ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 52

[EPA-R04-OAR-2022-0012; FRL-9727-01-R4]

Air Plan Approval; Florida; Update to Materials Incorporated by Reference

AGENCY:

Environmental Protection Agency (EPA).

ACTION:

Final rule; notice of administrative change.

SUMMARY:

The Environmental Protection Agency (EPA) is updating the materials that are incorporated by reference (IBR) into the Florida State Implementation Plan (SIP). The regulations affected by this update have been previously submitted by Florida and approved by EPA. In this notice, EPA is also notifying the public of corrections and clarifying changes in the Code of Federal Regulations (CFR) tables that identify material incorporated by reference into the Florida SIP. This update affects the materials that are available for public inspection at the National Archives and Records Administration (NARA) and the EPA Regional Office.

DATES:

This action is effective March 1, 2023.

ADDRESSES:

The SIP materials whose incorporation by reference into 40 CFR part 52 is finalized through this action are available for inspection at the following locations: Environmental Protection Agency, Region 4, 61 Forsyth Street SW, Atlanta, GA 30303; and

www.regulations.gov

. To view the materials at the Region 4 Office, EPA requests that you email the contact listed in the

FOR FURTHER INFORMATION CONTACT

section to schedule your inspection. The Regional Office's official hours of business are Monday through Friday 8:30 a.m. to 4:30 p.m., excluding Federal holidays.

FOR FURTHER INFORMATION CONTACT:

Sarah LaRocca, Air Regulatory Management Section, Air Planning and Implementation Branch, Air and Radiation Division, U.S Environmental Protection Agency, Region 4, 61 Forsyth

Street SW, Atlanta, Georgia 30303-8960. Ms. LaRocca can be reached via telephone at (404) 562-8994 and via electronic mail at

larocca.sarah@epa.gov.

SUPPLEMENTARY INFORMATION:

I. Background

Each state has a SIP containing the control measures and strategies used to attain and maintain the national ambient air quality standards (NAAQS). The SIP is extensive, containing such elements as air pollution control regulations, emission inventories, monitoring networks, attainment demonstrations, and enforcement mechanisms.

Each state must formally adopt the control measures and strategies in the SIP after the public has had an opportunity to comment on them and then submit the proposed SIP revisions to EPA. Once these control measures and strategies are approved by EPA, and after notice and comment, they are incorporated into the federally-approved SIP and are identified in part 52—“Approval and Promulgation of Implementation Plans,” Title 40 of the Code of Federal Regulations (40 CFR part 52). The full text of the state regulation approved by EPA is not reproduced in its entirety in 40 CFR part 52 but is “incorporated by reference.” This means that EPA has approved a given state regulation or specified changes to a given regulation with a specific effective date. The public is referred to the location of the full text version should they want to know which measures are contained in a given SIP. The information provided allows EPA and the public to monitor the extent to which a state implements a SIP to attain and maintain the NAAQS and to take enforcement action for violations of the SIP.

The SIP is a living document which the state can revise as necessary to address the unique air pollution problems in the state. Therefore, EPA from time to time must take action on proposed revisions containing new or revised state regulations. A submission from a state can revise one or more rules in their entirety or portions of rules. The state indicates the changes in the submission (such as by using redline/strikethrough text), and EPA then takes action on the requested changes. EPA establishes a docket for its actions using a unique Docket Identification Number, which is listed in each action. These dockets and the complete submission are available for viewing on

www.regulations.gov.

On May 22, 1997 (62 FR 27968), EPA revised the procedures for incorporating by reference, into the Code of Federal Regulations, materials approved by EPA into each SIP. These changes revised the format for the identification of the SIP in 40 CFR part 52, streamlined the mechanisms for announcing EPA approval of revisions to a SIP, and streamlined the mechanisms for EPA's updating of the IBR information contained for each SIP in 40 CFR part 52. The revised procedures also called for EPA to maintain “SIP Compilations” that contain the federally approved regulations and source-specific permits submitted by each state agency. EPA generally updates these SIP Compilations on an annual basis. Under the revised procedures, EPA must periodically publish an informational document in the rules section of the

Federal Register

notifying the public that updates have been made to a SIP Compilation for a particular state. EPA began applying the 1997 revised procedures to Florida on June 16, 1999, and is providing this notice in accordance with such procedures.

