DEPARTMENT OF TRANSPORTATION

Federal Transit Administration

49 CFR Part 611

[Docket No. FTA-2010-0009]

RIN 2132-AB02

Major Capital Investment Projects

AGENCY:

Federal Transit Administration (FTA), DOT.

ACTION:

Final rule.

SUMMARY:

This final rule sets a new regulatory framework for FTA's evaluation and rating of major transit capital investments seeking funding under the discretionary “New Starts” and “Small Starts” programs. This final rule is being published concurrently with a Notice of Availability of revised proposed policy guidance that provides additional detail on the new measures and proposed methods for calculating the project justification and local financial commitment criteria specified in statute and this final rule. FTA seeks public comment on the revised proposed policy guidance referenced in the Notice of Availability published today. Because of the recent enactment of the Moving Ahead for Progress in the 21st Century Act (MAP-21), subsequent interim guidance and rulemaking will be forthcoming to address provisions not covered in this final rule.

DATES:

This rule will become effective on April 9, 2013.

FOR FURTHER INFORMATION CONTACT:

Elizabeth Day, Office of Planning and Environment, (202) 366-5159 or

Elizabeth.Day@dot.gov;

for questions of a legal nature, Scott Biehl, Office of Chief Counsel, (202) 366-0826 or

Scott.Biehl@dot.gov.

FTA is located at 1200 New Jersey Avenue SE., Washington, DC 20590. Office hours are from 9:00 a.m. to 5:30 p.m., EST, Monday through Friday, except Federal holidays.

SUPPLEMENTARY INFORMATION:

I. Introduction

This final rule is being issued to amend the regulation (Part 611 of Title 49 of the Code of Federal Regulations) under which the Federal Transit Administration (FTA) evaluates and rates major transit capital investments seeking funding under the discretionary “New Starts” and “Small Starts” programs authorized by Section 5309 of Title 49, U.S. Code. The New Starts and Small Starts programs are FTA's primary capital funding programs for new or extended fixed guideway and corridor-based bus systems across the country, including rapid rail, light rail, commuter rail, bus rapid transit, and ferries. This final rule was the subject of an Advance Notice of Proposed Rulemaking (ANPRM) published on June 3, 2010 (75 FR 31383), which posed a series of questions about the current regulation and three of the criteria used to assess project justification, in particular. Following the ANPRM, FTA published a Notice of Proposed Rulemaking (NPRM) on January 25, 2012 (77 FR 3848), that proposed changes to the regulatory text. FTA also published on January 25, 2012, a Proposed New Starts/Small Starts Policy Guidance that provided additional detail on the proposed new measures and methods for calculating the project justification and local financial commitment criteria specified in statute. On July 8, 2012, President Obama signed into law the Moving Ahead for Progress in the 21st Century Act (MAP-21), which made changes in FTA's New Starts and Small Starts programs under Section 5309 of Title 49, United States Code. However, because significant portions of the project evaluation and rating requirements for major capital investments were not changed by MAP-21, FTA is proceeding with this final rule that covers the features of the NPRM that are consistent with the new law.

Accordingly, this final rule puts into place the following features:

• The regulatory structure that was proposed in the NPRM

• The New and Small Starts evaluation criteria and rating process defined in MAP-21 (including the five of the six evaluation criteria which were not changed by MAP-21); and

• The before and after study requirements for New Starts projects.

Subsequent guidance and rulemaking will cover new items included in MAP-21 that have not yet been the subject of a rulemaking process. These include

• The “congestion relief” evaluation criterion;

• The core capacity evaluation and rating process;

• The program of interrelated projects evaluation and rating process;

• The pilot program for expedited project delivery;

• The process for an expedited technical capacity review for project sponsors that have recently and successfully completed at least one new fixed guideway or core capacity project; and

• The revised New Starts and Small Start processes including eliminating the requirement that a New Starts or Small Starts project be the result of an alternatives analysis and instead relying on evaluations performed as part of the Metropolitan Transportation Planning process and the environmental review process conducted in accordance with the National Environmental Policy Act (NEPA); and

• The reduced number of defined steps in the process when FTA must evaluate and rate proposed projects.

MAP-21 created a step in the process called “project development” during which a local project sponsor will conclude the review required under NEPA, select a locally preferred alternative (LPA), adopt that LPA into the fiscally constrained regional long range transportation plan and develop sufficient information for FTA to evaluate and rate the project. Once “project development” is complete, if the project meets the criteria for advancement, the project will begin the “engineering” phase. Upon completion of “engineering” a project will be eligible for a construction funding commitment. While the final rule includes the names of the steps in the New and Small Starts process as defined in MAP-21, further detail on how those steps will be implemented will be the subject of future interim policy guidance and rulemaking. An important aspect of this subsequent guidance and rulemaking will be better defining the relationship of these changes in the New Starts process and the requirements for concluding the NEPA process during project development.

MAP-21 amends 49 U.S.C. § 5309(g)(5) to require the issuance of interim policy guidance describing how FTA will implement the requirements of MAP-21 on an interim basis. Additionally, Section 5309(g)(6), as amended by MAP-21, calls for a new regulation. Accordingly, as a next step in implementing MAP-21, FTA will issue draft interim policy guidance for public comment covering the MAP-21 changes which are not addressed in this final rule. FTA's new rulemaking on these subjects will follow.

In developing this final rule, FTA has been guided by two broad goals, outlined in the NPRM. First, FTA intends, as noted in the NPRM, to measure a wider range of benefits transit projects provide. Second, FTA desires to do so while establishing measures that support streamlining the New Starts and Small Starts process. In balancing these goals, FTA is seeking to continue a system in which well-justified projects are funded. At the same time, FTA seeks to ensure that it does not perpetuate a system in which the measures used to determine the project justification or local financial commitment are so

complex that they unnecessarily burden projects sponsors and FTA, or are difficult to understand.

First, to streamline the process, FTA has adopted measures of both mobility benefits and cost-effectiveness that are simplified yet reliably objective metrics. Second, FTA is expanding the ability of projects to pre-qualify based on the characteristics of the project or the corridor in which it is located. As with the current “Very Small Starts” category, FTA will determine, at some point in the future, what characteristics would be sufficient, without further analysis, to warrant a satisfactory rating of “medium” on one or more of the evaluation criteria. Third, FTA is adopting ways the data submitted by project sponsors and the evaluation methods employed by FTA could be simplified. Fourth, FTA is greatly simplifying the process for developing a point of comparison for incremental measures (i.e., measures that are based on a comparison between two different scenarios, such as a comparison of vehicle miles of travel (VMT) in the corridor without the project and VMT in the corridor with the project). Fifth, FTA is clarifying the local financial commitment criteria to address more clearly the strong interaction between capital and operating funding plans. To address more explicitly the broad range of benefits that transit projects provide, FTA has adopted several ways such benefits will be incorporated into the evaluation process. FTA is including more meaningful measures of the environmental benefits and additional measures on economic development effects of projects, as well as providing for equal weights for all of the project justification criteria. While FTA is streamlining the New Starts and Small Starts processes, nothing in this rule is intended to subvert or diminish the quality and rigor of the existing NEPA process.

II. What This Final Rule Contains

FTA also is publishing a notice in the

Federal Register

today that announces the availability of revised proposed policy guidance related to the provisions in this final rule for public review and comment. The regulation acts as a framework for the project evaluation process, and the policy guidance provides non-binding interpretations for implementing the regulations. Under both prior law and MAP-21, FTA is required to issue such policy guidance for public comment at least every two years and whenever major changes in policy are proposed. FTA believes that this approach allows FTA to make improvements in the measures used for the criteria as new techniques become available. FTA published proposed policy guidance along with the NPRM, and as promised in the NPRM, has revised that proposed policy guidance in response to comments received. In the revised proposed policy guidance made available today, FTA is providing more specificity on the measures and analytical techniques needed to calculate those measures. FTA encourages comment on the revised proposed policy guidance. Prior to the effective date of this final rule, FTA will publish final policy guidance on these issues. As noted above, at a later date, FTA will publish interim policy guidance on the items in MAP-21 under the major capital investment program that are not addressed in this rulemaking.

The Executive Summary that follows describes the purpose of this rule, discusses its major provisions, and summarizes its benefits and costs. The section that follows the Executive Summary includes a detailed summary of the comments received on the NPRM and FTA's responses to those comments. FTA received approximately 1,000 individual comments from over 103 respondents to the NPRM. FTA chose to categorize the comments by topical area, group them, and summarize them to assure all relevant comments received consideration in the development of this final rule and accompanying revised proposed policy guidance. The responses to comments help elucidate the provisions adopted by this final rule and provide additional context to the proposals in the accompanying revised proposed policy guidance. The provisions adopted by this final rule are more specifically detailed in the “Section-by-Section” analysis that directly follows the comment summaries and responses.

The Section-by-Section analysis is intended to do two things: (1) Explain the changes to the regulatory text found at the end of this final rule; and (2) explain what is in the related revised proposed policy guidance being published for comment today. FTA must strictly comply with the authorization statute, 49 U.S.C. 5309, in setting the regulatory process the agency will use to evaluate, rate, and approve funding for New Starts and Small Starts projects, and the criteria the agency will use to evaluate those projects. FTA is taking the occasion of this rulemaking, however, to introduce a number of administrative steps consistent with MAP-21, that will help to streamline the New Starts and Small Starts process.

Following the Section-by-Section analysis is the “Regulatory Evaluation” section of this final rule, which includes descriptions of the requirements that apply to the rulemaking process and information on how this rulemaking effort complies with those requirements.

The final rule concludes with the actual regulatory text FTA is adopting for its New Starts and Small Starts programs. This is the language that will govern the way New Starts and Small Starts projects are evaluated, rated, and funded. The language is binding, which means that FTA's future policy guidance documents must be consistent with the regulatory text. As noted earlier, while the regulatory text being adopted today includes the revised regulatory structure proposed in the NPRM and additional features consistent with the changes to the program made by MAP-21, further rulemaking will be needed to address the aspects of the major capital investment program in MAP-21 that were not included in the NPRM. Such changes require further public comment before being made final and thus will be the subject of a subsequent interim policy guidance and rulemaking.

III. Executive Summary

A. Purpose of Rule

The New Starts and Small Starts programs, established in Section 5309 of Title 49, U.S. Code, as amended by MAP-21, are FTA's primary capital funding programs for new or extended transit systems across the country, including rapid rail, light rail, commuter rail, bus rapid transit, and ferries. Under this discretionary program, proposed New and Small Starts projects are evaluated and rated as they seek FTA approval for a Federal funding commitment to finance project construction. Overall ratings for proposed New Starts and Small Starts projects are based on summary ratings for two categories of criteria: project justification and local financial commitment. Within these two categories, projects are evaluated and rated against several criteria specified in law. A summary of the current New Starts and Small Starts evaluation and rating process can be found at

http://www.fta.dot.gov/documents/FY13_Evaluation_Process.pdf.

It is important to distinguish the purpose of this rule from other requirements which must be met as a prerequisite for funding of Major Capital Investments. This rule covers the process by which FTA rates and evaluates candidates for grants under the Major Capital Investments program.

Thus, it focuses on the criteria which FTA will use for this purpose. Candidate projects must still meet the other requirements, in particular, those laid out to address the National Environmental Policy Act (NEPA). Because of the changes made by MAP-21, these requirements will have to be met first, in particular for New Starts projects to advance into the newly defined “engineering” stage. Only once these requirements are met will projects be subject to evaluation and rating against the criteria laid out in this final rule. For example, through the NEPA process (including the use of linking planning and NEPA as provided for in 23 CFR 450.318), all environmental impacts will be evaluated, reasonable alternatives will be examined, and measures necessary to mitigate any adverse environmental impacts will be developed and included in the scope of the project. Only once these environmental effects are analyzed through the NEPA process, will the “environmental benefits” be evaluated using the measures established under this rule and the New Starts/Small Starts evaluation will focus on a more limited range of environmental criteria then the NEPA analysis.

This final rule is issued pursuant to the requirements first outlined in SAFETEA-LU and continued in MAP-21 that the Secretary promulgate regulations to implement the Small Starts program. The final rule and accompanying revised proposed policy guidance change FTA's implementation of the major capital investment program, primarily by giving the project justification criteria specified in law “comparable, but not necessarily equal weights” as required by Sections 5309 (g)(2)((B)(ii) and (h)(6), improving the measures FTA uses for each of the evaluation criteria specified in law, and streamlining and simplifying the means by which project sponsors develop the data needed by FTA.

In addition, this rule implements an initiative in the Department of Transportation's (DOT)

Plan for Implementation of Executive Order 13563: Retrospective Review and Analysis of Existing Rules

(

http://regs.dot.gov/docs/RRR-Planfinal-8-20.pdf

). Executive Order 13563 calls on agencies to identify rules that may be “outmoded, ineffective, insufficient, or excessively burdensome, and to modify, streamline, expand, or repeal them…” This rule streamlines and simplifies the various means by which project sponsors may obtain the information needed by FTA for its evaluation and rating of projects. For example, FTA is allowing project sponsors to use a simplified FTA-developed national model, once available, to estimate ridership rather than standard local travel forecasting models; to use a series of standard factors in a simple spreadsheet to calculate vehicle miles traveled (VMT) and environmental benefits; to no longer require the development of a baseline alternative for calculation of incremental measures; and to expand the use of warrants whereby a project may be able to automatically qualify for a rating if it meets parameters established by FTA. By doing so, this final rule achieves two broad goals—measuring a wider range of benefits that transit projects provide while at the same time establishing measures that support streamlining of the New Starts and Small Starts process. In balancing these goals, FTA is seeking to continue a system in which well-justified projects are funded. At the same time, FTA seeks to ensure that it does not perpetuate a system in which the measures used are so complex that they are difficult to understand or unnecessarily burdensome to project sponsors.

B. Major Provisions in This Final Rule

This section describes the most significant changes being adopted in this final rule. These adopted changes, some of which are altered in this final rule from the proposals made in the NPRM, are the result of FTA's review of the comments received on the ANPRM and NPRM and further evaluation of its proposals based on those comments.

