Consolidation of Mentor-Protégé Programs and Other Government Contracting Amendments
Federal RegisterOct 16, 2020
Ask Donna
What actually matters in this document.
Text
SMALL BUSINESS ADMINISTRATION
13 CFR Parts 121, 124, 125, 126, 127, and 134
RIN 3245-AG94
Consolidation of Mentor-Protégé Programs and Other Government Contracting Amendments
AGENCY:
U.S. Small Business Administration.
ACTION:
Final rule.
SUMMARY:
In response to President Trump's government-wide regulatory reform initiative, the U.S. Small Business Administration (SBA) initiated a review of its regulations to determine which might be revised or eliminated. As a result, this rule merges the 8(a) Business Development (BD) Mentor-Protégé Program and the All Small Mentor-Protégé Program to eliminate confusion and remove unnecessary duplication of functions within SBA. This rule also eliminates the requirement that 8(a) Participants seeking to be awarded an 8(a) contract as a joint venture submit the joint venture agreement to SBA for review and approval prior to contract award, revises several 8(a) BD program regulations to reduce unnecessary or excessive burdens on 8(a) Participants, and clarifies other related regulatory provisions to eliminate confusion among small businesses and procuring activities. In addition, in response to public comment, the rule requires a business concern to recertify its size and/or socioeconomic status for all set-aside orders under unrestricted multiple award contracts, unless the contract authorized limited pools of concerns for which size and/or status was required.
DATES:
This rule is effective on November 16, 2020, except for § 127.504 which is effective October 16, 2020.
FOR FURTHER INFORMATION CONTACT:
Mark Hagedorn, U.S. Small Business Administration, Office of General Counsel, 409 Third Street SW, Washington, DC 20416; (202) 205-7625;
mark.hagedorn@sba.gov.
SUPPLEMENTARY INFORMATION:
I. Background Information
On January 30, 2017, President Trump issued Executive Order 13771, “Reducing Regulation and Controlling Regulatory Costs”, which is designed to reduce unnecessary and burdensome regulations and to control costs associated with regulations. In response to the President's directive to simplify regulations, SBA initiated a review of its regulations to determine which might be revised or eliminated. Based on this analysis, SBA identified provisions in many areas of its regulations that can be simplified or eliminated.
On November 8, 2019, SBA published in the
Federal Register
a comprehensive proposal to merge the 8(a) Business Development (BD) Mentor-Protégé Program and the All Small Mentor-Protégé Program to eliminate confusion and remove unnecessary duplication of functions within SBA; eliminate the requirement that 8(a) Participants seeking to be awarded an 8(a) contract as a joint venture submit the joint venture to SBA for review and approval prior to contract award; revise several 8(a) BD program regulations to reduce unnecessary or excessive burdens on 8(a) Participants; and clarify other related regulatory provisions to eliminate confusion among small businesses and procuring activities. 84 FR 60846. Some of the proposed changes involved technical issues. Others were more substantive and resulted from SBA's experience in implementing the current regulations. The proposed rule initially called for a 70-day comment period, with comments required to be made to SBA by January 17, 2020. SBA received several comments in the first few weeks after the publication to extend the comment period. Commenters felt that the nature of the issues raised in the rule and the timing of comments during the holiday season required more time for affected businesses to adequately review the proposal and prepare their comments. In response to these comments, SBA published a notice in the
Federal Register
on January 10, 2020, extending the comment period an additional 21 days to February 7, 2020. 85 FR 1289.
As part of the rulemaking process, SBA also held tribal consultations pursuant to Executive Order 13175, Tribal Consultations, in Minneapolis, MN, Anchorage, AK, Albuquerque, NM and Oklahoma City, OK to provide interested tribal representatives with an opportunity to discuss their views on various 8(a) BD-related issues.
See
84 FR 66647. These consultations were in addition to those held by SBA before issuing the proposed rule in Anchorage, AK (
see
83 FR 17626), Albuquerque, NM (
see
83 FR 24684), and Oklahoma City, OK (
see
83 FR 24684). SBA considers tribal consultation meetings a valuable component of its deliberations and believes that these tribal consultation meetings allowed for constructive dialogue with the Tribal community, Tribal Leaders, Tribal Elders, elected members of Alaska Native Villages or their appointed representatives, and principals of tribally-owned and Alaska Native Corporation (ANC) owned firms participating in the 8(a) BD Program. Additionally, SBA held a Listening Session in Honolulu, HI to obtain comments and input from key 8(a) BD program stakeholders in the Hawaiian small business community, including 8(a) applicants and Participants owned by Native Hawaiian Organizations (NHOs).
During the proposed rule's 91-day comment period, SBA received 189 timely comments, with a high percentage of commenters favoring the proposed changes. A substantial number of commenters applauded SBA's effort to clarify and address misinterpretations of the rules. For the most part, the comments supported the substantive changes proposed by SBA.
This rule merges the 8(a) BD Mentor-Protégé Program and the All Small Mentor-Protégé Program. The rule also eliminates the requirement that 8(a) Participants seeking to be awarded an 8(a) contract as a joint venture must submit the joint venture to SBA for review and approval prior to contract award in every instance. Additionally, the rule makes several other changes to the 8(a) BD Program to eliminate or reduce unnecessary or excessive burdens on 8(a) Participants.
The rule combines the 8(a) BD Mentor-Protégé Program and the All Small Mentor-Protégé Program in order to eliminate confusion regarding perceived differences between the two Programs, remove unnecessary duplication of functions within SBA, and establish one, unified staff to better coordinate and process mentor-protégé applications. SBA originally established a mentor-protégé program for 8(a) Participants a little more than 20 years ago. 63 FR 35726, 35764 (June 30, 1998). The purpose of that program was to encourage approved mentors to provide various forms of business assistance to eligible 8(a) Participants to aid in their development. On September 27, 2010, the Small Business Jobs Act of 2010 (Jobs Act), Public Law 111-240 was enacted. The Jobs Act was designed to protect the interests of small businesses and increase opportunities in the Federal marketplace. The Jobs Act was drafted by Congress in recognition of the fact that mentor-protégé programs serve an important business development function for small businesses and therefore included language authorizing SBA to establish separate mentor-protégé programs for the Service-Disabled Veteran-Owned Small Business Concern (SDVO SBC) Program, the HUBZone Program, and the Women-Owned Small Business (WOSB)
Program, each of which was modeled on SBA's existing mentor-protégé program available to 8(a) Participants.
See
section 1347(b)(3) of the Jobs Act. Thereafter, on January 2, 2013, the National Defense Authorization Act for Fiscal Year 2013 (NDAA 2013), Public Law 112-239 was enacted. Section 1641 of the NDAA 2013 authorized SBA to establish a mentor-protégé program for all small business concerns. This section further provided that a small business mentor-protégé program must be identical to the 8(a) BD Mentor-Protégé Program, except that SBA could modify each program to the extent necessary, given the types of small business concerns to be included as protégés.
Subsequently, SBA published a Final Rule in the
Federal Register
combining the authorities contained in the Jobs Act and the NDAA 2013 to create a mentor-protégé program for all small businesses. 81 FR 48558 (July 25, 2016).
The mentor-protégé program available to firms participating in the 8(a) BD Program has been used as a business development tool in which mentors provide diverse types of business assistance to eligible 8(a) BD protégés. This assistance may include, among other things, technical and/or management assistance; financial assistance in the form of equity investments and/or loans; subcontracts; and/or assistance in performing Federal prime contracts through joint venture arrangements. The explicit purpose of the 8(a) BD Mentor-Protégé relationship has been to enhance the capabilities of protégés and to improve their ability to successfully compete for both government and commercial contracts. Similarly, the All Small Mentor-Protégé Program is designed to require approved mentors to aid protégé firms so that they may enhance their capabilities, meet their business goals, and improve their ability to compete for contracts. The purposes of the two programs are identical. In addition, the benefits available under both programs are identical. Small businesses and 8(a) Program Participants receive valuable business development assistance and any joint venture formed between a protégé firm and its SBA-approved mentor receives an exclusion from affiliation, such that the joint venture will qualify as a small business provided the protégé individually qualifies as small under the size standard corresponding to the NAICS code assigned to the procurement. A protégé firm may enter a joint venture with its SBA-approved mentor and be eligible for any contract opportunity for which the protégé qualifies. If a protégé firm is an 8(a) Program Participant, a joint venture between the protégé and its mentor could seek any 8(a) contract, regardless of whether the mentor-protégé agreement was approved through the 8(a) BD Mentor-Protégé Program or the All Small Mentor-Protégé Program. Moreover, a firm could be certified as an 8(a) Participant after its mentor-protégé relationship has been approved by SBA through the All Small Mentor-Protégé Program and be eligible for 8(a) contracts as a joint venture with its mentor once certified.
Because the benefits and purposes of the two programs are identical, SBA believes that having two separate mentor-protégé programs is unnecessary and causes needless confusion in the small business community. As such, this rule eliminates a separate 8(a) BD Mentor-Protégé Program and continues to allow any 8(a) Participant to enter a mentor-protégé relationship through the All Small Mentor-Protégé Program. Specifically, the rule revises § 124.520 to merely recognize that an 8(a) Participant, as any other small business, may participate in SBA's Small Business Mentor-Protégé Program. In merging the 8(a) BD Mentor-Protégé Program with the All Small Mentor-Protégé Program, the rule also makes conforming amendments to SBA's size regulations (13 CFR part 121), the joint venture provisions (13 CFR 125.8), and the All Small Mentor-Protégé Program regulations (13 CFR 125.9).
A mentor-protégé relationship approved by SBA through the 8(a) BD Mentor-Protégé Program will continue to operate as an SBA-approved mentor-protégé relationship under the All Small Mentor-Protégé Program. It will continue to have the same remaining time in the All Small Mentor-Protégé Program as it would have had under the 8(a) BD Mentor-Protégé Program if that Program continued. Any mentor-protégé relationship approved under the 8(a) BD Mentor-Protégé Program will count as one of the two lifetime mentor-protégé relationships that a small business may have under the All Small Mentor-Protégé Program.
As stated previously, SBA has also taken this action partly in response to the President's directive that each agency review its regulations. Therefore, this rule also revises regulations pertaining to the 8(a) BD and size programs in order to further reduce unnecessary or excessive burdens on small businesses and to eliminate confusion or more clearly delineate SBA's intent in certain regulations. Specifically, this rule makes additional changes to the size and socioeconomic status recertification requirements for orders issued against multiple award contracts (MACs). A detailed discussion of these changes is contained below in the Section-by-Section Analysis.
II. Section-by-Section Analysis
Section 121.103(b)(6)
The rule amends the references to SBA's mentor-protégé programs in this provision, specifying that a protégé firm cannot be considered affiliated with its mentor based solely on assistance received by the protégé under the mentor-protégé agreement. The rule eliminates the cross-reference to the regulation regarding the 8(a) BD Mentor-Protégé Program (13 CFR 124.520), leaving only the reference to the regulation regarding the All Small Business Mentor-Protégé Program.
Section 121.103(f)(2)(i)
Under § 121.103(f)(2), SBA may presume an identity of interest (and thus affiliate one concern with another) based upon economic dependence if the concern in question derived 70 percent or more of its receipts from another concern over the previous three fiscal years. The proposed rule provided that this presumption may be rebutted by a showing that despite the contractual relations with another concern, the concern at issue is not solely dependent on that other concern, such as where the concern has been in business for a short amount of time and has only been able to secure a limited number of contracts or where the contractual relations do not restrict the concern in question from selling the same type of products or services to another purchaser. Commenters supported this change, appreciating that SBA seemed to be making economic dependence more about the issue of control, where they thought it should be. SBA adopts this language as final.
Section 121.103(g)
The rule amends the newly organized concern rule contained in § 121.103(g) by clarifying that affiliation may be found where both former and “current” officers, directors, principal stockholders, managing members, or key employees of one concern organize a new concern in the same or related industry or field of operation, and serve as the new concern's officers, directors, principal stockholders, managing members, or key employees. The rule merely adds the word “current” to the regulatory text to ensure that affiliation may arise where the key individuals are still associated with the first company. SBA believes that such a finding of affiliation has always been authorized,
but merely seeks to clarify its intent to make sure there is no confusion. Several commenters were concerned that the rule was not clear with respect to entity-owned firms, specifically that the newly organized concern rule should not apply to tribes, ANCs and NHOs. SBA believes that entities and entity-owned firms are already excepted from affiliation under the newly organized concern rule by § 121.103(b)(2). A few commenters recommended that SBA put in clarifying language to ensure that the rule cannot be read to contradict § 124.109(c)(4)(iii), which permits a manager of a tribally-owned concern to manage no more than two Program Participants at the same time. The final rule adds such clarifying language.
Section 121.103(h)
The proposed rule sought to amend the introductory text to § 121.103(h) to revise the requirements for joint ventures. SBA believes that a joint venture is not an on-going business entity, but rather something that is formed for a limited purpose and duration. If two or more separate business entities seek to join together through another entity on a continuing, unlimited basis, SBA views that as a separate business concern with each partner affiliated with each other. To capture SBA's intent on limited scope and duration, SBA's current regulations provide that a joint venture is something that can be formed for no more than three contracts over a two-year period. The proposed rule sought to eliminate the three-contract limit for a joint venture, but continue to prescribe that a joint venture cannot exceed two years from the date of its first award. In addition, the proposed rule clarified SBA's current intent that a novation to the joint venture would start the two-year period if that were the first award received by the joint venture. Commenters generally supported the proposal to eliminate the three-contract limit, saying that the change will eliminate significant and unnecessary confusion. Commenters also believed that requiring partners to form a second or third joint venture after they received three contract awards created an undue administrative burden on joint ventures, and they viewed this change as an elimination of an unnecessary burden. Several commenters recommended further amending the rule to extend the amount of time that a joint venture could seek contracts to some point greater than two years. These commenters recommended two approaches, either allowing all joint ventures to seek contracts for a period greater than two years or allowing only joint ventures between a protégé and its mentor to seek contracts beyond two years. In the mentor-protégé context, commenters reasoned that a joint venture between a protégé and its mentor should be either three years (the length of the initial mentor-protégé agreement) or six years (the total allowable length of time for a mentor-protégé relationship to exist). It is SBA's view that the requirements for all joint ventures should be consistent, and that they should not be different with respect to joint ventures between protégé firms and their mentors. One of the purposes of this final rule is to remove inconsistencies and confusion in the regulations. SBA believes that having differing requirements for different types of joint ventures would add to, not reduce, the complexity and confusion in the regulations. Regarding extending the amount of time a joint venture could operate and seek additional contracts generally, SBA opposes such an extension. As SBA noted in the supplementary information to the proposed rule, SBA believes that a joint venture should not be an on-going entity, but, rather, something formed for a limited purpose with a limited duration. SBA believes that allowing a joint venture to operate as an independent business entity for more than two years erodes the limited purpose and duration requirements of a joint venture. If the parties intend to jointly seek work beyond two years from the date of the first award, the regulations allow them to form a new joint venture. That new entity would then be able to seek additional contracts over two years from the date of its first award. Although requiring the formation of several joint venture entities, SBA believes that is the correct approach. To do otherwise would be to ignore what a joint venture is intended to do.
