NUCLEAR REGULATORY COMMISSION

[Docket Nos. 50-334, 50-412, 50-483, 50-413, 50-414, 50-346, 50-331, 50-341, 50-348, 50-364, 50-416, 50-354, 50-272, 50-311, 50-245, 50-336, 50-423, 50-528, 50-529, 50-530, 50-440, 50-171, 50-277, 50-278, 72-29, 50-282, 50-306, 50-254, 50-265, 50-458, 50-327, 50-328, 50-387, 50-388; NRC-2020-0110]

Issuance of Multiple Exemptions in Response to COVID-19 Public Health Emergency

AGENCY:

Nuclear Regulatory Commission.

ACTION:

Exemptions; issuance.

SUMMARY:

The U.S. Nuclear Regulatory Commission (NRC) issued 20 exemptions in response to requests from 14 licensees. The exemptions afford these licensees temporary or permanent relief from certain requirements under NRC regulations. The exemptions are in response to the licensees' requests for relief due to the coronavirus disease 2019 (COVID-19) public health emergency (PHE). The NRC is issuing a single notice to announce the issuance of the exemptions.

DATES:

During the period from November 2, 2020, to November 25, 2020, the NRC granted 20 exemptions in response to requests submitted by licensees from September 17, 2020, to November 20, 2020.

ADDRESSES:

Please refer to Docket ID NRC-2020-0110 when contacting the NRC about the availability of information regarding this document. You may obtain publicly available information related to this document using any of the following methods:

•

Federal Rulemaking website:

Go to

https://www.regulations.gov

and search for Docket ID NRC-2020-0110. Address questions about NRC Docket IDs in

Regulations.gov

to Jennifer Borges; telephone: 301-287-9127; email:

Jennifer.Borges@nrc.gov.

For technical questions, contact the individual listed in the

FOR FURTHER INFORMATION CONTACT

section of this document.

•

NRC's Agencywide Documents Access and Management System (ADAMS):

You may obtain publicly available documents online in the ADAMS Public Documents collection at

https://www.nrc.gov/reading-rm/adams.html.

To begin the search, select “Begin Web-based ADAMS Search.” For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by email to

pdr.resource@nrc.gov.

•

Attention:

The PDR, where you may examine and order copies of public documents, is currently closed. You may submit your request to the PDR via email at

pdr.resource@nrc.gov

or call 1-800-397-4209 between 8:00 a.m. and 4:00 p.m. (EST), Monday through Friday, except Federal holidays.

For the convenience of the reader, instructions about obtaining materials referenced in this document are provided in the “Availability of Documents” section.

FOR FURTHER INFORMATION CONTACT:

James Danna, Office of Nuclear Reactor Regulation, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-7422, email:

James.Danna@nrc.gov.

SUPPLEMENTARY INFORMATION:

I. Introduction

During the period from November 2, 2020, to November 25, 2020, the NRC granted 20 exemptions in response to requests submitted by licensees from September 17, 2020, to November 20, 2020. These exemptions temporarily allow the licensees to deviate from certain requirements (as cited below) of various parts of chapter I of title 10 of the

Code of Federal Regulations

(10 CFR).

The exemptions from certain requirements of 10 CFR part 26, “Fitness for Duty Programs,” for Energy Harbor Nuclear Corp. (for Beaver Valley Power Station, Units 1 and 2; Davis-Besse Nuclear Power Station, Unit No. 1; and Perry Nuclear Power Plant, Unit No. 1); Union Electric Company (for Callaway Plant, Unit No. 1); DTE Electric Company (for Fermi-2); and Arizona Public Service Company (for Palo Verde Nuclear Generating Station, Units 1, 2, and 3), afford these licensees temporary relief from the work-hour controls under 10 CFR 26.205(d)(1) through (d)(7). The exemptions from 10 CFR 26.205(d)(1) through (d)(7) ensure that the control of work hours and management of worker fatigue do not unduly limit licensee flexibility in using personnel resources to most effectively manage the impacts of the COVID-19 PHE on maintaining the safe operation of these facilities. Specifically, these licensees have stated that their staffing levels are affected or are expected to be affected by the COVID-19 PHE, and they can no longer meet or likely will not meet the work-hour controls of 10 CFR 26.205(d)(1) through (d)(7). These licensees have committed to effecting site-specific administrative controls for COVID-19 PHE fatigue management for personnel specified in 10 CFR 26.4(a).

