Waste Prevention, Production Subject to Royalties, and Resource Conservation

Federal RegisterNov 18, 2016

Ask Donna

What actually matters in this document.

Text

DEPARTMENT OF THE INTERIOR

Bureau of Land Management

43 CFR Parts 3100, 3160 and 3170

[17X.LLWO310000.L13100000.PP0000]

RIN 1004-AE14

Waste Prevention, Production Subject to Royalties, and Resource Conservation

AGENCY:

Bureau of Land Management, Interior.

ACTION:

Final rule.

SUMMARY:

The Bureau of Land Management (BLM) is promulgating new regulations to reduce waste of natural gas from venting, flaring, and leaks during oil and natural gas production activities on onshore Federal and Indian (other than Osage Tribe) leases. The regulations also clarify when produced gas lost through venting, flaring, or leaks is subject to royalties, and when oil and gas production may be used royalty-free on-site. These regulations replace the existing provisions related to venting, flaring, and royalty-free use of gas contained in the 1979 Notice to Lessees and Operators of Onshore Federal and Indian Oil and Gas Leases, Royalty or Compensation for Oil and Gas Lost (NTL-4A), which are over 3 decades old.

DATES:

The final rule is effective on January 17, 2017.

FOR FURTHER INFORMATION CONTACT:

Timothy Spisak at the BLM Washington Office, 20 M Street SE., Room 2134LM, Washington, DC 20003, or by telephone at 202-912-7311. For questions relating to regulatory process issues, contact Faith Bremner at 202-912-7441.

Persons who use a telecommunications device for the deaf (TDD) may call the Federal Relay Service (FRS) at 1-800-877-8339 to contact these individuals during normal business hours. FRS is available 24 hours a day, 7 days a week to leave a message or question with these individuals. You will receive a reply during normal business hours.

SUPPLEMENTARY INFORMATION:

I. Table of Contents

II. Executive Summary

A. Background

B. Summary of Rule

1. Venting and Flaring

2. Leaks

3. Reducing Venting from Equipment and Practices

4. Royalty Provisions Governing New Competitive Leases

5. Unavoidable Versus Avoidable Losses of Gas

6. Interaction With EPA and State Regulations

7. Other Provisions

8. Summary of Costs and Benefits

III. Background

A. Impacts of Waste and Loss of Gas

B. Purpose of the Rule

1. Overview

2. Issues Addressed by Rule

3. Relationship to Other Federal, State, and Industry Activities

C. Legal Authority

D. Stakeholder Outreach

IV. Summary of Final Rule

V. Major Changes From Proposed Rule

A. Venting Prohibition and Capture Targets

1. Venting Prohibition

2. Capture Targets

B. Leak Detection and Repair

1. Requirements of Final Rule

2. Changes From Proposed Rule

3. Significant Comments

C. Liquids Unloading at New Wells

1. Requirements of Final Rule and Changes From Proposed Rule

2. Significant Comments

D. Variances Related to State and Tribal Regulations

1. Requirements of Final Rule

2. Changes From Proposed Rule

3. Significant Comments

VI. Additional Significant Comments and Responses

A. Interaction With EPA Regulations

B. Authority to Require Flaring of Gas

C. “Avoidably Lost” Oil or Gas

D. Application to Units and Communitized Areas

E. ROW Permitting

F. Planning

VII. Section by Section

Part 3100

Section 3103.3-1 Royalty on production

Section 3160.0-5 Definitions

Section 3162.3-1 Drilling applications and plans

Subpart 3178—Royalty-Free Use of Lease Production

Section 3178.1 Purpose

Section 3178.2 Scope of This Subpart

Section 3178.3 Production on Which Royalty is not due

Section 3178.4 Uses of Oil or Gas on a Lease, Unit, or Communitized Area That do not Require Prior Written BLM Approval for Royalty-Free Treatment of Volumes Used

Section 3178.5 Uses of Oil or Gas on a Lease, Unit, or Communitized Area That Require Prior Written BLM Approval for Royalty-Free Treatment of Volumes Used

Section 3178.6 Uses of Oil or Gas Moved off the Lease, Unit, or Communitized Area That do not Require Prior Written Approval for Royalty-Free Treatment of Volumes Used

Section 3178.7 Uses of Oil or Gas Moved off the Lease, Unit, or Communitized Area That Require Prior Written Approval for Royalty-Free Treatment of Volumes Used

Section 3178.8 Measurement or Estimation of Volumes of Oil or Gas That are Used Royalty-Free

Section 3178.9 Requesting Approval of Royalty-Free Treatment When Approval is Required

Section 3178.10 Facility and Equipment Ownership

Subpart 3179—Waste Prevention and Resource Conservation

Section 3179.1 Purpose

Section 3179.2 Scope

Section 3179.3 Definitions and Acronyms

Section 3179.4 Determining When the Loss of Oil or Gas is Avoidable or Unavoidable

Section 3179.5 When Lost Production is Subject to Royalty

Section 3179.6 Venting and Flaring From Gas Wells and Venting Prohibition

Section 3179.7 Gas Capture Requirement

Section 3179.8 Alternative Capture Requirement

Section 3179.9 Measuring and Reporting Volumes of Gas Vented and Flared

Section 3179.10 Determinations Regarding Royalty-Free Flaring

Section 3179.11 Other Waste Prevention Measures

Section 3179.12 Coordination With State Regulatory Authority

Section 3179.101 Well Drilling

Section 3179.102 Well Completion and Related Operations

Section 3179.103 Initial Production Testing

Section 3179.104 Subsequent Well Tests

Section 3179.105 Emergencies

Section 3179.201 Equipment Requirements for Pneumatic Controllers

Section 3179.202 Requirements for Pneumatic Diaphragm Pumps

Section 3179.203 Storage Vessels

Section 3179.204 Downhole Well Maintenance and Liquids Unloading

Section 3179.301 Operator Responsibility

Section 3179.302 Approved Instruments and Methods

Section 3179.303 Leak Detection Inspection Requirements for Natural Gas Wellhead Equipment and Other Equipment

Section 3179.304 Repairing Leaks

Section 3179.305 Leak Detection Inspection, Recordkeeping and Reporting

Section 3179.401 State or Tribal Requests for Variances From the Requirements of This Subpart

VIII. Analysis of Impacts

A. Description of the Regulated Entities

1. Potentially Affected Entities

2. Affected Small Entities

B. Impacts of the Requirements

1. Overall Costs of the Rule

2. Overall Benefits of the Rule

3. Net Benefits of the Rule

4. Distributional Impacts

IX. Procedural Matters

A. Executive Order 12866, Regulatory Planning and Review

B. Regulatory Flexibility Act and Small Business Regulatory Enforcement Fairness Act of 1996

C. Unfunded Mandates Reform Act of 1995

D. Executive Order 12630, Governmental Actions and Interference with Constitutionally Protected Property Rights (Takings)

E. Executive Order 13132, Federalism

F. Executive Order 12988, Civil Justice Reform

G. Executive Order 13175, Consultation and Coordination with Indian Tribal Governments

H. Paperwork Reduction Act

I. National Environmental Policy Act

J. Executive Order 13211, Actions Concerning Regulations That Significantly Affect Energy Supply, Distribution, or Use

K. Executive Order 13563, Improving Regulation and Regulatory Review

X. Authors

II. Executive Summary

A. Background

This final regulation aims to reduce the waste of natural gas from mineral leases administered by the BLM. This gas is lost during oil and gas production activities through venting or flaring of the gas, and through equipment leaks. While oil and gas production technology has advanced dramatically in recent years, the BLM's rules to minimize waste of gas have not been updated in over 30 years. The Mineral Leasing Act of 1920 (MLA) requires the BLM to ensure that lessees “use all reasonable precautions to prevent waste of oil or gas developed in the land,” 30 U.S.C. 225, and that leases include “a provision that such rules . . . for the prevention of undue waste as may be prescribed by [the] Secretary shall be observed,”

id.

at § 187. The BLM believes there are economical, cost-effective, and reasonable measures that operators can take to minimize gas waste. These measures will enhance our nation's natural gas supplies, boost royalty receipts for American taxpayers, tribes, and States, reduce environmental damage from venting, flaring, and leaks of gas, and ensure the safe and responsible development of oil and gas resources.

The BLM's onshore oil and gas management program is a major contributor to our nation's oil and gas production. The BLM manages more than 245 million acres of land and 700 million acres of subsurface estate, making up nearly a third of the nation's mineral estate. Domestic production from 96,000 Federal onshore oil and gas wells accounts for 11 percent of the Nation's natural gas supply and 5 percent of its oil. In Fiscal Year (FY) 2015, operators produced 183.4 million barrels (bbl) of oil, 2.2 trillion cubic feet (Tcf) of natural gas, and 3.3 billion gallons of natural gas liquids (NGLs) from onshore Federal and Indian oil and gas leases. The production value of this oil and gas exceeded $20.9 billion and generated over $2.3 billion in royalties, which were shared with tribes, Indian allottee owners, and States.

1

Over the past decade, the United States has experienced a dramatic increase in oil and natural gas production due to technological advances, such as hydraulic fracturing combined with directional drilling. Yet the American public has not benefited from the full potential of this increased production, due to venting, flaring, and leaks of significant quantities of gas during the production process. Federal and Indian onshore lessees and operators reported to the Office of Natural Resources Revenue (ONRR) that they vented or flared 462 billion cubic feet (Bcf) of natural gas between 2009 and 2015—enough gas to serve about 6.2 million households for a year, assuming 2009 usage levels.

2

1

Office of Natural Resources Revenue, Statistical Information,

http://statistics.onrr.gov/ReportTool.aspx

using Sales Year—FY 2015—Federal Onshore—All States Sales Value and Revenue for Oil, Natural Gas Liquids (NGL), and Gas products as of September 7, 2016.

2

BLM analysis of ONRR Oil and Gas Operations Report Part B (OGOR-B) data provided for 2009-2015;

see

Energy Information Administration (EIA),

Trends in U.S. Residential Natural Gas Consumption, http://www.eia.gov/pub/oil_gas/natural_gas/feature_articles/2010/ngtrendsresidcon/ngtrendsresidcon.pdf

(reporting that in 2009, U.S. residential consumption was approximately 74 Mcf per household with natural gas service).

Venting, flaring, and leaks waste a valuable resource that could be put to productive use, and deprive American taxpayers, tribes, and States of royalty revenues. In addition, the wasted gas may harm local communities and surrounding areas through visual and noise impacts from flaring, and contribute to regional and global air pollution problems of smog, particulate matter, and toxics (such as benzene, a carcinogen). Finally, vented or leaked gas contributes to climate change, because the primary constituent of natural gas is methane, an especially powerful greenhouse gas (GHG), with climate impacts roughly 25 times those of carbon dioxide (CO

2

), if measured over a 100-year period, or 86 times those of CO

2

, if measured over a 20-year period.

3

Thus, measures to conserve gas and avoid waste may significantly benefit local communities, public health, and the environment.

3

See Intergovernmental Panel on Climate Change, Climate Change 2013: The Physical Science Basis, Chapter 8,

Anthropogenic and Natural Radiative Forcing,

at 714 (Table 8.7),

available at https://www.ipcc.ch/pdf/assessment-report/ar5/wg1/WG1AR5_Chapter08_FINAL.pdf

.

Congress has directed the BLM to oversee Federal and Indian oil and gas activities under multiple laws, including the MLA, the Mineral Leasing Act for Acquired Lands of 1947 (MLAAL), the Federal Oil and Gas Royalty Management Act (FOGRMA), the Federal Land Policy and Management Act of 1976 (FLPMA), the Indian Mineral Leasing Act of 1938 (IMLA), the Indian Mineral Development Act of 1982 (IMDA), and the Act of March 3, 1909.

4

In particular, the MLA requires the BLM to ensure that lessees “use all reasonable precautions to prevent waste of oil or gas developed in the land.”

5

Leases issued by BLM must ensure that operations are conducted with “reasonable diligence, skill, and care” and that lessees comply with rules “for the prevention of undue waste.”

6

4

Mineral Leasing Act, 30 U.S.C. 188-287; Mineral Leasing Act for Acquired Lands, 30 U.S.C. 351-360; Federal Oil and Gas Royalty Management Act, 30 U.S.C. 1701-1758; Federal Land Policy and Management Act of 1976, 43 U.S.C. 1701-1785; Indian Mineral Leasing Act of 1938, 25 U.S.C. 396a-g; Indian Mineral Development Act of 1982, 25 U.S.C. 2101-2108; Act of March 3, 1909, 25 U.S.C. 396.

5

30 U.S.C. 225.

6

30 U.S.C. 187.

Advancing those mandates, this rule replaces the BLM's decades-old NTL-4A requirements related to venting and flaring, and to royalty-free use of oil and gas production; amends the BLM's oil and gas regulations at 43 CFR part 3160 to include requirements for a waste minimization plan; and adds new subparts 3178 and 3179 to 43 CFR part 3170 that address royalty-free use of lease production (subpart 3178) and waste prevention through reduction of venting, flaring and leaks (subpart 3179). This rule will apply to all Federal and Indian (other than Osage Tribe) onshore oil and gas leases as well as leases and business agreements entered into by tribes (including IMDA agreements), as consistent with those agreements and with principles of Federal Indian law.

7

7

Key statutes underpinning this proposed regulation contain exceptions for the Osage Tribe. Specifically, the Osage Tribe is excepted from the application of both the Indian Mineral Leasing Act and the Federal Oil and Gas Royalty Management Act, 25 U.S.C. 396f; 43 U.S.C. 1702(3), 1702(4). The leasing of Osage Reservation lands for oil and gas mining is subject to special Bureau of Indian Affairs regulations contained in 25 CFR part 226.

This rule implements recommendations from several oversight reviews, including reviews by the Office of the Inspector General of the Department of the Interior (OIG) and the Government Accountability Office (GAO). These reviews raised concerns about waste of gas from Federal and Indian production, found that the BLM's existing requirements regarding venting and flaring are insufficient and outdated, and expressed concerns about the “lack of price flexibility in royalty

rates”

8

and about royalty-free use of gas. The GAO also noted that “around 40 percent of natural gas estimated to be vented and flared on onshore Federal leases could be economically captured with currently available control technologies.”

9

The OIG and GAO reports recommended that the BLM update its regulations to require operators to augment their waste prevention efforts, afford the BLM greater flexibility in rate setting, and clarify BLM policies regarding royalty-free, on-site use of oil and gas.

8

GAO, Oil and Gas Royalties: The Federal System for Collecting Oil and Gas Revenues Needs Comprehensive Reassessment, GAO-08-691, September 2008, 6.

9

GAO, Federal Oil and Gas Leases: Opportunities Exist to Capture Vented and Flared Natural Gas, Which Would Increase Royalty Payments and Reduce Greenhouse Gases, GAO-11-34, (Oct. 2010), 2.

The BLM has engaged in substantial stakeholder outreach in the course of developing this proposal. In 2014, the BLM conducted a series of forums to consult with tribal governments and to solicit stakeholder views to inform the development of this proposed rule, with public meetings (some of which were livestreamed) in Colorado, New Mexico, North Dakota, and Washington, DC.

10

The BLM continued to consult with stakeholders throughout the rule development process, including holding numerous meetings and calls with State and tribal representatives, individual companies, trade associations, and non-governmental organizations (NGOs). The BLM conducted additional outreach with States and tribes where there is extensive oil and gas production from BLM-administered leases. We issued a proposed rule on January 21, 2016, which was published on February 8, 2016, and accepted public comments through April 22, 2016, after extending the comment period. In addition, we held public meetings during the comment period in Farmington, New Mexico; Oklahoma City, Oklahoma; Denver, Colorado; and Dickinson, North Dakota. We also held separate meetings with tribes at each of these locations, and held further government-to-government consultation meetings at the request of several tribes. The BLM received approximately 330,000 public comments on the proposed rule, including approximately 1,000 unique comments.

10

Further information can be found at the BLM oil and gas program's outreach-events page:

http://www.blm.gov/wo/st/en/prog/energy/public_events_on_oil.html.

