Appropriations for FY2002:

Energy and Water Development

Updated February 5, 2002

Coordinated by Carl Behrens and name redacted

Resources, Science, and Industry Division

Congressional Research Service ˜ The Library of Congress

Appropriations are one part of a complex federal budget process that includes budget

resolutions, appropriations (regular, supplemental, and continuing) bills, rescissions, and

budget reconciliation bills. The process begins with the President’s budget request and is

bounded by the rules of the House and Senate, the Congressional Budget and Impoundment

Control Act of 1974 (as amended), the Budget Enforcement Act of 1990, and current program

authorizations.

This report is a guide to one of the 13 regular appropriations bills that Congress passes each

year. It is designed to supplement the information provided by the House and Senate

Appropriations Subcommittees on Energy and Water. It summarizes the current legislative

status of the bill, its scope, major issues, funding levels, and related legislative activity. The

report lists the key CRS staff relevant to the issues covered and related CRS products.

NOTE: A Web version of this document with active links is

available to congressional staff at:

[http://www.crs.gov/products/appropriations/apppage.shtml].

Appropriations for FY2002:

Energy and Water Development

Summary

The Energy and Water Development appropriations bill includes funding for civil

works projects of the Army Corps of Engineers, the Department of the Interior’s

Bureau of Reclamation (BOR), most of the Department of Energy (DOE), and a

number of independent agencies. The Bush Administration requested $22.5 billion

for these programs for FY2002 compared with $23.6 billion appropriated in FY2001.

The House bill, (H.R. 2311), passed on June 28, 2001, allocated $23.7 billion for

these programs. The Senate approved its version of the bill July 19, 2001, with $25.0

billion. The final bill appropriating $25.086 billion was approved by both houses on

November 1, 2001 and enacted on November 12, 2001 as P.L. 107-66.

Key issues involving Energy and Water Development appropriations programs

included:

! authorization of appropriations for major water/ecosystem restoration

initiatives for the Florida Everglades and California “Bay-Delta”;

! general provisions concerning operation of federal water projects on the

Missouri River;

! proposed reductions in spending for solar and renewable energy;

! the electrometallurgical treatment of nuclear spent fuel for storage and

disposal, a process that opponents contend raises nuclear proliferation

concerns;

! cost and management of the National Ignition Facility (NIF) in DOE’s Nuclear

Weapons Stewardship program;

! restricted funding of physical sciences research in DOE contrasted with major

increases in life sciences research in the National Institutes of Health; and

! proposed higher funding for DOE’s civilian nuclear waste management

program as the Department nears a decision on building a waste repository

under Nevada’s Yucca Mountain.

Key Policy Staff

Area of Expertise

Name

CRS Telephone

Division

Corps/Bureau of Reclamation

Steve Hughes

Betsy Cody

RSI

RSI

7-....

7-7229

General

Carl Behrens

(name redacted)

RSI

RSI

7-....

7-7264

Nuclear Energy

(name redacted)

RSI

7-....

R&D Programs

Dick Rowberg

(name redacted)

RSI

RSI

7-....

7-7039

Nonproliferation and Terrorism

Carl Behrens

RSI

7-....

Nuclear Weapons Stewardship

Jonathan Medalia

FDT

7-....

PMAs

Rob Bamberger

RSI

7-....

Report Preparation and Support

(name redacted)

RSI

7-....

Division abbreviations: RSI = Resources, Science, and Industry; FDT= Foreign Affairs, Defense, and

Trade.

Contents

Most Recent Developments . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

Status . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

Title I: Corps of Engineers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

Key Policy Issues — Corps of Engineers . . . . . . . . . . . . . . . . . . . . . . . . . . 3

Proposed Corps Reforms . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

Auburn Dam Study . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

Missouri River Water Flows . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4

Everglades . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

Title II: Department of the Interior . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6

Title III: Department of Energy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

Key Policy Issues — Department of Energy . . . . . . . . . . . . . . . . . . . . . . . 11

Funding to Combat Terrorism . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

Renewable Energy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

Nuclear Energy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13

Science . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

Nuclear Weapons Stockpile Stewardship . . . . . . . . . . . . . . . . . . . . . 16

Directed Stockpile Work (DSW) . . . . . . . . . . . . . . . . . . . . . . . . . . . 17

Nuclear Weapons Stewardship R&D . . . . . . . . . . . . . . . . . . . . . . . . 19

Nonproliferation and National Security Programs . . . . . . . . . . . . . . . 20

Environmental Management . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21

Civilian Nuclear Waste . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 22

Power Marketing Administrations . . . . . . . . . . . . . . . . . . . . . . . . . . 23

Federal Energy Regulatory Commission (FERC) . . . . . . . . . . . . . . . 24

Title IV: Independent Agencies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25

Key Policy Issues — Independent Agencies . . . . . . . . . . . . . . . . . . . . . . 25

Nuclear Regulatory Commission . . . . . . . . . . . . . . . . . . . . . . . . . . . 25

For Additional Reading . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26

CRS Issue Briefs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26

CRS Reports . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27

List of Tables

Table 1. Status of Energy and Water Appropriations, FY2002 . . . . . . . . . . . . . 1

Table 2. Energy and Water Development Appropriations, FY1995 to FY2002 . 2

Table 3. Energy and Water Development Appropriations

Title I: Corps of Engineers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3

Table 4. Energy and Water Development Appropriations

Title II: Central Utah Project Completion Account . . . . . . . . . . . . . . . . . . . 6

Table 5. Energy and Water Development Appropriations

Title II: Bureau of Reclamation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7

Table 6. Energy and Water Development Appropriations

Title III: Department of Energy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9

Table 7. Energy and Water Development Appropriations

Title IV: Independent Agencies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25

Appropriations for FY2002:

Energy and Water Development

Most Recent Developments

The House and Senate approved $25.086 billion in appropriations for energy

and water development programs, $2.1 billion more than the Administration’s

request. The act funds the Corps at $4.49 billion, Interior at $914 million, and DOE

at $14.54 billion. The bill was signed (P.L. 107-66) by the President on November

12, 2001.