See

64 FR 32346.

II. EPA Action

In this action, EPA is providing notice of an update to the materials incorporated by reference into the Florida SIP as of August 31, 2022, and identified in 40 CFR 52.520(c) and (d). This update includes SIP materials approved by EPA since the last IBR update.

See

83 FR 17081 (April 18, 2018). In addition, EPA is providing notice of the following corrections and clarifying changes to 40 CFR 52.520(c) and (d):

Changes Applicable to Paragraph (c), EPA Approved Florida Laws and Regulations

A. Correcting Table (c)'s title, from “

(c) EPA Approved Florida Regulations

” to “

(c) EPA-Approved Florida Laws and Regulations

”.

B. Correcting the header of paragraph (c), from “EPA Approved Florida Regulations” to “EPA-Approved Florida Laws and Regulations”.

C. Where applicable, under the “State effective date” and “EPA Approval Date,” removing the leading zero from the month and day, and change the 2-digit year to reflect a 4-digit year (for consistency), and correcting a

Federal Register

citation to reflect the beginning page of the preamble as opposed to that of the regulatory text.

D. Correcting a typographical error for State Statute 62-296.570 by changing the title, “Reasonably Available Control Technology (RACT)—Requirements for Major VOC and NO

X

- Emitting Facilities” to “Reasonably Available Control Technology (RACT)—Requirements for Major VOC- and NO

X

- Emitting Facilities”.

E. Correcting a typographical error for State Statute 62-296.705 by changing the title, “Phosphate Processing operations” to “Phosphate Processing Operations”.

F. Correcting a typographical error for State Statute 62-296.711 by changing the title, “Materials Handling, Sizing, Screening, Crushing and Grinding operations” to “Materials Handling, Sizing, Screening, Crushing and Grinding Operations”.

G. Changing the reference to State Statute 112.3143(4) by removing reference to subsection (4) and correcting a typographical error by changing the title, “Voting Conflict” to “Voting conflicts”.

H. Reformatting “State Statutes” 120.569 and 403.131 to be in sequential order.

I. Correcting state effective dates listed under State Statutes in paragraph 52.520(c), as described below:

a. 112.3143, Voting conflicts, State effective date is revised to read “6/29/1999.”

b. 112.3144, Full and public disclosure of financial interests, State effective date is revised to read “10/1/2006.”

c. 120.569, Decisions which affect substantial interests, State effective date is revised to read “6/24/2011.”

d. 403.131, Injunctive relief, remedies, State effective date is revised to read “6/15/2001.”

J. Adding language to the explanation column under State Statute 120.569, Decisions which affect substantial interests, to read as follows: “Paragraph (2)(n) only; to satisfy the requirements of section 110(a)(2)(G).”

Changes Applicable to Paragraph (d), EPA Approved Florida Source-Specific Requirements

A Correcting Table (d)'s title, from “

(d) EPA-approved State Source-specific requirements

” to “

(d) EPA-Approved State Source-Specific Requirements.

”

B. Correcting the header of paragraph (d) from “EPA-approved Florida source-specific requirements” to “EPA-Approved Florida Source-Specific Requirements.”

C. Where applicable, under the “State effective date” and “EPA Approval Date,” removing the leading zero from the month and day, changing the 2-digit year to reflect a 4-digit year (for consistency), and correcting a

Federal Register

citation to reflect the beginning

page of the preamble as opposed to that of the regulatory text.

D. Correcting the explanation column listed in Table (d), as described below:

a. Mosaic Fertilizer, LLC, revised to read “Specific Conditions pertaining to EU004; EU005; and EU006.”

b. Rayonier Performance Fibers, LLC, revised to read “Specific Conditions pertaining to EU005; EU006; and EU022.”

c. Tampa Electric Company—Big Bend Station, Air Permit No. 0570039-074-AC, removing the word “only.”

d. Tampa Electric Company—Big Bend Station, Air Permit No.0570039-120-AC, removing the word “only.”

