The Sacramento-San Joaquin River Delta (the Delta) is formed by the confluence of the northflowing San Joaquin River, the south-flowing Sacramento River, and the San Francisco Bay, to
which the delta of the two rivers is linked. The 1,153-square-mile estuary is the hub of
California’s extensive water supply system. The Delta provides water to more than 25 million
people and habitat for various species, including the threatened delta smelt and endangered
chinook salmon. As such, the Delta has endured decades of competing water demands. During
this time, the Delta ecosystem has experienced environmental degradation, increasing regional
water demands, and a decrease in reliable water supplies for urban, agricultural, and natural areas.
The numerous stakeholders associated with the Delta include agricultural, urban, industrial,
environmental, and recreational interests. In order to provide water to the various users, two
major water projects were created: the federal Central Valley Project and the State Water Project.
Concerns have been raised about the effectiveness of the regulation of these projects and the
Delta waters generally, both to meet the needs of water users and to avoid environmental impacts
to water quality and species. Specifically, in late 2007, a federal judge ordered a reduction in the
amount of water pumped out of the Delta in order to preserve the habitat of endangered fish in the
Delta, meaning less water would be available for areas that depend on the water projects for their
water supply. In 2008, those restrictions were continued under a newly issued biological opinion,
and another judicial decision was issued that indicates similar restrictions may be required for
other species. Furthermore, Governor Schwarzenegger declared a state of drought for the entire
State of California in June 2008 and declared a state of emergency in California due to drought in
February 2009. These events pose significant impacts on California’s water supply. As a matter of
overseeing the impacts of water flow and water management in the Delta, the House Natural
Resources Committee held a subcommittee hearing on the effect conditions in the Delta have on
the endangered species there in 2008.
This report provides a summary of California’s dual system of water rights, which includes
riparian and prior appropriation doctrines, and regulation of those rights by the state. In particular,
the report discusses considerations used in the process of regulating water usage, including the
public trust doctrine, the rule of beneficial use, and the no injury rule. The report discusses the
California water projects, the projects’ rights, and access to water by other users. Significant court
decisions and relevant statutes that affect the Delta are explained as well.
ȱȱȱ
ȱ
ȱȱ ȱȱȱȬȱ ȱȱ
ȱ
Introduction ..................................................................................................................................... 1
California Water Rights ................................................................................................................... 1
Acquiring Water Rights............................................................................................................. 1
Priority of Water Rights ............................................................................................................ 2
Modification of Water Rights and the No Injury Rule .............................................................. 2
Rule of Reasonable Use and the Public Trust Doctrine ............................................................ 2
The Water Projects and Water Rights .............................................................................................. 3
Settlement Contracts ................................................................................................................. 3
Exchange Contracts................................................................................................................... 4
Contractual Rights to Water ...................................................................................................... 4
Regulation of Water Rights and Water Quality in the Delta............................................................ 5
Water Rights Regulation ........................................................................................................... 5
Water Quality Oversight............................................................................................................ 5
Litigation of Water Rights and Management in the Delta ............................................................... 6
The Racanelli Decision ............................................................................................................. 6
The State Water Resources Control Board Cases...................................................................... 8
Selected Litigation Regarding Flow Reductions in the Delta ................................................... 8
Congressional Authority to Act and Current Interest ...................................................................... 9
ȱ
Author Contact Information .......................................................................................................... 10
ȱȱȱ
ȱȱ ȱȱȱȬȱ ȱȱ
ȱ
ȱ
The Sacramento-San Joaquin River Delta (the Delta) is formed by the confluence of the northflowing San Joaquin River, the south-flowing Sacramento River, and the San Francisco Bay, to
which the delta of the two rivers is linked. The 1,153-square-mile estuary is the hub of
California’s extensive water supply system.1 The Delta provides water to more than 25 million
people and habitat for various species, including the threatened delta smelt and endangered
chinook salmon. As such, the Delta has endured decades of competing water demands. During
this time, the Delta ecosystem has experienced environmental degradation, increasing regional
water demands, and a decrease in reliable water supplies for urban, agricultural, and natural areas.