A point of debate in the final passage of H.R. 2311 was an attempt by some

Members to increase funding of DOE’s nonproliferation programs by $131 million

to help secure nuclear materials in Russia. The bill’s managers blocked the move

but promised to try to obtain funding in another bill. On November 28 the House

passed H.R. 3338, the FY2002 Defense Appropriations and Emergency Supplemental

bill, without the additional nonproliferation funding, after blocking a move to

include it. However, the Senate-passed version of the bill included similar funding,

and on December 20 both the House and the Senate passed a conferenced H.R. 3338

with the Senate nonproliferation funding included ($226 million). In addition, the

supplemental bill included $30.3 million in security funding for the Bureau of

Reclamation and $139 million for the Corps of Engineers.

Status

Table 1. Status of Energy and Water Appropriations, FY2002

Subcommittee

Markup

House

House

Report

House

Passage

Senate

Report

Senate

Passage

Conf.

Report

Senate

6/19/01 7/12/01

H.Rept.

107-112

6/28/01

S.Rept.

107-39

7/19/01

H.Rept.

107-258

Conference Report

Approval

P.L.

107-66

House

Senate

11/1/01

11/1/01 11/12/01

Overview

The Energy and Water Development Appropriations Act 2002, P.L. 107-66,

includes funding for civil works projects of the Army Corps of Engineers, the

Department of the Interior’s Bureau of Reclamation (BOR), most of the Department

of Energy (DOE), and a number of independent agencies, including the Nuclear

Regulatory Commission (NRC) and the Appalachian Regional Commission (ARC).

CRS-2

The Administration requested $22.5 billion for these programs for FY2002, compared

with $23.6 billion appropriated for FY2001. The House bill contained $23.7 billion

and the Senate bill $25.0 billion. The final bill (P.L. 107-66) appropriated $25.086

billion.

For the Corps of Engineers, the Administration sought $3.9 billion in FY2002,

about $600 million less than the amount appropriated for FY2001. The House-passed

bill, H.R. 2311, contained $4.47 billion. The Senate-passed version of H.R. 2311

contained $4.305 billion. The final bill approved $4.49 billion. The Administration

requested $820 million for FY2002 for the Department of the Interior programs

included in the Energy and Water bill — the Bureau of Reclamation and the Central

Utah Project. This would have been an increase of approximately $3.3 million over

FY2001. The House-passed version of H.R. 2311 included $843 million for the DOI

programs, and the Senate-passed version included $884 million. The final bill

appropriated $914 million.

The request for DOE programs was $18.1 billion, about $276 million less than

the previous year. The House bill approved $18.75 billion, the Senate bill $20.2

billion. The final bill appropriated $19.5 billion. The major activities in the DOE

budget are energy research and development, general science, environmental cleanup,

and nuclear weapons programs. (Funding of DOE’s programs for fossil fuels, energy

efficiency, and energy statistics is included in the Interior and Related Agencies

appropriations bill, H.R. 2217. The FY2002 net appropriations request for these

programs was $1.5 billion. For details see CRS Report RL31006, Appropriations for

FY2002: Interior and Related Agencies.) For the Nuclear Regulatory Commission

and other independent agencies funded in Title IV of the Energy and Water bill, the

net appropriations requested for FY2002 was $182 million, compared to $172 million

appropriated for FY2001. The House bill contained $136 million and the Senate bill

$197 million. The final bill approved $184 million.

Table 2. Energy and Water Development Appropriations,

FY1995 to FY2002

(budget authority in billions of current dollars*)

FY95

FY96

FY97

FY98

FY99

FY00

FY01

FY02

(Req.)

20.7

19.3

20.0

21.2

21.2

21.2

23.9

22.5

*These figures represent current dollars, exclude permanent budget authorities, and reflect

rescissions.

Table 2 includes budget totals for energy and water appropriations enacted for

FY1995 to FY2001 and the Administration’s request for FY2002. Tables 3-7 provide

budget details for Title I (Corps of Engineers), Title II (Department of the Interior),

Title III (Department of Energy) and Title IV (independent agencies) for FY2001 FY2002.

CRS-3

Title I: Corps of Engineers

The House-passed version of H.R. 2311 recommended $4.468 billion for the

civil projects of the U.S. Army Corps of Engineers (Corps) for FY2002, an increase

of $568 million above the Administration’s request of $3.900 billion. The Senatepassed version recommended $4.305 billion. The final bill appropriated $4.486 billion.

Table 3. Energy and Water Development Appropriations

Title I: Corps of Engineers

(in millions of dollars)

FY

2001*

FY2002

Request

House

H.R.2311

Senate

H.R.2311

P.L. 10766

160.6

130.0

163.3

152.4

154.3

1,716.2

1,324.0

1,671.9

1,570.8

1,715.9

Flood Control,

Mississippi River

350.5

280.0

347.7

328.0

346.0

Operation and

Maintenance

1,897.8

1,745.0

1,864.5

1,833.3

1,874.8

Regulatory

124.7

128.0

128.0

128.0

127.0

General Expenses

151.7

153.0

153.0

153.0

153.0

FUSRAP

139.7

140.0

140.0

140.0

140.0

4,541.1

3,900.0

4,468.2

4,305.5

4,486.1**

Program

Investigations &

Planning

Construction

Total

*Figures reflect enacted levels for FY2001 as reported by the House Appropriations Committee.

