Proposed Agency Information Collection Activities; Comment Request

Federal RegisterApr 28, 2022

Ask Donna

What actually matters in this document.

Text

DEPARTMENT OF TRANSPORTATION

Federal Railroad Administration

[Docket No. FRA-2022-0002-N-7]

Proposed Agency Information Collection Activities; Comment Request

AGENCY:

Federal Railroad Administration (FRA), Department of Transportation (DOT).

ACTION:

Notice of information collection; request for comment.

SUMMARY:

Under the Paperwork Reduction Act of 1995 (PRA) and its implementing regulations, FRA will seek approval of the Information Collection Request (ICR) abstracted below. Before submitting this ICR to the Office of Management and Budget (OMB) for approval, FRA is soliciting public comment on specific aspects of the activities identified in the ICR.

DATES:

Interested persons are invited to submit comments on or before June 27, 2022.

ADDRESSES:

Written comments and recommendations for the proposed ICR should be submitted on

regulations.gov

to the docket, Docket No. FRA-2022-0002. All comments received will be posted without change to the docket, including any personal information provided. Please refer to the assigned OMB control number in any correspondence submitted. FRA will summarize comments received in response to this notice in a subsequent notice and include them in its information collection submission to OMB for approval.

FOR FURTHER INFORMATION CONTACT:

Ms. Hodan Wells, Information Collection Clearance Officer, at email:

Hodan.Wells@dot.gov

or telephone: (202) 493-0440, or Ms. Stephanie Anderson, Attorney Adviser, at email:

Stephanie.Anderson@dot.gov

or telephone: (202) 493-0445.

SUPPLEMENTARY INFORMATION:

The PRA, 44 U.S.C. 3501-3520, and its implementing regulations, 5 CFR part 1320, require Federal agencies to provide 60-days' notice to the public to allow comment on information collection activities before seeking OMB approval of the activities.

See

44 U.S.C. 3506, 3507; 5 CFR 1320.8-1320.12. Specifically, FRA invites interested parties to comment on the following ICR regarding: (1) Whether the information collection activities are necessary for FRA to properly execute its functions, including whether the activities will have practical utility; (2) the accuracy of FRA's estimates of the burden of the information collection activities, including the validity of the methodology and assumptions used to determine the estimates; (3) ways for FRA to enhance the quality, utility, and clarity of the information being collected; and (4) ways for FRA to minimize the burden of information collection activities on the public, including the use of automated collection techniques or other forms of information technology.

See

44 U.S.C. 3506(c)(2)(A); 5 CFR 1320.8(d)(1).

FRA believes that soliciting public comment may reduce the administrative and paperwork burdens associated with the collection of information that Federal statutes and regulations mandate. In summary, FRA reasons that comments received will advance three objectives: (1) Reduce reporting burdens; (2) organize information collection requirements in a “user-friendly” format to improve the use of such information; and (3) accurately assess the resources expended to retrieve and produce information requested.

See

44 U.S.C. 3501.

The summary below describes the ICR that FRA will submit for OMB clearance as the PRA requires:

Title:

Positive Train Control (PTC) and Other Signal Systems.

OMB Control Number:

2130-0553.

Abstract:

On November 15, 2021, President Joseph R. Biden signed into law the Infrastructure Investment and

Jobs Act (IIJA).

1

Section 22414 of the Passenger Rail Expansion and Rail Safety Act of 2021, part of the IIJA, impacts FRA's existing Form FRA F 6180.152, the Biannual Report of PTC System Performance, which is one part of the existing information collection request under OMB Control No. 2130-0553. Section 22414 of the IIJA establishes the same reporting requirement as FRA's existing regulations, using the same FRA form number (Form FRA F 6180.152) and content requirements. 49 U.S.C. 20157(m); 49 CFR 236.1029(h). However, the statutory reporting cadence is quarterly, not biannual as FRA's regulations currently require.