The BLM is not the only regulator with the responsibility to oversee aspects of onshore oil and gas production, and throughout this rulemaking the BLM has focused on potential interactions of this rule with other Federal, State, or tribal regulatory requirements. For example, the U.S. Environmental Protection Agency (EPA) issued rules in 2012 and early 2016 to control emissions of methane and volatile organic compounds (VOCs) from new, modified and reconstructed oil and gas wells and production equipment, and many States and tribes regulate aspects of the oil and gas production process to address safety, waste, production accountability, and/or air quality concerns. Regulatory agencies often have overlapping authority and may adopt very similar measures to realize those complementary goals, such as improving air quality and reducing waste. For example, measures in this rule that aim to avoid the waste of methane gas through venting or leaks will also reduce methane pollution.

The BLM recognizes that overlapping regulatory regimes can create difficulties for operators, and has therefore very carefully considered and minimized potential overlaps with other Federal, State, or tribal regulations. The BLM aligned the requirements of this new rule with similar requirements adopted by the EPA and States, where practicable, and exempted equipment complying with relevant EPA requirements from overlapping requirements of this rule. In addition, this rule includes a provision that authorizes the BLM to grant variances from particular BLM requirements if a State or tribe demonstrates that a State, local, or tribal regulation imposes equally effective requirements.

It is critical to note, however, that neither EPA nor State and tribal requirements obviate the need for this rule. First, the BLM has an independent legal responsibility and a proprietary interest as a land and resource manager to oversee and minimize waste from oil and gas production activities conducted pursuant to Federal and Indian (other than Osage Tribe) leases, as well as to ensure that development activities on Federal and Indian leases are performed in a safe, responsible, and environmentally protective matter. The BLM's existing venting and flaring requirements are over 30 years old and predate significant technological developments. Updating and clarifying those requirements will make them more effective, more transparent, and easier to understand and administer; and will reduce operators' compliance burdens in some respects. The BLM must carry out its responsibility, delegated by Congress, to ensure that the public's resources are not wasted and are developed in a manner that provides for long-term productivity and sustainability.

Second, as a practical matter, neither EPA nor State and tribal regulations fully address the issue of waste of gas from BLM-administered leases. The EPA regulations are directed at air pollution reduction, not waste prevention; they cover only new, modified and reconstructed sources; and they do not address wasteful routine flaring of associated gas from oil wells, among other things. Similarly, no State or tribe has established a comprehensive set of requirements addressing all three avenues for waste—venting, flaring, and leaks—and only a few States have significant requirements in even one of these areas. The BLM therefore believes this rule is a necessary step in fulfilling its statutory mandate to minimize waste of the public's and tribes' natural gas resources.

B. Summary of Rule

This rule requires operators to take various actions to reduce waste of gas, establishes clear criteria for when flared gas will qualify as waste and therefore be subject to royalties, and clarifies which on-site uses of gas are exempt from royalties. The rule focuses on several key points or processes in the oil and gas production process where waste-prevention actions are most effective and least costly: Venting and flaring of associated gas from development oil wells (routine flaring occurs at oil wells that dispose of gas as a waste product), gas leaks from equipment at the well site or elsewhere on the lease, operation of high-bleed pneumatic controllers and certain pneumatic pumps, gas emissions from storage vessels, downhole well maintenance and liquids unloading, and well drilling and completions. The following discussion summarizes the rule's requirements applicable to each of these aspects of the production process, and also outlines the rule's provisions with respect to royalties, and the interaction between the rule and related EPA and State or tribal regulations.

1. Venting and Flaring

In 2014, operators vented about 30 Bcf and flared at least 81 Bcf of natural gas from BLM-administered leases, totaling 4.1 percent of the total production from those leases in that year, and sufficient gas to supply nearly 1.5 million households with gas for a year.

11

In

2015 operators flared at least 85 Bcf, a 114 percent increase from 2009 levels.

12

Roughly 83 Bcf of this flaring came from oil wells.

13

Analysis of data supplied by the ONRR suggests that most of the flaring was routine flaring of associated gas from development oil wells (as opposed to flaring during exploration, well testing, and emergencies). Over 88 percent of this flaring occurred in North Dakota, South Dakota, and New Mexico.

11

RIA at 16;

see

Energy Information Administration (EIA),

Trends in U.S. Residential Natural Gas Consumption, http://www.eia.gov/pub/oil_gas/natural_gas/feature_articles/2010/ngtrendsresidcon/ngtrendsresidcon.pdf

(reporting

that in 2009, U.S. residential consumption was approximately 74 Mcf per household with natural gas service).

12

BLM analysis of ONRR OGOR-B data provided for 2009-2015 and EPA GHG Inventory data for 2014.

13

RIA at 49.

This rule prohibits venting of natural gas, except under certain specified conditions, such as in an emergency or when flaring is technically infeasible.

14

With respect to flaring, the rule requires operators to reduce wasteful flaring of gas by capturing for sale or using on the lease a percentage of their gas production. The required capture percentage increases over time, and is also adjusted to provide for a base level of “allowable” flaring that ramps down over time. This capture requirement builds on the proposed rule's flaring limits, and modifies that approach in response to comments, to make compliance more feasible and less costly, while working towards phasing out routine flaring of associated gas from oil wells by increasing capture. Specifically, beginning one year from the effective date of the final rule, operators must capture 85 percent of their adjusted total volume of gas produced each month. This percentage increases to 90 percent in 2020, 95 percent in 2023, and 98 percent in 2026. An operator's adjusted total volume of gas produced is calculated based on the quantity of high pressure gas produced from the operator's development oil wells that are in production, adjusted to exempt a specified volume of gas per well, which declines over time. Beginning one year from the effective date of the final rule, operators are allowed to exempt 5,400 Mcf gas per well per month, and this quantity declines to 3,600 beginning in 2019, 1,800 in 2020, 1,500 in 2021, 1,200 in 2022, 900 in 2024, and 750 from 2025 on.

14

See 43 CFR 3179.6.

The final rule gives operators the option to meet their capture targets on a lease-by-lease basis, or an average basis over all of their Federal or Indian production from development oil wells county-by-county or State-by-State. Giving operators the ability to average their rates of gas capture over geographic areas beyond individual leases enhances flexibility and makes the targets less costly to meet. Similarly, the more extended phasing in of the capture targets eases costs and compliance burdens, while allowing appropriate planning and investment by industry to meet more stringent targets in out years. At the same time, the BLM recognizes that it has a statutory responsibility to ensure that operators minimize waste of public resources. Accordingly, the BLM has structured the capture targets to ensure that operators will achieve overall reductions in wasteful flaring that are comparable to, and eventually slightly greater than, what the BLM estimated would have been achieved under the proposed rule.

The BLM estimates that, once fully implemented, the capture targets will reduce flaring by up to 49 percent relative to 2015 levels. Like the proposed rule, the final rule also retains the BLM's discretion to craft alternative requirements for certain operators that cannot meet the baseline flaring reduction obligations. Specifically, the final rule allows the BLM to adjust the capture target for an operator on an existing lease that demonstrates to the BLM that meeting the target would impose such costs as to cause the operator to cease production and abandon significant recoverable oil reserves under the lease. In assessing the operator's showing, the BLM will consider the costs of gas capture, and the costs and revenues of all oil and gas production on the lease.

As explained in the proposed rule, the initial flaring limitations were intended to motivate operators to increase their capture of gas associated with oil development, since a reduction in flaring is achieved most effectively by an increase in capture. Consequently, flaring limitations and capture requirements are two sides of the same coin. Increasing capture is the BLM's primary goal in imposing these waste prevention requirements, and we concluded that it would be a more direct means of achieving that goal to require capture rather than merely encourage it through the imposition of flaring limits. In modifying the rule in this way, we have determined that both approaches are expected to achieve comparable results, in terms of both increasing capture and reducing wasteful flaring.

In addition, this rule finalizes the proposal to require operators to submit a Waste Minimization Plan when they apply for a permit to drill a new development oil well. Preparation of a Waste Minimization Plan ensures that the operator carefully considers and plans for how it will capture the gas that will be produced, before the operator drills a well. While the provisions of a plan will not be enforceable against the operator, plan submission is mandatory, and the plan must include specific elements listed in the regulations. As in the proposed rule, failure to submit a complete and adequate plan could be grounds for denial of an application for permit to drill (APD).

2. Leaks

Based on our estimates, leaks are the second largest source of vented gas from Federal and Indian leases, accounting for about 4 Bcf of the natural gas lost in 2014.

15

Our analysis indicates that Leak Detection and Repair (LDAR) programs are a cost-effective means of reducing waste in oil and gas production, and multiple studies have found that once leaks are detected, the vast majority can be repaired with a positive return to the operator.

16

15

RIA at 3.

16

RIA at 27.

Like the proposed rule, the final rule requires operators to use an instrument-based approach to leak detection. The final rule allows operators to use optical gas imaging equipment, portable analyzers deployed according to the protocol prescribed in EPA's Method 21,

17

or an alternative leak detection device approved by the BLM. In response to comments on the proposed rule, the final rule was revised to be consistent with the EPA's final requirements under 40 CFR part 60 subpart OOOOa, requiring operators to conduct semi-annual inspections at well sites and quarterly inspections at compressor stations. Operators may also request BLM approval of an alternative instrument-based leak detection program; the BLM may approve such a program if it finds that the program would reduce leaked volumes by at least as much as the BLM program. Operators must repair a leak within 30 days of discovery, absent good cause, and verify that the leak is fixed. Operators must also keep records documenting the dates and results of leak inspections, repairs, and follow-up inspections.

17

See 40 CFR part 60, appendix A-7.

3. Reducing Venting From Equipment and Practices

Like the proposed rule, the final rule includes requirements to update old, inefficient equipment and to follow best practices to minimize waste through venting. These provisions address gas losses from pneumatic controllers and pumps, storage vessels, liquids

unloading, and well drilling and completions.

a. Pneumatic Controllers and Pumps

We estimate that on BLM-administered leases in 2014, operators lost about 14.9 Bcf of natural gas from pneumatic controllers and about 2.3 Bcf from pneumatic pumps.

18

A recent study by the consulting firm ICF International (ICF) identified replacement of high-bleed pneumatic controllers (those with bleed rates higher than 6 standard cubic feet (scf)/hour) with low-bleed pneumatic controllers (those with bleed rates of 6 scf/hour or less) as one of the most inexpensive options for reducing methane losses, estimating that replacing these devices would actually save industry $2.65 per Mcf of avoided methane emissions.

19

Like the proposed rule, the final rule requires operators to replace high-bleed pneumatic controllers with low-bleed or no-bleed pneumatic controllers within one year of the effective date of the final rule. This requirement tracks existing requirements in Colorado and Wyoming (in part of the State), and it applies only to pneumatic controllers that are not covered by EPA regulations.

18

RIA at 4.

19

ICF International, Economic Analysis of Methane Emission Reduction Opportunities in the U.S. in the Onshore Oil and Natural Gas Industries, 4-4 (Mar. 2014),

available at https://www.edf.org/sites/default/files/methane_cost_curve_report.pdf

(ICF 2014 Study) (base case assumed $4/Mcf price for recovered gas and a 10 percent discount rate/cost of capital).

For pneumatic pumps, the final rule requires the operator to replace pneumatic diaphragm pumps that operate 90 or more days per year with zero-emissions pumps, or route the pump exhaust gas to processing equipment. If use of a pneumatic pump is required based on the function the pump must serve, and the operator determines that routing the exhaust gas to processing equipment would be technically infeasible or unduly costly, the operator must route the pneumatic diaphragm pump to a combustor or flare, if one is located on the site.

The BLM modified the requirements in the proposed rule for pneumatic pumps in response to comments and to better align with the EPA's final subpart OOOOa requirements. For example, the BLM eliminated the proposed requirements for chemical injection pumps and diaphragm injection pumps that operate relatively infrequently, as we believe that these pumps vent relatively small quantities of gas. Like the proposed rule, the final rule does not apply to pneumatic pumps that are subject to EPA regulations.

The final rule provides that an operator can receive an exemption from the requirements for pneumatic controllers or pumps if the operator demonstrates and the BLM concurs that replacing the pneumatic pump(s) would impose such costs as to cause the operator to cease production and abandon significant recoverable oil reserves under the lease. In making this determination, the BLM will consider the costs of capture, and the costs and revenues of all oil and gas production on the lease.

b. Storage Vessels

We estimate that 2.94 Bcf of natural gas was lost in 2014 from storage tank venting on Federal and Indian lands.

20

Of that volume, we estimate that 1.54 Bcf was lost from storage vessels used in natural gas production and 1.4 Bcf of gas was lost from storage vessels used in oil production.

21

Tank vapors can be controlled by installing a vapor recovery unit (VRU) or by routing them to a flare or combustor. New, modified and reconstructed vessels used in oil and gas production are already subject to EPA emissions limits, which require that individual storage vessels with VOC emissions equal to or greater than 6 tons per year (tpy) achieve at least a 95 percent reduction in VOC emissions from baseline levels. Colorado and part of Wyoming have similar, somewhat more stringent requirements for storage vessels.

22

20

RIA at 17.

21

RIA at 17.

22

Colorado Air Quality Control Commission Regulations, Regulation 7, 5 CCR 1001-9, Sections XII.D-F; XVII.C; Wyoming, Nonattainment Area Regulations Ch. 8, Section 6(c) (June 2015),

available at http://soswy.state.wy.us/Rules/RULES/9868.pdf.

Like the proposed rule, this final rule includes requirements to reduce gas losses from existing storage vessels, which are not covered by the EPA standards. Using the same applicability threshold as EPA and Colorado (6 tpy of VOCs, which the BLM is using as a proxy for natural gas losses since the VOCs in this context are coming from the natural gas from storage vessels), the rule requires operators to route storage vessel vapor gas to a sales line, if the storage vessel has the potential to emit at least 6 tpy of VOCs. If an operator determines that compliance with this requirement is technically infeasible or unduly costly, the operator may instead route the tank vapor gas to a combustor or flare. Like the proposed rule, this final rule allows operators to request an exemption from these requirements if the operator demonstrates, and the BLM concurs, that complying with the requirements would impose such costs as to cause the operator to cease production and abandon significant recoverable oil reserves under the lease. In making this determination, the BLM will consider the costs of compliance, and the costs and revenues of all oil and gas production on the lease.

c. Well Maintenance and Liquids Unloading

We estimate that 3.26 Bcf of natural gas was lost in 2014 during liquids unloading operations on Federal and Indian lands.

23

There are a wide variety of methods for liquids unloading, and technological developments, such as automated well controls and plunger lift systems, now allow liquids to be unloaded with minimal loss of gas. The BLM expects prudent operators to use available technologies and practices to minimize gas losses, and we believe that the failure to use such technologies and practices during liquids unloading constitutes waste.

23

RIA at 3.

The final rule does not adopt the provision from the proposed rule that would have prohibited manual well purging from new wells, due to concerns about the technical feasibility of such a ban. Instead, the final rule requires an operator to: (1) Minimize gas vented to unload liquids, consistent with safe operations; (2) optimize the operation of the plunger lift or automated well control system, at wells equipped with such a system, to minimize gas losses from the system to the extent possible; (3) consider other methods for liquids unloading and determine that they are technically infeasible or unduly costly, prior to manually purging a well for the first time; and (4) comply with specified procedures and document venting events when unloading liquids by manual well purging.

d. Reduction of Waste From Drilling, Completion, and Related Operations

We estimate that in 2014, 1.12 Bcf of natural gas was lost during drilling, completion, and refracturing (sometimes referred to by the broader term “workover”) operations on BLM-administered leases.

24

The EPA requires new hydraulically fractured and refractured oil or gas wells to capture or flare gas that otherwise would be released during drilling and completion operations. The BLM final rule also includes provisions to minimize the waste of gas during these operations by

requiring operators to capture, use, flare, or inject the gas. While we do not expect that these provisions will obligate operators to take any additional actions beyond what they must do to comply with the EPA requirements, we believe it is appropriate for the BLM to adopt its own provisions governing operator conduct, to fulfill its independent statutory obligation to minimize waste of oil and gas resources on BLM-administered leases.

24

RIA at 3.

