DEPARTMENT OF TRANSPORTATION
Pipeline and Hazardous Materials Safety Administration
49 CFR Parts 107, 130, 171, 173, and 174
[Docket No. PHMSA-2014-0105 (HM-251B)]
RIN 2137-AF08
Hazardous Materials: Oil Spill Response Plans and Information Sharing for High-Hazard Flammable Trains (FAST Act)
AGENCY:
Pipeline and Hazardous Materials Safety Administration (PHMSA), Department of Transportation (DOT).
ACTION:
Final rule.
SUMMARY:
PHMSA, in consultation with the Federal Railroad Administration and pursuant to the Fixing America's Surface Transportation Act (FAST Act) of 2015, issues this final rule to revise and clarify requirements for comprehensive oil spill response plans (COSRPs) and to expand their applicability based on petroleum oil thresholds that apply to an entire train consist. Specifically, this final rule: Expands the applicability for COSRPs; modernizes the requirements for COSRPs; requires railroads to share information about high-hazard flammable train (HHFT) operations with State and tribal emergency response commissions to improve community preparedness; and incorporates by reference a voluntary standard. The amendments in this final rule will provide regulatory flexibility and improve response readiness to mitigate effects of rail accidents and incidents involving petroleum oil and HHFTs.
DATES:
Effective date:
This final rule is effective as of April 1, 2019.
Voluntary compliance date:
PHMSA is authorizing voluntary compliance beginning February 28, 2019.
Delayed compliance date:
Unless otherwise specified, compliance with the amendments adopted in this final rule is required beginning August 27, 2019.
Incorporation by reference:
The incorporation by reference of certain publications listed in the rule is approved by the Director of the Federal Register as of April 1, 2019.
ADDRESSES:
Information about this rulemaking (Docket Number PHMSA-2014-0105) is available at the Federal eRulemaking Portal:
http://www.regulations.gov,
or at DOT's Docket Operation Office: Room W12-140 on the ground floor of the West Building, 1200 New Jersey Avenue SE, Washington, DC 20590, between 9 a.m. and 5 p.m., Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT:
Alexander Wolcott, (202) 366-8553, Standards and Rulemaking Division, Pipeline and Hazardous Materials Safety Administration, U.S. Department of Transportation, 1200 New Jersey Avenue SE, Washington, DC 20590-0001; or Mark Maday, (202) 493-0479, Office of Safety Assurance and Compliance, Federal Railroad Administration, U.S. Department of Transportation, 1200 New Jersey Avenue SE, Washington, DC 20590-0001.
SUPPLEMENTARY INFORMATION:
Abbreviations and Terms
AAR Association of American Railroads
ACP Area Contingency Plan
AFPM American Fuel & Petrochemical Manufacturers
ANPRM Advance Notice of Proposed Rulemaking
ANSI American National Standards Institute
API American Petroleum Institute
ASLRRA American Short Line and Regional Railroad Association
ASTM ASTM International
BSEE Bureau of Safety and Environmental Enforcement
CFR Code of Federal Regulations
COSRP Comprehensive Oil Spill Response Plan
Crude Oil Petroleum crude oil
CWA Clean Water Act (
see
Federal Water Pollution Control Act)
DHS U.S. Department of Homeland Security
DOE U.S. Department of Energy
DOI U.S. Department of the Interior
DOT U.S. Department of Transportation
E.O. Executive Order
EPA Environmental Protection Agency
EPCRA Emergency Planning and Community Right-to-Know Act
ESA Environmentally Sensitive/Significant Area
FAST Act Fixing America's Surface Transportation Act of 2015
FEMA Federal Emergency Management Agency
FMCSA Federal Motor Carrier Safety Administration
FR Federal Register
FRA Federal Railroad Administration
FRP Facility Response Plan
FRSA Federal Railroad Safety Act
FWPCA Federal Water Pollution Control Act (
see
Clean Water Act)
GIUE Government Initiated Unannounced Exercises
GRP Geographic Response Plan
HHFT High-Hazard Flammable Train
HMR Hazardous Materials Regulations (
see
49 CFR parts 171-180)
HMT Hazardous Materials Table (
see
49 CFR 172.101)
HMTA Hazardous Materials Transportation Act
IAFC International Association of Fire Chiefs
IBP Initial Boiling Point
ICS Incident Command System
ICP Integrated Contingency Plan
IMT Incident Management Team
LEPC Local Emergency Planning Committee
MPMS API Manual of Petroleum Measurement Standards
NASTTPO National Association of SARA Title III Program Officials
NCP National Contingency Plan
NFPA National Fire Protection Association
NIMS National Incident Management System
NPRM Notice of Proposed Rulemaking
NTSB National Transportation Safety Board
OMB Office of Management and Budget
OPA 90 Oil Pollution Act of 1990
OSC Federal On-Scene Coordinator
OSRO Oil Spill Removal Organization
OSRP Oil Spill Response Plan
PG Packing Group
PHMSA Pipeline and Hazardous Materials Safety Administration
PREP National Preparedness for Response Exercise Program
RCP Regional Contingency Plan
RFA Regulatory Flexibility Act
RIA Regulatory Impact Analysis
RP Recommended Practice
RSPA Research and Special Programs Administration
SACP Sub-Area Contingency Plans
SERC State Emergency Response Commission
SSI Sensitive Security Information
TERC Tribal Emergency Response Commission
TRANSCAER Transportation Community Awareness and Emergency Response
TSA Transportation Security Administration
TTCI Transportation Technology Center Inc.
U.S.C. United States Code
USCG United States Coast Guard
USFA United States Fire Administration
Table of Contents
I. Executive Summary
A. Comprehensive Oil Spill Response Plans
B. HHFT Information Sharing Notification for Emergency Response Planning
C. Initial Boiling Point Test
II. Background
A. Oil Spill Response Plans
B. HHFT Information Sharing Notification for Emergency Response Planning
C. Initial Boiling Point Test
III. Recent Spill Events
IV. National Transportation Safety Board Safety Recommendations
V. Summary and Discussion of Public Comment
A. Overview of NPRM Comments
B. Summary of Oil Spill Response Plans Comments
C. Summary of HHFT Information Sharing Notification Comments (§ 174.312)
D. Summary of Initial Boiling Point Test Comments (§ 173.121)
VI. Incorporated by Reference
VII. Section-by-Section Review
VIII. Regulatory Analyses and Notices
A. Statutory/Legal Authority for This Rulemaking
B. Executive Order 12866 and DOT Regulatory Policies and Procedures
C. Executive Order 13771
D. Executive Order 13132
E. Executive Order 13175
F. Regulatory Flexibility Act, Executive Order 13272, and DOT Policies and Procedures
G. Paperwork Reduction Act
H. Executive Order 13211
I. Unfunded Mandates Reform Act
J. Executive Order 13609 and International Trade Analysis
K. Environmental Assessment
L. Regulation Identifier Number (RIN)
M. Privacy Act
List of Subjects
I. Executive Summary
The Pipeline and Hazardous Materials Safety Administration (PHMSA), in consultation with the Federal Railroad Administration (FRA), issues this final rule to improve oil spill response readiness and mitigate effects of rail accidents and incidents involving petroleum oil and high-hazard flammable trains (HHFTs).
See
49 CFR 171.8 for definition. This final rule is necessary due to expansion in U.S. energy production having led to significant challenges for the country's transportation system. PHMSA is finalizing this rule in accordance with sections 7302 and 7307 of the FAST Act, Public Law 114-94, and the Consolidated Appropriations Act of 2018, division L, title I, Public Law 115-141.
On July 29, 2016, PHMSA, in consultation with FRA, published a Notice of Proposed Rulemaking (NPRM) under the same title as this final rule (81 FR 50068). The NPRM proposed regulations in three areas: Comprehensive oil spill response plans (COSRPs), HHFT information sharing, and incorporation of an initial boiling point test for determination of light hydrocarbons in stabilized petroleum crude oils. Overall, this final rule adopts the requirements proposed in the NPRM with minor changes for plain language or clarification in consideration of the comments received to the NRPM. The estimated costs and benefits for this final rule are described in Table 1 below:
Table 1—10 Year and Annualized Costs (in Millions) and Benefits by Stand-Alone Regulatory Proposal
Provision
Benefits
(7%)
Qualitative
Breakeven
Costs
(7%)
Oil Spill Response Planning and Response
• Improved Communication/Defined Command Structure may improve response
• Pre-identified Access to Equipment and Staging of Appropriate Equipment for Response Zones
• Trained Responders.
Cost-effective if this requirement reduces the consequences of oil spills by 6.7%
10-Year: $21.4.
Annualized: $3.1.
Information Sharing
• Improved Communication
• Enhanced Preparedness.
Cost-effective if this requirement reduces the consequences of oil spills by 1.2%
10-Year: $3.7.
Annualized: $0.53.
IBR of ASTM D7900
• Regulatory Flexibility
• Enhanced Accuracy in Packing Group Assignments.
N/A
No Cost Estimated.
Total
Cost-effective if this requirement reduces the consequences of oil spills by 7.8%
10-Year: $25.2.
Annualized: $3.6.
A. Comprehensive Oil Spill Response Plans
This final rule adopts the requirements for COSRPs as proposed in the NPRM. The COSRP requirements are promulgated under the authority of the Oil Pollution Act of 1990 (OPA 90), Public Law 101-380, which amended the Federal Water Pollution Control Act (FWPCA), also known as the Clean Water Act (CWA), at 33 U.S.C. 1321. Table 2 below summarizes the applicable statutory requirements for COSRPs, the requirements adopted in this final rule, and the differences between the requirements adopted in this final rule and the proposals of the NPRM:
Table 2—COSRPs
OSRP statutory requirements
HM-251B final rule COSRP requirements
HM-251B NPRM differences
33 U.S.C. 1321(j)(5)(A)(i)
49 CFR part 130
49 CFR part 130
The President shall issue regulations which require an owner or operator of a tank vessel or facility described in paragraph (j)(5)(C) to prepare and submit to the President a plan for responding, to the maximum extent practicable, to a worst-case discharge, and to a substantial threat of such a discharge, of oil or a hazardous substance
Restructures part 130 to create subpart C for COSRPs
Responds to commenter requests to better align COSRPs with minimum requirements for other federally mandated (Oil Spill Response Plans) OSRPs, especially those for pipelines in 49 CFR part 194. Requires PHMSA to approve COSRPs
Minimal clarification and plain language wording changes between NPRM and final rule throughout all sections in response to comments.
NPRM proposed that FRA would be responsible for approving COSRPs, and final rule consolidates DOT's OSRP approval under PHMSA.
§ 130.105
§ 130.104 renumbered as § 130.105
Provides general requirements for recordkeeping, plan format, and information about response structure
Permits use of Integrated Contingency Plan (ICP) and State plans providing equivalent level of coverage
Minimal. Clarifies COSRPs with only one response zone do not need to include separate “core plan” section.
Adds greater flexibility by permitting use of State plans that provide equivalent protection.
33 U.S.C. 1321(j)(5)(C)(iv)
§ 130.100
§ 130.101 renumbered as § 130.100
An onshore facility [e.g. rolling stock]
1
that, because of its location, could reasonably be expected to cause substantial harm to the environment by discharging into or on the navigable waters, adjoining shorelines, or the exclusive economic zone
Expands current applicability (42,000 gallons of oil in a single package) to also include route segments which are used for:
• At least 20 cars of liquid petroleum oil in a continuous block or 35 cars of liquid petroleum oil in a train consist
• For example, tank cars containing crude oil, fuel oil, petroleum distillates, diesel, or gasoline must be included when counting cars in the consist. Mixtures that do meet the criteria for Class 3 flammable or combustible material in § 173.120, or containing residue as defined in § 171.8 of subchapter C, are not required to be included when determining the number of tank cars transporting liquid petroleum oil. Examples of petroleum oils which may not meet the definition of a Class 3 flammable or combustible liquid include diluted waste water and certain mineral oils
Minimal. Clarifies COSRP are only required for routes used to transport applicable quantities of oil.
33 U.S.C. 1321(j)(5)(D)(i)
§§ 130.105 and 130.110
§ 130.103 renumbered as § 130.110
Be consistent with the requirements of the National Contingency Plan (NCP) and Area Contingency Plans (ACP)
Requires certification that the plan is consistent with a list of specific NCP/ACP requirements for “minimum compliance” to clarify the elements of NCP/ACP applicable to rail shipments
Minimal. Clarifies railroads are identifying Environmentally Sensitive Areas (ESAs) from existing Area or Regional Contingency Plans.
33 U.S.C. 1321(j)(5)(D)(ii)
§§ 130.120 and 130.125
§§ 130.104 and 130.105 renumbered as §§ 130.120 and 130.125, respectively
Identify the qualified individual having full authority to implement removal actions, and require immediate communications between that individual and the appropriate Federal official and the persons providing personnel and equipment pursuant to clause
Requires identification of Qualified Individual for each response zone in quickly accessible information summary. Requires immediate communication between Qualified Individual and appropriate Federal official and the persons providing personnel and equipment
Requires plan include a checklist of necessary notifications, contact information, and necessary information to clarify procedures.
Minimal. Clarifies that communication between Qualified Individuals and appropriate Federal officials and persons providing response personnel and equipment, must be immediate.
33 U.S.C. 1321(j)(5)(D)(iii)
§§ 130.105 and 130.130
§§ 130.102 and 130.106 renumbered as §§ 130.105 and 130.130, respectively
Identify, and ensure by contract or other means approved by the President the availability of, private personnel and equipment necessary to remove to the maximum extent practicable a worst-case discharge (including a discharge resulting from fire or explosion), and to mitigate or prevent a substantial threat of such a discharge
Includes the establishment of response zones, to ensure availability of personnel and equipment in different geographic route segments. Requires planning framework for response zones including ensuring resources are staged within 12 hours at any part of the applicable route
Includes requirements to identify organization, personnel, equipment, and deployment location thereof capable of removal and mitigation for a worst-case discharge (WCD). Allows use of Oil Spill Removal Organization (OSRO) which has been classified by the United States Coast Guard under 33 CFR 154.1035 or 155.1035 to be used in lieu of listing personnel and equipment
Minimal. Clarifies railroads determine the boundaries of each response zone, provided resources are identified with appropriate planning framework. Clarifies use of U.S. Coast Guard (USCG) guidelines for determining and evaluating required response resources during the response in accordance with appendix C of 33 CFR part 154.
33 U.S.C. 1321(j)(5)(D)(iv)
§ 130.135
§ 130.107 renumbered as § 130.135
Describe the training
Requires certification and documentation employees have been trained in carrying out their responsibilities under the plan
Minimal. Clarifies Incident Command System (ICS) incident commander level training is recommended best practice.
33 U.S.C. 1321(j)(5)(D)(iv)
§ 130.140
§ 130.108 renumbered as § 130.140
Describe . . . equipment testing
Requires description and certification equipment testing meets the manufacturer's minimum requirements
Minimal. Edits section number and title.
33 U.S.C. 1321(j)(5)(D)(iv)
§ 130.140
§ 130.108 renumbered as § 130.140
Describe . . . periodic unannounced drills
Requires exercises to be equivalent to the PREP Guidelines
Minimal. Updates USCG website address and replaces term “drill” with “exercise.”
33 U.S.C. 1321(j)(5)(D)(iv)
§ 130.130
§ 130.106 renumbered as § 130.130
Describe . . . response actions of persons on the vessel or at the facility
COSRPs describe:
• Activities and responsibilities of railroad personnel prior to arrival of Qualified Individual;
• Qualified Individual's responsibilities and actions; and
• Procedures coordinating railroad/Qualified Individual actions with On-Scene Coordinator (OSC).
Minimal. Adds a reference to appendix C of 33 CFR part 154 to clarify the equivalent planning standards to use of OSROs classified under 33 CFR 154.1035 and 155.1035.
