Service Rules for Advanced Wireless Services in the 2000-2020 MHz and 2180-2200 MHz Bands, etc.

Federal RegisterFeb 5, 2013

Ask Donna

What actually matters in this document.

Text

FEDERAL COMMUNICATIONS COMMISSION

47 CFR Parts 1, 2, 25, 27, and 101

[WT Docket Nos. 12-70 and 04-356; ET Docket No. 10-142; FCC 12-151]

Service Rules for Advanced Wireless Services in the 2000-2020 MHz and 2180-2200 MHz Bands, etc.

AGENCY:

Federal Communications Commission.

ACTION:

Final rule; order of proposed modification.

SUMMARY:

In this document, the Federal Communications Commission (“Commission”) increases the Nation's supply of spectrum for mobile broadband by adopting flexible use rules for up to 40 megahertz of spectrum in the 2 GHz band (2000-2020 MHz and 2180-2200 MHz), which we term the AWS-4 band. In so doing, we carry out a recommendation in the

National Broadband Plan

that the Commission enable the provision of stand-alone terrestrial services in the 2 GHz Mobile Satellite Service (MSS) spectrum band. Specifically, we remove unnecessary regulatory barriers to mobile broadband use of this spectrum, and adopt service, technical, and licensing rules that will encourage innovation and investment in mobile broadband and provide a stable regulatory regime in which broadband deployment can develop.

DATES:

Effective March 7, 2013, except amendments to 47 CFR 1.949, 27.14, 27.17, 27.1131, 27.1134, 27.1136, 27.1166, 27.1168, 21.1170, 101.69, and 101.73(d), which contain new or modified information collection requirements that require approval by the Office of Management and Budget (OMB). The Commission will publish a document in the

Federal Register

announcing the effective date of those sections.

ADDRESSES:

Federal Communications Commission, 445 12th Street SW., Washington, DC 20554. A copy of any comments on the Paperwork Reduction Act information collection requirements contained herein should be submitted to Judith B. Herman, Federal Communications Commission, Room 1-B441, 445 12th Street SW., Washington, DC 20554 or via the Internet at

Judith B. Herman@fcc.gov.

FOR FURTHER INFORMATION CONTACT:

Kevin Holmes, Wireless Telecommunications Bureau, Broadband Division, at (202) 418-BITS or by email at

Kevin.Holmes@fcc.gov.

For additional information concerning Paperwork Reduction Act information collection requirements contained in this document, contact Judith B. Herman at (202) 418-0214, or via the Internet at

PRA@fcc.gov.

SUPPLEMENTARY INFORMATION:

This is a summary of the Commission's

Report and Order and Order of Proposed Modification,

FCC 12-151, adopted on December 11, 2012, and released on December 17, 2012. The full text of this document is available for inspection and copying during normal business hours in the FCC Reference Information Center, Room CY-A257, 445 12th Street SW., Washington, DC 20554. The complete text of the

Report and Order and Order of Proposed Modification

and related Commission documents may be purchased from the Commission's duplicating contractor, Best Copy and Printing, Inc. (BCPI), Portals II, 445 12th Street SW., Room CY-B402, Washington, DC 20554, (202) 488-5300 or (800) 387-3160, contact BCPI at its Web site:

http://www.bcpiweb.com.

When ordering documents from BCPI, please provide the appropriate FCC document number, for example, FCC 12-151. The complete text of the

Report and Order and Order of Proposed Modification

is also available on the Commision's Web site at

http://wireless.fcc.gov/edocs_public/attachment/FCC-12-151A1doc.

This full text may also be downloaded at:

http://wireless.fcc.gov/releases.html.

Alternative formats (computer diskette, large print, audio cassette, and Braille) are available by contacting Brian Millin at (202) 418-7426, TTY (202) 418-7365, or via email to

bmillin@fcc.gov.

I. Introduction

1. With this

Report and Order,

we increase the Nation's supply of spectrum for mobile broadband by adopting flexible use rules for 40 megahertz of spectrum in the 2 GHz band (2000-2020 MHz and 2180-2200 MHz), which we term the AWS-4 band. In so doing, we carry out a recommendation in the

National Broadband Plan

that the Commission enable the provision of stand-alone terrestrial services in the 2 GHz Mobile Satellite Service (MSS) spectrum band, thus dramatically increasing the value of this spectrum to the public. Specifically, we remove regulatory barriers to mobile broadband use of this spectrum, and adopt service, technical, and licensing rules that will encourage innovation and investment in mobile broadband and provide certainty and a stable regulatory regime in which broadband deployment can rapidly occur.

2. To create a solid and lasting foundation for the provision of terrestrial services in this spectrum and to make this spectrum available efficiently and quickly for flexible, terrestrial use, such as mobile broadband, we will assign the spectrum to the incumbent MSS operators. Thus, together with this

Report and Order,

we issue an

Order of Proposed Modification,

proposing to replace the incumbent MSS operators' Ancillary Terrestrial Component (ATC) authority with full flexible use terrestrial authority. Additionally, we decline to adopt the alternative band plan proposals presented in the

AWS-4 Notice of Proposed Rulemaking and Notice of Inquiry

(

“AWS-4 NPRM”

and

“AWS-4 NOI”

), 77 FR 22720, April 17, 2012, and 77 FR 22737, April 17, 2012, including shifting the AWS-4 uplink spectrum up five or ten megahertz or further exploring the larger and more complex 2 GHz Extension Band Concept.

II. Background

A. The Growing Spectrum Demands of Mobile Broadband Services

3. Demand for wireless broadband services and the network capacity associated with those services is surging, resulting in a growing demand for spectrum to support these services.

B. The Spectrum Act

4. In February 2012, Congress enacted Title VI of the Middle Class Tax Relief and Job Creation Act of 2012, Public Law 112-96, 126 Stat. 156 (2012) (the “Spectrum Act”). The Spectrum Act includes several provisions to make more spectrum available for commercial use, including through auctions, and to improve public safety communications. Among other things, the Spectrum Act requires the Commission, by February 23, 2015, to allocate the 1915-1920 MHz band and the 1995-2000 MHz band (collectively, the “H Block”) for commercial use, and to auction and grant new initial licenses for the use of each spectrum band, subject to flexible use service rules. Congress provided, however, that if the Commission determined that either of the bands could not be used without causing harmful interference to commercial licensees in 1930-1995 MHz (PCS downlink), then the Commission was prohibited from allocating that specific band for commercial use or licensing it.

See

47 U.S.C. 1451(b)(4). Additionally, sections 6401(f) and 6413 of the Spectrum Act specify that the proceeds from an auction of licenses in the 1995-2000 MHz band and in the 1915-1920

MHz band shall be deposited in the Public Safety Trust Fund and then used to fund the Nationwide Public Safety Broadband Network (“FirstNet”).

See

47 U.S.C. 309(j)(8)(D)(iii), 1457. The H block spectrum could be the first spectrum specified by the Spectrum Act to be licensed by auction, and thus could represent the first inflow of revenues toward this statutory goal.

5. In March 2012, the Commission adopted the

AWS-4 NPRM,

which consisted of a Notice of Proposed Rulemaking and Notice of Inquiry. In the

AWS-4 NPRM,

the Commission proposed to increase the Nation's supply of spectrum for mobile broadband by removing barriers to flexible use of spectrum currently assigned to the MSS. The Commission proposed terrestrial service rules for the 2 GHz band that would generally follow the Commission's part 27 flexible use rules, modified as necessary to account for issues unique to the particular spectrum bands. The proposed rules were designed to provide for flexible use of this spectrum, to encourage innovation and investment in mobile broadband, and to provide a stable regulatory environment in which broadband deployment could develop. The proposed rules also included aggressive build-out requirements and concomitant penalties for failure to build out designed to ensure timely deployment of wireless, terrestrial broadband in the band. Additionally, in the Notice of Inquiry, the Commission sought comment on potential ways to free up additional valuable spectrum to address the Nation's growing demand for mobile broadband spectrum, including through examination of alternative band plans incorporating the Federal 1695-1710 MHz band.

6. Comments on the

AWS-4 NPRM

were due by May 17, 2012 and reply comments were due by June 1, 2012. Thirty-four comments and twenty-one reply comments were filed in response to the

AWS-4 NPRM.

In addition, as permitted under our rules, there have been

ex parte

presentations.

III. Report and Order: AWS-4

7. In this

AWS-4 Report and Order,

we build on the Commission's recent actions to increase the availability of spectrum by enabling terrestrial mobile broadband service in 40 megahertz of spectrum in the 2000-2020 MHz and 2180-2200 MHz spectrum bands. As explained below, we adopt AWS-4 terrestrial service, technical, and licensing rules that generally follow the Commission's Part 27 flexible use rules, modified as necessary to account for issues unique to the AWS-4 bands. First, we establish 2000-2020 MHz paired with 2180-2200 MHz as the AWS-4 band plan.

8. Second, we adopt appropriate technical rules for operations in the AWS-4 band. This includes rules governing the relationship of the AWS-4 band to other bands. For example, as explained below, we require the licensees of AWS-4 operating authority to accept some limited interference from operations in the adjacent upper H block at 1995-2000 MHz, and impose more stringent out-of-band emission (OOBE) limits and power limits on these licensees to protect future operations in 1995-2000 MHz. With respect to adjacent operations at 2200 MHz, we permit operator-to-operator agreements to address concerns regarding interference and also establish default rules to protect against harmful interference. Further, we require licensees of AWS-4 authority to comply with the OOBE limits contained in a private agreement entered into with the Global Positioning Systems (GPS) industry.

9. Third, mindful that AWS-4 spectrum is now allocated on a co-primary basis for Mobile Satellite and for terrestrial Fixed and Mobile services and that MSS licensees already have authorizations to provide service in the band, we determine that the AWS-4 rules must provide for the protection of 2 GHz MSS systems from harmful interference caused by AWS-4 systems. In addition, consistent with our determination below to grant AWS-4 terrestrial operating authority to the incumbent 2 GHz MSS licensees, we propose to assign terrestrial rights by modifying the MSS operators' licenses pursuant to section 316 of the Communications Act.

10. Fourth, we adopt performance requirements for the AWS-4 spectrum. Specifically, licensees of AWS-4 operating authority will be subject to build-out requirements that require a licensee to provide terrestrial signal coverage and offer terrestrial service to at least 40 percent of its total terrestrial license areas' population within four years, and to at least 70 percent of the population in each of its license areas within seven years, and will be subject to appropriate penalties if these benchmarks are not met.

11. Fifth, we adopt a variety of regulatory, licensing, operating, and relocation and cost sharing requirements for licensees of AWS-4 operating authority.

12. Sixth, we eliminate the ATC rules for the 2 GHz MSS band and propose to modify the 2 GHz MSS operators' licenses to eliminate their ATC authority.

13. Seventh, consistent with the scope of the

AWS-4 NPRM,

we take no action on the Commission's ATC rules for other MSS bands.

14. In reaching these conclusions below, we consider other possible outcomes for this spectrum, proposed in the

AWS-4 NPRM

or by commenters in response thereto, but ultimately decline to adopt them. For example, we decline to adopt any of the proposed alternative band plans, including shifting the AWS-4 uplink spectrum or pursuing the 2 GHz Extension Band Concept that was set forth in the

AWS-4 NOI.

Similarly, we reject calls to reduce or take back spectrum allocated to the 2 GHz MSS licensees and decline to assign AWS-4 terrestrial rights through an auction. We also decline to adopt the interim build-out benchmarks and their associated penalties as proposed in the

AWS-4 NPRM.

Further, we decline to impose restrictions on transferring or assigning AWS-4 spectrum beyond the general requirements applicable to Wireless Radio Service spectrum generally. Nor do we impose any roaming or wholesale obligations beyond those contained in the Commission's rules, or “use it or share it” obligations. Rather, the rules we adopt today represent the Commission's efforts to make more spectrum available for terrestrial flexible use, including for mobile broadband, in the public interest, without imposing undue restrictions on the use of the spectrum.

15. We emphasize that we find the rules we adopt and the actions we take and propose to take today to be in the public interest based on the totality of the facts and circumstances before us considered as a whole.

A. AWS-4 Band Plan

16. Band plans establish parameters and provide licensees with certainty as to the spectrum they are authorized to use. As explained below, based on the record before us, we adopt as the AWS-4 band plan 2000-2020 MHz paired with 2180-2200 MHz, configured in two consistently-spaced 10 megahertz blocks. Further, we will license the blocks on an EA basis.

1. AWS-4 Frequencies and Paired Spectrum (uplink/downlink)

17. We adopt the band plan and spectrum pairing proposed in the

AWS-4 NPRM,

and establish the AWS-4 spectrum band as 2000-2020 MHz uplink band paired with 2180-2200 MHz downlink band.

a. AWS-4 Frequencies

18. We establish the AWS-4 band as 2000-2020 MHz and 2180-2200 MHz. After considerable analysis of the facts and the record before us, we conclude that this band plan will result in the most efficient use of spectrum for mobile broadband and, when paired with appropriate technical rules, will not impair the future use of the 1995-2000 MHz band, thereby enabling us to best fulfill our obligations under the Spectrum Act and our general obligation to maximize the benefits of the spectrum for the public interest.

19. Establishing these frequencies for AWS-4 terrestrial spectrum is the culmination of several years of Commission effort exploring this path. In July 2010, the Commission adopted the

MSS NPRM and NOI

in which it proposed to add co-primary Fixed and Mobile allocations for this spectrum, 75 FR 49871, Aug. 16, 2010. In April 2011, the Commission added these terrestrial allocations, thereby “lay[ing] the foundation for more flexible use of the band * * * [and] promoting investment in the development of new services and additional innovative technologies,” 76 FR 31252, 31254, May 31, 2011. In that order, the Commission also stated its intent to initiate a rulemaking—this proceeding—to explore “service rule changes that could increase investment and utilization of the band in a manner that serves the public interest * * * [including examining] potential synergies with neighboring bands,” 76 FR 31254, May 31, 2011. The record before us demonstrates nearly unanimous support to add terrestrial rights to the 2 GHz MSS band generally.

20. We adopt this band plan because, of the options available to us, it should enable the use of the spectrum for mobile broadband in the most expeditious and efficient manner. Setting the AWS-4 band as 2000-2020 MHz and 2180-2200 MHz mirrors the existing 2 GHz MSS band. Because the existing 2 GHz MSS licensees will have AWS-4 operating authority, under this band plan they will be able to offer both terrestrial and satellite service using the same spectrum. In contrast, because the 2020-2025 MHz band is not allocated for MSS, shifting the AWS-4 band up to include this spectrum would necessarily create a mismatch between the spectrum available to provide terrestrial service and the spectrum available to provide satellite service.

21. We decline to adopt our alternative proposals to shift the spectrum in the lower portion of the AWS-4 band plan. We acknowledge that setting the lower AWS-4 band at 2000-2020 MHz gives rise to potential interference issues between the AWS-4 band and the 1995-2000 MHz band (AWS-2 upper H block). This raises particular concerns because, as discussed below, Congress has directed the Commission to assign licenses in the 1995-2000 MHz band through a system of competitive bidding—a system that, among other things, promotes efficient and intensive use of that spectrum and recovers a portion of the value of the spectrum resource. Regulatory actions that might compromise the utility of the 1995-2000 MHz band cannot easily be reconciled with the purposes of the Spectrum Act's mandate that this band be licensed through a system of competitive bidding. We find, however, that the tension between this mandate and the public interest benefits of the band plan we are adopting can be resolved by promulgating appropriate technical rules for the AWS-4 band, as described below.

22. Because we resolve these interference issues through technical rules, we decline to adopt any of the three alternative band plans proposed in the

AWS-4 NPRM:

(1) 2005-2025 MHz paired with 2180-2200 MHz; (2) 2010-2025 MHz paired with 2180-2200 MHz; and (3) the alternative NOI proposal, as well as any of the alternative band plan proposals presented by commenters. We decline to shift the band because we find that the technical rules we adopt below offer a better solution than shifting the band. Further, nothing in the record has convinced us that the 2020-2025 MHz band cannot be put to productive use in the future. We decline to pursue the alternative NOI proposal for the reasons discussed in section VI. below. Finally, we decline at this time to adopt more aggressive proposals that would reduce the amount of MSS spectrum or return licenses to the Commission, because we believe the approach adopted herein will lead to faster and more efficient terrestrial deployment in the AWS-4 band.

b. Paired Spectrum

23. For the AWS-4 band plan, we adopt the same uplink and downlink pairing designations as those currently used in the 2 GHz MSS band. Specifically, for AWS-4 spectrum, the lower band (2000-2020 MHz) will be the uplink band and the upper band (2180-2200 MHz) will be the downlink band. As we noted in the

AWS-4 NPRM,

“[a]dopting the same uplink/downlink pairing approach for AWS-4 as for 2 GHz MSS may facilitate the continued use of existing satellites for MSS,” 77 FR 22722, April 17, 2012. Thus, it is consistent with our determination,

infra,

to require AWS-4 operators to protect 2 GHz MSS operations from harmful interference. Stated otherwise, having the AWS-4 band parallel the spectrum pairing of the 2 GHz MSS band, in terms of their uplink and downlink designations, will minimize the possibility that AWS-4 operations could interfere with 2 GHz MSS operations and will offer the greatest opportunity for synergies between the two mobile services. Our finding is supported by the record and no commenter objected to this pairing of uplink and downlink spectrum.