In addition, one commenter sought further clarification regarding novations. The rule makes clear that where a joint venture submits an offer prior to the two-year period from the date of its first award, the joint venture can be awarded a contract emanating from that offer where award occurs after the two-year period expires. The commenter recommended that SBA add clarifying language that would similarly allow a novation to occur after the two-year period if the joint venture submits a novation package for contracting officer approval within the two-year period. SBA agrees, and has added clarifying language to one of the examples accompanying the regulatory text.
In the proposed rule, SBA also asked for comments regarding the exception to affiliation for joint ventures composed of multiple small businesses in which firms enter and leave the joint venture based on their size status. In this scenario, in an effort to retain small business status, joint venture partners expel firms that have exceeded the size standard and then possibly add firms that qualify under the size standard. This may be problematic where the joint venture is awarded a Federal Supply Schedule (FSS) contract or any other MAC vehicle. A joint venture that is awarded a MAC could receive many orders beyond the two-year limitation for joint venture awards (since the contract was awarded within that two-year period), and could remain small for any order requiring recertification simply by exchanging one joint venture partner for another (
i.e.,
a new small business for one that has grown to be other than small). SBA never intended for the composition of joint ventures to be fluid. The joint venture generally should have the same partners throughout its lifetime, unless one of the partners is acquired. SBA considers a joint venture composed of different partners to be a different joint venture than the original one. To reflect this understanding, the proposed rule asked for comments as to whether SBA should specify that the size of a joint venture outside of the mentor-protégé program will be determined based on the current size status and affiliations of all past and present joint venture partners, even if a partner has left the joint venture. SBA received several comments responding to this provision on both sides of the issue. Several commenters believed that SBA should not consider the individual size of partners who have left the joint venture in determining whether the joint venture itself continues to qualify as small. These commenters thought that permitting substitution of joint venture partners allows small businesses to remain competitive for orders under large, complex MACs. Other commenters acknowledged that SBA has accurately recognized a problem that gives a competitive advantage to joint ventures over individual small businesses. They agreed that SBA likely did not contemplate a continuous turnover of joint venture partners when it changed its affiliation rules to allow a joint venture to qualify as small provided that each of its partners individually qualified as small (instead of aggregating the receipts or employees of all joint venture partners as was previously the case). SBA notes that this really is an issue only with respect to MACs. For a single award contract, size is
determined at one point in time—the date on which an offeror submits its initial offer including price. Where an offeror is a joint venture, it qualifies as small provided each of the partners to the joint venture individually qualifies as small on the date of the offer. The size of the joint venture awardee does not change if an individual member of the joint venture grows to be other than small during the performance of the contract. As detailed elsewhere in this rule, for a MAC that is not set-aside for small business, however, size may be determined as of the date a MAC holder submits its offer for a specific order that is set-aside for small business. In such a case, if a partner to the joint venture has grown to be other than small, the joint venture would not be eligible as a small business for the order. One commenter recommended that once a multi-small business joint venture wins its first MAC, its size going forward (for future contracts or any recertification required under the awarded MAC) should be determined based on the size of the joint venture's present members and any former members that were members as of the date the joint venture received its first MAC. This would allow a joint venture to remove members for legitimate reasons before the first award of the first MAC, but not allow the joint venture to change members after such an award just to be able to recertify as small for an order under the MAC. SBA thoroughly considered all the comments in response to this issue. After further considering the issue, SBA does not believe that reaching back to consider the size of previous partners (who are no longer connected to the joint venture) would be workable. A concern that is no longer connected to the joint venture has no incentive to cooperate and provide information relating to its size, even if it still qualified individually as small. Thus, SBA is not making any changes to the regulatory text to address this issue in this final rule.
The rule also proposed to add clarifying language to the introductory text of § 121.103(h) to recognize that, although a joint venture cannot be populated with individuals intended to perform contracts awarded to the joint venture, the joint venture can directly employ administrative personnel and such personnel may specifically include Facility Security Officers. SBA received overwhelming support of this change and adopts it as final in this rule.
The proposed rule also sought comments on the broader issue of facility clearances with respect to joint ventures. SBA understands that some procuring agencies will not award a contract requiring a facility security clearance to a joint venture if the joint venture itself does not have such clearance, even if both partners to the joint venture individually have such clearance. SBA does not believe that such a restriction is appropriate. Under SBA's regulations, a joint venture
cannot
hire individuals to perform on a contract awarded to the joint venture (the joint venture cannot be “populated”). Rather, work must be done individually by the partners to the joint venture so that SBA can track who does what and ensure that some benefit flows back to the small business lead partner to the joint venture. SBA proposed allowing a joint venture to be awarded a contract where either the joint venture itself or the lead small business partner to the joint venture has the required facility security clearance. In such a case, a joint venture lacking its own separate facility security clearance could still be awarded a contract requiring such a clearance provided the lead small business partner to the joint venture had the required facility security clearance and committed to keep at its cleared facility all records relating to the contract awarded to the joint venture. Additionally, if it is established that the security portion of the contract requiring a facility security clearance is ancillary to the principal purpose of the procurement, then the non-lead partner to the joint venture (which may include a large business mentor) could possess such clearance. The majority of commenters supported this proposal, agreeing that it does not make sense to require the joint venture to have the necessary facility security clearance where the joint venture entity itself is not performing the contract. These commenters believed that as long as the joint venture partner(s) performing the necessary security work had the required facility security clearance, the Government would be adequately protected.
This rule also removes current § 121.103(h)(3)(iii), which provides that a joint venture between a protégé firm and its mentor that was approved through the 8(a) BD Mentor-Protégé Program is considered small provided the protégé qualifies as individually small. Because this rule eliminates the 8(a) BD Mentor-Protégé Program as a separate program, this provision is no longer needed.
The proposed rule also clarified how to account for joint venture receipts and employees during the process of determining size for a joint venture partner. The joint venture partner must include its percentage share of joint venture receipts and employees in its own receipts or employees. The proposed rule provided that the appropriate percentage share is the same percentage figure as the percentage figure corresponding to the joint venture partner's share of work performed by the joint venture. Commenters generally agreed with the proposed treatment of receipts. Several commenters sought further clarification regarding subcontractors, specifically asking how to treat revenues generated through subcontracts from the individual partners. One commenter recommended that the joint venture partner responsible for a specific subcontract should take on that revenue as its share of the contract's total revenues. As with all contracts, SBA does not exclude revenues generated by subcontractors from the revenues deemed to be received by the prime contractor. Where a joint venture is the prime contractor, 100 percent of the revenues will be apportioned to the joint venture partners, regardless of how much work is performed by other subcontractors. The joint venture must perform a certain percentage of the work between the partners to the joint venture (generally 50 percent, but 15 percent for general construction). SBA does not believe that it matters which partner to the joint venture the subcontract flows through. Of the 50 percent of the total contract that the joint venture partners must perform, SBA will look at how much is performed by each partner. That is the percentage of total revenues that will be attributed to each partner. This rule makes clear that revenues will be attributed to the joint venture in the same percentage as that of the work performed by each partner.
A few commenters thought that that same approach should not be applied to the apportionment of employees. They noted that some or all of the joint venture's employees may also be employed concurrently by a joint venture partner. Without taking that into account, the proposed methodology would effectively double count employees who were also employed by one of the joint venture partners. In response, SBA has amended this paragraph to provide that for employees, the appropriate way to apportion individuals employed by the joint venture is the same percentage of employees as the joint venture partner's percentage ownership share in the joint venture, after first subtracting any joint venture employee already accounted for in the employee count of one of the partners.
Section 121.402
The proposed rule amended how NAICS codes are applied to task orders to ensure that the NAICS codes assigned to specific procurement actions, and the corresponding size standards, are an accurate reflection of the contracts and orders being awarded and performed. Consistent with the final rule for FAR Case 2014-002, 85 FR 11746 (Feb. 27, 2020), a contracting officer must assign a single NAICS code for each order issued against a MAC, and that NAICS code must be a NAICS code that is included in the underlying MAC and represents the principal purpose of the order. SBA believes that the NAICS code assigned to a task order must reflect the principal purpose of that order. Currently, based on the business rules of the Federal Procurement Data System (FPDS) and the FAR, all contracts including MACs are restricted to only being assigned a single NAICS code, and if a MAC is assigned a service NAICS code, then that service NAICS code flows down to each individual order under that MAC. SBA does not believe it is appropriate for a task order that is nearly entirely for supplies to have a service NAICS code. In such a case, a firm being awarded such an order would not have to comply with the nonmanufacturer rule. In particular, set-aside orders should be assigned a manufacturing/supply NAICS code, so that the nonmanufacturer rule will apply to the order if it is awarded to a nonmanufacturer. Additionally, the current method for NAICS code assignment can also be problematic where a MAC is assigned a NAICS code for supplies but a particular order under that MAC is almost entirely for services. In such a case, firms that qualified as small for the larger employee-based size standard associated with a manufacturing/supply NAICS code may not qualify as small businesses under a smaller receipts-based services size standard. As such, because the order is assigned the manufacturing/supply NAICS code associated with the MAC, firms that should not qualify as small for a particular procurement that is predominantly for services may do so. SBA recognizes that § 121.402(c) already provides for a solution that will ensure that NAICS codes assigned to task and delivery orders accurately reflect the work being done under the orders. Specifically, the requirement for certain MACs to be assigned more than one NAICS code (
e.g.,
service NAICS code and supply NAICS code) will allow for orders against those MACs to reflect both a NAICS code assigned to the MAC and also a NAICS code that accurately reflects work under the order. The requirement to assign certain MACs more than one NAICS code has already been implemented in the FAR at 48 CFR 19.102(b)(2)(ii) but it will not go into effect until October 1, 2022. The future effective date is when FPDS is expected to implement the requirement and it allows all the Federal agencies to budget and plan for internal system updates across their multiple contracting systems to accommodate the requirement. Thus, this rule makes only minor revisions to the existing regulations to ensure that the NAICS codes assigned to specific procurement actions, and the corresponding size standards, are an accurate reflection of the contracts and orders being awarded and performed.
Commenters supported SBA's intent. They noted that allowing contracting officers to assign a NAICS code to an order that differs from the NAICS code(s) already contained in the MAC could unfairly disadvantage contractors who did not compete for the MAC because they did not know orders would be placed under NAICS codes not in the MAC's solicitation. A commenter noted, however, that the proposed rule added a new § 121.402(c)(2)(ii) when it appears that a revision to § 121.402(c)(2)(i) might be more appropriate. SBA agrees and has revised § 121.402(c)(2)(i) in this final rule to clarify that orders must reflect a NAICS code assigned to the underlying MAC.
In addition, the rule makes a minor change to § 121.402(e) by removing the passive voice in the regulatory text. The rule also clarifies that in connection with a size determination or size appeal, SBA may supply an appropriate NAICS code designation, and accompanying size standard, where the NAICS code identified in the solicitation is prohibited, such as for set-aside procurements where a retail or wholesale NAICS code is identified.
Sections 121.404(a)(1), 124.503(i), 125.18(d), and 127.504(c)
Size Status
SBA has been criticized for allowing agencies to receive credit towards their small business goals for awards made to firms that no longer qualify as small. SBA believes that much of this criticism is misplaced. Where a small business concern is awarded a small business set-aside contract with a duration of not more than five years and grows to be other than small during the performance of the contract, some have criticized the exercise of an option as an award to an other than small business. SBA disagrees with such a characterization. Small business set-aside contracts are restricted only to firms that qualify as small as of the date of a firm's offer for the contract. A firm's status as a small business is relevant to its qualifying for the award of the contract. If a concern qualifies as small for a contract with a duration of not more than five years, it is considered a small business throughout the life of that contract. Even for MACs that are set-aside for small business, once a concern is awarded a contract as a small business it is eligible to receive orders under that contract and perform as a small business. In such a case, size was relevant to the initial award of the contract. Any competitor small business concern could protest the size status of an apparent successful offeror for a small business set-aside contract (whether single award or multiple award), and render a concern ineligible for award where SBA finds that the concern does not qualify as small under the size standard corresponding to the NAICS code assigned to the contract. Furthermore, firms awarded long-term small business set-aside contracts must recertify their size status at five years and every option thereafter. Firms are eligible to receive orders under that contract and perform as a small business so long as they continue to recertify as small at the required times (
e.g.,
at five years and every option thereafter). Not allowing a concern that legitimately qualified at award and/or recertified later as small to receive orders and continue performance as a small business during the base and option periods, even if it has naturally grown to be other than small, would discourage firms from wanting to do business with the Government, would be disruptive to the procurement process, and would disincentivize contracting officers from using small business set-asides.
SBA believes, however, that there is a legitimate concern where a concern self-certifies as small for an unrestricted MAC and at some point later in time when the concern no longer qualifies as small the contracting officer seeks to award an order as a small business set-aside and the firm uses its self-certification as a small business for the underlying unrestricted MAC. A firm's status as a small business does not generally affect whether the firm does or does not qualify for the award of an unrestricted MAC contract. As such, competitors are very unlikely to protest the size of a concern that self-certifies as small for an unrestricted MAC. In SBA's view, where a contracting officer sets aside an order for small business under
an unrestricted MAC, the order is the first time size status is important. That is the first time that some firms will be eligible to compete for the order while others will be excluded from competition because of their size status. To allow a firm's self-certification for the underlying MAC to control whether a firm is small at the time of an order years after the MAC was awarded does not make sense to SBA.
