Public Participation in the Management of Forest Service and Bureau of Land Management Lands: Overview and Recent Changes

Congressional research reportJun 17, 2004

Ask Donna

What actually matters in this document.

Text

Order Code RL32436

CRS Report for Congress

Received through the CRS Web

Public Participation in the

Management of Forest Service and

Bureau of Land Management Lands:

Overview and Recent Changes

June 17, 2004

name redacted

Legislative Attorney

American Law Division

Congressional Research Service ˜ The Library of Congress

Public Participation in the Management of Forest

Service and Bureau of Land Management Lands:

Overview and Recent Changes

Summary

Historically, opportunities for public participation in the management of the

federal lands managed by the Forest Service (FS) and the Bureau of Land

Management (BLM) increased over the years as the statutes and regulations

governing the lands were modernized, and the remaining federal lands became

increasingly important to the public. Public participation in the management of FS

and BLM lands derives primarily from four sources: (1) the relevant management

laws, regulations, and agency guidance – especially as to planning procedures; (2) the

National Environmental Policy Act environmental review processes; (3) the

Administrative Procedure Act; and (4) administrative and judicial appeals.

Recently, administrative changes have been made to the planning,

environmental review, and administrative appeals procedures to streamline them and

make them more efficient. In addition, the Healthy Forests Restoration Act of 2003

(P.L. 108-148) also seeks to promote efficiency in the context of hazardous fuels

reduction projects by limiting the scope of environmental reviews and expediting

administrative and judicial review. The act also allows other authorities to be used,

including new agency-developed “categorical exclusions” (agency procedures that

eliminate formal environmental evaluations), and a new approach to considering

“extraordinary circumstances” that could reduce the number of environmental

analyses and the associated opportunities for public input. The FS may also place

more of its management direction below the level of regulations, arguably making

it more difficult for the public to obtain information, participate in management

decisions, and perform oversight or seek enforcement.

Both the FS and BLM have changed their systems of administrative appeals.

The FS has eliminated appeals of plans, revisions, and amendments, unless the

amendment is made as part of a project decision. Instead, the FS has instituted a predecisional opportunity to object to a proposed plan. BLM has made fire-related

project decisions effective immediately. This could result in eliminating

administrative appeals in favor of more costly judicial review, and a drop in appeals

numbers may result. A similar stance is proposed by BLM for grazing decisions.

Some applaud these changes as producing long-overdue efficiency and economy

in agency processes. Others assert that the changes are closing the public out of

management decisions for the publicly owned lands, and question whether the

breadth and effects of some of the changes comport with the spirit and letter of the

governing laws. The extent to which recent changes in agency procedures allow or

preclude meaningful public participation in the management of these federal lands

may raise questions of compliance with current statutory requirements, and may raise

policy issues of either legislative or oversight interest to the Congress. This report

discusses these issues and will be updated as circumstances warrant.

Contents

Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

Background . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

The Agencies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

Sources of Public Participation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

NEPA Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

Forest Service . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

FS Planning . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

FS Administrative Appeals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

FS Planning Regulations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

1982 Regulations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

2000 Regulations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

2002 Proposed Regulations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16

Expansion of and Changes to “Categorical Exclusions” . . . . . . . . . . . . . . . 21

The Healthy Forests Restoration Act of 2003 . . . . . . . . . . . . . . . . . . . . . . . 24

Counterpart Regulations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27

Bureau of Land Management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28

Federal Land Policy and Management Act . . . . . . . . . . . . . . . . . . . . . . . . . 28

BLM Regulations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30

BLM – NEPA and Counterpart Procedures . . . . . . . . . . . . . . . . . . . . . . . . . 31

Proposed Grazing Regulations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 34

Proposed Grazing Appeals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35

General DOI Appeals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35

Conclusion . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 37

Public Participation in the Management of

Forest Service and Bureau of Land

Management Lands:

Overview and Recent Changes

Introduction

The Bureau of Land Management (BLM) in the Department of the Interior and

the Forest Service (FS) in the Department of Agriculture together manage 454

million acres of land, which is approximately two-thirds of the land owned by the

federal government and one-fifth of the total land area of the United States.1 These

lands continue to be important in our national life, serving economic, security,

social, scenic, habitat, watershed, recreational and other purposes. Historically,

opportunities for public participation in the management of these federal lands

increased over the years and came to play a greater role as the statutes and regulations

governing the lands were modernized, and as other open space lands became scarce

and the remaining federal lands became increasingly important to the surrounding

communities and to the public at large.

Public participation in the management of FS and BLM lands derives primarily

from four sources:

1) the relevant management laws, regulations, and other agency management

guidance – especially as to planning procedures;

2) the National Environmental Policy Act (NEPA)2 environmental review

processes;

3) the Administrative Procedure Act (APA)3; and

4) administrative and judicial appeals.

Recently, administrative changes have been made to the planning and appeals

procedures of the agencies in an effort to streamline them and make them more

efficient. The planning and appeal processes of the agencies had been criticized by

1

For background on these two agencies and current issues regarding the lands they manage,

see CRS Issue Brief IB10076, Bureau of Land Management (BLM) Lands and National

Forests, coordinated by (name redacted) and Carol Hardy-Vincent.

2

Pub. L. No. 91-190, 83 Stat. 852, 42 U.S.C. §§ 4321 et seq.

3

5 U.S.C. §§ 551 et seq.

CRS-2

some as cumbersome, expensive, and time-consuming,4 and the changes were

applauded as producing long-overdue efficiency. Others assert that the changes are

closing the public out of management decisions for the publicly-owned lands, and

question whether the changes comport with the spirit and letter of the governing

laws. The extent to which the public is allowed to participate meaningfully in the

management of these federal lands may raise questions of compliance with current

statutory requirements, and may raise policy issues of either legislative or oversight

interest to the Congress.

In addition to these administrative changes, several recent laws have changed

or affected public participation through provisions that address the planning, NEPA,

and appeals processes. Chief among these is the Healthy Forest Restoration Act of

2003, which modifies NEPA, administrative appeals, and judicial review procedures

for hazardous fuel reduction projects on FS or BLM lands. In addition, Congress has

at times legislated to address specific NEPA issues and how agencies may approach

certain time constraints. See, for example, provisions extending the terms and

conditions of expiring grazing permits and leases pending completion of NEPA

reviews.5 Current legislative proposals address only particular aspects of federal

land management, such as management of old growth, etc. – there are no current bills

that would amend the major federal land laws generally, whether as to public

participation or otherwise.

The principal statutes that provide for modern management for the FS and BLM

lands are nearly thirty years old. They provide most clearly for public participation

at the macro-level of area planning, but lack detailed requirements as to public

participation below that level. Whether the statutes should be amended to increase

or decrease public participation involves important policy issues, on which

viewpoints differ.6

This report discusses the management of federal lands by the FS and BLM, and

how public participation enters into that management. The report will be updated as

circumstances warrant.

4

See The Process Predicament – How Statutory, Regulatory, and Administrative Factors

Affect National Forest Management, USDA Forest Service, June 2002. This report at 12-13

discusses, among other things, how the modern management and environmental laws moved

management to a new era marked by ecosystem management across boundaries at the same

time that administrative rules made forest management more complex and cumbersome, and

a “costly procedural quagmire” where a single project can take years to move forward and

planning costs can exceed $1 million. Some have referred to this situation as “Paralysis by

Analysis.”

5

6

See § 325 of Pub. L. No 108-108.

In commenting on the extraordinary million and a half comments received on the rule to

manage roadless forest areas, most of which favored the greater restrictions that the rule

provided, a FS spokesperson stated that “the final details of the proposed policy won’t be

decided by a popularity contest.” Statement of Cindy Chojnacky quoted in The Oregonian,

at B01, Tuesday, August 29, 2000. The weight to be given public input as a factor in forest

management planning and decisions is an important issue.

CRS-3

Background

The Agencies

The BLM and FS have similar multiple use-sustained yield management

responsibilities for their lands, and many key issues affect both agencies. However,

historically the two agencies have developed differently, and each agency has

particular emphases and functions. For instance, most BLM lands are rangelands,

and the BLM also administers mineral development on federal lands throughout the

nation. BLM also manages significant timber resources in Oregon and northern

California.7 BLM manages the surface of approximately 261.5 million acres of land,

predominantly in the West, principally under the Federal Land Policy and

Management Act of 1976 (FLPMA).8 Title III of FLPMA is sometimes called

BLM’s Organic Act because it consolidated and modernized the agency’s

responsibilities. FLPMA establishes the management principles of multiple use and

sustained yield; provides that the federal government must receive fair market value

for the use of public lands and resources; establishes a general national policy that

the public lands be retained in federal ownership; and expressly requires and

encourages public participation in the management of the public lands.

Most federal forests are managed by the FS, which administers 192.5 million

acres of federal land, with most concentrated in the West. Management direction for

the national forests, first enacted in 1897 and expanded in 1960 and 1976, directs

“harmonious and coordinated management” to provide multiple uses and sustained

yields of resources. Congress enacted the National Forest Management Act

(NFMA)9 in 1976 to revise timber sale authorities and to establish requirements for

land and resource management plans and for public involvement in their

development. NFMA planning has been criticized by some as expensive, timeconsuming, and ineffective for making decisions and informing the public, and there

have been various proposals for changes. The first post-NFMA regulations were

adopted in 1979 and revised in 1982. The 1982 regulations remained in effect until

new regulations were finalized under the Clinton Administration in November of

2000. Because compliance with the 2000 regulations has been postponed, the 1982

regulations continue to govern management of most National Forest System lands.

New planning regulations again were proposed in 2002 by the Bush Administration,

and final regulations may be issued soon. Each set of regulations addresses and

affects public participation in various ways, and is discussed below.

Sources of Public Participation

Despite differences in the lands each agency manages and in agency history and

emphases, the principal statutes governing both agencies direct that public

participation be a part of planning and management. These requirements of the land

7

Oregon and California Railroad and Coos Bay Wagon Road Grant Lands Act of August

28, 1937, ch. 876, 50 Stat. 874, codified at 43 U.S.C. §§ 1181 — 1181j.

8

Pub. L. No. 94-579, 90 Stat. 2744, codified at 43 U.S.C. §§ 1701 et seq.

9

Pub. L. No. 94-588, 90 Stat. 2949, codified at 16 U.S.C. §§ 1600 et seq.

CRS-4

management statutes and their accompanying regulations are one source of authority

and guidance on public participation.

The National Environmental Policy Act (NEPA) provides another important

opportunity for public participation through required procedures for environmental

reviews. The NEPA processes are separate from, but are integrated into, the land

management planning processes, and provide important opportunities for public

participation in agency activities. In some instances, agencies may not provide for

public participation aside from the NEPA context.

The Administrative Procedure Act requires that the public be given access to

certain agency information,10 and afforded notice and an opportunity to comment on

proposed regulatory changes.11 The APA requirements for public notice and

opportunity to comment apply to rulemaking, not to public participation in projects

and activities of the FS and BLM. The act also provides for judicial review of agency

actions,12 and this aspect of the act applies to agency actions in carrying out projects

and activities too.

Various opportunities to administratively appeal agency decisions provide a

fourth avenue for public input into agency decision making by providing

opportunities to change agency decisions. Review opportunities include predecisional administrative “protests” or “objections,” post-decisional administrative

appeals, and judicial review.

All of these aspects are intertwined in the management activities of the two

agencies and will be discussed in this report under headings for each agency.

NEPA Overview

Because NEPA and its requirements for public involvement as part of

environmental reviews play a significant role in agency planning and decision

making, more extensive background on NEPA is provided in this section. Unless

Congress provides otherwise, NEPA applies to all actions of federal agencies. It

establishes national environmental policies and prescribes certain procedural

requirements for all federal agency actions, including those that intersect with private

activities — for example, through federal permits or funding. NEPA requires the

preparation of a full environmental impact statement (EIS) for any major federal

action significantly affecting the quality of the human environment. In practice, and

as articulated in NEPA regulations promulgated by the Council on Environmental

Quality (CEQ), agencies typically prepare an environmental assessment (EA) if an

action might have significant effects on the environment. If an EA indicates that a

proposed action would not have significant environmental effects, the agency issues

a “finding of no significant impact” (FONSI), and formal NEPA procedures are

10

5 U.S.C. § 552.

11

5 U.S.C. § 553.

12

5 U.S.C. §§ 702, 704.

CRS-5

complete. If the EA indicates a proposed action could have significant effects, a full

EIS is then prepared.