1

Infrastructure Investment and Jobs Act, Public Law 117-58, 135 Stat. 429 (Nov. 15, 2021). The IIJA was funded in relevant part by the Consolidated Appropriations Act of 2022, which was signed into law on March 15, 2022.

During a recent rulemaking, FRA collected public comment on this reporting requirement.

See

85 FR 82400 (Dec. 18, 2020) (Notice of Proposed Rulemaking); 86 FR 40154 (July 27, 2021) (Final Rule) (amending 49 CFR 236.1029(h) and creating Form FRA F 6180.152). During the comment period, FRA received seven sets of generally supportive comments from the following entities and individuals: The American Public Transportation Association; the Association of American Railroads and the American Short Line and Regional Railroad Association (jointly filed); the National Railroad Passenger Corporation (Amtrak); New Jersey Transit; and two individuals.

Feedback from the public and industry has already been incorporated into the existing Form FRA F 6180.152 that OMB approved in October 2021.

See

49 CFR 236.1029(h). The substance of the form remains unchanged in light of the statutory requirements IIJA imposes, as the content required by FRA's existing regulations and Section 22414 of the IIJA are identical in substance. To implement Section 22414 of the IIJA, as codified at 49 U.S.C. 20157(m), the existing OMB-approved Form FRA F 6180.152 would need to be modified only to refer to the new quarterly reporting frequency.

Accordingly, FRA is hereby proposing to modify Form FRA F 6180.152 to align with the statutory quarterly framework under 49 U.S.C. 20157(m). The modified form would refer to the following quarterly reporting deadlines under 49 U.S.C. 20157(m)(3): April 30 (covering the period from January 1 to March 31), July 31 (covering the period from April 1 to June 30), October 31 (covering the period from July 1 to September 30), and January 31 (covering the period from October 1 to December 31 of the prior calendar year).

See

49 U.S.C. 20157(m)(3). To be clear, in the interim, before OMB approves these statutory modifications to Form FRA F 6180.152, host railroads would continue to comply with the following biannual reporting deadlines for Form FRA F 6180.152 under FRA's existing regulations, 49 CFR 236.1029(h)(3): July 31 (covering the period from January 1 to June 30), and January 31 (covering the period from July 1 to December 31 of the prior calendar year). Railroads would transition to the quarterly frequency once OMB approves the modified Form FRA F 6180.152.

The only other modification FRA proposes to make to Form FRA F 6180.152 is to lock the formatting of instructions and headings in the form so users cannot manipulate those components of the form. FRA is placing the proposed, modified Form FRA F 6180.152 in Docket No. FRA-2022-0002 for review and interested persons are invited to submit comments on or before June 27, 2022.

For a detailed discussion regarding the reporting metrics in the proposed Quarterly Report of PTC System Performance (Form FRA F 6180.152), please see FRA's Final Rule outlining the comments received and corresponding content requirements under 49 CFR 236.1029(h).

See

86 FR 40154, 40157-59, 40163-68 (July 27, 2021);

see also

49 U.S.C. 20157(m). FRA may not alter the existing reporting requirements in Form FRA F 6180.152 as they are now statutorily mandated. As a reminder, modified Form FRA F 6180.152 would be identical in substance to existing, OMB-approved Form FRA F 6180.152 (Biannual Report of PTC System Performance) that the public commented on during the 2020-2021 PTC rulemaking.

See

85 FR 82400 (Dec. 18, 2020) (Notice of Proposed Rulemaking); 86 FR 40154 (July 27, 2021) (Final Rule). The only material changes to Form FRA F 6180.152 FRA is proposing are those necessary to shift from the biannual framework under FRA's regulations, 49 CFR 236.1029(h), to the new quarterly framework under 49 U.S.C. 20157(m)(3).

Under the currently approved biannual framework, FRA estimated that each performance report (Form FRA F 6180.152), covering a six-month period, would take 48 hours to prepare.