In considering the issue, SBA looked at the data for orders that were awarded as small business set-asides under unrestricted base multiple award vehicles in FY 2018. In total, 8,666 orders were awarded as small business set-asides under unrestricted MACs in FY 2018. Of those set-aside orders, 10 percent are estimated to have been awarded to firms that were no longer small in SAM under the NAICS code size standard at the time of the order award. Further, it is estimated that 7.0 percent of small business set-aside orders under the FSS were awarded to firms that were no longer small in SAM under the NAICS code size standard at the time of the order (510 out of 7,266 orders). That amounted to 12.6 percent of the dollars set-aside for small business under the FSS ($129.6 million to firms that were no longer small in SAM out of a total of $1.0723 billion in small business set-aside orders). Whereas, it is estimated that 49.4 percent of small business set-aside orders under government-wide acquisition contracts (GWACs) were awarded to firms that were no longer small in SAM under the NAICS code size standard at the time of the order (261 out of 528 orders). That amounted to 67 percent of the dollars set-aside for small business under GWACs ($119.6 million to firms that were no longer small in SAM out of a total of $178.6 million in small business set-aside orders). SBA then considered the number and dollar value of new orders that were awarded as small business set-asides under unrestricted base multiple award vehicles in FY 2018 using the size standard “exceptions” that apply in some of SBA's size standards (
e.g.,
the IT Value-Added Reseller exception to NAICS 541519). Taking into account all current size standards exceptions, which allow a firm to qualify under an alternative size standard for certain types of contracts, it is estimated that 6.4 percent of small business set-aside orders under the FSS were awarded to firms that were no longer small in SAM at the time of the order (468 out of 7,266 orders). That amounted to 11.3 percent of the dollars set-aside for small business under the FSS ($120.7 million to firms that were no longer small in SAM out of a total of $1.0723 billion in small business set-aside orders). Considering exceptions for set-aside orders under GWACs, it is estimated that 11.6 percent were awarded to firms that were no longer small in SAM at the time of the order (61 out of 528 orders). That amounted to 39.5 percent of the dollars set-aside for small business under GWACs ($70.5 million to firms that were no longer small in SAM out of a total of $178.6 million in small business set-aside orders). It is not possible to tell from FPDS whether the “exception” size standard applied to the contract or whether the agency applied the general size standard for the identified NAICS code. Thus, all that can be said with certainty is that for small business set-aside orders under the FSS, between 11.3 percent and 12.1 percent of the order dollars set-aside for small business were awarded to firms that were no longer small in SAM. This amounted to somewhere between $120.7 million and $129.6 that were awarded to firms that were no longer small in SAM. For GWACs, the percentage of orders and order dollars being awarded to firms that no longer qualify as small is significantly greater. Between 39.5 percent and 67.0 percent of the order dollars set-aside for small business under GWACs were awarded to firms that were no longer small in SAM. This amounted to somewhere between $70.5 million and $119.6 million that were awarded to firms that were no longer small in SAM.
Because discretionary set-asides under the FSS programs have proven effective in making awards to small business under the program and SBA did not want to add unnecessary burdens to the program that might discourage the use of set-asides, the proposed rule provided that, except for orders or Blanket Purchase Agreements issued under any FSS contract, if an order under an unrestricted MAC is set-aside exclusively for small business (
i.e.,
small business set-aside, 8(a) small business, service-disabled veteran-owned small business, HUBZone small business, or women-owned small business), a concern must recertify its size status and qualify as such at the time it submits its initial offer, which includes price, for the particular order.
SBA received a significant number of comments on this issue. Many commenters supported the proposed language as a needed approach to ensure that firms that are not small do not receive orders set-aside for small businesses and procuring agencies do not inappropriately take credit for awards to small business when the awardees are not in fact small. Many of these commenters believed that it was not fair to them as small businesses to have to compete for small business set-aside orders under unrestricted MACs with concerns that did not currently qualify as small and may not have done so for several years. Other commenters opposed the proposal for various reasons. Some believed that the regulations should be intended to foster and promote growth in small businesses and that the recertification requirement could stifle that growth. Others believed that the proposal undermines the general rule that a concern maintains its small business status for the life of a contract. SBA does not believe that a rule that requires a concern to actually be what it claims to be (
i.e.,
a small business) in any way stifles growth. Of course, SBA supports the growth of small businesses generally. SBA encourages concerns to grow naturally and permits concerns that have been awarded small business set-aside contracts to continue to perform those contracts as small businesses throughout the life of those contracts (
i.e.,
for the base and up to four additional option years). This rule merely responds to perceptions that SBA has permitted small business awards to concerns that do not qualify as small. As noted above, it is intended to apply only to unrestricted procurements where size and status were not relevant to the award of the underlying MAC. SBA also disagrees that this provision is inconsistent with the general rule that once a concern qualifies as small for a contract it can maintain its status as a small business throughout the life of that contract. SBA does not believe that a representation of size or status that does not affect the concern's eligibility to be awarded a contract should have the same significance as one that does.
Several commenters agreed with SBA's intent but believed that the rule needed to more accurately take into account today's complex acquisition environment. These commenters noted that many MACs now seek to make awards to certain types of business concerns (
i.e.,
small, 8(a), HUBZone, WOSB, SDVO) in various reserves or “pools,” and that concerns may be excluded from a particular pool if they do not qualify as eligible for the pool. These commenters recommended that a concern being awarded a MAC for a particular pool should be able to carry the size and/or status of that pool to each order made to the pool. SBA agrees. As noted above, SBA proposed recertification in connection with orders
set-aside for small business under an unrestricted MAC because that is the first time that some firms will be eligible to compete for the order while others will be excluded from competition because of their size and/or status. However, where a MAC solicitation seeks to make awards to reserves or pools of specific types of small business concerns, the concerns represent that they are small or qualify for the status designated by the pool and having that status or not determines whether the firm does or does not qualify for the award of a MAC contract for the pool. In such a case, SBA believes that size and status should flow from the underlying MAC to individual orders issued under that MAC, and the firm can continue to rely on its representations for the MAC itself unless a contracting officer requests recertification of size and/or status with respect to a specific order. SBA makes that revision in this final rule.
Many commenters also believed that there was no legitimate programmatic reason for excluding the FSS program from this recertification requirement. The commenters, however, miss that the FSS program operates under a separate statutory authority and that set-asides are discretionary, not mandatory under this authority. SBA and GSA worked closely together to stand up and create this discretionary authority and it has been very successful. This discretionary set-aside authority was authorized by the Small Business Jobs Act of 2010 (Pub. L. 111-240) and implemented in FAR 8.405-5 in November 2011. As a result, benefits to small businesses have been significant. The small business share of GSA Schedule sales rose from 30% in fiscal year 2010 (the last full fiscal year before the authority was implemented) to 39% in fiscal year 2019. That equates to an additional $1 billion going to small businesses in fiscal year 2019. Although SBA again considered applying the recertification requirement to the FSS program (and allow the FSS, as with any other MAC, to establish reserves or pools for business concerns with a specified size or status), SBA believes that is unworkable at this time. Consequently, consistent with the proposed rule, this final rule does not apply the modified recertification requirement to the FSS program. Doing so would pose an unnecessary risk to a program currently yielding good results for small business.
For a MAC that is set aside for small business (
i.e.,
small business set-aside, 8(a) small business, SDVO small business, HUBZone small business, or WOSB), the rule generally sets size status as of the date of the offer for the underlying MAC itself. A concern that is small at the time of its offer for the MAC will be considered small for each order issued against the contract, unless a contracting officer requests a size recertification in connection with a specific order. As is currently the case, a contracting officer has the discretion to request recertification of size status on MAC orders. If that occurs, size status would be determined at the time of the order. That would not be a change from the current regulations.
Socioeconomic Status
Where the required status for an order differs from that of the underlying contract (
e.g.,
the MAC is a small business set-aside award, and the procuring agency seeks to restrict competition on the order to only certified HUBZone small business concerns), SBA believes that a firm must qualify for the socioeconomic status of a set-aside order at the time it submits an offer for that order. Although size may flow down from the underlying contract, status in this case cannot. Similar to where a procuring agency seeks to compete an order on an unrestricted procurement as a small business set-aside and SBA would require offerors to qualify as small with respect to that order, (except for orders under FSS contracts),), SBA believes that where the socioeconomic status is first required at the order level, an offeror seeking that order must qualify for the socioeconomic status of the set-aside order when it submits its offer for the order.
Under current policy and regulations, where a contracting officer seeks to restrict competition of an order under an unrestricted MAC to eligible 8(a) Participants only, the contracting officer must offer the order to SBA to be awarded through the 8(a) program, and SBA must accept the order for the 8(a) program. In determining whether a concern is eligible for such an 8(a) order, SBA would apply the provisions of the Small Business Act and its current regulations which require a firm to be an eligible Program Participant as of the date set forth in the solicitation for the initial receipt of offers for the order.
This final rule makes these changes in § 121.404(a)(1) for size, § 124.503(i) for 8(a) BD eligibility, § 125.18(d) for SDVO eligibility, and § 127.504(c) for WOSB eligibility.
Several commenters voiced concern with allowing the set-aside of orders to a smaller group of firms than all holders of a MAC. They noted that bid and proposal preparation costs can be significant and a concern that qualified for the underlying MAC as a small business or some other specified type of small business could be harmed if every order was further restricted to a subset of small business. For example, where a MAC is set-aside for small business and every order issued under that MAC is set-aside for 8(a) small business concerns, SDVO small business concerns, HUBZone small business concerns and WOSBs, those firms that qualified only as small business concerns would be adversely affected. In effect, they would be excluded from competing for every order. SBA agrees that is a problem. That is not what SBA intended when it authorized orders issued under small business set-aside contracts to be further set-aside for a specific type of small business. SBA believes that an agency should not be able to set-aside all of the orders issued under a small business set-aside MAC for a further limited specific type of small business. As such, this final rule provides that where a MAC is set-aside for small business, the procuring agency can set-aside orders issued under the MAC to a more limited type of small business. Contracting officers are encouraged to review the award dollars under the MAC and to aim to make available for award at least 50 percent of the award dollars under the MAC to all contract holders of the underlying MAC.
In addition, a few commenters asked for further clarification as to whether orders issued under a MAC set-aside for 8(a) Participants, HUBZone small business concerns, SDVO small business concerns or WOSBs/EDWOSBs could be further set aside for a more limited type of small business. These commenters specifically did not believe that allowing the further set-aside of orders issued under a multiple award set-aside contract should be permitted in the 8(a) context. The commenters noted that the 8(a) program is a business development program of limited duration (
i.e.,
nine years), and felt that it would be detrimental to the business development of 8(a) Participants generally if an agency could issue an order set-aside exclusively for 8(a) HUBZone small business concerns, 8(a) SDVO small business concerns, or 8(a) WOSBs. The current regulatory text of § 125.2(e)(6)(i) provides that a “contracting officer has the authority to set aside orders against Multiple Award Contracts, including contracts that were set aside for small business,” for small and subcategories of small businesses. SBA intended to allow a contracting officer to issue orders for subcategories of small businesses only under small
business set-aside contracts. This rule clarifies that intent.
Section 121.404
In addition to the revision to § 121.404(a)(1) identified above, the rule makes several other changes or clarifications to § 121.404. In order to make this section easier to use and understand, the rule adds headings to each subsection, which identify the subject matter of the subsection.
The proposed rule amended § 121.404(b), which requires a firm applying to SBA's programs to qualify as a small business for its primary industry classification as of the date of its application. The proposed rule eliminated references to SBA's small disadvantaged business (SDB) program as obsolete, and added a reference to the WOSB program. SBA received no comments on these edits and adopts them as final in this rule.
The proposed rule also amended § 121.404(d) to clarify that size status for purposes of compliance with the nonmanufacturer rule, the ostensible subcontractor rule and joint venture agreement requirements is determined as of the date of the final proposal revision for negotiated acquisitions and final bid for sealed bidding. Currently, only compliance with the nonmanufacturer rule is specifically addressed in this paragraph, but SBA's policy has been to apply the same rule to determine size with respect to the ostensible subcontractor rule and joint venture agreement requirements. This would not be a change in policy, but rather a clarification of existing policy. Several commenters misconstrued this to be a change in policy or believed that this would be a departure from the snapshot in time rule for determining size as of the date a concern submits its initial offer including price. As noted, SBA has intended this to be the current policy and is merely clarifying it in the regulatory text. In addition, SBA does not view this as a departure from the snapshot in time rule. The receipts/employees are determined at one specific point in time—the date on which a concern submits its initial offer including price. SBA believes that compliance with the nonmanufacturer rule, the ostensible subcontractor rule and joint venture agreement requirements can justifiably change during the negotiation process. If an offer changes during negotiations in a way that would make a large business mentor joint venture partner be in control of performance, for example, SBA does not believe that the joint venture should be able to point back to its initial offer in which the small business protégé partner to the joint venture appeared to be in control.
The proposed rule also added a clarifying sentence to § 121.404(e) that would recognize that prime contractors may rely on the self-certifications of their subcontractors provided they do not have a reason to doubt any specific self-certification. SBA believes that this has always been the case, but has added this clarifying sentence, nevertheless, at the request of many prime contractors. SBA received positive comments on this change and adopts it as final in this rule.
The proposed rule made several revisions to the size recertification provisions in § 121.404(g). First, the recertification rule pertaining to a joint venture that had previously received a contract as a small business was not clear. If a partner to the joint venture has been acquired, is acquiring or has merged with another business entity, the joint venture must recertify its size status. In order to remain small, however, it was not clear whether only the partner which has been acquired, is acquiring or has merged with another business entity needed to recertify its size status or whether all partners to the joint venture had to do so. The proposed rule clarified that only the partner to the joint venture that has been acquired, is acquiring, or has merged with another business entity must recertify its size status in order for the joint venture to recertify its size. Commenters generally supported this revision. One commenter believed that a joint venture should be required to recertify its size only where the managing venture, or the small business concern upon which the joint venture's eligibility for the contract was based, is acquired by, is acquiring, or has merged with another business entity. SBA disagrees. SBA seeks to make the size rules pertaining to joint ventures similar to those for individual small businesses. Where an individual small business awardee grows to be other than small, its performance on a small business contract continues to count as an award to small business. Similarly, where a joint venture partner grows to be other than small naturally, that should not affect the size of the joint venture. However, under SBA's size rules, in order for a joint venture to be eligible as small, each partner to the joint venture must individually qualify as small. Size is not determined solely by looking at the size of the managing venture. Just as an individual small business awardee must recertify its size if it is acquired by, is acquiring, or has merged with another business entity, so too should the partner to a joint venture that is acquired by, is acquiring, or has merged with another business entity. As such, SBA adopts the proposed language as final in this rule.