33 U.S.C. 1321(j)(5)(D)(v)
§ 130.150
§ 130.109 renumbered as § 130.150
Be updated periodically
Clarifies plans should be reviewed every 5 years, when significant information changes, or after a discharge requiring plan activation ocurs
Minimal. In response to commenters, this final rule clarifies that railroads may operate for two years upon submission of response plan to PHMSA and certification of appropriate resources, for better consistency with the CWA.
33 U.S.C. 1321(j)(5)(E)
§ 130.150
§ 130.111 renumbered as § 130.150
(1) With respect to any response plan submitted under this paragraph for an onshore facility that, because of its location, could reasonably be expected to cause significant and substantial harm to the environment by discharging into or on the navigable waters or adjoining shorelines or the exclusive economic zone, and with respect to each response plan submitted under this paragraph for a tank vessel, nontank vessel, or offshore facility, the President shall—
Requires approval of plans by PHMSA provided minimum requirements for the plan are met
Minimal. NPRM proposed FRA approve railroad COSRPs. Final rule consolidates DOT's approval of OSRPs under PHMSA. As with other PHMSA programs and procedures, PHMSA will continue to work with FRA for guidance on rail specific information and procedures, including shared review and enforcement. Clarifies method to submit plans in electronic format.
(i) promptly review such response plan;
(ii) require amendments to any plan that does not meet the requirements of this paragraph;
(iii) approve any plan that meets the requirements of this paragraph;
(2) A tank vessel, nontank vessel, offshore facility, or onshore facility required to prepare a response plan under this subsection may not handle, store, or transport oil unless—
§ 130.100
Prohibits transportation of oil subject to COSRPs unless requirements for submission, review, and approval in § 130.150 are met and the railroad is operating in compliance with the plan
§ 130.101 moved to §§ 130.100 and 130.150
Minimal. Edits the section numbering and title for plain language.
(i) in the case of a tank vessel, nontank vessel, offshore facility, or onshore facility for which a response plan is reviewed by the President under paragraph (1), the plan has been approved by the President; and
(ii) the vessel or facility is operating in compliance with the plan
(3) Notwithstanding paragraph (1), the President may authorize a tank vessel, nontank vessel, offshore facility, or onshore facility to operate without a response plan approved under this paragraph, until not later than 2 years after the date of the submission to the President of a plan for the tank vessel, nontank vessel, or facility, if the owner or operator certifies that the owner or operator has ensured by contract or other means approved by the President the availability of private personnel and equipment necessary to respond, to the maximum extent practicable, to a worst-case discharge or a substantial threat of such a discharge
§ 130.100
Allows railroads to temporarily continue operating for up to 2 years while waiting for plan approval, provided the plan has been submitted to PHMSA and the railroad submits a signed certification statement of appropriate resources.
§ 130.111 moved to § 130.100
Minimal. PHMSA receives plans. Clarifies temporary continuation are limited to 2 years per statutory language.
B. HHFT Information Sharing Notification for Emergency Response
Planning
1
“Onshore facility” means any facility (including, but not limited to, motor vehicles and rolling stock) of any kind located in, on, or under, any land within the United States other than submerged land. 33 U.S.C. 1321(a)(10).
This final rule adopts the requirements for HHFT information sharing as proposed in the NPRM, with clarification for plain language and modifications in response to commenters. The information sharing notification requirements are promulgated under the authority of Federal hazardous materials transportation law (49 U.S.C. 5101-5128). Table 3 below summarizes the advanced notification information sharing requirements mandated by the Fixing America's Surface Transportation (FAST) Act of 2015 and adopted in this final rule.
Table 3—Information Sharing Notification for Emergency Response Planning
Topic
FAST Act (advanced notification)
Section 7302(a)(3), (4), (6)
Final rule HM-251B (information sharing)
49 CFR 174.312
Who is subject?
Class I railroads transporting HHFT (20 cars in a block, 35 in consist carrying ANY Class 3 flammable liquid)
All railroads transporting HHFT (20 cars in a block, 35 in consist carrying ANY Class 3 flammable liquid).
Who must the railroads notify?
Railroads must notify State Emergency Response Commissions (SERCs), who must provide the notification information (and updates) to any political subdivision of a State or public agency responsible for emergency response or law enforcement, upon request of the political subdivision or public agency
Railroads must notify SERCs, Tribal Emergency Response Commissions (TERCs), or other appropriate State designated entities who share information with appropriate local authorities, upon their request.
What security measures are required?
Required security and confidentiality protections include protections from the public release of proprietary information or security-sensitive information, to prevent the release to unauthorized persons
If the disclosure includes information that railroads believe is security sensitive or proprietary and exempt from public disclosure, the railroads should indicate that in the notification.
What to include in the notification?
A reasonable estimate of the number of implicated trains that are expected to travel, per week, through each county within the applicable state
A reasonable estimate of the number of HHFTs that are expected to travel, per week, through each county within the state.
Identification of the routes over which such liquid will be transported
The routes over which the affected trains will be transported.
Identification and a description of the Class 3 flammable liquid being transported on such trains and applicable emergency response information, as required by regulation
A description of the materials shipped and applicable emergency response information required by subparts C and G of part 172 of this subchapter.
A point of contact at the Class I railroad responsible for serving as the point of contact for State emergency response centers and local emergency responders related to the Class I railroad's transportation of such liquid
At least one point of contact at the railroad (including name or email address, title, phone number, and address) for the SERC, TERC, and relevant emergency responders related to the railroad's transportation of affected trains.
When/how often?
Update the notifications prior to making any material changes to any volumes or frequencies of HHFTs traveling through a county. `Material changes' in Emergency Order means changes greater than 25%
Updates the notification for changes in volume greater than 25 percent.
How are records maintained?
Requires notification “consistent with the notification content requirements in Emergency Order Docket No. DOT-OST-2014-0067”
Notification may be provided electronically or in writing. Railroads provide the notification to DOT upon request.
What COSRP Information must be included?
N/A
For petroleum oil trains subject to the COSRP in part 130, includes the contact information for Qualified Individual and the response zone description from the COSRP.
C. Initial Boiling Point Test
The NPRM proposed to incorporate by reference ASTM International's (ASTM) D7900, “Standard Test Method for Determination of Light Hydrocarbons in Stabilized Crude Oils by Gas Chromatography” related to initial boiling point for crude oils containing light hydrocarbons as an acceptable testing alternative to the boiling point tests specified in the current regulations. This ASTM standard is referenced by the industry best practice, American National Standards Institute (ANSI)/American Petroleum Institute (API) Recommended Practices 3000, “Classifying and Loading of Crude Oil into Rail Tank Cars,” First Edition, September 2014.
This final rule incorporates the test method by reference as proposed under the authority of Federal hazardous materials transportation law (49 U.S.C. 5101-5128). This final rule clarifies that initial boiling point, when determining the boiling distribution using ASTM D7900, is the temperature at which 0.5 weight percent is eluted. Inclusion of this additional boiling test option provides regulatory flexibility and promotes enhanced safety in transport through accurate Packing Group (PG) assignment.
II. Background
Expansion in U.S. energy production has led to significant challenges for the country's transportation system. Traditionally, pipelines and oceangoing tankers have delivered most crude oil to U.S. refineries, accounting for approximately 93 percent of total receipts (in barrels) in 2012.
2
Although other modes of transportation—rail, barge, and truck—have accounted for a relatively minor portion of crude oil shipments historically, volumes have risen rapidly in the 2010s relative to previous decades.
3
The rail transportation of large volumes of crude oil and other petroleum products presents unique safety risks. Rail accidents have tracked changes in production and rail shipments of crude oil— rising when rail shipments increase in volume and falling when crude oil volumes fall according to FRA and PHMSA incident report data. Please see the RIA for further discussion and a graph of oil-by-rail shipments and derailments. This final rule will improve response readiness and mitigate effects of rail accidents and incidents by instituting information sharing requirements for HHFTs and COSRP requirements for petroleum oil trains.
2
Bureau of Transportation Statistics, “Crude Oil and Petroleum Products Transported in the United States by Mode.” U.S. Department of Transportation. Last modified 01/2018.
https://www.bts.gov/content/crude-oil-and-petroleum-products-transported-united-states-mode.
3
U.S Energy Information Administration. “Petroleum and Other Liquids.” Independent Statistics and Analysis. Last modified 08/2018.
https://www.eia.gov/dnav/pet/hist/LeafHandler.ashx?n=PET&s=ESM_EPC0_RAIL_ZAMN-ZAMN_MBBL&f=M.
DOT reached out to stakeholders in industry, emergency response, and State and tribal governments through various forums and events to better understand and increase community awareness and preparedness for response to bulk transportation incidents involving energy products. In May 2014, PHMSA published the “Crude Oil Rail Emergency Response Lessons Learned Roundtable Report,” which outlined key factors that were identified by a panel of fire chiefs and emergency response management officials as having a direct impact on success in managing the outcomes of a crude oil transportation incident.
4
More information about DOT's actions related to community awareness of and preparedness for response to bulk transportation incidents involving energy products is available on PHMSA's “Safe Transportation of Energy Products” website.
5
4
https://www.phmsa.dot.gov/safe-transportation-energy-products/emergency-response-and-training.
5
https://www.phmsa.dot.gov/safe-transportation-energy-products/safe-transportation-energy-products-overview.
A. Oil Spill Response Plans
The Oil Pollution Act of 1990 (OPA 90) amended the Federal Water Pollution Control Act (FWPCA), also known as the Clean Water Act (CWA), at 33 U.S.C. 1321 by adding oil spill response planning requirements for “facilities” that handle oil. Railroads or “rolling stock” are included in the definition of “onshore facility.”
6
The CWA requires owners and operators of onshore facilities to prepare and submit Oil Spill Response Plans (ORSPs) for facilities that “could reasonably be expected to cause substantial harm to the environment by discharging into or on the navigable waters, adjoining shorelines, or the exclusive economic zone.” The CWA directs the President to issue regulations requiring owners and operators of onshore oil facilities to develop, submit, update and in some cases obtain approval of OSRPs meeting certain minimum requirements in 33 U.S.C. 1321(j)(5).
6
“Onshore facility” means any facility (including, but not limited to, motor vehicles and rolling stock) of any kind located in, on, or under, any land within the United States other than submerged land.” 33 U.S.C. 1321(a)(10). “Rolling stock” refers to rail cars.
On October 22, 1991, the President delegated authority to the Secretary of Transportation to regulate certain transportation-related facilities (
i.e.,
motor carriers and railroads) under sections 1321(j)(1)(C) and 1321(j)(5) of the CWA.
See
E.O. 12777, 56 FR 54757, sections 2(b)(2) and 2(d)(2). The Secretary later delegated this authority to PHMSA's predecessor agency, the Research and Special Programs Administration (RSPA). PHMSA's delegated authority under sections 1321(j)(1)(C) and 1321(j)(5) for certain transportation-related facilities (
i.e.,
motor vehicles and rolling stock) is solely the authority to promulgate regulations. When required, COSRPs are submitted to the Federal Highway Administration or the FRA, for motor carriers and railroads, respectively.
On June 17, 1996, RSPA published a final rule carrying out its delegated authority under the CWA for motor carriers and railroads.
7
The 1996 final rule established “comprehensive plans” under the authority of 33 U.S.C. 1321(j)(5) for anyone transporting oil in a quantity greater than 1,000 barrels or 42,000 gallons per package. The 1996 final rule also adopted requirements in part 130 for the preparation of “basic plans” for containers with a capacity of
3,500 gallons or more carrying petroleum oil. Basic plans were adopted as a “containment rule pursuant to § 1321(j)(1)(C)” of the CWA and therefore do not meet the minimum requirements for OSRPs in section 1321(j)(5).
8
7
61 FR 30533 (June 17, 1996).
8
61 FR 30537 (June 17, 1996).
A rail tank car designed to carry liquid materials, including petroleum oil, has an approximate capacity of 30,000 gallons. Because the typical rail tank car has a capacity around 30,000 gallons, no rail carriers are currently transporting tank cars of petroleum oil subject to the 42,000-gallon packaging threshold for COSRPs adopted by the 1996 final rule. On July 6, 2013, an unattended, runaway unit train carrying crude oil from the Bakken region of North Dakota derailed in the town of Lac-Mégantic, Quebec. The incident resulted in loss of life and destruction of property and the environment. The cause was found to be human error that led to the unattended train gathering speed before derailing near the center of Lac-Mégantic. While an OSRP may not have prevented this incident, the Lac-Mégantic incident prompted examination into the safety of crude oil transportation by rail. The National Transportation Safety Board (NTSB) recommended requiring COSRPs for unit trains of petroleum in Safety Recommendation R-14-005. Congress also directed DOT to develop and report on a plan to finalize updated requirements for OSRPs in section 7307 of the FAST Act. Additionally, in the Consolidated Appropriations Act of 2018, signed into law on March 23, 2018, Congress directed the Secretary to “issue a final rule to expand the applicability of comprehensive oil spill response plans.”
On July 29, 2016, PHMSA, in consultation with FRA, published an NPRM titled “Oil Spill Response Plans and Information Sharing for High-Hazard Flammable Trains.” The NPRM proposed to modernize COSRP requirements under 49 CFR part 130 in response to NTSB recommendations (including Safety Recommendation R-14-005), the FAST Act, and comments from the public to an August 1, 2014, Advance Notice of Proposed Rulemaking (ANPRM) (79 FR 45079). PHMSA also proposed the requirements to address needs identified by first responders in the “Crude Oil Rail Emergency Response Lessons Learned Roundtable Report” and challenges identified through analysis of recent spill events.
9
9
https://www.phmsa.dot.gov/safe-transportation-energy-products/emergency-response-and-training.
Specifically, the NPRM proposed to expand COSRPs to routes over which railroads operate a single train containing 20 or more tank cars loaded with liquid petroleum oil in a continuous block or a single train containing 35 or more tanks cars loaded with liquid petroleum oil throughout the train consist.
The NPRM also proposed to update the COSRP requirements in response to comments requesting greater specificity to plan contents through a closer alignment to other Federal OSRP regulations promulgated under the CWA. The proposed requirements in the NPRM are similar to PHMSA's Office of Pipeline Safety's (OPS) requirements for pipeline oil spill response plans in 49 CFR part 194. Developing OSRPs for both pipeline and rail require planning for routes spanning large geographic areas. The NPRM proposed railroads divide their routes into “response zones” that connect notification procedures and available response resources to the specific geographic area for the covered route segments. Response zones include geographic information, such as a planning framework, which ensures response resources are staged within 12 hours of any point along the route. The NPRM requested comments on providing regulatory flexibility for small businesses, requiring faster response times in certain “High Volume Areas,” and recommending that the Qualified Individual should be trained to the Incident Commander level using the Incident Command System (ICS).
B. HHFT Information Sharing Notification for Emergency Response Planning
Federal hazardous materials transportation law (49 U.S.C. 5101-5128) authorizes the Secretary to “prescribe regulations for the safe transportation, including security, of hazardous material in intrastate, interstate, and foreign commerce.” The Secretary delegates this authority to PHMSA under 49 CFR 1.97(b). PHMSA is responsible for overseeing a hazardous materials safety program that minimizes the risks to life and property inherent in the transportation of hazardous materials in commerce. The Hazardous Materials Regulations (HMR; 49 CFR parts 171-180) include operational requirements applicable to transportation of hazardous materials by highway, rail, aircraft, and vessel. The Secretary also has authority over all areas of railroad transportation safety (Federal railroad safety laws, principally 49 U.S.C. chapters 201-213); this authority is delegated to FRA under 49 CFR 1.89. FRA promulgates and enforces a comprehensive regulatory program (49 CFR parts 200-244) and inspects and audits railroads, tank car facilities, and hazardous material offerors for compliance with both FRA's regulations and the HMR. Because of the shared role in the safe and secure transportation of hazardous materials by rail, PHMSA and FRA work closely when considering regulatory changes. The agencies take a system-wide, comprehensive approach consistent with the risks posed by the bulk transport of hazardous materials by rail.