**Total reflects $25 million recission for Coastal Emergencies.

Key Policy Issues — Corps of Engineers

Funding for the Corps’ civil works program has often been a contentious issue

between the Administration and Congress, with final appropriations typically

providing more funding than requested by the Administration, regardless of which

political party controls the White House and Congress. For FY2001, for example,

Congress added $480 million (12%) to the $4.08 billion requested by the Clinton

Administration. Similarly, the FY2002 bill as passed the House would have funded

the Corps at almost 15% more than requested by the Bush Administration, and the

final bill appropriated slightly more than that.

Proposed Corps Reforms. The Corps has come under increasing criticism

over the way it evaluates and undertakes its projects. Some have called for major

agency “reforms”; others have called for review of Corps programs and policies. The

106th Congress, in passing the Water Resources Development Act (WRDA) of 2000

(P.L. 106-541, Section 216), directed the Corps to contract with the National

Academy of Sciences to study the feasibility of establishing an independent review

CRS-4

panel for Corps project studies. Further legislation proposing changes to the project

development and authorization process was introduced in the 107th Congress.

The House Appropriations Committee acknowledged the on-going criticisms in

its report accompanying H.R. 2311, and noted its belief that a study of navigation

improvements on the Upper Mississippi River and Illinois Waterway was “poorly

managed by the Corps....” The House Appropriations Committee also commented

on the accusations that Corps officials were improperly trying to expand the civil

works program; the report states “[t]he Committee finds this criticism to be somewhat

absurd.” The Senate Appropriations Committee also acknowledged recent criticisms

of the Corps and stated it “is satisfied that the Corps has responded professionally to

the issues raised....” Both Committees note that the Corps has a backlog of

approximately $40 billion in projects. (For more information, see CRS Report

RL30928, Army Corps of Engineers: Reform Issues for the 107th Congress.)

Auburn Dam Study. Section 103 of H.R. 2311, as reported from the House

Appropriations Committee, would have directed the Corps to include an “alternatives

analysis” of a multipurpose Auburn Dam as part of its American River watershed

long-term study. However, as part of the rule adopted for consideration of the bill on

the House floor, the provision was dropped.

Congress has repeatedly debated complex measures to increase flood protection

along the American River in California, in large part to protect the City of

Sacramento. Proposals have included strengthening existing levees and flood warning

systems, changing the operation of an existing dam on the river, and building a large

new multi-purpose dam near Auburn. Debates over the Auburn Dam and other water

supply proposals for the area have been particularly contentious – most recently

during consideration of the Water Resources Development Act of 1999.

Environmentalists generally oppose construction of a high dam at or near the Auburn

site, while others interested in developing water supplies for the area have continued

to support a multi-purpose Auburn dam. Others weighing in on the debate have

advocated strengthening levees and taking other measures to increase flood protection

for the City of Sacramento in lieu of building a large, multi-purpose dam.

Missouri River Water Flows. After extended debate in both the House and

the Senate, Section 116 of the final bill included Senate language that prohibits the use

of funds “to accelerate the schedule to finalize the Record of Decision for the revision

of the Missouri River Master Water Control Manual and any associated changes to

the Missouri River Annual Operating Plan.” The provision was a temporary

compromise of an on-going issue that had led President Clinton to veto the previous

year’s Energy and Water Development appropriations bill.

The central issue behind the revision of the manual is how to operate dams along

the Missouri River. Their operation determines the timing of water releases, which

affect competing uses of the river such as barge traffic, threatened and endangered

species protection, and upstream recreation. In November 2000, the U.S. Fish and

Wildlife Service (FWS) issued a biological opinion pursuant to the Endangered

Species Act, which recommended altering dam operations to provide higher

springtime water releases to benefit the pallid sturgeon. This change is also believed

by some to benefit other threatened and endangered species affected by current dam

CRS-5

operations. The Corps has issued a draft implementation plan and is currently

evaluating the effects of the proposed spring rise on other Missouri River water users.

The Corps is scheduled to release the new Master Manual no earlier than 2003.

The House-passed version of H.R. 2311 prohibited using funds to “revise” the

manual “if such revision provides for an increase in the springtime water release

program during the spring heavy rainfall and snow melt period in the States that have

rivers draining into the Missouri River below the Gavins Point Dam.” Opponents of

the House provision claimed it threatened to stop all work on the manual; the Senate

version contained a milder prohibition against “accelerating” the process. During

Senate floor debate both sides agreed to an amendment to allow the Corps to consider

alternatives for species recovery other than the much debated “spring rise”

recommended in the FWS biological opinion. The amended provision also directed

the Corps to consider the views of other federal and non-federal agencies and

individuals “to ensure that other congressionally authorized purposes are maintained.”

This language was included in Section 116 of the final bill.

Everglades. Implementation of a Comprehensive Everglades Restoration Plan

(CERP) was authorized in the Water Resources Development Act of 2000 (Title VI).

Funding for CERP activities, as well as other Everglades restoration projects is

included in both the annual Energy and Water Development Appropriations Act (for

the Corps) and in the annual Department of the Interior and Related Agencies

Appropriations Act (for DOI agencies such as the National Park Service and Fish and

Wildlife Service). The Energy and Water bill also includes funding for other

Everglades and South and Central Florida projects. For FY01, approximately $150

million for the South Florida ecosystem was in the Administration request. In

addition, the request included $28 million to fund the first of the WRDA 2000 pilot

restoration activities. The final bill included approximately $95 million for existing

Central and Southern Florida project construction; $20 million for Everglades

ecosystem restoration (for CERP activities); and $26 million for Kissimmee river

restoration. (For more information, see CRS Report RL20702, South Florida

Ecosystem Restoration and the Comprehensive Everglades Restoration Plan.)

CRS-6

Title II: Department of the Interior

For the Department of the Interior, the Energy and Water Development bill

provides funding for the Bureau of Reclamation (BOR) and the Central Utah Project

Completion Account. For FY2002 the President requested $783.5 million for BOR

and $36.2 million for the Central Utah Project Completion Account (gross current

authority). The final appropriation for FY2001 (P.L. 106-377) included $776.5

million for BOR, approximately $10 million more than enacted for FY2000, and $39.9

million for the Central Utah Project Completion Account, the same as enacted for

FY2000. The House-passed version of H.R. 2311 included $36.2 million for the

Central Utah Project (CUP) – the same as requested – and $806.7 million for BOR.