Certain categories of activities have been found either separately or

cumulatively to have minor or no environmental effects.13 An agency is excused

from preparing any formal NEPA environmental analyses at all with respect these

categories of actions, and hence they are known as “categorical exclusions.”

In addition to describing types of actions that may be categorical exclusions,

agencies are required to “provide for extraordinary circumstances in which a

normally excluded action may have a significant environmental effect,”14 and be

removed from categorical exclusion status and once again be subject to the

requirements for environmental analyses. A recent source of controversy involves

what approach should be taken when extraordinary circumstances — such as

wetlands or an endangered species — are present in the area of a proposed action that

would otherwise be regarded as a categorical exclusion. Recent expansion of the

circumstances regarded as categorical exclusions and recent changes in handling

extraordinary circumstances have generated controversy, because NEPA analyses are

not being prepared for a broader range of activities, and thus NEPA-associated

opportunities for public participation have been eliminated.

Agencies have other NEPA duties aside from preparation of environmental

documents, and these duties may play a more important role in light of the expanded

use of categorical exclusions. An agency must “[s]tudy, develop, and describe

alternatives to recommended courses of action in any proposal which involves

unresolved conflicts concerning alternative uses of available resources,”15 and must

initiate and use ecological information in the planning and development of resourceoriented projects.16

The CEQ/NEPA regulations emphasize public involvement, beginning early in

the planning process. An agency is to provide public notice of NEPA-related

hearings, public meetings, and the availability of environmental documents. Notice

of an action of “national concern” is to be published in the Federal Register, and

other notice provisions are specified in the regulations.17 Public hearings or meetings

are to be held if there is substantial environmental controversy concerning the

proposed action or substantial interest in holding the hearing, and agencies are to

solicit appropriate information from the public.18 How some of these requirements

may be applied to FS and BLM actions is unclear.

13

40 C.F.R. § 1508.4.

14

Id.

15

40 C.F.R. § 1507.2(d).

16

40 C.F.R. § 1507.2(e).

17

40 C.F.R. § 1506.6.

18

40 C.F.R. § 1506(c) and (d).

CRS-6

The NEPA processes are to begin with “an early and open process for

determining the scope of issues to be addressed and for identifying the significant

issues related to a proposed action.”19 This “scoping” process affords the public an

opportunity for pre-decisional input. An extensive NEPA regulation requires public

involvement and requires agencies to make “diligent efforts to involve the public in

preparing and implementing their NEPA procedures” and to provide notice of all

NEPA-related hearings, meetings, and documents.20 Public hearings or public

meetings are to be held whenever appropriate, or in accordance with statutory

requirements applicable to the agency, considering such things as whether there is

substantial environmental controversy concerning the proposed action or substantial

interest in holding the hearing.21

In addition, the public is to be given an opportunity to comment on draft EISs.22

There is no express requirement for a comment period on EAs in the NEPA

regulations. The most detailed and express NEPA requirements regarding

opportunities for public participation occur in the context of EIS preparation, and the

agencies’ planning processes also afford the greatest opportunities for public

involvement in connection with actions involving preparation of an EIS. NEPA

procedures are to be integrated into the other studies and processes an agency would

otherwise be following.23 Each department and each agency within a department may

elaborate on the CEQ/NEPA processes with their own requirements and guidance.24

Each agency also may be subject to requirements for public participation that derive

from other statutes, and each may voluntarily require or allow additional public

participation aside from the NEPA context.

One result of the integration of NEPA processes with the planning process has

been that agency regulations may not expressly provide specific opportunities for

public participation aside from the NEPA context. For example, if a proposed

activity is categorically excluded from NEPA documentation and reviews, there may

be an absence of other administrative requirements for public involvement in the

project decision making process. This issue has been highlighted by the recent

expansion of categorical exclusions by the FS and BLM. It is possible that the

public participation in categorically excluded projects may consist only of the general

scoping process,25 but it is possible that some additional public involvement may be

required for controversial projects or those with unresolved alternatives for resource

management required under NEPA regulations.

19

40 C.F.R. § 1501.7.

20

40 C.F.R. § 1506.6(a) and (b).

21

40 C.F.R. § 1506.6(c).

22

40 C.F.R. § 1503.1.

23

40 C.F.R. § 1500.2(c).

24

40 C.F.R. § 1507.3.

25

Even the scoping process may not be required. Department of the Interior guidance in the

Departmental Manual at 516 DM 3.3B states that scoping “may” be done in connection with

preparation of an EA. If scoping is discretionary at the level of an EA, it is likely to be

discretionary or eliminated with respect to categorical exclusions.

CRS-7

The particular statutes and regulations governing each agency are discussed in

the following sections of this report.

Forest Service

FS Planning

The original 1897 statute governing the management of the national forests did

not address public participation.26 The Multiple-Use Sustained-Yield Act of 1960

authorizes the Secretary of Agriculture to cooperate with interested state and local

governmental agencies “and others” in the development and management of the

national forests.27 In 1976, Congress enacted laws to modernize the management of

both the public lands and the National Forest System. The National Forest

Management Act of 1976 (NFMA)28 was enacted as a major amendment to the Forest

and Rangeland Renewable Resources Planning Act of 1974.29 In the findings section

of NFMA, Congress found that the national interest in a renewable resource program

must be based on “... [certain elements] and public participation in the development

of the program.”30 Land and resource management plans are to be developed for

units of the National Forest System, and these plans are to be “coordinated with the

land and resource management planning processes of State and local governments

and other Federal agencies.”31 The public is to be involved in the development,

review, and revision of these plans:

The Secretary shall provide for public participation in the development, review,

and revision of land management plans including, but not limited to, making the

plans or revisions available to the public at convenient locations in the vicinity

of the affected unit for a period of at least three months before final adoption,

during which period the Secretary shall publicize and hold public meetings or

comparable processes at locations that foster public participation in the review

of such plans or revisions.32

The land and resource management plans are to form one integrated plan for

each unit of the National Forest System, incorporating in one document or one set of

documents, available to the public at convenient locations, all of the features required

by the NFMA planning section.33 Plans may be amended “in any manner

whatsoever” after public notice, but if an amendment would result in a significant

change in a plan, it must be amended in accordance with the substantive and form

26

Act of June 4, 1897, ch.2, 30 Stat. 35.

27

Pub. L. No. 86-517, 74 Stat. 215, 16 U.S.C. § 531.

28

Pub. L. No 94-588, 90 Stat. 2949, codified 16 U.S.C. §§ 1600 et seq.

29

Pub. L. No. 93-378, 88 Stat. 476.

30

16 U.S.C. § 1600(3).

31

16 U.S.C. § 1604(a).

32

16 U.S.C. § 1604(d).

33

16 U.S.C. § 1604(f)(1).

CRS-8

requirements for plans.34 Plans may be revised from time to time, and must be

revised at least every 15 years in accordance with the substantive, form, and public

participation requirements of the planning section.35 NFMA also states that

implementing regulations shall include procedures to insure that land management

plans are prepared in accordance with NEPA, including direction on when and for

which plans an environmental impact statement shall be prepared.36 Therefore, it is

clear that Congress envisioned public participation in the development and revision

of plans; it is less clear how extensive public participation must be with respect to

amendments of plans or management, projects and activities implementing plans, or

decision making in general.37 Department of Agriculture NEPA regulations do not

elaborate on when an EIS or EA is required and do not address public participation

in either context. They do require agencies to determine continued eligibility of

actions for categorical exclusion status.38

FS Administrative Appeals

Another significant aspect of public involvement in FS planning and activities

has been administrative appeals of agency decisions. Although until recently there

was no express statutory requirement to do so, the FS has provided for some version

of administrative appeals since 1906.39 Basically, appeals of decisions of one forest

officer were taken to a superior officer. Before the enactment of NEPA, appeals were

the primary mechanism for challenging management decisions of the FS.40 As public

involvement in federal land management increased over time, and especially after the

first round of plans required by NFMA were completed, the number of appeals grew.

Some asserted that appeals were crippling management; others disputed that the

problems were as bad as was sometimes asserted.41

34

16 U.S.C. § 1604(f)(4).

35

16 U.S.C. § 1604(f)(5).

36

16 U.S.C. § 1604(g)(1).

37

The committee report indicates that Congress believed that early public participation in

the development of regulations, plans, criteria, and standards for FS programs was most

important. S. Rep. No. 94-893 at 1, 5, 34, 40 (1976); S. Rep. No. 94-905 at 2 (1976); H.R.

Rep. No. 941478, Pt. 1 at 7 and 19 (1976), emphasizing making proposed plans available

for public comment; and S. Rep. No. 94-1335 at 23 (1976).

38

7 C.F.R. § 1b.3.

39

See 53 Fed. Reg. 17,310 -17,311 (1988).

40

Bradley C. Bobertz and Robert L. Fischman, Administrative Appeal Reform: the Case of

the Forest Service, 64 U. Colo. L. Rev. 372, 375-376 (1993).

41

Several studies provided factual background: Office of Technology Assessment, U.S.

Congress, Pub. No. OTA-F-505, Forest Service Planning: Accommodating Uses, Producing

Outputs, and Sustaining Ecosystems (February, 1992); (name redacted), Congressional

Research Service, Pub. No. 92-349A: Administrative Appeals of Forest Service Timber

Sales (April 8, 1992); and, more recently, (name redacted), Congressional Research Service,

Pub. No. 97-274A: Federal Land Management: Appeals and Litigation – Overview

Prepared for a Workshop Held by the Senate Committee on Energy and Natural Resources

(continued...)

CRS-9

In May 1988, the FS proposed changes to its appeals system that were premised

in part on the view that if the public was involved earlier in the decision making

process — through NEPA and some of the provisions of NFMA on planning —

administrative appeals were redundant.42 According to the FS, the public

participation aspects of NEPA had legislated administrative appeals into

obsolescence.43 The FS finalized new appeal regulations in 1989,44 streamlining

appeals of actions documented under NEPA and NFMA, including plans and project

decisions, reiterating that appeals were simply another type of public participation

and were less important than pre-decisional public participation. “We believe that

public participation and involvement in planning and decisionmaking is more

effective prior to making the actual decision than afterwards.”45 On March 19, 1992,

Secretary of Agriculture Edward Madigan announced that the appeals regulations

would again be revised to eliminate appeals of timber sales and other project-level

decisions.46 Instead, notice of projects for which an EA had been prepared would be

published and comments taken before a final decision would be made. This predecisional process combined with the elimination of a right to appeal again reflects

the agency thinking that administrative appeals have become a redundant form of

public participation.

Pre-decisional public input can be beneficial in that a proposed agency action

can more readily be modified before a decision is finalized, to take into account

matters and preferences presented by the public. On the other hand, absent any form

of administrative post-decisional appeal, and with only the more expensive option of

judicial review of agency decisions, there could be a tendency on the part of agency

decision-makers to disregard the pre-decisional public input.

Arguably,

administrative appeals can complement pre-decisional input by providing a check on

actual agency action.

The 1992 FS proposal to eliminate appeals elicited controversy and debate, and

resulted in Congress enacting the Appeals Reform Act (ARA), § 322 of the FY1993

Department of the Interior and Related Agencies Appropriations Act.47 ARA

41

(...continued)

(February 26, 1997).

42

53 Fed. Reg. 17,312-17,313 (1988).

43

Id.