2. Spectrum Block Size and Duplex Spacing

24. We determine to license the AWS-4 spectrum in two paired 10 + 10 megahertz blocks, but, in doing so, we adopt a consistent (

i.e.,

non-variable) duplex spacing. The AWS-4 band will therefore consist of two paired 10 + 10 megahertz blocks as follows: Block A pairs 2000-2010 MHz with 2180-2190 MHz and Block B pairs 2010-2020 MHz with 2190-2200 MHz.

25.

Block Size.

We adopt 10 megahertz blocks as the block size for the AWS-4 band. This block size has several advantages. First, it mirrors the current MSS/ATC block size. Second, spectrum bands of this size will encourage technologies that utilize wider bandwidth, and will encourage the adoption of and use of next generation technologies. This is particularly the case in a band, such as this one, where large contiguous blocks are readily configurable. We expect that use of wide, contiguous blocks of spectrum will support continued innovation and deployment of mobile broadband technologies, such as Long Term Evolution (“LTE”), to meet higher data rates and wider bandwidths. Additionally, 10 + 10 megahertz blocks allow for the possibility that multiple providers may make use of the spectrum (including through the operation of secondary markets), but can also be used as a single 20 + 20 megahertz block if a single operator controls both blocks in a market. The record supports both the 10 + 10 MHz blocks and the ability for a single operator to combine both blocks into a 20 + 20 MHz block. Further, no one submitted comments in opposition to the 10 + 10 block size for AWS-4 terrestrial licenses. However, AT&T argued that the MSS allocation be reduced to one single 10 + 10 MHz block. We decline to pursue AT&T's request that we reallocated part of the 2 GHz band. As the Commission stated in 2011 in the

2 GHz Band Co-Allocation Report and Order

when adding the co-primary fixed and mobile allocations to

the band, “MSS remains co-primary in the 2 GHz MSS band * * * Both of the MSS licensees in the band will continue to operate under the terms of their existing licenses,” 76 FR 31252, 31254, May 31, 2011. Thus, to support the continued innovation of mobile broadband technologies by providing wide, contiguous channels, we adopt our proposal to license the AWS-4 spectrum in paired 10 + 10 megahertz blocks.

26. In the

AWS-4 NPRM,

the Commission proposed that, in the event that a single licensee holds both the A and the B Blocks, that licensee should be permitted to combine the blocks into one paired 20 + 20 megahertz block. We adopt this proposal. We find it consistent with the record, with our decision to permit flexible use of AWS-4 spectrum, and with our technical findings below. The rules adopted herein will allow a licensee holding all paired 20 + 20 megahertz of AWS-4 spectrum to make use of that spectrum as it sees fit, so long as such use otherwise complies with the Commission's rules, including the technical and interference rules established herein. Thus, we will provide a licensee holding AWS-4 terrestrial authority with the opportunity to design its network in a manner that enables it to best respond to its business and technical needs. For example, combining these blocks may enable a licensee to benefit from establishing larger channel bandwidths, such as paired 15 + 15 megahertz or 20 + 20 megahertz blocks, which can result in greater spectral efficiency and network capacity and, consequently, improved customer experiences.

27.

Duplex Spacing.

We find that the paired 10 megahertz blocks should operate with a consistent duplex spacing. Thus, block A will pair 2000-2010 MHz with 2180-2190 MHz and Block B will pair 2010-2020 MHz with 2190-2200 MHz. We license the AWS-4 spectrum such that duplex spacing of the spectrum blocks will be uniform. Although some commenters support using the existing 2 GHz MSS duplex spacing for AWS-4, we concur with other parties, such as AT&T, that to “facilitate the deployment of terrestrial AWS-4 service, the Commission should adopt an A-B/A-B configuration, similar to the consistent duplex spacing used in other AWS and 3GPP standards.” AT&T Comments to WT Docket No. 12-70, ET Docket No. 10-142, WT Docket No. 04-356, at page 5. Further, this is consistent with the recent change by 3rd Generation Partnership Project (“3GPP”) in band class 23 to shift from an A-B/B-A pairing to an A-B/A-B pairing. Thus, to promote uniformity among mobile wireless bands and to maintain consistency with standards setting bodies, we find it appropriate to license AWS-4 spectrum bands in A-B/A-B paired blocks.

28.

Changes to MSS Duplex Spacing.

Currently, the two MSS licenses in the band are arranged with one license authorized to use of 2000-2010 MHz as uplink paired with 2190-2200 MHz as downlink, and the other authorized to use 2010-2020 MHz uplink paired with 2180-2190 MHz downlink. That is, there are effectively two blocks, each 10 + 10 megahertz, paired A-B/B-A. As discussed above, we are establishing the AWS-4 blocks in an A-B/A-B pairing, rather than an A-B/B-A pairing. There remains, however, a need to coordinate between MSS and AWS-4 operations. In fact, as discussed below, we have found that the assignment of AWS-4 terrestrial use rights must be made to the existing MSS authorization holders to allow coordination and prevention of harmful interference. Therefore, we determine to also align the MSS blocks with the AWS-4 blocks. Because, as AT&T states, the MSS satellites should be “capable of providing service under a modified A-B/A-B configuration,” this rearrangement should be feasible and not present a significant burden on the MSS licensees. Consequently, we adopt a rearrangement of the 2 GHz MSS blocks as follows: the first block shall be 2000-2010 MHz uplink paired with 2180-2190 MHz downlink, and the second block shall be 2010-2020 MHz paired with 2190-2200 MHz. This rearrangement results in the first MSS block aligning with the AWS-4 A block, and the second MSS block aligning with the AWS-4 B block.

29.

Interoperability.

The

AWS-4 NPRM

also sought comment on whether the Commission should take action to ensure that equipment for the AWS-4 band is interoperable across both paired blocks. No commenters discussed this issue. As the AWS-4 spectrum will be licensed to the existing 2 GHz MSS licensees, and the commenter controlling both licensees has stated its desire to operate across the entire band, we anticipate that its operations would result in devices that operate across the entire AWS-4 band. We therefore take no action at this time on this issue. We observe, however, that the Commission is investigating interoperability issues in other contexts. We continue to believe that interoperability is an important aspect of future deployment of mobile broadband services. We will closely examine any actions taken that have the potential to undermine the development of interoperability in the AWS-4 band and may take action on this issue if it is warranted in the future.

3. Geographic Area Licensing

30. We will assign terrestrial spectrum use rights in the AWS-4 band on a geographic-area basis. A geographic-area licensing approach is well suited for the types of fixed and mobile services we expect to be deployed in this band. Further, geographic-area licensing will maintain consistency between the AWS-4 band and the AWS-1 band.

31. Having examined the record, which is mixed on this issue, we will award terrestrial rights for the AWS-4 spectrum on an Economic Area (“EA”) basis. We adopt an EA licensing area scheme. We do so for four reasons. First, addressing the concerns of those seeking larger license areas, EA license areas are a useful and appropriate geographic unit that Commission has used for similar bands. Notably, AWS-1 Blocks B and C spectrum is licensed on an EA basis. EA licenses can be aggregated up to larger license areas, including into MEAs or larger units, including nationwide. Any such aggregation, however, would not relieve a licensee from obligations that are based on the original EA license area, such as, importantly, build-out requirements. Second, EA-based licensing is consistent with the other requirements adopted herein, most notably the performance requirements discussed below, which establish EA-based build-out requirements. Third, licensing AWS-4 on an EA basis best balances the Commission's goals of encouraging the offering of broadband service both to broad geographic areas and to sizeable populations. For example, as one commenter notes, licensing in smaller geographic blocks averts the phenomenon of huge tracts of licensed territory being left unserved. Finally, contrary to one commenter's unsubstantiated claim, we do not believe that licensing on an EA basis impairs nationwide operations. Indeed, other than the PCS G block, all other major terrestrial spectrum bands are licensed in discrete geographic areas, including AWS-1, several blocks of which are licensed on an EA-basis. These bands have not proven unduly difficult for licensees to administer. Consequently, because EAs allow licensees to build their geographic coverage as needed, are consistent with the other requirements established for this band, and promote the Commission's goal of widespread broadband service, we adopt the proposal in the

AWS-4 NPRM

to assign AWS-4 spectrum rights on an EA basis.

32.

Gulf of Mexico.

In the

AWS-4 NPRM,

the Commission sought comment on how to include the Gulf of Mexico in its licensing scheme. The Commission questioned if the Gulf should be licensed in a similar fashion as the Upper 700 MHz band, where the Gulf was included as part of larger service areas, or whether the Gulf should be licensed separately. The Commission has addressed the issue of licensing the Gulf of Mexico in other proceedings and we will follow the established policy on this issue. Therefore, because we are adopting an EA-based licensing scheme, and the Commission received no comments directly addressing this issue, we will license the Gulf of Mexico as EA licensing area 176. As we did in licensing other Part 27 services, the Gulf of Mexico service area is comprised of the water area of the Gulf of Mexico starting 12 nautical miles from the U.S. Gulf coast and extending outward.

B. Technical Issues

33. Pursuant to its statutory direction in the Communications Act, the Commission adopts rules for commercial spectrum in a manner that furthers and maximizes the public interest. For example, allowing spectrum to be repurposed for its highest and best use serves this end as more efficient spectrum use, among other things, spurs investment and benefits consumers through better performance and lower prices. Deciding how best to further and maximize the public interest, moreover, is not an assessment that is made in a vacuum. Notably, when developing policies for a particular band, the Commission looks at other bands that might be affected, particularly the adjacent bands. In revising its rules, therefore, the Commission often must strike a balance among competing interests of adjacent bands, and between sometimes competing public interest considerations.

34. The rules for one band, particularly the interference protection rules, affect the use and value of other bands and thus the public interest benefits that can be realized through the use of those adjacent bands. Moreover, the public interest analysis, and the balancing of interests across bands, does not necessarily reduce to an inquiry about the amount of spectrum that is or could be made available in the relevant bands. Not all spectrum use has equal value or leads to the same public interest benefits. For example, as explained below, wireless providers tend to use more downlink than uplink spectrum. Therefore, it is not clear that the loss of some uplink spectrum would diminish the value of, or the public's interest in, a large paired band when compared to the value that would be created in enabling a smaller full power downlink band. Indeed, the public interest benefits of a fully usable new downlink spectrum band likely are substantially greater than a fully usable equal sized addition of uplink spectrum that is a part of a larger band. The balancing between adjacent bands may be weighted further if one band will enable the combination of spectrum bands, including the aggregation of smaller bands, while the other band does not.

35. In this section, we adopt the technical operating rules (

e.g.,

interference rules) that will govern AWS-4 operations and licensees. In general, our aim in establishing technical rules is to maximize the flexible use of spectrum while appropriately protecting operations in neighboring bands. We also specifically consider here our statutory obligations set forth in the Spectrum Act with respect to the 1995-2000 MHz band. We base the technical rules we adopt below on the rules for AWS-1 spectrum, with specific additions or modifications designed to protect operations in adjacent bands from harmful interference. These bands include (1) the existing 1930-1995 MHz broadband PCS service; (2) future services operating in the 1995-2000 MHz band; and (3) Federal operations in the 2200-2290 MHz band.

1. OOBE Limits

36. In this section we adopt interference rules for operations between AWS-4 blocks within the AWS-4 band and between AWS-4 blocks and adjacent and nearby bands. In the event that, once individual systems are deployed and operational, it is determined that these limitations do not prevent an AWS-4 fixed or mobile transmitter from causing harmful interference, we shall, at our discretion, require the licensee of that transmitter to provide greater emission attenuation consistent with the typical treatment of Part 27 services.

a. Interference Between Services in Adjacent AWS-4 Blocks

37. We require fixed and mobile transmitters operating in 2000-2020 MHz and 2180-2200 MHz bands to attenuate emissions outside the licensed channels in these bands by 43 + 10 log

10

(P) dB, unless all affected parties agree otherwise. This limit of 43 + 10 log

10

(P) dB is consistent with other CMRS bands, including the AWS-1 band that forms the basis for many of the technical rules we adopt herein. This specific emission limit, as well as the principle of adopting the same limits across multiple CMRS bands, is supported by the record. Further, we disagree with the assertion that permitting unified operations in the band makes it unnecessary for us to establish emissions levels between adjacent block AWS-4 operations. We observe, however, that to the extent a service provider establishes unified operations across the AWS-4 blocks, that operator may choose not to observe this emission level strictly between its adjacent block AWS-4 licenses in a geographic area, so long as it complies with other Commission rules and is not adversely affecting the operations of other parties by virtue of exceeding the emission limit.

38. Additionally, we adopt the measurement procedures found in § 27.53(h) to AWS-4 mobile and base stations. Specifically, we require a measurement bandwidth of 1 MHz or greater, with an exception allowing a smaller measurement bandwidth within the first megahertz outside the channel. In sum, after reviewing the record and finding it supports the Commission's proposals, we conclude that the potential benefits of our proposals would outweigh any potential costs and adopt the proposed OOBE limit and measurement procedures.

b. Interference with Services in Adjacent and Other Bands

39. Having established interference rules for operations between adjacent AWS-4 blocks, we next set rules for AWS-4 operations relative to operations in adjacent and nearby spectrum bands. In so doing, wherever possible, we establish rules that permit flexible use of the AWS-4 band, while effectively protecting adjacent and nearby bands from harmful interference resulting from AWS-4 emissions. As a preliminary matter, we observe that the Commission frequently applies a minimum attenuation level of 43 + 10 log

10

(P) dB to protect operations in adjacent frequency bands.

(i) Interference with operations below 1995 MHz

40. We conclude that fixed and mobile transmitters operating in the 2000-2020 MHz AWS-4 uplink band must attenuate emissions below 1995 MHz by 70 + 10 log

10

(P) dB. We also apply the existing measurement procedure contained in § 27.53(h) of our rules, whereby a measurement bandwidth of 1 MHz or greater is required, with an exception allowing a

smaller measurement bandwidth in the first megahertz outside the channel. This emission level is supported by the record. AT&T, CTIA, Sprint, and T-Mobile all support the need to protect PCS operations below 1995 MHz. DISH, Greenwood, Motorola, Nokia, and Sprint all support our proposed OOBE limit of 70 + 10 log

10

(P) dB below 1995 MHz for AWS-4 emissions. No commenters opposed this OOBE limit. We observe that DISH and Sprint have disagreed as to the technical standards that the 3GPP had established to protect operations in 1990-1995 MHz from interference from 2 GHz MSS/ATC operators. This disagreement was resolved on November 13, 2012 in 3GPP as −40 dBm/MHz, equivalent to 70 + 10 log

10

(P) dB, although DISH has expressed concern that Sprint might reopen this issue. We decline to insert ourselves into this dispute before an external standards organization. Given the record before us, we therefore conclude that the potential benefits of our proposals would outweigh any potential costs and adopt this out-of-band emission limit below 1995 MHz for all fixed and mobile transmitters operating in the AWS-4 uplink band.

(ii) Interference with operations in 1995-2000 MHz

41.

General Considerations.

In considering the rules that should govern potential interference between the spectrum being repurposed—here, AWS-4 spectrum—and the adjacent bands, to maximize the public interest, the Commission must consider the value of potential uses in both bands. We are thus generally disinclined to treat an adjacent band as a permanent guard band, which, by definition, would preclude most use of that spectrum for the provision of full flexible use service to the public, or as a limited use band, which would have considerably less economic value than would a full flexible use band.

