Protecting Against National Security Threats to the Communications Supply Chain Through FCC Programs

Federal RegisterJan 13, 2021

Ask Donna

What actually matters in this document.

Text

FEDERAL COMMUNICATIONS COMMISSION

47 CFR Parts 1 and 54

[WC Docket No. 18-89; FCC 20-176; FRS 17361]

Protecting Against National Security Threats to the Communications Supply Chain Through FCC Programs

AGENCY:

Federal Communications Commission.

ACTION:

Final rule.

SUMMARY:

In this document, the Federal Communications Commission (Commission) establishes rules to publish a list of covered communications equipment and services determined to be a risk to national security. Eligible telecommunications carriers (ETCs) that receive universal service funding to provide service in remote areas of the country must remove such equipment or services from their networks and properly dispose of it. This document also establishes the Secure and Trusted Communications Networks Reimbursement Program, which will provide funds to smaller providers of advanced communications services for the removal and replacement of covered communications equipment and services, conditioned on the appropriation of funds by Congress. Lastly, all providers of advanced communications services must report whether their networks include any covered communications equipment or services acquired after August 14, 2018.

DATES:

Effective March 15, 2021, except for amendatory instruction 3 adding §§ 1.50004(c), (d)(1), (g), (h)(2), (j) through (n); amendatory instruction 5 adding § 1.50007; and amendatory instruction 7 adding § 54.11. The Commission will publish a document in the

Federal Register

announcing the effective date of those amendments.

FOR FURTHER INFORMATION CONTACT:

For further information, please contact Brian Cruikshank, Competition Policy Division, Wireline Competition Bureau, at

brian.cruikshank@fcc.gov.

SUPPLEMENTARY INFORMATION:

This is a summary of the Commission's Second Report and Order in WC Docket No. 18-89; FCC 20-176, adopted on December 10, 2020, and released on December 11, 2020. The full text of this document is available for public inspection on the Commission's website at

https://www.fcc.gov/document/fcc-adopts-rules-secure-communications-networks-and-supply-chain-0.

I. Introduction

1. The Commission plays an important role in protecting America's communications networks and the Commission takes further steps toward securing its communications networks by implementing the Secure and Trusted Communications Networks Act of 2019 (Secure Networks Act). The Commission first adopts a rule that requires ETCs to remove and replace covered equipment from their networks. Second, the Commission establishes the Secure and Trusted Communications Networks Reimbursement Program to subsidize smaller carriers to remove and replace covered equipment, once Congress appropriates at least $1.6 billion that Commission staff estimate will be needed to reimburse providers eligible under current law. Third, the Commission establishes the procedures and criteria for publishing a list of covered communications equipment or services that pose an unacceptable risk to the national security of the United States or the security and safety of United States persons and prohibit Universal Service Fund (USF) support from being used for such covered equipment or services. Last, the Commission adopts a reporting requirement to ensure it is informed about the ongoing presence of covered equipment in communications networks.

II. Report and Order

2. In the

2019 Supply Chain Further Notice,

85 FR 277, January 3, 2020, the Commission sought comment on the establishment of a reimbursement program to “offset reasonable costs” for ETCs to remove and replace covered communications equipment and services from their networks. The Wireline Competition Bureau (WCB) separately sought comment on section 4 of the Secure Networks Act, which created the Secure and Trusted Communications Networks Reimbursement Program. In the

2020 Supply Chain Second Further Notice,

85 FR 48134, August 10, 2020, the Commission sought comment on how to implement the various provisions of the Secure Networks Act into the Commission's ongoing Supply Chain proceeding. Based on the Commission's review of the record created in response, it adopts several rules to protect the security of its communications networks and implement the Secure Networks Act.

3. In the

2019 Supply Chain Further Notice,

the Commission proposed to require ETCs receiving USF support to remove and replace covered equipment and services from their network operations, contingent on the availability of a funded reimbursement program. The Commission based the scope of the proposed requirement on its view that sections 201(b) and 254 of the Communications Act provides the Commission the legal authority to condition receipt of USF support to advance universal service principles grounded in the provision of “[q]uality services . . . at just, reasonable, and affordable rates,” while furthering the public interest and the promotion of nationwide access to advanced telecommunications and information services, and sought comment on that rationale. Following the passage of the Secure Networks Act, which, among other provisions, established a reimbursement program for the removal, replacement, and disposal of covered equipment and services, the Commission modified its proposal and sought further comment on implementation of the Secure Networks Act and, specifically, whether it provided the Commission independent authority to require ETCs or other providers to remove and replace equipment on the Covered List.

4. Consistent with the Commission's proposal in the

2019 Supply Chain Further Notice

and the directives of the Secure Networks Act, it requires recipients of reimbursement funds under the Reimbursement Program and ETCs receiving USF support to remove and replace from their network and operations environments equipment and services included on the covered list required by section 2 of the Secure Networks Act (Covered List). The Commission conditions this obligation to remove and replace covered equipment and services upon a congressional appropriation to fund the Reimbursement Program. The Commission also adopts deadlines consistent with those for reimbursement funding recipients. This requirement, and the steps the Commission takes towards its implementation, will further its goal of protecting its communications networks and supply chains from communications equipment and services that pose a national security threat while facilitating the transition to safer and more secure alternatives.

5. The obligation to remove and replace covered equipment and services on the Covered List applies to recipients of reimbursement funds from the Reimbursement Program and ETCs receiving universal service support. The Commission's authority to require these entities to remove and replace covered equipment and services arises from both

the Secure Networks Act and sections 201(b) and 254(b) of the Communications Act. By limiting the requirement to these recipients, the Commission protects the nation's networks from a substantial amount of equipment and services that pose a threat to the security of its communications networks while minimizing the financial and logistical challenges of removal and replacement on providers.

6. The Secure Networks Act requires any recipient of Reimbursement Program funding to remove all existing covered equipment or services in their networks as a condition of receiving reimbursement funds. The Secure Networks Act prohibits recipients of reimbursement funds from purchasing, renting, leasing, or otherwise obtaining covered equipment or services with reimbursement funds or any other funding, including private funds. Recipients must also certify that they will permanently remove, replace, and dispose of all covered equipment or services that are in the recipient's network as of the date of submission of the application for reimbursement. Also, recipients must certify that they have fully complied, or are in the process of complying, with all terms and conditions of the Reimbursement Program, all commitments made in the application, and the timeline submitted with the application. These provisions indicate congressional intent that recipients of Reimbursement Program funds are to be included within the scope of the Commission's remove-and-replace rule and must remove covered equipment. Additionally, commenters support a broad application of the Commission's remove-and-replace requirement to entities that meet the definitions contained in the Secure Networks Act. Because section 4 of the Secure Networks Act requires the removal and replacement of covered equipment and services from recipients' networks, the Commission finds sufficient support both in the language of the statute and the record to include recipients of reimbursement funding from the Reimbursement Program in the Commission's remove-and-replace requirement. No commenters in the record oppose this conclusion. While Huawei Technologies Company (Huawei) argues that the Secure Networks Act does not grant the Commission authority to mandate removal and replacement as proposed in the

2019 Supply Chain Further Notice,

it does not dispute that recipients of funding through the Reimbursement Program, who volunteer to participate in the Program, are required to remove covered equipment and services as a condition of receiving funding.

7. To ensure that USF funds are not supporting covered equipment and services, and that the Commission's rule effectively and broadly removes covered equipment and services from recipients' networks to the extent permissible under its legal authority, the Commission obligates ETCs receiving USF support to remove covered equipment and services throughout their entire network, not just in jurisdictions where they operate as an ETC, and irrespective of whether they receive reimbursement under the Reimbursement Program. This broad approach to removal greatly mitigates the identified risks to national security underlying both the Commission's rules and recognized by Congress. However, the scope of the rule does not extend to affiliates and subsidiaries of ETCs. The Commission's decision to require ETCs that receive USF support to remove covered equipment and services is also consistent with the scope of removal under the Reimbursement Program recipient obligations in the Secure Networks Act, which similarly requires recipients to permanently remove covered communications equipment or services contained on the Covered List from their networks. By aligning the scope of the Commission's removal requirement with the obligations under section 4 of the Secure Networks Act, its rules will best effectuate the congressional intent to “mitigat[e] threats posed by vulnerable communications equipment and services” throughout U.S. networks.

8. The Commission conditions the implementation of its remove-and-replace rule on the appropriation of funding by Congress for the Reimbursement Program, to ensure sufficient funding is available to pay for the removal and replacement of covered equipment. Several commenters support this proposal and encourage the Commission to wait until Congress has appropriated funding, and others express concern that any obligation to remove and replace covered equipment and services without reimbursement amounts to an unfunded mandate.

9. Pursuant to the Secure Networks Act, only providers with two million or fewer broadband customers are eligible for the Reimbursement Program, but the Commission finds no reason to accordingly limit the applicability of its remove-and-replace rule to only those ETCs which are eligible for the Reimbursement Program. Although the data shows the vast majority of ETCs will be eligible to receive funding under the Reimbursement Program, in line with the intended scope of eligible entities as set forth by Congress under the Secure Networks Act, some large ETCs receiving USF support may not be eligible for reimbursement under the Reimbursement Program due to the size of their broadband customer base. ETCs are providers of “advanced communications services” and, as such, are subject to the provisions of the Secure Networks Act, including prohibitions on Federal subsidy spending in section 3 and reimbursement in section 4 of the Secure Networks Act, where eligible. Regardless, the House Report suggests that Congress intended to focus on providing reimbursement for small providers, noting that larger communications companies “generally have avoided installing and using Huawei and other suspect foreign equipment in their networks,” while smaller providers with limited resources may have purchased such equipment because it was less expensive or they were unaware of the security risks, or both. Based on the data submitted pursuant to the Information Collection and subscription data from FCC Form 477, only two ETCs using suspect foreign equipment appear to fall outside the scope of reimbursement eligibility due to the number of broadband customers. Larger ETCs are also more likely to have resources to pay for removal, replacement, and disposal of covered communications equipment and services themselves, and not need taxpayer money to accomplish the objectives of the Commission's remove-and-replace requirement. The Commission clarifies that ETCs receiving USF support that do not receive funding through the Reimbursement Program are required to remove covered communications equipment and services from their networks, but whether they replace such equipment and services with alternatives from the Replacement List is within their discretion. Furthermore, nothing in the Secure Networks Act prevents the Commission from requiring removal from entities beyond those who receive reimbursement funding. Because of the serious risks that untrusted participants in the Commission's supply chain pose to the Commission's communications networks, the benefits to our national security of removing covered equipment and services from the Commission's communications networks far outweigh the burdens that compliance with the requirement may impose on a small number of large ETCs.

10. The Commission further clarifies that, consistent with the requirements for participation in the Reimbursement Program under the Secure Networks Act, it requires all ETCs receiving USF support to dispose of the removed covered equipment and services rather than resell, donate, or trade them. Similar to other applications of the rule, such as the certification requirement, this requirement synchronizes the disposal requirements for ETC recipients of USF support with those applicable to other reimbursement recipients and minimizes any burdens that may result from the administration of disparate regimes. Furthermore, allowing ETCs that receive USF support to resell covered equipment and services removed from their networks undermines the effectiveness of the rule and fails to effectively eliminate those products that pose national security risks from the Commission's communications networks and supply chain.

11. The application of the Commission's remove-and-replace requirement to both ETCs receiving USF support and recipients of reimbursement under the Reimbursement Program appropriately considers the benefits to our national security of a broader approach against the burdens to remove and replace covered communications equipment and services from networks. The Commission recognizes that the presence of products in communications networks that pose risks to our national security is not limited to ETCs and believe that the application of its remove-and-replace requirement to recipients of reimbursement funding in addition to ETCs receiving USF support encompasses a wide range of entities whose networks may contain covered equipment or services. Furthermore, while some commenters support an expansive application of the remove-and-replace rule to require all entities to replace covered equipment or services, rather than just the recipients described in this document, the Commission finds that the slightly more limited scope of its rule not only covers entities with flawed equipment and services, it also best captures the broadest application while staying within the bounds of the Commission's legal authority. Some commenters representing non-ETC USF recipients such as schools, libraries, and rural healthcare providers favor expanding the remove-and-replace requirement to non-ETC USF recipients because of the cyberthreats such recipients face when compromised equipment and services remain in their networks. While the Commission recognizes that the continued existence of such untrusted products in its communications networks and supply chains does introduce risks, it must, as USTelecom posits, consider the “large administrative burdens” that inclusion of non-ETC USF recipients would impose against the proportionate impact on national security. The Commission finds that limiting the requirement to recipients of the Reimbursement Program and ETC recipients of USF support, rather than all USF recipients, reduces the administrative burdens of removing and replacing covered equipment and services on non-ETC USF recipients while reducing national security threats to its communications supply chain. Eligible non-ETC USF recipients may voluntarily participate in the Reimbursement Program, which would subject them to the remove-and-replace requirement but also allow them to receive reimbursement for removal, replacement, and disposal of covered equipment and services; otherwise, non-ETC USF recipients are under no obligation to remove or replace covered equipment or services from their networks. The Commission draws this important distinction to avoid imposing an unfunded mandate on non-ETC USF recipients were the Commission to require the removal and replacement of covered equipment when such recipients are not eligible to participate in the Reimbursement Program. Nevertheless, because the record indicates very little covered equipment outside the USF programs requiring an ETC designation, the Commission will closely monitor future developments, including through the information collection adopted pursuant to section 5 of the Secure Networks Act, to determine whether addressing non-ETC USF recipients is necessary and appropriate. This information collection applies to all providers of advanced communications service, unlike the Commission's previous information collection adopted in the

2019 Supply Chain Information Collection Order,

85 FR 230, January 3, 2020, which applied only to ETCs, thus providing a more expanded and comprehensive awareness of covered communications equipment and services in networks.

12.

Legal Authority.

A variety of separate and independent statutory provisions provide the Commission with the appropriate authority and ability to impose a remove-and-replace requirement. Section 4 of the Secure Networks Act expressly requires recipients of Reimbursement Program funding to “permanently remove[ ]” and replace “all covered communications equipment or services” in their networks as a condition of receiving reimbursement funds. The Secure Networks Act requires applicants to certify that they will permanently remove, replace, and dispose of covered equipment or services in the recipient's network as of the date of submission of the application for reimbursement and further requires recipients to submit a final certification to the Commission that they have permanently removed, replaced, and disposed of, or are in the process of doing so, all covered communications equipment or services from their networks. Relatedly, the Secure Networks Act prohibits recipients of reimbursement funds from purchasing, renting, leasing, or otherwise obtaining covered equipment or services with reimbursement funds or any other funding, including private funds, indicating congressional intent to have covered equipment and services eliminated from recipients' networks as a condition of receiving funding.