44

54 Fed. Reg. 3,342 (1989).

45

54 Fed. Reg. 3,342, 3,344 (1989).

46

57 Fed. Reg. 10,444 (1992).

47

Pub. L. No. 102-381, 106 Stat. 1419. Some Senators had reacted vigorously to the

proposal to eliminate appeals: Sen. Wyche Fowler asserted forest management problems

would be worsened not solved by saying “Well, we’ll listen to these people, but if we

disagree with them, tough. That’s it. Book closed. You have no appeal. We are the

government, not you ... I am the god of the forest.” Speaker Thomas Foley asserted that

eliminating appeals would violate the legal guarantees of full and open public participation

and weaken public confidence. However, other senators supported the proposed changes.

(continued...)

CRS-10

requires the Secretary of Agriculture, acting through the Chief of the FS, to establish

processes both for notice and comment regarding proposed projects and activities

implementing plans, and for administrative appeals of such projects and activities.

ARA added to the NFMA language regarding public participation in planning

processes by specifically requiring notice and an opportunity for comment with

respect to projects and activities implementing plans. Before proposing an action

concerning projects and activities implementing plans, the Secretary is required to

mail notice about the proposed action to any person who has requested it in writing,

and to persons who are known to have participated in the decision making process.

Newspaper publication is also generally required, and a Federal Register notice is

required for actions taken by the Chief. A 30 day comment period then must follow.

Therefor, although an opportunity for public comment is not expressly required by

the CEQ regulations with respect to project EAs, a comment period is required by

ARA.

Under ARA, persons who are involved in the public comment process through

written or oral comments or by otherwise notifying the FS of their interest in the

proposed action have a right to appeal within 45 days from the time of a decision.

The statute provides for informal or formal disposition of administrative appeals, and

establishes time periods. Unless the Chief of the FS determines that an emergency

exists, a decision normally is to be stayed during the appeal filing period, or until 15

days after the date of the disposition of an appeal.

ARA effectively rejected the FS position that post-decisional administrative

appeals are redundant if an opportunity for pre-decisional public input is provided.

However, as will be seen in the discussion of recent regulatory changes and

proposals, that FS approach is still evident as to FS actions not covered by ARA —

notably the amendment or revision of plans, where the FS has eliminated appeals for

some actions if an opportunity for pre-decisional public involvement is provided.

Until the recent changes to the appeal regulations, there were three types of

appeals set out in 36 C.F.R., Part 217 for appeals of plans and significant plan

amendments, Part 215 for appeals of projects and activities implementing plans, and

Part 251 for appeals by permittees. There was no pre-decisional process for objecting

to or protesting a proposed FS decision. Provisions relating to notice of actions and

opportunities for public comment appeared in the planning and appeals regulations,

and varied depending of the level of the action. Despite the breadth of the ARA

language, notice and an opportunity to comment were not provided for all proposed

actions implementing forest plans. New FS post-ARA appeal regulations will be

discussed in connection with the 2002 proposed planning regulations below. The

ARA notice, comment, and appeal requirements have been dealt with in varying

ways in the FS regulations.

47

(...continued)

See Administrative Appeal Reform: the Case of the Forest Service, supra, at 398-399.

CRS-11

FS Planning Regulations

The general FS planning regulations have had a history of changes. Basic

planning regulations were adopted in 1979 and revised in 1982. The 1982

regulations basically remained in place with few changes until new planning

regulations were finalized November 9, 2000 under the Clinton Administration.48

The 2000 regulations were to have been phased in over time, but the current

Administration has extended the time for compliance with the new regulations,

thereby leaving the 1982 regulations in place. A new set of planning regulations was

proposed in 2002, but these have not yet been finalized.49 Both the 2000 regulations

and the 2002 proposed regulations would make significant changes in the application

of NEPA to forest planning, and would affect public participation as well.

The statutory requirements for public participation are most detailed and express

with respect to plans. While plans are vitally important in establishing the overall

guidance for forest management, a great deal of actual on-the-ground forest

management takes place in the selection, configuration, and execution of projects and

activities that implement the plans.50 In the absence of specific statutory direction in

NFMA in this regard, ARA, agency regulations, and other agency directives currently

play a major role in determining the extent of public involvement below the level of

plans.

Regulations of the Department of Agriculture and of the FS also contain the

framework for NEPA compliance. Departmental regulations set out the NEPA

policies for the Department as a whole, require compliance with that act, and charge

the Under Secretary, Natural Resources and Environment with ensuring that the

implementing procedures of agencies within the department are consistent with CEQ

regulations.51 Some departmental categorical exclusions are set out, and agencies are

charged with identifying additional ones and establishing exceptions when an EA or

EIS must be prepared.52

Some of the aspects of the three sets of FS planning regulations that are most

relevant to public participation are discussed in this section. References in this

section to the year 2000 Code of Federal Regulations (C.F.R.) refer to the 1982

regulations; references to the 2003 C.F.R. set out the November 9, 2000 Clinton

Administration changes; references to the Federal Register refer to the new planning

regulations that were proposed in 2002.

48

65 Fed Reg. 67,514 (November 9, 2000).

49

67 Fed. Reg. 72,700 (December 6, 2002).

50

Michael J. Gippert and Vincent L. DeWitte, The Nature of Land and Resource

Management Planning Under the National Forest Management Act, 3 ENVTL. LAW 149,

(September, 1996).

51

7 C.F.R. § 1b2.

52

7 C.F.R. § 1b.3(c).

CRS-12

1982 Regulations. The 1982 regulations set out the general principle of

public participation, and are more clear and specific with respect to public

participation in the development and revision of plans and regional guidance than

they are with respect to projects and activities that implement plans. However, the

regulations do refer to public participation in connection with activities below the

planning level:

(a) Because the land and resource management planning process determines how

the lands of the National Forest System are to be managed, the public is

encouraged to participate throughout the planning process. The intent of public

participation is to –

(1) Broaden the information base upon which land and resource management planning

decisions are made;

(2) Ensure that the Forest Service understands the needs, concerns, and values of the

public;

(3) Inform the public of Forest Service land and resource planning activities; and

(4) Provide the public with an understanding of Forest Service programs and proposed

actions.

...

(c) Public participation activities, as deemed appropriate by the responsible line

officer, shall be used early and often throughout the development of plans. At

least 30 days’ public notice shall be given for public participation activities

associated with the development of regional guides and forest plans. Any notice

requesting written comments on regional planning shall allow at least 60

calendar days for response. A similar request on forest planning shall allow at

least 30 calendar days for response. Draft regional guides and forest plans and

environmental impact statements shall be available for public comment for at

least three months.53

Section 219.6 details the type of notice and duration of comment periods

required in connection with regional guides and forest plans. Requirements for

notice and preparation of an EIS for such documents also are set out:

The responsible line officer shall give notice of the preparation of a land and

resource management plan, along with a general schedule of anticipated planning

actions, to the official or agency so designated by the affected State. These

notices shall be issued simultaneously with the publication of the notice of intent

to prepare an environmental impact statement required by NEPA procedures.54

A draft and final EIS must be prepared for plans, regional guides, plan revisions,

or significant amendments to plans, and for proposed standards and guidelines in

53

36 C.F.R. § 219.6 (2000) (emphasis added).

54

36 C.F.R. § 219.7 (2000).

CRS-13

regional guides,55 with at least a three-month comment period on a draft EIS.56

Before the most recent appeal regulation changes, former § 215.4 stated that actions

described in a draft EIS were subject to the NEPA notice and comment requirements

of 40 C.F.R. §§ 1500-1508, but not to FS notice and comment requirements.

Although the NFMA requires revision of forest plans at least every 15 years, the 1982

regulations require the revision cycle ordinarily to be every 10 years.57 Significant

amendments to a plan are to be completed through the same procedures as those

required for development and approval of a plan.58 NFMA and the regulations

require all activities to be consistent with the relevant plan.59 For plan amendments,

the responsible official must complete “satisfactory” environmental analyses and

conduct “appropriate” public involvement.60 Additional guidance with respect to

when environmental assessments, rather than EISs, are to be prepared, and on those

activities that are categorically excluded from NEPA document preparation are found

in the FS Handbook 1909.15, chapter 30.

Although there are no provisions in the 1982 planning regulations that require

specific types of public participation with respect to projects and activities

implementing forest plans, after the enactment of ARA in 1992, there is general

direction that “appropriate” public notification be provided, and there is guidance that

appears to allow for public participation for activities below the level of plans:

Public participation activities should be appropriate to the area and people

involved. Means of notification should be appropriate to the level of planning.

Public participation activities may include, but are not limited to, requests for

written comments, meetings, conferences, seminars, workshops, tours, and

similar events designed to foster public review and comment ....61

After 1992, the 1982 planning regulations were implemented in the context of

the notice and comment and appeal provisions of ARA and the new appeals

regulations that followed its enactment. Despite the breadth of the language in ARA

that required notice and comment for all projects and activities implementing plans,

under the regulations implementing ARA (i.e. before the 2000 Clinton

Administration changes or proposals), notice and opportunity to comment was only

provided for projects for which at least an environmental assessment was prepared,

and for most timber harvests that were listed as categorical exceptions to the

preparation of NEPA documents. Notice and comment was not provided for other

55

36 C.F.R. §§ 219.8(c) and 219.10(b)(2000). The NEPA documents were required to be

a single process that complied both with planning requirements and NEPA/CEQ

requirements.

56

36 C.F.R. § 219.8(b) (2000).

57

36 C.F.R. § 219.10(g) (2000).

58

36 C.F.R. § 219.10(f) (2000).

59

36 C.F.R. § 219.10(e) (2000).

60

36 C.F.R. § 219.10(f) (2000).

61

36 C.F.R. § 219.6(d) (2000).

CRS-14

categorically excluded activities,62 nor for non-significant amendments to plans that

were separate from project decisions, or were a part of a project for which no EA or

EIS was prepared.63

2000 Regulations. The 2000 (Clinton Administration) planning rule stressed

expansion of collaboration and pre-decisional public participation requirements.64

The regulations again specified more details with respect to revisions of plans, and

one regulation required public participation in planning in general:

The responsible official must:

(a) Make planning information available to the extent allowed by law;

(b) Conduct planning processes that are fair, meaningful, and open to persons of

diverse opinions;

(c) Provide early and frequent opportunities for participation in the identification of

issues;

(d) Encourage interested individuals and organizations to work collaboratively with

one another to improve understanding and develop cooperative landscape and other

goals;

(e) Consult with individuals and organizations who can provide information about

current and historic public uses within an assessment or plan area, about the location

of unique and sensitive resources and values and cultural practices related to issues in

the plan area; and

(f) Consult with scientific experts and other knowledgeable persons, as appropriate,

during consideration of collaboratively developed landscape goals and other

activities.65

The responsible official must seek to collaborate with those who have control or

authority over lands adjacent to or within the external boundaries of national

forests or grasslands ....66

Plan revisions began with advance notice and a comment period, and a draft and

final EIS were to be completed with an associated comment period.67 The 2000

regulations eliminated the requirement that plans be revised every 10 years and

instead simply referred to the relevant NFMA provision — which requires revision

every 15 years.68 This change also is expressed in the 2002 proposed rules.

Unless otherwise provided by law, under the 2000 regulations the responsible

official could propose to amend or revise a plan, propose a site-specific action, or

both, and was required to analyze the effects of any proposal and alternative(s) in

62

36 C.F.R. § 215.4(e)(2000)

63

36 C.F.R. 215.4(b), 215.3(a),(c) (2000).

64

See 36 C.F.R. §§ 219.2(c)(2) and (d); 219.12; – 219.18 (2003). The explanatory materials

indicate that not all commenters agreed that public participation had been expanded. 65

Fed. Reg. 67,537.

65

36 C.F.R. § 219.16 (2003).

66

36 C.F.R. § 219.17 (2003).

67

36 C.F.R. § 219.09 (2003).

68

36 C.F.R. § 219.9(a) (2003).

CRS-15

conformance with Forest Service NEPA procedures.69 This language did not require

any particular level of NEPA analysis and no particular type of public participation

was specified.

Reflecting statutory language, all site-specific decisions, including authorized

uses of land, were required to be consistent with the applicable plan. If a proposed

site-specific decision was not consistent with the applicable plan, the responsible

official might modify the proposed decision to make it consistent with the plan, reject

the proposal; or amend the plan to authorize the action.70 Similar language is

contained in the 2002 proposed regulations.

