Congressional Nullification of the Stream Protection Rule Under the Congressional Review Act
Federal RegisterNov 17, 2017
Ask Donna
What actually matters in this document.
Text
DEPARTMENT OF THE INTERIOR
Office of Surface Mining Reclamation and Enforcement
30 CFR Parts 700, 701, 773, 774, 777, 779, 780, 783, 784, 785, 800, 816, 817, 824, and 827
[Docket ID: OSM-2010-0018; S1D1S SS08011000 SX064A000 178S180110; S2D2S SS08011000 SX064A000 17X501520]
RIN 1029-AC63
Congressional Nullification of the Stream Protection Rule Under the Congressional Review Act
AGENCY:
Office of Surface Mining Reclamation and Enforcement, Interior.
ACTION:
Final rule; CRA Revocation.
SUMMARY:
By operation of the Congressional Review Act, the Stream Protection Rule shall be treated as if it had never taken effect. The Office of Surface Mining Reclamation and Enforcement issues this document to effect the removal of any amendments, deletions or other modifications made by the nullified rule, and the reversion to the text of the regulations in effect immediately prior to the effective date of the Stream Protection Rule.
DATES:
This rule is effective on November 17, 2017. The incorporation by reference of material listed in the rule was previously approved by the Director of the Federal Register.
ADDRESSES:
Previous documents related to the Stream Protection Rule, published at 81 FR 93066 (Dec. 20, 2016), are available at
www.regulations.gov
in Docket No. OSM-2010-0018.
FOR FURTHER INFORMATION CONTACT:
Kathleen Vello, Office of Surface Mining Reclamation and Enforcement, U.S. Department of the Interior, 1849 C Street NW., Mail Stop 4550, MIB, Washington, DC 20240 Telephone: 202-208-1908.
SUPPLEMENTARY INFORMATION:
The Office of Surface Mining Reclamation and Enforcement published the Stream Protection Rule on December 20, 2016 (81 FR 93066). The rule became effective on January 19, 2017. On February 1, 2017, the United States House of Representatives passed a joint resolution of disapproval (H.J. Res. 38) of the Stream Protection Rule in accordance with the Congressional Review Act, 5 U.S.C. 801
et seq.
The Senate passed the joint resolution of disapproval on February 2, 2017 (Cong. Rec. p. S611). President Trump then signed the resolution into law as Public Law 115-5 on February 16, 2017. Under the terms of the Congressional Review Act, the Office of Surface Mining Reclamation and Enforcement's Stream Protection Rule must be “treated as though such rule had never taken effect.” 5 U.S.C. 801(f).
However, because the Congressional Review Act does not include direction regarding the removal, by the Office of the Federal Register or otherwise, of the voided language from the Code of Federal Regulations, the Office of Surface Mining Reclamation and Enforcement must publish this document to effect the removal of the voided text. This document will enable the Office of the Federal Register to effectuate congressional intent to remove the voided text of the Stream Protection Rule which is to be treated as if it had never taken effect and to restore the previous language and prior state of the Code of Federal Regulations.
This action is not an exercise of the Department's rulemaking authority under the Administrative Procedure Act because the Department is not “formulating, amending, or repealing a rule” under 5 U.S.C. 551(5). Rather, the Department is effectuating changes to the Code of Federal Regulations to reflect what congressional action has already accomplished—namely, the nullification of any changes purported to have been made to the Code of Federal Regulations by the Stream Protection Rule and the reversion to the regulatory text in effect immediately prior to January 19, 2017, the effective date of the Stream Protection Rule. Accordingly, the Department is not soliciting comments on this action. Moreover, this action is not a final agency action subject to judicial review.
List of Subjects
30 CFR Part 700
Administrative practice and procedure, Reporting and recordkeeping requirements, Surface mining, Underground mining.
30 CFR Part 701
Law enforcement, Surface mining, Underground mining.
30 CFR Part 773
Administrative practice and procedure, Reporting and recordkeeping requirements, Surface mining, Underground mining.
30 CFR Part 774
Reporting and recordkeeping requirements, Surface mining, Underground mining.
30 CFR Part 777
Reporting and recordkeeping requirements, Surface mining, Underground mining.
30 CFR Part 779
Environmental protection, Reporting and recordkeeping requirements, Surface mining.
30 CFR Part 780
Incorporation by reference, Reporting and recordkeeping requirements, Surface mining.
30 CFR Part 783
Environmental protection, Reporting and recordkeeping requirements, Underground mining.
30 CFR Part 784
Reporting and recordkeeping requirements, Underground mining.
30 CFR Part 785
Reporting and recordkeeping requirements, Surface mining, Underground mining.
30 CFR Part 800
Insurance, Reporting and recordkeeping requirements, Surety bonds, Surface mining, Underground mining.
30 CFR Part 816
Environmental protection, Incorporation by reference, Reporting and recordkeeping requirements, Surface mining.
30 CFR Part 817
Environmental protection, Incorporation by reference, Reporting and recordkeeping requirements, Underground mining.
30 CFR Part 824
Environmental protection, Surface mining.
30 CFR Part 827
Environmental protection, Surface mining, Underground mining.
For the reasons given in the preamble, and under the authority of the Congressional Review Act (5 U.S.C. 801
et seq.
) and Public Law 115-5 (February 16, 2017), the Department of the Interior, Office of Surface Mining Reclamation and Enforcement amends parts 700, 701, 773, 774, 777, 779, 780, 783, 784, 785, 800, 816, 817, 824, and 827 of chapter VII of title 30 of the Code of Federal Regulations as follows:
1. Revise part 700 to read as follows:
PART 700—GENERAL
Sec.
700.1
Scope.
700.2
Objective.
700.3
Authority.
700.4
Responsibility.
700.5
Definitions.
700.10
Information collection.
700.11
Applicability.
700.12
Petitions to initiate rulemaking.
700.13
Notice of citizen suits.
700.14
Availability of records.
700.15
Computation of time.
Authority:
30 U.S.C. 1201
et seq.
§ 700.1
Scope.
The regulations in chapter VII of 30 CFR, consisting of parts 700 through 899, establish the procedures through which the Secretary of the Interior will implement the Surface Mining Control and Reclamation Act of 1977 (Pub. L. 95-87, 91 Stat. 445 (30 U.S.C. 1201
et. seq.
)). Chapter VII is divided into 13 subchapters.
(a) Subchapter A contains introductory information intended to serve as a guide to the rest of the chapter and to the regulatory requirements and definitions generally applicable to the programs and persons covered by the Act.
(b) Subchapter B contains regulations covering the initial regulatory program which apply before the applicability of permanent program regulations to persons conducting surface coal mining and reclamation operations and other persons covered by the Act.
(c) Subchapter C sets forth regulations covering applications for and decisions on permanent State programs; the process to be followed for substituting a Federal program for an approved State program, if necessary; the process for assuming temporary Federal enforcement of an approved State program; and the process for implementing a Federal program in a State when required by the Act.
(d) Subchapter D of this chapter identifies the procedures that apply to surface coal mining and reclamation operations conducted on Federal lands rather than State or private lands and incorporates by reference the requirements of the applicable regulatory program and the inspection and enforcement requirements of subchapter L of this chapter.
(e) Subchapter E of this chapter contains regulations that apply to surface coal mining and reclamation operations conducted on Indian lands.
(f)(1) Subchapter F implements the requirements of the Act for—
(i) Designating lands which are unsuitable for all or certain types of surface coal mining operations;
(ii) Terminating designations no longer found to be appropriate; and
(iii) Prohibiting surface coal mining and reclamation operations on those lands or areas where the Act states that surface coal mining operations should not be permitted or should be permitted only after specified determinations are made.
(2) Subchapter F does not include regulations governing designation of areas unsuitable for noncoal mining under the terms of section 601 of the Act or the designation of Federal lands under the Federal lands review provisions of section 522(b) of the Act. The Bureau of Land Management of the Department of the Interior is responsible for these provisions which will be implemented when promulgated by regulations in title 43 of the Code of Federal Regulations.
(g) Subchapter G governs applications for and decisions on permits for surface coal mining and reclamation operations on non-Indian and non-Federal lands under a State or Federal program. It also governs coal exploration and permit application and decisions on permits for special categories of coal mining on non-Indian and non-Federal lands under a State or Federal program. Regulations implementing the experimental practices provision of the Act are also included in subchapter G.
(h) Subchapter J sets forth requirements for performance bonds and public liability insurance for both surface mining and underground mining activities.
(i) Subchapter K sets forth the environmental and other performance standards which apply to coal exploration and to surface coal mining and reclamation operations during the permanent regulatory program. The regulations establish the minimum requirements for operations under State and Federal programs. Performance standards applicable to special mining situations such as anthracite mines, steep slope mining, alluvial valley floors, and prime farmlands are included.
(j) Subchapter L sets forth the inspection, enforcement, and civil penalty provisions that apply to a State, Federal, or Federal lands program.
(k) Subchapter M sets forth the requirements for the training, examination, and certification of blasters.
(l) Subchapter P sets forth the provisions for protection of employees who initiate proceedings under the Act or testify in any proceedings resulting from the administration or enforcement of the Act.
(m) Subchapter R sets forth the regulations for the abandoned mine land reclamation program. These regulations include the fee collection requirements and the mechanisms for implementing the State and Federal portions of the abandoned mine land reclamation program.
(n) Subchapter S sets forth the regulations that apply to grants for mining and mineral research institutes and grants for mineral research projects.
§ 700.2
Objective.
The objective of chapter VII is to fulfill the purposes of the Act found in section 102 in a manner which is consistent with the language of the Act, its legislative history, other applicable laws, and judicial interpretations.
§ 700.3
Authority.
The Secretary is authorized to administer the requirements of the Act, except the following:
(a) Provisions of the Act that authorize the Secretary of Agriculture to establish programs for the reclamation of rural lands, identification of prime agricultural lands, and other responsibilities described in the Act. Regulations promulgated by the Secretary of Agriculture are in 7 CFR;
(b) Provisions of the Act for which responsibility is specifically assigned to other Federal agencies, including the Department of Labor, the Environmental Protection Agency, the Corps of Engineers, the Council on Environmental Quality, and the Department of Energy; and
(c) Authority retained by the States to enforce State laws or regulations which are not inconsistent with the Act and this chapter, including the authority to enforce more stringent land use and environmental controls and regulations.
§ 700.4
Responsibility.
(a) The Director of the Office of Surface Mining Reclamation and Enforcement, under the general direction of the Assistant Secretary, Energy and Minerals, is responsible for exercising the authority of the Secretary, except for the following:
(1) Approval, disapproval or withdrawal of approval of a State program and implementation of a Federal program. The Director is responsible for exercising the authority of the Secretary to substitute Federal enforcement of a State program under section 521(b) of the Act.
(2) Designation of non-Federal lands or Federal lands without the concurrence of the Federal surface managing agency as unsuitable for all or certain types of surface coal mining operations under section 522 of the Act and as unsuitable for non-coal mining under section 601 of the Act; and
(3) Authority to approve or disapprove mining plans to conduct surface coal mining and reclamation operations on Federal lands.
(b) The Director is responsible for consulting with Federal land-managing
agencies and Federal agencies with responsibility for natural and historic resources on Federal lands on actions which may have an effect on their responsibilities.
(c) The States are responsible for the regulation of surface coal mining and reclamation operations under the initial regulatory program and surface coal mining and reclamation operations and coal exploration under an approved State program and the reclamation of abandoned mine lands under an approved State Reclamation Plan on non-Federal and non-Indian lands in accordance with procedures in this chapter.
(d) The Secretary may delegate to a State through a cooperative agreement certain authority relating to the regulation of surface coal mining and reclamation operations on Federal lands in accordance with 30 CFR part 745.
(e) The Director, Office of Hearings and Appeals, U.S. Department of the Interior, is responsible for the administration of administrative hearings and appeals required or authorized by the Act pursuant to the regulations in 43 CFR part 4.
§ 700.5
Definitions.
As used throughout this chapter, the following terms have the specified meaning except where otherwise indicated—
Act
means the Surface Mining Control and Reclamation Act of 1977 (Pub. L. 95-87).
AML
means abandoned mine land(s).
AML inventory
means OSM's listing of abandoned mine land problems eligible to be reclaimed using moneys from the Abandoned Mine Reclamation Fund or the Treasury as appropriate.
Anthracite
means coal classified as anthracite in ASTM Standard D 388-77. Coal classifications are published by the American Society of Testing and Materials under the title,
Standard Specification for Classification of Coals by Rank,
ASTM D 388-77, on pages 220 through 224. Table 1 which classifies the coals by rank is presented on page 223. This publication is hereby incorporated by reference as it exists on the date of adoption of these regulations. Notices of changes made to this publication will be periodically published by the Office of Surface Mining in the
Federal Register
. This ASTM Standard is on file and available for inspection at the OSM Office, U.S. Department of the Interior, South Interior Building, Washington, DC 20240, at each OSM Regional Office, District Office and Field Office, and at the central office of the applicable State Regulatory Authority, if any. Copies of this publication may also be obtained by writing to the above locations. A copy of this publication will also be on file for public inspection at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA, call 202-741-6030, or go to:
http://www.archives.gov/federal_register/code_of_federal_regulations/ibr_locations.html.
Incorporation by reference provisions approved by the Director of the Federal Register February 7, 1979. The Director's approval of this incorporation by reference expires on July 1, 1981.
Coal
means combustible carbonaceous rock, classified as anthracite, bituminous, subbituminous, or lignite by ASTM Standard D 388-77, referred to and incorporated by reference in the definition of
Anthracite
immediately above.
Department
means the Department of the Interior.
Director
means the Director, Office of Surface Mining Reclamation and Enforcement, or the Director's representative.
Eligible lands and water
means lands and water eligible for expenditures under title IV of SMCRA and this chapter. Eligible lands and water for reclamation or drainage abatement expenditures under the Abandoned Mine Land program contained in this chapter are those which were mined for coal or which were affected by such mining, wastebanks, coal processing, or other coal mining processes and left or abandoned in either an unreclaimed or inadequately reclaimed condition prior to August 3, 1977, and for which there is no continuing reclamation responsibility. However, lands and water damaged by coal mining operations after that date and on or before November 5, 1990, may also be eligible for reclamation if they meet the requirements specified in § 874.12(d) and (e) of this chapter. Following certification of the completion of all known coal problems, eligible lands and water for noncoal reclamation purposes are those sites that meet the eligibility requirements specified in § 875.14 of this chapter. For additional eligibility requirements for water projects, see § 874.14 of this chapter, and for lands affected by remining operations, see section 404 of SMCRA.
Emergency
means a sudden danger or impairment that presents a high probability of substantial physical harm to the health, safety, or general welfare of people before the danger can be abated under normal program operation procedures.
Expended
means that moneys have been obligated, encumbered, or committed by contract by the State, Tribe, or us for work to be accomplished or services to be rendered.
Extreme danger
means a condition that could reasonably be expected to cause substantial physical harm to persons, property, or the environment and to which persons or improvements on real property are currently exposed.