1. Cost-effectiveness

Cost-effectiveness is currently evaluated and rated based on the incremental annualized capital and operating cost of the project divided by the incremental hour of travel time savings (i.e., the cost of the project divided by how much time it would save travelers). Changes in cost and travel time are estimated by comparing forecast data for the proposed project with forecast data for a baseline alternative (typically a lower-cost bus alternative referred to as the Transportation System Management alternative). FTA's thresholds for assigning ratings from “low” to “high” are based on U.S. DOT guidance on the value of time. To establish these thresholds, benefits other than travel time savings are not estimated directly, but are assumed to be equal to the value of the travel time savings. MAP-21 defined cost-effectiveness as “cost per rider.”

With this final rule, FTA is adopting the significantly streamlined and simpler approach for measuring cost-effectiveness as proposed in the NPRM and consistent with the change in law in MAP-21. The measure of cost-effectiveness for New Starts project will now be annualized capital cost and operating cost per trip taken on the project, with some allowances for project “enrichments” to be excluded from the cost side of the equation. For Small Starts projects, the measure of cost-effectiveness will be annualized Federal share per trip taken on the project in accordance with the MAP-21 requirement that FTA base Small Starts ratings on the “evaluation of the benefits of the project as compared to the Federal assistance to be provided.”

FTA will allow the cost of “enrichments” (referred to in the NPRM as “betterments”) to be excluded from the cost side of the cost-effectiveness calculation for New Starts projects. Enrichments are those items above and beyond the items needed to deliver the mobility benefits of the project. Enrichments may include, for example, features needed to obtain LEED certification for the transit facilities, additional features to provide extra pedestrian and bicycle access to surrounding development, aesthetically-oriented design features, or joint development expenses. This will remove a disincentive to include such features in the design of projects. FTA received numerous helpful comments on the kinds of enrichments that should be excluded from the calculation and as a result was able to adopt a simple approach to identify how to define and assign a value to these features.

FTA is adopting the proposal in the NPRM to develop pre-qualification approaches that would allow for a project to automatically receive a satisfactory rating on a given criterion based on its characteristics or the characteristics of the project corridor. In Section 5309(g)(3), the use of such warrants is required for projects where: (1) The Section 5309 share either does not exceed $100,000,000 or is 50 percent or less of the project cost; and (2) the applicant seeks the use of warrants and certifies that the existing public transportation system is in a state of good repair. The text of the final rule will allow use of warrants for all projects, but the final warrants to be specified in subsequent policy guidance will be mindful of this statutory structure. The approach for pre-qualification would be developed by analyzing how certain projects or corridor characteristics would contribute to producing a satisfactory rating on the criterion in question. In this way, a project whose characteristics meet or exceed a certain threshold value

could be automatically rated without further project-specific analysis. Proposed pre-qualification values (“warrants”) would be proposed in future policy guidance with a period for public comment before being made final. The revised proposed policy guidance published along with this final rule does not propose any pre-qualification values at this time. However, FTA is interested in receiving suggestions about specific factors and values which could be adopted as pre-qualification thresholds.

2. Environmental Benefits

To evaluate and rate environmental benefits, FTA currently uses the EPA air quality designation for the metropolitan area in which a proposed project is located. Thus, FTA assigns projects located in nonattainment areas (areas that EPA has designated as having poor air quality) with a “high” rating; all other projects receive a “medium” rating.

FTA is adopting the proposal in the NPRM to expand the measure for environmental benefits to include direct and indirect benefits to the natural and human environment. These benefits will be based on estimated changes in highway and transit VMT resulting from an estimated change in mode from highway to transit due to the implementation of the project. FTA will evaluate changes in air quality based on changes in total emissions of EPA criteria pollutants, changes in energy use, changes in total greenhouse gas emissions, and safety improvements based on reductions in the amount of accidents, fatalities, and property damage. Changes in public health, such as benefits associated with long-term activity levels that would result from changes in development patterns, would be included once better methods for calculating this information are developed.

3. Economic Development

Currently, FTA evaluates and rates the economic development effects of major transit investments on the basis of the transit-supportive plans and policies in place and the demonstrated performance and impact of those policies. FTA adopts the proposal in the NPRM to continue to use this measure and to add a consideration of whether policies maintaining or increasing affordable housing are in place. The number of domestic jobs related to design, construction, and operation of the project will also be reported but not considered in the rating, as proposed in the NPRM.

FTA is also adopting the proposal in the NPRM to allow project sponsors, at their option, to also estimate indirect changes in VMT resulting from changes in development patterns that are anticipated to occur with implementation of the proposed project. The resulting environmental benefits from these changes in VMT would be calculated, monetized, and for New Starts projects compared to the annualized capital and operating cost of the project and for Small Starts projects compared to the Federal share. The resulting estimate would be evaluated under the economic development criterion. For New Starts projects, the final rule includes a provision that would subtract the costs of “enrichments” from the costs used in this calculation, just as in the measures of cost-effectiveness and environmental benefits. It is anticipated that the project sponsor at its option would undertake an analysis of the economic conditions in the project corridor, the mechanisms by which the project would improve those conditions, the availability of land in station areas for development and redevelopment, and a pro forma assessment of the feasibility of specific development scenarios to calculate the VMT changes.

4. Streamlining

Aside from changes that will improve FTA's measures for evaluating projects, FTA is adopting the changes proposed in the NPRM that are intended to streamline the process.

First, FTA will allow project sponsors to forgo a detailed analysis of benefits that are unnecessary to justify a project. For example, if a project rates “medium” overall based on benefit calculations developed using existing conditions in the project corridor today, the project sponsor would not be required to do the analysis necessary to forecast benefits out to some future year (i.e., a “horizon” year). In response to comments received on the NPRM, if a sponsor chooses to prepare future year forecasts, FTA will allow the project sponsor to use either a 10-year horizon, as proposed in the NPRM, or a 20-year horizon (which is consistent with metropolitan transportation planning requirements). Similarly, FTA is developing methods that can be used to estimate benefits using simple approaches. Only when a project sponsor feels it is necessary to further identify benefits beyond a simplified method would more elaborate analysis be undertaken, and only at the project sponsor's option.

C. Benefits and Costs

FTA believes that the benefits of this rule will far exceed its costs. FTA estimates that implementation of this final rule will have a one-time cost of $306,200 due to the need for projects sponsors and contractors to become familiar with the changes made by this final rule and another one-time cost of $306,200 for the development of the additional information required by this rule.

FTA estimates an annual savings of $423,750 in reduced paperwork burden arising from project sponsors being given the option of replacing the costly and time consuming application of local travel demand models with a simplified national model, the elimination of the requirement that project sponsors develop and analyze a baseline alternative, and the expanded use of automatic, pre-qualification (“warrants”) for certain projects. FTA believes that this is a conservative estimate. FTA believes some of the streamlining changes made in this final rule could result in much larger savings, including savings that may result from projects being able to be constructed sooner because of the reduced time it may take them to comply with Federal requirements.

FTA also estimates that because of the changes in evaluation criteria incorporated in this final rule, implementation of the final rule may result in the selection for a recommended commitment of Major Capital Investment program funding of one different New Starts or Small Starts project than under the current final rule each fiscal year, with an average Major Capital Investments program contribution of $250,000,000. However, because of the large number of factors which go into the selection of recommended projects beyond those being revised by this final rule (such as project readiness), there is a considerable degree of uncertainty to FTA's estimate of the number of different projects which may be recommended as a result of the changes made by this final rule. To put this figure in context, the Major Capital Investments program provides a total of just under $2,000,000,000 per year for New Starts and Small Starts projects.

The following table summarizes the costs, benefits, and changes in Federal transfers (Major Capital Investments grants) of this final rule over a ten year period, discounted at three and seven percent:

Total Benefits and Costs Summary for Major Capital Investments Final Rule Over Ten Years, 2012$

3% Discount

rate

7% Discount

rate

Total Monetized Benefits

$3.7 M

$3.2 M

Total Cost

0.6 M

0.6 M

Total Net Impact (Benefit—Costs)

3.1 M

2.6 M

Changes in Transfer Payments

2.2 B

1.8 B

IV. Response to Comments

The following is a summary of the comments received in response to the proposals in the NPRM, FTA's response to the comments received, and how FTA has responded in this final rule to the issues raised. FTA received approximately 103 comment submissions from a wide-range of organizations and individuals that provided approximately 1,000 individual comments. Comments were received from: operators of public transportation; State departments of transportation; other departments of State government; metropolitan planning organizations (MPO) and regional councils of governments; local governments or entities; trade organizations; national non-profit organizations; lobbyists; research institutions; universities; local or regional community organizations; private citizens; and businesses.

Please note that FTA attempted to respond to all relevant comments received on the NPRM. In the section below, FTA summarizes and responds to a variety of general comments, comments on the project justification criteria, comments on the local financial commitment criteria, comments on the process for developing New Starts and Small Starts projects, and comments on eligibility for funding under these programs.

A. General Comments

1. General Support or Opposition

Comment:

FTA received a total of 53 comments providing either general support or opposition to the NPRM. Of these comments, 51 expressed strong support for the proposed rule, citing the streamlined analytical approaches, use of a multiple measure approach, elimination of the baseline alternative as the point of comparison, use of a simplified measure for cost-effectiveness, improvements in the measures of environmental benefits, enhanced consideration of affordable housing, consideration of the mobility of transportation disadvantaged persons, the proposed approach for economic development, and the ability for projects to pre-qualify under certain conditions.

Two comments were generally opposed to the proposals in the NPRM. One of these comments objected to assessing projects on other than mobility impacts, and the other comment suggested use of a qualitative “make the case” approach focused primarily on how a project supports local goals and objectives.

Response:

FTA appreciates the strong support for the ideas in the NPRM and thus is adopting much of what was proposed. FTA believes there are multiple reasons to make public transportation investments, and that they should be taken into account when evaluating and rating projects, not just the mobility benefits provided by the project. The statute requires FTA to evaluate six project justification criteria and to weight them comparably, but not necessarily equally. As this is a discretionary program in which projects across the United States compete with one another for a limited amount of federal financial assistance, FTA must explicitly consider more than just local goals and must be able to address project merit based on how well projects do against quantitative criteria.

2. Horizon Year

Comment:

FTA received 41 comments on the horizon year to be used when a project sponsor chooses to prepare an optional future year forecast. In the NPRM, FTA proposed that a project sponsor would be required to provide forecasts of ridership on the proposed project using current year inputs. If the project sponsor was comfortable with how the project rated under the evaluation criteria based on the current year data, no further analysis would be required. FTA proposed that, at a project sponsor's option, it could choose to make a future year forecast, but that it would be based on a 10 year time horizon. Although many comments supported the concept of having a future year forecast be optional, only one agreed entirely with FTA's proposal to use a horizon year 10 years in the future. Another agreed with the 10-year time horizon, but suggested that funding be provided to project sponsors to do the analysis because it is not consistent with the normal time frame used in long range planning. Two comments asked for further clarification on the issue, and the remaining comments suggested that FTA retain its current practice of using a 20-year time horizon. These comments suggested that continuing to use a 20-year time horizon would be consistent with the requirements of the metropolitan planning process, which requires a 20-year fiscally constrained long-range transportation plan, and with the NEPA process. Comments suggested that it would be burdensome to have to do a 10-year forecast given that most MPO's forecast demographic data and develop transportation networks for a 20-year time horizon.

Response:

FTA is not requiring project sponsors to prepare future year forecasts but is rather making them optional. FTA agrees that there is merit to using a 20-year time horizon for consistency with long-range planning requirements in the metropolitan transportation planning process. Nonetheless, FTA believes there is also merit in using a 10-year time horizon given that it allows for use of a simplified model to estimate trips on the project and a simpler point of comparison for estimating incremental measures. Additionally, FTA notes there is less uncertainty in 10-year forecasts than in 20-year forecasts and that 10-year forecasts are used for conformity purposes in non-attainment areas. Accordingly, FTA is adopting an approach that will require all project sponsors to prepare a current year forecast, and will make preparation of future year forecasts optional. FTA believes that current year data is a good basis for the evaluation of project merits in the opening year. Project sponsors may choose to prepare future year forecasts using either a 10-year or a 20-year time horizon. FTA cannot provide additional funding for sponsors that choose the 10-year time horizon to do additional analysis that would be needed. Also, FTA notes that project reviews pursuant to NEPA do not necessarily require any particular time horizon, but rather must be structured to evaluate impacts that are reasonably foreseeable.

3. Basis for Comparison

Comment:

FTA received a total of 32 comments on the point of comparison to be used in calculating incremental measures. Of these comments, 29 supported FTA's proposal to use a no-build alternative while three supported continued use of the “baseline alternative” required under the current regulation (defined as the best that can be done in the absence of a major investment, typically the “Transportation System Management (TSM) alternative”. Those supporting use of the no-build alternative cited the burden involved in developing a baseline alternative and the fact that it is often an artificial alternative not under active consideration locally for implementation. Those in support of continued use of the baseline or TSM alternative as the point of comparison noted the importance of isolating the effects of the proposed investment and the need for a level playing field between differing systems.

Response:

FTA agrees that although there is some technical merit in the use of the baseline or TSM alternative for isolating the effect of the major investment versus less costly investments, the burden of developing the baseline alternative is significant as it requires an iterative process. FTA has found that it can take as much as a year to develop an adequate baseline alternative due to the difficulty in FTA and the project sponsor reaching agreement on what constitutes “the best that can be done without a major investment” since that is often a matter of judgment. FTA believes that consideration of lower cost alternatives should remain an integral part of the ongoing metropolitan planning and NEPA processes that occur prior to and during the project development phase. Once a locally preferred alternative has been chosen through completion of the metropolitan planning and NEPA processes, FTA does not believe it is necessary to continue examining other alternatives, including a baseline or TSM, after entering the engineering phase of the New Starts and Small Starts program. In addition, MAP-21 explicitly calls for use of the “no-action” alternative as the point of comparison for Small Starts projects. Accordingly, FTA is adopting use of a no-build alternative as the point of comparison for incremental measures.

Comment:

Of the 29 comments supporting use of a no-build alternative, 12 commented further that it should be defined based on various products of the metropolitan planning process appropriate to the horizon year selected. Most supported a no-build alternative that includes projects in the Transportation Improvement Program (TIP), while others supported a no-build alternative that includes projects in the fiscally constrained long-range transportation plan.