III. Good Cause Exemption

EPA has determined that this action falls under the “good cause” exemption in the section 553(b)(3)(B) of the Administrative Procedure Act (APA) which, upon finding “good cause,” authorizes agencies to dispense with public participation and section 553(d)(3) which allows an agency to make an action effective immediately (thereby avoiding the 30-day delayed effective date otherwise provided for in the APA). This administrative action simply codifies provisions which are already in effect as a matter of law in Federal and approved state programs, makes typographical/ministerial revisions to the tables in the CFR, and makes ministerial changes to the prefatory heading to the tables in the CFR. Under section 553(b)(3)(B) of the APA, an agency may find good cause where procedures are “impracticable, unnecessary, or contrary to the public interest.” Public comment for this administrative action is “unnecessary” and “contrary to the public interest” since the codification (and corrections) only reflect existing law and the changes to the prefatory heading to the tables are ministerial in nature. Immediate notice of this action in the

Federal Register

benefits the public by providing the public notice of the updated Florida SIP Compilation and notice of corrections to the Florida “Identification of Plan” portion of the CFR. Further, pursuant to section 553(d)(3), making this action immediately effective benefits the public by immediately updating both the SIP Compilation and the CFR “Identification of plan” section (which includes table entry corrections).

IV. Incorporation by Reference

In this rule, EPA is finalizing regulatory text that includes incorporation by reference as described in Sections I and II of this preamble. In accordance with requirements of 1 CFR 51.5, EPA is finalizing the incorporation by reference of previously EPA-approved regulations promulgated by Florida and federally effective prior to August 31, 2022. EPA has made, and will continue to make, these materials generally available through

www.regulations.gov

and at the EPA Region 4 Office (please contact the person identified in the

FOR FURTHER INFORMATION CONTACT

section of this preamble for more information).

V. Statutory and Executive Order Reviews

Under the CAA, the Administrator is required to approve a SIP submission that complies with the provisions of the Act and applicable Federal regulations.

See

42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in reviewing SIP submissions, EPA's role is to approve state choices, provided that they meet the criteria of the CAA. Accordingly, this final rule and notification of administrative change does not impose additional requirements beyond those imposed by state law. For that reason, this action:

• Is not a significant regulatory action subject to review by the Office of Management and Budget under Executive Orders 12866 (58 FR 51735, October 4, 1993) and 13563 (76 FR 3821, January 21, 2011);

• Does not impose an information collection burden under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501

et seq.

);

• Is certified as not having a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601

et seq.

);

• Does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded Mandates Reform Act of 1995 (Pub. L. 104-4);

• Does not have Federalism implications as specified in Executive Order 13132 (64 FR 43255, August 10, 1999);

• Is not an economically significant regulatory action based on health or safety risks subject to Executive Order 13045 (62 FR 19885, April 23, 1997);

• Is not a significant regulatory action subject to Executive Order 13211 (66 FR 28355, May 22, 2001);

• Is not subject to requirements of Section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) because application of those requirements would be inconsistent with the CAA; and

• Does not provide EPA with the discretionary authority to address, as appropriate, disproportionate human health or environmental effects, using practicable and legally permissible methods, under Executive Order 12898 (59 FR 7629, February 16, 1994).

The SIP is not approved to apply on any Indian reservation land or in any other area where EPA or an Indian tribe has demonstrated that a tribe has jurisdiction. In those areas of Indian country, the rule does not have tribal implications as specified by Executive Order 13175 (65 FR 67249, November 9, 2000), nor will it impose substantial direct costs on tribal governments or preempt tribal law.

The Congressional Review Act, 5 U.S.C. 801

et seq.,

as added by the Small Business Regulatory Enforcement Fairness Act of 1996, generally provides that before a rule may take effect, the agency promulgating the rule must submit a rule report, which includes a copy of the rule, to each House of the Congress and to the Comptroller General of the United States. EPA will submit a report containing this action and other required information to the U.S. Senate, the U.S. House of Representatives, and the Comptroller General of the United States prior to publication of the rule in the

Federal Register

. A major rule cannot take effect until 60 days after it is published in the

Federal Register

. This action is not a “major rule” as defined by 5 U.S.C. 804(2).

EPA also believes that the provisions of section 307(b)(1) of the CAA pertaining to petitions for judicial review are not applicable to this action. This is because prior EPA rulemaking actions for each individual component of the Florida SIP Compilation previously afforded interested parties the opportunity to file a petition for judicial review in the United States Court of Appeals for the appropriate circuit within 60 days of such rulemaking action. Thus, EPA believes judicial review of this action under section 307(b)(1) is not available.

List of Subjects in 40 CFR Part 52

Environmental protection, Air pollution control, Carbon monoxide, Incorporation by reference, Intergovernmental relations, Lead, Nitrogen dioxide, Ozone, Particulate matter, Reporting and recordkeeping requirements, Sulfur oxides, Volatile organic compounds.

