FEDERAL COMMUNICATIONS COMMISSION

47 CFR Parts 15, 27, 73 and 90

[MB Docket No. 03-15; FCC 04-192]

Second Periodic Review of the Commission's Rules and Policies Affecting the Conversion To Digital Television

AGENCY:

Federal Communications Commission.

ACTION:

Final rule.

SUMMARY:

In this document, the Commission adopts final rules that resolve several issues important to the rapid conversion of the nation's broadcast television system from analog to digital television. The Order adopts a multi-step channel election and repacking process through which broadcast licensees and permittees (“licensees”) will select their ultimate DTV channel inside the core. The Order also adopts deadlines for replication and maximization; provides for flash cut transition for satellite stations; eliminates simulcasting requirements; mandates broadcaster use of PSIP; clarifies rules concerning closed captioning and v-chip functionalities; amends interference protection rules; and permits limited use of distributed transmission systems.

DATES:

Effective November 3, 2004 except for § 73.1201 which contains information collection requirements that are not effective until approved by the Office of Management and Budget. The FCC will publish a document in the

Federal Register

announcing the effective date for those sections. The incorporation by reference of certain publications listed in the regulations is approved by the Director of the Federal Register, as of November 3, 2004.

FOR FURTHER INFORMATION CONTACT:

Evan Baranoff,

Evan.Baranoff@fcc.gov,

(202) 418-7142. For additional information concerning the Paperwork Reduction Act information collection requirements contained in this document, contact Leslie Smith, Federal Communications Commission, Room 1-A804, 445 12th Street, SW., Washington, DC 20554, or via the Internet to

Leslie.Smith@fcc.gov.

SUPPLEMENTARY INFORMATION:

This is a summary of the Federal Communications Commission's Report and Order FCC 04-192, adopted on August 4, 2004 and released on September 7, 2004. The full text of this document is available for inspection and copying during normal business hours in the FCC Reference Center, 445 12th Street, SW., Washington, DC 20554. The complete text may be purchased from the Commission's copy contractor, Qualex International, 445 12th Street, SW., Room CY-B402, Washington, DC 20554. The full text may also be downloaded at: www.fcc.gov. Alternative formats are available to persons with disabilities by contacting Brian Millin at (202) 418-7426 or TTY (202) 418-7365 or at

Brian.Millin@fcc.gov.

Paperwork Reduction Act

This document contains modified information collection requirements subject to the Paperwork Reduction Act of 1995 (PRA), Public Law 104-13. It will be submitted to the Office of Management and Budget (OMB) for review under section 3507(d) of the PRA. OMB, the general public, and other Federal agencies will be invited to comment on the modified information collection requirements contained in this proceeding.

Summary of the Report and Order

1. With this

Report and Order

in our second periodic review, we resolve several issues important to the rapid conversion of the nation's broadcast television system from analog to digital television (“DTV”). The Commission conducts these periodic reviews of the progress of the digital conversion to make any adjustments necessary to our rules and policies to “ensure that the introduction of digital television and the recovery of spectrum at the end of the transition fully serves the public interest.” In our first DTV periodic review, begun in March 2000, we addressed a number of issues important to the transition. In the

Notice of Proposed Rulemaking

(68 FR 7737, February 18, 2003) in this second periodic review, we revisited several issues addressed in the first periodic review and sought comment on additional issues that we consider necessary to resolve in order to ensure continued progress on the digital transition. We received numerous comments in response to our NPRM.

2. In this

Report and Order,

we adopt a multi-step channel election and repacking process through which broadcast licensees and permittees (“licensees”) will select their ultimate DTV channel inside the core (

i.e.

, channels 2-51). The process will start in November 2004 with licensees filing certain pre-election certifications. In December 2004, licensees currently with an in-core channel (whether one or two) will make their channel elections in the first round of elections. Licensees currently with only out-of-core channels (

i.e.

, channels 52-69), as well as licensees electing to be treated like them, will file elections in the second round, expected in July 2005. Licensees without confirmed elections from the previous two rounds will file elections in the third round, expected in January 2006. In a public notice released August 3, 2004, the Media Bureau implemented a freeze on the filing of certain TV and DTV requests for allotment or service area changes to facilitate the channel election and repacking process. The freeze includes applications to swap channels, but will not apply to proposals for negotiated channel election arrangements submitted as part of the channel election process. The freeze is described in section IV. A., infra.

3. We adopt the following replication and maximization protection deadlines:

• July 1, 2005—Use-it-or-lose-it deadline for DTV licensees affiliated with the top-four networks (

i.e.

, ABC, CBS, Fox and NBC) in markets 1-100. Those licensees that receive a tentative DTV channel designation in the channel election process on their current digital channel must construct full, authorized facilities. Those licensees that receive a tentative DTV channel designation on a channel that is not their current DTV channel must serve at least 100 percent of the number of viewers served by the 1997 facility on which their replication coverage was based.

• July 1, 2006—Use-it-or-lose-it deadline for all other commercial DTV licensees as well as noncommercial DTV licensees. Those licensees that receive a tentative DTV channel designation in the channel election process on their current digital channel must construct full, authorized DTV facilities. Those licensees that receive a tentative DTV channel designation on a channel that is not their current DTV channel must serve at least 80 percent of the number of viewers served by the 1997 facility on which their replication coverage was based.

4. In evaluating service areas we will consider the population served within the geographic area reached by a station's service area as defined under § 73.622(d) of the Commission's rules less any portions of that area that receive interference from other stations. Stations failing to meet the replication/maximization requirements on their allotted DTV channels by our deadlines will lose interference protection to the unserved portions of their current DTV service areas, as well as to the equivalent unserved portion of their NTSC Grade B contours for stations using those channels for DTV service after the transition occurs. Those

stations wishing to maximize their service area must meet the above requirements in order to “carry over” their maximized service area to their in-core assignment with a priority over Class A stations. We adopt limited exceptions for certain stations with out-of-core DTV allotments and satellite stations, both of which may turn in their DTV allotments and “flash cut” to digital by the end of the transition without losing their replication/maximization rights. We do not adopt an intermediate signal requirement, but retain the 7 dB increase in the principal community signal coverage required by December 31, 2004, for commercial stations and December 31, 2005, for noncommercial stations.

5. In this

Report and Order,

we also eliminate, for the time being, the requirement that broadcasters air on their digital channel the programming aired on their analog channel (“simulcasting”). We retain, however, the minimum digital operating hours requirement currently tied to the simulcast rule. We permit satellite stations to surrender their paired DTV channels and flash cut to DTV by the end of the transition. We are also reviewing the issues raised in the comments concerning the need for point-of-sale labeling for digital and analog televisions. We are monitoring retailer and manufacturer efforts to improve information provided to consumers and will address this issue in a future item. We adopt Program and System Information Protocol (“PSIP”) and mandate its use by broadcasters. We also adopt new rules and clarify existing rules to support the functioning of closed captioning and v-chip on digital televisions. We approve in principle the use of distributed transmission system (“DTS”) technologies and defer to a separate “fast track” proceeding the development of rules for DTS operation and the examination of several policy issues related to its use.

6. Finally, we sought comment in the NPRM on how we should interpret certain portions of section 309(j)(14) of the Communications Act, which requires the Commission to reclaim the 6 MHz each broadcaster uses for transmission of analog television service by December 31, 2006, unless an extension is granted pursuant to the criteria established in section 309(j)(14)(B). Commenters made a number of suggestions regarding the interpretation of various aspects of section 309(j)(14)(B). We are continuing to review these comments and to consider the issues raised in the NPRM regarding section 309(j)(14) and plan to address these issues in the near future.

Background

7. In January 2001, we released the

First DTV Periodic Report and Order

in which we made a number of determinations to further the transition. Among other things, we established channel election and interference protection deadlines. We also imposed a principal community coverage requirement that is stronger than the DTV service contour requirement adopted as an initial obligation in the

Fifth Report and Order.

This new principal community coverage requirement, which becomes effective December 31, 2004, for commercial stations and December 31, 2005, for noncommercial stations, was intended to improve the availability of service in the community of license and to prevent undue migration of stations from their communities of license.

8. In the

First DTV Periodic MO&O,

we revised a number of the determinations made in the

First DTV Periodic Report and Order.

To address broadcasters' concerns that they could not meet certain requirements in the

First DTV Periodic Report and Order,

we decided to allow stations to construct initial DTV facilities designed to serve at least their communities of license, while still retaining for the time being DTV interference protection to provide full replication at a later date. We did not, however, alter our decision to require stations to increase their signal strengths within their communities of license beyond those adopted as an initial requirement in the

Fifth Report and Order.

This principal community coverage requirement will become effective December 31, 2004, for commercial stations and December 31, 2005, for noncommercial stations. We also determined that we would continue to provide DTV interference protection to the maximized service area specified in outstanding DTV construction permits for facilities in excess of those specified in the DTV Table of Allotments. Television broadcast licensees may seek to expand or shift (also referred to as “maximize”) their DTV allotments by filing applications to increase power or change the site or height of their antenna in such a way that it increases their DTV service area in one or more directions beyond the area resulting from the station's DTV allotment parameters. The term maximization can be confusing in that it does not necessarily entail enlarging the station's service area. Rather, it might more accurately be characterized as alteration of a station's previously allotted contour. Given that the term maximization is commonly used, however, we will continue to use it here. We temporarily deferred the replication protection and channel election deadlines established in the

First DTV Periodic Report and Order.

We stated, however, that in the second DTV periodic review we would establish a firm date by which broadcasters must either replicate their NTSC coverage or lose DTV service protection of the unreplicated areas, and by which broadcasters with authorizations for maximized digital facilities must either provide service to the coverage area specified in their maximization authorizations or lose DTV service protection to the uncovered portions of those areas. We also stated that we would establish a deadline by which broadcasters with two in-core allotments must elect which channel they prefer to use at the end of the transition. We stated that these replication, maximization, and channel election deadlines may be earlier than, but will in no event be later than, the latest of either the end of 2006 or the date by which 85 percent of the television households in a licensee's market are capable of receiving the signals of digital broadcast stations.

The reduced build-out requirements adopted in the

First DTV Periodic MO&O

allowed broadcasters to save both on construction and operating costs. In addition, we allowed DTV stations subject to the May 1, 2002, or May 1, 2003, construction deadlines to operate initially at a reduced schedule by providing, at a minimum, a digital signal during prime time hours, consistent with their simulcast obligations. Commencing April 1, 2003, DTV licensees and permittees were required to simulcast 50 percent of the video programming of the analog channel on the DTV channel. NCE stations were granted a six-month waiver of the simulcasting requirement, but not the minimum hours of operation requirement. This requirement stepped up to a 75 percent simulcast requirement in April 2004, and was to increase to a 100 percent requirement in April 2005. 47 CFR 73.624(f). Stations that were subject to the earlier construction deadlines (top four network affiliates in the top 30 markets) remained subject to the previous rule—

i.e.

, they must operate their DTV station at any time that the analog station is operating. For broadcasters unable to complete even the minimum permitted facilities by the applicable deadline, however, we revised our rules to permit applicants to seek an extension of time to construct a digital television station based on financial hardship. To qualify

for an extension of time to construct a digital television facility under the financial hardship standard, the applicant must demonstrate that the cost of meeting the minimum build-out requirements exceeds the station's financial resources. The applicant must provide an itemized estimate of the costs of construction and a detailed explanation of why its financial condition precludes such expenditures.

9. By permitting stations to elect a more graduated approach to providing DTV service, we allowed stations to focus their energies initially on providing digital service to their core communities, with the expectation that they would increase operating hours and expand their coverage area as the transition progresses.

10. On January 27, 2003, we began this Second Periodic Review of the Commission's Rules and Policies Affecting the Conversion to Digital Television. Among other things, we sought comment on new channel election, replication, and maximization deadlines for broadcast television service. We also sought comment on a number of other issues concerning the protection that must be provided to incumbent analog and digital broadcasters in channels 52-69 (698-806 MHz, also referred to as the “700 MHz band”) during the transition. The Second DTV Periodic NPRM raised a number of other issues, including: (1) Whether the Commission should retain, revise, or remove the requirement that licensees simulcast a certain percentage of their analog channel programming on their DTV channel; (2) whether the Commission needs to take steps to assist noncommercial television stations in the transition; (3) whether labeling requirements for TV-related consumer equipment would assist the transition and protect consumers; (4) whether and how the Commission should license multiple lower-powered transmitters, similar to cellular telephone systems, called distributed transmission systems; (5) whether broadcasters should be required to include Program System and Information Protocol (“PSIP”) information within their digital signals to ensure the availability of certain functions; (6) whether the Commission should adopt digital V-chip and closed captioning requirements; and (7) what station identification requirements should apply to digital stations. In the Second DTV Periodic NPRM, we also invited commenters to update the records in the DTV Public Interest Form NPRM (MM Docket No. 00-168), Children's DTV Public Interest NPRM (MM Docket No. 00-167), and the public interest NOI (MM Docket No. 99-360), and directed that such comments be filed in those proceedings. We will address any comments on public interest issues filed in response to the Second DTV Periodic NPRM when we finalize the public interest proceedings in the near future.

Progress Report

11. The transition to digital television is a massive and complex undertaking, affecting virtually every segment of the television industry and every American who watches television. The spectrum that will be recovered at the end of the transition will bring tremendous benefits to consumers and the United States economy. Twenty-four megahertz of spectrum currently used for television broadcast channels 63, 64, 68, and 69 will be returned and used for first responders and other critically important public safety needs. The remaining 84 MHz in the 700 MHz band (currently television broadcast channels 59-62 and 65-66) have been or will be auctioned for use by new wireless services. The Commission has been continuously involved in the migration to digital television by, among other things, adopting a standard for digital broadcasting, creating a DTV Table of Allotments, awarding DTV licenses, establishing operating rules for the new service, and overseeing the physical build-out of digital broadcast stations.

Build-Out Status

12. In 1997, the Commission set dates for construction and operation of broadcasters' allotted digital broadcast facilities. Pursuant to the construction schedule set forth in § 73.624(d) of the Commission's rules, affiliates of the top four networks in the top ten television markets were required to complete construction of their digital facilities by May 1, 1999; top four network affiliates in markets 11-30 by November 1, 1999; all remaining commercial television stations by May 1, 2002; and all noncommercial television stations by May 1, 2003.