Federal lands
means any land, including mineral interests, owned by the United States, without regard to how the United States acquired ownership of the lands or which agency manages the lands. It does not include Indian lands. However, lands or mineral interests east of the 100th meridian west longitude owned by the United States and entrusted to or managed by the Tennessee Valley Authority are not subject to sections 714 (surface owner protection) and 715 (Federal lessee protection) of the Act.
Federal lands program
means a program established by the Secretary pursuant to section 523 of the Act to regulate surface coal mining and reclamation operations on Federal lands.
Fund
means the Abandoned Mine Reclamation Fund established on the books of the U.S. Treasury for the purpose of accumulating revenues designated for reclamation of abandoned mine lands and other activities authorized by section 401 of SMCRA.
Indian lands
means all lands, including mineral interests, within the exterior boundaries of any Federal Indian reservation, notwithstanding the issuance of any patent, and including rights-of-way, and all lands including mineral interests held in trust for or supervised by an Indian tribe.
Indian tribe
means any Indian tribe, band, group, or community having a governing body recognized by the Secretary.
Office
means the Office of Surface Mining Reclamation and Enforcement established under title II of the Act.
Left or abandoned in either an unreclaimed or inadequately reclaimed condition
means, for Abandoned Mine Land programs, lands and water:
(1) Which were mined or which were affected by such mining, wastebanks, processing or other mining processes prior to August 3, 1977, or between August 3, 1977, and November 5, 1990, as authorized pursuant to section 402(g)(4) of SMCRA, and on which all mining has ceased;
(2) Which continue, in their present condition, to degrade substantially the quality of the environment, prevent or
damage the beneficial use of land or water resources, or endanger the health and safety of the public; and
(3) For which there is no continuing reclamation responsibility under State or Federal laws, except as provided in sections 402(g)(4) and 403(b)(2) of SMCRA.
OSM
and
OSMRE
mean the Office of Surface Mining Reclamation and Enforcement established under title II of the Act.
Person
means an individual, Indian tribe when conducting surface coal mining and reclamation operations on non-Indian lands, partnership, association, society, joint venture, joint stock company, firm, company, corporation, cooperative or other business organization and any agency, unit, or instrumentality of Federal, State or local government including any publicly owned utility or publicly owned corporation of Federal State or local government.
Person having an interest which is or may be adversely affected
or
person with a valid legal interest
shall include any person—
(a) Who uses any resource of economic, recreational, esthetic, or environmental value that may be adversely affected by coal exploration or surface coal mining and reclamation operations or any related action of the Secretary or the State regulatory authority; or
(b) Whose property is or may be adversely affected by coal exploration or surface coal mining and reclamation operations or any related action of the Secretary or the State regulatory authority.
Project
means a delineated area containing one or more abandoned mine land problems. A project may be a group of related reclamation activities with a common objective within a political subdivision of a State or within a logical, geographically defined area, such as a watershed, conservation district, or county planning area.
Public office
means a facility under the direction and control of a governmental entity which is open to public access on a regular basis during reasonable business hours.
Reclamation activity
means the reclamation, abatement, control, or prevention of adverse effects of past mining by an Abandoned Mine Land program.
Reclamation program
means a program established by a State or an Indian tribe in accordance with Title IV of SMCRA for reclamation of lands and water adversely affected by past mining, including the reclamation plan and annual applications for grants under the plan.
Regional Director
means a Regional Director of the Office or a Regional Director's representative.
Regulatory authority
means the department or agency in each State which has primary responsibility at the State level for administering the Act in the initial program, or the State regulatory authority where the State is administering the Act under a State regulatory program, or the Secretary in the initial or permanent program where the Secretary is administering the Act, or the Secretary when administering a Federal program or Federal lands program or when enforcing a State program pursuant to section 521(b) of the Act.
Regulatory program
means any approved State or Federal program or, in a State with no approved State or Federal program and coal exploration and surface coal mining and reclamation operations are on Federal lands, the requirements of subchapters A, F, G, J, K, L, M, and P of this chapter.
Secretary
means the Secretary of the Interior or the Secretary's representative.
SMCRA
means the Surface Mining Control and Reclamation Act of 1977, 30 U.S.C. 1201
et seq.,
as amended.
State regulatory authority
means the department or agency in each State which has primary responsibility at the State level for administering the initial or permanent State regulatory program.
Surface coal mining operations
mean—
(a) Activities conducted on the surface of lands in connection with a surface coal mine or, subject to the requirements of section 516 of the Act, surface operations and surface impacts incident to an underground coal mine, the products of which enter commerce or the operations of which directly or indirectly affect interstate commerce. Such activities include excavation for the purpose of obtaining coal, including such common methods as contour, strip, auger, mountain top removal, box cut, open pit, and area mining; the use of explosives and blasting; in situ distillation or retorting; leaching or other chemical or physical processing; and the cleaning, concentrating, or other processing or preparation of coal. Such activities also include the loading of coal for interstate commerce at or near the mine site.
Provided,
these activities do not include the extraction of coal incidental to the extraction of other minerals, where coal does not exceed 16
2/3
percent of the tonnage of minerals removed for purposes of commercial use or sale, or coal exploration subject to section 512 of the Act; and,
Provided further,
that excavation for the purpose of obtaining coal includes extraction of coal from coal refuse piles; and
(b) The areas upon which the activities described in paragraph (a) of this definition occur or where such activities disturb the natural land surface. These areas shall also include any adjacent land the use of which is incidental to any such activities, all lands affected by the construction of new roads or the improvement or use of existing roads to gain access to the site of those activities and for haulage and excavation, workings, impoundments, dams, ventilation shafts, entryways, refuse banks, dumps, stockpiles, overburden piles, spoil banks, culm banks, tailings, holes or depressions, repair areas, storage areas, processing areas, shipping areas, and other areas upon which are sited structures, facilities, or other property or material on the surface, resulting from or incident to those activities.
Surface coal mining and reclamation operations
means surface coal mining operations and all activities necessary or incidental to the reclamation of such operations. This term includes the term surface coal mining operations.
Ton
means 2000 pounds avoirdupois (.90718 metric ton).
§ 700.10
Information collection.
The collection of information, and recordkeeping requirements, contained in 30 CFR 700.11(d), 700.12(b) and 700.13 has approved by the Office of Management and Budget under 44 U.S.C. 3501
et seq.
and assigned clearance number 1029-0094. The information collected in § 700.11(d) is used by OSMRE and States to establish standards for determining when a mine site is no longer a surface coal mining and reclamation operation and thereby when regulatory jurisdiction may end. The information collection under § 700.12(b) is used by OSMRE to consider need, costs, and benefits of a proposed regulatory change in order to grant or deny a petition that has been submitted. Information collected in § 700.13 identifies the person and nature of a citizen's suit, so that OSMRE or a state can respond appropriately.
§ 700.11
Applicability.
(a) Except as provided in paragraph (b) of this section, this chapter applies to all coal exploration and surface coal mining and reclamation operations, except:
(1) The extraction of coal by a landowner for his or her own noncommercial use from land owned or leased by him or her. Noncommercial
use does not include the extraction of coal by one unit of an integrated company or other business or nonprofit entity which uses the coal in its own manufacturing or power plants;
(2) The extraction of 250 tons of coal or less by a person conducting a surface coal mining and reclamation operation. A person who intends to remove more than 250 tons is not exempted;
(3) The extraction of coal as an incidental part of Federal, State or local government-financed highway or other construction in accordance with part 707 of this chapter;
(4) The extraction of coal incidental to the extraction of other minerals where coal does not exceed 16
2/3
percent of the total tonnage of coal and other minerals removed for purposes of commercial use or sale in accordance with part 702 of this chapter.
(5) Coal exploration on lands subject to the requirement of 43 CFR parts 3480-3487.
(b) This chapter does not apply to the extraction of coal for commercial purposes where the surface coal mining and reclamation operation, together with any related operations, has or will have an affected area of two acres or less. For purposes of this paragraph:
(1) Where a segment of a road is used for access or coal haulage by more than one surface coal mining operation, the entire segment shall be included in the affected area of each of those operations; provided, that two or more operations which are deemed related pursuant to paragraph (b)(2) of this section shall be considered as one operation for purposes of this paragraph.
(2) Except as provided in paragraph (b)(3) of this section, surface coal mining operations shall be deemed related if they occur within twelve months of each other, are physically related, and are under common ownership or control.
(i) Operations shall be deemed physically related if drainage from both operations flows into the same watershed at or before a point within five aerial miles of either operation.
(ii) Operations shall be deemed under common ownership or control if they are owned or controlled, directly or indirectly, by or on behalf of:
(A) The same person;
(B) Two or more persons, one of whom controls, is under common control with, or is controlled by the other; or
(C) Members of the same family and their relatives, unless it is established that there is no direct or indirect business relationship between or among them;
(iii) For purposes of this paragraph,
control
means: Ownership of 50 percent or more of the voting shares of, or general partnership in, an entity; any relationship which gives one person the ability in fact or law to direct what the other does; or any relationship which gives one person express or implied authority to determine the manner in which coal at different sites will be mined, handled, sold or disposed of.
(3) Notwithstanding the provisions of paragraph (b)(2) of this section, the regulatory authority may determine, in accordance with the procedures applicable to requests for determination of exemption pursuant to paragraph (c) of this section, that two or more surface coal mining operations shall not be deemed related if, considering the history and circumstances relating to the coal, its location, the operations at the sites in question, all related operations and all persons mentioned in paragraph (b)(2)(ii) of this section, the regulatory authority concludes in writing that the operations are not of the type which the Act was intended to regulate and that there is no intention on the part of such operations or persons to evade the requirements of the Act or the applicable regulatory program.
(4) The exemption provided by paragraph (b) of this section applies only to operations with an affected area of less than two acres where coal is being extracted for commercial purposes and to surface coal mining operations within that affected area incidental to such operations.
(c) The regulatory authority may on its own initiative and shall, within a reasonable time of a request from any person who intends to conduct surface coal mining operations, make a written determination whether the operation is exempt under this section. The regulatory authority shall give reasonable notice of the request to interested persons. Prior to the time a determination is made, any person may submit, and the regulatory authority shall consider, any written information relevant to the determination. A person requesting that an operation be declared exempt shall have the burden of establishing the exemption. If a written determination of exemption is reversed through subsequent administrative or judicial action, any person who, in good faith, has made a complete and accurate request for an exemption and relied upon the determination, shall not be cited for violations which occurred prior to the date of the reversal.
(d)(1) A regulatory authority may terminate its jurisdiction under the regulatory program over the reclaimed site of a completed surface coal mining and reclamation operation, or increment thereof, when:
(i) The regulatory authority determines in writing that under the initial program, all requirements imposed under subchapter B of this chapter have been successfully completed; or
(ii) The regulatory authority determines in writing that under the permanent program, all requirements imposed under the applicable regulatory program have been successfully completed or, where a performance bond was required, the regulatory authority has made a final decision in accordance with the State or Federal program counterpart to part 800 of this chapter to release the performance bond fully.
(2) Following a termination under paragraph (d)(1) of this section, the regulatory authority shall reassert jurisdiction under the regulatory program over a site if it is demonstrated that the bond release or written determination referred to in paragraph (d)(1) of this section was based upon fraud, collusion, or misrepresentation of a material fact.
§ 700.12
Petitions to initiate rulemaking.
(a) Any person may petition the Director to initiate a proceeding for the issuance, amendment, or repeal of any regulation under the Act. The petition shall be submitted to the Office of the Director, Office of Surface Mining Reclamation and Enforcement, Department of the Interior, Washington, DC 20240.
(b) The petition shall be a concise statement of the facts, technical justification, and law which require issuance, amendment, or repeal of a regulation under the Act and shall indicate whether the petitioner desires a public hearing.
(c) Upon receipt of the petition, the Director shall determine if the petition sets forth facts, technical justification and law which may provide a reasonable basis for issuance, amendment or repeal of a regulation. Facts, technical justification or law previously considered in a petition or rulemaking on the same issue shall not provide a reasonable basis. If the Director determines that the petition has a reasonable basis, a notice shall be published in the
Federal Register
seeking comments from the public on the proposed change. The Director may hold a public hearing, may conduct an investigation or take other action to determine whether the petition should be granted.
(d) Within 90 days from receipt of the petition, the Director shall issue a written decision either granting or denying the petition. The Director's decision shall constitute the final decision for the Department.
(1) If the petition is granted, the Director shall initiate a rulemaking proceeding.
(2) If the petition is denied, the Director shall notify the petitioner in writing, setting forth the reasons for denial.
§ 700.13
Notice of citizen suits.
(a) A person who intends to initiate a civil action on his or her own behalf under section 520 of the Act shall give notice of intent to do so, in accordance with this section.
(b) Notice shall be given by certified mail to the Secretary and the Director in all cases and to the head of the State regulatory authority, if a complaint involves or relates to a specific State. A copy of the notice shall be sent by first class mail to the Regional Director, if the complaint involves or relates to surface coal mining and reclamation operations in a specific region of the Office.
(c) Notice shall be given by certified mail to the alleged violator, if the complaint alleges a violation of the Act or any regulation, order, or permit issued under the Act.
(d) Service of notice under this section is complete upon mailing to the last known address of the person being notified.
(e) A person giving notice regarding an alleged violation shall state, to the extent known—
(1) Sufficient information to identify the provision of the Act, regulation, order, or permit allegedly violated;
(2) The act or omission alleged to constitute a violation;
(3) The name, address, and telephone numbers of the person or persons responsible for the alleged violation;
(4) The date, time, and location of the alleged violation;
(5) The name, address, and telephone number of the person giving notice; and
(6) The name, address, and telephone number of legal counsel, if any, of the person giving notice.
(f) A person giving notice of an alleged failure by the Secretary or a State regulatory authority to perform a mandatory act or duty under the Act shall state, to the extent known:
(1) The provision of the Act containing the mandatory act or duty allegedly not performed;
(2) Sufficient information to identify the omission alleged to constitute the failure to perform a mandatory act or duty under the Act;
(3) The name, address, and telephone number of the person giving notice; and
(4) The name, address, and telephone number of legal counsel, if any, of the person giving notice.
§ 700.14
Availability of records.
(a) Records required by the Act to be made available locally to the public shall be retained at the geographically closest office of the State or Federal regulatory authority having jurisdiction over the area involved.
(b) Other records or documents in the possession of the Office may be requested under 43 CFR part 2, which implements the Freedom of Information Act and the Privacy Act.
§ 700.15
Computation of time.
(a) Except as otherwise provided, computation of time under this chapter is based on calendar days.
(b) In computing any period of prescribed time, the day on which the designated period of time begins is not included. The last day of the period is included unless it is a Saturday, Sunday, or legal holiday on which the regulatory authority is not open for business, in which event the period runs until the end of the next day which is not a Saturday, Sunday, or legal holiday.
(c) Intermediate Saturdays, Sundays, and legal holidays are excluded from the computation when the period of prescribed time is 7 days or less.
2. Revise part 701 to read as follows:
PART 701—PERMANENT REGULATORY PROGRAM
Sec.