Dated: February 22, 2023.

Daniel Blackman,

Regional Administrator, Region 4.

40 CFR part 52, is amended as follows:

PART 52—APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS

1. The authority for citation for part 52 continues to read as follows:

Authority:

42 U.S.C. 7401

et seq.

Subpart K—Florida

2. § 52.520, paragraphs (b), (c), and (d) are revised to read as follows:

§ 52.520

Identification of plan.

(b)

Incorporation by reference.

(1) Material listed in paragraphs (c) and (d) of this section with an EPA approval date prior to August 31, 2022, for Florida was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists on the date of the approval and notice of any change in the material will be published in the

Federal Register

. Entries in paragraphs (c) and (d) of this section with EPA approval dates after August 31, 2022, for Florida will be incorporated by reference in the next update to the SIP compilation.

(2) EPA Region 4 certifies that the rules/regulations provided by EPA in the SIP compilation at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated State rules/regulations which have been approved as part of the State Implementation Plan as of the dates referenced in paragraph (b)(1).

(3) Copies of the materials incorporated by reference may be inspected at the Region 4 EPA Office at 61 Forsyth Street SW, Atlanta, GA 30303. To obtain the material, please call (404) 562-9022. You may inspect the material with an EPA approval date prior to August 31, 2022, for Florida at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA email

fedreg.legal@nara.gov

or go to:

http://www.archives.gov/federal-register/cfr/ibr-locations.html.

(c)

EPA-approved Florida laws and regulations.

EPA-Approved Florida Laws and Regulations

State citation

(section)

Title/subject

State

effective

date

EPA approval date

Explanation

Chapter 62-204 Air Pollution Control—General Provisions

62-204.100

Purpose and Scope

3/13/1996

6/16/1999, 64 FR 32346

62-204.200

Definitions

2/12/2006

6/27/2008, 73 FR 36435

62-204.220

Ambient Air Quality Protection

3/13/1996

6/16/1999, 64 FR 32346

62-204.240

Ambient Air Quality Standards

3/13/1996

6/16/1999, 64 FR 32346

62-204.260

Prevention of Significant Deterioration Maximum Allowable Increases (PSD Increments)

2/12/2006

6/27/2008, 73 FR 36435

62-204.320

Procedures for Designation and Redesignation of Areas

3/13/1996

6/16/1999, 64 FR 32346

62-204.340

Designation of Attainment, Nonattainment, and Maintenance Areas

3/13/1996

6/16/1999, 64 FR 32346

62-204.360

Designation of Prevention of Significant Deterioration Areas

3/13/1996

6/16/1999, 64 FR 32346

62-204.400

Public Notice and Hearing Requirements for State Implementation Plan Revisions

11/30/1994

6/16/1999, 64 FR 32353

62-204.500

Conformity

8/31/1998

8/11/2003, 68 FR 47468

Except for the incorporation by reference of 40 CFR 93.104(e) of the Transportation Conformity Rule.

Chapter 62-210 Stationary Sources—General Requirements

62-210.200

Definitions

10/23/2013

9/16/2020, 85 FR 57707

The ethanol production facility exclusion within the definition of “major stationary source” at 62-210.200 does not apply to 62-212.500. Except the following definitions: “animal crematory”; “biological waste”; “biological waste incinerator”; “biomedical waste”; “capture efficiency”; “cast polymer operation”; “human crematory”; “major source of air pollution,” “major source,” or “title V source”; “printed interior panels”; “unit-specific applicable requirement”; and “waste-to-energy facility”.

62-210.220

Small Business Assistance Program

10/6/2008

7/3/2017, 82 FR 30767

62-210.300

Permits Required

5/9/2007

6/1/2009, 63 FR 26103

62-210.310

Air General Permits

6/29/2011

10/6/2017, 82 FR 46682

62-210.350

Public Notice and Comment

10/12/2008

7/29/2020, 85 FR 45539

Except for 62-210.350(1)(c).