13. As of July 28, 2004, 1,658 television stations in all markets (representing approximately 96 percent of all stations) have been granted a DTV construction permit (“CP”) or license. A total of 1,423 stations are now broadcasting a digital signal, 634 with licensed facilities or program test authority and 789 operating pursuant to special temporary authority (“STA”) or experimental DTV authority.

14. In the top 30 television markets, all 119 network-affiliated television stations are on the air in digital, 110 with licensed DTV facilities or program test authority and nine with STAs. In markets 1-10, of the 40 network affiliates due to be on the air by May 1, 1999, all are providing digital service, 38 with licensed DTV facilities and two with STAs. Two stations that were licensed and on the air prior to September 11, 2001, went off the air due to the attack on the World Trade Center. WABC-DT and WNBC-DT are now back and operating at STA facilities, thereby completing the list of stations once on the air that have returned to operations In markets 11-30, all 79 network affiliate stations required to be on the air by November 1, 1999 are providing digital service. Seventy-two have constructed their licensed DTV facilities and seven are on the air with STAs.

15. Approximately 1,230 commercial television stations were due to commence digital broadcasts by May 1, 2002. As of July 28, 2004, 1,018 of these stations (83 percent) are broadcasting a digital signal. In addition, approximately 373 noncommercial educational television stations were required to commence digital operations by May 1, 2003. As of July 28, 2004, 286 (77 percent) of these stations are broadcasting a digital signal.

DTV Equipment Availability

16. In the NPRM, we asked several questions about the types and availability of DTV equipment on the market. We invited commenters to provide us with up-to-date information about the pace of DTV receiver sales and the price of such units as well as trends in consumer demand for digital equipment.

17. The Consumer Electronics Association (“CEA”) reports that manufacturers offer more than 400 models of HDTV monitors and integrated sets, which is three times the number from 2000. It reports an 11 percent drop in HDTV monitor prices from March 2002 to March 2003, with a larger drop expected over the duration of 2003. The consumer electronics industry invested $15 billion in DTV products from 1998 through 2003. In addition, CEA reports that DTV products represented more than 10 percent of all television sales in 2002. In the first quarter of 2003, according to CEA, 766,000 DTV product units were sold, which was up 86 percent over the first quarter unit sales of 2002. CEA projected that manufacturers would sell 3.8 million DTV sets and displays in 2003.

18. According to the CEA's website, 4.1 million DTV products were sold in 2003 for about $6.1 billion, a 44 percent increase in dollar sales and a 56 percent increase in unit sales from 2002. More

than 640,000 digital television sets were sold in December 2003 alone. CEA predicts that 5.8 million digital sets will be sold in 2004, 8.3 million in 2005, 11.9 million in 2006 and 16.1 million in 2007. CEA defines DTV products as integrated sets and monitors displaying active vertical scanning lines of at least 480p and, in the case of integrated sets, receiving and decoding ATSC terrestrial digital transmissions.

Ongoing Commission Efforts To Encourage the DTV Transition

19. Since the First DTV Periodic Report and Order, we have taken a number of important steps to encourage the consumer adoption of digital television. On August 8, 2002, the Commission adopted the DTV Tuner Order requiring that all TV receivers manufactured or shipped in the U.S. with screen sizes 13 inches and above be capable of receiving DTV signals over the air no later than July 1, 2007. This requirement will be phased in beginning with the largest sets in 2004 to minimize the cost impact on consumers. Receivers with screen sizes 36 inches and above—50 percent of a responsible party's units must include DTV tuners effective July 1, 2004; 100 percent of such units must include DTV tuners effective July 1, 2005. Receivers with screen sizes 25 to 35 inches—50 percent of a responsible party's units must include DTV tuners effective July 1, 2005; 100 percent of such units must include DTV tuners effective July 1, 2006. Receivers with screen sizes 13 to 24 inches—100 percent of all such units must include DTV tuners effective July 1, 2007. TV Interface Devices, VCRs, and DVD players/recorders, etc. that receive broadcast television signals—100 percent of all such units must include DTV tuners effective July 1, 2007 The DTV tuner requirement was designed to facilitate the transition to digital television by promoting the availability of reception equipment, as well as to protect consumers by ensuring that their television sets go on working in the digital world just as they do today.

20. In addition to the Order mandating DTV tuners, in October 2003, the Commission released a Second Report and Order and Second Further Notice of Proposed Rulemaking regarding Commercial Availability of Navigation Devices and Compatibility Between Cable Systems and Consumer Electronics Equipment. This Plug and Play Order was another step forward in the transition to digital television. Under the specifications developed by the cable and consumer electronics industries and adopted in the Plug and Play Order, consumers will be able to plug their cable directly into their digital TV set without the need of a set-top box. The new rules will ease the transition to digital TV by promoting competition, convenience, and simplicity for consumers.

21. In addition, we adopted a redistribution control system, also known as the “broadcast flag,” for digital broadcast television. The goal of the Broadcast Flag Order is to prevent the mass indiscriminate redistribution of digital broadcast television in order to foster the transition to digital TV and forestall potential harm to the viability of free, over-the-air broadcasting in the digital age. We found that the current lack of digital broadcast content protection could be a key impediment to the DTV transition's progress. Specifically, we found that the absence of such content protection could lead to reduced availability of high value content on broadcast television and thereby harm the viability of free over-the-air television and slow the DTV transition. Given our progress on this front, we expect that such programming will not be unreasonably withheld from over-the-air television.

Issue Analysis

Channel Election

22. In the DTV Sixth Memorandum Opinion and Order, we determined that, after the transition, DTV service would be limited to a “core spectrum” consisting of current television channels 2 through 51 (54-698 MHz). Although some licensees received DTV transition channels out of the core, and a few have both their NTSC and DTV channels outside the core, there will be sufficient spectrum to accommodate all DTV stations at the end of the transition. At this stage in the transition it is important for licensees with two in-core channels to indicate which one of their channels they prefer to use for digital broadcasting after the transition. In addition, we will require licensees with one in-core channel to make a decision about their in-core channel, and will require licensees involved in negotiated channel election arrangements with other licensees to inform us of these arrangements. This step is critical in determining what channels will be available for stations with two out-of-core channels and in clearing the out-of-core spectrum.

23. In the First DTV Periodic Report and Order, we established December 31, 2003, as the channel election deadline for commercial stations. Largely due to reports of difficulties some stations were facing in meeting our construction deadlines, we later decided that this date might be too early for some stations and suspended the channel election deadline, announcing that we would use this second periodic review to re-establish the date. We also stated in the First DTV Periodic Report and Order that we would resolve in a future DTV periodic review whether and when licensees with one or both of their channels out of the core will have the opportunity to make a channel election as well as the details and procedures for the election process. We stated that

in

all cases, including licensees with both channels in-core, we reserve the right to select the final channel of operation in order to minimize interference and maximize the efficiency of broadcast allotments in the public interest. In the Second DTV Periodic NPRM, we stated that our goal was to establish a channel election deadline that gives broadcasters with two in-core channels enough time to make an informed decision about which of their two core channels they preferred to use for digital broadcasting, while at the same time providing licensees with two out-of-core assignments the time to plan their moves to in-core channels before the end of the transition. We proposed that commercial and noncommercial broadcast licensees with two in-core assigned channels make their final channel election by May 1, 2005. As an alternative, we sought comment on whether establishing the same deadline(s) for channel election as for replication and maximization protection and allowing broadcasters more time to increase to full power before they determine which channel is preferable for digital broadcasting would be more effective in speeding the transition.

24. In this

Report and Order

, we are establishing firm deadlines for channel elections and a procedure and time frame for evaluating, processing and confirming the elections. These decisions are consistent with the majority of the comments received from a wide range of participants in this proceeding. Most of the commenters that address channel election support establishing a firm deadline for channel election.

25. We initially established December 31, 2003, as the channel election deadline for commercial stations, but suspended the date pending a date to be established in this Order. We now agree with the commenters, such as CEA and KM Companies, which state that the industry has had enough time to evaluate DTV operations. Circumstances are significantly different from the time we suspended the channel election deadline. At the time, less than 400 of the 1,688 full-power stations with

paired DTV channels commenced DTV operations; now more than 1,400 stations have done so. Stations that chose to begin service at lower power have had an opportunity to operate DTV facilities and to test for interference or other service problems. DTV stations have had significant on-air time to conduct the necessary tests and evaluate available data in order to make reasoned channel election decisions. 47 CFR 73.624(d) required construction to be completed more than two years ago for most commercial broadcasters, fourteen months ago for noncommercial broadcasters, and more than four years ago for top-four network affiliated broadcasters in the top markets.

26. We therefore conclude that stations are likely to understand the performance characteristics of the DTV transmission standard and to know which channel they prefer to operate on after the transition, and reject the option that the channel election deadline be tied to replication requirements or DTV tuner penetration rates. As discussed more fully below in section IV.J.2., infra, we are adopting the ATSC A/65B (“PSIP”) standard and mandating its use by DTV stations. As part of PSIP, a broadcaster's “major channel number” is its NTSC channel number. This major channel number is the station's channel identity during and after the transition. Therefore, a station's channel election decision will have no effect on the assignment of its NTSC channel number as its “major channel number” in PSIP. Consequently, channel election decisions need not be based on considering stations' historic “branding” to consumers, but instead may be based more on the operating characteristics of a particular frequency and the service populations the stations would project for each channel.

27. We find that the multi-step approach offered by MSTV has merit, and we adopt its proposal with modifications. We agree with many of the goals set forth by MSTV. First, the channel election process should provide the best possible DTV service to the public. Second, the plan should move the DTV transition along without undue delay. Third, we seek to create an orderly channel election process that produces as much clarity and transparency as possible. Fourth, licensees should be afforded the best opportunity for informed choice when making their channel election decisions. Fifth, we seek to provide every eligible station with a channel for operation after the end of the transition. Sixth, we seek to recognize industry expectations by protecting existing service and respecting investments already made, to the extent feasible. Finally, the channel election process should take into account overall spectrum efficiency, even as we seek to ensure to the extent possible that the final channel allotments accommodate replicated and maximized service areas for those stations certifying their intent to serve such areas.

28. To enable us to complete the reallocations necessary to accommodate all stations with a channel in the core, we need to know each in-core licensee's channel preference as soon as possible. Therefore, we adopt December 2004, as the starting date for channel elections, by which time commercial and noncommercial broadcast licensees with an in-core channel must state their channel preference. As of this date, commercial and noncommercial broadcasters will have had ample time after their applicable digital construction deadlines to make their channel decisions. A December 2004, channel election deadline for in-core licensees will also provide out-of-core licensees time to plan for their move into the core. We recognize that this date is earlier than the election date proposed in the Second DTV Periodic NPRM. Given, however, our adoption of a multi-step channel election process as proposed by MSTV and other necessary election procedures, this deadline is necessary to arrive at a final election for all stations in a timely manner. The choice of this election deadline strikes an appropriate balance between the need for stations to have a sufficient amount of time in which to gain experience in DTV operation and allowing stations that will have to move—particularly from out-of-core to in-core—to plan for the DTV channel conversion.

Channel Election and Repacking Process/New Allotment Process

29. We adopt a multi-step channel election plan based in considerable part on the MSTV proposal, but which also incorporates certain modifications and refinements. Specifically, we adopt a seven-step channel election and repacking process as follows: (1) Step 1 addresses any preliminary matters to the channel election and repacking process, which includes requiring all licensees to certify their intent to replicate their allotted facilities or maximize their already-authorized facilities; (2) Step 2 is the first round of elections in which in-core licensees (

i.e.

, those with at least one in-core channel) will file their channel election forms; (3) Step 3 analyzes the interference conflicts arising out of the first round and gives licensees an opportunity to resolve them; (4) Step 4 is the second round of elections, at which point the remaining licensees—out-of-core only licensees who have not yet filed channel election forms and those now being treated like them—will make their elections; (5) Step 5 analyzes the interference conflicts arising out of the second round elections, at which time staff will seek to place as many licensees as possible on their election preferences; (6) Step 6 is the third and final round of elections, at which point licensees not yet placed will file a final election preference; and (7) Step 7 is a Notice of Proposed Rulemaking to propose a new DTV Table of Allotments.

a. Step 1: Pre-Channel Election Matters

30. Database clean up. We agree with MSTV that it is important for our database to provide a consistent starting point. To that end, we ask that licensees review the accuracy of their database technical information and contact staff as quickly as possible with any submitted corrections. Any proposed corrections to database information must be consistent with station authorizations, as reflected in the Commission's records. So that we may consider any proposed corrections to our database, licensees should contact staff by October 1, 2004, with any concerns. We note that it may not be possible to process and consider any proposed corrections to database information offered after this date. Database errors that are discovered after this date may be corrected at the discretion of Commission staff. To ensure that licensees timely review their database information, we will require them to certify that they have reviewed their database information on file with the Commission and that it is accurate to the best of their knowledge. Licensees will make this certification using the Pre-Election Certification Form, which must be filed by November 2004. The Pre-Election Certification Form will also include licensees' certifications of their intent to replicate or maximize. While MSTV proposes a one-year period devoted to “database clean up,” we do not believe such an extended period is necessary. Moreover, we do not believe that there is a need for a formal process to invite licensees to submit information to “clean up the database” because we expect that licensees have informed us of any discrepancies as they arose. We note that MSTV has notified its members about the need to make sure their database information is accurate, and invited them to contact the Commission and MSTV concerning questions about database inaccuracies or discrepancies. MSTV also asked its

members to share this notice with other stations. As a result of this letter dated June 1, 2004, the Commission has received three letters from licensees. We remind licensees that they have an ongoing obligation to ensure the accuracy of their database information and to apprise us of any discrepancies between their authorized facilities and their operations.

31. Filing freeze. On August 3, 2004, the Media Bureau imposed a freeze on the filing of certain TV and DTV requests for allotment or service area changes to facilitate the channel election and repacking process. Included in the freeze are: (i) Petitions for rulemaking to change DTV channels within the DTV Table of Allotments, (ii) petitions for rulemaking to establish a new DTV channel allotment, (iii) petitions for rulemaking to swap in-core DTV and NTSC channels; Notwithstanding the freeze, negotiated channel election arrangements may be sought during the election process. (iv) applications to change DTV channel allotments among two or more licensees; (v) petitions for rulemaking by licensees/permittees to change NTSC channels or communities of license; (vi) applications to maximize DTV or analog TV facilities; and (vii) certain Class A station applications. Notwithstanding this freeze, licensees are not prevented from filing modification applications that would resolve international coordination issues. We do this to alleviate a burden on those licensees who are actively working to resolve their international coordination issues, or when a broadcast station seeks a new tower site due to the events of September 11, 2001. In addition, the Media Bureau will consider requests for waiver of the freeze on a case-by-case basis. Such a filing freeze is necessary to provide a stable baseline for developing a final DTV Table of Allotments. The freeze is discussed more fully in section IV.A.2., infra.

