Proposed Agency Information Collection Activities; Comment Request

Federal RegisterAug 1, 2018

Ask Donna

What actually matters in this document.

Text

DEPARTMENT OF TRANSPORTATION

Federal Railroad Administration

[Docket No. FRA-2018-0008-N-5]

Proposed Agency Information Collection Activities; Comment Request

AGENCY:

Federal Railroad Administration (FRA), U.S. Department of Transportation (DOT).

ACTION:

Notice of information collection; request for comment.

SUMMARY:

Under the Paperwork Reduction Act of 1995 (PRA) and its implementing regulations, FRA seeks approval of the Information Collection Requests (ICRs) abstracted below. Before submitting these ICRs to the Office of Management and Budget (OMB) for approval, FRA is soliciting public comment on specific aspects of the activities identified below.

DATES:

Interested persons are invited to submit comments on or before October 1, 2018.

ADDRESSES:

Submit written comments on the ICRs activities by mail to either: Mr. Robert Brogan, Information Collection Clearance Officer, Office of Railroad Safety, Regulatory Analysis Division, RRS-21, Federal Railroad Administration, 1200 New Jersey Avenue SE, Room W33-497, Washington, DC 20590; or Ms. Kim Toone, Information Collection Clearance Officer, Office of Information Technology, RAD-20, Federal Railroad Administration, 1200 New Jersey Avenue SE, Room W34-212, Washington, DC 20590. Commenters requesting FRA to acknowledge receipt of their respective comments must include a self-addressed stamped postcard stating, “Comments on OMB Control Number 2130-XXXX” (the relevant OMB control number for each ICR is listed below), and should also include the title of the ICR. Alternatively, comments may be faxed to (202) 493-6216 or (202) 493-6497, or emailed to Mr. Brogan at

Robert.Brogan@dot.gov,

or Ms. Toone at

Kim.Toone@dot.gov.

Please refer to the assigned OMB control number in any correspondence submitted. FRA will summarize comments received in response to this notice in a subsequent notice and include them in its information collection submission to OMB for approval.

FOR FURTHER INFORMATION CONTACT:

Mr. Robert Brogan, Information Collection Clearance Officer, Office of Railroad Safety, Regulatory Analysis Division, RRS-21, Federal Railroad

Administration, 1200 New Jersey Avenue SE, Room W33-497, Washington, DC 20590 (telephone: (202) 493-6292) or Ms. Kim Toone, Information Collection Clearance Officer, Office of Information Technology, RAD-20, Federal Railroad Administration, 1200 New Jersey Avenue SE, Room W34-212, Washington, DC 20590 (telephone: (202) 493-6132).

SUPPLEMENTARY INFORMATION:

The PRA, 44 U.S.C. 3501-3520, and its implementing regulations, 5 CFR part 1320, require Federal agencies to provide 60-days' notice to the public to allow comment on information collection activities before seeking OMB approval of the activities.

See

44 U.S.C. 3506, 3507; 5 CFR 1320.8-12. Specifically, FRA invites interested parties to comment on the following ICRs regarding: (1) Whether the information collection activities are necessary for FRA to properly execute its functions, including whether the activities will have practical utility; (2) the accuracy of FRA's estimates of the burden of the information collection activities, including the validity of the methodology and assumptions used to determine the estimates; (3) ways for FRA to enhance the quality, utility, and clarity of the information being collected; and (4) ways for FRA to minimize the burden of information collection activities on the public, including the use of automated collection techniques or other forms of information technology.

See

44 U.S.C. 3506(c)(2)(A); 5 CFR 1320.8(d)(1).

FRA believes that soliciting public comment may reduce the administrative and paperwork burdens associated with the collection of information that Federal regulations mandate. In summary, FRA reasons that comments received will advance three objectives: (1) Reduce reporting burdens; (2) organize information collection requirements in a “user-friendly” format to improve the use of such information; and (3) accurately assess the resources expended to retrieve and produce information requested.

See

44 U.S.C. 3501.

The summaries below describe the ICRs that FRA will submit for OMB clearance as the PRA requires:

Title:

Railroad Locomotive Safety Standards and Event Recorders.

