Strategic Airlift Modernization: Analysis of C-5 Modernization and C-17 Acquisition Issues

Congressional research reportJun 6, 2008

Ask Donna

What actually matters in this document.

Text

Order Code RL34264

Strategic Airlift Modernization: Analysis of C-5

Modernization and C-17 Acquisition Issues

Updated June 6, 2008

William Knight and Christopher Bolkcom

Foreign Affairs, Defense, and Trade Division

Strategic Airlift Modernization: Analysis of C-5

Modernization and C-17 Acquisition Issues

Summary

Strategic airlift has played a pivotal role in U.S. national security strategy since

World War II. Since then, strategic airlift has provided timely worldwide reach for

both combat and humanitarian relief operations. The Department of Defense (DOD)

currently operates a mix of C-5 and C-17 aircraft. C-5s were built in two production

batches, designated the C-5A and C-5B, respectively. A total of 52 C-5s are

scheduled to undergo two major modification programs, after which they will be

redesignated C-5M Super Galaxies; the remaining 59 C-5s will a major avionics

upgrade. C-17s are currently in production, but the C-17 production line is scheduled

to close unless additional orders are placed in an anticipated FY2008 supplemental

appropriations bill.

A major issue currently before Congress is how big should the strategic airlift

fleet be. There is a consensus among policy makers that the DOD must maintain a

robust and effective strategic airlift fleet.

Currently, the most pressing issue is whether Congress should appropriate

money for the purchase of more C-17s in the FY2008 emergency supplemental bill

and, if so, for how many. A third potential issue is the optimal mix of C-5s and C17s that Congress should fund in FY2009 authorization and appropriation bills and

in the out years. At least five options have been proposed for C-5 modernization and

C-17 procurement including the following:

!

!

!

!

!

Buy additional C-17s and pursue modernization of all C-5s.

Halt C-17 production but modernize the current C-5 fleet.

Maintain the C-5 fleet but forego modernization on all or part of the

C-5 fleet while replacing the capability gap with C-17s.

Replace all C-5A-models with new C-17s.

Replace 30 C-5s with 30 C-17s.

Most agree the strategic airlift fleet should consist of a mix of C-17s and

modified C-5s. Independent studies have analyzed policy options by attempting to

measure long-term costs associated with various alternatives of C-5 modernization

with C-17 acquisition. However, there remains disagreement over how many aircraft

are required, and of what type. Policy considerations include costs, budget

constraints, industrial base risk, aircraft performance considerations, and optimal

fleet mix.

In addition to the aforementioned options, DOD could increase use of

commercial aircraft, encourage foreign or civilian sales of the C-17, bolster reliance

on pre-positioning of equipment, leverage potential KC-X airlift capability, pursue

airships or hybrid airships, or simply accept less strategic airlift capability.

This report will be updated as events warrant.

Contents

Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2

Combat Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2

Brigade Airdrop . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

Medical Evacuation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

Humanitarian Relief Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

Aircraft . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

C-5 Galaxy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

Avionics Modernization Program (AMP) . . . . . . . . . . . . . . . . . . . . . . . 5

Reliability Enhancement Re-engining Program (RERP) . . . . . . . . . . . . 5

Legislative Retirement Restrictions . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

“Bad Actors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

C-17 Globemaster III . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10

Convoy Relief . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

Precision Airdrop . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

Strategic Airlift Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

Mobility Capability Study (MCS) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

Changes Since MCS . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

92,000 Additional Troops . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

Army Transformation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

C-5 Modernization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

Africa Command (AFRICOM) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

Requirements Summary . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16

Legislative Direction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16

Policy Considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17

Costs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17

Institute for Defense Analysis (IDA) Study . . . . . . . . . . . . . . . . . . . . . 18

Rand Study . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20

Budget . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21

C-17 Production Line and Risk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22

Other Strategic Airlifters . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22

C-17 Production Requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23

Smart Shutdown Option . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23

Long-term Cost Considerations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23

Long-Term Force Structure Implications . . . . . . . . . . . . . . . . . . . . . . . 24

Performance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24

Fleet Mix . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26

Low Density/High Demand (LD/HD) assets . . . . . . . . . . . . . . . . . . . . 26

Homogeneous Strategic Airlift Fleet . . . . . . . . . . . . . . . . . . . . . . . . . . 26

Organic Fleet Size Impact on the Civil Reserve Air Fleet . . . . . . . . . . 26

Fleet Mix Options for C-5 Modernization/C-17 Acquisition . . . . . . . . . . . . . . . 27

Modernize All C-5s and Purchase Additional C-17s . . . . . . . . . . . . . . . . . . 27

Modernize All C-5s and Halt Acquisition of the C-17 . . . . . . . . . . . . . . . . 28

Forego RERP on Some or All C-5s and Buy More C-17s . . . . . . . . . . . . . . 28

Replace All C-5As with C-17s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29

Replace 30 C-5As with 30 C-17s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29

Other Strategic Airlift Options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31

Increased Use of Commercial Aircraft . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31

Encourage Civilian/Foreign C-17 Sales . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32

BC-17X . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32

Foreign Sales . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34

Bolster Reliance on Pre-positioning of Equipment . . . . . . . . . . . . . . . . . . . 36

Leverage Next Generation Tanker’s Airlift Capability . . . . . . . . . . . . . . . . 37

Pursue Airships or Hybrid Airships . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39

Appendix A. FY2008 National Defense Authorization Act (P.L. 110-181)

Report Language Directing Study on Size and Mix of Airlift Force . . . . . . 40

Appendix B. C-5 System Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44

Appendix C. C-17 System Description . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45

Appendix D. C-5 and C-17 Availability, and Readiness Comparisons . . . . . . . . 46

List of Figures

Figure 1. DOD Base Budget and GWOT . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22

Figure 2. Comparison of C-5 and C-17 Capabilities . . . . . . . . . . . . . . . . . . . . . 25

Figure 3. Number and Cost of An-124 Missions Contracted by Air

Mobility Command . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32

Figure 4. C-5 Galaxy at Balad Air Base, Iraq . . . . . . . . . . . . . . . . . . . . . . . . . . . 44

Figure 5. C-17 Globemaster III Taking Off from Unfinished Runway . . . . . . . . 45

List of Tables

Table 1. Current C-5 Fleet . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

Table 2. RERP Production Schedules and Cost Growth . . . . . . . . . . . . . . . . . . . . 7

Table 3. C-5 Modernization vs. C-17 Procurement . . . . . . . . . . . . . . . . . . . . . . . 18

Table 4. Life-Cycle Cost (LCC) Estimates of Potential Alternatives to

Modernizing the Strategic Airlift Fleet . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19

Table 5. Comparison of 180 C-17s with Various C-5 Fleets . . . . . . . . . . . . . . . . 29

Table 6. Typical Load Capabilities of 30 C-5A, C-5M, and C-17

Airlifters Considering Expected Mission Capable Rates (MCR) . . . . . . . . 30

Table 7. C-17 Foreign Sales . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35

Table 8. KC-135 and Potential KC-X Airlift Capabilities . . . . . . . . . . . . . . . . . . 38

Strategic Airlift Modernization: Analysis of

C-5 Modernization and C-17

Acquisition Issues

Introduction

The C-5 Galaxy and C-17 Globemaster III form the core of DOD’s strategic

airlift capability. Both posses intercontinental range and the ability to transport

outsized1 and oversized cargo.2 The C-5 is the Air Force’s largest strategic airlift

aircraft and can carry some loads too large for any other DOD airlifter. In addition

to its strategic airlift capabilities, the C-17 can perform the tactical airlift mission,

which the C-5 cannot.

The Air Force’s current plan is to extensively modernize a total of 52 C-5s,

partially modernize 59 C-5s, and end C-17 production. This represents a departure

from prior DOD plans that called for fully modernizing the Air Force’s entire C-5

fleet and was part of changes announced when DOD re-certified one of the C-5’s two

major modification programs following high program costs growth.3 The

Administration did not request C-17s in either its FY2008 or FY2009 budget

requests. Further, the Administration’s FY2009 budget request did not contain

funding to close the C-17 production line.4 However, the Air Force’s FY2009

Unfunded Priority List contained a request for 15 additional C-17s.5

Currently, the most pressing issue is whether Congress should appropriate

money for the purchase of more C-17s in the FY2008 emergency supplemental bill

1

Outsized cargo exceeds the dimensions of oversized cargo and requires the use of a C-5

or C-17 aircraft or surface transportation. (Joint Publication 1-02, DOD Dictionary of

Military and Associated Terms, amended through October 17, 2007, p. 401).

2

Oversized cargo is air cargo that exceeds the dimensions of a standard (463L) pallet, but

is air transportable on the C-5, C-17, C-130, KC-10, and most civilian contract cargo

carriers. (Joint Publication 1-02, DOD Dictionary of Military and Associated Terms,

amended through October 17, 2007, p. 402).

3

Jen DiMascio, “Young Certifies C-5 Re-engining Program,” Defense Daily, Vol. 237, Issue

31, February 15, 2008.

4

Marc V. Schanz, “The C-17 and the Airlift Question,” Daily Report, Air Force Magazine,

February 6, 2008, online at [http://dailyreport.afa.org/AFA/Features/modernization/

box020608airlift.htm].

5

“FY2009 Unfunded Requirements List,” U.S. Air Force, SAF/FMB, Budget and

Appropriations Liaison Office, February 2008, p.2, online at [http://dailyreport.afa.org/

NR/rdonlyres/BAD928B9-0927-4628-BE43-14992CB464C1/0/FY09URL.pdf].

CRS-2

and, if so, for how many. A third potential issue is the optimal mix of C-5s and C17s that Congress should fund in FY2009 authorization and appropriation bills and

in the out years. Decisions made this year regarding force structure of the Air Force’s

strategic airlift fleet could significantly affect future U.S. military capabilities, Air

Force funding requirements, and the aerospace industrial base.

Background

A central tenet of U.S. national military strategy, strategic airlift is an essential

capability enabling the military power projection anywhere around the world.

Strategic airlift has proven critical in the success of global combat and humanitarian

relief operations. An alternative transportation mode, sealift, is capable of deploying

larger quantities of troops and cargo when compared with airlift, but it is slower and

sometimes constrained by a lack of seaports near potential contingency operations.

The capability that strategic airlift provides is the ability to deliver forces, equipment,

and supplies with the greatest speed to virtually any place on the globe.

Despite its importance, DOD’s strategic airlift system is under stress, having

supported continuous contingency operations over the last 17 years. At the same

time, the United States has reduced its Cold War infrastructure by closing two-thirds

of its forward bases. Thus, U.S. forces are now required to deploy more frequently

and over greater distances. For example, even before the 9/11 terrorist attacks and

resulting conflicts, the Air Force estimated that it was deploying four times more

frequently than when it enjoyed the larger Cold War infrastructure.6 The ongoing

war against terrorism has placed further demands on the strategic airlift system.

Combat Operations

The massive military buildup prior to the 1991 Gulf War highlighted the value

of strategic airlift when U.S. aircraft moved over 500,000 troops and 543,548 tons

of cargo into the Persian Gulf region.7 After Desert Storm, strategic airlift provided

12 years of continuous support to coalition forces enforcing the northern and

southern no-fly zones over Iraq. Since 1995, strategic airlift has also supported U.S.

and NATO operations in the Balkans.

Strategic airlift plays a key role in combat operations in the Middle East. On a

typical day, C-5s bring cargo and troops from the United States to staging bases in

Europe, Central Asia, and the Middle East, while C-17s fly directly to forward

operating bases in Iraq and Afghanistan. Since September 2001, over 260,000 airlift

missions have delivered over 3.3 million passengers and 1.7 billion short tons of

cargo to Iraq and Afghanistan.8 Few nations possess the organic airlift capability

6

Maj. Gen. Howie Chandler, Basic Air Force Structure and Expeditionary Aerospace Force

Operations, Briefing to Congressional Air Force Caucus, March 23, 2001, Bolling AFB.

7

Gulf War Air Power Survey, vol. V, (Washington: GPO, 1993), p. 76.

8

The Air Force Handbook 2007, pp 18-19.

CRS-3

necessary to project power around the world. Consequently, DOD’s strategic airlift

capability is often requisite to enabling coalition partners to join us in operations.

As part of Operation Enduring Freedom in Afghanistan, nearly 170 C-5 and C17 cargo planes were initially dispatched to create an “air bridge” to this distant,

landlocked nation.9 Although distance was clearly a challenge, securing permission

for overflight and sourcing infrastructure appears to have been even more

burdensome. Most Afghan airfields from which C-17s operated were short (~3,500

feet) and strewn with debris and potholes. Some airfields were nothing more than

packed dirt, and C-5s cannot operate from these types of primitive airfields.10 Two

events from the Global War on Terrorism — the 2003 brigade airdrop and medical

evacuation missions — reflect the evolving capabilities of strategic airlift.

Brigade Airdrop. Prior to Operation Iraqi Freedom, U.S. commanders

expressed a desire to open a northern front during the invasion of Iraq. After the

Turkish government denied the United States rights to stage the land invasion from

Turkey, Air Force C-17s executed a much publicized airdrop of the 173rd Airborne

Brigade into northern Iraq on March 26, 2003.11

Medical Evacuation. DOD retired its dedicated aeromedical evacuation fleet

in 2003, switching to a concept where nearly every air mobility aircraft is capable of

performing this time-critical mission. Strategic airlift platforms are now routinely

tasked “in system” to perform patient movements. As a result, the time required to

return a wounded service member from the battlefield is now approximately 72 hours

— less than half that required for Desert Storm. This is contributing to survival rates

for casualties in Afghanistan and Iraq now exceeding 90%, compared with 75%

during Desert Storm.12

Humanitarian Relief Operations

Strategic airlift has proven its value many times since World War II by

delivering humanitarian relief. During a 15-month stretch in 1948 and 1949,

American and British airmen executed some 277,000 airlift sorties, keeping Berlin

from being cut off from the West.13 During the 1990s, more than 85% of some

160,000 metric tons of food, medicine, and relief supplies reached besieged Sarajevo,

9

Eric Schmitt, “Busy Skies Over Asia Controlled from U.S.,” New York Times, October 14,

2001.

10

Seena Simon, “Air Force Makes Play for More C-17s,” Air Force Times, March 18, 2002,

p. 26.

11

Lt Col M. Shane Hershman, “Employment of the C-17 in Airdrop and Airland Operations

in Closing the Force,” March 18, 2005, pp. 6-7.

12

Bruce D. Callander and Adam J. Hebert, “The 90 Percent Solution,” Air Force Magazine,

October 2006, vol. 89, no. 10, [http://www.afa.org/magazine/oct2006/1006solution.asp].

13

Stewart M. Powell, “The Berlin Airlift,” Air Force Magazine, June 98, vol. 81, no. 6.

CRS-4

Bosnia-Herzegovina, via airlift.14 More recently, strategic airlift delivered disaster

relief after earthquakes in Iran (2003) and Pakistan (2005), the southeast Asia

tsunami (2004), and Hurricane Katrina (2005), demonstrating the importance of

strategic airlift in mitigating consequences after natural disasters.15

Aircraft

The Air Force currently operates two strategic airlift aircraft: the C-5 Galaxy

and the C-17 Globemaster III. Both are capable of being refueled in-flight. The C-5

is equipped with a nose section that opens, whereas both aircraft have rear-opening

doors to facilitate rapid on-loading and offloading. Also, DOD utilizes air refueling

aircraft and contract civilian carriers to provide additional strategic airlift.