32. Table of station assignment and service information. As a preliminary matter to the channel election process, the Media Bureau will issue a table of station assignment and service information (“table of station information”) for use by TV station licensees and other interested parties so they may determine and evaluate the DTV service populations to be used by the Commission to process stations' channel elections and create the new DTV table of allotments. In developing the table of station information, the Commission will generally use the DTV and NTSC station locations and facilities authorized by license or construction permit (CP). Where station records include both a construction permit and license, we will use the construction permit given that the changes permitted in the construction permit reflect the station's facilities for the future, as of October 1, 2004, a month before TV station licensees will be asked to file their Pre-Election Certification Forms. The Pre-Election Certification Form will require all broadcast licensees and permittees to certify to (1) the accuracy of their database information on file with the Commission, which will be reflected by the table; and (2) their intent to replicate or maximize pursuant to their existing authority, as will be defined by the table. We will issue this table of station information prior to the filing of the Pre-Election Certification Forms. (We note that the Media Bureau imposed a freeze on the filing of certain TV and DTV requests for allotment or service area changes in anticipation of generating this table of station information.) The data provided in the table of station information will be based on the technical information on file in the Commission database. Licensees should review the table of station information before making their pre-election certifications. We will update the table of station information to reflect service areas based on certifications to build to replication or maximization facilities and any other changes to station facilities prior to the first round election date.

33. Station service evaluations based on currently authorized operations. As noted above, we will use current authorized station operations to determine and evaluate the DTV service populations in processing channel elections and creating the new DTV table of allotments. We believe that basing station service evaluations on current authorized station operations will more accurately reflect the current viewer access to station services than the parameters specified for the initial DTV Table of Allotments in 1997, and will at the same time preserve the service areas of those stations that constructed and are operating in accordance with the DTV buildout schedules. Consistent with MSTV ex parte submissions and discussions, we will define new interference as interference beyond that caused by NTSC and DTV operations, as described by the table of station information, in evaluating new interference to post-transition TV operations.

34. On this basis, stations that operate, or plan to operate as authorized by a CP, in accordance with the facilities specified in the initial DTV Table of Allotments will have the same service as that contemplated in the DTV Second MO&O, less any changes in interference received from new stations or from stations that changed their operations. Stations that have departed from their initial DTV allotment facilities (including location and/or channel changes) or maximized (or in a few cases reduced) their operations through such modifications and new stations, will have service as authorized in those changes or new authorizations, again less interference from other stations. Stations granted a DTV channel change are generally authorized facilities that they requested if such operations do not cause new interference to other stations that exceed the

de minimis

interference standards of § 73.623(c)(2) of the rules, 47 CFR 73.623(c)(2). In some cases the new channel allotment facilities cover more area than the stations were authorized on their initial DTV channel allotment, while in other cases the stations cover less area. In the case of stations whose applications for maximization of DTV facilities are delayed in processing due to international negotiations, we will consider the service that would be provided based on those applications pending the resolution of those coordination issues and authorizations of specific facilities. All analyses of service and reduction of service due to interference will be based on population only. We will use population data from the year 2000 census in determining the populations served by stations and the impact of interference on stations' service. In this regard, the more up-to-date population data from the year 2000 census will provide a more accurate indication of the station service and impacts of interference on that service than the older year 1990 population data used in computing the service data for the initial DTV Table of Allotments.

35. Border coordination. We agree with commenters that it is important to resolve international coordination issues as quickly as possible. To that end, we have reduced the number of coordination conflicts from several hundred to fewer than 50. We cannot, however, delay the implementation of our channel election and repacking process pending resolution of every outstanding case of Canadian or Mexican coordination. Parties with pending applications that are being delayed due to coordination issues are advised that while we will make every effort in negotiating on their behalf, we can provide no assurance that such issues will be resolved favorably. In nearly all of the remaining cases, the licensee can build a checklist facility.

Only a few stations cannot build checklist facilities because of border coordination issues. This list includes: WPXJ-DT, Batavia, NY (allotted DTV 53); WNYO-DT, Buffalo, NY (allotted DTV 34); and KAJB-DT, Calipatria, CA (allotted DTV 50). In some cases, additional coordination actions will be needed to provide in-core channel assignments. If an election would require international coordination, then that channel may be elected at authorized replicated and maximized facilities, subject to the outcome of the international coordination. We recognize that maximization may cause coordination issues and that successful coordination may require reduction to replication facilities We encourage stations in markets or regions that require coordination to work together to identify in-core channels that are feasible. Such arrangements among stations will be accepted as part of the channel election process and will be accorded great weight in determining final assignments. The Commission will continue to work with licensees to resolve remaining international coordination issues as part of the process of developing new DTV allotments and will consider a station's border coordination efforts when prioritizing channel assignments. Border coordination issues are discussed more fully below in section IV.A.3.,

infra

.

36. We are aware of some stations with a DTV channel outside of the core and an analog channel inside the core for which, according to the stations, the analog channel is not available for digital transmission because of international coordination issues with Canada. These stations should indicate this fact on their channel election form and attach a brief explanation of why their in-core channel is not available for digital use under the U.S.—Canada Letter of Understanding, which governs modifications of the initial DTV table of allotments within 400 km of the U.S./Canadian border. Stations with an out-of-core DTV channel and an in-core analog channel that is not available for digital transmission because of international coordination issues will be treated like stations with two out-of-core channels.

Certifications for replication and maximization. We adopt a requirement, that stations that intend to fully replicate or maximize certify this commitment to the Commission by November 2004, subject to sanctions if the station fails to meet its commitment. In the Pre-Election Certification Form, licensees will certify their intent to build-out their allotted “replication” facilities or already-authorized “maximization” facilities. Licensees are reminded that false certifications may result in fines and loss of license. Moreover, where stations do not build-out to their certified facilities, we will limit their station's interference protection to the service population within the noise-limited contour predicted from the station's operating facilities, as of the certification date. (In other words, a licensee's failure to replicate or maximize to the extent it certified will result in the loss of interference protection to those service areas not replicated or maximized.) Licensees will be required to replicate and maximize by the replication/maximization deadline (

i.e.

, July 1, 2005, for affiliates of the top-four networks in markets 1-100; and July 1, 2006, for all other stations). Further, licensees may only certify to maximize pursuant to their existing authority to do so. Channel elections will be evaluated at this stage based on the coverage that is predicted from the certified authorized maximization or certified replication facilities. We anticipate that many licensees will have an opportunity to enlarge their final DTV allotment coverage after the final table has been adopted, pursuant to the rules for changes and applications established then. In developing rules for resolving or avoiding conflicts between stations requesting such coverage enlargements, we will consider giving priority to stations that can demonstrate that they had built-out their full authorized DTV facilities and had been unable to maximize on their transition DTV channel.

37. Such certifications must be filed with the Commission in advance of the channel election date so that all licensees will be able to consider the commitments of other licensees in their channel elections. To provide sufficient time for this information to be useful, we will require that such certifications be filed in November 2004. Stations that do not submit certification forms by this date will be presumed not to intend to replicate or maximize, and such decision will be taken into account in determining final channel assignments. More specifically, in establishing the authorized facilities and service area for a station not certifying to fully replicate or maximize, we will provide for the station to serve the same geographic area served by its existing DTV facilities, operating as of the certification date. Certifications must be filed electronically and will be made accessible to the public.

38. Election Forms. All broadcast licensees participating in the channel election process are required to file a pre-election certification form and a channel election form. Stations that do not timely submit a pre-election certification form will be presumed both (i) to agree that their database technical information on file with the Commission is accurate and complete, and (ii) not to intend to replicate or maximize, and such decision will be taken into account in determining final channel assignments. Stations that do not timely submit a channel election form will be assigned a post-transition DTV channel by the Commission prior to the end of the channel election process. Appendices E and F to this Report and Order illustrate the forms to be used in the channel election and repacking process. We have developed the following six forms: (1) Pre-Election Certification Form; (2) First Round Election Form; (3) First Round Conflict Decision Form; (4) Second Round Election Form; (5) Second Round Conflict Decision Form; and (6) Third Round Election Form. These forms, which are adopted by this Report and Order, must be filed electronically and will be made accessible to the public on the Commission's database.

b. Step 2: First Round of Elections; Election Forms Filed

39. We set December 2004 as the date for the first round of channel elections. Although we proposed in the NPRM an election date of May 1, 2005, we believe that the broadcasters making first round elections are able to make an informed statement of their final channel preference at this time. Moreover, given that we will be adopting a multi-step and multi-round approach that will occur over the course of several months, we find that we must begin the process as soon as possible in order to effectuate a timely transition.

40. In this first round, licensees with in-core channels (

i.e.

, licensees with two in-core channels and licensees with one in-core channel) will make their channel elections by filing a First Round Election Form. The First Round Election Form will provide up to three options for in-core licensees: (1) Elect one of its currently assigned in-core channels; (2) elect a negotiated channel pursuant to an agreement with another licensee(s); or, (3) if (i) a one-in-core licensee, or (ii) a two-in-core licensee with two low VHF channels (

i.e.

, channels 2-6), then such a licensee may choose to make no election in the first round and instead elect to participate in the second round of elections. Licensees in this round may not elect a channel that is not assigned to them, unless rights to that channel are being sought through a

proposed negotiated channel election arrangement. Licensees that have negotiated channel election arrangements with other licensees must obtain Commission approval for the proposed channel changes in the arrangement in order for their election of a negotiated channel to be considered valid. Upon completion of the first round and subsequent interference conflict analysis, each licensee electing an in-core channel will receive an informal tentative channel designation, to the extent possible. Licensees with two in-core channels (including those with two low VHF channels (

i.e.

, channels 2-6). We will permit two in-core low VHF licensees to release both of their channels in the first round and agree to be treated as two out-of-core licensees and participate in the second round of elections. Licensees that choose to elect, and which receive a tentative channel designation for, their in-core low VHF channel will have an opportunity to make an alternate election in the third round) will make the first channel elections, choosing between their two in-core channels. Licensees with only one in-core channel will be required to elect whether to keep their in-core channel, or turn it in and be treated like a licensee with two out-of-core channels. We believe that, by this time, one in-core licensees should know whether they intend to keep their in-core channel. This will further increase the number of channels available for future selection. Moreover, we are including in this one in-core licensee category those licensees with only one channel (

i.e.

, in-core singletons).

41. Negotiated Channel Election Arrangements. As an alternative to the channel election process, licensees may negotiate channel election arrangements with other stations. Such negotiated arrangements are subject to Commission approval, including particular consideration of the effect on the channel election rights of, and interference impact on, any licensee not a party to the negotiated channel election agreement. “Channel swapping” is an existing practice with beneficial results for the marketplace and consumers, and these channel election arrangements are similar in nature to them. We do not anticipate that channel election arrangements are likely to have anti-competitive effects. We will, however, review them for such effects. All licensees involved in a negotiated channel election arrangement must file a channel election form. Licensees will be asked to indicate their negotiated channel elections on their channel election forms. To select the channel they would use for digital operations after the transition if the negotiated channel election arrangement is approved, as well as the channel they would elect if the negotiated arrangement is not approved. Stations involved in the negotiated channel election arrangement must satisfy our DTV interference rules with regard to their relationship to other stations not involved in the negotiated arrangement. Evidence of a signed negotiated channel election arrangement and technical engineering information demonstrating compliance with § 73.623(g) of the Commission's rules must be submitted to the Commission to enable us to consider negotiated channel election arrangement requests. In order to demonstrate the validity of their negotiated channel election arrangements, licensees will be required to provide the name(s) and call sign(s) of the other licensees involved in the arrangement. Licensees may, upon request, be required to provide a copy of the negotiated channel election agreement and/or engineering information to the Commission. The Commission may contact proponents of these arrangements, as may be necessary. We will review all agreements to assure compliance with the public interest and will not approve agreements proposing the acceptance of significant levels of interference or loss of service.

42. Election of DTV in-core channel. We conclude that if a two in-core licensee elects its DTV channel, then its NTSC channel will be released. By “release,” we mean that the licensee relinquishes its post-transition rights to this channel and that the channel now becomes available for future selection by another licensee. The DTV channel will be “locked in.” By “locked in,” we mean that the channel assignment is confirmed. However, the amount of interference the station is subjected to may increase to some extent in the Final Table in an effort to provide all licensees with an in-core DTV channel that replicates their analog service, to the extent the station has certified intent to so replicate. In other words, even though channels may be “locked in,” licensees may be required at the end of the allotment process to accept interference resulting from establishment of DTV stations at full replication facilities to accommodate all stations with a channel in the DTV core spectrum. This system of “locking in” channels can be viewed as making an informal tentative channel designation to that licensee. While informal tentative channel designations in themselves cannot confer legal rights to licensees, they do come with a heavy presumption that these informal designations will be the channel assignments proposed in the new DTV Table of Allotments. (

i.e.

, channel will be protected. By “protected,” we mean that a subsequent election may not cause an interference conflict to a “locked in” channel to the extent the “locked in” station's coverage is certified, except against interference that may result from establishment of DTV stations at the end of the allotment process at full replication facilities to accommodate all stations with a channel in the DTV core spectrum. An interference conflict would occur where interference exists any greater than existing interference plus no more than 0.1 percent additional reduction in service population. For purposes of this process, we will use this 0.1 percent interference protection standard proposed by MSTV. We agree with MSTV that “protect” in this context should mean that a subsequent election may not cause interference any greater than existing interference plus no more than 0.1 percent additional reduction in service population.) To the extent certified against future elections, except against interference that may result from establishment of DTV stations at full replication facilities to accommodate all stations currently allotted an out-of-core DTV channel with a channel in the DTV core spectrum). We recognize that a station that ends up keeping its in-core DTV channel as its final allotment might not have to incur any additional construction expenses. In contrast, a station that ends up operating in digital on its analog allotment would need to incur expenses to change its DTV operation to another channel. To allow stations to minimize the cost of this phase of the DTV transition whenever possible, we will afford the highest priority in the allotment process to maintaining existing DTV allotments selected on the channel election forms.

