Hydropower Licenses and Alternative Licensing Conditions in H.R. 6, 109th Congress

Congressional research reportMay 12, 2005

Ask Donna

What actually matters in this document.

Text

Order Code RL32921

CRS Report for Congress

Received through the CRS Web

Hydropower Licenses and

Alternative Licensing Conditions

in H.R. 6, 109th Congress

May 12, 2005

Kyna Powers

Analyst in Energy and Environmental Policy

Resources, Science, and Industry Division

Congressional Research Service ˜ The Library of Congress

Hydropower Licenses and Alternative Licensing

Conditions in H.R. 6, 109th Congress

Summary

In the next ten years, nearly 20% of the nation’s nonfederal hydropower projects

will require new federal licenses to continue operating. New licenses will establish

facilities’ operating parameters for the next 30 to 50 years. These operating

parameters will affect the total quantity and timing of electricity production. They

will also affect flood control, irrigation, municipal and industrial water supplies,

recreation, fish and wildlife habitat, and transportation.

Under the 1920 Federal Power Act (FPA), the Federal Energy Regulatory

Commission (FERC) has primary responsibility for balancing multiple water uses

and evaluating licensing and relicensing applications. The FPA also creates a role

in the licensing process for federal agencies that are responsible for managing

fisheries or federal reservations (e.g., national forests). Specifically, § 4(e) and §18

of the FPA give certain federal agencies the authority to attach conditions to FERC

licenses. For example, federal agencies may require applicants to build passageways

for fish (fishways), schedule periodic water releases for recreation, release minimum

flows for fish migration, or control water release rates to reduce erosion. Once an

authorized agency issues such conditions, FERC must include them in the project’s

license. While these conditions often generate environmental or recreational

benefits, they may also require construction expenditures and may increase

generation costs by reducing operational flexibility.

Reflecting recommendations by FERC and the hydropower industry, the House

included a provision to alter federal agencies’ license-conditioning authority in the

Energy Policy Act of 2005 (H.R. 6). This provision would allow stakeholders to propose alternative license conditions and would require federal agencies to consider and

accept the applicant’s proposed alternative if it found that the alternative (1) provides

for the adequate protection and utilization of the federal reservation, or would be no

less protective of the fish resource than the fishway initially prescribed, and (2) costs

less to implement, and/or would result in improved operation of the project for

electricity production. It also requires that the Secretary of the relevant conditioning

agency submit a written statement showing it gave equal consideration to the effects

of the original and alternative conditions on energy, flood control, navigation, air

quality, and water supply.

Response to the pending provision has been mixed. While the hydropower

industry supports the legislation, some environmental organizations oppose the bill,

and officials within some conditioning agencies have expressed concerns. Opponents

of the legislation contend that it could increase relicensing time, weaken

environmental protections, give applicants undue standing in the conditioning

process, and weaken FERC’s new Integrated Licensing Process. Proponents contend

that it would create accountability for the conditioning agencies, decrease the cost of

license conditions without diminishing agencies’ conditioning authority, and enhance

FERC’s licensing processes.

This report will be updated as events warrant.

Contents

Background and Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

Licensing Authority . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2

Federal Power Act §4(e) and §18 License Conditions . . . . . . . . . . . . . . . . . . 2

License Conditions for Projects on Federal Reservations (FPA §4(e)) . 2

Fishway Provisions (FPA §18) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

License Conditioning Agencies and the Relicensing Process . . . . . . . . . . . . 3

Pre-Application Phase . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

Post-Application Phase . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

Cost of Mandatory Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

Proposed Changes to the License-Conditioning Process . . . . . . . . . . . . . . . . 6

Hydroelectric Relicensing Legislation in the 109th Congress . . . . . . . . . . . . . . . . 7

Discussion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

Length of Process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

Environmental Issues . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

Effectiveness of the Integrated Licensing Process (ILP) . . . . . . . . . . . . 9

Participation in the Conditioning Process . . . . . . . . . . . . . . . . . . . . . . 10