13. The requirement adopted is similarly consistent with the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (2019 NDAA), which directs the Commission to “prioritize funding and technical support to assist affected . . . entities to transition from covered communications equipment [as defined by the statute], and to ensure that communications service to users and customers is sustained.” While one commenter indicated that the Commission could rely on the 2019 NDAA to obligate removal and replacement of covered equipment and services, it finds that the provisions of the Secure Networks Act, discussed in this document, builds upon the goals of the 2019 NDAA and provides the Commission with express authority to require removal and replacement. As the Commission finds they have sufficient authority under sections 201(b) and 254 of the Communications Act and various provisions of the Secure Networks Act, it needs not consider whether the Communications Assistance and Law Enforcement Act or sections 316 or 214 of the Communications Act provide a legal basis for regulation.

14. In addition, the Communications Act provides legal authority for the application of the Commission's rule to ETCs that receive USF support. As the U.S. Court of Appeals for the Tenth Circuit has held, section 254(e) is reasonably interpreted as allowing the Commission “to specify what a USF recipient may or must do with the

funds,” consistent with the policy principles outlined in section 254(b). Section 254(b) requires the Commission to base its universal service policies on the principles of providing “[q]uality services . . . at just, reasonable, and affordable rates,” as well as promoting “[a]ccess to advanced telecommunications and information services . . . in all regions of the Nation.” Section 201(b) authorizes the Commission to “prescribe such rules as may be necessary in the public interest to carry out the provisions of the [Communications] Act.” By requiring ETCs that receive USF support to remove covered equipment and services, the Commission further advances the provision of quality services nationwide, and ensure the safety, reliability, and security of the nation's communications networks, which is necessary in the public interest in fulfillment of the purpose of the Communications Act.

15. The record also supports the Commission's determination that the Communications Act provides the Commission broad legal authority to require removal of covered equipment and services by ETCs that receive USF support. Telecommunications Industry Association states that the Commission is “properly acting within its assigned responsibilities by promulgating rules that place conditions and restrictions on use of USF support.” WTA and NCTA both note that the Commission has clear and well-established authority to impose public interest conditions on the use of USF. Furthermore, the provisions of the Communications Act tied to the Commission's administration of universal service programs provide well-established authority for imposing remove-and-replace requirements on ETCs receiving universal service funds.

16. The Commission rejects arguments that it lacks the authority to mandate removal and replacement of covered equipment and services. Huawei asserts that neither the Secure Networks Act nor any other statute provides the requisite authority to impose a remove-and-replace requirement. According to Huawei, nothing in the Secure Networks Act requires removal and replacement, nor does the Reimbursement Program, which is voluntary, mandate removal. The Commission disagrees. The Secure Networks Act conditions receipt of reimbursement funds on removal and disposal of all covered equipment from the recipient's network; put differently, section 4 obligates recipients of reimbursement funds to certify to the removal of all covered equipment and services from their network, then provides a means by which to replace such equipment and services through reimbursement. While providers' participation in the Reimbursement Program is not mandatory, the Secure Networks Act requires the Commission to mandate removal of covered equipment and services by any provider who does choose to participate.

17. The Commission also rejects International Technology and Trade Associates, Inc. (ITTA) and Huawei's arguments that the Communications Act does not provide the Commission legal authority to adopt its remove-and-replace rule. ITTA argues that the proposed requirement is beyond the Commission's authority under section 254 of the Communications Act. Huawei argues that the section 254(b) principles upon which the Commission must “base policies for the preservation and advancement of universal service” do not include the promotion of national security or equipment regulation applied to a subset of USF recipients. Conditioning the receipt of USF support on removal of covered equipment and services, however, ensures against the substantial security risks associated with such equipment and services and thereby promotes access to “quality” advanced telecommunications and information services. Moreover, while Huawei contends that section 201(b) alone does not empower the Commission to enact rules in the absence of other authority under the Communications Act, it finds that the combination of these Communications Act provisions grants the Commission the authority to adopt a remove-and-replace requirement for ETCs receiving USF support.

18. The Commission limits the scope of the remove-and-replace requirement to equipment and services on the Covered List. This approach aligns with the scope of equipment and services that Congress intended to restrict under the statute, as both the section 3 prohibition and the section 4 reimbursement eligibility apply to equipment and services added to the Covered List. The Commission's rules on publication of the Covered List also incorporate notice for updates to the covered equipment or services listed, and entities will therefore have notice with regard to the scope of equipment or services they are subsequently required to remove and replace. The Commission finds that using the Covered List better aligns compliance with removal and replacement obligations to the administration of the Reimbursement Program and creates a bright-line determination for ETCs receiving USF support and reimbursement recipients to easily identify equipment and services to remove and replace from their networks. Furthermore, the Commission ties administration of the remove-and-replace requirement to the administration of the Reimbursement Program; therefore, it finds it will not be overly burdensome for entities, including smaller carriers, to identify, remove, replace, and discard covered equipment and services from their networks.

19. Consistent with the provisions of the 2019 NDAA and Secure Networks Act, this rule represents a reasoned modification of the Commission's proposal in the

2019 Supply Chain Further Notice.

There, the Commission proposed to require the removal of all equipment and services from covered companies. To synchronize the requirement the Commission adopts with the scope of covered equipment and services under the Secure Networks Act, however, the Commission slightly modifies its rule from its original proposal. The Commission concludes upon review of the record in this proceeding and after considering the Secure Networks Act that its proposal risks being too broad and excessively burdensome. The Commission's slightly modified and more narrowly tailored rule instead supports a risk-based assessment of problematic equipment and services within a network, consistent with the approach taken in section 889 of the 2019 NDAA and ultimately incorporated into section 2 of the Secure Networks Act, rather than the proposed blanket prohibition to all equipment and services produced by a manufacturer. The Covered List is limited to such equipment and services that the federal government, including the U.S. intelligence community, has identified as national security threats and that are placed at the most vulnerable spots in the Commission's communications infrastructure. Equipment and services on the Covered List are also limited to certain operational functions such as routing or redirecting user data traffic, causing an advanced communications service provider's network to be remotely disrupted, or otherwise posing an unacceptable risk to United States national security. Secure Networks Act sections 2(b)(2)(A)-(C). As such, concerns raised in the record regarding inclusion of Lifeline end-user equipment are moot because they are outside the scope of the Secure Networks Act. Therefore, the Commission believes limiting the remove-and-replace requirement to

equipment and services on the Covered List advances its goals of protecting its communications networks and supply chains from those products that pose a risk to our national security while minimizing the financial, administrative, and logistical efforts entities may face in compliance. The Commission clarifies that, while there is nothing in § 54.9 of the Commission's rules that restricts the use of private funds to purchase, obtain, maintain, improve, modify, or otherwise support any equipment or services produced or provided by any company posing a national security threat to the integrity of communications networks or the communications supply chain, nor is there anything in § 54.10 of the Commission's rules that restricts the use of private funds to purchase, rent, lease, or otherwise obtain any covered communications equipment or service, or maintain any covered communications equipment or service previously purchased, rented, leased, or otherwise obtained, as identified and published on the Covered List, compliance with the remove-and-replace mandate requires ETCs receiving USF support and recipients of Reimbursement Program funding to remove all covered equipment and services from their network operations and to certify compliance. To the extent there are equipment or services not on the Covered List but fall within the scope of § 54.9, entities may continue to use private funds to purchase, obtain, maintain, improve, modify, or otherwise support such equipment or services.

20. USTelecom posits that the Commission's proposal to implement section 3 of the Secure Networks Act “stands to create a significant gap in the scope of equipment that could be subject to replacement funding” vis-à-vis the scope of covered equipment under the two prohibitions. According to USTelecom, the Commission should either reconsider the scope of § 54.9 of the Commission's rules to match the definition of “covered communications equipment or service” required by the Secure Networks Act, or it should clarify that equipment subject to § 54.9 is also eligible for funded removal and reimbursement under the Reimbursement Program; otherwise, USTelecom argues, failure to do either creates a

de facto

unfunded mandate.

21. The Commission disagrees with USTelecom that the interplay of § 54.9 and Reimbursement Program eligibility amounts to an unfunded mandate. First, section 3 of the Secure Networks Act does not, in itself, require the removal and replacement of covered equipment or services; it merely prohibits prospective use of certain Federal subsidies to purchase, rent, lease, or otherwise obtain any covered communications equipment or service, or maintain any covered communications equipment or service previously purchased, rented, leased, or otherwise obtained on the Covered List. Second, the requirement to remove and replace, like the prohibition under § 54.10 and the equipment and services eligible for reimbursement under the Reimbursement Program, only applies to the products and services contained on the Covered List. To the extent there is equipment or service that is prohibited under § 54.9 but is not on the Covered List, it is not subject to the remove-and-replace requirement, and thus that rule does not constitute an unfunded mandate. The Commission does, however, acknowledge that the creation of two prohibitions will establish different parameters for designation of covered equipment or services.

22. The Commission disagrees with arguments raised by commenters that mandating removal and replacement is impermissibly retroactive or amounts to a regulatory taking. The Commission addresses these two concerns raised in the record in turn.

23. Pursuant to the Administrative Procedure Act (APA), in the absence of express statutory authority to promulgate retroactive rules, the Commission may only adopt legislative rules that apply prospectively. The Commission notes that the Secure Networks Act requires it to publish a list of any covered communications equipment or service produced by an entity that poses an unacceptable risk to national security or the security and safety of United States persons and to establish a reimbursement program for removal of such equipment purchased, rented, leased, or otherwise obtained before August 14, 2018. The Secure Networks Act requires the Commission to publish the list of covered communications equipment or services to its website and to complete a rulemaking to implement the reimbursement program by March 12, 2021. To the extent the rules adopted in this document serve to implement the rulemaking requirement of the Secure Networks Act, this APA limitation is inapplicable. A rule may be found to be impermissible as primarily retroactive “if it impairs rights a party possessed when he acted, increases a party's liability for past conduct, or imposes new duties with respect to transactions already completed.” Additionally, a rule may be impermissible for secondary retroactivity, in which rules affect the future legal consequence of past or ongoing actions. Where a rule has secondary retroactive effect, it is permissible unless such effect is unreasonable. And the Takings Clause of the Fifth Amendment prohibits the government from taking “private property . . . for public use, without just compensation.” Notably, and relevant to any takings arguments, Commission and judicial precedent have established that carriers have no vested property interest in USF support.

24.

Retroactivity Claims.

Huawei argues that the Commission's proposal to mandate replacement of covered equipment and services would impose primary retroactivity and therefore be invalid under the APA and, further, would impose secondary retroactivity by adversely and unreasonably altering future legal consequences of past actions. According to Huawei, requiring removal of equipment and services installed before the adoption of § 54.9 of the Commission's rules would “constitute a sanction on Huawei's past conduct” and restrict its ability to supply equipment and services to telecommunications carriers. LATAM argues that a remove-and-replace requirement raises concerns about the retroactive impact of regulatory actions on private investment. PRTC states that the requirement raises the same prospective application concerns that the Commission found would not be impacted in the

2019 Supply Chain Order,

85 FR 230, January 3, 2020, when adopting § 54.9 of the Commission's rules, thus contradicting the Commission's arguments in that

Order

that the rule would only be applied prospectively and not require carriers to remove or stop using existing equipment or services.

25. The Commission disagrees with commenters that the remove-and-replace requirement constitutes impermissible primary retroactivity. Huawei claims that the rule attaches a “new disability” or “new burdens” to past conduct. In support of its argument, Huawei cites

National Mining Association,

where the D.C. Circuit found that a Department of Interior rule was invalid because it imposed a “new disability,” namely permit ineligibility, based upon “pre-rule violations by mine operators over whom permit operators acquired control before the rule's effective date.” It also cites

Rock of Ages Corp.,

where the Second Circuit found a new regulation from the Department of Labor to be impermissibly retroactive because it required on-going inspections at blasting sites beginning a year before the effective date of the regulation that imposed the inspection requirement,

thus impermissibly imposing new duties on already completed transactions. Huawei also cites

AMC Entertainment, Inc.,

where the Ninth Circuit invalidated an agency's interpretation of a rule which would have required retrofitting movie theaters before the agency announced its interpretation. The Commission finds that Huawei's interpretation of these cases is incorrect as applied to the requirement at hand. The standard for primary retroactivity assesses whether a rule has changed the past legal consequences of past actions. Unlike the factual circumstances in the cases cited by Huawei, the remove-and-replace requirement does not attach a “new disability” before the rule goes into effect. Carriers will not be penalized for having covered equipment or services in their networks before the removal and replacement rule is effective, nor do they have to take action prior to the rule taking effect; therefore, the rule has no primary retroactive effect. Thus, while it “changes the legal landscape,” it has not “rendered past actions illegal or otherwise sanctionable,” even as to the carriers themselves—much less those from whom the carriers purchase equipment not governed by such rules, such as Huawei. As to Huawei, the new rules have no application at all. They apply only to carriers, requiring them to replace Huawei equipment only if and after reimbursement to the carriers for doing so becomes available. While collateral effects on its contracts with such carriers would not be cognizable as primary retroactivity under

NCTA,

in any event Huawei makes no claim that the Commission's action could result in any carrier claims against Huawei, much less any damages in support of any such claims notwithstanding the reimbursement program.

26. While the effect of the removal and replacement rule may alter the future legal consequence to certain carriers of having certain equipment or services in a network by making what was once permissible equipment and services to operate now impermissible to retain going forward, “[i]t is often the case that a business will undertake a certain course of conduct based on the current law, and will then find its expectations frustrated when the law changes.” Such action “has never been thought to constitute retroactive lawmaking, and indeed most economic regulation would be unworkable if all laws disrupting prior expectations were deemed suspect.”