The Senate-passed version included $884 million for both programs: $36.2 million for

the CUP, and $848 million for BOR. The final bill appropriated $36.2 million for

CUP and $878 million for BOR, for a total of $914 million.

Table 4. Energy and Water Development Appropriations

Title II: Central Utah Project Completion Account

(in millions of dollars)

FY2001

FY2002

Request

House

H.R.2311

Senate

S.1171

P.L.

107-66

Central Utah project

construction and

oversight

25.7

25.5

25.5

25.5

25.5

Mitigation and

conservation activities*

14.1

10.8

10.8

10.8

10.8

Program

Total, Central Utah

39.8

36.3

36.3

36.2

36.2

Project

* Includes funds available for Utah Reclamation Mitigation and Conservation Commission

activities and $5 million for the contribution authorized by §402(b)(2) of the Central Utah

Project Completion Act (P.L. 102-575). Totals do not reflect permanent appropriations of

approximately $1.2 million.

CRS-7

Table 5. Energy and Water Development Appropriations

Title II: Bureau of Reclamation

(in millions of dollars)

Program

FY2001

FY2002

Request

House

H.R.2311

Senate

S.1171

P.L.

107-66

Water and related resources

678.9

648.0

691.2

732.5

762.5

California Bay-Delta

(CALFED)

0.0

20.0

0.0

0.0*

0.0

Loan program account

9.3

7.5

7.5

7.5

7.5

Policy & Admin.

50.2

53.0

53.0

53.0

53.0

Central Valley Project (CVP)

Restoration Fund

38.4

55.0

55.0

55.0

55.0

Gross Current Authority

776.5

783.5

806.7

848.0

878.0

*The Senate Appropriations Committee recommended $40 million for CVP activities that support

the CALFED program, but no funding for the program itself.

Background on Reclamation Policy

Most of the large dams and water diversion structures in the West were built by,

or with the assistance of, the Bureau of Reclamation (BOR). Whereas the Corps built

hundreds of flood control and navigation projects, BOR’s mission was to develop

water supplies and to reclaim arid lands in the West, primarily for irrigation. Today,

BOR manages more than 600 dams in 17 western states, providing water to

approximately 10 million acres of farmland and 31 million people. BOR is the largest

supplier of water in the 17 western states and the second largest hydroelectric power

producer in the Nation.

Key Policy Issues — Bureau of Reclamation

The FY2002 request for Water and Related Resources, BOR’s primary account

for managing water and energy projects and programs, was $648.0 million, $31

million less than the FY2001 appropriation. The House recommended $679.0 million

for this account, and the Senate recommended $732.5 million. The final bill

appropriated $762.5 million for the Water and Related Resources Account.

Included in the Water and Related Resources request was $21million for

Garrison Diversion Unit in North Dakota, $20.5 million for Mni Wiconi rural water

supply project in South Dakota, and $12 million for Animas-La Plata in Colorado.

The House bill included $21 million for the Garrison, $25.5 million for the Mni

Wiconi, and $16 million for Animas-La Plata. The Senate bill included $24 million for

Garrison, $26 million for Mni Wiconi and $16 million for Animas-La Plata. The final

bill funded Garrison at $22.5 million, Mni Wiconi at $30 million, and Animas-La Plata

at $16 million. (Figures for these three projects do not include funds for operations,

management, and rehabilitation or repair.)

CRS-8

The House Appropriations Committee did not fund the President’s request of

$20 million for the California Bay-Delta Restoration Program (Bay-Delta, or

CALFED). As it did last year, the Committee stated it would not fund the

Administration’s request until the program received an authorization for such

appropriations. No funds were provided for CALFED in FY2001. When the Senate

Appropriations Committee reported out S. 1171 July 12, Senator Reid, Chairman of

the Energy and Water Subcommittee, said the bill funded $40 million of CALFEDrelated projects under other accounts, in the absence of authorizing legislation.

Although an attempt was made on the Senate floor to cut this funding by $10 million

(as an offset for another unrelated program), the amendment was tabled on a 56-44

vote (S.Amdt. 1018; vote #238). The final bill included $30 million in the Water and

Related Resources account for projects supporting the goals of CALFED; however,

it did not fund the CALFED program per se. The Conference Committee report,

while keeping language similar to the Senate bill, directs funding toward several

specific CALFED-related projects, including planning for the Sites Reservoir ($0.75

million) and assessment of raising Shasta Dam ($1.9 million).

Funding for CALFED was requested in BOR’s budget, but the appropriation

would be allocated among several federal agencies. According to BOR, there are still

unobligated prior year funds that may be used for some CALFED projects. The final

bill also included $15 million for the Klamath project in Oregon. (For more

information on these issues, see CRS Issue Brief IB10019, Western Water Issues.)

CRS-9

Title III: Department of Energy

The Energy and Water Development bill includes funding for most of DOE’s

programs. Major DOE activities in the bill include research and development on

renewable energy and nuclear power, general science, environmental cleanup, and

nuclear weapons programs. The Administration’s FY2002 request for DOE programs

in the Energy and Water bill was $18.1 billion, about $200 million less than the

amount appropriated for FY2001. The House bill contained $18.7 billion and the

Senate bill $20.1 billion. The final bill appropriated $19.5 billion for DOE programs

in Title III. (The FY2002 appropriation request for DOE’s programs for fossil fuels,

energy efficiency, the Strategic Petroleum Reserve, and energy statistics, included in

the Interior and Related Agencies appropriations bill, was $1.50 billion. The final bill,

P. L. 107-63, appropriated $1.77 billion for these programs. For details, see CRS

Report RL31006, Appropriations for FY2002: Interior and Related Agencies.)