701.1
Scope.
701.2
Objective.
701.3
Authority.
701.4
Responsibility.
701.5
Definitions.
701.11
Applicability.
Authority:
30 U.S.C. 1201
et seq.
§ 701.1
Scope.
(a) This part provides general introductory material for the permanent regulatory program required by the Act.
(b) The following regulations apply to the permanent regulatory program:
(1) Subchapter C on State program application, approval, withdrawal, and grants, and Federal program implementation;
(2) Subchapter D on surface coal mining and reclamation operations on Federal lands;
(3) Subchapter E on surface coal mining and reclamation operations on Indian lands.
(4) Subchapter F on criteria for designating lands unsuitable for surface coal mining operations and the process for designating these lands or withdrawing the designation by the regulatory authority;
Provided,
That, part 761 is applicable during the initial regulatory program under subchapter B of this chapter and 30 CFR part 211
1
and that part 769 and other parts incorporated therein are applicable to the initial Federal lands program under 30 CFR part 211;
(5) Subchapter G on the process for application, approval, denial, revision, and renewal of permits for surface coal mining and reclamation operations, including the small operator assistance program, requirements for special categories of these operations, and requirements for coal exploration;
(6) Subchapter J on public liability insurance and performance bonds or other assurances of performance for surface coal mining and reclamation operations;
(7) Subchapter K on performance standards which apply to coal exploration, surface coal mining and reclamation operations, and special categories of these operations;
(8) Subchapter L on inspection and enforcement responsibilities and civil penalties; and
(9) Subchapter M on the training, examination, and certification of blasters.
§ 701.2
Objective.
The regulations in this part give—
(a) A general overview of the regulatory program to be implemented by the State or Federal regulatory authority;
(b) The applicability of that program to coal exploration and surface coal mining and reclamation operations; and
(c) The definitions that apply to the regulation of coal exploration and surface coal mining and reclamation operations.
§ 701.3
Authority.
The Secretary is required by section 501(b) of the Act to promulgate regulations which establish the permanent regulatory program; by section 523 of the Act to promulgate regulations which establish the Federal lands programs; and is authorized by section 710 of the Act to promulgate regulations which establish a Federal program for Indian lands.
§ 701.4
Responsibility.
(a) A State regulatory authority shall assume primary responsibility for regulation of coal exploration and surface coal mining and reclamation operations during the permanent regulatory program upon submission to
and approval by the Secretary of a State program meeting all applicable requirements of the Act and this chapter. After approval of the State program, the State regulatory authority has responsibility for review of and decisions on permits and bonding for surface coal mining and reclamation operations, approval of coal exploration which substantially disturbs the natural land surface and removes more than 250 tons of coal from the earth in any one location, inspection of coal exploration and surface coal mining and reclamation operations for compliance with the Act, this chapter, the State program, permits and exploration approvals, and for enforcement of the State program.
(b) While a State regulatory program is in effect, the Office's responsibility includes, but is not limited to—
(1) Evaluating the administration of the State program through such means as periodic inspections of coal exploration and surface coal mining and reclamation operations in the State and review of exploration approvals, permits, inspection reports, and other documents required to be made available to the Office;
(2) Referring to the State regulatory authority information which creates reasonable belief that a person is in violation of the Act, this chapter, the State regulatory program, a permit condition, or coal exploration approval condition, and initiating an inspection when authorized by the Act or this chapter;
(3) Issuing notices of violation when a State regulatory authority fails to take appropriate action to cause a violation to be corrected; and
(4) Issuing cessation orders, including imposing affirmative obligations, when a condition, practice, or violation exists which creates an imminent danger to the health or safety of the public, or is causing or could reasonably be expected to cause significant, imminent environmental harm to land, air, or water resources.
(c) The Office shall implement a Federal program in a State, if that State does not have an approved State program by June 3, 1980. The Office shall not implement a Federal program in a State for a period of up to 1 year following that date if the State's failure to have an approved program by that date is due to an injunction imposed by a court of competent jurisdiction.
(d) Under a Federal program, the Office shall be the regulatory authority for all coal exploration and surface coal mining and reclamation operations in that State and shall perform the functions that a State regulatory authority would perform under an approved State program.
(e) During the period in which a State program is in effect, the Office shall assume responsibility for enforcing permit conditions, issuing new or revised permits, and issuing necessary notices and orders, when required by 30 CFR part 733.
(f) The Secretary shall substitute a Federal program under 30 CFR part 736 for an approved State program, when required by 30 CFR part 733.
(g) The Secretary shall have the responsibility for administration of the Federal lands program. The Director and other Federal authorities shall have the responsibilities under a Federal lands program as are provided for under subchapter D of this chapter. In addition, State regulatory authorities shall have responsibilities to administer the Federal lands program as provided for under cooperative agreements approved by the Secretary in accordance with 30 CFR part 745.
(h) The Secretary shall have the responsibility for the administration of the Federal program for Indian lands, as provided for under subchapter E of this chapter. The Director and other Federal authorities have the responsibilities under the Indian lands program as are provided for under subchapter E of this chapter.
§ 701.5
Definitions.
As used in this chapter, the following terms have the specified meanings, except where otherwise indicated:
Acid drainage
means water with a pH of less than 6.0 and in which total acidity exceeds total alkalinity, discharged from an active, inactive or abandoned surface coal mine and reclamation operation or from an area affected by surface coal mining and reclamation operations.
Acid-forming materials
means earth materials that contain sulfide minerals or other materials which, if exposed to air, water, or weathering processes, form acids that may create acid drainage.
Adjacent area
means the area outside the permit area where a resource or resources, determined according to the context in which
adjacent area
is used, are or reasonably could be expected to be adversely impacted by proposed mining operations, including probable impacts from underground workings.
Administratively complete application
means an application for permit approval or approval for coal exploration where required, which the regulatory authority determines to contain information addressing each application requirement of the regulatory program and to contain all information necessary to initiate processing and public review.
Affected area
means any land or water surface area which is used to facilitate, or is physically altered by, surface coal mining and reclamation operations. The affected area includes the disturbed area; any area upon which surface coal mining and reclamation operations are conducted; any adjacent lands the use of which is incidental to surface coal mining and reclamation operations; all areas covered by new or existing roads used to gain access to, or for hauling coal to or from, surface coal mining and reclamation operations, except as provided in this definition; any area covered by surface excavations, workings, impoundments, dams, ventilation shafts, entryways, refuse banks, dumps, stockpiles, overburden piles, spoil banks, culm banks, tailings, holes or depressions, repair areas, storage areas, shipping areas; any areas upon which are sited structures, facilities, or other property material on the surface resulting from, or incident to, surface coal mining and reclamation operations; and the area located above underground workings. The affected area shall include every road used for purposes of access to, or for hauling coal to or from, surface coal mining and reclamation operations, unless the road (a) was designated as a public road pursuant to the laws of the jurisdiction in which it is located; (b) is maintained with public funds, and constructed, in a manner similar to other public roads of the same classification within the jurisdiction; and (c) there is substantial (more than incidental) public use.
Agricultural activities
means, with respect to alluvial valley floors, the use of any tract of land for the production of animal or vegetable life, based on regional agricultural practices, where the use is enhanced or facilitated by subirrigation or flood irrigation. These uses include, but are not limited to, farming and the pasturing or grazing of livestock. These uses do not include agricultural activities which have no relationship to the availability of water from subirrigation or flood irrigation practices.
Agricultural use
means the use of any tract of land for the production of animal or vegetable life. The uses include, but are not limited to, the pasturing, grazing, and watering of livestock, and the cropping, cultivation, and harvesting of plants.
Alluvial valley floors
means the unconsolidated stream-laid deposits holding streams with water availability sufficient for subirrigation or flood irrigation agricultural activities but does not include upland areas which are
generally overlain by a thin veneer of colluvial deposits composed chiefly of debris from sheet erosion, deposits formed by unconcentrated runoff or slope wash, together with talus, or other mass-movement accumulations, and windblown deposits.
Applicant
means any person seeking a permit, permit revision, renewal, and transfer, assignment, or sale of permit rights from a regulatory authority to conduct surface coal mining and reclamation operations or, where required, seeking approval for coal exploration.
Applicant/Violator System
or
AVS
means an automated information system of applicant, permittee, operator, violation and related data OSM maintains to assist in implementing the Act.
Application
means the documents and other information filed with the regulatory authority under this chapter for the issuance of permits; revisions; renewals; and transfer, assignment, or sale of permit rights for surface coal mining and reclamation operations or, where required, for coal exploration.
Approximate original contour
means that surface configuration achieved by backfilling and grading of the mined areas so that the reclaimed area, including any terracing or access roads, closely resembles the general surface configuration of the land prior to mining and blends into and complements the drainage pattern of the surrounding terrain, with all highwalls, spoil piles and coal refuse piles eliminated. Permanent water impoundments may be permitted where the regulatory authority has determined that they comply with 30 CFR 816.49 and 816.56, 816.133 or 817.49, 817.56, and 817.133.
Aquifer
means a zone, stratum, or group of strata that can store and transmit water in sufficient quantities for a specific use.
Arid and semiarid area
means, in the context of alluvial valley floors, an area of the interior western United States, west of the 100th meridian west longitude, experiencing water deficits, where water use by native vegetation equals or exceeds that supplied by precipitation. All coalfields located in North Dakota west of the 100th meridian west longitude, all coalfields in Montana, Wyoming, Utah, Colorado, New Mexico, Idaho, Nevada, and Arizona, the Eagle Pass field in Texas, and the Stone Canyon and the Ione fields in California are in arid and semiarid areas.
Auger mining
means a method of mining coal at a cliff or highwall by drilling holes into an exposed coal seam from the highwall and transporting the coal along an auger bit to the surface.
Best technology currently available
means equipment, devices, systems, methods, or techniques which will (a) prevent, to the extent possible, additional contributions of suspended solids to stream flow or runoff outside the permit area, but in no event result in contributions of suspended solids in excess of requirements set by applicable State or Federal laws; and (b) minimize, to the extent possible, disturbances and adverse impacts on fish, wildlife and related environmental values, and achieve enhancement of those resources where practicable. The term includes equipment, devices, systems, methods, or techniques which are currently available anywhere as determined by the Director, even if they are not in routine use. The term includes, but is not limited to, construction practices, siting requirements, vegetative selection and planting requirements, animal stocking requirements, scheduling of activities and design of sedimentation ponds in accordance with 30 CFR parts 816 and 817. Within the constraints of the permanent program, the regulatory authority shall have the discretion to determine the best technology currently available on a case-by-case basis, as authorized by the Act and this chapter.
Coal exploration
means the field gathering of:
(a) surface or subsurface geologic, physical, or chemical data by mapping, trenching, drilling, geophysical, or other techniques necessary to determine the quality and quantity of overburden and coal of an area; or
(b) the gathering of environmental data to establish the conditions of an area before beginning surface coal mining and reclamation operations under the requirements of this chapter.
Coal mine waste
means coal processing waste and underground development waste.
Coal preparation
means chemical or physical processing and the cleaning, concentrating, or other processing or preparation of coal.
Coal preparation plant
means a facility where coal is subjected to chemical or physical processing or cleaning, concentrating, or other processing or preparation. It includes facilities associated with coal preparation activities, including, but not limited to the following: loading facilities; storage and stockpile facilities; sheds; shops, and other buildings; water-treatment and water-storage facilities; settling basins and impoundments; and coal processing and other waste disposal areas.
Coal processing waste
means earth materials which are separated and wasted from the product coal during cleaning, concentrating, or other processing or preparation of coal.
Combustible material
means organic material that is capable of burning, either by fire or through oxidation, accompanied by the evolution of heat and a significant temperature rise.
Compaction
means increasing the density of a material by reducing the voids between the particles and is generally accomplished by controlled placement and mechanical effort such as from repeated application of wheel, track, or roller loads from heavy equipment.
Complete and accurate application
means an application for permit approval or approval for coal exploration where required, which the regulatory authority determines to contain all information required under the Act, this subchapter, and the regulatory program that is necessary to make a decision on permit issuance.
Control
or
controller,
when used in parts 773, 774, and 778 of this chapter, refers to or means—
(a) A permittee of a surface coal mining operation;
(b) An operator of a surface coal mining operation; or
(c) Any person who has the ability to determine the manner in which a surface coal mining operation is conducted.
Cropland
means land used for the production of adapted crops for harvest, alone or in a rotation with grasses and legumes, and includes row crops, small grain crops, hay crops, nursery crops, orchard crops, and other similar specialty crops.
Cumulative impact area
means the area, including the permit area, within which impacts resulting from the proposed operation may interact with the impacts of all anticipated mining on surface- and ground-water systems. Anticipated mining shall include, at a minimum, the entire projected lives through bond releases of:
(a) The proposed operation,
(b) all existing operations,
(c) any operation for which a permit application has been submitted to the regulatory authority, and
(d) all operations required to meet diligent development requirements for leased Federal coal for which there is actual mine development information available.
Disturbed area
means an area where vegetation, topsoil, or overburden is removed or upon which topsoil, spoil, coal processing waste, underground development waste, or noncoal waste is
placed by surface coal mining operations. Those areas are classified as
disturbed
until reclamation is complete and the performance bond or other assurance of performance required by subchapter J of this chapter is released.
Diversion
means a channel, embankment, or other manmade structure constructed to divert water from one area to another.
Downslope
means the land surface between the projected outcrop of the lowest coalbed being mined along each highwall and a valley floor.
Drinking, domestic or residential water supply
means water received from a well or spring and any appurtenant delivery system that provides water for direct human consumption or household use. Wells and springs that serve only agricultural, commercial or industrial enterprises are not included except to the extent the water supply is for direct human consumption or human sanitation, or domestic use.
Embankment
means an artificial deposit of material that is raised above the natural surface of the land and used to contain, divert, or store water, support roads or railways, or for other similar purposes.
Ephemeral stream
means a stream which flows only in direct response to precipitation in the immediate watershed or in response to the melting of a cover of snow and ice, and which has a channel bottom that is always above the local water table.
Essential hydrologic functions
means the role of an alluvial valley floor in collecting, storing, regulating, and making the natural flow of surface or ground water, or both, usefully available for agricultural activities by reason of the valley floor's topographic position, the landscape, and the physical properties of its underlying materials. A combination of these functions provides a water supply during extended periods of low precipitation.
Excess spoil
means spoil material disposed of in a location other than the mined-out area; provided that spoil material used to achieve the approximate original contour or to blend the mined-out area with the surrounding terrain in accordance with §§ 816.102(d) and 817.102(d) of this chapter in non-steep slope areas shall not be considered excess spoil.
Existing structure
means a structure or facility used in connection with or to facilitate surface coal mining and reclamation operations for which construction begins prior to the approval of a State program or implementation of a Federal program or Federal lands program, whichever occurs first.
Farming
means, with respect to alluvial valley floors, the primary use of those areas for the cultivation, cropping or harvesting of plants which benefit from irrigation, or natural subirrigation, that results from the increased moisture content in the alluvium of the valley floors. For purposes of this definition, harvesting does not include the grazing of livestock.