Numerous categories of stakeholders have an interest in water flowing through the Delta,
including agricultural, urban, industrial, environmental, and recreational interests. In 2007, a
federal court ordered flow restrictions on the Delta water projects to prevent the negative effect
water diversions were having on species in the Delta ecosystem until the U.S. Fish and Wildlife
Service completed consultations and issued a new biological opinion in late 2008.2 This decision
required federal and state entities to reduce pumping water in two large water projects and
therefore has had significant effects on the water supply of California. In a July 2008 decision,
the same judge indicated that restrictive measures may also be necessary for another species.3
In 1959, the state enacted the Delta Protection Act, which provided a specific law to govern Delta
waters based on the unique problems posed by the Delta.4 The Delta Protection Act provides for
protections against the two major problems—salinity control and adequate supply.5 These
problems stem from an “uneven distribution of water resources.”6 Quantitatively, the areas in
California in which demand for water is highest are also the areas in which the supply is lowest,
causing shortages for users—largely south of the Delta. Qualitatively, the Delta is affected by
saltwater intrusion, caused by the inflow of saline tidal waters and the diversion of fresh water
that would normally counterbalance the inflow. The Delta and its ecosystem are also affected by
contaminants from urban and agricultural runoff.
ȱȱȱ
ȱȱȱ
California law provides for several limits on the use of the state’s waters. Because the waters of
California are considered to be “the property of the people of the State,” anyone wishing to use
those waters must acquire a right to do so.7 California follows a dual system of water rights,
1
General information about the Delta can be found at http://baydeltaoffice.water.ca.gov/.
Natural Resources Defense Council v. Kempthorne, No. 1:05-cv-01207-OWW-GSA (E.D. Cal. 2007). This decision
is often referred to as the Wanger decision.
3
See Pacific Coast Federation of Fisherman’s Associations v. Gutierrez, No. 06-0245 (E.D. Cal. July 18, 2008).
4
Cal. Water Code § 12200 et seq.
5
Cal. Water Code § 12202.
6
United States v. State Water Resources Control Board (Racanelli), 182 Cal. App. 3d 82, 98 (Cal. Ct. App. 1986).
7
Cal. Water Code § 102. See National Audubon Society v. Superior Court, 33 Cal. 3d 419, 441 (Cal. 1983).
2
ȱȱȱ
ŗȱ
ȱ
ȱȱ ȱȱȱȬȱ ȱȱ
recognizing both the riparian and prior appropriation doctrines.8 Under the riparian doctrine, a
person who owns land that borders a watercourse has the right to make reasonable use of the
water on that land. Under the prior appropriation doctrine, a person who diverts water from a
watercourse (regardless of his location relative thereto) and makes reasonable and beneficial use
of the water acquires a right to that use of the water. Before exercising the right to use the water,
appropriative users must obtain permission from the state through a permit system run by the
State Water Resources Control Board (the Board).
¢ȱȱȱȱ
California law provides for a hierarchy of these rights for users sharing water that may not meet
all users’ needs.9 Because riparian users share the rights to the water with other riparians, no one
riparian user’s right is considered superior to another’s riparian right. Therefore, riparian rights
are reduced proportionally in times of shortage. With regard to appropriative rights, the person’s
right that was appropriated first is considered superior to later appropriators’ rights to the water.
Between the two types of rights, users with riparian rights generally have superior claims to those
who have appropriative rights.10 That is, riparians generally may fill their needs before
appropriators, and appropriators fill their needs according to the order in which they secured the
right to the water.11
ȱȱȱȱȱȱȱ ¢ȱȱ
Water rights may be modified under certain circumstances. If a right is acquired by appropriation,
it is approved for a specific place and purpose of use, which can be changed only with the
Board’s permission.12 Under what is known as the no injury rule, the Board cannot approve
changes to water permits unless “the change will not operate to the injury of any legal user of the
water involved.”13
ȱȱȱȱȱȱȱȱȱ
Under its constitutional and statutory rules, the state requires that water users, regardless of the
manner by which they acquired their rights, are all limited to uses that are reasonable and for a
beneficial purpose.14 Courts have upheld this limitation, known as the rule of reasonable use, as a
valid exercise of the state’s police power to regulate water for public benefit.15 The California
8
See In re Determination of Rights to Water of Hallett Creek Stream System, 44 Cal. 3d 448, 455 (Cal. 1988); National
Audubon Society v. Superior Court, 33 Cal. 3d 419, 441 (Cal. 1983); People v. Shirokow, 26 Cal. 3d 301, 307 (Cal.
1980).
9
These rules are specific to California. Rules in other western states may differ.
10
While users acquire appropriative rights through a permit system, riparian users are required to file a statement with
the Board that declares their right. With regard to later riparians, the California Supreme Court has noted that an
appropriator may have a superior right to a riparian if the appropriator acquires his right before the riparian secures his
right in the land. See Lux v. Haggin, 69 Cal. 255, 344-49 (Cal. 1844).