On May 7, 2014, the Secretary, under the authority of 49 U.S.C. 5121(d), issued an Emergency Restriction/Prohibition Order in Docket No. DOT-OST-2014-0067 (Order).
10
The Order requires each railroad transporting 1 million gallons or more of Bakken crude oil in a single train in commerce within the United States to provide certain information in writing to the State Emergency Response Commission (SERC) for each state in which it operates such a train. Tribal Emergency Response Commissions (TERCs) are permitted to coordinate with the appropriate SERC(s) for access to data supplied under this Emergency Restriction/Prohibition Order.
11
The Order also requires a railroad to provide SERCs information about the type of oil, volume, route, and emergency response procedures, as well as appropriate railroad contact information. It also requires railroads to provide SERCs updated notifications prior to any “material change” in the volume of affected trains and provide copies of notifications made to each SERC to FRA upon request. DOT subsequently issued a document compiling frequently asked questions (FAQs) to clarify several aspects of the Order.
12
10
https://www.regulations.gov/document?D=DOT-OST-2014-0067-0001.
11
https://www.regulations.gov/document?D=DOT-OST-2014-0067-0003.
12
See
document number 0003 in Docket No. DOT-OST-2014-0067.
On October 3, 2014, FRA published “Proposed Agency Information Collection Activities; Notice and Request for Comments” (79 FR 59891) to provide additional analysis of the requirements of the Order. FRA consulted with DOT, the U.S. Department of Homeland Security (DHS), and the Transportation Security Administration (TSA), and determined the information required by the Order was not commercially sensitive or Sensitive Security Information (SSI) as defined by DOT, DHS, or TSA regulations.
Id.
at 59892. FRA further noted that DOT found no basis to
conclude that the public disclosure of the information is detrimental to transportation safety.
In the May 8, 2015, final rule “Hazardous Materials: Enhanced Tank Car Standards and Operational Controls for High-Hazard Flammable Trains” (HM-251 final rule), PHMSA decided against adopting an earlier proposal to codify the specific requirements of the Order for railroads transporting 1 million gallons or more of crude oil originating in the Bakken region, and instead adopted similar requirements more easily integrated into the HMR that achieved the desired result.
On May 28, 2015, PHMSA announced plans to extend the Order indefinitely and to consider options for codifying the disclosure requirement on a permanent basis after further evaluating the issue within DOT.
13
PHMSA recognized the desire for local communities to receive proactive notification of hazardous materials moving through their cities and towns. PHMSA noted that transparency is critical to DOT's comprehensive approach to safety and expressed support for the public disclosure of this information to the extent allowed by applicable State, local, and tribal laws.
13
https://www.phmsa.dot.gov/news/phmsa-notice-regarding-emergency-response-notifications-shipments-petroleum-crude-oil-rail.
On December 4, 2015, the FAST Act was signed into law. The FAST Act includes the “Hazardous Materials Transportation Safety Improvement Act of 2015” at sections 7001 through 7311, which provides direction for the hazardous materials safety program. Section 7302 directs the Secretary to issue regulations to require (1) real-time sharing of the electronic train consist information for hazardous materials shipments; and (2) advanced notification of HHFTs. DOT has initiated a separate rulemaking to address the requirements of section 7302(a)(1) related to real-time electronic train consists. Docket No. PHMSA-2016-0015 (HM-263).
14
14
https://www.regulations.gov/docket?D=PHMSA-2016-0015.
Section 7302(a)(3) of the FAST Act directs DOT to promulgate regulations requiring advanced notification consistent with notification content requirements of the Order. The FAST Act expands the Order to require Class I railroads to provide advanced notification and information on HHFTs to each SERC. The FAST Act requires SERCs receiving this advanced notification to provide the information to law enforcement and emergency response agencies upon request. The FAST Act, in section 7302(a)(6), also directs the Secretary to establish security and confidentiality protections for electronic train consist information and advanced notification information.
In response to the FAST Act and DOT's commitment to codifying the Order, PHMSA proposed information sharing notification requirements in the “Hazardous Materials: Oil Spill Response Plans and Information Sharing for High-Hazard Flammable Trains (HM-251B)” NPRM published July 29, 2016. The NPRM proposed that all railroads transporting HHFTs notify SERCs, Tribal Emergency Response Commissions (TERCs), or other State-delegated agencies with information consistent with the Order. The NPRM proposed that the notification include key information from COSRPs, when applicable.
The intent of these requirements is to ensure that local emergency responders and emergency response planning officials have access to sufficient information regarding the movement of HHFTs in their jurisdictions to adequately plan and prepare for emergency events involving HHFTs. This purpose is reaffirmed by the FAST Act's requirements for sharing and protection of information required by the advanced notification. Under the Emergency Planning and Community Right-to-Know Act (EPCRA) in title III of the Superfund Amendments and Reauthorization Act of 1986 (SARA), the Governor of each state is required to establish a SERC. The SERC is responsible for establishing emergency planning districts and appointing, supervising, and coordinating Local Emergency Planning Committees (LEPCs). For federally recognized tribal governments, the Chief Executive Officer of the Tribe appoints a Tribal Emergency Response Commission (TERC), as designated by the Environmental Protection Agency (EPA) in a final rule published July 26, 1990 (55 FR 30632). TERCs have the same responsibilities as SERCs. On July 26, 1990, EPA published a final rule designating Indian Tribes and their chief executive officers as the implementing authorities for EPCRA on all Indian lands.
The NPRM proposed to protect information by allowing railroads to indicate information they “believe is security sensitive or proprietary and exempt from public disclosure.” Previous analysis by DOT, FRA, and DHS concluded that the aggregated information required to be shared by railroads does not qualify for withholding under Federal standards for business confidential information or SSI; however, as noted in FRA's previous discussion of this matter in its October 2014 Information Disclosure Notice, State laws control, and may limit, the disclosure and dissemination of this information.
15
Therefore, the NPRM acknowledged that states may differ in their methods and proposed an approach intended to provide flexibility for SERCs, TERCs, and other State-delegated agencies to disseminate information in accordance with state laws and procedures. As proposed, before fulfilling a request for information and releasing the information, the States and Tribes will be on notice of which information the railroads consider to be inappropriate for public release.
15
79 FR 59892 (June 30, 2014).
C. Initial Boiling Point Test
The offeror's responsibility to classify and describe a hazardous material is a key requirement under the HMR. Improper classification and failure to identify applicable material properties can have significant negative impacts on transportation safety. Proper classification is necessary to ensure proper packaging, operational controls, and hazard communication requirements are met, all of which are important to mitigate the negative effects of a train derailment or other hazardous materials incident. It is an offeror's responsibility to accurately classify and describe a hazardous material. For transportation purposes, classification is ensuring the proper hazard class, packing group, and shipping name are assigned to a material. To determine whether a hazardous material should be classified as Class 3 Flammable liquid, as well as determine the appropriate packing group, the HMR require testing for the material's flash point and initial boiling point (IBP) under §§ 173.120 and 173.121.
The American National Standards Institute (ANSI) recognized recommended practice includes guidance on the material characterization, transport classification, and quantity measurement for overfill prevention of petroleum crude oil for the loading of rail tank cars (
see
API RP 3000, “Classifying and Loading of Crude Oil into Rail Tank Cars”). For crude oils containing volatile, low molecular weight components (
e.g.,
light ends), the industry recommended best practice for IBP is to test using ASTM D7900. The initial boiling point, when determining the boiling distribution using ASTM D7900, is the temperature at which 0.5
weight percent is eluted. The ASTM D7900 differs from the boiling point tests currently in the HMR in that it is the only test that ensures a minimal loss of light ends; however, the ASTM D7900 is not currently included in the list of testing methods authorized in the HMR in § 173.121(a)(2).
In this final rule, PHMSA is adopting the NPRM's proposal to incorporate by reference the ASTM D7900 test method identified within API RP 3000, thus permitting use of this IBP industry best practice. The incorporation of the ASTM D7900, which aligns with the API RP 3000, will not replace the currently authorized initial boiling point testing methods. Rather, it will serve as a testing alternative if one chooses to use that method. PHMSA believes this provides flexibility and promotes enhanced safety in transport through accurate packing group assignment.
III. Recent Spill Events
PHMSA collected and reviewed information from various sources pertaining to recent derailments involving discharges of petroleum oil. In this rulemaking and the accompanying analysis, PHMSA has focused on the following derailments: Mosier, OR (June 2016); Watertown, WI (November 2015); Culbertson, MT (July 2015); Heimdal, ND (May 2015); Galena, IL (March 2015); Mt. Carbon, WV (February 2015); La Salle, CO (May 2014); Lynchburg, VA (April 2014); Vandergrift, PA (February 2014); New Augusta, MS (January 2014); Casselton, ND (December 2013); Aliceville, AL (November 2013); and Parkers Prairie, MN (March 2013). In the Regulatory Impact Analysis (RIA), PHMSA provides narratives and discussion of the circumstances and consequences of these derailments. Please refer to the rulemaking docket (Docket No. PHMSA-2014-0105) for the preliminary and final RIA and all supporting documents.
PHMSA's review of these derailments identified challenges during oil spill response that occurred in the past and could potentially occur in future derailment scenarios. PHMSA incorporates this understanding of response challenges into this rulemaking, which amends the requirements of 49 CFR part 130, to improve COSRPs by way of new and revised requirements. Improved oil spill response planning will, in turn, improve the actual response to future derailments involving petroleum oil and lessen potential negative effects on communities.
IV. National Transportation Safety Board Safety Recommendations
This rulemaking partially addresses several recommendations from the NTSB, as summarized in Table 4:
Table 4—NTSB Recommendations Partially Addressed in This Rulemaking
NTSB recommendation
Recommendation summary
Rulemaking description
R-14-002: Issued January 23, 2014
Recommends that FRA develop a program to audit response plans for rail carriers of petroleum products to ensure that adequate provisions are in place to respond to and remove a worst-case discharge to the maximum extent practicable and to mitigate or prevent a substantial threat of a worst-case discharge
Requires PHMSA to approve COSRPs for rail.
R-14-005: Issued January 23, 2014
Recommends that PHMSA revise the spill response planning thresholds contained in 49 CFR part 130 to require comprehensive response plans to effectively provide for the carriers' ability to respond to worst-case discharges resulting from accidents involving unit trains or blocks of tank cars transporting oil and petroleum products
Revises the spill planning thresholds to address 20 cars of liquid petroleum oil in a continuous block or 35 cars of liquid petroleum oil in a consist.
R-14-014: Issued August 22, 2014
Recommends that PHMSA require railroads transporting hazardous materials through communities to provide emergency responders and local and state emergency planning committees with current commodity flow data and assist with the development of emergency operations and response plans
Adopts information sharing requirements for HHFTs.
R-14-006: Issued January 23, 2014
Recommends that PHMSA require shippers to sufficiently test and document the physical and chemical characteristics of hazardous materials to ensure the proper classification, packaging, and record-keeping of products offered in transportation
Adds ASTM D7900 test method as option to determine boiling point of certain crude oil.
V. Summary and Discussion of Public Comment
A. Overview of NPRM Comments
In the NPRM, PHMSA solicited public comment on potential revisions to regulations that would: Expand the applicability of COSRPs to HHFTs based on the amount of petroleum oil in an entire train consist, rather than a single package or tank car; require rail carriers to share information regarding HHFTs with State authorities; and incorporate by reference of the ASTM D7900 test method. The NPRM summarized and discussed comments received in response to questions regarding potential revisions to the COSRP requirements asked by the earlier ANPRM. PHMSA received approximately 130 comments in response to the NPRM. See Table 5 describing commenter backgrounds:
Table 5—Commenter Background
Commenter background
Count
Description and examples of category
Non-Government Organizations
35
Environmental groups (30), emergency response organizations (4), and other non-governmental organizations (1).
Governments
19
Local (8), State (9), Federal (2).
Private Individuals
67
Members of the public.
Carrier Industry Stakeholders
6
Railroads (1) and related trade associations (5).
Shipper Industry Stakeholders
4
Shippers (2) and petroleum-related trade associations (2).
Most commenters addressed proposed COSRP requirements. COSRP-related comments comprised four general categories: (1) Reiterating comments provided to the ANPRM; (2) providing statements of general support for expanding COSRP requirements; (3) expressing general concern or requests to require faster response times for response zones; or (4) recommending additional requirements not proposed by the NPRM. Many commenters noted the negative impact that a petroleum oil spill or HHFT derailment would have on their individual communities and personal property, with most such comments coming from residents of the Hudson River Valley region. A few commenters provided detailed comments about specific proposals in the NPRM for COSRPs. Comments related to COSRPs are further discussed in “Section V.B. Summary of Oil Spill Response Plan Comments” of this final rule.
PHMSA received approximately 20 comments on the proposed HHFT information sharing notification requirements. These comments fall into several categories, including: (1) Applicability; (2) notification recipients; (3) frequency of notification; and (4) information security and confidentiality concerns. Comments related to HHFT information sharing are further discussed in “Section V.C. Summary of HHFT Information Sharing Notification Comments” of this final rule.
PHMSA received five comments addressing the proposed incorporation by reference of the ASTM D7900 test method. Comments related to incorporation by reference are further addressed in “Section V.D. Summary of Initial Boiling Point Comments” of this final rule.
Additionally, PHMSA received several miscellaneous comments that voiced general concern about the public health, safety, and/or environmental risks of petroleum trains and/or fossil fuels. These comments either did not provide recommendations for regulatory action or exceeded the scope of PHMSA's authority.
B. Summary of Oil Spill Response Plans Comments
Summary and Response to Basic Spill Response Plan (§ 130.31) Comments
The current threshold for a basic OSRP is 3,500 gallons of petroleum oil. Several commenters suggested that basic plans for packages exceeding this threshold should be eliminated and replaced with comprehensive oil spill response plans, which would effectively require a COSRP for all tank-car shipments of petroleum oil. Commenters suggested basic OSRPs be replaced because they do not meet the minimum requirements of the CWA in 33 U.S.C. 1321(j)(5)(D). The State of California Department of Fish and Wildlife, for example, disagreed that basic OSRPs could be issued under a containment rule pursuant to section 1321(j)(1)(C).
The NPRM did not propose changes to the requirements for basic OSRPs; therefore, this rule does not make such changes. As stated in the NPRM and the initiating 1996 final rule, the requirements for a basic OSRP were issued as a “containment rule pursuant to § 1321(j)(1)(C)” of the CWA, and therefore were not intended to fulfill the requirements of 33 U.S.C. 1321(j)(5)(D). The requirements of 33 U.S.C. 1321(j)(5)(D) for OSRPs are promulgated in the requirements for COSRPs.
Summary of Comments Regarding Applicability of COSRP (§ 130.100)
The NPRM proposed to expand the applicability for COSRPs so that any railroad that transports a single train carrying 20 or more loaded tank cars of liquid petroleum oil in a continuous block or a single train carrying 35 or more loaded tank cars of liquid petroleum oil throughout the train consist must also have a current, written COSRP. The NPRM provided an exception for tank cars carrying residue as defined in § 171.8 of subchapter C or diluted mixtures that do not meet the definition of a Class 3 flammable or combustible liquid. The NPRM maintained both the current exception in part 130 for mixtures that contain less than 10 percent oil by volume and the current threshold of 42,000 gallons per package for both petroleum oil and non-petroleum oil.
PHMSA received approximately 20 comments to the NPRM pertaining to the applicability of COSRPs. Most of these comments fell into two major categories: The volume of oil being transported and the type of materials that trigger COSRPs. Additionally, there were a few comments pertaining to applicability in response to a question in the NPRM that asked whether additional relief should be given to small entities, such as Class II or III railroads.