Response:

As noted above, FTA will require all project sponsors to prepare a current year forecast in which case the no-build alternative is simply the existing transportation system. FTA will allow project sponsors to choose either a 10-year or a 20-year time horizon if they wish to prepare a future year forecast that describes the environment to be affected by the proposed project. When a sponsor chooses to prepare a future year forecast based on a 10-year horizon, FTA is adopting its proposal to define the no-build alternative as the current transportation system plus projects included in the TIP in place at the time the sponsor seeks entry into the “engineering” phase. If forecasts are updated later, as required when there is a significant change in the project, the point of comparison would include projects in the TIP at that time. When a sponsor chooses to prepare a future year forecast based on a 20-year horizon, FTA is adopting a definition of the no-build alternative that includes all projects included in the fiscally constrained long-range transportation plan. Thus, sponsors choosing to prepare a forecast using a 20-year horizon should do so recognizing that development of the point of comparison (the no-build alternative) will require additional work beyond that required if they choose to prepare only a current year forecast or a 10-year forecast.

Regardless of which horizon years are used for purposes of the evaluation process under New Starts and Small Starts, FTA still expects that during the NEPA process, project sponsors will evaluate all reasonably foreseeable impacts of the proposed project and reasonable alternatives to the project as appropriate. As has always been the case, the horizon involved in evaluating those impacts could potentially vary depending on the type of impact and how reasonably foreseeable a particular impact type is determined to be.

Comment:

FTA received two comments on how to weight the current and horizon year forecasts if a project sponsor chooses to do a horizon year forecast. FTA proposed that the current and future forecasts be weighted equally. One comment suggested that the current year forecast receive a higher weight (75 percent), citing the greater reliability of estimates based on known current year inputs of population and employment. The other comment suggested that the horizon year receive a higher weight (80 percent), noting that these are long term investments that should address future growth in population and employment.

Response:

FTA believes that weighting estimates based on current year data and future year data equally is a reasonable trade-off between the increased reliability of current year estimates and the fact that major capital investment projects covered by this rule are long-lived investments with benefits that extend well out into the future. Under the current regulation, FTA evaluates only a 20-year time horizon, favoring investments whose benefits accrue in the longer term and giving no additional credit to projects that will accrue substantial benefits immediately after implementation. While many projects may need to use future year forecasts in order to be fully justified, FTA believes that because of the large demand for funds from this program, giving additional credit to projects whose benefits occur sooner is reasonable. FTA believes equally weighting estimates based on current year data with those based on horizon year data to develop a rating should appropriately balance the increased reliability that comes with using current year data and at the same time give adequate consideration to projects in fast growing areas and the long term benefits of the project.

4. Weighting of Project Justification Criteria

Comment:

FTA received a total of 22 comments on the use of a multiple measure approach. All of these comments supported use of a multiple measure approach. A total of eight comments supported FTA's proposal to weight each project justification criterion equally. Three comments suggested weighting cost-effectiveness more heavily, assigning it as much as forty percent of the total weight. Two comments suggested allowing project sponsors to set their own weights.

Response:

FTA is adopting its proposal to weight each of the project justification criteria equally. The statute requires “comparable, but not necessarily equal” weights. FTA believes each of the project justification criteria provides important information about project merit and, thus, feels that equal weights are appropriate. Although cost-effectiveness is important, it remains only one legislatively mandated criterion among several. Thus to give it a higher weight would undervalue some of the other significant benefits. FTA does not believe a weight of 40 percent would be consistent with the

requirement in the law that the weights of the project justification criteria be “comparable.” Given that this is a competitive, national discretionary grant program, FTA believes that consistent weights must be applied to all projects to assure fair evaluations.

5. Pre-Qualification and Establishing Breakpoints

Comment:

FTA received a total of 25 comments about its proposal to allow projects to pre-qualify based on characteristics of the project or the corridor in which it is located (also called “warrants”). Of these comments, 17 expressed general support for the concept. Many of these comments indicated that warrants could be applied to several of the criteria, not just to cost-effectiveness. The remaining eight comments provided general support, but expressed some concerns. Several of these expressed the concern that warrants not be developed in such a way as to be biased in favor of a specific mode. These comments noted that FTA's existing Very Small Starts warrants appear to strongly favor bus rapid transit. Others indicated that FTA needs to justify the warrants that it promulgates by describing exactly how a project with the FTA-specified characteristics would rate against the various criteria. Several suggestions were provided on specific warrants.

Response:

FTA appreciates the support for the pre-qualification or “warrants” concept and is adopting it in the final rule. FTA notes that MAP-21 explicitly calls for the use of warrants for projects requesting $100 million or less in New Starts funds or requesting a Federal share of 50 percent or less. FTA agrees that warrants should be mode-neutral and will work to assure that when FTA proposes them in future policy guidance. FTA will provide the justification as each warrant is proposed. FTA will not be publishing warrants in the revised proposed policy guidance being published along with this final rule, but plans to do so in the near future once the criteria are established and additional data are gathered. Even though the changes made by MAP-21 focus warrants only on a certain set of projects, FTA believes it is appropriate to consider using warrants for as many kinds of projects as possible, in order to allow for additional streamlining of the process. Nonetheless, FTA will be mindful of the strictures placed on warrants by MAP-21 when it proposes warrants in the future.

Comment:

FTA received 15 comments on how breakpoints should be established for the various quantitative criteria. Two of these comments suggested using different breakpoints for different modes. One comment provided a suggestion that several Transit Cooperative Research Program (TCRP) projects could provide input on how breakpoints should be established. A total of 12 comments were received on FTA's proposal that breakpoints should be established to recognize that a small amount of positive benefits is not bad, just small. Of these comments, eight opposed FTA's proposal to give a medium rating to projects that had small but positive benefits, citing the need to be able to more fully distinguish between projects. Four comments supported FTA's proposal.

Response:

FTA appreciates the suggestions on how to establish breakpoints. FTA believes the breakpoints should be mode-neutral, as projects of various modes are competing for a single source of funds. Further, the intrinsic value of a particular benefit is not based on the mode of the project being considered. FTA agrees that assigning projects with small but positive benefits a medium rating will create a problem of not being able to adequately differentiate between projects. Thus, FTA is not adopting its proposal in this area. Instead, FTA will develop breakpoints that use all five rating levels. FTA is publishing proposed breakpoints for the criteria in the revised proposed policy guidance accompanying this final rule and requests comments on those breakpoints.

6. Use of Standard Factors To Calculate Benefits

Comment:

FTA received a total of nine comments regarding the use of standard factors to calculate the value of the various evaluation criteria. Although four of the comments provided general support for the concept, citing the reduced burden on project sponsors, concern was expressed about the need to allow for some variation based on local conditions. Two comments suggested that establishment of the factors should await completion of ongoing TCRP projects. Three comments opposed the proposal, citing the wide variety in local conditions.

Response:

FTA believes that use of standard factors can significantly streamline the process, but understands the need for flexibility. FTA is publishing the proposed standard factors in the revised proposed policy guidance accompanying this final rule and is seeking comments. FTA notes that certain factors, such as the value of time or of a statistical life, are established in policy that applies throughout the programs administered by the U.S. Department of Transportation (DOT). In these cases, FTA will use those set values.

7. Program Administration

Comment:

FTA received eight comments suggesting the importance of cooperation with other Federal agencies in administering the New Starts and Small Start program. Specifically identified were the U.S. Department of Housing and Urban Development (HUD) on issues related to affordable housing and sustainable communities, other DOT modal administrations on alternative project delivery, and the Centers for Disease Control and Prevention (CDC) of the U.S. Department of Health and Human Services on issues related to public health.

Response:

FTA agrees with the need to work with other agencies on a variety of issues. In particular, FTA has sought support and technical guidance from HUD on issues related to affordable housing. FTA will continue to work with other DOT agencies and agencies such as CDC to improve the process.

Comment:

FTA received three comments supporting the proposal to have the measures and weights included in policy guidance, with the regulation itself providing a broader outline of the process and other required features. These comments supported the idea due to the increased flexibility allowing changes to be made through policy guidance subject to a public comment period as more information about various measures becomes available.

Response:

FTA is adopting the approach of having measures and weights specified in policy guidance.

Comment:

FTA received four comments noting the importance of developing clearly defined deliverables and schedules for the various steps in the process for developing New Starts and Small Starts projects. Similarly, FTA received one comment calling for as much streamlining as possible for Small Starts projects.

Response:

FTA agrees that clearly defined deliverables and schedules are particularly important and notes that FTA already has clearly defined checklists of deliverables required of the project sponsor for each phase of the process and develops “roadmaps” for every project outlining a planned schedule. FTA plans to continue to make efforts along these lines as well as to assure that the process is as streamlined as possible. FTA continues to refine its reporting instructions and other information about the program to provide as much clarity as possible.

Further, FTA has found that the establishment of project roadmaps has been extremely effective in clearly identifying what must be done, who is responsible for it, and when deliverables are expected. FTA continues to look for ways to streamline the process.

Comment:

FTA received three comments about the relationship of the New Starts and Small Starts project development process and the NEPA process.

Response:

FTA continues to work to ensure that the New Starts and Small Starts process is coordinated with requirements under NEPA. FTA notes that MAP-21 calls for completion of the NEPA process during a newly-defined phase called “project development.” FTA notes that the evaluation criteria defined in this final rule are applied subsequent to the completion of the NEPA process for approval of entry in the “engineering” phase. In subsequent guidance and rulemaking, FTA will provide additional information on how a project sponsor will gain entry into the newly defined phase of “project development” and what must be completed during the phase before entry into the subsequent “engineering” phase will be granted.

Comment:

FTA received seven comments about how the New Starts and Small Starts process should be structured to assure compliance with fair housing requirements, the Americans with Disabilities Act (ADA), FTA's requirements for Environmental Justice, Title VI of the Civil Rights Act, and private sector participation in New Starts and Small Starts projects, consistent with FTA's requirements for third-party contracting.

Response:

FTA believes that fair housing issues are addressed by the inclusion under the economic development criterion of an assessment of local plans and policies to maintain or increase affordable housing, but that enforcement of fair housing practices is under the authority of HUD. The DOT and FTA regulations under the ADA prescribe the rules for grantee compliance with the ADA. In addition, FTA has published guidance for compliance with Title VI of the Civil Rights Act and the Executive Order on Environmental Justice. FTA is fully supportive of private sector involvement in New Starts and Small Starts projects, and will continue to explore opportunities to promote innovative project delivery methods. MAP-21 provides for a pilot program to test how to utilize such methods. FTA will more fully define this pilot program in subsequent interim policy guidance and rulemaking.

8. Definitions of Eligible Projects

Comment:

FTA received two comments expressing general support for the definition of eligible projects proposed in the NPRM. Three comments suggested limiting bus rapid transit (BRT) to projects that operate on an exclusive guideway along at least half of the project length, while two other comments suggested broadening the definition of BRT to clearly include service operating on high occupancy or managed lanes. Another commenter suggested using a standard recently proposed by the Institute for Transportation Development Policy in order to define BRT. Another commenter suggested that the service standards for BRT clearly be limited to the “trunk” segment of a proposed route. One commenter suggested that eligibility be expanded to cover a variety of “alternative modes,” while another commenter suggested expanding eligibility to cover “core capacity” projects.

Response:

In MAP-21, Small Starts BRT projects may include “corridor-based bus projects” not operating on exclusive rights of way. Accordingly, FTA must continue to define Small Starts BRT projects without specifying a requirement for an exclusive right-of-way. BRT projects proposed to operate on managed lanes may be eligible for funding through the Small Starts program, but only if the project otherwise meets the parameters for “corridor-based bus projects” defined by FTA. Under current law, managed lanes cannot be counted as exclusive lanes since they are not for the exclusive use of high occupancy vehicles. FTA's current approach, which it is continuing, allows a project to qualify as a corridor-based bus project if the frequency of service requirements defined by FTA are met on at least the core segment of the bus route, sometimes called the trunk. Services operated off the trunk may be part of the overall project. FTA is limited by law to fund only public transportation projects, not any “alternative mode.” Further, MAP-21 limits New Starts funding to new fixed guideways and extensions to existing fixed guideways. MAP-21 allows core capacity projects as eligible projects for funding through the Section 5309 major capital investments program. FTA will define the requirements for core capacity projects in subsequent interim policy guidance and rulemaking.

9. Incremental Funding and Programs of Projects

Comment:

Thirteen comments recommended defining a project in such a way as to allow it to be evaluated and rated, but then have funding and construction of that project provided on a segment-by-segment basis incrementally. Another commenter suggested more clearly defining allowable programs of projects.

Response:

FTA can undertake programs of projects, and can fund projects incrementally. In general, FTA believes it is appropriate to evaluate each segment of a project being proposed for funding independently, consistent with the requirement in law to fund “operable segments.” Thus, FTA is not adopting the suggestions to evaluate and rate a project as a whole and then fund it on a segment-by-segment basis. However, FTA will define the requirements for “programs of interrelated projects” in subsequent interim policy guidance and rulemaking.

10. Other General Issues

Comment:

FTA received a total of 21 comments on other general issues. Three comments provided information related to the merits of specific local projects. Four comments expressed general support for comments received from other commenters. One comment opposed continuation of the New Starts and Small Starts program, while several comments provided general support for investment in public transportation. Several additional comments pointed out clerical or typographical errors or suggested editorial changes. One comment suggested that project sponsors be required to report the uncertainty involved in their forecasts.

Response:

FTA appreciates the general comments and suggestions. FTA notes that this rulemaking concerns the process by which a specific grant funding program specified in law is implemented. The merits of investing in public transportation in general are a subject for other forums. FTA agrees it is important to have reliable forecasts and notes MAP-21 requires FTA to consider “the reliability of the forecasting methods used to estimate costs and utilization” on the project when developing the project justification rating.

B. Project Justification Criteria

1. Mobility Improvements

a. General Comments

Comment:

Twelve comments supported FTA's proposed approach of measuring mobility improvements

solely in terms of trips. Eight comments disagreed with the proposed approach. Of these eight, three comments suggested that FTA retain passenger miles as part of the measure, three others recommended that the current measure be retained as is, and one requested that an alternative approach submitted in response to the Advance Notice of Proposed Rulemaking be adopted. The alternative approach suggested that FTA create a five-step process that would require project sponsors to: (1) Identify the full range of alternative projects; (2) identify key non-monetizable benefits of those alternative projects including benefits to mobility, the environment, and economic development; (3) estimate the costs and monetizable benefits of each alternative project, (4) estimate the non-monetary benefits of each alternative project, and (4) rank the alternative projects in terms of dollars of net cost per unit of each key non-monetary benefit. The suggested alternative indicated that FTA should fund only those projects that are the highest or near-highest ranked alternative by each of the non-monetary measure but did not provide specifics on how mobility benefits should be determined. This same commenter suggested that it is important to assess how a transit project may affect other modes, such as in the case where a general purpose lane is converted to exclusive transit use, thus increasing highway congestion.