42. Here, one of the adjacent bands—the 1995-2000 MHz portion of the H block—is not in use today, but Congress has directed that it be licensed via a system of competitive bidding by February 2015. As explained below, this adjacent band raises particularly difficult technical issues because it may result in an uplink band (2000-2020 MHz) adjacent to a downlink band (1995-2000 MHz). In 2004, the Commission determined to pair the 1915-1920 MHz band with the 1995-2000 MHz band, and contemplated that the lower band would be used for mobile transmissions. In particular, the Commission determined that these bands were comparable to the 1910-1915 MHz and 1995-2000 MHz PCS bands, which are used as uplink and downlink bands, respectively. The technical rules we adopt today, therefore, are designed to protect future operations in the 1995-2000 MHz band from harmful interference by future operations in the repurposed AWS-4 band. Moreover, enabling full flexible use of the 1995-2000 MHz band may lead to the pairing of this band with the 1915-1920 MHz band, which would thereby maximize the public interest benefit of both of these five megahertz bands. Furthermore, we recognize that in establishing rules that allow the 1995-2000 MHz spectrum band to be put to its highest and best use, we also further Congress's objectives related to the use of public safety broadband spectrum in the 700 MHz band. The Spectrum Act directs that the proceeds from the auction of licenses in the 1995-2000 MHz band be deposited into the Public Safety Trust Fund, which will be used to fund FirstNet.

43. In considering the rules that should govern potential interference between the 1995-2000 MHz band, which the Commission envisions as a downlink band, and the adjacent AWS-4 uplink band, the Commission must consider the public interest benefits associated with potential uses in both bands, including, but not limited to, the net effect on the economic values of these bands, and adopt technical rules accordingly. The public interest in the 1995-2000 MHz band is almost certainly maximized if the band is used as an additional PCS band. DISH, conversely, argued first that the Commission should effectively treat the 1995-2000 MHz band as a guard band, which would eliminate most of its value. DISH then argued that the H block should not be made available for full power use, and instead could be auctioned for air-to-ground or small cell use, although both of these uses would, in our assessment, have considerably less economic value and other public interest benefits than an additional PCS downlink band. Limiting the use of the band to air-to-ground operations would be inconsistent with the Spectrum Act's direction to license the 1995-2000 MHz band for flexible use. Additionally, both the air-to-ground and small cell proposals, by precluding the possibility of full power cellular operations, would restrict the value of the band in a way that we believe does not promote the public interest in this particular instance given specific characteristics of the band and the available alternative of higher power use. All four nationwide wireless providers have broadband PCS spectrum, as do regional and rural providers, and any of these providers could use additional PCS spectrum to expand capacity. One analyst projected that the value of the paired H block would be $2-3 billion, which implies a price of at least $0.67-$1.00 per MHz POP, or $1-$1.5 billion for the downlink band. We note that economists frequently consider it a rule of thumb that the public benefit of a licensed spectrum band typically equates to about ten times its value at auction. Although as a matter of practice the Commission does not predict auction prices, we reference these figures as an indicator of the economic value or public benefit that could be derived from the spectrum, if it is usable for high power commercial services.

44. The public interest benefits of the AWS-4 spectrum, including its economic value, will also increase significantly once it is available for terrestrial use. The largest increase in value would occur if AWS-4 operations did not need to protect any adjacent bands. But that is not the case here. For example, AWS-4 operations need to comply with technical rules designed to prevent harmful interference below 2180 MHz and above 2200 MHz. However, DISH argues that, while licensees of AWS-4 authority should also be subject to technical rules for operations below 2000 MHz, these rules should not restrict AWS-4 operations even if they limit the efficient use of the spectrum below 2000 MHz. DISH identifies certain costs associated with such technical rules, including the claimed loss of the ability to use 5 MHz of uplink spectrum. Sprint suggests that this impact can be mitigated through base station receive filters, co-location of base stations, and LTE interference mitigations. DISH counters that filters would require 5 megahertz of transition band, co-location is not possible in all cases, and the LTE features mentioned by Sprint are more effective for UE-to-UE interference than base-to-base interference. DISH has not attempted to quantify the economic value of its possible loss of some of the use of this 5 MHz to society, but simply argues that there is no net gain in spectrum because the Commission would be trading 5 MHz of AWS-4 uplink spectrum for 5 MHz of H block downlink spectrum. This argument ignores the possibility of the Commission pairing 1995-2000 MHz with 1915-1920 MHz, as previously proposed and proposed again in the

H Block NPRM,

in which case making the 1995-2000 MHz band available may enable a total of 10 megahertz of spectrum by completing

the pairing. Moreover, the 1915-1920 MHz and 1995-2000 MHz bands could be used by PCS operators to expand, for example, from 5 + 5 megahertz blocks to 10 + 10 megahertz blocks, or to otherwise aggregate PCS blocks. Also, as explained below, the technical rules we adopt do not prevent the use of 5 megahertz of spectrum; rather, they merely limit its use, and make provisions for improving its usability.

45. More importantly, as explained above, the amount of spectrum is not the only question that the Commission must consider as we evaluate the rules that will govern the AWS-4 band. Rather, we must evaluate how best to serve and maximize the public interest with respect to all relevant bands. Because, as explained below, companies tend to use more downlink than uplink spectrum today, it is not clear that the loss of some uplink spectrum would significantly diminish the utility (and economic value) of the paired AWS-4 spectrum. At a minimum, it appears that the public interest benefit (including economic value) of a fully usable 1995-2000 MHz band, which the Commission envisions as a downlink PCS band, is substantially greater than that of a fully usable additional 5 MHz of AWS-4 uplink—perhaps an order of magnitude greater. This may be particularly so if the 1995-2000 MHz band is ultimately paired with the 1915-1920 MHz band and the paired band is combined with other PCS spectrum to create, for example, 10+10 megahertz of PCS spectrum.

46. Further, the Spectrum Act does not preclude auctioning the 1995-2000 MHz band. We do not reach any conclusions on the specific future use of the 1995-2000 MHz band in this proceeding; such determinations are outside its scope. However, in our role as spectrum managers we do establish rules for AWS-4 that do not preclude uses of the 1995-2000 MHz band, or prejudge it to be unusable. And, although we do not make a final determination on the use of 1995-2000 MHz, we note that arguments that it may not be auctioned under the Spectrum Act have several flaws. First, many commenters on the H block proceeding have suggested that with appropriate technical limitations, the 1915-1920 MHz band will not interfere with the 1930-1995 MHz band. Thus, such interference may not present a problem, or, if it does, the problem may be partially overcome. Second, although the Commission has proposed pairing 1915-1920 MHz with 1995-2000 MHz, the Spectrum Act does not require this, and a finding that 1915-1920 MHz cannot be auctioned due to interference with 1930-1995 MHz does not, in and of itself, release us from our obligation to auction the 1995-2000 MHz band.

47. DISH has put forward a technical proposal that it feels balances the usability of the 1995-2000 MHz band with the usability of the AWS-4 uplink band, while also speeding deployment in AWS-4 by minimizing the impact of our rulemaking on the 3GPP standards body. This proposal includes DISH voluntarily designating 2000-2005 MHz as a terrestrial guard band, proposing the Commission set an emissions limit of 60 + 10 log

10

(P) dB for AWS-4 emissions into the 1995-2000 MHz band, and asking the Commission to limit any emissions from the 1995-2000 MHz band by 79 + 10 log

10

(P) dB above 2005 MHz. As discussed further below, we decline to adopt this proposal because we find that it will not speed deployment of the AWS-4 band or allow for full flexible use of the 1995-2000 MHz band. Moreover, DISH's request that we establish OOBE limits for the 1995-2000 MHz band is not within the scope of this proceeding. Rather these limits will be addressed in our companion

H Block NPRM.

48. Consequently, while the Commission has not adopted rules for the 1995-2000 MHz band, we are adopting technical rules for the AWS-4 uplink band that we predict will, in light of the record and of our assessment of the nature and characteristics of both bands, ensure efficient use of the AWS-4 band while preserving our ability to auction licenses for operations in the 1995-2000 MHz band. Moreover, we find that the approach and the technical rules we adopt will best serve the public interest by striking an appropriate balance that will enable both the AWS-4 band and the 1995-2000 MHz band that is adjacent to the AWS-4 uplink band (2000-2020 MHz) to be used for providing flexible use services in the most efficient manner possible. In this way, we further and fully comply with our statutory mandates, including our responsibilities under the Communications Act to manage the spectrum in the public interest and Congress's specific direction regarding the 1995-2000 MHz band in the Spectrum Act. Furthermore, we recognize that in establishing rules that will enable the 1995-2000 MHz spectrum to be put to its highest and best use, we also further Congress's objectives related to the use of public safety broadband spectrum in the 700 MHz band. The Spectrum Act directs that the proceeds from the auction of licenses in the H Block, including 1995-2000 MHz, be deposited into the Public Safety Trust Fund, which will be used to fund FirstNet.

49. Therefore, as explained below, we establish carefully calibrated, limited technical restrictions on AWS-4 operations in 2000-2005 MHz, the lowest five megahertz of the AWS-4 uplink band. In particular, as explained below, we are imposing (1) increased OOBE limits at and below 2000 MHz, (2) reduced power limits for mobile terrestrial operations in 2000-2005 MHz, and (3) requirements that a licensee of AWS-4 terrestrial rights or of 2 GHz MSS rights must accept harmful OOBE interference, if any occurs, from future operations in the 1995-2000 MHz band into the 2000-2005 MHz portion of the AWS-4 and 2 GHz MSS uplink bands and harmful overload interference, if any occurs, from operators in the 1995-2000 MHz band into the AWS-4 and 2 GHz MSS uplink bands. We do this to protect future operations in the 1995-2000 MHz band from harmful interference; to ensure the possibility of flexible commercial use of that band, consistent with Congressional direction; and to strike a balance in ensuring the efficient use of both the AWS-4 and the 1995-2000 MHz bands. The Communications Act established “that the Commission's powers are not limited to the engineering and technical aspects of radio communications.” Rather, the Communications Act directs the Commission to “encourage the larger and more effective use of radio in the public interest” and to adopt “such rules and regulations and prescribe such restrictions and conditions * * * as may be necessary to carry out the provisions of this Act.” As explained below, we deem it necessary to set these technical limits to best maximize AWS-4 and 1995-2000 MHz spectrum for flexible terrestrial use by minimizing harmful interference between the bands. We believe that the technical rules we adopt today to protect against harmful interference will promote more effective and efficient use of the 1995-2000 MHz band and the AWS-4 band and we believe that the benefits of these rules will outweigh any restrictions on the use of a portion of the AWS-4 uplink band. Moreover, any restrictions on the use of a portion of the AWS-4 band would be more than offset by the considerable increase in flexibility that the authorization holders will receive in obtaining overall terrestrial use rights under the Commission's part 27 flexible use rules instead of under the existing ATC rules.

50. Finally, we adopt rules that allow for the restrictions specified above to be modified by private agreement, thereby providing a licensee of AWS-4

operating authority with the ability to utilize this five megahertz of spectrum through deployment of higher performance technologies, commercial agreements with future 1995-2000 MHz band licensees, or other means. This will also provide greater flexibility to any operators that obtain licenses for both the AWS-4 A block and the 1995-2000 MHz band, as could be the case for a licensee of AWS-4 authority who bids on the 1995-2000 MHz band.

51.

Discussion.

For AWS-4 operations in 2000-2020 MHz, we adopt an OOBE limit of 70 + 10 log

10

(P) dB at and below 2000 MHz. This limit promotes the public interest for several reasons: (1) It promotes the best and highest use of spectrum, (2) it fulfills our statutory obligations, (3) it provides consistent levels of protection for the adjacent 1990-1995 MHz and 1995-2000 MHz downlink bands, and (4) it maintains consistency with past Commission actions.

52.

Best and highest use of adjacent spectrum.

DISH has stated that a required attenuation of 70 + 10 log

10

(P) dB below 2000 MHz would have a negative impact on operations in the AWS-4 uplink band. While this is correct, we seek to balance this negative impact on a portion of the AWS-4 uplink spectrum with the positive impact on the usability of the 1995-2000 MHz band, to obtain the most efficient use of both bands, and to maximize the overall public interest. To this end, we observe that mobile broadband uses far more downlink than uplink spectrum. For example, at an FCC forum on the future of wireless band plans, Nokia Siemens Networks presented data showing a typical LTE network producing 13 times more downlink data than uplink data, while Alcatel Lucent showed 17 to 30 times more downlink data than uplink data. Accordingly, there is a more pressing need for downlink spectrum than for uplink spectrum. Therefore, a possible limited reduction in uplink capacity may not present a hardship to a licensee of AWS-4 operating authority. In addition, as discussed further below, while some of the uplink spectrum may be restricted in power, our rules do not eliminate the use of any uplink spectrum. Furthermore, extensions of existing bands can typically be put to use more cost-effectively than new bands. Finally, to the extent some spectrum may have reduced utility to address interference issues, a fixed spectrum impact will represent a larger fraction of the 5 megahertz band from 1995 to 2000 MHz than of the lower 10 megahertz block in the 2000-2020 MHz band. Therefore, because 1995-2000 MHz can be used as a small downlink expansion of the existing PCS band, while 2000-2020 MHz is the larger uplink of a new band, these factors indicate that more efficient use of spectrum can be realized by promoting usability of 1995-2000 MHz even if it decreases the usability of a limited portion of the 2000-2020 MHz AWS-4 band.

53.

Statutory obligations.

We find this OOBE limit, combined with the mobile power limits and requirement to accept interference within the 2000-2005 MHz band from lawful operations in the 1995-2000 MHz band, which we establish below, allows us to fulfill our spectrum manager role under the Communications Act by balancing the public interest goals of enabling efficient use of both the 1995-2000 MHz band and the AWS-4 band. Moreover, this limit enables us to fulfill our obligations under the Spectrum Act with regard to the 1995-2000 MHz band. The Spectrum Act requires the Commission, among other things, to make available via a system of competitive bidding the 1995-2000 MHz band. We believe it is consistent with Congress's specific direction to auction this spectrum to preserve our ability to reach a possible finding that this band should support the deployment of full, robust, commercial service—including for mobile broadband. DISH suggests that we could restrict an auction of 1995-2000 MHz to small cell operations or as part of a paired air-to-ground/ground-to-air band. We decline to so limit the potential uses of the 1995-2000 MHz band at this time, because this would likely diminish the efficiency and usefulness of the spectrum given the significant value we believe exists for high power uses in the 1995-2000 MHz band. Further, the Spectrum Act specifically calls for flexible use of 1995-2000 MHz, and limiting the band to be suitable only for small cell or air-to-ground services may improperly curtail such flexible use if full terrestrial use remains a reasonable possibility for the band. While flexible use rules that permit higher power terrestrial use could also permit small cell or air-to-ground services, the reverse is not true—a band limited to either of those uses could not also be used for full power terrestrial operations. DISH fails to explain how we can fulfill our statutory obligation to make the 1995-2000 MHz band available for flexible use via a system of competitive bidding without a strong OOBE limit. Moreover, it is not clear if either small cell or air-to-ground use would result in an improved interference environment as compared to full power use. Should the Commission ultimately determine, in the forthcoming proceeding on this band, to limit the permissible services in this band, DISH or any other party is free to petition us to revisit the technical rules we adopt herein.

54.

Consistent Protection Levels.

To promote more effective and efficient use of the 1995-2000 MHz band, we believe the same OOBE limit the Commission adopted to protect current PCS operations below 1995 MHz—70 + 10 log

10

(P) dB—will be both necessary and sufficient to protect future operations in the 1995-2000 MHz band. This creates consistency in our rules, by affording the 1995-2000 MHz band the same protections as the existing PCS band.

55.

Past Commission Actions.

The Commission has long sought to put the 1995-2000 MHz band to productive commercial use. In 2004, 2007, and 2008, the Commission undertook efforts to make this spectrum available for full flexible use. We therefore reject the approach advocated by some that the 1995-2000 MHz band should be used as a guard band between the extended PCS downlink band from 1990-1995 MHz and the AWS-4 uplink band. Setting aside this block for no use is directly at odds with the Commission's past actions. Further, in 2010, the National Broadband Plan recommended that the Commission make this band available through auction. Thus, the public has long been on notice that the 1995-2000 MHz band is not intended for use as a guard band. Such notice significantly predates the current MSS licensee's acquisition of DBSD and TerreStar in 2011.

56.

The Record.

