Adoption and Submittal of State Plans for Designated Facilities: Implementing Regulations Under Clean Air Act Section 111(d)
Federal RegisterNov 17, 2023
Ask Donna
What actually matters in this document.
Text
ENVIRONMENTAL PROTECTION AGENCY
40 CFR Part 60
[EPA-HQ-OAR-2021-0527; FRL-8606-01-OAR]
RIN 2060-AV48
Adoption and Submittal of State Plans for Designated Facilities: Implementing Regulations Under Clean Air Act Section 111(d)
AGENCY:
Environmental Protection Agency (EPA).
ACTION:
Final rule.
SUMMARY:
The Environmental Protection Agency (EPA) is finalizing amendments to the regulations that govern the processes and timelines for state and Federal plans to implement emission guidelines under Clean Air Act (CAA) New Source Performance Standards for existing sources (the “implementing regulations”). The amendments include revisions to the timing requirements for state and the EPA actions related to plans; the addition of mechanisms to improve flexibility and efficiency in plan processes; and new requirements for demonstration of timely meaningful engagement with pertinent stakeholders—including, but not limited to, industry, small businesses, and communities most affected by and vulnerable to the impacts of the plan. This action additionally provides a process for states' consideration of `remaining useful life and other factors' (RULOF) in applying a standard of performance; amends the definition of standard of performance in the implementing regulations; and clarifies compliance flexibilities that states may choose to incorporate into state plans, including trading or averaging. Finally, this action adds requirements for the electronic submission of state plans and provides several other clarifications and minor revisions to the implementing regulations.
DATES:
This final rule is effective on December 18, 2023.
ADDRESSES:
The EPA has established a docket for this action under Docket ID No. EPA-HQ-OAR-2021-0527. All documents in the docket are listed on the
https://www.regulations.gov/
website. Although listed, some information is not publicly available,
e.g.,
Confidential Business Information (CBI) or other information whose disclosure is restricted by statute. Certain other material, such as copyrighted material, is not placed on the internet and will be publicly available only in hard copy form. Publicly available docket materials are available electronically through
https://www.regulations.gov/.
FOR FURTHER INFORMATION CONTACT:
For questions about this action contact Dr. Michelle Bergin, Sector Policies and Programs Division (Mail Code D205-01), Office of Air Quality Planning and Standards, U.S. Environmental Protection Agency, 109 T.W. Alexander Drive, P.O. Box 12055, Research Triangle Park, North Carolina 27711; telephone number: (919) 541-2726; email address:
bergin.michelle@epa.gov.
SUPPLEMENTARY INFORMATION:
Preamble acronyms and abbreviations.
We use multiple acronyms and terms in this preamble. While this list may not be exhaustive, to ease the reading of this preamble and for reference purposes, the EPA defines the following terms and acronyms here:
ACE Affordable Clean Energy Rule
ALA American Lung Association
BSER Best System of Emission Reduction
CAA Clean Air Act
CBI confidential business information
CDX Central Data Exchange
CFR Code of Federal Regulations
EG Emission Guideline
EGU electric generating unit
EJ environmental justice
EPA Environmental Protection Agency
FIP Federal Implementation Plan
ICR Information Collection Request
IoP Increments of Progress
NAAQS National Ambient Air Quality Standards
OAQPS Office of Air Quality Planning and Standards
OMB Office of Management and Budget
PRA Paperwork Reduction Act
PM
2.5
fine particulate matter (2.5 microns and less)
RTC Response to Comments document
RFA Regulatory Flexibility Act
RIN Regulatory Information Number
RULOF remaining useful life and other factors
SIP State Implementation Plan
SpeCS State Planning Electronic Collaboration System
TAR Tribal Authority Rule
TAS Treatment as a State
TIP Tribal Implementation Plan
UMRA Unfunded Mandates Reform Act
U.S.C. United States Code
Organization of this document.
The information in this preamble is organized as follows:
I. General Information
A. Does this action apply to me?
B. Where can I get a copy of this document and other related information?
C. Judicial Review and Administrative Review
II. Background
A. What is the statutory authority for this action?
B. What is the background for this action?
C. What changes did we propose?
D. What outreach and engagement did the EPA conduct?
III. What actions are we finalizing and what is our rationale for such decisions?
A. Revised Implementing Timelines
B. Federal Plan Authority and Timeline Upon Failure to Submit a Plan
C. Outreach and Meaningful Engagement
D. Regulatory Mechanisms for State Plan Implementation
E. Remaining Useful Life and Other Factors (RULOF) Provisions
F. Provision for Electronic Submission of State Plans
G. Other Proposed Modifications and Clarifications
IV. Summary of Cost, Environmental, and Economic Impacts
V. Statutory and Executive Order Reviews
A. Executive Order 12866: Regulatory Planning and Review; Executive Order 13563: Improving Regulation and Regulatory Review; and Executive Order 14094: Modernizing Regulatory Review
B. Paperwork Reduction Act (PRA)
C. Regulatory Flexibility Act (RFA)
D. Unfunded Mandates Reform Act (UMRA)
E. Executive Order 13132: Federalism
F. Executive Order 13175: Consultation and Coordination With Indian Tribal Governments
G. Executive Order 13045: Protection of Children From Environmental Health Risks and Safety Risks
H. Executive Order 13211: Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use
I. National Technology Transfer and Advancement Act (NTTAA)
J. Executive Order 12898: Federal Actions To Address Environmental Justice in Minority Populations and Low-Income Populations
K. Congressional Review Act (CRA)
I. General Information
A. Does this action apply to me?
This action applies for the development and adoption of plans for implementation of CAA section 111(d) final emission guidelines (EGs) published in the
Federal Register
after July 8, 2019. In particular, this action applies to states in the development and submittal of state plans and to the EPA in processing state plan submissions and to the EPA in promulgating Federal plans. After the EPA promulgates a final EG, each state that has one or more designated facilities must develop, adopt, and submit to the EPA a state plan under CAA section 111(d). The term “designated facility” means “any existing facility . . . which emits a designated pollutant and which would be subject to a standard of performance for that pollutant if the existing facility were an affected facility [
i.e.,
a new source].”
See
40 CFR 60.21a(b). If a state fails to submit a plan or if the EPA determines that a state plan is not
satisfactory, the EPA has the authority to establish a Federal CAA section 111(d) plan for designated facilities located in the state.
Under the Tribal Authority Rule (TAR), eligible tribes may seek approval to implement a plan under CAA section 111(d) in a manner similar to a state. See 40 CFR part 49, subpart A. Tribes may, but are not required to, seek approval for treatment in a manner similar to a state (treatment as a state; TAS) for purposes of developing a Tribal Implementation Plan (TIP) implementing an EG. If a tribe obtains approval and submits a TIP, the EPA will use similar timelines and criteria and will follow similar procedures as those for state plans. Tribes that choose to develop plans will have the same flexibilities available to states in this process. The TAR authorizes tribes to develop and implement one or more of its own air quality programs, or portions thereof, under the CAA; however, it does not require tribes to develop a CAA program. Tribes may implement programs that are most relevant to their air quality needs. A tribe with an approved TAS under TAR for CAA 111(d) is not required to resubmit TAS approval to implement an EG subject to subpart Ba.
1
If a tribe does not seek and obtain the authority from the EPA to establish a TIP, the EPA has the authority to establish a Federal CAA section 111(d) plan for designated facilities that are located in areas of Indian country. A Federal plan would apply to all designated facilities located in the areas of Indian country covered by the Federal plan unless and until the EPA approves a TIP applicable to those facilities.
1
See the EPA website,
https://www.epa.gov/tribal/tribes-approved-treatment-state-tas,
for information on those tribes that have treatment as a state for specific environmental regulatory programs, administrative functions, and grant programs.
B. Where can I get a copy of this document and other related information?
In addition to being available in the docket, an electronic copy of this action is available on the internet. Following signature by the EPA Administrator, the EPA will post a copy of this final action at
https://www.epa.gov/stationary-sources-air-pollution/adoption-and-submittal-state-plans-designated-facilities-40-cfr.
Following publication in the
Federal Register
,
the EPA will post the
Federal Register
version of the final rule, a memorandum showing the rule edits finalized in this action, and key supporting documents at this same website.
C. Judicial Review and Administrative Review
Section 307(b)(1) of the CAA governs judicial review of final actions by the EPA. This section provides, in part, that petitions for review must be filed in the D.C. Circuit: (i) when the agency action consists of “nationally applicable regulations promulgated, or final actions taken, by the Administrator,” or (ii) when such action is locally or regionally applicable, but “such action is based on a determination of nationwide scope or effect and if in taking such action the Administrator finds and publishes that such action is based on such a determination.” For locally or regionally applicable final actions, the CAA reserves to the EPA complete discretion whether to invoke the exception in (ii) described in the preceding sentence.
2
2
Sierra Club
v.
EPA,
47 F.4th 738, 745 (D.C. Cir. 2022) (“EPA's decision whether to make and publish a finding of nationwide scope or effect is committed to the agency's discretion and thus is unreviewable”);
Texas
v.
EPA,
983 F.3d 826, 834-35 (5th Cir. 2020).
This action is “nationally applicable” within the meaning of CAA section 307(b)(1). The final rule governs the EPA's promulgation of emission guidelines under CAA section 111(d), which are nationally applicable regulations for which judicial review is available only in the U.S. Court of Appeals for the District of Columbia (D.C. Circuit) pursuant to CAA section 307(b)(1).
3
Moreover, it revises the generally applicable, nationally consistent implementing regulations that govern the development and submission for all states of state plans and the EPA's development of Federal plans pursuant to EGs under CAA section 111(d), as well as the EPA's review of states' plans.
3
See,
e.g., Nat'l Waste & Recyling Ass'n
v.
EPA,
No. 16-1371 (D.C. Cir. 2016) (consolidated challenges to the CAA section 111(d) emissions guidelines for municipal solid waste landfills in the D.C. Circuit);
Am. Lung Ass'n
v.
EPA,
985 F.3d 914 (D.C. Cir. 2021) (consolidated challenges to, among other things, the CAA section 111(d) emission guidelines for fossil fuel-fired electric generating units known as the Affordable Clean Energy Rule).
In the alternative, to the extent a court finds this final action to be locally or regionally applicable, the Administrator is exercising the complete discretion afforded to him under the CAA to make and publish a finding that this action is based on a determination of “nationwide scope or effect” within the meaning of CAA section 307(b)(1).
4
As explained above, this final action is revising a single set of nationally consistent implementing regulations that apply to every state that must develop a state plan submission pursuant to CAA section 111(d) and an EPA-issued EG, as well as apply to the EPA when it reviews state plan submissions. The regulations also govern the EPA's development of EGs pursuant to CAA section 111(d), which apply to every state that contains designated facilities.
4
In deciding whether to invoke the exception by making and publishing a finding that an action is based on a determination of nationwide scope or effect, the Administrator takes into account a number of policy considerations, including his judgment balancing the benefit of obtaining the D.C. Circuit's authoritative centralized review versus allowing development of the issue in other contexts and the best use of agency resources.
The Administrator finds that this is a matter on which national uniformity in judicial resolution of any petitions for review is desirable, to take advantage of the D.C. Circuit's administrative law expertise, and to facilitate the orderly development of the law under the Act. The Administrator also finds that consolidated review of this action in the D.C. Circuit will avoid piecemeal litigation in the regional circuits, further judicial economy, and eliminate the risk of inconsistent results, and that a nationally consistent approach to implementation of EGs pursuant to CAA section 111(d) constitutes the best use of agency resources.
For these reasons, this final action is nationally applicable or, alternatively, the Administrator is exercising the complete discretion afforded to him by the CAA and finds that this final action is based on a determination of nationwide scope or effect for purposes of CAA section 307(b)(1) and is publishing that finding in the
Federal Register
. Under section 307(b)(1) of the CAA, petitions for judicial review of this action must be filed in the United States Court of Appeals for the District of Columbia Circuit by January 16, 2024. Under CAA section 307(b)(2), the requirements established by this final rule may not be challenged separately in any civil or criminal proceedings brought by the EPA to enforce the requirements.
Additionally, pursuant to CAA section 307(d)(1)(V), the Administrator determines that this action is subject to the provisions of CAA section 307(d). The EPA made this determination at proposal and has complied with the applicable procedural requirements in the course of this rulemaking. Section 307(d)(1)(V) of the CAA provides that the provisions of CAA section 307(d) apply to “such other actions as the Administrator may determine.” Section 307(d)(7)(B) of the CAA further provides that “[o]nly an objection to a rule or procedure which was raised with reasonable specificity during the period
for public comment (including any public hearing) may be raised during judicial review.” This section also provides a mechanism for the EPA to convene a proceeding for reconsideration, “[i]f the person raising an objection can demonstrate to the Administrator that it was impracticable to raise such objection within [the period for public comment] or if the grounds for such objection arose after the period for public comment (but within the time specified for judicial review) and if such objection is of central relevance to the outcome of the rule.” Any person seeking to make such a demonstration should submit a Petition for Reconsideration to the Office of the Administrator, U.S. Environmental Protection Agency, Room 3000, WJC South Building, 1200 Pennsylvania Ave. NW, Washington, DC 20460, with a copy to both the person listed in the preceding
FOR FURTHER INFORMATION CONTACT
section, and the Associate General Counsel for the Air and Radiation Law Office, Office of General Counsel (Mail Code 2344A), U.S. Environmental Protection Agency, 1200 Pennsylvania Ave. NW, Washington, DC 20460.
The EPA notes that the individual regulatory provisions it is revising or finalizing in this action are severable from one another because each is supported by an independent rationale. That is, the individual subsections within each of the sections of subpart Ba are generally justified independently and are therefore severable for purposes of judicial review.
II. Background
A. What is the statutory authority for this action?
The statutory authority for this action is provided by CAA section 111 (42 U.S.C. 7411). As described further in the next section, CAA section 111 requires the EPA to establish standards of performance for certain categories of stationary sources that, in the Administrator's judgment, “cause[ ], or contribute[] significantly to, air pollution which may reasonably be anticipated to endanger public health or welfare.” CAA section 111(b) provides the EPA's authority to regulate new and modified sources, while CAA section 111(d) directs the EPA to “prescribe regulations which shall establish a procedure” for states to submit plans to the EPA that establish standards of performance for existing sources of certain air pollutants to which a standard would apply if such existing source were a new source. The EPA addresses its obligation under CAA section 111(d) to establish a procedure for states to submit plans both through its promulgation of general implementing regulations, including those addressed by this action, and through promulgation of EGs for specific source categories. Additional statutory authority for this action is provided by section 301 of the CAA (42 U.S.C. 7601), which contains general provisions for the administration of the CAA, including the authority for the Administrator to “prescribe such regulations as are necessary to carry out [the] functions” of the CAA under section 301(a)(1).
B. What is the background for this action?
Clean Air Act section 111(d) governs the establishment of standards of performance for existing stationary sources. CAA section 111(d) directs the EPA to “prescribe regulations which shall establish a procedure similar to that provided by [CAA section 110]” for states to submit state plans that establish standards of performance for existing sources of certain air pollutants to which a standard of performance would apply if such an existing source were a new source under CAA section 111(b). Therefore, an existing source can only be regulated under CAA section 111(d) if it belongs to a source category that is regulated under CAA section 111(b). The EPA's implementing regulations use the term “designated facility” to identify those existing sources.