Response:

FTA is adopting its proposed trip-based mobility improvements measure. Use of a trip-based measure will permit use of a simplified national model. Furthermore, a trips measure is more easily understood by the public and decision-makers than is transportation system user benefits. Additionally, using fewer and simpler measures for the mobility criterion supports FTA's streamlining goal.

FTA believes that travel time savings can be an important benefit of a major transit investment, but notes they have been challenging to estimate. The proposed trips measure is easier to forecast and still provides a good indication of the mobility benefits provided by the project. FTA is not adopting the suggestion that the mobility measure include passenger miles travelled since that measure gives an advantage to projects serving longer trips. FTA believes that credit should be given to projects that serve the most riders, regardless of trip distance. FTA is also not adopting the suggested alternative approach to consider under the mobility measure the impact implementation of a transit project may have on other modes since it would be cumbersome to do so and be inconsistent with the goal of streamlining the process. FTA believes the impact of a transit project on other modes is adequately considered in the environmental process, where the mitigation of such negative effects is addressed. FTA does not believe it is necessary to assess such effects as part of the evaluation of mobility benefits.

Comment:

Two comments suggested that FTA develop the mobility improvements criterion's breakpoints according to project mode or type. Three comments requested that FTA clarify whether a trip is equivalent to a boarding.

Response:

FTA has developed a single set of mobility improvements breakpoints that will apply to all New and Small Starts projects regardless of mode. Mode-specific breakpoints would imply that a trip made on one mode is worth more or less than a trip made on another mode or that one mode is preferred over another. FTA has clarified in the revised proposed policy guidance being published concurrently with this final rule that a trip is equivalent to a “linked trip using the project.”

b. Weighting of Trips by Transit Dependent Passengers

Comment:

Fourteen comments supported FTA's proposal to assign a weight of two to project trips made by transit dependent passengers in the mobility improvements measure. Fourteen additional comments supported additional weight for transit dependent trips but requested that FTA provide a clear definition of “transit dependent persons” in final policy guidance. Of the comments that requested clarity on the definition of “transit dependent persons,” one commenter suggested that the elderly be included in the definition, one recommended that persons with disabilities be included, two commented that all zero-car households be included regardless of income level, and two proposed that FTA define transit dependent persons in terms of automobile ownership as a function of household size.

Eighteen comments disagreed with the proposal to assign extra weight to trips made by transit dependent persons. Of these, nine suggested that trips by transit dependent persons be reported as an “other factor” in project evaluation rather than included in the mobility improvements criterion. Three comments suggested that the measure count transit dependent households within one-half mile of stations rather than trips by transit dependent persons. Two comments proposed assigning additional weight to other types of trips instead, with one suggesting that FTA assign more weight to work trips than non-work trips and the other suggesting that FTA give credit to projects that offer travel options to “highway dependent” users.

Response:

FTA is adopting its proposal to weight trips made by transit dependent persons twice that of trips made by non-transit dependent persons in the calculation of mobility improvements. FTA believes the mobility improvements criterion is the appropriate place to incorporate equity considerations into the New and Small Starts project evaluation and rating process given that populations that lack other travel options have a particularly strong need for mobility improvements. To keep data collection requirements manageable, in the simplified national model FTA is developing, trips made by “transit dependent persons” will be defined as trips made by individuals residing in households that do not own a car. Project sponsors that choose to continue to use their local travel model rather than the simplified national model to estimate trips will use trips made by individuals in the lowest socioeconomic stratum in the local model as the measure of trips made by transit dependent persons. Local models classify trips either by household auto ownership or by income level. Thus, trips made by transit dependent persons would be either trips made by individuals residing in households that do not own a car or trips made by individuals in the lowest income category. FTA feels that this proposed approach offers a relatively simple way to incorporate equity considerations into the mobility improvements measure and is consistent with other streamlining proposals included in this final rule. FTA believes that a weight of two on transit dependent trips is appropriate based on data from the National Household Travel Survey, which show that persons in zero-car households make up approximately 8.7 percent of households but make only 4.3 percent of all trips. FTA believes increasing mobility for these transit dependent persons should be considered in the evaluation. FTA notes that MAP-21 eliminated “other factors” as a consideration in the evaluation and rating process.

c. Simplified National Model

Comment:

Ten comments supported the option of using an FTA-developed simplified national model to estimate trips for the purposes of the cost-

effectiveness and mobility improvements criteria. Three comments opposed the use of a simplified national model due to concerns that the model would not be adequately calibrated to the particularities of each region. One of the three felt that the model may be reasonable for Small Starts or Very Small Starts projects, but not robust enough for New Starts projects.

Several comments expressed concerns about the simplified national model without indicating support or opposition. Eleven comments indicated a preference for using travel forecasting approaches already in place in their localities. Seven comments stressed that the national model's approach should be transparent, tested by project sponsors, and neutral in its assumptions. Six comments (beyond the three that opposed the use of the simplified national model) indicated that the model may not replicate local conditions. Finally, four comments anticipated that FTA's proposal would require more effort because many project sponsors would likely feel compelled to prepare forecasts using both the simplified national model and their local travel model.

Response:

FTA is making use of the simplified national model optional. The simplified national model is currently being developed by FTA and will only be made available to project sponsors after it is calibrated against completed transit projects in a range of environments. The model is intended to reduce the effort required by project sponsors to develop the data needed for the cost-effectiveness and mobility improvements criteria. Thus, it fits with FTA's streamlining goals. Moreover, FTA believes that it will allow project sponsors and/or metropolitan planning organizations the option of not expending significant time and resources on modeling refinements when ample data on the performance of transit projects in a wide range of environments would be available through the simplified national model. Regardless of the approach that project sponsors opt to pursue, FTA will continue to work with sponsors to assure that the models used are appropriate and the results as accurate as possible.

2. Environmental Benefits

a. General

Comment:

One comment supported FTA's proposal in the NPRM to measure the direct and indirect benefits to human health, safety, energy, and air quality in the environmental benefits criterion. Two comments were concerned about FTA making the environmental benefits criterion a “catch-all” measure. Seventeen comments supported FTA's proposal to broaden the measures used in the environmental benefits criterion and suggested that FTA look at both direct and indirect benefits to the natural and human environment. Fourteen comments expressed support for including the change in air quality in the environmental benefits criterion. Four comments expressed support for including estimates of the change in greenhouse gas emissions as a measure under the environmental benefits criterion. Nine comments expressed support for including the change in energy use as a measure under the environmental benefits criterion. One comment agreed with the quantitative approach proposed by FTA instead of a simple checklist approach. This comment also agreed with FTA's proposal to specify the details of the approach in policy guidance as opposed to the final rule.

Response:

FTA agrees that a new approach to evaluating and rating environmental benefits is required and is adopting the approach to quantify benefits to human health, safety, energy, and air quality. FTA believes this approach is appropriately focused on the benefits related to human health and the natural environment. As new information or methods for calculating environmental benefits data become available, FTA can propose alternate methodologies in future policy guidance.

Comment:

One comment stated that the proposed environmental benefits measures appeared to favor transit agencies with a variety of fleet vehicles, corridors with high population density, corridors with strong existing transit service, and longer projects due to its use of change in vehicle miles of travel (VMT) as the basis for the various benefit calculations. One comment made a statement about data collection for environmental benefits and stated that a one-size-fits-all approach does not work in an urban setting. This comment also suggested that FTA should consider quality of life issues under the environmental benefits criterion.

Response:

FTA agrees that by using VMT as a basis for the calculation of environmental benefits, longer projects or those projects with a high potential for acquiring new transit riders will generate a greater change in VMT and thus get a higher amount of environmental benefits. This advantage will be somewhat moderated because for New Starts projects environmental benefits will be compared to the annualized capital and operating cost of the project and for Small Starts projects environmental benefits will be compared to the Federal share. FTA does not expect transit agencies with a variety of fleet vehicles, strong existing service, and in areas with higher population density to have an advantage over other transit agencies.

b. Complexity and Suggestions for Simpler Approaches

Comment:

One comment stated that the proposed measures for environmental benefits appeared to be somewhat complex, but went on to say that these types of analyses seem consistent with goals for environmental improvement. Another comment encouraged FTA to keep in mind the desire to simplify the project justification criteria and reduce the subjective measures that require FTA review. A third comment stated there were too many environmental measures proposed and that FTA should simplify the measures and consider warrants. One comment suggested a more qualitative analysis be used to evaluate environmental benefits given that it is difficult to combine and quantify environmental benefits. Another comment stated that because of the breadth and complexity of the measures proposed, they may not be in place at the time the final rule is published. This comment encouraged FTA to continue with the multi-measure approach.

Response:

In choosing measures to use under the environmental benefits criterion, FTA's goal was to ensure that calculation of the measures would not impose an undue burden on project sponsors. FTA is adopting measures that are based on data coming directly from the project analysis methods normally used by project sponsors during project planning, as well as adopting simplified approaches for calculating environmental benefits. Through revised proposed policy guidance being published concurrently with the final rule, FTA is requesting public comment on a simple spreadsheet tool that will allow project sponsors to input only a few key data. The spreadsheet will use standard factors to calculate the various environmental benefits and monetize them, including air quality, greenhouse gas emissions, energy, and safety. The factors are shown in the revised proposed policy guidance.

FTA agrees it can be difficult to quantify environmental benefits and combine the measures into a meaningful value. To overcome this difficulty, FTA is using DOT-standard economic values or other published environmental and health economic research to monetize

the various measures of environmental benefits. By converting the environmental benefits into dollar values, they can easily be combined. FTA anticipates it may be necessary at some point in future proposed policy guidance to update the measures or modify the spreadsheet tool as new information and research becomes available.

c. Additional Information Sources

Comment:

One comment recommended that FTA wait for the publication of the TCRP Report on Environmental Benefits before advancing measures and data sources. Another comment suggested that, in addition to using U.S. Environmental Protection Agency (EPA) and TCRP guidance to develop its measures, FTA should examine American Public Transportation Association (APTA) Sustainability Commitment metrics. This comment also suggested FTA create a system of data collection to enable project sponsors to use more specific environmental data when available (e.g., utility electricity emission factors vs. EPA regional grid factors).

Response:

FTA agrees that information from TCRP's Report on Environmental Benefits was a helpful resource in defining the environmental benefits measures. FTA wrote the problem statement for that TCRP study and served as part of the review panel for the study. FTA has considered the research and findings in the development of the final rule and revised proposed policy guidance. If new or revised information on calculation methodologies becomes available they could be incorporated into the environmental benefits criterion in the future by FTA through policy guidance.

d. Monetization of Environmental Benefits

Comment:

Two comments stated support for the monetization of environmental benefits, and one comment added that monetization of benefits “can be good public policy.”

Thirteen comments expressed concern that monetizing environmental benefits would cause people to view it as a cost-benefit analysis when it is not attempting to capture all benefits. One comment added that environmental benefits do not need to be monetized because several other project justification criteria include cost considerations. Another comment stated it is appropriate to evaluate the environmental benefits of a project against the project's size or cost, but the environmental benefits themselves should not be monetized. One comment recommended, instead of monetizing environmental benefits, creating a second part to the cost-effectiveness criterion that would compare environmental benefits to the cost of the project.

Response:

One of FTA's goals is to streamline the evaluation and rating process to the extent possible while maintaining sufficient rigor in the process to inform decision-making on whether taxpayer dollars should be invested in a project or not. FTA believes a detailed analysis of the net impacts of certain environmental factors, as may be required to support a cost-benefit analysis, is unnecessarily complicated. Instead, FTA is focusing on relevant environmental benefits that are most easily addressed, such as changes in air quality pollutant and greenhouse gas emissions, energy use, and safety. FTA notes that a complete review of all environmental effects, is still required as a part of the NEPA process (including through the use of linking planning and NEPA as provided for in 23 CFR 450.318), performed prior to entering into the engineering phase and independent of the particular variables chosen as part of the environmental benefits measures. FTA believes that at a later date it may be possible to develop an approach for assessing public health benefits. Monetizing these environmental benefits using existing economic methods and research is the simplest and most transparent way to combine the results into a single measure of environmental benefits. FTA is adopting the proposal to compare the combined monetized value of environmental benefits to the annualized capital and operating cost of a proposed New Starts project or to the Federal share of a proposed Small Starts project in order to ensure fair comparison of environmental benefits across widely variant projects. FTA believes it is best to compare the benefits to cost in the environmental benefits criterion, rather than combining environmental benefits into the cost-effectiveness criterion, because combining the two would not comport with the requirement in law that there be a separate environmental benefits criterion and that it be given “comparable, but not necessarily equal weight” in the evaluation process.

Comment:

Three comments stated that a reliable tool does not exist that can accurately capture the full monetary value of environmental benefits. One comment felt monetizing environmental benefits would work against streamlining the process. Two comments suggested environmental benefits are subjective and that regions of the country do not have uniform environmental needs. These comments went on to say that attempting to monetize or uniformly quantify all environmental benefits for a national ranking may prove contrary to the overall goal of encouraging projects that provide environmental benefits as one of their key elements. These comments added that FTA should take a measured approach to monetization. One commenter recommended that FTA conduct an analysis of the “impact” of the monetization approach on projects that have successfully received New Starts and Small Starts funds in the past before finalizing the environmental benefits measures.

Response:

FTA is not proposing and does not believe that it is necessary to capture the full monetary value of all environmental benefits generated by implementation of a major transit investment as would be necessary for a cost-benefit analysis. Instead, FTA is focusing on the potential environmental benefits most relevant and easily calculated on a national scale, such as changes in air quality pollutant and greenhouse gas emissions, energy use, and safety. FTA believes that at a later date it may also be possible to develop an approach for assessing public health benefits. FTA is using established methods and research to quantify and appropriately monetize these environmental benefits.