See

86 FR at 40169-71. Under the new statutory quarterly framework, FRA estimates that, on average, each report, covering a shorter period (three months), would take 32 hours to prepare. This estimate is based on the fact that under the quarterly framework, the reporting period would be half as long and, correspondingly, it would take approximately half as long (

i.e.,

24 hours) to compile the performance-related data for that period, plus an additional 8 hours to account for any additional administrative burdens in completing the form. Railroads will collect, analyze, and report 365 days' worth of data about their PTC systems' performance under either reporting framework (biannual or quarterly), and FRA estimates that shifting the frequency from biannual (under the existing regulation) to quarterly (under the recent legislation) would result in an increase of 73 reports per year and a burden increase of 1,168 hours total.

In addition, FRA notes that the Statutory Notification of PTC System Failures (Form FRA F 6180.177) expired by law on December 31, 2021, so FRA proposes to remove that form from this information collection request.

See

49 U.S.C. 20157(j). That adjustment would result in a decrease of 144 reports per year and a burden decrease of 144 hours. In summary, FRA proposes two changes to the PRA table—

i.e.,

revising one line item (Form FRA F 6180.152) due to a program change and removing one line item (Form FRA F 6180.177) as it is no longer required by law and the burden associated with this requirement has been completed.

Type of Request:

Revision to a currently approved collection.

Affected Public:

Businesses.

Form(s):

FRA F 6180.152.

Respondent Universe:

742 railroads.

Frequency of Submission:

On occasion.

Reporting Burden:

CFR section/subject

2

Respondent

universe

Total annual

responses

Average time

per response

Total annual

burden hours

Total annual

dollar cost

equivalent

3

235.6(c)—Expedited application for approval of certain changes described in this section

42 railroads

10 expedited applications

5 hours

50

$3,850

—Copy of expedited application to labor union

42 railroads

10 copies

30 minutes

5

385

—Railroad letter rescinding its request for expedited application of certain signal system changes

42 railroads

1 letter

6 hours

6

462

—Revised application for certain signal system changes

42 railroads

1 application

5 hours

0.5

385

—Copy of railroad revised application to labor union

42 railroads

1 copy

30 minutes

0.5

39

236.1—Railroad-maintained signal plans at all interlockings, automatic signal locations, and controlled points, and updates to ensure accuracy

700 railroads

25 plan changes

15 minutes

6.25

481

236.15—Designation of automatic block, traffic control, train stop, train control, cab signal, and PTC territory in timetable instructions

700 railroads

10 timetable instructions

30 minutes

5

385

236.18—Software management control plan—New railroads

2 railroads

2 plans

160 hours

320

24,640

236.23(e)—The names, indications, and aspects of roadway and cab signals shall be defined in the carrier's Operating Rule Book or Special Instructions. Modifications shall be filed with FRA within 30 days after such modifications become effective

700 railroads

2 modifications

1 hour

2

154

236.587(d)—Certification and departure test results

742 railroads

4,562,500 train departures

5 seconds

6,336.81

487,934

236.905(a)—Railroad Safety Program Plan (RSPP)—New railroads

2 railroads

2 RSPPs

40 hours

80

6,160

236.913(a)—Filing and approval of a joint Product Safety Plan (PSP)

742 railroads

1 joint plan

2,000 hours

2,000

240,000

(c)(1)—Informational filing/petition for special approval

742 railroads

0.5 filings/approval petitions

50 hours

25

1,925

(c)(2)—Response to FRA's request for further data after informational filing

742 railroads

0.25 data calls/documents

5 hours

1.25

96

(d)(1)(ii)—Response to FRA's request for further information within 15 days after receipt of the Notice of Product Development (NOPD)

742 railroads

0.25 data calls/documents

1 hour

0.25

19

(d)(1)(iii)—Technical consultation by FRA with the railroad on the design and planned development of the product

742 railroads

0.25 technical consultations

5 hours

1.25

96

(d)(1)(v)—Railroad petition to FRA for final approval of NOPD

742 railroads

0.25 petitions

1 hour

0.25

19

(d)(2)(ii)—Response to FRA's request for additional information associated with a petition for approval of PSP or PSP amendment