While some commenters supported the proposed volume applicability threshold, many commenters provided alternative suggestions. Most comments reiterated suggestions regarding applicability provided in comments responding to the ANPRM. Generally, individuals and environmental organizations recommended using lower thresholds of petroleum oil to trigger COSRPs due to environmental concerns, safety concerns, or interpretations that the CWA requires oil spill response plans for all rolling stock carrying oil. Several commenters requested lower applicability thresholds without specifying an alternative number.
16
Lower-volume thresholds proposed by commenters ranged from any amount of oil to 20 rail cars of oil. Commenters suggested replacing basic plans with COSRPs for packages exceeding 3,500 gallons. Commenters who suggested a threshold of one tank car—approximately 29,000 gallons—believed that any rail line carrying an oil tank car should be subject to COSRPs. Commenters that suggested a two-tank car threshold did so to maintain consistency with the current requirement of 42,000 gallons in one tank car, but suggested changing the language to require COSRPs when a train is carrying 42,000 gallons of oil in any form, not just one tank car. It was also suggested that the 42,000-gallon threshold be removed outright. The Minnesota Pollution Control Agency stated that the threshold is not meaningful and seems “arbitrary and outdated especially when you consider two 30,000-gallon tank cars pose the same or more risk and are not regulated.”
16
See PHMSA-2014-0105-0250, PHMSA-2014-0105-0251, PHMSA-2014-0105-0252, PHMSA-2014-0105-0253, PHMSA-2014-0105-0256, PHMSA-2014-0105-0290.
In addition to quantitative applicability comments, PHMSA received several qualitative applicability comments about the type of oil that should require a COSRP. Most of these comments were from environmental groups or private citizens and reiterated comments provided in response to the ANPRM, without providing additional data. Suggestions for expanded applicability of COSRPs included all hazardous substances, all Class 3 flammable liquids or other hazardous materials, all kinds of oil, or all kinds of liquid petroleum oils (irrespective of hazard class). Mandating COSRPs for all hazardous substances was suggested by state agencies and environmental groups, who cited the CWA statute requirements for hazardous substances, in addition to oil spills per 33 U.S.C. 1321(j)(5). These commenters supported using the Federal On-Scene Coordinator (OSC) to identify concerns evaluating a plan's compliance with the statutory and regulatory requirements and expressed concern about the potential harm from hazardous substances. In addition, commenters cited some state
plans, such as Minnesota's, in which COSRPs are required for all hazardous substances. Multiple commenters suggested adding all Class 3 flammable liquids to the materials requiring a COSRP, with justifications mostly based on environmental or safety concerns. Commenters also cited ethanol as an example of a Class 3 flammable material that poses a risk by rail.
NTSB opposed the exception from the COSRP requirements for unit trains carrying “mixtures or solutions of petroleum oil not meeting the criteria for Class 3 flammable or combustible material.” NTSB found use of the term “mixtures or solutions” confusing, as petroleum products are inherently a mixture. NTSB also stated:
[S]pilled, petroleum products are significant environmental pollutants, whether or not they are Class 3 flammable or combustible liquids. In fact, less-flammable petroleum materials that are denser than water may sink to form emulsions, adhere to sediments, and produce tar balls that are often more difficult to remove from waterways than less viscous Class 3 flammable oils.
The Association of American Railroads (AAR) provided comments related to the identification of petroleum oil subject to the plan. AAR requested that PHMSA specify which UN or NA identification numbers are associated with the definition of petroleum oil. AAR suggested requiring railroads to determine which UN or NA numbers associated with Class 3 materials further meet the definition of petroleum oil and create an additional burden on railroads.
AAR provided comments about the applicability of route segments in the plans and requested clarification that the COSRP requirements do not apply to route segments where applicable quantities of oil are not transported. AAR also suggested “that plans should be required for only portions of HHFT routes situated within a half-mile (0.5 miles) of a navigable waterway” so that railroads do not need to perform their own environmental reviews throughout the entire rail network, which would be overly burdensome. In addition, AAR stated that the use of a half-mile standard for planning purposes is consistent with existing standardized planning distances found in 40 CFR part 112, appendix C, section 5.
The International Association of Fire Chiefs (IAFC) suggested revising the applicability proposed in § 130.101 (“Any railroad which transports a single train transporting . . .”), so as to replace “transports” with “operates” for “better flow.”
In the NPRM, PHMSA asked whether regulatory relief may be appropriate for certain small businesses (
i.e.,
Class II and III short lines). Most commenters supported regulations based on the risk, quantity, and type of oil, regardless of business size. The State of California Department of Fish and Wildlife expressed concern that the threshold of 20 tank cars in a unit or 35 tank cars across the consist would exempt too many short lines from COSRPs. The American Short Line and Regional Railroad Association (ASLRRA) submitted comments stating that many Class II and III short lines only operate the first or last mile of an applicable route and that requiring them to create plans would be an undue burden. ASLRRA also described scenarios in which the short line acts as a tenant on track owned by a Class I railroad, suggesting that Class III railroads should be offered some level of relief if voluntarily entering into agreement to use a plan created by the Class I for the route section used by both railroads. ASLRRA further clarified:
[This is not to] suggest the host railroad's oil spill response plan should address the tenant's operations as a matter of regulatory fiat. Rather, ASLRRA is asking PHMSA to acknowledge that it is permissible for a tenant railroad to contract with a host railroad for the latter to supply the oil spill response capability required by PHMSA.
Response to Comments Regarding Applicability of COSRP (§ 130.100)
PHMSA initiated this rulemaking in response to changing conditions stemming from the increase in the volume of petroleum oil transported by rail and the consequent incidents and accidents; however, pursuant to the CWA requirement for rolling stock that “could reasonably be expected to cause substantial harm,” PHMSA seeks to minimize burdens by expanding requirements for COSRPs only where there is a demonstrated need. PHMSA does not have evidence of rail incidents involving unit trains carrying other non-petroleum oils (as defined in 49 CFR 130.5) that have demonstrated a need to expand the applicability of comprehensive plans to other non-petroleum oils. Commenters did not provide additional data on rail transportation of non-petroleum oil or hazardous substances identifying new conditions, nor did they identify rail incidents indicating new risks posed by other non-petroleum oils or hazardous substances. Therefore, we are continuing with a threshold of 42,000 gallons for tank cars carrying petroleum or other non-petroleum oil. However, we may consider revising the requirements for other non-petroleum oils or hazardous substances in a future rulemaking.
We disagree that the applicability should be expanded to include additional hazardous materials, such as all Class 3 flammable or combustible liquids. Commenters did not provide adequate data indicating that the type of planning and level of resources required by this rulemaking would be appropriate for cleaning up spills for materials other than oils. Furthermore, this rulemaking was promulgated to respond directly to the risks and unique response requirements related to the large volumes of petroleum oil being transported in unit trains.
PHMSA disagrees that COSRPs would be appropriate for a lower volume of petroleum oil or a lesser number of tank cars. As discussed in the NPRM and HM-251 final rule, modeling data from FRA indicates that for trains with fewer than 20 tank cars in a block, or fewer than 35 tank cars dispersed throughout a train, relatively few tank cars containing petroleum oil would be breached on average in the event of an incident.
17
The threshold of 20 cars in a block as used in the HM-251 rulemaking comes from AAR's Circular OT-55, which provides “Recommended Railroad Operating Practices for Transportation of Hazardous Materials” and defines “key trains.” Then, FRA performed an analysis to determine the average number of cars that would derail with 20 tank cars in a block. Once that number was determined, FRA did further analysis to determine at what number of tank cars dispersed throughout the consist would the number of tanks cars derailed be equivalent. The result was 35 tank cars throughout the consist. Therefore, in a derailment scenario, these lower-risk train configurations (
i.e.,
fewer than 20 tank cars in a block or 35 tank cars throughout the train) are not “reasonably expected” to breach in a manner that could “cause substantial harm to the environment by discharging into or on the navigable waters, adjoining shorelines, or the exclusive economic zone.” Furthermore, given the enhanced tank car standards promulgated in the HM-251 final rule and resulting improvements in tank-car integrity, PHMSA believes the likelihood of a tank car releasing its total contents in a derailment has been significantly reduced.
18
PHMSA maintains that lower-risk train configurations should not be the focus of this rulemaking because extending
the requirements of this rule to operators of lower-risk configurations would be burdensome, costly, and inefficient.
17
80 FR 26665 (May 8, 2015).
18
80 FR 26665 (May 8, 2015).
PHMSA did not propose changes to the communication requirements in 49 CFR 130.11, which apply to both basic and comprehensive plans. Basic plans already require that shipments of tank cars carrying petroleum oil be described on shipping papers or similar documents as containing oil, unless they are identified as “aviation fuel, diesel fuel, fuel oil, gasoline, jet fuel, kerosene, motor fuel, or petroleum.” While basic plans will be replaced with COSRPs for certain train configurations, the responsibility for offerors to identify oil will not change. Additionally, the U.S. Coast Guard (USCG) maintains a “List of Petroleum and Non-Petroleum Oils” as a guide to determining whether a particular substance is an oil under their regulations.
19
Therefore, PHMSA further disagrees that additional guidance is necessary to identify petroleum oil, and is adopting the definition of petroleum oil as proposed.
19
United States Coast Guard, Hazardous Materials Division, available at:
http://www.dco.uscg.mil/Our-Organization/Assistant-Commandant-for-Prevention-Policy-CG-5P/Commercial-Regulations-standards-CG-5PS/Design-Engineering-Standards/eng5/
The definition of petroleum oil in § 130.5 includes both refined and unrefined petroleum products. Oils which do not contain petroleum, such as synthetic oils or essential oils, continue to be defined as “non-petroleum oil” in § 130.5. We are maintaining PHMSA's longstanding provision that any “mixture or solution in which oil is in a concentration by weight of less than 10 percent” is excluded from the requirements in part 130. Therefore, petroleum oil in part 130 includes mixtures containing at least 10 percent petroleum oil, such as denatured ethanol fuel E85 (ethanol containing 15 percent gasoline); however, mixtures containing less than 10 percent petroleum oil, such as diluted waste water or E95 (ethanol with 5 percent gasoline) continue to be excluded.
We also disagree with NTSB that the exception for unit trains not carrying petroleum oil meeting the definition of a Class 3 flammable liquid or combustible liquid should be removed. Providing this exception aligns this rulemaking's applicability to unit trains with the subset of HHFTs carrying petroleum oil covered in other PHMSA rulemakings. Furthermore, the railroad can leverage information from the routing analysis required by 49 CFR 172.820 when developing plans.
We agree with AAR that the intent of COSRPs is to cover routes where applicable quantities of oil are transported. Railroads are not required to include routes or route segments in response zones when applicable quantities of oil are not transported on these routes or route segments. We assume that routes transporting applicable quantities of oil are a subset of the routes that railroads must already identify under the requirements for routing analysis in the HM-251 final rule. Therefore, we are editing the applicability language in § 130.100 to state, “any route or route segments used to transport. . .a single train carrying. . . .” This clarification further addresses IAFC's recommendation to avoid using the term “transports a single train transporting” in the requirements proposed in § 130.101, adopted in § 130.100.
The CWA requires OSRPs for any facility that “because of its location, could reasonably be expected to cause substantial harm to the environment by discharging into or on the navigable waters, adjoining shorelines, or the exclusive economic zone.” PHMSA is not aware of evidence demonstrating that routes located more than 0.5 miles from navigable waters provide a sufficient buffer to ensure substantial harm could not occur in the event of a spill. The EPA's FRP requirements in section 5.0 of attachment C-III (“Calculation of the Planning Distance”) to appendix C of 40 CFR part 112 provide detailed planning calculations for facilities to determine the threat to fish and wildlife and sensitive environments or downstream public water intake as a result of a discharge of oil to navigable waters. For example, under section 5.6 of the above-referenced attachment, facilities located further than 0.5 miles from navigable waters must also consider the distance to nearby storm drains and factors that may be conducive to overland transport of oil to these storm drains. Additionally, section 5.7 of the above-referenced attachment requires an owner or operator to consider the “proximity to fish and wildlife and sensitive environments, not bordering a navigable water” in whether a facility poses substantial harm. PHMSA was unable to perform detailed analysis for features such as storm drains, or topographic features, along every point on an HHFT route, so PHMSA assumes that all rail routes used for applicable quantities of oil are expected to have the potential to impact navigable waters. Therefore, the entire route carrying applicable oils should be covered by the planning requirements for COSRPs.
PHMSA disagrees that Class II or III railroads transporting petroleum oil should be excluded from COSRP requirements. As evidenced by the derailment in Aliceville, Alabama, which involved a 90-car crude oil unit train, Class II and Class III railroads are transporting quantities of petroleum oil that pose the same risk as Class I railroads. Nothing in the regulations precludes Class I railroads from assisting short lines in developing a plan or precludes one railroad from utilizing resources provided by another railroad through contract or other means; however, both railroads would be subject to submitting a plan covering their responsibilities to ensure those responsibilities are clearly delineated.
Summary of Comments Regarding General Requirements for COSRP Format (§ 130.105)
In the NPRM, PHMSA proposed a COSRP format requiring a core plan with general information applicable to the entire plan and response zones with information specific to the route segment. The NPRM proposed that the plan must use and be consistent with the core principles of the National Incident Management System (NIMS), including use of the Incident Command System (ICS) throughout the plan. The NPRM also proposed use of the Integrated Contingency Plan (ICP) as an alternate format.
20
20
In June 1996, the National Response Team (NRT) published the Integrated Contingency Plan (ICP, or One Plan) Guidance with support from five agencies: The Environmental Protection Agency (EPA); the Coast Guard; the Occupational Safety and Health Administration (OSHA); the Office of Pipeline Safety of the Department of Transportation (DOT); and the Minerals Management Service (MMS) of the Department of the Interior. The ICP provides a mechanism for consolidating multiple facility response plans into one plan that can be used during an emergency. See 61 FR 28642
NTSB commented in support of the general plan requirements in proposed § 130.102, stating they would “serve to ensure a carrier's ability to respond to worst-case oil and petroleum discharges called for by Safety Recommendation R-14-005.”
We received comments from State government agencies and railroad stakeholders on the use of alternative plan formats. The Washington State Department of Ecology and AAR both supported the permissive use of ICPs as providing greater flexibility to meet planning standards when subject to requirements by other agencies. Both AAR and other State government commenters highlighted differences between requirements for State plans
and the proposed Federal plan requirements.
Several commenters supported the requirement that plans integrate NIMS and ICS, while also requesting further clarification of their roles. API commented in support of ensuring that “the terminology used and practices required are consistent with established response organizations and structures to include the National Response Framework, the National Contingency Plan, the National Preparedness and Response Exercise Program (NPREP), and National Incident Management System (NIMS).” Additionally, industry commenters highlighted the importance of NIMS and ICS, and recommended additional clarity. AAR stated, “PHMSA should clarify that railroads, at their discretion, may use EPA's or DHS's criteria to be consistent with the NCP” in relation to the requirements to use NIMS/ICS terminology. API highlighted the importance of railroad personnel following NIMS and ICS using “common terminology, training and management of change for staff,” further suggesting that PHMSA and FRA “should be prepared to provide guidance and oversight to the regulated community as they establish processes that support personnel and organizational changes.”
IAFC recommended clarifying that NIMS and ICS are utilized throughout the plan by adding the underlined words to the proposed requirements: “The plan must use
and be consistent with the core principle
of the National Incident Management System (NIMS)
including the utilization of the
ICS.”
Comments in Response to General Requirements for COSRP Format (§ 130.105)
PHMSA agrees with providing flexibility for railroads submitting multiple plans under differing Federal and State regulations. The ICP was developed to provide a single format for response plans in recognition that entities may be required to develop and submit plans for multiple Federal agencies to cover different facility types and activities. The ICP provides railroads with flexibility.