OMB Control Number:

2130-0004.

Abstract:

The Locomotive Safety Standards at 49 CFR part 229 require railroads to inspect, repair, and maintain locomotives, including their event recorders to ensure they are safe and free of defects. Crashworthy locomotive event recorders provide FRA with verifiable factual information about how trains are operated. These devices are used by FRA and State inspectors for part 229 enforcement. The information garnered from crashworthy event recorders is used by railroads to monitor railroad operations and by railroad employees (locomotive engineers, train crews, dispatchers) to improve train handling, and promote the safe and efficient operation of trains throughout the country, based on a surer knowledge of different control inputs.

Type of Request:

Extension with Change of a Currently Approved Information Collection.

Affected Public:

Businesses.

Form(s):

FRA F 6180.49A.

Respondent Universe:

741 railroads.

Frequency of Submission:

On occasion.

Reporting Burden:

CFR section

Respondent

universe

Total annual

responses

Average time

per response

Total annual

burden hours

229.9—Movement of Non-Complying Locomotives

44 Railroads

21,000 tags

1 minute

350

229.15—Remote control locomotive—tagging to indicate in remote control

44 Railroads

3,000 tags

2 minutes

100

—Repair record of defective OCU linked to remote control locomotive

44 Railroads

300 records

5 minutes

25

229.17—Accident Reports

44 Railroads

1 report

15 minutes

.25

229.20—Electronic Recordkeeping—Automatic notice to RR each time locomotive is due for inspection or maintenance

44 Railroads

21,000 notifications

1 second

6

229.21—Daily Locomotive Inspection

741 Railroads

1,674,400 insp. reports + 5,215,600 insp. reports/records

31 minutes + 33 minutes

3,733,687

—Written Reports of MU Locomotive Inspections

741 Railroads

230,000 written reports

13 minutes

49,833

Locomotive Inspection & Repair Record—Form FRA F 6180.49A

741 Railroads

4,000 forms

16 minutes

1,067

229.23—Periodic Inspection: Secondary record of information on Form FRA F 6180.49A

741 Railroads

9,500 secondary records

2 minutes

317

—List of defects/repairs during inspection provided to RR employees + copies of lists

741 Railroads

4,000 lists + 4,000 copies

2 minutes + 2 minutes

266

—Document from railroad to employees of all tests conducted since last periodic inspection

741 Railroads

9,500 documents/records

2 minutes

317

229.31—Main reservoir tests: Periodic inspections—repairs & adjustments, & data on Form 49A

741 Railroads

9,500 tests/forms

8 hours

76,000

229.33—Out-of-Use Credit for Locomotives

741 Railroads

500 out-of-use notations

5 minutes

42

Recordkeeping Requirements

229.25—Periodic Inspection of Event Recorders: Written Copy of Instructions—Amendments

741 Railroads

200 amendment copies

15 minutes

50

—Data Verification Readout of Event Recorder

741 Railroads

4,025 readout records/reports

90 minutes

6,038

—Pre-Maintenance Test Failures of Event Recorder

741 Railroads

700 test failure notations

30 minutes

350

229.135—Removal of event recorder from service—Tags

741 Railroads

1,000 removal tags

1 minute

17

—Preserving Locomotive Event Recorder Accident Data—reports

741 Railroads

3,100 data reports

15 minutes

775

Other Requirements

229.27—Annual tests of event recorders w/self-monitoring feature displaying a failure indication—tests

741 Railroads

700 tests/records

90 minutes

1,050

229.29—Calibration of Locomotive Air Flow Meter—Tests

741 Railroads

88,000 tests/records

60 seconds

1,467

229.46—Tagging locomotive with inoperative or ineffective automatic/independent brake that can only be used in trailing position

741 Railroads

2,100 tags

2 minutes

70

229.85—Marking of all doors, cover plates, or barriers having direct access to high voltage equipment with words “Danger High Voltage” or with word “Danger”