Dispute Resolution Process . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10

Conclusion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10

For Additional Reading . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

CRS Reports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

Other Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

Hydropower Licenses and

Alternative Licensing Conditions

in H.R. 6, 109th Congress

Background and Analysis

Hydropower is one of multiple benefits the nation’s waters provide. It accounts

for approximately 6% of all electricity consumed in the United States and 15% or

more of the electricity consumed in Idaho (86%), Oregon (68%), Washington (68%),

South Dakota (45%), Montana (26%), Alaska (21%), and New York (15%).1

Hydroelectric power is generated by releasing water through a set of turbines. It does

not pollute the air and may be turned on or off in a matter of minutes. By storing

water behind dams and controlling water releases, some hydropower facilities can

generate electricity during periods of high energy demand (so-called peaking power).

While hydropower facilities are important sources of clean peaking power, the

construction and management of dams are contentious because they affect other

water uses and resources. Dams alter rivers by blocking downstream flows and

creating reservoirs. These reservoirs may provide some recreational and habitat

benefits, but they reduce river recreation and may block the passage of migratory fish,

harming the commercial fishing industry that these fish support. Once a hydropower

facility is built, its management also affects water uses. For example, the decision

of when, how, and how much water to release from a hydroelectric facility affects

flood control, irrigation, municipal water supplies, recreation, fish and wildlife

habitats, and transportation. (See CRS Report RL31536, Licensing of Non-Federal

Hydroelectric Projects: Background and Current Issues, by Nicole T. Carter).

To make sure navigable waters are managed for the public interest, Congress

oversees the construction and operation of hydroelectric facilities. Congress directly

authorizes federal hydropower projects and requires that private hydropower projects

obtain federal licenses.2 This report summarizes federal licensing and licenseconditioning authority for nonfederal projects, discusses key arguments for and

against changing the process through which federal resource agencies issue license

conditions, and reviews current legislative proposals to revise federal licensing

authority.

1

U.S. Dept. of Energy, Energy Information Administration, State Energy Data 2001

Consumption, Table S8, “Electric Power Sector Consumption Estimates, 2001,” available

at [http://www.eia.doe.gov/emeu/states/sep_sum/html/sum_btu_eu.html].

2

Managers of federal dams may implement operational changes similar to those contained

in hydropower licenses.

CRS-2

Licensing Authority

Rivers are national resources that may be used for interstate commerce and can

provide multiple benefits. As such, the federal government regulates the construction

and operation of facilities that block or pollute navigable waters. Through the 1920

Federal Power Act (FPA; 16 U.S.C. §792), Congress created the Federal Power

Commission (FPC), later renamed the Federal Energy Regulatory Commission

(FERC), to license all nonfederal hydropower facilities. Using this authority, FERC

granted 30- to 50-year licenses to projects located in 45 states (excluding Delaware,

Hawaii, Mississippi, North Dakota, and South Dakota, which have no FERC-licensed

nonfederal dams). Many of the licenses for these projects were issued during the

1950s and 1960s, and are now expiring. In the next 10 years, 199 projects, or about

20% of all licensed nonfederal hydropower facilities, will need new licenses to

continue operating.3

To help ensure that FERC licenses protect migratory fish and federally reserved

lands (e.g., lands, such as Indian reservations and national forests, that are set apart

by the federal government for a special purpose), Congress created a role in the

licensing process for certain federal agencies. The FPA requires that FERC include

certain agency-established operating conditions in its licenses. For example, §18 of

the FPA (16 U.S.C. §811) stipulates that the Secretary of the Interior or the Secretary

of Commerce may develop license conditions that direct the applicant to construct

and maintain a passageway, called a fishway, through which fish can travel around

barriers created by the dam. Furthermore, §4(e) authorizes certain department

Secretaries to develop license conditions for facilities located in the federal

reservations they manage (16 U.S.C. §797(e)). Under § 4(e), a Secretary may

stipulate provisions that are necessary to maintain the reservation for its federally

designated purposes. Conditioning authority is not limited to FERC and federal

agencies. The 1970 Federal Water Pollution Control Act, commonly known as the

Clean Water Act (CWA; 33 U.S.C. §1341), extends such authority to state water

pollution-control agencies. Under the CWA, a FERC-issued license must include

any conditions that the state deems necessary to maintain state-designated uses or

water quality standards. (For more information on §401, see CRS Report 97-488

ENR, Clean Water Act Section 401: Background and Issues, by Claudia Copeland.)