We are also adding an alternative for railroads to submit plans that meet State requirements, provided the State plan also meets the minimum requirements of the Federal standard. In addition to the State plan, the railroad must include the information summary (including the contact information for the Qualified Individual) and ensure through contract or other approved means the availability of private personnel and equipment necessary to respond to a worst-case discharge (WCD) or a substantial threat of such a discharge. The use of State plans is voluntary and, therefore, does not impose any additional burdens. PHMSA is adding this alternative to ensure that railroads do not engage in unnecessary duplication and to provide regulatory flexibility in response to comments that discuss the potential burden from states with differing requirements and plan formats. PHMSA encourages railroads to make use of this alternative when possible to minimize compliance costs. This alternative will provide equivalent or greater protections to the Federal response plan. Furthermore, the allowance of ICP and state plans is consistent with the OPS requirements for pipelines. In addition, it is PHMSA's intention that railroads will be able to use the same data and other information gathered for other response plans (
i.e.,
Federal, state, international) to inform the OSRPs required under this rulemaking action, provided they meet PHMSA's OSRP requirements.
PHMSA agrees that consistency with NIMS and ICS is important. Requiring use of NIMS and ICS maintains consistency with EPA or DHS and ensures better consistency with the current response framework. We are adopting the requirements as proposed in the NPRM, with clarifications suggested by IAFC to highlight the role of the NIMS and ICS throughout the plan, and with minor edits for plain language.
Summary of Comments Regarding Worst-Case Discharge for COSRP (§§ 130.105 and 130.5)
Under the statute, worst-case discharge (WCD) means “the largest foreseeable discharge in adverse weather conditions,” as defined at 33 U.S.C. 1321(a)(24). PHMSA proposed to define a WCD from a train consist as the greater of: (1) 300,000 gallons of liquid petroleum oil; or (2) 15 percent of the total lading of liquid petroleum oil transported within the largest train consist reasonably expected to transport liquid petroleum oil in a given response zone.
Environmental groups stated the WCD calculation was too low and should instead include the entire petroleum content of all tank cars on the train and additional factors affecting the incidence or severity of a derailment (
e.g.,
bridge collapse, tide activity, etc.). The coalition comments from Riverkeeper, Center for Biological Diversity, et al. stated that the analysis for WCD was insufficient. They provided several arguments against specific analysis points in the agency's determination of WCD, citing an incomplete incident history, disagreeing with adjustments made to account for the protections from the enhanced tank car standard in the HM-251 final rule, and asserting that CWA only provides deviation from setting a WCD at a package's full contents when “secondary containment” is provided.
The coalition comments from Riverkeeper, Center for Biological Diversity, et al. also stated the WCD should be redefined to include the full contents of all tank cars carrying petroleum oil in a train. They stated the full contents is a “reasonable assumption” and provided examples of Area Contingency Plans (ACP) that plan for a WCD using the full contents of all tank cars. The coalition comments from Riverkeeper, Center for Biological Diversity, et al. also stated that the final rule must “appropriately account for a range of damages and resources required to rehabilitate communities and the environment after a worst-case disaster.”
Some private individuals supported removing the “300,000 gallon” option for the WCD and requiring it to be 15 percent for all trains carrying petroleum oil. These commenters stated 300,000 gallons was too low of a calculation. However, they did not address train configurations for which 300,000 gallons is a greater volume than 15 percent.
Response to Comments Regarding Worst-Case Discharge for COSRP (§§ 130.105 and 130.5)
This final rule adopts the proposed requirements for WCD. Under the statute, worst-case discharge means “the largest foreseeable discharge in adverse weather conditions,” as defined at 33 U.S.C. 1321(a)(24). The largest foreseeable discharge includes discharges resulting from fire or explosion.
21
PHMSA and FRA have not observed any unit train derailments that have resulted in the release of the entirety of the train's contents. Furthermore, the likelihood of a unit train losing the entire contents of all tank cars is extremely low. Therefore, defining a WCD as the total contents of all tank cars overstates the “largest foreseeable discharge.”
21
33 U.S.C. 1321(j)(5)(D)(iii).
PHMSA disagrees that the analysis for the WCD is inadequate; it is based on the U.S. incident record relevant to the applicability of this rule. PHMSA identified and analyzed the quantities released from tank cars in the major derailments involving petroleum oil that have occurred in recent years in the
United States to estimate the approximate volume of petroleum oil that would constitute a WCD in the United States. PHMSA continues to maintain that including rail incidents that have occurred outside of the United States is not appropriate for COSRP analysis. PHMSA's analysis indicates that the WCD, in terms of the quantity released from tank cars that punctured or experienced thermal tears, would be approximately 500,000 gallons of petroleum oil.
Recognizing that the comprehensive safety enhancements, including tank car design enhancements promulgated in the HM-251 final rule, would reduce the overall quantity released in a derailment scenario occurring in the future, PHMSA did not propose 500,000 gallons as a planning volume for a WCD. The HM-251 final rule adopted lower speed limits for HHFTs during the phase-in period for the new tank car design to reduce risk. PHMSA believes the safety improvements for HHFTs adopted in the HM-251 final rule provide a reasonable basis for adopting a lower planning volume for WCDs. Adjusting the largest quantity released within the crude-by-rail derailment history (
i.e.,
474,936 gallons) by the expected mitigation of damages (0.33) from the HM-251 rule, we expect related safety improvements over the 10-year period from 2017-2026.
22
This calculation (474,936 x 0.67) yields 318,000 gallons. Specifically, the quantity released in the Casselton, ND indicates that a WCD would involve 474,936 gallons. Expressed as a percentage of the total petroleum oil lading carried by the derailed Casselton, ND train, a WCD would involve approximately 15 percent of the total (474,936 gallons released divided by the 3,088,000 gallons carried by the train; rounded down from 15.38 percent). Specifically, 104 tank cars loaded with petroleum oil were involved in that derailment, and we have assumed that the all tank cars contained 29,700 gallons. Notably, there have been only two derailment incidents in the U.S. safety record that had greater than 15 percent of material released: Casselton, ND and Aliceville, AL. The crude oil tank car fleet has seen major improvements since the HM-251 final rule, and if those derailments would have occurred given the current fleet composition, we would expect the releases for both incidents to fall beneath the WCD threshold. In addition, the WCD is sufficiently high so that no incident has exceeded it to the degree that it seems unlikely that preparation for the WCD amount would have resulted in an inadequate response to the incident that occurred.
22
Please see the benefits section, Section 3, in the RIA.
As previously discussed, PHMSA accounted for the expected mitigation of damages achieved through the HM-251 final rule to determine the proposed 300,000 gallon WCD planning volume. However, for the proposed WCD planning volume based on the percentage of the total petroleum oil lading within a train consist, PHMSA did not incorporate the expected mitigation of damages of the HM-251 rulemaking because we believe that this percentage does not account for uncertainty in large train configurations. Large train configurations (
e.g.,
135-tank car trains) have an appropriate WCD planning volume, commensurate with their presentation of increased risk.
As an illustration of the WCD definition and its application to WCD planning volumes for use in COSRPs, consider a 50-tank car train and a 100-tank car train carrying petroleum oil. For the 50-tank car train, the WCD planning volume would be 300,000 gallons, since 300,000 gallons is greater than 15 percent of the total petroleum oil lading carried by that train (
i.e.,
225,000 gallons, assuming each tank car carries 30,000 gallons). For the 100-tank car train, the WCD planning volume would be 450,000 gallons, since 15 percent of the petroleum oil carried by that train—or 450,000 gallons—is greater than 300,000 gallons. Furthermore, PHMSA acknowledges both the existence of even larger trains (
e.g.,
120-tank car trains), as well as the uncertainty surrounding the number of tank cars loaded with petroleum oil that might be transported by rail in the future.
PHMSA maintains that distinguishing larger train configurations from relatively smaller ones is appropriate given differences in risk, and we further maintain that this calculation is to be used to determine the “planning volume” for WCDs within a given response zone. It is not re-calculated for each train in operation within a given response zone; rather, it is based on the largest train configuration that can reasonably be expected to transport petroleum oil within a response zone. Furthermore, nothing in the rulemaking prohibits a railroad from using a higher planning volume in their plan.
Given that the discussion above applies to the WCD for the expanded applicability to unit trains of petroleum oil, we are clarifying that the calculation for 300,000 gallons or 15 percent of the lading across the train consist applies to unit trains. As stated in the NPRM, PHMSA did not propose to change the applicability requirements for tank cars exceeding 42,000 gallons. When separating the definition of “maximum most probable discharge” and “worst-case discharge,” the planning volume for tank cars exceeding 42,000 gallons was inadvertently omitted. Therefore, we are amending the definition of “worst-case discharge” to reinstate that the planning volume for tank cars exceeding 42,000 gallons “equals the capacity of the cargo container.”
Summary of Comments Regarding the Response Zone for COSRP (§§ 130.105 and 130.5)
In the NPRM, PHMSA proposed to define the term response zone as “one or more route segments identified by the railroad utilizing the response resources which are available to respond within 12 hours after the discovery of a WCD or to mitigate the substantial threat of such a discharge for a comprehensive plan meeting requirements of subpart C.” PHMSA additionally asked whether the 12-hour response time was sufficient for all areas subject to the plan, or whether a shorter response time (
e.g.,
6 hours) would be appropriate for certain areas (
e.g.,
High Volume Areas) which pose an increased risk for higher consequences from a spill. PHMSA further invited comments on the criteria and support-levels for “high volume areas.” Commenters to the NPRM provided recommendations for determination of the response zone and response times.
Commenters recommended several different revisions to the definition of response zone. Environmental groups and State agencies recommended re-defining response zones as pre-defined “geographic response areas.” This suggestion promotes resource sharing and more closely aligns with the EPA response structure. For example, the Minnesota Pollution Control Agency gave the example of non-profits “WAKOTA CAER and Red Wing CAER,” which have voluntarily formed a response cooperative. The Minnesota Pollution Control Agency further suggested utilizing response zones with pre-defined areas because, “all railroads/industries operating within that geographical area could be encouraged or required to establish caches of equipment, contractors and other response resources jointly. Those resources would then be available to any industry with similar preparedness/response requirements.”
Other commenters supported resource sharing without linking the requirement to specific geographic response zone definition. ASLRRA requested that short
lines (Class II or III) operating as a tenant to a Class I railroad be permitted to enter into a voluntary agreement to use the plan and resources belonging to the Class I railroad for the area of track (
e.g.,
response zone) which falls under the tenant/host relationship. NTSB encourages, “small entities to enter into an agreement similar to the one managed by the Marine Preservation Association, a not-for-profit membership corporation that helps its members address problems caused by spills of oil and petroleum in transportation and allows its members to enter into a OSRO [oil spill removal organization] service agreements.”
AAR commented, “PHMSA should allow each railroad (Class 1, 2 or 3) to define the number and location of `Response Zones' that meet the specific railroad's existing incident management team (“IMT”) location, organizational structure, and contractor network. Railroads should not be required to use a prescriptive set of planning standards that specify `Response Zones.' ” AAR provided sample regulatory text:
Railroad plan holders will develop “Response Zones” with response resources located within 12 hours of each point along the HHFT route where “Response Activities” would occur. Additionally, Response Zone locations, boundaries and numbers will be based on the existing location and organizational structure of each railroad's incident management team (IMT) including Qualified Individuals (QIs), response resources, and railroad-contracted Oil Spill Removal Organization (OSROs) available to arrive onsite to mitigate a WCD or substantial threat of one.
Overall, most commenters felt that 12 hours was too long and recommended a shorter response timeframe ranging from immediately to 6 hours for all areas. Commenters expressed concerns about public safety and environmental damage that could be caused by spills, fires, or explosions during the first 12 hours and provided detailed descriptions of harm that could occur during that timeframe. Commenters claimed faster response times provide better protection, but they provided no quantitative data to support the effectiveness of faster response resources.
Commenters provided examples of State requirements and proposed legislation specifying response times for various activities related to responding to rail incidents. The State of Minnesota requires railroads to: (1) Within one hour, provide qualified personnel on-scene to assess the discharge; (2) within the first 8 hours, be capable of deploying resources to contain and recover 10 percent of the volume of the worst-case scenario and to protect sensitive areas and potable water intakes; and (3) within the first 60 hours, deploy full response resources for containing and recovering the worst-case scenario. The coalition comments from the Riverkeeper, Center of Biological Diversity, et al. provided the response times in the Emergency Response Guidebook and the requirements adopted in the HM-251 final rule for thermal protection capable of withstanding a pool fire for 100 minutes.
Commenters provided support for including different areas with a faster response timeframe. NTSB suggested that no areas should have a longer response time than 12 hours, given the capability for the 12-hour response time was already demonstrated. NTSB also suggested adopting a 6-hour response time for “High Volume Areas” (consistent with the definition in § 194.5 of the pipeline regulations, excepting the pipeline diameter). NTSB further recommended that PHMSA adopt a High Volume Area definition “that recognizes credible single HHFT exposure risks based on the proximity of the track to the river and natural drainage paths,” citing the pipeline spill in Marshall Michigan
23
and the Lac-Mégantic, Quebec derailment as having caused more than one billion dollars in damage and supporting a need for faster response times.
23
https://www.ntsb.gov/investigations/AccidentReports/Pages/PAR1201.aspx
.
Commenters defined a wide range of features, such as population, schools, economic activity, cultural and ecological significance, geologic factors, speed of tides, and location of nuclear reactors or other higher risk activities, as necessitating a faster response time. Commenters most frequently described drinking water intakes, environmentally-sensitive areas, and specific local waterways, such as the Hudson River, as necessitating faster response times and more detailed identification or mapping in a plan. Commenters also included suggestions such as scaling response times based on the amount of time oil would take to reach water or the volume of applicable trains in an area as criteria for faster response times. The State of Idaho Department of Environmental Quality included concerns that inclement weather and fast moving water streams would delay response and lead to larger area of impact. Commenters also focused on risk factors, and suggested weighting factors from the railroad routing analysis required by § 172.820 of the HMR. Commenters also provided the “High Consequence Areas (HCA)” from the part 195 of the OPS pipeline regulations as an example of risk-based criteria. These areas include population density in the definition and are related requirements for an operator's pipeline integrity management program. It should be noted this is a separate program from the OPS requirements for OSRPs in 49 CFR part 194.
AAR requested clarification that response times are a “planning standard, not a compliance standard. For example, if a response vehicle has a flat tire on the way to a response, the company should not be cited as being out of compliance.” AAR also requested that PHMSA “clarify that the 12-hour response timeframe applies only to track where HHFT trains traverse, and not to the entire rail network.” AAR provided examples of specific changes to the regulatory text to clarify this responsibility.
Response to Comments Regarding Response Zone for COSRP (§§ 130.105 and 130.5)
We are adopting the proposed requirements for response zones with clarification to the regulatory text in response to commenters. We disagree with limiting response zones to pre-defined areas, whether geographic response areas or similar criteria. Providing pre-defined response areas exceeds the scope of this rulemaking, as commenters did not have the opportunity to comment on such boundaries. Furthermore, the requirements for consistency with the NCP, ACP, along with the notification requirements, ensure that railroads have the necessary consistency with local and regional response structures.
We agree with AAR that the intent of the requirement for response zones is to allow railroads the flexibility to develop response zones and stage resources, provided that the planning standards for resources are met. The draft RIA provided an estimate of the number of response zones for each railroad for the purpose of estimating costs. We did not intend for the assumptions and estimation in the draft RIA to prescribe a specific number of response zones. Furthermore, we did not intend for railroads to provide information and resources about route segments where applicable quantities of oil are not transported. Therefore, we are clarifying both the definition of response zone and the general requirements to communicate that railroads may determine the boundaries of response zones, provided that the plan demonstrates that resources within the response zone meet the planning criteria. We are also clarifying that plans
with only one response zone do not need to duplicate information between the core plan and response zone.