Table 6. Energy and Water Development Appropriations

Title III: Department of Energy

(in millions of dollars)

Program

FY2001*

FY2002

Request

House

H.R. 2311

Senate

S.1171

P.L.

107-66

Energy Supply R&D

Solar and Renewable

375.8

276.7

376.8

435.0

396.0

Nuclear Energy

259.9

223.1

224.1

264.1

250.5

Other

44.6

44.5

39.4

42.0

38.3

Subtotal

680.3

544.2

640.3

741.1

684.8

Adjustments

(19.8)

0

(1.0)

(5.0)

(18)

Total, Energy Supply

660.6

544.2

639.3

736.1

666.7

392.5

363.4

393.4

408.7

418.4

High Energy Physics

726.1

716.1

716.1

725.1

716.1

Nuclear Physics

369.9

360.5

361.5

373.0

360.5

1,013.4

1,004.7

1,006.7

1,040.7

1,003.7

Bio. & Env. R&D

501.3

443.0

445.9

490.0

527.4

Fusion

255.0

248.5

248.5

248.5

248.5

Adv. Scientific Computing

170.0

163.0

163.0

163.0

158.1

Other

199.7

229.0

231.6

233.4

236.6

Adjustments

(79.3)

(4.9)

(6.9)

(4.9)

(17.7)

Total, General Science

3,180.3

3,159.9

3,166.4

3,268.8

3,233.1

Uranium Enrichment

Maint. & Remediation

General Science

Basic Energy Sciences

CRS-10

Program

FY2001*

Non-Defense Environmental

Management

FY2002

Request

277.2

House

H.R. 2311

Senate

S.1171

P.L.

107-66

228.6

227.9

228.6

236.4

5,006.1

5,300.0

5,123.8

6,062.9

5,429.2

Nuclear Nonproliferation

872.3

773.7

845.3

880.5

803.6

Naval Reactors

688.6

688.0

688.0

688.0

688.0

Office of Administrator

10.0

15.0

10.0

15.0

312.6

6,577.0

6,776.8

6,667.3

7,646.4

7,233.5

National Nuclear Security Administration (NNSA)

Weapons

Total, NNSA

Defense Environmental Management

Environ. Restoration

4,963.5

4,548.7

5,174.5

5,389.9

5,234.6

Defense Facilities

Closure Projects

1,080.3

1,050.6

1,092.9

1,080.5

1,092.9

Environ. Rest. Privatization

65.0

141.5

143.2

157.5

153.5

Total, Defense Env. Man.

6,108.9

5,740.8

6,410.6

6,627.9

6,481.0

Other Defense Activities

584.4

527.6

501.2

564.2

544.0

Defense Nuclear Waste

199.7

310.0

310.0

250.0

280.0

Total, Defense Activities

13,468.1

13,355.1

13,875.4

15,088.5

14,538.5

Departmental Admin. (net)

74.9

83.8

71.8

71.1

73.0

Office of Inspector General

31.4

31.4

32.4

30.0

32.4

Power Marketing Administrations (PMA’s)

Southeastern

3.9

4.9

4.9

4.9

4.9

Southwestern

28.0

28.0

28.0

28.0

28.0

Western

165.5

169.5

172.2

169.5

171.9

2.7

2.7

2.7

2.7

2.7

Total, PMA’s

200.1

205.1

207.8

205.1

207.5

FERC

(revenues)

175.2

(175.2)

181.2

(181.2)

181.2

(181.2)

181.2

(181.2)

184.1

(184.1)

Civilian Nuclear Waste

190.1

135.0

133.0

25.0

95.0

Adjustments

(172.0)

Total, Title III

18,303.1

18,106.6

18,747.4

20,062.0

19,501.1

Falcon & Armistad O&M

*Figures reflect enacted levels for FY2001 as reported by the House Appropriations Committee.

CRS-11

Key Policy Issues — Department of Energy

Funding to Combat Terrorism. The Department of Energy is a major

participant in activities to combat terrorism, largely because of its role in producing

and maintaining nuclear weapons capability. According to OMB’s August 2001

report to Congress (see the online version at

[http://www.whitehouse.gov/omb/legislative/nsd_annual_report2001.pdf]), the

FY2002 request included $792.5 million for these activities, of which $307 million

was concerned with weapons of mass destruction (WMD), in this case nuclear

weapons. This compared with $710 million appropriated for FY2001, $324 million

of it for WMD defense. (These funds are distributed among several activities listed

in Table 6 above. The OMB report does not specify how much is attributed to

individual activities.)

The major portion of this funding is for physical security of DOE’s facilities, and

the increase in requested funding would be directed to this activity: $691 million

requested for FY2002 compared to $594 million appropriated for FY2001.

Other DOE activities, identified by OMB as combating terrorism, include

preparing for and responding to terrorist acts, $47 million appropriated for FY2001,

$45 million requested for FY2002, and research and development, $68 million

appropriated for FY2001, $56 million requested for FY2002.

In its report filed October 30 [H. Rept. 107-258], the Conference Committee

said it expected new security requirements that arise because of the September 11

attacks to be addressed within the $40 billion emergency supplemental appropriation,

or to be included in the FY2003 budget submission. The Committee also directed the

Secretaries of the Army, Energy and Interior each to submit a report to the

Appropriations Committees by February 15, 2002, identifying all known physical

security requirements that have surfaced since the attacks, and the degree to which

they have been funded.

Additional funding for DOE’s anti-terrorist activities was included in H.R. 3338,

the FY2002 Defense Appropriations and Emergency Supplemental Appropriations

bill, passed by both House and Senate on December 20. $118 million was added to

DOE’s weapons program accounts to increase security at nuclear weapons complex

facilities, and $226 million went to the Nonproliferation and National Security

Programs. (See below.)