The proposed OOBE limit of 70 + 10 log

10

(P) dB at and below 2000 MHz received some support in the record. For example, Sprint supports this OOBE level as necessary to protect the 1995-2000 MHz band. U.S. Cellular proposed a limit of 70 + 10 log

10

(P) dB at and below 2000 MHz to protect the 1995-2000 MHz band. Several other commenters indirectly support an OOBE limit of 70 + 10 log

10

(P) at 2000 MHz, which will be five megahertz away from full power use of the AWS-4 uplink band, by stating that this level is necessary to protect PCS operations below 1995 MHz without assuming any reduction in power between 2000-2005 MHz. To achieve this level of protection for the 1995-2000 MHz band without applying this OOBE limit at 2000 MHz and lower power limits in 2000-2005 MHz, we would need to create frequency separation between the 1995-2000 MHz band and the AWS-4 uplink band. For the reasons explained above,

however, we decline to shift the AWS-4 uplink band up 5 megahertz (or more) to 2005-2025 MHz. DISH makes several arguments objecting to this OOBE limit as unprecedented, unnecessary, and restrictive. DISH also asserts that this limit would affect AWS-4 operations, including negative impacts for AWS-4 devices, rendering 25% of the AWS-4 uplink unusable, slowing DISH's deployment due to delays in the 3GPP standards process, requiring as many as 15-30% additional sites for licensees of AWS-4 authority, and not creating a net gain of spectrum for broadband. DISH proposed that we instead adopt an OOBE limit of 43 + 10 log

10

(P) dB at 2000 MHz and separately that we adopt an OOBE limit of 60 + 10 log

10

(P) dB at 2000 MHz. We are not persuaded by these arguments.

57. We adopt the specific level of 70 + 10 log

10

(P) dB because it provides a reasonable level of protection for the 1995-2000 MHz band, there is directly applicable precedent in the existing protection of the PCS G block from MSS/ATC, and it is superior to other attenuation levels raised in the record. As DISH correctly notes, the interference from the AWS-4 uplink to operations in the 1995-2000 MHz band is likely to be mobile-to-mobile interference, and is therefore probabilistic, meaning the probability of interference depends on the likelihood of the interfering and victim mobiles passing close enough to each other under the right conditions. However, determining that interference is probabilistic does not mean that it should be ignored; rather, it means that rules should be set to ensure that the probability of interference is reasonably low. To evaluate this probability, we make reasonable assumptions about interference and look at the separation needed between mobile devices to prevent interference with those assumptions. A larger resulting separation indicates a higher likelihood of interference. In its comments on this proceeding, Motorola proposes assumptions for the protection of the 1930-1995 MHz band that we find reasonable, with one modification, and applicable to the 1995-2000 MHz band. Using the proposed assumptions with this modification, 70 + 10 log

10

(P) dB yields a separation of 1.4 meters (under 5 feet), similar to the separation of 2 meters (about 6 feet) proposed by Motorola and the separations typically used in 3GPP standards. 70 + 10 log

10

(P) dB is also the level that Sprint recommends as necessary to protect the 1995-2000 MHz band. As another reference point, 3GPP adopts a similar but more stringent level of 80 + 10 log

10

(P) dB for the protection of mobile receivers from mobile transmitters in most cases.

58. DISH's initial proposal of 43 + 10 log

10

(P) dB does not provide adequate protection to the 1995-2000 MHz band. Applying the same calculations to the level of 43 + 10 log

10

(P) dB yields a separation of 32 meters (over 100 feet). This represents a dramatic increase in the probability in interference, because it is far more likely that two mobiles will pass within 100 feet of each other, rather than 5 feet of each other.

59. Although DISH provides more technical support for its later proposal of 60 + 10 log

10

(P) dB, including references to two 3GPP submissions, from Qualcomm and Intel respectively, and one CEPT (European Conference of Postal and Telecommunications Administrations) study that proposed levels less stringent than 60 + 10 log

10

(P) dB in various situations, we observe that applying the above assumptions to the 60 + 10 log

10

(P) dB level would result in a separation of 14 meters (about 46 feet), an unacceptably high separation compared to industry norms. In addition, each of these studies considers a different case than we consider here, and thus is not directly applicable. Finally, we note that despite these studies, 3GPP has adopted the level of 80 + 10 log

10

(P) dB for the protection of the vast majority of bands, and offering a level of only 60 + 10 log

10

(P) dB may not allow full use of the 1995-2000 MHz band. Further, DISH argues that independent of the OOBE level, interference can only occur 0.25% of the time. However, DISH offered no data to support its conclusions. In sum, contrary to DISH's assertions that this emission limit is not necessary to protect the 1995-2000 MHz band, we find attenuating OOBE in 1995-2000 MHz by a factor of 70 + 10 log

10

(P) dB will provide needed protection to the 1995-2000 MHz band.

60. In addition to providing reasonable protection from interference, 70 + 10 log

10

(P) dB is the level the Commission has already determined appropriate for protection of PCS operations below 1995 MHz, and given the expected similarity of operations in the 1995-2000 MHz band, this level is also applicable to AWS-4 emissions into the 1995-2000 MHz band. DISH suggests that this is not an applicable precedent because it was previously applied at 5 megahertz separation from the MSS/ATC band, not at the band edge. DISH suggests that precedents such as 60 + 10 log

10

(P) dB, 55 + 10 log

10

(P) dB, or 43 + 10 log

10

(P) dB are more relevant. We disagree with DISH because we find that the interference in the 1995-2000 MHz band will be driven by the AWS-4 OOBE into the 1995-2000 MHz band itself, not by the emission levels of the transmissions outside these frequencies. Therefore, the frequency separation from the band edge is not determinative of establishing the OOBE limit. In addition, the 60 + 10 log

10

(P) dB level is from a study of TDD to FDD interference released by the Commission's Office of Engineering and Technology (OET), which did not result in the adoption of this limit into our rules. Although this study considers a similar case of mobile-to-mobile interference, the difference results from differing assumptions, including assumptions that the victim handset is using UMTS and can tolerate an interfering signal 11.8 dB stronger than its desired signal. LTE mobiles, however, cannot necessarily tolerate such high levels of interference, and we find, in agreement with the modified Motorola assumptions discussed above, that the interfering signal should be no stronger than the mobile's noise floor. Applying this one change to the assumptions of the OET study would result in level of at least 71 + 10 log

10

(P) dB. DISH also argues that the 55 + 10 log

10

(P) level, used in BRS, is a similar case of TDD to FDD interference. There are many differences between the BRS band and the 1995-2000 MHz band, including the flexibility of BRS operators to synchronize their systems to avoid interference and the greater ease of achieving frequency separations in a 194 megahertz band. In addition, we note that the BRS rules apply a level of 67 + 10 log

10

(P) to fixed stations in the event of interference complaints, much closer to the 70 +10 log

10

(P) level we adopt here. Further, as discussed above, the 43 + 10 log

10

(P) dB level does not provide adequate protection from interference in this case and so is not appropriate here.

61. Although applying this limit of 70 +10 log

10

(P) dB at the edge of the AWS-4 band may be more restrictive than applying it at 1995 MHz and below, we find DISH's assertions that adopting this limit at and below 2000 MHz would increase the cost of mobile devices, require significant power reductions, and require a roll-off region to be poorly supported and unpersuasive. DISH did not quantify these hardships with specific cost numbers, filter insertion losses, power reduction requirements, or the amount of spectrum impacted. Nor did DISH explain what factors would increase the cost of the mobile devices, so it is not clear if these impacts would be independent of or

additive to one another. For example, there is a trade-off between filter roll-off and filter cost (and therefore device cost), so it may not be reasonable to assert both hardships will result. Further, we note that to the extent there is a roll-off region or power reduction region, these reduce the power in the lower part of the AWS-4 uplink band, but do not necessarily render it unusable. For example, if there is reduced coverage in the first 5 megahertz, it may still be usable for capacity in areas of good coverage. In fact, with technological advancements it may be put to use dynamically. For example, a base station scheduler using a 10 megahertz carrier in 2000-2010 MHz could assign mobiles in good signal conditions (and therefore requiring less power to close the link) to the lower 5 megahertz, and mobiles in poor signal conditions (requiring higher power) to the upper 5 megahertz, thereby making use of all of the spectrum.

62. Similarly, we find to be flawed DISH's arguments that the limit of 70 + 10 log

10

(P) dB at and below 2000 MHz would render 25% of the AWS-4 uplink spectrum unusable and increase AWS-4 deployment costs by 15-30% DISH's argument for rendering 25% of the uplink unusable actually asserts that base station operations in the 1995-2000 MHz band would potentially overload its AWS-4 base station receivers; DISH does not make an argument based on the AWS-4 uplink OOBE limit. Therefore, this argument is not relevant to the OOBE limits on AWS-4 devices. However, we do discuss potential interference from the 1995-2000 MHz band to AWS-4 base stations below. Similarly, DISH argues that the anticipated OOBE from 1995-2000 MHz band transmitters above 2005 MHz will require additional site builds where colocation is not possible, and makes some high-level, general statements that the impact represents about a 15% increase in the number of sites to be built. This is also not relevant to the limit of 70 + 10 log

10

(P) dB at 2000 MHz for the AWS-4 uplink. The technical requirements for base stations in the 1995-2000 MHz band are outside the scope of this Report and Order and will be addressed in the

H Block NPRM.

63. We also find for the reasons stated above that, to the extent imposing a limit of 70 +10 log

10

(P) dB at and below 2000 MHz does have some negative impact on the usability of the AWS-4 uplink, this impact is balanced by the increased utility of the 1995-2000 MHz band. DISH argues that its claimed loss of 25% of its uplink spectrum to enable the full flexible use of the 5 megahertz of the 1995-2000 MHz band will result in no net increase in the amount of spectrum available for broadband. However, this claim overlooks the fact that if 1995-2000 MHz is paired with 1915-1920 MHz, the calibrated restrictions we place on AWS-4 may enable the Commission to make available 10 megahertz of broadband spectrum. Moreover, the restrictions would still allow the full use of at least 5 megahertz (if not more) of uplink (

i.e.,

at least 2005-2010 MHz of the 2000-2010 MHz uplink segment) and the full 10 megahertz of paired downlink spectrum (

i.e.,

2180-2190 MHz). This would not be the case if the restrictions at issue were imposed on 1995-2000 MHz in a scenario where that spectrum is only paired with another 5 megahertz. And, even if 1995-2000 MHz becomes an unpaired downlink band, DISH's argument rests on the assumption that 5 megahertz of uplink in the 2000-2020 MHz band is equivalent to 5 megahertz of downlink in the 1995-2000 MHz. As discussed above, this argument is flawed, because (1) there is more need for downlink spectrum than uplink spectrum, (2) the restricted use of 5 megahertz would have less of an impact to a 10 or 20 megahertz carrier in the AWS-4 band than it would to a 5 megahertz carrier in the 1995-2000 MHz band, including a carrier that would use the 1995-2000 MHz band to expand an existing use of the PCS band, (3) given the downlink-limited nature of broadband capacity, the loss of 5 megahertz of uplink spectrum in a band with two paired 10 + 10 megahertz blocks may have no impact on actual network capacity, and (4) an extension of an existing band is more easily utilized than a new band.

64. We are also not convinced by DISH's argument that adopting this limit will protect and favor an unassigned band over an assigned band. Because there has been no deployment of terrestrial services, devices, or base stations in either band, we find this argument unpersuasive. DISH further argues that adopting this limit places “the entire burden” on AWS-4, and that imposing this limit is premature and an attempt to predetermine the rules for the 1995-2000 MHz band. We disagree. We do not set rules for 1995-2000 MHz in this proceeding; rather, we set some limitations on AWS-4 which are balanced by promoting the usability of the 1995-2000 MHz band.

65. In addition, the likely practical impact of technical protections for the 1995-2000 MHz band in the AWS-4 uplink is small. We are not reclaiming any spectrum; rather, we are implementing an OOBE limit that may reduce the power levels on some uplink spectrum. As discussed above, with newer technologies such as LTE, power reductions of a portion of a carrier do not prevent it from being put to use in some portions of a cell and augmenting capacity. Further, current broadband networks use far more downlink capacity than uplink capacity. Based on prevailing traffic patterns, a licensee of AWS-4 authority with 20 MHz of downlink capacity is very likely to have excess uplink capacity in any case. DISH states that this line of reasoning is “misguided”, because DISH needs 40 megahertz to compete, and needs “more spectrum, not less.” However, DISH fails to address the asymmetry of traffic, and only makes the blanket statement that it needs more spectrum. Of course, like all operators, DISH is free to acquire more spectrum as needed, and in fact we observe that DISH has spectrum in other bands, including in the 700 MHz Band. In any case, we are creating 40 megahertz of terrestrial rights. Although the rules we adopt may limit the power levels in part of the uplink spectrum, they do not prohibit its use, and as discussed below, they leave room for the licensee of AWS-4 operating authority to find technical or business approaches to increase the utility of the uplink spectrum if needed.

66. Finally, we find DISH's arguments that adopting this emission limit would delay its deployment time frame by causing delay in equipment standards in 3GPP to be unpersuasive. First, the Commission has historically not based its decisions regarding the appropriate technical rules for a wireless service merely on the potential of those decisions to delay the development of private party technical standards. Second, DISH is not required to await 3GPP standards resolution to design, test, and deploy equipment, particularly if it is the only operator in the band. Rather, a decision to wait until 3GPP has established final standards is an internal business decision, not a delay imposed by the Commission's development of technical rules for the service. Third, the only change necessary in the 3GPP standard would be modifying band 23 to accommodate the emission limit at 2000 MHz (and the power limits for operations in 2000-2005 MHz); many of the other parameters for this band (

e.g.,

OOBE at 2020 MHz; duplex spacing; frequencies; channel numbers; and so forth) could remain the same. Sprint has indicated that this additional work should take less than 6 months, and it has stated its commitment to facilitating relevant work in 3GPP. Fourth, DISH can also

mitigate a delay in obtaining final standards in several ways. For example, in its comments, DISH identifies several groups of tasks that would need to be completed prior to the launch of service, but states that the task groups must be performed serially, taking four years in sum. We do not believe that either engineering or business practices require these tasks be completed in a serial process; rather, we believe that they can be accomplished in part in parallel. Indeed, in the WCS proceeding, AT&T indicated that about half of the time needed to develop standards would overlap with equipment design and equipment testing. If DISH were to apply a similar level of overlap to the tasks it outlines, it would still be able to meet its proposed 4 year timeline for launching service. In sum, while DISH makes unsupported, speculative, and vague statements as to the possible impact of 3GPP timing on its market entry, the impact of not adopting these rules is clear and detrimental to the public interest.

67. As discussed above, DISH also proposed a combination of rules and commitments that it says will allow full use of the 1995-2000 MHz band while preventing any 3GPP delay. In addition to finding above that this proposal does not facilitate full flexible use of the 1995-2000 MHz band, we also find that it does not reduce the likelihood of 3GPP delays. DISH bases its argument on its assertion that integration of an external duplexer will allow it to meet a level of 60 + 10 log

10

(P) dB without changing the design of its chipset. However, as DISH has pointed out, the 3GPP standards contain the current ATC rule for OOBE in 1995-2000 MHz in the device co-existence table, and regardless as to whether the limit is 60 + 10 log

10

(P) dB or 70 + 10 log

10

(P) dB, 3GPP may choose to update this table and evaluate the impact of the new level on device design. Further, since the level of 60 + 10 log

10

(P) dB affords less protection than 70 + 10 log

10

(P) dB, it may create more contention and delay in 3GPP than our proposal. In summary, we do not find support in the record that adopting a level of 60 + 10 log

10

(P) dB will bring operations in the AWS-4 band to market sooner than the attenuation of 70 + 10 log

10

(P) dB that we do adopt.

68.

Private Agreements.

We recognize that technological improvements in devices in the 1995-2000 MHz band, as well as willingness on the part of licensees of the 1995-2000 MHz band to accept a higher probability of interference, could reduce the need for OOBE restrictions in 1995-2000 MHz. Therefore, we allow for licensees of AWS-4 authority to enter into private operator-to-operator agreements with all 1995-2000 MHz licensees to operate in 1995-2000 MHz at OOBE levels above 70 + 10 log

10

(P) dB.

69.

Summary.

We find that while DISH argues that the imposition of an OOBE limit of 70 + 10 log

10

(P) dB on AWS-4 uplink operations will render 5 megahertz of the AWS-4 uplink unusable and create delays in 3GPP, these arguments are unsupported, speculative, and vague, and in some cases not relevant to the uplink OOBE limit. Similarly, we do not find DISH's recent proposal of 60 + 10 log

10

(P) dB at 2000 MHz to be an appropriate limit. While we acknowledge that imposition of the limit of 70 + 10 log

10

(P) dB may have a negative impact on the usability of a portion of the AWS-4 uplink band, this is more than offset by the public interest benefits of increasing the usability of the 1995-2000 MHz band. Moreover, some of DISH's objections are not relevant to the OOBE limit on the AWS-4 uplink, but instead have to do with power and OOBE for operations in the 1995-2000 MHz band. As discussed below, DISH in fact does also suggest OOBE and power limitations for the 1995-2000 MHz band. As discussed elsewhere, we have had an open proceeding since 2004 that proposed full power use in 1995-2000 MHz, and an OOBE limit of 43 + 10 log

10

(P) dB for H block transmitters. Therefore, DISH has been aware of these issues for some time. These issues, moreover, can be addressed in the

H Block NPRM.