In general, we agree that railroads and industries should be encouraged to share response resources; however, we disagree that adding pre-defined response zone boundaries for response zones is necessary to enable resource sharing. Nothing in this rulemaking prohibits the formation of cooperatives or other such resource sharing agreements, provided that each railroad required to have a plan demonstrates the availability of appropriate resources by contract or other means. Additionally, railroads communicate the response zone location to emergency response planning officials through the information sharing notification requirements adopted in § 174.312, providing adequate information to enable resource sharing.
The purpose of the response time requirement is to ensure railroads are demonstrating that they can identify, and ensure by contract or other means approved by the President, the availability of private personnel and equipment necessary to remove, to the maximum extent practicable, a worst-case discharge (including a discharge resulting from fire or explosion), and to mitigate or prevent a substantial threat of such a discharge.
24
USCG has developed planning guidance and standard calculations for response times in the 2016 “Guidelines for the U.S. Coast Guard Oil Spill Removal Organization Classification Program.”
25
Adopting a 12 hour response time and the USCG's assumption that response resources can travel according to a land speed of 35 miles per hour ensures that the resources listed in the plan are available for a response and that response personnel will know when the resources can reasonably be expected to be available on-site. However, we disagree with AAR's recommendation that it is necessary to include additional regulatory language stating 12 hours is not a performance guarantee.
24
33 U.S.C. 1321(j)(5)(D)(iii).
25
https://homeport.uscg.mil/Lists/Content/Attachments/1286/Guidelines%20for%20the%20USCG%20OSRO%20Classification%20Program.pdf
.
In this final rule, we are adopting the requirement for a single response time of 12 hours in all areas. This response time is consistent with the requirement for “all other areas” used by the OPS for pipelines. In the NPRM, PHMSA requested public comment on whether the 12-hour response time would be sufficient for all areas subject to the plan, or whether a shorter response time (
e.g.,
6-hours) would be appropriate for certain areas (
e.g.
High Volume Areas) that pose an increased risk for higher consequences from a spill; on criteria to define such “High Volume Areas” where a shorter response time should be required, as well as whether the definition for “High Volume Area” in 49 CFR 194.5 (excluding pipeline diameter) captures this increased risk, or if there is other criteria that can be used to reasonably and consistently identify such areas for rail; on whether requiring response resources to be capable of arriving within 6 hours would lead to improvements in response, and for specific evidence of these improvements; and on whether the final rule should have a longer response time than 12 hours for spills for all other areas subject to the plan requirements in order to offset costs from requiring shorter response times for High Volume Areas. Commenters did not provide adequate support to demonstrate that requiring the staging of resources for response times faster than 12 hours would bring about measurably improved protection or benefits, and that there were clear definitions for adequately defining high volume areas. Without sufficient data, PHMSA is unable to support a clear definition of a high volume area. Therefore, in the interest of safety and economic efficiency, PHMSA assumes the entire route threatens navigable water and that further identification for every point along the route would be impracticable. Rather, the use of 12 hours as a planning framework provides flexibility for OSROs to maintain larger inventory to be included within the response area. There is nothing prohibiting railroads from staging resources closer to specific route segments, and disagree that a voluntary designation will increase coverage for sensitive areas. We also note that providing response resources to remove, maintain, and mitigate WCD does not replace other emergency response procedures and resources for responding to a release of hazardous materials by rail.
Summary of Comments Regarding COSRP Consistency With NCP and ACP (§§ 130.110 and 130.115)
NTSB commented generally in support of compliance with the National Contingency Plan and Area Contingency Plan provisions proposed in § 130.103, stating they would “serve to ensure a carrier's ability to respond to worst-case oil and petroleum discharges called for by Safety Recommendation R-14-005.”
Coalition comments from Riverkeeper, Center for Biological Diversity, et al. questioned whether the proposed “minimum consistency” with the NCP and ACPs meets the requirements of OPA 90. Conversely, AAR stated that PHMSA “must clarify which elements are necessary for minimum consistency with the National Contingency Plan.”
IAFC supported the requirements for minimum consistency with NCP, but recommended additional clarification to ensure that the railroads understand that both Federal and state entities have an active role in the unified command, citing the NCP requirements in 40 CFR 300.105(d). The NCP requirements in 40 CFR 300.105(d) provide the “organizational concepts of the national response system” and describe a framework which, “brings together the functions of the Federal Government, the state government, and the responsible party to achieve an effective and efficient response.” IAFC suggested the proposed language for the requirement in § 130.103(a)(1)(i), namely to “[d]emonstrate a railroad's clear understanding of the function of the federal response structure” be amended to include the “applicable state and federal response structure.”
Overall, commenters supported consistency with the ACP, but had several suggestions related to the inclusion of Environmentally Sensitive Areas (ESAs). Environmental groups and private citizens supported special identification and protections for ESAs. They also described many specific geographic areas, or suggested criteria for determining which environmentally sensitive areas require additional protection. They often cited cultural, economic, and ecological significance in their descriptions. The coalition comments of Scenic Hudson and Riverkeeper highlighted the importance of including additional strategies to protect and deflect oil from ESAs. They further recommended including a requirement to update and revise the plan contents.
AAR noted that the burden of railroads determining ESAs would be too great and recommended limiting the requirement to:
[R]eadily available U.S. Fish and Wildlife and Sensitive Environment Regional Contingency Plans (RCPs), Area Contingency Plans (ACPs), Sub-Area Contingency Plans (SACPs) or Geographic Response Plans (GRPs) Annex(s) or databases to identify environmentally sensitive or significant areas as defined in § 130.5 of this part, along the route, which could be adversely affected by a worst-case discharge and reference available SACPs or GRPs deflection and protection strategies to protect these areas.
A private individual also requested that PHMSA ban the use of dispersants,
instead of limiting their use to scenarios where they are permitted and approved by the ACP and Federal OSC.
Response to Comments Regarding COSRP Consistence With NCP and ACP (§§ 130.110 and 130.115)
PHMSA maintains that the requirements for “minimum consistency” fulfill the requirements of the CWA. The requirements for the NCP and ACP in 40 CFR part 300 include many sections that may not be applicable to the rail context. Clarifying which requirements must be followed for minimum consistency ensures the most important elements are included. Doing so also responds to AAR's comments in response to both the ANPRM and NPRM requesting additional clarity and provides greater consistency with the OPS requirements for pipelines. We further agree with IAFC that the intent of requiring a clear understanding of the Federal response structure is to ensure that railroads can operate within a unified command, which may include State entities. Therefore, we are simplifying the requirement to state that OSRPs must, “[d]emonstrate a railroad's clear understanding of the Incident Command System and Unified Command and the roles and responsibilities of the Federal On-Scene Coordinator.” Overall, we are adopting the requirements as proposed, with clarifications, as discussed in this section.
We agree with AAR that the intent of including ESAs was to ensure consistency with the approach identified in ACPs. We did not intend to include the additional burden of requiring a new category for analysis. Therefore, we are adopting AAR's suggestion that we clarify that the inclusion of required ESAs be limited to those which have been identified in the existing contingency plans. We are further simplifying the definition of ESA to mean a “sensitive area” identified in the applicable Area Contingency Plan, or if no applicable, complete ACP exists, an area of environmental importance which is in or adjacent to navigable waters. We are not adopting the recommendation to expand the definition of ESAs to include additional areas and to include additional deflection strategies at this time. Doing so would require railroads to perform extensive analysis and develop new expertise, which would further delay the development and implementation of plans.
We further disagree that DOT should ban the use of dispersants, but rather the appropriate use should be determined per the NCP, ACP, and Federal OSC. The use of dispersants is generally not authorized by the NCP or ACP for inland oil discharges.
Summary of Comments Regarding Notification Procedures and Contacts for COSRPs (§ 130.125)
Overall, commenters supported the inclusion of notification requirements. The NTSB commented in support of the notification procedures proposed in § 130.105, stating they would ensure a carrier's ability to respond to worst-case oil and petroleum discharges called for by Safety Recommendation R-14-005.
Commenters also recommended providing time limits on the notification procedures. Riverkeeper, Center for Biological Diversity, et al. stated that because the proposed requirements do not explicitly require immediate communication “between OSROs or the affected industry and the Federal official in charge of spill response,” the proposed requirements do not meet the requirements of OPA 90.
Several commenters also recommended that the notification procedures either include additional state or local resources (
e.g.,
SERCs, TERCs, water utilities, etc.) or that the communication between the railroad and local resources be formalized with additional requirements. The State of Minnesota provided the State requirement for annual communication with emergency managers, fire departments, and employee unions as an example of more formal communication.
Response to Comments Regarding Notification Procedures and Contacts for COSRPs (§ 130.125)
The proposed rule establishes a new section with requirements for the notification procedures and contact information that a railroad must include in a COSRP. The proposed rule sought to improve consistency with existing requirements for pipelines in § 194.107 and appendix A to part 194. Both part 194 and the combined comment of AAR and ASLRRA in response to the ANPRM include a requirement for immediate communication procedures. Therefore, in the final rule we are adding a requirement to include “immediate notification procedures” to the proposed language in § 130.107(a)(4) stating, “the circumstances and necessary time frames under which the notifications must be made.”
We disagree that listing additional entities or further formalizing communication requirements is necessary at this time. The government structure and the entities that require contacting will vary between States or localities, and based upon the characteristics of the response zone. Furthermore, the plan requires consistency with the NCP and ACP, which requires the railroads to understand the response structure along the route. Additionally, the information sharing requirements adopted in part 174 provide contact between the railroad and State and tribal agencies.
Summary of Comments Regarding Response and Mitigation Activities for COSRPs (§ 130.130)
Overall, commenters agreed that response and mitigation activities should be included in the plan. NTSB commented generally in support of the response and mitigation activities proposed in § 130.106, stating they would ensure a carrier's ability to respond to worst-case oil and petroleum discharges called for by Safety Recommendation R-14-005; however, commenters provided a range of suggestions on the response and mitigation activities included in the plan.
Some commenters provided general support for the response and mitigation activities, but also recommended additional specificity or clarifications. IAFC recommended the proposed language requiring resources able to “remove oil” be edited to “control and remove oil” to clarify that the plan also includes common and necessary response resources which may not directly remove oil. The National Association of SARA Title Three Program Officials (NASTTPO) supported the proposed requirements for railroads to include the location and inventory of equipment that can be mobilized in a response, but recommended including the number and training level of personnel that will be mobilized and providing a description of the response time, assuming favorable weather.
Many commenters offered multiple suggestions to require railroads to provide response resources which exceeded the scope of the proposed requirements. For example, some commenters suggested requiring railroads to stage additional resources that were not proposed or to require specific equipment, such as helicopters with firefighting capabilities or “SAFETY Rail Cars” which contain firefighting and containment equipment. One private individual suggested all equipment or supplies should be heavily duplicated. Other commenters recommended adding requirements for railroads to provide equipment to local responders. For example, the City of Berkeley commented that response
resources should be available to first responders, in addition to the clean-up resources and personnel.
Commenters recommended requiring more detailed procedures. For example, commenters recommended including supplies and procedures to account for more specific WCD scenarios, such as specific adverse weather conditions, bridge collapses, and the effect of tides. Citizens Acting for Rail Safety-Twin Cities requested “public education” that includes evacuation procedures. Scenic Hudson and Riverkeeper suggested that, at a minimum, COSRPs should ensure, “the maximum cleanup practicable, given both the weather, the physical conditions and other factors at the spill site.” Commenters also recommended specifying requirements for differing procedures to account for different oil types, such as heavy- or light-crude oil, citing studies on differing clean-up procedures.
The coalition comments from Riverkeeper, Center for Biological Diversity, et al. expressed concern that “certifying” that the identified resources are available by “contract or other means” is not sufficient to ensure that the preparations have been made. They requested that PHMSA reintroduce the requirement that OSRPs show—by contract—that preparations have been made to respond to the maximum extent practicable. They further specified that the proposed rulemaking should account for a range of damages and resources required to rehabilitate communities and the environment after a WCD. The comments included a list of examples of potential damages ranging from “loss of life” to “fear of a future catastrophe,” but do not specify figures or how to address these damages beyond “inclusion” in the WCD.
Response to Comments Regarding Response and Mitigation Activities for COSRPs (§ 130.130)
Overall, we have adopted the proposed requirements, which continue to align with the pipelines requirements. Many of the additional response resources recommended by commenters would increase the burden of the rulemaking beyond what was proposed in the NPRM. Furthermore, the comments recommending additional resources and activities lacked data about the corresponding costs and benefits of these recommendations. We did not propose specific mitigation activities. We are clarifying in the final rule that the equipment and resources must meet the planning standards outlined in appendix C of 33 CFR part 154. This is consistent with the approval of OSRPs for pipelines in 49 CFR part 194 and the assumptions in the NPRM; it also maintains a level of OSRO response resources equivalent to that specified by the USCG in 33 CFR 154.1035 and 155.1035. We are maintaining the exception from listing equipment for OSROs classified in the aforementioned sections. We expect railroads, in cooperation with OSROs, to determine and describe the appropriate mitigation and response activities they use relative to the response zone and available resources. The guidance in appendix C of 33 CFR part 154 provides the necessary flexibility to allow railroads and OSROs to tailor activities and equipment to the specific geographic conditions in the response zone.
We agree with IAFC's proposed edit to include the word “control.” It clarifies that the range of activities may include those beyond the direct removal of oil.
We disagree with coalition comments from Riverkeeper, Center for Biological Diversity, et al. that the language to “certify” response resources is inadequate. The plan requirements make it clear that the resources must be available by “contract or other means.”
26
Plans must meet all requirements of subpart C of part 130 for approval and, therefore, must demonstrate a “contract or other means” of availability.
26
“Contract or other means” is defined in 49 CFR 130.5. This rulemaking did not change the definition.
Summary of Comments Regarding Training Procedures for COSRPs (§ 130.135)
The NPRM proposed requirements for training of railroad employees to ensure that they are capable of carrying out a role in the plan and are familiar with the applicable requirements. The proposed training requirements further specify the minimum elements to be included in training for all reporting personnel and railroad employees subject to the plan. The NPRM also proposed requirements for the railroad to document and certify completion of this training. The NPRM asked commenters whether ICS incident commander-level training should be required for the Qualified Individual.
PHMSA received several comments about COSRP training procedures. Many commenters highlighted the importance of training. NTSB commented generally in support of the training procedures proposed in § 130.107, stating they would ensure a carrier's ability to respond to worst-case oil and petroleum discharges, as called for by Safety Recommendation R-14-005. Many commenters provided suggestions for additional training requirements that exceeded the scope of the proposed rulemaking, such as requiring railroads or shippers to either train or provide additional funding for the training of firefighters and local responders. NTSB also recommended requiring the use of training referenced by OSHA in 29 CFR 1910.120(p) and (q) and by the National Fire Protection Association (NFPA) in Standard 472.12. The State of Idaho recommended increasing training frequency to every three years, instead of every five years.
Some industry commenters suggested additional clarification was needed for training requirements. API suggested that the training standards lacked specificity and needed to describe the required training for the Qualified Individual and clarify differences “for personnel on the train versus other railroad personnel, or whether or not plans and employee training records should be kept on the trains or with the conductor.” They recommended aligning these practices with commonly accepted practices for other modes and facilities to provide consistency and confidence in railroad capabilities.
AAR commented that the proposed training is too broad and does not sufficiently protect railroads from liability relating to volunteers working under the direction of state and other stakeholder groups. They provided suggested edits to the proposed regulatory text in § 130.107(c)(4)(d), including clarifying that “[p]lan holders shall not be responsible for contracting with or training volunteers during responses working under the direction of state or stakeholder groups” and distinguishing that additional training standards may apply to response personnel “under contract to the plan holder.”