Federal Power Act §4(e) and §18 License Conditions

As noted above, §4(e) and §18 of the FPA grant federal agencies the authority

to issue license conditions designed to preserve or enhance federally reserved lands,

and to help fish travel around barriers created by hydropower facilities. The type of

conditions issued pursuant to FPA §4(e) and §18 are described below.

License Conditions for Projects on Federal Reservations (FPA

§4(e)). Section 4(e) of the FPA applies to hydropower facilities located on federally

reserved lands (e.g., Indian reservations and national forests). Under this section, the

3

Federal Energy Regulatory Commission, Hydroelectric Projects Under Commission

License, updated Jan. 19, 2005, at [http://www.ferc.gov/industries/hydropower/gen-info/

projlic.PDF].

CRS-3

Secretary of the department with jurisdiction over the reserved land has the authority

to issue any license conditions necessary to maintain the reservation. Depending on

the purpose of the reservation, the agency’s conditions may address a range of goals

including the preservation or enhancement of recreation, federal lands, and aquatic

habitat. For example, the Secretary could require the applicant to schedule periodic

water releases for recreation (white-water releases), to release minimum quantities

of water for fish migration (minimum flows), to control the rate of water release to

reduce habitat disruption (ramping requirements), and to limit reservoir fluctuations

to reduce erosion and maintain habitat (reservoir fluctuation limits). The Department

of the Interior reports that the Bureau of Indian Affairs, Bureau of Reclamation,

National Park Service, and Bureau of Land Management issued §4(e) conditions for

6% of the projects relicensed between 1995 and 2000.4

Fishway Provisions (FPA §18). Under §18 of the FPA, the Secretary of the

Interior and the Secretary of Commerce may require applicants to construct and

operate a physical structure, facility, or levee (called a fishway) that allows fish to

pass around barriers created by the hydropower project.5 Fishways provide young

migratory fish with a passage around the dam on their way downstream. Without a

fishway, migratory fish may traverse the more dangerous passage over the dam via

spill, or through the project’s turbines. Adult fish may also use fishways, such as fish

ladders, to get past the dam on their way upstream to spawn. Without fishways, a

hydropower project may block upstream migration. To preserve and enhance fish

resources, the Fish and Wildlife Service (FWS) issued §18 conditions for 20% of the

projects relicensed between 1995 and 2000. The Department of Commerce, through

the National Marine Fisheries Service (NMFS), issued §18 conditions for 7.6% of the

projects licensed between 1995 and 2000. In some cases, the NMFS and the FWS

issued conditions for the same projects.6

License Conditioning Agencies

and the Relicensing Process

Federal resource agencies establish FPA §4(e) and §18 license conditions by

working with FERC’s licensing processes. FERC’s regulations allow three licensing

processes: (1) a structured process, known as the Traditional Licensing Process

(TLP), (2) a collaborative process, known as the Alternative Licensing Process

(ALP), and (3) a new licensing process, called the Integrated Licensing Process (ILP),

that is both structured and collaborative. The ILP is the default process. Each of

these processes has two phases: a pre-application phase led by the applicant, and a

4

Letter by William D. Bettenberg (Interior) to David P. Boergers (FERC), Hydroelectric

Licensing Policies, Procedures, and Regulations: Comprehensive Review, entered into

FERC Docket No. PL01-1-000 on April 16, 2001. (Hereafter referred to as 2001 DOI

Letter.)