741 Railroads

1,000 re-paintings/decals

3 minutes

50

229.123—Locomotives equipped with a pilot, snowplow, & plate with clearance above 6 inches—Marking/stenciling with words “9 inch Maximum End Plate Height, Yard or Trail Service Only”

741 Railroads

20 markings/stencils

4 minutes

1

—Notation in Remarks section of Form FRA F6180.49A of pilot, snowplow, or end plate clearance above 6 inches

741 Railroads

20 notations

2 minutes

1

Subpart E

229.303—Requests to FRA for on-track testing of products outside a facility

741 Railroads

20 requests

8 hours

160

229.307—Safety Analysis for each product subject to this Subpart—Document establishing minimum requirements

741 Railroads

50 safety analysis documents

240 hours

12,000

229.309—Safety critical changes to product subject to this Subpart—Notice to FRA

741 Railroads

10 notifications

16 hours

160

—Report by product suppliers and private owners to railroads of any safety-critical changes to product

3 Manufacturers

30 reports

8 hours

240

229.311—Notice to FRA by railroad before placing product in service

741 Railroads

50 notifications

2 hours

100

—Railroad document provided to FRA upon request demonstrating product meets Safety Analysis requirements for life cycle of product

741 Railroads

50 documents

2 hours

100

—Railroad maintenance of data base of all safety relevant hazards encountered after product is placed in service

741 Railroads

50 databases

4 hours

200

—Written report to FRA disclosing frequency of safety relevant hazards for product exceeding threshold set forth in Safety Analysis

741 Railroads

10 written reports

2 hours

20

—Final Report to FRA on results of analyses and counter measures to reduce frequency of safety related hazards

741 Railroads

10 written final reports

4 hours

40

229.313—Product testing results and records

741 Railroads

120,000 product testing records

5 minutes

10,000

229.315—Railroad maintenance of Operations and Maintenance Manual containing all documents related to installation, maintenance, repair, modification, & testing of a product subject to this Part

741 Railroads

45 manuals + 255 manuals

40 hours + 5 hours

3,075

—RR Configuration Management Control Plan

741 Railroads

45 plans + 255 plans

8 hours + 2 hours

870

—Positive ID of safety-critical components

741 Railroads

60,000 identified components

5 minutes

5,000

229.317—RR Establishment and Implementation of Training Qualification program for products subject to this Subpart

741 Railroads

300 programs

40 hours

12,000

—Employees trained under RR program

741 Railroads

10,000 trained employees

60 minutes

10,000

—Periodic refresher training of employees

741 Railroads

1,000 re-trained employees

60 minutes

1,000

—RR regular and periodic evaluation of effectiveness of its training program

741 Railroads

300 evaluations

4 hours

1,200

—RR record of individuals designated as qualified under this Section

741 Railroads

10,000 records

10 minutes

1,667

Appendix F to Part 229—Guidance for Verification and Validation of Products—3rd Party Assessments

741 Railroads/3 Manufacturers

1 3rd party assessment

4,000 hours

4,000

—Final Report of Assessment

741 Railroads/3 Manufacturers

1 final report

80 hours

80

Total Estimated Annual Responses:

7,509,648.

Total Estimated Annual Burden:

3,933,791 hours.

Title:

Railroad Signal System.

OMB Control Number:

2130-0006.

Abstract:

The regulations pertaining to railroad signal systems are contained in 49 CFR parts 233 (Signal System Reporting Requirements), 235 (Instructions Governing Applications for Approval of a Discontinuance or Material Modification of a Signal System), and 236 (Rules, Standards, and Instructions Governing the Installation, Inspection, Maintenance, and Repair of Signal and Train Control Systems, Devices, and Appliances). Section 233.5 provides that each railroad must report to FRA within 24 hours after learning of an accident or incident arising from signal failure (

e.g.,

failure of a signal appliance, device, method or system to function or indicate as required by 49 CFR part 236 that results in a more favorable aspect than intended) or other condition hazardous to the movement of a train. Section 233.7 provides that each railroad must report signal failures within 15 days in accordance with the instructions printed on Form FRA F 6180.14.