Additionally, the proposed rule clarified that if a merger or acquisition causes a firm to recertify as an other than small business concern between time of offer and award, then the recertified firm is not considered a small business for the solicitation. Under the proposed rule, SBA would accept size protests with specific facts showing that an apparent awardee of a set-aside has recertified or should have recertified as other than small due to a merger or acquisition before award. SBA received comments on both sides of this issue. Some commenters supported the proposed provision as a way to ensure that procuring agencies do not make awards to firms who are other than small. They thought that such awards could be viewed as frustrating the purpose of small business set-asides. Other commenters opposed the proposed change. A few of these commenters believed that a firm should remain small if it was small at the time it submitted its proposal. SBA wants to make it clear that is the general rule. Size is generally determined only at the date of offer. If a concern grows to be other than small between the date of offer and the date of award (
e.g.,
another fiscal year ended and the revenues for that just completed fiscal year render the concern other than small), it remains small for the award and performance of that contract. The proposed rule dealt only with the situation where a concern merged with or was acquired by another concern after offer but before award. As stated in the supplementary information to the proposed rule, SBA believes that situation is different than natural growth. Several other commenters opposing the proposed rule believed such a policy could adversely affect small businesses due to the often lengthy contract award process. Contract award can often occur 18 months or more after the closing date for the receipt of offers. A concern could submit an offer and have no plans to merge or sell its business at that time. If a lengthy amount of time passes, these commenters argued that the concern should not be put in the position of declining to make a legitimate business decision concerning the possible merger or sale of the concern simply because the concern is hopeful of receiving the award of a contract as a small business. Several commenters recommended an intermediate position where recertification must occur if the merger or acquisition occurs within a certain amount of time from either the concern's offer or the date for the receipt
of offers set forth in the solicitation. This would allow SBA to prohibit awards to concerns that may appear to have simply delayed an action that was contemplated prior to submitting their offers, but at the same time not prohibit legitimate business decisions that could materialize months after submitting an offer. Commenters recommended requiring recertification when merger or acquisition occurs within 30 days, 90 days and 6 months of the date of an offer. SBA continues to believe that recertification should be required when it occurs close in time to a concern's offer, but agrees that it would not be beneficial to discourage legitimate business transactions that arise months after an offer is submitted. In response, the final rule continues to provide that if a merger, sale or acquisition occurs after offer but prior to award the offeror must recertify its size to the contracting officer prior to award. If the merger, sale or acquisition (including agreements in principal) occurs within 180 days of the date of an offer, the concern will be ineligible for the award of the contract. If it occurs after 180 days, award can be made, but it will not count as an award to small business.
The proposed rule also clarified that recertification is not required when the ownership of a concern that is at least 51 percent owned by an entity (
i.e.,
tribe, ANC, or Community Development Corporation (CDC)) changes to or from a wholly-owned business concern of the same entity, as long as the ultimate owner remains that entity. When the small business continues to be owned to the same extent by the tribe, ANC or CDC, SBA does not believe that the real ownership of the concern has changed, and, therefore, that recertification is not needed. Commenters overwhelmingly supported this change, and SBA adopts it as final in this rule. The rule makes this same change to § 121.603 for 8(a) contracts as well.
Finally, the proposed rule sought to amend § 121.404(g)(3) to specifically permit a contracting officer to request size recertification as he or she deems appropriate at any point in a long-term contract. SBA believes that this authority exists within the current regulatory language but is merely articulating it more clearly in this rule. Several commenters opposed this provision, believing that it would undermine the general rule that a concern's size status should be determined as of the date of its initial offer. They believe that establishing size at one point in time provides predictability and consistency to the procurement process. SBA agrees that size for a single award contract that does not exceed five years should not be reexamined during the life of a contract. SBA believes, however, that the current regulations allow a contracting officer to seek recertifications with respect to MACs. Pursuant to § 121.404(g), “if a business concern is small at the time of offer for a Multiple Award Contract . . ., then it will be considered small for each order issued against the contract with the same NAICS code and size standard,
unless
a contracting officer requests a new size certification in connection with a specific order.” (Emphasis added). The regulations at § 121.404(g)(3) also provide that for a MAC with a duration of more than five years, a contracting officer must request that a business concern recertify its small business size status no more than 120 days prior to the end of the fifth year of the contract, and no more than 120 days prior to exercising any option thereafter. Under this provision, a business concern is not required to recertify its size status until prior to the end of the fifth year of that contact. However, SBA also interprets § 121.404(g)(3) as not prohibiting a contracting officer from requesting size recertification prior to the 120-day point in the fifth year of the long-term contract. As noted above, the general language of § 121.404(g) allows a contracting officer to request size recertification with respect to each order. SBA believes that the regulations permit a contracting officer the discretion to request size recertification at the contract level prior to the end of the fifth year if explicitly requested for the contract at issue and if requested of all contract holders. In this respect, the authority to request size recertification at the contract level prior to the fifth year is an extension of the authority to request recertification for subsequent orders. As such, this final rule clarifies that a contracting officer has the discretion to request size recertification as he or she deems appropriate at any point only for a long-term MAC.
Section 121.406
The rule merely corrects a typographical error by replacing the word “provided” with the word “provide.”
Section 121.702
The proposed rule clarified the size requirements applicable to joint ventures in the Small Business Innovation Research (SBIR) program. Although the current regulation authorizes joint ventures in the SBIR program and recognizes the exclusion from affiliation afforded to joint ventures between a protégé firm and its SBA-approved mentor, it does not specifically apply SBA's general size requirements for joint ventures to the SBIR program. The proposed rule merely sought to apply the general size rule for joint ventures to the SBIR program. In other words, a joint venture for an SBIR award would be considered a small business provided each partner to the joint venture, including its affiliates, meets the applicable size standard. In the case of the SBIR program, this means that each partner does not have more than 500 employees. Comments favored this proposal and SBA adopts it as final in this rule.
Section 121.1001
SBA proposed to amend § 121.1001 to provide authority to SBA's Associate General Counsel for Procurement Law to independently initiate or file a size protest, where appropriate. Commenters supported this provision, and SBA adopts it as final in this rule. In response to a comment, the final rule also revises § 121.1001(b) to reflect which entities can request a formal size determination. Specifically, a commenter pointed out that although § 121.1001(b) gave applicants for and participants in the HUBZone and 8(a) BD programs the right to request formal size determinations in connection with applications and continued eligibility for those programs, it did not provide that same authority to WOSBs/EDWOSBs and SDVO small business concerns in connection with the WOSB and SDVO programs. The final rule harmonizes the procedures for SBA's various programs as part of the Agency's ongoing effort to promote regulatory consistency.
Sections 121.1004, 125.28, 126.801, and 127.603
This rule adds clarifying language to § 121.1004, § 125.28, § 126.801, and § 127.603 regarding size and/or socioeconomic status protests in connection with orders issued against a MAC. Currently, the provisions authorize a size protest where an order is issued against a MAC if the contracting officer requested a recertification in connection with that order. This rule specifically authorizes a size protest relating to an order issued against a MAC where the order is set-aside for small business and the underlying MAC was awarded on an unrestricted basis, except for orders or Blanket Purchase Agreements issued under any FSS contract. The rule also specifically authorizes a socioeconomic protest relating to set-aside orders based on a different socioeconomic status from the underlying set-aside MAC.
Section 121.1103
An explanation of the change is provided with the explanation for § 134.318.
Section 124.3
In response to concerns raised to SBA by several Program Participants, the proposed rule added a definition of what a follow-on requirement or contract is. Whether a procurement requirement may be considered a follow-on procurement is important in several contexts related to the 8(a) BD program. First, SBA's regulations provide that where a procurement is awarded as an 8(a) contract, its follow-on or renewable acquisition must remain in the 8(a) BD program unless SBA agrees to release it for non-8(a) competition. 13 CFR 124.504(d)(1). SBA's regulations also require SBA to conduct an adverse impact analysis when accepting requirements into the 8(a) BD program. However, an adverse impact analysis is not required for follow-on or renewal 8(a) acquisitions or for new requirements. 13 CFR 124.504(c). Finally, SBA's regulations provide that once an applicant is admitted to the 8(a) BD program, it may not receive an 8(a) sole source contract that is a follow-on procurement to an 8(a) contract that was performed immediately previously by another Participant (or former Participant) owned by the same tribe, ANC, NHO, or CDC. 13 CFR 124.109(c)(3)(ii), 124.110(e) and 124.111(d).
In order to properly assess what each of these regulations requires, the proposed rule defined the term “follow-on requirement or contract”. The definition identified certain factors that must be considered in determining whether a particular procurement is a follow-on requirement or contract: (1) Whether the scope has changed significantly, requiring meaningful different types of work or different capabilities; (2) whether the magnitude or value of the requirement has changed by at least 25 percent; and (3) whether the end user of the requirement has changed. These considerations should be a guide, and not necessarily dispositive of whether a requirement qualifies as “new.” Applying the 25 percent rule contained in this definition rigidly could permit procuring agencies and entity-owned firms to circumvent the intent of release, sister company restriction, and adverse impact rules.
For example, a procuring agency may argue that two procurement requirements that were previously awarded as individual 8(a) contracts can be removed from the 8(a) program without requesting release from SBA because the value of the combined requirement would be at least 25 percent more than the value of either of the two previously awarded individual 8(a) contracts, and thus would be considered a new requirement. Such an application of the new requirement definition would permit an agency to remove two requirements from the 8(a) BD program without requesting and receiving SBA's permission for release from the program. We believe that would be inappropriate and that a procuring agency in this scenario must seek SBA's approval to release the two procurements previously awarded through the 8(a) BD program. Likewise, if an entity-owned 8(a) Participant previously performed two sole source 8(a) contracts and a procuring agency sought to offer a sole source requirement to the 8(a) BD program on behalf of another Participant owned by the same entity (tribe, ANC, NHO, or CDC) that, in effect, was a consolidation of the two previously awarded 8(a) procurements, we believe it would be inappropriate for SBA to accept the offer on behalf of the sister company. Similarly, if a small business concern previously performed two requirements outside the 8(a) program and a procuring agency wanted to combine those two requirements into a larger requirement to be offered to the 8(a) program, SBA should perform an adverse impact analysis with respect to that small business even though the combined requirement had a value that was greater than 25 percent of either of the previously awarded contracts.
SBA received a significant number of comments regarding what a follow-on requirement is and how SBA's rules regarding what a follow-on contract is should be applied to the three situations identified above. Many commenters believed that the proposed language was positive because it will help alleviate confusion in determining whether a requirement should be considered a follow-on or not. In terms of taking requirements or parts of requirements that were previously performed through the 8(a) program out of the program, commenters overwhelmingly supported SBA's involvement in the release process. Commenters were concerned that agencies have increased the value of procurement requirements marginally by 25 percent merely to call the procurements new and remove them from the 8(a) program without going through the release process. These commenters were particularly concerned where the primary and vital requirements of a procurement remained virtually identical and an agency merely intended to add ancillary work in order to freely remove the procurement from the 8(a) BD program. A few commenters also recommended that SBA provide clear guidance when the contract term of the previously awarded 8(a) contract is different than that of a successor contracting action. Specifically, these commenters believed that an agency should not be able to compare a contract with an overall $2.5 million value (consisting of a one year base period and four one-year options each with a $500,000 value) with a successor contract with an overall value of $1.5 million (consisting of a one year base period and two one-year options each with a $500,000 value) and claim it to be new. In such a case, the yearly requirement is identical and commenters believed the requirement should not be removed without going through the release process. SBA agrees. The final rule clarifies that equivalent periods of performance relative to the incumbent or previously-competed 8(a) requirement should be compared.
Many commenters agreed that the 25 percent rule should not be applied rigidly, as that may open the door for the potential for (more) contracts to be taken out of the 8(a) BD program. Commenters also believed that SBA should be more involved in the process, noting that firms currently performing 8(a) contracts often do not discover a procuring agency's intent to reprocure that work outside the 8(a) BD program by combining it with other work and calling it a new requirement until very late in the procurement process. Once a solicitation is issued that combines work previously performed through an 8(a) contract with other work, it is it difficult to reverse even where SBA believes that the release process should have been followed. Several commenters recommended adding language that would require a procuring agency to obtain SBA concurrence that a procurement containing work previously performed through an 8(a) contract does not represent a follow-on requirement before issuing a solicitation for the procurement. Although SBA does not believe that concurrence should be required, SBA does agree that a procuring activity should notify SBA if work previously performed through the 8(a) program will be performed through a different means. A contracting officer will make the determination as to whether a requirement is new, but SBA should be given the opportunity to look at the procuring activity's strategy and supply input where appropriate. SBA has added such language to § 124.504(d) in this final rule.
Several commenters supported the proposed definition of a follow-on procurement for release purposes where they agreed that a procuring agency should not be able to remove two requirements from the 8(a) program merely by combining them and calling the consolidated requirement new because it exceeds the 25 percent increase in magnitude. These commenters, however, recommended that the 25 percent change in magnitude be a “bright-line rule” with respect to whether a requirement should be considered a follow-on requirement to an 8(a) contract that was performed immediately previously by another Participant (or former Participant) owned by the same tribe, ANC, Native Hawaiian Organization (NHO), or CDC. SBA understands the desire to have clear, objective rules. However, as noted previously, SBA opposes a bright-line 25 percent change in magnitude rule in connection with release. In addition, because SBA does not believe that it is good policy to have one definition of what a follow-on requirement is for one purpose and have a different definition for another purpose, SBA opposes having a bright-line 25 percent change in magnitude rule in determining whether to allow a sister company to perform a particular sole source 8(a) contract and then provide discretion only in the context of whether certain work can be removed from the 8(a) program. SBA continues to believe that the language as proposed that allows discretion when appropriate is the proper alternative. In the context of determining whether to allow a sister company to perform a particular sole source 8(a) contract, SBA agrees that a 25 percent change in magnitude should be sufficient for SBA to approve a sole source contract to a sister company. It would be the rare instance where that is not the case.
Section 124.105
The proposed rule amended § 124.105(g) to provide more clarity regarding situations in which an applicant has an immediate family member that has used his or her disadvantaged status to qualify another current or former Participant. The purpose of the immediate family member restriction is to ensure that one individual does not unduly benefit from the 8(a) BD program by participating in the program beyond nine years, albeit through a second firm. This most often happens when a second family member in the same or similar line of business seeks 8(a) BD certification. However, it is not necessarily the type of business which is a problem, but, rather, the involvement in the applicant firm of the family member that previously participated in the program. The current regulatory language requires an applicant firm to demonstrate that “no connection exists” between the applicant and the other current or former Participant. SBA believes that requiring no connections is a bit extreme. If two brothers own two totally separate businesses, one as a general construction contractor and one as a specialty trade construction contractor, in normal circumstances it would be completely reasonable for the brother of the general construction firm to hire his brother's specialty trade construction firm to perform work on contracts that the general construction firm was doing. Unfortunately, if either firm was a current or former Participant, SBA's rules prevented SBA from certifying the second firm for participation in the program, even if the general construction firm would pay the specialty trade firm the exact same rate that it would have to pay to any other specialty trade construction firm. SBA does not believe that makes sense. An individual should not be required to avoid all contact with the business of an immediate family member. He or she should merely have to demonstrate that the two businesses are truly separate and distinct entities.