5

U.S. Environmental Protection Agency, “Notice of Proposed Interagency Policy on the

Prescription of Fishways under Section 18 of the Federal Power Act,” 65 Fed.Reg. 80898

(Dec. 22, 2000). See also 16 U.S.C. §811.

6

2001 DOI Letter.

CRS-4

post-application analysis phase led by FERC.7 As described below, conditioning

agencies participate in both licensing phases.

Pre-Application Phase. For FERC and other agencies to evaluate a project

and develop license conditions, they need information on how the project affects

various resources. FERC and conditioning agencies generally obtain this information

from the applicant, who conducts studies before submitting a license application.8

Specifically, FERC’s licensing process requires an applicant to consult with

stakeholders, including conditioning agencies, before the applicant proposes a study

plan.

The pre-application process can be delayed when the applicant disagrees with

the conditioning agencies about the need for, or content of, particular studies.

Agencies, unlike FERC, do not have the authority to require applicants to conduct

studies. However, agencies’ authority to issue license conditions does provide

applicants with an incentive to resolve study disagreements. Prior to the recent rulemaking, conditioning agencies and applicants could use FERC’s still-existing

Dispute Resolution Service (DRS). (The DRS mediates license disputes, and can call

on FERC staff to help clarify issues, but has no authority over the outcome.) Now,

based on the recent FERC rule, applicants and stakeholders may first try to resolve

disputes through voluntary discussions. If this voluntary process fails, however,

conditioning agencies can file for study dispute resolution. When this occurs, FERC

convenes a panel to review the dispute and make a recommendation to the director

of FERC’s Office of Energy Projects. This process may help to reduce litigation and

the initiation of studies late into the licensing process. (For more information on this

process, see CRS Report RL31903, Relicensing of Non-Federal Hydroelectric

Projects: Summary and Discussion of Procedural Reform Proposals, by Kyna

Powers.)

Post-Application Phase. Once the applicant completes the studies and

submits the license application, FERC evaluates the study results and develops the

license. FERC’s role is to develop a license that balances hydropower, recreation,

ecological, cultural, and other aspects influenced by the project. This license may

include conditions proposed by various resource agencies. Currently, agencies

develop license conditions that may or may not incorporate suggestions from other

stakeholders. After the agency submits its conditions, FERC must include them in

its license unless FERC finds that the conditions are unrelated to the agencies’ FPA

jurisdiction. If the conditions are outside the agencies’ jurisdiction, FERC may

refuse to include them in its license.

A key issue prompting legislative proposals is that under the current processes,

applicants and other stakeholders have little opportunity to contest certain agency

conditions. However, some administrative activities are underway. In September

7

Federal Energy Regulatory Commission, Final Rule (Docket No. RM02-16-000, Order No.

2002), at [http://www.ferc.gov/whats-new/comm-meet/072303/H-1.pdf].

8

In some cases, FERC requests additional studies after the applicant has submitted the

license application.

CRS-5

2004, the Department of the Interior released a proposed rule to establish an

administrative appeals process for license applicants, but no other stakeholders.9

Another issue is the delay in the license-conditioning process when the agency

has insufficient information to evaluate the project. Specifically, some officials

within conditioning agencies have voiced concern that applicants do not always

provide sufficient information in their license applications for agencies to develop

conditions. In some cases, agencies requested information as part of the study phase,

but the applicants decided not to include the studies in their study plan. If a study is

not conducted during the pre-application phase, a conditioning agency may ask

FERC to require that the applicant conduct the study. The agency may also conduct

the study itself, or may issue license conditions in the absence of full information.

However, conducting studies often requires significant financial resources, and the

imposition of conditions without the underlying studies may lead to litigation.

Therefore, a major goal of the proposed ILP is to resolve study disputes early in the

pre-application phase.