FTA recognizes the diversity of environmental settings throughout the country and that transit projects may have different, specialized effects on the human and natural environment depending on the environmental setting. FTA believes it is best to evaluate and mitigate, as appropriate, these specialized effects through the NEPA process. But FTA believes that the evaluation of changes in air quality pollutants and greenhouse gas emissions, energy use, safety, and, potentially some point in the future, public health benefits, is appropriate. These can be evaluated fairly and uniformly across the country to identify the merits of individual transit projects.

FTA believes transit projects are developed to meet numerous goals, one of which is to improve the environment. Similarly, the environmental benefits criterion is just one of six project justification criteria in the New and Small Starts evaluation process. FTA disagrees that the proposed environmental benefits measures would change or discourage environmental goals.

FTA is currently testing the environmental benefits measures with data from existing transit projects and will continue to do so prior to issuing final policy guidance. As expected, transit projects that reduce the greatest amount of VMT and New Starts projects with relatively lower costs or Small Starts projects with relatively lower Federal shares perform better than projects that do not result in substantial changes in VMT or have a very high cost or Federal share. FTA recognizes the primary goals and objectives of some projects seeking New or Small Starts funds are to make the transit system network run more efficiently and to improve mobility of existing transit riders. Although these types of projects would not result in substantial reductions in VMT and might, therefore, receive a lower environmental benefits rating, they would likely perform well under some of the other project justification criteria.

Comment:

One comment suggested that instead of monetizing environmental benefits FTA develop warrants for evaluating environmental benefits related to development densities and land use patterns. Another comment suggested that, in lieu of monetization of environmental benefits, FTA use a checklist approach to allow projects to more easily demonstrate environmental improvements across an array of areas. This comment went on to suggest that the checklist include improvements to the natural environment through restoration of degraded wetlands, the clean-up of contaminated sites, and reductions in accidents at pedestrian crosswalks or railroad crossings. Another comment stated that, in lieu of monetization of environmental benefits, FTA use a checklist that would ask project sponsors if certain environmental benefits are expected from the proposed project and/or whether the project sponsor participates in a third-party verified environmental program.

Response:

FTA does not agree that a checklist evaluating environmental improvements would be simpler or more advantageous over relatively simple quantitative measures of environmental benefits. In addition, the restoration of wetlands and the clean-up of contaminated sites are actions that are typically governed by or required by federal or state laws and, therefore, would not be an appropriate measure to evaluate the merits of an individual transit project. Also, all transit projects should be designed to avoid accidents at pedestrian crosswalks or railroad crossings to the maximum extent possible. FTA notes that the various environmental issues described in the comments are the kinds of issues that should be addressed through the metropolitan planning and NEPA processes, which would develop mitigation measures to be included in the proposed action in the event there are negative or adverse environmental impacts as a result of the proposed project.

FTA agrees that warrants can be useful in streamlining project evaluation. Such approaches, however, should be based primarily on the evaluation measures being used. In future proposed policy guidance, FTA may propose warrants for the environmental benefits criterion, but is not doing so at this time.

e. Use of VMT Change as Basis for Environmental Benefits

Comment:

One comment stated the current approach of basing the rating simply on the air quality attainment status of the metropolitan area in which the project is located is not related to a project's effects on the environment and supported FTA's proposal for evaluating environmental benefits based on a reduction in VMT instead. The comment also stated that future changes to air quality standards for ozone may cause much of the country to be in nonattainment status, thereby making the current measure even less effective in differentiating between projects.

Response:

FTA agrees that the existing measure, which examines only the EPA air quality conformity designation for the area in which the proposed project is located and does not look at any specific environmental benefits, does not provide a useful basis for decision-making.

Comment:

Two comments did not support evaluating and rating environmental benefits from estimates of changes in VMT based on the idea that VMT-based calculations may not capture all environmental benefits or result in scores that fairly recognize the full environmental benefit of a given project. One comment noted that VMT assessed at a regional level would not capture localized health impacts or benefits of projects on “hot spots” of changes in air quality. The comment noted that, with respect to air quality, technology to assess intra-regional exposure variation and project level pollutant concentrations now exists with computational modeling approaches such as dispersion modeling and land use regression. It went on to say these tools can be used to create maps of cumulative air pollution concentrations within regions. The commenter noted the example of the San Francisco Department of Public Health (SFDPH), which has developed and routinely applies tools to assess local impacts that are being employed in the San Francisco Community Risk Reduction Plan to evaluate whether infill residential development needs additional ventilation system protections. Another comment stated that measuring the change in air quality criteria pollutants would be better for the proposed transit corridor than for the region. Two comments stated that environmental benefits should include changes in VMT for all roadways, not just “highways.” One comment suggested that FTA include environmental benefits due to the future predicted VMT changes resulting from projected development around stations instead of the economic development measure.

Response:

FTA does not believe it is necessary in the New and Small Starts evaluation process to attempt to do a full cost-benefit analysis and capture all of the environmental benefits a transit project may produce as this would conflict with FTA's streamlining objectives. FTA also believes it is unnecessarily complicated to use computational modeling approaches to assess localized “hot spots” changes in air quality for the purposes of the New and Small Starts evaluation and rating process. FTA believes focusing on the most relevant environmental benefits that are more easily estimated and evaluated on a national scale is appropriate, such as changes in air quality pollutant and greenhouse gas emissions, energy use, safety, and at some point in the future human health. These can be derived from estimated changes in VMT and they allow FTA to fairly compare the merits of proposed projects. FTA conducts “hot spot” analyses as part of the NEPA process, as needed, in order to support transportation air quality conformity determinations required by the Clean Air Act.

FTA intends to look at the change in VMT for all roadways and not just changes in highway VMT. Estimates of VMT change will be based on the results of the simplified national model FTA is currently developing, or at the option of the project sponsor, from the results of their local travel forecasting models. FTA intends to continue the current practice of evaluating only the first order effects that come when transportation system users choose to change modes, rather than attempting to quantify higher order effects that might come from changes in land use patterns and increased densities that may lead to changes in destinations. Further, FTA

does not intend to quantify any induced or latent demand on the highway system that could result. FTA believes that while more accurate forecasts of overall transportation system usage might be possible by applying more complex analytical techniques, the increased precision is not worth the additional burden on project sponsors and that a metric relying on first order changes in VMT is sufficient to accurately determine the relative environmental benefits of candidate projects.

FTA believes that the best location to capture the benefits associated with dense, more compact development is in the economic development criterion rather than the environmental benefits criterion. FTA believes it is appropriate to focus the environmental benefits measure on the direct environmental effects that result from changes in mode use as a result of the project. The environmental benefits that might come as a result of changes in development patterns are a secondary impact of the economic development effects of the project.

Comment:

Five comments suggested FTA consider total auto trips reduced given that “cold starts” of vehicles have a disproportionate impact on emissions and fuel consumption.

Response:

FTA agrees cold starts can have a disproportionate effect on emissions and fuel consumption, but they are already included in the average emissions factors.

Comment:

Five comments suggested FTA develop warrants for evaluating environmental benefits. Specifically, two comments stated many transit projects in dense urban areas do not result in VMT reduction, but do support existing dense development and energy-efficient land use patterns leading to walkable and bike-able communities and are still important for air quality emission reductions. These comments suggested that the environmental benefits of these projects should be counted. One of the comments went on to mention this linkage is currently being studied in a TCRP project entitled Quantifying Transit's Impact on GHG Emissions and Energy Use: The Land Use Component. Another comment stated transit projects located in corridors within or near the freeway system would experience more safety benefits based on VMT reduction than would transit projects located away from freeway systems.

Response:

FTA recognizes the primary goals and objectives of some projects seeking New and Small Starts funds are to make the transit system network run more efficiently and to improve mobility for existing transit riders. FTA also recognizes these projects are environmentally beneficial because they sustain or improve transit service and are important components to maintaining regional air quality standards. While these types of projects would not result in substantial reductions of VMT and thereby would receive a lower environmental benefits rating, FTA anticipates they would perform well under the other New and Small Starts project justification criteria.

FTA agrees warrants can be useful in streamlining the New and Small Starts project evaluation process. Such approaches, however, should be based primarily on the evaluation measures being used. In future proposed policy guidance, FTA may propose warrants for the environmental benefits criterion, but is not doing so at this time.

f. Use of a National Model To Assess Environmental Benefits

Comment:

Five comments stated concerns or did not support use of a simplified national model for deriving changes in highway VMT to be used when calculating environmental benefits. Three comments did support the flexibility to use a standard local travel forecasting method at the sponsor's option.

Response:

Because streamlining is one of the main objectives associated with this rulemaking, FTA is proposing that project sponsors, at their option, may choose to use a simplified national model for estimating the number of trips on the project. The information from the simplified national model would be used to estimate the change in VMT, which would then be used to calculate environmental benefits. FTA recognizes estimating VMT in this manner may result in a higher margin of error than estimating VMT through standard travel forecasting tools, but believes the results will be fair estimates of environmental benefits attributable to the transit project. Given the streamlining benefits this approach will allow, FTA believes it will be an attractive option for many project sponsors. FTA will continue to allow project sponsors the flexibility of calculating VMT from their standard local travel forecasting models if they so choose. Project sponsors choosing this approach should recognize that FTA will need to verify the calculations.

g. Valuing Energy and Greenhouse Gas (GHG) Reductions and Recognizing GHG Performance Targets

Comment:

One comment did not support evaluating and rating environmental benefits based on both the change in energy use and the change in greenhouse gas emissions. Another comment suggested that states or regions with GHG performance targets for their regional transportation plans should be acknowledged in the scoring for environmental benefits.

Response:

FTA recognizes a significant part of the benefits that come from reducing energy use are accounted for by the resulting reduction in pollutant and greenhouse gas emissions. To avoid the double counting, the monetary value of energy conservation will be factored down to account for this, and will count only the public benefits related to energy security and will also not include the private benefits which accrue to transportation system users who do not have to purchase fuel. Because there is wide variation in the use of GHG performance targets in regional transportation plans and in the requirements and methods for achieving these targets, FTA could not acknowledge the use of these plans in the scoring for environmental benefits.

h. Inclusion of Health and Safety Benefits in Environmental Benefits

Comment:

Twelve comments expressed support for the inclusion of changes in health in the environmental benefits criterion and nine comments expressed support for the inclusion of safety in the environmental benefits criterion.

One comment acknowledged FTA's efforts to keep the environmental benefits calculations as simple as possible. But this comment recommended FTA limit the evaluation of environmental benefits to only the impacts on air quality and greenhouse gas emissions, which are direct environmental impacts. This comment stated that calculation of change in energy use and health benefits would add time and uncertainty to project evaluations, would not help to distinguish between projects, and would dilute the importance of the direct environmental benefits, which are required to be evaluated under the current statute.

Two comments stated that although reduction in traffic accidents is important, it is not an environmental benefit and is captured in other project justification criteria. One comment went on to say FTA should avoid the complication of trying to measure health and safety separately under the environmental benefits criterion. Another comment suggested the best location to evaluate safety is within “other factors” or within the economic development criterion. Another comment added that safety is captured through the local financial commitment evaluation, which considers funding for

core state of good repair of the transit system. One comment suggested FTA distinguish between transit systems that operate in mixed traffic verses those operating on exclusive guideways.

Response:

FTA disagrees that health and safety are not environmental benefits and believes that some safety and health benefits, in addition to the health benefits that come from improved air quality, should be included in the evaluation. FTA believes it is appropriate to highlight explicitly the safety and public health benefits of transit. Once a methodology becomes available for doing so, FTA believes it will measure public health benefits coming from implementation of a project based on the additional walking and other physical activity that would be expected. FTA notes that MAP-21 eliminates the consideration of “other factors” in the development of a project justification rating.

i. Valuation of Environmental Benefits in Areas of Nonattainment and Maintenance Areas

Comment:

Five comments suggested while reductions in VMT and emissions are a benefit of many transit projects, emission reductions have greater value in metropolitan areas that are in nonattainment of the National Ambient Air Quality Standards. Three of these comments stated FTA's environmental benefit rating should continue to take into account a metropolitan area's nonattainment status. These comments further recommended FTA either increase the environmental benefit rating by one or two levels for projects located in metropolitan areas with the most severe air quality conditions or give a higher monetary value to emission reductions in these areas. One comment felt the New and Small Starts process should favor projects that support regional air quality objectives. Three comments said it is unclear how air quality maintenance areas would be treated and recommended they be treated like nonattainment areas when evaluating environmental benefits.

Response:

FTA believes any reduction in the emission of criteria pollutants would be beneficial to public health. FTA agrees that reductions in pollutant emissions in metropolitan areas in nonattainment or maintenance of the National Ambient Air Quality Standards have greater value than reductions of emissions in areas that are in attainment of those air quality standards. FTA is reflecting these differences in how environmental benefits will be monetized rather than raising a rating by one or two levels.

j. Electric Vehicles and Fleet Energy Use

Comment:

One comment stated electrically powered transit has a significant advantage because the vehicles do not produce any air pollution at the source, adding that the air pollution is generated at power plants, which are usually located away from population centers and employ advanced emission control technologies. The comment also stated that electric vehicles run more efficiently because of faster acceleration. In addition, the comment observed that bus fleets usually use a combination of new and older technologies and the effectiveness of new technologies such as hybrid vehicles in reducing air emissions is uncertain. The comment said it was unclear whether FTA would consider the increase in transit VMT from the new project or whether FTA would also look at system-wide changes. Another comment observed that in some parts of the country the electric generation mix is significantly different from the national average. This comment suggested the factors used by FTA to calculate emissions should be adjusted in these cases and should consider changes to the energy mix in the future.

Response:

FTA does not believe electric vehicles will necessarily have a significant advantage in the environmental benefits measure because some emissions generated from power plants will still be calculated. FTA intends that the environmental benefits measure will consider both changes in automobile and truck VMT and changes in transit VMT to calculate changes in air quality, safety, greenhouse gas emissions, and energy. For transit VMT, FTA will consider changes in VMT associated with the proposed project and changes in ancillary service that may feed into the project. At this time, FTA plans to use national factors based on the national electric generation mix rather than adjusting the energy mix region by region. FTA may consider using regional electric generation mixes in future policy guidance.

k. Health Benefits

Comment:

One comment suggested NEPA may be the more appropriate venue for assessing environmental impacts of a proposed project, and said ideally the New and Small Starts evaluation and rating process would be consistent with NEPA with respect to health findings and analysis.

Another comment recommended the environmental benefits measure for changes in health focus on the air quality of the Community Planning Association (CPA) district where the transit project is located based on the idea that minority and lower-income communities experience the poorest air quality and the highest rates of asthma.