To this end, SBA proposed that an individual would not be able to use his or her disadvantaged status to qualify a concern for participation in the 8(a) BD program if that individual has an immediate family member who is using or has used his or her disadvantaged status to qualify another concern for the 8(a) BD program and the concerns are connected by any common ownership or management, regardless of amount or position, or the concerns have a contractual relationship that was not conducted at arm's length. In the first instance, if one of the two family members (or business entities owned by the family member) owned
any
portion of the business owned by the other family member, the second in time family member could not qualify his or her business for the 8(a) BD program. Similarly, if one of the two family members had any role as a director, officer or key employee in the business owned by the other family member, the second in time family member could not qualify his or her business for the 8(a) BD program. In the second instance, the second in time family member could not qualify his or her business for the 8(a) BD program if it received or gave work to the business owned by the other family member at other than fair market value. With these changes, SBA believes that the rule more accurately captures SBA's intent not to permit one individual from unduly benefitting from the program, while at the same time permitting normal business relations between two firms. Commenters generally supported this change. A few commenters supported the provision but believed that an additional basis for disallowing a new immediate family member applicant into the 8(a) BD program should be where the applicant shared common facilities with a current or former Participant owned and controlled by an immediate family member. SBA agrees that an applicant owned by an immediate family member of a current or former Participant should not be permitted to share facilities with that current or former Participant. This rule adds that situation as a basis for declining an applicant. Several commenters sought further clarification as to whether a presumption against immediate family members in the same or similar line of business would continue from the previous regulations into this revised provision, and whether some sort of waiver will be needed to allow an immediate family member applicant to be certified into the 8(a) BD program. In particular, a few commenters were concerned that if an immediate family member attempted to certify an applicant concern in the same primary NAICS as the current or former Participant and the individual applying for certification has no management or technical experience in that NAICS code, that the owner/manager of the current or former Participant would play a significant role in the applicant concern even though a formal role was not identified. As noted above, SBA believes that the rules pertaining to immediate family members seeking to participate in the 8(a) BD program have been too harsh. The rule seeks to allow an applicant owned and controlled by an immediate family member of current or former Participant into the program, even in the same or similar line of business, provided certain conditions do not exist. SBA agrees with the comments that an individual seeking to certify an applicant concern in a primary NAICS code that is the same primary NAICS code of a current or former Participant operated by an immediate family member must have management or technical experience in that primary NAICS code. SBA agrees that without such a requirement, there is a risk that the owner/manager of the current or former Participant would have some role in the management or control of the applicant concern. This
rule adds a requirement that an individual applying in the same primary NAICS code as an immediate family member must have management or technical experience in that primary NAICS code, which would include experience acquired from working for an immediate family member's current or former Participant. Aside from that refinement, there is no presumption against such an applicant. The applicant must, however, demonstrate that there is no common ownership, control or shared facilities with the current or former Participant, and that any contractual relations between the two companies are arm's length transactions. One commenter questioned whether the revised requirement in proposed § 124.105(g)(2) that SBA would annually assess whether the two firms continue to “operate independently” of one another after being admitted to the program was inconsistent with the language in § 124.105(g)(1) that allows fair market contractual relations between the two firms. That language was not meant to imply that those arm's length transactions cannot occur once the second firm is admitted to the program. As part of an annual review, SBA will determine that ownership, management, and facilities continue to be separate and that any contractual relations are at fair market value. SBA would not initiate termination proceedings merely because the two firms entered into fair market value contracts after the second firm is admitted to the program. One commenter recommended that SBA should place a limit on the amount of contractual, arm's length transactions that have occurred between the firms (either dollar value or percentage of revenue). SBA disagrees. SBA does not believe a firm should be penalized for having an immediate family member participate in the 8(a) BD program. It does not make sense that a business concern owned by one family member cannot hire the business concern owned by another family member as a subcontractor at the same rate that it could hire any other business concern. Business relationships are often built upon trust. If a subcontractor has done a good job at a fair price, it is likely that the prime contractor will hire that firm again when the need arises to do that kind of work. Based upon the comments received in response to proposed § 121.103(f) (which loosened the presumption of economic dependence where one concern derived at least 70 percent of its revenues from one other business concern), most commenters believed there should not be a hard restriction on the amount of work one business concern should be able to do with another. SBA believes the same should apply in the immediate family member context as long as a clear line of fracture exists between the two business concerns. As such, SBA does not adopt this recommendation in this final rule.
The proposed rule also amended the 8(a) BD change of ownership requirements in § 124.105(i). First, the proposed rule lessened the burden on 8(a) Participants seeking minor changes in ownership by providing that prior SBA approval is not needed where a previous owner held less than a 20 percent interest in the concern both before and after the transaction. This is a change from the previous requirement which allows a Participant to change its ownership without SBA's prior approval where the previous owner held less than a 10 percent interest. This change from 10 percent to 20 percent permits Participants to make minor changes in ownership more frequently without requiring them to wait for SBA approval.
In addition, the proposed rule eliminated the requirement that all changes of ownership affecting the disadvantaged individual or entity must receive SBA prior approval before they can occur. Specifically, proposed revisions to § 124.105(i)(2) provided that prior SBA approval is not needed where the disadvantaged individual (or entity) in control of the Participant will increase the percentage of his or her (its) ownership interest. SBA believes that prior approval is not needed in such a case because if SBA determined that an individual or entity owned and controlled a Participant before a change in ownership and the change in ownership only increases the ownership interest of that individual or entity, there could be no question as to whether the Participant continues to meet the program's ownership and control requirements. This change will decrease the amount of times and the time spent by Participant firms seeking SBA approval of a change in ownership. SBA received unanimous support on these provisions and adopts them as final in this rule.
Section 124.109
In order to eliminate confusion, this rule clarifies several provisions relating to tribally-owned (and ANC-owned) 8(a) applicants and Participants. First, SBA amends § 124.109(a)(7) and § 124.109(c)(3)(iv) to clarify that a Participant owned by an ANC or tribe need not request a change of ownership from SBA where the ANC or tribe merely reorganizes its ownership of a Participant in the 8(a) BD program by inserting or removing a wholly-owned business entity between the ANC/tribe and the Participant. SBA believes that a tribe or ANC should be able to replace one wholly-owned intermediary company with another without going through the change of ownership process and obtaining prior SBA approval. In each of these cases, SBA believes that the underlying ownership of the Participant is not changing substantively and that requiring a Participant to request approval from SBA is unnecessary. The recommendation and approval process for a change of ownership can take several months, so this change will relieve Participants owned by tribes and ANCs from this unnecessary burden and allow them to proactively conduct normal business operations without interruption.
Second, the rule amends § 124.109(c)(3)(ii) to clarify the rules pertaining to a tribe/ANC owning more than one Participant in the 8(a) BD program. The rule adds two subparagraphs and an example to § 124.109(c)(3)(ii) for ease of use and understanding. In addition, SBA clarifies that if the primary NAICS code of a tribally-owned Participant is changed pursuant to § 124.112(e), the tribe could immediately submit an application to qualify another of its firms for participation in the 8(a) BD program under the primary NAICS code that was previously held by the Participant whose primary NAICS code was changed. A change in a primary NAICS code under § 124.112(e) should occur only where SBA has determined that the greatest portion of a Participant's revenues for the past three years are in a NAICS code other than the one identified as its primary NAICS code. In such a case, SBA has determined that in effect the second NAICS code really has been the Participant's primary NAICS code for the past three years. Commenters supported these provisions, and SBA adopts them as final.
The rule also clarifies SBA current policy that because an individual may be responsible for the management and daily business operations of two tribally-owned concerns, the full-time devotion requirement does not apply to tribally-owned applicants and Participants. This flows directly from the statutory provision which allows an individual to manage two tribally-owned firms. Commenters supported this change, noting that if statutory and regulatory requirements explicitly allow an individual to manage two 8(a) firms,
then it would be illogical to impose the full-time work requirement on such a manager. This rule adopts the proposed language as final.
Finally, the proposed rule clarified the 8(a) BD program admission requirements governing how a tribally-owned applicant may demonstrate that it possesses the necessary potential for success. SBA's regulations previously permitted the tribe to make a firm written commitment to support the operations of the applicant concern to demonstrate a tribally-owned firm's potential for success. Due to the increased trend of tribes establishing tribally-owned economic development corporations to oversee tribally owned businesses, SBA recognizes that in some circumstances it may be adequate to accept a letter of support from the tribally-owned economic development company rather than the tribal leadership. The proposed rule permitted a tribally-owned applicant to satisfy the potential for success requirements by submitting a letter of support from the tribe itself, a tribally-owned economic development corporation or another relevant tribally-owned holding company. In order for a letter of support from the tribally-owned holding company to be sufficient, there must be sufficient evidence that the tribally-owned holding company has the financial resources to support the applicant and that the tribally-owned company is controlled by the tribe. Commenters supported this change. They noted that an economic development corporation or tribally-owned holding company is authorized to act on behalf of the tribe and is essentially an economic arm of the tribe, and that oftentimes due to the size of the tribe it can be difficult and take significant amounts of time and resources to obtain a commitment letter from the tribe itself. SBA adopts this provision as final in this rule.
Section 124.110
The proposed rule would make some of the same changes to § 124.110 for applicants and Participants owned and controlled by NHOs as it would to § 124.109 for tribally-owned applicants and Participants. Specifically, the proposed rule would subdivide § 124.110(e) for ease of use and understanding and would clarify that if the primary NAICS code of an NHO-owned Participant is changed pursuant to § 124.112(e), the NHO could submit an application and qualify another firm owned by the NHO for participation in the 8(a) BD program under the NAICS code that was the previous primary NAICS code of the Participant whose primary NAICS code was changed.
Section 124.111
The proposed rule made the same change for CDCs and CDC-owned firms as for tribes and ANCs mentioned above. It clarified that a Participant owned by a CDC need not request a change of ownership from SBA where the CDC merely reorganizes its ownership of a Participant in the 8(a) BD program by inserting or removing a wholly-owned business entity between the CDC and the Participant. It also subdivided the current subparagraph (d) into three smaller paragraphs for ease of use and understanding, and clarified that if the primary NAICS code of a CDC-owned Participant is changed pursuant to § 124.112(e), the CDC could submit an application and qualify another firm owned by the CDC for participation in the 8(a) BD program under the NAICS code that was the previous primary NAICS code of the Participant whose primary NAICS code was changed. SBA did not receive any comments in response to these changes. As such, SBA adopts them as final in this rule.
Section 124.112
SBA proposed to amend § 124.112(d)(5) regarding excessive withdrawals in connection with entity-owned 8(a) Participants. The proposed rule permitted an 8(a) Participant that is owned at least 51 percent by a tribe, ANC, NHO or CDC to make a distribution to a non-disadvantaged individual that exceeds the applicable excessive withdrawal limitation dollar amount if it is made as part of a pro rata distribution to all shareholders. Commenters supported this change as a needed clarification to allow an entity-owned firm to increase its distribution to the tribe, ANC, NHO or CDC, and thus enable it to provide additional resources to the tribal or disadvantaged community. A few commenters were concerned with having dollar numbers in the examples set forth in the regulatory text. They were concerned that $1 million would become the default unless done in pro rata share. SBA believes these commenters misunderstood the intent of this provision. The example in the regulation provides that where a tribally-owned Participant pays $1,000,000 to a non-disadvantaged manager that was not part of a pro rata distribution to all shareholders, SBA would consider that to be an excessive withdrawal. SBA continues to believe that a $1 million payout to a non-disadvantaged individual in that context is excessive. If a tribe, ANC, NHO, or CDC owns 100 percent of an 8(a) Participant and wants to give back to the native or underserved community, nothing in this regulation would prohibit it from doing so. That Participant could give a distribution of $1 million or more back to the tribe, ANC, NHO, or CDC in order to ensure that the native or underserved community receives substantial benefits. The clarification regarding pro rata distributions was intended to allow greater distributions to tribal communities, not to restrict such distributions. The final rule adopts that provision.
In 2016, SBA amended § 124.112(e) to implement procedures to allow SBA to change the primary NAICS code of a Participant where SBA determined that the greatest portion of the Participant's total revenues during a three-year period have evolved from one NAICS code to another. 81 FR 48558, 48581 (July 25, 2016). The procedures require SBA to notify the Participant of its intent to change the Participant's primary industry classification and afford the Participant the opportunity to submit information explaining why such a change would be inappropriate. The proposed rule authorized an appeal process, whereby a Participant whose primary NAICS code was changed by its servicing district office could seek further review of that determination at a different level. Commenters supported this provision and SBA adopts it as final in this rule.
Section 124.201
The proposed rule did not amend § 124.201. However, SBA sought comments as to whether SBA should add a provision that would require a small business concern that seeks to apply for participation in the 8(a) BD program to first take an SBA-sponsored preparatory course regarding the requirements and expectations of the 8(a) BD program. Commenters were split on this proposal. Some felt it would be helpful to those firms who did not have a clear understanding of the expectations of participating in the 8(a) BD program. Others thought it would merely delay their participation in the program needlessly. Some commenters were concerned that there might be time commitments and travel expenses if a live course were required and recommended having the option to provide such training via a web-based platform. Commenters also noted that for entity-owned applicants, this requirement should not apply beyond the entity's first company to enter the 8(a) BD program. After reviewing the
comments, SBA believes that such a preparatory course should be an option, but not a requirement. As such, SBA does not believe that the regulatory text needs to be revised in this final rule.
Section 124.203
Section 124.203 requires applicants to the 8(a) BD program to submit certain specified supporting documentation, including financial statements, copies of signed Federal personal and business tax returns and individual and business bank statements. In 2016, SBA removed the requirement that an applicant must submit a signed Internal Revenue Service (IRS) Form 4506T, Request for Copy or Transcript of Tax Form, in all cases. 81 FR 48558, 48569 (July 25, 2016). At that time, SBA agreed with a commenter to the proposed rule that questioned the need for every applicant to submit IRS Form 4506T. In eliminating that requirement for every applicant, SBA reasoned that it always has the right to request any applicant to submit specific information that may be needed in connection with a specific application. As long as SBA's regulations clearly provide that SBA may request any additional documents SBA deems necessary to determine whether a specific applicant is eligible to participate in the 8(a) BD program, SBA will be able to request that a particular firm submit IRS Form 4506T where SBA believes it to be appropriate. SBA proposed to amend § 124.203 to add back the requirement that every applicant to the 8(a) BD program submit IRS Form 4506T (or when available, IRS Form 4506C) because not having the Form readily available when needed has unduly delayed the application process for those affected applicants. In addition, SBA believed that requiring Form 4506T in every case would serve as a deterrent to firms that may think it is not necessary to fully disclose all necessary financial information.
However, during the comment period SBA determined that neither Form is a viable option for independent personal income verification purposes at this time. On July 1, 2019, the IRS removed the third-party mailing option from the Form 4506T after it was determined that this delivery method presents a risk to sensitive taxpayer information. As a result, the IRS will no longer send tax return transcripts directly to SBA; rather, transcripts must be mailed to the taxpayer's address of record. Because SBA may not receive tax return transcripts directly from the IRS under Form 4506T, the Agency no longer believes it is an effective tool for independent income verification. In addition, current IRS guidance indicates that Form 4506C is available only to industry lenders participating in the Income Verification Express Service program.