4. Royalty Provisions Governing New Competitive Leases

The final rule revises 43 CFR 3103.3-1, which governs royalty rates applicable to onshore oil and gas leases, to make the rule text parallel to the BLM's statutory authority, which specifies that competitively-issued BLM-administered leases “shall be conditioned upon the payment of a royalty at a rate of

not less than

12.5 percent in amount or value of the production removed or sold from the lease.” 30 U.S.C. 226(b)(1)(A). The final version of 43 CFR 3103.3-1 thus makes clear that for competitive leases issued after the effective date of this rule, the BLM has the flexibility to set rates at or above 12.5 percent. This change finalizes this provision as it was proposed, and responds to findings and recommendations in audits from the GAO. The final rule does not, however, set a new rate for competitively-issued leases.

Like the proposed rule, the final rule specifies the fixed, statutory rate of 12.5 percent for all noncompetitive leases issued after the effective date of the rule, as required by statute.

25

In addition, the final rule makes clear that the royalty rate on all existing leases remains the rate prescribed in the lease or in regulations applicable at the time of lease issuance.

25

30 U.S.C. 226(c)(1).

5. Unavoidable Versus Avoidable Losses of Gas

Like the proposed rule, the final rule also updates the pre-existing royalty provisions in NTL-4A to more clearly and specifically define when a loss of gas is considered “unavoidable” and royalty-free, and when it is considered “avoidable” and subject to royalties. A loss of gas is deemed unavoidable when an operator has complied with all applicable requirements and taken prudent and reasonable steps to avoid waste, and the gas is lost from one of the operations or sources specified in this final regulation, subject to certain limitations. The specified operations and sources include emergencies; well drilling, completions, and tests; normal operations of pneumatic devices and storage vessels; liquids unloading; leaks; equipment or pipeline maintenance requiring depressurization; and residual gas after stripping of natural gas liquids. A loss of gas is also deemed unavoidable when gas is flared from a well that is not connected to a gas pipeline, provided the BLM has not otherwise determined that the loss of gas is avoidable. All other losses of gas, as well as any gas flared in violation of the capture requirement (regardless of whether the well is connected to a pipeline), are deemed avoidable and subject to royalties. By establishing clear-cut categories for unavoidable and avoidable losses, the final rule will dramatically reduce the large number of requests for approval to flare royalty-free that operators have had to file and the BLM has had to process each year.

6. Interaction With EPA and State Regulations

Like the proposed rule, this final rule seeks to minimize regulatory overlap. Thus, if EPA and/or States or tribes have adopted requirements that are at least as effective as and would potentially overlap with the provisions of this rule, the final rule provides a means for operators to comply with the EPA, State, local or tribal requirements in lieu of the BLM requirements. Specifically, in cases in which EPA rules limit venting from equipment or require leak inspections and repairs, those operators that are in compliance with those EPA requirements are deemed, under this rule, to be in compliance with the comparable BLM requirements. With respect to State, local, or tribal rules, the final rule allows a State or tribe to request a variance from a particular BLM regulation. If the variance is granted, the BLM has the authority to enforce the specific provisions of the State, local, or tribal rule for which the variance was granted, in lieu of the comparable provisions of the BLM rule. As clarified in the final rule, the BLM may grant a State or tribal variance request only if the BLM determines that the State, local, or tribal rule would perform at least as well as the BLM provision to which the variance would apply, in terms of reducing waste of oil and gas, reducing environmental impacts from venting and/or flaring of gas, and ensuring the safe and responsible production of oil and gas.

7. Other Provisions

Like the proposed rule, the final rule includes provisions that update and clarify pre-existing BLM requirements regarding when operators may use oil or gas from a lease for production activities without owing royalties on the oil or gas used. In addition, like the proposed rule, the final rule includes provisions specifying when operators must measure the volumes of gas vented or flared, and requiring operators to report to ONRR volumes of gas vented or flared.

8. Summary of Costs and Benefits

Overall, the BLM estimates that the benefits of this rule would outweigh its costs by a significant margin. Under certain assumptions, for example, the rule is expected to produce net benefits ranging from $46 million to $199 million per year (annualizing capital costs using a 7 percent discount rate) or from $50 million to $204 million per year (annualizing capital costs using a 3 percent discount rate).

26

26

BLM, Economic Impact and Regulatory Threshold Analysis for 43 CFR 3178 (Royalty Free Use of Production) and 43 CFR 3179 (Venting and Flaring Requirements) (2015) (hereinafter RIA) at 6.

a. Costs

The BLM estimates that this rule will pose costs ranging from $114-$279 million per year (using a 7 percent discount rate to annualize capital costs) or $110-$275 million per year (using a 3 percent discount rate to annualize capital costs) over the next 10 years.

27

These costs include engineering compliance costs and the social cost of minor additions of carbon dioxide to the atmosphere, resulting from the on-site or downstream use of gas that is newly captured as a result of this rule.

28

The engineering compliance costs presented do not include potential cost savings from the recovery and sale of natural gas (those savings are shown in the summary of benefits).

27

RIA at 4.

28

Some gas that would have otherwise been vented would now be combusted on-site or presumably downstream to generate electricity. As described in the RIA, the estimated value of these carbon additions would not exceed $30,000 in any given year.

In some areas, operators have already undertaken, or plan to undertake, voluntary actions to address gas losses. To the extent that operators are already in compliance with the requirements of this final rule, the above estimates overstate the likely impacts of the rule.

We expect that cost impacts on individual operators would be small, even for businesses with less than 500 employees. In the Regulatory Impact Analysis (RIA), we estimate that average costs for a representative small operator would increase by about $55,200, which would result in an average reduction in

profit margin of 0.15percentage points.

29

29

RIA at 129. These estimates rely on 2014 company data, and use a 7 percent discount rate.

b. Benefits

We measure the benefits of the rule as the cost savings that the industry would receive from the recovery and sale of natural gas and the environmental benefits of reducing the amount of methane (a potent GHG) and other air pollutants released into the atmosphere. As with the estimated costs, we expect benefits on an annual basis. The BLM estimates that this rule would result in monetized benefits of $209-$403 million per year (using model averages of the social cost of methane with a 3 percent discount rate).

30

We estimate that the final rule would reduce methane emissions by 175,000-180,000 tpy, roughly a 35% reduction in methane emissions from the 2014 estimates, and which we estimate to be worth $189-$247 million per year (this social benefit is included in the monetized benefit above).

31

30

RIA at 5.

31

RIA at 110. We also estimate that the final rule would have an incidental benefit of reducing VOC emissions by 250,000-267,000 tpy (this benefit is not monetized in our calculations).

Adoption of the final rule will also have numerous ancillary benefits. These include improved quality of life for nearby residents, who note that flares are noisy and unsightly at night; reduced release of VOCs, including benzene and other hazardous air pollutants; and reduced production of nitrogen oxides (NOx) and particulate matter, which can cause respiratory and heart problems.

c. Net Benefits

Overall, the BLM estimates that the benefits of this rule outweigh its costs by a significant margin. The BLM expects net benefits ranging from $46-$199 million per year (using a 7 percent discount rate to annualize capital costs) or $50-$204 million per year (using a 3 percent discount rate to annualize capital costs). Specifically, assuming a 7 percent discount rate to annualize capital costs, we estimate the following annual net benefits in selected years:

• $99-$115 million in 2018;

• $51-$93 million in 2022; and

• $120-$189 million in 2026.

Assuming a 3 percent discount rate to annualize capital costs, we estimate the annual net benefits would be:

• $103-$119 million in 2018;

• $55-$97 million in 2022; and

• $125-$193 million in 2026.

32

32

RIA at 111.

d. Influence on Production

The final rule has a number of requirements that are expected to influence the production of natural gas, NGLs, and crude oil from onshore Federal and Indian oil and gas leases. We estimate the following incremental changes in production, noting the representative share of the total U.S. production in 2015 for context. We estimate additional natural gas production, ranging from 9-41 Bcf per year (representing 0.03-0.15 percent of the total U.S. production), and a reduction in crude oil production ranging from 0.0-3.2 million bbl per year (representing 0-0.07 percent of the total U.S. production). We also expect 0.8 Bcf of gas to be combusted on-site that would have otherwise been vented. Combined, the rule will reduce venting by about 35 and reduce flaring by 49%, depending on the year.

33

33

RIA at 5.

Since the relative changes in production are expected to be small, we do not expect that the final rule will significantly impact the price, supply, or distribution of energy.

e. Royalties

We estimate that this final rule will produce additional royalties of $3-$10 million per year (discounted at 7 percent) or $3-$14 million per year (discounted at 3 percent).

34

34

RIA at 143.

III. Background

The BLM's onshore oil and gas management program is a major contributor to the nation's oil and gas production. The BLM manages more than 245 million acres of land and 700 million acres of subsurface estate, comprising nearly a third of the nation's mineral estate. Domestic production from over 96,000 Federal onshore oil and gas wells accounts for 11 percent of the Nation's natural gas supply and 5 percent of its oil supply. In FY 2015, the ONRR reported that operators produced 183.4 million bbl of oil, 2.6 Tcf of natural gas, and 3.3 billion gallons of NGLs from onshore Federal and Indian oil and gas leases. The production value of this oil and gas exceeded $20.9 billion and generated over $2.3 billion in royalties.

35

35

Office of Natural Resources Revenue, Statistical Information,

http://statistics.onrr.gov/ReportTool.aspx

using Sales Year-FY 2015-Federal Onshore-All States Sales Value and Revenue for Oil, NGL, and Gas products as of September 21, 2016.

Over the past decade, the United States has experienced a dramatic increase in oil and natural gas production due to technological advances, such as hydraulic fracturing combined with directional drilling. This boost in production has brought many benefits in the form of expanded and more secure domestic supplies, lower prices, increased economic activity in certain regions of the country, and greater royalty revenues for Federal, State, and tribal governments.

At the same time, the American public has not benefited from the full potential of this increased production, as the increase in oil production has been accompanied by significant and growing quantities of wasted natural gas. Between 2009 and 2015, operators on BLM-administered leases wasted enough natural gas to serve over 6.2 million homes for 1 year, according to data reported to ONRR.

36

36

Office of Natural Resources Revenue, Statistical Information,

http://statistics.onrr.gov/ReportTool.aspx

using Sales Year-FY 2015-Federal Onshore—All States Sales Value and Revenue for Oil, NGL, and Gas products as of September 7, 2016.

A. Impacts of Waste and Loss of Gas

As explained in the proposed rule preamble section IV.B, natural gas is a limited and valuable public resource, which is critical to U.S. energy security and national security. Natural gas also provides significant economic benefits as an energy source for electricity generation and industrial and residential use, and as a feedstock for manufacturing. Royalty payments on natural gas sales provide Federal, State, and tribal governments with over $3 billion in revenues each year.

Venting, flaring, and leaks of natural gas from production on BLM-administered sites waste this limited natural resource and deprive the American public and tribes of the security and economic benefits that this resource, which belongs to the public and tribes, would otherwise provide. In addition to the economic and security losses, the waste of natural gas also imposes public health and environmental costs, in the form of air pollution, such as smog and regional haze; emissions of hazardous air pollutants, some of which are carcinogenic; and emissions of methane, a powerful contributor to global warming and a primary target for reduction under the President's Climate Action Plan.

37

Absent stronger provisions to reduce natural gas waste on Federal lands, the avoidable loss of gas will continue to threaten climate

stability and undermine respiratory and cardiovascular health.

37

The President's Climate Action Plan (June 2013) (

https://www.whitehouse.gov/sites/default/files/image/president27sclimateactionplan.pdf

).

B. Purpose of the Rule

1. Overview

The purpose of this rule is to reduce waste of natural gas owned by the American public and tribes, which occurs during the oil and gas production process. While the BLM already regulates venting and flaring of natural gas during oil and gas production on Federal and Indian (other than Osage Tribe) leases, the current requirements are over 30 years old and do not reflect modern technologies, practices, and understanding of the harms caused by venting, flaring, and leaks of gas. Oversight reviews have also suggested that the current requirements are insufficiently clear in their directives, which complicates implementation for BLM staff and creates uncertainty for oil and gas operators. Today's rule updates the existing provisions to direct operators to take reasonable and common-sense measures to prohibit routine venting, minimize the quantities of natural gas routinely flared, reduce natural gas losses through leaks, and deploy up-to-date technology to reduce routine losses from production equipment.

2. Issues Addressed by Rule

a. Large Quantities of Natural Gas Are Wasted on Federal and Indian Leases

As explained in the proposed rule preamble section IV.H.1, while there is some uncertainty regarding the total volume of natural gas lost during production on public and tribal lands, the volume is unacceptably high.

There is no single definitive source for the total volume of natural gas losses from oil and gas production on Federal Lands. BLM efforts to estimate the total volume are informed by the Oil and Gas Operations Report Part B (OGOR-B) filed with the ONRR, the EPA Greenhouse Gas Inventory,

38

data from the EPA Greenhouse Gas Reporting Program,

39

and numerous studies discussed in the preamble to the proposed rule and provided by commenters. Each data set, however, has limitations. The ONRR data rely on self-reporting, and there is substantial variation in the types of losses that different operators report (and certain types of losses, such as most leaks, are not reported at all). The EPA data are based on emissions factors that are representative rather than actual.

40

Even though data in these programs have recently been updated, they are still incomplete, and recent studies suggest actual emissions may be somewhat, or even substantially, higher than the emissions factors suggest.

41

Thus, we believe that the estimates of losses used to support today's rule, while substantial, are conservative. For purposes of this final rule, ONRR provided the BLM with data evidencing 7 years of vented and flared volumes reported on the OGOR-Bs. The data analyzed included gas flared and vented from both oil and gas wells from 2009 through 2015. During this period, operators reported that they vented or flared a total of 462 Bcf of natural gas, or about 2.7 percent of the 16.8 Tcf of natural gas that was produced from BLM-administered leases from 2009 through 2015.

42

This is enough natural gas to supply over 6.2 million households—or every household in the States of Colorado, Montana, New Mexico, North Dakota, South Dakota, Utah, and Wyoming—for 1 year.

43

38

U.S. EPA, (

U.S. Greenhouse Gas Inventory Report: 1990-2014

),

available at https://www.epa.gov/sites/production/files/2016-04/documents/us-ghg-inventory-2016-main-text.pdf

(“2016 GHG Inventory”).

39

U.S. EPA,

Greenhouse Gas Reporting Program; Petroleum and Natural Gas Systems. Available at https://www.epa.gov/ghgreporting/ghgrp-petroleum-and-natural-gas-systems.

40

EPA,

2016 GHG Inventory Report: 1990-2014.

Available at

https://www3.epa.gov/climatechange/Downloads/ghgemissions/US-GHG-Inventory-2016-Main-Text.pdf.

41

Envt'l Def. Fund,

New EPA Stats Confirm: Oil & Gas Methane Emissions Far Exceed Prior Estimates

(Apr. 15, 2016),

https://www.edf.org/media/new-epa-stats-confirm-oilgas-methane-emissions-far-exceed-prior-estimates.

42

BLM analysis of ONRR OGOR-B data provided for 2009-2015.

43

Using U.S. Energy Information Administration Natural Gas Consumption by End Use for 2015 found at

http://www.eia.gov/dnav/ng/ng_cons_sum_a_EPG0_vrs_mmcf_a.htm.

These data are reported by operators on BLM-administered leases, but the production is actually derived from lands with various ownership patterns. Of the vented and flared gas reported to ONRR, 15 percent came from wells extracting only Federal minerals; 8.8 percent came from wells extracting only Indian minerals, and 76.2 percent from wells extracting minerals with mixed ownership (some combination of Federal, Indian, fee (private) and State minerals).

Finally, the BLM notes that available data suggest the problem of natural gas loss on BLM-administered leases is growing. The total amounts of annual reported flaring from Federal and Indian leases increased by over 1000 percent from 2009 through 2015.

44

During this period, reported volumes of flared oil-well gas increased by 318 percent, while reported volumes of flared gas-well gas decreased by 86 percent.

45

The reduction in flaring at gas wells coincides with the adoption of EPA 40 CFR part 60 subpart OOOO (“subpart OOOO”) air pollution requirements, which limit emissions from gas wells hydraulically fractured after August 23, 2011.

46

44

BLM analysis of ONRR OGOR-B data provided for 2009-2015.

45

BLM query of AFMSS database for the number of Flaring Sundry Notices filed on Federal and Indian lands between 2009 and 2015 on November 4, 2011.