27. The Commission similarly finds Huawei's arguments regarding secondary retroactivity unpersuasive. Huawei argues that to compel equipment replacement would impose unreasonable secondary retroactivity on carriers and suppliers “because such a requirement would adversely and unreasonably alter the future legal consequences of past actions” and render covered equipment “essentially useless.” However, “secondary activity—which occurs if an agency's rule affects a regulated entity's investment made in reliance on the regulatory status quo before the rule's promulgation—will be upheld if it is reasonable.” First, the Commission disagrees with Huawei that this rule constitutes secondary retroactivity. The remove-and-replace requirement imposes a future obligation, albeit on existing property, by mandating removal,

as well as

replacement, of covered equipment and services; replacement can only occur once removal—a future action—occurs. As such, this requirement imposes a legal consequence on an action to occur at a future date,

i.e.,

should a reimbursement recipient or an ETC receiving USF support retain covered equipment or services in its networks past the certification requirement deadline for the rule. And the Commission, in creating the Reimbursement Program, has sought to mitigate any harm that the future effect of the rule may incur.

28. Second, even assuming

arguendo

that the removal-and-replacement requirement amounts to secondary retroactivity, it is reasonable and therefore permissible. The threat that the presence of covered equipment and services in the Commission's communications networks poses to our national security necessitates the prompt removal and replacement of such equipment, thereby supporting that this requirement is not arbitrary and capricious. Courts have held that the Commission “is entitled to reconsider and revise its views as to the public interest and the means needed to protect that interest, though it must give a sufficient explanation of that change.” The rule the Commission adopts facilitates the transition away from such identified equipment and services that threaten our nation's security to ensure entities are able to offer secure, reliable, and quality service over their networks. To that end, the Commission's rule is no different than other regulatory requirements which require regulated entities to upgrade their networks for the improved provision of services. For example, the Commission may require a common carrier subject to section 214 of the Communications Act to “provide itself with adequate facilities for the expeditious and efficient performance of its service” which, for some carriers, could require an upgrade of their equipment. Similarly, the remove-and-replace rule requires recipients of reimbursement funding and ETCs receiving USF support—which are, in fact, common carriers—to effectively upgrade their networks by removing compromised products and services and thus improve the provision of quality services at just, reasonable, and affordable rates, in accordance with section 254 of the Communications Act.

29. Third, providers may choose alternatives to removal and replacement of covered equipment and services to avoid compliance or avoid any perceived impact on private investment. Participation in the Reimbursement Program is voluntary; providers are under no obligation to accept reimbursement funding and the conditions associated with such support. Designation as an ETC, and the opportunity therefore to participate in USF programs, or acceptance of USF funds through those programs, is likewise voluntary, and providers that are currently designated as ETCs or that accept universal service funding may decline to participate in USF programs. To allow providers so inclined a reasonable opportunity to relinquish their ETC status or secure alternative funding to USF support, ETCs choosing this option must do so within one year after WCB issues a Public Notice announcing the acceptance of applications filed during the initial filing window to participate in the Reimbursement Program. A state commission, or the Commission in the case of a common carrier providing telephone exchange service and exchange access that is not subject to the jurisdiction of a state commission, shall permit an ETC to relinquish its designation as such in any area served by more than one ETC. This time period is consistent with the amount of time that carriers participating in the Reimbursement Program and for ETCs receiving USF support that retain their designation or continue to accept universal service funding have to comply with the remove-and-replace requirement. Finally, the Commission reiterates that the applicability of this rule is within the bounds of its legal authority and, as such, only extends to recipients of reimbursement funds and ETCs receiving USF support; beyond this, the rule imposes no restriction on Huawei's ability to supply equipment and services to telecommunications carriers and other providers who are not subject to this requirement. ETCs that choose to forego their ETC designation

or disclaim USF support may avoid any impact that this rule may have on future legal consequences of past actions. While the rule no doubt may frustrate a business that undertook a course of conduct based on current law, only to have its expectations frustrated, when the law changes, “this has never been thought to constitute retroactive lawmaking.”

30. Furthermore, the Commission disagrees with PRTC's assertion that the rule it adopts raises the same concerns regarding prospective application that the Commission addressed when adopting § 54.9 in the

2019 Supply Chain Order.

In that

Order,

the Commissions found that because the rule restricting use of USF support was prospective in effect, it therefore did “not prohibit the use of existing services or equipment already deployed or in use.” That finding is not contradicted here. The prohibition contained in § 54.9 of the Commission's rules prospectively limits the use of future USF support, whereas the requirement to remove and replace obligates recipients of reimbursement funding and ETCs receiving USF support to take action to remove covered equipment and services from their networks. Not only do the regulations impose different obligations, but, as stated in this document, the future receipt of USF support is not mandatory. Therefore, under both rules, affected entities may decline to accept USF support and avoid compliance with either rule.

31.

Unconstitutional Taking.

LATAM argues that the Commission's remove-and-replace requirement raises regulatory takings concerns. PRTC contends that this requirement raises the same regulatory takings arguments that the Commission addressed in the

2019 Supply Chain Order.

Huawei also argues that mandating removal and replacement would violate the Takings Clause and due process “because carriers have vested property interests in already-purchased equipment, and mandating its removal would deny all economically beneficial or productive use or all economically viable use of the equipment.”

32. The Commission finds the arguments from LATAM, PRTC, and Huawei unpersuasive. As explained in the

2019 Supply Chain Order,

universal service support recipients do not have a property interest in maintaining particular levels of support notwithstanding changes in the program rules. Nor is the Commission persuaded that the effects on carriers' existing equipment represents a regulatory taking under the

Penn Central

framework. In assessing whether such a taking has occurred, courts consider: (1) The economic impact of the regulation on the regulated party; (2) the extent to which the regulation interferes with the regulated party's reasonable investment-backed expectations; and (3) the “character” of the government action. First, the economic impact on carriers is minimal, especially for reimbursement recipients who are eligible to receive reimbursement for reasonable costs incurred to remove, replace, and dispose of covered equipment through the Reimbursement Program. For those ETCs receiving USF support that do not receive reimbursement funding, the impact to replace covered equipment and services should not be severe because larger entities, who would otherwise be ineligible for reimbursement, are less likely to have covered equipment or services in their networks and otherwise have more opportunity to bear the cost of any such replacement due to their size. Second, the rule should not upend reasonable investment-backed expectations, as providers have been aware of the designation of certain products and manufacturers as covered equipment or services since the passage of the 2019 NDAA in 2018. And over the last decade, Congress and the Executive Branch have repeatedly stressed the importance of identifying and eliminating potential security vulnerabilities in communications networks and their supply chains. Third and finally, the requirement does not amount to a physical invasion of the property, especially when there is recourse for entities to relinquish their ETC designation or forego receiving future USF support in order to avoid any consequence of the rule upon physical property.

33. As an alternative basis for the Commission's conclusion, it is not persuaded that the regulatory takings precedent represents the appropriate manner of analyzing its action here. In particular, the restriction applies only as a condition on a provider's continued participation in the federal universal service program, including receipt of compensation from the federal universal service support mechanisms. However, recipients of Reimbursement Program funding are prohibited from using funding, including private funds to purchase, rent, lease, or otherwise obtain any covered communications equipment or service. Even assuming

arguendo

that the restriction resulted in some effect on providers' property interest in their existing equipment, there is a sufficient nexus and proportionality between the restriction and the providers' participation in the USF programs. The restriction on use of universal service support for equipment and services that pose an ongoing security risk has a clear nexus to the Commission's legitimate concerns, as explained in the

2019 Supply Chain Order.

By targeting the providers' actions only insofar as they would be using federal universal service support in a manner that perpetuates a security risk, the restriction is appropriately proportional to address that harm.

34. Separately, the Commission observes that these arguments only focus on the removal of the equipment and disregard the support provided for the replacement of the equipment and the availability of “just compensation” through reimbursement appropriations. Eligibility for providers of advanced communications service to participate in the Reimbursement Program is expansive, and the vast majority of affected entities required to remove and replace covered equipment and services under the Commission's rule by virtue of their continued receipt of universal service support will be eligible to receive reimbursement. Where recipients of reimbursement funding do have a property interest in the covered equipment the Commission requires them to remove, the Reimbursement Program offers just compensation.

35. In the

2019 Supply Chain Further Notice,

the Commission proposed making the remove-and-replace requirement contingent on the creation of a reimbursement program that would help “mitigate the impact on affected entities, and in particular small, rural entities.” Commenters supported this approach. Accordingly, the Commission will proceed as proposed and make compliance with the removal obligation that will coincide with the implementation of the Reimbursement Program, which the Commission separately establishes in the following. Specifically, the Commission will require ETC recipients of USF support to certify that they have complied with its new rule requiring the removal of equipment and services on the Covered List. The first certification will be required one year after WCB issues a Public Notice announcing the acceptance of applications filed during the initial filing window to participate in the Reimbursement Program. Once the one-year period has expired, ETCs receiving USF support will then need to certify going forward that they are not using equipment or services identified on the Covered List before receiving USF support each funding year. Participants in the Reimbursement Program will not need to certify

compliance with the remove-and-replace rule until after the expiration of their removal, replacement, and disposal term.

36. The Commission finds that adopting a uniform certification requirement and transition period will promote equitable compliance deadlines for all entities subject to the remove-and-replace requirement, regardless of their participation in the Reimbursement Program. Additionally, as the threat to our national security is immediate, it better advances the Commission's goals to require entities to remove and replace covered equipment and services consistent with the transition periods for reimbursement in the Reimbursement Program, rather than permitting them to wait until such products are at end-of-life or replaced in the ordinary course of business.

37. The Secure Networks Act's requirements apply to “communications equipment or service” and to providers of “advanced communications service.” Although the Secure Networks Act defines “communications equipment or service” as “any equipment or service that is essential to the provision of advanced communications service,” it does not define which factors make equipment or service “essential.” Similarly, the Secure Networks Act defines “advanced communications service” as the “advanced telecommunications capability” described in section 706 of the Telecommunications Act of 1996, which encompasses “high-speed, switched, broadband telecommunications capability that enables users to originate and receive high-quality voice, data, graphics, and video telecommunications using any technology,” but does not define how the Commission should determine what constitutes “high-speed, switched, broadband telecommunications capability.” In the

2020 Supply Chain Second Further Notice,

the Commission sought comment on how to interpret these two terms employed throughout the Secure Networks Act.

38.

Interpretations of “communications equipment or service”.

Consistent with the Commission's proposal in the

2020 Supply Chain Second Further Notice,

it interprets “communications equipment and service” as defined in section 9(4) to include all equipment or services used in fixed and mobile broadband networks, provided they include or use electronic components. Included in the definition of “communications services” is software and firmware used in broadband networks. This interpretation is consistent with Commission precedent regarding software's potential security risk. Also included in this definition is any optical switching equipment or services that include or use electronic components. The Commission believes that all equipment or services that include or use electronic components can be reasonably considered essential to broadband networks, and it further believes that the Commission's definition will provide a bright-line rule that will ease regulatory compliance and administrability. The Commission's proposed definition received support from several commenters in the record, who agreed that it provides regulatory certainty and as one commenter explained, “would make it universally clear for compliance purposes.” RWA also supports the definition because it “provides the FCC with the flexibility it needs as technology evolves so that regulations do not lag behind technological developments.”

39. The Commission rejects arguments that it should interpret “communications equipment or service” more broadly or narrowly. Although the Commission agrees with CCA that it “needs not adopt a cramped interpretation in order to implement the [Reimbursement] Program,” the definition is appropriately tailored because it provides clear and simple guidance to regulated parties while still covering any equipment and service that could potentially pose a threat to national security. The Commission's decision to include in the definition of communications equipment or services any equipment or service that includes or uses electronic components does not alter or modify the statutory language, but instead interprets it in a way so as to “most accurately reflect[ ] the broad participant pool Congress intended for the program.”

40. Alternatively, CTIA's argument that the Commission's definition is “unduly broad” conflates its interpretation of “communications equipment or service” with the separate inquiry in section 2(b)(2) of the Secure Networks Act. Section 2(b)(2) provides that, relying solely on determinations made by a list of enumerated sources, the Commission shall publish on the Covered List communications equipment or service that meet specific criteria. CTIA would read out the difference between “communications equipment or service” in section 9(4) of the Secure Networks Act and section 2(b)(2), which limits the Covered List, to communications equipment and services that possess certain capabilities. CTIA proposes to “narrow the scope of the `communications equipment or service' ” because “not all equipment subcomponents are essential,” and asks the Commission to “develop a risk-based analysis relevant to the core layer, distribution layer, and access layer.” The Commission disagrees because the Secure Networks Act already provides a definition for the subset of communications equipment and services that have been subjected to the section 2(b)(2) review. Section 9(5) defines “covered communications equipment or service” as “any communications equipment or service that is on the [Covered List] . . . ,” and, thus, subject to the section 2(b)(2) criteria. These factors, which determine which pieces of equipment or service should be considered “covered communications equipment and services,” and thus must be published on the Covered List, do not apply to the definition of “communications equipment and services.”

41.

Definition of “advanced communications service.”

Consistent with the Commission's proposal in the

2020 Supply Chain Second Further Notice,

it interprets “advanced communications service” for the purposes of the Secure Networks Act to include services with any connection of at least 200 kbps in either direction. No commenter opposed this definition. This interpretation had unanimous support in the record and is consistent with the Commission's historic interpretation of section 706 of the Telecommunications Act. The Commission acknowledges that it has encouraged providers of advanced communications service to offer broadband service at greater speeds and adjusted over time its definition of advanced telecommunications capability in its annual Broadband Deployment Reports. However, the Commission's interpretation in this proceeding covers a broader array of equipment and services, consistent with congressional intent to identify and remove insecure equipment and, therefore, it believes establishing a standard that captures this broader number of providers is appropriate. Using the standard will maximize program participation to include providers with older, legacy technology.

42. The Commission agrees with Dell that its interpretation “would ensure that insecure equipment is not left in our nation's interconnected broadband networks.” The 200 kbps threshold is a familiar benchmark to current providers of advanced communications services, as it matches the definition of “broadband services” the Commission uses to determine which facilities-based broadband providers must file the

Commission's FCC Form 477 and which helps determine the availability of advanced communications services throughout the country. The Commission does not modify the definition of “advanced communications service” for any other purposes other than interpreting the Secure Networks Act. Using this standard will also allow the Commission to leverage available information on FCC Form 477 filers to verify applicant eligibility.

43. Section 2(a) of the Secure Networks Act directs the Commission to publish, no later than March 12, 2021, a list of covered communications equipment and services (Covered List). The Covered List, which will be publicly available, will serve as a reference for interested parties to indicate the communications equipment and services that certain providers must remove from their networks, as well as the equipment and services to which the section 3(a) prohibition applies, the communications equipment and services eligible for reimbursement pursuant to section 4, and the equipment and services that form the basis for the reporting requirements in section 5.