The exemptions from certain requirements of 10 CFR part 50, appendix E, “Emergency Planning and Preparedness for Production and Utilization Facilities,” section IV.F., “Training,” for Energy Harbor Nuclear Corp. (for Beaver Valley Power Station, Units 1 and 2); NextEra Energy Duane Arnold, LLC (for Duane Arnold Energy Center); Southern Nuclear Operating Company (for Joseph M. Farley Nuclear Plant, Units 1 and 2); Dominion Energy Nuclear Connecticut, Inc. (for Millstone Power Station, Unit Nos. 1, 2, and 3); Northern States Power Company (for Prairie Island Nuclear Generating Plant, Units 1 and 2); Exelon Generation Company, LLC (for Peach Bottom Atomic Power Station, Units 1, 2, and 3; and Quad Cities Nuclear Power Station, Units 1 and 2); Entergy Operations, Inc. (for River Bend Station, Unit 1); Tennessee Valley Authority (for Sequoyah Nuclear Plant, Units 1 and 2); and Susquehanna Nuclear, LLC (for Susquehanna Steam Electric Station, Units 1 and 2), grant temporary exemptions from the biennial emergency preparedness exercise requirement. The exemptions allow a temporary exemption from the requirements of 10 CFR part 50, appendix E, regarding the conduct of the biennial emergency preparedness exercise. These exemptions will not adversely affect the emergency response capability of the facilities because affected licensee personnel are currently qualified, and the licensees' proposed compensatory measures will enable their staff to maintain their knowledge, skills, and abilities without the conduct of the biennial emergency preparedness exercise during the exemption term.

The exemptions from certain requirements of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” section VI, “Nuclear Power Reactor Training and Qualification Plan for Personnel Performing Security Program Duties,” for Duke Energy Carolinas, LLC (for Catawba Nuclear Station, Units 1 and 2); Entergy Operations, Inc. (for Grand Gulf Nuclear Station, Unit 1); and PSEG Nuclear LLC (for Hope Creek Generating Station and Salem Nuclear Generating Station, Unit Nos. 1 and 2), will help to ensure that these regulatory requirements do not unduly limit licensee flexibility in using personnel resources in a manner that most effectively manages the impacts of the COVID-19 PHE on maintaining the safe and secure operation of these facilities and the implementation of the licensees' NRC approved security plans, protective strategy, and implementing procedures. These licensees have committed to certain security measures to ensure

response readiness and for their security personnel to maintain performance capability.

The NRC is providing compiled tables of exemptions using a single

Federal Register

notice for COVID-19 related exemptions instead of issuing individual

Federal Register

notices for each exemption. The compiled tables below provide transparency regarding the number and type of exemptions the NRC has issued. Additionally, the NRC publishes tables of approved regulatory actions related to the COVID-19 PHE on its public website at

https://www.nrc.gov/about-nrc/covid-19/reactors/licensing-actions.html.

II. Availability of Documents

The tables below provide the facility name, docket number, document description, and ADAMS accession number for each exemption issued. Additional details on each exemption issued, including the exemption request submitted by the respective licensee and the NRC's decision, are provided in each exemption approval listed in the tables below. For additional directions on accessing information in ADAMS, see the

ADDRESSES

section of this document.

Document description

ADAMS accession No.

Beaver Valley Power Station, Units 1 and 2

Docket Nos. 50-334 and 50-412

Beaver Valley Power Station, Units 1 and 2—COVID-19 Related Request for Exemption from part 26 Work Hours Requirements, dated November 20, 2020

ML20328A006.

Beaver Valley Power Station, Units 1 and 2—Exemption from Select Requirements of 10 CFR part 26 (EPID L-2020-LLE-0211 [COVID-19]), dated November 23, 2020

ML20326A000.