Federal program
means a program established by the Secretary pursuant to section 504 of the Act to regulate coal exploration and surface coal mining and reclamation operations on non-Federal and non-Indian lands within a State in accordance with the Act and this chapter.
(a)
Complete Federal program
means a program established by the Secretary pursuant to section 504 of the Act before June 3, 1980, or upon the complete withdrawal of a State program after June 3, 1980, by which the Director regulates all coal exploration and surface coal mining and reclamation operations.
(b)
Partial Federal program
means a program established by the Secretary pursuant to sections 102, 201 and 504 of the Act upon the partial withdrawal of a State program, by which the Director may regulate appropriate portions of coal exploration and surface coal mining and reclamation operations.
Flood irrigation
means, with respect to alluvial valley floors, supplying water to plants by natural overflow or the diversion of flows, so that the irrigated surface is largely covered by a sheet of water.
Fugitive dust
means that particulate matter not emitted from a duct or stack which becomes airborne due to the forces of wind or surface coal mining and reclamation operations or both. During surface coal mining and reclamation operations it may include emissions from haul roads; wind erosion of exposed surfaces, storage piles, and spoil piles; reclamation operations; and other activities in which material is either removed, stored, transported, or redistributed.
Gravity discharge
means, with respect to underground mining activities, mine drainage that flows freely in an open channel downgradient. Mine drainage that occurs as a result of flooding a mine to the level of the discharge is not gravity discharge.
Ground cover
means the area of ground covered by the combined aerial parts of vegetation and the litter that is produced naturally onsite, expressed as a percentage of the total area of measurement.
Ground water
means subsurface water that fills available openings in rock or soil materials to the extent that they are considered water saturated.
Half-shrub
means a perennial plant with a woody base whose annually produced stems die back each year.
Head-of-hollow fill
means a fill structure consisting of any material, other than organic material, placed in the uppermost reaches of a hollow where side slopes of the existing hollow, measured at the steepest point, are greater than 20 degrees or the average slope of the profile of the hollow from the toe of the fill to the top of the fill is greater than 10 degrees. In head-of-hollow fills the top surface of the fill, when completed, is at approximately the same elevation as the adjacent ridge line, and no significant area of natural drainage occurs above the fill draining into the fill area.
Higher or better uses
means postmining land uses that have a higher economic value or nonmonetary benefit to the landowner or the community than the premining land uses.
Highwall
means the face of exposed overburden and coal in an open cut of a surface coal mining activity or for entry to underground mining activities.
Highwall remnant
means that portion of highwall that remains after backfilling and grading of a remining permit area.
Historically used for cropland
means
(a) lands that have been used for cropland for any 5 years or more out of the 10 years immediately preceding the acquisition, including purchase, lease, or option, of the land for the purpose of conducting or allowing through resale, lease or option the conduct of surface coal mining and reclamation operations;
(b) lands that the regulatory authority determines, on the basis of additional cropland history of the surrounding lands and the lands under consideration, that the permit area is clearly cropland but falls outside the specific 5-years-in-10 criterion, in which case the regulations for prime farmland may be applied to include more years of cropland history only to increase the prime farmland acreage to be preserved; or
(c) lands that would likely have been used as cropland for any 5 out of the last 10 years, immediately preceding such acquisition but for the same fact of ownership or control of the land unrelated to the productivity of the land.
Hydrologic balance
means the relationship between the quality and quantity of water inflow to, water outflow from, and water storage in a hydrologic unit such as a drainage basin, aquifer, soil zone, lake, or reservoir. It encompasses the dynamic
relationships among precipitation, runoff, evaporation, and changes in ground and surface water storage.
Hydrologic regime
means the entire state of water movement in a given area. It is a function of the climate and includes the phenomena by which water first occurs as atmospheric water vapor, passes into a liquid or solid form, falls as precipitation, moves along or into the ground surface, and returns to the atmosphere as vapor by means of evaporation and transpiration.
Imminent danger to the health and safety of the public
means the existence of any condition or practice, or any violation of a permit or other requirements of the Act in a surface coal mining and reclamation operation, which could reasonably be expected to cause substantial physical harm to persons outside the permit area before the condition, practice, or violation can be abated. A reasonable expectation of death or serious injury before abatement exists if a rational person, subjected to the same condition or practice giving rise to the peril, would avoid exposure to the danger during the time necessary for abatement.
Impounding structure
means a dam, embankment or other structure used to impound water, slurry, or other liquid or semi-liquid material.
Impoundments
means all water, sediment, slurry or other liquid or semi-liquid holding structures and depressions, either naturally formed or artificially built.
In situ processes
means activities conducted on the surface or underground in connection with in-place distillation, retorting, leaching, or other chemical or physical processing of coal. The term includes, but is not limited to, in situ gasification, in situ leaching, slurry mining, solution mining, borehole mining, and fluid recovery mining.
Intermittent stream
means—
(a) A stream or reach of a stream that drains a watershed of at least one square mile, or
(b) A stream or reach of a stream that is below the local water table for at least some part of the year, and obtains its flow from both surface runoff and ground water discharge.
Irreparable damage to the environment
means any damage to the environment, in violation of the Act, the regulatory program, or this chapter, that cannot be corrected by actions of the applicant.
Knowing
or
knowingly
means that a person who authorized, ordered, or carried out an act or omission knew or had reason to know that the act or omission would result in either a violation or a failure to abate or correct a violation.
Land use
means specific uses or management-related activities, rather than the vegetation or cover of the land. Land uses may be identified in combination when joint or seasonal uses occur and may include land used for support facilities that are an integral part of the use. Changes of land use from one of the following categories to another shall be considered as a change to an alternative land use which is subject to approval by the regulatory authority.
(a)
Cropland.
Land used for the production of adapted crops for harvest, alone or in rotation with grasses and legumes, that include row crops, small grain crops, hay crops, nursery crops, orchard crops, and other similar crops.
(b)
Pastureland or land occasionally cut for hay.
Land used primarily for the long-term production of adapted, domesticated forage plants to be grazed by livestock or occasionally cut and cured for livestock feed.
(c)
Grazingland.
Land used for grasslands and forest lands where the indigenous vegetation is actively managed for grazing, browsing, or occasional hay production.
(d)
Forestry.
Land used or managed for the long-term production of wood, wood fiber, or wood-derived products.
(e)
Residential.
Land used for single-and multiple-family housing, mobile home parks, or other residential lodgings.
(f)
Industrial/Commercial.
Land used for—
(1) Extraction or transformation of materials for fabrication of products, wholesaling of products, or long-term storage of products. This includes all heavy and light manufacturing facilities.
(2) Retail or trade of goods or services, including hotels, motels, stores, restaurants, and other commercial establishments.
(g)
Recreation.
Land used for public or private leisure-time activities, including developed recreation facilities such as parks, camps, and amusement areas, as well as areas for less intensive uses such as hiking, canoeing, and other undeveloped recreational uses.
(h)
Fish and wildlife habitat.
Land dedicated wholly or partially to the production, protection, or management of species of fish or wildlife.
(i)
Developed water resources.
Land used for storing water for beneficial uses, such as stockponds, irrigation, fire protection, flood control, and water supply.
(j)
Undeveloped land or no current use or land management.
Land that is undeveloped or, if previously developed, land that has been allowed to return naturally to an undeveloped state or has been allowed to return to forest through natural succession.
Lands eligible for remining
means those lands that would otherwise be eligible for expenditures under section 404 or under section 402(g)(4) of the Act.
Material damage,
in the context of §§ 784.20 and 817.121 of this chapter, means:
(a) Any functional impairment of surface lands, features, structures or facilities;
(b) Any physical change that has a significant adverse impact on the affected land's capability to support any current or reasonably foreseeable uses or causes significant loss in production or income; or
(c) Any significant change in the condition, appearance or utility of any structure or facility from its pre-subsidence condition.
Materially damage the quantity or quality of water
means, with respect to alluvial valley floors, to degrade or reduce by surface coal mining and reclamation operations the water quantity or quality supplied to the alluvial valley floor to the extent that resulting changes would signficantly decrease the capability of the alluvial valley floor to support farming.
MSHA
means the Mine Safety and Health Administration.
Moist bulk density
means the weight of soil (oven dry) per unit volume. Volume is measured when the soil is at field moisture capacity (
1/3
bar moisture tension). Weight is determined after drying the soil at 105 °C.
Mulch
means vegetation residues or other suitable materials that aid in soil stabilization and soil moisture conservation, thus providing micro-climatic conditions suitable for germination and growth.
Non-commercial building
means any building, other than an occupied residential dwelling, that, at the time the subsidence occurs, is used on a regular or temporary basis as a public building or community or institutional building as those terms are defined in § 761.5 of this chapter. Any building used only for commercial agricultural, industrial, retail or other commercial enterprises is excluded.
Noxious plants
means species that have been included on official State lists of noxious plants for the State in which the surface coal mining and reclamation operation occurs.
Occupied residential dwelling and structures related thereto means,
for purposes of §§ 784.20 and 817.121, any building or other structure that, at the
time the subsidence occurs, is used either temporarily, occasionally, seasonally, or permanently for human habitation. This term also includes any building, structure or facility installed on, above or below, or a combination thereof, the land surface if that building, structure or facility is adjunct to or used in connection with an occupied residential dwelling. Examples of such structures include, but are not limited to, garages; storage sheds and barns; greenhouses and related buildings; utilities and cables; fences and other enclosures; retaining walls; paved or improved patios, walks and driveways; septic sewage treatment facilities; and lot drainage and lawn and garden irrigation systems. Any structure used only for commercial agricultural, industrial, retail or other commercial purposes is excluded.
Operator
means any person engaged in coal mining who removes or intends to remove more than 250 tons of coal from the earth or from coal refuse piles by mining within 12 consecutive calendar months in any one location.
Other treatment facilities
mean any chemical treatments, such as flocculation or neutralization, or mechanical structures, such as clarifiers or precipitators, that have a point source discharge and are utilized:
(a) To prevent additional contributions of dissolved or suspended solids to streamflow or runoff outside the permit area, or
(b) To comply with all applicable State and Federal water-quality laws and regulations.
Outslope
means the face of the spoil or embankment sloping downward from the highest elevation to the toe.
Overburden
means material of any nature, consolidated or unconsolidated, that overlies a coal deposit, excluding topsoil.
Own, owner,
or
ownership,
as used in parts 773, 774, and 778 of this chapter (except when used in the context of ownership of real property), means being a sole proprietor or owning of record in excess of 50 percent of the voting securities or other instruments of ownership of an entity.
Perennial stream
means a stream or part of a stream that flows continuously during all of the calendar year as a result of ground-water discharge or surface runoff. The term does not include
intermittent stream
or
ephemeral stream.
Performance bond
means a surety bond, collateral bond or self-bond or a combination thereof, by which a permittee assures faithful performance of all the requirements of the Act, this chapter, a State, Federal or Federal lands program, and the requirements of the permit and reclamation plan.
Permanent diversion
means a diversion remaining after surface coal mining and reclamation operations are completed which has been approved for retention by the regulatory authority and other appropriate State and Federal agencies.
Permanent impoundment
means an impoundment which is approved by the regulatory authority and, if required, by other State and Federal agencies for retention as part of the postmining land use.
Permit
means a permit to conduct surface coal mining and reclamation operations issued by the State regulatory authority pursuant to a State program or by the Secretary pursuant to a Federal program. For purposes of the Federal lands program, permit means a permit issued by the State regulatory authority under a cooperative agreement or by OSM where there is no cooperative agreement.
Permit area
means the area of land, indicated on the approved map submitted by the operator with his or her application, required to be covered by the operator's performance bond under subchapter J of this chapter and which shall include the area of land upon which the operator proposes to conduct surface coal mining and reclamation operations under the permit, including all disturbed areas; provided that areas adequately bonded under another valid permit may be excluded from the permit area.
Permittee
means a person holding or required by the Act or this chapter to hold a permit to conduct surface coal mining and reclamation operations issued by a State regulatory authority pursuant to a State program, by the Director pursuant to a Federal program, by the Director pursuant to a Federal lands program, or, where a cooperative agreement pursuant to section 523 of the Act has been executed, by the Director and the State regulatory authority.
Precipitation event
means a quantity of water resulting from drizzle, rain, snow, sleet, or hail in a limited period of time. It may be expressed in terms of recurrence interval. As used in these regulations,
precipitation event
also includes that quantity of water emanating from snow cover as snowmelt in a limited period of time.
Previously mined area
means land affected by surface coal mining operations prior to August 3, 1977, that has not been reclaimed to the standards of 30 CFR chapter VII.
Prime farmland
means those lands which are defined by the Secretary of Agriculture in 7 CFR part 657 (
Federal Register
Vol. 4 No. 21) and which have historically been used for cropland as that phrase is defined above.
Principal shareholder
means any person who is the record or beneficial owner of 10 percent or more of any class of voting stock.
Property to be mined
means both the surface estates and mineral estates within the permit area and the area covered by underground workings.
Rangeland
means land on which the natural potential (climax) plant cover is principally native grasses, forbs, and shrubs valuable for forage. This land includes natural grasslands and savannahs, such as prairies, and juniper savannahs, such as brushlands. Except for brush control, management is primarily achieved by regulating the intensity of grazing and season of use.
Reasonably available spoil
means spoil and suitable coal mine waste material generated by the remining operation or other spoil or suitable coal mine waste material located in the permit area that is accessible and available for use and that when rehandled will not cause a hazard to public safety or significant damage to the environment.
Recharge capacity
means the ability of the soils and underlying materials to allow precipitation and runoff to infiltrate and reach the zone of saturation.
Reclamation
means those actions taken to restore mined land as required by this chapter to a postmining land use approved by the regulatory authority.
Recurrence interval
means the interval of time in which a precipitation event is expected to occur once, on the average. For example, the 10-year 24-hour precipitation event would be that 24-hour precipitation event expected to occur on the average once in 10 years.
Reference area
means a land unit maintained under appropriate management for the purpose of measuring vegetation ground cover, productivity and plant species diversity that are produced naturally or by crop production methods approved by the regulatory authority. Reference areas must be representative of geology, soil, slope, and vegetation in the permit area.
Refuse pile
means a surface deposit of coal mine waste that does not impound water, slurry, or other liquid or semi-liquid material.
Remining
means conducting surface coal mining and reclamation operations which affect previously mined areas.
Renewable resource lands
means aquifers and areas for the recharge of aquifers and other underground waters, areas for agricultural or silvicultural
production of food and fiber, and grazinglands.
Replacement of water supply
means, with respect to protected water supplies contaminated, diminished, or interrupted by coal mining operations, provision of water supply on both a temporary and permanent basis equivalent to premining quantity and quality. Replacement includes provision of an equivalent water delivery system and payment of operation and maintenance costs in excess of customary and reasonable delivery costs for premining water supplies.
(a) Upon agreement by the permittee and the water supply owner, the obligation to pay such operation and maintenance costs may be satisfied by a one-time payment in an amount which covers the present worth of the increased annual operation and maintenance costs for a period agreed to by the permittee and the water supply owner.