43. Election of NTSC in-core channel. If a two in-core licensee elects its NTSC channel, then Commission staff will determine whether and to what extent DTV operations on this channel would cause new interference to the service populations of other DTV stations. For purposes of this analysis, DTV service populations will be those resulting from the allotted “replication” facilities or authorized “maximization” facilities, as certified. This interference conflict analysis will take place in Step 3, when we intend to resolve, to the extent possible, the interference conflicts

resulting from the first round of elections.

44. We do not expect there to be widespread difficulties in fitting replicated DTV service into paired NTSC channels, as paired DTV channels were initially designed to be the best approximation of the NTSC Grade B contours. However, the interference relationships between DTV to DTV and NTSC to DTV operations are such that a DTV station would have a 1 dB greater interference impact on another co-channel DTV station than a NTSC station and an 8 dB greater impact on adjacent channel DTV station than an NTSC station, assuming the same coverage and locations for all stations. Thus, it is likely that in some cases DTV operation on an associated NTSC channel could result in new interference. In such cases, it may be possible to resolve the new interference by reducing the DTV station's operating facilities. We would allow stations to make such adjustments to address such conflicts. For those stations electing their NTSC channel for their eventual in-core DTV channel, we will attempt to accommodate the broadcasters' authorized maximized facilities into the NTSC “destination” channels. As discussed in section IV.B.,

infra,

except for stations with out-of-core DTV channel allotments, stations failing to serve their authorized maximized service area by our replication/maximization deadlines will lose interference protection to any unserved areas. In addition, the Community Broadcast Protection Act of 1999 provides an interference protection priority to Class A TV stations with respect to certain maximized DTV facilities. Specifically, Class A stations are entitled to a protection priority with respect to those maximized DTV facilities, including technically necessary adjustments to those facilities, for which an applicant had not filed an application for maximization nor a notice of its intent to seek such maximization by December 31, 1999, or, if a notice of intent was timely filed, did not also file a

bona fide

application for maximization by May 1, 2000. 47 U.S.C. 336(f)(1)(D).

See also,

47 CFR 73.623(c)(5). Thus, DTV broadcasters that did not meet these statutory filing deadlines are not entitled to carry over to their NTSC channels maximized DTV facilities that would conflict with a Class A TV station.

See

Class A Order, 15 FCC Rcd at 6379, para. 60. However, if a broadcaster's maximized DTV service area cannot be carried over to an NTSC channel or another DTV channel as part of a channel swap arrangement or it is not otherwise willing to reduce its operations, we may find it necessary to base its use of the new channel on its replication facilities or to assign the broadcaster another channel in the market that can accommodate its maximized facilities as part of the process of generating a new Table.

45. Elections by one in-core licensees. Licensees with only one in-core channel (including singletons Singletons' or “single-channel licensees” refers to those licensees that do not have a second or “paired” channel to convert to DTV. In 1998, in the “Service Reconsideration Order,” the Commission decided to afford new NTSC permittees, whose applications were not granted on or before April 3, 1997, and who were therefore not eligible for an initial DTV paired license, the choice to immediately construct either an analog or a digital station on the channel they were granted. Pursuant to this policy, the Commission specified that these new NTSC permittees, which we now sometimes refer to as “singletons” or “single-channel licensees,” would not be awarded a second channel to convert to DTV, but could, instead, convert on their single 6 MHz channel. It was further decided that if they choose initially to build an analog station, they may request Commission authorization to convert to DTV at any point during the transition, up to the end of that period), including those with low VHF channels (2-6), must elect to either (1) keep their in-core channel or (2) release their in-core channel in favor of being treated like a licensee with two out-of-core channels. MSTV proposed that we assume that such stations would decide to remain on their in-core channels; however, we find that it is more efficient to determine which in-core channels are unacceptable to these stations so that those channels can become available for future elections and to ensure that those stations are given an opportunity to identify a workable channel.

46. We expect that in most cases stations with only one in-core channel, where the channel is a DTV channel, will choose to remain on that channel. In such cases, that channel will be “locked-in,” as defined above. If the one in-core licensee chooses not to elect its in-core DTV channel, then that channel will be released, and the licensee will be treated as a two out-of-core licensee. In being treated like a two out-of-core licensee, the licensee will be required to file a new election form in the second round of elections. Licensees with only one in-core channel (including singletons), where the in-core channel is the NTSC channel, must elect to either (1) keep their in-core NTSC channel or (2) release their in-core NTSC channel in favor of being treated like a two out-of-core licensee. If a one in-core licensee elects its NTSC, then Commission staff will determine (in Step 3's “interference conflict analysis”) whether and to what extent this NTSC channel would cause new interference to the service populations of DTV stations. In light of their status, in-core NTSC channels of one in-core licensees will be afforded a high priority in permitting their conversion to a DTV channel.

47. Later opportunity to change elections of low VHF channels and channels subject to international coordination. Licensees electing, and receiving a tentative channel designation for, a low VHF channel or a channel subject to a pending international coordination issue will be permitted to seek an alternate tentative channel designation in the third round of elections. See discussion in section IV.A.1.f., infra.

48. No first round election for two out-of-core licensees. Licensees with two out-of-core channels will not make an election in the first round. Requiring two out-of-core licensees to elect at this time would be premature and unnecessarily limit the channel choices available to these licensees. We disagree with MSTV that it would be beneficial for two out-of-core licensees to make elections in the first round a month after the two in-core licensees have elected. We note, for example, that under MSTV's plan two out-of-core licensees would not know at this time whether a two in-core licensee selecting its NTSC channel in the first round would ultimately obtain that election. This situation would not be resolved until Step 3, through interference conflict analysis MSTV would have two out-of-core licensees protect both channels of two-in-core licensees electing their NTSC channel, effectively denying two out-of-core licensees' the ability to select certain otherwise available channels. Accordingly, as will be discussed below, two out-of-core licensees will make their elections in the second round, at which point two in-core and one in-core licensees may already have a channel “locked in” (as defined above) and have released an in-core channel, making that in-core channel available for future selection.

a. Step 3: First Round Interference Conflict Analysis and Tentative Designations;

Conflict Forms Filed

49. The interference conflict analysis contemplated in our Step 3, which we expect to complete by February 2005, will determine whether and to what extent an elected in-core NTSC channel would cause interference to an existing or proposed in-core DTV channel. Using objective computer analysis, we will identify and communicate interference conflicts arising from the first round. We agree with MSTV that knowing what channels are available for selection in the second round is important in order to provide second round electors with an informed choice among all channels remaining after completion of the first round. Accordingly, through the interference conflict analysis process, we will set tentative channel designations for in-core licensees with channels that have been elected in the first round and “locked in.”

50. Specifically, through our first round interference conflict analysis, Commission staff will determine whether and to what extent an elected in-core NTSC channel causes an interference conflict to: (1) An in-core DTV channel that was elected in the first round; (2) an in-core DTV channel of any licensee that elected its NTSC channel in the first round that still may need to revert to its DTV channel; or (3) another elected in-core NTSC channel in the first round. We note that the nature of the interference conflict differs with respect to an elected NTSC channel of a one-in-core station, which enjoys a special status, as opposed to an elected NTSC channel of a two-in-core station, which has the option to change its election to its currently assigned DTV channel.

51. Upon completion of our first round interference conflict analysis, the Media Bureau will issue a letter to each licensee determined to cause an interference conflict(s). Licensees with interference conflicts will have 60 days from the date of this conflict notification letter in which to file their First Round Conflict Decision Forms, indicating how they intend to resolve their interference conflict. These First Round Conflict Decision Forms, which we expect to be filed in April 2005, will provide licensees with the opportunity to decide whether to maintain their in-core NTSC election, change their election to their in-core DTV channel, or, if a one-in-core licensee, elect to participate in the second round. Two in-core licensees may not release both in-core channels to participate in the second round of elections, except for the case of two in-core low VHF channels. We note that two in-core licensees already have the advantage of having an in-core DTV channel. Licensees can maintain their in-core NTSC election if they resolve their interference conflict by (1) agreeing to accept interference and reduce facilities; In choosing this option, licensees would have to agree to accept interference or reduce facilities, as necessary. Licensees must certify that they will resolve their interference conflict(s), and will be required to demonstrate such by submitting technical engineering data. and/or (2) negotiating an agreement (

i.e.

, conflict resolution agreement) with the licensee(s) with which they are in conflict. In choosing this option, licensees would have to negotiate a settlement with the licensee(s) with which they are in conflict. Licensees must certify that they will resolve their interference conflict(s), and will be required to demonstrate such by submitting evidence of a negotiated conflict resolution agreement and supplying engineering information, as may be necessary. Licensees' submissions must evidence compliance with 47 CFR 73.623(g).

52. Licensees currently allotted an out-of-core DTV channel will be afforded the opportunity for full replication facilities on an in-core DTV channel, unless they choose to accept less. The licensee may agree to accept interference as long as it is still able to serve all of its community of license. If the conflict is thus resolved, the licensee's currently assigned in-core DTV channel is released. After receipt of the First Round Conflict Decision Forms, we will announce any additional channel elections that have been “locked in” as tentative channel designations. Based on this information, second round electors will be able to determine which channels will be available for selection in the second round of elections.

53. An interference conflict exists when it is determined that more than tolerable new interference exists (

i.e.

, in this context, 0.1 percent in addition to existing interference). If it is determined that no interference conflict exists (meaning in this context that the elected in-core NTSC station adequately protects stations in each of the three categories noted above, to the extent required), then the licensee's elected NTSC channel will be “locked in” and its DTV channel will be released, if applicable. If it is determined that an interference conflict does exist, and would therefore prevent granting the in-core NTSC channel election with the certified coverage, then the licensee must decide whether to reduce its facilities to eliminate the interference, Licensees electing to reduce their facilities will be required to submit data demonstrating specifying how they will eliminate the interference conflict. or change its election to its DTV channel, or be treated as a two out-of-core licensee if its paired DTV channel is out of core. The licensee will indicate its decision by filing a conflict decision form. The licensee may agree to reduce its facilities to eliminate interference as long as it is still able to serve all of its community of license. With regard to stations with an allotted out-of-core DTV channel electing to operate a DTV station on their in-core NTSC channel, we will permit the 0.1 percent additional interference limit to be exceeded on a limited basis in order to afford these stations an improved opportunity to select their NTSC channel. Such allowance is justified because these single channel licensees have only one in-core channel to select and may need this additional accommodation. We are concerned, however, that such operations not cause substantial interference to existing DTV service (

e.g.

interfering within the area in which service replication is already being achieved by an operating station). Although we do not expect such instances will be widespread, where we find it appropriate to do so, we may ask a station seeking DTV operation on its in-core NTSC channel to operate at a power level that would avoid large amounts of interference to existing DTV operations, even if this would preclude that station from operating with full replication facilities. Licensees should be aware that the burden is on them to ensure that the channel they elect can serve their community of license. Consequently, should it be determined when proposing a final DTV Table of Allotments that a licensee's election does not cover its community of license, we will void that election and place the licensee on a more appropriate channel.

54. The interference conflict analysis performed in the first round is illustrated through the following examples. In the case of a two-in-core licensee whose election of its in-core NTSC channel causes an interference conflict which prevents granting the in-core NTSC channel with the certified coverage, the licensee will file a conflict decision form indicating whether it will accept its in-core NTSC channel with interference and reduced facilities or if it will revert to its DTV channel. The channel selected at this time would be “locked in” and the other channel

would be released. In the case of a licensee with only one in-core NTSC channel (including singletons) that elected its in-core NTSC channel and an interference conflict was found that would prevent granting coverage to extent certified, the licensee will file a conflict decision form indicating whether it wishes to accept its in-core NTSC channel with interference or if it wishes to be treated as a two out-of-core licensee and file an election in the second round (see Step 4). Licensees are cautioned that it is possible that they may obtain a less preferable tentative channel designation than had they decided to keep their in-core NTSC channel election with interference and reduced facilities. We note that these licensees may include their reduced-facilities NTSC channel on their list of second round election preferences. There would be, however, no guarantee that their discarded in-core channel would be awarded back to them should their higher second round election preferences not be available to them.

d. Step 4: Second Round Election Forms Filed

55. In our second round of elections, which we expect to occur July 2005, licensees with two out-of-core channels and those now treated like them, This category includes those first round electors that indicated in their conflict decision forms that they wanted to be treated as two out-of-core licensees, rather than accept their in-core NTSC channel with interference and reduced facilities. Also included in this category are licensees that do not have an in-core channel (

e.g.

, an out-of-core singleton). will be required to file a Second Round Election Form.

56. Two out-of-core licensees. In their Second Round Election Form, two out-of-core licensees may submit one channel election preference (two out-of-core licensees may negotiate channel election arrangements with other licensees) or may request that the Commission determine a “best available” channel (

i.e.

, one that minimizes new interference to all protected channels) for them at full replication facilities. Two out-of-core licensees wishing to ensure receipt of a tentative channel designation in the second round should consider making a Commission-determined “best available” channel their election preference. Thus, licensees that request that the Commission determine a “best available” channel for them at full replication facilities will be placed by Commission staff in this round. Second round electors may also submit one contingent channel preference which would be available for selection only if the licensee rescinds its original second round election as part of a negotiated conflict resolution or settlement agreement with another licensee. We do this in an effort to encourage licensees to resolve conflicting channel preferences through settlement negotiations. Licensees may also request that the Commission determine a “best available” channel for their contingent preference.

e. Step 5: Second Round Interference Conflict Analysis and Tentative Designations

57. We recognize that there may be a sizable number of election preferences filed in the second round and that licensees may list conflicting channel preferences. Second round electors may also be asked to accept a channel with interference and reduced facilities because of an interference conflict with a protected channel. In anticipation of these issues, our second round interference conflict analysis, which we expect to complete by September 2005, offers a process of identifying and resolving such interference conflicts. We will evaluate election preferences for interference conflicts (as defined above), and “lock in” second round election preferences as tentative channel designations, to the extent possible. We will accommodate the election preference of each licensee to the extent possible, but cannot guarantee that licensees will receive their selected channel. The Second Round Conflict Form will provide second round electors with the opportunity to decide whether the interference and reduced facilities to which they would have to agree to obtain their channel preference would be acceptable to maintain their election preference. Second round electors unwilling to accept its election preference with interference and reduced facilities or that otherwise cannot resolve their interference conflict may participate in the third round of elections. We believe that in many cases of conflicting second round channel preferences, licensees will be able to reach settlement agreements, thereby avoiding the necessity of having the Commission resolve their conflict after the third round of elections.