46

79 FR 49490 (Aug.16, 2012).

Another indicator of the increase of flaring on Federal and Indian lands is the increased number of applications to vent or flare royalty-free that the BLM has received from operators. In 2005, the BLM received just 50 applications to vent or flare gas. In 2011, the BLM received 622 applications, and this doubled again within 3 years to 1,248 applications in 2014. BLM field offices indicate that most of the additional applications were for flaring of associated gas from oil wells in New Mexico, Montana, the Dakotas, and, to a lesser extent, Wyoming.

b. Recent Studies of Venting and Leaks

The proposed rule preamble section IV.H.2 discussed recent efforts to improve our understanding of the quantities of natural gas lost through venting and leaks during the production process, and it highlighted a number of recent studies. These include both “bottom up” studies, which attempt to improve the accuracy and understanding of current estimates by conducting site-specific intensive measurements of losses during the production process, and “top down” studies, which use aircraft and tracers to quantify atmospheric methane levels and attribute them to oil and gas production activities. Several of these recent studies by government, industry, and environmental organizations suggest that emission levels are higher than those estimated using the DOI and EPA data, and in particular, some studies highlighted emissions levels two to three times higher than those based on EPA data. They also provided information on the distribution of gas leaks, which are heavily concentrated at “super-emitter” facilities, and highlighted the challenges in predicting which sites will experience super-emitter conditions. Commenters on the proposed rule pointed to additional studies, some issued after the proposal, that further demonstrate significant gas loss, the potential to reduce such waste through various technologies and practices, and the need for widespread leak detection and repair.

Commenters pointed to both bottom up and top down studies that suggest BLM's estimate of natural gas waste is conservative. For example, EPA's 2016 GHG Inventory was released in April 2016 (after BLM issued its proposed rule), and provides estimates of methane loss from the oil and gas sector that are significantly greater than previous estimates.

47

EPA updated its method for estimating emissions using the latest peer-reviewed science published over the last several years. The data also revealed that emissions had grown by more than 10 percent between 2010 and 2014.

47

EPA,

U.S. Greenhouse Gas Inventory Report: 1990-2014

at 3-69, Table 3-46 (2016),

available at https://www.epa.gov/sites/production/files/2016-04/documents/us-ghg-inventory-2016-main-text.pdf

(“2016 GHG Inventory”); EPA,

U.S. Greenhouse Gas Inventory Report: 1990-2013

at 3-70, Table 3-44 (2016),

available at https://www.epa.gov/sites/production/files/2016-03/documents/us-ghg-inventory-2015-main-text.pdf

(“2015 GHG Inventory”).

See also

Envt'l Def. Fund,

New EPA Stats Confirm: Oil & Gas Methane Emissions Far Exceed Prior Estimates

(Apr. 15, 2016),

https://www.edf.org/media/new-epa-stats-confirm-oilgas-methane-emissions-far-exceed-prior-estimates;

A.R. Brandt et al.,

Methane Leaks from North American Natural Gas Systems,

343 Science 733 (2014),

available at http://www.novim.org/images/pdf/ScienceMethane.02.14.14.pdf;

Gina McCarthy,

Remarks on Climate Action at CERA in Houston, Texas

(Feb. 24, 2016),

available at https://yosemite.epa.gov/opa/admpress.nsf/8d49f7ad4bbcf4ef852573590040b7f6/5c432a7068e191e985257f630054fea8!OpenDocument.

Commenters also referenced a 2013 top-down study led by the National Oceanic and Atmospheric Administration (NOAA) that estimated emissions from an oil and natural gas production field in Uintah County, Utah, using atmospheric measurements in a mass balance approach. The measurements, published in Geophysical Research Letters, suggested an emission rate between 6.2 and 11.7 percent of production, allowing for uncertainties in gas composition and gas production.

48

This is significantly higher than estimates from bottom up inventories, such as the 1.4 percent of production assumed in the 2012 EPA Greenhouse Gas Inventory, and further suggests that natural gas waste is likely underestimated in commonly cited inventories.

48

Anna Karion et al., Methane Emissions Estimate from Airborne Measurements Over a Western United States Natural Gas Field, 40,

Geophysical Research Letters

4393, 4393 (2013) (

http://onlinelibrary.wiley.com/doi/10.1002/grl.50811/full

).

In meetings pursuant to E.O. 12866, stakeholders referenced a new study published in

Nature

on October 5, 2016, entitled “Upward revision of global fossil fuel methane emissions based on isotope database.”

49

The research was conducted by scientists from NOAA and the Cooperative Institute for Research in Environmental Sciences at the University of Colorado, Boulder. The study relied on the largest isotopic methane source signature database ever assembled to estimate total global methane emissions and identify the sources of emissions. It finds that methane emissions from fossil fuel production are 20% to 60% greater than previous estimates, and that they represent 20% to 25% of global methane emissions. The study also highlights that methane emissions by microbial sources (

e.g.,

cows, agriculture, landfills, and wetlands) are responsible for 58% to 67% of total methane emissions each year, and that these sources drove most of the global increase in methane emissions observed between 2007 and 2013. Thus, the study affirms the potential for methane mitigation from fossil fuel production, while indicating that significant further reductions may be available from expanding mitigation efforts to other sectors as well.

49

Schwietzke, Stefan et al. “Upward Revision of Global Fossil Fuel Methane Emissions Based on Isotope Database.”

Nature,

88 Vol. 538. (Oct. 5, 2016) (

http://www.nature.com/nature/journal/v538/n7623/full/nature19797.html

); U.S. Department of Commerce, National Oceanic and Atmospheric Administration.

Study Finds Fossil Fuel Methane Emissions Greater Than Previously Expected

(2016) (

http://www.noaa.gov/media-release/study-finds-fossil-fuel-methane-emissions-greater-than-previously-estimated

).

There have also been recent and ongoing studies of so-called “super-emitters,” which account for a disproportionate quantity of the losses. One of these is a study by Zavala et al., published on July 7, 2015, in

Environmental Science and Technology.

The study used data collected from gas wells in the Barnett Shale region in Texas to identify unusually high emitters—that is, emissions outliers—by focusing on a site's absolute methane emissions divided by production rate. The study referred to this metric as the proportional loss rate, and demonstrated that sites with “high proportional loss rates have excess emissions resulting from abnormal or otherwise avoidable operating conditions such as improperly functioning equipment.” The study then concluded that these sources' “reduction potential”—that is, their ability to reduce their losses—is likely greater than that suggested by emission-factor based estimates. The study also found that the losses and abnormal operating conditions that characterize these super-emitters are not specific to a given set or type of sources, but can and do occur at different sources over time.

50

50

Zavala-Araiza, et al., (2015) “Toward a Function Definition of Methane Super-Emitters: Application to Natural Gas Production Sites,” Environ. Sci. Technol., 49, at 8167-8174 (“Zavala-Araiza (2015)”), available at

http://pubs.acs.org/doi/abs/10.1021/acs.est.5b00133

.

In 2015, a team of scientists at Colorado State University published studies based on direct measurements of emissions from 114 gathering facilities at sixteen different processing plants. The study found that 30 percent of facilities were responsible for approximately 80 percent of the venting. Substantial venting occurred at liquid storage tanks at approximately 20 percent of the facilities where emission rates were four times the average rate. Moreover, the high emitting facilities were generally capable of immediate emission reductions through operating adjustments, such as adjusting the operating pressure of the separation equipment.

51

51

Mitchell, A.L., et al, (2015) “Measurements of Methane Emissions from Natural Gas Gathering Facilities and Processing Plants,”

Environ. Sci. Technol,

2015, 49 (5), pp 3219-3227,

available at http://pubs.acs.org/doi/abs/10.1021/es5052809.

In 2012, the City of Fort Worth, Texas, sponsored a study of 375 oil and gas production facilities. It found that thief hatches were the largest source, and pneumatic controllers were the most frequent source, of fugitive emissions at well pads and compressor stations. These leaks were often due to operator error or inadequate maintenance.

52

52

Eastern Research Group and Sage Environmental Consulting, City of Fort Worth Natural Gas Air Quality Study (Final Report) 3-99 (2011),

available at http://fortworthtexas.gov/uploadedFiles/Gas_Wells/AirQualityStudy_final.pdf

.

Commenters also pointed to the largely random nature of significant leaks. A recent study, authored by Lyon et al., used optical gas imaging to survey 8,220 oil and gas well pads through aerial surveys. The study found only a small correlation between the probability of detection of a leak and site characteristics, such as well count, well age, gas production, oil production, and water production. The stochastic and diverse nature of the sites with leaks, along with the level of waste observed, provides further support for broadly applicable leak detection and repair programs.

53

53

David R. Lyon et. al, Aerial Surveys of Elevated Hydrocarbon Emissions from Oil and Gas Production Sites, 1 Envtl. Sci. Tech. (2016)

Both the Zavala and Lyon studies observed that leak rates are not strongly correlated with well production rates—that is, higher and lower producing wells can both have significant levels of natural gas waste. Specifically, the Zavala study found small producing sites (10-100 Mcf/day) were twice as likely as those sites an order of magnitude larger (100-1,000 Mcf/day) to be among the 5% of sites with the

highest emissions. The Lyon study found that well pad characteristics, such as oil production levels, could only collectively explain about 14% of the variation in observed emissions. While a statistically significant correlation between size and leaks is observed, both studies note that it is a weak linear correlation and that leak occurrence is largely stochastic. The Lyon study found that over 15 percent of the high-emitting sites detected in its survey were low production sites, producing 15 barrel of oil equivalent (BOE) per day or less.

54

54

David R. Lyon et. al,

Aerial Surveys of Elevated Hydrocarbon Emissions from Oil and Gas Production Sites,

1 Envtl. Sci. Tech. (2016) available at

http://pubs.acs.org/doi/abs/10.1021/acs.est.6b00705.

See supporting information “Site-level parameter data for well pads in the surveyed areas and basins” file columns M and N in the “Surveyed Well Pads” worksheet.

Another recent study by the Colorado Air Pollution Control Division surveyed oil and gas wells over two years using optical gas imaging. The research revealed a significant number of leaks, but also highlighted that it is possible to achieve immediate reduction or minimization of waste from production facilities with timely identification and repair of leaks. The survey spanned from July 2013 through June of 2015 and covered over 4,400 facilities. The optical gas imaging technology identified gas lost through leaks or vents at more than 25 percent of the facilities, with the majority of these leaks or vents occurring at storage tanks.

55

55

Colorado Department of Public Health and Environment Air Pollution Control Division Colorado Optical Gas Imaging Infrared Camera Pilot Project: Final Assessment July 11, 2016 Author: Tim Taylor

c. Existing BLM Regulations Need To Be Updated

As discussed in detail in the proposed rule preamble at section IV.E, venting, flaring, and royalty-free uses of oil and natural gas on BLM-administered leases are currently governed by NTL-4A. This “Notice to Lessees” was issued by the U.S. Geological Survey on December 27, 1979, before the BLM assumed oversight responsibility for onshore oil and gas development and production. NTL-4A places limitations on venting or flaring of gas-well or oil-well gas, unless approved in writing by BLM. NTL-4A also specifies the circumstances under which an operator owes royalties on oil or gas that is lost from a lease.

In the past 37 years since NTL-4A was issued, oil and gas production technologies and practices have advanced considerably, particularly with the development of modern hydraulic fracturing techniques and directional drilling. Technologies for capturing and using gas on-site, detecting leaks, powering equipment, controlling vapors from storage vessels, removing liquids from gas wells, and many other aspects of the production process have also advanced. Not surprisingly, NTL-4A neither reflects today's best practices and advanced technologies, nor is particularly effective in minimizing waste of public minerals, as the previously described data and studies show. In addition, as discussed in the preamble to the proposed rule, ambiguities have arisen regarding how NTL-4A is interpreted and implemented by various BLM offices and industry entities. There is a compelling need to update these requirements to make them clearer, more effective, and reflective of modern technologies and practices.

d. Concerns Identified Through Oversight

External oversight reviews strongly support the BLM's conclusion that the current NTL-4A requirements need to be updated, and many of the changes made in this rule implement recommendations from relevant oversight reviews. As discussed in the proposed rule, key oversight reviews that influenced the development of this rule include: (1) A December 2007 Royalty Policy Committee (RPC) report,

Mineral Revenue Collection from Federal and Indian Lands and the Outer Continental Shelf,

which recommended that the BLM update its rules and identified many specific actions to improve production accountability; (2) a March 2010 report by the OIG,

BLM and MMS Beneficial Use Deductions,

which recommended that the BLM clarify its requirements for royalty-free use of natural gas; and (3) an October 2010 GAO report,

Federal Oil and Gas Leases—Opportunities Exist to Capture Vented and Flared Gas, Which Would Increase Royalty Payments and Reduce Greenhouse Gases,

which recommended that the BLM update its regulations to take advantage of opportunities to capture economically recoverable natural gas using available technologies.

In July 2016, the GAO issued another report relevant to this rule. The 2016 report entitled, “

OIL AND GAS—Interior Could Do More to Account for and Manage Natural Gas Emissions,

” reviewed the DOI's provisions to account for and manage natural gas emissions. The GAO found that DOI agencies, including the BLM and ONRR, have historically focused on determining the volume of natural gas production and accounting for the percent of that volume that is royalty-bearing, but have not focused enough on providing operators clear guidance on how to determine, account for, and report the volumes of natural gas that are

not

royalty bearing. The GAO suggested that lack of specific guidance in these areas has resulted in substantial variation in how operators obtain and report the data, and may result in inaccuracy in the DOI's data on natural gas emissions. The GAO recommended that the BLM provide operators with specific instructions regarding how to estimate natural gas emissions, which the GAO suggests would improve emissions data and better ensure that, when appropriate, royalties are collected on these lost quantities of natural gas. The GAO also addressed recommendations to the ONRR that are closely related to provisions of this rule. For example, the GAO recommended that the ONRR provide additional guidance on how to report royalty-free and royalty-bearing flaring, and how to report unreported or underreported emissions from sources such as tanks. Some of the changes made in today's rule will help clarify the regulatory requirements that relate to some of these reporting concerns.

3. Relationship to Other Federal, State, and Industry Activities

Understanding that other Federal, State and tribal rules also apply to aspects of onshore oil and gas production, the BLM has aimed to ensure that this rule will complement other regulatory requirements. As noted earlier, for example, the EPA issued rules in 2012 and May of 2016 to control emissions of methane and VOCs from new, modified and reconstructed oil and gas wells and production equipment, and many States and tribes also regulate aspects of the production process to address safety, waste, production accountability, and/or air quality concerns.

In updating the BLM regulations, the BLM carefully considered and accounted for these potentially overlapping regimes. Thus, to the maximum extent possible, today's rule aligns its requirements with similar requirements adopted by the EPA or the States, exempts equipment and processes covered by EPA requirements, and authorizes the BLM to grant variances from particular rule provisions if a petitioner State or tribe can show that a State, local, or tribal requirement is at least as effective as the corresponding provision of this rule. The BLM is also committed to working with the EPA to ensure that any future EPA regulations align to the extent possible with the BLM requirements. To

the extent that additional State or tribal regulations are adopted in the future, the State and tribal variance provisions in section 3179.401 provide a mechanism for the BLM to approve compliance with those regulations in lieu of the BLM regulations, where the State or tribal regulations meet the criteria for a variance.

As noted earlier, even though EPA, State, and tribal requirements address some gas waste, there is still a clear need for this rule. For one thing, the BLM has independent legal and proprietary responsibilities to prevent waste in the production of Federal and tribal minerals, as well as to ensure the safe, responsible, and environmentally protective use of BLM-managed lands and resources. This rule will update the BLM's decades-old venting and flaring requirements, and represents an important element of BLM's larger effort to ensure that its oil and gas regulations are effective, transparent, and easy to understand and administer, and that the provisions of those regulations adequately account for significant recent technological advances in the industry.

The BLM also notes that this regulation covers a range of sources and activities that are not adequately addressed by existing BLM, State, or tribal regulations. Further, EPA regulations cover only new, modified, and reconstructed sources, not the many existing and unmodified sources on BLM-administered leases. EPA regulations also do not address flaring or activities such as liquids unloading. Finally, State and tribal regulations are effective only within the jurisdiction of the relevant State or tribe, and State and tribal regulations do not consistently address all the sources of waste BLM seeks to prevent via this rule. Indeed, no State or tribe has requirements covering all the sources of waste addressed by this rule.