742 railroads

1 request

50 hours

50

3,850

(e)—Comments to FRA on railroad informational filing or special approval petition

742 railroads

0.5 comments/letters

10 hours

5

385

(h)(3)(i)—Railroad amendment to PSP

742 railroads

2 amendments

20 hours

40

3,080

(j)—Railroad field testing/information filing document

742 railroads

1 field test document

100 hours

100

7,700

236.917(a)—Railroad retention of records: results of tests and inspections specified in the PSP

13 railroads with PSP

13 PSP safety results

160 hours

2,080

160,160

(b)—Railroad report that frequency of safety-relevant hazards exceeds threshold set forth in PSP

13 railroads

1 report

40 hours

40

3,080

(b)(3)—Railroad final report to FRA on the results of the analysis and countermeasures taken to reduce the frequency of safety-relevant hazards

13 railroads

1 report

10 hours

10

770

236.919(a)—Railroad Operations and Maintenance Manual (OMM)

13 railroads

1 OMM update

40 hours

40

3,080

(b)—Plans for proper maintenance, repair, inspection, and testing of safety-critical products

13 railroads

1 plan update

40 hours

40

3,080

(c)—Documented hardware, software, and firmware revisions in OMM

13 railroads

1 revision

40 hours

40

3,080

236.921 and 923(a)—Railroad Training and Qualification Program

13 railroads

1 program

40 hours

40

3,080

236.923(b)—Training records retained in a designated location and available to FRA upon request

13 railroads

350 records

10 minutes

58.33

4,491

236.1001(b)—A railroad's additional or more stringent rules than prescribed under 49 CFR part 236, subpart I

38 railroads

1 rule or instruction

40 hours

40

4,800

236.1005(b)(4)(i)-(ii)—A railroad's submission of estimated traffic projections for the next 5 years, to support a request, in a PTC Implementation Plan (PTCIP) or a request for amendment (RFA), not to implement a PTC system based on reductions in rail traffic

The burden is accounted for under 49 CFR 236.1009(a) and 236.1021.

(b)(4)(iii)—A railroad's request for a

de minimis

exception, in a PTCIP or an RFA, based on a minimal quantity of poisonous-by-inhalation materials traffic

7 Class I railroads

1 exception request

40 hours

40

3,080

(b)(5)—A railroad's request to remove a line from its PTCIP based on the sale of the line to another railroad and any related request for FRA review from the acquiring railroad

The burden is accounted for under 49 CFR 236.1009(a) and 236.1021.

(g)(1)(i)—A railroad's request to temporarily reroute trains not equipped with a PTC system onto PTC-equipped tracks and vice versa during certain emergencies

38 railroads

45 rerouting extension requests

8 hours

360

27,720

(g)(1)(ii)—A railroad's written or telephonic notice of the conditions necessitating emergency rerouting and other required information under 236.1005(i)

38 railroads

45 written or telephonic notices

2 hours

90

6,930

(g)(2)—A railroad's temporary rerouting request due to planned maintenance not exceeding 30 days

38 railroads

720 requests

8 hours

5,760

443,520

(h)(1)—A response to any request for additional information from FRA, prior to commencing rerouting due to planned maintenance

38 railroads

10 requests

2 hours

20

1,540

(h)(2)—A railroad's request to temporarily reroute trains due to planned maintenance exceeding 30 days

38 railroads

160 requests

8 hours

1,280

98,560

236.1006(b)(4)(iii)(B)—A progress report due by December 31, 2020, and by December 31, 2022, from any Class II or III railroad utilizing a temporary exception under this section

262 railroads

5 reports

16 hours

80

6,160

(b)(5)(vii)—A railroad's request to utilize different yard movement procedures, as part of a freight yard movements exception

The burden is accounted for under 49 CFR 236.1015 and 236.1021.