SBA nevertheless continues to recognize the importance of obtaining authorization to receive taxpayer information at the time of application. It is SBA's understanding that the IRS is currently developing a successor form or program through which SBA and other Federal agencies may directly receive a taxpayer's tax return information for income verification purposes. As such, the final rule provides that each individual claiming disadvantaged status must authorize SBA to request and receive tax return information directly from the IRS if such authorization is required. Although SBA does not anticipate using this authorization often to verify an applicant's information, SBA believes that this additional requirement imposes a minimal burden on 8(a) BD program applicants. Additionally, SBA believes that this required authorization will help to maintain the integrity of the program.
Section 124.204
This rule provides that SBA will suspend the time to process an 8(a) application where SBA requests clarifying, revised or other information from the applicant. While SBA is waiting on the applicant to provide clarifying or responsive information, the Agency is not continuing to process the application. This is not a change in policy, but rather a clarification of existing policy. Commenters did not have any issue with this change, believing that it already is SBA's existing practice and that the regulatory change will simply clarify/formalize this practice. As such, SBA adopts it as final in this rule.
Sections 124.205, 124.206 and 124.207
The proposed rule amended § 124.207 to allow a concern that has been declined for 8(a) BD program participation to submit a new application 90 days after the date of the Agency's final decision to decline. Under the current regulations, a firm is required to wait 12 months from the date of the final agency decision to reapply. SBA believes that this change will reduce the number of appeals to SBA's Office of Hearings and Appeals (OHA) and greatly reduce the costs associated with appeals borne by disappointed applicants. In addition, because a firm that is declined could submit a new application 90 days after the decline decision, SBA requested comments on whether the current reconsideration process should be eliminated. Commenters enthusiastically supported the proposed change to allow firms to remedy eligibility deficits and reapply after 90 days instead of one year. In conjunction with this proposed change, many commenters supported eliminating the reconsideration process as unnecessary due to the shorter reapplication time period. A few commenters supported both the reduction in time to reapply and elimination of the reconsideration process, but asked SBA to ensure that SBA provide comprehensive denial letters to fully apprise applicants of any issues or shortcomings with their applications. SBA agrees that denial letters must fully inform applicants of any issues with their applications, and will continue to explain as specifically as possible the shortcomings in any declined application. Several commenters opposed changing the current reconsideration process because they believed that it could take longer for an applicant to ultimately be admitted to the program if all it had to do was change one or two minor things, and that doing so during reconsideration would be quicker than SBA looking at a re-application anew. Contrary to what some commenters believed, SBA looks at all eligibility criteria during reconsideration and may find additional reasons to decline an application during reconsideration that were not clearly identified in the initial application process. Where that occurs, a firm may be entitled to an additional reconsideration process which may potentially prolong the review process even further. SBA believes reducing the timeframe to address identified deficits and reapply from one year to 90 days will obviate the need for a separate, possibly drawn-out reconsideration process. One commenter believed that allowing the shortened 90-day waiting period to re-apply to the 8(a) BD program would encourage concerns that are clearly ineligible to repeatedly apply for certification. Although SBA does not believe that this would be a significant problem, SBA does understand that its limited resources could be overburdened if clearly ineligible business concerns are able to re-apply to the program every 90 days. As such, this final rule amends § 124.207 to incorporate a 90-day wait period to reapply generally, but adds language that provides that where a concern has been declined three times within 18 months of the date of the first final agency decision finding the concern ineligible, the concern cannot submit a new application for admission to the
program until 12 months from the date of the third final Agency decline decision. The final rule also amends § 124.205 to eliminate a separate reconsideration process and § 124.206 to delete paragraph (b) as unnecessary.
Section 124.300 and 124.301
The proposed rule redesignated the current § 124.301 (which discusses the various ways a business may leave the 8(a) BD program) as § 124.300 and added a new § 124.301 to specifically enunciate the voluntary withdrawal and early graduation procedures. The rule set forth SBA's current policy that a Participant may voluntarily withdraw from the 8(a) BD program at any time prior to the expiration of its program term. In addition, where a Participant believes it has substantially achieved the goals and objectives set forth in its business plan, the Participant may elect to voluntarily early graduate from the 8(a) BD program. That too is SBA's current policy, and the proposed rule merely captured it in SBA's regulations.
The proposed rule, however, changed the level at which voluntary withdrawal and voluntary early graduation could be finalized by SBA. Prior to this final rule, a firm submitted its request to voluntarily withdraw or early graduate to its servicing SBA district office. Once the district office concurs, the request was sent to the Associate Administrator for Business Development (AA/BD) for final approval. SBA believes that requiring several layers of review to permit a concern to voluntarily exit the 8(a) BD program is unnecessary. SBA proposed that a Participant must still request voluntary withdrawal or voluntary early graduation from its servicing district office, but the action would be complete once the District Director recognizes the voluntary withdrawal or voluntary early graduation. SBA believes this will eliminate unnecessary delay in processing these actions. Commenters supported giving voluntary withdrawal and voluntary early graduation decisions to the district office level, agreeing with SBA that the change will assist in reducing processing times. As such, SBA adopts the proposed changes as final.
Section 124.304
The proposed rule clarified the effect of a decision made by the AA/BD to terminate or early graduate a Program Participant. Under SBA's current procedures, once the AA/BD renders a decision to early graduate or terminate a Participant from the 8(a) BD program, the affected Participant has 45 days to appeal that decision to SBA's OHA. If no appeal is made, the AA/BD's decision becomes the final agency decision after that 45-day period. If the Participant appeals to OHA, the final agency decision will be the decision of the administrative law judge at OHA. There has been some confusion as to what the effect of the AA/BD decision is pending the decision becoming the final agency decision. The proposed rule clarified that where the AA/BD issues a decision terminating or early graduating a Participant, the Participant would be immediately ineligible for additional program benefits. SBA does not believe that it would make sense to allow a Participant to continue to receive program benefits after the AA/BD has terminated or early graduated the firm from the program. If OHA ultimately overrules the AA/BD decision, SBA would treat the amount of time between the AA/BD's decision and OHA's decision on appeal similar to how it treats a suspension. Upon OHA's decision overruling the AA/BD's determination, the Participant would immediately be eligible for program benefits and the length of time between the AA/BD's decision and OHA's decision on appeal would be added to the Participant's program term. Commenters generally supported this clarification. One commenter opposed the change, believing ineligibility or suspension should not be automatic, but rather, occur only where SBA “determines that suspension is needed to protect the interests of the Federal Government, such as because where information showing a clear lack of program eligibility or conduct indicating a lack of business integrity exists” as set forth in § 124.305(a). SBA believes this comment misses the point. The suspension identified in § 124.305(a) is an interim determination pending a final action by the AA/BD as to whether a Participant should be terminated from the program. The suspension identified here flows from the AA/BD's final decision that termination is appropriate. As noted above, SBA believes it is contradictory to allow a Participant to continue to receive program benefits after the AA/BD has terminated or early graduated the firm from the program. As such, SBA adopts the proposed language as final in this rule.
Sections 124.305 and 124.402
Section 124.402 requires each firm admitted to the 8(a) BD program to develop a comprehensive business plan and to submit that business plan to SBA. Currently, § 124.402(b) provides that a newly admitted Participant must submit its business plan to SBA as soon as possible after program admission and that the Participant will not be eligible for 8(a) BD benefits, including 8(a) contracts, until SBA approves its business plan. Several firms have complained that they missed contract opportunities because SBA did not approve their business plans before procuring agencies sought to award contracts to fulfill certain requirements. The proposed rule amended § 124.402(b) to eliminate the provision that a Participant cannot receive any 8(a) BD benefits until SBA has approved its business plan. Instead, the proposed rule provided that SBA would suspend a Participant from receiving 8(a) BD program benefits if it has not submitted its business plan to the servicing district office and received SBA's approval within 60 days after program admission. A firm coming in to the 8(a) BD program with commitments from one or more procuring agencies will immediately be able to be awarded one or more 8(a) contracts. Commenters appreciated SBA's recognition of the delays and possible missed opportunities caused by the current requirements and supported this change. They believed that the change will enable Participants to start receiving the benefits of the program in a more timely manner and enjoy their full nine-year term. A few commenters recommended that a new Participant should not be suspended where it has submitted its business plan within 60 days of being certified into the program but SBA has not approved it within that time. These commenters believed that a Participant should be suspended in this context only for actions within the Participant's control (
i.e.,
where the Participant did not submit its business plan within 60 days, not where SBA has not approved it within that time). That is SBA's intent. The proposed rule provided that SBA will suspend a Participant from receiving 8(a) BD program benefits, including 8(a) contracts, if it has not submitted its business plan to the servicing district office within 60 days after program admission. As long as a Participant has submitted its business plan to SBA within the 60-day timeframe, it will not be suspended. SBA believes that is clear in the regulatory text as proposed and that no further clarification is needed. As such, SBA adopts the proposed language as final in this rule.
This rule also corrects a typographical error contained in § 124.305(h)(1)(ii). Under § 124.305(h)(1)(ii), an 8(a) Participant can elect to be suspended from the 8(a) program where a disadvantaged individual who is involved in controlling the day-to-day
management and control of the Participant is called to active military duty by the United States. Currently, the regulation states that the Participant may elect to be suspended where the individual's participation in the firm's management and daily business operations is critical to the firm's continued eligibility, and the Participant elects not to designate a non-disadvantaged individual to control the concern during the call-up period. That should read where the Participant elects not to designate another disadvantaged individual to control the concern during the call-up period. It was not SBA's intent to allow a non-disadvantaged individual to control the firm during the call-up period and permit the firm to continue to be eligible for the program. Finally, one commenter questioned why SBA required a suspension action to generally be initiated simultaneous with or after the initiation of a BD program termination action. The commenter believed that if the Government's interests needed to be protected quickly, SBA should be able to suspend a particular Program Participant without also simultaneously initiating a termination proceeding. The commenter argued that the Government should be able to stop inappropriate or fraudulent conduct immediately. Although SBA envisions initiating a termination proceeding simultaneously with a suspension action in most cases, SBA concurs that immediate suspension without termination may be needed in certain cases. As such, the final rule amends § 124.305(a) to allow the AA/BD to immediately suspend a Participant when he or she determines that suspension is needed to protect the interests of the Federal Government.
Sections 124.501 and 124.507
Section 124.501 is entitled “What general provisions apply to the award of 8(a) contracts?” SBA must determine that a Participant is eligible for the award of both competitive and sole source 8(a) contracts. However, the requirement that SBA determine eligibility is currently contained only in the 8(a) competitive procedures at § 124.507(b)(2). Although SBA determines eligibility for sole source 8(a) awards at the time it accepts a requirement for the 8(a) BD program, that process is not specifically stated in the regulations. The proposed rule moved the eligibility determination procedures for competitive 8(a) contracts from § 124.507(b)(2) to the general provisions of § 124.501 and specifically addressed eligibility determinations for sole source 8(a) contracts. To accomplish this, the proposed rule revised current § 124.501(g). Commenters did not object to this clarification. One commenter sought further clarification regarding eligibility for 8(a) sole source contracts. The commenter noted that for a sole source 8(a) procurement, SBA determines eligibility of a nominated 8(a) firm at the time of acceptance. The commenter recommended that the regulation clearly notify 8(a) firms and procuring agencies that if a firm graduates from the program before award occurs, the award cannot be made. Although SBA believes that is currently included within § 124.501(g), this final rule adds additional clarifying language to remove any confusion. One commenter also sought further clarification for two-step competitive procurements to be awarded through the 8(a) BD program. The commenter noted that the solicitation has two dates, and asked SBA to clarify which date controls for eligibility for the 8(a) competitive award. In response, this final rule adds a new § 124.507(d)(3) that provides that for a two-step design-build procurement to be awarded through the 8(a) BD program, a firm must be a current Participant eligible for award of the contract on the initial date specified for receipt of phase one offers contained in the contract solicitation.
Similarly, SBA believes that the provisions requiring a bona fide place of business within a particular geographic area for 8(a) construction awards should also appear in the general provisions applying to 8(a) contracts set forth in § 124.501. Section 8(a)(11) of the Small Business Act, 15 U.S.C. 637(a)(11), requires that to the maximum extent practicable 8(a) construction contracts “shall be awarded within the county or State where the work is to be performed.” SBA has implemented this statutory provision by requiring a Participant to have a bona fide place of business within a specific geographic location. Currently, the bona fide place of business rules appear only in the procedures applying to competitive 8(a) procurements in § 124.507(c)(2). The proposed rule moved those procedures to a new § 124.501(k) to clearly make them applicable to both sole source and competitive 8(a) awards. Based on the statutory language, SBA believes that the requirement to have a bona fide place of business in a particular geographic area currently applies to both sole source and competitive 8(a) procurements, but moving the requirement to the general applicability section removes any doubt or confusion. Commenters did not object to these changes and SBA adopts them as final in this rule.
In response to concerns raised by Participants, the proposed rule also imposed time limits within which SBA district offices should process requests to add a bona fide place of business. SBA has heard that several Participants missed out on 8(a) procurement opportunities because their requests for SBA to verify their bona fide places of business were not timely processed. In order to alleviate this perceived problem, SBA proposed to provide that in connection with a specific 8(a) competitive solicitation, the reviewing office will make a determination whether or not the Participant has a bona fide place of business in its geographical boundaries within 5 working days of a site visit or within 15 working days of its receipt of the request from the servicing district office if a site visit is not practical in that timeframe. SBA also requested comments on whether a Participant that has filed a request to have a bona fide place of business recognized by SBA in time for a particular 8(a) construction procurement may submit an offer for that procurement where it has not received a response from SBA before the date offers are due. Commenters supported imposing time limits in the regulations for SBA to process requests to establish bona fide places of business. Commenters also supported Participants being able to presume approval and submit an offer as an eligible Participant where SBA has not issued a decision within the specified time limits. One commenter asked SBA to clarify what happens if a Participant submits an offer based on this presumption and SBA later does not verify the Participant's bona fide place of business. SBA does not believe that verification will not occur before award. The final rule allows a Participant to presume that SBA has approved its request for a bona fide place of business if SBA does not respond in the time identified. This allows a Participant to submit an offer where a bona fide place of business is required. However, clarification is added at 124.501(k)(2)(iii)(B) that in order to be eligible for award, SBA must approve the bona fide place of business prior to award. If SBA has not acted prior to the time that a Participant is identified as the apparent successful offeror, SBA will make such a determination within 5 days of receiving a procuring activity's request for an eligibility determination unless the procuring activity grants additional time for review.