11
See Meridian, Ltd. v. San Francisco, 13 Cal. 2d 424, 445-47 (Cal. 1939).
12
Cal. Water Code § 1701.
13
Cal. Water Code § 1702. See also Kidd v. Laird, 15 Cal. 161 (Cal. 1860); Hill v. Smith, 27 Cal. 476 (Cal. 1865).
14
Cal. Const. Art. X, § 2; Cal. Water Code § 100.
15
See People ex rel. State Water Resources Control Board v. Forni, 54 Cal. App. 3d 743, 753 (Cal. Ct. App. 1976);
(continued...)
ȱȱȱ
Řȱ
ȱ
ȱȱ ȱȱȱȬȱ ȱȱ
Supreme Court recognized the public trust doctrine as a further limitation on water rights. The
court held that the state acts as a trustee for the people of the state with a duty to protect the
waters, which are held in a public trust, from harmful diversions by water rights users.16
ȱȱȱȱȱȱ
Two major water projects transfer water throughout the state. The Central Valley Project (CVP) is
a federal project run by the U.S. Bureau of Reclamation (Reclamation). The State Water Project
(SWP) is run by the California Department of Water Resources (DWR). The projects “divert
water from the rivers that flow into the Delta and store the water in reservoirs. Quantities of this
stored water are periodically released into the Delta. Pumps situated at the southern edge of the
Delta eventually lift the water into canals for transport south.... ”17
Both projects acquired appropriative rights, receiving several permits at various points between
1927 and 1967.18 Section 8 of the Reclamation Act of 190219 requires Reclamation to comply
with state law, including requiring Reclamation to acquire water rights for the CVP.20 If
Reclamation found it necessary to take the water rights of other users, those users would be
entitled to just compensation.21 In some cases, Reclamation found it necessary to enter into
“settlement” or “exchange” contracts with water users who had rights pre-dating the CVP.
ȱȱ
In 1964, in order to avoid legal problems that might arise if the CVP could not operate without
interfering with other users’ water rights claims to the Sacramento River, Reclamation negotiated
settlement contracts with users who held water rights predating the CVP (often referred to as
Settlement Contractors). The settlement contracts provided an agreed upon allocation of water
(...continued)
Chow v. City of Santa Barbara, 217 Cal. 673, 701-03 (Cal. 1933).
16
National Audubon Society, 33 Cal. 3d 419, 445-48 (Cal. 1983). The public trust doctrine continues to be invoked in
the dispute over Delta water regulation. In March 2008, two environmental groups filed a petition with the Board
alleging that the Board is violating the public trust doctrine and state and federal laws “by allowing clearly excessive
export of ... water.” Press Release, California Water Impact Network, Public Trust, Unreasonable Use Complaint Filed
With State Board (March 19, 2008).
17
Racanelli, 182 Cal. App. 3d at 97.
18
For a discussion of the projects’ permit process, see Racanelli, 182 Cal. App. 3d at 106.
19
43 U.S.C. § 383.
20
The U.S. Supreme Court has held that Section 8 “requires the Secretary to comply with state law in the ‘control,
appropriation, use or distribution of water’” by a federal project. See California v. United States, 438 U.S. 645, 674-75
(1978). This requirement to comply with state law applied so long as the conditions imposed by state law were “not
inconsistent with clear congressional directives respecting the project.” See id. at 670-73; see also Ivanhoe Irrig. Dist.
v. McCracken, 357 U.S. 275 (1958); City of Fresno v. California, 372 U.S. 627 (1963). In the context of the CVP, a
court has held that the permit conditions were consistent with the project purpose of river regulation. Racanelli, 182
Cal. App. 3d at 135. See also United States v. State Water Resources Control Board, 694 F.2d 1171 (9th Cir. 1982).
21
See Int’l Paper Co. v. United States, 282 U.S. 399, 407 (1931); United States v. Gerlach Live Stock Co., 339 U.S.
725, 736-39 (1950).