C-5 Galaxy

Made by Lockheed Martin, the C-5 is the largest strategic airlift platform in the

DOD inventory. (C-5 specifications and basing appear in Appendix B.) The Air

Force operates a total of 111 C-5s in the active, Air National Guard, and Reserve

components. C-5s were built in two production batches, and aside from age, both

models are interchangeable operationally. The first production aircraft were

designated A-models, while later aircraft were designated as B-models. Two Amodels were later modified to carry outsize cargo such as NASA rocket components

and were redesignated C-models. The entire A/C-model fleet received new wings

during the 1980s. In 2004, the Air Force retired 14 A-model C-5s.16 Table 1

highlights key factors of the C-5 fleet.

Table 1. Current C-5 Fleet

C-5A/C

C-5B

Current Inventory

60/2

49

# Produced

81

50

Years Built

1969-73

1985-89

Source: Teal Group Corporation, World Military & Civil Aircraft Briefing, September 2006.

All C-5s can carry large and irregularly shaped cargo, such as the Army’s 74-ton

mobile scissors bridge, that no other U.S. aircraft can hold. However, the C-5 has

been plagued by reliability problems. FY2005-FY2007 data show C-5 mission

capable rates of only 48% for C-5A/C and 65% for the C-5B. To address reliability

issues, the Air Force proposed two major modification programs designed to bring

14

Louis A. Arana-Barradas (MSgt, USAF), “A ‘Promise’ of Peace,” available at

[http://www.af. mil/news/airman/0396/promise.htm].

15

16

USTRANSCOM Annual Command Reports, FY2002-2006, [http://www.transcom.mil].

Susan H. H. Young, “Gallery of USAF Weapons: 2007 USAF Almanac,” Air Force

Magazine, May 2007, p. 146.

CRS-5

C-5 mission capable rates to a goal of 75% — the Avionics Modernization Program

(AMP) and the Reliability Enhancement Re-engining Program (RERP). After

completing these two programs, C-5s will be designated C-5M Super Galaxies.

Avionics Modernization Program (AMP). AMP is a $1.4 billion project

to upgrade C-5 communications, navigation, and air traffic control surveillance

components.17 AMP is intended to ensure C-5s comply with emerging air traffic

management requirements, allowing C-5s to fly in global airspace without

restrictions. Operational testing of AMP was completed in 2006, and the last of the

111 C-5s planned for upgrade is scheduled to be complete by 2015. As of September

2007, 30 C-5s had completed AMP modification, which establishes the digital

baseline for follow-on components to be installed under RERP.18

Reliability Enhancement Re-engining Program (RERP). RERP is a

reportedly $7.7 billion19 comprehensive modernization plan with more than 70

initiatives to upgrade major C-5 systems.20 The goal of RERP is to improve

availability, reliability, and maintainability of a portion of the C-5 fleet. The

centerpiece of RERP is replacing C-5 engines with modern General Electric CF6

engines. Air Force officials expect the C-5M (C-5s modernized through both AMP

and RERP) to bolster the strategic airlift capability by making more of the C-5 fleet

available on a daily basis. For example, C-5 mission-capable rates are expected to

improve from the low 50% range today to at least 76% in the future. In addition, the

C-5M is expected to possess operational improvements that will require 30% less

takeoff distance, while enabling the Super Galaxy to reach cruise altitude 58% faster

that current C-5s. Finally, the C-5M is anticipated to be more environmentally

friendly by creating less noise and fewer carbon emissions.21 Currently, three C-5s

have been modified with RERP — one A-model and two B-models — and are

undergoing operational testing.22

17

Selected Acquisition Report, C-5 AMP, December 31, 2007, p. 12, from Defense

Acquisition Management Information Retrieval. Cost is shown in 2007 This Year dollars

and includes $409.3 million for Research, Development, Test and Evaluation.

18

The Honorable Sue C. Payton, Assistant Secretary of the Air Force (Acquisition), Written

Statement before the Senate Homeland Security and Governmental Affairs Committee,

Federal Financial Management, Government Information, Federal Services, and

International Security Subcommittee Hearing, September 27, 2007, pp. 3-4.

19

“Lockheed Deal Scaled Back,” Washington Post, February 15, 2008, p.D2.

20

Selected Acquisition Report, C-5 RERP, September 30, 2007, p. 9, from Defense

Acquisition Management Information Retrieval. Cost is shown in 2007 This Year dollars

and includes $1,657.2 million for Research, Development, Test and Evaluation.

21

Hearing of the Senate Homeland Security and Governmental Affairs Committee, Federal

Financial Management, Government Information, Federal Services, and International

Security Subcommittee on Military Airlift Costs, September 27, 2007. Other sources cite

a 75% target mission capable rate.

22

The Honorable Sue C. Payton, Assistant Secretary of the Air Force (Acquisition), Written

Statement before the Senate Homeland Security and Governmental Affairs Committee,

Federal Financial Management, Government Information, Federal Services, and

(continued...)

CRS-6

In 2007, significant cost growth estimates for C-5 RERP became an issue for

many in Congress prompting legislation. As a result of changes in program costs, in

February 2008, DOD announced changes for the C-5 RERP.

RERP Cost Growth. In 2007, Air Force officials began to express concern

about anticipated significant C-5 RERP cost growth. As late as December 2006, the

SAR for the C-5 RERP showed average procurement unit cost growth of 2.9% over

the current acquisition program baseline and 16% over the original baseline. This

rate of cost growth is significantly lower than 15% and 30% cost growth,

respectively, required to trigger a Nunn-McCurdy breech notification.23 In September

2007, the Air Force declared C-5 RERP had breached Nunn-McCurdy thresholds.

The September 2007 SAR followed, showing a cost increase of approximately $6

billion and estimating RERP will now cost a total of $17.5 billion.24

Unfortunately, the Air Force and Lockheed Martin were far apart on cost

estimates for C-5 RERP. Lockheed Martin has submitted a combination firm-fixed

price (FFP)/not-to-exceed (NTE) contract offer for approximately $11.6 billion

dollars.25 Further, many contributing factors to RERP cost growth reported in the

SAR appeared to be one-time management problems that may not affect future costs.

For example, a permanent waiver to the Berry Amendment26 would allow the Air

Force to proceed with purchase of new General Electric engines that are built in part

with imported specialty metals.27 The impact of other factors affecting cost growth

has proven more difficult to reconcile.

In testimony before a Senate subcommittee, Lockheed Martin and the Air Force

explained their perspectives on cost growth. Ms. Payton, Assistant Secretary of the

Air Force for Acquisition, testified that the C-5’s AMP upgrade, a prerequisite the

RERP, has taken longer than anticipated, because the Air Force has encountered

unexpected repairs on its aging C-5s during the modification process. In addition,

22

(...continued)

International Security Subcommittee Hearing, September 27, 2007, p. 4.

23

The Nunn-McCurdy Amendment was designed to curtail cost growth in defense

procurement programs. When a program exceeds the Nunn-McCurdy thresholds for cost

growth, the service secretary must notify Congress, and the Secretary of Defense must (1)

either cancel the program or certify that it remains essential to national defense, (2) certify

that the program is the least cost alternative available, and (3) ensure that proper

management controls are in place.

24

Selected Acquisition Report, C-5 RERP, September 30, 2007, p. 19, from Defense

Acquisition Management Information Retrieval.

25

Michael Sirak, “Payton: Air Force Expects First C-5 RERP Contract in Early 2008,”

Defense Daily, vol. 236, issue 1, October 1, 2007.

26

For more on the Berry Amendment, see CRS Report RL31236, The Berry Amendment:

Requiring Defense Procurement to Come from Domestic Sources, and CRS Report

RL33751, The Specialty Metal Clause in the Berry Amendment: Issues for Congress, both

by Valerie Bailey Grasso.

27

Selected Acquisition Report, C-5 RERP, December 31, 2006, p. 4, from Defense

Acquisition Management Information Retrieval.

CRS-7

Ms. Payton expressed concern that the Air Force could not commit to a long-term

schedule that might form the basis of a FFP contract, noting uncertainty with legacy

maintenance issues and hard-to-predict wartime requirements. Under FFP contracts,

some changes in quantity could serve to reopen contract negotiations leading to

increased program costs. The Air Force believes this risk alone could drive engine

costs up by as much as $10 million per airplane in future years. In addition, the Air

Force believes that Lockheed Martin cost estimates for hands-on or touch labor are

overly optimistic. Further, the Air Force’s cost position accounts for anticipated

legacy aircraft repairs that are likely to be discovered during RERP production.28

While testifying, Larry McQuien, Vice President of Business Ventures for

Lockheed Martin Aeronautics, acknowledged Lockheed Martin’s cost proposal did

not include costs for “training, spares, support equipment, over and above aircraft

maintenance, and program management.”29 However, he stated confidence in

estimates for engine costs and cited production changes that would eliminate about

19,600 hours in touch labor.30 Lockheed Martin argues that if its cost estimates are

proven correct, the RERP program will grow at rates below the Nunn-McCurdy

threshold notification requirement.31 Table 2 provides Lockheed Martin’s estimates

of various production schedules.

Table 2. RERP Production Schedules and Cost Growth

FY

07 08 09 10 11 12 13 14 15 16 17 18 19 20

21

Total

($B)

PB 03

5

7 12 12 12 12 12 12 12 12

8.7

PB 06

1

3

5

7

8.9

PB 08

1

3

9 10 10 10 12 12 13 13 12

LM

1

3

USAF

01/07

1

3

9 12 12 12 12 12 12 12

2

9.8

5

7 10 10 10 12 12 13 13 12

11.6

6

7

7

7

7

7

7

7 12 12 12

13

14.9

Source: Lockheed Martin Aeronautics Company, September 10, 2007.

Note: PB = President’s Budget, LM = Lockheed Martin, USAF = U.S. Air Force.

RERP Legislation. Further, the 2008 National Defense Authorization Act

directed the Air Force to identify options for accelerating the C-5 RERP operational

testing. Congress also directed DOD to task IDA to perform an objective analysis

28

Senate Homeland Security and Governmental Affairs Committee, Federal Financial

Management, Government Information, Federal Services, and International Security

Subcommittee Hearing on Military Airlift Costs, September 27, 2007.

29

Ibid.

30

Ibid.

31

White Paper on C-5 Reliability Enhancement and Re-Engining Program (RERP) Costs,

Lockheed Martin Corp, [undated], e-mailed to CRS on April 27, 2007.

CRS-8

of the Air Force’s cost position regarding the C-5 RERP and to forward the review

to congressional defense committees by March 1, 2008.32

RERP Recertified by DOD. In Febraury 2008, Undersecretary of Defense

for Acquisition, Technology, and Logistics, John Young, re-certified the C-5 RERP,

but with changes. Under the new program, the Air Force can contract with Lockheed

Martin to perform RERP modifications to the remaining 47 C-5Bs and 2 C-5Cs.

DOD officials expect the changes to save $9.8 billion by foregoing the RERP on 59

older C-5As.33 This represents a departure from prior DOD plans that called for fully

modernizing the Air Force’s entire C-5 fleet.34

Legislative Retirement Restrictions. The FY2004 Defense Authorization

Act (P.L. 108-136, Sec. 132) prohibited the retirement of C-5A aircraft until the

effectiveness of the C-5A AMP and RERP efforts has been determined through

testing and evaluation and reported to Congress. As such, the Air Force modified

one C-5A through both AMP and RERP and is currently conducting operational

testing on the aircraft. In 2007, Congress amended this restriction, allowing the Air

Force to retire strategic airlifters beginning October 1, 2008, as long as the Air Force

maintains a strategic airlift fleet of at least 299 aircraft — seven aircraft above the

MCS baseline.35

“Bad Actors.” During FY2008 budget deliberations, Air Force leaders

frequently requested permission to retire some C-5A aircraft independent of flight

test results on C-5A RERP and AMP. To support their request, former Secretary of

the Air Force, Michael W. Wynne, and former Air Force Chief of Staff, General T.

Michael “Buzz” Moseley, testified that some subset of the C-5A fleet is composed

of “bad actors,” — aircraft that are “hard broke” and prime candidates for retirement.

GEN. MOSELEY: In a perfect world, we would like to be able to manage that

inventory and divest ourselves of the bad-acting tail numbers, and some of them

are bad actors; they’re broke. A lot of the C-5As have low flight hours on them

because they’re broke and you can’t fly them.... If I could line up the best B

model or the best A model at the head of a line ... and go to the back end of the

line and begin to kill off the bad actors and replace them with something new, I

would be very happy. That doesn’t mean all of them; it doesn’t mean that we

class or block-retire airplanes, it just means let us get at the tail numbers that are

bad actors.36

32

H.Rept. 110-477, December 6, 2007, pp.746-747.

33

Andrea Shalai-Esa, “Pentagon Slashes Lockheed’s C-5 Upgrade Work,” Reuters, February

14, 2008.

34

Jen DiMascio, “Young Certifies C-5 Re-engining Program,” Defense Daily, Vol. 237,

Issue 31, February 15, 2008.

35

36

P.L. 110-107, 10 U.S.C. 807, Sec. 8062.

Hearing of the House Armed Services Committee on Fiscal Year 2008 National Defense

Budget Request From the Department of the Air Force, February 28, 2007, 2118 Rayburn

House Office Building, Congressional Transcript, Federal News Service, Inc.

CRS-9

SEC. WYNNE: There’s some that are really bad actors. And I think if you gave

us the right to manage the fleet, you would find that we would manage it in a way

that would actually retain the best mission profiles....37

SEC. WYNNE: I can tell you, sir, that right now some worry about the entirety

of the C-5 fleet. There are two things we should know about this. First is that we

don’t — we want to line up worst to best, and we think there are between 20, 25

and 30 of bad actors that we would like to retire.38

Some in Congress appeared supportive of Secretary Wynne’s and General

Moseley’s “bad actor” testimony and requested the Air Force provide a list of these

“hard broke” aircraft, presumably to make a judgement on whether these aircraft

should indeed be retired early.39 Others were skeptical, concerned that Congress had

not received “factual data” on the health and performance of the C-5A fleet.

During a September 2007 Senate hearing, both Ms. Sue Payton, Assistant

Secretary of the Air Force for Acquisition, and General Norton A. Schwartz,

Commander of U.S. Transportation Command, stated that they were unaware of

specific “bad actor” C-5 aircraft.40 Further, an examination of C-5 reliability and

maintainability statistics for the past three fiscal years did not identify any obvious

subset of the C-5 fleet that stands out as notably “bad actors.” Reliability and

availability measures studied included the amount of time spent in a depot or

otherwise unavailable because of maintenance, mission capable rate, and mission

departure reliability. (Graphic representation of data and analysis of the C-5 fleet can

be found in Appendix D.)

Some might argue all C-5As could be considered bad actors. While the C-5A

may have many hours of life remaining, it is an older aircraft than the C-17.

However, the Air Force’s Fleet Viability Board found the C-5A fleet — with

appropriate investments — has at least 25 years of life remaining.41 In addition, the

Defense Science Board and the Institute for Defense Analysis have also endorsed the

viability of the C-5A fleet. Further, C-5A performance and reliability are not

uniformly inferior to the C-5B. Over the past three years, for example, the C-5A fleet

37

Ibid.

38

Hearing on the Senate Armed Services Committee on Air Force Authorization Request

for Fiscal Year 2008 and the Future Years Defense Program, March 20, 2007, 325 Russell

Senate Office Building, Congressional Transcript, Federal News Service, Inc.

39

See, for example, dialogue between Reps. Marshall and Saxton and Lt. Gen. Carol

“Howie” Chandler. Hearing of the Air and Land Forces Subcommittee of the House Armed

Services Committee on Air Force and Army Airlift and Aerial Refueling Fixed-Wing

Aircraft Programs, March 7, 2007, 2118 Rayburn House Office Building, Congressional

Transcript, Federal News Service, Inc.