See
40 CFR 60.21a(b).
CAA section 111(b)(1)(A) requires that a source category be included on the list for regulation if, “in [the EPA Administrator's] judgment it causes, or contributes significantly to, air pollution which may reasonably be anticipated to endanger public health or welfare.” Once a source category is listed, CAA section 111(b)(1)(B) requires that the EPA propose and then promulgate “standards of performance” for new sources in such source category. CAA section 111(a)(1) defines a “standard of performance” as “a standard for emissions of air pollutants which reflects the degree of emission limitation achievable through the application of the best system of emission reduction which (taking into account the cost of achieving such reduction and any nonair quality health and environmental impact and energy requirements) the Administrator determines has been adequately demonstrated.” This provision requires the EPA to determine both the best system of emission reduction (BSER) for the regulated source category and the degree of emission limitation achievable through application of the BSER. The EPA must then, under CAA section 111(b)(1)(B), promulgate standards of performance for new sources that reflect that level of stringency.
Once the EPA promulgates standards of performance for new sources within a particular source category, the EPA is required, in certain circumstances, to regulate emissions from existing sources in that same source category.
5
Under CAA section 111(d), the Agency has, to date, issued EGs regulating five pollutants from six source categories that are currently in effect (
i.e.,
sulfuric acid plants (acid mist), phosphate fertilizer plants (fluorides), primary aluminum plants (fluorides), kraft pulp plants (total reduced sulfur), municipal solid waste landfills (landfill gases)), and fossil fuel-fired electric generating units (greenhouse gases [GHGs]).
See
“Phosphate Fertilizer Plants; Final Guideline Document Availability,” 42 FR 12022 (March 1, 1977); “Standards of Performance for New Stationary Sources; Emission Guideline for Sulfuric Acid Mist,” 42 FR 55796 (October 18, 1977); “Kraft Pulp Mills, Notice of Availability of Final Guideline Document,” 44 FR 29828 (May 22, 1979); “Primary Aluminum Plants; Availability of Final Guideline Document,” 45 FR 26294 (April 17, 1980); “Emission Guidelines and Compliance Times for Municipal Solid Waste Landfills,” 81 FR 59276 (August 29, 2016); “Repeal of the Clean Power Plan; Emission Guidelines for Greenhouse Gas Emissions From Existing Electric Utility Generating Units; Revisions to Emission Guidelines Implementing Regulations,” 84 FR 32520 (July 8, 2019) (Affordable Clean Energy (ACE) Rule).
6 7
Additionally, the
EPA recently proposed EGs addressing GHG emissions from two different source categories. On November 15, 2021, the EPA proposed EGs to regulate GHG emissions (in the form of methane limitations) from sources in the oil and natural gas source category (86 FR 63110) and provided a supplemental proposal for that sector on December 6, 2022 (87 FR 74702). On May 23, 2023, the EPA proposed to repeal the existing EG for GHG emissions from certain fossil fuel-fired electric generating units (the ACE Rule) and to promulgate a new EG in order to regulate GHG emissions (in the form of carbon dioxide limitations) from existing fossil fuel-fired electric generating units. 88 FR 33240. Finally, the Agency has regulated additional pollutants from solid waste incineration units under CAA section 129 and in accordance with CAA section 111(d).
8
5
In accordance with CAA section 111(d), states are required to submit plans to establish standards of performance for existing sources for any air pollutant: (1) the emission of which is subject to a Federal New Source Performance Standard; and (2) which is neither a pollutant regulated under CAA section 108(a) (
i.e.,
criteria air pollutants such as ground-level ozone and particulate matter, and their precursors, like volatile organic compound) or a hazardous air pollutant regulated from the same source category under CAA section 112. See also definition of “designated pollutant” in 40 CFR 60.21a(a).
6
The EPA has also issued several EGs that have subsequently been repealed or vacated by the courts. The EPA regulated mercury from coal-fired electric power plants in a 2005 rule that was vacated by the D.C. Circuit, “Standards of Performance for New and Existing Stationary Sources: Electric Utility Steam Generating Units; Final Rule,” 70 FR 28606 (May 18, 2005) (Clean Air Mercury Rule), vacated by
New Jersey
v.
EPA,
517 F.3d 574 (D.C. Cir. 2008). The EPA also issued CAA section 111(d) EGs regulating GHG emissions from fossil fuel-fired electric power plants in a 2015 rule, “Carbon Pollution Emission Guidelines for Existing Stationary Sources: Electric Utility Generating Units; Final Rule,” 80 FR 64662 (October 23, 2015)
(Clean Power Plan). The EPA subsequently repealed and replaced the 2015 rule with the ACE Rule.
7
The ACE Rule was initially vacated by
Am. Lung Ass'n
v.
EPA,
985 F.3d 914 (D.C. Cir. 2021). The Supreme Court subsequently reversed and remanded the D.C. Circuit's opinion,
West Virginia
v.
EPA,
142 S. Ct. 2587 (June 30, 2022). On October 27, 2022, the D.C. Circuit amended its judgement and recalled the partial mandate vacating the ACE Rule, effectively reinstating ACE. Order,
ALA
v.
EPA,
No. 19-1140, ECF No. 1970895.
8
CAA section 129 directs the EPA Administrator to develop regulations under CAA section 111 limiting emissions of nine air pollutants from four categories of solid waste incineration units.
The mechanism for regulating designated facilities
9
under CAA section 111(d) differs from the mechanism for regulating new facilities under CAA section 111(b). Pursuant to CAA section 111(b), the EPA promulgates standards of performance that are directly applicable to new, modified, and reconstructed facilities in a specified source category. In contrast, CAA section 111(d) operates together with CAA section 111(a)(1) to collectively establish and define roles and responsibilities for both the EPA and the states in the regulation of designated facilities. Under the statutory framework, the EPA has the responsibility to determine the BSER for designated facilities, as well as the degree of emission limitation achievable through application of that BSER. The EPA identifies both the BSER and the degree of emission limitation as part of an EG, which it may typically reflect as a presumptive standard of performance or methodology for calculating a presumptive standard of performance for designated facilities. States use the EPA's presumptive standards of performance as the basis for establishing requirements for designated facilities in their state plans. In addition to standards of performance, CAA section 111(d)(1) requires state plans to include provisions for the implementation and enforcement of such standards. CAA section 111(d)(1) also requires the EPA's regulations to permit states, in applying a standard of performance to particular sources, to take into account the source's remaining useful life and other factors, a process addressed in more detail in section III.E of this preamble.
9
A “designated facility” is any existing facility which emits an air pollutant, the emissions of which are subject to a standard of performance for new stationary sources but for which air quality criteria have not been issues and that is not included on a list published under CAA section 108(a) or 112, and which would be subject to a standard of performance for that pollutant if the existing facility were a new facility. See 40 CFR 60.21a.
CAA section 111(d) directs the EPA to establish a procedure for the submission of state plans, which the EPA addresses both through its promulgation of general implementing regulations for section 111(d) and through promulgation of EGs for specific source categories. While CAA section 111(d)(1) authorizes states to develop state plans that establish standards of performance and provides states with certain discretion in determining the appropriate standards, CAA section 111(d)(2) provides the EPA a specific oversight role with respect to such state plans. The states must submit their plans to the EPA, and the EPA must evaluate each state plan to determine whether each plan is “satisfactory.” If a state fails to submit a plan or the EPA determines that a state plan is not satisfactory, the EPA has the “same authority” to prescribe a Federal plan as it has to promulgate a Federal Implementation Plan (FIP) under CAA section 110(c).
In 1975, the EPA issued the first general implementing regulations to prescribe the process for the adoption and submittal of state plans for designated facilities under CAA section 111(d) (codified at 40 CFR part 60, subpart B (subpart B)). 40 FR 53340 (November 17, 1975). Responding to the direction to “establish a procedure similar to that provided by” CAA section 110, in promulgating subpart B, the EPA aligned the timing requirements for state and Federal plans under CAA section 111(d) with the then-applicable timeframes for State Implementation Plans (SIPs) and FIPs prescribed in CAA section 110, as established by the 1970 CAA Amendments. The implementing regulations were not significantly revised after their original promulgation in 1975
10
until 2019, when the EPA promulgated a new set of implementing regulations codified at 40 CFR part 60, subpart Ba (subpart Ba). 84 FR 32520 (July 8, 2019).
10
In 2012, the EPA revised several provisions of subpart B, mainly to include allowance systems as a form of standard of performance. 77 FR 9303 (February 16, 2012).
In promulgating subpart Ba in 2019, the EPA intended to update and modernize the implementing regulations to align the procedures for CAA section 111(d) state and Federal plans with CAA amendments made after subpart B was first promulgated in 1975. Notably, subpart B did not align either with CAA section 111(d) as amended by Congress in 1977 or with the timelines in CAA section 110 as amended by Congress in 1990. The EPA therefore considered it appropriate to update the implementing regulations for CAA section 111(d) to make changes similar to CAA section 110, given that section 111(d)(1) of the CAA directs the EPA to “prescribe regulations which shall establish a procedure similar to that provided by section 110” of the CAA for states to submit plans to the EPA. In promulgating subpart Ba, the EPA directly aligned the timing requirements for CAA section 111(d) state and Federal plans (40 CFR 60.23a(a)(1) and 60.27a(c), respectively) with the timing requirements for SIPs and FIPs under CAA section 110 (see CAA section 110(a)(1) and 110(c)(1), respectively).
In promulgating subpart Ba, the EPA also added the definition of “standard of performance” (40 CFR 60.21a(f)) (defined under subpart B as “emission standard” (40 CFR 60.21(f))) and the “remaining useful life” provision (40 CFR 60.24a(e)) (referred under subpart B as the “variance” provision (40 CFR 60.24(f))). The EPA further added required minimum administrative and technical criteria for inclusion in state plans (40 CFR 60.27a(g)). Applying these criteria, the EPA determines whether a state plan or portion of a plan submitted is complete (referred to as a completeness review). Once a state plan or portion of a plan is determined to be complete, the EPA must approve or disapprove the plan or portions of the plan. For details on the EPA's rationale for the promulgation of these provisions, see 84 FR 32520 (July 8, 2019).
The EPA proposed minor revisions to the subpart Ba applicability provision and is finalizing those revisions largely as proposed (see section III.G.2.a. of this preamble). As finalized in 2019, subpart Ba was applicable to any final 111(d) EG published, or the implementation of which was ongoing, after July 8, 2019. The EPA proposed revisions to this provision for clarity, including to
remove the phrase “if implementation of such final guideline is ongoing.”
11
It did not propose to change the already-established applicability date. At the time of promulgation of this rule, there are no final EGs that have been published after July 8, 2019, so subpart Ba will not retroactively apply to the implementation of any EG. Specifically, the final EG for greenhouse gas emissions from existing electric utility generating units that was included in the ACE Rule was published on July 8, 2019;
12
thus, subpart Ba as revised will not apply to that EG. Regardless, the EPA proposed to repeal the ACE Rule on May 23, 2023,
13
and intends to finalize its repeal, at which point neither states nor the EPA will have any obligations under the ACE Rule and the potential applicability of subpart Ba to this EG will be moot. In contrast, the EPA has recently proposed two EGs that would regulate GHG emissions from designated facilities in the oil and natural gas industry (86 FR 63110, November 15, 2021; 87 FR 74702, December 6, 2022) and in the power sector (88 FR 33240, May 23, 2023). If those EGs are finalized and to the extent that the final EGs do not contain EG-specific requirements superseding subpart Ba provisions, subpart Ba as revised in this action will apply. Subpart B continues to apply to CAA section 111 EGs promulgated on or prior to July 8, 2019, and to EGs issued pursuant to CAA section 129.
11
87 FR 79176, 79208-09 (Dec. 23, 2022). As explained in section III.G.2.a. of this preamble, the EPA is finalizing the removal of this phrase from 40 CFR 60.20a(a).
12
84 FR 32520 (July 8, 2019).
13
“New source Performance Standards for Greenhouse Gas Emissions From New, Modified, and Reconstructed Fossil Fuel-Fired Electric Generating Units; Emission Guidelines for Greenhouse Gas Emissions From Existing Fossil Fuel-Fired Electric Generating Units; and Repeal of the Affordable Clean Energy Rule,” 88 FR 33240 (May 23, 2023).
In January 2021, the D.C. Circuit vacated several provisions of subpart Ba related to timelines for state plans and Federal plans.
Am. Lung Ass'n
v.
EPA,
985 F.3d 914, 991. (D.C. Cir. 2021) (
ALA
).
14
In this vacatur, the court identified several flaws in the EPA's rationale for extending CAA section 111(d) state and Federal plan timelines. First, the court found that the EPA erred in adopting the timelines for SIPs and FIPs in CAA section 110 without meaningfully addressing the differences in the scale of effort required for development and evaluation of CAA section 110 SIPs, as compared with the scale of effort needed for CAA section 111(d) state plans.
Id.
at 992-93. The court also concluded that in promulgating the timelines in subpart Ba, the EPA failed to justify why the shorter deadlines under subpart B were unworkable.
Id.
at 993. Further, the court held that the EPA was required to consider the effect of its subpart Ba timelines on public health and welfare, consistent with the statutory purpose of CAA section 111(d). In the court's view, the EPA's “complete failure to say anything at all about the public health and welfare implications of the extended timeframes” meant that the EPA failed to consider an important aspect of the problem.
Id.
at 992 (citing
Motor Vehicle Mfrs. Ass'n of U.S., Inc.
v.
State Farm Mut. Auto. Ins. Co.
463 U.S. 29, 43 (1983)).
14
The Supreme Court subsequently reversed and remanded the D.C. Circuit's opinion.
West Virginia
v.
EPA,
142 S.Ct. 2587 (June 30, 2022). However, no Petitioner sought certiorari on, and the Supreme Court's
West Virginia
decision did not implicate, the D.C. Circuit's vacatur of portions of subpart Ba.
See
Amended Judgment,
ALA
v.
EPA,
No. 19-1140 (D.C. Cir. October 27, 2022), ECF No. 1970898 (ordering that petitions for review challenging the timing portion of implementing regulations be granted).
Based on these reasons, the court vacated the timeline for state plan submissions after publication of a final EG (40 CFR 60.23a(a)(1)), the EPA's deadline for taking action on state plan submissions (40 CFR 60.27a(b)), the EPA's deadline for promulgating a Federal plan (40 CFR 60.27a(c)), and the timeline associated with requirements for increments of progress (IoPs; 40 CFR 60.24 (a(d)). Because of the vacatur, subpart Ba currently does not provide generally applicable timelines for state plan submissions, a deadline for the EPA's action on state plan submissions, a deadline for the EPA's promulgation of a Federal plan, or a timeline associated with requirements for IoPs. The EPA notes that while it is finalizing generally applicable timelines for the implementing regulations, a particular EG may supersede those generally applicable timelines with its own specific timelines. 40 CFR 60.20a(a)(1). This may be appropriate, for example, based on the complexity of regulating a particular source category, such as a category with a large number of disparate facilities to be regulated.
C. What changes did we propose?
On December 23, 2022, the EPA proposed several revisions to subpart Ba both to address the vacatur of the timing provisions by the D.C. Circuit in
ALA
and to further improve the state and Federal plan development and implementation process. See 87 FR 79176 (December 23, 2022). In response to the
ALA
decision, the EPA proposed timeframes for (1) state plan submittal, (2) the timeline for the EPA to determine completeness of state plans, (3) the EPA's action on state plan submissions, (4) the EPA's promulgation of a Federal plan, and (5) requirements to establish IoPs. Additionally, the EPA proposed to remove the publication in the
Federal Register
of a “finding of failure to submit” as the starting point for the clock to promulgate a Federal plan.