Commenters also provided suggestions on the recordkeeping and re-training requirements. The coalition comments from Riverkeeper, Center for Biological Diversity, et al. stated it is not sufficient to certify that employees received training, as 33 U.S.C. 1321(j)(5)(D)(iv) states that “a response plan must describe the training to be carried out under the plan to ensure the safety of the facility and to mitigate or prevent the discharge.”
Many commenters also responded to PHMSA's inquiry in the NPRM about whether the proposed training requirements were sufficient, or whether the Qualified Individual should be trained to the ICS Incident Commander-level. Commenters, including State governments and
emergency responder organizations provided support for requiring either the Qualified Individual or another individual to receive Incident Commander-level training. The Washington State Department of Ecology explained that the Qualified Individual and the Incident Commander do not perform the same functions, stating that railroads must identify an individual who will be trained and qualified to act as an Incident Commander, whether it is the Qualified Individual or some other individual. The IAFC further recommended requiring that Incident Commander training be consistent with the intent of “Homeland Security Presidential Directive-5—Management of Domestic Incidents.” Other commenters recommended further identifying and outlining the roles and responsibilities of an Incident Commander in the COSRP until the appropriate local, State, or Federal authorities take control of the incident. API supported a requirement to include Incident Commander training, as consistent with use of NIMS and ICS, but stated PHMSA and FRA should be prepared to provide guidance and oversight to the regulated community as they establish processes that support personnel and organizational changes.
Response to Training Procedures for COSRP Comments (§ 130.135)
We disagree with adding requirements for railroads to train emergency responders in State and local governments, or otherwise provide training which exceeds the scope of the rulemaking. Such comments did not account for current programs available to improve training of emergency responders. For example, PHMSA's Hazardous Materials Emergency Preparedness (HMEP) Grant Program awards more than $20 million annually in grant funding to States, Territories, and Tribes to carry out planning and training activities to ensure State and local emergency responders are properly prepared and trained to respond to hazardous material transportation incidents.
27
27
https://www.phmsa.dot.gov/grants/hazmat/hazardous-materials-grants-program
.
We agree with the industry, State and other governments, and emergency responder organizations that a best practice is for the individual acting as the Incident Commander to have Incident Commander-level training to ensure the ability to operate in a unified command. We further agree that the railroads should have the flexibility to designate the Incident Commander, as someone other than the Qualified Individual to receive the training and serve in this role; however, we note that mandating that the railroad name the incident commander or requiring Incident Commander-level training may limit the railroad's ability to quickly establish an incident command after a release. Employees in proximity to an event may need to temporarily serve as the Incident Commander until additional employees arrive onsite to assume command. Therefore, we are encouraging, but not mandating, use of ICS-300, Intermediate ICS for Expanding Incidents, or equivalent, and NFPA 472 Chapter 8 for Incident Commander-level training as a best practice.
28
Additional guidance can be found in NFPA High Hazard Flammable Trains (HHFT) On-Scene Incident Commander Field Guide.
29
28
https://training.fema.gov/emicourses/crsdetail.aspx?cid=E300&ctype=R
.
29
http://www.nfpa.org/news-and-research/fire-statistics-and-reports/research-reports/for-emergency-responders/fireground-operations/high-hazard-flammable-trains-on-scene-incident-commander-field-guide
.
We further disagree that the proposed training requirements lack clarity or create undue burdens to train volunteers. The training requirements allow railroads flexibility to provide training appropriate to an employee's role in carrying out the duties specified in the response plan. The regulatory text provides a note and illustrative examples as a reminder that other training may be applicable (see § 130.135(d)). However, this cross-reference does not impose new training burdens on employees or volunteers. Therefore, we are adopting the training requirements as proposed.
Summary of Comments Regarding Recordkeeping, Plan Updates, Submission, and Approval for COSRPs (§§ 130.145 and 130.150)
The NPRM inquired whether the proposed mandatory compliance date of 60 days after the date of publication of a final rule in the
Federal Register
was feasible. PHMSA received two comments in response to this inquiry. Citizens Acting for Rail Safety-Twin Cities supported the 60-day compliance date. AAR requested 180 days, stating the time was necessary for the coordination, contracting, and planning required for covered routes. They further stated that additional time would be needed if PHMSA did not adopt their recommendation for clarifying use of previously identified ESAs. API also suggested additional time would be necessary for railroads to develop COSRPs.
We also received other comments on various aspects of the recordkeeping and approval requirements. The coalition comments from Riverkeeper, Center for Biological Diversity, et al. recommended including “CWA and OPA” in the statement, “FRA will approve the response plan if FRA determines that the response plan meets all requirements of this part to ensure plans meet both the regulations and the statute.”
Many commenters, such as the NASTTPO, agreed that FRA was the appropriate agency to review and approve plans. Several commenters questioned whether FRA had the resources and knowledge to approve and enforce the oil spill response planning regulations. NTSB noted that the requirements for FRA approval would work toward implementing the intent of Safety Recommendation R-14-2. NSTB further stated:
It is vital that the FRA develop a program and provide sufficient resources for thorough on-site audits. This will help to avoid the regulated industry essentially policing itself and spill response plans being approved without sufficient verification. Therefore, we believe that while the proposed requirements in the NPRM for comprehensive OSRPs are complete and admirable, it is not enough to approve plans without trained staff to verify that sufficient resources and tactics are in place to ensure timely and effective responses to worst-case oil discharges.
API encouraged DOT to ensure that FRA receives the personnel, resources, and expertise necessary to execute its new role effectively and efficiently. API requested additional details related to FRA's COSRP administration, approval, and adjudication processes.
The Washington State Department of Ecology supported FRA approval with the proposed consultation by EPA and USCG, as well as expanding consultation to include states. Several commenters recommended requiring approval from additional entities. Private individuals suggested public hearings on plans prior to approval. Riverkeeper, Center for Biological Diversity, Sierra Club, etc. requested inclusion of “regulatory impact survey” of FRA's ability to enforce these requirements.
The coalition comments from Riverkeeper, Center for Biological Diversity, et al. further recommended adding a two-year limit to the time a railroad can operate without a plan, after submitting it for approval to better align with the OPA 90 law. The State of Idaho Department of Environmental Quality recommended requiring FRA to approve or deny plans within 180 days.
Comments from State governments and others suggested stricter timelines for resubmission of plans. The State of Minnesota suggested plans should be resubmitted every three years, instead of the five years proposed in the rulemaking. The State of Idaho Department of Environmental Quality recommended that the railroad should only have 30 days to revise plans that have been resubmitted after an initial denial. Citizens Acting for Rail Safety-Twin Cities suggested that railroad plans should be updated and tested at least annually and within 30 days of railroad ownership change.
Other commenters requested additional clarification or criteria for conditions requiring resubmission of plans. Scenic Hudson and Riverkeeper stated that plans should be revised to reflect periodic updates to the ACP, especially when changes to the ESAs are made or the associated protection and/or deflection strategies are updated.
AAR supported the inclusion of specific criteria that determine when railroads must update plans, but suggested the proposed language was overly broad and required clarification. Specifically, AAR suggested clarifying that the requirement to modify plans to include new routes should only apply to HHFT routes. AAR also suggested that ACP or NCP changes must be presented to the railroad before being required to be considered for plan changes. AAR also suggested removing the requirement, “Any other information relating to circumstances that may affect full implementation of the plan.”
Response to Comments Regarding Recordkeeping, Plan Updates, Submission, and Approval for COSRPs (§§ 130.145 and 130.150)
We agree with AAR's comments that 180 days (6 months) is appropriate for plan development, given the inclusion of geographic information. Railroads have already developed basic plans that include some components of the comprehensive oil spill response plans. Railroads are required to perform a routing analysis in 49 CFR 172.820, which indicates the location of applicable route segments. Furthermore, many railroads have participated in voluntary programs to increase spill preparedness. However, other plan elements may require reformatting or additional data gathering. Therefore, we believe 180 days is sufficient for the additional planning and coordination necessary to submit the COSRPs.
The Secretary of Transportation has to approve OSRPs for rail tank cars. While this authority was originally delegated by the Secretary to FRA, after considering comments questioning FRA's resources to approve plans, this authority is transferred to PHMSA, so that a sole DOT administration will have the authority to approve OSRPs. In addition to reviewing and approving OSRPs, PHMSA also has authority to pursure administrative penalties for violation of part 130, as it is issued pursuant to its delegated authority of 33 U.S.C. 1321(j).
30
PHMSA's Oil Spill Preparedness and Emergency Support Division is an established program with experience approving OSRPs for pipelines. However, as with other PHMSA programs and procedures, PHMSA will continue to work with FRA for guidance on rail specific information and procedures, including shared review and enforcement. We are also adopting the option for PHMSA to consult with the EPA or the USCG, as needed. As 33 U.S.C. 1321(j)(5)(E) requires that a plan that meets the minimum requirements be approved, we maintain that mandating multi-agency, public participation, or additional approval activities would fail to provide enough value in an explicit approval process to justify the increased burden and potential delay.
30
33 U.S.C. 1321(b)(6) authorizes the Secretary of Transportation to assess “Class I” administrative penalies as specified and as updated in 40 CFR 19.4. The Attorney General has authority, pursuant to 33 U.S.C. 1321(b)(7), to pursue a civil penalty action in the district court in which is the defendant is located, resides, or is doing business.
We disagree with Riverkeeper, Center for Biological Diversity, et al. that it is necessary to include “the OPA and CWA” in the regulatory text specifying plan approval. The regulatory authority for part 130 references the appropriate citations for CWA, and the requirements have been promulgated in accordance with the statutory requirements. Further specifying this law in the regulatory text as suggested by these comments may cause confusion.
We agree with Riverkeeper, Center for Biological Diversity, et al. that a two-year limit for the time a railroad can operate without a plan after submitting it for approval should be added to better align with the OPA 90 law (33 U.S.C. 1321(j)(5)(G)). We have added language to meet the requirements of OPA 90. Although, the NPRM did not include language specifying two years, the additional burden to approve plans in a timely manner is placed on PHMSA; there is no additional burden on railroads.
We disagree with States recommending a stricter timeline for resubmission of plans, as this goes beyond the proposed rulemaking and creates an additional burden for railroads not proposed. Furthermore, the requirement for resubmission every 5 years aligns with OPS requirements for pipelines and requires resubmission of plans within 90 days of significant changes that affect the implementation of the plan. We do not expect that more frequent submission of non-significant changes (
i.e.,
changes that will not affect the implementation of the plan) will improve response.
We agree with commenters on many of the clarifications requested regarding the approval and submission requirements. We agree with Scenic Hudson and Riverkeeper comments that changes to the identification ESAs or deflection strategies may require resubmission of the plan. In the proposed rule, we included language requiring updates for “[a] change in the NCP or an ACP that has significant [effect] on the equipment appropriate for response activities.” As ESAs are a component of the ACP, they would fall under this requirement. We have added language clarifying this relationship and explaining that a change to applicable ESAs is an example of a significant change to the ACP, requiring an update. We have also added “the type of oil transported, if the type affects the required response resources, such as a change from crude oil to gasoline” as an example of a change requiring an update. We agree with AAR that railroads only need to include updated route information if the route is used to transport trains requiring a COSRP.
We disagree, however, that further clarification of the requirements triggering an update to the plan is necessary. We also disagree with AAR that NCP and ACP changes must be presented to the railroads. It is the railroads' responsibility to ensure they maintain consistency with the NCP and ACP for the route segments in which they are operating. We further disagree that including “information relating circumstances that may affect full implementation of the plan” is overly broad. This language is consistent with the longstanding language in the OPS requirements for pipelines, and ensures that railroads are updating plans to reflect changing conditions and informing those who need to know.
We disagree with commenters that the methods proposed in § 130.109 and adopted in § 130.145 for railroads to respond to alleged deficiencies are inadequate and should be either further limited or further elaborated. These requirements are parallel to the longstanding requirements adopted by the OPS for pipelines, which ensure a documented and timely response to
either fix or contest the identification of deficiencies by the approval agency.
Comments Regarding Confidentiality and Security Concerns for COSRPs (§ 130.150)
Industry commenters described the plans as sensitive for both business and security concerns. AAR's comments highlighted concerns that releasing COSRPs to the public would lead to security risks. The comments emphasized that they considered routing information to be especially vulnerable. AAR cited terrorist propaganda targeting petroleum trains as support for their position. Other commenters highlighted the value of releasing plan information to a broader audience. These commenters expressed their belief in the importance of sharing information freely with State entities, emergency responders, and the public. The coalition comments from Riverkeeper, Center for Biological Diversity, et al. supported full public disclosure, but suggested that the plans be shared with public and local response agencies at a minimum. They requested details about which specific COSRP elements are sensitive. Members of Congress, States, and cities suggested both State and/or local authorities should receive unredacted plans, as they are familiar with protecting information, and since advance knowledge of the plans can help them better respond to incidents. For example, the City of Davis, California, provided examples of pipeline information and dam inundation maps, for which first responders and local entities who participate in NIMS structure sign non-disclosure agreements. Comments submitted on behalf of San Francisco Baykeeper requested the comprehensive plan information be provided online, including sensitive site strategies.
Response to Comments Regarding Confidentiality and Security Concerns for COSRPs (§ 130.150)
PHMSA values transparency and provides resources to the emergency response community in many forms. We continue to disagree, however, that providing an entire COSRP to emergency responders or the public will lead to better preparedness. We agree with AAR and ASLRRA that some elements of a COSRP may contain information that is business confidential, SSI, or personally identifiable information. Other elements are specific to railroad operations and will not inform the actions of first responders or communities.
Therefore, we are adopting the proposed requirements that railroads may follow existing procedures to request confidential treatment for documents filed with the agency, provided that the information is exempt by law from public disclosure (
e.g.,
exempt from the mandatory disclosure requirements of the Freedom of Information Act (5 U.S.C. 552), required to be held in confidence by 18 U.S.C. 1905). However, we are changing the citation for confidential information from FRA's procedures in 49 CFR 209.11 to PHMSA's equivalent procedures in 49 CFR 105.30. Under this process, the railroads may submit a redacted version of the plan, but PHMSA retains the right to make its own determination in this regard. We disagree with the comment that specific examples of confidential information should be provided. These decisions are determined on a case-by-case basis as differences between the levels of detail provided by the railroad may impact the determination. We maintain that these procedures are well-established and allow for both transparency and the safe and secure flow of information.
To ensure that State, tribal, and local government planning agencies receive advanced notification of the most pertinent information from COSRPs, we are adopting the proposed information sharing requirements in § 174.312 to include a description of the response zone and the contact information for the Qualified Individual for HHFTs subject to the response plan.
Summary of Comments Regarding Equipment Testing and Drill/Exercise Procedures for COSRPs (§ 130.140)
NTSB commented in support of the equipment testing and drill requirements proposed in § 130.108. One commenter recommended requiring heavily duplicated equipment testing. No other comments addressing the proposed equipment testing requirements were received. The NPRM received several comments on the drills/exercises.
NTSB and several other commenters recommended changing the term “drill” to “exercise” for consistency with National Scheduling Coordination Committee and PREP Guidelines. API requests additional clarification on use of Government Initiated Unannounced Exercises (GIUEs) in accordance with the PREP Guidelines. Other commenters commented in support of government-led exercises and drills.
Many commenters highlighted the value of regular exercises or drills between railroads and the local response community. Minnesota highlighted a State requirement for railroads to conduct at least one containment, recovery, and sensitive areas-protection drill every three years. NASTTPO described the need for exercises in rural areas, acknowledging, “we have no expectation that rail carriers would be paying for the attendance of local first responders at training events and exercises, nor do we have an expectation that these exercises could rapidly be conducted in all areas,” but continuing to request that rail carriers assess the local hazardous material response capability along their routes in conjunction with WCDs and prioritize field exercises and training for first responders in vulnerable areas.