44. Consistent with the clear direction in the Secure Networks Act and the Commission's proposal in the

2020 Supply Chain Second Further Notice,

the Commission will publish on its website the Covered List of communications equipment or services determined to pose an unacceptable risk to the national security of the United States or the security and safety of United States persons. Section 2(c) of the Secure Networks Act states that the “Commission shall place” on the Covered List “any communications equipment or service that poses an unacceptable risk to the national security of the United States or the security and safety of United States persons based solely on one or more of the following determinations,” and then lists four sources for such determinations:

• “A specific determination made by any executive branch interagency body with appropriate national security expertise, including the Federal Acquisition Security Council”;

• “A specific determination made by the Department of Commerce pursuant to Executive Order No. 13873 . . . relating to securing the information and communications technology and services supply chain”;

• “The communications equipment or service being covered telecommunications equipment or services, as defined in section 889(f)(3)” of the 2019 NDAA; or

• “A specific determination made by an appropriate national security agency.” The Act defines “appropriate national security agency” to include the Department of Homeland Security, the Department of Defense, the Office of the Director of National Intelligence, the National Security Agency, and the Federal Bureau of Investigation.

45.

Requirement to accept determinations.

Consistent with the

2020 Supply Chain Second Further Notice,

the Commission interprets Congress's use of the words “shall place” to mean it has no discretion to disregard determinations from these enumerated sources. Huawei agrees, and stated in its comments that “the Secure Networks Act's use of the term `shall' provides the Commission no discretion” when evaluating determinations for inclusion on the Covered List. The record supports the Commission's interpretation. For example, USTelecom contends that “once one of the federal agencies, either enumerated or implied, make a granular determination about `covered equipment', the Commission is bound to accept it.” Similarly, NCTA explains that “[the] Secure Networks Act did not grant the Commission plenary authority to regulate the communications network supply chain based upon its own assessment of national security risks posed by covered equipment and services.” Thus, where there is a determination from one of these sources, the Commission must take action to publish or update the Covered List to incorporate communications equipment or services covered by that determination. While it is difficult for the Commission to calculate the national security benefits derived from removing covered communications equipment and services, the Secure Networks Act requires the Commission to rely on the judgment and expertise of those enumerated sources tasked with making this assessment.

46.

No deviation from enumerated sources.

Consistent with the Commission's proposal in the

2020 Supply Chain Second Further Notice

and the record, it interprets Congress' use of the word “solely” in section 2(c) to mean the Commission can accept determinations only from these four categories of sources. “In taking action under subsection (b)(1), the Commission shall place on the list any communications equipment or service that poses an unacceptable risk to the national security of the United States or the security and safety of United States persons based

solely

on one or more of the following determinations . . . .” This interpretation is shared by multiple commenters, including USTelecom, NCTA, NTCA, CTIA, and Huawei.

47.

Determinations from any executive branch interagency body with appropriate national security expertise.

The Secure Networks Act directs the Commission to rely on “a specific determination made by any executive branch interagency body with appropriate national security expertise, including the Federal Acquisition Security Council” to accept determinations. The Commission includes in this definition two cross-government groups: Team Telecom and the Committee on Foreign Investment in the United States (CFIUS), as these executive branch interagency bodies routinely provide expert advice to the Commission on national security-related questions. The members of Team Telecom are the Secretary of Defense, the Attorney General, the Secretary of Homeland Security, and the head of any other executive department or agency, or any Assistant to the President, as the President determines appropriate. The Executive Order establishing Team Telecom explained that Team Telecom was created to “assist the FCC in its public interest review of national security and law enforcement concerns that may be raised by foreign participation in the United States telecommunications services sector.” The Executive Order creating CFIUS authorized it to conduct inquiries “with respect to the potential national security risk posed by a transaction.”

48. The Commission has no discretion to ignore determinations from CFIUS and Team Telecom because they are plainly “executive branch interagency bodies with appropriate national security expertise.” For example, Team Telecom and the economic agencies (Department of Commerce, U.S. Trade Representative, and Department of State), recently recommended in 2018 that the Commission deny China Mobile USA's section 214 application, finding that allowing China Mobile USA to “offer telecommunications services as a common carrier between the United States and international countries . . . would pose substantial and unacceptable national security and law enforcement risks” because China Mobile USA is “subject to exploitation, influence, and control by the Chinese Government.” The Commission assessed this recommendation as part of its public interest analysis of the pending application and concluded that “significant national security and law enforcement harms would arise from granting China Mobile USA an

international section 214 authorization” and decided determined that a “grant of the application would result in substantial and serious national security and law enforcement risks.” And the Commission recently adopted rules streamlining the process by which it “coordinates with [Team Telecom] for assessment of any national security, law enforcement, foreign policy, or trade policy issues regarding certain applications filed with the Commission.”

49. The Commission therefore disagrees with CTIA and NTCA that findings from Team Telecom or CFIUS “are not structured to make determinations of general supply chain risk,” because regardless of their structure, the Commission must incorporate any determinations they make into the Covered List. Huawei argues that relying on Team Telecom and CFIUS is unnecessary “given the involvement of the agencies that comprise CFIUS and Team Telecom in other relevant bodies identified in the Secure Networks Act.” But that argument fails to recognize that section 2(c)(1) of the Secure Networks Act specifically includes executive branch interagency bodies with appropriate national security expertise. The Commission also disagrees with CTIA's claim that determinations made by the [Federal Acquisition Security Council] should not “result in automatic listing of items on the Covered List” because the “FASC does not operate in a public fashion.” The Secure Networks Act specifically lists the Council as an executive branch interagency body with national security expertise, and the Commission has no authority to disregard Congress's clear direction. Moreover, any additions the Commission makes to the Covered List will be made public.

50.

Determinations from the Department of Commerce.

The Secure Networks Act directs the Commission to rely on determinations made by the Department of Commerce. Executive Order No. 13873 grants the Secretary of Commerce the authority to prohibit any transaction of any information and communications technology or service where the Secretary, in consultation with other relevant agency heads, determines that the transaction: (i) Involves property in which foreign country or national has an interest; (ii) includes information and communications technology or services designed, developed, manufactured, or supplied by persons owned by, controlled by, or subject to the jurisdiction or direction of a foreign adversary; and (iii) poses certain undue risks to the critical infrastructure or the digital economy in the United States or certain unacceptable risks to U.S. national security or U.S. persons. In November 2019, the Department of Commerce commenced a rulemaking to implement Executive Order No. 13873. The proposed rule would authorize the Secretary to make a preliminary determination to prohibit or mitigate certain transactions, subject to a notice period before the Secretary issues a final determination.

51. Pursuant to this statutory requirement, the Commission will incorporate any final determinations from the Department of Commerce and add them to the Covered List once they are published in the

Federal Register

. Although CTIA contends that “Commerce's implementation of the 2019 Supply Chain E.O. is replete with concerns about breadth and unpredictability,” the Secure Networks Act does not permit the Commission the discretion to alter or ignore Department of Commerce determinations. Furthermore, administrative and judicial remedies are available should there be any disagreement with the Department of Commerce's implementation of its authority under the Secure Networks Act to make determinations, and those have no bearing here. The Commission will, therefore, comply with its statutory obligation to incorporate determinations from the Department of Commerce's proceeding into the Covered List.

52.

Determinations from the 2019 NDAA.

The third enumerated source for determinations is found in section 889(f)(3) of the 2019 NDAA. Each subpart of section 889(f)(3) contains determinations. Section 889(f)(3) of the 2019 NDAA defines “covered telecommunications equipment or services” to include “(A) telecommunications equipment produced or provided by Huawei or ZTE Corporation (ZTE); (B) for the purpose of public safety, security of government facilities, physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications Corporation (Hytera), Hangzhou Hikvision Digital Technology Company (Hikvision), or Dahua Technology Company (Dahua); [and] (C) telecommunications or video surveillance services provided by such entities or using such equipment.” Additionally, section 889(f)(3)(D) provides that covered telecommunications equipment or services includes “[t]elecommunications or video surveillance equipment or services produced or provided by an entity that the Department of Defense, in consultation with the Director of National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the governments of [the People's Republic of China].”

53. As the Commission explained in the

2020 Supply Chain Second Further Notice,

the 2019 NDAA establishes four sources of determinations. The first is telecommunications equipment produced or provided by Huawei or ZTE capable of the functions outlined in sections 2(b)(2)(A)-(C) of the Secure Networks Act. The Commission “shall place” on the Covered List “any communications equipment or service” “if, based exclusively on the determinations” under section 2(c), such equipment or service poses an unacceptable risk to the national security of the United States and the security and safety of United States persons” and is “capable” of “(A) routing or redirecting user data traffic or permitting visibility into any user data or packets that such equipment or service transmits or otherwise handles; (B) causing the network of a provider of advanced communications service to be disrupted remotely; or (C) otherwise posing an unacceptable risk to the national security of the United States or the security and safety of United States persons.” The Commission disagrees with NCTA and Huawei, which argue that the Commission must limit the scope of its designation because section 889(a)(2)(b) of the 2019 NDAA limits the restriction on the procurement of “covered telecommunications equipment or services” to equipment and services that can “route or redirect user data traffic or permit visibility into any user data or packets that such equipment transmits or otherwise handles.” This restriction to only certain types of equipment and services, however, applies only to section 889(a)(1) and does not extend to the definition section in section 889(f)(3). Nor does the restriction in section 889(b)(3)(B), which limits the scope of the prohibition on federal agency spending to equipment capable of routing or permitting network visibility, support NCTA or Huawei's argument. That restriction specifically applies only to subsection (b), not section 889(f). Congress explicitly limited the scope of its procurement restrictions to Huawei and ZTE equipment in subsections (a) and (b) of the 2019 NDAA to equipment

capable of routing or permitting network visibility, but did not include such a limitation in paragraph 889(f)(3), which governs the determination the Commission must incorporate onto the Covered List. To limit the NDAA determination to equipment capable of routing or permitting network visibility would both ignore the plain text of the NDAA and read section 2(b)(2)(C) out of the Secure Networks Act, which lists the capabilities of communications equipment or service that warrant inclusion on the Covered List. The Commission will thus place on the Covered List the determination found in section 889(f)(3)(A), that is, “telecommunications equipment produced or provided by Huawei or ZTE” capable of the functions outlined in sections 2(b)(2)(A), (B), or (C) of the Secure Networks Act.

54. The second determination the Commission will incorporate from the 2019 NDAA is video surveillance and telecommunications equipment produced by Hytera, Hikvision, and Dahua capable of the functions outlined in section 2(b)(2)(A)-(C) of the Secure Networks Act. Consistent with the Commission's proposal from the

2020 Supply Chain Second Further Notice,

it will incorporate onto the Covered List such equipment from Hytera, Hikvision, and Dahua, “to the extent it is used for public safety or security,” capable of the functions outlined in sections 2(b)(2)(A), (B), or (C) of the Secure Networks Act.

55. The third determination the Commission incorporates from the 2019 NDAA is “[o]ther telecommunications or video surveillance services produced or provided by Huawei, ZTE, Hytera, Hikvision, and Dahua or using such equipment” that are capable of the functions outlined in section 2(b)(2)(A)-(C) of the Secure Networks Act. Finally, the Commission will also include on the Covered List “telecommunications or video surveillance equipment” that the Department of Defense “reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of” China, but it is unaware of any such determination by the Department of Defense at this time.

56.

Determinations from appropriate national security agencies.

Consistent with the Commission's proposal in the

2020 Supply Chain Second Further Notice,

because it is required to incorporate a specific determination made by an appropriate national security agency, the Commission will include in the definition of “an appropriate national security agency” any sub-agencies of the enumerated agencies provided in section 9(2) of the Secure Networks Act. The only party that commented on this subject, USTelecom, agrees that “sub-agencies of enumerated `appropriate national security agenc[ies]' should qualify [to make determinations under section 2(c)].”

57.

Form of determinations.

The Secure Networks Act grants the Commission no discretion to disregard determinations from any of these four enumerated sources. Although the Commission recognizes that each source may follow a different procedure to arrive at the conclusion that equipment or services, or classes of equipment or services, pose an unacceptable security risk, it nevertheless must incorporate their decisions into the Covered List. Accordingly, the Commission rejects CTIA's argument that the transparency of the originating source should control what kind of deference it gives to a national security determination, and Huawei's argument that an determination should only be incorporated if it identifies “particular pieces or categories of equipment.” Congress granted the Commission no authority to dictate to other agencies how to arrive at their determinations, and granted it no discretion to disregard or modify these determinations.

58. Consistent with the Commission's proposal from the

2020 Supply Chain Second Further Notice

and the text of the Secure Networks Act, it will publish, update, or modify the Covered List without providing notice or opportunity to comment. Section 2(a) of the Secure Networks Act states the Commission “shall publish on its website [the Covered List]” and section 2(d) states the Commission “shall periodically update the [Covered List.]”. As the Commission stated in the

2020 Supply Chain Second Further Notice,

it reads this language “to be mandatory—precluding us from altering the list beyond the specific updates (all tied to changes in section 2(c) determinations) required by its terms.” Because the Commission is statutorily obligated to update the Covered List in light of new or modified determinations, it needs not provide notice

before

updating the Covered List to reflect new or modified determinations. Accordingly, when one of the enumerated sources makes a new or modified determination, the Commission will update the Covered List without first providing notice or seeking comment on these changes. To provide clear guidance for affected providers, however, the Public Safety and Homeland Security Bureau (PSHSB) will issue a Public Notice each time the Covered List is updated. The Secure Networks Act's section 3(a)(1) prohibition and section 5 reporting requirement will then apply to the communications equipment and services added to the Covered List 60 days after publication of the updated Covered List.

59. Because this notice process is based on the clear language of the Secure Networks Act, the Commission disagrees with commenters who argue this process to update the Covered List fails to provide proper notice for affected parties. Section 2(a) of the Secure Networks Act tasks the agency with publishing the Covered List no later than March 13, 2021. In taking action to publish this list, Congress clearly directs the agency to rely “solely” on the determinations from external sources. The Act then requires the Commission to enforce the provisions of the Act, including section 3(a)'s prohibition that applies to items on the Covered List 60 days after their inclusion. The text of the Secure Networks Act indicates Congress intended for an expedited regulatory process by establishing procedures “so clearly different from those required by the APA that is must have intended to displace them.”