In addition, the EPA proposed revisions to subpart Ba that would enhance the provision of reasonable notice and opportunity for public participation by requiring that states, as part of the state plan development or revision process, undertake outreach and meaningful engagement with a broad range of pertinent stakeholders. The EPA proposed to define pertinent stakeholders as including communities most affected by and vulnerable to the impacts of the plan or plan revision. Increased vulnerability, as described in the proposal, may be attributable, among other reasons, to both an accumulation of negative and lack of positive environmental, health, economic, or social conditions within these populations or communities.
To improve flexibility and efficiency in the submission, review, approval, and implementation of state plans, the EPA proposed to include the following mechanisms in subpart Ba, all of which currently exist under CAA section 110: (1) partial approval/disapproval, (2) conditional approval, (3) allowance for parallel processing, (4) a mechanism for the EPA to call for plan revisions, and (5) an error correction mechanism.
The EPA also proposed revisions to the existing regulations governing the “remaining useful life and other factors” (RULOF) provision of the statute. These proposed revisions were intended to promote clarity and increase consistency in situations where states or the EPA consider RULOF when applying standards of performance to individual sources and to ensure that such standards fulfill the statutory requirements of CAA section 111(d).
Finally, the EPA proposed to require electronic submissions of state plans, as well as additional modifications and clarifications to subpart Ba. In particular, the EPA proposed clarifying amendments to the subpart Ba definition of standard of performance, along with a revised interpretation of CAA section 111(d) with respect to permissible compliance flexibilities. The EPA proposed to determine that, under appropriate circumstances, the Agency may approve state plans that authorize sources to meet their emission limits in the aggregate, such as through standards that permit compliance via
trading or averaging. In doing so, the EPA also proposed to conclude that CAA section 111 does not limit the BSER to controls that can be applied at and to the source.
The EPA did not reopen any subpart Ba requirements other than the specific provisions that the EPA explicitly proposed to revise in the December 2022 notice of proposed rulemaking. Any comments received on the proposal that did not relate to the proposed revisions or additions are considered out of the scope of this action.
D. What outreach and engagement did the EPA conduct?
The EPA conducted both pre- and post-proposal outreach and meaningful engagement events with environmental justice (EJ) communities, small businesses, states, and Tribes. On July 7 and July 11, 2022, the EPA conducted two pre-proposal webinars for states addressing meaningful engagement for pertinent stakeholders, and on July 26, 2022, the Agency conducted a pre-proposal webinar for EJ communities and other key stakeholders about potential requirements for states to conduct meaningful engagement in developing their state plans. The EPA emailed an announcement of the subpart Ba proposal to Tribal nations and environmental justice communities via existing listservs on December 15, 2022. Post-proposal outreach during the public comment period with environmental justice communities included participation on the January 24, 2023 Environmental Justice National call and the January 26, 2023 National Tribal Air Association call. The EPA also conducted a public training webinar on January 31, 2023, for environmental justice community members and their representatives. Additionally, the EPA conducted post-proposal outreach with small businesses through the Small Business Environmental Assistance Program call on February 21, 2023, and with state environmental protection associations including the Association of Air Pollution Control Agencies on January 10, 2023, and the National Association of Clean Air Agencies on February 8, 2023.
III. What actions are we finalizing and what is our rationale for such decisions?
This action finalizes amendments to subpart Ba, including the timing requirements for state plan submittal, the EPA's action on state plan submissions, the EPA's promulgation of a Federal plan, and the establishment of IoPs; the addition of five regulatory mechanisms to improve state plan processing: (1) partial approval/disapproval, (2) conditional approval, (3) allowance for parallel processing, (4) a mechanism for the EPA to call for plan revisions, and (5) an error correction mechanism; new requirements for meaningful engagement with pertinent stakeholders; and amended requirements for states' and the EPA's consideration of RULOF in applying a standard of performance in certain circumstances. This action also finalizes amendments to the subpart Ba definition of “standard of performance” and finalizes clarifications associated with CAA section 111(d) compliance flexibilities. Finally, this action finalizes requirements for the electronic submission of state plans and several other clarifications and minor revisions to the implementing regulations. While the EPA is finalizing most amendments as proposed, in response to comments submitted on the proposal, the EPA is extending the state plan submittal timeline and the timeline for requirement of IoPs; providing for additional flexibility and guidance for meaningful engagement; as well as revising and streamlining the requirements for accounting for RULOF in applying a less-stringent standard. There are also other provisions that we are finalizing with slight revisions relative to proposal. Further detail is provided in the following sections of this preamble and additional detailed responses to comments are located in the response to comment document (RTC).
While this action amends the generally applicable requirements of subpart Ba, the EPA has recognized that, under certain circumstances, some provisions of the implementing regulations may not fit the needs of a specific EG. Therefore, the existing implementing regulations provide that each EG may include specific implementing provisions in addition to or that supersede the requirements of subpart Ba. 40 CFR 60.20a(a)(1). The EPA will address source category-specific circumstances or facts that are not accommodated by the general provisions of subpart Ba through a specific EG, as the time and processes needed for development and adoption of state plans to implement the EG may be affected by unique characteristics of a source category. For example, if a proposed EG addresses a particularly large and complex source category that necessitates a relatively long timeframe for state planning, the EPA may provide a state plan submission deadline that is longer than the 18 months being finalized for subpart Ba.
15
15
See,
e.g.,
88 FR 33240, 33402-03 (May 23, 2023) (proposing a 24-month state plan submission deadline for the EG for GHG emissions from fossil fuel-fired electric generating units).
A. Revised Implementing Timelines
As described in section II.A. of this preamble, the subpart Ba timing requirements were vacated by the D.C. Circuit in the
ALA
decision. These vacated timing requirements include: the timeline for state plan submissions, the timeline for the EPA to act on a state plan, the timeline for the EPA to promulgate a Federal plan, and the timeline that dictates when state plans must include IoPs. These timelines are all critical to ensuring that the emission reductions anticipated by the EPA when promulgating an EG become federally enforceable measures that are timely implemented by the designated facilities.
The EPA proposed the following timelines to replace those vacated in
ALA
(87 FR 79176, Dec. 23, 2022): 15 months for state plan submissions after publication of a final EG; 60 days after submission for the EPA to determine if a plan is complete; 12 months for the EPA to take final action on a complete state plan (
i.e.,
approve, disapprove); 12 months for the EPA to promulgate a Federal plan either after the state plan submission deadline if a state has failed to submit a complete plan, or after the EPA's disapproval of a state plan submission; and requiring state plans to include IoPs if the plan requires final compliance with standards of performance later than 16 months after the plan submission deadline.
16
16
See 87 FR 79176, 79181-90 (Dec. 23, 2022).
The EPA received numerous comments on these proposed timelines, most of which expressed support for timelines longer than those proposed. Some commenters asserted that the
ALA
decision does not direct the EPA to necessarily reduce timelines from those vacated, only to justify the timelines more fully. In particular, most commenters expressed the need for a longer state plan submittal timeline in order to accommodate state regulatory processes associated with plan submittals (
i.e.,
legislative and/or administrative state processes), as well as to accommodate technical development of the plans and to implement the proposed meaningful engagement requirements. However, a few commenters noted that the EPA should not accommodate all lengthy state administrative processes that would unnecessarily postpone emission-reduction obligations. Some
commenters asserted that if the EPA were to finalize the state plan submittal timeline as proposed, the EPA should include a mechanism in the rule for states to request for extensions for state plan submittals.
While some commenters also asserted the need for longer timelines associated with the EPA's obligations to take action on a state plan submittal and to promulgate a Federal plan when required, as well as allowing a longer timeline before IoPs are required in the state plans, other commenters supported the proposed timelines for these milestones based, among other concerns, on the need for timely protection of health and welfare and in consideration of the EPA's ability to extend timelines if warranted in a particular EG.
In consideration of these comments and for the reasons described in detail in the sections that follow, the EPA is finalizing extended timelines from those proposed for submission of state plans, for significant state plan revisions, and for when IoPs must be considered for inclusion in state plans. The EPA is finalizing the remaining timelines as proposed. The EPA determined that these timelines will appropriately balance the need to reasonably accommodate the processes generally required by states and the EPA to develop, evaluate, and adopt plans to effectuate the EG with the need to ensure that designated facilities control emissions of dangerous pollutants as expeditiously as reasonably possible, consistent with the health and welfare-based objectives of CAA section 111(d). A summary of the timelines finalized in this action is shown in Table 1.
The final subpart Ba timelines are applicable to any final EG published pursuant to CAA section 111(d) after July 8, 2019, including, if finalized, those recently proposed to regulate GHG emissions from sources in the oil and natural gas industry (86 FR 63110, November 15, 202187 and FR 74702, December 6, 2022) and those proposed to regulate GHG emissions from fossil fuel-fired electric generating units (88 FR 33240, May 23, 2023), to the extent that the final EGs do not contain provisions superseding any of these timelines in subpart Ba.
17
17
Under each of these EGs the EPA proposed to supersede the 15-month state plan submittal timeline in proposed subpart Ba based on the size and complexity of the source sectors at issue.
Table 1—Final 40 CFR Part 60, Subpart B
a
, Timeline Compared With Those Initially Proposed, Vacated From Subpart B
a
, and From Subpart B
Process step
2023 Subpart Ba final
2022 Subpart Ba proposal
Subpart Ba (2019) vacated timelines
Subpart B
(1975)
State Plan submittal after publication of EG in the
Federal Register
18 months
15 months
36 months
9 months.
State Plan completeness determination
60 days after State Plan submission
60 days after State Plan submission
*6 months after State Plan submission
N/A.
State Plan evaluation
12 months after completeness
12 months after completeness
12 months after completeness
4 months after State Plan submittal deadline.
EPA Federal Plan promulgation
12 months after failure to submit or disapproval
12 months after failure to submit or disapproval
24 months after finding of failure to submit or disapproval
6 months after State Plan submittal deadline.
Requirements for Increments of Progress after submittal deadline
If compliance is >20 months
If compliance is >16 months
If compliance is >24 months
If compliance is >12 months.
* Although the timeline for the state plan completeness determinations was not vacated, the EPA has evaluated this timeline light of the court vacatur of the related timelines.
As described in greater detail in section II. of this preamble, the D.C. Circuit's vacatur of the extended timelines in subpart Ba was based both on the EPA's failure to substantiate the necessity for the additional time at each step of the administrative process, and the EPA's failure to address how those extended implementation timelines would impact public health and welfare. Accordingly, the EPA has evaluated these factors and is finalizing timelines, as described in the following sections, based on the minimum administrative time reasonably necessary for each step in the implementation process, thus minimizing impacts on public health and welfare by proceeding as expeditiously as reasonably possible while accommodating the time needed for states or the EPA to develop an effective plan. This approach addresses both aspects of the
ALA
decision because the EPA and states will take no longer than necessary to develop and adopt plans that impose requirements consistent with the overall objectives of CAA section 111(d).
The EPA acknowledges these timelines are not identical to those for SIPs under CAA section 110. This is consistent with the requirement of CAA section 111(d) that the EPA promulgate a procedure “similar” to that of CAA section 110, rather than an identical procedure. This is also consistent with the
ALA
decision, which requires the EPA to “engage meaningfully with the different scale” of CAA section 111(d) and 110 plans. 985 F.3d at 993. In proposing the revised timelines, the EPA evaluated each step of the state plan implementation process to independently determine the appropriate duration needed to accomplish a given step as part of the overall process. After receiving comments on the proposed timelines, the EPA again evaluated each step in light of the new information; the timelines being finalized in this action represent the Agency's revised assessment of the most reasonably expeditious timelines that are appropriate to provide as a default for EGs under these generally applicable implementing regulations.
The EPA recognizes that, under certain circumstances, the timelines being finalized in this action may not fit the needs of a specific EG because of the specific characteristics of an EG. The EPA will address source category-specific circumstances or facts that are not accommodated by the timelines of subpart Ba through a specific EG. Examples of circumstances that may require consideration for different
timelines could include EGs that require states to perform extensive engineering and/or economic analyses before submitting their plans; EGs with an exceptional need to expedite implementation (
e.g.,
in order to address immediate health and welfare impacts); EGs that apply to an extraordinary number of disparate designated facilities; or EGs that are novel and/or unusually complex. For situations like these, 40 CFR 60.20a(a)(1) provides that an EG may supersede any aspect of the implementing regulations, including the implementation timelines. It is within the EPA's discretion to determine whether a proposed change in implementation time may be justified within an individual EG based on these or other appropriate factors. For EGs that supersede implementation timelines, the EPA will, in the EG, both provide a justification for the differing timelines and address how the change in timeline will impact health and welfare.
1. State Plan Submission Timelines
This section discusses the amount of time states will have to submit plans and plan revisions to the EPA following the publication of a final or revised EG in the
Federal Register
. As described in further detail in section III.E of this preamble, under CAA section 111(d), the EPA first determines a BSER and the degree of emission limitation for designated facilities and promulgates these determinations in an EG. CAA section 111(a)(1), 40 CFR 60.22a(b)(5). It is then each state's obligation to submit a plan to the EPA which establishes standards of performance based on the EG for each designated facility. See CAA section 111(d)(1), 40 CFR 60.24a(c). The implementing regulations promulgated in 1975 under subpart B provide that states have 9 months to submit a state plan after publication of a final EG. 40 CFR 60.23(a)(1). In 2019, the EPA promulgated subpart Ba and provided 3 years for states to submit plans or plan revisions for subsequently promulgated or revised EGs, consistent with the timelines provided for submission of SIPs pursuant to CAA section 110(a)(1). This 3-year timeframe was vacated by the D.C. Circuit in the
ALA
decision, and thus currently there is no applicable deadline for state plan submissions and revisions required under EGs subject to subpart Ba.
As laid out in the notice of proposed rulemaking and summarized below, in evaluating the appropriate timeline for plan submittal to replace the vacated provisions in subpart Ba, the EPA reviewed steps that states need to carry out to develop, adopt, and submit a state plan to the EPA, and its history in implementing EGs under the timing provisions of subpart B. The EPA further evaluated the statutory deadlines and processes for relatively comparable state plans under CAA section 129, and attainment planning SIPs submitted pursuant CAA sections 189(a)(2)(B) and 189(b)(2) for the 2012 National Ambient Air Quality Standards (NAAQS) for fine particulate matter (PM
2.5
). 78 FR 3085 (January 15, 2013). Finally, the EPA incorporated consideration of the
ALA
decision addressing expediency in implementation of EGs for protection of public health and welfare.
To develop a CAA section 111(d) state plan, a state must complete a series of steps to ensure that the plan will meet all applicable requirements. Subpart Ba specifies the elements that must be included in a state plan submission (see 40 CFR 60.24a, 60.25a, 60.26a) as well as certain processes that a state must undertake in adopting and submitting a plan (see 40 CFR 60.23a). In addition to the requirements of these implementing regulations, there are also state-specific processes applicable to the development and adoption of a state plan, including the administrative processes (
e.g.,
permitting processes, regulatory development, legislative approval) necessary to develop and adopt enforceable standards of performance. State plan development generally involves several phases, including providing notice that the state agency is considering adopting a rule; taking public comment; and approving or adopting a final rule. The process required to formally adopt a rule at the state level differs from state to states.