Response to Comments Regarding Equipment Testing and Drill/Exercise Procedures for COSRPs (§ 130.140)
We disagree with commenters that duplicate equipment testing is necessary for all equipment. We are adopting the proposed requirement to describe and certify that equipment testing meets the manufacturer's minimum requirements. This ensures that the equipment is maintained as intended by the manufacturer and aligns with other Federal OSRP requirements under the USCG.
31
31
33 CFR 154.1057(a)(1).
This final rule adopts the use of PREP Guidelines as proposed, with a minor change in wording. We agree with commenters that the word “drill” should be replaced with “exercise” for better consistency with the PREP Guidelines. We disagree that commenters provided sufficient data to justify further prescribing exercise requirements at this time.
On April 11, 2016, USCG announced that the updated 2016 PREP Guidelines have been finalized and are now publicly available.
32
These updates included broadening section 5 of the PREP Guidelines to allow for the inclusion of other DOT/PHMSA-regulated facilities, such as rail. This provides an option for railroads to conduct exercises using the same guidelines as pipelines. The scope of the 2016 PREP Guidelines exercises is to: Demonstrate notification processes and accessibility between key facility personnel and the Qualified Individual; exercise the IMT's organization, communication, and decision‐making in managing a response; and demonstrate the ability to deploy response equipment identified in the Facility Response Plan (FRP). The 2016 PREP Guidelines also specify that DOT/PHMSA has—and reserves—the
authority to conduct and require an operator to participate in a GIUE.
32
81 FR 21362.
Summary of Comments Regarding Implementation of COSRPs and PHMSA Response (§ 130.155)
The NTSB provided support for the response plan implementation requirements proposed in § 130.112, stating they would ensure a carrier's ability to respond to worst-case oil and petroleum discharges, as called for by Safety Recommendation R-14-005. No other comments were received for this requirement. Therefore, we are adopting implementation language as proposed.
Summary of Comments Regarding Requirements for HHFT Operators and PHMSA Response (§ 174.310)
The State of California Department of Fish and Wildlife opposed including a cross-reference to part 130 requirements for COSRPs in the requirements for operators of HHFTs in § 174.310, stating that inclusion of the requirement inaccurately associates the plan with safety requirements related to the design, operation, and maintenance of railroads.
We disagree. Section 174.310 provides a consolidated list of PHMSA requirements specific to HHFTs. The section includes both unique requirements and cross-references (
e.g.,
additional security planning requirements in § 177.820). Adding a cross-reference to COSRPs in part 130 for those HHFTs carrying petroleum oil provides better clarity for navigating PHMSA's regulations, consistent with the intent of the section. We have also added a cross-reference to the HHFT information sharing notification in § 174.312 for clarity. These cross-references do not impose new burdens on railroads.
C. Summary of HHFT Information Sharing Notification Comments (§ 174.312)
PHMSA received approximately 20 comments about the proposed HHFT information sharing requirements. These comments fall into several categories, including applicability, notification recipients, frequency of notification, data security, and confidentiality concerns. PHMSA also received several comments outside the scope of this rulemaking requesting advanced notification of all hazardous materials rail shipments or notification to various local entities following an incident. The Kentucky Emergency Response Commission supported the proposed requirements in § 174.312 as written in the NPRM.
PHMSA received a small number of comments on the appropriate quantity threshold at which the HHFT information sharing requirements would apply. These suggested thresholds included: One car of any hazardous material; any oil; any hazardous material in any quantity; and a general reduction in the number of cars triggering the notification requirements. NTSB stated that the HHFT applicability partly satisfies Safety Recommendation R-14-14 in that emergency response agencies would have access to periodic reports of flammable hazardous material commodities transported through their communities, but urged PHMSA to require all railroads to provide advanced notification to communities for all hazardous materials transported on a given route.
Generally, most comments concerning notification recipients agreed with supplying HHFT information to the SERCs and TERCs. Several commenters also supported SERCs and TERCs further disseminating information to the appropriate local government officials. IAFC suggested adding fusion centers as an additional entity to receive notifications, but clarified that fusion centers should not replace SERCs. In terms of TERCs specifically, two commenters suggested that we work closely with tribes and allow their leadership to determine the best approach. One comment from AAR requested that the final rule mandate a registration system for SERCs and TERCs to receive information. NTSB supported expanding the notification requirements to include LEPCs.
PHMSA received several comments about the frequency and type of information provided to SERCs and TERCs. IAFC agreed with the requirement for monthly updates and updates for when routes change a significant amount. They highlighted that receiving active, monthly notification was useful for emergency response planning by fire chiefs. AAR stated that the monthly reporting requirement would be redundant and asked that a new report should only be filed when there is a change in volume of 25 percent or greater. Commenters also requested more detailed notification of shipments either before or after incidents, including “real-time notification” of hazardous materials train consists. NTSB supported further inclusion of additional resources (
i.e.,
an emergency coordinator who participates in the local emergency planning process), additional notice of any operational changes that could affect emergency planning, and any information necessary to develop and implement local emergency plans.
The most discussed category was the topic of data security and confidentiality. PHMSA received several comments on this topic with commenters either asking for the information to be more widely available or requesting increased confidentiality measures. State governments, environmental organizations, and a private individual were in favor of keeping the information public. A local government, trade organizations, a carrier, and an emergency response organization were in favor of keeping information confidential. Both sides provided various reasoning for their given perspective. The Washington State Department of Ecology explained that the requirement to provide aggregate information weekly is “consistent and complimentary with Washington law of aggregating crude rail information when releasing it to the public.” The commenters advocating for this information to be public argued that making information private will put “the SERC and TERC staff in a situation of undue legal jeopardy” or cause confusion and delays in further providing information to appropriate entities. Commenters further supported public dissemination, as this information is not considered security sensitive information (SSI) by a number of States, right-to-know, and FRA's previous October 2014 Information Disclosure Notice.
33
Several comments mentioned FRA's determination in the October 2014 Information Disclosure Notice that crude-by-rail information required to be reported is not business confidential or proprietary information. Industry commenters, such as Union Pacific Railroad, advocated for this information to be withheld from the public. They argued that the proposed rule fails to meet the FAST Act requirement to identify rail information as sensitive, and expressed security concerns over the requested information being publicly available. The American Fuel & Petrochemicals Manufacturers (AFPM) specifically requested that the information be exempt from public disclosure—including state FOIA and sunshine laws—for anyone without need-to-know, due to concerns over security.
33
79 FR 59892.
Some comments supported a mixed approach, supporting both greater public availability of data and increased security measures. One comment requested that PHMSA and FRA establish guidelines as to what information is considered non-public
SSI. Another comment suggested that security and confidentiality should be controlled at the SERC level. Commenters explained that SERCs have experience properly controlling other sensitive information. Some commenters suggested that local governments should receive the notification, but sign non-disclosure agreements.
Response to Comments Regarding HHFT Information Sharing Notification (§ 174.312)
PHMSA disagrees that the applicability threshold should be lowered. Lowering the threshold is outside the scope of this rulemaking, and was not sufficiently supported by commenters. Additionally, a lower threshold may include non-unit trains in the requirement and significantly increase cost for small businesses. As such, the HHFT threshold captures the risk of unit trains and provides a consistent approach with the requirement to perform routing analysis. This applicability aligns with the FAST Act requirement to apply the information sharing provision to HHFTs. It also expands the applicability from the FAST Act to include Class II and III railroads to provide a unified approach to the risk posed by HHFTs.
We disagree with commenters that the proposed requirements are overly burdensome for ensuring SERCs, TERCs, and local responders receive the information contained in the notification. The entities included in the notification requirements align with the FAST Act. Furthermore, SERCs are already receiving the types of information specified in this requirement through the Emergency Order. The purpose of this notification is to actively inform communities about HHFTs which are transported through them. The routing notification requirements in § 172.820 already provide a method for communities to request information. The AAR Circular OT-55-P outlines a voluntary procedure whereby local emergency response officials and emergency planning organizations may request and obtain a list of the types and volumes of hazardous materials that are transported through their communities.
34
We also disagree with adding additional detailed information elements to the notification, as some of the suggestions by commenters for additional requirements exceed the scope of this rulemaking. Furthermore, PHMSA is addressing the FAST Act mandate in section 7302 to issue regulations that require real-time sharing of electronic train consist information for hazardous materials shipments in a separate rulemaking action.
34
https://www.aar.org/boe
.
We agree with AAR that omitting the language for a “change of 25 percent or more” may cause confusion in determining when use of a certification of no change is appropriate and that requiring monthly notifications is redundant. This is the standard used for the Emergency Order. Therefore, we are adopting a requirement to update the notification when changes in volume are greater than 25%.
We disagree with commenters that the approach to security and confidentiality is inadequate. We maintain that notification to SERCs, TERCs, or other State-delegated agencies for the purpose of sharing with appropriate local officials is sufficient. Adoption of the proposed language, “If the disclosure includes information that railroads believe is security sensitive or proprietary and exempt from public disclosure, the railroads should indicate that in the notification,” is sufficient to ensure confidentiality and security. The purpose of SERCs and TERCs is to share information with local planning authorities, and adopting commenter recommendations for more prescriptive measures to disseminate information both exceeds the scope of the proposed rulemaking and places an additional burden on states. We acknowledge that states may differ in their methods. Maintaining this approach provides flexibility to ensure that SERCs, TERCs, and other State-delegated agencies disseminate information in accordance with State laws and procedures. Furthermore, this approach will help guard against inadvertent public disclosure of protected materials by ensuring that the information that railroads believe to be confidential for business or security reasons is marked appropriately. Before fulfilling a request for information and releasing the information, States will be on notice as to what information the railroads consider inappropriate for public release.
The adopted information sharing notification elements include aggregated information, and analyses by DOT and DHS have indicated that the information elements in the notification are not considered SSI. Furthermore, railroads have not demonstrated specific prospective harm that would be caused by the release of such aggregated information. Commenters to the NPRM repeated the same previously raised concerns that the sharing of routing information for HHFTs required them to reveal proprietary business information. As discussed above, railroads argued that the Emergency Order routing information, if published or shared widely, could reveal information about customers. After considering the claim in an October, 2014 information collection notice, FRA concluded that the information would not be considered business confidential or SSI under Federal law. FRA's “Proposed Agency Information Collection Activities; Notice and Request for Comments”
35
noted that the railroads did not specifically identify any prospective harm caused by the sharing of this information. DOT's previous analysis concluded that the information shared by railroads does not qualify for withholding under Federal standards as business confidential information or SSI. DOT requires railroads to share aggregated information about the volumes of HHFTs that travel through a jurisdiction on a weekly basis. This information does not include customer information or other business identifying details. Further, it does not provide specifics about the timing of HHFT trains.
35
79 FR 59891 (October 3, 2014).
D. Summary of Initial Boiling Point Test Comments (§ 173.121)
PHMSA received five comments addressing the proposed incorporation by reference of the ASTM D7900 test method. The coalition comments from Scenic Hudson, Riverkeeper, et al. stated that the new test method should be mandatory. NTSB supported use of the test, but recommended that PHMSA remove other boiling point test options they consider to be less accurate and, further, mandate additional requirements for best method of classification, such as API RP 3000 and the report on sampling methods by Sandia National Laboratories. NTSB described adding the test as partly addressing NTSB Safety Recommendation R-14-6, which recommends testing and documentation for all hazardous materials. Industry commenters provided a more detailed description and recommendations related to the use of the test. Commenters additionally provided recommendations related to additional testing and sampling requirements for petroleum crude oil, which exceeded the scope of this rulemaking.
Both the AFPM and API stated that use of the test is not fully aligned with API RP 3000, pointing to differences between the API RP 3000 and HMR regarding sampling methods and specificity about when to use the test.
For example, API stated that ASTM D7900 was applicable only to stabilized crude oils, defined as having a Reid vapor pressure equivalent to or less than 82.7 kPa (12 psi). Newer versions of the API RP 3000 incorporate additional IBP tests for other crude oils. AFPM explains:
[The API RP 3000 requires] conducting an IBP analysis based on the definition of IBP in ASTM D7169, both the ASTM D7169 and ASTM D7900 tests must be run. The results of both tests are merged to obtain a boiling point distribution curve for the crude oil. The IBP is then calculated in accordance with the calculation procedures set out in ASTM D7169 to arrive at an IBP consistent with the IBP as defined in ASTM D7169 . . . The recommended practice for sampling in API RP 3000 differs substantially from the sampling methods prescribed in ASTM D7900, which requires that sampling be conducted in accordance with ASTM D4057 or D4177.
Both AFPM and API supported adoption of the API RP 3000 but recommended incorporating specific, detailed language containing limitations or descriptions about when and how the test should be used, if adopted. API further recommended incorporation of additional standards for the collection of samples (
e.g.,
the API Manual of Petroleum Measurement Standards (MPMS) Chapter 8.1/ASTM D4057, API MPMS Chapter 8.5/ASTM D8009, or ASTM D3700). AFPM recommended including an exception that crude oil may be classified as Packing Group (PG) I without further testing for better harmonization with requirements of Transport Canada.
Response to IBP Test Comments (§ 173.121)
PHMSA mostly disagrees with commenters and is adopting the IBP test as proposed in the NPRM with the addition of the boiling point definition for clarity. The proposed rule included incorporation by reference of an additional initial boiling point test method, which would make no further changes to other testing and sampling requirements for petroleum products in § 173.41, § 173.120, or § 173.121. The NPRM did not propose requiring mandatory use of the ASTM D7900 test or incorporating additional standards, nor did it provide an exception from all other sampling and testing requirements in the HMR by providing a PG I designation. Such requirements would reduce flexibility of industry stakeholders to comply with test requirements.
Additionally, a more precise test to measure boiling point may provide a limited value, as it is unlikely to lead to a difference in classification of weathered and/or treated stable crude oils and may be unnecessarily costly to counter the limited outcome. However, PHMSA may consider incorporation of additional standards and further revising other sampling and testing criteria and methodology for petroleum crude oil in a future rulemaking action.
Overall, PHMSA further disagrees that adding limitations to the use of ASTM D7900 initial boiling point test is necessary to ensure shippers use the right test for their flammable materials. Currently, § 173.121 provides a list of initial boiling point tests. These tests do not apply to all Class 3 liquids; rather, shippers determine which test is most appropriate for their material. The full title of the test provided in § 173.121 is “Petroleum products containing known flammable gases—Standard Test Method for Determination of Light Hydrocarbons in Stabilized Crude Oils by Gas Chromatography (ASTM D7900),” which clearly describes the test is appropriately used for certain petroleum products. However, use of the ASTM D7900 requires understanding the definition of “initial boiling point, when determining the boiling distribution using ASTM D7900, is the temperature at which 0.5 weight percent is eluted.” This definition is included in the ASTM D7169, which is referenced inside the ASTM D7900. Therefore, we are adopting the proposed requirement and including the aforementioned definition. This provides sufficient information for shippers to follow the current classification procedures to select the most appropriate test for their samples.
VI. Incorporated by Reference
Section 171.7 lists all standards incorporated by reference into the HMR that are not set out in full text in the regulations. This final rule incorporates by reference the ASTM D7900-13
e1,
Standard Test Method for Determination of Light Hydrocarbons in Stabilized Crude Oils by Gas Chromatography, 2013, available for interested parties to purchase in either print or electronic versions through ASTM's website at the following URL:
https://www.astm.org/Standards/D7900.htm.
The price charged for this standard at the time of publishing is $52.00. The price charged to interested parties helps cover the cost of developing, maintaining, hosting, and accessing these standards.
This publication (
i.e.,
test method) ensures a minimal los