(b) If the affected water supply was not needed for the land use in existence at the time of loss, contamination, or diminution, and if the supply is not needed to achieve the postmining land use, replacement requirements may be satisfied by demonstrating that a suitable alternative water source is available and could feasibly be developed. If the latter approach is selected, written concurrence must be obtained from the water supply owner.
Road
means a surface right-of-way for purposes of travel by land vehicles used in surface coal mining and reclamation operations or coal exploration. A road consists of the entire area within the right-of-way, including the roadbed, shoulders, parking and side areas, approaches, structures, ditches, and surface. The term includes access and haulroads constructed, used, reconstructed, improved, or maintained for use in surface coal mining and reclamation operations or coal exploration, including use by coal hauling vehicles to and from transfer, processing, or storage areas. The term does not include ramps and routes of travel within the immediate mining area or within spoil or coal mine waste disposal areas.
Safety factor
means the ratio of the available shear strength to the developed shear stress, or the ratio of the sum of the resisting forces to the sum of the loading or driving forces, as determined by accepted engineering practices.
Sedimentation pond
means an impoundment used to remove solids from water in order to meet water quality standards or effluent limitations before the water leaves the permit area.
Significant, imminent environmental harm to land, air or water resources
means—
(a) An environmental harm is an adverse impact on land, air, or water resources which resources include, but are not limited to, plant and animal life.
(b) An environmental harm is imminent, if a condition, practice, or violation exists which—
(1) Is causing such harm; or,
(2) May reasonably be expected to cause such harm at any time before the end of the reasonable abatement time that would be set under section 521(a)(3) of the Act.
(c) An environmental harm is significant if that harm is appreciable and not immediately reparable.
Siltation structure
means a sedimentation pond, a series of sedimentation ponds, or other treatment facility.
Slope
means average inclination of a surface, measured from the horizontal, generally expressed as the ratio of a unit of vertical distance to a given number of units of horizontal distance (
e.g.,
1v: 5h). It may also be expressed as a percent or in degrees.
Soil horizons
means contrasting layers of soil parallel or nearly parallel to the land surface. Soil horizons are differentiated on the basis of field characteristics and laboratory data. The four master soil horizons are—
(a)
A horizon.
The uppermost mineral layer, often called the surface soil. It is the part of the soil in which organic matter is most abundant, and leaching of soluble or suspended particles is typically the greatest;
(b)
E horizon.
The layer commonly near the surface below an A horizon and above a B horizon. An E horizon is most commonly differentiated from an overlying A horizon by lighter color and generally has measurably less organic matter than the A horizon. An E horizon is most commonly differentiated from an underlying B horizon in the same sequum by color of higher value or lower chroma, by coarser texture, or by a combination of theses properties;
(c)
B horizon.
The layer that typically is immediately beneath the E horizon and often called the subsoil. This middle layer commonly contains more clay, iron, or aluminum than the A, E, or C horizons; and
(d)
C horizon.
The deepest layer of soil profile. It consists of loose material or weathered rock that is relatively unaffected by biologic activity.
Soil survey
means a field and other investigation, resulting in a map showing the geographic distribution of different kinds of soils and an accompanying report that describes, classifies, and interprets such soils for use. Soil surveys must meet the standards of the National Cooperative Soil Survey as incorporated by reference in 30 CFR 785.17(c)(1).
Special bituminous coal mines
means those mines in existence on January 1, 1972, or mines adjoining or having a common boundary with those mines for which development began after August 3, 1977, that are located in the State of Wyoming and that are being mined or will be mined according to the following criteria:
(a) Surface mining takes place on a relatively limited site for an extended period of time. The surface opening of the excavation is at least the full size of the excavation and has a continuous border.
(b) Excavation of the mine pit follows a coal seam that inclines 15° or more from the horizontal, and as the excavation proceeds downward it expands laterally to maintain stability of the pitwall or as necessary to accommodate the orderly expansion of the total mining operation.
(c) The amount of material removed from the pit is large in comparison to the surface area disturbed.
(d) There is no practicable alternative to the deep open-pit method of mining the coal.
(e) There is no practicable way to reclaim the land as required in subchapter K.
Spoil
means overburden that has been removed during surface coal mining operations.
Stabilize
means to control movement of soil, spoil piles, or areas of disturbed earth by modifying the geometry of the mass, or by otherwise modifying physical or chemical properties, such as by providing a protective surface coating.
State program
means a program established by a State and approved by the Secretary pursuant to section 503 of the Act to regulate surface coal mining and reclamation operations on non-Indian and non-Federal lands within that State, according to the requirements of the Act and this chapter. If a cooperative agreement under part 745 has been entered into, a State program may apply to Federal lands, in accordance with the terms of the cooperative agreement.
Steep slope
means any slope of more than 20° or such lesser slope as may be designated by the regulatory authority after consideration of soil, climate, and other characteristics of a region or State.
Subirrigation
means, with respect to alluvial valley floors, the supplying of water to plants from underneath or from a semisaturated or saturated subsurface
zone where water is available for use by vegetation.
Substantially disturb
means, for purposes of coal exploration, to significantly impact land or water resources by blasting; by removal of vegetation, topsoil, or overburden; by construction of roads or other access routes; by placement of excavated earth or waste material on the natural land surface or by other such activities; or to remove more than 250 tons of coal.
Successor in interest
means any person who succeeds to rights granted under a permit, by transfer, assignment, or sale of those rights.
Surface mining activities
means those surface coal mining and reclamation operations incident to the extraction of coal from the earth by removing the materials over a coal seam, before recovering the coal, by auger coal mining, or by recovery of coal from a deposit that is not in its original geologic location.
Suspended solids
or nonfilterable residue, expressed as milligrams per liter, means organic or inorganic materials carried or held in suspension in water which are retained by a standard glass fiber filter in the procedure outlined by the Environmental Protection Agency's regulations for waste water and analyses (40 CFR part 136).
Temporary diversion
means a diversion of a stream or overland flow which is used during coal exploration or surface coal mining and reclamation operations and not approved by the regulatory authority to remain after reclamation as part of the approved postmining land use.
Temporary impoundment
means an impoundment used during surface coal mining and reclamation operations, but not approved by the regulatory authority to remain as part of the approved postmining land use.
Topsoil
means the A and E soil horizon layers of the four master soil horizons.
Toxic-forming materials
means earth materials or wastes which, if acted upon by air, water, weathering, or microbiological processes, are likely to produce chemical or physical conditions in soils or water that are detrimental to biota or uses of water.
Toxic mine drainage
means water that is discharged from active or abandoned mines or other areas affected by coal exploration or surface coal mining and reclamation operations, which contains a substance that through chemical action or physical effects is likely to kill, injure, or impair biota commonly present in the area that might be exposed to it.
Transfer, assignment, or sale of permit rights
means a change of a permittee.
Unanticipated event or condition,
as used in § 773.13 of this chapter, means an event or condition related to prior mining activity which arises from a surface coal mining and reclamation operation on lands eligible for remining and was not contemplated by the applicable permit.
Underground development waste
means waste-rock mixtures of coal, shale, claystone, siltstone, sandstone, limestone, or related materials that are excavated, moved, and disposed of from underground workings in connection with underground mining activities.
Underground mining activities
means a combination of—
(a) Surface operations incident to underground extraction of coal or in situ processing, such as construction, use, maintenance, and reclamation of roads, above-ground repair areas, storage areas, processing areas, shipping areas, areas upon which are sited support facilities including hoist and ventilating ducts, areas utilized for the disposal and storage of waste, and areas on which materials incident to underground mining operations are placed; and
(b) Underground operations such as underground construction, operation, and reclamation of shafts, adits, underground support facilities, in situ processing, and underground mining, hauling, storage, and blasting.
Undeveloped rangeland
means, for purposes of alluvial valley floors, lands where the use is not specifically controlled and managed.
Upland areas
means, with respect to alluvial valley floors, those geomorphic features located outside the floodplain and terrace complex, such as isolated higher terraces, alluvial fans, pediment surfaces, landslide deposits, and surfaces covered with residuum, mud flows or debris flows, as well as highland areas underlain by bedrock and covered by residual weathered material or debris deposited by sheetwash, rillwash, or windblown material.
Valley fill
means a fill structure consisting of any material, other than organic material, that is placed in a valley where side slopes of the existing valley, measured at the steepest point, are greater than 20 degrees, or where the average slope of the profile of the valley from the toe of the fill to the top of the fill is greater than 10 degrees.
Violation,
when used in the context of the permit application information or permit eligibility requirements of sections 507 and 510(c) of the Act and related regulations, means—
(1) A failure to comply with an applicable provision of a Federal or State law or regulation pertaining to air or water environmental protection, as evidenced by a written notification from a governmental entity to the responsible person; or
(2) A noncompliance for which OSM has provided one or more of the following types of notice or a State regulatory authority has provided equivalent notice under corresponding provisions of a State regulatory program—
(i) A notice of violation under § 843.12 of this chapter.
(ii) A cessation order under § 843.11 of this chapter.
(iii) A final order, bill, or demand letter pertaining to a delinquent civil penalty assessed under part 845 or 846 of this chapter.
(iv) A bill or demand letter pertaining to delinquent reclamation fees owed under part 870 of this chapter.
(v) A notice of bond forfeiture under § 800.50 of this chapter when—
(A) One or more violations upon which the forfeiture was based have not been abated or corrected;
(B) The amount forfeited and collected is insufficient for full reclamation under § 800.50(d)(1) of this chapter, the regulatory authority orders reimbursement for additional reclamation costs, and the person has not complied with the reimbursement order; or
(C) The site is covered by an alternative bonding system approved under § 800.11(e) of this chapter, that system requires reimbursement of any reclamation costs incurred by the system above those covered by any site-specific bond, and the person has not complied with the reimbursement requirement and paid any associated penalties.
Violation, failure or refusal,
for purposes of parts 724 and 846 of this chapter, means—
(1) A failure to comply with a condition of a Federally-issued permit or of any other permit that OSM is directly enforcing under section 502 or 521 of the Act or the regulations implementing those sections; or
(2) A failure or refusal to comply with any order issued under section 521 of the Act, or any order incorporated in a final decision issued by the Secretary under the Act, except an order incorporated in a decision issued under section 518(b) or section 703 of the Act.
Violation notice
means any written notification from a regulatory authority or other governmental entity, as specified in the definition of
violation
in this section.
Water table
means the upper surface of a zone of saturation, where the body of ground water is not confined by an overlying impermeable zone.
Willful
or
willfully
means that a person who authorized, ordered or carried out an act or omission that resulted in either a violation or the failure to abate or correct a violation acted—
(1) Intentionally, voluntarily, or consciously; and
(2) With intentional disregard or plain indifference to legal requirements.
§ 701.11
Applicability.
(a) Any person who conducts surface coal mining operations on non-Indian or non-Federal lands on or after 8 months from the date of approval of a State program or implementation of a Federal program shall have a permit issued pursuant to the applicable State or Federal program. However, under conditions specified in 30 CFR 773.4(b) of this chapter, a person may continue operations under a previously issued permit after 8 months from the date of approval of a State program or implementation of a Federal program.
(b) Any person who conducts surface coal mining operations on Federal lands on or after 8 months from the date of approval of a State program or implementation of a Federal program for the State in which the Federal lands are located shall have a permit issued pursuant to part 740 of this chapter. However, under conditions specified in § 740.13(a)(3) of this chapter, a person may continue such operations under a mining plan previously approved pursuant to 43 CFR part 3480 or a permit issued by the State under the interim State program after 8 months after the date of approval of a State program or implementation of a Federal program.
(c) Any person who conducts surface coal mining operations on Indian lands on or after eight months from the effective date of the Federal program for Indian lands shall have a permit issued pursuant to part 750 of this chapter. However, a person who is authorized to conduct surface coal mining operations may continue to conduct those operations beyond eight months from the effective date of the Federal program for Indian lands if the following conditions are met:
(1) An application for a permit to conduct those operations has been made to the Director within two months after the effective date of the Federal program for Indian lands and the initial administrative decision on that application has not been issued; and
(2) Those operations are conducted in compliance with all terms and conditions of the existing authorization to mine, the requirements of the Act, 25 CFR part 216, and the requirements of all applicable mineral agreements, leases or licenses.
(d) The requirements of subchapter K of this chapter shall be effective and shall apply to each surface coal mining and reclamation operation for which the surface coal mining operation is required to obtain a permit under the Act, on the earliest date upon which the Act and this chapter require a permit to be obtained, except as provided in paragraph (e) of this section.
(e)(1) Each structure used in connection with or to facilitate a coal exploration or surface coal mining and reclamation operation shall comply with the performance standards and the design requirements of subchapter K of this chapter, except that—
(i) An existing structure which meets the performance standards of subchapter K of this chapter but does not meet the design requirements of subchapter K of this chapter may be exempted from meeting those design requirements by the regulatory authority. The regulatory authority may grant this exemption only as part of the permit application process after obtaining the information required by 30 CFR 780.12 or 784.12 and after making the findings required in 30 CFR 773.15;
(ii) If the performance standard of subchapter B of this chapter is at least as stringent as the comparable performance standard of subchapter K of this chapter, an existing structure which meets the performance standards of subchapter B of this chapter may be exempted by the regulatory authority from meeting the design requirements of subchapter K of this chapter. The regulatory authority may grant this exemption only as part of the permit application process after obtaining the information required by 30 CFR 780.12 or 784.12 and after making the findings required in 30 CFR 773.15;
(iii) An existing structure which meets a performance standard of subchapter B of this chapter which is less stringent than the comparable performance standards of subchapter K of this chapter or which does not meet a performance standard of subchapter K of this chapter, for which there was no equivalent performance standards in subchapter B of this chapter, shall be modified or reconstructed to meet the performance and design standard of subchapter K of this chapter pursuant to a compliance plan approved by the regulatory authority only as part of the permit application as required in 30 CFR 780.12 or 784.12 and according to the findings required by 30 CFR 773.15;
(iv) An existing structure which does not meet the performance standards of subchapter B of this chapter and which the applicant proposes to use in connection with or to facilitate the coal exploration or surface coal mining and reclamation operation shall be modified or reconstructed to meet the performance and design standards of subchapter K prior to issuance of the permit.
(2) The exemptions provided in paragraphs (e)(1)(i) and (e)(1)(ii) of this section shall not apply to—
(i) The requirements for existing and new coal mine waste disposal facilities; and
(ii) The requirements to restore the approximate original contour of the land.
(f)(1) Any person conducting coal exploration on non-Federal and non-Indian lands on or after the date on which a State program is approved or a Federal program implemented, shall either file a notice of intention to explore or obtain approval of the regulatory authority, as required by 30 CFR part 772.
(2) Coal exploration performance standards in 30 CFR part 815 shall apply to coal exploration on non-Federal and non-Indian lands which substantially disturbs the natural land surface 2 months after approval of a State program or implementation of a Federal program.
3. Revise part 773 to read as follows:
PART 773—REQUIREMENTS FOR PERMITS AND PERMIT PROCESSING
Sec.