18
18
In many states, the agency must submit its rule to a particular independent commission or the legislature for review and approval before the rule is finally adopted. Generally, adopted rules are filed with a state entity, such as the secretary of state, and eventually published in a register and placed into the state's administrative code. State law establishes when an adopted rule is effective.
As previously mentioned, subpart B provides 9 months for states to submit plans after publication of a final EG. The EPA's review of state's timeliness for submitting CAA section 111(d) plans under the 9-month timeline indicated that most states either did not submit plans or submitted plans that were substantially late.
19
The EPA also noted that the plans submitted under subpart B were not subject to additional requirements for meaningful engagement and consideration of RULOF, which may add time to the state development process relative to plans developed and submitted under subpart B. For these reasons, the EPA found that 9 months is not a reasonable amount of time for most states to adequately develop a plan for an EG.
19
The EPA reviewed the information available in 40 CFR part 62. The supporting information reviewed is available at Docket ID No. EPA-HQ-OAR-2021-0527. Part 62 codifies the Administrator's approval and disapproval of state plans for the control of pollutants and facilities under CAA section 111(d), and under CAA section 129 as applicable, and the Administrator's promulgation of such plans or portions of plans thereof.
To help inform the proposal for the state plan submission deadline, the EPA also reviewed CAA section 129's statutory deadline and requirements for state plans, and the timeliness and responsiveness of states under CAA section 129 EGs. CAA section 129 references CAA section 111(d) in many instances, creating considerable overlap in the functionality of the programs. The processes for CAA sections 111(d) and 129 are similar in that states are required to submit plans to implement and enforce the EPA's EGs. However, there are some key distinctions between the two programs, most notably that CAA section 129(b)(2) specifies that state plans be submitted no later than 1 year from the promulgation of a corresponding EG, whereas the statute does not specify a particular timeline for state plan submissions under CAA section 111(d). Moreover, CAA section 129 plans are required by statute to be at least as protective as the EPA's EGs, without exception. CAA section 129(b)(2). While CAA section 111(d) permits states to take into account remaining useful life and other factors to set less stringent standards for particular sources. This suggests that the development of a CAA section 111(d) plan could involve more complicated analyses than a CAA section 129 plan and that a longer timeframe is likely reasonable for state plans under CAA section 111(d) than the 1-year timeframe the statute provides under CAA section 129.
Additionally, the EPA found that a considerable number of states have not made timely state plan submissions in response to previous CAA section 129 EGs. In instances where states submitted CAA section 129 plans, a significant number of states submitted plans between 14 to 17 months after the promulgated EG.
20
This again suggests that states will typically need more than
one year to develop a state plan to implement an EG.
20
The EPA reviewed the information available in 40 CFR part 62. The supporting information reviewed is available at Docket ID No. EPA-HQ-OAR-2021-0527. Part 62 codifies the Administrator's approval and disapproval of state plans for the control of pollutants and facilities under CAA section 111(d), and under CAA section 129 as applicable.
In the 2019 promulgation of subpart Ba, the EPA mirrored CAA section 110 by giving states 3 years to submit plans. As previously described, the D.C. Circuit faulted the EPA for adopting the CAA section 110 timelines without accounting for the differences in scale and scope between CAA section 110 and 111(d) plans. Therefore, in proposing the revised timelines the EPA closely evaluated other statutory deadlines and requirements for state implementation plans to determine what is feasible for a CAA section 111(d) state plan submission timeline. The EPA specifically focused on statutory SIP submission deadlines and requirements in the context of attainment plans for the 2012 PM
2.5.
NAAQS under CAA section 189 because it provided a comparable process. CAA section 189(a)(2)(B) requires states to submit attainment planning SIPs within 18 months after an area is designated nonattainment and there is a record of successful state submittals pursuant to this timeline. The 2012 PM
2.5.
NAAQS attainment plans were, in most cases, more complicated for states to develop when compared to a typical plan that may be required under CAA sections 111(d). For example, attainment plans require states to determine how to control a variety of sources, based on extensive modeling and analyses, in order to bring a nonattainment area into attainment of the PM
2.5
NAAQS by a specified date. Identification of contributing emission sources and the development of effective control strategies can be challenging because particulate matter pollution is comprised of both primary emissions and secondary particle formation. By contrast, under CAA section 111(d), it is clear which designated facilities are subject to a state plan, in general what control methods are available for the designated pollutant from that facility, and that the standards of performance for these sources must reflect the level of stringency for the facility as determined by the EG unless a state chooses to account for RULOF.
Informed by these analyses, the EPA proposed to require that each state adopt and submit to the Administrator a plan for the control of the designated pollutant(s) to which the EG applies within 15 months of publication of a final EG. Some commenters supported the proposed timeline based on the need for urgency in achieving the emission reductions targeted by an EG. Additionally, some commenters noted that, in comparison with NAAQS SIP requirements, states are generally well-positioned to address the source sectors historically regulated under CAA section 111(d) and have access to information about control strategies and regulatory approaches for controlling emissions. Most commenters on this issue were state agencies or other state-related entities that generally expressed the need for a longer state plan submittal timeline in order to accommodate state regulatory processes associated with plan submittals (
i.e.,
legislative and/or administrative state processes), as well as to accommodate technical development of the plans and to implement the proposed meaningful engagement requirements. Approximately 10 states responded to the EPA's request with information about their state processes. The information received indicates that states argued that they need anywhere from 15 months to 36 months to adopt and submit state plans. As discussed further below, the EPA is finalizing a state plan submittal timeline of 18 months. It is doing so after consideration of comments received on the proposal and recognizing the need to protect public health and welfare. The EPA has determined that 18 months is the appropriate timeline for these general implementing regulations; for a generic EG, this represents a reasonable balance between providing states sufficient time to develop and submit a plan that satisfies the applicable requirements and ensuring that the emission reductions contemplated in an EG are achieved as expeditiously as practicable. Consistent with the existing regulations of subpart Ba, 40 CFR 60.20a(a)(1), the EPA may supersede this 18-month state plan submittal timeline in an individual EG.
The proposed 15-month submittal timeline was based on the EPA's proposed determination that this was a reasonably expeditious deadline that would provide states and stakeholders sufficient time to develop and submit an approvable state plan. However, based on public comments received, we no longer believe that 15 months will provide sufficient time to complete the substantive and procedural requirements under subpart Ba. For example, the EPA is revising subpart Ba to require that states demonstrate meaningful engagement as part of their state plan development. While the time needed to conduct meaningful engagement will depend highly on the source category, the designated pollutant, and the types of impacts associated with designated facilities and potential controls, as well as on the pertinent stakeholders under a given EG within each state, it is very likely to require additional time relative to the existing public notice and hearing requirements under CAA section 110 and subpart Ba. We received comments that 15 months would be insufficient time to identify pertinent stakeholders, develop public participation strategies, and conduct outreach and engagement. Some commenters also pointed out that adding requirements, such as meaningful engagement and RULOF, without a corresponding extension of time to develop plans may undermine states' abilities to submit timely, approvable plans. While some commenters requested 36 months to submit state plans, several indicated that a minimum timeframe of 18 months would be appropriate for a state plan under a generic EG. Given the preponderance of comments suggesting that 15 months was not a reasonable amount of time to develop an approvable state plan and in recognition of the need to promulgate a timeline that achieves emission reductions as expeditiously as practicable, the EPA believes 18 months is the most reasonable timeline to include in these generally applicable implementing regulations.
The EPA acknowledges that, as commenters asserted, state regulatory and legislative processes and resources can vary significantly and influence the time needed to develop and submit state plans (
e.g.,
legislative procedures and timelines vary by state). Some commenters opposed to a shorter state plan submission timeline asserted that they need 36 months to complete their administrative and legislative processes. However, because the CAA contains numerous, long-standing requirements under other programs for states to develop and submit plans within 18 months (or fewer),
21
the EPA believes that states should be well positioned to accommodate an 18-month submittal timeline for plans under section 111(d). In designing a submittal deadline for state plans, it is reasonable to look to what Congress has determined are appropriate timelines for SIPs and to assume that states should be able to accommodate comparable timelines under CAA section 111(d). Indeed, some commenters recommend that the EPA not defer to lengthy state administrative processes, and expressed concern that some states have adopted, or may adopt, procedures that are longer than necessary and that will unnecessarily postpone Federal emission-reduction obligations. To this point, extending
state plan submittal timelines to account for any and all unique state procedures would inappropriately delay reductions in emissions that have been found under CAA section 111 to endanger health or the environment.
21
See,
e.g.,
CAA sections 110(k)(5); 129; 179(d)(1); 189.
Some commenters asserted that the
ALA
decision does not preclude the EPA from adopting a 36-month time frame for state plan submittals and that the Agency need only justify a longer timelines more fully. However, the EPA recognizes that the D.C. Circuit, in
ALA,
faulted the Agency for failing to consider the potential impacts to public health and welfare associated with extending planning deadlines. In response, the EPA is promulgating a state plan submittal timeline that reflects the generally expeditious period of time for states to develop and submit a plan per the corresponding emission guidelines that is both comprehensive and legally sound. The EPA does not interpret the court's direction to require a quantitative measure of impact, but rather consideration of the importance of meeting the public health and welfare goals when determining appropriate deadlines for implementation of regulations under CAA section 111(d). Based on EPA's assessment of the time it will take for states to develop and submit plans under these general implementing regulations, both in the notice of proposed rulemaking and this preamble and after consideration of comments received, the EPA has determined that 18 months represents the generally expeditious period of time.
Some commenters stated that reduction of the designated pollutants addressed by currently proposed emission guidelines (
i.e.,
GHG) is not urgent based on the fraction of global GHG reduced by currently proposed emission guidelines, so a longer state plan timeline would be justified. The EPA disagrees with the commenters' characterizations of the threat posed by elevated concentrations of greenhouse gases in the atmosphere. The EPA has determined that greenhouse gas air pollution may reasonably be anticipated to endanger public health or welfare
22
and has explained that “scientific assessments, EPA analyses, and documented observed changes in the climate of the planet and of the U.S. present clear support regarding the current and future dangers of climate change and the importance of GHG emissions mitigation.”
23
Moreover, subpart Ba applies to any EG promulgated after July 8, 2019, not only to the recently proposed EGs addressing GHG emissions from two source categories. The EPA regulates source categories, through EGs, that emit pollutants the Agency has determined under CAA section 111(d) to cause or significantly contribute to an endangerment of public health or welfare. Accordingly, consistent with
ALA,
it is appropriate for the EPA to set an expeditious but reasonable schedule in these general provisions for state plan development and submission to ensure that emission reductions occur in a timely manner.
22
See,
e.g.,
80 FR 64510, 64530 (Oct. 23, 2015).
23
88 FR 33240, 33252 (May 23, 2023).
Finally, some commenters asserted that if the EPA were to finalize the state plan submittal timeline as proposed, the EPA should include a mechanism in subpart Ba for states to ask for extensions of the state plan submittal deadline. However, as we are providing additional time for state plan submittals relative to proposal, we are not providing a mechanism for states to request deadline extensions in subpart Ba. Additionally, the EPA has the ability to supersede the timelines in subpart Ba in individual EGs and will take into account any unique considerations that may result in the need for longer or shorter timelines on an EG-by-EG basis.
In summary, while the EPA proposed a 15-month state plan submittal timeline, after consideration of comments, the EPA is finalizing 40 CFR 60.23a(a)(1) to provide an 18-month timeline for the submission of state plans following publication in the
Federal Register
of a final EG. The EPA has determined that this is the generally expeditious period in which states can create and submit a plan per the EPA's corresponding EGs that is both comprehensive and legally sound. In considering the appropriate timeline, the EPA has evaluated data from previously implemented EGs and the statutory deadlines and data from analogous programs (
e.g.,
CAA sections 129 and 189). We have also considered comments that some of the requirements the EPA had proposed for subpart Ba would require additional time to implement, as well as comments asserting that certain states need up to 36 months to complete their administrative and legislative processes. While a reasonable state plan submittal timeline must provide states sufficient time to develop and submit plans that comport with the applicable requirements, the EPA also believes that state processes should be able to accommodate an 18-month timeline because the CAA already contains numerous deadlines that require SIP submissions to be developed and submitted to the Agency within 18 or fewer months. Thus, this finalized timeline should provide states reasonable time to adopt and submit approvable plans, and is also sufficiently expeditious to protect against significant adverse impacts to health and welfare resulting from foregone emission reductions during the state planning process. Providing states sufficient time to develop feasible implementation plans for their designated facilities that adequately address public health and environmental objectives also ultimately helps ensure more timely implementation of an EG, and therefore achievement in actual emission reductions, than would an unattainable deadline. Because 18 months is an expeditious time period, it follows that the EPA has appropriately considered the potential impacts to public health and welfare associated with this extension of time by providing no more time than the states reasonably need to ensure a plan is comprehensive and timely.
The EPA is also finalizing the proposed amendment to 40 CFR 60.27a(a) replacing the word “shorten” with “amend”. The applicability provision at 40 CFR 60.20a(a)(1) states that “each emission guideline may include specific provisions in addition to or that supersede requirements of this subpart.” However, the existing provision in 40 CFR 60.27a(a) only provides for the Administrator to “shorten the period for submission of any plan or plan revision or portion thereof.” To make these two provisions consistent in light of the timelines for plan submission finalized in this action, the EPA is replacing the word “shorten” with “amend.” One commenter opposed the amendment stating there is no regulatory certainty for the state in state plan submittal if the Administrator can simply change the timeline as he deems necessary. However, the appropriate timeline would undergo notice and comment rulemaking as the EG is proposed and finalized so that states would have sufficient notice of the timeline. To the extent the EPA considers deviating from this 18-month timeframe in promulgating an EG in the future, the EPA will consider the public health and welfare impacts associated with extending the state plan submission timeline, consistent with the D.C. Circuit's direction in
ALA.
The EPA is also finalizing two amendments to 40 CFR 60.28a(a), which addresses plan revisions by the state. First, the EPA is finalizing the proposed clarification that meaningful engagement requirements apply to any significant plan revision by the state. Second, the EPA is finalizing revisions
to the timeline for state plan revisions required in response to a revised emission guideline. At proposal, the EPA indicated in the revised regulatory text that it was proposing to shorten the timeline for state plan revisions in this specific circumstance from three years to 12 months.
24
The EPA received comments on this proposed revision asserting that the same process-related challenges that apply to initial state plan submissions, including conducting meaningful engagement and RULOF procedures and working through states' administrative and legislative processes, also apply to state plan revisions. Commenters requested that the EPA extend the timeline for state plan revisions in response to revised emission guidelines; one commenter specifically requested that the EPA leave it at 36 months. However, the EPA anticipates that, in most instances, plan revisions required in response to a revised emission guideline would be narrower in scope than the initial state plan and would not require states to reevaluate standards of performance or conduct significant new analysis. For example, the EPA may revise an emission guideline to provide for additional or updated monitoring or compliance protocols or to clarify applicability provisions. In such instances, the full period of time provided for initial state plan development and submission would not be necessary.
25
Thus, the EPA believes it is reasonable to set a default timeline for the submission of state plan revisions in these general implementing guidelines that is shorter than the timeline for initial state plan submission. Because the EPA is providing an additional three months for state plan submission in this final rule relative to the proposed timeline (18 months versus 15 months), it is finalizing a timeline for the submission of state plan revisions in response to a revised emission guideline of fifteen months, which is also three months longer than the twelve months proposed. Additionally, in recognition that some state plan revisions in response to a revised emission guideline may in fact be more complex or necessitate additional analysis or rulemaking, the EPA is finalizing the provision at 40 CFR 60.28a(a) to allow the Agency to determine a different timeline for the submission of revised state plans, which it will provide in the revised emission guideline.