ȱȱȱ
řȱ
ȱ
ȱȱ ȱȱȱȬȱ ȱȱ
rights to the river. These contracts’ initial term was 40 years and the contracts are currently in the
process of renewal.22
¡ȱȱ
Exchange contracts provide assurance that the needs of these users whose rights predated the
CVP (often referred to as Exchange Contractors) would be satisfied. In entering these contracts,
the Exchange Contractors sold their water rights on the San Joaquin River to the government,
except for reserved water (water to which the Exchange Contractors held vested rights), and
agreed not to exercise the reserved water rights in exchange for the government delivering
specified amounts of substitute water.23 The terms of the contract are for “a conditional permanent
substitution of water supply. The United States has a right to use the Exchange Contractors’ water
rights ‘so long as, and only so long as, the United States does deliver ... substitute water in
conformity with this contract.’”24 To date, Reclamation has met this obligation by delivering CVP
water. The water is pumped from the Delta and delivered south via the Delta-Mendota Canal.
ȱȱȱȱ
Reclamation, therefore, holds legal water rights to the water in the CVP and enters contracts with
other users for water supply.25 The water supplied to users under these contracts is determined by
the terms of the contract, rather than the legal doctrines of water rights. These contracts
incorporate the requirements of federal legislation and are made subject to federal Reclamation
law.26 Specifically, the contracts typically include provisions that address the possibility of water
shortages that may affect users’ access to water provided under their contract.27 Generally, courts
have allowed the government to reduce water allocations provided by contract if the reduction is
made necessary by federal law, but the extent of liability depends on the terms of the specific
contract used in each case.28
22
For more information on Sacramento River Settlement Contract renewal, see http://www.usbr.gov/mp/cvpia/3404c/
srsc/index.html.
23
See Westlands Water Dist. v. Patterson, 337 F.3d 1092, 1096-97 (9th Cir. 2003).
24
Id. at 1097.
25
For a CVP-wide form of contract (CVP Contract) that Reclamation uses, see http://www.usbr.gov/mp/cvpia/3404c/
lt_contracts/cvpwide_final_form_contract_04-19-04.pdf.
26
CVP Contract preamble.
27
See CVP Contract art. 3(b) (“Because the capacity of the Central Valley Project to deliver Project Water has been
constrained in recent years and may be constrained in the future due to many factors including hydrologic conditions
and implementation of Federal and State laws, the likelihood of the Contractor actually receiving the amount of Project
Water set out [in this contract] in any given Year is uncertain.”).
28
See Stockton E. Water Dist. v. United States, 76 Fed. Cl. 321, 358-59 (Fed. Cl. 2007) (Bureau not liable where
reductions “occurred due to implementation of amendments to federal Reclamation law”); O’Neill v. United States, 50
F.3d 677, 682-83 (9th Cir. 1995) (contract provision relieving government of liability “for any damage ... arising from a
shortage on account of errors in operation, drought, or any other causes” included protection for shortages caused by
“the effects of subsequent Congressional mandates”). But see Tulare Lake Basin Water Storage Dist. v. United States,
49 Fed. Cl. 313 (Fed. Cl. 2001) (holding that the federal government was liable when federal legislation forced
reductions under state contract to which the federal government was not a party). Six years later, the same judge that
wrote the Tulare decision repudiated the physical taking characterization, citing intervening caselaw and noting the
absence of a physical diversion. See Casitas Municipal Water Dist. v. United States, 76 Fed. Cl. 100 (Fed. Cl. 2007).
On appeal, the U.S. Court of Appeals for the Federal Circuit reversed the district court’s holding in Casitas, noting that
the intervening caselaw did not bear on the case. Casitas Municipal Water Dist. v. United States, 543 F.3d 1276 (Fed.
(continued...)
ȱȱȱ
Śȱ
ȱ
ȱȱ ȱȱȱȬȱ ȱȱ
ȱȱȱȱȱȱ¢ȱȱȱ
ȱ
The State Water Resources Control Board (the Board) is the state agency charged with water
supply and water quality issues. It is authorized to regulate water rights permits and to regulate
water pollution and quality control.29
ȱȱȱ
Although riparian rights are not a part of the state’s permit system, the Board has the authority to
regulate these rights to ensure beneficial use of the water through adjudications.30 The Board has
two duties when issuing appropriation permits: to determine the availability of surplus water, and
to protect the public interest. A person who seeks to appropriate water must apply to the Board for
a permit.31 The Board’s review of that application “must first determine whether surplus water is
available, a decision requiring an examination of prior riparian and appropriative rights.”32
Appropriation then may be made “for beneficial purposes of unappropriated water under such
terms and conditions as in [the Board’s] judgment will best develop, conserve, and utilize in the
public interest the water sought to be appropriated.”33 To determine whether an appropriation
would be in the public interest, the Board must consider “any general or coordinated plan ...
toward the control, protection, development, utilization, and conservation of the water resources
of the State” and the relative benefit of “all beneficial uses of the water concerned.”34
ȱ¢ȱȱ
The Board also has responsibility to regulate water quality. Under the federal Clean Water Act
(CWA), the states must adhere to certain federal standards regarding water quality.35 Although the
federal law may not apply to salinity intrusion as a discharged pollutant, the law provides
protections under water quality provisions.36 Specifically, the CWA recognizes saltwater intrusion
(...continued)
Cir. 2008).