Part 235 of title 49 of the Code of Federal Regulations sets forth the specific conditions under which FRA will approve the modification or discontinuance of railroad signal systems. These regulations also describe the process that should be followed by a railroad to seek such an approval. The application process prescribed under 49 CFR part 235 enables FRA to obtain the necessary information to make logical and informed decisions concerning railroad requests to modify or discontinue signal systems. Section 235.5 requires railroads to apply for FRA approval to discontinue or materially modify railroad signal systems. However, section 235.7 cites signal system changes that do not require FRA approval such as removal of an interlocking where a drawbridge has been permanently closed by the formal approval of another governmental agency. Section 235.8 allows railroads to seek relief from the requirements in 49 CFR part 236. Sections 235.10, 235.12, and 235.13 explain where the application must be submitted, what information must be included, what the format should be, and who is authorized to sign the application. FRA provides public notice concerning applications for relief and allows individuals and organizations to protest the granting of an application for relief. Section 235.20 describes the protest process, including essential information that must accompany the protest, the address for filing the protest, the time limit for filing the protest, and the requirement that a person requesting a public hearing explain why written statements cannot be used to explain his or her position.

49 CFR part 236 contains FRA's signal system requirements. Section 236.110 requires that the results of signal system tests required under §§ 236.102-109; §§ 236.376-236.387; §§ 236.576-577; and §§ 236.586-589 be recorded on pre-printed forms provided by the railroad or by electronic means, subject to FRA approval. These forms must show the name of the railroad, place and date of the test conducted, type of equipment tested, results of the test, describe any repairs, replacements, and adjustments performed on the equipment that has been tested, and the condition in which the equipment was left. This section also requires that the employee conducting the test must sign the form and that the record be retained at the office of the supervisory official. Test results made in compliance with § 236.587, must be retained for 92 days. The results of all other tests required under §§ 236.102-109; §§ 236.376-236.387; §§ 236.576-577; § 236.586; and §§ 236.588-589, including results of periodic tests, must be retained until the next record is filed, but no less than one year. Additionally, § 236.587 requires each railroad to make a departure test of the cab signal, automatic train stop, or train control devices on locomotives before the locomotives enter equipped territory. This section further requires that whoever performs the departure test must certify in writing that the test was properly performed. The certification and test results must be posted in the locomotive cab with a copy of the certification and test results retained at the office of the supervisory official. However, if it is impractical to leave a copy of the certification and test results at the location where the test is conducted, then the test results must be transmitted to the dispatcher or another designated official who must keep a written record of the test results and the name of the person performing the test. All records prepared under this section are required to be retained for 92 days. Finally, § 236.590 requires railroads to clean and inspect the pneumatic apparatus of automatic train stop, train control, or cab signal devices on locomotives as required by § 229.29(a).

Type of Request:

Extension with Change of a Currently Approved Information Collection.

Affected Public:

Businesses.

Form(s):

FRA F 6180.14.

Respondent Universe:

1 Class I railroad.

Frequency of Submission:

On occasion.

Reporting Burden:

CFR section

Respondent

universe

Total annual

responses

Average time

per response

Total annual

burden hours

233.5—Accidents resulting from signal failure—telephone report to FRA

741 Railroads

10 telephone calls

30 minutes

5

233.7—Signal Failure Reports

741 Railroads

20 reports

15 minutes

5

235.5—Filing of Applications for changes to Signal Systems

80 Railroads

20 applications

10 hours

200

235.8—Relief from requirements of Part 236 of this Title

80 Railroads

10 relief requests/applications

2.5 hours

25

235.20—Protests against application for relief from Part 236 requirements

80 Railroads

20 protest letters

30 minutes

10

236.110—Results of Tests made in compliance with sections 236.102-109; sections 236.376-387; section 236.576; section 236.577; sections 236.586-589; and sec. 236.917(a)—Records

80 Railroads

796,161 forms + 140,499 forms

27 minutes. 15 minutes

393,397

236.587—Departure Test—Record

18 Railroads

730,000 tests/records

4 minutes

48,667

236.590—Pneumatic Apparatus—Inspection, cleaning, and results of Inspection—Record

18 Railroads

6,697 stencilings/tags

22.5 minutes

2,511

Total Estimated Annual Responses:

1,673,437.