Beaver Valley Power Station, Units 1 and 2

Docket Nos. 50-334 and 50-412

Beaver Valley Power Station, Units 1 and 2—Request for One-Time Exemption from 10 CFR part 50, appendix E, “Biennial Emergency Preparedness Exercise Requirements,” due to COVID-19 Pandemic, dated September 22, 2020

ML20266G336.

Submittal of Pennsylvania Letter Requesting Exemption from Biennial Exercise Requirements for Pennsylvania Nuclear Power Plants in Calendar Year 2020, dated October 9, 2020

ML20283A772.

Beaver Valley Power Station, Units 1 and 2—Temporary Exemption from Biennial Emergency Preparedness Exercise Frequency Requirements of 10 CFR part 50, appendix E, section IV (EPID L-2020-LLE-0149), dated November 6, 2020

ML20288A640.

Callaway Plant, Unit No. 1

Docket No. 50-483

Callaway Plant, Unit No. 1—Request for Exemption from Specific Requirements of 10 CFR part 26, “Fitness for Duty Programs,” dated November 5, 2020

ML20310A333.

Callaway Plant, Unit No. 1—Exemption from Select Requirements of 10 CFR part 26 (EPID L-2020-LLE-0181 [COVID-19]), dated November 17, 2020

ML20317A153.

Catawba Nuclear Station, Units 1 and 2

Docket Nos. 50-413 and 50-414

Catawba Nuclear Station, Units 1 and 2—Response to “U.S. Nuclear Regulatory Commission Planned Actions Related to the Requirements for 10 CFR part 73, appendix B, section VI During the Coronavirus Disease 2019 Public Health Emergency,” dated October 5, 2020

non-public, withheld pursuant to 10 CFR 2.390.

Catawba Nuclear Station, Units 1 and 2—Supplement to Request for Temporary Exemption from 10 CFR part 73, appendix B, VI.C.3.(I)(1), Force-on-Force Annual Exercises, dated October 22, 2020

non-public, withheld pursuant to 10 CFR 2.390.

Catawba Nuclear Station, Units 1 and 2—Temporary Exemption from Certain Requirements of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” section VI, dated November 2, 2020

ML20300A312.

Davis-Besse Nuclear Power Station, Unit No. 1

Docket No. 50-346

Davis-Besse Nuclear Power Station, Unit No. 1—COVID-19 Related Request for Exemption from part 26 Work Hours Requirement, dated November 18, 2020

ML20323A169.

Davis-Besse Nuclear Power Station, Unit No. 1—Exemption from Select Requirements of 10 CFR part 26 (EPID L-2020-LLE-0208 [COVID-19]), dated November 19, 2020

ML20323A412.

Duane Arnold Energy Center

Docket No. 50-331

Duane Arnold—Request for One-Time Exemption from 10 CFR part 50, appendix E, “Biennial Emergency Preparedness Evaluated Exercise Requirements,” due to COVID-19 Pandemic, dated September 22, 2020

ML20266G292.

Duane Arnold Energy Center—Temporary Exemption from Requirements of 10 CFR part 50, appendix E, sections IV.F.2.B and IV.F.2.C (EPID L-2020-LLE-0150 [COVID-19]), dated November 25, 2020

ML20301A846.

Fermi-2

Docket No. 50-341

Fermi-2—Work Hour Limits Exemption Request due to COVID-19, dated November 10, 2020

ML20315A373.

Fermi-2—Exemption from Select Requirements of 10 CFR part 26 (EPID L-2020-LLE-0187 [COVID-19]), dated November 18, 2020

ML20317A272.

Joseph M. Farley Nuclear Plant, Units 1 and 2

Docket Nos. 50-348 and 50-364

Joseph M. Farley Nuclear Plant, Units 1 and 2—Request for One-Time Exemption from 10 CFR part 50, appendix E, “Biennial Emergency Preparedness Exercise Requirements,” due to COVID-19 Pandemic, dated September 21, 2020

ML20265A353.

Joseph M. Farley Nuclear Plant, Units 1 and 2—Temporary Exemption from Requirements of 10 CFR part 50, appendix E, sections IV.F.2.B and IV.F.2.C (EPID L-2020-LLE-0148 [COVID-19]), dated November 10, 2020

ML20295A502.