29
Cal. Water Code § 179.
30
See Cal. Water Code § 2501; see, e.g., In re Waters of Long Valley Creek Stream System, 25 Cal. 3d 339 (Cal.
1979).
31
See Cal. Water Code § 1375; People v. Shirokow, 26 Cal. 3d 301, 308 (Cal. 1980).
32
Racanelli, 182 Cal. App. 3d at 102-03 (citing Temescal Water Co. v. Dept. Public Works, 44 Cal. 2d 90 (Cal. 1955)).
See also Cal. Water Code § 1375(d).
33
Cal. Water Code § 1253; see also Cal. Water Code § 1255.
34
Cal. Water Code §§ 1256-57. Section 1257 indicates that possible beneficial uses at least include “use for domestic,
irrigation, municipal, industrial, preservation and enhancement of fish and wildlife, recreational, mining and power
purposes, and any uses specified to be protected in any relevant water quality control plan.” The Water Code explicitly
provides that the Board must consider nonconsumptive uses such as the preservation of fish and wildlife and amounts
necessary for protection of beneficial uses protected by water quality control plans. See Cal. Water Code §§ 1243,
1243.5. Among beneficial uses, § 1254 provides that domestic use is highest, then irrigation.
35
For more information on the Clean Water Act and its requirements, see CRS Report RL30030, Clean Water Act: A
Summary of the Law, by (name redacted).
36
See Racanelli, 182 Cal. App. 3d at 108-09.
ȱȱȱ
śȱ
ȱ
ȱȱ ȱȱȱȬȱ ȱȱ
as a form of pollution meant to be regulated by the states under the planning process and water
quality standards.37 Each state is required to maintain a “continuing planning process” and once
every three years each state pollution control agency must review its water quality standards,
which are subject to EPA approval.38 Water quality standards provide the framework for specific
pollution control requirements that are contained in CWA permits for individual dischargers.
California’s Porter-Cologne Water Quality Control Act39 (Porter-Cologne Act) provides for a
statewide program for water quality control to implement the federal CWA, as well as additional
state requirements. Under the Porter Cologne Act, nine regional boards formulate and adopt water
quality plans across the state, which are subject to the Board’s approval.40 The state Board sets the
statewide policy for water quality control, and its authority to act in regard to the water control
plan has been held to be very broad.41 The plan must be the best reasonable option considering all
present and future demands made on the waters and the values and benefits involved.42
ȱȱȱȱȱȱȱȱ
ȱ
Over the decades since the construction of the water projects, there has been extensive litigation
regarding water rights, Delta water management, and the regulation of permits and standards for
water in the Delta. Some of the ensuing court decisions have affected the overall management of
the Delta and are summarized in the following paragraphs.
ȱȱȱ
In 1978, in the first exercise of its dual authority to regulate water supply and quality, the Board
adopted a water quality control plan that established new standards for salinity control and
protection of fish and wildlife in the Delta, pursuant to obligations under the CWA.43 In adopting
the new plan, “the Board reconsidered existing water quality standards in light of current data
concerning the effects on the Delta of the operations of the two water projects—the users with the
greatest impact.”44 The Board also issued Water Right Decision 1485, which modified permits
held by Reclamation and the DWR for the water projects to implement the new standards. In
1986, a state appellate court upheld the modification of the water rights permits, but held that the
water quality standards were insufficient in light of the scope of the Board’s duty to act in
37
See id. at 109 (“Thus, the federal act mandates certain planning responsibilities including formulation of water
quality standards to provide salinity control. But the act contains no provision for either implementation of water
quality standards or regulation of nonpoint pollution sources, matters of enforcement relegated to the states.”).
38
33 U.S.C. §§ 1313(e)(1), (c)(1).
39
Cal. Water Code § 13000 et seq.
40
Cal. Water Code §§ 13240, 13245.