40

Hearing of the Senate Homeland Security and Governmental Affairs Committee, Federal

Financial Management, Government Information, Federal Services, and International

Security Subcommittee on Military Airlift Costs, September 27, 2007.

41

Tech. Sgt. David A. Jablonski, “Air Force Fleet Viability Board releases C-5A

Assessment,” Air Force Print News, July 15, 2004, and Amy Butler, “With a Little Help —

And Cash — C-5As Can Fly For 25 More Years, Panel Says,” Defense Daily, July 19, 2004.

CRS-10

has averaged a marginally higher mission departure reliability rate (83.1%) than the

C-5B fleet (81.3%). This data may lead one to conclude that C-5A mission capable

rates lag behind those of the C-5B because of management decisions rather than

aging aircraft maintenance issues.

In the summer of 2007, two C-5A aircraft were restricted from flight, and 12

were load-restricted or flight profile-restricted, because of a variety of maintenance

or repair issues. Some suggest these 14 aircraft are appropriate candidates for early

retirement. In contrast, others cite that it is estimated to cost only $26.7 million to

repair all 14 aircraft. In addition, 8 of the 14 restricted aircraft required routine

modifications to address human-error damage incurred during routine maintenance.

Arguably, these problems are minor and easily addressed, and do not warrant early

retirement. While this counter-argument appears sound, it also speaks to the value

of conducting robust analysis of an aircraft’s maintenance and performance history

and projected future costs and challenges. A single-point snapshot of an aircraft’s

condition can be an incomplete and misleading description of its health, and, by

itself, a poor basis for retirement decisions.

C-17 Globemaster III42

Made by Boeing, the C-17 is DOD’s most modern strategic airlifter. (C-17

specifications and basing are located in Appendix C.) Because it can use short and

unfinished runways and has high maneuverability on the ground, the C-17 can

operate in environments traditionally confined to smaller airlifters. Thus, C-17s can

often deliver payloads from the United States directly to forward bases near the

battle. Like C-5s, C-17s can carry outsize and oversize cargo such as helicopters and

missile launchers.

Current DOD plans call for the acquisition of 190 C-17s. The Administration

did not request additional C-17s in either its FY2008 or FY2009 budget requests.

Further, the Administration’s FY2009 budget request did not contain funding to close

the C-17 production line.43 However, the Air Force’s FY2009 Unfunded Priority List

contained a request for $3.9 billion to fund 15 additional C-17s.44

The C-17 is also capable of performing tactical airlift missions. During

Operation Allied Force, the Kosovo Campaign in 1999, 12 C-17s were tasked to fly

intra-theater airlift missions moving 24 Apache helicopters, 36 Abrams tanks, and

42

See CRS Report RS22763, Military Airlift: C-17 Program Background, by William

Knight and Christopher Bolkcom.

43

Marc V. Schanz, “The C-17 and the Airlift Question,” Daily Report, Air Force Magazine,

February 6, 2008, online at [http://dailyreport.afa.org/AFA/Features/modernization/

box020608airlift.htm].

44

“FY2009 Unfunded Requirements List,” U.S. Air Force, SAF/FMB, Budget and

Appropriations Liaison Office, February 2008, p. 2, online at [http://dailyreport.afa.org/

NR/rdonlyres/BAD928B9-0927-4628-BE43-14992CB464C1/0/FY09URL.pdf].

CRS-11

58 Bradley fighting vehicles from bases within Europe to Tirana, Albania.45

Likewise, the C-17 has been used extensively in a tactical role in both Afghanistan

and Iraq. In the summer of 2006, the Air Force forward-deployed two squadrons of

C-17s. In addition to connecting mobility hubs in southwest Asia and Europe, these

two squadrons have been used extensively in both Afghanistan and Iraq.

Convoy Relief. In late 2004, military commanders increased intra-theater

airlift capability to reduce the number of ground convoys exposed to ambush in Iraq

and Afghanistan. C-17s were tasked to transition to the tactical airlift role along side

C-130s to perform this mission.46 The reported effect of increased tactical airlift has

been to “relieve nearly 3,500 vehicles and 9,000 convoy operators per month from

having to travel treacherous Iraqi and Afghan roads.”47

Precision Airdrop. Enabling coalition ground forces operating in the rugged

mountains of Afghanistan, C-17s are using the Joint Precision Airdrop System

(JPADS) to airdrop supplies with GPS-guided steerable parachutes. JPADS allows

the resupply of field units with a high degree of accuracy helping ground forces

receive supplies while avoiding the exposure of larger, traditional drop zones. Also,

airdrops can be flown from high altitude, increasing safety margins to airlift aircraft.48

Strategic Airlift Requirements

Strategic airlift requirements are ultimately derived from the President’s overall

national security strategy. Based on the President’s strategy, DOD periodically

studies the global threat environment and seeks to identify the military force structure

necessary to meet national objectives, and articulates this analysis in the National

Military Strategy (NMS) and Quadrennial Defense Review (QDR). Then, in the case

of strategic airlift, DOD examines the status of its fleet and quantifies future airlift

requirements to judge whether airlift modernization programs are sufficient to

support DOD force structure and the President’s strategy. In June 2004, DOD began

its first “post 9/11” review of transportation requirements. The most recent Mobility

Capability Study (MCS) was completed in December 2005 and briefed to Congress

in February 2006. Currently, two studies are underway that are expected to quantify

strategic airlift requirements. The Institute of Defense Analyses is conducting a

congressionally mandated study on the size and mix of DOD’s air mobility fleet that

is due to Congress in January 2009. DOD is conducting a Mobility Capabilities and

Requirements Study that is expected to be completed by May 2009.

45

Lt Gen William J. Begert, USAF, “Kosovo and Theater Air Mobility,” Aerospace Power

Journal, Winter 1999.

46

TSgt Don Nelson, “Increased C-130, C-17 Flights Relieve Army Ground Convoys,” Air

Force Print News, December 15, 2004, [http://www.globalsecurity.org/military/library/

news/2004/12/mil-041215-afpn04.htm].

47

Gen T. Michael Moseley, USAF, “CSAF’s Vector: Air Mobility’s Strategic Impact,” May

23, 2007, [http://www.af.mil/library/viewpoints/csaf.asp?id=324].

48

Air Mobility Command Public Affairs, “C-17 Employs “Screamer” in Combat Airdrop,”

May 25, 2007, [http://www.af.mil/news/story.asp?id=123054785].

CRS-12

Mobility Capability Study (MCS)

The current analytical basis for DOD’s strategic airlift requirements is the MCS

of 2005. The unclassified executive summary of the MCS notes that unlike past

mobility studies, the MCS did not recommend an airlift requirement expressed in

million-ton-miles per day (MTM/D). Instead, the MCS assessed the capabilities of

the current and projected force by providing a range of potential resource

requirements for strategic airlift, intra-theater (tactical) airlift, and air refueling fleets.

The MCS identified a need for between 292 and 383 strategic airlift aircraft. This

assessment coincided with the Air Force’s program of record at the time of 292

aircraft (180 C-17s and 112 C-5s with engine and avionics upgrades).49 Thus, MCS

recommended a strategic airlift force structure at the bottom of the range necessary

to meet NMS requirements with “acceptable risk.”50 Subsequently, the 2006 QDR

stated a DOD goal of maintaining 292 strategic airlifters.51 To provide Congress with

greater clarity into airlift requirements, the FY2007 Defense Authorization Act (P.L.

109-364, Sec. 1034) required DOD to submit a report to Congress no later than

February 1, 2007, defining airlift requirements in terms of million-ton-miles per day.

In response to this requirement, DOD delivered a classified report to the

congressional defense committees on February 27, 2007.

The MCS findings surprised observers. Many expected the study to project a

growth in airlift needs — perhaps a requirement closer to 60 MTM/D — from the

previous estimate. The mobility study immediately prior to the MCS, the Mobility

Requirements Study 2005 (MRS-05), completed in 2000, set airlift requirements at

54.5 MTM/D.52 Others speculated the MCS would not increase the 54.5 MTM/D

requirement because planners knew that DOD could not afford to purchase enough

aircraft to provide additional airlift.53 They imply the MCS was not an unbiased

study of requirements, but a compromise between what is needed and what can likely

be afforded within current budget constraints.

Analysts also criticized the MCS for its methodology and focus. In September

2005, the Government Accountability Office (GAO) documented a number of

shortcomings in methodology for the ongoing MCS.54 A more detailed GAO

49

One C-5B was destroyed in a crash on April 3, 2006. See unattributed, “17 Airmen

Survive Dover C-5 Crash,” Air Force Print News, San Antonio, April 3, 2006, at

[http://www.af.mil/news/story.asp?id=123018520].

50

“Headquarters Air Mobility Command White Paper, KC-X: The Next Mobility Platform,

The Need For A Flexible Tanker,” p. 4.

51

“Quadrennial Defense Review Report,” February 6, 2006, p. 54.

52

Marc Selinger, “DoD Launching New Review of Transportation Needs,” Aerospace

Daily, March 11, 2004.

53

John Tirpak, “Air Mobility in the Doldrums,” Air Force Magazine, vol. 88, issue 8,

August 2005, at [http://www.afa.org/magazine/aug2005/0805mobility.html].

54

Defense Transportation: Opportunities Exist to Enhance the Credibility of the Current

and Future Mobility Capabilities Studies, Government Accountability Office, September,

2005.

CRS-13

criticism followed in September 2006 after the final MCS was released.55 Others

criticized the study for not adequately addressing DOD intra-theater airlift needs and

for focusing on “near-term” capabilities rather than taking a longer view.56 Criticism

of the MCS with regard to intra-theater airlift requirements is particularly germane

because the C-17 can be used in both the strategic and intra-theater roles. As a result,

some believe DOD requires more C-17s to meet tactical requirements, even if

strategic airlift requirements can be met with DOD’s current programs of record.

In light of the criticism, some have called for DOD or an independent agency

to conduct another mobility study to rectify the MCS’s perceived shortcomings. In

September 2006, it was reported that the Air Force’s Air Mobility Command was

again studying DOD airlift needs. Some may interpret the Air Force’s initiation of

another airlift study so soon after the completion of the MCS as tacit

acknowledgment of flaws in the MCS and an attempt to ameliorate them.57 DOD’s

ongoing study, the Mobility Capability and Requirements Study (MCRS), is expected

to be completed by May 2009.58 Some have criticized the timing of the completion

of the MCRS for being “late to need” to inform near-term force structure decisions

currently being debated by Congress.

Changes Since MCS

Advocates of a larger strategic airlift force structure often point contextual

changes that were not considered by the MCS. Those that hold this view often point

to four issues that have arisen since the MCS was released that may potentially

increase strategic airlift requirements:

!

!

!

!

Planned growth of the Army and Marine Corps by 92,000 troops

Army’s ongoing transformation

C-5 Modernization Program Changes

Stand up of United States Africa Command (USAFRICOM)

92,000 Additional Troops. On January 11, 2007, Secretary of Defense,

Robert Gates announced a recommendation to the President to raise military endstrength by 65,000 Army soldiers and 27,000 Marines.59 The President concurred

55

Defense Transportation: Study Limitations Raise Questions About the Adequacy and

Completeness of the Mobility Capabilities Study and Report, GAO, September 2006.

56

John T. Bennett, “Influential DoD Mobility Study’s Focus on Intratheater Needs

Questioned,” Inside the Air Force, April 7, 2006.

57

Michael Fabey, “AF Formulating Mobility Plan,” Aerospace Daily, September 28, 2006.

58

General Arthur J. Lichte, USAF, Written Statement to the House Armed Services

Committee, Subcommittee on Air and Land Forces, Hearing on United States Transportation

Command Posture and Air Force Mobility Aircraft Programs, April 1, 2008, p. 4.

59

Robert M. Gates, Briefing by the Secretary of State, Secretary of Defense and Chairman

of the Joint Chiefs of Staff, January 11, 2007.

CRS-14

with the recommendation, and bipartisan support was received for expanding activeduty end-strength by approximately 92,000 service members.60

The adequacy of the Air Force’s current and projected strategic airlift fleet to

support these additional ground forces will need to be carefully evaluated. For

example, if additional troops are used to form additional combat maneuver units,

some in the Air Force reportedly believe it will take another 35 strategic airlift

aircraft to support them.61 In contrast, the placement of additional ground forces into

support units of current combat maneuver units would require less additional airlift,

as the number of maneuver units available for deployment would more closely

parallel the force structure studied in the MCS. Further, how new ground forces are

intended to be employed could also potentially impact strategic airlift requirements.

For example, if additional forces are intended to increase the number of maneuver

units for potential future ground force operational surges, then additional strategic

airlift may be necessary to adequately support those forces. However, a scenario

where additional ground force end strength is used to reduce operational tempo of

both the Army and Marine Corps would be less likely to change overall strategic

airlift requirements.

Army Transformation. As yet unclear is the impact that the Army

transformation will have on future requirements. A key facet of the Army plan is the

Brigade Combat Team (BCT).62 BCTs and future forces are being designed to be

lighter and more easily air transportable. Therefore, the Army set a goal of obtaining

the capability to deploy a “BCT anywhere in the world in 96 hours after liftoff, a

division on the ground in 120 hours, and five divisions in theater in 30 days.”63

Although this organizational initiative may have merit, it is not clear that the current

strategic airlift fleet will be able to meet these deployability targets. For example, a

typical Stryker BCT consists of approximately 3,500 soldiers, 327 Stryker vehicles,

600 wheeled vehicles, field and air defense artillery, and engineering equipment.

When considering the feasability of Army plans, a June 2003 GAO study found that

“at present, it would take from five to 14 days, depending on brigade location and

destination, and require over one third of the Air Force’s C-17 and C-5 transport

aircraft fleet to deploy one Stryker brigade by air.”64 Some might argue this

illustrates a shortfall in strategic airlift capability. Others may point to prepositioning and fast sealift as better methods to accelerate BCT deployment

timelines. Further, some may propose a change in the composition of ground

maneuver units to make them more deployable.

60

See CRS Report RL33999, Defense: FY2008 Authorization and Appropriations, by

Stephen Daggett and Amy Belasco.

61

John A. Tirpak, “The Air Force Starts Over: What Will it take to Get Some Stability into

the Air Force Program?” Air Force Magazine, August 2007, vol. 90, no. 8, p. 36.

62

BCTs have three organizational constructs: light infantry, armor, and Stryker. See CRS

Report RL32476, U.S. Army’s Modular Redesign: Issues for Congress, by Andrew Feickert.

63

64

U.S. Department of the Army, Concepts for the Objective Force, 2001, p. 9.

GAO Report to Congressional Committees, Military Transformation: Realistic

Deployment Timelines Needed for Stryker Brigades, June 2003.