Grand Gulf Nuclear Station, Unit 1

Docket No. 50-416

Grand Gulf Nuclear Station, Unit 1—Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1) Regarding Annual Force-on-Force (FOF) Exercises, due to COVID 19 Pandemic, dated November 13, 2020

ML20318A386.

Grand Gulf Nuclear Station, Unit 1—Exemption from Annual Force-On-Force Exercise Requirements of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” subsection VI.C.3(I)(1) (EPID L-2020-LLE-0196 [COVID-19]), dated November 24, 2020

ML20323A047.

Hope Creek Generating Station

Docket No. 50-354

Salem Nuclear Generating Station, Unit Nos. 1 and 2

Docket Nos. 50-272 and 50-311

Salem Generating Station, Unit Nos. 1 and 2, and Hope Creek Generating Station—Request for a One-Time Exemption from 10 CFR part 73, appendix B, section VI, subsection C.3.(I)(1), Regarding Annual Force-on-Force (FOF) Exercises, due to COVID-19 Pandemic, dated October 26, 2020

ML20300A588.

Hope Creek Generating Station and Salem Nuclear Generating Station, Unit Nos. 1 and 2—One-Time Exemption from Certain Requirements of 10 CFR part 73, appendix B, “General Criteria for Security Personnel,” section VI (EPID L-2020-LLE-0168 [COVID-19]), dated November 20, 2020

ML20309A887.

Millstone Power Station, Unit Nos. 1, 2, and 3

Docket Nos. 50-245, 50-336, and 50-423

Millstone Power Station Unit Nos. 1, 2, and 3—Request for Exemption from Biennial Emergency Preparedness Exercise Requirements in 10 CFR part 50, appendix E, sections IV.F.2.b and IV.F.2.c, dated September 17, 2020

ML20261H597.

Millstone Power Station, Unit Nos. 1, 2, and 3—Temporary Exemption from Exercise Frequency Requirements of 10 CFR part 50, appendix E, sections IV.F.2.B and IV.F.2.C (EPID L-2020-LLE-0145 [COVID-19]), dated November 24, 2020

ML20287A273.

Palo Verde Nuclear Generating Station, Units 1, 2, and 3

Docket Nos. 50-528, 50-529, and 50-530

Palo Verde Nuclear Generating Station, Units 1, 2, and 3, and Independent Spent Fuel Storage Installation—Request for Exemption from Specific Requirements of 10 CFR part 26, “Fitness for Duty Programs,” dated October 28, 2020

ML20302A417.

Palo Verde Nuclear Generating Station, Units 1, 2, and 3—Exemption from Select Requirements of 10 CFR part 26 (EPID L-2020-LLE-0170 [COVID-19]), dated November 2, 2020

ML20303A015.

Perry Nuclear Power Plant, Unit No. 1

Docket No. 50-440

Perry Nuclear Power Plant, Unit No. 1—COVID-19 Related Request for Exemption from 10 CFR part 26 Work Hours Requirements, dated November 20, 2020

ML20325A070.

Perry Nuclear Power Plant, Unit No. 1—Exemption from Select Requirements of 10 CFR part 26 (EPID L-2020-LLE-0209 [COVID-19]), dated November 23, 2020

ML20325A158.

Peach Bottom Atomic Power Station, Units 1, 2, and 3

Docket Nos. 50-171, 50-277, 50-278, and 72-29

Peach Bottom Atomic Power Station, Units 1, 2, and 3—Request for One-Time Exemption from the Biennial Emergency Preparedness Exercise Requirements in 10 CFR part 50, appendix E, section IV.F.2.c, due to COVID-19 Public Health Emergency, dated September 25, 2020

ML20269A267.

Submittal of Pennsylvania Letter Requesting Exemption from Biennial Exercise Requirements for Pennsylvania Nuclear Power Plants in Calendar Year 2020, dated October 9, 2020

ML20283A772.