In the proposed rule preamble section IV.I.2., the BLM also discussed the commendable efforts that some oil and gas operators have made to reduce waste of gas through venting, flaring, and leaks. While steps in the right direction, these voluntary efforts are insufficient by themselves, given the large and growing volumes of waste. Moreover, for the one specific activity area for which industry has identified a reduction in gas losses over the past few years—well completions at hydraulically fractured gas wells—the decreases appear to be largely driven by the adoption of the EPA subpart OOOO requirements for green completions at those wells.

The following sections provide a brief overview of EPA and State regulations that are particularly relevant to this rulemaking.

a. EPA Regulations

The EPA regulates air pollution from oil and gas production, and since measures to reduce emissions tend to limit releases of natural gas, the EPA's air pollution regulations to reduce emissions from the oil and gas sector have the co-benefit of reducing waste of natural gas and increasing gas capture. BLM very carefully coordinated the waste prevention requirements under today's rule with EPA requirements applicable to some of the same sources, to minimize compliance burdens for operators and to avoid unnecessary duplication.

As explained in section IV.I.3 of the proposed rule preamble, the EPA adopted new source performance standards (NSPS) in 2012 (subpart OOOO) that require new, modified, or reconstructed sources to limit the release of VOCs by requiring that operators use “green completions” at hydraulically fractured natural gas wells.

56

The EPA's NSPS also imposed requirements at gas processing plants and boosting stations.

57

56

79 FR 49490, August 16, 2012.

57

Subpart OOOO imposed emission standards for pneumatic controllers, centrifugal compressors and storage vessels, and required work practices for reciprocating compressors and equipment leaks at gas processing plants. Subpart OOOO also imposed a sulfur dioxide emission standard for sweetening units at gas processing plants.

On September 18, 2015, EPA proposed NSPS standards that would update the 2012 standards to limit methane in addition to VOCs, as described in the BLM proposed rule, to be codified in proposed 40 CFR part 60 subpart OOOOa.

58

This rule also proposed to limit methane and VOC emissions from additional sources not covered under the 2012 subpart OOOO rule. EPA finalized 40 CFR part 60 subpart OOOOa on May 12, 2016, after receiving over 900,000 public comments and holding three public hearings, and the rule went into effect in August 2016. As with the subpart OOOO standards, subpart OOOOa applies only to new, modified, or reconstructed sources, and not to existing equipment and operations. The final OOOOa rule regulates greenhouse gases through limits on methane emissions that owners and operators can meet using readily available and cost-effective technologies.

59

It also requires leak detection and repair at new, modified, and reconstructed sources, and it covers additional new, modified, and reconstructed equipment and activity in the oil and gas production sector not addressed in the subpart OOOO standards, such as hydraulically fractured oil well completions, pneumatic pumps, and fugitive emissions from well sites and compressor stations. The final 40 CFR subpart OOOOa rule includes several changes from the EPA's proposed rule that are particularly noteworthy with respect to the BLM's rulemaking, including: (1) It establishes a fixed semi-annual schedule for monitoring leaks from well sites; (2) it does not adopt a proposed exemption from the LDAR requirements for low-production wells; and (3) it does not adopt proposed requirements to limit emissions from pneumatic piston pumps.

58

80 FR 56593, Sept. 18, 2015.

59

81 FR 35823, June 3, 2016.

On May 12, 2016, EPA also announced the availability of Control Technique Guidelines (CTGs) to help States reduce VOC emissions from

existing

sources in certain ozone nonattainment areas. Although reducing methane emissions is not the purpose of CTGs, control of VOC emissions also results in co-control of methane emissions. These CTGs identify many of the same types of measures required by the OOOOa standards, but the guidelines are not legally binding. Rather, the CTGs are a set of recommendations that State and local air pollution control agencies must consider when evaluating what they will identify as Reasonably Available Control Technology (RACT) for existing sources covered under State ozone nonattainment plans to implement Clean Air Act requirements, known as State Implementation Plans (SIPs). States are only required to include RACT measures in their SIPs for ozone nonattainment areas whose air quality levels violate the Clean Air Act air quality standard for ozone and are classified as moderate nonattainment or higher.

60

In October of 2015, EPA revised the health-based ambient air quality standard for ozone pollution to 70 parts per billion. The changes to SIPs required to address that pollution would be due to EPA within two years after the ozone classifications are published in the

Federal Register

, which is projected to be no later than Jan. 21, 2021.

61

It appears that few, if any, areas with significant Federal or Indian oil and gas production are likely to be classified as moderate nonattainment or above for the most recent ozone standard. Moreover, even if some areas with

significant Federal or Indian oil and gas production are identified as having ozone pollution problems, the changes to SIPs required to address that pollution would not likely be due to EPA for a number of years.

60

I.e.,

nonattainment areas designated “moderate” or above.

61

These are the attainment dates for areas designated as moderate nonattainment or above.

The EPA has also taken the first steps to gather information to promulgate regulations that would require subsequent State regulation of existing sources under Clean Air Act (CAA) section 111(d). When the EPA establishes NSPS for new sources in a particular source category, as it did for the oil and gas sector in its OOOOa regulations promulgated in May 2016, the EPA is also required, under CAA section 111(d)(1), to prescribe regulations for States to submit plans establishing emissions performance standards for existing sources in that source category. Acting under this CAA mandate, in March of 2016 the EPA announced its intention to regulate existing oil and gas sources for methane and VOC emissions.

62

To begin this process, the EPA issued a draft information collection request (ICR) on May 12, 2016, and a second draft ICR on September 23, 2016.

63

Once the ICR is approved by the Office of Management and Budget, the ICR is expected to gather a broad range of information on the oil and gas industry regarding emission control efficacy, costs, and timing requirements.

64

The EPA then expects to use this information in developing regulations to guide State plans to reduce emissions from existing sources. This rulemaking would then be followed by State development and adoption of State plans containing enforceable performance standards for sources, State plan approvals by EPA, and subsequent implementation by industry to meet compliance deadlines established in the State plans. Given the length of this process and the uncertainty regarding the final outcomes, and in light of the BLM's independent statutory mandate to prevent waste from Federal and Indian oil and gas leases based on information currently available, the BLM has determined that it is necessary and prudent to update and finalize this regulation at this time.

62

McCarthy, Gina. “EPA Taking Steps to Cut Methane Emissions from Existing Oil and Gas Sources”. March 10, 2016. Available at

https://blog.epa.gov/blog/2016/03/epa-taking-steps-to-cut-methane-emissions-from-existing-oil-and-gas-sources

.

63

81 FR 35763 and 81 FR 66692.

64

On September 23, 2016, EPA issued a second draft ICR, and public comments are due October 31, 2016. Once all of the public comments are reviewed and incorporated, and the ICR is approved by the Office of Management and Budget, the EPA will issue a final ICR, using its authority under CAA Section 114. Industry will have at least 30 days to complete the operator survey and 120 days to respond to the facility survey.

https://www.gpo.gov/fdsys/pkg/FR-2016-09-29/pdf/2016-23463.pdf

.

b. State Regulations

In developing this rule, the BLM consulted with State regulators and reviewed analogous State requirements related to waste of oil and gas resources. Specifically, the BLM reviewed requirements from Alaska, California, Colorado, Montana, North Dakota, Ohio, Pennsylvania, Utah, and Wyoming. Most of these State requirements were discussed in the preamble to the proposed rule, which also explained that these State requirements, and the outcomes they produce, vary widely.

65

As noted in the preamble to the proposed rule, of the States with extensive oil and gas operations on BLM-administered leases, only one has comprehensive requirements to reduce flaring, and only one has comprehensive statewide requirements to control losses from venting and leaks.

66

Furthermore, State regulations do not apply to BLM-administered leases on Indian lands, and States do not have a statutory mandate or trust responsibility to reduce the waste of Federal and Indian oil and gas. Finally, because State laws and regulations are subject to change, BLM reliance on State standards risks additional waste of public resources and adverse environmental impacts to Federal and Indian lands should the State standards change to allow for additional waste and environmental impacts. There is therefore a need for uniform, modern waste reduction standards for oil and gas operations on public and Indian lands across the country. Nonetheless, the BLM did look to some of the most effective State approaches as models. In particular, we have drawn on approaches that Colorado, Wyoming and North Dakota adopted to address rising rates of flaring, waste of minerals, and pollution impacts in those states.

65

81 FR at 6633-34.

66

81 FR at 6636.

The BLM also notes that at least two States have recently expressed an intent to further reduce methane emissions through regulatory action. On February 1, 2016, California's Air Resources Board proposed new rules to reduce emissions of methane through venting and leaks during oil and gas production, processing, and storage.

67

These proposed rules would require the use of vapor collection systems and the control of vapors with 95 percent efficiency. The rules would limit the use of combustion; however, if a combustion control device must be used, the rules would require the use of a low-emissions incinerator. In January 2016, the Pennsylvania Department of Environmental Protection also announced that it would pursue an enhanced strategy for reducing methane emissions.

68

Importantly, though, neither of these proposed regimes nor any existing State regimes cover the full suite of oil and gas activities addressed by this rule.

67

State of California Air Resources Board Staff Report: Statement of Reasons, available at:

http://www.arb.ca.gov/cc/oil-gas/Oil%20and%20Gas%20ISOR.pdf

.

68

Pennsylvania Department of Environmental Protection, A Pennsylvania Framework of Actions for Methane Reductions from the Oil and Gas Sector, available at:

http://files.dep.state.pa.us/Air/AirQuality/AQPortalFiles/Methane/DEP%20Methane%20Strategy%201-19-2016%20PDF.pdf

.

C. Legal Authority

Pursuant to a delegation of Secretarial authority, the BLM is authorized to regulate oil and gas activities on Federal and Indian lands under a variety of statutes, including the MLA, the MLAAL, FOGRMA, FLPMA, the IMLA, the IMDA, and the Act of March 3, 1909.

69

These statutes authorize the Secretary of the Interior to promulgate such rules and regulations as may be necessary to carry out the statutes' various purposes.

70

69

Mineral Leasing Act, 30 U.S.C. 188-287; Mineral Leasing Act for Acquired Lands, 30 U.S.C. 351-360; Federal Oil and Gas Royalty Management Act, 30 U.S.C. 1701-1758; Federal Land Policy and Management Act of 1976, 43 U.S.C. 1701-1785; Indian Mineral Leasing Act of 1938, 25 U.S.C. 396a-g; Indian Mineral Development Act of 1982, 25 U.S.C. 2101-2108; Act of March 3, 1909, 25 U.S.C. 396.

70

30 U.S.C. 189 (MLA); 30 U.S.C. 359 (MLAAL); 30 U.S.C. 1751(a) (FOGRMA); 43 U.S.C. 1740 (FLPMA); 25 U.S.C. 396d (IMLA); 25 U.S.C. 2107 (IMDA); 25 U.S.C. 396.

The MLA rests on the fundamental principle that the public should benefit from mineral production on public lands.

71

A primary instrument for public benefit is the requirement that a lessee return a portion of the proceeds from production to the public through the payment of royalties to Federal, State, and/or tribal governments. For competitively issued leases, the MLA requires the payment of a royalty “at a rate

not less than

12.5 percent in amount or value of the production removed or sold from the lease”; for non-competitive leases, the MLA sets the royalty “at a rate of 12.5 percent in amount or value of the production

removed or sold from the lease.”

72

The BLM is responsible for specifying royalty rates and determining the quantity of produced oil and gas that is subject to royalties under the terms and conditions of a Federal lease.

71

See, e.g., California Co.

v.

Udall,

296 F.2d 384, 388 (D.C. Cir. 1961) (noting that the MLA was “intended to promote wise development of . . . natural resources and to obtain for the public a reasonable financial return on assets that `belong' to the public”).

72

30 U.S.C. 226(b)(1)(A) (emphasis added); 30 U.S.C. 226(c)(1);

see also

30 U.S.C. 352 (applying that requirement to leases on acquired land). The same royalty provision is included in the lease instruments for leases of Indian tribal and allotted lands under applicable regulations, although that rate is set at no less than 16

2/3

%, absent approval of the Secretary. 25 CFR 211.41, 212.41.

Another important means of ensuring that the public benefits from mineral production on public lands is minimizing and deterring the waste of oil and gas produced from the Federal mineral estate. To this end, the MLA requires oil and gas lessees to “use all reasonable precautions to prevent waste of oil or gas developed in the land, . . .”

73

The MLA requires lessees to exercise “reasonable diligence, skill, and care” in their operations and also requires oil and gas lessees to observe “such rules . . . for the prevention of undue waste as may be prescribed by [the] Secretary.”

74

Lessees are not only responsible for taking measures to prevent waste, but also responsible for making royalty payments on wasted oil and gas when waste does occur. In FOGRMA, Congress expressly made lessees “liable for royalty payments on oil or gas lost or wasted from a lease site when such loss or waste is due to negligence on the part of the operator of the lease, or due to the failure to comply with any rule or regulation, order or citation issued under [FOGRMA] or any mineral leasing law.”

75

73

30 U.S.C. 225.

74

30 U.S.C. 187.

75

30 U.S.C. 1756.

In addition to ensuring that the public benefits from oil and gas production from public lands, the BLM is also tasked with regulating the physical impacts of oil and gas development on public lands. The MLA directs the Secretary to “regulate all surface-disturbing activities conducted pursuant to any lease” and to “determine reclamation and other actions as required in the interest of conservation of surface resources.”

76

The MLA requires oil and gas leases to include provisions “for the protection of the interests of the United States . . . and for the safeguarding of the public welfare,” which includes lease terms for the prevention of environmental harm.

77

The Secretary may suspend lease operations “in the interest of conservation of natural resources,” a phrase that encompasses not just conservation of mineral deposits, but also preventing environmental harm.

78

The Secretary also may refuse to lease lands in order to protect the public's interest in other natural resources and the environment.

79

BLM's regulations governing oil and gas operations on the public lands have always required operators to avoid damaging other natural resources or environmental quality.

80

76

30 U.S.C. 226(g).

77

See Natural Resources Defense Council, Inc.

v.

Berklund,

458 F. Supp. 925, 936 n.17 (D. DC 1978).

78

30 U.S.C. 209;

Copper Valley Machine Works

v.

Andrus,

653 F.2d 595, 601 & nn.7-8 (D.C. Cir. 1981);

Hoyl

v.

Babbitt,

129 F.3d 1377, 1380 (10th Cir. 1997);

Getty Oil Co.

v.

Clark,

614 F. Supp. 904, 916 (D. Wyo. 1985).

79

Udall

v.

Tallman,

380 U.S. 1, 4 (1965);

Duesing

v.

Udall,

350 F.2d 748, 751-52 (1965).

80

See

43 CFR 3162.5-1 to .5-2 (1983-2014).

The MLA additionally requires oil and gas leases to contain “a provision that such rules for the safety and welfare of the miners . . . as may be prescribed by the Secretary shall be observed . . . .”

81

This rule helps to ensure safety of workers engaged in the production of oil and gas on Federal and Indian lands by requiring, except in special circumstances, the combustion of natural gas loosed from wells and equipment during production.

81

30 U.S.C. 187.

FLPMA further authorizes BLM to “regulate” the “use, occupancy, and development” of the public lands via “published rules.”

82

FLPMA also mandates that the Secretary, “[i]n managing the public lands . . . shall, by regulation or otherwise, take any action necessary to prevent unnecessary or undue degradation of the lands.”

83

And FLPMA authorizes BLM to “promulgate rules and regulations to carry out the purposes of this Act and of other laws applicable to the public lands.”

84

FLPMA expressly declares that the BLM should balance the need for domestic sources of minerals against the need to “protect the quality of scientific, scenic, historical, ecological, environmental, air and atmospheric, water resources, and archeological values; . . . [and] provide for outdoor recreation and human occupancy and use.”

85

82

43 U.S.C. 1732(b).

83

43 U.S.C. 1732(b).

84

43 U.S.C. 1740.

85

43 U.S.C. 1701(a)(8).

FLPMA requires the BLM to manage public lands under principles of multiple use and sustained yield.