Total Estimated Annual Burden:

444,820 hours.

Title:

Inspection Brake System Safety Standards for Freight and Other Non-Passenger Trains and Equipment (Power Brakes).

OMB Control Number:

2130-0008.

Abstract:

Recognizing the importance of upgrading rail technologies, Congress in 1980 passed the Rock Island Railroad Transition and Employee Assistance Act (the “Rock Island Act”), which, inter alia, provides statutory relief for the implementation of new technologies. More specifically, when certain statutory requirements preclude the development or implementation of more efficient railroad transportation equipment or other transportation innovations, the applicable section of the Rock Island Act, currently codified at 49 U.S.C. 20306, provides the Secretary of Transportation with the authority to grant an exemption to those requirements based on evidence received and findings developed at a hearing. In accordance with that statute, FRA held a public hearing and invoked its discretionary authority under 49 U.S.C. 20306 to provide a limited exemption from § 20303 for freight trains and freight cars operating with electronically controlled pneumatic (ECP) brake systems. In doing so, FRA revised the regulations governing freight power brakes and equipment in October 2008 by adding a new subpart G. The revisions are designed to provide for and encourage the safe implementation and use of ECP brake system technologies. These revisions contain specific requirements relating to design, interoperability, training, inspection, testing, handling defective equipment, and periodic maintenance related to ECP brake systems. The final rule also provides flexibility to facilitate the voluntary adoption of this advanced brake system technology. The collection of information is used by FRA to monitor and enforce regulatory requirements related to power brakes on freight cars, including the requirements related to ECP brake systems. The collection of information is also used by locomotive engineers and road crews to verify that the terminal air brake test has been performed in a satisfactory manner.

Type of Request:

Extension with Change of a Currently Approved Information Collection.

Affected Public:

Businesses.

Form(s):

N/A.

Respondent Universe:

1 Class I railroad.

Frequency of Submission:

On occasion.

Reporting Burden:

CFR section

Respondent

universe

Total annual

responses

Average time per

response

Total annual burden hours

229.27—Annual Tests

30,000 Locomotives

120,000 tests

15 minutes

30,000

232.3—Applicability—Cars Not Used in Service

741 Railroads

8 cards

10 minutes

1

232.7—Waivers

741 Railroads

10 petitions

160 hours

1,600

232.15—Movement of Defective Equipment

1,620,000 Cars/locos

128,400 tags

2.5 minutes

5,350

—Notice of Defective Car/Locomotive and Restrictions

1,620,000 Cars/locos

25,000 notices

3 minutes

1,250

232.17—Special Approval Procedure

741 Railroads

1 petition

100 hours

100

—Petitions—Pre-Revenue Svc Plans

741 Railroads

1 petition

100 hours

100

—Copies of Petitions—Special Approval

741 Railroads

1 petition

20 hours

20

—Statements of Interest

Public/Railroads

4 statements

8 hours

32

—Comments on Special Approval Procedure Petition

Public/Railroads

13 comments

4 hours

52

232.103—General Requirements for All Train Brakes

114,000 cars

70,000 stickers

10 minutes

11,667

—RR Plan identifying locations or circumstances when equipment left on a main track or siding unattended

741 Railroads

1 revised plan

10 hours

10

—Notification to FRA that railroad has developed plan

741 Railroads

1 notification

30 minutes

1

—Securement job briefings

741 Railroads

23,400,000 briefings

30 seconds

195,000

—Inspection of proper securement by qualified employee of unattended equipment that a non-railroad emergency responder has been on, under, or between

741 Railroads

12 inspections

4 hours

48

232.105—General Requirements for Locomotives

30,000 Locomotives

30,000 forms

5 minutes

2,500

—Inspection of operative exterior locking mechanism on locomotive left unattended outside of a yard but not on a track directly adjacent to the yard