CRS-15

Future airlift requirements may also be affected by the Army’s Future Combat

System (FCS). A 2007 Defense Science Board (DSB) report cautioned increasing

weights of FCS vehicles stating, “vehicles originally intended to weigh 17 to 18 tons

are now approaching 30 tons.”65 The additional weight could prove significant: FCS

vehicles may become too heavy for C-130 tactical transports, leaving only strategicsized airlifters capable of moving the FCS. While testifying before Congress,

General T. Michael Moseley stated,

The Future Combat System vehicle that we have counted on being able to fit in

the C-130, we’re told now that it likely won’t fit in the C- 130. We’ll have to put

it into C-17s and C-5s ... And sir, as we look at the difference up-armored

Humvees and MRAPs, and to be able to move those, it takes us away from the

C-130 capability.66

Further, some have suggested that the Army use the C-17 as the “sizing template” for

carrying future Army vehicles — this concept, if accepted, would almost certainly

require more strategic airlift aircraft.67

C-5 Modernization. Both the MCS and QDR called for fully modernizing the

entire C-5 fleet. However, cost growth identified in 2007 led to changes in DOD’s

modernization plans for the C-5 fleet. The Air Force’s current plan is to modernize

all C-5s through the Avionics Modernization Program and a total of 52 C-5s with the

Reliability Enhancement and Re-engining Propgram (RERP) — all 49 C-5Bs, 2 C5Cs, and 1 C-5A.68 The program change was announced when DOD re-certified the

C-5 RERP following costs growth estimates for the previous 111-aircraft program

reached $17.5 billion.69 As a result, some may question whether the current program

of record for 190 C-17s — an increase of 10 aircraft over force structure recommend

in the most recent MCS and QDR — is sufficient to compensate for capability lost

by forgoing the RERP on 59 C-5As.70

Africa Command (AFRICOM). Some have suggested that the emergence of

AFRICOM will lead to the need for a larger strategic airlift force. For example, Vice

Admiral Robert Moeller, AFRICOM’s deputy commander, reportedly highlighted

airlift capability as “probably the biggest need that we anticipate in the years to

65

DSB Task Force, “Future Need for VTOL/STOL Aircraft,” July 2007, p. viii.

66

Transcript from the Hearing of the Senate Armed Services Committee on Fiscal Year

2009 National Defense Budget Request From the Department of the Air Force, March 5,

2008.

67

Gen. (Ret) Barry R. McCaffrey, Adjunct professor of International Affairs, Department

of Social Sciences, United States Military Academy, West Point, NY, After Action Report

— Visit to Nellis and Scott AFB, 14-17 August 2007, October 15, 2007, p. 4.

68

Jen DiMascio, “Young Certifies C-5 Re-engining Program,” Defense Daily, Vol. 237,

Issue 31, February 15, 2008.

69

70

“Lockheed Deal Scaled Back,” Washington Post, February 15, 2008, p.D2.

Caitlin Harrington, “U.S. DOD Cancels Engine Replacements for Older Galaxies,” Jane’s

Defence Weekly, February 27, 2008 on line at [http://www.janes.com].

CRS-16

come.”71 Further, during testimony before the Senate Armed Service Committee

General Moseley was asked to explain why the Air Force had requested 15 C-17s on

its FY2009 unfunded requirements list. In response, General Moseley testified in

part that,

AFRICOM has stood up, which will be an incredibly mobility- intense operation

to be able to move humanitarian relief and disaster relief, equipment and people

around that huge continent, that huge AOR.72

Others may counter that having one combatant command responsible for directing

operations on the continent of Africa does not necessarily increase the number of

operations that strategic airlift aircraft will support on the continent.

Requirements Summary

How significant is the potential airlift shortfall, and does it jeopardize force

projection capabilities? In November 2007, General Schwartz reportedly told

Members of Congress that he believes the “sweet spot” for the strategic airlift fleet

is 205 C-17s and 111 fully modernized C-5s — an increase of 15 C-17s over the

current program of record.73 In March of 2008 — with the C-5’s RERP program

reduced and recertified by DOD — General Schwartz reiterated that he believes

DOD needs a fleet of 111 C-5s and 205 C-17s.74

It may be difficult for Congress to evaluate DOD’s airlift recapitalization plans

because answers from DOD and independent studies are either dated, unclear, or

classified. Questions include How much outsized/oversized airlift capacity is

required, now that major state-on-state conventional warfare appears less likely, but

still a contingency for which DOD must plan? How many aircraft are required now

that irregular warfare — which can occur less predictably, and frequently in theaters

with limited infrastructure — appears more likely? Will the standup of U.S. Africa

Command result in additional strategic airlift requirements?

Legislative Direction. Section 1046 of the 2008 National Defense

Authorization Act (NDAA) directed DOD to conduct a comprehensive requirementsbased study of fixed-wing airlift to include full-spectrum life-cycle costs of operating

current and planned strategic airlift, tactical airlift, and air refueling fleets.

Specifically, the legislation requires DOD to analyze the size and mix of the strategic

71

Christopher J. Castelli, “AFRICOM Eyes Airlift Needs,” Inside Washington Publishers,

May 29, 2008, on-line at [http://www.insidedefense.com/secure/defense_docnum.asp?f=

defense_2002.ask&docnum=5292008_may29b].

72

Transcript from the Hearing of the Senate Armed Services Committee on Fiscal Year

2009 National Defense Budget Request From the Department of the Air Force, March 5,

2008.

73

Amy Butler, “Schwartz Says No to C-17 Line Closure,” Aviation Week and Space

Technology, November 7, 2007, at [http://www.aviationweek.com].

74

Transcript from the Hearing of the Senate Armed Services Subcommittee on Seapower

on Fiscal Year 2009 Budget for the Department of Defense Strategic Lift Programs, March

12, 2008 obtained through [http://www.cq.com].

CRS-17

airlift fleet while considering emerging requirements to transport new Army

equipment such as the Future Combat System and leveraging new capabilities such

as the anticipated airlift capability of future Air Force air refueling aircraft. Further,

the study is expected to to analyze whether the estimated cost of C-5 RERP makes

a RERP-modified C-5 fleet’s life cycle costs higher when compared with alternative

fleets with fewer C-5Ms and more C-17s. This study is required to forecast

requirements for 2012, 2018, and 2024, respectively.

The Air Force has contracted with the Institute of Defense Analyses (IDA) for

completion of this study.75 In an April 2008 letter to DOD and IDA, the Government

Accountability Office (GAO) criticized IDA’s initial study plan, stating it “does not

meet the terms of the Act and lacks sufficient detail for assessment.”76 In response,

DOD concurred with the GAO recommendations that the study be of sufficient detail

to meet legislative requirements, and IDA has agreed to submit a more robust study

plan to DOD by June 2008.77 DOD is required to submit the results of this study to

Congress by January 10, 2009.78 Report language from Section 1046 of the 2008

NDAA is provided in Appendix A.

Policy Considerations

In addition to strategic airlift requirements, additional factors to consider

regarding the future strategic airlift fleet include the following:

!

!

!

!

!

Costs.

Budget Constraints.

Industrial Base Risk.

Aircraft Performance.

Optimal Fleet Mix.

Costs

Making an “apples-to-apples” comparison of C-5 and C-17 costs is complicated.

The scope and time frame considered (e.g., flyaway cost, procurement cost, life-cycle

cost), rate of production assumed, and procurement approach used (e.g., multi-year,

annual, or supplemental procurement) all affect comparisons. For example, it is

estimated 10 C-17s procured via annual congressional earmark cost approximately

75

Marcus Weisgerber, “Report Due in January 2009: Institute of Defense Analyses Submits

Airlift Study Plan to Congress,” Inside the Air Force, April 25, 2008,

[http://www.insidedefense.com/secure/defense_docnum.asp?f=defense_2002.ask&docnu

m=AIRFORCE-19-17-11].

76

Letter from William M. Solis (GAO) to IDA and DOD, “Defense Transportation: DOD

Should Ensure that the Final Size and Mix of Airlift Force Study Plan Includes Sufficient

Detail to Meet the Terms of the Law and Inform Decision Makers,” April 28, 2008, p. 3.

77

Ibid, pp. 6-7.

78

H.Rept. 110-477, Section 1046, December 6, 2007, pp.313-316.

CRS-18

$20 million more per aircraft than C-17s procured via multiyear contracts.79

Consequently, some may question whether it is appropriate to compare these costs

to those incurred by acquisitions included in annual Air Force budgets. Table 3

summarizes some factors to consider when comparing costs of C-5 modernization

with C-17 procurement.

Table 3. C-5 Modernization vs. C-17 Procurement

Average Procurement Unit Costa

Estimated Flying Hour Cost

c

Production Rate

Aircraft Flying Hours Remaining

RERP Entire C-5 Fleet

Buy More C-17s

$146.7 Millionb

$276.9 Million

$23,075

d

$11,330

~12 aircraft/ year

~15 aircraft/year

26,000 hours

30,000 hours

a. DOD Selected Acquisition Report (SAR), Defense Acquisition Management Information Retrieval,

C-17A (Dec. 2007 SAR, p. 21), and C-5RERP (Sept. 2007 SAR, pp. 16-17).

b. These costs have and will likely fluctuate over time. The procurement cost of future C-17s will

likely be lower than the average, as learning increases and fixed costs are amortized over a

longer production run.

c. Aircraft Reimbursement Rates (per Flying Hour) FY2007. Air Force Cost Analysis Agency, Cost

Factors Branch. Table A15-1.

d. Aircraft Reimbursable Rates (per Flying Hour) reflect amortization of modernization programs, but

not procurement costs. Because the C-5 AMP and RERP modernization programs are in their

early phases, these costs strongly affect the hourly cost to operate the C-5. The C-17 is not

implementing a modernization plans on the scale of AMP and RERP.

Institute for Defense Analysis (IDA) Study. The Air Force’s decision to

modernize all C-5 aircraft was informed by a March 2000 Institute of Defense

Analysis (IDA) study on the cost and reliability implications of various C-17 and C-5

force structure options. The idea of modernizing the C-5 to achieve improved

availability gained support in 1996 when the Air Force asked Lockheed Martin to

submit proposals to bring C-5 performance in-line with other air mobility assets. In

1997, IDA validated that the concepts proposed by Lockheed Martin could be cost

effective if near-term dollars were available to fund the modernization program.80

IDA noted that earlier studies indicated:

Upgrading the C-5 may be cost-effective if the C-5 is to be retained in the fleet

long enough, the larger question of whether money spent for improving strategic

airlift should be directed toward C-5 improvements or toward some other

improvements, such as adding more C-17s, or even some of both, is an issue.81

IDA measured the life-cycle cost (LCC) of nine alternatives for C-5

modernization and C-17. Findings are summarized in Table 4. However, at least

79

Conversation between SAF/AQQ and CRS, September 21, 2007.

80

Analysis of Alternatives for Out- and Over-Size Strategic Airlift: Reliability and Cost

Analyses, Institute for Defense Analyses, IDA Paper P-3500, March 2000, pp. 1-2.

81

Ibid., p. 1.

CRS-19

three assumptions have changed since the IDA study was published, causing some

to question the validity of the now seven-year-old study:

!

Analysis was based on C-17 procurement of 135 aircraft, compared

with the 190-aircraft program of record today.82

!

Analysis was based on modernization of the Air Force’s 126-aircraft

C-5 fleet, compared with the current 111-aircraft C-5 fleet today.83

!

IDA calculated a $5.7 billion cost for RERP.84 Using the 2.9%

discount rate IDA used in the study, this translates to a 2007 cost of

$6.96 billion — significantly below DOD’s September 2007

estimated cost of $17.5 billion.85

Table 4. Life-Cycle Cost (LCC) Estimates of Potential

Alternatives to Modernizing the Strategic Airlift Fleet

Alternative MTM/D

C-5A

RERP

upgrade

C-5B

RERP

upgrade

# of

C-17s

LCC

LCC

LCC

Discounted ThenConstant $B

$B

year $B

1

24.9

No

No

135

60.5

32.9

98.5

2

27.1

No

No

155

72.4

40.8

115.5

3

30.1

No

No

180

87.3

50.4

137.0

4

27.8

No

Yes

155

70.2

40.4

110.6

5

30.7

No

Yes

180

85.1

50.0

132.1

6

27.2

Yes

Yes

135

56.7

32.5

89.5

7

32.3

Yes

Yes

180

83.5

50.0

127.9

8

27.7

Retired

Yes

210

80.2

49.0

120.9

9

27.9

Retired

Retired

257

88.3

55.4

129.3

Source: IDA Paper P-3500, March 2000. Tables 2 and 3 combined and adapted by CRS.

Notes: All cost estimates expressed in $FY2000. Constant dollars allow comparisons over different

time periods without inflation. Discounted dollars are adjusted to account for the year in which funds

are expended. OMB discount factor of 2.9% per year used. Then-year dollars represent the estimated

actual outlay of funds through 2040, including inflation. MTM/D = million-ton-miles per day.

IDA found “... the least costly option was Alternative 6, a full upgrade to the

C-5 fleet with no additional C-17s,” and that “... the $5 billion required for the

upgrades in Alternative 6 more than pays for itself in reduced operating costs over

82

Ibid., p. 3.

83

Ibid., p. 6.

84

Ibid., p. 44.

85

Selected Acquisition Report, C-5 RERP, September 30, 2007, p. 9, from Defense

Acquisition Management Information Retrieval. Cost is shown in 2007 This Year dollars.

CRS-20

the 40-year period examined.”86 Skeptics might contend that Alternative 6 is no

longer a viable option because Congress has already funded a C-17 fleet of 190

aircraft. While some may question whether IDA’s study is still valid, others believe

it is still relevant to C-5 modernization and C-17 procurement decisions. For

example, a comparison of Alternatives 1 and 6 reveals the cost of a re-engined C-5

fleet may be lower than one without re-engining while also providing a higher

MTM/D capacity. In addition, a comparison of Alternatives 3, 5, and 7 — the

alternatives that most closely approximate DOD’s current program of record —

indicates that modernization of all C-5s maybe more cost effective and provide more

capability than modernizing no C-5s or only the C-5B fleets.

Rand Study. In 2005, the Rand Corporation completed a study proposing a

model to inform decisions about modernizing aging aircraft and procuring

replacements. The study specifically compared C-5A RERP with C-17 procurement

using the Air Force’s Total Ownership Cost as a measure. Like IDA’s study, some

may criticize Rand’s analysis for underestimating the cost of RERP by using a cost

of $75 million per RERP-modernized C-5A — approximately $18 million per

RERP-modernized aircraft below estimates found in the Air Force’s December 2006

SAR after adjusting with a discount factor of 2.9% per year. Second, the study was

unable to fully isolate C-5A cost factors from those of the C-5B. This could be

problematic if younger B-models masked higher operating costs potentially

associated with flying older A-models. As a result, the study’s authors viewed their

“findings as illustrative and suggestive, rather than definitive, particularly in light of

concerns with” C-5A cost parameters utilized in the study.87

Rand’s study found for C-5A RERP to cost less than new C-17s, RERP would

have to start prior to 2015. To some, this indicates beginning C-5A RERP earlier

makes the program more attractive than C-17 acquisition. When the first C-5A

begins RERP upgrade in 2014, the youngest A-model will be 41-years old.88 In 2004,

former commander of U.S. Transportation Command, General John Handy, stated,

“by 2012 it may be that the whole notion (of performing the RERP on the C-5As) is

overcome by events.” The A-models, he said, might be too far gone to be worth the

investment.89 Rand’s study also suggested the number of C-17s required to replace

C-5As was a second key consideration. Results indicated if 70 or more C-17s were

required to replace the C-5A fleet, then RERP becomes the lower-cost option.90

86

Analysis of Alternatives for Out- and Over-Size Strategic Airlift: Reliability and Cost

Analyses, Institute for Defense Analyses, IDA Paper P-3500, March 2000, p. 11.

87

Edward G. Keating, Don Snyder, Matthew Dixon, and Elvira N. Loredo, Rand

Corporation Project Air Force, Aging Aircraft Repair-Replacement Decisions with DepotLevel Capacity as a Policy Choice Variable, Santa Monica, CA, 2005, pp. xii-xiii.

88

Selected Acquisition Report, C-5 RERP, September 30, 2007, p. 12, from Defense

Acquisition Management Information Retrieval.

89

90

John A. Tirpak, “Saving the Galaxy,” Air Force Magazine, January 2004, pp. 31-35.

Edward G. Keating, Don Snyder, Matthew Dixon, and Elvira N. Loredo, Rand

Corporation Project Air Force, Aging Aircraft Repair-Replacement Decisions with DepotLevel Capacity as a Policy Choice Variable, Santa Monica, CA, 2005, p. xiii.