As discussed in connection with the 1982 regulations above, notice and

comment provisions appeared as part of the appeals regulations after the enactment

of ARA in 1993 (See 36 C.F.R. Part 215.) Despite the broad language of the ARA,

notice and opportunity to comment was only required for proposed actions

implementing forest plans for which an environmental assessment was prepared, for

categorical exclusions involving timber harvests, but not for other projects, nor for

non-significant amendments to plans that were included as part of a decision on a

proposed action for which an EA was prepared.71 Exceptions to the notice and

comment requirements of ARA were retained under the 2000 regulations and would

be expanded under the 2002 proposed regulations.

The Clinton rules included a new pre-decisional “objection” process for plans

and eliminated administrative appeals of plan revisions and amendments. Any

person could object to a proposed plan amendment or revision, except for those

proposed by the Chief.72 If an objection was received, the proposed amendment or

revisions could not be approved until the reviewing officer had responded to all

objections, and the final decision had to be consistent with the reviewing officer’s

response to objections.73 The Part 217 appeals of plans, revisions, and amendments

would be phased out.74 Appeals of site-specific decisions would still be available

under Part 215. These approaches are also taken in the 2002 proposed rules.

The explanatory material accompanying the Clinton regulations indicates that

many comments urged retaining appeals to ensure cumulative analysis of actions and

to allow public oversight of FS policy, and asserted that appeals are a citizen’s right,

and provide a means to resolve conflicts other than through litigation. The FS

responded that Part 217 appeals forced the expenditure of significant human and

financial resources “in fulfillment of procedural requirements,”75 and that appeals

may result in a polarized relationship in contrast to the pre-decisional objection

69

36 C.F.R. § 219.6 (2003).

70

36 C.F.R. § 219.10 (2003).

71

36 C.F.R. 215.3(a) – (c) (2000).

72

36 C.F.R. § 219.32 (2003).

73

36 C.F.R. § 219.32 (2003).

74

36 C.F.R. § 215.12 (2003).

75

65 Fed. Reg. 67,562.

CRS-16

process that could provide the “opportunity to seek reasonable solutions to

conflicting views before a plan amendment or revision is adopted.”76 These

arguments reflect points made before ARA was enacted, and seem premised on the

belief that appeals serve no purpose if pre-decisional public participation is provided.

Whether Congress will once again legislate to address public participation and

appeals of planning decisions is unclear.

2002 Proposed Regulations. The new proposed planning rule77 contains

general requirements for public participation, but also could make public

participation more difficult. On the one hand, the 2002 proposed rules include

general language that would require meaningful public participation in the planning

process, but would leave the specifics of how that participation will occur to the

responsible official:

The Responsible Official must provide early and frequent opportunities for

individuals and entities to participate openly and meaningfully in the planning

process. The Responsible Official shall determine the methods and timing of

opportunities to participate in the planning process. The Responsible Official

must provide for and encourage participation by interested individuals and

organizations, including private landowners whose lands are within, adjacent to,

or otherwise affected by management actions on National Forest System lands.78

Several other changes, however, appear likely to make public participation more

difficult. Of particular relevance is proposed § 219.2(c)(2), which indicates that more

management direction is to be moved to the directives level (i.e. it will not be in the

more binding and readily available regulations, but rather in the FS Manual or

handbooks, or even below that level in agency ‘white papers’ that are referred to

several times in the explanatory material accompanying the proposed regulations).79

It is not clear where or how these agency white papers, that will evidently contain

management guidance, may be made available to the public. Although the FS

Manual and handbooks are on-line, they do not have changes integrated into a

comprehensive text promptly.80 In addition to the Manual, handbooks, and white

paper guidance, regional and forest-by-forest guidance also affect plans and

activities. Arguably it could be difficult for a member of the public to retrieve all the

relevant pieces of information and meld them into coherent information on how

forests are to be managed. This piecemeal approach, by which planning requirements

and guidance are not compiled and integrated, could make it more difficult for the

public to ascertain what the planning requirements are, and hence whether there has

76

Id.

77

67 Fed. Reg. 72,770 (December 6, 2002). For a general discussion of the proposed rule,

see the CRS Congressional Distribution Memorandum, Analysis and Critique of the Forest

Service Planning Regulations Proposed on December 6, 2002, by (name redacted), January

3, 2003.

78

Proposed 36 C.F.R. § 219.12; 67 Fed. Reg. 72,799.

79

See e.g. 67 Fed. Reg. 72,784 and 72,786, both of which refer to expected guidance on

conservation of species being set out in agency white papers.

80

For example, as of May 26, 2004, the on-line FS Handbook materials on categorical

exclusions at 1909.30 still do not reflect the 2002 changes.

CRS-17

been compliance with them in any particular instance, or how the public might be

able to have input into the process or obtain judicial review.81

There are currently regulations at 36 C.F.R. Part 216 that were adopted in 1984

and provide for public input into and comment on FS Manual directives. If a Manual

directive is determined by the responsible official to be one that is of “substantial

public interest or controversy,”82 the regulations provide for a gradation of public

notice and comment procedures depending on the scope of the directive involved.

National proposals normally require notice published in the Federal Register,

followed by a minimum of 60 days for public review and comment. At the forest or

district level, the responsible official determines the appropriate means of notifying

the public of Manual changes, which may include a notice published in a newspaper

of general circulation or a press release, and a minimum of 30 calendar days for

review and comment.83 However, these procedures may be waived “for good cause

that an exigency exists,” in which case an interim Manual directive may be put in

place before any opportunity is afforded for public comment.84

However, the requirements of Part 216 do not apply to material in Handbooks

or to certain types of Manual directives,85 and it appears likely that “white papers” are

not covered either. If not, public input is not required with respect to those forms of

directives and any management direction they contain could be accomplished without

public notice or involvement.

In addition, there is some question whether and when manual and handbook

materials are even binding on the agencies. A court may conclude in some cases that

manual and handbook provisions are binding on an agency, depending on whether

the manual or handbook provisions were adopted with publication and other

formalities associated with full rulemaking. But, in contrast to agency regulations,

provisions contained in agency manuals and handbooks have generally been held to

lack the force and effect of law, to be non-binding on agencies, to be subject to

informal change, and not to give rise to private rights of enforcement.86 To the extent

a court so characterized the FS Manual handbook, white papers, or other directives,

moving forest management guidance to this level may preclude citizen enforcement

actions or judicial review both of agency planning standards and requirements, and

of compliance with them.

81

One has only to look at the series of directives issued in the context of the management

of the roadless areas to see the problems that can ensue. Those national directives have been

seen as confusing at best, sometimes were published only well after they were effective, and

are difficult to find on-line in an integrated form.

82

36 C.F.R. § 216.4 (2003).

83

36 C.F.R. § 216.6 (2003).

84

36 C.F.R. § 216.7 (2003).

85

36 C.F.R. § 216.3(a)(2) and (3)(2003).

86

KENNETH CULP DAVIS AND RICHARD J. PIERCE, JR., ADMINISTRATIVE LAW TREATISE §

3.5 (3d ed. 1994); CHARLES H. KOCH, JR., ADMINISTRATIVE LAW AND PRACTICE §§ 3.73 3.75 (1985).

CRS-18

All of the sets of regulations have urged coordination of federal planning with

other federal agencies and with non-federal planning entities in the area, such as

state, local, and tribal governments, but some of the details of the 2002 proposed

regulations may connote a shift in emphasis as to the type of participation in some

circumstances. Section 219.12 refers to “engaging the skills” of interested people

and entities. Under proposed § 219.12, the regulations state that individuals

(subsection (a)(1)) and Indian Tribes (subsection (a)(3)) must be given opportunities

to “participate.” When referring to state and local governments and other federal

agencies in (a)(2), the opportunity that must be provided is to “be involved.” This

may mean that non-federal state and local government staff may directly engage in

the planning process, as was done in the preparation by BLM of the Grand StaircaseEscalante Management Plan.87 In such circumstances, issues may arise involving the

difference between coordinating a federally-devised management plan for the federal

lands with those of surrounding jurisdictions – even following collaborative and

cooperative public input – and improperly permitting federal planning to be

conducted by non-federal personnel.

The 2002 proposed regulations expressly state that plans are usually to be

revised every 15 years — a provision that reflects the express language of the NFMA.

In a significant change, an EIS would not necessarily be prepared for plans, revisions,

and amendments, and some plans could even be prepared as categorical exclusions

— without completion of any NEPA analysis at all:

(a) The Responsible Official must comply with NEPA procedures and

incorporate them as necessary and appropriate throughout the planning process.

The Responsible Official must determine how NEPA applies in the development

of a new plan, plan amendment, or plan revision. The Responsible Official shall

ensure that the level of NEPA analysis for planning is proportional to the

decisions being made.

(b) If the Responsible Official determines that a new plan, plan amendment, plan

revision, or a component thereof, would be an action significantly affecting the

quality of the human environment, or authorizes an action that commits funding

or resources that could have a significant effect on the quality of the human

environment, then an environmental impact statement would be required. A new

plan, plan amendment, or plan revision may be categorically excluded from

documentation in an Environmental Assessment or Environmental Impact

Statement as provided in agency NEPA procedures.88 (Emphasis added.)

As discussed above, despite the broad language of ARA, under current

regulations decisions related to projects that are categorically excluded from NEPA

analyses need not include public notice and comment. What public participation

would be provided for plans prepared as categorical exclusions is not clear.

The explanatory materials to the 2002 proposed regulations assert that the

reason plans can be categorically excluded is that plans are permissive — they allow,

87

Jarry Spangler, ‘Enlibra’ – balance & stewardship, DESERET NEWS, November 29, 1998,

at B01, described the state and local officials as working “hand-in-glove” with federal

personnel.

88

67 Fed. Reg. 72,797 re 36 C.F.R. § 219.6.

CRS-19

but do not direct, that things may happen in specified areas. However, the plans are

the “programmatic management direction,”89 set the objectives of all forest

management that will guide particular decisions,90 set standards that state the

permissions or limitations for uses and actions,91 zone the forests, and eliminate some

uses and activities from particular areas — all decisions that could be made under the

proposed regulations without consideration of the environmental effects of these

choices or consideration of other alternatives, and without public participation.

Under the 2002 proposed rule, plans could be amended instantly in several ways

— with some associated limitations on public participation. Under proposed §§

219.7 and 219.18, administrative corrections and additions are expressly stated as not

being amendments. Proposed § 219.7(f) would provide for “interim amendments”

which could be for a term of up to four years that is renewable.92 The regulation is

silent as to notice to the public and public participation in the promulgation of such

interim amendments, except with respect to notice of renewals of interim

amendments. The planning regulation is also silent as to whether these amendments

may be appealed, but under § 219.7(f)(4), interim amendments would not be subject

to the objection process.

Proposed § 219.10(d)(3) would allow a plan to be amended in and by a project

decision — anytime a project would be inconsistent with a plan, the plan could be

instantly amended to produce consistency. This is similar to § 215.3 of the Clinton

regulations. Under the 2002 proposed regulations, an amendment made as part of a

decision is not subject to the objection process,93 but is appealable.94 It appears that

even an amendment made as part of a project decision for which an EA is prepared

is not eligible for the objection process. Legal notice must be published in designated

local newspapers for amendments that are subject to the objection process95 — which

amendments made as part of a project decision are not.

For an amendment that is subject to objection under § 219.19, proposed §

219.7(e) would require prior notice to the public of the opportunity to object to the

proposed amendment and any associated NEPA documents. Under § 219.19(a),

there will usually be a 30 calendar day period for pre-decisional review of a proposed

89

Id., re 36 C.F.R. § 219.4(a).

90

Id., re 36 C.F.R. § § 219.4(a)(2).

91

Id., re 36 C.F.R. § 219.4(a)(3).

92

67 Fed. Reg. 72,803.

93

67 Fed. Reg. 72,803, re 36 C.F.R. § 219.19(a)(1).

94

67 Fed. Reg. 72,804, re 36 C.F.R. § 219.20 (2003) states that a plan amendment made as

part of a site-specific decision may only be appealed as described in 36 C.F.R. § 215.7(a).