60. The Commission also disagrees with commenters who advocate for a notice period in addition to the one already provided by the Secure Networks Act to “ensure that the Commission has an accurate factual basis upon which to make the technical determination required by the Act.” For example, Huawei argues the notice period is crucial to “ensure that appropriate due process protections are provided and that companies have the opportunity to respond to allegations and provide information relevant to the analyses required by the Secure Networks Act before the Commission places any equipment or services on the Covered List.” Huawei contends that notice and comment “from relevant stakeholders regarding the technical capabilities of equipment is a critical step for the Commission to conduct the analyses section 2(b)(2)(A) and (B) require.” But under the Secure Networks Act, the Commission merely accepts the determination from the enumerated source and then add to the Covered List all communications equipment or service from that determination that is capable of the functions outlined in section 2(b)(2)(A)-(C). The Commission does not conduct its own analysis of the national security threat the equipment or services identified by these enumerated sources pose to the communications supply chain; the Secure Network Act requires the Commission to be deferential to the

source agency providing the determination. In addition, there is no need to solicit public comment when the Commission performs no technical analysis prior to including equipment or services on the Covered List.

61. To the extent necessary, the Commission also finds good cause to deviate from the standard rulemaking or formal adjudication process when publishing or updating the Covered List in response to determinations. As the Commission tentatively found in the

2020 Supply Chain Second Further Notice,

“the Commission's placement of the equipment or service on the Covered List . . . is a non-discretionary, ministerial act.” Because the Secure Networks Act provides the Commission no discretion when incorporating determinations onto the Covered List, its action is not subject to the notice and comment provisions of the APA. While the Commission expects that the source of the determination will either provide some opportunity for notice and comment prior to making the determination or have a justifiable reason, such as valid national security concerns, for deviating from this process, regardless of the process provided by the source of the determination, the Commission has no discretion to deviate from its role to publish and update the Covered List. When an enumerated source makes a determination that communications equipment or services pose an unacceptable risk to the national security of the United States or the security and safety of United States persons, the Commission will include it on the Covered List without seeking comment.

62. When the Commission publishes or updates the Covered List, it will do so in response to a new or modified determination from an agency specifically enumerated by the Secure Networks Act. The Commission itself changes or creates no new rule when doing so. Whether the determination originated from a process where the opportunity for notice and comment was present is irrelevant to the ministerial function the Commission performs by updating the Covered List. The Commission accordingly rejects NTCA's suggestion that it should use its designation process under § 54.9 of the Commission's rules in the Secure Networks Act designation process, as that view is untethered from the statutory requirements. The Commission therefore rejects arguments to the contrary, as inconsistent with and undermining the statutory process.

63. Moreover, inclusion on the Covered List does not mean providers are immediately prohibited from using the communications equipment—the Act's prohibition applies 60 days after the equipment or services are included on the Covered List. Similarly, such communications equipment or service must be reported pursuant to the reporting requirement in section 5 of the Secure Networks Act 60 days after the communications equipment or service has been placed on the Covered List. When updated, the PSHSB will issue a public notice indicating that the Covered List has been updated. Providers, manufacturers, and other interested parties will then have 60 days' notice before the prohibition and reporting requirement take effect and may in that time period seek whatever relief they believe is appropriate.

64. The Commission also disagrees with commenters who believe it should implement a notice period to allow time for industry to provide feedback to the Commission regarding potential effects of adding communications equipment and services to the Covered List. For example, NCTA believes the Commission should implement a “notice and interim transition period prior to placement of new equipment or services on the list.” Under this program, the Commission would allow industry to “apprise the Commission of any potential impacts of its proposed updates or seek clarification regarding models of equipment or components that would be covered by the update.” Dell argues that the Commission should seek “confidential industry advice from trusted domestic technology companies . . .” in order to “establish the level of specificity that is required to determine the threat posed by equipment or service[s].” Because the prohibition on the use of federal subsidies will not take effect until 60 days after the equipment or service's inclusion on the Covered List, the Act already provides a time period for industry to review and take appropriate action. Moreover, any interim period proposal ignores the plain language of the Secure Networks Act. If a designated government agency determines that communications equipment or services pose a threat to national security of the safety and security of United States persons, the Commission has no discretion and must add this equipment or service to the Covered List. The Commission rejects Huawei's arguments to the contrary, as they assume a degree of discretion it simply lacks under the statute.

65. Section 2(b) of the Secure Networks Act states that the Commission “shall place” on the Covered List “any communications equipment or service” that (1) “is produced or provided by any entity” “if, based exclusively on the determinations” from section 2(c), “such equipment or service poses an unacceptable risk to the national security of the United States and the security and safety of United States persons” and (2) is “capable” of “(A) routing or redirecting user data traffic or permitting visibility into any user data or packets that such equipment or service transmits or otherwise handles; (B) causing the network or a provider of advanced communications service to be disrupted remotely; or (C) otherwise posing an unacceptable risk to the national security of the United States or the security and safety of United States persons.” The Commission anticipates that some determinations will list specific communications equipment or services that “pose[ ] an unacceptable risk to the national security of the United States and the security and safety of United States persons” and others will list general categories or classes of equipment that pose such a risk. In the case of the former, the Commission will incorporate these national security determinations onto the Covered List automatically. With the latter, the Commission will incorporate these determinations onto the Covered List to the extent the class or category of equipment or service identified is “capable” of the 2(b)(2)(A)-(C) criteria.

66.

Specific determinations based on the section 2(b)(2)(C) criteria.

If a determination indicates that a specific piece of equipment or service poses an unacceptable risk to the national security of the United States and the security and safety of United States persons, the Commission will automatically include this determination on the Covered List. The Commission takes this approach because of the plain language in section 2(b)(2)(C) which lists, among other equipment or service capabilities mandating inclusion on the Covered List, whether the equipment or service poses an unacceptable risk to the national security of the United States or the security and safety of United States persons. If an enumerated source has already performed this analysis as part of its determination, the only action the Commission needs to take is to incorporate this determination onto the Covered List. The Commission notes that USTelecom agrees with this simple process because, when a national security determination makes a “granular determination about `covered equipment' the Commission is bound to accept it.” The Commission's role is

limited to serving as “the custodian of such determinations.”

67. The Commission rejects Huawei's arguments that section 2(b)(2)(C) should be interpreted more narrowly. Huawei argues the canon of surplusage dictates that, should the Commission automatically include equipment or services that have been explicitly deemed a national security threat by an enumerated source, it would read out of the statute the technical analysis found in sections 2(c)(2)(A) and (B). But it is Huawei's reading that gives no meaning to section 2(b)(2)(C), which requires inclusion on the list of any communications equipment or services subject to a national security determination if it “otherwise posing an unacceptable risk to the national security of the United States or the security and safety of United States persons.” Huawei then claims a different canon, ejusdem generis, requires the Commission to use section 2(b)(2)(C) only to modify equipment subject to sections 2(b)(2)(A) and (B), but that would again would essentially read section 2(b)(2)(C) out of the statute. These arguments center around Huawei's contention that, by incorporating onto the Covered List specific determinations of particular pieces of equipment or services, the Commission is disregarding sections 2(b)(2)(A) and (B) because it would neglect to conduct a required analysis of the capabilities of equipment and service it includes on the Covered List. Those sections play an important role in determining which specific pieces of equipment or services belong on the Covered List when the Commission receives a more general determination. But when a determination covers a specific piece of equipment or service and the agency has indicated that such equipment or service poses a national security risk, the Commission is obligated to include it on the Covered List, particularly because one of the three capabilities that warrant inclusion on the list is whether the equipment or service is capable of “otherwise posing an unacceptable risk to the national security of the United States or the security and safety of United States persons.” The Commission therefore rejects Huawei's argument that it claims the Secure Networks Act gives the Commission a “broad, roving license” to make national security decisions. Section 2(b)(2)(C) provides that ability to other agencies or Congress. The Commission's actions in this scenario are non-discretionary and ministerial. If the determination is specified to a particular piece of communications equipment or service, the Commission has no discretion to exclude that determination from the Covered List.

68.

Determinations identifying broader classes or categories of equipment or services.

In the

2020 Supply Chain Second Further Notice,

the Commission sought comment on how best to incorporate determinations that are made at “different levels of granularity.” Because the Commission will rely on determinations from other government agencies and sources, not every determination will be conveyed with the same level of specificity. When the Commission identifies a broader determination from a section 2(c) source that a class or category of communications equipment or service poses an unacceptable national security risk, the Commission will publish it on the Covered List to the extent the equipment or service identified is capable of the section 2(b)(2)(A)-(C) criteria. The Commission believes this procedure is best viewed through the lens of the determination the Commission received from section 889(f)(3)(A) of the 2019 NDAA. Congress provided the Commission with the determination that all “telecommunications equipment produced or provided by Huawei or ZTE C (or any subsidiary or affiliate of such entities)” poses a threat. This broader determination refers a class of equipment or service—telecommunications equipment produced or provided by Huawei or ZTE—but did not specify which specific pieces of communications equipment or services to add to the Covered List. In this case, and likewise when the Commission receives similarly broad determinations in the future, it will include on the Covered List “telecommunications equipment produced by Huawei or ZTE that is capable of (A) routing or redirecting user data traffic or permitting visibility into any user data or packets that such equipment or service transmits or otherwise handles, (B) causing the networks of a provider of advanced communications service to be disrupted remotely, or (C) otherwise posing an unacceptable risk to the national security of the United States or the security and safety of United States persons.”

69. This method for incorporating broader classes of equipment and services into the Covered List relies on the expertise and determinations of enumerated sources, and is supported by CTIA and USTelecom, which argue for a “whole-of-government approach, led by DHS and supported by Commerce.” By adopting this approach and continuing to be deferential to the enumerated sources making the determination, the Commission will “continue to work closely with Executive Branch entities with expertise and responsibilities concerning telecommunications security, including supply chain security.”

70. The Commission disagrees with commenters who argue that more general determinations should not trigger inclusion on the Covered List. Huawei commented that “the specified agencies must identify

particular

pieces or categories of equipment that, in their view, `pose[ ] an unacceptable risk.” Huawei believes that because the Secure Networks Act does not define “specific,” the Commission must use the ordinary meaning of the word, which is understood as “constituting or falling into a specifiable category, restricted to a particular individual, situation, relation, or effect; free from ambiguity.” Thus, Huawei asserts that the references to “specific determinations” in section 2(c) mean that only determinations as to individual types of equipment or services trigger the Commission's obligations to include such equipment or services on the Covered List. Huawei argues that “[g]eneral guidance or mere expressions of concern regarding particular manufacturers or types of equipment does not constitute a `specific determination' upon which the Commission can rely.” The Commission disagrees. The Commission interprets the Secure Networks Act to require “specific determinations” to have a level of specificity sufficient to allow the Commission to incorporate the determination onto the Covered List. Should the Commission identify a determination, for example, that failed to indicate the source or type of communications equipment or service that the originating source found potentially insecure, it would be unable to incorporate this generic determination onto the Covered List. If, however, the originating source identifies a class or category of communications equipment or service, even at a broad level, such a determination provides the Commission enough information to include it on the Covered List. Furthermore, with more general determinations, the Commission does not place on the Covered List, for example, “all Huawei equipment or services.” Instead, the Commission limits inclusion on the Covered List to a specifiable category of Huawei equipment or services capable of the functions outlined in 2(b)(2)(A)-(B) or that otherwise poses an unacceptable

risk to the national security of the United States or the security and safety of United States persons. When the Commission identifies a determination, the Covered List will include the determination, subject to the 2(b)(2)(A)-(C) criteria.

71. The Secure Networks Act does not require the Commission to conduct a technical analysis of the communications equipment or service prior to including it on the Covered List. Section 2(b) merely states that, upon receipt of a determination from an enumerated source, the Commission “shall place” on the Covered List only the communications equipment and service from that determination that is capable of the functions outlined in section 2(b)(2)(A)-(C). That is precisely what the Commission will do. Accordingly, the Commission rejects the arguments of commenters that contend it should conduct various technical analyses. The Covered List, as NTCA requests, will serve as a “single source for covered [ ] equipment and service.” To the extent NTCA argues for additional specificity, it is not required by the text of the Secure Networks Act.

72.

Definition of “capable” for incorporation on the Covered List.

Section 2(b) requires the Commission to place on the Covered List communications equipment or service if, among other requirements, it is “capable” of the functions or impacts set forth in section 2(b)(2)(A)-(C). Consistent with the Commission's proposal in the

2020 Supply Chain Second Further Notice,

it interprets “capable” for the purposes of fulfilling section 2(b)(2)(A)-(C), to include equipment or service that can possibly perform these functions, even if the subject equipment or service is not ordinarily used to perform the functions in section 2(b)(2)(A)-(C). The Commission takes this approach because it is unwilling to risk the deployment of unsecure equipment or services that would occur if it defined “capable” too narrowly. The term “capable” as presented in the Secure Networks Act is ambiguous and the Commission interprets it in light of the goals of the statute.

73. Although the Commission disagrees with Huawei that its decision to define “capable” broadly is “misguided,” it agrees that a piece of equipment or service's capabilities “refers to the

present

functionality of equipment or a service” as that is the ordinary interpretation of that word. The Commission's interpretation of “capable” tracks the word's definition in the Merriam-Webster Dictionary—“having traits conducive to or features permitting something.” In patent law, where “a claim [ ] recites capability and not actual operation, an accused device `need only be capable of operating' in the described mode.” “The meaning of `capable of' is explained as . . . `the ability to perform.” For the purposes of including communications equipment and services on the Covered List, the Commission defines “capable” to include the current possible uses of equipment or service. The Commission's approach does not extend this definition to the functionalities of communications equipment or services should they be modified in the future. The Commission's broad definition of “capable” in this context alone does not, as Huawei suggests, unreasonably extend the definition to equipment or services “

potentially

having such attributes after modification.” The Commission merely declines to narrow the scope of communications equipment or service's capability to the equipment or service's marketed use. To do otherwise would allow potentially insecure equipment or service to remain in communications networks.

74.

Clarifying inclusion on the Covered List.