CRS-21

Budget

Both the IDA and Rand studies suggested life cycle costs savings favor C-5

RERP performed sooner rather than later by providing a longer period for the Air

Force to recoup its up-front investment. Likewise, testimony by both Lockheed

Martin and the Air Force suggests that a predictable schedule, although difficult to

achieve, is potentially a critical element to keeping program costs down over time.

The most efficient rate of RERP production is 12 aircraft per year. Obtaining and

sustaining this production rate over a longer period could save $6 billion, when

comparing the President’s Budget from 2003 and most recent Air Force RERP

profiles.91 The challenge of achieving this schedule appears to be primarily

budgetary. Some assert that more money will be required in the Air Force’s air

mobility account during the Future Years Defense Plan (FYDP) than currently exists

to keep C-5A modernization LCC below the LCC for C-17 acquisition.

Proponents of C-17 acquisition have suggested that retiring some C-5s early

could make funds available for additional C-17s. However, these funds do not “line

up” in the DOD budget. C-5 RERP procurement funds for FY2008 are only $253

million — just less than the cost of a single C-17. C-5 RERP funds in FY2009 are

$540 million — approximately the cost of two C-17s. Significant C-5 RERP funds

are not projected to be available until the end of the FYDP, and continued C-17

production is an FY2008 issue, given the imminent closure of the C-17 production

line. Therefore, if more C-17s are to be purchased in FY2008, room would need to

be found in the Air Force’s “base budget,” or Congress would need to add funds to

DOD’s FY2008 Global War on Terror (GWOT) funding request.

Figure 1 highlights how defense appropriations exempted from budget caps

(including “bridge funds” for overseas operations provided as separate titles in the

regular defense appropriations bills) have grown considerably in recent years, in both

absolute terms and as a proportion of overall defense spending. According to some,

this growth

reflects a progressive expansion of the kinds of equipment and operational

support that both the Defense Department and Congress have agreed to consider

as sufficiently urgent to warrant inclusion in emergency funding measures, even

though the funding may not meet definitions either of the narrowly defined

incremental costs of military operations, or of what constitutes an emergency by

congressional standards.92

91

Factors other than production rate may affect costs, making the degree of causality

uncertain.

92

CRS Report RL33900, FY2007 Supplemental Appropriations for Defense, Foreign

Affairs, and Other Purposes, by Stephen Daggett, Amy Belasco, Pat Towell, Susan B.

Epstein, Connie Veillette, Curt Tarnoff, Rhoda Margesson, and Bart Elias.

CRS-22

Figure 1. DOD Base Budget and GWOT

700

598.4

600

501

$ Billions

500

400

300

311 14

200

345

526

93.4

444

69

443

66

101

115

70

375

377

400

411

435

FY03

FY04

FY05

FY06

FY07

623.1

141.7

17

297

328

FY01

FY02

481.4

100

0

Base Budget

FY08

Supplementals Enacted

FY07 Supplemental Request

FY08 DoD Budget Request

FY08 GWOT Request

Totals

Source: FY2008 Global War on Terror Request. Department of Defense, February 2007, p.1.

Decisions to add funds to DOD’s FY2008 GWOT request for C-17s are likely

to be influenced by a wider debate on whether some of the large increase in weapons

procurement requested in the past supplemental appropriation bills goes beyond the

expanded definition of war-related requirements that some have come to accept.

Those opposed to expanded use of emergency supplementals may argue adding funds

to the FY2008 GWOT request is inappropriate because the rationale for doing so is

not related to the immediate conflict. Instead, the arguments proffered by the Air

Force pertain to long-term savings. Those in favor of expanded use of supplemental

appropriations may point to congressional action in the FY2007 supplemental, where

Congress provided over $1 billion more than requested for DOD procurement.

C-17 Production Line and Risk

The C-17 production line is scheduled to close without additional DOD orders

for FY2008. Arguments for continued C-17 production often revolve around the

concept of risk. Questions commonly asked in discussions that address the risk of

closing America’s only strategic airlift production line include the following:

!

!

!

!

!

What alternative strategic airlift platforms are in production?

How many C-17s would DOD have to purchase to keep the C-17

line open?

Can the C-17 line be shutdown in such a way that would allow it to

reopen later?

What are the long-term costs of keeping the C-17 production line

open?

What are the long-term force structure implications of continuing C17 production?

CRS-23

Other Strategic Airlifters. Currently, the C-17 is the only strategic airlift

aircraft specifically designed for military applications still in production. European

Aeronautic Defence and Space (EADS) Company is nearing production of the

A400M that some tout as a potential strategic airlift competitor. Others counter that

with less than one-half the payload capacity of a C-17 and roughly one quarter the

payload capacity of a C-5, the A400M is too small to meet the Air Force’s strategic

airlift needs.93 Reportedly, the Air Force has asked EADS for data on the freighter

version of the A380 as a potential C-5 replacement.94 While an A380 is capable of

carrying a larger payload than a C-5, like most commercial aircraft, its airframe

design has been optimized for carrying passengers and pallets. This may lead some

to argue it is not suitable for moving outsized and oversized cargo like the C-5 or C17.

C-17 Production Requirements. Boeing representatives say that depending

on their success in negotiating near-term international sales of the C-17, Boeing will

require funding for between 14 and 18 Globemasters in FY2008 or the production

line will begin to shut down in January or February 2008 with a full shutdown in

mid-2009.95 However, to date, Boeing officials have kept the C-17 line open in

anticipation of additional orders through the anticipated FY2008 supplemental war

appropriations bill.96

Smart Shutdown Option. If Congress foregoes additional C-17

procurement, a decision will have to be made regarding maintaining capacity to build

C-17s in the future. When planning for the C-17 line’s end, the Air Force budgeted

$650 million to be spent shutting down the line in a manner that would facilitate its

restoration if necessary. The advantage of this strategy is that the government pays

a one-time sum to hedge its bets. A disadvantage of a “smart shutdown” is that in

addition to the monetary cost of storing and maintaining tooling necessary to build

future C-17s, there is also risk associated with losing the expertise of the current C17 production workforce. Some believe that Boeing may sell its production site at

Long Beach, California, if the C-17 line closes. Having to restart C-17 production

at a new location would likely further increase costs.97 A comparison of estimated

costs over different time spans between a “smart shutdown,” followed by line

restoration, and keeping the C-17 line open via additional purchases would be useful.

93

According to EADS, the max payload of an A400M is 37 tons, or approximately 74,000

pounds. See [http://www.eads.com/1024/en/businet/miltrair/a400m/teca400m.html].

94

Stephen Trimble, “Exclusive: US Considers Airbus A380 as Air Force One and

potentially a C-5 replacement,” Flightglobal.com, October 17, 2007.

95

Telephone conversation between CRS and Boeing officials, February 26, 2007. “Boeing

Announces C-17 Line May End in mid-2009; Stops Procurement of Long-lead Parts,” News

Release, Boeing Integrated Defense Systems, March 2, 2007.

96

Damian Kemp, “Boeing Remains Confident C-17 Production Will Be Extended,” Jane’s

Defense Weekly, February 6, 2008, at [http://www.janes.com].

97

“C-17 Lobbying Picks up in Wake of Commerce Department Report,” Defense Industry

Daily, February 22, 2006, at [http://www.defenseindustrydaily.com/c17-lobbying- picks-upin-wake-of-commerce-dept-report-01916].

CRS-24

Long-term Cost Considerations. Some argue that purchasing aircraft

predominantly to keep the line alive, while safeguarding rapid production capability,

also incurs billions of dollars of costs over the aircraft’s lifetime. However, these life

cycle costs could be offset to some degree if older aircraft were retired. When DOD

officials defended the FY2006 budget decision to end C-17 procurement, they argued

keeping the C-17 production line open “would be a smart thing to do” from a pure

risk perspective, but “the cost would be prohibitive” given the other airlift

procurement programs in Air Force plans.98 In a 2005 study on mobility, the Defense

Science Board (DSB) also considered risk an issue to consider in determining the

total number of C-17s to purchase.

The task force understands that each year of additional (C-17) production beyond

2008 would represent an additional $2.4 billion acquisition and $2-3 billion life

cycle cost commitment, which the department must weigh against other warfighting capabilities it could not acquire. However, in view of the prominence of

organic strategic airlift in enabling rapid response to crises, the task force

believes it is prudent to keep options open for the acquisition of additional C17s.99

Long-Term Force Structure Implications. While decisions about C-5

modernization and C-17 acquisition must be made near-term, there are long-term

implications to these decisions. For example, Air Force leaders have stated the C-5

RERP will enable C-5Ms to remain in service until 2040.100 In 2040, C-17s will

average 30-40 years old, potentially reaching the end of their service life. Will C-17s

be viable candidates for a service life extension program after years of heavy use?

Will pursuing DOD’s current program of record result in DOD’s entire strategic

airlift fleet reaching the end of its service life at about the same time? When is the

optimal time to shift focus to future technology that may be better tailored to support

the very dynamic requirements expected to be driven by Army transformation?

Performance

Some view the C-17 as better-suited than the C-5 for counter-insurgency

operations in parts of the world with limited aviation infrastructure. A Cold War

model of using strategic airlifters to transport large amounts of materiel from major

stateside aerial ports to theater mobility hubs before trans-loading into smaller intratheater aircraft for delivery into forward operating locations is no longer the most

expedient airlift method. C-17s, able to operate in hostile and austere environments,

remove long-standing seams traditionally woven together by strategic C-5s and

tactical C-130s. Air mobility leaders often tout this concept of “velocity” as the

98

Michael Sirak, “Senior DOD Officials Defend Decision To Halt C-17 Production At 180,”

Defense Daily, February 10, 2006.

99

Defense Science Board Task Force on Mobility, Office of the Under Secretary of Defense

(AT&L), September 2005, p. 14.

100

The Honorable Sue C. Payton, Assistant Secretary of the Air Force (Acquisition), Written

Statement to the Senate Homeland Security and Governmental Affairs Committee, Federal

Financial Management, Government Information, Federal Services, and International

Security Subcommittee Hearing on Military Airlift Costs, September 27, 2007, p. 3.

CRS-25

ultimate measure of success for airlift.101 Some argue that velocity is improved by

having a larger, mid-sized fleet capable of generating a larger number of sorties and

supporting more point-to-point service.

The C-5’s unique capabilities may also argue for its continuation, potentially at

the expense of additional C-17s. In a period where DOD’s force posture is moving

from forward basing to expeditionary, it may be unwise to prematurely retire aircraft

in today’s inventory. In addition to its capability to carry approximately 60% more

cargo than a single C-17, the C-5 can carry several unique loads that do not fit on a

C-17. However, it is not clear how many C-5s are needed to meet DOD’s

requirement to carry loads that cannot fit on C-17s. Just as the C-17 can improve

airlift velocity by providing planners with the ability to generate more sorties by

supporting more point-to-point pairings, the C-5 is superior in moving bulk.102

General Handy recalled, “in this last conflict [there were] many, many times when,

frankly, the only way to unclog [Charleston AFB, SC, Dover AFB, DE, or Ramstein

Airbase, Germany, was] to get the C-5 in there in sufficient numbers ... and literally,

in a weekend, ... clean out all three aerial ports.”103 Figure 2 provides a comparison

of selected airlift loads that can be carried on C-17s and C-5s.

Figure 2. Comparison of C-5 and C-17 Capabilities

Source: FY06 Congressional Overview (C-5, C-130J), “C-5 Operations During Iraqi Freedom,”

Lockheed Martin Aeronautics Company, p. 18.

101

Michael Sirak, “Payton: Air Force Expects First C-5 RERP Production Contract in Early

2008,” Defense Daily, vol. 235, issue 1, October 1, 2007.

102

Air transportation it typically conducted using two models: hub and spoke or point-topoint. Point-to-point service is faster because it takes cargo directly from origin (spoke) to

destination (spoke) avoiding delays associated with connecting through major ports (hubs).

103

John A. Tirpak, “Saving the Galaxy,” Air Force Magazine, vol. 87, no. 1, January 2004,

[http://www.afa.org/magazine/jan2004/0104galaxy.asp].

CRS-26

Fleet Mix

How to maintain the optimal fleet mix of the Air Force’s strategic airlift fleet

is often debated in Congress. In deliberations, three issues are often discussed

including:

!

!

!

The potential for turning the C-5 fleet into a low density/high

demand (LD/HD) asset

The merits of maintaining a single-aircraft type fleet against the

perceived risk of a potential fleet-wide grounding.

The need to balance the size of the Air Force’s organic fleet while

maintaining incentives for commercial air carriers to participate in

the Civil Reserve Air Fleet (CRAF).104

Low Density/High Demand (LD/HD) assets. For many, potential cost and

capability concerns intersect when reductions to the size of the C-5 fleet are

discussed. DOD’s program of record maintains a fleet of over 100 C-5Ms through

the 2040s. If the C-5As are not modernized, some believe the Air Force will be left

with a fleet of approximately 50 C-5Ms as older C-5As are potentially divested from

the Air Force’s inventory. Some would argue that this would create another LD/HD

challenge for the Air Force because of the relatively small number of C-5Ms that

would remain in the inventory. Both the 1997 and 2001 Quadrennial Defense

Reviews identified the challenges of operating and maintaining small aircraft fleets

that are heavily used in peacetime and in war. Both studies recommended changes

to asset management in order to reduce the prevalence of LD/HD aircraft fleets.

Likewise, Air Force leaders have taken steps, such as implementing the

Expeditionary Aerospace Force (EAF) construct, in part to mitigate the LD/HD

problem. Conversely, others might argue that if the tonnage capacity of retired C-5s

was replaced by C-17s, then a smaller C-5 fleet would not be in high demand as long

as enough C-5Ms were retained to move bulk cargo shipments between air mobility

hubs and large cargo loads unable to fit on smaller C-17s.

Homogeneous Strategic Airlift Fleet. Some voice concern that a fleet

composed entirely of one model of aircraft is less robust than a fleet composed of two

aircraft types, pointing out that if one aircraft type is grounded for safety, the other

can still fly. Others argue homogeneous fleets offer potentially significant savings

in operations, training, and maintenance costs. Those that hold this view might point

to Southwest Airlines — an airline that has turned an enviable string of profitable

years in part by using a homogeneous fleet designed to minimize maintenance,

training, and operating costs. Likewise, the bulk of DOD’s intra-theater airlift fleet

has been composed of just C-130s for decades.

Organic Fleet Size Impact on the Civil Reserve Air Fleet. Some

believe there is a need to maintain a balance between DOD’s organic airlift capability

and the Civil Reserve Air Fleet (CRAF) program. Under the CRAF program,

commercial carriers agree to make their commercial airliners available to DOD to

104

See CRS Report RL33692, Civil Reserve Air Fleet, by Christopher Bolkcom and William

Knight.

CRS-27

enable surge airlift operations in exchange for a portion of DOD’s airlift business

during peacetime. During congressional testimony General Schwartz, cautioned that

too large of an organic airlift fleet could potentially hurt the CRAF program in the

future when he stated,

One of the things that you hold me accountable for is sort of maintaining the

balance between the organic fleet and the commercial capability. And as I

mentioned in my opening remarks, I caution about overbuilding the organic fleet;

because if that occurs, it can competes in peace time with that preference cargo,

the incentives that we offer our commercial partners. And so that’s one of the

reasons that I believe 205 is the right number of C-17s.105

Fleet Mix Options for C-5 Modernization/C-17

Acquisition

As the C-17 production line wanes, pressure is building to procure more aircraft.