58. Upon completion of our second round interference conflict analysis, the Media Bureau will notify each licensee that is determined to cause an interference conflict(s). Licensees will have 60 days from the date of this conflict notification letter in which to file their Second Round Conflict Decision Forms, indicating how they intend to resolve their interference conflict. These Second Round Conflict Decision Forms, which we expect to be filed in November 2005, will provide licensees with the opportunity to decide whether to maintain their second round channel elections or instead participate in the third round. Licensees have several options available to them. Licensees can maintain their second round channel election if they resolve their interference conflict by (1) agreeing to accept interference and reduce facilities; Licensees must certify that they will resolve their interference conflict(s), and will be required to demonstrate such by submitting technical data. and/or (2) negotiating an agreement (

i.e.

, conflict resolution agreement) with the licensee(s) with which they are in conflict. Licensees must certify that they will resolve their interference conflict(s), and will be required to demonstrate such by submitting evidence of a negotiated conflict resolution agreement and supplying engineering information, as may be necessary Licensees can decide to change their election to their contingent second round channel by entering into a negotiated channel election arrangement with another licensee whereby they surrender rights to their original channel preference to that licensee. Licensees may use their contingent channel election only in the context of a negotiated settlement with another licensee, and may not use their contingent channel election at all if such use would result in an interference conflict. Finally, licensees can decide that they are not willing to accept their election preference with interference and reduced facilities or that they cannot otherwise negotiate a resolution to their interference conflict and elect to participate in the third round of elections. We believe that in many cases of conflicting second round channel preferences, licensees will be able to reach settlement agreements, thereby avoiding the necessity of having the Commission resolve their conflict after the third round of elections. We note that where more than one station elects the same channel and those stations cannot negotiate a settlement agreement, the subject channel will become unavailable for selection in the second round and licensees will have the opportunity to select that channel in the third round. The Commission will resolve third round conflicts pursuant to certain criteria After receipt of the Second Round Conflict Decision Forms, we will announce any additional channel elections that have been “locked in” as tentative channel designations. Upon completion of the

second interference conflict analysis and tentative channel designations, we expect that only a small number of licensees will remain with no channel “locked in.” These licensees will be afforded an opportunity to file one additional election preference in the third and final round of elections. Based on this information, third round electors will be able to determine which channels are available to them for selection.

f. Step 6: Third and Final Round of Elections

59. We will hold a third round of elections, expected to occur in January 2006, to find channels for licensees that were not “locked in” at tentative channel designations in the previous two rounds. This third round provides a subsequent round for two out-of-core licensees whose election preferences could not be accommodated in their initial round of elections. We agree with MSTV that these licensees, as well as any other licensees that remain unplaced at this time, should be afforded the opportunity to make one additional channel election preference. These licensees will file a Third Round Election Form Election preferences made in this round must protect all “locked in” channels. Participants in the Third Round may elect from available channels and may file negotiated channel election arrangements. If a licensee is not able to specify a preferred channel on which it can operate satisfactorily without conflicting with a protected channel, it may ask the Commission to specify a channel for its use at full replication facilities. In such cases, the Commission will select a channel that minimizes new interference among all affected stations.

60. In this third round, we will also permit licensees with a low VHF channel or a channel subject to international coordination issues to seek an alternate tentative channel designation. Although the data are incomplete at this time, we are persuaded that low VHF licensees should be afforded an additional opportunity to find a channel that may better serve the public. For this reason, we will also permit two in-core low VHF licensees to release both of their channels after the first round so that they may be treated as two out-of-core licensee and participate in the second round of elections. MSTV proposed an additional election round for licensees who found their prior election unacceptable and contemplated that licensees which had to choose between two low VHF channels would be among those possibly dissatisfied licensees. Specifically, to the extent a preferred channel is available in this final election round, we will allow such licensees to elect a different channel for their final DTV operations, notwithstanding that they have an elected and “locked in” channel. These licensees may also request that the Commission determine a “best available” channel for them at full replication facilities. We note that it may not be possible to accommodate these preferences. Moreover, it is possible that the low VHF channel may be the best available channel for the licensee. No other licensees with an elected (and “locked in”) channel will be permitted to participate in this third and final round of elections.

61. Conflicts among third round preferences. In deciding among third round election preferences, we will determine on a case-by-case basis what channel best replicates a station's service area while minimizing new interference to other stations. If, for example, the channel elected conflicts with a DTV channel tentatively designated for post-transition use by another station, the Commission will resolve the conflict by determining the best available channel for the licensee, as described herein. This analysis includes considerations of service to the public “ including service to local communities Considering licensees” ability to reach and provide coverage to local communities is consistent with the Commission's statutory obligation to ensure that broadcasters are responsive to the needs and interests of local communities. “ and overall spectrum efficiency. We will also consider in our analysis those factors enumerated by MSTV: (1) Whether the station was an early adopter of DTV technology (

i.e.

, the length of time the station has been operating on DTV); (2) the impact on the public's access to DTV services (

i.e.

, the population served by the station's digital signal and the percentage of replication population covered); (3) whether one or both of the station's channels is/are in the low VHF band (which might weigh in favor of that station receiving priority); (4) whether coordination with or interference to or from Canada or Mexico is a problem; (5) the existence of any zoning, environmental or other such issues; and (6) any other factors that may be relevant at the time.

g. Step 7: New DTV Table of Allotments and Authorizations Proposed and Adopted Through Rulemaking Process

62. After completion of our channel election and repacking process, expected by August 2006, we will issue a Notice of Proposed Rule Making to propose a New DTV Table of Allotments. In creating the new DTV allotments proposals, we will provide all eligible stations with channels for DTV operations after the transition. In developing the new allotments, we will attempt to accommodate the preferences of broadcasters to the extent possible. To clarify as requested by Cox Broadcasting, the process will account for interference agreements among stations under § 73.623(g) of the Commission's rules and will generally preserve the protection afforded by those agreements. Our proposed Table will be based on the tentative channel designations established through our channel election process, as well as on our evaluation of overall spectrum efficiency and providing the best service to the public, including service to local communities. In the NPRM, we will seek comment on our proposed new DTV Table of Allotments.

63. Only Commission licensees and permittees will participate in the channel election process. Applicants for new stations and petitioners for new allotments will not make elections. We note that there are remaining applications that have been pending since before 1997 to obtain approximately 50 new NTSC stations. These applications will be dismissed if found to be inconsistent with the current protection requirements. In developing the post-transition DTV table, we will generally protect those NTSC allotments with pending new station applications that have “cut-off” status (do not face an additional opportunity for filing of mutually exclusive applications). This is consistent with the protection that must be afforded by DTV applications pursuant to § 73.623(h)(2) of the rules. An exception to this protection is that we will not protect the existing channel allotment where the applications are associated with a rule making petition that requests another channel (but may protect the new channel proposed in the rule making petition in accordance with the discussion that follows). For mutually-exclusive groups of applications where there is a settlement, or the tentative selectee is known, we will consider the facilities proposed by the prevailing applicant in the settlement group or the tentative selectee. We will continue to process these protected applications to grant of an NTSC construction permit and note that these will be new single-channel stations, allowed to choose between NTSC and DTV operation during the transition, but required to become DTV

at the end of the transition. At the conclusion of the channel election and repacking process, remaining unprotected new station applications will be evaluated and may be accommodated with a post-transition DTV allotment or dismissed when we issue the NPRM proposing the new DTV Table of Allotments.

64. Pursuant to opportunities the Commission provided, some of the pre-1997 NTSC applicants have continued to pursue a new station authorization by filing rule making petitions requesting a different NTSC channel or a DTV channel. In addition, some petitions have been filed seeking DTV channel allotments for new stations. These pending NTSC and DTV rule making proposals will be dismissed if found to be inconsistent with the current protection requirements. Each rule making request, including those associated with applications and those seeking new DTV allotments, falls into one of three groups: (1) Pending petitions for rulemaking; (2) outstanding rule makings (Notice of Proposed Rule Making issued); or (3) completed rule makings that now have pending applications for a construction permit. We will attempt to protect allotments and proposed allotments in the second and third groups where we have already adopted a Notice of Proposed Rule Making or a Report and Order to establish a channel allotment. Protection of these rule making proceedings is consistent with the requirements placed on DTV applications by § 73.623(h)(2) of the rules. However, we advise these petitioners that there may be a few cases where we must modify, restrict or eliminate their requested allotment in order to accommodate all eligible broadcasters with a post-transition DTV allotment. Remaining rule making petitions will be evaluated at the conclusion of the channel election and repacking process and may be accommodated with a post-transition DTV allotment or dismissed when we issue the NPRM proposing the new DTV Table of Allotments.

Freeze of Procedures To Change Allotments

65. A stable database is not only crucial to the channel election process, but is vital to the completion of the technically difficult task of developing a new DTV Table of Allotments. To make the channel election process and the creation of the new DTV Table of Allotments as manageable as possible, the Media Bureau has temporarily suspended certain procedures for altering DTV and analog TV service areas and channels until after the new DTV Table of Allotments is complete. We will continue to process rulemakings in which a Notice of Proposed Rule Making has been issued prior to the adoption of this Order. Additionally, the Media Bureau staff is directed to dismiss all pending petitions to change the NTSC Table of Allotments in which a Notice of Proposed Rule Making has not been issued prior to the adoption of this Order. We note that the Media Bureau staff previously dismissed or denied a number of petitions for new or changed NTSC allotments on various grounds, thereby declining to issue a Notice of Proposed Rule Making for these petitions. Several petitioners have sought reconsideration or review of these actions. In view of our decision to dismiss all pending petitions for new NTSC allotments which have not been subject to the notice process, all pending petitions for reconsideration or review of NTSC allotment requests that have not advanced to the notice stage are hereby dismissed. Pursuant to the freeze, the Media Bureau we will not accept for filing, until further notice, the following:

• Petitions for rulemaking to change DTV channels within the DTV Table of Allotments.

• Petitions for rulemaking for new DTV allotment proceedings.

• Petitions for rulemaking to swap in-core DTV and NTSC channels. In the NPRM, we sought comment on whether we should allow stations to use an application process to make these swaps. We proposed to require that parties meet the spacing requirements for amending the analog Table of Allotments pursuant to 47 CFR 73.610 and to allow parties to use Longley-Rice analysis to demonstrate that an analog TV station protects DTV stations and for amending the DTV Table of Allotments pursuant to 47 CFR 73.623. We invited comment on these proposals and on how the Commission should address any loss of analog service or cable carriage or other public interest issues that may arise in connection with analog/DTV channel swap proposals.

Second DTV Periodic NPRM,

18 FCC Rcd at 1288, para. 28. Currently, two or more DTV licensees/permittees are allowed to request a swap of their DTV channel allotments by filing modification applications for each station. Few commenters address this issue on the record. Fewer state that they support channel swaps by application.

See

CEA Comments at 16; Thomas Smith Comments at 4.

See also

NYS-OFT Comments at 12-13; NPSTC Reply at 3-4 (supporting easing Taboo restrictions on early DTV/In-core analog swaps); MSTV/NAB Comments at 7; Paxson Reply at 10; Sinclair Comments at 8. For the reasons stated above, we have determined that we will freeze all NTSC/DTV channel swaps upon adoption of this Order. We therefore do not reach the issue of streamlining the NTSC/DTV channel swap process.

• Applications to change DTV channel allotments among two or more licensees. 47 CFR 73.622(c)(1), 73.623. Stations hoping to participate in negotiated channel election arrangements, discussed supra, must notify the Commission in the channel election form. If these arrangements are approved, the participants will be notified.

• Petitions for rulemaking by licensees/permittees to change NTSC channels or communities of license.

• Television modification applications that would increase a station's DTV service area in channels 2-51 in one or more directions beyond the combined area resulting from the station's parameters as defined in the following: (1) The DTV Table of Allotments; (2) Commission authorizations (license and/or construction permit); and (3) applications on file with the Commission prior to release of this Order; and television modification applications that would increase a station's analog service area in channels 2-51 in one or more directions beyond the combined area resulting from the station's parameters as defined in the following: (1) Commission authorizations (license and/or construction permit) and (2) applications on file with the Commission prior to release of this Order. We froze maximization applications for channels 52-59 on June 18, 2002. Public Notice, 17 FCC Rcd 11290 (2002). We froze maximization applications for channels 60-69 on January 24, 2003. Public Notice, 18 FCC Rcd 627 (2003). We will continue to process applications on file as of the date this Order is adopted. The Media Bureau may consider, on a case by case basis and consistent with the public interest, amendments to those applications to, for example, resolve interference with other stations or pending applications or resolve mutual exclusivity with other pending applications.

• Class A station displacement applications and applications for coverage changes that would serve any area that is not already served by that Class A station's authorized facilities. As an exception to this freeze, on-air Class A stations demonstrating that they

face imminent disruption of service may request an STA to continue operations. Displacement applications filed by out-of-core LPTV stations that have been deemed Class A-eligible requesting a move to an in-core channel where Class A authority could be granted will not be acted on during this freeze, but for such stations, immediate non-Class A LPTV displacement relief may be requested through an STA.

66. Notwithstanding the freeze, licensees will not be prevented from filing modification applications when the application would help resolve international coordination issues or when a broadcast station seeks a new tower site due to the events of September 11, 2001. In addition, the Media Bureau will consider, on a case-by-case basis, requests for waiver of the freeze when the modification application is necessary or otherwise in the public interest for technical or other reasons, such as when zoning restrictions preclude tower construction at a particular site or when unforeseen events, such as extreme weather events or other extraordinary circumstances, require relocation to a new tower site.

Border Interference Issues

67. There are approximately 43 stations with DTV applications awaiting international coordination. As of August 4, 2004, there are 32 pending DTV applications/rule making proposals requiring Canadian approval and 11 pending DTV applications/rule making proposals requiring Mexican approval. (These numbers do not reflect those applications which have failed the coordination process or which require further action by the applicant.) We recognize that certain issues may remain to be completed in connection with the Canadian approval process for these stations. We will still require, however, broadcasters to make timely channel elections. As noted above, broadcasters with an out-of-core DTV channel and an in-core analog channel that is not available for digital use under the LOU should indicate this fact on their channel election form. Like any one in-core licensee, these licensees may release their in-core channel and participate in the second round of elections; however, we will also afford licensees a later opportunity in the third round to elect another channel in the event their elected channel remains subject to, or was in the interim adversely affected by, international coordination. Those broadcasters remaining on their DTV allotments that do not have applications to maximize should not have unusual difficulties in the approval process. With respect to post-transition DTV replication of stations' current analog service, we must coordinate DTV use of NTSC channels in border areas. We will conduct this coordination in the course of the new allotment rulemaking. We will resolve any remaining international coordination issues as part of the process of developing new DTV allotments.