The Commission also sought comment in the

2020 Supply Chain Second Further Notice

on a process to allow interested parties to clarify whether a specific piece of communications equipment or a specific service is included on the Covered List. Some commenters argue that the Commission should consider mechanisms to provide transparency on which specific pieces of communications equipment and service are included on the Covered List. As with any Commission proceeding, providers of advanced communications service and other interested parties may seek a declaratory ruling to “terminat[e] a controversy” or “remov[e] uncertainty.” To the extent a party is uncertain whether a specific piece of equipment is subject to a determination under section 2(c) of the Secure Networks Act, the party may seek a declaratory ruling. That said, the Commission lacks discretion to modify a determination under section 2(c), and it is skeptical that any equipment that an enumerated source has determined “poses an unacceptable risk to the national security of the United States or the security and safety of United States persons” would not also, at a minimum, “pos[e] an unacceptable risk to the national security of the United States or the security and safety of United States persons.”

75. Once the Commission publishes the Covered List, PSHSB will issue a public notice indicating that the Covered List has been revised and that the section 3(a) prohibition and section 5(a) reporting requirement will take effect for communications equipment and service on the Covered List 60 days later. Pursuant to the Secure Networks Act, the Commission “shall periodically update the [Covered List] to reflect changes in the determinations described [in section 2(c)].” If one of the sources for determinations changes or modifies a determination, the Commission will update the Covered List accordingly. The Commission notes, however, that it has no discretion to reverse or modify determinations from other sources as the statute requires the Commission to accept and incorporate the determinations as provided. Should interested parties seek to reverse or modify the scope of one of these determinations, the party should petition the source of the determination.

76. Section 2(d) of the Secure Networks Act concerns how the Covered List should be updated to reflect new or revised determinations of covered communications equipment or services. Congress directed the Commission to “periodically update the [Covered List] to reflect changes in the determinations described [in section 2(c)].” In addition, the Commission “shall monitor the making or reversing of the determinations” from the enumerated sources in order to “place additional communications equipment or services on the [Covered List] or to remove communications equipment and services from such list.” If any of these determinations are reversed, the Commission “shall remove such equip- ment or service from the list . . .” unless the equipment or service's inclusion on the Covered List is based on a determination received from another enumerated source. Section 4(f) of the Secure Networks Act, discussed

infra,

provides options for when communications equipment or services are removed from the Covered List following an update or revocation of any determination. Secure Networks Act § 4(f). Finally, the Commission must notify the public for every twelve-month period during which the Commission does not update the Covered List. The Commission must indicate that “no updates were necessary during such period to protect national security or to address changes in the determinations . . . .”

77.

No updates to Covered List unless Commission receives new or modified determination.

In the

2020 Supply Chain Second Further Notice,

the Commission sought comment on “the process to update and publish the Covered List and solicit ideas and best

practices for ways to maintain the Covered List and keep it current and readily available.” The Commission interpreted the Secure Networks Act to not give its discretion to make any updates to the Covered List outside of determinations made by the sources enumerated in section 2(c). The Commission noted that the text of section 2(d) “does not appear to give it discretion not to update the Covered List based on changes in determinations, and hence it would be unclear what purpose a notice period would serve.”

78. The Commission believes the best interpretation of the Secure Networks Act is that it does not grant its authority to update the Covered List outside of these national security determinations, and thus, the Commission will make no changes or modifications to the Covered List unless it identifies a new or modified determination of covered communications equipment or services from any of the sources identified in section 2(c) of the Act. If one of the sources issues a new or modified determination, the Commission will update the Covered List to reflect this change. Once the Commission updates the Covered List, the PSHSB, in conjunction with WCB, will issue a Public Notice declaring that the Covered List has been updated to reflect a new or modified determination. This approach is consistent with NCTA's desire for the Commission to “provide clear and prominent notice of decisions to remove vendors of equipment items from the Covered List.” If the Commission identifies no updates or modifications in any twelve-month period, PSHSB shall issue a Public Notice indicating that “no updates were necessary during such period to protect national security or to address changes in the determinations . . . .”

79. Section 3 of the Secure Networks Act prohibits funding from Federal programs made available to subsidize capital expenditures necessary for the provision of advanced communications service from being used to purchase, rent, lease, or otherwise obtain any covered communications equipment or service, or maintain any covered equipment or service previously purchased, rented, leased, or otherwise obtained. Currently, § 54.9 of the Commission's rules imposes a similar prohibition on the spending of USF support, yet broadly applies to equipment and services produced or provided by entities designated as posing a national security threat to the integrity of communications networks or the communications supply chain. In the

2020 Supply Chain Declaratory Ruling and Second Further Notice,

85 FR 47211, August 4, 2020 and 85 FR 48134, August 10, 2020, the Commission found that § 54.9 substantially implements the prohibition under section 3 of the Secure Networks Act, but it nonetheless proposed a new rule, independent of § 54.9, to align the Commission's rules with the scope of the prohibition found in the Secure Networks Act. The Commission sought comment on that proposal and an effective period of 60 days after communications equipment or services are placed on the Covered List. The Commission also sought comment on the impact of the proposed rule on multiyear contracts or contracts with voluntary extensions between USF recipients and companies producing or providing communications equipment or services posing a supply chain security risk, if any such contracts exist.

80. Consistent with the Commission's proposal in the

2020 Supply Chain Second Further Notice,

it adopts a rule to enact section 3 of the Secure Networks Act by prohibiting the use of Federal subsidies made available through a program administered by the Commission and that provides funds to be used for the capital expenditures necessary for the provision of advanced communications service to purchase, rent, lease, or otherwise obtain any communications equipment or service, or maintain any covered communications equipment or service previously purchased, rented, leased, or otherwise obtained, and identified and published on the Covered List.

81. The new rule the Commission adopts, codified at § 54.10, prohibits the use of a Federal subsidy made available through a program administered by the Commission that provides funds for the capital expenditures necessary for the provision of advanced communications service to purchase, rent, lease, or otherwise obtain any covered communications equipment or service identified and published on the Covered List, or maintain any such covered communications equipment or service previously purchased, rented, leased, or otherwise obtained. The Commission has interpreted section 3 of the Secure Networks Act as intending to apply to all universal service programs but not other Federal subsidy programs to the extent those programs may tangentially or indirectly involve expenditures related to the provision of advanced communications service. The Commission acknowledges that there will be two processes to designate equipment or services as prohibited from federal funding—one for the designation of an entity as posing a national security threat to the integrity of communications networks or the communications supply chain, and one for the designation of specific equipment and services through the Covered List process outlined in section 2 of the Secure Networks Act. Certain equipment or services may be subject to either or both the prohibition under § 54.9 of the Commission's rules and the new § 54.10 prohibition enacting section 3 of the Secure Networks Act. Parties subject to these requirements are responsible for complying with both prohibitions, as applicable, and in accordance with any applicable effective dates. The Commission finds that the prohibitions in §§ 54.9 and 54.10 of the Commission's rules are consistent with, and fully implement, section 3(a) of the Secure Networks Act. In the

2020 Supply Chain Declaratory Ruling,

the Commission found that it satisfied the requirement to implement the section 3(a) prohibition within 180 days of enactment of the Secure Networks Act through its action in the

2019 Supply Chain Order;

therefore, the Commission's action has no bearing on section 3(b)'s implementation deadline. The new prohibition encompasses covered equipment and services found on or added to the Covered List, while the existing prohibition in § 54.9 applies to a somewhat overlapping group of products or services from companies designated as posing a threat to national security. As the Commission stated in the

2020 Supply Chain Second Further Notice,

the addition of § 54.10 will grant the Commission two different designation processes, “one for the designation of an entity, as currently provided by [§ 54.9 of] the Commission's rules, and another, more targeted process, for the designation of specific communications equipment and services per section 2 of the Secure Networks Act.” The new prohibition further applies to any funding programs administered by the Commission made available to subsidize capital expenditures for the provision of advanced communications service, including any future USF programs, whereas § 54.9 is limited to USF support. RWA recommends that the Commission apply the prohibition to both “USF programs that fund capital expenditures and to USF programs that fund operational expenditures” to encompass the broadest range of risky or compromised equipment. The Commission clarifies that, through both prohibitions under §§ 54.9 and 54.10 of the Commission's rules, the rules apply, respectively, to both USF funds and to Federal subsidies administered by the

Commission that provide funds for capital expenditures used for the provision of advanced communications services, which it has interpreted to mean universal service programs. Both prohibitions apply to all universal service funding from all current USF programs. The Commission believes that this approach will comprehensively encapsulate the universe of products and services that pose a risk to our nation's communications systems and prohibit spending of public funds consistent with congressional intent.

82. The two rules are intended to complement each other, and compliance should not impose additional burdens on providers of advanced communications service. CTIA raises concerns about the overlap of the two prohibitions, specifically that parties subject to both requirements are responsible for compliance with both prohibitions, and urges the Commission to “promote consistency, pursue transparency, and work with agencies that have expertise on supply chain and national security.” Although there is some overlap between the two prohibitions, the Commission believes that the rules are straightforward and transparent in their applicability to entities, funding, and equipment or services such that providers are able to comply. For example, the equipment and services designated under each rule will be published in accordance with the respective requirements (

i.e.,

the Commission's website for § 54.9, or the Covered List for § 54.10) such that entities can identify which equipment or services are subject to each prohibition.

83. CTIA urges the Commission to limit the new prohibition to subsidies under the USF programs, rather than expanding to include “other programs administered by the Commission that primarily support the provision of advanced communications services” and requests that the rule explicitly state the limitation to USF. The Commission finds additional limitation would be misplaced given its previously stated interpretation of the statute and its applicability. Furthermore, the Commission is compelled by the clear and direct language of the statute to make the language of § 54.10 potentially broader than USF programs. Section 3 of the Secure Networks Act applies only to Federal subsidies administered by the Commission used for capital expenditures necessary for the provision of advanced communications services which, as stated in the

2020 Supply Chain Declaratory Ruling,

the Commission interprets to encompass universal service programs. Consistent with the

2020 Supply Chain Declaratory Ruling,

the Commission reiterates that the prohibition does not apply to the Interstate Telecommunications Relay Service (TRS) Fund, as the TRS Fund does not subsidize capital expenditures necessary for the provision of advanced communications services. However, to the extent Congress creates additional programs in the future that provide a Federal subsidy administered by the Commission that provides funds to be used for capital expenditures necessary for the provision of advanced communications services, they would appear to fall under the prohibition in section 3 of the Secure Networks Act, and it would expect that § 54.10 would apply to those programs as well.

84. Consistent with the Commission's decision not to grandfather existing contracts under § 54.9 in the

2019 Supply Chain Order,

the Commission also declines to grandfather existing contracts for equipment or services on the Covered List under § 54.10 of the Commission's rules. Exempting or excluding covered equipment or services purchased under existing multiyear contracts would negate the purpose behind the Commission's rule in contravention of the clear and direct language in section 3 of the Secure Networks Act. Dell “urge[s] the Commission to prioritize risk factors before contractual obligations,” and the Commission believes its decision advances that directive. Furthermore, although NCTA supports grandfathering existing equipment acquired pursuant to multiyear contracts except in instances where the authorized Federal body making the risk determination cites compelling evidence of an ongoing threat to national security, the Commission finds that, given the process by which the referring agencies or entities make such determinations that trigger inclusion of equipment and services on the Covered List, it finds that there is compelling evidence that equipment and services on the Covered List do pose such a threat, and grandfathering is not warranted.

85. NCTA urges the Commission to avoid an “unfair retroactive effect” by grandfathering existing equipment acquired pursuant to multiyear contracts in certain circumstances. The Commission disagrees with NCTA's assessment of the rule's effect. Section 3 of the Secure Networks Act does not, in itself, require a future action that generates a retroactive effect; it merely prohibits prospective use of certain Federal subsidies to purchase, rent, lease, or otherwise obtain any covered communications equipment or service, or maintain any covered communications equipment or service previously purchased, rented, leased, or otherwise obtained on the Covered List. As such, there can be no primary retroactivity in restricting the use of future Federal subsidies for covered equipment or services provided pursuant to existing contracts. Furthermore, the Commission relies on the presumption that, in passing the Secure Networks Act, Congress intended to apply section 3 to existing contracts absent manifest injustice. The Commission determines that the record does not support a finding of manifest injustice. Therefore, absent such a showing, the Commission declines to adopt a grandfathering exception to § 54.10.

86. Some commenters favor grandfathering existing equipment contracts in order to promote predictability and minimize network disruptions, and propose alternatives to allow for grandfathering in certain situations. For instance, CTIA suggests that rather than attempting to define

ex ante

what kinds of arrangements qualify for grandfathering, the Commission should “exercise its discretion and work with the regulated community to build in permissible grandfathering that is consistent with fair process and sensible regulatory practice.” NCTA further asks that the Commission clarify that “where a provider has already been selected to provide services that receive USF support, the support will not end 60 days after equipment or services are added to the Covered List.”

87. The Commission declines to adopt these alternative proposals. The Commission finds that the urgency of the threat that allowing covered equipment and services to remain in its communications networks poses to our national security outweighs the potential burdens associated with failure to grandfather or exempt certain contracts. Because such exemptions would create security loopholes to the effectiveness of the prohibition, the Commission rejects commenters' proposals to grandfather existing equipment contracts for covered equipment or services.

88.

Effective date.

The prohibition on the use of Federal subsidies under § 54.10 of the Commission's rules that the Commission adopts takes effect 60 days after any particular communications equipment or services are placed on the Covered List, consistent with the Secure Networks Act. Furthermore, adopting a 60-day period between placement on the Covered List and the effectiveness of the prohibition on funds appropriately balances the consideration of the

compelling national security interests to promptly remove insecure equipment and services from the Commission's networks against the burdens on advanced communications service providers to identify covered equipment and services and make any adjustments to alternative funding to effectuate the prohibition. The Commission will require recipients of universal service support from each of the four USF programs to certify that they have complied with its new rule prohibiting the use of Federal subsidies for equipment and services on the Covered List.

89. Some commenters raise concerns about the 60-day period between when items are placed on the Covered List and when the prohibition under § 54.10 takes effect, and many propose alternatives. NTCA suggests that providers continue receiving USF support until federal funding is available to reimburse for the cost of replacement or the provider replaces the equipment in the normal course of business. CCA urges the Commission to be mindful of the strains the current public health crisis has placed on small and rural wireless carriers and advocates for a transition timeline that allows carriers to demonstrate progress through milestones. NCTA proposes the creation of a safe harbor “for providers that are making a reasonable, good-faith effort to transition away from newly-banned equipment but cannot meet the 60-day removal timetable without significant disruptions to network operations or service delivery.”