In effect, this brings long-term Air Force funding for C-17 production into direct

competition with C-5 modernization. However, there are strong arguments for both

programs, and viewing them from this “either/or” perspective may be unnecessary

and counter-productive. Because the C-17 can perform both tactical and strategic

airlift, it also competes to some degree with the C-130J for funding. Thus, decisions

on C-130 recapitalization affect strategic airlift. Preferably, air mobility programs

should be developed, planned, funded, and executed in a joint and interdependent

way. Below are five commonly proposed tradeoffs between C-5 modernization and

C-17 procurement, with some pros and cons for each.

Modernize All C-5s and Purchase Additional C-17s

Advocates of this option might believe the current Mobility Capabilities Study

(MCS) underestimated strategic airlift requirements or accepted too much risk. Some

in Congress have encouraged DOD to procure more C-17s than are currently planned,

arguing airlift needs are increasing.106 For example, General Schwartz recently stated

that he believes the “sweet spot” for the strategic airlift fleet is 205 C-17s and 111

fully modernized C-5s.107 These arguments are often based on planned force

structure increases or Army plans to deploy faster that may foreshadow additional

strategic airlift requirements. Finally, proponents might cite the economic and

industrial benefits of continuing the C-17 production line. For example, a longer

production run might allow potential foreign or civilian sales to come to fruition and

provide a hedge against future uncertainty. One might also assert the C-17’s

105

Transcript from the Hearing of the Senate Armed Services Subcommittee on Seapower

on Fiscal Year 2009 Budget for the Department of Defense Strategic Lift Programs, March

12, 2008 obtained through [http://www.cq.com].

106

Gail Kaufman, “USAF C-17s May Come Earlier Than Requested,” Defense News,

March 29, 2004.

107

Amy Butler, “Schwartz Says No to C-17 Line Closure,” Aviation Week and Space

Technology, November 7, 2007, at [http://www.aviationweek.com].

CRS-28

capability to perform tactical airlift missions justifies continued production at the

expense of C-130 buys. Others could argue adding dollars to the strategic airlift

portfolio will pull scarce resources from higher priority programs in the zero-sum

gain DOD budget when there is no quantified requirement present. Likewise, some

DOD leaders caution against building too much strategic airlift capacity, as General

Schwartz recently testified:

In terms of organic capacity, too much aluminum is just as counterproductive as

not enough. We should guard against overbuilding the organic fleet to the

detriment of other strategic necessities, such as modernizing the aging tanker

fleet or the viability of our commercial partners.108

Modernize All C-5s and Halt Acquisition of the C-17

This option was DOD’s program of record until DOD cancelled the RERP for

additional C-5As. Advocates of this approach note that DOD has not requested more

C-17s during the budget process. Likewise, some assert that there are no validated

requirements to justify purchasing additional C-17s for the tactical airlift role.

Further, some state this option is backed by both the most recent MCS and the 2000

IDA study as the most cost effective solution.109 Others counter that recent cost

growth has invalidated C-5 RERP cost assumptions used in IDA’s analysis.

Opponents also criticize this approach because it allows the C-17 production line to

shut down before operational testing validates whether C-5As can reach availability

and reliability rates planned for in AMP and RERP. Further, some fear without the

competitive option of C-17 buys, future C-5 RERP cost may soar.

Forego RERP on Some or All C-5s and Buy More C-17s

This option appears to most closely resemble DOD’s current program of record.

Another alternative is to accept the current mission-capable rates and availability of

the C-5 fleet, but to invest some C-5A RERP dollars into additional C-17

procurement. Some favor this option because it preserves the unique outsize cargo

capability of the C-5, keeps the C-17 production line open and allows DOD to move

to a less risky point on the continuum established in the most recent MCS. However,

it is unclear how many C-17s would be required to fill the airlift gap created by not

improving C-5 reliability. Some may argue that the 10 C-17s Congress provided the

Air Force with FY2007 funds is sufficient to compensate for the loss of one C-5 as

a result of an accident, and DOD’s decision to forego RERP on remaining C-5As.

Skeptics also assert this option runs counter to analysis in the 2000 IDA study.

Table 5 summarizes the IDA study alternatives that compared the purchase of 180

C-17s with various mixes of C-5 fleets.

108

Hearing of the Senate Homeland Security and Governmental Affairs Committee, Federal

Financial Management, Government Information, Federal Services, and International

Security Subcommittee on Military Airlift Costs, September 27, 2007.

109

Analysis of Alternatives for Out- and Over-Size Strategic Airlift: Reliability and Cost

Analyses, Institute for Defense Analyses, IDA Paper P-3500, March 2000.

CRS-29

Table 5. Comparison of 180 C-17s with Various C-5 Fleets

C-5A

RERP C-5B RERP

# of

Alternative MTM/D upgrade upgrade

C-17s

LCC

Constant

$B

LCC

LCC

Discounted Then$B

year $B

3

30.1

No

No

180

87.3

50.4

137.0

5

30.7

No

Yes

180

85.1

50.0

132.1

7

32.3

Yes

Yes

180

83.5

50.0

127.9

Source: Extracted from IDA Paper P-3500, March 2000. Tables 2 and 3 combined and adapted by

CRS.

Note: All cost estimates expressed in $FY2000.

Although the IDA study is dated in many ways, a closer examination of the three

alternatives that hold the number of C-17s constant at a total acquisition program

similar to DOD’s current program of record of 190 C-17s may prove helpful. Based

on the assumptions IDA examined, fully modernizing all C-5s produced the highest

airlift capacity in terms of million-ton-miles per day for the lowest life cycle costs.

However, it is not clear where the near-term money would come from to keep C-17

production going, nor whether cost assumptions used in the IDA study invalidate this

comparison.

Replace All C-5As with C-17s

DOD could also replace all C-5As with C-17s. A principal advantage of this

approach is investing budget resources into new aircraft thereby facilitating

recapitalization of the Air Force’s aging fleet. Some believe that this might provide

a more flexible airlift fleet than DOD’s current program of record and would closely

mirror Air Force plans prior to being faced with C-5 retirement restrictions from

Congress.110 However, some contend that this option runs counter to analysis

conducted by both the Rand Corporation and IDA. Others point out that this option

would likely take resources from potentially higher DOD acquisition priorities. Like

the “30/30” proposal discussed below, murkiness of requirements as defined in the

latest MCS makes it unclear how many C-17s would be required to replace retiring

C-5s. Further, it is also unclear whether this approach would leave DOD with

sufficient C-5s for cargo that can only be carried by the Galaxy or that would

optimally be transported on a C-5.

Replace 30 C-5As with 30 C-17s

In early 2007, senior Air Force officials proposed buying 30 additional C-17s

instead of modernizing 30 C-5As. Likewise, it was reported Boeing provided the Air

Force with an unsolicited bid for a multiyear purchase of 30 Globemasters purchased

at a rate of 10 per year. According to the report, the cost of purchasing 30 C-17s and

retiring 30 C-5s was roughly equivalent — “couple hundred million dollars apart,”

110

U.S. Representative Jim Saxton, “There’s More To The Story,” Washington Post,

October 30, 2007, p. 14.

CRS-30

but where the Air Force would find funds for this proposal is unclear.111 Proponents

of this idea argue it would allow the Air Force to retire the oldest or poorest

performing A-models and invest in the youngest portion of the C-5 fleet — the

portion that has the most time to return dividends on the up-front RERP investment.

Opponents of this option contend this approach is premature because operational

testing of the first A-model upgraded to the C-5M configuration is incomplete.

Likewise, because of budget pressures, a “30/30” proposal may only be executable

as an add to the FY2008 GWOT request.112 Furthermore, skeptics may point out the

Air Force has not proven that there is a subset of the C-5A fleet that chronically

underperforms the remainder of the fleet.

Replacing 30 C-5 aircraft with 30 C-17s might also present airlift capability

issues. Airlift capability can be measured in different ways, but it appears clear that

on a one-for-one basis, the C-5 can carry more outsize cargo and more cargo pallets

than the C-17. In many cases, C-5s can carry twice as much of a given piece of

outsize cargo as the C-17.113 The C-5’s advantage in size is offset, to a degree, by

lower availability. Thus, Figure 2 does not compare accurately the two aircrafts’

capabilities over multiple sorties. Table 6 illustrates the effect the C-17’s superior

mission capable rate has on airlift capabilities by providing a simplified comparison

of 30 C-5As, 30 C-5Ms, and 30 C-17s moving typical wartime loads over an

intercontinental distance in a single day.

Table 6. Typical Load Capabilities of 30 C-5A, C-5M, and C-17

Airlifters Considering Expected Mission Capable Rates (MCR)

C-5A

(50% MCR)

C-5M

(75% MCR)

C-17

(85% MCR)

M1A1 Abrams

30

45

25

M2/M3 Bradley

60

90

51

AH-64 Apache

90

135

76

Patriot Missile Launcher

30

45

25

HMMWV TOW

210

315

255

Pallets

540

810

459

3,915,000 lbs.

5,872,500 lbs.

4,204,950 lbs.

Maximum Payload

Source: CRS. Figures extrapolated from data provided by Lockheed Martin.

111

Carlos Munoz, “As Boeing Submits C-17 Bid to Service ... Air Force Floats Multiyear

Globemaster Buy to Defense Lawmakers,” Inside the Air Force, April 20, 2007, at

[http://www.insidedefense.com/secure/defense_docnum.asp?f=defense_2002.ask&docnum

=AIRFORCE-18-16-1].

112

113

CRS interview with SAF/FML April 27, 2007.

Outsize cargo is defined by DOD as cargo that exceeds the dimensions of oversized cargo

and requires the use of a C-5 or C-17 aircraft or surface transportation: a single item that

exceeds 1,000 inches long by 117 inches wide by 105 inches high in any one dimension.

CRS-31

Other Strategic Airlift Options

At least four other approaches have been suggested to address DOD’s strategic

needs. These approaches include increasing use of commercial aircraft, encouraging

foreign or civilian sales of C-17s, bolstering reliance on pre-positioning of

equipment, leveraging potential KC-X airlift capabilities, and pursuing airships. Like

the tradeoffs of buying C-17s compared with upgrading C-5s, each of these options

has strengths and weaknesses. These options are not mutually exclusive from the C5/C-17 debate, as some might be pursued concurrently.

Increased Use of Commercial Aircraft

DOD currently contracts with civilian carriers to move passengers and cargo.

Under the Civil Reserve Air Fleet (CRAF) program, DOD can also obtain use of

additional civilian airliners to augment the Air Force’s organic strategic airlift fleet.114

Some suggest that DOD should increase the use of commercial aircraft, which offer

many advantages over dedicated military aircraft. Commercial aircraft are numerous,

tend to have longer range, and are typically less expensive to buy and operate than

most military aircraft. However, civilian aircraft also have limitations. Most cannot

carry outsized cargo, conduct special missions like airdrops, or support special

operations. Also, they tend to congest airfields because of longer ground times

resulting from a lack of roll on/roll off capability and reduced ramp

maneuverability.115 Further, potential hostile fire effectively deters civilian crews

from entering combat zones.

It is noteworthy that during Operations Enduring Freedom and Iraqi Freedom,

DOD has leased Russian An-124 aircraft to carry outsize and oversize cargo. The

An-124 Condor is a strategic lift aircraft larger than, but comparable to, the C-5. It

also appears that DOD use of An-124 missions is accelerating. Some contend that

while C-5s may not be as modern as C-17s, or able to operate from as many runways,

the fact that DOD is outsourcing missions to Russian aircraft indicates C-5s offer

important capabilities other U.S. aircraft may not be able to satisfy. In contrast, it is

possible An-124 contract missions may be the result of the convenient availability

of relatively low-cost airlift near a busy theater of operations. Since the Air Force

retired 14 C-5s in 2004, the number of An-124 missions has increased. During

congressional testimony, General Schwartz explained that costs associated with

transporting Mine Resistant Ambush Protected (MRAP) vehicles to Iraq were about

$130,000 per MRAP for both C-5s and An-124s — and less expensive than moving

them on C-17s. However, he suggested An-124 reliability made it the logical choice

stating, “because kids are in jeopardy, I’m not going to have airplanes broke in

Europe or somewhere else when I have an alternative which, to date, has not resulted

114

See CRS Report RL33692, Civil Reserve Air Fleet, by Christopher Bolkcom and William

Knight.

115

Robert C. Owen, Professor, Embry-Riddle Aeronautical University-Daytona Beach, FL,

“Transport Trade-offs,” written in response to a previous letter to the editor in

“Correspondence,” Aviation Week and Space Technology, October 8, 2007, p. 8.

CRS-32

in a late delivery.”116 Figure 3 illustrates that the Air Force has spent nearly $170

million since FY2002 for An-124 missions.

Figure 3. Number and Cost of An-124 Missions Contracted by Air

Mobility Command

140

120

100

80

#Missions

$Millions

60

40

20

0

02

03

04

05

06

07

FY

TOTAL: 434 missions. $168,434,265.00

Source: USAF Air Mobility Command, International Airlift Procurement Branch, February 23, 2007.

Perhaps DOD is already exploiting commercial aircraft to its maximum

potential. The Air Force indicates in the MRS-05 study that it could not use the 20.5

MTM/D of CRAF capability assigned for most of the halt phase of the wartime

scenarios studied, because of the limitations listed above. Likewise, planning to

utilize foreign-owned contract carriers during contingency operations might be risky

because of potential political constraints a foreign carrier’s government may impose

on their use.

Encourage Civilian/Foreign C-17 Sales

Civilian sales and international exports of C-17s are seen as potentially

complementary methods of keeping the C-17 production line open and reducing the

per-unit production costs. Likewise, foreign military sales could potentially reduce

allied nations’ demand on U.S. strategic airlift platforms in future operations.

BC-17X. One civil aircraft initiative that may have some utility for the military

is the effort by Boeing, with the Air Force’s endorsement, to market a civilian version

of the C-17. Appropriations conferees have directed the Air Force to study options

for commercializing the heavy, outsized aircraft for incorporation into the CRAF.117

However, is there sufficient market for these aircraft to be commercially viable? In

May of 2007, Boeing’s C-17 Program Manager, Dave Bowman, stated, “we have

116

Hearing of the Senate Homeland Security and Governmental Affairs Committee, Federal

Financial Management, Government Information, Federal Services, and International

Security Subcommittee on Military Airlift Costs, September 27, 2007.

117

H.Rept. 108-553, p. 77.

CRS-33

several customers with money that have given us requests for proposals.”118 Some

industry studies suggest that a commercial market for up to 10 C-17s may exist for

use in heavy industry, mining, or similar endeavors, while Boeing believes there is

market potential of “upwards of 100 aircraft.”119 The Air Force and Boeing have

considered a number of different potential strategies to exploit or expand this

potential market.

If the Commercial Application of Military Airlift Aircraft (CAMAA) were

pursued, DOD would loan money directly to companies or guarantee their financing

to enable purchase of C-17s from Boeing. Civilian owners of the BC-17X (as the

commercial variant would be called) would make the aircraft available to DOD in

time of need, much like CRAF. The Air Force proposed several options to “sweeten

the deal,” such as helping companies find customers who need outsized cargo

delivery and providing them monthly military business paid for at commercial rates.

In addition to having access to these aircraft, the Air Force and civilian users could

benefit, because building BC-17Xs for civilian use would effectively exploit excess

production capacity and help lower the per-unit cost of aircraft bought by DOD.120

In October 2002, it was reported that DOD’s Business Initiatives Council had

approved CAMAA as an “efficiency measure.”121 However, DOD has reportedly

cooled to this approach. In an April 2006 letter to Congress, Secretary Michael

Wynne wrote the Pentagon’s recent reviews of mobility requirements determined

there is no need for an outsized, commercial aircraft in CRAF.122

A second strategy could be for the Air Force or the General Services

Administration (GSA) to sell used C-17s to commercial companies. Commercial

clients would, presumably, be interested in used aircraft because they would cost less

than new aircraft. As part of the arrangement, commercial owners would make the

aircraft available to DOD in times of crisis, thus increasing the potential inventory

of outsize/oversize airlifters available to DOD. The Air Force could use the proceeds

from the sales to help finance the purchase of new C-17s.