24
“Docket_memo_outlining_proposed_changes_to_regulatory_text.pdf,”
available at https://www.epa.gov/stationary-sources-air-pollution/adoption-and-submittal-state-plans-designated-facilities-40-cfr,
as well as Docket ID No. EPA-HQ-OAR-2021-0527-0002.
25
The EPA's response to comments that the state plan submission timelines should accommodate every state's unique administrative and legislative processes is also relevant here and is provided elsewhere in this section of the preamble.
2. Timeline for the EPA To Determine Completeness of State Plans
Once a state plan has been submitted to the EPA, the EPA reviews the plan for “completeness” to determine whether it includes certain elements necessary to ensure that the EPA can substantively evaluate the plan. The EPA determines completeness by comparing the state's submission against the administrative and technical criteria specified in subpart Ba to determine whether the submission contains the specified elements (see 40 CFR 60.27a(g)(2) for completeness criteria). The timeline to make completeness determinations in the version of subpart Ba the EPA promulgated in 2019 mirrored the language for SIPs in CAA section 110(k)(1)(B): “Within 60 days of the Administrator's receipt of a plan or plan revision, but no later than 6 months after the date, if any, by which a State is required to submit the plan or revision, the Administrator shall determine whether the minimum criteria [for completeness] have been met.” Like CAA section 110(k)(1)(B), subpart Ba also provided that a state plan would be deemed complete by operation of law if the EPA had not made an affirmative determination by the date 6 months after receipt of the plan submission. 40 CFR 60.27a(g)(1).
After a state plan is deemed complete through either an affirmative determination or by operation of law, the EPA will act on the state plan submission through notice-and-comment rulemaking. The timeline for the EPA to act on a state plan submission runs from the date a submission is deemed complete; more on this timeline can be found in section III.A.3. of this preamble.
If a state plan submission does not contain the elements required by the completeness criteria, the EPA would find that the state has failed to submit a complete plan and notify the state through a letter. The determination of incompleteness treats the state as if the state has made no submission at all. The determination that a submission is incomplete and that the state has failed to submit a plan is ministerial in nature.
As part of the EPA's overall effort to set implementation timelines under CAA section 111(d) that are as expeditious as possible, the EPA proposed to revise the timing element of the completeness review at 40 CFR 60.27a(g)(1). In light of the ministerial nature of the completeness determination, the EPA proposed a maximum of 60 days from receipt of the state plan submission for the EPA to make a determination of completeness. The EPA additionally proposed that any state plan or plan revision submitted to the EPA that has not received a completeness determination within 60 days of receipt, shall on that date be deemed, by operation of law, to meet the completeness criteria, which will trigger the EPA's obligation to take substantive action on the state plan. Sixty days provides an expeditious timeframe for the EPA to evaluate state plans for completeness and to notify the states of the determination. Because the EPA may be required to evaluate up to 50 state plans during this period, in addition to plans submitted by territories and tribes, the EPA explained at proposal that it did not find that this timeframe could reasonably be shortened any further.
While most commenters supported the 60-day completeness period, some commenters expressed concern that a state plan that is automatically deemed complete by operation of law as of the allotted 60 days could cause unnecessary turbulence in state plan implementation if the plan is later disapproved by the EPA due to missing information. Other commenters noted that if a plan is determined to be incomplete, a 60-day period will not allow states sufficient time to correct the deficiency and submit a complete plan. First, the EPA notes that the completeness determination is ministerial in nature and does not affect the Agency's subsequent responsibility and authority to substantively review a state plan submission against the requirements of the Act and applicable regulations, including this subpart Ba and the relevant EG. That is, a determination that a state plan is complete does not signify that it necessarily satisfies the substantive requirements. The commenters fail to explain how deeming a state plan submission complete by operation of law, in this case after 60 days, and later finding it does not satisfy an applicable requirement is a new phenomenon or would cause unnecessary turbulence in state plan implementation. Rather, a shorter period for deeming plans complete by operation of law would be less disruptive than a longer period in this instance because the EPA will complete its substantive evaluation of the plan sooner and the state will have notice earlier on of any deficiencies. Additionally, because states may submit plan revisions at any time, states may
work collaboratively with the EPA on any portions of a plan identified as being deficient during both the completeness determination period and the period for the EPA's substantive review of the plan. Thus, again, a shorter completeness determination period that includes a cutoff for deeming submissions complete by operation of law merely keeps the state plan review process moving expeditiously and does not foreclose any state opportunities to correct or supplement submissions at any point in the EPA's review process.
Moreover, the EPA intends to review for completeness as soon as possible after submittal. Although the EPA believes that it will be able to provide a timely completeness determination for most if not all state plan submissions, providing for completeness through operation of the law will help ensure that the EPA's action on state plans does not significantly delay plan processing or implementation.
The EPA is therefore finalizing the completeness provision at 40 CFR 60.27a(g)(1) as proposed. The EPA notes that if the EPA determines a plan is incomplete, the EPA is required to promulgate, through notice-and-comment rulemaking, a Federal plan. See sections III.A.4. and III.B. for the discussion and final amendments associated with the timeline and triggers of the Federal Plan respectively. If a state submits a plan prior to the state plan submission deadline and the EPA also makes a determination that the plan is incomplete prior to that deadline, the EPA will treat the state as if the state has made no submission at all, but this determination does not yet trigger further action by the EPA. Instead, because the state still has an opportunity to submit a complete plan before the state plan submission deadline, the EPA's authority to promulgate a Federal plan is only triggered if the state fails to timely submit a new plan to replace the incomplete plan by the state plan deadline.
3. Timeline for the EPA's Action on State Plans
After a state plan has been determined to be complete or is deemed complete by operation of law, CAA section 111(d) provides that the EPA must evaluate whether the plan is “satisfactory”; that is, whether the components of the plan meet all the requirements of the statute, these implementing regulations, and the corresponding EG. The EPA does so by evaluating a plan (or plan revision) to determine whether the plan or plan revision is approvable, in part or in whole (see section III.D.1. of this preamble for discussion on partial plan approvals), through a notice-and-comment rulemaking process. After the EPA proposes an action on a state plan submission (
e.g.,
approval, partial approval/partial disapproval, disapproval) and reviews comments on the proposed action, the EPA will finalize its action on the plan. If the EPA approves a state plan, the standards of performance and other components of that state plan become federally enforceable. If the state plan is disapproved, in part or in whole, the EPA is obligated to promulgate a Federal plan for designated facilities within the state that were covered by the disapproved portions of the plan (see section III.A.4. of this preamble below for the EPA's timeline to publish a Federal plan).
Subpart B requires the EPA to take action on applicable state plans (
e.g.,
approve or disapprove) within 4 months after the date required for submission. 40 CFR 60.27(b). In the development of subpart Ba, the EPA contended that 4 months was an inadequate time to review and take action on state plans and therefore instead provided a deadline of 12 months for final action on a state plan (mirroring the maximum time permitted under CAA section 110(k)(1)(2) for the EPA's action on complete SIPs). 84 FR 32520, July 8, 2019. In the
ALA
decision, the D.C. Circuit vacated this revised timeline in subpart Ba on the basis that the EPA did not adequately justify the extended timeframes and did not consider the public health and welfare impacts of extending the implementation times. As is discussed below, the EPA has in this rulemaking closely evaluated the process, steps, and timeframes for the EPA to substantively review and act upon each state plan submission through a public notice-and-comment rulemaking process. After considering the time anticipated to be necessary for generally expeditious EPA action on state plans, the EPA again proposed that it must take final action on a state plan or plan revision submission within 12 months after a plan is determined to be complete or becomes complete by operation of law.
26
26
The deadlines for the EPA action under subpart Ba would apply to any state plan submission regardless of when it is submitted.
In the notice of proposed rulemaking, the EPA explained that the first step it takes once a state plan submittal has been deemed “complete” under 40 CFR 60.27a(g) is for an intra-agency workgroup to review the plan components to determine whether they conform to the applicable regulatory requirements. The workgroup may require a broad range of expertise in legal, technical, and policy areas, potentially including attorneys, engineers, scientists, economists, air monitoring experts, health and welfare analysts, and/or policy analysts from across a variety of the EPA programs. After review and coordination, the workgroup then develops recommendations for approval or disapproval of each plan component and presents them to Agency decision-makers for review. Once the Agency completes its internal decision-making process, the workgroup proceeds to prepare a written notice of proposed rulemaking. The notice of proposed rulemaking contains the EPA's legal, policy, and technical bases for its proposed action on a state plan submission, which must be thoroughly developed and explained in writing to provide clear and concise information and reasoning to support the public in understanding the Agency's decision and the justification for that decision, and so that the public may provide informed comments on the proposal. The EPA may further develop technical support documents as record support for the proposal. The draft proposed rulemaking and any record support then undergo a multi-layered review process across the EPA offices and levels of management before being processed for signature. The process to evaluate the state plan, draft a proposed action on a CAA section 111(d) state plan, and get the proposed action edited, reviewed, and signed typically requires a minimum of between 6 to 8 months to complete. The signed notice of proposed rulemaking is then submitted for publication in the
Federal Register
,
which may require several weeks of review and processing prior to publication.
The publication of the proposed rulemaking triggers the start of a public comment period of at least 30 days with possible extension, if requested by commenters. Because of the types of sources and pollutants regulated under CAA section 111(d), the EPA reasonably anticipates that many of its proposed actions on state plans will garner significant public interest from individuals, industry, states, and environmental and public health advocates. After completion of the comment period, the EPA then reviews all comments and determines whether, based on any information provided by the comments, it should alter its proposed action or further augment the legal, policy, and technical rationales
supporting that action. Comments received on a proposed action may include technical information that was not available to the EPA at the time of proposal. In the event technical data are received as part of comments on the proposed action, the EPA would then be required to review the new data and evaluate whether and how it should affect the EPA's proposed conclusions regarding the state plan. If a substantive comment is raised that merits reconsideration of the EPA's proposed action, the EPA may determine that it is necessary to revise and repropose its action on the state plan or it may go to the state for more information to help the Agency determine how to proceed.
Once this review of comments is complete, the workgroup drafts and presents updated recommendations for action for internal review and consideration by Agency decision-makers. Once the Agency completes its internal decision-making process, the workgroup then drafts a notice of final rulemaking on the plan submission, which includes responses to comments, any necessary record support, and may also include final regulatory text. The draft final action is then reviewed by senior management and other interested EPA offices within the Agency prior to signature of the final rulemaking approving or disapproving, in whole or in part, a state plan. It is reasonable to permit at least 4 to 7 months for evaluation of the comments received, any necessary technical analysis, decision-making, and drafting and review of the final action.
The duration of each step in this deliberative process varies. The amount of time the EPA needs to review a state plan submission and the time it needs to finalize a notice of proposed rulemaking depends in part on the plan's complexity and the nature of the technical, policy, and legal issues that it implicates. For example, a state plan submission that includes standards of performance for dozens of facilities on different compliance schedules would be more complex and time consuming to review than a plan that simply establishes standards of performance reflecting the presumptive level of stringency for all sources. Similarly, the amount of time needed to respond to comments and issue a final rulemaking depends in part on the number and type of comments received on the EPA's proposed rulemaking. Additionally, the EPA reasonably anticipates that it will be required to review multiple plan submissions at a given time, and these phases of review for a given plan are impacted by the EPA's review of other state plan submissions, as the EPA will need to assure its review across multiple plans and regional offices is consistent from a legal, technical, and policy perspective.
While some commenters supported 12 months as an expeditious timeframe for the EPA review and action on state plan submittals, several noted that 12 months may be insufficient. These commenters asserted that the EPA must meaningfully evaluate and take action on a state plan and a 12-month timeframe may be too short for this process. However, as detailed in the discussion above, the EPA has a mapped out the time necessary to take action on a generic plan submission and believes that 12 months is the most expeditious and therefore the most appropriate period to provide for these generally applicable implementing regulations. Additionally, the EPA has completed hundreds of actions on CAA section 110 SIPs within 12 months over the past 4 years. Given that the EPA may choose to supersede the requirements of subpart Ba as necessary in an individual EG, we believe that providing the shortest period here is consistent with considering health and welfare impacts by designing timelines to achieve state plan implementation as expeditiously as reasonably possible.
The EPA is therefore finalizing as proposed 40 CFR 60.23a(b) to provide that it will take action on a state plan or plan revision within 12 months of a determination of a complete plan pursuant to 40 CFR 60.27a(g). This is a reasonably expeditious timeframe to accommodate the EPA action on a state plan or plan revision submission and the considerations described above, while ensuring that an EG is expeditiously implemented. The process and steps described in this action highlight the fact that it would be unreasonable, if not impossible, to accomplish all of the steps in a legally and technically sound manner within a 4-month timeframe as required under subpart B. Particularly, any proposed action by the EPA has to be open for public comment for at least 30 days, and therefore the 4-month timeline provided in subpart B only gave the EPA 3 months to do the substantive work of both the proposed and final actions, including evaluating the state plan submission, drafting preamble notices, responding to comments, and developing record support at both the proposed and final action stages. A 12-month timeframe after a plan is determined to be complete more reasonably accommodates the process and steps described in this action.
27
27
While the EPA would have the discretion to act on a state's submission more quickly than 12 months where specific circumstances allow (
e.g.,
where there are no public comments on the proposed action), the EPA does not believe that it would be reasonably possible to act significantly more quickly than 12 months in most cases.
As explained at proposal, the EPA recognizes that the court in
ALA
faulted the Agency for failing to consider the potential impacts to public health and welfare associated with extending planning deadlines. The EPA does not interpret the court's direction to require a quantitative measure of impact, but rather consideration of the importance of the public health and welfare goals of CAA section 111(d) when determining appropriate deadlines. Because 12 months is an adequate period of time in which the EPA can both expeditiously act on a plan submission
and
ensure that its action is technically and legally sound, it follows that the EPA has appropriately considered the potential impacts to public health and welfare associated with this extension of time by providing no more time than the EPA reasonably needs to ensure a plan submission contains appropriate and protective emission reduction measures. If the EPA does not have adequate time to evaluate a state plan submission, its ability to ensure the plan contains appropriate measures to satisfactorily implement and enforce the standards necessary to comply with the EG may be compromised, which would in turn compromise the EPA's ability to ensure that the public health and welfare objectives of the EG are satisfied. Although several commenters noted that the review of some plans may require a more in depth analysis, the EPA believes 12 months is a both reasonable and expeditious timeframe to evaluate and act on most state plans. Accordingly, in order to ensure that the public health and welfare objectives of CAA section 111 are timely realized, and consistent with the direction in
ALA,
the EPA does not believe it would be appropriate to finalize a timeframe longer than 12 months for the EPA action on state plans.
4. Timeline for the EPA To Promulgate a Federal Plan
CAA section 111(d)(2) provides that the EPA has the same authority to prescribe a Federal plan for a state that fails to submit a satisfactory plan as it does for promulgating a FIP under CAA section 110(c). Accordingly, the EPA's obligation to promulgate a Federal plan is triggered in three situations: where a state does not submit a plan by the plan
submission deadline; where the EPA determines a portion or all of a state plan submission did not meet the completeness criteria and the time period for state plan submission has elapsed and, therefore, the state is treated as having not submitted a required plan; and where the EPA disapproves a state's plan. 40 CFR 60.27a(c). The EPA is finalizing as proposed the revisions to 40 CFR 60.27a(c) providing that the Agency will promulgate a Federal plan at any time within 12 months of any of the triggers in § 60.27a(c)(1) and (2) (see section III.B. of this preamble for discussion).