This latter section at that time (before the new appeal regulations) provided that project and

activity decisions that were documented in a Record of Decision or Decision Notice,

including those which contained a non-significant amendment as part of a project approval

decision, were subject to appeal. New § 215.11(a) allows an appeal of a non-significant

plan amendment made as part of a project decision.

95

67 Fed. Reg. 72,803 re 36 C.F.R. § 219.19(b)(2).

CRS-20

plan amendment, or revision through the “objection” process. Objections may only

be original submissions (as opposed to pre-printed postcards, etc.), and objections

may only raise the issue of whether the decision is consistent with the plan and law

– not whether it needs to be adjusted in some way to avoid some harm or to better

accomplish some goal.

Post-approval notice of some plan revisions and amendments is required to be

published in the Federal Register if the decision is made by the Chief of the Forest

Service or the Secretary of Agriculture, and “by other appropriate means, as

needed.”96 There is no administrative appeal of these decisions and recourse is to the

courts.97

Proposed § 219.7(d) provides that a plan amendment for which an EIS is

prepared is a significant amendment, and § 219.6(b) requires preparation of an EIS

for actions that could have a significant effect on the quality of the human

environment (the requirement in NEPA). In light of the fact that under the 2002

proposed regulations, an EIS might not be prepared even for plan revisions, there

may not be many plan amendments for which an EIS would be prepared and hence

few that would be deemed “significant,” and have clear requirements for full public

participation.

There are no specific requirements for public participation set out in the

proposed planning rule for non-significant plan amendments; rather it appears that

only the general provision of proposed § 219.12(a) that calls for “early and frequent”

opportunities for individuals and entities to participate openly and meaningfully in

the planning process pertains. If so, it is for the Responsible Official to determine

the “methods and timing” of opportunities to participate.

However, the new notice and appeal regulations also enter into the public

participation picture. The requirements of ARA are reflected in the notice and

comment and appeals provisions, but exceptions to the ARA requirements are

continued. Under new §215.3, notice and comment is required for projects and

activities for which an EA is prepared, and non-significant amendments made as part

of a project decision for which at least an EA is prepared. However, because ARA

only applied to projects and activities implementing plans, under new § 215.4 notice

and comment are not required for amendments, revisions, or adoptions of plans that

are made separately from any proposed actions and which therefore are subject either

to the objection process under §219.32,98 or administrative appeal under part 217 in

effect prior to November 9, 2000. Also under § 215.4, legal notice and opportunity

to comment is not available for actions taken as categorical exclusions. As will be

discussed in the next section of this report, categorical exclusions have recently been

expanded significantly.

96

36 C.F.R. § 219.21, 67 Fed. Reg. 72,804.

97

36 C.F.R. § 215.20.

98

This reference to § 219.32 is to a section in the 2000 [Clinton Administration] regulations

related to the objection process. The section apparently would be replaced under the 2002

proposed regulations by § 219.19.

CRS-21

Projects and activities implementing plans that are documented in a Record of

Decision or Decision Notice are subject to appeal under § 215.11(a), including those

which contain a non-significant plan amendment. Decisions for actions that are

categorical exclusions are not subject to appeal. Under § 215.12, amendments,

revisions, or adoption of a plan are not subject to appeals under part 215, but rather

are subject to either the objection process of § 219.32 or the appeal procedure under

§ 217 in effect prior to November 9, 2000. An amendment, revision or adoption of

a plan that includes a project decision also is not subject to appeal under part 215,

except that the project portion of the decision is.

Under § 215.9, decisions that are not subject to appeal may be implemented

immediately after publication of a decision documented in a Decision Notice or

Record of Decision that complies with those relevant time-frames. When a

determination has been made under § 215.10 that an emergency exists, a decision

documented in a Decision Notice or Record of Decision may also be implemented

immediately. Part 215 does not contain any provisions to stay a decision and

therefore, judicial review appears to be available for decisions that are immediately

effective.

To obtain a more complete picture of the extent to which the public may

participate in the management of the FS lands, planning rules must be read in

conjunction with the new appeal regulations described above, the new counterpart

regulations and implementing documents, various new categorical exclusions, and

Pub. L. No. 108-148.

Expansion of and Changes to “Categorical Exclusions”

Changes to agency NEPA documentation requirements also could significantly

affect public participation. As discussed above, some agency actions have been

shown to have so little effect on the environment that no NEPA documents are

necessary. An agency may indicate what these clearly non-harmful actions are

through its articulation of “categorical exclusions” — actions that are excluded from

preparation of NEPA documents because they have been found, individually or

cumulatively, not to have a significant effect on the human environment.99 Under

CEQ regulations, categorical exclusions may be adopted only after an opportunity for

public review and review by CEQ.100 Once adopted, however, activities within a

categorical exclusion may be conducted without formal environmental analyses, and,

despite the breadth of language in the ARA requiring notice and an opportunity to

comment for projects and activities implementing plans, no notice or comment is

required by the FS for activities within a categorical exclusion.

New categorical exclusions were developed jointly with the Department of the

Interior to allow “hazardous fuels reduction” activities and rehabilitation projects for

lands and infrastructure impacted by fires or fire suppression to be conducted without

99

40 C.F.R. 1508.4.

100

40 C.F.R. 1507.3.

CRS-22

environmental analyses.101 The hazardous fuels referred to consist of dense forest

growth of trees and underbrush that provide fire ladders and result in fires that burn

very hot and destroy whole trees as opposed to fires that sweep through a forest and

do not burn the crowns of trees. Projects could include mechanical fuels reduction

activities (e.g. cutting) on up to 1,000 acres, and fuels reduction activities using fire

on up to 4,500 acres. Rehabilitation projects may not exceed 4,200 acres. Projects

are to be developed through a collaborative process and limited to certain land types.

They may not be conducted in wilderness areas, but may be conducted in wilderness

study areas if they will not impair the suitability of wilderness study areas, and may

be conducted in FS roadless areas. They may not include the use of herbicides or

pesticides or the construction of new permanent roads.

New categorical exclusions regarding certain timber sales were finalized on July

29, 2003.102 The new exclusions allow live harvests of up to 70 acres; harvests of up

to 250 acres of dead and dying trees; and, if necessary to control insects and disease,

commercial or non-commercial timber harvests of up to 250 acres — with no

requirement that trees be dead or dying.

In addition, Title IV of the Healthy Forests Restoration Act of 2003 on insect

infestations and related diseases authorizes “applied silvicultural assessments,” which

are defined as treatments carried out for information gathering and research purposes,

and include timber harvesting, thinning, prescribed burning, pruning, and any

combination of those activities.103 Under § 404, these treatments may be conducted

on federal land that the Secretary determines is at risk of infestation by, or is infested

with forest-damaging insects, but not in components of the National Wilderness

Preservation System, a congressionally-designated wilderness study area, any federal

land on which, by Act of Congress or Presidential proclamation, the removal of

vegetation is restricted or prohibited, or in an area where the activities would be

inconsistent with the applicable land and resource management plan.

“Secretary” is defined in § 402(4) as the Secretary of Agriculture, acting through

the Forest Service, with respect to National Forest System land, and the Secretary of

the Interior, acting through appropriate offices of the United States Geological

Survey, with respect to federally owned land administered by the Secretary of the

Interior. Therefore, apparently projects could be conducted on all lands managed by

the Secretary of the Interior, including national parks and national wildlife refuges,

and not just on BLM lands.

Title IV projects are to be peer reviewed by scientific experts selected by the

Secretary and the public is to receive notice of each and be given an opportunity to

comment on it. Projects on not more than 1,000 acres may be categorically excluded

from NEPA documentation, but may not be carried out adjacent to another area that

is categorically excluded and being treated with similar methods. The Secretary is

not required to make any findings as to whether an applied silvicultural assessment

101

68 Fed. Reg. 33,814 (June 5, 2003).

102

68 Fed. Reg. 44,598.

103

Section 402(1).

CRS-23

project, either individually or cumulatively, has a significant effect on the

environment. Projects are subject to the extraordinary circumstances procedures

established by the Secretary. Not more than 250,000 acres may be treated as

categorical exclusions.104

Some have reacted favorably to the expanded use of categorical exclusions as

a way to accomplish necessary projects promptly. Others have pointed out that

environmental effects are not being analyzed despite the cumulative size of excluded

project areas, and have claimed that usually the public is denied an opportunity to

comment on or modify the project. In addition, some assert that the desire to reduce

fire risk is being used to accomplish the cutting of large green timber.

The categorical exclusions portion of the FS Handbook sets out types of

activities that normally would be excluded from preparation of NEPA documents —

unless extraordinary circumstances are present. Extraordinary circumstances include

the presence of inventoried roadless areas or species listed under the Endangered

Species Act. Until recent FS changes, extraordinary circumstances were defined as

“conditions associated with a normally excluded action that are identified during

scoping as potentially having effects which may significantly affect the

environment.” (Emphasis added.) The presence of an extraordinary circumstance

arguably removed the proposed action from qualifying as a categorical exclusion and

required the preparation of an EA in order to evaluate the possible environmental

effects and determine whether an action might have significant effects requiring an

EIS. This is the interpretation of the Handbook section and its legislative history in

a Seventh Circuit case.105

New interim guidance has been finalized106 so that now the presence of

extraordinary circumstances does not necessarily preclude an action from being a

categorical exclusion if the responsible official determines — without preparing an

EA — that no significant environmental effects will result from going forward with

the proposed agency action. Indeed, under the new directive, a circumstance is

“extraordinary” only if the responsible official determines it is such because the

proposed action would have significant effects and preparation of an EIS is

warranted. If the responsible official is uncertain whether the proposed action may

have a significant effect on the environment, an EA is to be prepared. However, the

official is free to conclude an action will have no significant effect, despite the

presence of circumstances such as listed species or inventoried roadless areas. Such

circumstances were previously considered (under one interpretation of the

regulations) to be extraordinary circumstances per se, but now are merely “resource

conditions” that must be considered in determining whether an action may have a

significant effect. “It is the degree of the potential effect of a proposed action on

these resource conditions that determines whether extraordinary circumstances

104

Section 404.

105

Rhodes v. Johnson, 153 F. 3d 785 (7th Cir. 1998).

106

67 Fed. Reg. 54,622 (August 23, 2002).

CRS-24

exist.”107 Arguably, this is a significant change from the previous guidance, in that

the judgment of the responsible official can replace an EA in determining whether

a proposed action in an area with sensitive conditions may have a significant effect

on the environment.

In support of the proposed changes on extraordinary circumstances, the

explanatory material asserts that there is a split in the decisions of the circuits on the

effects of the presence of extraordinary circumstances. The Ninth Circuit has held

that an agency may issue a categorical exclusion even where a certain resource

condition, such as the presence of threatened or endangered species, is found.108

However, the case cited for this proposition involved a salvage sale under § 2001 of

the Emergency Supplemental Appropriations and Rescission Act,109 a statute that

addressed a particular situation, provided the Secretary with very broad discretion to

determine the adequacy of any environmental reviews, and set out a very narrow

scope of judicial review of environmental decisions. In contrast, the Seventh Circuit

concluded that conducting an internal agency review to determine whether an agency

action proposed in an area with one or more extraordinary circumstances could have

a significant impact on the environment was not permitted under the then-current FS

categorical exclusion provisions, and that preparation of an EA was the proper means

to make that determination.110 The court also noted that the EA process allows for

public review; the internal agency determination would not.111 The recent FS

changes now permit the internal review (rather than preparation of an EA) the court

referred to. Whether a court would find the new FS position valid under NEPA has

not been determined. Under the final FS directive on extraordinary circumstances,

some timber sales could be conducted in roadless areas (and possibly in roadless

areas with endangered or threatened species) without environmental analyses if the

official determines, without the necessity of written documentation of any underlying

analysis, that there would be no significant environmental effects.