773.1
Scope and purpose.
773.3
Information collection.
773.4
Requirements to obtain permits.
773.5
Regulatory coordination with requirements under other laws.
773.6
Public participation in permit processing.
773.7
Review of permit applications.
773.8
General provisions for review of permit application information and entry of information into AVS.
773.9
Review of applicant and operator information.
773.10
Review of permit history.
773.11
Review of compliance history.
773.12
Permit eligibility determination.
773.13
Unanticipated events or conditions at remaining sites.
773.14
Eligibility for provisionally issued permits.
773.15
Written findings for permit application approval.
773.16
Performance bond submittal.
773.17
Permit conditions.
773.19
Permit issuance and right of renewal.
773.21
Initial review and finding requirements for improvidently issued permits.
773.22
Notice requirements for improvidently issued permits.
773.23
Suspension or rescission requirements for improvidently issued permits.
773.25
Who may challenge ownership or control listings and findings.
773.26
How to challenge an ownership or control listing or finding.
773.27
Burden of proof for ownership or control challenges.
773.28
Written agency decision on challenges to ownership or control listings or findings.
Authority:
30 U.S.C. 1201
et seq.,
16 U.S.C. 470
et seq.,
16 U.S.C. 661
et seq.,
16 U.S.C. 703
et seq.,
16 U.S.C. 668a
et seq.,
16 U.S.C. 469
et seq.,
and 16 U.S.C. 1531
et seq.
§ 773.1
Scope and purpose.
This part provides minimum requirements for permits and permit processing and covers obtaining and reviewing permits; coordinating with other laws; public participation; permit decision and notification; permit conditions; and permit term and right of renewal.
§ 773.3
Information collection.
The collections of information contained in part 773 have been approved by the Office of Management and Budget under 44 U.S.C. 3501
et seq.
and assigned clearance number 1029-0115. The information collected will be used by the regulatory authority in processing surface coal mining permit applications. Persons intending to conduct surface coal mining operations must respond to obtain a benefit. A Federal agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. Response is required to obtain a benefit in accordance with SMCRA. Send comments regarding burden estimates or any other aspect of this collection of information, including suggestions for reducing the burden, to the Office of Surface Mining Reclamation and Enforcement, Information Collection Clearance Officer, Room 202—SIB, 1951 Constitution Avenue NW., Washington, DC 20240.
§ 773.4
Requirements to obtain permits.
(a)
All operations.
On and after 8 months from the effective date of a permanent regulatory program within a State, no person shall engage in or carry out any surface coal mining operations, unless such person has first obtained a permit issued by the regulatory authority except as provided for in paragraph (b) of this section. A permittee need not renew the permit if no surface coal mining operations will be conducted under the permit and solely reclamation activities remain to be done. Obligations established under a permit continue until completion of surface coal mining and reclamation operations, regardless of whether the authorization to conduct surface coal mining operations has expired or has been terminated, revoked, or suspended.
(b)
Continuation of initial program operations.
(1) If a State program receives final disapproval under part 732 of this chapter, including judicial review of the disapproval, existing surface coal mining and reclamation operations may continue pursuant to the provisions of subchapter B of this chapter and section 502 of the Act until promulgation of a complete Federal program for the State. During this period, no new permits for surface coal mining and reclamation operations shall be issued by the State. Permits that lapse during this period may continue in full force and effect within the specified permit area until promulgation of a Federal program for the State.
(2) Except for coal preparation plants separately authorized to operate under 30 CFR 785.21(e), a person conducting surface coal mining operations, under a permit issued or amended by the regulatory authority in accordance with the requirements of section 502 of the Act, may conduct such operations beyond the period prescribed in paragraph (a) of this section if—
(i) Not later than 2 months following the effective date of a permanent regulatory program, regardless of litigation contesting that program, an application for a permanent regulatory program permit is filed for any operation to be conducted after the expiration of 8 months from such effective date in accordance with the provisions of the regulatory program;
(ii) The regulatory authority has not yet rendered an initial administrative decision approving or disapproving the permit; and
(iii) The surface coal mining and reclamation operation is conducted in compliance with the requirements of the Act, subchapter B of this chapter, applicable State statutes and regulations, and all terms and conditions of the initial program authorization or permit.
(3) No new initial program permits may be issued after the effective date of a State program unless the application was received prior to such date.
(c)
Continued operations under Federal program permits.
(1) A permit issued by the Director pursuant to a Federal program for a State shall be valid under any superseding State program approved by the Secretary.
(2) The Federal permittee shall have the right to apply to the State regulatory authority for a State permit to supersede the Federal permit.
(3) The State regulatory authority may review a permit issued pursuant to the superseded Federal program to determine that the requirements of the Act and the approved State program are not violated by the Federal permit, and to the extent that the approved State program contains additional requirements not contained in the Federal program for the State, the State regulatory authority shall—
(i) Inform the permittee in writing;
(ii) Provide the permittee an opportunity for a hearing;
(iii) Provide the permittee a reasonable opportunity to resubmit the permit application in whole or in part, as appropriate; and
(iv) Provide the permittee a reasonable time to conform ongoing surface coal mining and reclamation operations to the requirements of the State program.
(d)
Continued operations under State program permits.
(1) A permit issued pursuant to a previously approved or conditionally approved State program shall be valid under a superseding Federal program.
(2) Immediately following promulgation of a Federal program, the Director shall review the permits issued under the previously approved State program to determine that the requirements of the Act, this chapter, and the Federal program are not violated. If the Director determines that a permit was granted contrary to the requirments of this Act, the Director shall—
(i) Inform the permittee in writing;
(ii) Provide the permittee an opportunity for a hearing;
(iii) Provide the permittee a reasonable opportunity to resubmit the permit application in whole or in part, as appropriate; and
(iv) Provide the permittee a reasonable time to conform ongoing surface coal mining and reclamation operations to the requirements of the Federal program, as prescribed in the Federal program for the State.
§ 773.5
Regulatory coordination with requirements under other laws.
Each regulatory program shall, to avoid duplication, provide for the coordination of review and issuance of permits for surface coal mining and reclamation operations with applicable requirements of the Endangered Species Act of 1973, as amended (16 U.S.C. 1531
et seq.
); the Fish and Wildlife Coordination Act, as amended (16 U.S.C. 661
et seq.
); the Migratory Bird Treaty Act of 1918, as amended (16 U.S.C. 703
et seq.
); The National Historic Preservation Act of 1966, as amended (16 U.S.C. 470
et seq.
); the Bald Eagle Protection Act, as amended (16 U.S.C. 668a); for Federal programs only, the Archeological and Historic Preservation Act of 1974 (16 U.S.C. 469
et seq.
); and the Archaeological Resources Protection Act of 1979 (16 U.S.C. 470aa
et seq.
) where Federal and Indian lands covered by that Act are involved.
§ 773.6
Public participation in permit processing.
(a)
Filing and public notice.
(1) Upon submission of an administratively complete application, an applicant for a permit, significant revision of a permit under § 774.13, or renewal of a permit under § 774.15, shall place an advertisement in a local newspaper of general circulation in the locality of the proposed surface coal mining and reclamation operation at least once a week for four consecutive weeks. A copy of the advertisement as it will appear in the newspaper shall be submitted to the regulatory authority. The advertisement shall contain, at a minimum, the following:
(i) The name and business address of the applicant.
(ii) A map or description which clearly shows or describes the precise location and boundaries of the proposed permit area and is sufficient to enable local residents to readily identify the proposed permit area. It may include towns, bodies of water, local landmarks, and any other information which would identify the location. If a map is used, it shall indicate the north direction.
(iii) The location where a copy of the application is available for public inspection.
(iv) The name and address of the regulatory authority where written comments, objections, or requests for informal conferences on the application may be submitted under paragraphs (b) and (c) of this section.
(v) If an applicant seeks a permit to mine within 100 feet of the outside right-of-way of a public road or to relocate or close a public road, except where public notice and hearing have previously been provided for this particular part of the road in accordance with § 761.14 of this chapter; a concise statement describing the public road, the particular part to be relocated or closed, and the approximate timing and duration of the relocation or closing.
(vi) If the application includes a request for an experimental practice under § 785.13, a statement indicating that an experimental practice is requested and identifying the regulatory provisions for which a variance is requested.
(2) The applicant shall make an application for a permit, significant revision under § 774.13, or renewal of a permit under § 774.15 available for the public to inspect and copy by filing a full copy of the application with the recorder at the courthouse of the county where the mining is proposed to occur, or an accessible public office approved by the regulatory authority. This copy of the application need not include confidential information exempt from disclosure under paragraph (d) of this section. The application required by this paragraph shall be filed by the first date of newspaper advertisement of the application. The applicant shall file any changes to the application with the public office at the same time the change is submitted to the regulatory authority.
(3) Upon receipt of an administratively complete application for a permit, a significant revision to a permit under § 774.13, or a renewal of a permit under § 774.15, the regulatory authority shall issue written notification indicating the applicant's intention to mine the described tract of land, the application number or other identifier, the location where the copy of the application may be inspected, and the location where comments on the application may be submitted. The notification shall be sent to—
(i) Local governmental agencies with jurisdiction over or an interest in the area of the proposed surface coal mining and reclamation operation, including but not limited to planning agencies, sewage and water treatment authorities, water companies; and
(ii) All Federal or State governmental agencies with authority to issue permits and licenses applicable to the proposed surface coal mining and reclamation operation and which are part of the permit coordinating process developed in accordance with section 503(a)(6) or section 504(h) of the Act, or § 773.5; or those agencies with an interest in the proposed operation, including the U.S. Department of Agriculture Soil Conservation Service district office, the local U.S. Army Corps of Engineers district engineer, the National Park Service, State and Federal fish and wildlife agencies, and the historic preservation officer.
(b)
Comments and objections on permit applications.
(1) Within a reasonable time established by the regulatory authority, written comments or objections on an application for a permit, significant revision to a permit under § 774.13, or renewal of a permit under § 774.15 may be submitted to the regulatory authority by public entities notified under paragraph (a)(3) of this section with respect to the effects of the proposed mining operations on the environment within their areas of responsibility.
(2) Written objections to an application for a permit, significant revision to a permit under § 774.13, or renewal of a permit under § 774.15 may be submitted to the regulatory authority by any person having an interest which is or may be adversely affected by the decision on the application, or by an officer or head of any Federal, State, or local government agency or authority, within 30 days after the last publication of the newspaper notice required by paragraph (a) of this section.
(3) The regulatory authority shall upon receipt of such written comments or objections—
(i) Transmit a copy of the comments or objections to the applicants; and
(ii) File a copy for public inspection at the same public office where the application is filed.
(c)
Informal conferences.
(1) Any person having an interest which is or may be adversely affected by the decision on the application, or an officer or a head of a Federal, State, or local government agency, may request in writing that the regulatory authority hold an informal conference on the application for a permit, significant revision to a permit under § 774.13, or renewal of a permit under § 774.15. The request shall—
(i) Briefly summarize the issues to be raised by the requestor at the conference;
(ii) State whether the requestor desires to have the conference conducted in the locality of the proposed operation; and
(iii) Be filed with the regulatory authority no later than 30 days after the last publication of the newspaper advertisement required under paragraph (a) of this section.
(2) Except as provided in paragraph (c)(3) of this section, if an informal conference is requested in accordance with paragraph (c)(1) of this section, the regulatory authority shall hold an informal conference within a reasonable time following the receipt of the request. The informal conference shall be conducted as follows:
(i) If requested under paragraph (c)(1)(ii) of this section, it shall be held in the locality of the proposed surface coal mining and reclamation operation.
(ii) The date, time, and location of the informal conference shall be sent to the applicant and other parties to the conference and advertised by the regulatory authority in a newspaper of general circulation in the locality of the proposed surface coal mining and reclamation operation at least 2 weeks before the scheduled conference.
(iii) If requested in writing by a conference requestor at a reasonable time before the conference, the regulatory authority may arrange with the applicant to grant parties to the conference access to the proposed permit area and, to the extent that the applicant has the right to grant access to it, to the adjacent area prior to the established date of the conference for the purpose of gathering information relevant to the conference.
(iv) The requirements of section 5 of the Administrative Procedure Act, as amended (5 U.S.C. 554), shall not apply to the conduct of the informal conference. The conference shall be conducted by a representative of the regulatory authority, who may accept oral or written statements and any other relevant information from any party to the conference. An electronic or stenographic record shall be made of the conference, unless waived by all the parties. The record shall be maintained and shall be accessible to the parties of the conference until final release of the applicant's performance bond or other equivalent guarantee pursuant to subchapter J of this chapter.
(3) If all parties requesting the informal conference withdraw their request before the conference is held, the informal conference may be canceled.
(4) Informal conferences held in accordance with this section may be used by the regulatory authority as the public hearing required under § 761.14(c) of this chapter on proposed relocation or closing of public roads.
(d)
Public availability of permit applications
—(1)
General availability.
Except as provided in paragraph (d)(2) or (d)(3) of this section, all applications for permits; revisions; renewals; and transfers, assignments or sales of permit rights on file with the regulatory authority shall be available, at reasonable times, for public inspection and copying.
(2)
Limited availability.
Except as provided in paragraph (d)(3)(i) of this section, information pertaining to coal seams, test borings, core samplings, or soil samples in an application shall be made available to any person with an interest which is or may be adversely affected. Information subject to this paragraph shall be made available to the public when such information is required to be on public file pursuant to State law.
(3)
Confidentiality.
The regulatory authority shall provide procedures, including notice and opportunity to be heard for persons both seeking and opposing disclosure, to ensure confidentiality of qualified confidential information, which shall be clearly identified by the applicant and submitted separately from the remainder of the application. Confidential information is limited to—
(i) Information that pertains only to the analysis of the chemical and physical properties of the coal to be mined, except information on components of such coal which are potentially toxic in the environment;
(ii) Information required under section 508 of the Act that is not on public file pursuant to State law and that the applicant has requested in writing to be held confidential;
(iii) Information on the nature and location of archeological resources on public land and Indian land as required under the Archeological Resources Protection Act of 1979 (Pub. L. 96-95, 93 Stat. 721, 16 U.S.C. 470).
§ 773.7
Review of permit applications.
(a) The regulatory authority will review an application for a permit, revision, or renewal; written comments and objections submitted; and records of any informal conference or hearing held on the application and issue a written decision, within a reasonable time set by the regulatory authority, either granting, requiring modification of, or denying the application. If an informal conference is held under § 773.6(c) of this part, the decision will be made within 60 days of the close of the conference.
(b) The applicant for a permit or revision of a permit shall have the burden of establishing that his application is in compliance with all the requirements of the regulatory program.
§ 773.8
General provisions for review of permit application information and entry of information into AVS.
(a) Based on an administratively complete application, we, the regulatory authority, must undertake the reviews required under §§ 773.9 through 773.11 of this part.
(b) We will enter into AVS—
(1) The information you are required to submit under §§ 778.11 and 778.12(c) of this subchapter.