41
See Racanelli, 182 Cal. App. 3d at 109-10; Cal. Water Code § 13000.
42
Cal. Water Code §§ 13000, 13241.
43
The CWA requires the states to implement water quality standards. See Racanelli, 182 Cal. App. 3d at 109. Through
the Porter-Cologne Act, California implements these federal requirements and authorizes the Board to adopt water
quality control plans. See Cal. Water Code § 13160.
44
Racanelli, 182 Cal. App. 3d at 111.
ȱȱȱ
Ŝȱ
ȱ
ȱȱ ȱȱȱȬȱ ȱȱ
accordance with the Porter-Cologne Act.45 The court also held that the Board “has the power and
duty to provide water quality protection to the fish and wildlife that make up the delicate
ecosystem within the Delta.”46
The court emphasized that under the CWA the Board is charged by law with protecting beneficial
uses of state waters, not protecting water rights.47 The Board is obligated to establish standards
that satisfy statewide interests and take account of the effects of all users.48 The court noted that
the Board must not disregard the effects of other users and instead must look at the impacts to the
system comprehensively, including “past, present, and probable future beneficial uses of water as
well as water quality conditions that could reasonably be achieved through the coordinated
control of all factors which affect water quality in the area.”49 The Board’s actions created a
standard that was enforceable only against the projects rather than against all users, which the
court held was an improperly narrow exercise of its authority.50 The court also noted that in
addition to its authority to regulate the effect of consumptive uses of the water, the Board also has
authority to regulate nonconsumptive instream uses, such as protection for fish and wildlife.51
In order to implement the state’s water quality control plan, the Board must use its power to
regulate “water rights to control diversions which cause degradation of water quality.”52 Although
the court held that the Board failed to properly take action in response to the quality control plan
by modifying only two of the users’ permits, it held that the Board has the authority to modify
permits to meet its water quality standards.53 State law specifically authorizes the Board to
reserve jurisdiction to modify the permits it issues, which the Board did in the case of the
projects.54 The Board is also authorized to modify permits “under its power to prevent waste or
unreasonable use or methods of diversion of water.”55 The court noted that “determination of
reasonable use depends upon the totality of the circumstances presented” and “varies as the
current situation changes.”56 The court held that the balancing of the considerations regarding the
use of water is “one the Board is uniquely qualified to make.”57
45
See United States v. State Water Resources Control Board, 182 Cal. App. 3d 82 (Cal. Ct. App. 1986). This opinion,
known as the Racanelli decision, was upheld by the state Supreme Court.
46
Id. at 98.
47
Id. at 116.
48
Id.
49
Id. at 118 (emphasis in original) (internal quotations and citations omitted).
50
Id. at 119-20.
51
Id. at 148-49.
52
Id. at 125. The court noted that “Congress has expressly declared a policy of noninterference with state authority to
allocate water quantities within its jurisdiction and has declined to supersede or abrogate water rights established by
any State.” Id. (internal quotations omitted).
53
Id. at 127.
54
Id. at 127-28 (citing Cal. Water Code § 1394).
55
Id. at 129 (noting the state constitutional limit on reasonable use of water).
56
Id. at 129-30 (internal quotations omitted).
57
Id. at 130.
ȱȱȱ
ŝȱ
ȱ
ȱȱ ȱȱȱȬȱ ȱȱ
ȱȱȱȱȱȱȱ
In 1995, the Board adopted a new water quality control plan that provided 17 beneficial uses in
three categories (municipal and industrial, agricultural, and fish and wildlife) and permitted water
flow to be regulated because of its impact on beneficial uses.58 The implementation of this plan
led to another series of lawsuits. After setting flow objectives in the plan, the Board implemented
alternate flow objectives upon which interested parties agreed instead. A state court held that it
was improper for the Board to implement provisions not included in some provision of the plan it
adopted.59 In other words, if the Board believed the alternate objectives were appropriate, it
needed to account for those objectives in the plan, which is the guiding authority of water quality
control for the Delta.60
ȱȱȱ ȱȱȱȱȱ
Courts have allowed a reduction in the flows in some situations and mandated them in others
(e.g., the 2007 Wanger decision). As discussed above, certain federal actions have led to
decreased flows in the rivers of the Delta. For example, in the early 1990s, Endangered Species
Act consultations regarding the newly threatened winter-run chinook salmon and delta smelt
resulted in Reclamation pursuing alternative management of the CVP to avoid jeopardy to the
species.61 At the same time, Congress enacted the Central Valley Project Improvement Act which
amended the project’s authorization to include consideration of fish and wildlife preservation and
allocated 800,000 acre-feet of water for fish and wildlife purposes (sometimes referred to as “b2
water”).62 These events resulted in allocations being reduced by up to half in some years for some
water contractors, which a federal court held was fair under the terms of the contract.63
Additionally, the question of how to account for the b2 water has been a recurring issue in
litigation.64
In other cases, courts have addressed reductions due to environmental conditions. One federal
district court held that Reclamation did not act in an arbitrary and capricious manner when it
reduced the amount of water released in response to a drought.65 When Trinity County sued
Reclamation in the late 1970s, it claimed that operation of the Trinity River Division of the CVP
in response to drought conditions was in violation of federal Reclamation law, specifically that
the reduced flows would not adequately preserve fish and wildlife.66 Noting that the decision to
reduce flows could be overturned only if it was found to be arbitrary and capricious, the court
58
State Water Resources Control Board Cases, 136 Cal. App. 4th 674, 701 (Cal. Ct. App. 2006).