Renewable Energy. In May 2001, the Bush Administration issued its revised

FY2002 budget request for Renewable Energy programs at DOE. Despite a

“growing need for clean and affordable energy,” it proposed to cut Renewable

Energy funding from $375.7 million in FY2001 to $276.7 million (excluding funding

for programs under the Office of Science) — a decrease of $99.0 million (26%) below

the FY2001 level. The final bill provided $396 million for renewable energy programs

– $120 million more than the request and $20 million, or 5%, above the FY2001

level.

For the technology programs, the Administration requested $36.8 million less for

photovoltaics, $19.5 million less for wind, $13.1 million less for geothermal, and

CRS-12

$11.8 million less for concentrating solar power. Also, for the support and

implementation programs, it eliminated the Renewable Energy Program for American

Indians and cut $2.5 million from the International Renewable Energy Program.

The House Appropriations Committee, in reporting out H.R. 2311, reversed

some of the cuts proposed by the Administration. The Committee’s report language

said the request has “no clear rationale to explain the selective budget cuts” and no

“apparent coordination” with the National Energy Policy report. At the same time,

the report cited a 2000 study by the National Academy of Public Administration that

found an absence of clear goals, priorities, work program, and milestones. The

Committee report also stressed that DOE technology programs are designed for longterm energy solutions, not immediate relief to the energy crisis, which is better

addressed by incentives other than appropriations. The House bill provided $376.8

million for renewable energy, which is $100.2 million (36%) above the request and

essentially level with the FY2001 appropriation.

Relative to the FY2001 appropriation, however, the House bill included

significant cuts in some individual programs. Under technology programs, there were

cuts of $5.9 million for Concentrating Solar Power and $2.0 million for Small Hydro.

A $9.1 million cut for support and implementation programs included reductions of

$6.6 million to eliminate the Renewable Energy Program for American Indians, $2.0

million for International Renewables, and $1 million for Program Support. These

funding reductions were offset by proposed increases of $6.0 million for Photovoltaics

and $8.0 million for Electric/Storage, which included $4.0 million for the

Transmission Reliability Program and $2.9 million for the Superconductivity Program.

In reporting out S. 1171, the Senate Appropriations Committee, noted that

although the Administration’s National Energy Policy report recognized the

importance of renewables, “... the Administration’s budget, even as amended, it

provided inadequate resources to accomplish these goals.” Thus, the Committee

recommended, and the Senate approved, $435 million, which is $158.3 million more

than the request, and $58.2 million more than the House recommendation. Relative

to the House recommendation, the Senate bill had $11.8 million less for

Photovoltaics, and $1.5 million less for Departmental Energy Management.

However, it also included $12.0 million more for Biomass Power, $11.0 million more

for Electric/Storage, $8.0 million more for Hydrogen, $7.4 million more for

Concentrating Solar Power, $7.0 million more for the National Renewable Energy

Lab (NREL), and $6.3 million more for Small Hydro.

Also, the Senate bill had $59.3 million more than the FY2001 appropriation.

Further, relative to the FY2001 level, the Senate bill had $5.8 million less for

Photovoltaics, $2.6 million less for Renewable American Indian Resources, and $2.0

million less for International Renewables. However, it also included $19.0 million

more for Electric/Storage, $12.2 million more for Biomass Power, $8.0 million more

for Hydrogen, and $8.0 million more for NREL. The funding for NREL included $5.0

million to address electric power needs in the Southwest.

The final bill appropriated $396.0 million, which was $19.2 million more than the

House recommendation and $39.0 million less than the Senate recommendation.

Also, the final bill level was $20.3 million, or 5%, more (excluding inflation) than the

CRS-13

FY2001 appropriation. This included increases of $11.0 million for Electric/Storage,

$6.0 million for Biomass/Biofuels and $4.0 million for Hydrogen. However, the final

bill level also had a $7.1 million, or 33%, cut for Renewable Support and

Implementation, including reductions of $3.6 million for Renewable American Indian

Resources and $2.0 million for International Renewables.

Nuclear Energy. For nuclear energy programs — including reactor research

and development, space power systems, and closing of surplus facilities — the Bush

Administration requested $223.1 million for FY2002, $35 million below the FY2001

appropriation. The House-passed bill provided $224.1 million, while the Senate

approved $264.1 million. The enacted measure provides $250.1 million, about $10

million below the FY2001 level but more than $25 million above the request.

The Bush Administration requested $18.1 million for FY2002 for the “nuclear

energy research initiative” (NERI), a program to support innovative nuclear energy

research projects, only about half the FY2001 level. The final FY2002 Energy and

Water Development Appropriations bill provides $32 million for this program.

The new “nuclear energy technologies” program would have been reduced in the

Administration request from $7.5 million in FY2001 to $4.5 million in FY2002; the

enacted bill provides $12 million. The program is designed to produce a “Generation

IV Technology Roadmap” for near-term commercial deployment of advanced nuclear

power plants. Included in the approved FY2002 funding is $3 million for sharing the

nuclear industry’s costs of applying to the Nuclear Regulatory Commission (NRC)

for early site permits, combined operating licenses, and design certifications for new

reactors and reactor technology, as well as $2 million for testing new reactor designs,

fuels, and materials at DOE national laboratories. DOE issued an interim report on

new technology deployment in May 2001 under the program.

Another $4.5 million was requested for “nuclear energy plant optimization”

(NEPO), a research program to improve the economic competitiveness of existing

nuclear power plants. That level is $500,000 below the FY2001 appropriation, but

the final Energy and Water bill increases the program to $7 million.