62-210.360

Administrative Permit Corrections

11/23/1994

6/16/1999, 64 FR 32346

62-210.370

Emissions Computation and Reporting

2/2/2006

6/27/2008, 73 FR 36435

62-210.550

Stack Height Policy

11/23/1994

6/16/1999, 64 FR 32346

62-210.650

Circumvention

10/15/1992

10/20/1994, 59 FR 52916

62-210.700

Excess Emissions

11/23/1994

6/16/1999, 64 FR 32346

62-210.900

Forms and Instructions

2/9/1993

11/7/1994, 59 FR 46157

Chapter 62-212 Stationary Sources—Preconstruction Review

62-212.300

General Preconstruction Review Requirements

6/29/2009

4/12/2011, 76 FR 20239

62-212.400

Prevention of Significant Deterioration

3/28/2012

9/16/2020, 85 FR 57707

Except the provisions for the PM

2.5

significant impact levels at (5)(b).

62-212.500

Preconstruction Review for Nonattainment Areas

2/2/2006

6/27/2008, 73 FR 36435

The ethanol production facility exclusion within the definition of “major stationary source” at 62-210.200 does not apply to 62-212.500.

62-212.720

Actuals Plantwide Applicability Limits (PALs)

12/17/2013

7/3/2017, 82 FR 30767

Chapter 62-252 Gasoline Vapor Control

62-252.300

Gasoline Dispensing Facilities Stage I Vapor Recovery

5/1/2015

8/12/2015, 80 FR 48259

Chapter 62-256 Open Burning and Frost Protection Fires

62-256.100

Declaration and Intent

12/9/1975

11/1/1977, 42 FR 57124

62-256.200

Definitions

11/30/1994

6/16/1999, 64 FR 32346

62-256.300

Prohibitions

11/30/1994

6/16/1999, 64 FR 32346

62-256.400

Agricultural and Silvicultural Fires

7/1/1971

5/31/1972, 37 FR 10842

62-256.450

Burning for Cold or Frost Protection

6/27/1991

9/9/1994, 59 FR 46552

62-256.500

Land Clearing

11/30/1994

6/16/1999, 64 FR 32346

62-256.600

Industrial, Commercial, Municipal, and Research Open Burning

7/1/1971

5/31/1972, 37 FR 10842

62-256.700

Open Burning Allowed

11/30/1994

6/16/1999, 64 FR 32346

62-256.800

Effective Date

7/1/1971

5/31/1972, 37 FR 10842

Chapter 62-296 Stationary Sources—Emission Standards

62-296.100

Purpose and Scope

10/6/2008

10/6/2017, 82 FR 46682

62-296.320

General Pollutant Emission Limiting Standards

3/13/1996

6/16/1999, 64 FR 32346

62-296.340

Best Available Retrofit Technology

1/31/2007

8/29/2013, 78 FR 53250

62-296.401

Incinerators

3/13/1996

6/16/1999, 64 FR 32346

62-296.402

Sulfuric Acid Plants

3/13/1996

6/16/1999, 64 FR 32346

62-296.403

Phosphate Processing

3/13/1996

6/16/1999, 64 FR 32346

62-296.404

Kraft (Sulfate) Pulp Mills and Tall Oil Plants

3/13/1996

6/16/1999, 64 FR 32346

62-296.405

Fossil Fuel Steam Generators with more than 250 million Btu per Hour Heat Input

3/2/1999

10/6/2017, 82 FR 46682

62-296.406

Fossil Fuel Steam Generator with less than 250 million Btu per Hour Heat Input, New and Existing Emissions Units

3/2/1999

10/6/2017, 82 FR 46682

62-296.408

Nitric Acid Plants

11/23/1994

6/16/1999, 64 FR 32346

62-296.409

Sulfur Recovery Plants

11/23/1994

6/16/1999, 64 FR 32346

62-296.410

Carbonaceous Fuel Burning Equipment

11/23/1994

6/16/1999, 64 FR 32346

62-296.412

Dry Cleaning Facilities

3/11/2010

10/6/2017, 82 FR 46682

62-296.414

Concrete Batching Plants

1/10/2007

10/6/2017, 82 FR 46682

62-296.415

Soil Thermal Treatment Facilities

3/13/1996

6/16/1999, 64 FR 32346

62-296.418

Bulk Gasoline Plants

3/11/2010

10/6/2017, 82 FR 46682

62-296.470

Implementation of Federal Clean Air Interstate Rule

4/1/2007

10/12/2007, 72 FR 58016

62-296.500

Reasonably Available Control Technology (RACT)—Volatile Organic Compounds (VOC) and Nitrogen Oxides (NO