The Healthy Forests Restoration Act of 2003

Title I of Pub. L. No. 108-148, the “Healthy Forests Restoration Act of 2003”

(HRFA), addresses hazardous fuel reduction projects. Section 104 allows hazardous

fuel reduction projects in certain areas to be conducted if an EA or EIS is prepared

under modified procedures that limit the alternatives that need be considered.

Section 104 of the bill requires either an EA or an EIS for each authorized hazardous

fuel reduction project, but the environmental evaluations usually need study only the

proposed agency action, the “no action” alternative, and possibly one other

alternative. If the project is within a specified distance of an “at-risk community,”

only the proposed agency action need be studied in the EA or EIS. However, § 107

107

FSH 1909.15 – Environmental Policy and Procedures Handbook, § 30.3b.2.

108

Southwest Center for Biological Diversity v. U.S. Forest Service, 100 F. 3d 1443, 1450

(9th Cir. 1996).

109

Pub. L. No. 104-19, 109 Stat. 194, 240-247.

110

Rhodes v. Johnson, 153 F. 3d 785, 790 (7th Cir. 1998).

111

Id., at 787.

CRS-25

of the new law expressly preserves the authority of the Secretary to use other

authority, including categorical exclusions, to conduct hazardous fuel reduction

projects on federal lands, and the funds appropriated to implement the new statute are

not limited to projects conducted in accordance with it. Therefore, the new statute

could fund projects conducted under the new categorical exclusions put in place

administratively by the FS.

The act includes several provisions that address public notice and participation.

Public notice of each authorized hazardous fuel reduction project must be provided

— “in accordance with applicable regulations and administrative guidelines,” which

vary and may excuse notice in some circumstances, as discussed above. The act does

not specifically exempt fire projects from ARA. Section 104(e)(2) requires a public

meeting to be conducted during the preparation of each hazardous fuel reduction

project; subsection (f) requires the Secretary to facilitate collaboration among all

interested persons and groups; subsection (g) requires the Secretary to provide an

opportunity for public comment during the preparation of any EA or EIS for a project

in accordance with applicable agency regulations and guidance [which, as discussed,

may vary]; and subsection (h) requires the Secretary to sign a decision document and

give notice of the final agency action. The new law also includes special

administrative and judicial review provisions for these projects, as discussed below.

Collaboration is directed at several points in the law; § 104(f) reads:

In order to encourage meaningful public participation during preparation of

authorized hazardous fuel reduction projects, the Secretary shall facilitate

collaboration among State and local governments and Indian tribes, and

participation of interested persons, during the preparation of each authorized fuel

reduction project in a manner consistent with the Implementation Plan.112

Instead of requiring an opportunity for public comment on the NEPA documents

prepared in accordance with that section, § 104(g) ties that opportunity for public

comment to the applicable regulations and administrative guidance, which, as

discussed above, may or may not require public comment for an EA.

Under § 103, the Secretary is to prioritize projects for both federal and nonfederal lands, after considering recommendations made by at-risk communities that

have developed community wildfire protection plans.

Section 105 requires the Secretary of Agriculture to issue an interim final rule

within 30 days of enactment to establish a pre-decisional administrative review

process for hazardous fuel reduction projects authorized by HFRA. A reasonable

time for public comment is required, leading to a permanent final rule.

112

The Plan referred to is the “Implementation Plan for the Comprehensive Strategy for a

Collaborative Approach for Reducing Wildland Fire Risks to Communities and the

Environment,” dated May, 2002. The Plan address collaboration, but does not contain many

specifics as to how collaboration will be carried out.

CRS-26

On January 9, 2004, an interim final rule was issued, along with a request for

comments.113 The interim rule takes hazardous fuel reduction projects out of those

projects that are subject to the notice, comment and appeal procedures of Part 215,

and establishes a separate pre-decisional objection procedure as new Part 218 of 36

C.F.R., specifically for hazardous fuel reduction projects. A modified EIS or EA

must be prepared for fuels projects under the HFRA, and new 36 C.F.R. § 218.4

requires that a final EIS or EA be mailed to those who previously requested to be on

the project mailing list or are known to have submitted specific written comments

related to the proposed project during the opportunity for public comment provided.

Section 218.6(a) clarifies that for projects described in an EA, “such opportunity for

public comment will be fulfilled during scoping or other public involvement

opportunities as environmental assessments are not circulated for public comment

in draft form.” Thereafter, notice of an opportunity to object is to be published, and

procedures are set out that govern how objections are to be submitted and considered.

The reviewing officer is to provide a written response, but objections may be

consolidated for this purpose. This response is the only administrative review of

HFRA projects.

36 C.F.R. § 218.12 preserves any other authority of the Secretary of Agriculture

to protect, manage, or administer National Forest System lands, and provides that

authorized hazardous fuel reduction projects proposed by the Secretary of Agriculture

or the Under Secretary, Natural Resources and Environment, are not subject to the

procedures set out in Part 218, but rather is the final decision of the Department and

may be reviewed by the courts. Section 218.13 asserts that any filing for judicial

review is premature and inappropriate unless the plaintiff has submitted specific

written comments relating to the proposed action and the plaintiff has challenged the

project under the Part 218 review process. Judicial review of projects subject to Part

218 “is strictly limited to those issues raised by the plaintiff’s submission during the

objection process, except in exceptional circumstances such as where significant new

information bearing on a specific claim only becomes available after conclusion of

the administrative review.”

Section 105 requires, with some exceptions, exhaustion of administrative review

before filing a civil action in a federal district court. Section 106 urges the federal

district courts to expedite, to the maximum extent practicable, challenges to

hazardous fuel reduction projects. That section also limits judicial review by limiting

injunctive relief and stays pending appeal to 60 days, but these may be renewed. The

act also directs the courts when considering any request for an injunction of an

authorized hazardous fuel reduction project, to balance likely short- and long-term

impacts to the ecosystem from undertaking an agency action against the short- and

long-term effects of not undertaking the action.

Title IV of the HFRA addresses silvicultural assessments to respond to insect

infestations and includes new categorical exclusions which could permit timber

harvests and other measures on not more than 250,000 acres, as discussed under that

heading above.

113

69 Fed. Reg. 1,529.

CRS-27

Counterpart Regulations

Pursuant to 50 C.F.R. §402.04, joint “counterpart” regulations were finalized

by FS, BLM, the National Park Service, Bureau of Indian Affairs, FWS and NOAA

Fisheries on December 8, 2003114 to streamline the consultations required under § 7

of the Endangered Species Act. Normally, a federal agency prepares a biological

assessment and then must consult with either the Fish and Wildlife Service (FWS)

or NOAA Fisheries, as appropriate, regarding proposed agency actions that might

affect a species listed as endangered or threatened under the ESA, or its critical

habitat. The new regulations would allow the FS, BLM and the other participating

land management agencies themselves to determine that a proposed federal action

implementing the National Fire Plan115 is not likely to adversely affect species listed

under that act. Prescribed fire, mechanical fuels treatments, emergency stabilization,

burned area rehabilitation, road maintenance and operation activities, and ecosystem

restoration are among the activities or projects that would be covered by the new

procedure.

There is no indication in the materials published with the final regulations, or

in the “Alternative Consultation Agreement” of whether an agency’s “not likely to

adversely affect” determination may be appealed administratively or be judicially

reviewed, but arguably it would not be. Section 215.12 of the new FS appeal

regulations states that preliminary findings made during planning and/or analysis

processes on a project or activity are not appealable unless they result in a decision

document. As will be discussed in the BLM section, in the grazing regulations

proposed by BLM, new 43 C.F.R. §4160.1(d) would state that a biological

assessment or biological evaluation prepared for purposes of an Endangered Species

Act consultation or conference is not a decision for purposes of protest or appeal.

Arguably, if this provision is finalized, it could apply to biological evaluations done

pursuant to the counterpart regulations as well. If agency “not likely to affect”

determinations are not appealable, only judicial review would be available for review

of these agency decisions. Arguably, this could result in a lessening of the public’s

current opportunity to seek review of similar determinations when they are made by

the FWS or NOAA Fisheries.

Counterpart regulations have not been promulgated in the past and their validity

has not yet been tested in the courts. A recent FS memorandum indicates that the

agency may expand use of the counterpart concept to “all land management

activities.” In response to the four threats of fire, invasive species, un-managed

recreation and loss of open space, the FS is considering expanding use of the selfcertification concept of the counterpart regulations, categorical exclusions, and other

processes to expedite many management processes.116 Depending on how and to

114

68 Fed. Reg. 68,254.

115

The National Fire Plan is defined in 50 C.F.R. § 402.30 as the September 8, 2000 report

to the President from DOI and DOA entitled “Managing the Impact of Wildfire on

Communities and the Environment” outlining a new approach to managing fires.

116

Balancing Our Approach – Process Improvements Related to the Four Threats,

(continued...)

CRS-28

what extent this goal is accomplished and whether the decisions are appealable,

public participation could also be curtailed.

Bureau of Land Management

The relevant statutes and recent administrative actions affecting public

participation also are discussed in this section of the report. Instances where BLM

actions are the same as those discussed above with respect to the FS are noted.

Federal Land Policy and Management Act

In 1976, the Federal Land Policy and Management Act (FLPMA) consolidated

and modernized the statutory authority for the management of BLM lands, and

established policies to guide that management. Express FLPMA policies require

public involvement in the development of land management regulations, and also

require the establishment of administrative adjudicatory processes and judicial

review:

The Congress declares that it is the policy of the United States that –

(5) in administering public land statutes and exercising discretionary authority

granted by them, the Secretary be required to establish comprehensive rules and

regulations after considering the views of the general public; and to structure

adjudication procedures to assure adequate third party participation, objective

administrative review of initial decisions, and expeditious decisionmaking;

(6) judicial review of public land adjudication decisions be provided by law;

....117

These policies are implemented through several FLPMA provisions that direct

that the general public be involved in the development of rules and regulations, land

use plans and land programs; be allowed to comment on the formulation of standards

and criteria; and be given an opportunity to participate in both the preparation and

execution of plans and programs for the management of the public lands, and in land

management activities and decisions. FLPMA both establishes the policy of public

involvement and repeatedly states how extensive that involvement must be.

FLPMA required land inventory and planning processes and required public

involvement in planning and in decision making in general. “Public involvement”

is defined in FLPMA as:

the opportunity for participation by affected citizens in rulemaking,

decisionmaking, and planning with respect to the public lands, including public

116

(...continued)

Intermountain Region Director’s Round Table Discussion with Chief Bosworth — January

14, 2004, updated January 21, 2004.

117

43 U.S.C. § 1701(a).

CRS-29

meetings or hearings held at locations near the affected lands, or advisory

mechanisms, or such other procedures as may be necessary to provide public

comment in a particular instance.118

Public involvement is repeatedly required in the development, maintenance, and

revision of land use plans for the BLM lands,119 and the statutory language also

requires public involvement in management decision making and activities as well

as in planning.

BLM plans are to be coordinated with plans for lands in the National Forest

System and with the planning and management programs of Indian tribes.120 To the

extent consistent with the laws governing the administration of the public lands, the

Secretary of the Interior also is to coordinate the land use inventory, planning, and

management activities of the public lands with the land use planning and

management programs of other federal departments, and with agencies of the states

and local governments within which the lands are located. To the extent the

Secretary finds practical, the Secretary is to coordinate with and consider other

planning efforts and “provide for meaningful public involvement of State and local

government officials, both elected and appointed, in the development of land use

programs, land use regulations, and land use decisions for public lands, including

early public notice of proposed decisions which may have a significant impact on

non-Federal lands.” These officials may advise the Secretary on land use matters and

the land use plans of the Secretary are to be “consistent with State and local plans to

the maximum extent [the Secretary] finds consistent with Federal law and the

purposes of this Act.”121

Other activities, such as sales of lands, also must involve public participation

because they are keyed to the land use planning process,122 and general direction to

provide public involvement in planning and management programs is reiterated in

43 U.S.C. § 1712(f) and 1739(e) respectively:

The Secretary shall allow an opportunity for public involvement and by

regulations shall establish procedures, including public hearings where

appropriate, to give Federal, State, and local governments and the public,

adequate notice and opportunity to comment upon and participate in the

formulation of plans and programs relating to the management of the public

lands.