59
Id. at 690. The court construed the language of § 1258 to require the Board to comply with the plan, noting that
although the language appears to be permissive, it is actually mandatory because a public duty is involved. Id. at 73132.
60
See id. at 719.
61
O’Neill, 50 F.3d at 681.
62
See P.L. 102-575, tit. XXXIV, 106 Stat. 4600. Section 3406(b)(2) of the CVPIA provides the 800,000 acre-feet of
water for fish and wildlife purposes, and thus is known as b2 water.
63
O’Neill, 50 F.3d at 681-84.
64
See, e.g., San Luis & Delta-Mendota Water Auth. v. United States Dep’t of Interior, 236 F.R.D. 491 (E.D. Cal.
2006); Bay Inst. of San Francisco v. United States, 87 Fed. Appx. 637 (9th Cir. 2004) (unpublished); Westlands Water
Dist. v. Natural Resources Defense Council, 43 F.3d 457 (9th Cir. 1994).
65
County of Trinity v. Andrus, 438 F.Supp. 1368 (E.D. Cal. 1977).
66
Id. at 1371-74.
ȱȱȱ
Şȱ
ȱ
ȱȱ ȱȱȱȬȱ ȱȱ
held that Reclamation appeared to consider the relevant factors and made a decision that seemed
reasonable given the context of the situation.67 Reclamation law required the Secretary of the
Interior to adopt “‘appropriate measures’ for fish conservation,” and the measures that had been
adopted were appropriate in light of drought conditions, according to the court.68 The statutory
provision requiring consideration of measures for the preservation of wildlife could not be
interpreted “in isolation from the management practices of the CVP as a whole.”69
In 2007, the federal district court for the Eastern District of California addressed the issue of
threatened species in the Delta by issuing an interim order that required specified water flows for
management of the Delta’s resources to protect the delta smelt.70 That order (often referred to as
the 2007 Wanger decision) placed limits on the amount of water that could be pumped out of the
Delta, and thus would affect water users downstream.71 The restrictions imposed by the interim
order remained in place until the U.S. Fish and Wildlife Service (FWS) completed new
consultations in light of the decision and issued a new biological opinion. The new biological
opinion issued in December 2008 effectively applies the same restrictions ordered by the court.72
In 2008, the same district court addressed the issue of another species in the Delta. In that case,
which is ongoing, the court has indicated that restrictive measures may be imposed to protect
another species in the Delta, but the court has not yet issued an order regarding what remedy
might be appropriate.73
In times of water reductions, the Exchange Contractors are put in a unique situation. This is
because their contracts differ from the general CVP contracts.74 As discussed above, because the
Exchange Contractors had rights predating the CVP, their contracts provide a guarantee that they
receive the entire share from Reclamation or that they could exercise their reserved rights to
acquire that share. Therefore, it is possible that in times of shortage, though other users’ access to
water is diminished, the Settlement and Exchange Contractors may still receive their entire share
of water.75
ȱ¢ȱȱȱȱȱ ȱ
Although water law is traditionally a matter left to the states, Congress has taken a role in the
regulation of waters under its constitutional authority to regulate channels of interstate
67
Id. at 1381-82.
Id. at 1380.
69
Id.
70
Natural Resources Defense Council v. Kempthorne, No. 1:05-cv-1207 OWW GSA (E.D. Cal., December 14, 2007).