30,000 Locomotives

30,000 inspections/records

30 seconds

250

—Broken exterior locking mechanism on locomotive requiring repair

30,000 Locomotives

73 repaired mechanisms/records

60 minutes + 15 seconds

73

232.107—Air Source Requirements—Plans

10 New Railroads

1 plan

40 hours

40

—Amendments to Plan

50 Existing Plans

10 amendments

20 hours

200

—Record Keeping

50 Existing Plans

1,150 records

20 hours

23,000

232.109—Dynamic Br. Requirements—Rcd

741 Railroads

1,656,000 rcd

4 minutes

110,400

—Repair of Inoperative Dynamic Brakes

30,000 Locomotives

6,358 records

4 minutes

424

— Locomotives w/Inoperative Dynamic Br.

30,000 Locomotives

6,358 tags

30 seconds

53

—Deactivated Dynamic Brakes: Markings

8,000 locomotives

10 markings

5 minutes

1

—Rule Safe Train Handling Procedures

5 New Railroads

5 oper. rules

4 hours

20

—Amendments

741 railroads

15 amendments

1 hour

15

—Over Speed Top Rules—5 MPH Increase

741 railroads

5 requests

20.5 hours

103

—Locomotive Engineer Certification Programs—Dynamic Brakes Training

5 new railroads

5 amendments

16 hours

80

232.111—Train Information Handling

5 New Railroads

5 procedures

40 hours

200

—Amendments

100 Railroads

100 am. proc.

20 hours

2,000

—Reports to Train Crews

741 Railroads

2,112,000 rpts

10 minutes

352,000

232.203—Training Requirements: Training Programs—Subsequent Years

15 Railroads

5 programs

100 hours

500

—Amendments to Written Program

741 Railroads

741 programs

8 hours

5,928

—Training Records

741 Railroads

67,000 records

8 minutes

8,933

—Training Notifications

741 Railroads

67,000 notices

3 minutes

3,350

—Validation/Assessment Plans

741 Railroads

1 plan + 741 copies

40 hrs./1 min

51

—Amendments to Validation/Assessment Plans

741 Railroads

50 revised plans

20 hours

1,000

232.205—Class I Brake Test—Initial Terminal Insp

741 Railroads

1,646,000 notices

45 seconds

20,575

232.207—Class I A Brake Tests: 1000 Mile Insp,—Designation of locations where performed:—Subsequent Years

741 Railroads

1 des. list

1 hour

1

—Notification to FRA headquarters and pertinent region within 24 hours that designation list has changed due to emergency situation

741 Railroads

250 notices

10 minutes

42

232.209—Class II Brake Tests—Communication of results of roll-by inspections to train operator

741 Railroads

159,740 comments

3 seconds

133

232.213—Extended Haul Trains—Designations of such trains in writing to FRA

83,000 Long Distance Train Movements

250 letters of designation

15 minutes

63

232.303—General Requirements—Repair Track Brake Test: Tagging cars needing to be moved for such tests

1,600,000 Freight Cars

5,600 tags

5 minutes

467

—Stenciling/marking of location of last repair track brake test/single car test required by section 232.305

1,600,000 Freight Cars

240,000 marks/stencillings

5 minutes

20,000

232.305—Single Car Tests/Records

1,600,000 Freight Cars

240,000 tests/records

60 minutes

240,000

232.307—Request to Modify Single Car Air Brake Test Procedures

AAR

1 request + 3 copies

20 hours + 5 minutes

20

—Statement Affirming That Request Copies Have been Served on Designated Employee Representatives

AAR

1 statement + 4 copies

30 minutes + 5 minutes

1

—Comment on Modification Request

RR Industry/Public/

Interested Parties

2 comments

8 hours

16

232.309—Equipment and devices performing single car air brake tests: Testing and Calibrations

640 Shops

5,000 tests

30 minutes

2,500

232.403—Design Standards For One-way EOT Devices—Request to FRA for unique code for each rear unit

245 Railroads

12 requests

5 minutes

1

232.407—Operations Requiring 2-Way EOTs: Communications between helper locomotive engineer with engineer on the head end of the train