Further, even if our actions do in fact create only 15 megahertz of usable uplink for terrestrial use, this Report and Order still creates a large increase in the overall utility of this spectrum. That is, 15 megahertz of full usable terrestrial uplink can be put to more productive use than 20 megahertz of MSS/ATC uplink spectrum. For example, one commenter suggested that this conversion creates billions of dollars in value. For all these reasons, we find that requiring an attenuation of 70 + 10 log

10

(P) dB at and below 2000 MHz is appropriate for the AWS-4 uplink.

70. Finally, we decline to address the request by DISH that we clarify that the existing linear interpolation of the OOBE between 2000 MHz and 1995 MHz should be calculated in watts, rather than in dB. Because we adopt a flat OOBE limit across 1995-2000 MHz, this issue is moot, and we do not make a determination on it.

71.

Measurement Procedure.

We adopt the measurement procedure set forth in Section 27.53(h) of our rules to determine compliance with this limit. This section requires a measurement bandwidth of 1 megahertz or greater with an exception allowing a smaller measurement bandwidth in the first megahertz adjacent to the channel.

72. In sum, in order to maximize the public interest, comply with Congressional direction, and best balance the most efficient use of all relevant spectrum bands, including enabling future operations in the 1995-2000 MHz band and creating a useful AWS-4 band, we set the OOBE limit of 70 + 10 log

10

(P) dB at all frequencies at or below 2000 MHz.

(iii) Interference with operations in 2020-2025 MHz

73. We conclude that the 43 + 10 log

10

(P) dB OOBE limit and the measurement procedure set forth in § 27.53(h) are appropriate for protecting the 2020-2025 MHz band. No commenters opposed this proposal. Thus, for the reasons articulated in the

AWS-4 NPRM,

77 FR 22720, Apr. 17, 2012, and in the

ICO Waiver Order,

74 FR 29607 (Jun. 23, 2009), we find that this OOBE limit remains appropriate.

(iv) Interference with operations above 2025 MHz

74. We conclude the 43 + 10 log

10

(P) dB OOBE limit and the associated measurement procedure defined in § 27.53(h) are appropriate for protecting federal operations and BAS and CARS operations at 2025-2110 MHz. This limit is consistent with the record and no commenters disagreed with a 43 + 10 log

10

(P) OOBE limit above 2025 MHz, thus we conclude the record indicates that the benefits of the proposal outweigh any potential costs. Thus, we find it appropriate to continue to apply the 43 + 10 log

10

(P) OOBE limit and its associated measurement procedure that has effectively been in place since 2009.

(v) Interference with operations below 2180 MHz

75. We adopt an OOBE limit of 43 + 10 log

10

(P) dB to protect wireless systems that will operate below 2180 MHz. This conclusion is supported by the record. Furthermore, we anticipate future operations in the 2155-2180 MHz band will be similar in design and use to cellular and PCS systems, in which the 43 + 10 log

10

(P) dB limit has been used effectively in limiting adjacent channel interference between systems operating in the same direction (

e.g.,

downlink next to downlink). We therefore adopt the 43 + 10 log

10

(P) dB OOBE limit below 2180 MHz for all transmitters operating in the 2180-2200 bands. With no commenters opposing this emission limit, we further conclude

that its benefits outweigh any potential costs.

(vi) Interference with operations above 2200 MHz

76.

Background.

In the

AWS-4 NPRM,

the Commission sought comment on the appropriate OOBE limit for licensees of AWS-4 downlink spectrum at 2180-2200 MHz in order to protect adjacent block operations, including federal operations at 2200-2290 MHz. The Commission observed that the part 25 rules set forth strict emission limitations (-100.6 dBW/4 kHz EIRP) in the 2180-2200 MHz band, including at the 2200 MHz band edge. The rules also prohibit the location of 2180-2200 MHz base stations within 820 meters of a Federal earth station operating in the 2200-2290 MHz band. In 2009, however, the Commission waived the part 25 emission limit (-100.6 dBW/4kHz EIRP) rule for one of the 2 GHz MSS/ATC licensees with regard to operations at or above 2200 MHz; instead of the rule, that licensee was required to satisfy the terms of an operator-to-operator agreement between the MSS/ATC licensee and certain federal operators in the 2200-2290 MHz band. That agreement specified that, in certain circumstances, the MSS/ATC licensee was required to satisfy the part 25 emission limit, but in other circumstances, only had to satisfy the standard Commission emission limit of 43 + 10 log

10

(P) dB. In December 2012, DISH and federal users of the 2200-2290 MHz band entered into an operator-to-operator agreement, which the National Telecommunications and Information Administration (NTIA) of the U.S. Department of Commerce transmitted to the Commission. The agreement specifies that DISH (through its subsidiaries, as appropriate) will operate each base station in the 2180-2200 MHz band such that the power spectral density (PSD) of the signal received at existing Federal earth stations and aeronautical mobile telemetry (AMT) stations shall not exceed agreed upon levels. The agreement also contains provisions for addressing the operation of 2180-2200 MHz base station relative to new federal stations to be deployed in the 2200-2290 MHz band.

77.

Discussion.

We adopt the following approach for protecting Federal operations in the 2200-2290 MHz band from harmful interference from AWS-4 operations in the 2180-2200 MHz band. First, as discussed further below, we permit AWS-4 operators and Federal operators to enter into an operator-to-operator agreement that will specify terms of the permissible AWS-4 OOBE limits and/or maximum actual AWS-4 emissions to be received at the sites of Federal operations in the 2200-2290 MHz band. Second, we establish default OOBE limits for AWS-4 operations into the 2200-2290 MHz band in the event such private agreement were not in effect (

e.g.,

the agreement was terminated pursuant to its terms); AWS-4 licenses return to the Commission (

e.g.,

for a licensee's failure to meet the construction requirements).

78. We adopt this approach after careful analysis of the options before us. As explained above, the current ATC regime for protecting Federal operations in the 2200-2290 MHz band is a mix of Commission rules, waiver orders, and operator-to-operator agreements. As a result, the two MSS/ATC licensees have different interference protection requirements with respect to Federal operators in the 2200-2290 MHz band. Further, as noted above, during the course of this proceeding, the current 2 GHz MSS/ATC licensees (and prospective AWS-4 licensees) entered into an operator-to-operator agreement with Federal operators in the 2200-2290 MHz band. It is against this backdrop that we promulgate OOBE rules for AWS-4 base station emissions into the 2200-2290 MHz band, which, like the ATC regime, will both set clear rules and allow licensees of AWS-4 operating authority to deviate from those rules by entering into operator-to-operator agreements, which will be transmitted to the Commission by NTIA.

79. First, we permit, but do not require, licensees of AWS-4 authority to enter into operator-to-operator agreements with Federal operators at 2200-2290 MHz to address the attenuation of emissions from AWS-4 base stations operating at 2180-2200 MHz into the adjacent Federal band, so long as such agreements do not otherwise run afoul of other Commission rules. We observe that the existing MSS/ATC licensees and federal users of the 2200-2290 MHz band have already effectuated such an agreement on what they, as actual operators, find to be the best environment to avoid actual harmful interference. We applaud the adjacent Federal and non-Federal operators for reaching this agreement and, with this Report and Order, provide a foundation for this agreement and other similar agreements that might be reached in the future without the need for a waiver or other special permission from the Commission. Therefore, we permit the DISH-Federal Agreement to govern AWS-4 base station emissions from 2180-2200 MHz into the 2200-2290 MHz band. Specifically, when, as discussed below, the licenses held by the current 2 GHz MSS licensees are modified to include AWS-4 service, we will include as conditions to such license modifications the requirement that the licensees of AWS-4 operating authority must comply with the DISH-Federal Agreement with regard to the permissible AWS-4 emissions into the 2200-2290 MHz band and/or the maximum actual AWS-4 emissions to be received at the specified sites of Federal operations in the 2200-2290 MHz band. To ensure that this agreement, and any subsequent agreements are consistent with other Commission rules and do not impede the operation of secondary markets, we require that the licensee of AWS-4 authority who is a party to an operator-to-operator agreement maintain a copy of the agreement(s) in its station files and disclose it, upon request, to prospective AWS-4 assignees, transferees, or spectrum lessees, to Federal operators in the 2200-2290 MHz band, and to the Commission.

80. Second, to ensure that OOBE limits are established in the event such private agreements are not entered into or do not address all situations between AWS-4 operations in the 2180-2200 MHz band and Federal operations in the 2200-2290 MHz band, we establish default OOBE limits for AWS-4 emissions into the 2200-2290 MHz band. Because the record does not contain any technical justification to support any specific OOBE limit, and because the Commission did not propose a specific limit in the

AWS-4 NPRM,

we adopt the protection levels contained in the ATC rules relative to protection of Federal operations in the 2200-2290 MHz band. Accordingly, AWS-4 base stations operating in 2180-2200 MHz shall not exceed an EIRP of -100.6 dBW/4 kHz for emissions into the 2200-2290 MHz band. Further AWS-4 base stations operating in 2180-2200 MHz may not be located less than 820 meters from a U.S. Earth Station facility operating in the 2200-2290 MHz band.

81. Finally, to avoid possible confusion between the operation of an operator-to-operator agreement and the default OOBE limit, we clarify the application of our rules in the event that (1) an operator-to-operator agreement ceases to operate (for whatever reason) or (2) is operative for less than the entire universe of AWS-4 licenses or Federal operations in the 2200-2290 MHz band. In either case where the agreement is not in effect, the licensee of AWS-4 operating authority must comply with the default rule. For example, should the DISH-Federal Agreement terminate

for any reason, DISH (assuming it is the licensee of AWS-4 authority) would be required to operate pursuant to the default rule.

82. To ensure that AWS-4 base stations would be able to operate pursuant both to an operator-to-operator agreement and to the default rule, equipment manufacturers may seek equipment authorization for equipment designed against either the OOBE limit in the default rule, the OOBE limit in an executed operator-to-operator agreement between a licensee of AWS-4 authority and Federal operators in the 2200-2290 MHz band (which must provide at least 43 + 10 log

10

(P) dB of attenuation), or both, except as specified below. We shall approve or deny the equipment authorization, based on testing against whichever (or both) OOBE the manufacturer requests.

83. We recognize, however, that equipment designed to operate to the stricter default OOBE limits will also comply with any more relaxed OOBE limit contained in an operator-to-operator agreement. In the case where equipment is intended to be operated at either the default or the relaxed limits, we believe the equipment will be either modified or adjusted by the manufacturer or in the field. That is, we expect the equipment to have more than one mode of operation in this case. We require the application for equipment authorization for such equipment to clearly demonstrate compliance with both limits. If at the time of authorization the equipment is only approved for compliance with one limit, but is expected to be modified subsequently by the manufacturer to operate in another mode either in the factory or in the field, the original equipment must be approved to permit such changes or meet such changes as allowed in the permissive change rules for equipment authorization.

84. In addition, a licensee in the AWS-4 band may operate its base stations consistent with its operator-to-operator agreement only if such an agreement is in effect. In any other situation, including where such an agreement existed, but has been terminated (for whatever reason), the licensee must operate AWS-4 base stations that have obtained equipment authorization based on the default rule. To the extent that a licensee of AWS-4 authority that is a party to an operator-to-operator agreement installs and operates bases stations that are authorized against an OOBE limit that is less stringent than the default rule, that licensee is solely responsible for ensuring that its equipment would be authorized to operate in the event that the agreement terminates (for whatever reason).

(vii) Interference with Global Positioning Systems (GPS) operations

85.

Background.

In the

AWS-4 NPRM,

the Commission observed that the current Part 25 MSS/ATC rules require certain protection limits over the GPS band at 1559-1610 MHz. Specifically, the current rules require 2 GHz MSS/ATC base stations and mobile terminals to provide an EIRP limit of -70 dBW/MHz or -80 dBW/700Hz, measured over any two millisecond active transmission interval, in the 1559-1610 MHz band. The Commission also observed that different MSS/ATC bands have different frequency separations from the GPS band and sought comment on whether any special interference rules should apply to AWS-4 operations to protect GPS service.

86. Some parties submitted comments asking for tighter emissions limits over the GPS band. USGIC argued that the current part 25 OOBE limits for the protection of GPS operations at 1559-1610 MHz from terrestrial operations in the 2 GHz band are obsolete and proposed that the Commission adopt the EIRP emission limits agreed to by TerreStar and DBSD in their ATC authorization proceedings—EIRP emission limits for mobile transmitters of -95dBW/MHz for wideband signals and of -105dBW/kHz for narrowband signals, and EIRP emission limits for fixed or base station of -100dBW/MHz for wideband signals and of -110dBW/kHz for narrowband signals. Deere similarly asserted that the OOBE limits in the Part 25 rules are not sufficient to protect GPS operations at 1559-1610 MHz, observed that TerreStar and DBSD had agreed to more stringent limits, and recommended that the Commission “further study this issue and consider an update to the OOBE limit” that should be applied to AWS-4 operations. On September 27, 2012, DISH and USGIC submitted a letter agreement in which DISH agreed to limit its OOBE EIRP densities over the 1559-1610 MHz band to the limits contained in USGIC's comments.

87. Other parties opposed the addition of GPS specific protection limits for AWS-4 operations. CTIA stated that GPS protection limits are not necessary for AWS-4 operations because the AWS-4 band is located several hundred megahertz away from the GPS band. CTIA further observed that operations in bands much closer to the GPS frequencies, such as the AWS-1 band (1710-1755 MHz; 2110-2155 MHz), operate with an OOBE limit of 43 + 10 log

10

(P) dB into the GPS band and these operations have not given rise to any complaints of interference to GPS. Instead of adopting OOBE limits, either by rule or by license condition, CTIA recommended that the Commission continue its recent efforts to examine receiver performance and noted that the Commission had recently held a workshop on receiver performance issues. LightSquared also stated that the Commission should focus its efforts to protect GPS by examining GPS receiver reliability standards. Greenwood claimed that the -105dBW/MHz EIRP limit would be reasonable if implemented over time, provided that receiver protection requirements for GPS/GNSS receivers increase to mitigate interference susceptibility. Greenwood, like CTIA, also observed that there are many millions of devices transmitting between the GPS and AWS-4 bands that operate in bands that do not have specific OOBE protection levels for GPS and that are not causing OOBE interference to GPS.

88.

Discussion.

The Commission has long recognized the importance of GPS and our responsibility to ensure that it receives appropriate interference protections from other radiocommunication services. The Commission generally supports the actions of licensees to resolve interference issues raised by other spectrum holders or users through private agreements, where, as is the case here, they are not otherwise inconsistent with Commission rules or policies. Because the prospective licensees of AWS-4 operating authority have reached a private agreement with the industry council representing GPS interests, the USGIC, we believe the most appropriate approach is to require that, as a license condition, the licensees comply with this agreement and the specific GPS protection limits contained therein. This is consistent with the USGIC's request that we “condition AWS-4 licenses with the OOBE limits jointly agreed by DISH and the USGIC.” The licenses, moreover, shall remain subject to this license condition in the event that the licensees assign or otherwise transfer the licenses to successors-in-interest or assignees. To the extent that AWS-4 licenses return to the Commission (

e.g.,

for a licensee's failure to meet the construction requirements), the Commission will, prior to reassigning such licenses, consult with NTIA about the need for specific OOBE requirements on the new licenses to protect GPS operations in the 1559-1610 MHz band.

89. In requiring the licensees comply with their voluntary agreement, we need not—and do not—reach the issue of

determining whether the record contains sufficient information on whether and, if so, at what level, to establish an OOBE limit rule for protection of GPS from AWS-4 operations. We observe that the USGIC stated that both it and its member Deere believe that the emissions limits for the GPS band for services operating in other frequency bands should be considered on a “case-by-case basis.” We make no determination as to whether the limits in the private agreement are appropriate or viable for services operating in other spectrum.

(viii) Interference with Other Bands

90. DISH suggested that we should impose emission limits on the 1995-2000 MHz block and on the 1930-1995 MHz PCS blocks, as well as power limitations for 1995-2000 MHz operations. Establishing such limits are outside the scope of this Report and Order, which sets service rules for AWS-4 spectrum, not the 1995-2000 MHz or 1930-1995 MHz bands. OOBE and power limits for the 1995-2000 MHz band will be addressed in the

H Block NPRM.

To the extent that any party seeks a change in the existing PCS rules, that party is free to petition the Commission for a rule change.