A third approach might allow the Air Force to trade older C-17s to Boeing and

receive credit toward the purchase of new ones. Reportedly, the Air Force prefers

this option over selling aircraft directly to commercial companies because it would

avoid potential costs with certifying C-17s for civil application.123 Some analysts

118

Guy Norris, online at Flightglobal.com, May 23, 2007.

119

Ibid.

120

Amy Butler, “Commercial C-17 Buys Would Stabilize Cost, Enhance Reserve Air Fleet,”

Inside the Air Force, December 22, 2000; Christian Lowe, “Air Force Issues Draft

Solicitation for Civilian C-17s,” Defense Week, July 9, 2001.

121

“DOD Business Initiatives Council Supports C-17 ‘Commercialization,’” Defense Daily,

October 16, 2002, p. 8.

122

Jason Sherman, “Wynne: No Room for Commercialized C-17 in Civil Reserve Air Fleet,”

Inside Defense.com, April 6, 2006.

123

Cynthia Di Pasquale, “Pentagon Proposes Trading in Older C-17s to Boeing to Grow

CRAF,” Inside the Air Force, April 22, 2005.

CRS-34

might question why the Air Force would want to sell any of its C-17s if there is a

growing requirement for them.

The feasibility of these strategies is unclear as few companies may wish to risk

investing in expensive outsize cargo aircraft. Conversely, one private company —

Cargo Force — has publicly stated a desire to purchase 25-80 C-17s, but alleges that

DOD is blocking deals fearing commercial sales may dampen Congress’s interest in

funding more C-17s for the Air Force.124 Some also question Congress’s appetite for

unconventional financing and procurement strategies in the aftermath of the KC-767

tanker lease proposal.125 Creative attempts to establish an outsize/oversize

commercial market using C-17s would likely have to be done without DOD incurring

financial liability.126

Foreign Sales. Allied nations also have strategic airlift requirements that

could potentially be satisfied by the C-17. In August 2006, the Royal Australian Air

Force awarded Boeing a $780 million contract for four C-17 aircraft.127 Likewise,

Canada is also importing four C-17s.128 Whether the C-17 is successful in the export

market will be determined in part by its competition. The most prominent competitor

is EADS’s A400M aircraft. Having long recognized a deficit in long-range airlift

capabilities, several NATO countries (Germany, France, Spain, Britain, Turkey,

Belgium, and Portugal) plan on purchasing the jointly developed A400M turboprop

airlifter. This program has experienced numerous perturbations in schedule and

budget. In December 2002, for example, Germany announced that it would reduce

its planned acquisition of the A400M from 73 to 60 aircraft. In October, 2007,

EADS informed A400M customers to expect delivery delays of 6 to 12 months.129

British defense officials view the C-17 as an asset that can be used in rapidreaction operations. The United Kingdom’s Strategic Defense Review of July 1998

first indicated that the Ministry of Defense might lease or buy several C-17s to meet

air mobility requirements of Britain’s Rapid Reaction forces. In August 2006, it was

reported that the U.K.’s Royal Air Force had committed to purchasing outright four

C-17s it had leased from Boeing and would purchase a fifth aircraft in 2008.130 In

July 2007, the United Kingdom Ministry of Defense announced purchase of a sixth

124

Dave Ahearn, “Air Force maneuvers to Ensure it Gets 220 C-17s — Analyst,” Defense

Today, March 7, 2005.

125

See CRS Report RL32056, The Air Force KC-767 Tanker Lease Proposal: Key Issues

for Congress, coordinated by Christopher Bolkcom.

126

Di Pasquale, op.cit.

127

“Boeing to Provide Four C-17s to Australia Air Force,” Defense Daily, August 1, 2006.

128

“Canada to Spend $1.3 billion for Four Boeing C-17 Globemasters,” Defense Daily,

September 15, 2006.

129

Press Release, “EADS informs A400M Customers about Revised Delivery Schedule,”

Amsterdam, October 17, 2007.

130

“More C-17s,” Aerospace Daily & Defense Report. August 8, 2006.

CRS-35

C-17 to fill strategic airlift needs.131 Britain had “conditionally committed” to

purchase 25 Airbus A400M transports following the C-17 lease, but it is unclear

whether the U.K. will purchase additional C-17 instead of the A400M aircraft.

Continued delays could drive customers to alternatives like the C-17 or C-130J.

Table 7 summarizes C-17 foreign military sales.

Table 7. C-17 Foreign Sales

County

C-17 Orders

Australia

4

Canada

4

United Kingdom

6

Source: Defense Industry Daily, “Defense Industry Daily Focus: The Global C-17 Sustainment

Partnership,” September 13, 2007, at [http://www.defenseindustrydaily.com].

In September 2006, NATO announced a group of member nations had signed

a letter of intent to jointly purchase up to four C-17 aircraft for NATO’s Strategic

Airlift Capability (SAC).132 These aircraft are intended to be shared by member

nations in what amounts to a time-share plan.133 To support this effort, Section 1032

of the FY2008 Defense Authorizations Act allowed the Air Force to send one C-17

from the current inventory in addition to NATO’s proposed buy.134 In return, the Air

Force would receive an amount of time equal to one C-17 (approximately 1,000

flying hours annually) from the proposed program to meet current and future airlift

requirements. DOD notified Congress in May 2008 of the possible sale of two C-17s

to the NATO SAC.135

Some Persian Gulf states have also reportedly expressed interest in the C-17

with an eye toward increased participation in humanitarian or disaster relief missions.

For example, reportedly Qatar has agreed to purchase two C-17s with options for two

additional aircraft.136 As with the proposed NATO arrangement, C-17s could be

131

United Kingdom Ministry of Defense Press Release, July 27, 2007, online at

[http://www.mod.uk/DefenceInternet/DefenceNews/EquipmentAndLogistics/Browne

PurchaseOfExtraC17WillsignificantlyBoostUkMilitaryOperations.htm].

132

Nicholas Fiorenza, “NATO pools resources to buy C-17s,” Jane’s Defence Weekly,

September 13, 2006.

133

Each C-17 will be programmed to fly 1,000 hours yearly. Participating nations will share

costs based on the number of flying hours reserved for annual utilization.

134

H.Rept. 110-477, Section 1032, December 6, 2007.

135

Richard J. Millies, Deputy Director of Defense Security Cooperation Agency, Letter to

The Honorable Nancy Pelosi, May 9, 2008, on-line at

[http://www.insidedefense.com/secure/data_extra/pdf7/dplus2008_1462.pdf].

136

Amy Butler, “Qatar Lined Up to Purchase C-17, Program Source Says,” Aerospace Daily

and Defense Report, February 25, 2008, p. 5.

CRS-36

purchased by individual states or as part of a consortium.137 If these sales come to

fruition they would represent a significant boost for the Globemaster’s export

prospects.

Bolster Reliance on Pre-positioning of Equipment138

Potential risk incurred by ending C-17 production is not apportioned solely over

the airlift fleet. Long-range cargo aircraft are only one component of a larger military

mobility system. While aircraft offer advantages over other transportation modes,

such as speed and flexibility, these characteristics may potentially be offered by a mix

of other assets. Both the Defense Science Board and the Congressional Budget

Office (CBO) recommended that DOD improve its mobility capabilities by increased

investments in afloat pre-positioning of equipment, not by large investments in fixedwing long-range airlift. For example, the DSB found that

investments now in intermediate staging bases, more and improved force and

sustainment pre-positioning and high-speed, intratheater vessels capable of

austere port access could add significant new capabilities to enable land force

deployments and meet a variety of contingencies. These investments need to be

complemented by incremental investments in aerial tankers and possibly in

strategic airlift.139

Both the DSB and CBO found pre-positioning equipment offered opportunities

to increase delivery velocity. For example, the DSB found that “pre-positioning is

the sole component of the mobility system that can deliver employable

heavy/medium land forces early in a campaign.”140 CBO added, “Prepositioning sets

of unit equipment offers greater improvements in the promptness of cargo deliveries

than the other options that CBO examined” such as increasing airlift and fast sea-lift

capabilities.141 Further, “increasing the number of existing ships and aircraft would

offer very limited improvements in the promptness of unit deliveries during large

deployments.”142

Further, there are some instances where an increased reliance on strategic airlift

could exacerbate logistical choke-points potentially slowing the deployment of

forces. Often, the transportation problem is not too few aircraft, but too few airfields

or poor infrastructure. A study conducted by the Army’s Military Traffic

137

Michael Sirak, “Air Force Promotes Airlift Options for Middle East Partners,” Defense

Daily, vol. 236, issue 32, November 14, 2007.

138

See CRS Report RL32513, Navy-Marine Corps Amphibious and Maritime

Prepositioning Ship Programs: Background and Oversight Issues for Congress, by Ronald

O’Rourke.

139

Defense Science Board Task Force on Mobility. Office of the Under Secretary of Defense

(AT&L), September 2005, p. 14.

140

Ibid., p.10.

141

Options for Strategic Military Transportation Systems, Congressional Budget Office,

September 2005. p. x.

142

Ibid, pp. x, xiii.

CRS-37

Management Command found the biggest roadblock to achieving the service’s

deployment goals is limited infrastructure at forward airfields.143 Infrastructure

shortfalls could include a lack of ramp space or loading/unloading equipment.

During Operation Allied Force, for example, “there were not enough air bases in the

area immediately around Kosovo to support all the aircraft....”144 In addition, the

CBO observed,

Aircraft offer rapid delivery of individual loads, but any attempt to significantly

increase their total cargo deliveries to a distant theater would probably be

hampered by constrained infrastructure at airfields, which is anticipated for

many, if not most, future conflicts.145

Leverage Next Generation Tanker’s Airlift Capability

Acquisition decisions regarding KC-X, the Air Force’s next generation tanker

program, may also affect strategic airlift capability.146 Both competitors for the KCX program, the Northrop Grumman KC-30 based on the Airbus 330-200 and the KC767 based on Boeing’s 767-200, could add airlift capability compared to the KC-135s

they are envisioned to replace. On February 29, 2008, the Air Force awarded the KCX contract to Northrop Grumman. The initial $12.1 billion KC-X contract provides

for the purchase the first 68 KC-45s of the anticipated 179 aircraft.147 On March 11,

2008, Boeing protested the Air Force’s decision to the Government Accountability

Office (GAO).148 The GAO is expected to adjudicate Boeing’s protest by June 19,

2008.149

First, some believe DOD should factor airlift capacity of tankers into strategic

airlift requirements derived from mobility capability studies. However, in

congressional testimony General Schwartz stated that KC-X proposals are not

expected to have the roll-on/roll-off capability of the Air Force’s current strategic

143

Kim Burger, “Army Study: Poor Forward Airfields Jeopardize Deployment Goals,”

Inside the Army, August 21, 2000.

144

Kosovo After Action Review, Secretary of Defense William S. Cohen and Gen. Henry H.

Shelton, Chairman of the Joint Chiefs of Staff, Senate Armed Services Committee, October

14, 1999.

145

Options for Strategic Military Transportation Systems. Op cit. p. x.

146

See CRS Report RL34398, Air Force Air Refueling: The KC-X Acquisition Program, by

William Knight and Christopher Bolkcom.

147

“Tanker Contract Award Announced,” Air Force Print News, February 29, 2008, online

at [http://www.af.mil/news/story.asp?id=123088392].

148

Boeing News Release, “Boeing Protests U.S. Air Force Tanker Contract Award,” March

11, 2008 online at [http://www.boeing.com/ids/globaltanker/news/2008/q1/

080311b_nr.html].

149

GAO Press Statement, “GAO Statement Regarding Protest Filed by Boeing Company

with the Government Accountability Office,” March 11, 2008 online at

[http://www.gao.gov/ press/pressstmt-boeing0311.pdf].

CRS-38

airlift fleet or the ability to handle oversized or outsized cargo.150 Others also point

out that airlift is a secondary mission for aerial refuelers and that tanker capability

could be fully tapped to perform core refueling missions during times of peak airlift

demand. Therefore, some argue that tanker airlift capacity should be viewed as

additive to other transportation means when calculating strategic airlift requirements.

Even though airlift is viewed as a secondary mission for KC-X, most agree

airlift capacity on tankers can reduce strain on the strategic airlift fleet. General

Schwartz expects the KC-X to “mitigate wear and tear on the C-5 and C-17.”151 The

Air Force envisions KC-X to be built from the outset with reinforced floors necessary

for carrying either passengers or cargo in the fuselage, a cargo door sized to facilitate

loading and off-loading, and defensive systems enabling a KC-X to land in certain

combat environments.152 With these capabilities, a KC-X could potentially fly a

scheduled combat air refueling mission, be subsequently retasked in-flight, land at

an airfield located within a threat environment, upload battle casualties, and air

evacuate the patients to needed medical care in another theater. This illustrates how

a KC-X, with defensive systems not currently found on KC-135s, might give

planners additional options to execute an unplanned medical evacuation sortie

perhaps negating the need to tap a strategic airlift platform. Likewise, this scenario

could be applied to the movement other time-sensitive cargo or passengers. Thus,

some believe purchasing a KC-X platform with robust airlift capabilities may extend

the service life of other airlifters. Table 8 summarizes airlift capability of selected

air refueling platforms.

Table 8. KC-135 and Potential KC-X Airlift Capabilities

KC-135

KC-30

KC-767

Passengers

54

226

200

463L Pallets

6

32

19

Defensive Systems

No

Planned

Planned

Source: USAF, Northrop Grumman and Boeing. KC-135 information derived from KC-135

Stratotanker Fact Sheet, [http://www.af.mil/factsheets/factsheet.asp?id=110], and the Air Force

Handbook 2007.

150

Hearing of the Senate Homeland Security and Governmental Affairs Committee, Federal

Financial Management, Government Information, Federal Services, and International

Security Subcommittee on Military Airlift Costs, September 27, 2007.

151

Gen. Norton A. Schwartz (USAF), Commander, U.S. Transportation Command, Written

Statement before the Senate Homeland Security and Governmental Affairs Committee,

Federal Financial Management, Government Information, Federal Services, and

International Security Subcommittee, September 27, 2007, p. 6.

152

Defensive systems facilitate a tanker aircraft’s primary mission of in-flight air refueling

by potentially enabling the tanker to operate closer to its refueling track, thus making more

fuel available on each mission. As this example illustrates, defensive systems also increase

a tanker’s capability in its secondary mission of airlift.

CRS-39

Pursue Airships or Hybrid Airships153

Another potential strategy to bolster strategic airlift capability might be to reinvigorate DOD efforts to develop heavy-lift airships. Before Congress cancelled the

program in 2006, the Defense Advanced Research Projects Agency was developing

a hybrid airship capable of transporting up to 1,000 tons across international

distances. Unlike traditional, cigar-shaped airships, a hybrid airship is shaped more

like an aircraft’s wing, to generate lift through aerodynamic forces. Advocates hope

airships may be capable of carrying a complete Army brigade directly from “the fort

to the fight,” overcoming logistic choke points and mitigating the effects of limited

forward basing.