The DOE budget justification contends that federally funded nuclear power

research will help ensure the future availability of “the only proven large-scale power

source that has unlimited potential to provide reliable electricity without producing

environmentally damaging air emissions.” However, environmental groups and other

members of the “Green Scissors Campaign” have targeted DOE’s nuclear R&D for

elimination, contending that “the highly dangerous radioactive waste that results from

nuclear power eliminates it as an acceptable alternative.”1

Controversy has also been generated by the “electrometallurgical treatment” of

DOE spent fuel, a process in which metal fuel is melted and highly radioactive

isotopes are electrochemically separated from uranium and plutonium. DOE decided

in September 2000 that such treatment would be the best way to render sodium-

1

Green Scissors 2001: Cutting Wasteful and Environmentally Harmful Spending. Green

Scissors Campaign. [http://www.greenscissors.org/energy/neri.htm]

CRS-14

bonded spent fuel — particularly from the closed Experimental Breeder Reactor II

(EBR-II) in Idaho — safe for long-term storage and disposal. DOE requested $15.8

million for the treatment program in FY2002, plus $10.0 million for further

development of the process. The $25.8 million total request for the two programs,

funded under Nuclear Facilities Management, represents a boost of about $1 million

over FY2001. The House-passed bill further increased the programs to $26.1 million,

the Senate approved the requested funding level, and the enacted bill adopted the

higher House level.

Opponents of electrometallurgical treatment contend that it is unnecessary and

that the process could be used for separating plutonium to make nuclear weapons.

They note that the process uses much of the same technology and equipment

developed for the plutonium-fueled Integral Fast Reactor, or Advanced Liquid Metal

Reactor, which was canceled by Congress in 1993 partly because of concerns about

nuclear weapons proliferation.

No funding was requested for a DOE program established by Congress last year

called Advanced Accelerator Applications (AAA), which received an appropriation

of $68 million in FY2001 through the Office of Nuclear Energy and the Office of

Defense Programs. The primary purposes of the AAA program are to study the use

of powerful particle accelerators for producing tritium for nuclear weapons and for

transmuting long-lived radioactive waste into shorter-lived isotopes. The Housepassed bill would have provided no new funding for the program, but the Senate

approved a total of $70 million – $55 million under Other Defense Activities and $15

million to close out the Accelerator Production of Tritium (APT) program. The

enacted bill provides $50 million for the AAA program, including $4.5 million for

research on spent fuel treatment in Nevada. No funding was provided for APT. The

bill’s conferees directed DOE to prepare a report by May 2002 on nuclear waste

transmutation options.

DOE requested $38.4 million to shut down the Fast Flux Test Facility (FFTF)

at Hanford, Washington, the same as the FY2001 funding level. FFTF, a sodiumcooled research reactor originally designed to support the commercial breeder reactor

program, has not operated since 1992 and had been maintained in standby condition.

The Clinton Administration had considered restarting the reactor for nuclear research

and medical isotope production but decided in January 2001 to permanently shut it

down. The Bush Administration budget request appeared to concur with that

decision. However, after the budget was issued, Energy Secretary Abraham

suspended DOE’s final decision on closing FFTF until late July 2001 to allow time for

further study. Abraham announced a further review of the medical isotope production

option on August 1, 2001. The House-passed bill included the funding initially

requested for closing the facility. The Senate also provided the full funding request

but directed DOE to give the House and Senate Appropriations panels a report after

the latest FFTF review was completed. The enacted bill also provides the full funding

request, but the conferees specified that the money be used only for FFTF shutdown

activities “until 90 days after receipt of the Secretary’s recommendations for

alternative actions at FFTF and the approval of those recommended alternative

actions” by the House and Senate Appropriations Committees.

CRS-15

Science. DOE’s science programs consist of a wide variety of basic research

activities designed to explore fundamental science and engineering issues about

energy. The programs are high-energy physics, nuclear physics, basic energy sciences

(BES), biological and environmental research (BER), fusion energy sciences, and

advanced scientific computing. Through the Office of Science programs, DOE is the

third largest supporter of basic research and the largest supporter of physical science

research in the federal government.

For FY2002, DOE requested $3.160 billion for Science, 0.6% below the

FY2001 level. The House-passed bill provided $3.166 billion, 0.2% over the request,

but 0.4% below the FY2001 level. The House noted its strong support of most of the

research funded by the Office of Science, but stated that constrained resources

prevented any significant increase in funding for FY2002. The House also directed

DOD to prepare a report that provides a strategy for improving the connection

between the research funded by the Office of Science and energy technology

development. The Senate appropriated $3.269 billion for the Office of Science, 3.4%

above the request and the FY2001 level. The Senate expressed concern, however,

that this increase was inadequate, and that budget constraints made it impossible to

provide these programs with the funds they deserve. The final bill provides $3.233

billion, $53 million above the FY2001 level and $73 million above the request.

DOE requested an increase in funding for BES by 1.3% as a result of an increase

of $17.4 million in construction funding for the Spallation Neutron Source (SNS), a

large physics research facility at Oak Ridge National Laboratory. The House

provided an increase of $2 million over the request for BES for FY2002 and the full

request for the SNS construction. The Senate approved an increase of $36.0 million

above the request for BES. The final bill provides $1.004 billion for BES, $1 million

below the request, including full funding for the SNS.

For BER, DOE’s request is 8.2% below the FY2001 level because of the

completion of 24 projects mandated by Congress in the FY2001 appropriations. DOE

did not request additional funds for those projects. The House bill provided an

increase of $2.9 million above the request, which would put the BER program 7.6%

below the FY2001 level. The Senate approved an increase of $47.0 million above the

request for BER. One new initiative is being proposed this year, the Genomes-to-Life

project, within BER, that follows from the human genome sequencing project. The

new project would make use of DOE computational and advanced imaging

capabilities to examine the behavior of proteins encoded by DNA, and to build

computer models of cellular behavior. The House-passed bill would fully fund this

project. The Senate approved a $10 million increase over the request for this

initiative. The final bill approved a level of $527.4 million for BER, $84.4 million

above the request. Most of the increase is for projects specifically identified by

Congress. The conferees did not approve any such projects included in either the

separate House or Senate bills.