91. Nevertheless, we observe that DISH proposed that the Commission limit 1995-2000 MHz block base station operations by an attenuation of 70 + 10 log

10

(P) dB at and above 2000 MHz, and later proposed instead that such operations should be attenuated by a factor of 79 + 10 log

10

(P) dB at and above 2005 MHz. Similarly, DISH suggested that the in-band transmit power of operations in the 1995-2000 MHz band should be significantly reduced, i.e., that this should be a low power band. These proposals could reduce the usability of the 1995-2000 MHz band. Such limits appear to be inconsistent with our general finding that the public interest, consistent with the Spectrum Act, is best served by preserving the usability of 1995-2000 MHz even if there is a possibility of reduced usability of the lower portion of the AWS-4 uplink band. Thus, we caution any licensee of AWS-4 operating authority against designing or deploying its network (except at its own risk) assuming either of these levels of OOBE protection for the 2000-2005 MHz band from the 1995-2000 MHz band or low power limits in the 1995-2000 MHz band. As noted below, the Commission will not take action to protect licensees of AWS-4 operating authority from interference that arises in such a scenario. We expect that licensees and their equipment suppliers will take this warning into account when establishing technical specifications, including industry standards, and procuring equipment for the band. To the extent that satellite receivers have already been deployed, which could suffer reductions in performance if full power services are deployed in 1995-2000 MHz, we note that our proceeding proposing full power flexible use for 1995-2000 MHz has been open since 2004, before satellites operating in the 2000-2020 MHz band were launched, or even likely designed. Therefore, we expect that the satellites were designed with this overload scenario in mind and there should, therefore, be no impact to MSS. To the extent this is not the case, we do not expect to limit use of 1995-2000 MHz due to any limitations of receivers deployed after our proceeding on use of 1995-2000 MHz was opened.

2. Co-Channel Interference Among AWS-4 Systems

92. Co-channel interference rules prevent harmful interference between geographically adjacent licenses operating in the same spectrum. Specifically, to avoid this interference, the Commission adopts field strength limits that apply at the geographic edge of the license area. In the

AWS-4 NPRM,

the Commission proposed that the current AWS-1 signal strength limit be applied to AWS-4 operations. we must adopt signal strength limits here. With no commenters opposing this proposal, we conclude that the benefits of our proposal outweigh any potential costs. As we are basing our technical rules generally on AWS-1 rules where applicable, we continue to believe it appropriate to adopt the AWS-1 co-channel interference requirements for AWS-4. Thus we adopt the proposed co-channel interference levels and expand § 27.55(a)(1) of the Commission's rules to include the 2180-2200 MHz band. We observe, however, that the assignment approach we adopt below likely will result in an individual licensee obtaining assignments for geographically adjacent AWS-4 EA licenses. In such a scenario, that licensee may choose not to observe this signal strength limit between its geographically adjacent AWS-4 licenses, so long as it complies with other Commission rules and the adjacent affected service area licensee(s) agree(s) to a different field strength.

3. Receiver Performance

93. We decline to address receiver performance issues at this time due to lack of details and discussions in the record. We will continue our efforts to collaborate with multiple stakeholders on receiver performance and establish a path forward based on the various inputs from interested parties, including the final recommendations of the Commission's Technological Advisory Council, Receiver and Spectrum Working Group.

4. Power Limits

94. The Commission sought comment on appropriate power limits for terrestrial operations in the AWS-4 band. Specifically, the Commission proposed to apply existing AWS-1 power limits for both base and mobile stations in the AWS-4 bands. As discussed below, we adopt the Commission's proposed power limit for base stations. For mobile operations we adopt a power limit of 2 watts total equivalent isotropically radiated power (EIRP) with the additional constraint that total power between 2000-2005 MHz be limited to 5 milliwatts EIRP.

a. Base Stations

95. We adopt the three base station power limits. As we explain throughout this order, we base our technical rules on those in place for AWS-1 spectrum. The proposed rules are based on those for AWS-1, and we received no comments opposing the rules. Thus, we adopt the proposal to limit AWS-4 base stations to 1640 watts EIRP for emissions less than 1 MHz and 1640 watts/MHz EIRP for emissions over 1 MHz for non-rural areas; the proposal to set AWS-4 power limits for base stations operating in rural areas at the limits specified in 27.50(d)(1-2) of the Commission's rules; and the proposal that AWS-4 base stations with transmit power above 1640 watts EIRP and 1640 watts/MHz EIRP be required to coordinate with users in adjacent AWS blocks located within 120 kilometers. These power limits will help ensure robust service in the AWS-4 bands, while also helping to minimize harmful interference into other bands. No commenters opposed these proposals.

b. Mobile Stations

96. We adopt the following power limits for AWS-4 mobile operations. First, we adopt a limit of 2 watts equivalent isotropically radiated power (EIRP) for the total power of a device operating in the AWS-4 uplink. Then, to protect future operations in the adjacent 1995-2000 MHz band, we also limit the power of the portion of a device's transmission that falls into 2000-2005 MHz to 5 milliwatts. Our adoption of these requirements is based on the following technical analysis.

97. First, we consider the total mobile power for the AWS-4 uplink band. Although we generally are applying AWS-1 technical rules to AWS-4, here we adopt the 2 watt EIRP power limit proposed by DISH. No party opposed this proposal. We find that DISH is correct in its understanding of the ATC rule, and a 2 watt power limit is more restrictive than the existing ATC rules in the case of large bandwidths, which may be deployed in this band. Conversely, we note that keeping the PSD-based ATC rule would unnecessarily limit flexibility, and it could restrict the use of narrow transmission bandwidths, such as an LTE mobile transmitting on only a few resource blocks. We agree with DISH that a 2 watt EIRP for AWS-4 mobiles will provide adequate protection to PCS mobiles operating at 1990-1995 MHz.

98. Second, as discussed above, to promote the best and highest use of spectrum, to fulfill our statutory obligations, and to maintain consistency with past Commission actions, we determine that it is in the public interest to ensure the efficient and robust use of both the 1995-2000 MHz band and the AWS-4 band, even if that results in adopting targeted rules that partially limit the usability of a portion of the AWS-4 uplink band. For these reasons, above we establish specific attenuation requirements to address interference from AWS-4 OOBE into the 1995-2000 MHz band. OOBE limits do not, however, address overload issues. Overload interference can occur in a receiver when it receives signals outside of the frequencies of the desired signal, especially if they are of a much higher power than the desired signal. Overload interference can be managed by improving receiver performance through filtering or other techniques, or by placing transmit power limitations on the authorized frequencies of the potential interferer. We find below that a balance of expected improved performance for receivers in 1995-2000 MHz (relative to typical specifications) and establishing power limitations on AWS-4 operations in the 2000-2005 MHz band best mitigates the possibility of mobile-to-mobile interference from the AWS-4 uplink band to the 1995-2000 MHz band.

99. As detailed below, to establish the appropriate power limitations for AWS-4 operations in 2000-2005 MHz we make several calculations. First, we determine the signal level that future mobiles operating in the 1995-2000 MHz band can tolerate in an adjacent band, considering both the desired signal and the undesired signal levels, that is, the blocking performance. Next, we describe the user environment under which interference can reasonably be prevented. The environment defines the path losses between the interfering AWS-4 mobile and the 1995-2000 MHz receiver. Then, we establish power limits on the AWS-4 mobiles by applying the path losses to the maximum interfering signal level to work back to the allowable transmitter power.

100.

Blocking Performance.

As the Commission has not yet adopted rules for the 1995-2000 MHz band, and does not have receiver standards for comparable bands, to calculate the level of overload interference that we anticipate future mobile receivers operating in the 1995-2000 MHz band will tolerate we must turn to other sources. With the rapid adoption of 4G mobile broadband technologies, LTE is a technology commonly being deployed today. We use the 3GPP specifications for LTE user equipment (UE) operating in the nearby PCS band, band 25 (1930-1995 MHz). Although these 3GPP LTE specifications are applicable to user equipment operating in 1930-1995 MHz, not 1995-2000 MHz, and are specific to LTE devices, we feel they are a reasonable indication of the likely performance of future 1995-2000 MHz band devices.

101. In the 3GPP specifications for LTE, blocking performance is specified with a desired signal 6 dB above the reference sensitivity. For a device operating in the 1930-1995 MHz band (band 25) on a 5 megahertz channel, the reference sensitivity is −96.5 dBm. Thus, the desired signal is −90.5 dBm. Next we determine the level of the undesired signal. For interferers on the adjacent channel, the 3GPP standard specifies the ratio of the undesired to desired signal level, termed the adjacent channel selectivity (ACS), rather than an absolute blocking level. For band 25, assuming 5 MHz carriers, the ACS is 33 dB, resulting in −57.5 dBm as the level of undesired signal that the receiver must tolerate.

102.

User Environment.

The interference scenario that has been discussed in the record is where a handheld AWS-4 mobile transmitter and a handheld PCS mobile receiver are in close proximity. Based on the parameters provided in the comments of Motorola Mobility, which we find reasonable with the modification that the body loss applies to both devices as discussed above, the characteristics of this environment are:

• Mobiles are separated by 2 meters

• The mobiles are in line of sight conditions, experiencing free space path loss (FSPL)

FSPL (dB) = 20 log (d) + 20 log (f) − 27.55, where d = distance in meters and f = frequency in MHz.

For a 2 meter separation and 2000 MHz transmit frequency, this translates to FSPL = 20 log(2) + 20 log (2000) − 27.55 = 44.5 dB,

• Each mobile (TxAntGain, RxAntGain) has a combined antenna gain and head/body loss of -10 dB

• Total path losses = TxAntGain + FSPL + RxAntGain = 10 + 44.5 + 10 = 64.5 dB

103.

Power Limitation.

The allowable transmitter power for AWS-4 is thus calculated by adding the path losses of 64.5 dB to the maximum level of the undesired signal level of −57.5 dBm. Hence, we arrive at a transmitter power level of 7 dBm, which is equivalent to 5 milliwatts. Accordingly, we find that the limit on the total EIRP of AWS-4 mobiles in 2000-2005 MHz must be at most 5 milliwatts. We recognize that carriers larger than 5 MHz may be deployed in the AWS-4 spectrum, and therefore, this power limit may in some cases apply to only a portion of the total power transmitted by the mobile. Therefore, we allow a device to transmit a total of 2 watts EIRP, as long as the portion of the device's transmission in 2000-2005 MHz is limited to an EIRP of 5 milliwatts.

104.

Comparison to OOBE limit.

To confirm the appropriateness of this limit, we compare the effect of overload interference to the 1995-2000 MHz band to OOBE interference to the 1995-2000 MHz band. As discussed above, we establish an OOBE attenuation of 70 + 10 log

10

(P) below 2000 MHz for AWS-4 uplink transmissions. This corresponds to a level of −40 dBm/MHz. Applying the same isolation of 64.5 dB for 2 meters of separation, this means the level present at the 1995-2000 MHz receiver is −104.5 dBm/MHz. This is 3 dB below Motorola's suggested typical noise floor of −101.5 dBm/MHz, consisting of thermal noise of −114 dBm/MHz plus a 12.5 dB noise figure. This is an approximately 2 dB noise rise or desensitization, close to the 3 dB desensitization Motorola recommends as a threshold of interference. So the OOBE attenuation of 70 + 10 log

10

(P) and power limitation of 5 milliwatts are well balanced, with neither one allowing significantly higher probability of interference than the other.

105.

Receiver Improvements.

We note that using standard 3GPP blocking specifications, similar analysis would also imply the need for power reductions in 2005-2020 MHz. However, we believe that future

equipment for the 1995-2000 MHz band should be able to exceed these specifications, if licensees find it necessary to do so. We impose power restrictions only in the first 5 megahertz because of the difficulty of improving filter performance in the first 5 megahertz adjacent to a band.

106.

Private Agreements.

We recognize that further improvement of the performance of receivers in 1995-2000 MHz band, as well as willingness on the part of licensees of the 1995-2000 MHz band to accept a higher probability of interference, could reduce or eliminate the need for power restrictions in 2000-2005 MHz. Therefore, we allow for licensees of AWS-4 authority to enter into private operator-to-operator agreements with all 1995-2000 MHz licensees to operate in 2000-2005 MHz at power levels above 5 milliwatts EIRP. In no case, however, may the total power of the AWS-4 mobile emissions exceed 2 watts EIRP.

107.

Alternate proposal.

As discussed above, DISH also proposed a combination of rules and commitments that it says will allow full use of the 1995-2000 MHz band while preventing any 3GPP delay. In particular, part of this proposal is that DISH will designate 2000-2005 MHz as a terrestrial guard band, and DISH's devices will not transmit on those frequencies. DISH suggests that this will create more certainty for potential bidders on the1995-2000 MHz band than a power limitation such as we adopt here, and that its proposal will therefore increase the usability of that band. However, we do not adopt any rules prohibiting transmission in 2000-2005 MHz, as establishing calibrated technical limits with the flexibility to be modified via private agreements allows technical and business solutions that increase the usability of this spectrum if needed, whereas a rule such as proposed by DISH would foreclose any productive use of the spectrum. We also do not believe that DISH's proposal will increase the usability of the 1995-2000 MHz band over the rules we adopt here, which adequately protect the 1995-2000 MHz band through a combination of OOBE limits and power limitations.

108. In sum, we decline to adopt the proposed power limit of 1 watt EIRP for mobiles. Rather, we set power limits for mobile operations in the 2000-2020 MHz band as follows: the total power of the mobile is limited to 2 watts EIRP for emissions in 2000-2020 MHz, and is limited to 5 milliwatts EIRP for the portion of any emission that falls into 2000-2005 MHz, except as provided for by private agreement between a licensee of AWS-4 operating authority and all 1995-2000 MHz licensees. No party presented data on the costs associated with different mobile power limits. Thus, given the record before us, we conclude that the potential benefits of our adopted mobile station power limit would outweigh any potential costs.

5. Acceptance of Interference into the AWS-4 Uplink Band

109. As discussed earlier, the Commission looks to maximize the flexible use of both the AWS-4 and the 1995-2000 MHz bands to enable deployment of full, robust, commercial service for mobile broadband. And, as discussed above, to promote the best and highest use of spectrum, fulfill our statutory obligations, and to maintain consistency with past Commission actions, we determine that it is in the public interest to ensure the efficient and robust use of both the 1995-2000 MHz band and the AWS-4 band, even if that results in adopting targeted rules that partially limit the usability of a portion of the AWS-4 uplink band. To this end, we have prescribed both power and emission limits on the AWS-4 mobile transmitters to prevent interference to the mobile receivers in the 1995-2000 MHz band. The Commission anticipates that the new technical rules to be provided in a forthcoming rulemaking for operation in the 1995-2000 MHz band will address interference to AWS-4 operations. Even with appropriate technical rules and good engineering practice, where uplink and downlink operations are so closely located, there will remain a potential for base stations in the 1995-2000 MHz band to interfere with the AWS-4 base station receivers. Further, although we are not adopting rules limiting the operations of MSS mobile transmitters, the proximity of uplink and downlink operations also raises the potential for 1995-2000 MHz band base stations to interfere with MSS satellite receivers. Therefore, to the extent that future operations in the 1995-2000 MHz band, operating within the rules established for use of the 1995-2000 MHz band, cause harmful interference to AWS-4 operations or MSS operations due to either OOBE in the 2000-2005 MHz portion of the AWS-4 and 2 GHz MSS uplink band or in-band power in 1995-2000 MHz, AWS-4 and 2 GHz MSS licensees must accept this interference.

110. We emphasize that we limit the acceptance of OOBE interference to the 2000-2005 MHz portion of the AWS-4 and 2 GHz MSS bands. However, should in band interference occur due to the power in 1995-2000 MHz overloading receivers above 2000 MHz, this overload can potentially affect the entire receive band. Overload interference can be prevented by improved receive filters. Therefore, if a licensee of AWS-4 operating authority determines such filters are necessary, the impact to the uplink band is limited to the transition band of the filter, not the entire band. Such a transition band would be less than 5 megahertz, thus the impact would be limited to (at most) the 2000-2005 MHz portion of the AWS-4 bands, and there is no legacy equipment impact, as ATC service has not been deployed. Finally, we note that unlike the terrestrial service, MSS has been deployed in this band, with two satellites launched. Because both satellites were launched well after the Commission initiated the H block proceeding, we expect that they were designed with this overload scenario in mind. Therefore, there should be no impact to MSS. To the extent this is not the case, we do not expect to limit use of 1995-2000 MHz due to any limitations of receivers deployed after our proceeding on use of 1995-2000 MHz was opened.