Peach Bottom Atomic Power Station, Independent Spent Fuel Storage Installation and Units 1, 2, and 3—Temporary Exemption from Biennial Emergency Preparedness Exercise Frequency Requirements of 10 CFR part 50, appendix E, section IV.F (EPID L-2020-LLE-0151 [COVID-19]), dated November 6, 2020

ML20288A718.

Prairie Island Nuclear Generating Plant, Units 1 and 2

Docket No. 50-282 and 50-306

Prairie Island Nuclear Generating Plant, Units 1 and 2—Request for a One-Time Exemption from 10 CFR part 50, appendix E, “Biennial Emergency Preparedness Exercise Requirements,” due to COVID-19 Pandemic, dated October 7, 2020

ML20281A665.

Prairie Island Nuclear Generating Plant, Units 1 and 2—Temporary Exemption Requirements of 10 CFR part 50, appendix E, sections IV.F.2.B and IV.F.2.C (EPID L-2020-LLE-0162 [COVID-19]), dated November 9, 2020

ML20297A239.

Quad Cities Nuclear Power Station, Units 1 and 2

Docket Nos. 50-254 and 50-265

Quad Cities Nuclear Power Station, Units 1 and 2—Renewed Facility Operating License Nos. DPR-29 and DPR-30, dated September 24, 2020

ML20269A392.

Quad Cities Nuclear Power Station, Units 1 and 2—Temporary Exemption from Requirements of 10 CFR part 50, appendix E, section IV.F.2.C (EPID L-2020-LLE-0152), dated November 12, 2020

ML20288A142.

River Bend Station, Unit 1

Docket No. 50-458

River Bend Station, Unit 1—Request for One-Time Exemption from 10 CFR part 50, appendix E, “Biennial Emergency Preparedness Evaluated Offsite Exercise Requirements,” due to COVID 19 Pandemic, dated October 6, 2020

ML20280A734.

River Bend Station, Unit 1—Temporary Exemption from Biennial Emergency Preparedness Exercise Frequency Requirements of 10 CFR part 50, appendix E, section IV.F.2.c (EPID L-2020-LLE-0163 [COVID-19]), dated November 25, 2020

ML20315A345.

Sequoyah Nuclear Plant, Units 1 and 2

Docket Nos. 50-327 and 50-328

Sequoyah Nuclear Plant, Units 1 and 2—Request for One-Time Exemption from 10 CFR part 50, appendix E, “Biennial Emergency Preparedness Evaluated Exercise Requirements due to COVID-19 Pandemic,” dated September 30, 2020

ML20274A362.

Sequoyah Nuclear Plant, Units 1 and 2—Temporary Exemption from Exercise Frequency Requirements of 10 CFR part 50, appendix E, “Emergency Planning and Preparedness for Production and Utilization Facilities,” section IV.F (EPID L-2020-LLE-0157 [COVID-19]), dated November 10, 2020

ML20288A546.

Susquehanna Steam Electric Station, Units 1 and 2

Docket Nos. 50-387 and 50-388

Susquehanna Steam Electric Station, Units 1 and 2—Request for One-Time Exemption from 10 CFR part 50, appendix E, “Biennial Emergency Preparedness Exercise Requirements,” due to COVID-19 Pandemic (PLA-7893), dated September 28, 2020

ML20272A020.

Submittal of Pennsylvania Letter Requesting Exemption from Biennial Exercise Requirements for Pennsylvania Nuclear Power Plants in Calendar Year 2020, dated October 9, 2020

ML20283A772.

Susquehanna Steam Electric Station, Units 1 and 2—Temporary Exemption from Biennial Emergency Preparedness Exercise Frequency Requirements of 10 CFR part 50, appendix E, section IV.F (EPID L-2020-LLE-0153 [COVID-19]), dated November 6, 2020

ML20294A291.

Dated: December 21, 2020.

For the Nuclear Regulatory Commission.

James G. Danna,

Chief, Plant Licensing Branch I, Division of Operating Reactor Licensing, Office of Nuclear Reactor Regulation.

[FR Doc. 2020-28588 Filed 12-23-20; 8:45 am]

BILLING CODE 7590-01-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.