Several commenters recommended that SBA broaden the geographic
boundaries as to what it means to have a bona fide place of business within a particular area. As identified above, the bona fide place of business concept evolved from the statutory requirement that to the maximum extent practicable 8(a) construction contracts must be awarded within the county or State where the work is to be performed. Commenters believed that strict state line boundaries may not be appropriate where a given area is routinely served by more than one state. A commenter recommended that SBA use Metropolitan Statistical Areas (MSAs) to better define the area within which a business should be located in order to be deemed to have a bona fide place of business in the area. The Office of Management and Budget has defined an MSA as “A Core Based Statistical Area associated with at least one urbanized area that has a population of at least 50,000. The MSA comprises the central county or counties containing the core, plus adjacent outlying counties having a high degree of social and economic integration with the central county or counties as measured through commuting.” 2010 Standards for Delineating Metropolitan and Micropolitan Statistical Areas, 75 FR 37246-37252 (June 28, 2010). The commenter noted that metropolitan areas frequently do not fit within one state and believed that a state does not always represent a single geography or economy. As an example, the commenter pointed to the Philadelphia, Pennsylvania MSA, which includes counties in four states, Delaware, Maryland, New Jersey and Pennsylvania. This MSA represents one regional economy, but is serviced by four different SBA District Offices: Baltimore, Philadelphia, Delaware and New Jersey. SBA believes that such an expansion makes sense in today's complex business environment. However, the use of MSAs will mostly impact the more densely populated coasts of the country, and not necessarily more rural or less populated areas. SBA believes the same rationale could be used in those areas, but instead use contiguous counties. A Participant located on the other side of a state border may be closer to the construction site than a Participant located in the same state as the construction site. It does not make sense to exclude a Participant immediately across the border from where construction work is to be done merely because that Participant is serviced by a different SBA district office, but to allow another Participant that may be located on the other side of the state where construction work is to be done (and be hundreds of miles further away from the construction site than the Participant in the other state) to be eligible because it is serviced by the correct SBA district office. As such this final rule defines bona fide place of business to be the geographic area serviced by the SBA district office, a MSA, or a contiguous county to (whether in the same or different state) where the work will be performed.
Section 124.503
The proposed rule amended § 124.503(e) to clarify SBA's current policy regarding what happens if after SBA accepts a sole source requirement on behalf of a particular Participant the procuring agency determines, prior to award, that the Participant cannot do the work or the parties cannot agree on price. In such a case, SBA allows the agency to substitute one 8(a) Participant for another if it believes another Participant could fulfill its needs. If the procuring agency and SBA agree that another Participant cannot fulfill its needs, the procuring agency may withdraw the original offering letter and fulfill its needs outside the 8(a) BD program. This change to the regulatory text was merely an attempt to codify existing procedures to make the process more transparent. No one objected to this provision, and SBA adopts it as final in this rule.
Currently, § 124.503(g) provides that a Basic Ordering Agreement (BOA) is not a contract under the Federal Acquisition Regulation (FAR). Rather, each order to be issued under the BOA is an individual contract. As such, a procuring activity must offer, and SBA must accept, each task order under a BOA in addition to offering and accepting the BOA itself. Once a Participant leaves the 8(a) BD program or otherwise becomes ineligible for future 8(a) contracts (
e.g.,
becomes other than small under the size standard assigned to a particular contract) it cannot receive further 8(a) orders under a BOA. Similarly, a blanket purchase agreement (BPA) is also not a contract. A BPA under FAR part 13 is not a contract because it neither obligates funds nor requires placement of any orders against it. Instead, it is an understanding between an ordering agency and a contractor that allows the agency to place future orders more quickly by identifying terms and conditions applying to those orders, a description of the supplies or services to be provided, and methods for issuing and pricing each order. The government is not obligated to place any orders, and either party may cancel a BPA at any time.
Although current § 124.503(g) addresses BOAs, it does not specifically mention BPAs. This rule amends § 124.503 to merely specifically recognize that BPAs are also not contracts and should be afforded the same treatment as BOAs.
Section 124.504
SBA proposed several changes to § 124.504.
The proposed rule amended § 124.504(b) to alter the provision prohibiting SBA from accepting a requirement into the 8(a) BD program where a procuring activity competed a requirement among 8(a) Participants prior to offering the requirement to SBA and receiving SBA's formal acceptance of the requirement. SBA believes that the restriction as written is overly harsh and burdensome to procuring agencies. Several contracting officers have not offered a follow-on procurement to the 8(a) program prior to conducting a competition restricted to eligible 8(a) Participants because they believed that because a follow-on requirement must be procured through the 8(a) program, such offer and SBA's acceptance were not required. They issued solicitations identifying them as competitive 8(a) procurements, selected an apparent successful offeror and then sought SBA's eligibility determination prior to making an award. A strict interpretation of the current regulatory language would prohibit SBA from accepting such a requirement. Such an interpretation could adversely affect an agency's procurement strategy in a significant way by unduly delaying the award of a contract. That was never SBA's intent. As long as a procuring agency clearly identified a requirement as a competitive 8(a) procurement and the public fully understood it to be restricted only to eligible 8(a) Participants, SBA should be able to accept that requirement regardless of when the offering occurred. Commenters supported this change as a logical remedy to an unintended consequence, and SBA adopts it as final in this rule.
The proposed rule clarified SBA's intent regarding the requirement that a procuring agency must seek and obtain SBA's concurrence to release any follow-on procurement from the 8(a) BD program. This is not a change in policy, but rather a clarification of SBA's current policy and the position SBA has taken in several protests before the Government Accountability Office. Some agencies have attempted to remove a follow-on procurement from
the incumbent 8(a) contractor and re-procure the requirement through a different contract vehicle (a MAC or Government-wide Acquisition Contract (GWAC) that is not an 8(a) contract) without seeking release by saying that they intend to issue a competitive 8(a) order off the other contract vehicle. In other words, because the order under a MAC or GWAC would be offered to and accepted for award through the 8(a) BD program and the follow-on work would be performed through the 8(a) BD program, some procuring agencies believe that release is not needed. SBA does not agree. In such a case, the underlying contract is not an 8(a) contract. The procuring agency may be attempting to remove a requirement from the 8(a) program to a contract that is not an 8(a) contract. That is precisely what release is intended to apply to. Moreover, because § 124.504(d)(4) provides that the requirement to seek release of an 8(a) requirement from SBA does not apply to orders offered to and accepted for the 8(a) program where the underlying MAC or GWAC is not itself an 8(a) contract, allowing a procuring agency to move an 8(a) contract to an 8(a) order under a non-8(a) contract vehicle would allow the procuring agency to then remove the next follow-on to the 8(a) order out of the 8(a) program entirely without any input from SBA. A procuring agency could take an 8(a) contract with a base year and four one-year option periods, turn it into a one-year 8(a) order under a non-8(a) contract vehicle, and then remove it from the 8(a) program entirely after that one-year performance period. That was certainly not the intent of SBA's regulations.
SBA has received additional comments recommending that release should also apply even if the underlying pre-existing MAC or GWAC to which a procuring agency seeks to move a follow-on requirement is itself an 8(a) contract. These commenters argue that an 8(a) incumbent contractor may be seriously hurt by moving a procurement from a general 8(a) competitive procurement to an 8(a) MAC or GWAC to which the incumbent is not a contract holder. In such a case, the incumbent would have no opportunity to win the award for the follow-on contract, and, would have no opportunity to demonstrate that it would be adversely impacted or to try to dissuade SBA from agreeing to release the procurement. Commenters believe that this directly contradicts the business development purposes of the 8(a) BD program. In response, the rule provides that a procuring activity must notify SBA where it seeks to re-procure a follow-on requirement through a limited contracting vehicle which is not available to all 8(a) BD Program Participants (
e.g.,
any multiple award or Governmentwide acquisition contract, whether or not the underlying MAC or GWAC is itself an 8(a) contract). If an agency seeks to re-procure a current 8(a) requirement as a competitive 8(a) award for a new 8(a) MAC or GWAC vehicle, SBA's concurrence will not be required because such a competition would be available to all 8(a) BD Program Participants.
The proposed rule also clarified that in all cases where a procuring agency seeks to fulfill a follow-on requirement outside of the 8(a) BD program, except where it is statutorily or otherwise required to use a mandatory source (
see
FAR subpart 8.6 and 8.7), it must make a written request to and receive the concurrence of SBA to do so. In such a case, the proposed rule would require a procuring agency to notify SBA that it will take a follow-on procurement out of the 8(a) procurement because of a mandatory source. Such notification would be required at least 30 days before the end of the contract period to give the 8(a) Participant the opportunity to make alternative plans.
In addition, SBA does not typically consider the value of a bridge contract when determining whether an offered procurement is a new requirement. A bridge contract is meant to be a temporary stop-gap measure intended to ensure the continuation of service while an agency finalizes a long-term procurement approach. As such, SBA does not typically consider a bridge contract as part of the new requirement analysis, unless there is some basis to believe that the agency is altering the duration of the option periods to avoid particular regulatory requirements. Whether to consider the bridge contract is determined on a case-by-case basis given the facts of the procurement at issue. SBA sought comments as to whether this long-standing policy should also be incorporated into the regulations. Although SBA did not receive many comments on this issue, those who did comment believed it made sense to clarify this in the regulatory text. This final rule does so.
Section 124.505
As noted above, SBA received a significant number of comments recommending more transparency in the process by which procuring agencies seek to remove follow-on requirements from the 8(a) BD program. In particular, commenters believed SBA should be able to question whether a requirement is new or a follow-on to a previously awarded contract. In response, the final rule adds language to § 124.505(a) authorizing SBA to appeal a decision by a contracting officer that a particular procurement is a new requirement that is not subject to the release requirements set forth in § 124.504(d).
Section 124.509
The proposed rule revised § 124.509(e), regarding how a Participant can obtain a waiver to the requirement prohibiting it from receiving further sole source 8(a) contracts where the Participant does not meet its applicable non-8(a) business activity target. Currently, the regulations require the AA/BD to process a Participant's request for a waiver in every case. The proposed rule substituted SBA for the AA/BD to allow flexibility to SBA to determine the level of processing in a standard operating procedure outside the regulations. SBA believes that at least at some level, the district office should be able to process such requests for waiver.
The current regulation also requires the SBA Administrator on a non-delegable basis to decide requests for waiver from a procuring agency. In other words, if the Participant itself does not request a waiver to the requirement prohibiting it from receiving further sole source 8(a) contracts, but an agency does so because it believes that the award of a sole source contract to the identified Participant is needed to achieve significant interests of the Government, the SBA Administrator must currently make that determination. Requiring such a request to be processed by several levels of SBA reviewers and then by the Administrator slows down the processing. If a procuring agency truly needs something quickly, it could be harmed by the processing time. The proposed rule changed the Administrator from making these determinations to SBA. Commenters believed that waiver requests should be processed at the district office level, as adding additional layers of review significantly delays the processing time, which harms both the Participant and the procuring agency and causes additional work for SBA. SBA has adopted these changes as final in this rule. This should allow these requests to be processed more quickly.
SBA also received a few comments regarding the business activity targets contained in § 124.509. Commenters supported the proposed revisions that changed requiring Participants to make “maximum efforts” to obtain business outside the 8(a) BD program, and
“substantial and sustained efforts” to attain the targeted dollar levels of non-8(a) revenue, to requiring them to make good faith efforts. These commenters also felt that the non-8(a) business activity target percentages for firms in the transitional stage of program participation are too high. The commenters noted that the Small Business Act did not require any specific percentages of non-8(a) work and believed that SBA was free to adjust them in order to promote the business development purposes of the program. They also believed that the current rules rigidly apply sole source restrictions without taking into account extenuating circumstances such as a reduction in government funding, continuing resolutions and budget uncertainties, increased competition driving prices down, and having prime contractors award less work to small business subcontractors than originally contemplated. They recommended that the sole source restrictions should be discretionary, depending upon circumstances and efforts made by the Participant to obtain non-8(a) revenues. SBA first notes that although the Small Business Act itself does not establish specific non-8(a) business activity targets, the conference report to the Business Opportunity Development Reform Act of 1988, Public Law 100-656, which established the competitive business mix requirement, did recommend certain non-8(a) business activity targets. That report noted that Congress intended that the non-8(a) business activity targets should generally require about 25 percent of revenues from sources other than 8(a) contracts in the fifth and sixth years of program participation and about 50 percent in the seventh and eighth years of program participation. H. Rep. No. 100-1070, at 63 (1988),
as reprinted in
1988 U.S.C.C.A.N. 5485, 5497. In response to the comments, this rule slightly adjusts the non-8(a) business activity targets to be more in line with the Congressional intent. In addition, SBA believes that the strict application of sole source restrictions may be inappropriate in certain extenuating circumstances. That same conference report provides that SBA “should consider a full range of options to encourage firms to achieve the competitive business targets,” and that these options might “include conditioning the award of future sole-source contracts or business development assistance on the firm's taking specified steps, such as changes in marketing or financing strategies.”
Id.
In addition, the conference report provides that SBA should take appropriate remedial actions, “including reductions in sole-source contracting,” to ensure that firms complete the program with optimum prospects for success in a competitive business environment.
Id.
Thus, Congress intended SBA to place conditions on firms to allow then to continue to receive one or more future 8(a) contracts and that sole source “reductions” should be an alternative. It appears that a strict ban on receiving any future 8(a) contracts is not appropriate in all instances. SBA believes that may make sense as a remedial measure if a particular Participant has made no efforts to seek non-8(a) awards, but it should not automatically occur if a firm fails to meet its applicable non-8(a) business activity target. The final rule recognizes that a strict prohibition on a Participant receiving new sole source 8(a) contracts should be imposed only where the Participant has not made good faith efforts to meet its applicable non-8(a) business activity target. Where a Participant has not met its applicable non-8(a) business activity target, however, SBA will condition the eligibility for new sole source 8(a) contracts on the Participant taking one or more specific actions, which may include obtaining business development assistance from an SBA resource partner such as a Small Business Development Center. The final rule also rearranges several current provisions for ease of use.