236.1007(b)(1)—For any high-speed service over 90 miles per hour (mph), a railroad's PTC Safety Plan (PTCSP) must additionally establish that the PTC system was designed and will be operated to meet the fail-safe operation criteria in appendix C

The burden is accounted for under 49 CFR 236.1015 and 236.1021.

(c)—An HSR-125 document accompanying a host railroad's PTCSP, for operations over 125 mph

38 railroads

1 HSR-125 document

3,200 hours

3,200

384,000

(c)(1)—A railroad's request for approval to use foreign service data, prior to submission of a PTCSP

38 railroads

0.33 requests

8,000 hours

2,640

203,280

(d)—A railroad's request in a PTCSP that FRA excuse compliance with one or more of this section's requirements

38 railroads

1 request

1,000 hours

1,000

120,000

236.1009(a)(2)—A PTCIP if a railroad becomes a host railroad of a main line requiring the implementation of a PTC system, including the information under 49 U.S.C. 20157(a)(2) and 49 CFR 236.1011

264 railroads

1 PTCIP

535 hours

535

64,200

(a)(3)—Any new PTCIPs jointly filed by a host railroad and a tenant railroad

264 railroads

1 joint PTCIP

267 hours

267

32,040

(b)(1)—A host railroad's submission, individually or jointly with a tenant railroad or PTC system supplier, of an unmodified Type Approval

264 railroads

1 document

8 hours

8

616

(b)(2)—A host railroad's submission of a PTC Development Plan (PTCDP) with the information required under 49 CFR 236.1013, requesting a Type Approval for a PTC system that either does not have a Type Approval or has a Type Approval that requires one or more variances

264 railroads

1 PTCDP

2,000 hours

2,000

154,000

(d)—A host railroad's submission of a PTCSP

The burdens are accounted for under 49 CFR 236.1015.

(e)(3)—Any request for full or partial confidentiality of a PTCIP, Notice of Product Intent (NPI), PTCDP, or PTCSP

38 railroads

10 confidentiality requests

8 hours

80

6,160

(h)—Any responses or documents submitted in connection with FRA's use of its authority to monitor, test, and inspect processes, procedures, facilities, documents, records, design and testing materials, artifacts, training materials and programs, and any other information used in the design, development, manufacture, test, implementation, and operation of the PTC system, including interviews with railroad personnel

38 railroads

36 interviews and documents

4 hours

144

11,088

(j)(2)(iii)—Any additional information provided in response to FRA's consultations or inquiries about a PTCDP or PTCSP

38 railroads

1 set of additional information

400 hours

400

30,800

236.1011(a)-(b)—PTCIP content requirements

The burdens are accounted for under 49 CFR 236.1009(a) and (e) and 236.1021.

(e)—Any public comment on PTCIPs, NPIs, PTCDPs, and PTCSPs

38 railroads

2 public comments

8 hours

16

1,232

236.1013—PTCDP and NPI content requirements

The burdens are accounted for under 49 CFR 236.1009(b), (c), and (e) and 236.1021.

236.1015—Any new host railroad's PTCSP meeting all content requirements under 49 CFR 236.1015

264 railroads

1 PTCSP

8,000 hours

8,000

616,000

(g)—A PTCSP for a PTC system replacing an existing certified PTC system

38 railroads

0.33 PTCSPs

3,200 hours

1,056

81,312

(h)—A quantitative risk assessment, if FRA requires one to be submitted

38 railroads

0.33 assessments

800 hours

264

20,328

236.1017(a)—An independent third-party assessment, if FRA requires one to be conducted and submitted

38 railroads

0.33 assessments

1,600 hours

528

63,360

(b)—A railroad's written request to confirm whether a specific entity qualifies as an independent third party

38 railroads

0.33 written requests

8 hours

2.64

203

—Further information provided to FRA upon request

38 railroads

0.33 sets of additional information

20 hours

6.6

508

(d)—A request not to provide certain documents otherwise required under Appendix F for an independent, third-party assessment