(2) The information you submit under § 778.14 of this subchapter pertaining to violations which are unabated or uncorrected after the abatement or correction period has expired.
(c) We must update the information referred to in paragraph (b) of this section in AVS upon our verification of any additional information submitted or discovered during our permit application review.
§ 773.9
Review of applicant and operator information.
(a) We, the regulatory authority, will rely upon the information that you, the applicant, are required to submit under § 778.11 of this subchapter, information from AVS, and any other available information, to review your and your operator's organizational structure and ownership or control relationships.
(b) We must conduct the review required under paragraph (a) of this section before making a permit eligibility determination under § 773.12 of this part.
§ 773.10
Review of permit history.
(a) We, the regulatory authority, will rely upon the permit history information you, the applicant, submit under § 778.12 of this subchapter, information from AVS, and any other available information to review your and your operator's permit histories. We must conduct this review before making a permit eligibility determination under § 773.12 of this part.
(b) We will also determine if you or your operator have previous mining experience.
(c) If you or your operator do not have any previous mining experience, we may conduct an additional review under § 774.11(f) of this subchapter. The purpose of this review will be to determine if someone else with mining experience controls the mining operation.
§ 773.11
Review of compliance history.
(a) We, the regulatory authority, will rely upon the violation information supplied by you, the applicant, under § 778.14 of this subchapter, a report from AVS, and any other available information to review histories of compliance with the Act or the applicable State regulatory program, and any other applicable air or water quality laws, for—
(1) You;
(2) Your operator;
(3) Operations you own or control; and
(4) Operations your operator owns or controls.
(b) We must conduct the review required under paragraph (a) of this section before making a permit eligibility determination under § 773.12 of this part.
§ 773.12
Permit eligibility determination.
Based on the reviews required under §§ 773.9 through 773.11 of this part, we, the regulatory authority, will determine whether you, the applicant, are eligible for a permit under section 510(c) of the Act.
(a) Except as provided in §§ 773.13 and 773.14 of this part, you are not eligible for a permit if we find that any surface coal mining operation that—
(1) You directly own or control has an unabated or uncorrected violation; or
(2) You or your operator indirectly control has an unabated or uncorrected violation and your control was established or the violation was cited after November 2, 1988.
(b) We will not issue you a permit if you or your operator are permanently ineligible to receive a permit under § 774.11(c) of this subchapter.
(c) After we approve your permit under § 773.15 of this part, we will not issue the permit until you comply with the information update and certification requirement of § 778.9(d) of this subchapter. After you complete that requirement, we will again request a compliance history report from AVS to determine if there are any unabated or uncorrected violations which affect your permit eligibility under paragraphs (a) and (b) of this section. We will request this report no more than five business days before permit issuance under § 773.19 of this part.
(d) If you are ineligible for a permit under this section, we will send you written notification of our decision. The notice will tell you why you are ineligible and include notice of your appeal rights under part 775 of this subchapter and 43 CFR 4.1360 through 4.1369.
§ 773.13
Unanticipated events or conditions at remining sites.
(a) You, the applicant, are eligible for a permit under § 773.12 if an unabated violation—
(1) Occurred after October 24, 1992; and
(2) Resulted from an unanticipated event or condition at a surface coal mining and reclamation operation on lands that are eligible for remining under a permit that was held by the person applying for the new permit.
(b) For permits issued under § 785.25 of this subchapter, an event or condition is presumed to be unanticipated for the purpose of this section if it—
(1) Arose after permit issuance;
(2) Was related to prior mining; and
(3) Was not identified in the permit application.
§ 773.14
Eligibility for provisionally issued permits.
(a) This section applies to you if you are an applicant who owns or controls a surface coal mining and reclamation operation with—
(1) A notice of violation issued under § 843.12 of this chapter or the State regulatory program equivalent for which the abatement period has not yet expired; or
(2) A violation that is unabated or uncorrected beyond the abatement or correction period.
(b) We, the regulatory authority, will find you eligible for a provisionally issued permit under this section if you demonstrate that one or more of the following circumstances exists with respect to all violations listed in paragraph (a) of this section—
(1) For violations meeting the criteria of paragraph (a)(1) of this section, you certify that the violation is being abated to the satisfaction of the regulatory authority with jurisdiction over the violation, and we have no evidence to the contrary.
(2) As applicable, you, your operator, and operations that you or your operator own or control are in compliance with the terms of any abatement plan (or, for delinquent fees or penalties, a payment schedule) approved by the agency with jurisdiction over the violation.
(3) You are pursuing a good faith—
(i) Challenge to all pertinent ownership or control listings or findings under §§ 773.25 through 773.27 of this part; or
(ii) Administrative or judicial appeal of all pertinent ownership or control listings or findings, unless there is an initial judicial decision affirming the listing or finding and that decision remains in force.
(4) The violation is the subject of a good faith administrative or judicial appeal contesting the validity of the violation, unless there is an initial judicial decision affirming the violation and that decision remains in force.
(c) We will consider a provisionally issued permit to be improvidently issued, and we must immediately initiate procedures under §§ 773.22 and 773.23 of this part to suspend or rescind that permit, if—
(1) Violations included in paragraph (b)(1) of this section are not abated within the specified abatement period;
(2) You, your operator, or operations that you or your operator own or control do not comply with the terms of an abatement plan or payment schedule mentioned in paragraph (b)(2) of this section;
(3) In the absence of a request for judicial review, the disposition of a challenge and any subsequent administrative review referenced in paragraph (b)(3) or (4) of this section affirms the validity of the violation or the ownership or control listing or finding; or
(4) The initial judicial review decision referenced in paragraph (b)(3)(ii) or (4) of this section affirms the validity of the violation or the ownership or control listing or finding.
§ 773.15
Written findings for permit application approval.
No permit application or application for a significant revision of a permit shall be approved unless the application affirmatively demonstrates and the regulatory authority finds, in writing, on the basis of information set forth in the application or from information otherwise available that is documented in the approval, the following:
(a) The application is accurate and complete and the applicant has complied with all requirements of the Act and the regulatory program.
(b) The applicant has demonstrated that reclamation as required by the Act and the regulatory program can be accomplished under the reclamation plan contained in the permit application.
(c) The proposed permit area is—
(1) Not within an area under study or administrative proceedings under a petition, filed pursuant to parts 764 and 769 of this chapter, to have an area designated as unsuitable for surface coal mining operations, unless the applicant demonstrates that before January 4, 1977, he has made substantial legal and financial commitments in relation to the operation covered by the permit application; or
(2) Not within an area designated as unsuitable for surface coal mining operations under parts 762 and 764 or 769 of this chapter or within an area subject to the prohibitions of § 761.11 of this chapter.
(d) For mining operations where the private mineral estate to be mined has been severed from the private surface estate, the applicant has submitted to the regulatory authority the documentation required under § 778.15(b) of this chapter.
(e) The regulatory authority has made an assessment of the probable cumulative impacts of all anticipated coal mining on the hydrologic balance in the cumulative impact area and has determined that the proposed operation has been designed to prevent material damage to the hydrologic balance outside the permit area.
(f) The applicant has demonstrated that any existing structure will comply
with § 701.11(d), and the applicable performance standards of subchapter B or K of this chapter.
(g) The applicant has paid all reclamation fees from previous and existing operations as required by subchapter R of this chapter.
(h) The applicant has satisfied the applicable requirements of part 785 of this chapter.
(i) The applicant has, if applicable, satisfied the requirements for approval of a long-term, intensive agricultural postmining land use, in accordance with the requirements of § 816.111(d) or § 817.111(d).
(j) The operation would not affect the continued existence of endangered or threatened species or result in destruction or adverse modification of their critical habitats, as determined under the Endangered Species Act of 1973 (16 U.S.C. 1531
et seq.
).
(k) The regulatory authority has taken into account the effect of the proposed permitting action on properties listed on and eligible for listing on the National Register of Historic Places. This finding may be supported in part by inclusion of appropriate permit conditions or changes in the operation plan protecting historic resources, or a documented decision that the regulatory authority has determined that no additional protection measures are necessary.
(l) For a proposed remining operation where the applicant intends to reclaim in accordance with the requirements of § 816.106 or § 817.106 of this chapter, the site of the operation is a
previously mined area
as defined in § 701.5 of this chapter.
(m) For permits to be issued under § 785.25 of this chapter, the permit application must contain:
(i) Lands eligible for remining;
(ii) An identification of the potential environmental and safety problems related to prior mining activity which could reasonably be anticipated to occur at the site; and
(iii) Mitigation plans to sufficiently address these potential environmental and safety problems so that reclamation as required by the applicable requirements of the regulatory program can be accomplished.
(n) The applicant is eligible to receive a permit, based on the reviews under §§ 773.7 through 773.14 of this part.
§ 773.16
Performance bond submittal.
If the regulatory authority decides to approve the application, it shall require that the applicant file the performance bond or provide other equivalent guarantee before the permit is issued, in accordance with the provisions of subchapter J of this chapter.
§ 773.17
Permit conditions.
Each permit issued by the regulatory authority shall be subject to the following conditions:
(a) The permittee shall conduct surface coal mining and reclamation operations only on those lands that are specifically designated as the permit area on the maps submitted with the application and authorized for the term of the permit and that are subject to the performance bond or other equivalent guarantee in effect pursuant to subchapter J of this chapter.
(b) The permittee shall conduct all surface coal mining and reclamation operations only as described in the approved application, except to the extent that the regulatory authority otherwise directs in the permit.
(c) The permittee shall comply with the terms and conditions of the permit, all applicable performance standards of the Act, and the requirements of the regulatory program.
(d) Without advance notice, delay, or a search warrant, upon presentation of appropriate credentials, the permittee shall allow the authorized representatives of the Secretary and the State regulatory authority to—
(1) Have the right of entry provided for in §§ 842.13 and 840.12 of this chapter; and
(2) Be accompanied by private persons for the purpose of conducting an inspection in accordance with parts 840 and 842, when the inspection is in response to an alleged violation reported to the regulatory authority by the private person.
(e) The permittee shall take all possible steps to minimize any adverse impact to the environment or public health and safety resulting from noncompliance with any term or condition or the permit, including, but not limited to—
(1) Any accelerated or additional monitoring necessary to determine the nature and extent of noncompliance and the results of the noncompliance;
(2) Immediate implementation of measures necessary to comply; and
(3) Warning, as soon as possible after learning of such noncompliance, any person whose health and safety is in imminent danger due to the noncompliance.
(f) As applicable, the permittee shall comply with § 701.11(d) and subchapter B or K of this chapter for compliance, modification, or abandonment of existing structures.
(g) The operator shall pay all reclamation fees required by subchapter R of this chapter for coal produced under the permit for sale, transfer or use, in the manner required by that subchapter.
§ 773.19
Permit issuance and right of renewal.
(a)
Decision.
If the application is approved, the permit shall be issued upon submittal of a performance bond in accordance with subchapter J. If the application is disapproved, specific reasons therefore shall be set forth in the notification required by paragraph (b) of this section.
(b)
Notification.
The regulatory authority shall issue written notification of the decision to the following persons and entities:
(1) The applicant, each person who files comments or objections to the permit application, and each party to an informal conference.
(2) The local governmental officials in the local political subdivision in which the land to be affected is located within 10 days after the issuance of a permit, including a description of the location of the land.
(3) If the regulatory authority is a State agency, the local OSM office.
(c)
Permit term.
Each permit shall be issued for a fixed term of 5 years or less, unless the requirements of § 778.17 of this chapter are met.
(d)
Right of renewal.
Permit application approval shall apply to those lands that are specifically designated as the permit area on the maps submitted with the application and for which the application is complete and accurate. Any valid permit issued in accordance with paragraph (a) of this section shall carry with it the right of successive renewal, within the approved boundaries of the existing permit, upon expiration of the term of the permit, in accordance with § 774.15.
(e)
Initiation of operations.
(1) A permit shall terminate if the permittee has not begun the surface coal mining and reclamation operation covered by the permit within 3 years of the issuance of the permit.
(2) The regulatory authority may grant a reasonable extension of time for commencement of these operations, upon receipt of a written statement showing that such an extension of time is necessary, if—
(i) Litigation precludes the commencement or threatens substantial economic loss to the permittee; or
(ii) There are conditions beyond the control and without the fault or negligence of the permittee.
(3) With respect to coal to be mined for use in a synthetic fuel facility or specified major electric generating facility, the permittee shall be deemed
to have commenced surface mining operations at the time that the construction of the synthetic fuel or generating facility is initiated.
(4) Extensions of time granted by the regulatory authority under this paragraph shall be specifically set forth in the permit, and notice of the extension shall be made public by the regulatory authority.
§ 773.21
Initial review and finding requirements for improvidently issued permits.
(a) If we, the regulatory authority, have reason to believe that we improvidently issued a permit to you, the permittee, we must review the circumstances under which the permit was issued. We will make a preliminary finding that your permit was improvidently issued if, under the permit eligibility criteria of the applicable regulations implementing section 510(c) of the Act in effect at the time of permit issuance, your permit should not have been issued because you or your operator owned or controlled a surface coal mining and reclamation operation with an unabated or uncorrected violation.
(b) We will make a finding under paragraph (a) of this section only if you or your operator—
(1) Continue to own or control the operation with the unabated or uncorrected violation;
(2) The violation remains unabated or uncorrected; and
(3) The violation would cause you to be ineligible under the permit eligibility criteria in our current regulations.
(c) When we make a preliminary finding under paragraph (a) of this section, we must serve you with a written notice of the preliminary finding, which must be based on evidence sufficient to establish a
prima facie
case that your permit was improvidently issued.
(d) Within 30 days of receiving a notice under paragraph (c) of this section, you may challenge the preliminary finding by providing us with evidence as to why the permit was not improvidently issued under the criteria in paragraphs (a) and (b) of this section.
(e) The provisions of §§ 773.25 through 773.27 of this part apply when a challenge under paragraph (d) of this section concerns a preliminary finding under paragraphs (a) and (b)(1) of this section that you or your operator currently own or control, or owned or controlled, a surface coal mining operation.
§ 773.22
Notice requirements for improvidently issued permits.
(a) We, the regulatory authority, must serve you, the permittee, with a written notice of proposed suspension or rescission, together with a statement of the reasons for the proposed suspension or rescission, if—
(1) After considering any evidence submitted under § 773.21(d) of this part, we find that a permit was improvidently issued under the criteria in § 773.21 paragraphs (a) and (b) of § 773.21 of this part; or
(2) Your permit was provisionally issued under § 773.14(b) of this part and one or more of the conditions in §§ 773.14(c)(1) through (4) exists.
(b) If we propose to suspend your permit, we will provide 60 days notice.
(c) If we propose to rescind your permit, we will provide 120 days notice.
(d) If you wish to appeal the notice, you must exhaust administrative remedies under the procedures at 43 CFR 4.1370 through 4.1377 (when OSM is the regulatory authority) or under the State regulatory program equivalent (when a State is the regulatory authority).
(e) After we serve you with a notice of proposed suspension or rescission under this section, we will take action under § 773.23 of this part.