28
28
The EPA has discretion to address its obligation to promulgate a Federal plan in a variety of ways for states that do not have an approved state plan. For example the EPA may initially promulgate a single Federal plan that applies to all appropriate states and then update that Federal plan as necessary to accommodate the inclusion of other states that trigger the need for a Federal plan in the future (
e.g.,
a Federal plan that applies to states that fail to submit a plan can be updated to include applicability for states that later have a plan disapproved); or the EPA may promulgate separate Federal plans each time its authority to do so has been triggered (
e.g.,
the EPA will promulgate a Federal plan for all states that fail to submit a plan and another Federal plan for all states that have their plan disapproved).
The EPA is obligated to promulgate a Federal plan for states that have not submitted a plan by the submission deadline. Once the obligation to promulgate a Federal plan is triggered, it can only be tolled by the EPA's approval of a state plan. If a Federal plan is promulgated, a state may still submit a plan to replace the Federal plan. A Federal plan under CAA section 111(d) is a means to ensure timely implementation of EGs, and a state may choose to accept a Federal plan for their sources rather than submit a state plan. While the EPA encourages states to timely submit plans for EGs, there are no sanctions associated with failing to timely submit an approvable plan or with the implementation of a Federal plan.
29
29
CAA section 179 provides that sanctions should be applied in states that fail to submit approvable SIPs for certain specified requirements for NAAQS implementation. The EPA has not promulgated any similar sanctions provisions governing the submission of state plans pursuant to section 111(d).
The original implementing regulations in subpart B provided the EPA with 6 months to promulgate a Federal plan once its obligation to do so was triggered. 40 CFR 60.27(d). When the EPA promulgated subpart Ba in 2019, it concluded that this amount of time was insufficient and consequently extended the time for the EPA to promulgate a Federal plan to 24 months, mirroring the timeframe permitted for promulgation of a FIP under CAA section 110. 84 FR 32520, July 8, 2019. In the
ALA
decision, the D.C. Circuit vacated this revised timeline in subpart Ba on the basis that the EPA did not adequately justify the extended timeframe and did not consider the health and welfare impacts of extending the implementation timeframe.
At proposal, the EPA reevaluated the process, steps, and timeframes for the EPA to promulgate a Federal plan through a public notice-and-comment rulemaking process and proposed a 12-month timeframe to promulgate a Federal plan once its obligation to do so is triggered.
30
As explained in the notice of proposed rulemaking, a Federal plan must meet the requirements of CAA section 111(d) and therefore contain the same components as a state plan, namely standards of performance for designated facilities and measures that provide for the implementation and enforcement of such standards. CAA section 111(d)(2)(B) also explicitly requires the EPA to consider RULOF in promulgating a standard of performance under a Federal plan. Additionally, Federal plans containing standards of performance are subject to the procedural requirements of CAA section 307(d), such as the requirements for proposed rulemaking and opportunity for public hearing. CAA section 307(d)(1)(C). The EPA's regulations at 40 CFR 60.27a implement these various statutory requirements and contain general regulatory requirements for the EPA's promulgation of a Federal plan. The process, and steps for the EPA to promulgate a Federal plan consistent with these applicable requirements is described in the following paragraphs.
30
The EPA reviewed the information available in 40 CFR part 62 associated with the promulgation of Federal Plans under CAA section 111(d). The supporting information reviewed is available at Docket ID No. EPA-HQ-OAR-2021-0527. Under the provisions of CAA section 111 and subpart B, the EPA promulgated Federal plans for municipal solid waste landfills EG 40 CFR part 60, subpart Cc (Federal plan codified at 40 CFR part 62, subpart GGG) and municipal solid waste landfills EG 40 CFR part 60, subpart Cf (Federal plan codified at 40 CFR part 62, subpart OOO).
The EPA also reviewed information available in 40 CFR part 62 associated with the promulgation of Federal Plans under CAA 129. The supporting information reviewed is available at Docket ID No. EPA-HQ-OAR-2021-0527. Under the provisions of CAA sections 111 and 129 and subpart B, the EPA has promulgated Federal plans for large municipal waste combustors EG 40 CFR part 60, subpart Cb (Federal plan codified at 40 CFR part 62, subpart FFF); small municipal waste combustors EG 40 CFR part 60, subpart BBBB (Federal plan codified at 40 CFR part 62, subpart JJJ); hospital, medical, and infectious waste incinerators EG 40 CFR part 60, subpart Ce (Federal plan codified at 40 CFR part 62, subpart HHH); commercial and industrial solid waste incinerators EG 40 CFR part 60, subpart DDDD (Federal plan codified at 40 CFR part 62, subpart III) and sewage sludge incinerators EG 40 CFR part 60, subpart MMMM (Federal plan codified at 40 CFR part 62, subpart LLL).
Once the EPA's obligation to promulgate a Federal plan is triggered, the EPA establishes an intra-agency workgroup to develop the rulemaking action to address that obligation. The workgroup first develops recommendations for the components of the Federal plan to be proposed, and on legal, policy, and technical rationales that support the recommendations. These components are identified in subpart Ba as well as in the corresponding EG and are generally the same as those required for a state plan. One of these fundamental components is the determination of standards of performance for designated facilities. Based on the requirements of CAA sections 111(d) and 111(a)(1), these standards must generally reflect the degree of emission limitation achievable through application of the BSER as determined by the EPA as part of the EG. Depending on the form of the BSER and the degree of emission limitation in a particular EG, the EPA may need to do additional work to calculate standards of performance that reflect this level of stringency. For example, an EG may translate the degree of emission limitation into a presumptive standard in the form of numerical emission rates, which a Federal plan could simply adopt as the requisite standards of performance. However, if an EG provides the degree of emission limitation in a form other than presumptive numerical standards, and the EPA may need to calculate appropriate standards of performance in the context of a Federal plan. Further, CAA section 111(d)(2) requires the EPA to consider RULOF for sources in the source category in setting standards of performance as part of a Federal plan which requires the EPA to identify whether the remaining useful lives of relevant designated facilities, among other appropriate factors, merit the EPA establishing different standards of performance for those facilities. The development of a Federal plan may also necessitate that the EPA determine appropriate testing, monitoring, reporting, and recordkeeping requirements to implement the standard if the EG does not provide presumptive requirements to address those aspects of implementation. Further, the EPA will need to consider associated compliance times for designated facilities in circumstances where they are not provided by an EG, or in cases where a standard of performance is adjusted to account for RULOF. There may also be situations where IoPs are warranted,
and the EPA will correspondingly need to identify and determine the appropriate IoPs. The development of a Federal plan with these components, or of significant revision to a Federal plan, will also include elements of meaningful engagement, as finalized in this action including revision to section 40 CFR 60.29a and as further described in section III.C. of this preamble.
Once the recommendations for each component are developed, the workgroup presents them to Agency decision-makers for review. After the Agency completes its internal decision-making process, the workgroup proceeds to prepare a written notice of proposed rulemaking. The proposal must include the following elements, as required by CAA section 307(d)(3): the factual data on which the proposed rulemaking is based; the methodology used in obtaining the data and in analyzing the data; and the major legal interpretations and policy considerations underlying the proposed rulemaking. These elements must be thoroughly developed and explained in the proposal to meaningfully provide the public adequate information to comment on the proposal. The EPA may further develop a technical support document as record support for the proposal.
The draft proposed rulemaking and any record support are then reviewed by the relevant EPA offices and processed for signature. The signed notice of proposed rulemaking is then submitted for publication in the
Federal Register
. To develop the proposed Federal plan rulemaking, establish unique standards for RULOF, allow review of materials by senior management, go through an interagency review process and have the package signed typically requires a minimum of between six to nine months to complete.
As previously noted, the EPA's promulgation of a Federal plan is subject to the requirements of CAA section 307(d), which includes providing the public with an opportunity to provide an oral presentation at a public hearing. CAA section 307(d)(5). The Federal Register Act requires the EPA to provide sufficient notice of a public hearing, which (in the absence of a different time specifically prescribed by the relevant Act of Congress) is satisfied if the EPA provides at least 15 days' notice. 44 U.S.C. 1508. Section 307(d)(5) of the CAA further provides that the EPA must keep the record for the proposed action open for public comment for 30 days after any public hearing for the submission of rebuttal and supplemental information. Because the EPA reasonably expects to provide notice of the required public hearing at the time its proposed action is published in the
Federal Register
,
in order to allow for both a 15-day notice of the public hearing and a subsequent 30-day comment period on the open record, the EPA should allow for at least 45 days for public comment on the notice of proposed action.
As with state plans, because of the types of sources and pollutants regulated under CAA section 111(d), the EPA reasonably anticipates that many of its proposed actions on a Federal plan will garner significant public interest from individuals, industry, states, and environmental and public health advocates. After completion of the comment period, the EPA then reviews all comments and determines whether, based on any comment, it should alter any components of the proposed Federal plan, or further augment the legal, policy, and technical rationales supporting that proposed action. Additionally, in the EPA's experience, comments may include technical information that was not in front of the Agency at the time of proposal. In the event technical data are received as part of comments on the proposed action, the EPA would then be required to review the new data and evaluate whether and how it should affect the EPA's proposed Federal plan. If a substantive comment is raised that merits reconsideration of any component in the proposed Federal plan, the EPA would need to repropose the plan.
Once this review of comments is complete, the workgroup drafts and presents updated recommendations for internal review and decision making. Once the Agency completes its internal decision-making process, the workgroup then drafts a notice of final rulemaking, which includes responses to comments and any necessary record support, and final regulatory text as the Federal plan directly regulates certain designated facilities. The draft final action is then reviewed by relevant offices within the Agency prior to signature of the final rule promulgating the Federal plan. The EPA typically anticipates that the process of reviewing comments received, making corresponding changes to the rulemaking, and promulgating the final Federal plan to be between 4 and 8 months.
The duration of each step in this deliberative process varies. The amount of time the EPA needs to develop, propose, and finalize a Federal plan depends in part of the plan's complexity and the nature of the technical, policy, and legal issues that it implicates. For example, some states needing a Federal plan may have thousands, if not hundreds of thousands, of designated facilities for which the EPA will need to establish standards of performance and implementation measures, while other Federal plans may be significantly smaller in scale. Similarly, the amount of time needed to respond to comments and issue a final rule depends in part on the number and type of comments received on the EPA's proposed rulemaking. Additionally, the EPA reasonably anticipates that it may need to promulgate a Federal plan for multiple states at a given time, which can amplify the amount of time and work needed.
In response to this proposed timeline, several commenters asserted that the EPA should provide itself more than the proposed 12 months to promulgate a Federal plan, with some commenters noting additional time needed for the EPA to provide for meaningful engagement and consideration of RULOF. However, based on the assessment as presented in the preceding paragraphs, recognizing that much of the evaluation needed for promulgating a Federal plan will be performed by the EPA during development of the EG, considering the need for expeditious implementation of EGs, and noting that RULOF is expected to only be needed for certain limited circumstances, the EPA is finalizing the requirement that it promulgate a Federal plan within 12 months once its obligation to do so is triggered,
i.e.,
either the date required for submission of a state plan (for states that fail to submit a complete plan) or the date the EPA disapproves a state's plan. As with the other timelines in subpart Ba, the EPA may supersede the 12 month timeline for a Federal plan as appropriate depending on the circumstances of the applicable EG.
The EPA also recognizes that some commenters stated that the EPA need not and should not wait for its Federal plan obligation to be “triggered” to begin developing such a plan. The EPA agrees that early development of the Federal plan, where possible before the EPA's obligation is formally triggered, could provide the EPA with additional time to meet this deadline. The EPA notes that to further streamline the timeline associated to the issuance of a Federal plan, the EPA is also finalizing the proposed change to the trigger for the EPA's obligation and timeline to provide a Federal plan for states that do not submit a timely plan. That discussion is found in section III.B. of this preamble.
Thus, the EPA is finalizing as proposed the revisions to 40 CFR 60.27a(c) providing that the Agency will promulgate a Federal plan at any time within 12 months of any of the triggers in § 60.27a(c)(1) and (2). While retaining the authority to supersede this timeline in an EG if appropriate, the EPA has determined that 12 months reasonably accommodates the amount of time that the EPA needs to undertake the process, steps, and the considerations described above, while ensuring that an EG is expeditiously implemented. The process and steps described earlier that the EPA must be taken in promulgating a Federal plan highlight the fact that it would be unreasonable, if not an impossibility, to accomplish all of the steps in a legally and technically sound manner within a 6-month timeframe as required under subpart B.
31
31
While the EPA would have the discretion to promulgate a Federal plan more quickly than 12 months where specific circumstances allow (
e.g.,
where there are no public comments on the proposed action), the EPA does not believe that would be reasonably possible to act significantly more quickly than 12 months in most cases.
As with the EPA's finalized timeline to act on state plan submissions, 12 months is generally the period of time in which the EPA can both expeditiously complete a Federal plan
and
ensure it is technically and legally sound. Therefore, this time period considers potential impacts to public health and welfare by giving the EPA a reasonably expeditious timeframe to promulgate a Federal plan that contains appropriate and protective emission reduction measures. This is especially true in the context of a Federal plan, where there is otherwise no state plan in place that is adequately protective of public health and welfare. If the EPA does not have adequate time to promulgate a Federal plan, its ability to ensure the plan contains appropriate measures to satisfactorily implement and enforce the standards necessary to comply with the EG may be compromised, which would in turn compromise the EPA's ability to ensure that the public health and welfare objectives of the EG are satisfied.
The EPA notes that a state may submit a plan to replace a Federal plan, even after the state plan submission deadline. However, once the EPA's authority and obligation to promulgate a Federal plan has been triggered, the act of a state submitting a plan alone does not abrogate the EPA's authority or obligatory timeline to promulgate a Federal plan. Only an approved state plan can supplant an already promulgated Federal plan or abrogate the EPA's responsibility to timely promulgate a Federal plan. Where a state submits a late plan, that may have the practical effect of concurrent timelines for promulgation of the Federal plan and the EPA's action on that late state plan; the EPA is not obligated to act on a late state plan prior to promulgating a Federal plan (40 CFR 60.27a(d)).
5. Timeline for Increments of Progress (IoPs)
As part of the EPA's statutory responsibility to determine the degree of emission limitation achievable through application of the BSER and to include it in an EG, the EPA also determines in an EG “the time within which compliance with standards of performance can be achieved.” 40 CFR 60.22a(b)(5). Accordingly, state plans must include both standards of performance for designated facilities and compliance schedules for achieving those standards of performance.
32
32
“Each plan shall include standards of performance and compliance schedules.” 40 CFR 60.24a(a).
In 1975, the EPA defined in subpart B “compliance schedule” as “a legally enforceable schedule specifying a date or dates by which a source or category of sources must comply with specific standards of performance contained in a plan or with any increments of progress to achieve such compliance.” In subpart B the EPA also defined “increments of progress” as steps to achieve compliance which must be taken by an owner or operator of a designated facility including: (1) submittal of a final control plan for the designated facility to the appropriate air pollution control agency; (2) awarding of contracts for emission control systems or for process modifications, or issuance of orders for the purchase of component parts to accomplish emission control or process modification; (3) initiation of on-site construction or installation of emission control equipment or process change; (4) completion of on-site construction or installation of emission control equipment or process change; and (5) final compliance. The EPA adopted these definitions without change when it promulgated subpart Ba in 2019.