38 railroads

0.33 requests

20 hours

6.6

508

(e)—A request for FRA to accept information certified by a foreign regulatory entity for purposes of 49 CFR 236.1017 and/or 236.1009(i)

38 railroads

0.33 requests

32 hours

10.56

813

236.1019(b)—A request for a passenger terminal main line track exception (MTEA)

38 railroads

1 MTEA

160 hours

160

12,320

(c)(1)—A request for a limited operations exception (based on restricted speed, temporal separation, or a risk mitigation plan)

38 railroads

1 request and/or plan

160 hours

160

12,320

(c)(2)—A request for a limited operations exception for a non-Class I, freight railroad's track

10 railroads

1 request

160 hours

160

12,320

(c)(3)—A request for a limited operations exception for a Class I railroad's track

7 railroads

1 request

160 hours

160

12,320

(d)—A railroad's collision hazard analysis in support of an MTEA, if FRA requires one to be conducted and submitted

38 railroads

0.33 collision hazard analysis

50 hours

16.5

1,271

(e)—Any temporal separation procedures utilized under the 49 CFR 236.1019(c)(1)(ii) exception

The burdens are accounted for under 49 CFR 236.1019(c)(1).

236.1021(a)-(d)—Any RFA to a railroad's PTCIP or PTCDP

38 railroads

10 RFAs

160 hours

1,600

123,200

(e)—Any public comments, if an RFA includes a request for approval of a discontinuance or material modification of a signal or train control system and a

Federal Register

notice is published

5 interested parties

10 RFA public comments

16 hours

160

12,320

(l)—Any jointly filed RFA to a PTCDP or PTCSP

The burdens are accounted for under 49 CFR 236.1021(a)-(d) and (m).

(m)—Any RFA to a railroad's PTCSP

38 railroads

15 RFAs

80 hours

1,200

92,400

236.1023(a)—A railroad's PTC Product Vendor List, which must be continually updated

38 railroads

2 updated lists

8 hours

16

1,232

(b)(1)—All contractual arrangements between a railroad and its hardware and software suppliers or vendors for certain immediate notifications

The burdens are accounted for under 49 CFR 236.1015 and 236.1021.

(b)(2)-(3)—A vendor's or supplier's notification, upon receipt of a report of any safety-critical failure of its product, to any railroads using the product

10 vendors or suppliers

10 notifications

8 hours

80

6,160

(c)(1)-(2)—A railroad's process and procedures for taking action upon being notified of a safety-critical failure or a safety-critical upgrade, patch, revision, repair, replacement, or modification, and a railroad's configuration/revision control measures, set forth in its PTCSP

The burdens are accounted for under 49 CFR 236.1015 and 236.1021.

(d)—A railroad's submission, to the applicable vendor or supplier, of the railroad's procedures for action upon notification of a safety-critical failure, upgrade, patch, or revision to the PTC system and actions to be taken until it is adjusted, repaired, or replaced

38 railroads

2.5 notifications

16 hours

40

3,080

(e)—A railroad's database of all safety-relevant hazards, which must be maintained after the PTC system is placed in service

38 railroads

38 database updates

16 hours

608

46,816

(e)(1)—A railroad's notification to the vendor or supplier and FRA if the frequency of a safety-relevant hazard exceeds the threshold set forth in the PTCDP and PTCSP, and about the failure, malfunction, or defective condition that decreased or eliminated the safety functionality

38 railroads

8 notifications

8 hours

64

4,928

(e)(2)—Continual updates about any and all subsequent failures

38 railroads

1 update

8 hours

8

616

(f)—Any notifications that must be submitted to FRA under 49 CFR 236.1023

The burdens are accounted for under 49 CFR 236.1023(e), (g), and (h).