86

The statutory definition of “multiple use” explicitly includes the consideration of environmental resources. Multiple use is a “combination of balanced and diverse resource uses that takes into account the long-term needs of future generations for renewable and nonrenewable resources . . . .”

87

Multiple use also requires resources to be managed in a “harmonious and coordinated” manner “without permanent impairment to the productivity of the land and the quality of the environment.”

88

Significantly, FLPMA admonishes the Secretary to consider “the relative values of the resources and not necessarily . . . the combination of uses that will give the greatest economic return or the greatest unit output.”

89

86

43 U.S.C. 1702(c), 1732(a).

87

43 U.S.C. 1702(c).

88

43 U.S.C. 1702(c).

89

43 U.S.C. 1702(c).

Finally, the promulgation of this rule helps to meet the Secretary's statutory trust responsibilities with respect to the development of Indian oil and gas interests. The Secretary's management and regulation of Indian mineral interests carries with it the duty to act as a trustee for benefit of the Indian mineral owners.

90

The Congress has directed the Secretary to “aggressively carry out [her] trust responsibility in the administration of Indian oil and gas.”

91

In furtherance of her trust obligations, the Secretary has delegated regulatory authority for administering operations on Indian oil and gas leases to the BLM,

92

which has developed specialized expertise through regulating the production of oil and gas from public lands administered by the Department. In choosing from among reasonable regulatory alternatives for Indian mineral development, the BLM is obligated to adopt the alternative that is in the best interest of the tribe and individual Indian mineral owners.

93

What is in the best interest of the tribe and individual Indian mineral owners is determined by a consideration of all relevant factors, including economic considerations as well as potential environmental and social effects.

94

The BLM believes that this rule is in the best interest of Indian mineral owners because it will prevent unnecessary and excessive losses (“waste”) of natural gas from Indian lands. In so doing, this rule will help ensure that the extraction of natural gas from Indian lands results in the payment of royalties to Indian mineral owners, rather than the waste of

the owners' mineral resources.

95

Additionally, the BLM believes tribal members and individual Indian mineral owners who live near Indian oil and gas development will realize environmental benefits as a result of this rule's reductions in flaring and air pollution from Indian oil and gas development. During public comment hearings, the BLM heard from a number of tribal members who raised concerns about the impacts of vented and leaked gas on their health, highlighting in particular increases in ozone pollution and air toxics. Tribal members also detailed the impacts of living near numerous large flares, noting the resulting noise and light pollution. The BLM believes that this rule will help to reduce some of these impacts on tribal members.

90

See Woods Petroleum Corp.

v.

Department of Interior,

47 F.3d 1032, 1038 (10th Cir. 1995) (

en banc

).

91

30 U.S.C. 1701(a)(4).

92

235 DM 1.1.K.

93

See Jicarilla Apache Tribe

v.

Supron Energy Corp.,

728 F.2d 1555, 1567 (10th Cir. 1984) (Seymour, J., concurring in part and dissenting in part), adopted as majority opinion as modified

en banc,

782 F.2d 855 (10th Cir. 1986).

94

See

25 CFR 211.3.

95

The remainder of this preamble refers to this analysis as the BLM's determination that, as a result of its trust obligations, it has an obligation or mandate to reduce waste from Indian lands, just as it does to reduce waste from BLM-administered Federal Lands.

In short, the BLM has the authority to manage public and tribal oil and gas resources to reduce waste and ensure environmentally responsible development. In response to the notice of proposed rulemaking, the BLM received many comments asserting a range of different arguments regarding the BLM's exercise of its legal authority in promulgating this rule. The most salient of these arguments are addressed later in this preamble, but the BLM did not make any changes to this rule based on comments about the BLM's authority.

D. Stakeholder Outreach

In 2014 and again in in 2016, the BLM conducted a series of forums to consult with tribal governments

96

and solicit stakeholder views to inform the BLM's development of the proposed and final rules. In 2014, the BLM held public meetings in Denver, Colorado (March 19, 2014), Albuquerque, New Mexico (May 7, 2014), Dickinson, North Dakota (May 9, 2014), and Washington, DC (May 14, 2014).

97

On each of those days, the BLM held a tribal outreach session in the morning and a public outreach session in the afternoon. In advance of the tribal outreach sessions, the BLM sent letters to over 200 tribal leaders that have previously expressed interest in oil and gas related matters. These letters explained generally the proposed rulemaking, invited the tribal leaders to attend the outreach sessions, provided contact persons for further information, and provided an email address for submitting comments. At the 2014 Denver, Colorado, and Washington, DC sessions, the tribal and public meetings were live streamed to allow for the greatest possible participation by interested parties. The tribal outreach sessions also served as initial consultation with Indian tribes to comply with Executive Order 13175, Consultation and Coordination with Indian Tribal Governments.

96

In developing this rule, the BLM consulted with tribal stakeholders in compliance with 25 U.S.C. 2107, 512 DM 4, and 512 DM 5.

97

See the BLM oil and gas program's outreach-events page:

http://www.blm.gov/wo/st/en/prog/energy/public_events_on_oil

.

As part of our pre-proposal outreach efforts, the BLM accepted informal comments generated as a result of the public/tribal outreach sessions through May 30, 2014. A total of 29 unique comments were received: 12 from the oil and gas industry and trade associations, 6 from NGOs representing 37 organizations, 2 from government officials or elected representatives, and 9 from private citizens. Two hundred and sixty comments from private citizens were part of an email campaign.

After the proposed rule was published on February 8, 2016, we conducted a second series of paired outreach meetings, with a tribal meeting each morning and a public meeting each afternoon. We held these meetings at four locations: Farmington, New Mexico (February 16, 2016), Oklahoma City, Oklahoma (February 18, 2016), Denver, Colorado (March 1, 2016), and Dickinson, North Dakota (March 3, 2016). Again, in advance of the tribal outreach sessions, the BLM sent letters to over 200 tribal leaders that have previously expressed interest in oil and gas related matters. These letters explained generally the proposed rule, invited the tribal leaders to attend the outreach sessions, provided contact persons for further information, and provided an email address for submitting comments. The public outreach sessions included a telephone conference call-in number to allow members of the public who could not attend in person to listen live to the proceedings.

In addition, the BLM conducted outreach to States with extensive oil and gas production on BLM-administered leases. Prior to the proposal, the BLM reviewed State regulations and guidance, and contacted State regulatory bodies that oversee aspects of oil and gas production to discuss their requirements and practices. After issuing the proposal, the BLM conducted seven online meeting sessions with State regulators from Alaska, Colorado, New Mexico, North Dakota, Utah (two meetings), and Wyoming.

In response to the proposed rule and these outreach meetings, the BLM received approximately 330,000 total comment submissions from Federal, State, and local governments and agencies, tribal organizations, industry representatives, non-governmental organizations, individuals, and other stakeholders. Of the approximately 330,000 comment submissions, approximately 1,000 were unique comments, with the remaining comments coming from mass-mailing campaigns from several organizations. The BLM closely reviewed and analyzed the comments we received, and made revisions to the proposed rule based on the information, data, analysis, insights, and viewpoints provided in the comments. The final rule reflects the very extensive input that the BLM gathered from these public meetings, discussions with States and tribes, and the public comment process.

IV. Summary of Final Rule

Like the proposed rule, the final rule focuses on key areas in the oil and gas production process where waste-prevention actions are most effective and least costly. Specifically, we are adopting requirements to reduce waste from the following: Venting or flaring of associated gas from producing oil wells; gas leaks from equipment and facilities located at the well site, as well as from compressors located on the lease; operation of high-bleed pneumatic controllers and certain pneumatic pumps; gas emissions from storage vessels; well maintenance and liquids unloading; and well drilling and completions. Based on the available data regarding methane emissions and the numbers and types of sources of gas losses from Federal and Indian leases, we believe that these aspects of the production process offer the best opportunities for reducing waste.

Like the proposed rule, the final rule requires operators to flare gas rather than vent it, except in specified circumstances, such as emergencies, the routine operation of certain equipment, and when flaring is technically infeasible. The final rule then requires operators to avoid wasteful flaring of gas by capturing for sale or using on-site specified percentages of their adjusted total gas production. Beginning one year from the effective date of the final rule, operators must capture 85 percent of their adjusted total gas production each month, and this gradually increases to 98 percent by 2026. An operator's adjusted total gas production is based on the quantity of high pressure gas produced from the operator's development wells that are in

production, adjusted to exempt a specified volume of gas per well. The exempted or “flaring allowable” volume declines over time. Beginning one year from the effective date of the final rule, operators are allowed to exempt 5,400 Mcf gas per well per month, and this quantity gradually declines to 750 Mcf by 2025.

With respect to leaks, the final rule largely follows the proposed rule, except that the required frequency of inspection is set at two times a year, and does not vary according to the number of leaks found. Operators must use optical gas imaging equipment or portable analyzers deployed according to Method 21, and leaks must be repaired and retested within specified time frames. The final rule clarifies the approval process for alternative leak detection devices and for operators' individual alternative leak inspection programs.

Like the proposed rule, the final rule includes requirements to update old and inefficient equipment, and to follow best practices to minimize waste through venting. Thus, operators must replace high-bleed pneumatic controllers and certain pneumatic pumps with less wasteful controllers and pumps, and capture or flare any high volumes of gas that would otherwise be vented from tanks. In addition, the final rule requires operators to capture, flare, use, or reinject gas produced during well drilling and well completions, and it limits the quantities of gas that may be vented royalty-free during well testing.

The final rule continues to address whether and when lost oil or gas is royalty-bearing, based on whether the loss is deemed unavoidable (royalty-free) or avoidable (royalty-bearing). Relative to the proposed rule, and after our evaluation of public comments, the final rule somewhat expands the list of circumstances in which a loss of oil or gas is deemed unavoidable (thereby expanding the circumstances under which the loss of gas is considered royalty-free), and retains the proposed approach that all oil or gas that is not specifically defined as unavoidably lost is deemed to be avoidably lost and subject to royalties. Unavoidable losses include oil or gas lost in emergencies, losses from normal equipment operation when the operator is in compliance with all requirements to update equipment, and gas that is flared from wells not connected to a gas pipeline (unless the operator has not met applicable gas capture requirements). Because the BLM believes that it is reasonable to expect operators to reduce waste in order to comply with the final rule's capture percentage requirements, any quantities of flared gas that cause the operator to violate the applicable capture requirements are deemed avoidable losses and subject to royalties.

In addition, the BLM is finalizing the proposed change to the royalty provisions, to align the provisions with the BLM's statutory authority and allow the BLM to set royalties for competitive leases at or above 12.5 percent. At this time, however, the BLM is not setting the royalty rate above 12.5 percent in this regulation.

Like the proposed rule, the final rule aligns the requirements of this rule to the extent practicable with EPA and State requirements. It also avoids potential regulatory overlap by exempting certain equipment covered by relevant EPA rules, and deeming the operator's compliance with relevant EPA requirements to satisfy the BLM requirements as well.

The final rule also allows a State or tribe to request a variance from particular BLM requirements. If the variance is granted, the BLM has authority to enforce the specific provision(s) of the State, local, or tribal rule for which the variance was granted, instead of the comparable provision(s) of the BLM rule. As clarified in the final rule, the BLM may grant a State or tribal variance request if the BLM determines that the State, local, or tribal rule would perform at least as well as the affected BLM regulatory provision in reducing waste of oil and gas, reducing environmental impacts from venting and or flaring of gas, and ensuring the safe and responsible production of oil and gas.

V. Major Changes From Proposed Rule

Based on information that has become available since the proposed rule, and the extensive material BLM received through public comments, the BLM has made changes and adjustments to the proposed regulatory text. This section of the preamble summarizes the most significant of those changes and addresses some of the key public comments.

This section only addresses a few substantive areas in which the BLM made significant changes from the proposed rule. Section VI discusses significant comments received on other aspects of the rule. The final text of all of the rule provisions, and changes made in light of all public comments, are discussed in Section VII, Section by Section. Finally, additional public comments are addressed in the separate Response to Comments document, which is available to the public on the BLM Web site and is part of the rule-making record.

A. Venting Prohibition and Capture Targets

As discussed in section III.B.2.a of this preamble, routine venting and flaring of gas from oil or gas wells waste significant volumes of natural gas. In 2014, for example, operators vented about 30 Bcf and flared at least 81 Bcf from BLM-administered leases—4.1 percent of the total production from those leases in that year, and sufficient gas to supply nearly 1.5 million households with gas for a year.

98

The final rule aims to reduce this waste using a two-pronged approach: A prohibition on venting, and capture targets to reduce flaring.

98

BLM analysis of ONRR OGOR-B data provided for 2009-2015 and EPA GHG Inventory data for 2014.

1. Venting Prohibition

a. Requirements of Final Rule

First, final rule § 3179.6 prohibits venting from oil and gas wells, except under certain enumerated conditions. The circumstances in which venting is permissible include: When flaring is technically infeasible, such as when the gas is not readily combustible or the volumes are small; when the gas is vented during normal operation of an on-site, gas-activated pneumatic pump or controller; when the gas is vented from a storage vessel, provided that § 3179.203 does not require flaring of the gas; when the gas is vented during downhole well maintenance or liquids unloading, provided those operations are conducted in accordance with § 3179.204 of the final rule; and when gas is vented through a leak, provided that the operator is complying with the rule's LDAR provisions in §§ 3179.301-3179.305. Venting is also permissible during “emergencies,” which final rule § 3179.105 defines as situations in which the loss of gas is “uncontrollable,” and venting or flaring is “necessary to avoid risk of an immediate and substantial adverse impact on safety, public health, or the environment.” In addition, venting is allowed if necessary to allow facility or pipeline non-routine maintenance to be performed. Any venting of gas from oil or gas wells that does not fit within one of the circumstances listed in § 3179.6 is a violation of this rule and could result in enforcement actions. In addition, gas vented in violation of this rule will be deemed “avoidable” under final rule § 3179.4, and thus subject to royalties under final rule § 3179.5.

b. Changes From Proposed Rule and Significant Comments

The final venting prohibition largely tracks proposed section § 3179.6, although the BLM modified a few provisions and added additional express exemptions in response to comments received. First, proposed § 3179.6(a)(3), which exempted gas vented from storage vessels subject to conditions specified in § 3179.203, has been renumbered § 3179.6(b)(4) and reworded for clarity. Second, proposed § 3179.6(a)(4), which exempted gas vented during normal operations of natural gas-activated pneumatic controllers and pumps, has been renumbered § 3179.6(b)(3). Third, the BLM added a provision, final rule § 3179.6(b)(5), to clarify that gas may be vented during downhole well maintenance or liquids unloading activities, provided those activities are performed in compliance with § 3179.204. This change responds to comments noting that while this rule requires operators to use best practices to minimize venting from liquids unloading operations, these operations will still release some quantity of gas, and it is not practical to capture and flare that gas regardless of whether the operator uses plunger lifts, manual purging, or another method to unload liquids. Fourth, in response to comments noting that there are additional losses through venting not listed in the proposed provision, the BLM added § 3179.6(b)(6) to the final rule, to clarify that an operator is not required to flare gas that is lost due to leaks, provided the operator is in full compliance with the leak detection and repair requirements in final rule §§ 3179.301-305. Fifth, the BLM added § 3179.6(b)(7) to the final rule, to respond to commenters' concern that some gas is released when pressurized equipment must be depressurized for maintenance, and their assertion that it is difficult and costly to route such infrequent, low-volume emissions to capture or a flare. This exemption from the venting prohibition is limited to venting associated with non-routine maintenance activities. In justifying their request for an exemption for venting associated with maintenance activities, commenters emphasized that these activities release only small quantities of gas in total because they occur infrequently and each incidence involves a relatively small volume of gas. The BLM is aware, however, that activities such as pigging a gathering line may release a not insignificant volume of gas, and, under some circumstances, operators conduct pigging routinely, such as monthly, weekly, or even several times a day. Under those circumstances, the BLM expects that a prudent operator would configure its operations or deploy capture or flaring equipment so as to avoid routine venting, and the final rule requires operators to avoid such routine venting. Finally, the BLM added § 3179.6(b)(8) to the final rule in response to commenters' observations that it may be necessary to vent gas when applicable laws, regulations, or permit terms prohibit flaring in particular areas or at particular times, such as flaring prohibitions that may be imposed in permafrost areas or during an extreme fire hazard.