Cost of Mandatory Conditions

Through the relicensing process, FERC often establishes license conditions

designed to preserve and enhance resources affected by hydropower projects. While

these conditions often generate environmental, recreational, or other benefits, they

may also generate costs for the applicant. In 2001, FERC calculated the median cost

of a license’s protection, mitigation, and enhancement measures, including state

agency conditions, as $246 per kilowatt (kW) of capacity under the TLP and as $58

per kW under the ALP.10 However, these figures were criticized by the General

Accounting Office (now Government Accountability Office) because they are based

on a sample of projects that submitted their costs to FERC and not on a

representative sample.11

License conditions may result in two types of costs: fixed capital costs such as

construction of installations, and variable costs that arise from changes in

management. For example, license conditions may require applicants to purchase or

construct installations, including fishways, boat ramps, and fish screens. Variable

costs, such as changing facility operations, may also decrease total hydropower

production. For example, minimum flow requirements, white water releases, or

fishway releases may reduce the facility’s total generation when the water is not

released through turbines. According to FERC, conditions placed in the license for

9

“Procedures for Review of Mandatory Conditions and Prescriptions in FERC Hydropower

Licenses.” 69 Fed. Reg, 174 (Sept. 9, 2004).

10

Federal Energy Regulatory Commission, Report to Congress on Hydroelectric Licensing

Policies, Procedures, and Regulations — Comprehensive Review and Recommendations

Pursuant to Section 603 of the Energy Act of 2000 (Washington, DC: May, 2001), available

at [http://www.ferc.gov/legal/ferc-regs/land-docs/ortc_final.pdf]. Hereafter referred to as

the Section 603 Report.

11

U.S. General Accounting Office, Licensing Hydropower Projects: Better Time and Cost

Data Needed to Reach Informed Decisions about Process Reforms, GAO-01-499

(Washington, DC: May 2, 2001).

CRS-6

environmental protection reduce average annual hydropower generation by 1.59%.12

While these conditions may decrease total electricity generation, they may also

reduce the facility operator’s leeway to store water behind the dam for release during

periods of peak demand.13 If hydropower is removed from the supply of peaking

power, additional generation by other higher cost producers may be required. At the

same time, FERC estimates that efficiency improvements (e.g., new turbines) made

during relicensing, increase hydropower generation capacity by an average of

4.06%.14

While license conditions generate costs for applicants, the absence of conditions

could cause (and may already have caused) harm to other stakeholders. For example,

operating dams without fishways or minimum water releases for fish could harm fish

stocks and people that enjoy or depend on fish (e.g., Native Americans, commercial

fishermen, anglers, and fish consumers). Similarly, operating dams without

constraints on reservoir fluctuations and water release rates may increase stream-bank

and reservoir-bank erosion. Such erosion generates costs for owners of shoreline or

river-front property (including taxpayers as owners of federal lands).

Proposed Changes to the License-Conditioning Process

A number of issues emerged as the first wave of hydropower projects were

relicensed throughout the 1990s. These issues have prompted Congress to hold

hearings and take other actions to examine the licensing process. The 106th Congress

directed FERC to conduct a comprehensive review of the policies, procedures, and

regulations guiding the licensing process and report to Congress (§603 of the Energy

Act of 2000, P.L.106-469). FERC responded in May 2001, with recommendations

on how to reduce the length and expense of obtaining a new license.15 In addition to

administrative proposals, the Section 603 Report proposed legislative changes to the

relicensing process. One class of proposals focused on agencies’ mandatory

conditioning authority. For example, FERC suggested that Congress grant it the

authority to reject or modify resource agencies’ conditions and that Congress require

agencies to better support their license conditions. While the hydropower industry

tends to support these FERC recommendations, environmental organizations and

some officials within federal and state agencies oppose these suggestions and any

other proposed reduction in resource agencies’ current license-conditioning authority.

Opponents of FERC’s legislative proposal contend that administrative reforms, such

as FERC’s rule establishing the ILP and development of agencies’ administrative

review processes, are adequate to improve the relicensing process.

Legislative proposals incorporating some of these suggestions have been

introduced in Congress in recent years, but none has been enacted. For example,

hydroelectric titles passed both chambers during the 107th Congress. (H.R. 4, the

12

Section 603 Report.