(g)—A railroad's and vendor's or supplier's report, upon FRA request, about an investigation of an accident or service difficulty due to a manufacturing or design defect and their corrective actions

38 railroads

0.5 reports

40 hours

20

1,540

(h)—A PTC system vendor's or supplier's reports of any safety-relevant failures, defective conditions, previously unidentified hazards, recommended mitigation actions, and any affected railroads

10 vendors or suppliers

20 reports

8 hours

160

12,320

(k)—A report of a failure of a PTC system resulting in a more favorable aspect than intended or other condition hazardous to the movement of a train, including the reports required under part 233

The burdens are accounted for under 49 CFR 236.1023(e), (g), and (h) and 49 CFR part 233.

236.1029(b)(4)—A report of an en route failure, other failure, or cut out to a designated railroad officer of the host railroad

150 host and tenant railroads

1,000 reports

30 minutes

500

38,500

Form FRA F 6180.152—49 U.S.C. 20157(m) and 49 CFR 236.1029(h)—Quarterly Report of PTC System Performance (*Revised requirement and updated form*)

38 railroads

146 reports

32 hours

4,672

359,744

236.1033—Communications and security requirements

The burdens are accounted for under 49 CFR 236.1009 and 236.1015.

236.1035(a)-(b)—A railroad's request for authorization to field test an uncertified PTC system and any responses to FRA's testing conditions

38 railroads

10 requests

40 hours

400

30,800

236.1037(a)(1)-(2)—Records retention

The burdens are accounted for under 49 CFR 236.1009 and 236.1015.

(a)(3)-(4)—Records retention

The burdens are accounted for under 49 CFR 236.1039 and 236.1043(b).

(b)—Results of inspections and tests specified in a railroad's PTCSP and PTCDP

38 railroads

800 records

1 hour

800

61,600

(c)—A contractor's records related to the testing, maintenance, or operation of a PTC system maintained at a designated office

20 contractors

1,600 records

10 minutes

266.67

20,534

(d)(3)—A railroad's final report of the results of the analysis and countermeasures taken to reduce the frequency of safety-related hazards below the threshold set forth in the PTCSP

38 railroads

8 final reports

160 hours

1,280

98,560

236.1039(a)-(c), (e)—A railroad's PTC OMM, which must be maintained and available to FRA upon request

38 railroads

2 OMM updates

10 hours

20

1,540

(d)—A railroad's identification of a PTC system's safety-critical components, including spare equipment

38 railroads

1 identified new component

1 hour

1

77

236.1041(a)-(b) and 236.1043(a)—A railroad's PTC Training and Qualification Program (

i.e.,

a written plan)

38 railroads

2 programs

10 hours

20

1,540

236.1043(b)—Training records retained in a designated location and available to FRA upon request

150 host and tenant railroads

150 PTC training record databases

1 hour

150

11,550

Total

N/A

4,567,826 responses

N/A

51,993

4,329,155

Total Estimated

Annual Responses:

4,567,826.

2

The current inventory exhibits a total burden of 50,969 hours and 4,567,897 responses, while the total burden in this notice is 51,993 hours and 4,567,826 responses. The change in burden is due both to a program change (an increase) and one adjustment (a decrease) as described above in the abstract section.

3

The dollar equivalent cost is derived from the 2019 STB Full Year Wage A&B data series using the appropriate employee group hourly wage rate that includes a 75-percent overhead charge. For Executives, Officials, and Staff Assistants, this cost amounts to $120 per hour. For Professional/Administrative staff, this cost amounts to $77 per hour.

Total Estimated Annual Burden:

51,993 hours.

Total Estimated Annual Burden Hour Dollar Cost Equivalent:

$4,329,155.

FRA informs all interested parties that it may not conduct or sponsor, and a respondent is not required to respond to, a collection of information that does not display a currently valid OMB control number.

Authority:

44 U.S.C. 3501-3520; 49 U.S.C. 20157.

Brett A. Jortland,

Deputy Chief Counsel.

[FR Doc. 2022-09142 Filed 4-27-22; 8:45 am]

BILLING CODE 4910-06-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.