(f) The regulations for service at § 843.14 of this chapter, or the State regulatory program equivalent, will govern service under this section.
(g) The times specified in paragraphs (b) and (c) of this section will apply unless you obtain temporary relief under the procedures at 43 CFR 4.1376 or the State regulatory program equivalent.
§ 773.23
Suspension or rescission requirements for improvidently issued permits.
(a) Except as provided in paragraph (b) of this section, we, the regulatory authority, must suspend or rescind your permit upon expiration of the time specified in § 773.22(b) or (c) of this part unless you submit evidence and we find that—
(1) The violation has been abated or corrected to the satisfaction of the agency with jurisdiction over the violation;
(2) You or your operator no longer own or control the relevant operation;
(3) Our finding for suspension or rescission was in error;
(4) The violation is the subject of a good faith administrative or judicial appeal (unless there is an initial judicial decision affirming the violation, and that decision remains in force);
(5) The violation is the subject of an abatement plan or payment schedule that is being met to the satisfaction of the agency with jurisdiction over the violation; or
(6) You are pursuing a good faith challenge or administrative or judicial appeal of the relevant ownership or control listing or finding (unless there is an initial judicial decision affirming the listing or finding, and that decision remains in force).
(b) If you have requested administrative review of a notice of proposed suspension or rescission under § 773.22(e) of this part, we will not suspend or rescind your permit unless and until the Office of Hearings and Appeals or its State counterpart affirms our finding that your permit was improvidently issued.
(c) When we suspend or rescind your permit under this section, we must—
(1) Issue you a written notice requiring you to cease all surface coal mining operations under the permit; and
(2) Post the notice at our office closest to the permit area.
(d) If we suspend or rescind your permit under this section, you may request administrative review of the notice under the procedures at 43 CFR 4.1370 through 4.1377 (when OSM is the regulatory authority) or under the State regulatory program equivalent (when a State is the regulatory authority). Alternatively, you may seek judicial review of the notice.
§ 773.25
Who may challenge ownership or control listings and findings.
You may challenge a listing or finding of ownership or control using the provisions under §§ 773.26 and 773.27 of this part if you are—
(a) Listed in a permit application or AVS as an owner or controller of an entire surface coal mining operation, or any portion or aspect thereof:
(b) Found to be an owner or controller of an entire surface coal mining operation, or any portion or aspect thereof, under §§ 773.21 or 774.11(g) of this subchapter; or
(c) An applicant or permittee affected by an ownership or control listing or finding.
§ 773.26
How to challenge an ownership or control listing or finding.
This section applies to you if you challenge an ownership or control listing or finding.
(a) To challenge an ownership or control listing or finding, you must submit a written explanation of the basis for the challenge, along with any evidence or explanatory materials you wish to provide under § 773.27(b) of this part, to the regulatory authority, as identified in the following table.
If the challenge concerns . . .
Then you must submit a written explanation to . . .
(1) a pending State or Federal permit application
the regulatory authority with jurisdiction over the application.
(2) your ownership or control of a surface coal mining operation, and you are not currently seeking a permit
the regulatory authority with jurisdiction over the surface coal mining operation.
(b) The provisions of this section and of §§ 773.27 and 773.28 of this part apply only to challenges to ownership or control listings or findings. You may not use these provisions to challenge your liability or responsibility under any other provision of the Act or its implementing regulations.
(c) When the challenge concerns a violation under the jurisdiction of a different regulatory authority, the regulatory authority with jurisdiction over the permit application or permit must consult the regulatory authority with jurisdiction over the violation and the AVS Office to obtain additional information.
(d) A regulatory authority responsible for deciding a challenge under paragraph (a) of this section may request an investigation by the AVS Office.
(e) At any time, you, a person listed in AVS as an owner or controller of a surface coal mining operation, may request an informal explanation from the AVS Office as to the reason you are shown in AVS in an ownership or control capacity. Within 14 days of your request, the AVS Office will provide a response describing why you are listed in AVS.
§ 773.27
Burden of proof for ownership or control challenges.
This section applies to you if you challenge an ownership or control listing or finding.
(a) When you challenge a listing of ownership or control, or a finding of ownership or control made under § 774.11(g) of this subchapter, you must prove by a preponderance of the evidence that you either—
(1) Do not own or control the entire surface coal mining operation or relevant portion or aspect thereof; or
(2) Did not own or control the entire surface coal mining operation or relevant portion or aspect thereof during the relevant time period.
(b) In meeting your burden of proof, you must present reliable, credible, and substantial evidence and any explanatory materials to the regulatory authority. The materials presented in connection with your challenge will become part of the permit file, an investigation file, or another public file. If you request, we will hold as confidential any information you submit under this paragraph which is not required to be made available to the public under § 842.16 of this chapter (when OSM is the regulatory authority) or under § 840.14 of this chapter (when a State is the regulatory authority).
(c) Materials you may submit in response to the requirements of paragraph (b) of this section include, but are not limited to—
(1) Notarized affidavits containing specific facts concerning the duties that you performed for the relevant operation, the beginning and ending dates of your ownership or control of the operation, and the nature and details of any transaction creating or severing your ownership or control of the operation.
(2) Certified copies of corporate minutes, stock ledgers, contracts, purchase and sale agreements, leases, correspondence, or other relevant company records.
(3) Certified copies of documents filed with or issued by any State, municipal, or Federal governmental agency.
(4) An opinion of counsel, when supported by—
(i) Evidentiary materials;
(ii) A statement by counsel that he or she is qualified to render the opinion; and
(iii) A statement that counsel has personally and diligently investigated the facts of the matter.
§ 773.28
Written agency decision on challenges to ownership or control listings or findings.
(a) Within 60 days of receipt of your challenge under § 773.26(a) of this part, we, the regulatory authority identified under § 773.26(a) of this part, will review and investigate the evidence and explanatory materials you submit and any other reasonably available information bearing on your challenge and issue a written decision. Our decision must state whether you own or control the relevant surface coal mining operation, or owned or controlled the operation, during the relevant time period.
(b) We will promptly provide you with a copy of our decision by either—
(1) Certified mail, return receipt requested; or
(2) Any means consistent with the rules governing service of a summons and complaint under Rule 4 of the Federal Rules of Civil Procedure, or its State regulatory program counterparts.
(c) Service of the decision on you is complete upon delivery and is not incomplete if you refuse to accept delivery.
(d) We will post all decisions made under this section on AVS.
(e) Any person who receives a written decision under this section, and who wishes to appeal that decision, must exhaust administrative remedies under the procedures at 43 CFR 4.1380 through 4.1387 or, when a State is the regulatory authority, the State regulatory program counterparts, before seeking judicial review.
(f) Following our written decision or any decision by a reviewing administrative or judicial tribunal, we must review the information in AVS to determine if it is consistent with the decision. If it is not, we must promptly revise the information in AVS to reflect the decision.
4. Revise part 774 to read as follows:
PART 774—REVISION; RENEWAL; TRANSFER, ASSIGNMENT, OR SALE OF PERMIT RIGHTS; POST-PERMIT ISSUANCE REQUIREMENTS; AND OTHER ACTIONS BASED ON OWNERSHIP, CONTROL, AND VIOLATION INFORMATION
Sec.
774.1
Scope and purpose.
774.9
Information collection.
774.10
Regulatory authority review of permits.
774.11
Post-permit issuance requirements for regulatory authorities and other actions based on ownership, control, and violation information.
774.12
Post-permit issuance information requirements for permittees.
774.13
Permit revisions.
774.15
Permit renewals.
774.17
Transfer, assignment, or sale of permit rights.
Authority:
30 U.S.C. 1201
et seq.
§ 774.1
Scope and purpose.
This part provides requirements for revision; renewal; transfer, assignment, or sale of permit rights; entering and updating information in AVS following the issuance of a permit; post-permit issuance requirements for regulatory authorities and permittees; and other actions based on ownership, control, and violation information.
§ 774.9
Information collection.
(a) The collections of information contained in part 774 have been approved by the Office of Management
and Budget under 44 U.S.C. 3501
et seq.
and assigned clearance number 1029-0116. Regulatory authorities will use this information to:
(1) Determine if the applicant meets the requirements for revision; renewal; transfer, assignment, or sale of permit rights;
(2) Enter and update information in AVS following the issuance of a permit; and
(3) Fulfill post-permit issuance requirements and other obligations based on ownership, control, and violation information.
(b) A Federal agency may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number. Response is required to obtain a benefit in accordance with SMCRA. Send comments regarding burden estimates or any other aspect of this collection of information, including suggestions for reducing the burden, to the Office of Surface Mining Reclamation and Enforcement, Information Collection Clearance Officer, Room 202-SIB, 1951 Constitution Avenue NW., Washington, DC 20240.
§ 774.10
Regulatory authority review of permits.
(a) The regulatory authority shall review each permit issued and outstanding under an approved regulatory program during the term of the permit. This review shall occur not later than the middle of each permit term and as follows:
(1) Permits with a term longer than 5 years shall be reviewed no less frequently than the permit midterm or every 5 years, whichever is more frequent.
(2) Permits with variances granted in accordance with § 785.14 of this chapter (mountaintop removal) and § 785.18 of this chapter (variance for delay in contemporaneous reclamation requirement in combined surface and underground mining operations) of this chapter shall be reviewed no later than 3 years from the date of issuance of the permit unless, for variances issued in accordance with § 785.14 of this chapter, the permittee affirmatively demonstrates that the proposed development is proceeding in accordance with the terms of the permit.
(3) Permits containing experimental practices issued in accordance with § 785.13 of this chapter and permits with a variance from approximate original contour requirements in accordance with § 785.16 shall be reviewed as set forth in the permit or at least every 2
1/2
years from the date of issuance as required by the regulatory authority, in accordance with §§ 785.13(g) and 785.16(c) of this chapter, respectively.
(b) After the review required by paragraph (a) of this section, or at any time, the regulatory authority may, by order, require reasonable revision of a permit in accordance with § 774.13 to ensure compliance with the Act and the regulatory program.
(c) Any order of the regulatory authority requiring revision of a permit shall be based upon written findings and shall be subject to the provisions for administrative and judicial review in part 775 of this chapter. Copies of the order shall be sent to the permittee.
(d) Permits may be suspended or revoked in accordance with subchapter L of this chapter.
§ 774.11
Post-permit issuance requirements for regulatory authorities and other actions based on ownership, control, and violation information.
(a) For the purposes of future permit eligibility determinations and enforcement actions, we, the regulatory authority, must enter into AVS the data shown in the following table—
We must enter into AVS all . . .
Within 30 days after . . .
(1) permit records
the permit is issued or subsequent changes made.
(2) unabated or uncorrected violations
the abatement or correction period for a violation expires.
(3) changes to information initially required to be provided by an applicant under 30 CFR 778.11
receiving notice of a change.
(4) changes in violation status
abatement, correction, or termination of a violation, or a decision from an administrative or judicial tribunal.
(b) If, at any time, we discover that any person owns or controls an operation with an unabated or uncorrected violation, we will determine whether enforcement action is appropriate under part 843, 846 or 847 of this chapter. We must enter the results of each enforcement action, including administrative and judicial decisions, into AVS.
(c) We must serve a preliminary finding of permanent permit ineligibility under section 510(c) of the Act on you, an applicant or operator, if the criteria in paragraphs (c)(1) and (c)(2) are met. In making a finding under this paragraph, we will only consider control relationships and violations which would make, or would have made, you ineligible for a permit under §§ 773.12(a) and (b) of this subchapter. We must make a preliminary finding of permanent permit ineligibility if we find that—
(1) You control or have controlled surface coal mining and reclamation operations with a demonstrated pattern of willful violations under section 510(c) of the Act; and
(2) The violations are of such nature and duration with such resulting irreparable damage to the environment as to indicate your intent not to comply with the Act, its implementing regulations, the regulatory program, or your permit.
(d) You may request a hearing on a preliminary finding of permanent permit ineligibility under 43 CFR 4.1350 through 4.1356.
(e) Entry into AVS.
(1) If you do not request a hearing, and the time for seeking a hearing has expired, we will enter our finding into AVS.
(2) If you request a hearing, we will enter our finding into AVS only if that finding is upheld on administrative appeal.
(f) At any time, we may identify any person who owns or controls an entire surface coal mining operation or any relevant portion or aspect thereof. If we identify such a person, we must issue a written preliminary finding to the person and the applicant or permittee describing the nature and extent of ownership or control. Our written preliminary finding must be based on evidence sufficient to establish a prima facie case of ownership or control.
(g) After we issue a written preliminary finding under paragraph (f) of this section, we will allow you, the person subject to the preliminary finding, 30 days in which to submit any information tending to demonstrate your lack of ownership or control. If, after reviewing any information you submit, we are persuaded that you are not an owner or controller, we will
serve you a written notice to that effect. If, after reviewing any information you submit, we still find that you are an owner or controller, or if you do not submit any information within the 30-day period, we will issue a written finding and enter our finding into AVS.
(h) If we identify you as an owner or controller under paragraph (g) of this section, you may challenge the finding using the provisions of §§ 773.25, 773.26, and 773.27 of this subchapter.
§ 774.12
Post-permit issuance information requirements for permittees.
(a) Within 30 days after the issuance of a cessation order under § 843.11 of this chapter, or its State regulatory program equivalent, you, the permittee, must provide or update all the information required under § 778.11 of this subchapter.
(b) You do not have to submit information under paragraph (a) of this section if a court of competent jurisdiction grants a stay of the cessation order and the stay remains in effect.
(c) Within 60 days of any addition, departure, or change in position of any person identified in § 778.11(c) of this subchapter, you must provide—
(1) The information required under § 778.11(d) of this subchapter; and
(2) The date of any departure.
§ 774.13
Permit revisions.
(a)
General.
During the term of a permit, the permittee may submit an application to the regulatory authority for a revision of the permit.
(b)
Application requirements and procedures.
the regulatory authority shall establish—
(1) A time period within which the regulatory authority will approve or disapprove an application for a permit revision; and
(2) Guidelines establishing the scale or extent of revisions for which all the permit application information requirements and procedures of this subchapter, including notice, public participation, and notice of decision requirements of §§ 773.6, 773.19(b) (1) and (3), and 778.21, shall apply. Such requirements and procedures shall apply at a minimum to all significant permit revisions.
(c)
Criteria for approval.
No application for a permit revision shall be approved unless the application demonstrates and the regulatory authority finds that reclamation as required by the Act and the regulatory program can be accomplished, applicable requirements under § 773.15 which are pertinent to the revision are met, and the application for a revision complies with all requirements of the Act and the regulatory program.
(d)
Request to change permit boundary.
Any extensions to the area covered by the permit, except incidental boundary revisions, shall be made by application for a new permit.
§ 774.15
Permit renewals.
(a)
General.
A valid permit, issued pursuant to an approved regulatory program, shall carry with it the right of successive renewal, within the approved boundaries of the existing permit, upon expiration of the term of the permit.
(b)
Application requirements and procedures.
(1) An application for renewal of a permit shall be filed with the
This text is long and has been trimmed here. Open the source document for the complete record.
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.