Replication and Maximization

68. In the creation of the DTV Table of Allotments, each DTV channel allotment was chosen to allow DTV service thereon to best match the Grade B service contour of the NTSC station with which it was paired. We took this approach to ensure that broadcasters have the ability to reach the audiences that they have been serving with the NTSC analog transmission system and that viewers continue to have access to the stations that they are accustomed to receiving over the air. Although we have declined to make full signal replication mandatory, we continue to believe that most DTV broadcasters eventually will replicate their NTSC coverage with DTV service. As an incentive to replicate, we stated that DTV licensees must either be on the air replicating their April 1997 NTSC Grade B service area as of the replication deadline or lose interference protection to the unreplicated portion of this service area outside the noise-limited signal contour. We stated that other full or low-power stations would then have the opportunity to expand their service areas to serve the viewers made available as a result of a DTV station's failure to fully replicate. We also stated in the First DTV Periodic MO&O that we would treat stations seeking to maximize their service areas in a similar manner. First DTV Periodic MO&O, 16 FCC Rcd at 20606, paras. 29-30. By maximizing, stations make power and antenna height increases above the values allotted in the DTV Table, and site changes that extend the service area of DTV facilities beyond the NTSC replication facilities. Class A Order, 15 FCC Rcd at 6377, para. 52. Congress has recognized the importance of preserving the right of DTV stations to maximize and has established specific measures to protect coverage areas defined in maximization applications. In the Community Broadcasters Protection Act of 1999, Congress protected applications for maximization against new Class A stations. To be entitled to protection by low power television stations applying for primary Class A status, DTV stations were required to have filed an application for maximization or a notice of intent to seek maximization by December 31, 1999, and to have filed a bona fide application for maximization by May 1, 2000. We have emphasized DTV service maximization in the digital transition as a means by which stations may increase their DTV signal coverage and provide DTV service competitively within their respective markets. Sixth Report and Order, 12 FCC Rcd at 14605, para. 30. The Media Bureau froze maximization applications in the 698-746 MHz band (channels 52-59 or the “Lower 700 MHz band”) to assist participants in Auction No. 44 to determine the areas potentially available in the band for the provision of service by auction winners before the channels are cleared. Public Notice, 17 FCC Rcd 11,290 (2002). The Media Bureau later froze maximization applications in the 746-806 MHz spectrum band (channels 60-69 or the “Upper 700MHz band”) to protect Guard Band and Public Safety entities from shifts or expansion in existing broadcast service, and to facilitate the eventual clearing of this spectrum and the auction of the commercial portions of the spectrum.

69. In the First DTV Periodic MO&O, our goal in temporarily deferring the replication protection deadline established in the First DTV Periodic Report and Order was to permit stations to elect a more gradual build-out of their DTV facilities, and thereby increase the number of stations capable of commencing digital service to at least their core communities by the May 2002 and May 2003 construction deadlines. We also gave DTV licensees seeking to maximize facilities, including analog UHF licensees, the same flexibility to implement graduated construction plans as analog VHF licensees.

70. We stated in the First DTV Periodic MO&O that we would establish in this second DTV periodic review a date by which broadcasters must either replicate their NTSC coverage or lose DTV service protection to the unreplicated areas, and by which broadcasters with authorizations for maximized digital facilities must either provide service to the associated coverage area or lose DTV service protection to the uncovered portions of those areas. For DTV channels within the core spectrum, we proposed in the NPRM to set new replication and maximization protection dates: July 1, 2005, for affiliates of the top-four networks (

i.e.

, ABC, CBS, Fox and NBC) in markets 1-100; and July 1, 2006, for all other commercial DTV licensees as well as noncommercial DTV licensees. We sought comment on these dates, stating our goal to allow stations sufficient time to provide full replication and maximization service while also ensuring that stations

continue to progress toward an all-digital broadcast service. We requested comment on whether we should adopt the same or different replication and maximization interference protection deadlines for stations operating in the 700 MHz band. We also sought comment on the disposition of construction permits or applications for replication or maximization pending after the deadline.

71. We take seriously our mandate to speed the transition and to ensure that the spectrum is used efficiently. At the same time, we have attempted to accomplish these objectives without imposing undue cost and delay on broadcasters. After careful consideration of the comments, we will adopt the following use-it-or-lose-it replication and maximization deadlines:

• July 1, 2005—Use-it-or-lose-it deadline for DTV licensees affiliated with the top-four networks (

i.e.

, ABC, CBS, Fox and NBC) in markets 1-100. Those licensees that receive a tentative DTV channel designation in the channel election process on their current digital channel must construct full, authorized facilities. Those licensees that receive a tentative DTV channel designation on a channel that is not their current DTV channel must serve at least 100 percent of the number of viewers served by the 1997 facility on which their replication coverage was based. The number of viewers served by a station's 1997 facility on which its replication is based will be determined using population data from the year 2000 census. Thus, the population that will be reported as served by a station's 1997 facility on the table of station information that we plan to issue soon will generally be different (in most cases larger) than the population reported as served by that facility.

• July 1, 2006—Use-it-or-lose-it deadline for all other commercial DTV licensees as well as noncommercial DTV licensees. Those licensees that receive a tentative DTV channel designation in the channel election process on their current digital channel must construct full, authorized DTV facilities. Those licensees that receive a tentative DTV channel designation on a channel that is not their current DTV channel must serve at least 80 percent of the number of viewers served by the 1997 facility on which their replication coverage was based.

72. We adopt these deadlines for the following reasons. First, we believe that the time has come to ensure that consumers have access to a full range of digital programming services from their local broadcast stations. We note that, even according to MSTV's own study, approximately 40 percent of stations operating pursuant to STAs are reaching less than 70 percent of their analog population with a digital signal. The unserved households are more likely to be in outlying or rural areas, since the minimum STA coverage requirement is that a station's DTV signal covers its actual community of license. Those consumers, like all consumers, reasonably expect that when they buy a digital television set they will be able to receive the same broadcast stations in digital that they receive in analog.

73. Second, our temporary deferral of the replication and maximization deadlines in 2001 recognized that, given the existing marketplace conditions, some broadcasters, particularly those in smaller markets, needed to take a more graduated build-out approach. In particular, we recognized the existing reality of modest DTV receiver penetration, which affected the financial decisions of broadcasters and those who fund them. The outlook for DTV receivers has changed dramatically since 2001. In August 2002, the Commission adopted a DTV tuner mandate. Beginning on July 1, 2004, television receivers shipped in the U.S. must include digital broadcast tuners on a phased-in basis; by July 2007, all television receivers 13 inches and above must include a digital broadcast tuner. In addition, in September 2003, the Commission adopted rules to permit the manufacture of cable-ready “plug-and-play” sets for one-way digital programming. By Commission mandate, each of these sets will also include an over-the-air digital tuner. Between these mandates and the overall increasing pace of the DTV transition, we expect that the penetration of digital televisions with off-air reception capability will dramatically increase in the coming years. Indeed, in testimony before Congress in June 2004, the Consumer Electronics Association (“CEA”) forecast that more than 85 million American homes will have DTV tuners by 2010. This emerging reality should alleviate the concerns of commenters stating that they do not wish to provide service in advance of widespread DTV set penetration. Therefore, we do not believe it is appropriate to further postpone replication and maximization deadlines.

74. Third, we do not believe a replication/maximization deadline will impose an undue burden on broadcasters. Approximately 45 percent of broadcasters currently on the air have built licensed facilities and are operating at full power. Many of these full-power stations are located in smaller markets and/or are non-commercial. Not only did they incur higher build-out costs than a station building today, but they have been incurring higher power costs to operate at full power. It would be inequitable to permit broadcasters operating at lower power—who have already accrued significant benefits from the Commission's STA policy—to continue to require the full-power broadcasters continue to shoulder a heavier load throughout the transition.

75. Fourth, we do not believe that the build-out deadlines will result in undue “stranded investment.” As an initial matter, we are not requiring stations to replicate or maximize. The “use-it-or-lose-it” deadline simply means that after a reasonable build-out period has passed, if a station fails to provide a signal to serve certain viewers, another entity should have the opportunity to do so. After a reasonable build-out period, we believe that the objectives of providing service to the public and spectrum efficiency militate against further protection of the unserved areas. In addition, we have made a significant accommodation for those broadcasters moving to a new DTV channel at the end of the transition: The top-four network affiliates in the top 100 markets need only provide service to the same number of viewers as their replicated service area in order to preserve their right to maximize/replicate on their ultimate DTV channel; the remaining stations need only serve 80 percent of the number of viewers in their replicated service area to preserve their right to maximize/replicate on their ultimate DTV channel. If, as MSTV asserts, a significant amount of power (and hence, expense) is needed to “push” a UHF television signal out the last few miles beyond the station's “line of sight” or “radio horizon,” this should help address the concern. Moreover, we have made a special accommodation, described below, for many of the broadcasters for whom there would certainly be stranded investment—those with a DTV allotment outside of the core. We also note, according to Harris Corporation, that much of the investment in building out will not be stranded even if a station ultimately moves to another channel because some of the equipment can be re-used. Depending on the station's power level and whether it ultimately moves to an in-core VHF or UHF channel, the “stranded” investment caused by an intermediate power increase on the existing DTV channel could range from $345,000 for a higher power station (out of a total investment of $1,355,000 to $1,975,000) to $505,000 for a lower

power station (out of a total investment of $1,145,000 to $1,720,000). Finally, for those broadcasters with an in-core DTV allotment that may want to consider moving elsewhere at the end of the transition, whatever additional costs there are can be factored into that decision just like the sunk costs of the initial STA facility. In any event, these broadcasters would be in no worse position than the hundreds of broadcasters that have already built out to full power and may face a similar choice.

76. Fifth, as with other aspects of the transition such as the initial construction deadlines, we recognize the particular needs of smaller market and non-commercial broadcasters by setting earlier deadlines for the larger market, commercial broadcasters expected to lead the transition. In addition, we are adopting a waiver process for stations that truly cannot afford to build out to these minimum requirements, or that cannot build out for other reasons beyond their control.

77. Stations on any channel that have received construction permits with construction deadlines that extend beyond these replication/maximization interference protection dates must meet their replication/maximization requirements at the expiration date specified by their construction permit. In the First DTV Periodic MO&O, the Commission established a process whereby certain commercial stations and all noncommercial educational stations operating pursuant to a DTV STA would receive automatic DTV CP extensions until a future “use or lose” date. 16 FCC Rcd at 20608, para. 36. In the Second DTV Periodic NPRM, we sought comment on new replication and maximization protection dates and on the disposition of construction permits or applications for replication or maximization pending at the time of the deadline. In conjunction with the replication and maximization protection dates adopted herein, we clarify that we will also apply the DTV CP extension policy to all stations operating with a licensed DTV facility. Therefore, all properly authorized operating DTV stations with authorized CPs to make changes to their licensed facilities, including the network affiliate stations in the top 30 markets, will have their CPs extended until the replication/maximization interference protection deadlines established in this order. We believe this change is appropriate in order to provide consistency in the treatment of stations with outstanding CPs that have already received a DTV license and those with an outstanding CP operating pursuant to a DTV STA. They must build facilities that meet the minimum requirements by that date or lose interference protection.

78. A station that fails to meet the above replication/maximization requirements will lose interference protection to the unused portion of the associated area as of the applicable interference protection deadline, as described more fully in section IV.D., infra. As a practical matter, nearly every station that has fully replicated its analog coverage will have maximized its DTV coverage by reaching at least some small areas beyond the analog Grade B contour. Where a station has maximized its DTV coverage by a coverage shift that leaves some of its replication coverage area unserved, then the station's protection will shift to its maximized coverage area and it will lose interference protection to the unserved replication area. In addition, a station failing to meet the above deadlines will lose the ability to “carry over” its interference protection to its unserved DTV service area on its post-transition channel (

e.g.

, on its in-core NTSC channel), as determined in the channel election process described above. Analog service will remain protected throughout the transition, but DTV service to the former analog area will not be protected after the transition unless replication deadlines are met. Some stations may currently have licenses or construction permits to serve areas smaller than the service area allotted to them in the DTV table of allotments. Unless broadcasters in this situation construct facilities to serve these unserved areas within the DTV allotment prior to the replication/maximization interference protection deadline, they risk not being able to expand later to regain that service area. Thus, for example, if a station subject to the July 1, 2006 deadline builds out only to 60 percent of its replicated service population by that date, it will lose interference protection on its digital allotment beyond that 60 percent service area, and, if it seeks to move to its NTSC allotment at the end of the transition, it will not retain the ability to carry over interference protection beyond the 60 percent service area.

79. By contrast, a station that meets its applicable build-out requirements will retain interference protection to its authorized service area on its DTV channel if it remains on that channel, as well as the ability to “carry over” its interference protection for its authorized DTV service area if it moves to a different DTV channel post-transition. This decision modifies our decisions in the Class A Order and Class A Recon. Class A Order, 15 FCC Rcd at 6379-80, para. 58; Class A Recon., 16 FCC Rcd 8269-70, para. 67. In the Class A Order, in the context of relative interference protection priorities of Class A and DTV stations, we stated that “[t]o preserve their ability to maximize * * * within the core, we will require stations * * * to * * * maximize their DTV service area on their * * * DTV channel. These stations must have filed a notice of intent to maximize and must file an application to maximize within the deadlines mandated by the CBPA. [W]e will allow these stations to carry over to their in-core [NTSC] channel the maximized digital service area achieved on the [DTV] channel, to the extent that the [NTSC] channel facilities for maintaining the maximized service area provide required interference protection to other DTV stations.” Class A Order, 15 FCC Rcd at 6379-80, para. 58. Under today's decision, stations need only meet our replication/maximization build-out deadlines to preserve their ability to maximize on their ultimate DTV channel. Similarly, stations electing to forfeit their current DTV channel and “flash-cut” to digital on their analog channel under the options described below for stations with out-of-core DTV allotments and satellite stations, will be entitled to interference protection as if they met the applicable replication/maximization build-out deadlines. However, a station moving to a different DTV channel at the end of the transition will lose interference protection during the transition to any unserved areas on its current DTV channel as of the applicable deadlines, notwithstanding the fact that it meets the minimum build-out requirements. For example, assume a broadcaster subject to the July 1, 2006 deadline will be changing DTV channels at the end of the transition and meets the 80 percent build-out requirement by serving 90 percent of its replicated service population by July 1, 2006. Assume further that it was authorized to build maximized facilities, serving 120 percent of its replicated service population. At the end of the transition, it will be entitled to “carry over” its full maximization service area, to the extent possible under our rules. However, during the transition, the station will lose interference protection on its existing DTV channel for those areas within its maximized service area that are unserved as of the deadline (

i.e.