X

) Emitting Facilities

3/11/2010

10/6/2017, 82 FR 46682

62-296.501

Can Coating

11/23/1994

6/16/1999, 64 FR 32346

62-296.502

Coil Coating

11/23/1994

6/16/1999, 64 FR 32346

62-296.503

Paper Coating

11/23/1994

6/16/1999, 64 FR 32346

62-296.504

Fabric and Vinyl Coating

11/23/1994

6/16/1999, 64 FR 32346

62-296.505

Metal Furniture Coating

11/23/1994

6/16/1999, 64 FR 32346

62-296.506

Surface Coating of Large Appliances

11/23/1994

6/16/1999, 64 FR 32346

62-296.507

Magnet Wire Coating

11/23/1994

6/16/1999, 64 FR 32346

62-296.508

Petroleum Liquid Storage

10/6/2008

10/6/2017, 82 FR 46682

Amendments effective 10/6/2008.

62-296.510

Bulk Gasoline Terminals

11/23/1994

6/16/1999, 64 FR 32346

62-296.511

Solvent Metal Cleaning

6/5/1996

01/16/2003, 68 FR 2204

62-296.512

Cutback Asphalt

11/23/1994

6/16/1999, 64 FR 32346

62-296.513

Surface Coating of Miscellaneous Metal Parts and Products

11/23/1994

6/16/1999, 64 FR 32346

62-296.514

Surface Coating of Flat Wood Paneling

11/23/1994

6/16/1999, 64 FR 32346

62-296.515

Graphic Arts Systems

11/23/1994

6/16/1999, 64 FR 32346

62-296.516

Petroleum Liquid Storage Tanks with External Floating Roofs

11/23/1994

6/16/1999, 64 FR 32346

62-296.570

Reasonably Available Control Technology (RACT)—Requirements for Major VOC- and NO

X

-Emitting Facilities

11/23/1994

6/16/1999, 64 FR 32346

62-296.600

Reasonably Available Control Technology (RACT)—Lead

3/13/1996

6/16/1999, 64 FR 32346

62-296.601

Lead Processing Operations in General

8/8/1994

9/18/1996, 61 FR 49064

62-296.602

Primary Lead Acid Battery Manufacturing Operations

3/13/1996

9/18/1996, 61 FR 49064

62-296.603

Secondary Lead Smelting Operations

8/8/1994

9/18/1996, 61 FR 49064

62-296.604

Electric Arc Furnace Equipped Secondary Steel Manufacturing Operations

8/8/1994

9/18/1996, 61 FR 49064

62-296.605

Lead Oxide Handling Operations

8/8/1994

9/18/1996, 61 FR 49064

62-296.700

Reasonably Available Control Technology (RACT)—Particulate Matter

11/23/1994

6/16/1999, 64 FR 32346

62-296.701

Portland Cement Plants

11/23/1994

6/16/1999, 64 FR 32346

62-296.702

Fossil Fuel Steam Generators

11/23/1994

6/16/1999, 64 FR 32346

62-296.703

Carbonaceous Fuel Burners

11/23/1994

6/16/1999, 64 FR 32346

62-296.704

Asphalt Concrete Plants

11/23/1994

6/16/1999, 64 FR 32346

62-296.705

Phosphate Processing Operations

11/23/1994

6/16/1999, 64 FR 32346

62-296.706

Glass Manufacturing Process

11/23/1994

6/16/1999, 64 FR 32346

62-296.707

Electric Arc Furnaces

11/23/1994

6/16/1999, 64 FR 32346

62-296.708

Sweat of Pot Furnaces

11/23/1994

6/16/1999, 64 FR 32346

62-296.709

Lime Kilns

11/23/1994

6/16/1999, 64 FR 32346

62-296.710

Smelt Dissolving Tanks

11/23/1994

6/16/1999, 64 FR 32346

62-296.711

Materials Handling, Sizing, Screening, Crushing and Grinding Operations

11/23/1994

6/16/1999, 64 FR 32346

62-296.712

Miscellaneous Manufacturing Process Operations

11/23/1994

6/16/1999, 64 FR 32346

Chapter 62-297 Stationary Sources—Emissions Monitoring

62-297.310

General Emissions Test Requirements

3/9/2015

10/6/2017, 82 FR 46682

62-297.440

Supplementary Test Procedures

7/10/2014

4/2/2018, 83 FR 13875

62-297.450

EPA VOC Capture Efficiency Test Procedures

7/10/2014

4/2/2018, 83 FR 13875

62-297.620

Exceptions and Approval of Alternate Procedures and Requirements

11/23/1994

6/16/1999, 64 FR 32346

State Statutes

112.3143

Voting conflicts

6/29/1999

7/30/2012, 77 FR 44485

Paragraph (4) only; to satisfy the requirements of sections 128 and 110(a)(2)(E)(ii).