90. The Commission disagrees with these commenters' assessments of the impact of the 60-day effective date of the § 54.10 prohibition and therefore declines to adopt their alternative proposals. First, setting the effective date of the prohibition at 60 days after covered equipment is placed on the Covered List is statutory, and the rule the Commission adopts codifies an effective date consistent with the statute. Second, the rule prohibits the use of Federal subsidies to purchase, rent, lease, or otherwise obtain covered communications equipment or service, or maintain covered communications equipment or service previously purchased, rented, leased, or otherwise obtained on the Covered List; it does not directly speak to a deadline to remove or replace that equipment. The Commission addresses issues regarding the transition periods for removal and replacement of covered equipment and services under the Reimbursement Program in this document. To the extent providers request a transition period to secure alternative funding, similar to the Commission's decision in the

2019 Supply Chain Order,

it finds that there is a compelling interest in protecting our national security, which necessitates prompt implementation of the prohibition. § 54.9 of the Commission's rules took effect immediately upon publication in the

Federal Register

because of the national security interests in moving expeditiously. The Commission is not granted the discretion to waive a statutory mandate; however, it believes 60 days is sufficient based on its experience with the effective date of § 54.9. Therefore, the Commission finds that 60 days is sufficient notice to prohibit spending of Federal subsidy funding on equipment and services added to the Covered List.

91. The Commission in the

2019 Supply Chain Further Notice

proposed a program to reimburse ETCs for reasonable transition costs associated with the removal and replacement of equipment and services produced or provided by entities posing a national security threat as designated by the process outlined in § 54.9 of the Commission's rules. Subsequently, the President signed into law the Secure Networks Act requiring the Commission to establish the Reimbursement Program. WCB then released a public notice seeking comment on the applicability of the Secure Networks Act on the Commission's proposed reimbursement mechanism.

92. The reimbursement program required by the Secure Networks Act largely mirrors the Commission's original proposal in purpose and process. Both are focused on reimbursing entities for the removal and replacement of equipment and services posing a national security risk. Both envision a reimbursement process focused on initial cost estimates and including procedures to protect against waste, fraud, and abuse. But there are also noticeable differences. For example, the Commission initially proposed limiting eligibility to ETCs, while the Secure Networks Act expands eligibility beyond ETCs to include all providers of advanced communications service with two million or fewer customers. The process for designating covered equipment and services also differs, which could change the scope of reimbursable expenses for the removal, replacement, and disposal of such equipment and services under the Commission's proposal versus the program required by Congress. The Commission concludes the Reimbursement Program effectively supersedes the Commission's original proposal, and it conforms it to the requirements set forth in the Secure Networks Act.

93. The Commission now establishes, as directed by the Secure Networks Act, the Reimbursement Program to reimburse the costs reasonably incurred by providers of advanced communication services with two million or fewer customers to permanently remove, replace, and dispose of covered communications equipment and services from their networks. The Commission will allow eligible providers to obtain reimbursement to remove and replace older covered communications equipment with upgraded technology and will reimburse providers for certain transition expenses incurred prior to the creation of this program. The Commission requires program participants to submit estimated costs to receive funding allocations. Recipients can then obtain funding disbursements on a rolling basis upon a showing of actual expenses incurred.

94. If aggregate demand exceeds available funding, the Commission will prioritize funding for ETCs and expenses for transitioning core networks over non-ETCs and non-core network transition expenses. Program recipients will have one year from the initial funding disbursement to complete the permanent removal, replacement, and disposal of covered communications equipment. The Commission may grant a single, general six-month extension for all recipients and/or individual extensions of time if circumstances warrant. The Commission also adopts a number of measures as directed by the Secure Networks Act to combat waste, fraud, and abuse, including the filing of status updates, spending reports, and a final certification, requiring documentation retention, audits, reviews and field inspections, and seeking the repayment of disbursed funds for violations of the Secure Networks Act and the Reimbursement Program rules in addition to taking other possible enforcement actions.

95.

Eligible Providers.

As directed by section 4 of the Secure Networks Act, the Commission limits eligibility for the Reimbursement Program to providers of advanced communication service with two million or fewer customers. The Secure Networks Act identifies advanced communication service providers as providers of advanced telecommunications capability as defined in section 706 of the Telecommunications Act of 1996 (Telecommunications Act). Advanced telecommunications capability is defined in section 706 of the Telecommunications Act “without

regard to any transmission media or technology, as high-speed, switched, broadband telecommunications capability that enables users to originate and receive high-quality voice, data, graphics, and video telecommunications using any technology.” As Blue Danube correctly notes, the advanced communications service term in the statute is “straight forward.” If Congress were to pass additional legislation defining eligibility for the reimbursement program, the Commission would modify its eligibility requirements.

96. The Commission has historically interpreted providers of advanced telecommunications capability, and thus providers of advanced communications services, to mean facilities-based providers, whether fixed or mobile, with a broadband connection to end users with at least 200 kbps in one direction. This standard is used by the Commission to identify providers required to report broadband deployment using the FCC Form 477. The few commenters addressing this issue generally support the use of this same speed threshold to determine providers of advanced communications service. Using this standard will maximize the pool of eligible applicants and help assist with the removal of insecure equipment that is older and slower than newer, more technologically up-to-date equipment from our Nation's interconnected networks.

97. Separately, for purposes of the Reimbursement Program, a school, library or health care provider, or consortium thereof, may also qualify as a provider of advanced communications service, and therefore be eligible to participate in the Reimbursement Program, if it provisions facilities-based broadband connections of at least 200 kbps in one direction to end users, which could include students, patrons, patients, or member institutions in the context of cooperative infrastructure sharing arrangements. This clarification addresses the concerns raised by Northern Michigan University as it seeks to remove and replace covered equipment from its LTE network that serves “over 15,000 NMU students, K-12 families, and community members.” However, a school, library, or health care provider that merely purchases advanced telecommunications or information services and is not a facilities-based network provider of services is not considered a provider of advanced communications services for purposes of the Reimbursement Program. Accordingly, the Commission disagrees with RWA's suggestion to interpret the statute to allow reimbursement eligibility for entities that only purchase but do not provide advanced communications services.

98. The Commission also takes this opportunity to clarify the demarcation point between eligible and non-eligible advanced communications service providers,

i.e.,

those with fewer than two million customers. The Secure Networks Act defines “customers” to mean “with respect to a provider of advanced communications service—(A) the customers of such provider” as well as the “customers of any affiliate . . . of such provider.” The statute references the definition of “affiliate” contained in section 3 of the Communications Act, which reads “a person that (directly or indirectly) owns or controls, is owned or controlled by, or is under common ownership or control with, another person.” The definition of affiliate further states “[f]or purposes of this paragraph, the term `own' means to own an equity interest (or the equivalent thereof) of more than 10 percent.”

99. The Commission reads the phrase “customers of such provider” and “customers of any affiliate” as having more than one possible interpretation. The language could refer only to those customers purchasing advanced communications service or could refer to any customer of the provider or affiliate regardless of the service or product purchased. The accompanying House Report states “[s]ection 4 requires the FCC . . . to reimburse providers of advanced communications service with 2 million or fewer subscribers.” This language suggests an intention to focus on the subscribers of the provider that purchase advanced communications service in determining eligibility. The House Report also states the Reimbursement Program is established “to assist small communications providers with the costs of removing prohibited equipment and services from their networks.” By limiting the meaning of “customer” to those purchasing advanced communications service, potentially a large company with a small number of advanced communications service customers could qualify for the Reimbursement Program. Given the overall intent of the program to assist with the removal of equipment and services posing a national security risk and the language in the House Report, the Commission chooses to interpret customer narrowly, which in turn will increase the pool of eligibility for the program. Accordingly, the Commission interprets “customers of such provider” and “customers of any affiliate” to mean those customers taking advanced communications service from the provider and its affiliates. A provider seeking to participate in the Reimbursement Program must have two million or fewer customers, as of the date its application is filed. If the provider's number of customers increases above two million after its application is filed, they will not lose their eligibility to participate in the Reimbursement Program by virtue of the customer increase.

100. To identify customers of advanced communications service, providers must count those customers purchasing a service that includes a broadband connection with a speed of at least 200 kbps in one direction. The Secure Networks Act states an advanced communications service has the meaning given the term advanced telecommunications capability. The Commission has historically interpreted “advanced telecommunications service” to mean a service with a broadband connection of at least 200 kbps in one direction. Accordingly, the Commission directs providers to count customers of broadband service meeting or exceeding this speed threshold for purposes of program eligibility. A subscriber merely purchasing traditional plain old telephone service would therefore not count as a subscriber of advanced communications service.

101. Lastly, to be eligible, the Secure Networks Act requires providers filing applications to make specific certifications per section 4(d)(4). Applicants must certify that “as of the date of the submission of the application, the applicant—(i) has developed a plan for—(I) the permanent removal and replacement of any covered communications equipment or service that are in the communications network of the applicant as of such date; and (II) the disposal of the equipment or services removed . . . and has developed a specific timeline . . . for the permanent removal, replacement, and disposal of the covered communications equipment or services identified . . . , which timeline shall be submitted to the Commission as part of the application.” The applicant must also certify on the date of its application's approval that it “will not purchase, rent, lease, or otherwise obtain covered communications equipment or services, using reimbursement funds or any other funds (including funds derived from private sources); and . . . will consult and consider the standards, guidelines, and best practices set forth in the cybersecurity framework developed by the National Institute of Standards and Technology . . . in developing and tailoring the risk management practices

of the applicant.” The Commission directs WCB to incorporate these certifications as part of the application submission process to ensure applicants are eligible for the Reimbursement Program.

102.

Covered Communications Equipment or Services.

The Secure Networks Act allows eligible providers to seek reimbursement for expenses associated solely with the permanent removal, replacement, and disposal of “covered communications equipment or services” as designated per section 2(a) of the Secure Networks Act. Specifically, eligible providers may seek reimbursement funds to remove, replace, and dispose of “covered communications equipment or services purchased, rented, leased or otherwise obtained” before August 14, 2018 if on the initial list published by the Commission, or no later than 60 days after the Commission adds further equipment and services to the initial list. Recipients are prohibited from using reimbursement funds to remove, replace, or dispose of covered communications equipment or service purchased, rented, or leased or otherwise obtained after these statutory cutoff dates. The Commission has no discretion to deviate from the scope of covered communications equipment or services provided under the Secure Networks Act. Accordingly, to the extent the Commission's original proposal in the

2019 Supply Chain Further Notice

suggested limiting eligibility to a broader or narrower category of equipment and services, it now instead follows the requirements contained in the Secure Networks Act.

103. As proposed in the

2019 Supply Chain Further Notice,

the Reimbursement Program will reimburse costs reasonably incurred for the removal, replacement, and disposal of covered equipment and services in accordance with the Secure Networks Act. The Commission notes that the Reimbursement Program does not modify rules that govern how universal service funds may be used in the various universal service programs. ETCs will still be required to certify, for example, that federal high-cost support was used only for the provision, maintenance, and upgrading of facilities and services for which the support is intended. The reasonableness standard the Commission adopts is consistent with the standard applicable to the broadcast incentive auction reimbursement mechanism. This standard is also consistent with approach taken in the

Emerging Technologies

framework when assisting existing operators with relocation costs in transitioning to new facilities. A standard of reasonableness will provide the Commission with a sensible approach for evaluating reimbursement costs to help combat waste, fraud and abuse through the exclusion of excessive and otherwise unreasonable costs from the Reimbursement Program.

104. The Secure Networks Act does not expressly establish a standard for evaluating costs for reimbursement. The statute simply requires the Commission to reimburse providers for the permanent removal, replacement, and disposal of covered communications equipment and services. The Commission therefore proposed to apply a standard of reasonableness when evaluating requests for reimbursement. One commenter, the Rural Wireless Broadband Coalition, urged the Commission to “follow the principle” of reimbursing any reasonable cost. Other commenters, while not engaging directly with the proposed reasonableness standard, implicitly supported this approach by commenting on the need for certainty in knowing upfront what expenses are reimbursable, advocating for the inclusion of various expenses as reasonable, and supporting use of the same standard as used in the broadcast incentive auction reimbursement mechanism.

105. The Commission sees no reason to deviate from using a standard of reasonableness, as proposed, for purposes of the Reimbursement Program. First, using a standard of reasonableness will help guide objective determinations of whether to include or deny costs for reimbursement and ensure that excessive, unreasonable costs do not jeopardize the available funding needed by all participating providers to transition away from networks posing a national security risk. Second, by using an existing standard, the Commission can leverage its prior experience with the broadcast incentive auction reimbursement mechanism standard and the

Emerging Technologies

framework to benefit the Reimbursement Program. There already exists in the incentive auction context a Catalog of Expenses, identifying categories of expenses considered reasonable for purposes of reimbursement. The Commission can look to these efforts to assist its determinations and help identify the types of expenses considered reasonable during a transition process in implementing the Reimbursement Program. While the equipment and services replaced may differ, the same basic steps apply here, as in planning and implementing a network transition while attempting to minimize disruptions for customers/users. Lastly, using the existing standard provides regulatory consistency between similarly situated program participants of both the broadcast incentive auction, other wireless proceedings involving the relocation of existing operators, and the instant Reimbursement Program. A fundamental precept of administrative law is to treat similarly situated entities in a similar manner.

106. The Commission will thus consider eligible for reimbursement costs reasonably incurred for the timely removal, replacement, and disposal of covered equipment and services obtained prior to the statutory cutoff dates. The Commission interpreted “costs reasonably incurred” in the broadcast incentive auction reimbursement mechanism context as requiring the reimbursement of “costs that are reasonable to provide facilities comparable to those . . . reasonably replaced.” The Commission has further interpreted “[t]hese costs [to] include both `hard' expenses, such as new equipment and tower rigging, and `soft' expenses, including legal and engineering services.” The Commission sees no reason to deviate from this model and will apply it to the instant Reimbursement Program. Although the Commission cannot forecast all types of reasonable expenses, it does provide guidance to help participants with their transition planning. The appropriate scope of “costs reasonably incurred” will necessarily be decided on a case-by-case basis, and the Commission delegates authority to WCB to make reimbursement determinations and to finalize a catalog to help participants estimate their reimbursable costs.