111. Thus, for the public interest reasons discussed above and because Congress requires us to make available via a system of competitive bidding the 1995-2000 MHz band, we find that the costs of the tailored limitations on the use of the 2000-2005 MHz portion of the AWS-4 band as well as possibly some portion of the 2 GHz MSS band are outweighed by the benefits of enabling full use of the 1995-2000 MHz band and of the 2005-2020 MHz portion of the AWS-4 band.

6. Antenna Height Restrictions

112. In the

AWS-4 NPRM,

the Commission proposed that the flexible antenna height rules applicable to AWS-1 should be also applied to AWS-4 stations. In response, only DISH commented on this issue. As explained below, we adopt the Commission's proposals with minor modifications.

113.

Base Stations.

We find that, consistent with the Commission's proposal, specific antenna height restriction for AWS-4 base stations are not necessary. As discussed above, the general requirement to not endanger air navigation and the effective height limitations implicitly resulting from our co-channel interference rules obviate the need for specific antenna height restrictions for AWS-4 base stations. Additionally, the sole commenter on this issue supports the Commission's position. Thus, we find specific antenna height restrictions for AWS-4 base stations are not required.

114.

Fixed Stations.

DISH suggests that a height restriction is not necessary

for AWS-4 fixed stations, because the uplink operations of AWS-4 will be more similar to BRS/EBS than AWS-1. The 10 meter height limit was adopted in AWS-1 specifically to protect the Federal operations in the 1710-1755 MHz band and the adjacent Federal bands above and below. Outside of this specific case, the Commission has not found a 10 meter height restriction necessary for other terrestrial mobile bands, such as BRS/EBS or PCS. No other comments were received on this issue. Because the AWS-4 uplink band at 2000-2020 MHz is not adjacent to Federal operations, and to promote flexibility in the use of AWS-4 spectrum, we decline to adopt a height limitation for fixed stations in the AWS-4 uplink band.

7. Canadian and Mexican Coordination

115. Because of our shared border with Canada and Mexico, the Commission routinely works in conjunction with the United States Department of State and Canadian and Mexican government officials to ensure efficient use of the spectrum as well as interference-free operations in the border areas. Until such time as any adjusted agreements, as needed, between the United States, Mexico and/or Canada can be agreed to, operations must not cause harmful interference across the border, consistent with the terms of the agreements currently in force. The list of agreements includes the “Protocol Concerning the Transmission and Reception of Signals from Satellites for the Provisions of Mobile-Satellite Services and Associated Feeder links in the United States of America and the United Mexican States.” We note that further modifications of the rules might be necessary in order to comply with any future agreements with Canada and Mexico regarding the use of these bands.

8. Other Technical Issues

116. In addition to the specific technical issues addressed above, the Commission also proposed applying additional part 27 rules to the AWS-4 band. Specifically, the Commission proposed applying the following rule sections: §§ 27.51 Equipment authorization, 27.52 RF safety, 27.54 Frequency stability, 27.56 Antennas structures; air navigation safety, and 27.63 Disturbance of AM broadcast station antenna patterns. The Commission reasoned that because AWS-4 will be a part 27 service, these rules should apply to all licensees of AWS-4 terrestrial authority, including those who acquire licenses through partitioning or disaggregation. No commenters opposed this proposal. Accordingly, because these rules generally apply to all part 27 services, and because, as we explain below, we find it appropriate to license the AWS-4 spectrum under our part 27 regulatory framework, we conclude that the potential benefits of our proposal would outweigh any potential costs and adopt the proposal to apply these additional part 27 rules to licensees of AWS-4 authority.

C. Protection of MSS Operations

117. We adopt a rule concerning protection of MSS operations in the 2 GHz band. The rule requires that AWS-4 operations not cause harmful interference to 2 GHz MSS operations and accept any interference received from duly authorized 2 GHz MSS operations. Further, with no commenters opposing the proposed MSS protection rules, we conclude that the benefits of these rules would outweigh any potential costs. As detailed more fully below, the approach adopted also involves reliance upon rapid terrestrial build-out by the licensees, with potential loss of MSS interference protection in the event terrestrial services are not built out. This approach is incompatible with deployment of additional MSS systems in the band, and therefore we do not anticipate accepting applications for new or modified MS operations, except from an incumbent operator or its assignee or transferee. Accordingly, we delegate authority to the International Bureau to dismiss, upon acceptance by the incumbent MSS licensees of modified license authorizing AWS-4 operations, the “Consolidated Petition for Reconsideration of Inmarsat Ventures Limited and Inmarsat Global Limited,” filed January 9, 2006, in IB Docket Nos. -50220 and 05-221. That petition sought reconsideration premised on the deployment of an additional MSS system in the 2 GHz MSS bands. Finally, we observe that, should a licensee of AWS-4 operating authority who also possesses 2 GHz MSS operating authority fail to satisfy its AWS-4 Final Build-out Requirement in an EA, among other things, the MSS protection rule (discussed in this paragraph) shall not apply to that EA.

D. Assignment of AWS-4 Operating Authority

118. License assignment refers to the process by which the Commission grants an entity the right to use specified channels or frequencies of radio transmission for a specified period of time; no ownership right is conveyed to the licensee.

See

47 CFR 2.1. Sections 307-309 of the Communications Act generally govern the initial assignment of licenses.

See

47 U.S.C. 307-309. Section 316 governs the modification of Commission licenses.

See

47 U.S.C. 316. As discussed below, we propose to modify, pursuant to our Section 316 authority, the incumbent 2 GHz MSS authorization holders' licenses to include AWS-4 terrestrial spectrum rights.

119. Specifically, we propose to modify the existing MSS licenses to add part 27 rights and obligations for AWS-4 terrestrial spectrum use with all of the attendant rights, limitations, and obligations associated with the AWS-4 service rules we adopt herein. We find that a section 316 license modification approach is the best course of action because it is the most efficient and quickest path to enabling flexible terrestrial use of this band while ensuring compliance with the MSS protection rule described above.

120. As explained below, we believe that technological difficulties continue to make it impractical today for same band, separate mobile satellite and terrestrial operator sharing of this spectrum, and therefore propose to modify the existing MSS licenses so that satellite and terrestrial services are managed by the same operator. We observe, however, that it may become possible for such same band, separate operator sharing to become technically feasible in the future. For this reason, and for other reasons discussed below, we find it appropriate to permit licensees of AWS-4 operating authority to utilize the Commission's wireless secondary market mechanisms with respect to their terrestrial operating authority.

1. Background

121. In 2003, the Commission established the ATC rules, concluding that any grant of ATC authority would only be to MSS incumbents. The Commission limited ATC authority to the existing MSS licensees because, in part, it determined that separately controlled MSS and terrestrial mobile operations (

i.e.,

two ubiquitous mobile services) in the same band would be “impractical and ill-advised” as the two distinct parties would be unable to overcome technical hurdles to reach a workable sharing arrangement. Technical analyses at the time, moreover, demonstrated that granting a third party the right to use licensed MSS spectrum for terrestrial use could not occur without impacting the rights of the existing satellite licensees.

2. Discussion

122.

Section 316 License Modification.

As discussed below, we reaffirm the Commission's earlier technical findings regarding same-band, separate operator sharing between mobile satellite and terrestrial operations in this band. We believe that such a sharing scenario generally remains impractical at this time and would inappropriately affect the rights of the existing MSS authorization holders. Evidenced by the broad support among commenters for the proposed license modification approach, we conclude that the Commission's initial proposal to grant terrestrial authority to operate in the AWS-4 band to the current 2 GHz MSS licensees, through section 316 license modifications, is appropriate and will serve the public interest, convenience, and necessity.

123. Of the numerous parties who commented on this issue, only NTCH opposes the license modification procedure outright. We disagree with NTCH, and explain our reasoning below.

124.

Legal Authority.

In the

AWS-4 NPRM,

the Commission proposed modifying the 2 GHz MSS licensees' authority to operate in the AWS-4 bands by adding the authority to operate part 27 terrestrial services. This approach is consistent with the Commission's broad license modification authority, existing precedent, and the record. We therefore adopt the Commission's proposal to issue an

Order of Proposed Modification,

which accompanies this

Report and Order,

to modify the existing 2 GHz MSS licenses to include terrestrial operating authority in the AWS-4 spectrum upon the effective date of the service rules adopted herein.

125. Section 316 grants the Commission authority to modify a license if the modification promotes “the public interest, convenience, and necessity.”

See

47 U.S.C. 316(a)(1). The D.C. Circuit has explained the authority granted by section 316 to be a “broad power to modify licenses; the Commission need only find that the proposed modification serve the public interest, convenience and necessity.”

California Metro Mobile Communications

v.

FCC,

365 F.3d 38, 45-46 (D.C. Cir. 2004). This broad nature includes eliminating harmful interference, or the potential for such interference, as an accepted basis for ordering wholesale license modifications.

126. Numerous commenters support the Commission's proposal to exercise this authority here. For example, PIO states that the Commission “has ample legal authority under Title III * * * to modify spectrum licenses at any time.” DISH comments that the license modification is consistent with both FCC precedent and the Communications Act, and that it is within the Commission's purview to modify the authorizations under section 316. Globalstar states that courts have confirmed the broad nature of Congress's grant of authority under section 316 to modify licenses when doing so serves the public interest. Moreover, even MetroPCS, who opposes, in part, the proposed approach, comments that the Commission is within its authority to modify licenses in order to improve spectrum utilization.

127. Grant of AWS-4 terrestrial operating authority to the 2 GHz MSS licensees will expand the amount of spectrum available for stand-alone terrestrial mobile broadband by 40 megahertz, while also reducing the potential for interference between existing satellite and new terrestrial operations in the band. Both reducing potential interference and increasing spectrum available for mobile broadband serve the public interest. To further ensure that modifying these licenses serves the public interest, we impose performance requirements and other license conditions, which will help to ensure the AWS-4 spectrum is used to provide consumers with mobile broadband service. Therefore, as explained in greater detailed below, we conclude both that the Commission has the authority under section 316 to modify the 2 GHz MSS licenses to add terrestrial rights and that so modifying these licenses will serve the public interest.

128. As discussed herein, the Commission is proposing to modify the 2 GHz MSS licenses to establish more uniform configuration and duplex spacing, one that will be consistent with the configuration of the spectrum for terrestrial use. We undertake this modification pursuant to section 316, which provides the Commission with the authority to modify licenses, including by rearranging licensees within a spectrum band. As evidenced by the 800 MHz proceeding, for example, the Commission previously has exercised this authority to modify a license to include authority to operate on new frequencies—there the Commission modified Nextel's authorization to add the 1990-1995 MHz band, 70 FR 76704, December 28, 2005. Additionally, the Commission modified licenses to relocate operations of certain Digital Electronic Message Service licensees from the 18 GHz band to the 24 GHz band, in order to accommodate Department of Defense military systems, 62 FR 24576, May 6, 1997. In modifying licenses to rearrange the MSS duplex spacing, the Commission must meet the public interest, convenience, and necessity requirements of section 316, which we do here for the reasons detailed below. Here, our action to reconfigure an existing band among existing licensees is of a much more limited nature than in previous exercises of Section 316 authority, such as the 800 MHz re-banding for Nextel. Indeed, although the 2000-2020 MHz and 2180-2200 MHz bands are currently assigned to two different licensees, Gamma Acquisitions L.L.C. (Gamma) and New DBSD Satellite Services G.P. (New DBSD), both of these licensees are wholly owned subsidiaries of DISH. As the satellites are under common control, the modification and resulting recalibration of the satellites should present a minimal burden to the existing licensees. We direct these licensees to determine how to effectuate the reconfiguration of the 2 GHz MSS band into an A-B/A-B arrangement. Providing the licensees with the ability to determine how to best effectuate the MSS band reconfiguration should further limit any burden the reconfiguration places on them. Thus, we will modify the respective licenses of Gamma and New DBSD to reflect the assignment of the paired spectrum as 2000-2010 MHz paired with 2180-2190 MHz and 2010-2020 MHz paired with 2190-2200 MHz, based on the licensees' responses to the Order of Proposed Modification herein.

129.

Public Interest Considerations.

In the

AWS-4 NPRM,

the Commission expected modification of the 2 GHz MSS licenses would yield certain public interest benefits, including the removal of regulatory barriers that impede the Commission's goal of terrestrial mobile broadband services in the 2 GHz band. The Commission proposed that if current technology did not permit separate MSS and terrestrial mobile licensees, then license modifications pursuant to section 316 would make more spectrum available for broadband use and avoid harmful electromagnetic interference. As discussed below, to benefit the public interest, we adopt our proposal to modify the 2 GHz MSS licenses pursuant to section 316.

130.

Making More Spectrum Available for Flexible Mobile Use.

As the Commission has observed, the availability and quality of wireless broadband services is likely to become constrained if additional spectrum is not made available to enable network

expansion and technology upgrades. The National Broadband Plan notes that, should additional mobile terrestrial spectrum not become available, the result could be higher prices, poor service quality, an inability for the U.S. to compete effectively on an international basis, depressed demand and, ultimately, a drag on innovation. Although the Commission previously envisioned the 2 GHz MSS band being available to respond to the demand for spectrum, including through the development of the ATC regime, to date commercial use of this spectrum remains virtually non-existent. Therefore, to improve the public interest benefits of the 2 GHz spectrum, the Commission proposed authorizing terrestrial operations in this spectrum. Granting the 2 GHz MSS operators the ability to provide more and better services to both existing and potentially new subscribers with the same amount of spectrum improves the efficiency with which they can use the spectrum. For example, DISH has commented that use of this spectrum for satellite service is most likely to be in conjunction with terrestrial service.

131. We emphasize that, although our determination to grant AWS-4 authority to the incumbent 2 GHz MSS licensees will undoubtedly result in an increase in value of those licensees, such increase in value is not a basis for our decision today; rather, it is a consequence of our decision, which is intended to enable AWS-4 spectrum to be meaningfully and timely put to use in a manner that promotes the public interest. We believe that various aspects of the rules we are adopting will create additional public benefits in consideration of the increase in the spectrum value. We deem the Section 316 license modification approach the best and fastest method for bringing this spectrum to market, a position underscored by commenters. Thus, we conclude Section 316 license modifications are in the public interest.

132. Additionally, the technical requirements that we are adopting today for 2000-2005 MHz operations will help make the adjacent band, 1995-2000 MHz, available for terrestrial, flexible use, including for mobile broadband use. The Commission allocated 1995-2000 MHz for fixed and mobile use in 2003 and designated it for AWS use in 2004 as a downlink band paired with 1915-1920 MHz. The existence of uplink operations adjacent to downlink operations, however, raises interference concerns; we resolve those through the establishment of technical and interference rules above. Further, the Spectrum Act requires the Commission to license the 1995-2000 MHz band under flexible use service rules, unless doing so would cause interference to PCS licensees in the 1930-1995 MHz band. Enabling this band to be used efficiently for flexible, commercial use is consistent with this statutory requirement. Moreover, as explained above, wireless broadband traffic is asymmetrical with more downlink than uplink; thus the public interest is best served by limiting uplink operations at 2000-2005 MHz to facilitate potential downlink operations at 1995-2000 MHz, particularly where such a downlink band could become part of the workhorse PCS band. Accordingly, we conclude Section 316 license modifications are in the public interest.

133. Finally, we disagree with NTCH's assertion that the license modification approach we take is not in the public interest. NTCH argues the Commission's proposed actions are inappropriate and that we should accept competing applications for AWS-4 spectrum. NTCH, however, ignores the critical detail that same-band, separate operator sharing of the spectrum is not technically feasible at this time. Moreover, nothing we do today eliminates the existing mobile satellite allocation for the 2 GHz MSS band or limits the licensees' continued satellite use rights for this spectrum (other than certain targeted technical restrictions applicable to 2000-2005 MHz). The Commission recognized these technical hurdles when it established co-primary fixed and mobile allocations in the 2 GHz band. Therefore, to make more spectrum in this band available for flexible terrestrial use, including for mobile broadband, and thereby serve the public interest, we will authorize AWS-4 operations by the incumbent 2 GHz MSS licensees through license modifications. To the extent NTCH suggests the Commission remove the MSS allocation in the 2 GHz band, we consider that request to be an untimely Petition for Reconsideration of the

2 GHz Band Co-Allocation Report and Order.

134.

Eliminating Harmful Interference.