112.3144

Full and public disclosure of financial interests

10/1/2006

7/30/2012, 77 FR 44485

To satisfy the requirements of sections 128 and 110(a)(2)(E)(ii).

120.569

Decisions which affect substantial interests

6/24/2011

7/30/2012, 77 FR 44485

Subsection (2)(n) only; to satisfy the requirements of section 110(a)(2)(G).

403.131

Injunctive relief, remedies

6/15/2001

7/30/2012, 77 FR 44485

To satisfy the requirements of section 110(a)(2)(G).

(d) EPA-approved Florida Source-Specific requirements.

EPA-Approved Florida Source-Specific Requirements

Name of source

Permit No.

State effective date

EPA approval date

Explanation

Harry S Truman, animal import center

NA

11/26/1996

1/19/2000, 65 FR 2882

Martin Gas Sales, Inc

0570477-007-AC

1/17/2003

5/1/2003, 68 FR 23209

Broward County Aviation Department

8/15/2003

6/17/2003, 69 FR 33862

Order Granting Variance from Rule 62-252.400.

Lockheed Martin Aeronautics Company

4/16/2005

11/28/2006, 71 FR 68745

Requirement that Lockheed Martin Aeronautics Company comply with EPA's Aerospace CTG at its Pinellas County facility.

Combs Oil Company

7/31/2009

9/25/2015, 80 FR 57727

Order Granting Variance from Rule 62-296.418(2)(b)2.

Mosaic Fertilizer, LLC

Air Permit No. 0570008-080-AC

1/15/2015

7/3/2017, 82 FR 30749

Specific Conditions pertaining to EU004; EU005; and EU006.

Rayonier Performance Fibers, LLC

Air Permit No. 0890004-036-AC

4/12/2012

7/3/2017, 82 FR 30749

Specific Conditions pertaining to EU005; EU006; and EU022.

Tampa Electric Company—Big Bend Station

Air Permit No. 0570039-074-AC

2/26/2015

7/3/2017, 82 FR 30749

Section 3, Subsection B, Condition 5.

WestRock, LLC

Air Permit No. 0890003-046-AC

1/9/2015

7/3/2017, 82 FR 30749

Specific Conditions pertaining to EU006; EU015; EU007; and EU011.

Tampa Electric Company—Big Bend Station

Air Permit No. 0570039-120-AC

12/14/2018

11/12/2019, 84 FR 60927

Section 2, Condition 4; the “SO

2

Emissions Cap” provision from Section 3, Condition 4; the “SO

2

CEMS” provision from Section 3, Condition 4; and the “Methods of Operation” for Units 1 and 2 provision from Section 3, Condition 6.

Mosaic Fertilizer, LLC—Bartow Facility

Air Permit No. 1050046-050-AC

7/3/2017

2/20/2020, 85 FR 9666

Section III, Subsection A, Specific Condition 3 (as administratively corrected by Permit No. 1050046-063-AC with an effective date of January 11, 2019); Condition 4; and Condition 5.

Mosaic Fertilizer, LLC—New Wales Facility

Air Permit No. 1050059-106-AC

10/30/2017

2/20/2020, 85 FR 9666

Section III, Subsection A, Specific Condition 3 (as administratively corrected by Permit No. 1050059-114-AC with an effective date of January 11, 2019); Condition 4; and Condition 5.

EnviroFocus Technologies, LLC

Air Construction Permit No. 0570057-27-AC

12/14/2012

6/4/2021, 86 FR 29949

Except for conditions not specifically related to lead emissions; Section 3, Subsection B, Specific Conditions 3 and 10; Section 3, Subsection C, Specific Condition 5; and Section 3, Subsection G, Specific Condition 5.

EnviroFocus Technologies, LLC

Air Construction Permit No. 0570057-37-AC

11/6/2019

6/14/2021, 86 FR 29949

Only incorporating the following conditions: Section 3, Subsection B, Specific Conditions 2 and 3a; Section 3, Subsection C, Specific Condition 1; and Section 3, Subsection D, Specific Condition 1.

[FR Doc. 2023-04013 Filed 2-28-23; 8:45 am]

BILLING CODE 6560-50-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.