Another comment commended FTA for recognizing the impacts poor transportation decisions have on public health (based on impacts they have on air quality, etc.) This comment suggested FTA find ways to evaluate how transit investments can foster better health through improved environments for accessing transit on foot and related physical activity. It went on to say this is an important step for FTA toward encouraging local and regional decision-makers to prioritize projects seeking to maximize public health benefits and reduce health disparities in the community where a transit project is to be built.

One comment recommended an evaluation tool—such as the Healthy Development Measurement Tool or a health impact assessment—should be used in order to determine the health impact of the transit project. This comment also stated FTA should recommend that project sponsors use health impact assessments as a means of prioritizing transit projects that could reduce health disparities across race and income and achieve more equitable outcomes.

Response:

FTA agrees the results of the NEPA process and the New and Small Starts evaluation and rating process should be consistent with respect to health findings and analysis. During the NEPA process and during evaluations of New and Small Starts projects, FTA works closely with project sponsors to ensure that project descriptions and assumptions that go into each process are consistent with each other and with fiscally constrained long-range transportation plans. FTA is continuing this approach with the implementation of this final rule.

FTA is implementing environmental benefit measures that examine changes in air quality, changes in safety, and, as soon as a methodology becomes available to assess public health benefits, including changes in public health potentially related to walking and other physical activity. FTA recognizes that changes in air quality and changes in safety help with public health, but the measure of health would be focused on items not already captured under the other environmental benefit measures so as to avoid double counting. In monetizing the benefits from changes in air quality, the published literature being used by FTA to develop the factors considers the relationship of pollutants emissions and incidences of disease such as asthma

and other chronic illnesses linked to air quality. FTA does not agree with the suggestion to evaluate health benefits of transit projects at the Community Planning Association district scale as it would add complexity and conflict with FTA's streamlining goals. FTA is including in the final rule an environmental benefits measure of public health benefits associated with walking or physical activity, but is not implementing it until a relatively simple methodology for calculating it can be developed. FTA will consider evaluation tools such as the Healthy Development Measurement Tool as it continues its research.

3. Cost-Effectiveness

a. General Comments

Comment:

Six comments supported FTA's proposed simplification of the cost-effectiveness measure in general. Two comments objected to the proposed simplification, stating the proposed changes would prioritize non-transportation objectives. Of these two comments, one recommended an alternative approach that had been submitted in response to the ANPRM, which is discussed above in the section on mobility benefits. Two comments suggested the cost-effectiveness criterion be renamed “Mobility Cost-effectiveness,” because other types of benefits are not explicitly included.

Response:

FTA is adopting its proposed changes to cost-effectiveness with the exception that FTA will no longer assign additional weight under the cost-effectiveness criterion to trips made by transit dependent persons. Further, as required by MAP-21, for Small Starts projects, the cost-effectiveness calculation will be based only on the Federal share rather than the total project cost. As noted earlier, MAP-21 specifies cost-effectiveness should be measured as “cost per trip”. FTA believes it is important in the mobility criterion to consider trips made by transit dependent persons, but that the cost-effectiveness evaluation should focus instead on total trips on the project without giving extra credit to a particular type of passenger. As noted above, FTA is not adopting the alternative approach received in a comment that was described in the earlier section of this document under the mobility measure since it was not fully described, it would appear to involve a cumbersome process, and it would not meet some of the streamlining goals intended by this final rule.

FTA notes major transit capital projects may serve worthwhile purposes beyond maximizing travel time savings, including improving accessibility to transit dependent persons, providing additional travel alternatives to the automobile, supporting changes in land development patterns around stations that may help to reduce sprawl and slow further congestion in the future, and improving environmental outcomes. The measure for the cost-effectiveness criterion is established in statute, and FTA is not proposing to change it as part of the rulemaking process, but rather is describing how the measure will be calculated, evaluated, and rated in Appendix A of the regulation. In addition, FTA is requesting comments in the revised proposed policy guidance published today on the method for calculating cost per trip. FTA notes that projects that produce significant travel time savings are likely to attract many riders since travel time is a major determinant of a traveler's choice of mode. Hence, the selected measure of cost-effectiveness does in fact account for reductions in travel time even if travel time savings, per se, is no longer the measure being utilized. FTA also notes that the calculation of net travel time savings is significantly more complex and subject to error compared to the calculation of estimated trips.

Comment:

Three comments raised points related to the travel demand models used to forecast trips on the project that is used in the cost-effectiveness calculation. One comment stated no empirical evidence exists for the mode-specific constants used in travel forecasts. Another requested clarification on how special-event ridership would be treated under the proposed cost-effectiveness measure. The third comment encouraged FTA to continue to allow the use of spreadsheets and other travel model alternatives in developing ridership estimates for short streetcar segments.

Response:

As described in the NPRM, FTA notes that it is all the attributes of a mode that cause riders to change modes, but that some cannot be modeled. Thus, FTA believes that mode-specific constants remain a good proxy for such un-modeled factors in travel demand models. FTA currently allows inclusion of special-event trips in ridership totals and will continue to do so. Sponsors of projects may propose use of simplified ridership estimating approaches to FTA. As outlined in FTA's Reporting Instructions, project sponsors should contact FTA to discuss potential alternate analytical techniques when beginning an alternatives analysis. If a sponsor uses a simplified ridership estimating approach, FTA will review the reasonability of the approach and the resulting ridership projections as it does today.

Comment:

One comment requested FTA reconsider its decision not to allow regional differences in calculating project costs. Another comment recommended FTA require project sponsors to analyze baseline causes of delay and to compare current transit travel speeds with estimated free-flow travel speeds.

Response:

As stated in the NPRM, FTA believes it is necessary to evaluate projects consistently rather than based on regional differences since this is a national program with greater demand for funds then there is supply of funds. Regarding travel speeds, FTA believes it is more appropriate to focus on total usage of the project in the cost-effectiveness calculation rather than travel time saved. The state of the art for reliably estimating travel time saved is not sufficiently advanced to make that method more appropriate than estimating total usage. Moreover, comfort, convenience, frequency of service, and travel time reliability will produce increased ridership, and thus will be captured in the number of trips on the project.

b. Discount Rate

Comment:

Nine comments supported FTA's proposal to use a two percent discount rate for calculation of annualized capital costs for use in the measures of cost-effectiveness and environmental benefits. One comment stated two percent is too low and recommended a three percent discount rate.

Response:

FTA is adopting the proposed two percent discount rate based on the fact that these are long term investments.

c. Cost per Trip Measure

Comment:

Twenty-five comments supported FTA's proposed change to a cost-per-trip measure of cost-effectiveness. Nine of these comments requested FTA clarify that a trip is defined as an “unlinked passenger trip” or “boarding” for the purposes of the measure. Two comments proposed defining a trip as a “passenger riding on the proposed project,” but one of these comments made reference to Small Starts projects only. One comment made a series of suggestions, summarized earlier in this document for the horizon year, discount rate, and other values that should be used in the cost-per-trip calculation.

Seven comments opposed the replacement of the current cost-effectiveness measure with the proposed

cost-per-trip measure. Of these, five requested travel time savings be retained as part of the measure, one requested benefits gained by reducing congestion for existing users of the transit system be considered, and one requested the current measure be retained as is.

Response:

FTA is adopting the proposed cost-per-trip measure of cost-effectiveness, except that no additional weight will be assigned to trips made by transit dependent persons. MAP-21 requires the use of cost per trip as the measure of cost-effectiveness. The definition of a trip in this measure is “linked trip using the project,” which FTA defines in the revised proposed policy guidance being published concurrently with this final rule. To support the streamlining of New and Small Starts procedures, FTA will not use multiple measures of cost-effectiveness.

FTA believes travel time savings can be an important benefit of a major transit investment, but observes they have been challenging to estimate reliably. The proposed trip-based measure is intended to be easier to forecast while still providing a good indication of project merit.

FTA has addressed comments on the horizon year, discount rate, and other parameters of the cost-per-trip measure elsewhere in this final rule.

d. Factor-Specific Breakpoints

Comment:

Three comments recommended FTA develop cost-effectiveness breakpoints according to the objectives and characteristics of projects, such as mode-specific breakpoints.

Response:

FTA is using a set of cost-effectiveness breakpoints that will apply to all New Starts projects and different set of breakpoints that will apply to all Small Starts projects. Because MAP-21 specifies the benefits of Small Starts project must be compared to the Federal share, the breakpoints will be different than for New Starts where the benefits are compared to the annualized capital and operating cost of the project. Having mode- or characteristic-specific breakpoints would imply that FTA weights trips and allocates funds according to these factors, which it does not.

e. Elimination of Baseline Alternative Requirement

Comment:

Thirty-eight comments supported FTA's proposal to eliminate the requirement for a baseline alternative for the purposes of calculating cost-effectiveness. Two comments opposed the proposal.

Response:

FTA is adopting its proposal to eliminate the baseline alternative requirement because of the streamlining benefits it will achieve for the New Starts and Small Starts process. Further, MAP-21 explicitly calls for use of the “no-action” alternative for Small Starts projects. Project sponsors have had to spend a significant amount of time, money, and effort to develop a baseline alternative. Often the baseline alternative is one that is never under serious consideration locally for actual construction because it is not desired by local leaders. Thus, developing the baseline alternative becomes simply a cumbersome exercise necessary to meet Federal requirements. The NEPA process requires project sponsors to consider a reasonable range of alternatives, so eliminating the development of a baseline alternative in no way eliminates the need for sponsors to look at various alternatives when making investment decisions. FTA required the development of a baseline alternative because of the use of incremental measures, particularly cost-effectiveness, and the need to help level the playing field for evaluation of a wide variety of projects nationwide. However, developing a baseline alternative was found to be a burdensome process and confusing to many, with the resulting calculation of cost-effectiveness not readily understood by the general public. By moving to a cost-effectiveness measure based on cost per trip as required in law, which is not an incremental measure, developing the baseline alternative as the point of comparison is no longer necessary. Furthermore, FTA believes it is the responsibility of local decision makers to balance the costs, benefits, and risks of various alternatives. Local officials are closest to the unique circumstances of their area and are in the best position to consider all relevant factors when developing alternatives for consideration. These analyses can be conducted as part of the metropolitan transportation planning and NEPA processes. Under MAP-21, only once a project has cleared both processes and a Locally Preferred Alternative is adopted into the Long Range Transportation Plan is a project ready to be evaluated for entry into the newly defined “engineering” stage for a New Starts project.

f. Pre-Qualification—Cost-Effectiveness-Specific

Comment:

Three comments supported FTA's proposal to develop warrants that would allow projects to pre-qualify as cost-effective. One comment suggested a project be able to qualify for the same cost-effectiveness rating as an earlier project in the same corridor if its annualized cost per trip is equal to or less than that of the earlier project. Another comment requested that warrants not favor a particular mode.

Response:

FTA is adopting in this final rule the ability to develop warrants. More information on warrants will be proposed in future policy guidance.

g. Betterments/Enrichments

Comment:

Forty-five comments supported the proposal to exclude certain items, originally defined as “betterments,” from the calculation of cost-effectiveness. Of the comments that supported this proposal, nine supported excluding the costs of pedestrian and bicycle facilities and six supported excluding the costs of LEED design elements. Twelve of the comments stated that allowable “betterments” should be defined by FTA in policy guidance, and four suggested FTA use the same definition of “betterments” used in Circular 5010.D. Ten comments requested FTA be flexible in the definition of betterments to reflect local conditions. Most of the comments that supported excluding “betterments” provided lists of various elements to be considered as “betterments,” including items needed for climate adaptation, energy efficiency measures, safety improvements, noise mitigation, acquiring land for affordable housing, energy reduction elements comparable to LEED certification, structured parking instead of surface parking, off-site pedestrian and bicycle improvements, storm-water management, and a variety of other activities. Three comments opposed the inclusion of parking. Two comments were opposed to excluding the cost of “betterments” from cost-effectiveness altogether. One of these two comments suggested that categorizing elements as “betterments” may result in them becoming ineligible for funding in the future. The other suggested that “betterments” such as LEED certification would be more appropriately captured under the environmental benefits measure rather than the cost-effectiveness measure. Several comments suggested using a different term than “betterments” to reduce confusion with the definition of “betterments” listed in Circular 5010.D. Two comments proposed capping the cost-reduction of “betterments” at 10 percent of project cost.

Response:

As suggested by several comments, FTA is adopting the term “enrichments” rather than the term “betterments” to avoid confusion with “betterments” defined in Circular

5010.1D. FTA believes allowing clearly defined “enrichments” (those elements that go beyond what is needed for the basic functioning of the project) to be excluded from the cost part of the cost-effectiveness calculation for New Starts projects is reasonable and can help to remove disincentives from including higher cost elements whose benefits would not be captured by the final rule's limited number of measures. For example, since the environmental benefits measure is focused on those impacts that come from a reduction in VMT, the environmental benefits of LEED certification of the transit facilities would not be captured in that measure. Likewise, most local travel models around the country are not sensitive enough to account for the number of trips that would be induced by bicycle improvements included in a project such as bike racks or lockers. FTA agrees with the comment received stating that New Starts cost-effectiveness should include only the costs necessary to produce the benefits examined in the cost-effectiveness calculation rather than include all costs. FTA is proposing to define the concept of “enrichments” in the Appendix to this final rule and to provide a list of the “enrichments” it will allow to be excluded from the New Starts cost-effectiveness calculation in the revised proposed policy guidance being published today concurrently with this final rule. Items being proposed as “enrichments” include artwork, landscaping, pedestrian and bicycle improvements, sustainable building design elements, alternative fueled vehicles, and joint development costs. FTA agrees the benefits of such features are not often captured in the primary benefits being evaluated in the cost-effectiveness criterion, but that these features nonetheless produce desirable outcomes such as reduced facility energy use, increased ridership, and/or improved aesthetics and quality of life factors. Although there is merit to the list of concurrent non-project activities or “betterments” described in Circular 5010.D, FTA proposes to limit the number of scope elements that may be considered “enrichments” to only those items non-integral for the planned functioning of the proposed project. Many comments expressed support for maintaining flexibility in what can be considered an “enrichment,” but a similar number of comments expressed concerns about prolonged negotiations with FTA over what may be considered as an “enrichment.” Thus, FTA is proposing a definition of “enrichments” in the Appendix to this final rule, and providing a list of allowable “enrichments” in the revised proposed policy guidance made available for comment today. FTA believes the list of “enrichments” that has been developed is generally consistent with the proposals suggested in the comments on the NPRM. The list of enrichments can be revisited in future proposed policy guidance, however, as more information becomes available. Further, FTA believes its approach for considering “enrichments” is consistent with its streamlining goals in that it will not require significant discussion or “back and forth” verification between project sponsors and FTA. FTA is not including parking in the list of proposed “enrichments” because some parking is clearly integral to some projects. FTA does not believe the “enrichments” it is proposing in the policy guidance would exceeded 10 percent of a proposed New Starts project's total cost.