13

Not all dams have storage capacity. Some facilities, known as run-of-river projects, have

little storage, thus they depend on daily water inflows to generate hydropower.

14

Section 603 Report.

15

Ibid.

CRS-7

Securing America’s Future Energy Act, passed the House August 2, 2001, and the

Energy Policy Act, also H.R. 4, passed the Senate April 25, 2002.) This legislation

was the basis of relicensing legislation proposed in the 108th Congress. Title III of

H.R. 4 (107th Congress) was incorporated into H.R. 6 as passed by the Senate during

the 108th Congress. Title III of H.R. 6 also passed the House (House H.R. 6), though

with substantive differences. The conference agreement16 contained similar language

to the House-passed bill, and is the basis of legislation proposed in the 109th

Congress.

Hydroelectric Relicensing Legislation

in the 109th Congress

Section 231 of H.R. 6, as passed by the House in the 109th Congress, focuses on

federal agencies’ license conditioning authority under §4(e) or §18 of the FPA. It

would provide license applicants, but not other interest groups, with the opportunity

for a trial-type hearing on facts related to agency-proposed license conditions. It

would allow all entities to propose alternative conditions. However, the conditioning

agency would be required to consider alternatives proposed by applicants, but no

other entities, and accept them if the alternative (1) “provides for the adequate

protection and utilization of the federal reservation,” or is “no less protective of the

fish resource than the fishway initially prescribed,” and (2) “costs less to implement,

and/or will improve operation of the project for electricity production.”

H.R. 6, as passed by the House, would also require the conditioning agency to

justify its decision to accept or reject the alternative after giving “equal

consideration” to a broad range of factors. These factors include energy supply,

distribution, cost, and use; flood control; navigation; water supply; and air quality (in

addition to the preservation of other aspects of environmental quality). This section

of the proposed legislation differs from some earlier versions of the bill (e.g., the

Senate-passed version from the 108th Congress), which would have required the

agency to include such factors in its justification, but not to consider them equally.

H.R. 6 would also establish a system for reviewing the agency’s decision when

it rejects the applicant’s alternative. Specifically, it states that FERC could refer the

agency’s decision to its Dispute Resolution Service (DRS). Unlike its current

mediation role, the proposed legislation would require the DRS to review the facts

and issue a non-binding advisory. The Secretary of the conditioning agency would

then reconsider his or her decision and may or may not accept the advisory.

Discussion

Response to the relicensing legislation in the 109th Congress is mixed. The

hydroelectric industry supports the legislation, but some environmental organizations

and some officials within relevant government agencies have expressed concerns.

While the National Hydropower Association is more supportive of H.R. 6 than

16

As noted above, the conference agreement did not pass by the end of the 108th Congress.

CRS-8

previous bills, some environmental organizations view the Senate-passed version

from the 108th Congress as preferable. According to FERC, H.R. 6 (as passed by the

House in the 108th and 109th Congresses) would provide accountability by making

agencies justify their conditions relative to the proposed alternatives and the

conditions’ effects on multiple resources. The hydropower industry contends that

this legislation would decrease the cost of license conditions. On the other hand,

some environmental organizations and officials within conditioning agencies have

expressed concerns that the legislation would further increase the length of the

relicensing process, diminish environmental protection, reduce the effectiveness of

FERC’s new ILP, and give license applicants more authority in the license

conditioning process than other stakeholders.17 These issues are discussed below.

Length of Process. If enacted, H.R. 6 would add additional steps to the

licensing process. Specifically, it would require that federal agencies determine

whether or not a proposed alternative meets the environmental and cost criteria

described above, and determine how the alternative and agencies’ conditions affect

energy supply, distribution, cost, and use; flood control; navigation; water supply;

and air quality (in addition to preserving other aspects of environmental quality).

H.R. 6 would also allow license applicants to initiate a trial-type hearing on issues

of material fact. Both of these provisions could add an undetermined amount of time

to the licensing process. H.R. 6 would also establish a 90-day process for the DRS

and FERC to review the agency’s conditions. This provision was not included in the

Senate-passed H.R. 6 from the 108th Congress.