The Commission previously determined that separately controlled MSS and terrestrial operations (

i.e.,

two ubiquitous mobile services) in the same band would be impractical because the parties would not be able to overcome the technical hurdles to reach a workable sharing arrangement. This determination suggested that the public interest would be best served by modifying the 2 GHz MSS license to allow the satellite licensee to operate terrestrial services, rather than make the band available for terrestrial licenses under a sharing regime with MSS. As discussed below, the record demonstrates that the earlier Commission conclusion regarding the impracticality of allowing same spectrum, different operator use of the AWS-4 spectrum remains valid. The majority of commenters discussing this issue concur with the Commission's assessment that harmful interference would occur if the 2 GHz MSS and AWS-4 terrestrial spectrum rights were controlled by different entities. Thus, we conclude that the public interest is best served by modifying the 2 GHz MSS license rather than allowing shared use of the band. Accordingly, based on the record before us at this time, we decline to assign AWS-4 terrestrial rights through a system of competitive bidding.

135. One party opposes the Commission's proposal that shared use of the AWS-4 spectrum remains infeasible. MetroPCS argues that the current technology environment actually allows for sharing the AWS-4 spectrum between different operators. MetroPCS suggests that use of known technologies, such as advance coding and interference cancellation and mitigation techniques, would allow for greater interference protection for satellite handsets from terrestrial broadcasts. Additionally, MetroPCS asserts that because MSS satellites “are essentially `bent pipes,' satellite and terrestrial operators will be able to coordinate their systems in a way that was not originally contemplated when the Commission decided that sharing was not feasible.” Although MetroPCS is correct that DISH's satellites use a “bent pipe” architecture where the satellite is essentially repeating a signal generated on the ground, MetroPCS does not clarify how this would facilitate coordination. Contrary to MetroPCS's assertions, we find the record demonstrates continued technical hurdles exist. As DISH notes, although such technologies do allow for greater interference protection, they are “

only

feasible when operations are integrated * * * [and] the reverse link interference cancellation technique * * * is not a viable solution in the absence of integration, as it requires real-time knowledge of signals for this interference to be prevented.” Similarly, as NRTC notes, the technology necessary to share spectrum between two separate licensees, such as dynamic spectrum access and cognitive radios, is not market-proven for sharing mobile satellite and terrestrial operators or addressed in relevant technical standards. Other parties, such as US

GIC, comment that the Commission correctly concluded that multiple parties would not be able to overcome technical hurdles.

136. Also, the record contains no evidence that dynamic frequency coordination can be achieved today between separately-controlled MSS and terrestrial networks. Indeed, as DISH notes, no commenter—including MetroPCS—provides technical support that disputes the continued validity of the Commission's 2003 finding. Rather, as Sprint states, the record engineering analysis presented by DISH “credibly indicates that frequency sharing between separate operations could cause interference between AWS-4 and MSS equipment and transmissions.” Thus, we find that spectrum sharing between separately-licensed MSS and terrestrial operators, while perhaps possible in the future, is not viable today in this spectrum band. Consequently, we conclude that substantial technical hurdles remain, justifying authorizing AWS-4 operations by the incumbent MSS licensees.

137. We emphasize that this public interest determination is based in part on rules that will limit or potentially limit the licensees' terrestrial use of a five megahertz portion of AWS-4 spectrum to facilitate the use of 1995-2000 MHz. In particular, as explained above, we are imposing increased OOBE limits at and below 2000 MHz, reduced power limits for mobile terrestrial operations in 2000-2005 MHz, and requiring an AWS-4 A block licensee to accept interference from duly authorized lawful operations in the 1995-2000 MHz band. We do this to protect future operations in the 1995-2000 MHz band from harmful interference, to ensure the possibility of flexible commercial use of that band, consistent with Congressional direction, and to strike a balance in ensuring the efficient use of all relevant spectrum bands. The Communications Act established “that the Commission's powers are not limited to the engineering and technical aspects of radio communications.”

National Broadcast Co.

v.

United States,

319 U.S. 190, 215 (1943). Rather, the Communications Act directs the Commission to “`encourage the larger and more effective use of radio in the public interest'” and to adopt “`such rules and regulations and prescribe such restrictions and conditions * * * as may be necessary to carry out the provisions of this Act.'”

See

47 U.S.C. 303(g), (r). As explained above, we deem it necessary to set these technical limits to best maximize AWS-4 and 1995-2000 MHz spectrum for flexible terrestrial use by minimizing harmful interference between the bands. We believe the technical rules we adopt today to protect against harmful interference will promote more effective and efficient use of the 1995-2000 MHz band and the AWS-4 band and we believe that the benefits of these rules will outweigh any restrictions on the use of a portion of the AWS-4 uplink band. Moreover, any restrictions on the use of a portion of the AWS-4 band would be more than offset by the considerable increase in flexibility that the authorization holders will receive in obtaining overall terrestrial use rights under the Commission's part 27 flexible use rules instead of under the existing ATC rules.

138. Commenters did not offer specific data on the amount of benefits or costs associated with our proposed authorization of AWS-4 operations by the incumbent MSS licensees. However, because of the technical difficulties associated with coordinating between different AWS-4 licensees and the MSS licensee using the shared spectrum in the same service area, and the requirement discussed above for licensees of AWS-4 operating authority to protect 2 GHz MSS operations from harmful interference, and given the record before us and the benefits discussed above, we conclude that the potential benefits of assigning the AWS-4 spectrum rights to the existing 2 GHz MSS licensees would outweigh any potential costs.

139.

Proposed Modification.

For the reasons discussed throughout this Report and Order, we conclude that it is in the public interest, convenience, and necessity to propose modifying the existing 2 GHz MSS licenses as described in section V below. These modifications include adding part 27 terrestrial spectrum rights to the 2 GHz MSS licenses, creating more uniform duplex spacing for the MSS rights, and eliminating ATC authority from the licenses. In the unexpected event that the license modification fails to become effectuated, we will take appropriate action at that time, potentially including full reconsideration of the assignment methods contemplated in this item and based on the revised factual scenario such an occurrence would represent.

E. Performance Requirements

140. The Commission establishes performance requirements to promote the productive use of spectrum, to encourage licensees to provide service to customers expeditiously, and to promote the provision of innovative services throughout the license area(s), including in rural areas. Historically, the Commission tailors performance and construction requirements to the unique characteristics of the spectrum band at issue. For the AWS-4 band, we adopt performance requirements that will ensure that the spectrum is put to use expeditiously, while providing licensees with the flexibility needed to deploy services according to their business plans. Specifically, we require:

•

AWS-4 Interim Build-out Requirement:

Within four (4) years, a licensee shall provide reliable terrestrial signal coverage and offer terrestrial service to at least forty (40) percent of its total AWS-4 population. A licensee's total AWS-4 population shall be calculated by summing the population of each of its license areas in the AWS-4 band.

•

AWS-4 Final Build-out Requirement:

Within seven (7) years, a licensee shall provide reliable terrestrial signal coverage and offer terrestrial service to at least seventy (70) percent of the population in each of its license areas.

141. Additionally, we adopt the following penalties for failing to meet the build-out benchmarks:

•

Failure to Meet AWS-4 Interim Build-out Requirement:

Where a licensee fails to meet the aggregate AWS-4 Interim Build-out Requirement, the AWS-4 Final Build-out Requirement shall be accelerated by one year (from seven to six years).

•

Failure to Meet AWS-4 Final Build-out Requirement:

Where a licensee fails to meet the AWS-4 Final Build-out Requirement in any EA, its authorization for each EA in which it fails to meet the requirement shall terminate automatically without Commission action. To the extent that the licensee also holds the 2 GHz MSS rights for the affected license area, failure to meet the AWS-4 Final Build-out Requirement in an EA shall also result in the MSS protection rule in § 27.1136 of the Commission's rules no longer applying to that EA.

142. We adopt specific performance requirements for the AWS-4 band in an effort to foster timely deployment of flexible terrestrial mobile service in the band, and to enable the Commission to take appropriate corrective action should the required deployment fail to occur. Although the record in response to the Commission's specific performance benchmark and penalty proposals is mixed, parties generally agree that performance requirements promote the timely, productive use of spectrum. Timely deployment of wireless networks in this band is vital given the failure of any terrestrial ATC

service and failure of significant MSS to develop despite years of Commission effort to enable deployment of emerging and innovative technologies in the band.

143. We disagree with commenters who argue that our build-out requirements would be of limited value, because they either do not believe the licensee (post license modification) intends to build out using the spectrum or believe that additional conditions are needed to ensure the spectrum is utilized. As an initial matter, we observe that the incumbent 2 GHz MSS licensees generally support our seven year end-of-term build-out benchmark and have committed to “aggressively build-out a broadband network” if they receive terrestrial authority to operate in the AWS-4 band. (DISH Comments, WT Docket Nos. 12-70, 04-356, ET Docket No. 10-142, page 18.) We expect this commitment to be met and, to ensure that it is, adopt performance requirements and associated penalties for failure to build-out, specifically designed to result in the spectrum being put to use for the benefit of the public interest. We address requests for conditions in addition to performance requirements below.

144.

Benchmarks.

To ensure that a licensee provides service to consumers expeditiously, we adopt specific quantifiable performance requirements. Consistent with our approach to performance benchmarks in other bands—including the Upper 700 MHz C-block and the 2.3 GHz WCS band—we adopt objective interim and final build-out benchmarks. As explained below, after taking into account the full range of comments, we adopt an interim requirement that differs somewhat from that proposed in the

AWS-4 NPRM

and adopt the final benchmark proposal in the

AWS-4 NPRM.

145.

Interim Benchmark.

We modify the proposed interim build-out requirement in response to the record. Recognizing concerns raised by commenters that the proposal may not afford a new entrant in a new flexible use terrestrial band sufficient time to deploy its network and offer service, we extend the interim build-out requirement timeframe from three to four years. Extending the interim benchmark to four years will enable service providers and equipment vendors to deploy network infrastructure and devices based on the most advanced technologies, including the LTE-Advanced standard. This is analogous to the Commission's decision in the

2012 WCS Order

in which the Commission extended the proposed build-out requirements by six months to accommodate new technological developments. 27 FCC Rcd 13641 (2012). Extending the interim benchmark from three to four years also accommodates possible timing effects that may result from our technical findings, above, to enable use of the adjacent 1995-2000 MHz band. We also increase the population benchmark from 30% to 40%, to more closely align the benchmark with interim benchmarks in other bands. Finally, we determine that a licensee's total AWS-4 population shall be calculated by summing the population, based on the most recent decennial U.S. Census Data at the time of measurement, of each of its license areas in the AWS-4 band.

146.

Final Benchmark.

We find, consistent with the record, that a final seven-year construction milestone provides a reasonable timeframe for a licensee to deploy its network and offer widespread service. No party suggested that a longer time frame would be necessary and, indeed, DISH stated that seven years is a reasonable period for a final build-out milestone. We are not persuaded by T-Mobile's proposal that we require an expedited build-out schedule. Although we expect it is possible for a licensee to meet a faster schedule, we believe such a benchmark could unnecessarily restrict the business plans of licensees, particularly new entrants. Therefore, after assessing the record and Commission precedent, we find that requiring 70% build-out at the seven-year milestone would serve the public interest.

147. As discussed above, we are adopting an EA-based AWS-4 band plan requirement and not a nationwide band plan. Setting build-out benchmarks on an EA basis is consistent with our general approach of assigning AWS-4 terrestrial spectrum rights under the Commission's part 27 rules, including permitting any licensee to avail itself of the Commission's secondary market mechanisms. Consistent with our practice in other bands, we will measure interim and final build-out benchmarks using percentages of license area population. We reject DISH's proposal to measure these benchmarks using static measures of population. This allows for more flexibility and certainty in licensing. For example, should a licensee partition some of its AWS-4 spectrum, a percentage-based approach would apply to each partition, while a single population count would not.

148.

Rural Specific Benchmarks.

We conclude that no additional rural-specific construction benchmarks are warranted beyond the performance requirements described above. We recognize that some commenters seek stricter performance requirements to promote service to rural areas. However, the performance requirements we adopt today will provide licensees with an ability to scale networks in a cost efficient manner while also ensuring that the vast majority of the population will have access to these wireless broadband services by the final benchmark. Because of the substantial capital investment and logistical challenges associated with a licensee building-out its terrestrial network to a significant percentage of the Nation's population within four and seven years, we conclude that the performance requirements we adopt are an appropriate balance.

149.

Penalties for Failure to Meet Construction Requirements.

We adopt meaningful and enforceable consequences, or penalties, for failing to meet both the interim and the final benchmarks. The penalties we adopt represent modification of the Commission's main proposal in the

AWS-4 NPRM

for the penalty for failure to meet in the interim build-out requirement; they reflect the record generated in this proceeding.

150.

Penalties for Failure to Meet the Interim Benchmark.

We modify the Commission's proposal and find that failure to meet the aggregate AWS-4 Interim Build-out Requirement will result in the AWS-4 Final Build-out Requirement being accelerated (shortened) by one year. If a licensee of AWS-4 authority fails to meet the interim benchmark, its final build-out benchmark would be reduced to 6 years instead of 7 years. We agree with commenters who suggest that penalties of this nature are appropriate for failure to meet the AWS-4 interim benchmark. In modifying the Commission's proposal from the

AWS-4 NPRM,

we note the concerns raised by commenters who argued that the proposal to terminate all of a licensee's terrestrial authority for not meeting the Interim Build-out Requirement could impact investment and impact customers.

151.

Penalties for Failure to Meet the Final Benchmark.

In the event a licensee fails to meet the AWS-4 Final Build-out Requirement in any EA, we adopt the proposal in the AWS-4 NPRM that the licensee's terrestrial authority for each such area shall terminate automatically without Commission action. Automatic termination is a common remedy for failure to build part 27 flexible use licenses. We also adopt the Commission proposal that any licensee who forfeits its AWS-4 operating authority for failure to meet the AWS-4 Final Build-out

Requirement in an EA shall be precluded from regaining that authorization. To the extent that a licensee is also the 2 GHz MSS licensee, failure to meet the AWS-4 Final Build-out Requirement in a license area shall also result in the MSS protection rule in § 27.1136 of the Commission's rules no longer applying to that AWS-4 license area. We believe that our approach strikes an appropriate balance between promoting prompt build-out and penalizing a licensee for not meeting its terrestrial performance obligations in a particular EA. In addition, by only terminating specific licenses where a licensee fails to meet the final benchmark in a particular license area, a licensee's customers in other license areas would not be impacted.

152. Moreover, we reject suggestions that MSS interference protections should not be affected by a failure to construct terrestrial services. If we do not remove the protection rule for satellite operations for those geographic areas where the terrestrial operating authority terminates, it will be challenging to relicense the spectrum in a way that will encourage productive terrestrial use. This could create incentives for the current licensees not to comply with the construction benchmarks and could potentially cause the spectrum to continue to lay fallow of terrestrial use contrary to the public interest.

153. We believe these penalties are necessary to ensure that licensees utilize the spectrum in the public interest. As explained above, the Nation needs additional spectrum supply. Failure by licensees to meet the build-out requirements would not address this need. Commenters did not offer specific data on the amount of benefits or costs associated with our proposed penalties or any alternative penalties for failure to meet performance requirements. We disagree that the penalties could potentially discourage network investment for the licensee or lower the service quality for terrestrial wireless service customers. While a customer might lose service if a licensee loses its terrestrial spectrum rights for failure to build-out, we expect that a future licensee of AWS-4 authority for that EA would ultimately serve more customers. We expect the probability of not meeting the performance requirements due to the costs of meeting the rules to be small and that the performance penalties are unlikely to deter network investment. Moreover, the Commission has consistently dismissed the contention that an automatic termination policy is unfair; rather, it is the same approach that the Commission applies to nearly all geographically-licensed wireless services. The Commission has specifically rejected the argument that the automatic termination penalty would deter capital investment, noting that the wireless industry has invested billions of dollars and has flourished under this paradigm.

154.

“Use it or Share it.”

We decline to impose any “use it or share it” requirements for the AWS-4 spectrum band. PIO argues that the Commission's build-out requirements should be “augmented by a `use it or share it' license condition that would permit other parties to make use of unused” AWS-4 spectrum on a localized basis until the licensee actually begins providing service. While we reserve the right to implement “use it or share it” obligations in the future, “use it or share it” is a complex concept that is not sufficiently developed in this record. Even though we do not adopt a requirement, we encourage providers to enter into leasing agreements for unused spectrum. While we discuss spectrum leasing in greater detail below, we note that engaging in spectrum leasing may assist a licensee in meeting its performance milestones. We also note that we asked a number of questions about “use or lease” in the

Incentive Auctions NPRM

and hope to build a more robust record in that proceeding about how such a process could work effectively, 77 FR 69934, Nov. 21, 2012.

155.

Compliance Procedures.

Aft

This text is long and has been trimmed here. Open the source document for the complete record.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.