In exercising his authorities under this Act, the Secretary, by regulation, shall

establish procedures, including public hearings where appropriate, to give the

federal, State, and local governments and the public adequate notice and an

118

43 U.S.C. § 1702(e).

119

43 U.S.C. § 1712(a).

120

43 U.S.C. § 1712(b).

121

43 U.S.C. § 1712(c)(9).

122

43 U.S.C. § 1713(a). See also 43 U.S.C. § 1720 for additional state notice and

coordination requirements when lands might be sold or otherwise conveyed and § 1721

regarding special conveyances to states.

CRS-30

opportunity to comment upon the formulation of standards and criteria for, and

to participate in, the preparation and execution of plans and programs for, and the

management of, the public lands.

FLPMA also authorizes advisory councils, whose members are to be

representative of the various major citizens’ interests concerning issues relating to

land use planning or the management of the public lands in the area for which an

advisory council is established.123

BLM Regulations

The FLPMA requirements are integrated with NEPA processes through

regulations that provide for public participation in the environmental reviews that

may accompany plans and management decisions. As was true with respect to the

FS, and despite the fact that FLPMA has more requirements for public involvement

in decision making than does the NFMA, there are more specific agency

requirements for public involvement related to plans, and plan revisions and

amendments than for project decisions. 43 C.F.R. § 1610.2 requires that the public

be provided opportunities to “meaningfully participate in and comment on the

preparation of plans, amendments and related guidance and be given early notice of

planning activities.” Advance notice of preparation of amendments or revisions of

plans must be published in the Federal Register and in appropriate media. At least

15 days of public notice must be given for activities the public is invited to attend.

Any notice requesting written comments shall provide for at least 30 calendar days

for response. Other time periods are specified for review of draft plans and

environmental impact statements. Additional requirements are stated very generally,

with discretion allowed as to the details. For example, public notice and opportunity

for participation in resource management plan preparation “shall be appropriate to

the areas and people involved,” and shall be provided at points in the planning

process that are set out in the regulation. Federal planning efforts are to be

coordinated with other federal agencies, state and local governments and Indian

tribes, who are to be given opportunities for review, advice, and suggestions.124

Resource management guidance is to be consistent with plans and with the

policies and programs of other federal agencies, state and local governments and

Indian tribes so long as consistency with federal laws and regulation is maintained.125

There is considerable detail provided as to notice and coordination with state and

local governments.

Plans may be revised and revisions shall comply with all the requirements of the

regulations for approving an original plan.126 Plan amendments may be accompanied

by an EIS or EA, public involvement as prescribed in 43 C.F.R. § 1610.2, and with

123

43 U.S.C. § 1739(a).

124

43 C.F.R. § 1610.3-1.

125

43 C.F.R. § 1610.3-2.

126

43 C.F.R. § 1610.5-6.

CRS-31

interagency coordination and consistency determinations.127 If an EA shows there is

no significant impact likely to result from the amendment, the District Manager can

recommend the amendment to the State Director for approval, and upon approval, the

District Manager issues a public notice of the action taken on the amendment. If the

amendment is approved, it may be implemented 30 days after that notice. If the EA

indicates that an EIS is necessary, then the amendment process follows the same

route as preparation and approval of the plan, but consideration is limited to only the

portion of the plan being considered for amendment.

Plans, revisions, and amendments may be “protested” before they are finalized,

and issues raised in a protest must be addressed before a plan (or relevant part of a

plan) may be approved.128 Further recourse is then to the courts; there is no

administrative appeal of plans.

BLM – NEPA and Counterpart Procedures

Many of the issues discussed above in connection with the NEPA processes of

the FS also apply to BLM.

There is NEPA guidance at both the Department of the Interior level and at the

BLM agency level. The departmental NEPA guidance at Part 516 of the

Departmental Manual (DM) was recently modified in several respects, and in the

future the revised NEPA guidance of particular agencies will be published as

chapters in the Departmental Manual.129 According to the departmental NEPA

materials, an update of the BLM chapter is currently being prepared.130 516 DM 4

identifies circumstances in which an EIS will normally be prepared; individual

agency chapters are supposed to begin with provisions on when an EA or EIS is

required, and also set out the categorical exclusions of each agency. Bureaus and

Offices are to develop and implement procedures to ensure the fullest practicable

provision of timely public information and understanding of their programs. These

procedures are to include public involvement in the development of NEPA analyses

and documents, and include, wherever appropriate, provision for public meetings in

order to obtain the views of interested parties, newsletters, and status reports of

NEPA compliance activities, and the coordination and collaboration with state and

local agencies and tribal governments in developing and using similar procedures for

informing the public.131 The public is to be involved as early as possible, and NEPA

procedures are intended to achieve early consensus on the scope of NEPA

compliance. “Consensus-based management, as described in 516 DM 1.5(A)(1),

127

43 C.F.R. § 1610.5-5.

128

43 C.F.R. § 1610.5-1.

129

69 Fed. Reg. 10,866 (March 8, 2004) The Departmental Manual is available at

[http://elips.doi.gov/]. (Visited 5/28/04.) The materials state that a website compares the

new NEPA guidance to previous guidance and sets out supplemental directives at

[http://www.doi.gov/oepc]. (CRS’s search of the website on 6/16/04 for “NEPA guidance”

did not, however, locate such a comparison.)

130

Id., at 10,867.

131

Id., at 10,875.

CRS-32

should be used, as appropriate to facilitate this process, and should include the

consideration of any publicly developed alternatives. However, the use of consensusbased management may be restricted or ended based on applicable statutory,

regulatory, or policy requirements.”132

The NEPA provisions in the Departmental Manual are relevant to public

participation in that there are fewest opportunities for public participation with

respect to actions taken as categorical exclusions. 516 DM 3 identifies circumstances

in which an EA will normally be required; 516 DM 3.3 states that the public must be

provided notice of the availability of EAs. Public comment is not required, but

“where appropriate” the public is to be involved and public comments considered.

This position is repeated in the BLM/NEPA handbook at 1790.1-4 B4.133 516 DM

2.6 states that the scoping process “should” be used to integrate planning activities

for separate projects that may have similar or cumulative impacts.134 This appears

to make scoping discretionary in the context of an EA.

BLM also is a party to the joint FS/BLM categorical exclusions for fuels

reduction and rehabilitation projects and activities. These exclusions are especially

relevant to the management of the significant timber resources by BLM in Oregon

and northern California, but also apply to projects on the rangelands. In addition,

there are DOI departmental categorical exclusions and BLM-wide categorical

exclusions. As discussed in connection with the FS, to the extent activities are

conducted as categorical exclusions, there are no formal environmental documents

for the public to review, and notice and comment are not required.

Appendix 1 of the Interior Departmental Manual lists departmental categorical

exclusions, many of which relate to administrative and personnel matters. Exclusion

1.9 is for policies, directives, regulations and guidelines that are of an administrative

nature and whose environmental effects are too broad, speculative, or conjectural to

lend themselves to meaningful analysis and will later be subject to the NEPA

process, either collectively or case-by-case. Section 1.11 excludes the joint

hazardous fuels reduction activities agreed to with the FS, and § 1.12 excludes the

post-fire rehabilitation activities. These categorical exclusions are recent changes.

Whether an EA must be prepared when evaluating the presence of extraordinary

circumstances in a situation that otherwise would be a categorical exclusion is

another important factor that bears directly on the extent of public participation

available. The position of BLM on extraordinary circumstances appears to parallel

the new position of the FS in that agency personnel will make crucial determinations

on environmental effects without preparation of an EA. The explanatory materials

accompanying the departmental changes refer to the CEQ regulations on

extraordinary circumstances as those in which a normally excluded action may have

a significant environmental effect – thus requiring additional analysis and action –

and then state: “[a]ny action that is normally categorically excluded must be

132

Id., at 10,876.

133

See [http://www.ca.blm.gov/caso/h1790-1.html], (visited 6/3/2004).

134

Id., at 10,877.

CRS-33

subjected to sufficient environmental review to determine whether it meets any of the

extraordinary circumstances, in which case, further analysis and environmental

documents must be prepared for the action. Bureaus are reminded and encouraged

to work within existing administrative frameworks, including any existing

programmatic agreements, when deciding how to apply any of the appendix 2

extraordinary circumstances.”135

Appendix 2 of the Interior Departmental Manual addresses extraordinary

circumstances and states that they are circumstances which may have significant

impacts on natural resources, ESA-listed species, etc. As was true of the FS, the

DOI approach does not list circumstances that trigger a need to prepare an EA, but

rather appears to call for the action officers to decide whether the proposed action in

particular circumstances may have a significant effect — a function intended to be

fulfilled by the preparation of an EA. Many of the paragraphs in Appendix 2 take a

similar stance — an extraordinary circumstance only exists if the acting official

concludes, without preparation of an EA, that the action may have a significant

effect. Yet 516 DM 3.2A states that the purpose of an EA is to allow the responsible

official to determine whether to prepare an EIS (i.e. the EA indicates whether a

proposed action may have a significant effect), or to otherwise assist in planning and

decision making. (Emphasis added.) Similarly, 516 DM 7.4B states that EAs “are

prepared either to provide information in order to make a finding that there are no

significant impacts or that an EIS should be prepared.” (Emphasis added.) This is

the function of an EA under the CEQ regulations. Previously, the section on

categorical exclusions contained a list of circumstances that required an EA to be

prepared to determine the likelihood of significant effects.

The new final DOI appeals regulations include a brief description of the

environmental review that is completed for a categorical exclusion:

A categorical exclusion does not exempt an agency action from environmental

review. Rather, it requires the agency to scrutinize the proposed action to see

whether it meets the criteria for categorical exclusion, that is, whether it is the

type of action that the agency has decided, through its procedures adopted under

40 CFR 1507.3 of the regulations of the Council on Environmental Quality, does

not individually or cumulatively have a significant effect on the human

environment. In practice, this will normally be done through a documented

checklist of criteria.136

BLM is a party to the counterpart regulations discussed above, and the same

points on possible limitations of public participation in connection with those

determinations pertain. In the grazing regulations proposed by BLM, new 43 C.F.R.

§4160.1(d) would state that a biological assessment or biological evaluation prepared

for purposes of an Endangered Species Act consultation or conference is not a

decision for purposes of protest or appeal. Arguably, if this provision is finalized,

it would probably apply to biological evaluations done pursuant to the counterpart

regulations as well. If so, it appears that the only public recourse would be judicial

135

Id. (emphasis added).

136

68 Fed. Reg. 33,799-33,800 (June 5, 2003).

CRS-34

review. We have no information as to whether BLM will seek to expand the self

certification process of the counterpart regulations to other planning and management

activities in the same way as the FS is considering.

Proposed Grazing Regulations

Other recent BLM actions also could affect public participation. On December

8, 2003, BLM proposed amendments to the grazing regulations.137 One proposal is

to reduce the instances in which BLM is required to solicit public comment on

pending grazing management decisions on the grounds that public participation

processes were consuming too much scarce staff time.138 The explanatory materials

state that BLM proposes retaining the requirement that BLM provide the interested

public with copies of proposed and final grazing decisions and allowing them

respectively to protest and appeal them. BLM also proposes retaining consultation

with the interested public for: (1) apportioning additional forage on BLM managed

lands; (2) developing or modifying a grazing activity plan and other BLM land use

plans; (3) planning a range development or improvement program; and (4) reviewing

and commenting on grazing management evaluation reports. BLM proposes

eliminating requiring public consultation on: (1) adjusting allotment boundaries; (2)

changing grazing preference; (3) issuing emergency closures; (4) renewing or issuing

a grazing permit or lease; (5) modifying permits and leases; or (6) issuing temporary

and non-renewable grazing permits. Arguably, many of these topics for which public

consultation would be eliminated could be important to the condition of the

rangelands and their ability to serve non-grazing multiple uses. BLM also may

consult with permittees and lessees, state and local officials and the interested public

on other matters if the authorized officer finds consultation would facilitate

management of grazing on the public lands.