Subpart B requires that each state plan include emission standards and compliance schedules. 40 CFR 60.24a. In addition, subpart B specifies in 40 CFR 60.24(e)(1) that any compliance schedule extending more than 12 months from the date required for submittal of the plan must include legally enforceable increments of progress to achieve compliance for each designated facility or category of facilities. Unless otherwise specified in the applicable subpart, increments of progress must include, where practicable, each increment of progress specified in § 60.21(h) and must include such additional increments of progress as may be necessary to permit close and effective supervision of progress toward final compliance. The provision in 40 CFR 60.24(e)(1) was amended in 2000.
33
The 2000 amendments to 40 CFR 60.24(e)(1) added the words “Unless otherwise specified in the applicable subpart” to the requirements associated with IoPs. The EPA described in the 1999 proposal that the purpose of this amendment was to allow the EPA, in a specific subpart, discretion in the number of IoPs that a designated facility must meet. Without this amendment subpart B required designated facilities to meet all five IoPs specified in the IoP definition. In the 1999 proposal the EPA recognized that while for some categories of designated facilities the five increments are appropriate, all five IoPs may not be necessary to ensure compliance for other categories of designated facilities. Therefore, EPA proposed and finalized amendments to 40 CFR 60.24(e) to allow discretion and flexibility in establishing IoPs for a particular subpart.
33
65 FR 76380 (Dec 6, 2000).
In promulgating subpart Ba in 2019, the EPA largely carried over the requirement of subpart B at 40 CFR 60.24(e)(1) in a new provision 40 CFR 60.24a(d).
34
However, to align the trigger of IoPs in 40 CFR 60.24a(d) to the updated timelines it was finalizing in subpart Ba, in 2019 the EPA adopted a timeframe trigger for IoPs of 24-months instead of the 12-months as in subpart B. Per the finalized 2019 subpart Ba provision at 40 CFR 60.24a(d), unless otherwise specified in the applicable subpart, any compliance schedule extending more than 24 months from the date required for submittal of the plan must include legally enforceable IoPs to achieve compliance for each designated facility or category of facilities. As discussed previously, the D.C. Circuit vacated the extended implementation timelines in subpart Ba, including the 24-months timeline trigger for IoPs in 40 CFR 60.24a(d).
35
34
In promulgating Ba in 2019, the EPA specified that for “For those provisions that are being carried over from the existing implementing regulations into the new implementing regulations, the EPA is not intending to substantively change those provisions from their original promulgation and continues to rely on the record under which they were promulgated.” 84 FR 32520 (July 8, 2019).
35
Petitioners did not challenge, and the court did not vacate in
ALA,
the substantive requirement for or definition of increments of progress.
To address the vacated timeline trigger of IoPs in 40 CFR 60.24a(d), the EPA proposed in 2022 that, unless otherwise specified in the applicable subpart, any compliance schedule extending more than 16 months from the date required for submittal of the plan must include legally enforceable IoPs to achieve compliance for each designated facility or category of facilities. The proposed 16-month trigger for IoPs overlapped with the EPA's proposed 60-day completeness review following a state plan submittal and the proposed 12-month period for the EPA to review and take action on the state's plan and would have further provided a 2-month buffer after the timeline for the EPA's action on a state plan (occurring no later than 14 months after the plan submission deadline under these general implementing regulations). In the 2022 proposal the EPA recognized the proposed 16-month timeframe trigger for IoPs provided a 2-month time buffer between the EPA's action on a state plan and the trigger of IoPs. As proposed, this 2-months buffer was less than both the 8 months previously provided by subpart B and the 6-month buffer provided by the vacated subpart Ba timeline.
In response to the proposed 16-month IoPs timeframe trigger, several commenters asserted the proposed 2-month buffer from the time of the EPA's action on a state plan to the trigger of IoPs is not practically workable. Some commenters argued that, assuming that there could be a required increment of progress right after the 16-months trigger and the EPA has 14 months to take final action on a state plan, the designated facilities would have only two months to comply with the requirement after it becomes federally enforceable. Other commenters similarly noted that if final compliance was required just after the 16-month trigger, designated facilities would similarly have only two months to complete any IoPs. The commenters explained that it is unduly burdensome for sources to expend resources on developing hypothetical final control plans and committing resources to construction projects that may ultimately be inconsistent with the EPA's action on a state plan. Several commenters that opposed the 16-months proposed timeframe trigger for IoPs suggested that the EPA extend the trigger to more than 24-months, consistent with the previously vacated subpart Ba. Some commenters argued that 24 months is the minimum time necessary to develop control strategies, design plans, procure construction materials and/or equipment, and complete the installations often necessary for compliance. Other commenters suggested that a 10-month buffer from the EPA action on a state plan to the trigger for IoPs would also be acceptable and even preferred, should the EPA miss its approval deadlines.
After consideration of comments and accounting for the discretion that EPA has in establishing IoPs in a particular EG, the EPA is extending the buffer associated with the trigger of IoPs from 2 months to 6 months, so that, unless otherwise specified in the applicable subpart, any compliance schedule extending more than 20 months from the date required for submittal of the plan must include legally enforceable IoPs to achieve compliance for each designated facility or category of facilities.
The EPA emphasizes that the timeline for the trigger for IoPs merely signals when the gap between state plan submission and final compliance is long enough that the EPA must consider whether IoPs are necessary. It is not the case that any EG with a final compliance date after the trigger for consideration of IoPs will necessarily require all of the increments listed in 40 CFR 60.21a(h). The EPA is required, per 40 CFR 60.22a(b)(4), to include within an EG “[i]ncremental periods of time normally expected to be necessary for the design, installation, and startup of identified control systems.” These incremental periods are determined within an EG through notice and comment rulemaking, providing an opportunity for appropriate consideration of the reasonable time needed for the designated facilities to meet the requirements associated with the pertinent standards of performance. As provided by subpart Ba, the EPA will determine in an individual EG whether IoPs are needed to achieve final compliance with the standards of performance and, if increments are needed, how many and the timeframes associated with compliance of such IoPs. However, the EPA also believes that the trigger requirement for IoPs should attach to plans that contain compliance periods that are longer than the period provided for the EPA's review of such plans and in addition provide a reasonable buffer after the EPA has acted on such plans so that designated facilities could reasonably comply with required increments. After further consideration, the EPA believes that a default 2-month buffer between an EPA action on a state plan and a hypothetical compliance deadline for a full set of IoPs is not generally sufficient.
In 2019, the EPA promulgated a trigger for IoPs of 24-months given that it was finalizing a period of up to 18 months for its action on state plans (
i.e.,
12 months from the determination that a state plan submission is complete, which could occur up to six months after receipt of the state plan). The 24-month period would have provided a 6-month buffer for designated sources to comply with any IoPs after the EPA acted on state plans. In this action, the EPA is finalizing a trigger for consideration of IoPs that provides the same buffer provided by the EPA in the 2019 vacated increment of progress timeline trigger. The EPA believes a 6-month buffer is generally needed to appropriately balance ensuring designated facilities control emissions of harmful pollutants as expeditiously as reasonably possible with the need for designated facilities to have reasonable certainty regarding their federally enforceable regulatory compliance obligations with sufficient time before those obligations are due. In addition, the EPA determines that the 6-months buffer provides a reasonable time to come into compliance with any potential increment of progress when compliance date that extends more than 20 months from the date required for submittal of the plan. Per the EPA's assessment of the comments and in light of the
ALA
court decision, the EPA determines that a 6-month timeframe buffer before the trigger for requirements associated with IoPs provides is the most reasonable expeditious period of time associated with the requirements for IoPs in 40 CFR 60.24a(d). While some commenters argued more time is necessary to develop control strategies, design plans, procure construction materials and/or equipment, and complete the installations often necessary for compliance, the final requirements in subpart Ba does not express the EPA's intent to require that states require designated facilities to complete all potential IoPs in a 6-month period.
Several commenters also urged the EPA to link the timelines for IoPs to the date on which the EPA takes final action on a state plan, instead of with the state plan submittal deadline. However, given that there will typically be a single final compliance date specified in an EG but the dates on which the EPA takes final action on individual states plans are likely to be many and varied based on,
inter alia,
when each state plan was submitted to the Agency, such an approach would create unnecessary confusion about whether IoPs must be
implemented and potentially uneven application of the requirement for state plans to include IoPs. It could also create a perverse incentive for states to delay submission of their state plans. Additionally, the timeline for IoPs initiates from the state plan submittal deadline because it is the earliest instance when all standards of performance in all timely state plans will be enforceable. It is a requirement of state plans, when submitted, to be enforceable at the state level and thus all designated facilities subject to a standard of performance in a state plan will have assurance of their requirements at the state level and can start planning for compliance while the EPA reviews and acts on the state plan.
The timeline for IoPs finalized in this action will ensure standards of performance are implemented as expeditiously as possible so that the intended emission reductions are achieved, and the public health and welfare are protected.
B. Federal Plan Authority and Timeline Upon Failure To Submit a Plan
CAA section 111(d)(2)(A) provides that the EPA has the same authority “to prescribe a plan for a State in cases where the State fails to submit a satisfactory plan as he would have under section 7410(c) of this title in the case of failure to submit an implementation plan.” The original implementing regulations in subpart B provide that the EPA is to “promptly prepare and publish proposed regulations setting for a plan, or portion thereof, for a State if:” a state fails to submit a plan within the time prescribed, the state fails to submit a plan revision within the time prescribed or the Administrator disapproves a state plan or plan revision or any portion thereof. 40 CFR 60.27(c). Subpart B further requires the EPA to promulgate the plan proposed under paragraph (c) “within six months after the date required for submission of a plan or plan revision . . . unless, prior to such promulgation, the State has adopted and submitted a plan or plan revision which the Administrator determines to be approvable.” 40 CFR 60.27(d).
In promulgating subpart Ba in 2019, the EPA incorporated language in the provisions associated with the Actions by the Administrator in 40 CFR 60.27a(c) from CAA sections 110(c)(1)(A) and 110(k)(1)(B) addressing the circumstances which trigger the EPA's authority under CAA section 111(d)(2) for promulgating a Federal plan. Specifically, in 2019 the EPA adopted language at 40 CFR 60.27a(c)(1) that requires the EPA to promulgate a Federal plan after it “
[f]inds
that a state fails to submit a required plan or plan revision or
finds
that the plan or plan revision does not satisfy the minimum criteria under” 40 CFR 60.27a(g),
i.e.,
the completeness criteria (emphasis added). Pursuant to the amendments being finalized in this action, the EPA will be required, under 40 CFR 60.27a(g), to determine whether completeness criteria have been met no later than 60 days after the date by which a state is required to submit a plan (see section III.A.2. of this preamble). These provisions under subpart Ba taken together would mean that, no later than 60 days after the state plan submission deadline has passed, the EPA must make a finding (often referred to as a “finding of failure to submit”) as to whether any states have failed to submit a plan that meets the completeness criteria, and such finding is what triggers the EPA's obligation and timeline to promulgate a Federal plan.
36
36
Note that this procedure does not address circumstances when the EPA promulgates a Federal plan for states whose plan is disapproved. In these circumstances, the state has submitted a plan so no finding of failure to submit is issued. The EPA's obligation and timeline to promulgate a Federal plan in this instance arises from the EPA's disapproval based on its conclusion that the state plan submission was unsatisfactory.
At proposal, the EPA acknowledged that in the CAA section 110 context, it has not always timely met its obligation to issue a finding of failure to submit, which in turn delays the timing for when the EPA promulgates a FIP to achieve the necessary emission reductions. Accordingly, the EPA proposed to streamline the process in the subpart Ba context to ensure that the emission reductions anticipated by the EG are realized in a timely way through the promulgation of any necessary Federal plan. In particular, the EPA proposed revisions to 40 CFR 60.27a(c)(1) consistent with the framework and requirements that have been effective in subpart B since 1975. As proposed the Administrator would issue a Federal plan if a state fails to submit a plan within the time prescribed without requiring the EPA to affirmatively issue a finding of failure to submit before the EPA's obligation to issue a Federal plan is triggered.
As explained in the notice of proposed rulemaking, as part of evaluating ways to streamline the steps leading to promulgation of a final Federal plan, the EPA considered the value and role of issuing findings of failure to submit in this process. A finding of failure to submit was intended to serve three purposes under subpart Ba, consistent with its purpose under CAA section 110: to notify the public of the status of state plan submissions (
i.e.,
providing transparency to the process); to notify states that the EPA has not received a plan; and to formally start the clock for the EPA to promulgate a Federal plan. While these concepts may have some utility as part of the overall Federal plan development and implementation process, the EPA finds that in the CAA section 111(d) context there is minimal value in coupling the notification aspects of a finding of failure with the initiation of the clock for the EPA to promulgate a Federal plan. These aspects are not inextricably linked to one another in that nothing about a formal finding of failure to submit substantively informs the development of a Federal plan; the EPA has the information it needs to know which states have and have not submitted complete plans. By decoupling the timeline from the finding of failure to submit, the EPA's obligation to promulgate a Federal plan can be triggered without the interim step and potential lag associated with issuing a formal finding of failure to submit notification. By removing this interim process, the EPA will be required to promulgate the Federal plan more expeditiously, and, in turn, overall implementation of the corresponding EG will be timelier. Finalizing this amendment is also consistent with the spirit of the
ALA
decision, where the D.C. Circuit emphasized the need for implementation timelines that consider potential impacts on public health and welfare. By expeditiously and efficiently promulgating a Federal plan and by removing an interim step of a finding of failure, the EPA is further addressing the potential impacts of implementation times on health and welfare.
Some commenters requested that the EPA retain a separate “finding of failure to submit” action as the trigger for starting the timeline on a Federal plan. They note that the “finding of failure” provides notification to the states, regulated community, and public of the failure, as state submissions can be difficult to track. Commenters also note that the need to first provide the finding also provides additional time for the states to submit plans or revisions. One commenter noted that the EPA should retain the “finding of failure to submit” procedure and avoid establishing automatic deadlines for itself on a schedule that, based on past experience, it is almost certain to miss.
First, the EPA notes that where a state has failed to timely submit a state plan, the absence of a state plan submission should be easy to track for the state,
regulated community, and public; many, if not all, states maintain public websites on which they document their submissions to the EPA. The EPA expects that notification and tracking capabilities will also generally be much improved through the use of electronic submittal (see section III.F. of this preamble) and increasing public access to online information.