, those areas containing 90 percent-120 percent of its service population).

80. For those stations that are unable to provide the required service by our replication/maximization protection deadlines because of severe financial

constraints or circumstances beyond a station's control, we will establish a limited waiver process and grant extensions of the applicable replication or maximization interference protection deadline on a six-month basis if good cause is shown. Broadcasters seeking a waiver on the basis of financial hardship must make a showing similar to that required to obtain a waiver of the DTV construction deadlines on financial hardship grounds. As with any request for waiver of our rules, a request for an extension of the applicable deadline will be granted only upon a showing of good cause and where grant of the extension will serve the public interest.

Single Channel Broadcasters

81. KM Companies requests that we specifically address the treatment of single channel broadcasters with respect to the interference protection deadline. As discussed elsewhere, single channel broadcasters will participate in the channel election process. Analysis of their channel elections will be based on their authorized facilities (construction permit for stations that have both a license and a construction permit). Whether their single-channel authority is analog or digital, a broadcaster that has not constructed or is not operating the appropriate facilities on which its election analysis is based will lose protection of the unserved area as of the applicable interference protection deadline (except in cases where the DTV allotment coverage is based on a construction permit that expires after the deadline, in which case they will keep their protection as long as the construction permit remains valid).

Early Surrender of DTV Out-of-Core Channels (“Flash Cut”)

82. The Second DTV Periodic NPRM asked if we should establish earlier replication and/or maximization interference protection deadline(s) for out-of-core broadcasters (

i.e.

, in the 700 MHz band) than broadcasters operating on channels within the core in order to allow new services to be provided in portions of replication areas that a DTV licensee may never plan to serve in this spectrum.

83. The Commission permits broadcasters with NTSC stations in the Upper 700 MHz (60-69) or the Lower 700 MHz (52-59) to enter into voluntary band clearing arrangements consistent with the Commission's existing band-clearing rules and Section 6 of the Auction Reform Act of 2002. Auction Reform Act of 2002, Pubic Law 107-195, 116 Stat. 715 (“Auction Reform Act”) section 6(a), 47 U.S.C. 337 note. Section 6 of the Auction Reform Act restricts the Commission from waiving certain broadcast interference standards and the minimum spacing requirements for certain proposals to relocate Channel 52-69 analog operations to a Channel 2-51 DTV allotment, if such waiver “will result in any degradation in or loss of service, or an increased level of interference to any television household except as the Commission's rules would otherwise expressly permit, exclusive of any waivers previously granted.” Id. These restrictions do not, however, apply to proposals to move Channel 63, 64, 68, or 69 analog operations to in-core DTV allotments “in order to make such frequencies available for public safety purposes.” Id., Section 6(b). In furtherance of the significant public interest in rapid band clearing, and in recognition of the fact that all out-of-core DTV facilities will have to move at the end of the transition, we will permit stations with an in-core NTSC channel paired with an out-of-core DTV channel, as well as stations with two out-of-core channels, to surrender their out-of-core DTV channels and operate in analog on their analog channels. We will also permit single-channel DTV stations out of the core, upon Commission approval, to elect not to construct DTV facilities and instead to give up their assigned DTV channel in the 700 MHz band in return for a DTV channel inside the core. We will assign these broadcasters an in-core DTV channel when we generate a revised DTV Table of Allotments Stations have up to their initial channel election deadline to inform the Commission that they will use this option. We delegate the authority to grant these requests to the Media Bureau. Upon approval from the Commission, these stations will then surrender their out-of-core digital channel and be treated as single channel stations, allowed to “flash cut” to digital on their in-core channel no later than the end of the transition in the stations' markets. These stations will retain their ability to replicate and/or maximize on their NTSC allotment as if they met the applicable replication/maximization build-out requirement. The station will then be responsible for meeting any DTV service obligations (

e.g.

hours of operation, and replication/maximization requirements), applicable to other like broadcasters on the date it commences DTV operations. Because of the greater potential for wasted expenditures in DTV facilities built in the 700 MHz band (since there will not be an opportunity to remain in that band after the transition), and given the potential for earlier use of this spectrum by public safety and other 700 MHz licensees, we will presume that granting such a request will be in the public interest if the station demonstrates that it is assigned a DTV channel out of the core and that grant of the request would not result in the loss of a DTV channel affiliated with one of the four largest national television networks (ABC, CBS, NBC, or Fox). We have consistently relied on affiliates of the four largest national television networks to achieve the necessary milestones throughout the DTV transition. These stations also must remain on the air in order to fulfill Congress' directive that stations “licensed to or affiliated with one of the four largest national television networks” must be “broadcasting a digital television service signal” in order for the transition to occur. We conclude that the presumption we establish is consistent with Congress' objectives for this spectrum, should generally increase the attractiveness of the spectrum to potential 700 MHz licensees, and will not unduly delay the expeditious transition to DTV.

84. This presumption, however, is neither conclusive nor dispositive. We will also consider whether special circumstances raised by the resulting loss of digital broadcast service would be sufficient to rebut the presumption. We find that the surrender of DTV channels of these out-of-core stations will generally not create a loss of particular programming to viewers during the transition because, as presented in Paxson's comments, the stations will continue analog operations until switching to DTV by the end of the transition Also, for requests that do not meet the presumption, we would consider all the relevant public interest factors regarding opportunities for provision of wireless and public safety services, acceleration of the DTV transition, and the loss of broadcast service in deciding whether or not to approve the request.

85. Stations that have been denied an extension of the construction requirements and admonished because they failed to demonstrate that they are meeting the necessary criteria for an extension and have not come into compliance are not eligible to surrender their out-of-core DTV channel. On April 16, 2003, the Commission released an Order establishing remedial measures to be followed when a television station fails to meet its DTV construction deadline and fails to adequately justify an extension of its DTV construction deadline. Under the three-step graduated sanction process we will first deny the request for an unqualified extension and admonish the station for its failure to comply with its DTV

construction obligation. The station will then have six months to complete its construction, subject to reporting requirements and possible additional sanctions in the interim. Under the second step, if the station has not come into compliance with the DTV construction requirement within the six-month period, then, absent extraordinary and compelling circumstances, we will issue a Notice of Apparent Liability for forfeiture to the licensee and require that the station report every 30 days on its proposed construction milestones and its efforts to meet those milestones. Under the third and final step, if the station has continued to fail in its efforts to come into compliance with the DTV construction requirement within the second six-month period of time (

i.e.

, one year from the date of the formal admonition), then, absent extraordinary and compelling circumstances, we will consider its construction permit for its DTV facilities to have expired and we will take whatever steps necessary to rescind the station's DTV authorization.

Satellite Stations

86. In the Second DTV Periodic NPRM we sought comment on whether the public interest would be served by allowing television satellite stations to turn in their digital authorization and “flash-cut” to DTV transmission at the end of the transition period. TV satellite stations are full power terrestrial broadcast stations authorized under part 73 of the Commission's rules to retransmit all or part of the programming of a parent station that is typically commonly owned. Eligible satellite stations were assigned a paired DTV channel in the current DTV Table of Allotments. The Commission first authorized TV satellite operations in small or sparsely populated areas, which were deemed to have economic bases insufficient to support stand-alone, full-service operations. The Commission later authorized satellite stations in larger markets when the applicant demonstrated that the proposed satellite could not operate as a stand-alone, full-service station. The Commission has also allowed a full-service station to convert to satellite operation upon a showing that the community no longer has a sufficient economic base to support a full-service operation.

87. On October 16, 2003, the Commission deferred the digital construction deadlines for 30 satellite stations that had requested a third extension of time to construct. The Commission noted that the issue of whether to permit satellites to turn in their digital authorization and “flash cut” to DTV transmission at the end of the transition period is under consideration in this proceeding.

88. To ensure that the channel election process described herein proceeds smoothly and that the channels being surrendered by satellite licensees are included, we will require all satellite stations to participate in the channel election process. We will permit satellite stations to surrender one of their paired channels (the one not elected on their channel-election form for use after the transition) and flash cut from analog to digital transmission by the end of the transition period. Satellite stations that choose to flash cut must make the flash cut decision and notify the Commission by their initial channel election deadline. Satellite stations choosing the flash cut option will be required to surrender one of their two broadcast channels. Except as provided below (for stations with out-of-core analog and in-core DTV channels), satellite stations that choose not to flash cut and instead choose to retain both an analog and a digital channel during the transition period must comply with the applicable digital construction deadlines, including any extension granted by the Commission. As noted above, a satellite station that surrenders one of its channels under the “flash-cut” option will be treated as if it met the applicable replication/maximization build-out requirements.

89. Satellite stations with an analog channel outside the core and that are electing their current in-core DTV channels for post-transition DTV service will not be required to surrender a channel at this time. To do so would require these stations to give up their DTV channels unnecessarily or to build DTV facilities now, unlike other satellite stations which, under the flash cut policy announced herein, may elect to wait to build their digital facilities until closer to the end of the transition period. In this instance, we believe the benefits of this approach outweigh our interest in rapid clearing of the out-of-core television spectrum. Satellite stations with an out-of-core analog channel and an in-core digital channel may retain their out-of-core channel for continued analog service until the end of the transition or until they decide to build and transmit only in digital, whichever is earlier.

90. Stations electing to return their DTV channel to the Commission will retain interference protection to the areas defined in existing DTV replication or maximization applications on file with the Commission until the end of the transition when the station must commence digital transmissions. This interference protection will apply to the digital service area of the channel on which the station flash cuts to digital to the extent that the station replicates and maximizes at the time of the flash cut and to the extent consistent with our DTV interference protection rules. To ensure that satellite stations that have already constructed digital facilities or that do so before the end of the transition are not disadvantaged, we will also permit these stations to retain replication and maximization interference protection for their digital stations until the end of the transition in their market. Similarly, to provide satellite stations that have constructed digital facilities additional flexibility during the transition while maintaining an basic level of service to the public, we will also permit satellite stations that choose to construct separate digital facilities to operate only during prime time hours (at a minimum) until the end of the transition.

91. We believe that this approach will best ensure that satellite stations complete the conversion to digital format and continue to provide broadcast programming to viewers in their communities. We agree with LeSEA, Media General, and MSTV/NAB that many satellite stations may not be financially capable of operating both an analog and a digital facility concurrently. As these commenters point out, satellite stations provide programming to communities that cannot support operation of these stations on a full-service basis. Indeed, Media General and LeSEA state that their satellite stations continually operate at a loss and that, absent some relief from the requirement of constructing and operating dual facilities during the transition, they may be forced to turn in their satellite licenses and cease all operations. Unlike full-service stations, satellite stations have chosen to forego or relinquish full-service status and instead retransmit the programming of a parent station because full-service operation of the satellite facility is not economically viable. We believe that the unique status of and circumstances faced by satellite stations warrant special treatment of these stations during the transition.

92. We do not believe that granting this special relief to satellite stations will unduly hinder the overall transition to digital television. Some of the affected viewers may have access to other digital signals. According to a study of its satellite stations. Moreover, the alternative to the flash-cut option we are adopting today, that of requiring

satellites to operate dual facilities during the transition, could result in the cessation of all service, either analog or digital, by some satellite stations. The approach we adopt today will ensure that satellite stations provide digital service by the end of the transition and will help preserve television service in the historically underserved communities in which most satellite stations operate.

Disposal of Construction Permits and Applications for Replication/Maximization

93. In the NPRM, we asked for comment on how the Commission should dispose of a station's construction permit or application for replication or maximization facilities if the station fails to construct and operate facilities that fully replicate its NTSC service or provide signal coverage over an authorized maximized service area by the interference protection deadlines established in this proceeding. We stated that our inclination was to restrict any station that has failed to fully replicate or construct its authorized maximization facilities by the applicable deadline from filing an application to expand coverage for a certain period of time in order to allow other existing or new stations, including Class A eligible LPTV stations on out-of-core channels, to apply to use this spectrum.

94. We will dismiss any applications and cancel any construction permits for facilities in excess of those in actual operation by a station as of the applicable interference protection date. We will require broadcasters to file applications for licenses to cover their actual facilities served as of the interference protection deadline. We have given broadcasters ample opportunities over the past years to expand their service areas, and advance warning that if they elect not to provide their viewers with DTV the Commission may ensure the area is served in other ways. Therefore, we will permit existing DTV stations seeking to expand their coverage area and Class A eligible stations on out-of-core channels to apply for unused spectrum within the core. LPTV stations may also apply for secondary operation on unused spectrum. We will describe the procedures for filling in those unserved areas in a future public notice or as part of the periodic review process. Broadcasters failing to meet our replication or maximization deadlines will be permitted to reapply for authorization to provide service to those areas, but their applications will be subject to conflicting applications. This will allow other existing stations, including Class A eligible LPTV stations on out-of-core channels, the opportunity to apply to use this spectrum. The process for resolving conflicting applications will be announced in another public notice or proceeding.

Pending DTV Construction Permit Applications

95. Approximately 65 commercial and noncommercial television licensees have not yet been granted an initial DTV CP. Almost all of these licensees have filed an application for a digital CP, but grant of these applications has been delayed for a variety of reasons, including delays in international coordination with Canada and Mexico and unresolved interference issues. To date, these applicants have not been required to construct DTV facilities pending action on their outstanding DTV applications. To ensure that all licensees that have been allotted digital spectrum begin to provide digital service, we proposed in the Second DTV Periodic NPRM to require that all television licensees that have filed an application for a digital CP with the Commission that has not yet been granted commence digital service pursuant to special temporary authority (“STA”) within one year from adoption of the Report and Order in this proceeding.