At several points, the proposed grazing regulations appear to give permittees

and grazing operators a greater role in management decisions than other segments of

the public. As discussed above, consultations are conducted with the permittees and

operators and with the state and local officials, but the public will be consulted only

with respect to certain topics.139 The materials explain that the public will be

consulted

where such input would be of the greatest value, such as when deciding

vegetation management objectives in an allotment management plan, or

preparing reports evaluating range conditions. BLM in cooperation with the

grazing operator, would retain the discretion to determine and implement the

most appropriate on-the-ground management actions. BLM values productive

consultation with the interested public. However, BLM needs some flexibility

137

68 Fed. Reg. 68,454. See Carol Hardy-Vincent, CRS Report No. CRS Report RL32244,

Grazing Regulations and Policies: Changes by the Bureau of Land Management.

138

Id., at 68,454.

139

Id.

CRS-35

in order to take responsive, timely, and efficient management action without

being required to first undertake mandatory consultation.140

In addition, the proposed regulations would add to 43 C.F.R. § 4120.5-2 (on

cooperation) to provide that BLM “shall cooperate” with state, local, or countyestablished grazing boards in reviewing range improvements and allotment

management plans on public lands. Federal grazing advisory boards authorized by

FLPMA expired under that act on December 31, 1985, and have not been reinstated.

The consultations with the non-federal grazing-focused boards mentioned in the

proposed regulations would be in addition to interactions with the federally

constituted Resource Advisory Councils, which are required to have balanced

membership.141

Proposed Grazing Appeals

The proposed grazing regulations would clarify how appeals of BLM grazing

decisions and petitions for stays of decisions pending appeal would affect the timing

of implementation of a grazing-related decision and the continuity of ongoing grazing

operations. As discussed in the explanatory materials, basically if an agency decision

can be and is stayed, an appellant must exhaust administrative remedies before going

to court; if a decision or action is effective immediately and not stayed, a claimant

may proceed to court. In developing the proposed regulations, BLM asserts that it

balanced its duties under various statutes by allowing grazing to continue under

existing permit terms and conditions if a decision changing those terms and

conditions is stayed. The agency asserts that this outcome is valid under the APA (5

U.S.C. § 558), which requires that “a license with reference to an activity of a

continuing nature” does not expire until an agency makes a new determination.142 In

instances where there is not an existing permit, BLM would allow grazing in

accordance with a decision, even in the case of a stay, if the decision favored grazing

in several enumerated circumstances, and affected parties could proceed to court

without exhausting administrative remedies. Under current and proposed

regulations, the authorized officer may provide that a grazing decision is effective

upon issuance unless a stay is granted by the Office of Hearing and Appeals. In sum,

it appears that under the current and proposed rules, existing grazing usually would

be allowed to continue and anyone challenging a change decision could be required

to pursue more expensive judicial appeals, which could reduce the number of

appeals.

General DOI Appeals

On June 5, 2003, the Office of Hearings and Appeals of the Department of the

Interior finalized changes to its appeals rules in several respects that affect public

140

Id.

141

43 C.F.R. § 1784.

142

Id.

CRS-36

participation issues.143 Under the new regulations, restrictive decisions of the Interior

Board of Land Appeals (IBLA) on certain definitions and on standing to appeal were

“codified” in the regulations as new 43 C.F.R. § 4.410.

A new provision at 43 C.F.R. § 4190.l and a change at § 5003.1 would make

BLM wildfire management decisions affecting rangelands and forests effective

immediately when issued, a position that complicates administrative appeals. The

appeals changes received many comments when proposed. Those in favor of the

proposed rules emphasized the protective nature of the actions and that “the faster

BLM is able to take action to reduce future threats of wildland fires, the more likely

BLM can safeguard public and firefighter health and safety, protect property, and

improve environmental baseline conditions in the wildland-urban interface and other

priority areas.”144 Other comments objected to the regulation, asserting that the rule

change would undermine the value of public comment by allowing citizen concerns

to be effectively ignored, further eroding the trust citizens have in public land

management agency decisions. Comments further asserted that (1) the proposed rule

would allow a project to begin before a decision is made on the appeal, effectively

discounting public opinion; (2) a decision on appeal to reject a proposed project has

less effect if the project has already commenced and any negative effects of the action

have already occurred; (3) the public is less likely to participate in the decision

making process when it can have no real or immediate effect on a proposed project;

and (4) such a policy “contradicts the spirit of FLPMA which encourages public

comment on proposed actions and participation in the appeal process for a

management decision.”145

In response, DOI stated that “[t]he appeal process is not part of the public

participation required by Section 309(e) of FLPMA.” This approach contrasts to the

position taken by the Forest Service that appeals are a part of public participation, but

are redundant if pre-decisional input is available. DOI also asserted that making fire

management decisions effective immediately actually “encourages public

participation by making it more essential at the project design/environmental review

state. It is at this stage that BLM gathers evidence and public input upon which to

base its fire management plans/projects and decisions.”146 Some comments pointed

out that there was existing authority to make decisions effective immediately on a

case-by-case basis, but BLM responded that it “views its ability to carry out fire

management practices as a matter of great urgency” and that “these fire management

decisions need to be effective immediately.”147 Wildfire management decisions are

also expedited before the IBLA under new § 4.416, such that a decision is to be

rendered by that Board within 60 days after all pleadings have been filed, and within

180 days after the appeal was filed.

143

68 Fed. Reg. 33,794.

144

Id., at 33,795.

145

Id., at 33,796.

146

Id.

147

Id.

CRS-37

There is precedent for these changes in the DOI regulation at 43 C.F.R. §

4160.3(f), which allows BLM to place certain protective grazing decisions into effect

immediately or on a date certain. A decision that is put into effect immediately could

still be appealed to the IBLA and a petition for a stay filed under 43 C.F.R. § 4.21(b).

(The action being appealed could be ‘stayed’ from going into effect for the time the

stay is in place.)

Several aspects of stays and effectiveness of decisions can present issues as to

when judicial review is available. The Supreme Court in Darby v. Cisneros148 held

that when judicial review is sought under the APA (and most cases would be brought

under the APA), a plaintiff can file in court once an agency decision is final, unless

further administrative review is required by the agency’s regulations and those

regulations also provide that the decision for which review is sought is made

inoperative during the time of review. If a hazardous fuels management project

decision is made effective immediately and the decision is not automatically made

inoperative during the time appeals, if any, are taken,149 it appears that judicial review

of such a decision would be available. Similarly, if a stay is sought before the IBLA

and denied, an injunction could be sought at the judicial level, although part of the

project in question could be underway. 43 C.F.R. § 4.21(c) states:

No decision which at the time of its rendition is subject to appeal to the Director

or an Appeals Board shall be considered final so as to be agency action subject

to judicial review under 5 U.S.C. 704, unless a petition for a stay of decision has

been timely filed and the decision being appealed has been made effective in the

manner provided in paragraphs (a)(3) or (b)(4) of this section [which provide that

the Director or an appeals board may deny or partially deny a petition for a stay

within a specified time] or a decision has been made effective pending appeal

pursuant to paragraph (a)(1) of this section [which provides that a decision not

normally effective immediately can be made so by the Director or an appeals

board] or pursuant to other pertinent regulation.

Conclusion

The principal statutes governing the federal lands administered by the FS and

BLM establish a policy of public participation in land and resource management

planning and decision making. Public participation requirements at both the statutory

and regulatory levels are most clear with respect to larger-scale decisions, such as the

development and revision of plans themselves, rather than with respect to projects

and activities implementing plans. However, FLPMA contains several requirements

for public participation in decision making and management activities. In addition,

148

149

509 U.S. 137 (1993).

On this point, see Natural Desert Association v. Green, 953 F. Supp. 1133, 1141-1142

(D. Or. 1997), which found the agency stay provisions did not render agency decisions

inoperative because they vested discretion in the agency to stay the decision pending appeal.

Idaho Watersheds Project v. Bureau of Land Management, 307 F. 3d 815 (9th Cir. 2002)

examined exhaustion of administrative appeal issues in the context of BLM grazing permits

and declined to rule on whether the regulations on stays per se failed to render agency

decisions inoperative because the court found that in the grazing context decisions were not

rendered inoperative as a factual matter.

CRS-38

the Appeals Reform Act, related to the FS, requires that the public receive notice and

have an opportunity to comment on projects and activities implementing FS plans.

Despite the broad language of ARA, FS implementing regulations exempt many

projects and activities, such as those conducted as categorical exclusions, from the

notice and comment provisions. This has been true since ARA was enacted, but

recent expansion of the number and scope of categorical exclusions makes the

elimination of public participation in connection with them more significant.

Both the FS and BLM have recently made or proposed administrative changes

to their planning, NEPA, and appeal processes that also affect public participation.

The FS has seen a succession of changes to its planning regulations and has expanded

management direction in agency documents below the level of regulations — through

agency manual and handbook materials and possibly down to the level of agency

“white papers” — a system that makes it difficult for a member of the public to

compile and integrate the relevant management information in order to participate

effectively.

In the past, both agencies relied heavily on NEPA processes to provide public

participation. Requirements for preparation of NEPA documents (especially EISs),

with associated requirements for public participation, are most clear in connection

with agency plans. Despite statutory direction to incorporate public participation into

agency decision making as well as planning (especially with respect to BLM), there

are fewer specific requirements in agency regulations to do so, and broader discretion

as to how public involvement may be provided.

In addition, there has been a significant expansion in the use of categorical

exclusions by both agencies, and a narrowing of the extent to which the presence of

extraordinary circumstances may remove a proposed action from being a categorical

exclusion. Although some of fire-related categorically excluded projects will be

developed collaboratively, and some insect control related categorically excluded

projects are required to have public notice and comment, arguably the elimination of

many environmental studies together with their associated notice and comment

periods, the expansion of projects conducted as categorical exclusions, and the new

approach to extraordinary circumstances may significantly reduce opportunities for

public input.

Access to administrative appeals has also been reduced. In the past, the FS has

viewed appeals as a type of public participation and recently has substituted a predecisional objection process for “redundant” public appeals of forest plans. The

ARA requires administrative appeals of projects and activities implementing plans,

but does not require appeals of plans themselves. In contrast, the BLM asserts that

appeals are not a form of public participation, and can be limited without violating

the letter or spirit of FLPMA. By making many decisions effective immediately —

with recourse likely to be only to the courts — both agencies have effectively skipped

administrative appeals in those instances. Because judicial review is more expensive,

this may result in fewer appeals, and hence a reduction in public review of agency

actions.

The agencies assert the need for expeditious decision making, improved

efficiency and cost reduction as reasons for some of the regulatory changes. Some

CRS-39

changes are the product of experience over time with the operation of certain

programs and the agencies’ judgment that streamlining is necessary for the efficient

management of the federal lands.

The extent to which the public is allowed to participate meaningfully in the

management of the federal lands managed by the FS and BLM may raise questions

of compliance with current statutory requirements. Agency actions and their effects

on public participation may raise policy issues of either legislative or oversight

interest to the Congress.

EveryCRSReport.com

The Congressional Research Service (CRS) is a federal legislative branch agency, housed inside the

Library of Congress, charged with providing the United States Congress non-partisan advice on

issues that may come before Congress.

EveryCRSReport.com republishes CRS reports that are available to all Congressional staff. The

reports are not classified, and Members of Congress routinely make individual reports available to

the public.

Prior to our republication, we redacted names, phone numbers and email addresses of analysts

who produced the reports. We also added this page to the report. We have not intentionally made

any other changes to any report published on EveryCRSReport.com.

CRS reports, as a work of the United States government, are not subject to copyright protection in

the United States. Any CRS report may be reproduced and distributed in its entirety without

permission from CRS. However, as a CRS report may include copyrighted images or material from a

third party, you may need to obtain permission of the copyright holder if you wish to copy or

otherwise use copyrighted material.

Information in a CRS report should not be relied upon for purposes other than public

understanding of information that has been provided by CRS to members of Congress in

connection with CRS' institutional role.

EveryCRSReport.com is not a government website and is not affiliated with CRS. We do not claim

copyright on any CRS report we have republished.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.