107. The Commission considers as reasonable replacement facilities comparable to the facilities in use by the provider prior to the removal, replacement, and disposal of covered communications equipment or service. The Commission recognizes, however, when replacing older technology that a certain level of technological upgrade is inevitable. Accordingly, the Commission will permit Reimbursement Program participants to obtain reimbursement for reasonable costs incurred for replacing older mobile wireless networks with fourth generation Long Term Evolution (4G LTE) equipment or service that are 5G ready.

108. The reimbursement program is intended “to assist small communications providers with the costs of removing prohibited equipment and services from their networks and replacing prohibited equipment with

more secure communications equipment and services.” Language from the House Report demonstrates that Congress “expects the Commission, when implementing regulations . . . to preclude network upgrades that go beyond the replacement of covered communications equipment or services from eligibility; however, [Congress] expects there to be a transition from 3G to 4G or even 5G-ready equipment in instances where equipment being replaced was initially deployed several years ago.”

109. The Commission sought comment in the

2019 Supply Chain Further Notice

on whether it should use the same “comparability standard” used in the broadcast incentive auction reimbursement mechanism. In the broadcast proceeding, the Commission said that reasonable reimbursement costs include “costs that are reasonable to provide facilities comparable those that [an existing operator] had prior to the auction.” The Commission further stated that it did “not anticipate providing reimbursement for optional features beyond those already present” but recognized when replacing older equipment that the new “equipment necessarily may include improved functionality.” The Commission uses a similar comparable facilities standard when relocating incumbent operators under the

Emerging Technologies

framework. One commenter, the Rural Wireless Association, urged the Commission to “closely mirror the structure used for the Broadcast Incentive Auction.” Another commenter, Rise Broadband, said a comparability standard for replacement costs is essential. Otherwise, commenters generally favored allowing some level of technological upgrade, especially when replacing older technology that is unlikely to have a comparable replacement.

110. Consistent with approach taken on equipment upgrades for the broadcast incentive auction, the Commission expects, as a general matter, eligible providers to “obtain the lowest-cost equipment that most closely replaces their existing equipment.” That said, the Commission recognizes the replacement of older legacy technology will inevitably require the use of newer equipment and services that have additional capabilities. Accordingly, consistent with the intent of Congress, the Commission will allow, and indeed encourage, eligible providers replacing third generation and older equipment to obtain reimbursement for the cost of 4G LTE replacement equipment that is 5G-ready.

111. The record indicates new equipment supporting older, second- and third generation wireless technology services is unavailable, and even acquiring such equipment and services on the secondary market is proving increasingly difficult and in some instances impossible. The reimbursement program is not limited to replacing covered equipment and services in wireless networks, but the Commission recognizes the initial focus is on the equipment and services provided by Huawei and ZTE, which is most often found with the provision of wireless services. Accordingly, while much of this discussion is focused on replacing wireless technology, the underlying rationale applies equally in the non-wireless context. And from a policy perspective, investing money on outdated and soon-to-be decommissioned equipment and service is of little benefit and an inefficient and wasteful use of Federal support. The Commission will therefore allow providers replacing older technology to obtain reimbursement for the cost of new replacement equipment that is 4G LTE compatible and is capable of subsequently being upgraded to provide 5G service. However, operators that elect “to purchase optional equipment capability or make other upgrades” beyond those reasonably needed to replace existing equipment must do so using their own funds, consistent with the approach the Commission took in the broadcast incentive auction proceeding and the recent C-Band auction proceeding.

112. By taking this approach on comparable facilities and technology upgrades, the Commission rejects alternative proposals for determining reimbursement amounts based on the value of the equipment being replaced. If, however, eligible providers are simply removing and disposing of covered equipment and service without replacement,

e.g.,

simply shutting down an older network, then the Commission would consider reimbursing the provider for the cost of the depreciated value of the decommissioned equipment. For example, NTCH and NTCA suggested that to avoid the “impossibility” of evaluating what constitute appropriate replacements, the Commission should simply reimburse the original cost of the covered equipment and services plus an additional 25%. This approach, however, may not result in providing sufficient reimbursement funding for providers if the cost of the replacement equipment exceeds the reimbursement support allocated to the recipient. In addition, the Commission finds PRTC's proposal to reimburse both the present-day value of the replaced equipment and the cost of the replacement equipment unreasonable, giving the provider a windfall and an unfair competitive advantage over other providers.

113. The Commission next delegates to WCB the responsibility to develop and finalize a Catalog of Eligible Expenses and Estimated Costs (Catalog of Eligible Expenses) to inform the Reimbursement Program. The Secure Networks Act requires the Commission to “develop a list of suggested replacements” for covered equipment and services and for applicants to submit “initial reimbursement cost estimate[s] at the time of application.” The Commission is also required to “take reasonable steps to mitigate the administrative burdens and costs associated with the application process, while taking into account the need to avoid waste, fraud, and abuse.” In the broadcast incentive auction reimbursement mechanism, the use of a catalog to estimate relocation costs played a critical role in the successful processing of reimbursement applications. The Commission seeks to duplicate that success here by using a Catalog of Eligible Expenses as suggested in the record. The catalog will identify reimbursable costs with as much specificity as possible, provide guidance to entities seeking reimbursement, streamline the reimbursement process, and increase accountability. Listing in the catalog, however, is not a guarantee of reimbursement for any individual expense, and all claimed expenses are subject to review by the Commission staff to ensure each expense and request for reimbursement is reasonable.

114. The Catalog of Eligible Expenses will also help the Commission and applicants satisfy the Secure Networks Act's requirements not only by helping applicants with transition planning and estimating costs for application submissions, but also with identifying potential replacement equipment and services and expediting the Commission's reimbursement request review process. As CCA points out, the removal, replacement and disposal of covered equipment and services in a mobile wireless network is a complex, multi-step process that is likely to encompass a range of expenses, including: Drive testing to determine baseline coverage; evaluating spectrum and backhaul capabilities; ordering new equipment; installing new network core and RAN equipment; potentially leasing space on or building new towers and

obtaining any associated permits and approvals; testing and optimizing the network; and migrating traffic and decommissioning covered equipment and services. Because there will likely be a range of expenses that could vary among providers, the Catalog of Eligible Expenses will be used to provide helpful guidance regarding the kinds and amounts of expenses that will be reimbursed. Accordingly, the Catalog of Eligible Expenses will not be a definitive list of all reimbursable expenses but a means to facilitate the reimbursement process. Given the importance of the Catalog of Eligible Expenses to the Reimbursement Program, Commission staff have already begun work to develop it, and the Commission expects to release it as soon as possible.

115. The Commission next turns to the acceptable timing of costs incurred by providers to comply with the Commission's requirement. Some providers have already started the process to remove and replace problematic equipment from Huawei and ZTE from their networks. The Commission applauds these providers for proactively taking steps to increase the security of their networks notwithstanding the uncertainty of Federal government assistance. As such, the Commission will allow providers to obtain reimbursement for costs reasonably incurred prior to the creation and funding of the Reimbursement Program, for the removal, replacement, and disposal of covered equipment and services.

116. The Secure Networks Act expressly limits reimbursement support to the removal, replacement, and disposal of covered equipment and services obtained before certain dates. For covered equipment and services placed by the Commission on the initial Covered List required by section 2(a) of the Secure Networks Act, the cutoff date is August 14, 2018, which is the day after the 2019 NDAA was signed into law. For equipment and services subsequently added to the Covered List required by section 2(a), the provider must have obtained the equipment or service no later than 60 days after being placed on the Covered List to obtain reimbursement for costs associated with its removal, replacement, and disposal. The cutoff deadlines are explicit in the statute, and the Commission lacks discretion to use different cutoff dates for the purchase of covered communications equipment or service that is eligible for the reimbursement of removal, replacement, and disposal costs. Because of the statutory cutoff date, the Commission lacks discretion to consider an alternative cutoff date.

117. The 2019 NDAA prohibits the head of an executive agency from obligating or expending “loan or grant funds to procure or obtain, extend or renew a contract to procure or obtain, or enter into a contract (or extend or renew a contract) to procure or obtain” telecommunications and video surveillance equipment produced by entities reasonably believed to be owned or controlled by a foreign country. The 2019 NDAA specifically identified Huawei and ZTE as producers of covered equipment, putting the general public on official notice that the Federal government considered the equipment and services produced by these entities to pose a potential national security risk.

118. Following the 2019 NDAA's enactment and as the instant rulemaking proceeding progressed, providers increasingly began planning and taking steps to proactively remove, replace, and dispose of covered equipment and services from their networks. Providers urged the Commission to reimburse costs associated with these efforts even if incurred prior to the creation of any reimbursement program. The Commission will not penalize these providers for taking decisive, proactive steps to secure their networks before the reimbursement program is created and funded. Indeed, in order to protect the nation's communications networks, the Commission encourages providers to remove and replace covered equipment and services before the Reimbursement Program begins. For any expenses incurred before the commencement of the Reimbursement Program providers may not be reimbursed for unreasonable expenses. The Commission will apply the same standard,

i.e.,

costs reasonably incurred, to determine whether an expense is eligible for reimbursement. Accordingly, for covered equipment and services placed on the initial list required by section 2(a) of the Secure Networks Act, the Commission will reimburse reasonable costs associated with the removal, replacement, and disposal of covered equipment that were incurred on or after April 17, 2018, the date the Commission adopted the

2018 Supply Chain Notice,

83 FR 19196, May 2, 2018, commencing this proceeding. The adoption date of the

2018 Supply Chain Notice

was the first clear indication that the Commission was considering taking action to remove covered equipment from U.S. networks. Costs incurred before that date are ineligible for reimbursement. For equipment and services subsequently added to the initial list, the provider must incur the costs of removal, replacement, and disposal on or after the date the equipment or services are placed on the list for the reasonably incurred cost to qualify for reimbursement.

119. The Commission recognizes the removal, replacement, and disposal of covered equipment may, in the case of mobile wireless networks, entail setting up parallel network core and RAN components and then migrating existing customers to the new network. The Commission expects providers will endeavor to mitigate service disruptions to effectuate a seamless transition for customers. Consistent with the Commission's proposal in the

2019 Supply Chain Further Notice,

to the extent providers experience a reduction in revenues as a result of a temporary loss in service, reduced coverage, or otherwise as a result of the transition, it will not reimburse providers for the lost revenues in the Reimbursement Program.

120. Allowing reimbursement for lost revenues would increase the costs of the Reimbursement Program substantially, and risk exhausting funding prematurely without reimbursing many eligible providers. The Commission is also concerned that evaluating the reasonableness of requests for reimbursement for lost revenues is challenging and speculative and may result in over-reimbursement. The Commission believes scarce program funding is better spent by assisting as many eligible providers as possible with the replacement costs directly related to the transition instead of trying to ensure providers are also reimbursed for lost revenues. Moreover, the Commission expects program participants will strive to minimize service disruptions for customers during the transition process to mitigate revenue loss. Accordingly, the Commission disagrees with Mark Twain Communications Company and deem lost revenues an unreasonable and ineligible expense for purposes of the reimbursement program.

121. The Secure Networks Act limits funding use to the removal, replacement, and disposal of covered communications equipment and services. Even with covered communications equipment and services, to use funds for the removal, replacement, and disposal, the Secure Networks Act requires the recipient to have obtained the equipment or service before a certain statutorily specified cutoff date. Specifically, for covered communications equipment or services published on the Commission's initial Covered List, the recipient must have obtained the equipment or service

before August 14, 2018. For communications equipment or service subsequently added to the Covered List, the recipient must have obtained the equipment or service no later than 60 days after being added to the Covered List. Separately, the Secure Networks Act prohibits recipients from using funds to “purchase, rent, lease, or otherwise obtain any covered communications equipment or service.” Recipients are also not allowed to use “other funds (including funds derived from private sources)” to “purchase, rent, lease, or otherwise obtain any covered communications equipment or service.” Requests for the reimbursement of expenses falling within the scope of these statutory prohibitions are considered unreasonable per se and thus ineligible.

122. Rural Wireless Broadband Coalition asks whether the statutory limit on funding use prohibits recipients from operating and maintaining covered communications equipment or service in their networks during the removal, replacement, and disposal process. The transition process will likely involve standing up a replacement network before migrating traffic to the replacement network and decommissioning the covered communications equipment or service in the old network. Recipients would thus need to continue operating and therefore maintain the old network containing covered communications equipment or service during the transition process to mitigate service disruptions for existing customers. According to the Rural Wireless Broadband Coalition, keeping the old network operational may involve replacing defective equipment that is covered, and because such equipment is typically proprietary, it would likely require, for purposes of interoperability, a replacement that is also supplied by the same supplier and covered.

123. The Commission reads the statute as clearly prohibiting the use of funds by recipients to obtain equipment or service that is on the Covered List even if such equipment is needed to maintain operations during a transition process. Notwithstanding this limitation, a provider possessing covered communications equipment spares obtained before becoming a Reimbursement Program recipient could use funds to install and maintain that covered communications equipment during the transition process. If, however, the recipient receives Universal Service support, then there may be other applicable rules that prohibit the use of funding to install and maintain covered communications equipment or service. The provider, however, must remove and dispose of all covered communications equipment by the time of the final certification.

124. The Commission in the

2019 Supply Chain Further Notice

proposed a “detailed reimbursement application process” like the reimbursement mechanism used in the broadcast incentive auction proceeding “to confirm that funding is being used only to replace covered equipment and services, rather than to deploy services to new areas or replace aging equipment or services that are not covered.” Applicants would “provide details of the covered equipment and services being replaced, the replacement equipment and services, and the estimated costs of replacement.” To help guide applicants, the Commission sought comments on “efficient ways” to develop replacement cost estimates. The Commission separately sought comment on whether to “prioritize payments for the replacement of certain equipment and services that are identified as posing the greatest risk to the security of networks, and what categories of equipment and services should that prioritization include.” Comments were also sought on measures to prevent waste, fraud, and abuse, including applicant certifications, deadlines for completing removal and replacement, periodic compliance audits, investigations, and enforcement penalties.

125. The Secure Networks Act establishes specific requirements applicable to the application process for the reimbursement program. Specifically, “[t]he Commission shall require an applicant to provide an initial reimb

This text is long and has been trimmed here. Open the source document for the complete record.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

Protecting Against National Security Threats to the Communications Supply Chain Through FCC Programs · 86 FR 2904 | Frix