Second, the EPA stresses that the purpose of using a finding of failure to submit as the trigger for Federal plan development was not to give states time to develop and submit their state plans in excess of the regulatorily allotted timeframes. In this action, the Agency is finalizing timeframes for state plan submissions that are reasonably achievable and that may be superseded where necessary. Decoupling the finding of failure to submit and the trigger of state plan development should therefore not impact states' abilities to develop and submit satisfactory state plans. States always have the ability to submit state plans and state plan revisions at any time. Additionally, while the EPA recognizes that it has not always provided timely Federal plans, the Agency does not believe that changing the starting point for its Federal plan clock from a finding of failure to submit to the day after state plan submission are due will have an appreciable impact on its ability to do so. Notably, the trigger for its timeline will not change the length of time the EPA has to promulgate a plan. While the commenter implies that the EPA would use the time before it has made a finding of failure to submit to start working on a Federal plan, it is not reasonable to assume that the Agency is in a position to start developing such a plan before it has had a chance to determine if a state plan is incomplete. Therefore, the EPA is finalizing its proposed approach of removing from subpart Ba a finding of failure to submit as the trigger for starting the timeline for a Federal plan. The approach being finalized in subpart Ba is consistent with the framework and requirements that have been effective in subpart B since 1975. The regulatory text at 40 CFR 60.27a(c)(1) is being revised slightly relative to proposal to clarify that the 12-month clock starts running the day after the state plan submission deadline for instances in which a state fails to submit a plan or plan revision by that deadline, and the day after state plan submissions would be deemed complete by operation of law (
i.e.,
60 days after the state plan submission deadline) for instances in which a state plan has been submitted but deemed incomplete.
37
These revisions merely clarify the EPA's intent at proposal to ensure that all states and stakeholders have a clear understanding of the timeline for promulgation of a Federal plan. As discussed in section III.A.4. of this preamble, the EPA is finalizing the requirement that it will have 12 months from the state plan deadline to promulgate a Federal plan for states that do not submit a plan. Note, the EPA is also finalizing a deadline of 12 months to promulgate a Federal plan for states whose plans are disapproved, but in those instances the EPA's obligation and timeline to provide a Federal plan are triggered off of its disapproval of a state plan.
37
As discussed in section III.A.2., if a state submits a plan but that submission does not contain the elements required by the completeness criteria, the EPA would find that the state has failed to submit a complete plan and notify the state through a letter. That letter is for notification only and, although the EPA intends to issue such letters expeditiously, it does not start the clock for a Federal plan.
The EPA notes that this amendment to subpart Ba does not affect the EPA's obligation under CAA section 110(c) to promulgate a FIP within 2 years of making a finding that a state has failed to submit a complete SIP. In the case of the CAA section 110, the obligation for the EPA to first make a finding of failure to submit is derived from the statute, whereas nothing in CAA section 111(d) obligates the EPA to make such a finding before promulgating a Federal plan. CAA section 111(d)(1) directs the EPA to promulgate a process “similar” to that of CAA section 110, rather than a process that is identical. Therefore, the fact that a finding of failure to submit serves as the legal predicate for the EPA's obligation to issue a FIP under CAA section 110 does not mean that the EPA is also required to treat such a finding as a legal predicate for a Federal plan under CAA section 111(d).
In summary, while recognizing that a finding of failure to submit can have value in notifying states and the public of the status of plans, the EPA does not find that it is integral to the process of promulgating a Federal plan for states that do not submit plans. Further, the requirement for the EPA to issue a finding of failure can result in significant unwarranted delays in EG implementation. The EPA is therefore finalizing the proposed amendment that this finding will no longer be the event that triggers the timeline for the EPA's issuance of a Federal plan. 40 CFR 60.27a(c)(1). While the EPA will not publish a formal finding of failure to submit in the
Federal Register
, the Agency will notify the states and the public of a failure to submit expeditiously following the state plan submission deadline or deadline for EPA determinations of completeness, as applicable. Additionally, the EPA notes that the completeness criteria in 40 CFR 60.27a(g) were promulgated in 2019, 84 FR 32520, 32578 (July 8, 2019), and, while the EPA is removing finding of failure to submit as the trigger for promulgation of a Federal rule, it emphasizes that states may have discussions with the EPA and submit revised state plans at any point. That is, there remains within this framework ample opportunity for iterative state plan development.
The regulatory provision at 40 CFR 60.27a(c)(1), as finalized, is consistent with the requirement that applies regarding the EPA's issuance of a Federal plan under subpart B. In subpart B (
i.e.,
applicable to implementing regulations for CAA section 111(d) EGs promulgated on or prior to July 8, 2019, and currently applicable implementing regulations for CAA section 129 EGs), the EPA's obligation to promulgate a Federal plan is triggered by the state plan submission deadline.
C. Outreach and Meaningful Engagement
The fundamental purpose of CAA section 111 is to reduce emissions from certain stationary sources that cause or significantly contribute to air pollution which may reasonably be anticipated to endanger public health or welfare. Therefore, a key consideration in the state's development of a state plan, in any significant plan revision,
38
and in the EPA's development of a Federal plan or significant plan revision, pursuant to an EG promulgated under CAA section 111(d) is the potential impact of the proposed plan requirements on public health and welfare. A robust and meaningful public participation process is critical to ensuring that the full range of these impacts are understood and considered.
38
A significant state plan revision includes, but is not limited to, any revision to standards of performance or to measures that provide for the implementation or enforcement of such standards.
States often rely primarily on public hearings as the foundation of their public engagement in their state plan development process because a public hearing has always been explicitly required pursuant to the applicable regulations. The existing provisions in subpart Ba (40 CFR 60.23a(c) through (f)) detail the public participation requirements associated with the development of a state plan. Per these implementing regulations, states must
provide certain notice of, and conduct one or more public hearings on, their state plan before such plan is adopted and submitted to the EPA for review and action.
39
The EPA is not reopening these basic and long-standing public hearing requirements in this rulemaking. However, as explained in the notice of proposed rulemaking,
40
robust and meaningful public involvement in the development of a plan should sometimes go beyond the minimum requirement to hold a public hearing depending on who may be most affected by and vulnerable to the impacts being addressed by the plan. Because the CAA section 111(d) program addresses existing facilities, some of which may be decades old, it is possible that impacted communities may not have had a voice in the process when the source was originally constructed, or previous outreach may have focused largely on engaging the industry. The EPA proposed amendments to 40 CFR part 60, subpart Ba, were intended to strengthen the public participation provisions and ensure that all affected members of the public, not just a particular subset, have an opportunity to participate in the pollution control planning process by requiring meaningful engagement with pertinent stakeholders in the state's development of a state plan, in any significant plan revision, and in the EPA's development of a Federal plan pursuant to an EG promulgated under CAA section 111(d).
39
States may cancel a public hearing if no request for one is received during the required notification period. 40 CFR 60.23a(e).
40
87 FR 79176, 79190-92 (Dec. 23, 2022).
The EPA proposed to add meaningful engagement with pertinent stakeholders in 40 CFR 60.23a(i) and 60.27a(f) and add the definition of meaningful engagement and of pertinent stakeholders in 40 CFR 60.21a. The EPA proposed to define meaningful engagement as it applies to this subpart as timely engagement with pertinent stakeholder representation in the plan development or plan revision process. Such engagement must not be disproportionate nor favor certain stakeholders. It must include the development of public participation strategies to overcome linguistic, cultural, institutional, geographic, and other barriers to participation to assure pertinent stakeholder representation, recognizing that diverse constituencies may be present within any particular stakeholder community. It must include early outreach, sharing information, and soliciting input on the state plan. The EPA also proposed to evaluate the approvability of state plans based on the components of the meaningful engagement definition.
The EPA proposed that pertinent stakeholders “. . . include, but are not limited to, industry, small businesses, and communities most affected by and vulnerable to the impacts of the plan or plan revision.” Additionally, to ensure that a robust and meaningful public engagement process occurs as the states develop their CAA section 111(d) plans, the EPA proposed to amend the requirements in 40 CFR 60.27a(g) to include, as part of the completeness criteria, the requirement for states to demonstrate in their plan submittal how they provided meaningful engagement with the pertinent stakeholders. The state would be required to provide, in their plan submittal: (1) a list of the pertinent stakeholders identified by the state; (2) a summary of engagement conducted; and (3) a summary of the stakeholder input received.
Most of the comments received on the proposed meaningful engagement requirements and proposed definitions were supportive of including meaningful engagement in the development of the state plans. Several commenters stated that they supported the inclusion of environmental justice considerations in Federal programs, including requirements for meaningful engagement. In particular, one commenter stated that outreach and meaningful engagement with stakeholders, specifically including communities most affected by and vulnerable to the pollution that would be reduced by a state plan, is an important and overdue step to ensuring that impacted communities have a voice in a process that directly impacts their health and welfare. While several commentors affirmed the EPA's authority to require meaningful engagement, some commenters said that the EPA lacks such authority. One of the commenters argued that the EPA lacks authority to require consideration of public health and welfare under CAA section 111(d) because CAA section 111 was devised as a technology-based approach to controlling emissions from stationary sources, not one predicated on the setting of standards directly and exclusively based on public health and welfare needs. One of the commenters stated the EPA lacks the authority to pass judgment on state plans submitted pursuant to CAA section 111(d) based on public engagement and argued that the only statutory requirement in CAA section 110 (which 111(d) cross-references) is the requirement that states provide “reasonable notice and public hearings” prior to adoption of a state plan.
Several commenters supported the EPA's definition of meaningful engagement and the proposed meaningful engagement requirement. Additionally, some comments supported the state plan approvability requirements for meaningful engagement and recommended that the EPA also require an accounting of what states have done with stakeholder input and how that input was used or not used in their state plan.
Several commenters expressed the need for additional resources in order to conduct meaningful engagement, both for states and communities. Some of the comments stated that the EPA needs to consider how these increased requirements may strain already limited state resources. One commenter said that resources needed to fulfill the requirements for meaningful engagement, including costs associated with identifying and contacting stakeholders, renting of rooms or spaces for multiple public meetings, travel, and associated staff time, will be significant and burdensome to states.
There were several comments requesting clarification on the definition of meaningful engagement, and on the proposed approvability requirements for meaningful engagement. Some commenters requested that the rule provide more clarity on what states need to do for meaningful engagement and provide a clear path for states to develop an approvable meaningful engagement demonstration. Similarly, other commenters recommended the EPA establish a more detailed definition and provide examples of best practices for states to follow in implementing meaningful engagement, particularly with vulnerable communities, and further clarify what is meant by meaningful engagement with pertinent stakeholders. Some commenters cited lack of clarity in expressing their concern with meaningful engagement being a requirement for state plan approvability.
Based on comments received, the EPA has revised the proposed definition of meaningful engagement and is finalizing revisions that are flexible enough to serve the unique needs of states and their stakeholders, rather than relying on the more prescriptive approach of the proposal. The EPA recognizes that states will generally be in the best position to understand how to meaningfully engage pertinent stakeholders within their borders as they develop state plans. The EPA also believes that states and the Federal Government may learn from each
other's efforts to meaningfully engage pertinent stakeholders. The EPA further recognizes that appropriate approaches to meaningful engagement, as well as the time and resources needed, will be highly dependent on characteristics of the source category—such as the number and location of designated facilities—as well as on the type of health or environmental impacts of the emissions addressed by an EG. Additionally, as noted by a number of commenters, states are highly diverse in, among other things, their local conditions, resources, and established practices of engagement. Also as noted by commenters, vulnerable communities are highly diverse in, among other things, their technical capacities, access to resources for meaningful participation (
e.g.,
geographic distribution, transportation, childcare), languages, and available representation.
For these reasons, rather than finalizing prescriptive substantive requirements for how states should conduct meaningful engagement, the EPA is requiring in subpart Ba that states, in their state plan submissions or significant plan revisions, describe the efforts they undertook to meaningfully engage pertinent stakeholders, what input they received from stakeholders, and how that input was used or not used in their state plan. The EPA will also include this information when promulgating Federal plans or significant plan revisions. In addition, the EPA is describing some current best practices for meaningful engagement in this preamble that states may consider, that and which the Agency expects will continue to develop as states experiment with different types of meaningful engagement and share their experiences through state plans.
Consistent with these changes, the EPA is finalizing the definition of meaningful engagement, as it applies to subpart Ba, as follows: “. . . timely engagement with pertinent stakeholders and/or their representatives in the plan development or plan revision process. Such engagement should not be disproportionate in favor of certain stakeholders and should be informed by available best practices.” States should therefore make a good faith effort to ensure that they are engaging in a proportionate manner with all pertinent stakeholders. The EPA is also finalizing, as proposed, a definition of “pertinent stakeholders.” Pertinent stakeholders “include, but are not limited to, industry, small business, and communities most affected by and/or vulnerable to the impacts of the plan or plan revision.” Finally, the EPA is including in subpart Ba the three proposed completeness criteria requirements for meaningful engagement at 40 CFR 60.27a(g)(2)(ix) and adding a fourth completeness criterion, which will require state to include in their plans a description of how stakeholder input was considered in the development of the state plan or plan revisions.
The EPA expects that the finalized approach to meaningful engagement in state plans will provide the flexibility needed to allow states to address specific and unique issues in their states and to appropriately communicate with and respond to their stakeholders during the notice and comment process. As revised, the meaningful engagement component finalized here strengthens the framework for public participation in state plan development, a long-standing cornerstone of the cooperative federalism structures of CAA sections 110 and 111(d). The meaningful engagement component finalized here is intended to promote equitable opportunities to participate in the planning process for all stakeholders, as opposed to dictating a specific approach or set of practices that constitute meaningful engagement.
To support the goals outlined above, and in response to comments received, the EPA is finalizing the proposed completeness criteria that require documentation of meaningful engagement, including adding a fourth completeness criterion, but the EPA is not finalizing specific requirements for what types of outreach meaningful engagement must include in subpart Ba. The fourth completeness criterion will require states to include a description of how stakeholder input from the meaningful engagement process was considered in the development of the plan, which the EPA expects will both bolster accountability to stakeholders and assist states in ensuring that their meaningful engagement processes are additive to the public hearing and notification processes which has always been required under subpart Ba. See 40 CFR 60.27a(g)(1)(ix). While the EPA finds that the requirements finalized in this action are sufficient and appropriate for the general CAA section 111(d) implementing regulations, the EPA may provide additional guidance pertaining to meaningful engagement in specific EGs.
While the EPA is revising the definition of meaningful engagement relative to proposal, the definition of pertinent stakeholders is being finalized as proposed. Pertinent stakeholders include, among other stakeholders, industry, small business, and communities—in particular, communities who are most affected by and vulnerable to the health or environmental impacts of pollution from the designated facilities addressed by the plan or plan revision. Increased vulnerability of communities may be attributable to, among other reasons, an accumulation of negative environmental, health, economic, or social conditions within these populations or communities, and a lack of positive conditions. Examples of such communities have historically included, but are not limited to, communities of color (often referred to as “minority” communities), low-income communities, Tribal and indigenous populations, and communities in the United States that potentially experience disproportionate health or environmental harms and risks as a result of greater vulnerability and/or exposure to environmental hazards. For example, populations lacking the resources and representation to combat the effects of climate change—which could include populations exposed to greater drought or flooding, or damaged crops, food, and water supplies—experience greater vulnerability to environmental hazards. Sensitive populations (
e.g.,
infants and children, pregnant women, the elderly, and individuals with disabilities exacerbated by environmental hazards) may also be most affected by and vulnerable to the impacts of the plan or plan revision depending on the pollutants or other factors addressed by an EG.
Communities in neighboring states or neighboring Tribal nations may also be impacted by a state plan and, if so, are pertinent stakeholders. In addition, to the extent a designated facility would qualify for a less stringent standard through consideration of RULOF as described in section III.E. of this preamble, the pertinent stakeholders would include the communities most affected by and vulnerable to the health and environmental impacts from the designated facility considered in a state plan for RULOF provisions.
The EPA has determined that the definitions of meaningful engagement and pertinent stakeholders in subpart Ba provide the states sufficient specificity while allowing for flexibility in the implementation of meaningful engagement. Meaningful engagement is an enhancement of the exis