For Small Starts projects, MAP-21 explicitly calls for FTA to establish ratings based on “an evaluation of the benefits of the project as compared to the Federal assistance to be provided.” Accordingly, FTA will adopt in this final rule a cost-effectiveness measure for Small Starts that compares the Federal share requested to trips taken on the project. FTA will not subtract the cost of “enrichments” from the Federal share considered in the cost-effectiveness measure for Small Starts.

4. Operating Efficiencies

Comment:

Five of the nineteen comments received agreed with the proposed “operating cost per place-mile” measure for evaluating operating efficiencies. Three agreed without any comment and one commented that the project sponsor could lower operating cost per place mile artificially by adding more capacity than warranted. The same comment suggested consideration of efficiency factor adjustments to the measure to allow closer analysis of large and small systems. Another comment suggested FTA implement a spreadsheet or simple tracking tool to calculate the measure and requested that the vehicles and transit services currently in a corridor not have a bearing on how vehicles and transit services for a proposed project are defined for the purposes of calculating place-miles.

Of the fourteen comments that disagreed with the new measure, most preferred using the current measure, which is operating cost per passenger mile. The reason most often cited for not liking the proposed measure was that it considers only service provided and not the level of service utilization. Thus, the comments stated the new measure seems to reward transit projects that simply provide more capacity by increasing frequencies even if those frequencies are not warranted based on estimated ridership levels. Several comments also stated the proposed measure could favor larger systems over smaller systems. One of the comments stated concerns with how FTA would consider standing capacity when calculating place-miles and suggested that FTA would allow certain modes such as bus and heavy rail to assume standing capacity but not commuter rail. Another comment stated that in the determination of place-miles, peak loads should not exceed identified levels of service from TCRP Report 100 (“Transit Capacity and Quality of Service”). A third comment suggested FTA use “operating cost per place-hour” instead given that it measures service provided as “operating cost per place-mile” but does not reward projects in areas where commute distances have ballooned due to sprawl and insufficient planning for growth.

Response:

MAP-21 eliminates “operating efficiencies” as a project justification criterion and instead calls for including a “congestion relief” criterion Accordingly, FTA will no longer include a measure for operating efficiencies. Because a measure for “congestion relief” was not proposed in the NPRM, FTA is proposing in the revised policy guidance published concurrently with this final rule to assign a medium rating for congestion relief for all projects seeking New and Small Starts funds until such time as subsequent interim policy guidance and rulemaking can be completed to allow for public comment on a proposed measure for the criterion.

5. Economic Development Effects

a. General Comments

Comment:

Forty-two general comments were offered on the proposed economic development criterion, which was that FTA would evaluate and rate the extent to which a proposed project is likely to enhance additional, transit-supportive development based on the existing plans and policies to support economic development proximate to the project. Twenty-six of these agreed with the proposed economic development criterion. Of these, 10 offered general support for including economic development in project evaluations; three suggested broader measures for economic development and consideration of scenario-based analysis of direct changes to VMT; two supported the use of more qualitative measures; one suggested the inclusion

of the track record of jobs created; one recommended additional research; one suggested assessing how local and regional plans and policies would allow for future transit-oriented development; and eight did not make specific recommendations.

Six comments disagreed with the proposed economic development criterion. Two of these comments suggested additional research. One comment stated there is a contradiction between corridor-level versus regional-level analysis. One comment asserted that FTA's proposal does not adequately distinguish between economic development and land use. One comment stated that transit's ability to reduce transaction costs and increase productivity is not sufficient to cluster or intensify development. One comment stated that transit agencies have little land use authority.

Ten of the comments received were neutral about the proposed economic development criterion or did not offer a clear position. Five of these comments pertained to jobs. They mentioned evaluating the percent of jobs accessible via transit before and after project implementation, consideration of job growth policies and job creation and potential, and the use of a warrant-based approach based on current levels of employment density. Two comments stated higher land values could be a negative effect of transit. One of the two comments recommended more attention to value capture. Three comments suggested consideration of plans and policies or proactive measures such as funding committed through public-private partnerships.

Response:

FTA appreciates the general support of the improved economic development criterion. FTA believes the clustering of development around a transit investment is a key measure of the value of the project. Transit projects can help local areas improve the livability and sustainability of their communities by increasing transportation choices and access to transportation services; improving energy efficiency, reducing greenhouse gas emissions and improving the environment; and improving the environmental sustainability of the communities they serve. Improved access to jobs and activity centers can contribute to local economic growth. FTA agrees with the comments that suggest additional research for this measure.

b. Affordable Housing

Comment:

Thirty-nine comments were received in response to FTA's proposal to examine the plans and policies in place to maintain or increase affordable housing in the project corridor under the economic development criterion.

Twenty-six of the comments agreed with including affordable housing plans and policies in the evaluation of economic development. Of these comments, the majority gave general support for evaluating affordable housing and transit-oriented development. Several recommended FTA define affordable housing and provide further guidance about how it would be evaluated. Suggestions provided by several comments included examining plans and policies related to employer-assisted housing, community land trusts, inclusionary zoning, programs to preserve subsidized housing, and programs for attracting workforce and market-rate housing. Two comments suggested FTA examine affordable housing funding per track mile. A few comments stated FTA should coordinate with other agencies on developing how it would evaluate plans and policies to support affordable housing, including the U.S. Department of Housing and Urban Development (HUD) and the Partnership for Sustainable Communities. One comment stated FTA should examine the affordability of new residential development near transit stations.

Three comments disagreed with including plans and policies to maintain or increase affordable housing under the economic development criterion. One comment stated affordable housing should be addressed through public policy, rather than transit policy. One comment suggested it should be considered under the land use criterion, not the economic development criterion. Another comment stated plans and policies should not be included because transit agencies can only support, not mandate, plans and policies.

Ten of the comments received about the proposal to evaluate plans and policies to maintain or increase affordable housing were neutral or did not offer a clear position. Two of these comments suggested giving greater weight to proposals that exceed a minimum number of accessible units and that maximize three-bedroom family-sized units. One comment recommended that FTA develop strategies that communities can use to preserve affordable housing. Another comment recommended including “workforce housing.” One comment suggested rewarding areas that minimize displacement. One comment proposed “affordability of new residential development near transit stations.” One comment stated that townhouses should meet ICC-ANSI Type C unit requirements for “visitable” housing. One comment supported more FTA efforts to collaborate with others. Finally, one comment recommended FTA focus on projects that reduce combined housing and transportation costs.

Response:

FTA is expanding its current practice of evaluating transit supportive plans and policies under economic development by including an examination of the plans and policies to maintain or increase the supply of affordable housing in the project corridor because FTA believes that maintaining affordable housing near transit creates more inclusive communities and helps to ensure lower income families have ready access to transit. FTA has outlined in the revised proposed policy guidance published today how it proposes to examine affordable housing plans and policies. The revised proposed policy guidance has been developed in coordination with HUD and is subject to public comment. FTA appreciates the suggestions provided and has taken them into consideration. In addition, FTA will evaluate the amount of existing affordable housing in the project corridor under the land use criterion.

FTA disagrees with comments stating affordable housing should not be addressed through transit policy based on the idea that affordable housing is a land use issue and not an economic development issue, and the comments stating that affordable housing plans and policies should not be included because transit agencies cannot mandate these plans and policies. Affordable housing is an economic development and land use issue because transportation access to affordable housing has great potential to stimulate new development and foster the future economic growth of an area. FTA recognizes transit agencies cannot mandate these plans and policies and they are instead developed by localities. But FTA believes the nature of the area surrounding transit has a great impact on its success, and, thus, through these requirements FTA encourages transit agencies to coordinate and form partnerships with localities to guide transit-supportive development and affordable housing.

c. Job Creation

Comment:

Six comments were received in response to FTA's proposal to report under the economic development criterion the number of domestic jobs created by the design,

construction, and operation of the proposed project. Four of the comments agreed with including job creation as a measure of economic development. One of these suggested “full-time equivalent jobs” as the measure. Another recommended reviewing the track record of local transit supportive policies and domestic jobs created. One comment disagreed with the consideration of job creation, stating any figures would be based on industry averages and not on specific work plans for constructing the project. Thus, the commenter felt such a measure was likely to correlate directly with project cost and did not need to be reported separately. Another comment neither agreed or disagreed, but suggested FTA develop a methodology for calculating indirect jobs based on a measurement of a station area.

Response:

FTA believes the number of domestic jobs related to the design, construction, and operation of a project is one indicator of how the transit investment contributes to local and regional economic development. FTA is not specifying a methodology for estimating job creation, but rather is allowing project sponsors to determine how to calculate the figure. FTA would not use the estimated number of domestic jobs in development of the economic development rating, but would simply report the number for the project as an informational item. FTA acknowledges that these jobs do not necessarily reflect net increases to overall U.S. employment. A net increase would result to the extent that these workers would otherwise be unemployed or underemployed. When the economy is at full employment, jobs related to New Starts and Small Starts projects are unlikely to have an impact on net overall U.S. employment; instead, labor would primarily be shifted from one sector to another. On the other hand, during a period of high unemployment, jobs related to New Starts and Small Starts projects may affect net overall U.S. employment because the labor market is not in equilibrium.

d. Optional Quantitative Analysis

Comment:

Thirty-five comments were received in response to FTA's proposal to allow project sponsors, at their option, to perform a quantitative analysis that would estimate the change in indirect VMT resulting from changes in development patterns anticipated with implementation of the proposed project and then monetize the resulting benefits for comparison with the same annualized capital and operating cost of the project as used in the cost-effectiveness measure.

Twenty-one of the comments agreed with allowing an optional quantitative analysis to be prepared and submitted for evaluation under the economic development criterion. Several suggested FTA continue research in this area and develop guidance or a specific methodology for undertaking the analysis. Two comments supported the optional quantitative analysis, but were concerned with monetizing the benefits and comparing them to cost, stating it could give the impression the measure is a cost-benefit calculation that intends to capture all benefits when it does not. One comment supported an analysis of workforce access for New Starts projects only and not for Small Starts projects. One comment agreed with an optional quantitative scenario analysis but felt that VMT evaluation should be kept under the environmental benefits criterion.

Nine comments disagreed with the proposal to allow an optional quantitative analysis. Three of these comments asserted such an analysis is not well linked with economic development. Three of the comments stated the methodology is unclear and offered an alternative approach. One such suggested approach was to use direct measures such as increased density, job density, affordable housing, and property tax records. Another suggested approach was to consider past regional performance. One comment stated that increased density does not translate to less VMT or job creation. Several of the comments that disagreed with the proposal expressed concern with monetizing the benefits.

Five of the comments received were neutral or did not offer a clear position in agreement or disagreement. Four of these comments wanted the analysis to examine job accessibility such as change in station area access to the regional work force within 40 minutes of transit travel time. One stated that FTA should acknowledge that the purpose of many projects is to retain existing development levels.

Response:

FTA believes allowing project sponsors the opportunity to do scenario analyses and estimate indirect changes in VMT resulting from changes in development patterns provides additional insight into the potential economic development effects of the proposed project. Such studies can assess whether denser land use patterns in the corridor that may result from implementation of the project will produce fewer VMT than if the development occurred elsewhere in the region at lower densities. Such analyses are not expected to produce results suggesting that the project is likely to induce additional growth in a region as a whole, but instead are likely to focus primarily the impacts of redirecting land development in the region. FTA notes that a recent Transit Cooperative Research Program (TCRP) report—“TCRP Web Only Document 56—Methodology for Determining the Economic Development Impacts of Transit Projects”—may provide useful insight into how such studies could be conducted. Such studies could lead localities and metropolitan planning organizations to reexamine growth plans and policies to reinforce transit-supportive development. FTA already uses direct measures such as existing population and employment densities to rate projects under the land use criterion. Similarly, FTA already considers past demonstrated regional performance in implementing transit supportive plans and policies under the economic development criterion and plans to continue to do so.

For some time, FTA has been researching methodologies for estimating economic development benefits resulting from implementation of transit projects. FTA sought comment on one potential approach it developed for undertaking such an analysis, but was told in the public comments received that the approach was too cumbersome and time consuming. Through the ANPRM, FTA again sought ideas on how to examine the economic development effects of transit projects. Again, no clear, consistent methodology was suggested that could be implemented nationwide using readily available and verifiable data. Thus, FTA is not prescribing an approach, but allowing project sponsors to undertake the analysis only at their option and only with a methodology they believe makes sense. FTA will continue to research better ways to measure economic development and perhaps propose a specific methodology in future policy guidance.

FTA understands the concerns noted with monetizing the benefits resulting from the change in indirect VMT and comparing them to the annualized capital and operating cost of the project, but believes under the multiple measure evaluation approach specified in law no single measure will be interpreted as a full cost-benefit analysis.

6. Policies and Land Use Patterns That Support Public Transportation

a. General Comments

Comment:

Twenty comments were offered on FTA's proposal to base the

land use criterion on the existing population and employment densities in the corridor and the amount of existing publically-supported housing in the corridor today. Twelve of these comments agreed with the proposed land use criterion. One of these emphasized that parking management and pricing policies are key contributors to making transit effective and suggested giving credit to communities that develop parking strategies that complement transit mobility goals. One of the comments in favor of the proposed approach suggested the breakpoints for the land use measures be geared to the cost of the project and the level of population density. Another in favor of the proposed approach expressed appreciation for publically supported housing terminology that permits consideration of both traditional federally-supported public housing as well as other affordable housing developments subject to long-term affordability restrictions. This comment recommended FTA define the term “publically supported housing” in its policy guidance and provided thoughts on what it should include. One comment suggested adding a review of bicycle and local transit-friendliness of the project area under land use.