245 Railroads

50,000 radio chats

30 seconds

417

232.409—Inspection and Testing of 2-Way EOTs: Notice to engineer of successful test

245 Railroads

447,500 notices

30 seconds

3,729

—Testing telemetry equipment for accuracy: Date and location of last test or calibration affixed to outside of both front & rear unit

245 Railroads

1,350 markings

60 seconds

23

232.503—Process to Introduce New Brake System Technology—Request to FRA for special approval

741Railroads

1 request/letter

60 minutes

1

—Pre-Revenue Service Demonstration of New Brake Technology: Request to FRA for approval prior to using in revenue service

741 Railroads

1 request

3 hours

3

232.505—Pre-Revenue Service Acceptance Testing Plan: Maintenance Procedure—Subsequent Years

741 Railroads

1 procedure

160 hours

160

—Amendments

741 Railroads

1 amendment

40 hours

40

—Design Descriptions—Petitions

741 Railroads

1 petition

67 hours

67

—Results Pre-Revenue Service Acceptance Testing

741 Railroads

1 report

13 hours

13

—Description of Brake Systems Technologies Previously Used in Revenue Service

741 Railroads

1 description

40 hours

40

232.603—ECP Requirements: Brakes—Modification of Standards: AAR or Industry Representative request to FRA

4 Railroads/AAR

1 request + 2 copies

8 hours + 5 minutes

8

—RR Statement Affirming Copy of Modification Request to Employee Reps

4 Railroads

4 statements+ 24 copies

60 minutes + 5 minutes

6

—Comments on Modification Request

Public/Interested Parties

4 comments

2 hours

8

232.607—ECP Trains Class I Brake Test & Inspection/: Notification to locomotive engineer it was successfully performed

4 Railroads

750 tests + 750 notices

90 minutes + 45 seconds

1,134

—Cars Added en Route—Tests/Notifications

4 Railroads

50 tests + 50 notices

60 minutes + 45 seconds

51

—Non-ECP Cars Added—Inspections and Tagging of Defective Equipment

2000 Cars

25 insp. + 50 tags

5 minutes + 2.5 minutes

4

232.609—Handling of Defective Equipment w/ECP Brake Systems—Tagging

25 Cars

25 tags

2.5 minutes

1

—Train in ECP Mode w/Less Than 85% of Cars w/Operative Brakes—Insp. + Tagging

20 Cars

10 insp. + 20 tags

5 minutes + 2.5 minutes

2

—Freight Cars w/ECP Systems Found with Defective Non-Safety Appliance—Tagging

25 Cars

25 tags

2.5 minutes

1

—Conventional Train Operating with ECP Stand Alone Brake Systems—Tagging

25 Cars

50 tags

2.5 minutes

2

—Procedures for Handling ECP Brake System Repairs

1 Railroad

1 procedure

24 hours

24

—Submission to FRA of ECP Brake System Repair Locations—Lists

1 Railroad

1 list

8 hours

8

—Notice to FRA of Change in List

1 Railroad

1 notification

60 minutes

1

232.611—Periodic Maintenance: Inspection & Repair of ECP Cars Before Release from Repair Shop or Track

500 Freight Cars

300 inspections and records

10 minutes

50

—Petitions for Special Approval of Pre-Revenue Service Acceptance Testing Plan

AAR

1 petition + 2 copies

24 hours+ 5 minutes

24

—Single Car Brake Test on ECP Retrofitted Cars

2,500 Freight Cars

50 tests/records

45 minutes

38

—Modification of Single Car Test Standard

AAR

1 procedure

40 hours

40

Total Estimated Annual Responses:

30,519,495.

Total Estimated Annual Burden:

1,045,550 hours.

Under 44 U.S.C. 3507(a) and 5 CFR 1320.5(b) and 1320.8(b)(3)(vi), FRA informs all interested parties that it may not conduct or sponsor, and a respondent is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Authority:

44 U.S.C. 3501-3520.

Juan D. Reyes III,

Chief Counsel.

[FR Doc. 2018-16403 Filed 7-31-18; 8:45 am]

BILLING CODE 4910-06-P

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.