2. Capture Targets

a. Requirements of Final Rule

The second prong of the final rule's approach to routine venting and flaring is laid out in final rule §§ 3179.7 and 3179.8, which together target routine flaring of associated gas from “development” oil wells.

99

These final rule provisions are based on proposed rule §§ 3179.6(b) and 3179.7, respectively, but the provisions have been renumbered and revised in the final rule in response to numerous comments received during the public comment period. This discussion first describes the approach taken in the final rule, and then, in part b., details how this modified approach responds to comments received.

99

As defined in final rule § 3179.3, a “development” oil or gas well is a well “drilled to produce oil or gas, respectively, from an established field in which commercial quantities of hydrocarbons have been discovered and are being produced.” The BLM retains the authority to determine whether the well in question is a development oil or gas well.

Id.

First, in response to comments, the final rule shifts from numerical limits on per-well flaring volumes (the approach taken in proposed rule § 3179.6(b)) to a more flexible approach modeled in part on existing North Dakota rules. The new approach sets targets for the percent of associated gas from development oil wells that must be captured in a given month, either on a per lease/unit/communitized area basis or averaged over a county or state. The capture targets do not, however, apply to the full volume of gas that an operator flares. Instead, like the proposed rule, the final rule allows operators to flare a specified volume of gas that declines over time. In the final rule, however, this allowed flaring has been recast as a “flaring allowable” volume that operators can subtract from their total flaring volume

prior

to calculating their capture percentage. Overall, then, the final rule's approach to flaring has three parts: Capture targets, which increase over time; averaging provisions that allow operators to choose whether to comply with the capture targets one lease/unit/communitized area at a time, or instead on an area-wide average basis; and finally, a flaring allowable volume that declines over time, which operators can subtract from their total flaring prior to assessing their compliance with the capture targets.

The mechanics of implementing this approach are as follows. First, final rule § 3179.7 establishes required capture targets that incrementally increase over the first nine years of rule implementation. The schedule for the capture targets is provided in § 3179.7(b)(1)-(4) and reproduced in Table 1:

Table 1

Date range

Required

monthly

capture

target

(percent of

associated gas

captured

per month)

1/17/2018 through 12/31/2019

85

1/1/2020 through 12/31/2022

90

1/1/2023 through 12/31/2025

95

Beginning 1/1/2026

98

Section 3179.7(c)(3) of the final rule then provides that, in order to demonstrate compliance with the relevant monthly capture target, operators must choose the “relevant area” over which they intend to assess their capture percentage(s). An operator may choose whether to comply with the capture targets on each of the operator's leases, units, or communitized areas (the “lease-by-lease approach,” see final rule § 3179.7(c)(3)(i)), or instead to comply on a county-wide or state-wide basis (the “averaging approach,” see final rule § 3179.7(c)(3)(ii)). An operator that chooses the lease-by-lease approach must demonstrate that

each

lease, unit, or communitized area is

individually

in compliance with the relevant capture target each month. An operator that chooses the averaging approach must notify the BLM by Sundry Notice of its choice by January 1 of the relevant year, and may then demonstrate monthly compliance with the relevant capture target on an area-wide average basis.

The second step to demonstrating compliance with the capture targets, detailed in final rule § 3179.7(c), is for an operator to determine its total volume of gas produced from development oil wells in the relevant

area, subtract the flaring allowable volume, and then divide the result of that calculation into the total volume of gas that the operator sold or used, to determine the operator's actual capture percentage. The operator must then compare its actual capture percentage to the required gas capture percentage for the applicable period, to determine whether the operator meets or exceeds the required capture target for the given month.

More specifically, the volume of gas that the operator sold or used is the volume of gas that the operator sold over the month from all of the operator's development oil wells in the relevant area plus the volume of gas that the operator used on lease, unit, or communitized area across the relevant area. The volume of gas flared is the volume that the operator flared from high pressure flares over the month in the relevant area. The flaring allowable concept derives from the flaring limits introduced in proposed rule § 3179.6(b), and it represents the volume of flared gas that is exempt from the capture target. Flaring allowable equals the total number of development oil wells “in production”

100

in the relevant area multiplied by the relevant flaring allowable quantity, which is specified in final rule § 3179.7(c)(2)(i) through (iv) and reproduced in Table 2. The final rule allows an operator to choose whether to calculate each of these volumes—the volumes of gas sold, used, or flared, and the flaring allowable volume—for each BLM-administered lease, unit, or communitized area (under the lease-by-lease approach), or instead to calculate them on an area-wide average basis for all BLM-administered leases, units, and communitized areas in the county or State (under the averaging approach).

100

As defined in § 3179.7(c)(4), a well is considered “in production” after “a completion, a completion report, or a notice of first production, whichever occurs first, and only during a month in which it produces gas (that is sold or flared) for 10 or more days.”

Table 2

Date range

Monthly

flaring

allowable

per well

(Mcf)

1/17/2018 through 12/31/2018

5,400

1/1/2019 through 12/31/2019

3,600

1/1/2020 through 12/31/2020

1,800

1/1/2021 through 12/31/2021

1,500

1/1/2022 through 12/31/2023

1,200

1/1/2024 through 12/31/2024

900

Beginning 1/1/2025

750

If the operator's actual capture percentage for a given lease, unit, or communitized area (lease-by-lease approach), or for the county or State (averaging approach), falls short of the required capture target for the given month, then the operator may face enforcement action, and must pay royalties on the excess flared gas, which is considered avoidably lost. The excess flared gas is the volume of gas by which the operator missed its required capture target, and it is calculated as follows:

Excess flared gas = (Required capture target * (total volume of produced gas−flaring allowable))−(volume of gas sold or used).

Royalties on the excess flared gas would be prorated across an operator's leases, units or communized areas that reported high-pressure flaring during the month.

Alternatively, an operator may request that the BLM establish an alternative capture target under final rule § 3179.8, if three conditions are met: (1) The operator has chosen to comply with the capture target using the lease-by-lease basis rather than the averaging approach; (2) the potentially noncompliant lease was issued before the effective date of this final rule; and (3) the operator demonstrates via Sundry Notice, and the BLM agrees, that the applicable capture percentage under final rule § 3179.7 “would impose such costs as to cause the operator to cease production and abandon significant recoverable oil reserves under the lease.”

b. Changes From Proposed Rule and Significant Comments

Proposed rule § 3179.6(b) would have imposed a monthly limit on flaring, beginning on the effective date of the final rule, with the specific limit decreasing over the first three years of the final rule. Specifically, the proposed rule would have established a flaring limit of 7,200 Mcf/month per development oil well in production on the lease, unit, or communitized area, for the first year the rule was in effect (proposed rule § 3179.6(b)(1)); 3,600 Mcf/month per development oil well in production on the lease, unit, or communitized area for the second year the rule was in effect (proposed rule § 3179.6(b)(2)); and 1,800 Mcf/month per development oil well in production on the lease, unit, or communitized area for every month beginning in year three and thereafter (proposed rule § 3179.6(b)(3)).

The proposed rule included a broad request for comments on a range of issues relating to this section, including: The feasibility and costs of imposing a long-term limit on routine flaring of associated gas from development oil wells; whether the specific long-term flaring limit should be lower or higher than 1,800 Mcf/month/well, to further reduce flaring or reduce compliance costs, respectively; operators' likely operational response(s) to the imposition of a flaring limit; the feasibility and costs of the proposed three-year timeline for decreasing the flaring limit from 7,200 to 1,800 Mcf/month/well; and the effectiveness of the proposed method and conditions in § 3179.7 for allowing operators to obtain an alternative flaring limit.

The BLM developed the capture target approach in final rule § 3179.7, and the alternative capture target provisions in final rule § 3179.8, after careful consideration of the many comments received on the flaring limit approach set forth in proposed rule §§ 3179.6(b) and 3179.7. In particular, the BLM gave careful consideration to operators' assertions that the numerical values of the proposed flaring limits, the proposed schedule for meeting those limits, and the prescriptive nature of the limits would make it prohibitively expensive—and, in some areas of the country, technically impossible—for operators to comply with the terms of the proposed rule. After reviewing the flaring data provided by these commenters, obtaining additional updated and more detailed data from ONRR, and reanalyzing these provisions, the BLM determined that the final rule should phase in its approach to routine flaring over a longer period of time, and provide operators with more flexibility to take better account of variable conditions on different leases, units, and communitized areas in different parts of the country.

The BLM remains committed to requiring operators to significantly reduce routine flaring of associated gas from development oil wells on BLM-administered leases, thereby increasing gas capture. We have structured final rule §§ 3179.7 and 3179.8 to achieve a comparable volume of flaring reductions as proposed rule §§ 3179.6(b) and 3179.7, although over a somewhat longer timeframe, and then to achieve additional reductions in later years.

The final rule's capture targets and the proposed rules flaring limits operate in a similar manner, with the latter approach a refinement of the former to enhance opportunities for compliance. For example, the long-term flaring limit of 1,800 Mcf/month/well in proposed rule § 3179.6(b)(3) is

exactly

equivalent to a capture target of 100 percent, with a flaring allowable volume of 1,800 Mcf/month/well, applied on a lease-by-lease

basis. The final rule phases in a 98 percent (rather than 100 percent) capture target over nine years, and converts the proposed volumetric flaring limits from the proposed rule into declining allowances against the capture target. The differences between proposed rule § 3179.6(b) and final rule § 3179.7(b) are therefore more a matter of form than function, with the final rule designed to achieve flaring reductions comparable to the reductions that the BLM expected from the proposed rule, but to allow operators more compliance flexibility.

That said, the proposed and final approaches to reducing routine flaring do differ in certain key respects, as a result of public comments. The five most significant differences are as follows.

First, the final rule uses specified capture targets, rather than requiring that operators capture 100 percent of their associated gas above fixed volumetric limits as initially proposed, in response to comments indicating that, in some states (notably North Dakota and New Mexico), gas volumes are so high and the availability of capture infrastructure so variable that it is extremely difficult to identify a fixed volumetric limit on flaring that would both be achievable and also provide meaningful reductions in all States. Commenters asserted that given the high gas-to-oil ratios (GOR) in the Bakken basin, there are certain areas where an operator could exceed the proposed flaring limit of 1,800 Mcf/month/well in a period of hours. Commenters argued that even after averaging over a month and across a lease, as the proposed rule would have allowed, the 1,800 Mcf/month/well limit would significantly impact future development in the Bakken and Permian basins. Operators in these areas suggested that allowing averaging of flaring volumes across multiple leases, units, or communitized areas—or even across counties or across a State—would enable operators to use high capture rates in areas with low GOR and/or significant gas capture capability to offset lower capture rates in other areas, and thereby avoid having to curtail production.

Based on these concerns, the BLM restructured the fixed flaring limits as capture targets both to better take account of geographically varying volumes of associated gas and to allow operators some greater flexibility to absorb the impacts of intermittent interruptions or reductions in capture capacity. Final rule § 3179.7, therefore, requires capture of a specified percentage of gas above the flaring allowable volume; this specified capture target incrementally increases from 85 percent in year two (

e.g.,

one year after the effective date of the final rule) to 98 percent in year nine. As noted, this flexible capture target approach is modeled in large part on North Dakota's regulations, which also impose an escalating capture target, as described in the preamble to the proposed rule.

101

101

81 FR at 6634.

Second, the BLM extended the compliance dates in response to commenters' concern that coming into compliance with a long-term flaring limit of 1,800 Mcf/month/well would take longer than the three years that the BLM had proposed. The final rule postpones the effective date of any capture requirements for one full year after the effective date of the rule. Thereafter, the final rule incrementally increases the required capture targets over a nine year period and incrementally decreases the flaring allowable volumes over an eight year period. Final rule § 3179.7(b) extends the time an operator has to meet the flaring allowable volume of 1,800 Mcf/month/well until calendar year 2021, about four years after the effective date of the final rule (and about two additional years after the 1,800 Mcf/month/well fixed flaring limit would have taken effect under § 3179.6(b)(3) of the proposed rule).

Third, and conversely, the BLM has reduced the long-term flaring allowable volumes that apply once the final rule is fully phased in, in response to other commenters' concerns that the proposed approach allowed significant quantities of wasteful flaring to continue unabated from 2020 on and did not provide sufficient incentives for industry to continue to decrease flaring over time. Natural gas is a valuable resource that should be put to productive use, and the MLA requires that we minimize the waste of public resources, consistent with existing lease obligations. In addition, if the only changes the BLM made to the final rule were to allow averaging over a broad geographic area and to impose capture targets that never ramp up to 100%, the final rule would achieve far less of a reduction in wasteful flaring than the proposed rule. While providing operators more flexibility to reduce flaring at lower costs by shifting from the proposed rule's fixed flaring limits to the final rule's capture targets and allowable flaring volumes, the BLM strived to ensure that the final rule still achieves meaningful flaring reductions, comparable to the reductions that the BLM expected from the proposed rule. The key change necessary to meet that goal was the shift from a fixed long-term flaring limit of 1,800 Mcf/month/well (proposed rule § 3179.6(b)(3)) over three years to a flaring allowable volume that decreases over time to 750 Mcf/month/well in year 2025 (final rule § 3179.7(c)(2)(iv)).

Fourth, the final rule allows greater flexibility in how operators may comply with the capture targets. Commenters indicated that leases, units, and communitized areas vary greatly in both the volumes of associated gas produced from oil wells and the availability of gas capture infrastructure, and asserted that complying with a single flaring limit that applies uniformly to every lease, unit, and communitized area would be prohibitively expensive or even, in some areas of the country, technically impossible. Commenters contended that as a result, they would be forced to submit numerous Sundry Notices under proposed rule § 3179.7 to request alternative flaring limits. Commenters asserted that North Dakota's approach, which allows operators to comply with capture targets on a statewide average basis, would reduce the need to request alternative limits and thus achieve comparable overall flaring reductions at significantly lower cost. The BLM agrees, and has in response to these comments structured the final rule to provide operators with greater discretion in how they choose to comply. Specifically, final rule § 3179.7(c)(3) allows an operator to choose whether to comply with the capture targets on a county- or state-wide average basis, or instead to comply on each lease, unit, or communitized area. This flexibility, too, is modeled on North Dakota's regulations, which allow for compliance on a well-, field-, county- or state-wide basis, as described in the preamble to the proposed rule.

102

102

81 FR at 6634.

Fifth and finally, the final rule makes certain changes to the alternative flaring provisions (proposed rule § 3179.7, renumbered as final rule § 3179.8) in part to address some commenters' concerns that the proposed renewable 2-year exemption (proposed rule § 3179.7(d)) would allow too many operators to evade the flaring limits and should therefore be eliminated. The changes also account for the change in the final rule from flaring limits to capture targets, and for the BLM's decision to allow operators to choose to demonstrate compliance with the capture targets on an area-wide average basis. Specifically, the BLM deleted the proposed 2-year exemption provision and restyled proposed rule § 3179.7 as an alternative capture target rather than

an alternative flaring limit. The change to a capture target approach and the decision to allow operators to choose to comply by averaging their flaring over an entire county or State significantly reduce the risk that a single remote lease, unit, or communitized area with high levels of flaring and little or no access to capture infrastructure will make it impossible for an operator to comply. Under the averaging approach, such leases, units, or communitized areas need not receive a blanket exemption from the capture target. Rather, an operator concerned about the ability of a lease, unit, or communitized area to comply with the capture target can either (a) reduce its flaring at other sites in the relevant area to compensate for the high levels of flaring at that remote lease, or (b) apply for an alternative capture target for that lease under final rule § 3179.8 (if the predicate conditions are met). Because fewer leases are likely to raise such concerns under the final rule's capture target approach than under the proposed rule, the BLM anticipates receiving fewer requests for alternative capture targets and having an increased capacity to process such requests on a case-by-case basis.

To set the capture targets and flaring allowable volumes in the final rule, the BLM conducted a detailed analysis of 2015 data submitted to ONRR of sales, on lease use and flaring volumes month-by-month for operators within a state. These data go substantially beyond what was available to BLM in preparing the proposed rule, and while the results show that the proposed rule would have reduced flaring less than we initially estimated, we have higher confidence in the updated estimates. Using the new data to reanalyze the likely flaring reductions from the proposed rule, the BLM estimates that the proposed rule would have reduced the quantity of flared gas in 2020 by 42 percent relative to 2015 levels.