From the perspective expressed by industry and FERC, H.R. 6 as passed by the

House during the 108th and 109th Congresses would improve the license conditions,

thus justifying additional process time. Furthermore, supporters of the legislation

contend that additional procedure on the front end could decrease delays at the end

of the process. However, some environmental organizations, such as the

Hydropower Reform Coalition, contend that the administrative hearings called for

in H.R. 6 could add 2-3 years18 to a licensing process (including the pre-application

phase) intended to take 5-5.5 years. Furthermore, some opponents of the legislation

contend that the administrative appeals processes under development and the new

ILP will sufficiently improve the relicensing process.

Environmental Issues. Under the FPA, Congress granted FERC the

authority to issue hydropower licenses, but gave federal land and water management

agencies the responsibility for protecting federal reservations and maintaining fish

resources. When issuing license conditions to fulfill their responsibilities under §4(e)

and §18 of the FPA, conditioning agencies are not required to analyze stakeholder

recommendations. Under H.R. 6, the agency “must consider” the alternative

conditions offered by the license applicant. After such consideration, the agency

would be required to accept the alternative if it found that the proposal meets

17

See, for example, Hydropower Reform Coalition, Oppose Hydropower Section in the

Energy Bill: More Red Tape and Less Environmental Protection, available at [http://www.

americanrivers.org/site/DocServer/05fulltextandcritique.doc?docID=282].

18

Ibid.

CRS-9

specified environmental and cost criteria (e.g., the proposed alternative adequately

protects the resource).

Although federal conditioning agencies could reject an alternative condition that

did not meet the bill’s environmental and cost criteria, environmental organizations

are concerned that the bill would distract agencies from their focus on protecting fish

and federal reservations by requiring them to give equal consideration to the effects

on energy supply, distribution, cost, and use; flood control; navigation; water supply;

and air quality (in addition to perserving other aspects of environmental quality).

They further contend that the agencies do not have adequate resources to conduct

these additional studies. Supporters of the bill contend that requiring agencies to

balance the multiple effects of their conditions would help ensure that license

conditions are established in the public interest.

While the equal consideration clause may expand the agencies’ focus, the effect

of this language on the conditions designed to protect fish and federally reserved

lands would depend on how the agencies interpret their responsibility to make sure

that the alternative is “no less protective of fish resources,” or that it provides

“adequate protection and utilization of the reservation.” Environmental organizations

are concerned that the language contained in H.R. 6, which states that the alternative

“will be no less protective of the fish resource than the fishway initially prescribed,”

could open the door for applicants to propose non-fishway alternatives to fishway

conditions.19 For example, environmental organizations are concerned that the

legislation would allow the applicant to propose maintaining fish populations by

means such as stocking the river with hatchery fish. Environmental organizations

generally find this and other mechanisms to be less successful than fishways in

maintaining naturally-diverse migratory fish populations. However, industry

representatives contend that such concerns regarding the effectiveness of alternative

conditions are unwarranted. They contend that the provisions preserve agencies’

authority to reject alternatives which are “less protective of the fish resources than

the agencies’ alternative.” Therefore, the applicant’s ability to substitute other

mechanisms for fishways, would depend on the agency’s determination of the

protectiveness of the alternative.

Effectiveness of the Integrated Licensing Process (ILP). In 2004,

FERC created a new licensing process called the Integrated Licensing Process (ILP).

This process was intended to improve the licensing process by increasing FERC

participation in the early phases and creating a study dispute resolution mechanism.

Environmental organizations and some officials within conditioning agencies assert

that H.R. 6 could weaken the ILP by reducing incentives for applicants to engage

actively in early consultations with resource agencies. Specifically, opponents of the

legislation contend that license applicants would be less willing to consult and

negotiate with resource agencies if the agencies do not have the authority to issue

final license conditions. Conversely, FERC and the hydropower industry contend

that this legislation would not reduce agencies’ conditioning authority, and thus

19

See the Hydropower Reform Coalition’s May 6, 2003 press release regarding the energy

bill, available at [http://www.americanrivers.org/site/DocServer/05ggsenatefloorhydroltr.

doc?docID=283].