Section 124.513
Currently, § 124.513(e) provides that SBA must approve a joint venture agreement prior to the award of an 8(a) contract on behalf of the joint venture. This requirement applies to both competitive and sole source 8(a) procurements. SBA does not approve joint venture agreements in any other context, including a joint venture between an 8(a) Participant and its SBA-approved mentor (which may be other than small) in connection with a non-8(a) contract (
i.e.,
small business set-aside, HUBZone, SDVO small business, or WOSB contract). In order to be considered an award to a small disadvantaged business (SDB) for a non-8(a) contract, a joint venture between an 8(a) Participant and a non-8(a) Participant must be controlled by the 8(a) partner to the joint venture and otherwise meet the provisions of § 124.513(c) and (d). If the non-8(a) partner to the joint venture is also a small business under the size standard corresponding to the NAICS code assigned to the procurement, the joint venture could qualify as small if the provisions of § 124.513(c) and (d) were not met (
see
§ 121.103(h)(3)(i), where a joint venture can qualify as small as long as each party to the joint venture individually qualifies as small), but the joint venture could not qualify as an award to an SDB in such case. If the joint venture were between an 8(a) Participant and its large business mentor, the joint venture could not qualify as small if the provisions of § 124.513(c) and (d) were not met. The size of a joint venture between a small business protégé and its large business mentor is determined without looking at the size of the mentor only when the joint venture complies with SBA's regulations regarding control of the joint venture. Where another offeror believes that a joint venture between a protégé and its large business mentor has not complied with the applicable control regulations, it may protest the size of the joint venture. The applicable Area Office of SBA's Office of Government Contracting would then look at the joint venture agreement to determine if the small business is in control of the joint venture within the meaning of SBA's regulations. If that Office determines that the applicable regulations were not followed, the joint venture would lose its exclusion from affiliation, be found to be other than small, and, thus, ineligible for an award as a small business. This size protest process has worked well in ensuring that small business joint venture partners do in fact control non-8(a) contracts with their large business mentors. Because size protests are authorized for competitive 8(a) contracts, SBA believes that the size protest process could work similarly for competitive 8(a) contracts. As such, the proposed rule eliminated the need for 8(a) Participants to seek and receive approval from SBA of every initial joint venture agreement and each addendum to a joint venture agreement for competitive 8(a) contracts. Commenters supported this change, noting that this will eliminate an unnecessary burden and noting that this will also eliminate the significant expense firms often incur during the SBA approval process. SBA believes that this will significantly lessen the burden imposed on 8(a) small business Participants. Participants will not be required to submit additional paperwork to SBA and will not have to wait for SBA approval in order to seek competitive 8(a) awards. This rule finalizes that change.
Section 124.515
The proposed rule amended § 124.515 regarding the granting of a waiver to the statutorily mandated termination for
convenience requirement where the ownership or control of an 8(a) Participant performing an 8(a) contract changes. The statute and regulations allow the ownership and control of an 8(a) Participant performing one or more 8(a) contracts to pass to another 8(a) Participant that would otherwise be eligible to receive the 8(a) contracts directly. Specifically, the proposed rule amended § 124.515(d) to provide that SBA determines the eligibility of an acquiring Participant by referring to the items identified in § 124.501(g) and deciding whether at the time of the request for waiver (and prior to the transaction) the acquiring Participant is an eligible concern with respect to each contract for which a waiver is sought. As part of the waiver request, the acquiring concern must certify that it is a small business for the size standard corresponding to the NAICS code assigned to each contract for which a waiver is sought. SBA will not grant a waiver for any contract if the work to be performed under the contract is not similar to the type of work previously performed by the acquiring concern. A few commenters objected to this last provision in the context of an entity-owned firm seeking to acquire an 8(a) Participant currently performing one or more 8(a) contracts. These commenters believed that this provision should not apply to entity-owned Participants because prior performance in a specific industry is not required for entity-owned firms seeking to enter the program. SBA disagrees. Those are two entirely separate requirements. In the case of program entry, SBA allows an entity-owned applicant to be eligible for the program where the entity (tribe, ANC, NHO or CDC) demonstrates a firm commitment to back the applicant concern. In other words, SBA will waive the general potential for success provision requiring an applicant to have at least two years of business in its primary NAICS code where the entity represents that it will support the applicant concern. In such case, SBA is assured that the applicant concern will be able to survive despite having little or no experience in its designated primary NAICS code. The termination for convenience and waiver provisions are statutory and serve an entirely different purpose. The general rule is that an 8(a) contract must be performed by the 8(a) Participant to which that contract was initially awarded. Where the ownership or control of the Participant awarded an 8(a) contract changes, the statute requires a procuring agency to terminate that contract unless the SBA Administrator grants a waiver based on one of five statutory reasons. One of those reasons is where the ownership and control of an 8(a) Participant will pass to another otherwise eligible 8(a) Participant. The proposed rule merely clarifies SBA's current policy that in order to be an “eligible” Participant, the acquiring firm must be responsible to perform the contract, and responsibility is determined prior to the transfer, just as responsibility is determined prior to the award of any contract. This has nothing to do with the entity-owned firm's potential for success in the program, but, rather, whether that firm would be deemed a responsible contractor and whether a procuring agency contracting officer would find the firm capable of performing the work required under the contract before any change of ownership or control occurs. Because SBA believes that this responsibility issue is relevant of all Participants acquiring another Participant that has been awarded one or more 8(a) contracts, the final rule adopts the language as proposed.
Section 124.518
The final rule clarifies when one 8(a) Participant can be substituted for another in order to complete performance of an 8(a) contract without receiving a waiver to the termination for convenience requirement set forth in of § 124.515. Specifically, the rule provides that SBA may authorize another Participant to complete performance of an 8(a) contract and, in conjunction with the procuring activity, permit novation of the contract where a procuring activity contracting officer demonstrates to SBA that the Participant that was awarded an 8(a) contract is unable to complete performance, where an 8(a) contract will otherwise be terminated for default, or where SBA determines that substitution would serve the business development needs of both 8(a) Participants.
Section 124.519
Section 124.519 limits the ability of 8(a) Participants to obtain additional sole source 8(a) contracts once they have reached a certain dollar level of overall 8(a) contracts. Currently, for a firm having a receipts-based size standard corresponding to its primary NAICS code, the limit above which a Participant can no longer receive sole source 8(a) contracts is five times the size standard corresponding to its primary NAICS code, or $100,000,000, whichever is less. For a firm having an employee-based size standard corresponding to its primary NAICS code, the limit is $100,000,000. In order to simplify this requirement, this proposed rule provided that a Participant may not receive sole source 8(a) contract awards where it has received a combined total of competitive and sole source 8(a) contracts in excess of $100,000,000 during its participation in the 8(a) BD program, regardless of its primary NAICS code. In addition, the proposed rule clarified that in determining whether a Participant has reached the $100 million limit, SBA would consider only the 8(a) revenues a Participant has actually received, not projected 8(a) revenues that a Participant might receive through an indefinite delivery or indefinite quantity contract, a multiple award contract, or options or modifications. Finally, the proposed rule amended what types of small dollar value 8(a) contracts should not be considered in determining whether a Participant has reached the 8(a) revenue limit. Currently, SBA does not consider 8(a) contracts awarded under $100,000 in determining whether a Participant has reached the applicable 8(a) revenue limit. The proposed rule replaced the $100,000 amount with a reference to the Simplified Acquisition Threshold (SAT). SBA has delegated to procuring agencies the ability to award sole source 8(a) contracts without offer and acceptance for contracts valued at or below the SAT. Because SBA does not accept such procurements into the 8(a) BD program, it is difficult for SBA to monitor these awards. The proposed rule merely aligned the 8(a) revenue limit with that authority. Commenters generally supported each of these changes. SBA adopts them as final in this rule.
Section 125.2
The proposed rule added a new paragraph (g) requiring contracting officers to consider the capabilities and past performance of first tier subcontractors in certain instances. This consideration is statutorily required for bundled or consolidated contracts (15 U.S.C. 644(e)(4)(B)(i)) and for multiple award contracts valued above the substantial bundling threshold of the Federal agency (15 U.S.C. 644(q)(1)(B)). Following the statutory provisions, the proposed rule required a contracting officer to consider the past performance and experience of first tier subcontractors in those two categories of contracts. The proposed rule did not require a contracting officer to consider the past performance, capabilities and experience of each first tier subcontractor as the capabilities and past performance of the small business prime contractor in other instances. Instead, it provided discretion to
contracting officers to consider such past performance, capabilities and experience of each first tier subcontractor where appropriate. SBA specifically requested comments as to whether as a policy matter such consideration should be required in all cases, or limited only to the statutorily required instances as proposed. The comments overwhelmingly supported the same treatment for all contracts. Most commenters believed that there was a valid policy reason to consider the capabilities and past performance of first tier subcontractors in every case since it is clear that those identified subcontractors will be responsible for some performance of the contract should the corresponding prime contractor be awarded the contract. Some commenters believed that small businesses may have the necessary capabilities, past performance and experience to perform smaller, non-bundled contracts on their own. Therefore, these commenters felt that it may not be necessary for an agency to consider the capabilities and past performance of first tier subcontractors in all cases. SBA believes that first tier subcontractors should be considered if the capabilities and past performance of the small business prime contractor does not demonstrate capabilities and past performance for award. As such this final rule adds language requiring a procuring agency to consider the capabilities and past performance of first tier subcontractors where the first-tier subcontractors are specifically identified in the proposal and the capabilities and past performance of the small business prime do not independently demonstrate capabilities and past performance necessary for award.
Section 125.3
The Small Business Act explicitly prohibits the Government from requiring small businesses to submit subcontracting plans. 15 U.S.C. 637(d)(8). This prohibition is set forth in § 125.3(b) of SBA's regulations and in FAR 19.702(b)(1). Under the Alaska Native Claims Settlement Act (ANCSA), a contractor receives credit towards the satisfaction of its small or small disadvantaged business subcontracting goals when contracting with an ANC-owned firm. 43 U.S.C. 1626(e)(4)(B). There has been some confusion as to whether an ANC-owned firm that does not individually qualify as small but counts as a small business or a small disadvantaged business for subcontracting goaling purposes under 43 U.S.C. 1626(e)(4)(B) must itself submit a subcontracting plan. SBA believes that such a firm is not currently required to submit a subcontracting plan, but proposed to add clarifying language to § 125.3(b) to clear up any confusion. The proposed rule clarified that all firms considered to be small businesses, whether the firm qualifies as a small business concern for the size standard corresponding to the NAICS code assigned to the contract or is deemed to be treated as a small business concern by statute, are not be required to submit subcontracting plans. Commenters supported this provision and this rule adopts it as final.
The final rule also fixes typographical errors contained in paragraphs 125.3(c)(1)(viii) and 125.3(c)(1)(ix).
Section 125.5
The proposed rule clarified that SBA does not use the certificate of competency (COC) procedures for 8(a) sole source contracts. This has long been SBA's policy.
See
62 FR 43584, 43592 (Aug. 14, 1997). Instead of using SBA COC procedures, an agency that finds a potential 8(a) sole source awardee to be non-responsible should proceed through the substitution or withdrawal procedures in the proposed § 124.503(e). SBA did not receive any comments on this provision and adopts it as final in this rule.
Section 125.6
The final rule first fixes a typographical error contained in the introductory text of § 125.6(a). It also amends § 125.6(b). Section 125.6(b) provides guidance on which limitation on subcontracting requirement applies to a “mixed contract.” The section currently refers to a mixed contract as one that combines both services and supplies. SBA inadvertently did not include the possibility that a mixed contract could include construction work, although in practice SBA has applied this section to a contract requiring, for example, both services and construction work. The proposed rule merely recognized that a mixed contract is one that integrates any combination of services, supplies, or construction. A contracting officer would then select the appropriate NAICS code, and that NAICS code is determinative as to which limitation on subcontracting and performance requirement applies. SBQ did not receive any comments on this change, and adopts it as final in this rule.
SBA also asked for comments in the proposed rule regarding how the nonmanufacturer rule should be applied in multiple item procurements (reference § 125.6(a)(2)(ii)). Currently, for a multiple item procurement where a nonmanufacturer waiver is granted for one or more items, compliance with the limitation on subcontracting requirement will not consider the value of items subject to a waiver. As such, more than 50 percent of the value of the products to be supplied by the nonmanufacturer that are not subject to a waiver must be the products of one or more domestic small business manufacturers or processors. The regulation gives an example where a contract is for $1,000,000 and calls for the acquisition of 10 items. Market research shows that nine of the items can be sourced from small business manufacturers and one item is subject to an SBA class waiver. The projected value of the item that is waived is $10,000. Under the current regulatory language, at least 50 percent of the value of the items not subject to a waiver, or $495,000 (50 percent of $990,000), must be supplied by one or more domestic small business manufacturers, and the prime small business nonmanufacturer may act as a manufacturer for one or more items. Several small business nonmanufacturers have disagreed with this provision. They believe that in order to qualify as a small business nonmanufacturer, at least 50 percent of the value of the contract must come from either small business manufacturers or from any businesses for items which have been granted a waiver (or that small business manufacturers plus waiver must equal at least 50 percent). In other words, in the above example, $500,000 (50 percent of the value of the contract) must come from small business manufacturers or be subject to a waiver. If items totaling $10,000 are subject to a waiver, then only $490,000 worth of items must come from small business manufacturers, thus requiring $5,000 less from small business manufacturers. The proposed rule asked for comments on whether this approach makes sense. Several commenters supported the change outlined in the proposed rule, believing that implementation of the change will provide less confusion to both small businesses and procuring agencies as the math is easier to understand. One commenter believed that was how the nonmanufacturer rule was already being applied in multiple item procurements, was concerned others too may have misinterpreted the rule, and, thus, supported the change. The final rule provides that a procurement should be set aside where at least 50 percent of the value of the contract comes from either small business manufacturers or from any business where a nonmanufacturer rule
waiver has been granted (or, in other words, a set aside should occur where small plus waiver equals at least 50 percent).
Section 125.8
The proposed rule made conforming changes to § 125.8 in order to take into account merging the 8(a) BD Mentor-Protégé Program with the All Small Mentor-Protégé Program. The comments supported these changes, and those changes are finalized in this rule.
Proposed § 125.8(b)(2)(iv) permitted the parties to a joint venture to agree to distribute profits from the joint venture so that the small business participant(s) receive profits from the joint venture that exceed the percentage commensurate with the work performed by them. Although several commenters questioned whether mentors would be willing to agree to distribute profits in such a manner, most commenters supported this proposed change. As such, SBA adopts it as final in this rule.
In response to the proposed rule, SBA also received comments seeking clarification of certain other requirements applicable to joint ventures. First, commenters sought guidance regarding the performance of work or limitation on subcontracting requirements in § 125.8(c). Specifically, commenters questioned whether the same rules as those set forth in § 125.6 apply to the calculation of work performed by a protégé in a joint venture and whether the 40 percent performance requirement for a protégé firm could be met through performance of work by a similarly situated subcontractor. SBA has always intended that the same rules as those set forth in § 125.6 should generally apply to the calculation of a protégé firm's workshare in the context of a joint venture. This means that the rules concerning supplies, construction and mixed contracts apply to the joint venture situation and certain costs are excluded from the limitation on subcontracting calculation. For instance, the cost of materials would first be excluded in a contract for supplies or products before determining whether the joint venture is not subcontracting more than 50 percent of the amount paid by the Government. However, SBA has never intended that a protégé firm could subcontract its 40 percent performance requirement to a similarly situated entity. In other words, SBA has always believed that the protégé itself must perform at least 40 percent of the work to be performed by a joint venture between the protégé firm and its mentor, and that it c
This text is long and has been trimmed here. Open the source document for the complete record.
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.