Using the same data and assumptions, the BLM estimates that the final rule's approach, which allows operators to average over their statewide production and establishes a capture target of 98% over time, will reduce the quantity of flared gas in 2020 by roughly 26 percent relative to 2015 levels. With the additional time and flexibility provided in the final rule, operators will be able to plan for and build out the additional infrastructure necessary to capture and transport greater volumes of gas in later years. Thus, the final rule further steps down the allowable flaring volumes after 2020, and likewise steps up the required capture percentages, to achieve almost a 50% reduction in flaring by 2025, 8 years after the rule comes into effect.

Thus, the BLM expects that the final rule's schedule and targets for reducing flaring will achieve a total volume of flaring reductions somewhat greater than the proposed rule, and at lower cost, though over a longer timeframe. Moreover, the final rule establishes a structure in § 3179.7 for reducing routine flaring that could be adapted to achieve more ambitious flaring reductions, if and when the BLM deems those reductions to be technologically feasible and cost effective. The BLM has only specified capture targets and flaring allowable volumes out to 2026. As additional data on flaring become available, and capture technologies improve, the BLM could choose to increase the capture targets further over time, and/or decrease the flaring allowable volumes, through future rulemakings in order to continue to reduce routine flaring of associated gas from BLM-administered leases, units, and communitized areas, consistent with the United States' March 2016 endorsement of the World Bank's Zero Routine Flaring by 2030 Initiative.

103

103

“Zero Routine Flaring by 2030” is a voluntary initiative introduced by the World Bank in 2015 and endorsed by multiple governments, oil companies, and development institutions. The initiative focuses on the phase-out of routine, high-pressure flaring of the type addressed by the BLM's capture targets in § 3179.7 of the final rule, not flaring for safety and other non-routine reasons. For more information and a list of endorsers, see

http://www.worldbank.org/en/programs/zero-routine-flaring-by-2030.

B. Leak Detection and Repair

1. Requirements of Final Rule

As discussed in detail in the RIA, we estimate using data from the EPA GHG Inventory that about 4.01 Bcf of natural gas was lost in 2014 as a result of leaks or other fugitive emissions from various components, including valves, fittings, pumps, storage vessels and compressors on well site operations on BLM-administered leases.

104

This quantity of gas would supply nearly 55,000 homes each year.

105

104

RIA at 17.

105

Based on an estimate of 74 Mcf of gas used per household per year. See footnote 2.

LDAR programs are a cost-effective means of reducing waste of gas in the oil and gas production process, as indicated by the studies and State programs discussed in the proposed rule, as well as additional information provided since the proposal, which is discussed in the background section III. Provisions in §§ 3179.301 through 3179.305 of the final rule require operators to carry out leak inspections and repairs at their well sites and associated equipment, meeting specified standards for leak detection methodology and frequency, and for the timing of repairs. Within one year of the effective date of the rule (or within 60 days of beginning production, for new sites), operators must use an instrument-based approach to conduct semi-annual inspections at well sites and quarterly inspections at compressor stations. Operators may also request BLM approval of an alternative instrument-based leak detection program, which the BLM may approve if it finds that the program would reduce leaked volumes by at least as much as the BLM program. Operators must repair a leak within 30 days of discovery, absent good cause, and verify that the leak is fixed. Operators must also keep records documenting the dates and results of leak inspections, repairs, and follow-up inspections, and submit annual reports with this information.

Section 3179.301 provides that the leak detection requirements in the final rule apply to sites

106

and associated equipment that is used to produce, process, compress, treat, store, or measure natural gas from or allocated to a Federal or Indian lease (or from a unit or communitized area that includes such a lease), where such sites are upstream of or contain the approved royalty point of measurements. These requirements also apply to each site located on a Federal or Indian lease, and all associated equipment operated by the operator, which is used to store, measure, or dispose of produced water. An operator is not required to inspect sites that contain only a wellhead or wellheads and no other equipment, nor is the operator required to inspect the “leak components”

107

that are not accessible

106

A “site” is defined as a discrete area containing a wellhead, wellhead equipment, or other equipment used to produce, process, compress, treat, store, or measure natural gas or store, measure, or dispose of produced water, which is suitable for inspection in a single visit.

107

Under the definitions in the final rule, “leak component” means any component that has the potential to leak gas and can be tested in the manner described in sections 3179.301 through 3179.305 of this subpart, including, but not limited to, valves, connectors, pressure relief devices, open-ended lines, flanges, covers and closed vent systems, thief hatches or other openings on a storage vessel, compressors, instruments, and meters.

In response to multiple requests from industry and NGO commenters, the final rule provides greater specificity on what constitutes a “leak”, which includes releases not associated with the normal operation of the component (

e.g.,

releases from equipment designed to vent that exceed the quantities and frequencies expected during normal operation of the equipment). Similarly,

releases due to operator error or equipment malfunctions, or from control equipment that does not meet the level of control required by this or other regulations, are also considered leaks. These types of leaks include releases from: A thief hatch left open; a vapor recovery unit that is not operating properly; a tank or combustor that is inadequately sized to handle the throughput of gas; or an intermittent controller that actuates continuously.

Section 3179.301(j) and (k) integrate the final rule with EPA NSPS requirements for operators to conduct a fugitive emissions inspection and repair program. Section 3179.301(j) provides that for new, modified or reconstructed equipment, an operator will be deemed to be in compliance with the BLM LDAR requirements if the operator is in compliance with the EPA subpart OOOOa requirements applicable to the equipment. Paragraph (k) further allows an operator to choose to comply with the EPA fugitive emissions monitoring requirements in subpart OOOOa and apply those requirements to all sites and equipment on a lease not already deemed in compliance with the BLM LDAR provisions, in lieu of complying with the BLM LDAR provisions. This provision allows an operator with new, modified or reconstructed facilities (which must comply with subpart OOOOa) as well as existing facilities (which are not subject to subpart OOOOa) to apply a single leak detection regime to all of their facilities, rather than complying with subpart OOOOa for some facilities and the BLM requirements for others.

The final BLM LDAR provisions also apply to a few specific types of equipment that EPA addresses under requirements that are separate from EPA's subpart OOOOa fugitive emissions program—specifically, certain covers and closed vent systems, and thief hatches or other openings on controlled storage vessels, which are covered under 40 CFR 60.5411a or 60.5395a, rather than under the fugitive emissions requirements in subpart OOOOa. The final rule provides that if an operator chooses to comply with the EPA subpart OOOOa fugitive emissions requirements in lieu of the BLM LDAR requirements for all equipment on a lease, the operator must apply the EPA fugitive emissions requirements to sources covered under 40 CFR 60.5411a or 60.5395a as well.

108

Absent this requirement, these equipment covers, closed vent systems, and openings on controlled storage vessels would not be subject to the BLM's LDAR requirements or the EPA's subpart OOOOa fugitive emission inspection requirements if the operator chose to comply with the EPA requirements in lieu of the BLM requirements.

108

See

Section VII, Section by Section, for discussion of treatment of sources exempt from the EPA fugitive emissions program specified in section 43 CFR 60.5397a.

The final rule requires operators to use an instrument-based approach to leak detection. This is consistent with the proposed rule, and with EPA, Colorado, and Wyoming leak detection requirements. Under final rule § 3179.302, operators must use an optical gas imaging device (also commonly referred to as an infrared camera), or a portable analyzer device capable of detecting leaks and used according to the specifications of Method 21, a protocol prescribed by EPA for effectively using these devices.

109

Use of a portable analyzer device must also be assisted by audio, visual, and olfactory (AVO) inspection, as these devices have much more narrowly-focused leak detection capabilities compared to optical gas imaging, which can be used to scan across broad arrays of equipment. The final rule includes specifications for acceptable optical gas imaging equipment, requires all instruments to be used according to the manufacturer's specifications, and requires the operator of any leak detection instrument to be adequately trained in its proper use.

109

See 40 CFR part 60, appendix A-7.

Final section 3179.302 also allows any person to request and the BLM to approve the use of an alternative monitoring device, accompanied by a monitoring protocol, and, in response to comments, this section also details the information that must be included in a request. The BLM may approve an alternative leak detection device and inspection protocol, if the BLM finds that the alternative would achieve equal or greater reduction of gas lost through leaks, compared with optical gas imaging used as required. The BLM may approve the device for use for all or most applications, or may approve use on a pilot project or demonstration basis. Finally, the BLM will provide public notice of a request for approval of an alternative monitoring device and will post on the BLM Web site a list of each approved monitoring device and protocol, along with any limitations on its use. The BLM intends that the decision to approve the use of an alternative monitoring device would be made only at the national level, by the Director, Deputy Director, or an Assistant Director, as, once approved, the alternative monitoring device could be used anywhere in the country.

Section 3179.303 specifies the required frequency for inspections, which is fully aligned with the requirements of Subpart OOOOa. Operators must inspect each well site at least semi-annually, with consecutive inspections spaced at least four months apart. Operators must inspect each compressor station at least quarterly, with consecutive inspections spaced at least 60 days apart.

In addition to alternative monitoring devices, the final rule allows for BLM approval of alternative monitoring programs. Specifically, like the proposed rule, the final rule allows an operator to request the BLM to approve an alternative instrument-based leak detection program in place of the program specified in the regulations. The BLM may approve the alternative program if it finds that the alternative program would achieve equal or greater reduction of gas lost through leaks compared with the approach specified in the regulations. Because approval of inadequate alternative programs could unintentionally but significantly undermine the effectiveness of the LDAR requirements, the BLM intends that the decision to approve an alternative program would be made only by the relevant BLM State Director, or, with respect to requests that cover operations in more than one State, at the national level by the BLM Director, Deputy Director, or an Assistant Director. In addition, the BLM will post approved alternative programs online both to provide public transparency and to allow other operators to see examples of alternative programs that the BLM believes will be effective.

Section 3179.304 requires operators to repair the leaks that they find. Operators must repair a leak as soon as practicable, and within 30 days of discovery, unless there is good cause to delay the repair. When an operator repairs a leak, the operator must verify that the repair was effective within 30 days of the date of the repair using optical gas imaging, a portable analyzer using Method 21, or a soap-bubble test.

Section 3179.305 requires operators to keep records related to leak detection inspections and repairs, make them available to the BLM upon request, and submit an annual summary report on the previous year's inspection activities.

2. Changes From Proposed Rule

The final rule provisions on leak detection and repair largely track the proposal, however, we adjusted the frequency of inspections, based upon public comments along with a desire to

align these requirements with EPA's final rule, and made other minor adjustments. The BLM had proposed an approach in which the initial required frequency of inspection was semi-annual, but then the frequency varied for each site according to the number of leaks found. An operator that found more than three leaks in each of two inspections would have been required to increase its inspection frequency to quarterly, while an operator that found fewer than three leaks in each of two inspections would have been allowed to drop its inspection frequency to annually. A broad swathe of commenters opposed this approach in the proposed rule (as well as in the EPA's proposed OOOOa). The final rule replaces this approach with a fixed semi-annual rate of inspections for all sites other than compressor stations, and a quarterly inspection rate for compressor stations, consistent with the final OOOOa as well.

Another change from proposed to final rule concerns the effective date of the leak detection requirements. The proposed rule would have imposed the leak detection requirements as of the effective date of the rule, with the first inspection required within six months of that date. In response to comments, the final rule extends the time for initial compliance to give operators one year from the effective date of the rule to make their first inspection.

The BLM made several other changes that adopt commenters' suggestions. We added a provision allowing approval of an alternative, potentially less effective, leak detection program for an operator that demonstrates that compliance with the LDAR requirements would impose such costs as to cause the operator to cease production and abandon significant recoverable oil or gas reserves. We also added a requirement that operators provide an annual summary report on the results of their leak inspections. Consistent with the final subpart OOOOa, the final rule also includes a new exemption from LDAR requirements for sites that contain only a wellhead(s), and no other equipment.

In addition, the BLM made various smaller changes to enhance the clarity of the final rule. The final rule has refined and clarified the specific sites and equipment subject to the leak inspection requirements. The final rule applies to all equipment handling Federal or Indian gas, upstream of and including the site where the royalty measurement point is located—whether the equipment is on or off the lease and regardless of the ownership of the equipment. The final rule also specifies that with respect to equipment associated with the storage, measurement, or disposal of produced water, the leak detection requirements apply only to such equipment operated by the operator and located on the Federal or Indian lease.

The final rule retains and refines the proposed rule's provision allowing an operator to satisfy the leak detection requirements by complying with the EPA leak detection requirements under 40 CFR part 60, subpart OOOOa. First, the final rule provides that for new, modified and reconstructed equipment, an operator that is in compliance with the EPA fugitive emissions requirements will be deemed to be in compliance with the BLM LDAR requirements, without any requirement to file a Sundry Notice and demonstrate compliance, as the BLM had proposed. Second, it clarifies that that an operator who chooses to comply with the EPA fugitive emissions monitoring requirements in subpart OOOOa in lieu of the BLM LDAR requirements must apply the EPA requirements to all sites and equipment on a lease not already deemed in compliance with the BLM LDAR provisions.

The final rule includes this change because leaks from some types of new, modified and reconstructed equipment, such as covers and closed vent systems, and thief hatches on controlled storage vessels, are not covered by the fugitive emissions requirements under subpart OOOOa, but instead are addressed through specific provisions for storage vessel affected facilities and any associated covers and closed vent systems in subpart OOOOa—namely 40 CFR 60.5395a and 60.5411a. These provisions establish comprehensive control programs for storage vessel affected facilities, including separate and distinct inspection regimes. This final rule ensures that if an operator elects to comply with the EPA fugitive emissions requirements in lieu of the BLM leak detection requirements for equipment on a given lease, the operator must apply the EPA fugitive emissions requirements to all equipment covered by the BLM leak detection requirements, including equipment such as covers, closed vent systems, and thief hatches. Absent this provision, operators could potentially avoid any leak detection program with respect to existing sources in these categories.

The final rule also modifies the requirement in the proposed rule that operators who choose to comply with the EPA requirements in lieu of the BLM requirements must file a Sundry Notice demonstrating compliance with the EPA rule. The final rule provides that the operator need only notify the BLM through a Sundry Notice that it is complying with the EPA rule in lieu of the BLM requirements for equipment on a lease. While the BLM needs to know for oversight purposes if an operator has elected not to comply with the BLM requirements, we agree with commenters that requiring a “demonstration” of compliance with the EPA requirements is unnecessary.

As noted earlier, the final rule also contains a more detailed definition of a “leak” than the proposed rule, as well as more detailed specifications of approved leak detection instruments and methods. In addition, the final rule separates approval of an alternative monitoring device and protocol from approval of an operator's alternative leak detection program, and it adds specificity on what is required for each of these. The final rule also adds a required minimum interval between inspections, which was not specified in the proposal, but is consistent with final subpart OOOOa. Other minor changes that align the rule with final subpart OOOOa include: A 30- rather than 15-day period for repair and follow-up inspections; additional detail on what constitutes good cause for delay of repair; and a new, two-year outer limit on the timeline for completing repairs delayed for good cause. In addition, while the proposal had required operators to verify the effectiveness of repair using the same method used to identify the leak, in response to comments, the final rule allows operators to use any approved monitoring instrument or the soap bubble test to verify the effectiveness of repair.

3. Significant Comments

Commenters provided many detailed comments on numerous aspects of the leak detection program. This section highlights the most significant comments; additional comments are addressed in Section V. and the Response to Comments document. Comments addressed here include: Coverage of the program (

i.e.,

which types of operations and equipment should be included in the program); program structure (how inspection frequency is to be determined, and the required frequency of inspection); the instruments and methods to be used for leak detection; opportunities for use of new instruments and methods; requirements for repairs; and potential exemptions from the requirements.

a. Coverage

Comments:

Many commenters addressed the coverage of the program. Some commenters supported

This text is long and has been trimmed here. Open the source document for the complete record.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

Waste Prevention, Production Subject to Royalties, and Resource Conservation · 81 FR 83008 | Frix