CRS-10

would not alter an applicant’s incentive to negotiate with agencies. (For more

information on the ILP, see CRS Report RL31536, Licensing of Non-Federal

Hydroelectric Projects: Background and Current Issues, by Nicole T. Carter.)

Participation in the Conditioning Process. Under current law, the

recommendations of industry and non-industry stakeholders are given similar weight

in agencies’ conditioning process. A key concern of environmentalists and other

nonutility stakeholder groups is that H.R. 6 would increase the applicant’s input

relative to other stakeholders. H.R. 6 would entitle license applicants, but not other

stakeholders, to a trial-type hearing through which they could counter disputed

factual issues related to the agency’s proposed conditions. Furthermore, H.R. 6

would require that agencies consider the applicant’s alternative conditions but not the

conditions offered by “other interested parties.”20 Some non-industry stakeholders

would prefer to see this section expanded to require that agencies consider

alternatives offered by any stakeholder. However, some officials within conditioning

agencies are concerned that they may have insufficient resources to consider all

industry-proposed alternatives in addition to other stakeholder-proposed alternatives.

Dispute Resolution Process. If the Secretary does not accept an

applicant’s alternative, H.R. 6 allows FERC to refer the dispute to its Dispute

Resolution Service (DRS). After consultation with the Secretary and the

Commission, the DRS would issue a non-binding advisory and the Secretary would

make a final determination. Supporters of this provision contend that the process

would help hold agencies’ accountable for their decisions. Others, however, point

out that the DRS is a facilitative entity that is not currently set-up to make

recommendations. They suggest that the administrative review processes agencies

are currently developing may be adequate, or that another process should be used

(e.g., a body similar to the Dispute Resolution Panels established pursuant to the

Final Rule). Still others contend that this process, which results in a non-binding

Dispute Resolution Service advisory, is unnecessary and lengthens the licensing

process.

Conclusion

As H.R. 6 moves from the House to the Senate, differences between H.R. 6

(109 Congress) and the Senate-passed version (108th Congress) leave multiple topics

for debate. In particular, the House-passed bill would establish trial-type hearings for

license applicants, but no other stakeholders; would require agencies to consider all

water resource uses equally; and would create a mechanism for reviewing

conditioning agencies’ decisions. While these provisions were incorporated into the

Conference agreement on H.R. 6 (108th Congress) and have support from the

hydropower community, opponents remain among other river users.

th

20

U.S. Congress, House, Energy and Commerce, Subcommittee on Energy and Air Quality,

testimony of Leon Szeptycki, General Council of Trout Unlimited, on Comprehensive

National Energy Policy, March 12, 2003.

CRS-11

For Additional Reading

CRS Reports

CRS Report RL31536. Licensing of Non-Federal Hydroelectric Projects:

Background and Current Issues.

CRS Report RL31903. Relicensing of Non-Federal Hydroelectric Projects:

Summary and Discussion of Procedural Reform Proposals.

Other Documents

Federal Energy Regulatory Commission. Hydroelectric License Regulations under

the Federal Power Act: Notice Requesting Comments and Establishing Public

Forums and Procedures and Schedule, FERC Docket No. RM02-16-000

(Washington, DC: September 12, 2002)

Federal Energy Regulatory Commission. Notice Requesting Comments and

Establishing Public Forums and Procedures and Schedule pursuant to (18 CFR

Parts 4 and 16), Docket No. RM02-16-000 (Washington, DC: February 20,

2003).

Federal Energy Regulatory Commission, Office of Energy Projects, Hydroelectric

Licensing Under the Federal Power Act, Final Rule and Tribal Policy

Statement, (Revised Feb. 23, 2004)

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.