71
Id. The order can be accessed online at
[http://www.fws.gov/sacramento/es/documents/OCAP_Final_Interim_Relief_Court_Order_12-14-07.pdf].
72
The complete biological opinion can be accessed at [http://www.fws.gov/sacramento/es/documents/SWPCVP_OPs_BO_12-15_final_OCR.pdf].
73
See Pacific Coast Federation of Fisherman’s Associations v. Gutierrez, No. 06-0245 (E.D. Cal. July 18, 2008).
74
Some scholars have summarized the contract differences as follows: “The exchange contract differs from the
standard CVP contracts in three respects. First, its term is perpetual. Second, in recognition of their preproject rights,
the exchange contractors pay nothing for CVP water. ... Third, neither the acreage limitations of the Reclamation Act of
1902 nor the provisions of the RRA are applicable to these districts.” Brian E. Gray, Bruce C. Driver, & Richard W.
Wahl, Economic Incentives for Environmental Protection, 21 ENVTL. L. 911, 970-71 (1991).
75
See O’Neill, 50 F.3d at 681; Westlands, 337 F.3d at 1097.
68
ȱȱȱ
şȱ
ȱ
ȱȱ ȱȱȱȬȱ ȱȱ
commerce.76 For instance, Reclamation law typically regulates water supplied via federal
Reclamation projects. The Rivers and Harbors Act of 1937 that reauthorized the CVP typically
regulates navigation and flood control. As discussed above, application of federal legislation has
led to federal action in recent decades to protect environmental interests in the Delta. Congress
may take a role in the current situation to redirect Reclamation’s authority in CVP operations or
management. In May 2008, a House Natural Resources Committee subcommittee held a hearing
on the management of salmon fisheries in the Delta.77
Court decisions, agency actions, and other recent events, including the Wanger decision,
corresponding biological opinion, the statewide drought emergency,78 have brought heightened
attention to the issues affecting water resources in California. These matters can be expected to
remain of interest to Congress as new lawsuits arise over the management of the state’s water
resources and operations of the water projects. For instance, two environmental groups filed a
lawsuit against the state water resources department, the SWRCB, and Reclamation in state court
in December 2008, claiming that the water projects’ diversions continue to cause environmental
problems, both for fish and for the water itself.79 The groups claim that the diversions have
violated of the public trust doctrine, the rule of reasonable use, and water quality requirements.80
ȱȱ ȱ
Cynthia Brougher
Legislative Attorney
[redacted]@crs.loc.gov, 7-....
76
U.S. CONST. art. I, § 8.
Oversight Hearing Regarding Management of West Coast Salmon Fisheries, Subcomm. On Fisheries, Wildlife and
Oceans of the H. Comm. on Natural Resources, May 15, 2008.
78
Citing below-average rainfall, low snowpack runoff, and significant court-ordered reductions in flows in the Delta,
Governor Schwarzenegger declared a statewide drought in Executive Order S-06-08, available at http://gov.ca.gov/
index.php?/press-release/9796/. Because of the water shortage experienced by the state, Governor Schwarzenegger
declared a state of emergency in February 2009, available at http://gov.ca.gov/proclamation/11557/.
79
The complaint can be accessed at [http://www.c-win.org/uploads/CWIN%20v%20SWRCB%20final.doc.pdf].
80
Id.
77
ȱȱȱ
ŗŖȱ
EveryCRSReport.com
The Congressional Research Service (CRS) is a federal legislative branch agency, housed inside the
Library of Congress, charged with providing the United States Congress non-partisan advice on
issues that may come before Congress.
EveryCRSReport.com republishes CRS reports that are available to all Congressional staff. The
reports are not classified, and Members of Congress routinely make individual reports available to
the public.
Prior to our republication, we redacted names, phone numbers and email addresses of analysts
who produced the reports. We also added this page to the report. We have not intentionally made
any other changes to any report published on EveryCRSReport.com.
CRS reports, as a work of the United States government, are not subject to copyright protection in
the United States. Any CRS report may be reproduced and distributed in its entirety without
permission from CRS. However, as a CRS report may include copyrighted images or material from a
third party, you may need to obtain permission of the copyright holder if you wish to copy or
otherwise use copyrighted material.
Information in a CRS report should not be relied upon for purposes other than public
understanding of information that has been provided by CRS to members of Congress in
connection with CRS' institutional role.
EveryCRSReport.com is not a government website and is not affiliated with CRS. We do not claim
copyright on any CRS report we have republished.
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.