96. It is crucial at this stage of the transition that all licensees with DTV CP applications that have not yet been granted begin to construct digital facilities. We will therefore adopt a proposal similar to that advanced in the NPRM. Rather than requiring licensees with pending DTV CP applications to construct at least the minimum initial facilities required to serve their communities of license within a year from the adoption of this Report and Order, as we proposed, we will instead require such licensees, within the same time frame, to construct and operate “checklist” facilities that conform with the parameters of the DTV Table of Allotments and other key processing requirements. “Checklist” facilities have power and antenna height equal to or less than those specified in the DTV Table of Allotments and are located within a specified minimum distance from the reference coordinates specified in the DTV Table of Allotments. Because these facilities comply with the interference requirements specified in the rules, no further consideration of interference is required. In addition, because the DTV Table has been coordinated with Canada and Mexico, “checklist” facilities generally do not require further international coordination. This approach best advances our goal of ensuring continued progress in the transition by requiring that all licensees begin to provide DTV service. “Checklist” applications are routinely processed by the Commission staff within three days of filing, and most do not require international coordination. Thus, this procedure is the most expeditious means of awarding DTV construction permits to those licensees who do not yet have them.

97. Many licensees with pending DTV CP applications are facing delays beyond their control. Some are awaiting international coordination of pending applications or resolution of interference issues. Other licensees have applied for new DTV allotments either to replace an initial out-of-core allotment with one in the core or to otherwise improve their potential DTV service. Although the Commission will continue to work with applicants to resolve outstanding issues and to process pending applications for digital facilities as expeditiously as possible, we nonetheless agree with those commenters who argue that it is critical at this stage in the transition that all licensees begin working toward construction of DTV facilities.

98. We will allow licensees with pending DTV CP applications that file checklist applications to continue to pursue their non-checklist applications now on file. Thus, while these applicants will receive a construction permit for a checklist facility and will be required to construct such facilities within one year from adoption of the Report and Order in this proceeding, we will permit these applicants to continue to attempt to resolve the issues delaying approval of their non-checklist application currently on file with the Commission. If the non-checklist application is approved before construction of the checklist facility is complete, the permittee may request that the Commission substitute the non-checklist CP for the checklist CP. The Commission will consider requests for waiver of the one year construction deadline, on a case-by-case basis, using the criteria for extension of DTV construction deadlines. Grounds for an extension must relate to the checklist facility, not the pending non-checklist application.

Intermediate Signal Level

99. In the First DTV Periodic MO&O, we allowed stations to commence digital operations by constructing and operating facilities that at least provide the required level of digital signal strength to their communities of license. We predicted that the “requirement that

broadcasters serve their community of license will ensure that, for most stations, the majority of their analog service populations will receive initial digital service.” We also decided to retain our enhanced principal community signal strength standard, which requires a 7dB increase in community of license coverage that must be met by December 31, 2004, for commercial stations and December 31, 2005, for noncommercial stations. In the First DTV Periodic Report and Order, we imposed a principal community coverage requirement that is stronger than the DTV service contour requirement that we adopted as an initial obligation in the Fifth Report and Order. The purpose of our revised requirement was to improve the availability and reliability of DTV service in the community of license and provide an extra measure of protection from interference to DTV service in the community. The NPRM asked if significant numbers of consumers are not being served by stations operating under low-power STAs, and, if so, what actions the Commission should take. We asked whether we should establish a deadline by which stations must provide DTV service within the entire area of their analog “city-grade” coverage contour or their Grade A coverage. We also asked whether the 7dB increase in community of license coverage will likely ensure that the majority of viewers are served without an additional coverage requirement.

100. We conclude that we will not impose an intermediate signal level requirement. With the community of license signal strength increases set for 2004 and 2005, we expect that more of broadcasters' service areas will be covered as these dates approach. Increasing power is one way of increasing the signal strength within an area, such as the community of license. A 7 dB increase in a station's power will result in a 7 dB increase in signal strength. A power increase will also increase the station's service area. Increasing antenna height is another way to increase a station's signal strength and service area. Nonetheless, we will closely monitor reports from consumers and other parties regarding broadcasters operating at insufficiently low power levels and will act on these reports should a pattern of abuse of our signal level requirements become evident. We may also, on our own initiative, conduct signal strength tests to ensure that broadcasters are operating at power levels that are consistent with the Commission's requirements.

Interference Protection of Analog and Digital Television Service in TV Channels 51-69

Definition of “Actual” Parameters

101. The Second DTV Periodic NPRM sought comment on an issue raised in the Public Safety Spectrum Report and Order. The NPRM explained that §§ 90.545(c) and 27.60(b) of the Commission's rules describe alternative methods for a wireless applicant or licensee in the 700 MHz band to move closer to an analog TV or DTV antenna while still complying with the interference protection requirements in the rules. Pursuant to one of these alternatives, the applicant or licensee may submit an engineering study that considers the “actual,” rather than “hypothetical,” parameters of the analog TV or DTV station and that demonstrates that the station's actual coverage area is smaller than its hypothetical operating parameters—because the station is operating, for example, with lower power than that presumed in the hypothetical parameters or because intervening terrain or other factors reduce the station's coverage area—thereby permitting land mobile stations and these broadcast facilities to be more closely spaced. Reference to the Grade B contour of a “hypothetical” station permits an applicant or licensee to determine if there is any need to submit additional engineering studies or if there is not even a hypothetical station within the relevant area. If there is a hypothetical station, then the applicant or licensee must demonstrate how it would protect the actual (including authorized or applied for) parameters. The Public Safety Order allowed applicants to submit engineering studies showing how they propose to meet the appropriate desired to undesired (“D/U”) signal strength ratio at the existing TV station's “authorized or applied for” Grade B service contour or equivalent contour for DTV stations instead of providing the protection built into the distance spacing table, which is based on a standard TV station's hypothetical Grade B contour. In the Second DTV Periodic NPRM, we tentatively concluded that §§ 90.545(c)(1)(ii) and 27.60(b)(1)(iii) of our rules should be amended to make clear that the interference protection specified in those provisions should be afforded to authorized and/or applied for NTSC and DTV facilities, including the facilities specified on the broadcast station's license or construction permit or both when a station has both a license and a construction permit. We sought comment on this tentative conclusion, as well as alternatives.

102. As proposed, we will amend §§ 90.545(c)(1)(ii) and 27.60(b)(1)(iii) to make clear that the interference protection specified in those provisions will be afforded to authorized and/or applied for NTSC and DTV facilities, including the facilities specified on the broadcast station's license or construction permit or both when a station has both a license and a construction permit. In the TV and DTV broadcasting services, applicants file separately for a construction permit and a license to operate a facility when construction is completed. Licensees may also file applications for construction permits to modify their stations' facilities. When applications are granted, the facilities are authorized by a construction permit or license. While some public safety and other entities in the 700 MHz band assert that protecting authorized and/or applied for NTSC and DTV facilities is unnecessary, this protection is necessary to permit broadcasters to increase their service to reach their replication and maximization levels without risk of interference from new services. Permitting stations to achieve replication and maximization coverage serves the transition to DTV by increasing the population with access to digital signals. In addition, as discussed in section IV.B., supra, replication on out-of-core DTV channels is necessary to preserve broadcasters' opportunity to carry over their DTV service areas to their eventual in-core channels. As asserted by Sinclair, protecting less than the full replicated or maximized facilities could create loss of service to wireless or public safety providers when DTV stations increase to replicated or maximized facilities. Our existing band-clearing policies and newly introduced “flash cut” policy discussed in section IV.B.2, supra, should alleviate some of the 700 MHz entities' concerns by more rapidly freeing up additional spectrum in channels 52-69. New operations in the 700 MHz band will essentially need to provide the interference protection specified in §§ 90.545(c)(1)(ii) and 27.60(b)(1)(iii) for authorized or applied for but un-built facilities only until the July 1, 2005, and July 1, 2006, replication/maximization interference protection dates. In limited circumstances we will grant interference protection beyond the replication/maximization dates for stations granted construction extension waivers. As discussed above, if a broadcaster is not serving its fully authorized replication or maximization facilities on the

applicable interference protection deadline, we will require the broadcaster to obtain a license to cover its existing facility and will only protect that existing facility going forward.

Applications for New Analog TV or DTV Facilities

103. As we stated in the

Second DTV Periodic NPRM

, the Commission has determined it will not authorize new DTV facilities in channels 60-69. The Commission has also determined that it will not authorize additional new analog full-service television stations on channels 60-69, and that it would dismiss any application or allotment petition for a new analog facility that was not satisfactorily amended to specify a channel below channel 60 by the established deadline (referred to herein as the “July 15, 2000 filing window”). Thus, there will be no new analog TV or DTV entrants in the 746-806 MHz band, other than those acquired through auction, which wireless and other new service providers must protect.

104. In the Lower 700 MHz Band Report and Order, we dismissed pending petitions for new NTSC channel allotments in the band comprising channels 52-59, stating that adding new analog TV allotments or stations at this stage of the transition would be inconsistent with the DTV transition process. With respect to pending applications for construction permits for new analog TV stations in this band, we provided a 45-day opportunity (referred to herein as the “March 8, 2002 filing window”) for applicants to request a change in their applications to either (1) provide analog or digital service in the core television spectrum,

i.e.

, channels 2-51, or (2) provide digital service in the 698-740 MHz band,

i.e.

, channels 52-58. Any applications or rulemaking proposals and later associated applications filed by pending applicants during this 45-day window must be protected by wireless and other entities. Because of the adjacent channel interference that new stations on channel 59 could cause to new licensees in the adjacent Upper 700 MHz band, we concluded that we will no longer accept or grant any application for a new analog TV or DTV station on channel 59 nor permit an existing DTV station to modify its channel to channel 59. We required parties with outstanding applications specifying channel 59 to request another channel within 45 days after release of the Lower 700 MHz Band Report and Order.

105. In the Second DTV Periodic NPRM we indicated that digital service in the Lower 700 MHz band could be proposed after the auction of channels in that band by a station with an existing DTV allotment on a channel outside the 52-58 band seeking to move to a channel inside this band or by a DTV station inside this band seeking to move to another channel inside the band. As we indicated in section IV. A. 2, supra, we have determined herein that, in order to facilitate the channel election process, we will no longer accept, as of the date of adoption of this Report and Order, applications for DTV channel changes and swaps. Thus, there will be no new analog or DTV entrants in the 698-740 MHz band other than those acquired through auction.

106. A few requests for DTV channels in the 52-58 band were filed during the July 15, 2000, and March 8, 2002, filing windows. The Commission has completed processing all but one of these petitions for rulemaking. While these parties may continue to pursue construction of their proposed facilities within the 52-58 band, we will permit these parties, upon Commission approval, to elect not to construct these facilities and instead to give up their assigned DTV channel in the 52-58 band in return for a DTV channel inside the core. We will assign these broadcasters an in-core DTV channel when we generate a revised DTV Table of Allotments.

Channel 51

107. In the Second DTV Periodic NPRM, we sought comment on the interference protection that should be afforded by wireless entities and other new service providers to future analog TV and DTV facilities on channel 51 that are authorized or requested after the auction of the spectrum comprising channel 52. Channel 51 will remain allocated to broadcast use as part of the core television spectrum (channels 2-51), and is available for use by existing and new analog TV and DTV stations. However, as we stated in the Second DTV Periodic NPRM, because channel 51 is adjacent to channel 52 we are concerned about possible interference between new wireless and other licensees on channel 52 and operations on channel 51. In the Lower 700 MHz Report and Order, we declined to adopt a guard band or other specialized mechanism to protect DTV operations on channel 51, and stated that we would instead rely on interference protection criteria to ensure that new licensees adequately protect core channel TV and DTV operations. We noted that the adjacent channel protection for TV and DTV stations on channels 52-69 is no different from the protection for those stations in the core spectrum; only the duration of that protection differs. Because DTV stations on channels 52-69 will eventually relocate to the core TV spectrum, the broadcast interference protection standards on channels 52-69 will no longer apply after the transition. By contrast, the need for protection of broadcast operations on core TV channel 51 will continue indefinitely. In light of our concern about possible adjacent channel interference, we sought comment on whether we should provide the same level of adjacent channel protection to future analog and digital broadcast facilities on channel 51 as is currently provided by wireless or other operators to incumbent analog and digital stations on this channel and, if so, how we can accomplish such protection without unduly restricting use of the channel 52 spectrum.

108. We will accord the same level of adjacent channel protection to both incumbent and future analog and digital broadcast facilities on channel 51. Thus, wireless and other operators on channel 52 must provide the interference protection prescribed in the Lower 700 MHz Report and Order to all broadcasters on channel 51, including any that may commence operation after the auction of the adjacent channels in the 52-58 band. We agree with MSTV/NAB that stations on channel 51 should receive the same level of protection as other stations on in-core channels, including protection from wireless and other new service providers. We disagree with Flarion that any interference protection the Commission adopts for channel 51 should be reciprocal. Channel 51 is part of the core channels reserved for broadcast use, and we do not believe use of channel 51 for broadcast purposes should be restricted in order to protect operations on channel 52, even if those operations predate the commencement of operations on channel 51. We also decline to adopt Flarion's proposal that the Commission reduce or eliminate the required desired/undesired signal strength ratio for “distantly adjacent” wireless channels. This proposal to revisit the wireless to TV and DTV protection criteria established in the 700 MHz proceedings is beyond the scope of this proceeding. The Commission's rules do permit wireless and other operators in the 52-58 band to negotiate agreements with broadcasters and other operators to accept any interference that may be caused by operations on distantly adjacent frequencies. Licensees proposing new operations in the 700 MHz bands on a frequency “distantly adjacent” to an existing

operation could also file a request for waiver of the interference requirements.

Simulcasting

109. In the

DTV Fifth Report and Order,

we adopted rules requiring DTV licensees to simulcast 50 percent of the video programming of their analog channel on their DTV channel by April 1, 2003. This requirement increased to a 75 percent simulcasting requirement on April 1, 2004, and increases to a 100 percent requirement on April 1, 2005. The simulcasting requirement was intended to ensure that consumers enjoy continuity of free over-the-air video programming service when analog spectrum is reclaimed at the end of the transition. The Commission has stated that it may be difficult to terminate analog broadcast service if broadcasters show programs on their analog channels that are not available on their digital channels.

110. In the Second DTV Periodic NPRM, the Commission sought comment on whether we should retain, revise, or remove the simulcasting requirement in 47 CFR 73.624(f), how to define simulcasting, and whether the existing dates for implementation of the simulcasting requirements are appropriate. We asked in the Second DTV Periodic NPRM whether

This text is long and has been trimmed here. Open the source document for the complete record.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.