters:

—Alternate technology—Analysis for FRA approval (Tier III)

1 railroad

0.33 analysis/test

40 hours

13.20

89.13

1,176.52

Total

4

35 railroads

4,860,838 Responses

N/A

95,947

N/A

8,296,770

1

Throughout the tables in this document, the dollar equivalent cost is derived from the 2023 Surface Transportation Board's Full Year Wage A&B data series using the appropriate employee group hourly wage rate that includes 75-percent overhead charges.

2

Paragraph 238.15(c)(4), Conditional requirement, has been removed from this submission. FRA determined that this regulatory requirement does not create a paperwork burden.

3

Paragraph 238.111(b), Subsequent equipment orders have been removed from this submission. After further review, this is not a requirement specified under this section and therefore there is no associated burden.

4

Totals may not add up due to rounding.

Total Estimated Annual Responses:

4,860,838.

Total Estimated Annual Burden:

95,947 hours.

Total Estimated Annual Burden Hour Dollar Cost Equivalent:

$8,296,770.

FRA informs all interested parties that it may not conduct or sponsor, and a respondent is not required to respond to, a collection of information that does not display a currently valid OMB control number.

Authority:

44 U.S.C. 3501-3520.

Christopher S. Van Nostrand,

Deputy Chief Counsel.

[FR Doc. 2025-04893 Filed 3-20-25; 8:45 am]

BILLING CODE 4910-06-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.