Four comments disagreed with the proposed land use criterion. Two suggested that rather than looking at existing land use only under this criterion, FTA should also examine regional and local planning documents and policies to support transit-oriented development. Another comment noted FTA does not explain why it proposed to focus on existing conditions only under the land use criterion rather than also looking at future conditions. One comment stated transit agencies have little land use authority and cannot control what is built.

Four of the comments received on the proposed land use criterion were neutral or did not offer a clear position. One of these recommended FTA clarify how it will evaluate non-central business district parking. One suggested adding to the evaluation the number of existing jobs within a corridor. One recommended a higher weight for the land use criterion given that existing patterns in corridors provide strong indicators of project success for environmental benefits, economic development, mobility, and operating efficiencies. One advocated that poor pedestrian accessibility reduce a land use rating.

Response:

FTA stated previously on numerous occasions that it is difficult to separate land use and economic development when evaluating proposed projects. Thus, for quite some time, FTA chose to evaluate and rate them together. But the SAFETEA-LU Technical Corrections Act required FTA to give each of the six project justification criteria comparable, but not necessarily equal, weight, which required FTA to evaluate land use and economic development separately and give them distinct ratings. Consequently, FTA chose to look only at existing land use under the land use criterion and to examine the potential the project has of leading to economic development by evaluating transit supportive plans and policies under the economic development criterion. MAP-21 renames this criterion slightly to “Policies and Land Use Patterns That Support Public Transportation” and continues to require that the evaluation criteria be given comparable, but not necessarily equal weights. Thus, land use and economic development must be differentiated. To evaluate land use, FTA will continue to examine existing corridor and station area development, including population and employment within one-half mile of station areas. FTA will also continue to examine corridor and station area parking supply, costs, and parking strategies that support transit-supportive development. Evaluation of pedestrian accessibility will remain a corridor characteristic that FTA examines under the land use criterion as well. Existing site and urban design and the mix of uses serve as key features for evaluating the station area development character under the land use criterion. Lastly, FTA believes examining the amount of affordable housing in the corridor today makes sense given the higher propensity of lower income individuals to take transit. FTA will evaluate the existing amount of affordable housing in the project corridor under the land use criterion. Use of this broader terminology in the Appendix to the regulation will ensure that consideration is given to more than just federally-supported public housing. In this measure, FTA is assessing the current situation with regard to affordable housing. In contrast, the economic development measure is assessing the local plans and policies in place to help ensure affordable housing in the corridor is maintained or increased.

FTA does not agree the breakpoints for the various measures under the land use criterion should be based on the cost of the project or the level of population density. Effective transit service requires sufficient densities of people and destinations to make it affordable and efficient, regardless of project cost.

FTA agrees transit agencies often have little or no authority over land use decisions. But FTA believes that sufficiently dense land uses are a significant factor in the success of a transit project, and thus FTA expects that transit agencies can engage in discussions with the localities that have decision-making authority over land use in the project corridor.

b. Publically Supported Housing

Comment:

Twenty-two comments were offered in response to FTA's proposal to include an examination of the amount of publically supported housing under the land use criterion.

Nineteen of these comments agreed with the proposal. Most of the comments supported this approach because of the link between transportation and housing policy and the fact that lower income families tend to use transit more frequently than higher income families and provide stable transit ridership and revenue. Several of the comments expressed concern that using HUD data only in the evaluation might underrepresent publically supported housing, and suggested a more expansive approach be used. Some comments recommended a broad definition of publically supported housing that includes housing supported by low-income housing tax credits, housing supported by other affordable housing programs, and housing that includes rent-restricted or income-restricted units per a government program. One comment suggested using the term “publically assisted housing” rather than “publically supported housing.”

Three comments disagreed with the consideration of publically supported housing. One of these comments suggested that the proposed approach would duplicate the consideration given under the mobility measure (double weight for transit-dependent trips). One comment suggested FTA consider all housing units in the measure.

Response:

FTA agrees that transportation and housing policy should be linked. FTA appreciates the comments and suggestions received for how FTA should examine affordable housing in the corridor. Although FTA recognizes there may be other methods for calculating the amount of publically supported or affordable housing in the project corridor, our goals for developing a streamlined and simplified evaluation process require that FTA stick with measures that are easily calculated based on available data. Thus, FTA is outlining in the revised

proposed policy guidance being published today how it will evaluate the amount of existing affordable housing in the project corridor using data obtained from local housing agencies and the Census. Use of this broader terminology in the Appendix to the regulation will ensure that consideration is given to more than just federally-supported public housing. FTA notes that the measure being used focuses on housing units defined as affordable and does not consider the possible use of housing vouchers.

FTA does not believe an evaluation of the extent of affordable housing in the corridor is duplicative of the trips made by transit dependent persons considered under the mobility measure, just as trips on the project used in the mobility criterion is not the same as total population and employment in the corridor evaluated under the land use criterion. The numbers are correlated but not the same. Thus, FTA believes it is prudent to examine them. The mobility criterion evaluates estimated usage of the project, while the land use criterion evaluates the transit supportive nature of the corridor in which the project is being located.

6. Other Factors

Comment:

FTA received a total of 16 comments related to “other factors.” One comment suggested project sponsors be given the opportunity to define the key features of their projects that might qualify as an “other factor.” Several comments made specific suggestions of possible other factors including: user benefits, if that measure is no longer used for mobility improvements and cost-effectiveness; multimodal connections; livable communities; other public investments; innovative construction or procurement methods; consistency with Regional Sustainability Plans; and unusually large amounts of health, energy use, or traffic impacts. One comment suggested that consideration of other factors is not authorized in law. One comment suggested that the “trip not taken” be included as an “other factor.” Two comments suggested that adequate facilities should be provided to transit dependent users, particularly those with disabilities. Two comments suggested that project sponsors should be given incentives to ensure adequate consideration of fair and affordable housing and environmental justice. On the other hand, one comment questioned why environmental justice was included as an “other factor.” Two comments suggested trips by transit dependent persons be counted as an “other factor,” rather than being treated as part of the mobility and cost-effectiveness criteria. One comment suggested high gasoline price scenarios be explicitly considered. Another comment suggested projects in areas with a strong transit riding culture or in areas where consideration is given to communities of concern be given priority.

Response:

MAP-21 eliminates “other factors” as a separate consideration in the evaluation process. Accordingly, this final rule does not include “other factors.”

C. Local Financial Commitment

Comment:

Thirty comments were received on FTA's proposal to evaluate local financial commitment by examining: current capital and operating condition (25 percent of rating); commitment of capital and operating funds (25 percent of rating); reasonableness of capital and operating cost estimates and planning assumptions/capital funding capacity (50 percent of rating); and the non-New Starts share of the proposed project (can raise the overall local financial commitment rating one level if greater than 50 percent). Of these, twenty-one agreed with the proposed approach, two disagreed with the proposed approach, and six neither agreed nor disagreed but opined on alternate approaches for evaluating some of the metrics.

Of the comments that agreed with the proposed approach, several stated that combining the evaluation of the capital and operating plans made sense given their interdependency. A majority were in favor of FTA's proposed approach of encouraging overmatch by using the share of non-New Starts funding contributed to the project as a way to boost the overall local financial commitment rating one level. These comments suggested further that FTA consider overmatch provided on the project sponsor's entire capital program. One of these suggested that rather than giving a one rating level boost to projects with significant overmatch, that FTA instead develop a graduated scale of rating improvements that could be possible based on the amount of overmatch.

A majority of the comments that agreed with the proposed approach also supported the expansion of pre-qualification or warrants to the local financial commitment rating of New Starts projects. Specifically, these comments suggested the same warrant that applies to Small and Very Small Starts projects be applied to New Starts projects. In other words, the comments suggested that if the estimated operating and maintenance cost of the proposed New Starts project is five percent or less of current system-wide operating and maintenance costs, the project should qualify for an automatic local financial commitment rating of medium without having to submit a detailed financial plan for evaluation and rating.

Several comments received in support of FTA's proposed approach for evaluating local financial commitment suggested FTA allow additional flexibility as to when funds need to be committed and in what shares under the commitment of funds subfactor. A few of these comments made specific reference to clarifying the commitment of funds necessary for design-build projects. Another comment suggested FTA be flexible when evaluating the current condition of project sponsors that have had to cut service due to extenuating circumstances. Another suggested that FTA's consideration of fleet age under the current condition subfactor take into account future vehicle purchases programmed in the long-term financial plan as well as reasonable vehicle life-cycles.

Another comment received in support of FTA's proposed approach suggested FTA ensure nationwide consistency, while considering geography, local economic conditions, and the age of the local transit system in its evaluation.

Of the comments received on the NPRM that disagreed with FTA's proposed approach to evaluating local financial commitment, one suggested FTA not use fleet age as a metric under the current condition subfactor. Instead, the comment suggested FTA use mean distance between failures as the metric. The comment felt using fleet age alone does not take into consideration aggressive preventative maintenance and rehabilitation programs that may be in place to extend the useful lives of vehicles.

Another comment that disagreed with FTA's proposed approach suggested FTA eliminate the examination of whether there have been significant service cutbacks in recent years when evaluating the current condition of the project sponsor. This comment felt service cuts do not necessarily reflect an agency's financial condition and the other metrics identified in FTA's proposal for evaluating current condition provide a more accurate representation.

Of the comments received on the NPRM that neither agreed nor disagreed with FTA's proposed approach, one suggested extra credit should be given in the evaluation process to project sponsors that are able to secure private contributions to the project. This same comment suggested FTA include

measures that will encourage states or regions to implement new taxes or user fees. Another comment suggested instead of evaluating the commitment of capital and operating funds for the project and the entire transit system, FTA instead look at “the commitment of capital and operating funds for the project and for maintenance of effort towards its own local transit system(s) as well as toward any regional system which the project sponsor is obligated to support financially.” Another urged FTA to recognize that state law or enabling legislation may limit a project sponsor's ability to make local financial commitments. Similarly, a separate comment stated that local legislative limitations may exist that would prevent a project sponsor from making capital commitments beyond a five-year timeframe. Lastly, one comment mentioned value capture should be used to evaluate local financial commitment.

Response:

FTA believes the approach outlined in the NPRM and being adopted with this final rule reflects the interaction between capital and operating budgets and, therefore, reduces redundancy in the current evaluation process. MAP-21 specifies that the proposed New Starts or Small Starts share of a proposed project can only help the local financial commitment rating and not hurt it. Thus, FTA believes it is appropriate to evaluate the share only to the extent that significant overmatch is provided. Although FTA understands the reasoning behind the comments that suggest FTA consider overmatch on a project sponsor's entire capital program rather than simply the proposed project, FTA believes such an approach would be difficult to put into practice as there would be no way for FTA to verify the data on overmatch submitted by project sponsors. Additionally, it is likely such an approach would lead to all projects receiving an artificially high local financial commitment rating simply because of overmatch provided for ongoing capital rehabilitation and repair projects rather than because of the strength of the financial plan for constructing and operating the proposed project.

The metrics used to evaluate current condition of the project sponsor have worked well for FTA over the past decade to differentiate among projects, including fleet age, recent bond ratings, the ratio of current assets to current liabilities, and whether there have been significant service cuts in the recent past. FTA does not agree that service cuts are an ineffective indicator of the current condition of the project sponsor. Although service adjustments to improve efficiency are routinely made by project sponsors, these do not typically include significant service reductions. Significant reductions in service generally are not undertaken unless a transit agency is facing a sizeable budget shortfall. FTA agrees fleet age in and of itself does not reflect the current capital condition of the project sponsor as different agencies have difference preventative maintenance and rehabilitation cycles for their vehicles. But there is no single definition used by the industry for mean distance between failures, and FTA would have no way to verify such data, whereas fleet age can be verified against what is reported in the National Transit Database. Thus, FTA believes fleet age is the best metric to use at this time. FTA does not agree that examination of fleet age should take into consideration future vehicle purchases. Fleet age is used by FTA to evaluate the current condition of the project sponsor, not a future condition.

With regard to the evaluation of the amount of funds committed to a project, FTA believes it has clear guidance on how it defines committed versus budgeted versus planned funds. These definitions already take into consideration unique local circumstances or legislation that may make commitment of funds beyond a given timeframe difficult. The law requires FTA to evaluate the degree of local financial commitment, including evidence of stable and dependable financing sources to construct, maintain, and operate the transit system or extension, and maintain and operate the entire public transportation system without requiring a reduction in existing services. FTA does not believe design-build projects should operate under a different set of rules with regard to the level of committed funds required at the various stages of project development.

In evaluating the strength of a project sponsor's financial plan, FTA believes private contributions and value capture mechanisms should be considered in the same way other sources of funds are considered. FTA does not believe it is the role of the Federal government to encourage states or regions to implement new taxes or user fees.

In this rule, FTA is including the opportunity for projects to pre-qualify for various criteria based on project characteristics or the characteristics of the corridor in which a project is located. At this time, FTA is implementing a pre-qualification or warrant for the overall local financial commitment rating for Small Starts and Very Small Starts projects only and not for New Starts projects. In future policy guidance, FTA may decide to expand local financial commitment warrants to New Starts projects. Such guidance would be subject to a public comment process.

D. Process for Developing and Overseeing New Starts and Small Starts Projects

1. Pre-Award Authority

Comment:

FTA received 18 comments on its proposal to codify current practice with respect to those activities for which pre-award authority is given and at what points in time, meaning when project sponsors are given approval to begin certain activities prior to award of a grant but retain eligibility of those activities for future Federal reimbursement should a future grant be awarded. All of these comments agreed that codification of the practice was desirable, with 12 of the comments suggesting that FTA expand the list of activities eligible for pre-award authority at various stages of the process. In addition, three of the comments suggested that pre-award authority for Small Starts be explicitly included.

Response:

Because of the changes made to the steps in the New Starts and Small Starts processes by MAP-21, FTA is not finalizing the parts of this regulation concerning these steps at this time. This includes the provisions related to pre-award authority and letters of no prejudice. This will be the subject of subsequent interim policy guidance and rulemaking.

2. Alternatives Analysis

Comment:

FTA received six comments suggesting modification of the definition of the Locally Preferred Alternative (LPA) selected at the conclusion of the alternatives analysis to be the “locally preferred mode and general alignment.” In addition, four comments suggested the regulation be

This text is long and has been trimmed here. Open the source document for the complete record.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.