In addition to very large payloads and long range, airships and hybrids may offer

other advantages to the strategic airlift mission. First, they may not require as

expensive and as specialized infrastructure as aircraft. A CBO study estimated

developing and procuring 14-16 heavy-lift airships would have the same life cycle

cost as 21 C-17 aircraft ($11 billion) but would deliver cargo at a rate nearly three

times greater. Second, they may be able to deliver their payloads near the conflict,

rather than at ports or airfields miles to the rear, thus overcoming logistic choke

points and mitigating the effects of limited forward basing. Airships and hybrids may

be able to land on water, which could prove valuable in realizing the Department of

the Navy’s sea basing concept.

Detractors challenge airship survivability and ability to operate in adverse

weather. Also, hybrid airships use aerodynamic lift and will take-off and land much

like conventional aircraft. Some estimate that 1,000 ton-class hybrid aircraft will

require 5,000 foot-long runways.154 Along with loading/offloading equipment and

facilities, these runways appear to constitute infrastructures like those required by

conventional aircraft. In addition, delivering a brigade-sized payload directly to a

theater of conflict sounds attractive from a conventional wisdom point of view.

However, large payloads take longer to consolidate, load, and unload than smaller

payloads, and the their delivery must be tightly scheduled. Likewise, the in-flight

loss of a single airship carrying a 3,500-soldier brigade could be both operationally

and politically catastrophic. Finally, while life-cycle costs for these concepts could

be notably less than manned aircraft, can DOD find budget room for another

procurement program?

153

See CRS Report RS21886, Potential Use of Airships and Aerostats, by Christopher

Bolkcom.

154

John Wood, “Airships: Good for Business, or Good for Nothing?” Presentation before

the 5th International Airship Convention & Exhibition, August 2004, Oxford, England.

CRS-40

Appendix A. FY2008 National Defense Authorization

Act (P.L. 110-181) Report Language Directing Study

on Size and Mix of Airlift Force

Section 1046 of the Conference Report (H.Rept. 110-477, December 6, 2007)

to H.R. 1585 stated the following:

SEC. 1046. STUDY ON SIZE AND MIX OF AIRLIFT FORCE.

(a) STUDY REQUIRED. — The Secretary of Defense shall conduct a

requirements-based study on alternatives for the proper size and mix of fixedwing intratheater and intertheater airlift assets to meet the National Military

Strategy for each of the following timeframes: fiscal year 2012, 2018, and 2024.

The study shall —

(1) focus on organic and commercially programmed airlift capabilities;

(2) analyze the full-spectrum lifecycle costs of the various alternatives for

organic models of each of the following aircraft: C — 5A/B/C/M, C — 17A, KC

— X, KC — 10, KC — 135R, C — 130E/H/J, Joint Cargo Aircraft; and

(3) incorporate the augmentation capability, viability, and feasibility of the

Civil Reserve Air Fleet during activation stages I, II, and III.

(b) USE OF FFRDC. — The Secretary shall select, to carry out the study

required by subsection (a), a federally funded research and development center

that has experience and expertise in conducting similar studies.

(c) STUDY PLAN. — The study required by subsection (a) shall be carried

out under a study plan. The study plan shall be developed as follows:

(1) The center selected under subsection (b) shall develop the study plan

and shall, not later than 60 days after the date of enactment of this Act, submit

the study plan to the congressional defense committees, the Secretary, and the

Comptroller General of the United States.

(2) The Comptroller General shall review the study plan to determine

whether it is complete and objective, and whether it has any flaws or weaknesses

in scope or methodology, and shall, not later than 30 days after receiving the

study plan, submit to the Secretary and the center a report that contains the

results of that review and provides any recommendations that the Comptroller

General considers appropriate for improvements to the study plan.

(3) The center shall modify the study plan to incorporate the

recommendations under paragraph (2) and shall, not later than 45 days after

receiving that report, submit to the Secretary and the congressional defense

committees a report on those modifications. The report shall describe each

modification and, if the modifications do not incorporate one or more of the

recommendations, shall explain the reasons for not doing so.

(d) ELEMENTS OF STUDY PLAN. — The study plan required by

subsection (c) shall address, at minimum, the following:

(1) A description of lift requirements and operating profiles for airlift

aircraft required to meet the National Military Strategy, including assumptions

regarding the following:

(A) Current and future military combat and support missions.

(B) The planned force structure growth of the military services.

CRS-41

(C) Potential changes in lift requirements, including the deployment of the

Future Combat Systems by the Army.

(D) New capability in airlift to be provided by the KC(X) aircraft and the

expected utilization of such capability, including its use in intratheater lift.

(E) The utilization of intertheater lift aircraft in intratheater combat mission

support roles.

(F) The availability and application of Civil Reserve Air Fleet assets in

future military scenarios.

(G) Air mobility requirements associated with the Global Rebasing

Initiative of the Department of Defense.

(H) Air mobility requirements in support of worldwide peacekeeping and

humanitarian missions.

(I) Air mobility requirements in support of homeland defense and national

emergencies.

(J) The viability and capability of the Civil Reserve Air Fleet to augment

organic forces in both friendly and hostile environments.

(K) An assessment of the Civil Reserve Air Fleet to adequately augment the

organic fleet as it relates to commercial inventory management restructuring in

response to future commercial markets, streamlining of operations, efficiency

measures, or downsizing of the participant.

(2) An evaluation of the state of the current airlift fleet of the Air Force,

including assessments of the following:

(A) The extent to which the increased use of airlift aircraft in ongoing

operations is affecting the programmed service life of the aircraft of that fleet.

(B) The adequacy of the current airlift force, including whether or not a

minimum of 299 strategic airlift aircraft for the Air Force is sufficient to support

future expeditionary combat and non-combat missions, as well as domestic and

training mission demands consistent with the requirements of meeting the

National Military Strategy.

(C) The optimal mix of C — 5 and C — 17 aircraft for the strategic airlift

fleet of the Air Force, to include the following:

(i) The cost-effectiveness of modernizing various iterations of the C — 5A

and C — 5B/C aircraft fleet versus procuring additional C — 17 aircraft.

(ii) The military capability, operational availability, usefulness, and service

life of the C — 5A/B/C/M aircraft and the C — 17 aircraft. Such an assessment

shall examine appropriate metrics, such as aircraft availability rates, departure

rates, and mission capable rates, in each of the following cases:

(I) Completion of the Avionics Modernization Program and the Reliability

Enhancement and Reengining Program.

(II) Partial completion of the Avionics Modernization Program and the

Reliability Enhancement and Re-engining Program, with partial completion of

either such program being considered the point at which the continued execution

of each program is no longer supported by the cost-effectiveness analysis.

(iii) At what specific fleet inventory for each organic aircraft, to include air

refueling aircraft used in the airlift role, would it impede the ability of Civil

Reserve Air Fleet participants to remain a viable augmentation option.

(D) An analysis and assessment of the lessons that may be learned from the

experience of the Air Force in restarting the production line for the C — 5

CRS-42

aircraft after having closed the line for several years, and recommendations for

the actions that the Department of Defense should take to ensure that the

production line for the C — 17 aircraft could be restarted if necessary, including

—

(i) an analysis of the methods that were used and costs that were incurred

in closing and re-opening the production line for the C — 5 aircraft;

(ii) an assessment of the methods and actions that should be employed and

the expected costs and risks of closing and re-opening the production line for the

C — 17 aircraft in view of that experience. Such analysis and assessment should

deal with issues such as production work force, production facilities, tooling,

industrial base suppliers, contractor logistics support versus organic

maintenance, and diminished manufacturing sources.

(E) Assessing the military capability, operational availability, usefulness,

service life and optimal mix of intra-theater airlift aircraft, to include —

(i) the cost-effectiveness of procuring the Joint Cargo Aircraft versus

procuring additional C — 130J or refurbishing C — 130E/H platforms to meet

intra-theater airlift requirements of the combatant commander and component

commands; and

(ii) the cost-effectiveness of procuring additional C — 17 aircraft versus

procuring additional C — 130J platforms or refurbishing C — 130E/H platforms

to meet intra-theater airlift requirements of the combatant commander and

component commands.

(3) Each analysis required by paragraph (2) shall include —

(A) a description of the assumptions and sensitivity analysis utilized in the

study regarding aircraft performances and cargo loading factors; and

(B) a comprehensive statement of the data and assumptions utilized in

making the program life cycle cost estimates and a comparison of cost and risk

associated with the optimally mixed fleet of airlift aircraft versus the program of

record airlift aircraft fleet.

(e) UTILIZATION OF OTHER STUDIES. — The study required by

subsection (a) shall build upon the results of the 2005 Mobility Capabilities

Studies, the ongoing Intratheater Airlift Fleet Mix Analysis, the Intratheater Lift

Capabilities Study, the Joint Future Theater Airlift Capabilities Analysis, and

other appropriate studies and analyses, such as Fleet Viability Board Reports or

special aircraft assessments. The study shall also include any testing data

collected on modernization, recapitalization, and upgrade efforts of current

organic aircraft.

(f) COLLABORATION WITH UNITED STATES TRANSPORTATION

COMMAND. — In conducting the study required by subsection (a) and

preparing the report required by subsection (c)(3), the center shall collaborate

with the commander of the United States Transportation Command.

(g) COLLABORATION WITH COST ANALYSIS IMPROVEMENT

GROUP. — In conducting the study required by subsection (a) and constructing

the analysis required by subsection (a)(2), the center shall collaborate with the

Cost Analysis Improvement Group of the Department of Defense.

CRS-43

(h) REPORT. — Not later than January 10, 2009, the center selected under

subsection (b) shall submit to the Secretary and the congressional defense

committees a report on the study required by subsection (a). The report shall be

submitted in unclassified form, but shall include a classified annex.

CRS-44

Appendix B. C-5 System Description155

Power plant:

Wingspan:

Length:

Height:

Cargo

compartment:

Speed:

Service ceiling:

Range:

Crew:

Maximum T/O

weight:

Load:

Four General Electric TF-39 engines

222.9 feet (67.89 meters)

247.1 feet (75.3 meters)

65.1 feet (19.84 meters)

length, 143 feet, 9 inches (43.8 meters); width, 19 feet (5.79

meters); height, 13.5 feet (4.11 meters)

518 mph (.77 Mach)

45,000 feet (13,716 meters)

Global with in-flight refueling

Seven (2 pilots, 2 flight engineers, and 3 loadmasters)

769,000 pounds (348,818 kilograms) in peacetime; 840,000

pounds (381,024 kilograms) in wartime

81 troops and 270,000 pounds (122,472 kilograms) of cargo (36

pallet positions) simultaneously

Basing. Active duty C-5s are stationed at Dover AFB, DE, and Travis AFB, CA, in

associate units teamed with the Air Force Reserve.156 C-5s are assigned to Reserve

units at Lackland AFB, TX; Westover Air Reserve Base, MA; and Wright-Patterson

AFB, OH, and to Air National Guard (ANG) units at Martinsburg ANGB, WV;

Memphis, TN; and Stewart ANGB, NY.157

Figure 4. C-5 Galaxy at Balad Air Base, Iraq

Source: USAF photo by SSgt Toney R. Tolley.

155

Derived from C-5 Galaxy Fact Sheet, [http://www.af.mil/factsheets/

factsheet.asp?fsID=84], and Air Force Magazine, 2007 USAF Almanac, May 2007, p. 146.

156

Associate units share aircraft between the active duty Air Force and either the Air Force

Reserve or the Air National Guard components.

157

Derived from C-5 Galaxy fact Sheet, [http://www.af.mil/factsheets/

factsheet.asp?fsID=84], and Air Force Magazine, 2007 USAF Almanac, May 2007, pp. 105108.

CRS-45

Appendix C. C-17 System Description158

Power plant:

Wingspan:

Length:

Height:

Cargo compartment:

Speed:

Service ceiling:

Range:

Crew:

Max. T/O weight:

Load:

Four Pratt & Whitney F117-PW-100 turbofan engines

169 feet 10 inches (to winglet tips) (51.76 meters)

174 feet (53 meters)

55 feet 1 inch (16.79 meters)

length, 88 feet (26.82 meters); width, 18 feet (5.48 meters);

height, 12 feet 4 inches (3.76 meters)

450 knots at 28,000 feet (8,534 meters) (Mach .76)

45,000 feet at cruising speed (13,716 meters)

Unlimited with in-flight refueling159

Three (two pilots and one load master)

585,000 pounds (265,352 kilograms)

102 troops/paratroops; 36 litter and 54 ambulatory patients

and attendants; 170,900 pounds (77,519 kilograms) of cargo

(18 pallet positions)

Basing. Active duty C-17s are based at Charleston AFB, SC; Dover AFB, DE;

Edwards AFB, CA; Elmendorf AFB, AK; Hickam AFB, HI; McChord AFB, WA;

McGuire AFB, NJ; and Travis AFB, CA, in associate units. The Air Force Reserve

operates eight C-17s at March ARB, CA; the ANG operates eight at Jackson, MS.160

Figure 5. C-17 Globemaster III Taking Off from

Unfinished Runway

Source: USAF photo by 1st Lt. Laurel Scherer.

158

Derived from C-17 Globemaster III Fact Sheet, [http://www.af.mil/factsheets/factsheet.

asp?fsID=86], and Air Force Magazine, 2007 USAF Almanac, May 2007, p. 146.

159

The first 70 C-17s have an unrefueled range of 4,370 miles with a 90,000 lb. load. An

extra fuel tank was installed on the 71st and subsequent aircraft extending unrefueled range

to 5,060 miles with a 90,000 lb. load. Seena Simon, “Extra Fuel Tank Allows C-17s to Fly

Farther,” Air Force Times, April 2, 2001.

160

Derived from C-17 Globemaster III Fact Sheet, [http://www.af.mil/factsheets/factsheet.

asp?fsID=86], and Air Force Magazine, 2007 USAF Almanac, May 2007, pp. 105-108.

CRS-46

Appendix D. C-5 and C-17 Availability, and

Readiness Comparisons161

Comparison of C-5 Fleet for 3 Availability / Reliability Measures FY05-FY07

Worst C-5s for Depot %

Tail #

Worst C-5s for Mission Capable Rate

Depot%

MCR

MXR

69000003

58.5

27

83.1

70000445

54.2

46.5

68000219

47.5

70000456

Worst C-5s for Mission Departure Reliability

Depot%

MCR

MXR

Depot%

MCR

MXR

69000014

5.6

26.4

87.3

70000168

0

59.1

50

84.4

69000003

58.6

27

81.1

70000461

12.6

44.6

70.1

37.2

75

69000025

46.2

27.4

78.9

70000462

24.7

65.3

71.4

47.3

29.7

83.3

70000456

47.4

29.7

85.6

69000010

1

65.9

71.4

69000025

46.2

27.4

78.9

70000451

7.1

33.1

78.9

84000059

63

62.3

73.1

87000038

39.1

58.6

75.5

68000215

6.1

33.8

82.2

70000457

24.9

34.5

73.2

68000220

36.5

42.9

84.3

70000457

24.9

34.5

73.2

69000020

22.1

42.6

74.6

68000224

35.7

45.9

82.2

68000212

30.3

35.7

82.7

68000219

47.6

37.2

75

70000447

34.3

49.9

83.5

68000219

47.6

37.2

75

85000005

51.3

58.2

75.6

70000453

31.1

47

80

70000460

41.5

38.9

83.6

87000029

15.1

62.8

75.6

70000446

30.9

51.9

81.5

70000455

6.8

39.3

85.6

87000045

42.3

59.6

75.8

68000212

30.3

35.7

82.7

68000221

2.3

39.7

81.5

67000174

0

48.8

76.9

C-5A Fleet Avg.

21.3

C-5A Fleet Avg.

48.2

Tail Numbers in:

Italics = worse than average in all 3 categories

Bold = among the worst (not just below average) in two of the three categories

Bold and Background = among the worst in all three categories

161

Source of charts: CRS, based on data provided by AMC.

C-5A Fleet Avg.

83.1

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.