Funding for the nanoscience initiative begun this year is expected to remain at

current levels. DOE did request $4 million for the establishment of three to five

nanoscale science research centers. The House indicated its support for this initiative

but directed DOE to ensure that the nanoscience centers be selected on a competitive,

peer review basis. The Senate approved funding to meet the full request for these

CRS-16

centers and expressed its strong support for the program. The final bill included $3

million to begin engineering and design for these three nanoscience centers. DOE also

requested level funding for the advanced scientific computing and networking

initiative, announced last year, that are housed in the Advanced Scientific Computing

Research (ASCR) program. The House and Senate bill provided the full request for

the Advanced Scientific Computing program. The final bill, however, reduced this

amount by $5 million below the request. In the report accompanying the final bill,

Congress expressed its support for the Scientific Discovery through Advanced

Computing program. It also urged DOE to ensure maximum involvement of the

academic community in the ASCR program.

The House directed DOE to provide a rationale linking the programs within the

Office of Science and the nations’ energy needs. It stated that DOE does not seem

to have a clear plan or policy making that connection and that there was little

coordination between the Office of Science and the DOE Energy Resource R&D

programs. Neither the Senate or the final bill, however, contained this language. The

House also directed DOE to prepare an implementation plan to transfer safety and

health regulation of its nuclear facilities at the non-defense laboratories to the Nuclear

Regulatory Commission and Occupational Safety and Health Administration in

FY2003. Currently, DOE is self-regulating as authorized by the Atomic Energy Act

of 1954. The facilities that would be affected include all of DOE’s major basic

research facilities that generate nuclear reactions. Again, such language did not

accompany the Senate or the final bill.

Nuclear Weapons Stockpile Stewardship. Congress established this

program in the FY1994 National Defense Authorization Act (P.L. 103-160) “to

ensure the preservation of the core intellectual and technical competencies of the

United States in nuclear weapons.” The program is operated by the National Nuclear

Security Administration (NNSA), a semiautonomous agency established by Congress

in the FY2000 National Defense Authorization Act (P.L. 106-65, Title XXXII) within

the Department of Energy (DOE). Its central goal is to maintain the safety and

reliability of the U.S. nuclear stockpile without nuclear testing. In a 1994 statement

that is still in effect, the Department of Defense, as the customer of DOE’s nuclear

weapons, did not require DOE to undertake “new-design nuclear warhead

production,” but required DOE to “[d]emonstrate capability to refabricate and certify

weapon types in [the] enduring stockpile” and “[m]aintain capability to design,

fabricate, and certify new warheads.”

Stockpile stewardship consists of all activities in NNSA’s Weapons Activities

program, for which $5,300.0 million was requested and $5,429.2 million was

appropriated for FY2002, compared to $5,006.2 million appropriated for FY2001.

Appropriations conferees stated that the FY2002 appropriation was actually $400.9

million above the request. While the request included $271.1 million for program

direction activities, the final legislation transferred that funding to the Office of the

NNSA Administrator, effectively reducing the Weapons Activities request to $5,028.9

million. The three main elements of stockpile stewardship, described below, with

their requested and appropriated amounts, respectively, are Directed Stockpile Work,

$1,043.8 million and $1,045.8 million; Campaigns, $1,996.4 million and $2,167.1

million; and Readiness in Technical Base and Facilities, $1,447.0 million and $1,553.1

CRS-17

million. The final legislation also provides $200.0 million for a new program to

upgrade nuclear weapons complex facilities and infrastructure.

In earlier action on the measure, the House-passed bill, H.R. 2311, funded

Weapons Activities at $5,123.9 million. The Senate Appropriations Committee

reported S. 1171 on July 12 with $6,062.9 million for Weapons Activities. Energy

and Water Subcommittee Chairman Harry Reid said the bill’s funding was “a huge

increase, but necessary to get the NNSA...programs back on track.” The committee’s

report (S.Rept. 107-39) noted such concerns as the long time before new components

for aging weapons can be certified, an “unacceptable decline in the physical plants,”

and the lack of progress toward establishing an enduring production complex. The

Senate passed the bill on July 19 without amending the Weapons Activities section.

NNSA manages two major programs in addition to Weapons Activities: Defense

Nuclear Nonproliferation ($773.7 million requested, $803.6 million appropriated; see

below) and Naval Reactors ($688.0 million requested and appropriated). Total

funding for NNSA, including the foregoing elements and several smaller ones, was

$6,776.8 million requested and $7,233.5 million appropriated.

Most stewardship activities take place at the nuclear weapons complex, which

consists of three laboratories (Los Alamos National Laboratory, NM; Lawrence

Livermore National Laboratory, CA; and Sandia National Laboratories, NM and CA),

four production sites (Kansas City Plant, MO; Pantex Plant, TX; Savannah River Site,

SC; and Y-12 Plant, TN), and the Nevada Test Site. NNSA manages and sets policy

for the complex; contractors to NNSA operate the eight sites.

Directed Stockpile Work (DSW). This program involves work directly on

nuclear weapons in the stockpile, such as monitoring the condition of weapons and

maintaining them through repairs, refurbishment, life extension, and modifications.

It includes R&D to support activities to be undertaken for specific warheads.

FY2002 activities include refurbishment of the W87 warhead for the MX

(Peacekeeper) missile, development engineering to modify the fins on certain B61

bombs, studies to examine aging of the secondary stage (thermonuclear component)

of other B61 bombs, a study on life extension and upgrades to the W80 cruise missile

warhead, and engineering on the W76 warhead for Trident missiles to extend the

warhead’s life, upgrade certain components, and refurbish elements of the nuclear

explosive package. Conferees expressed concern that the Administration’s Nuclear

Posture Review, which was nearing completion when the conference bill was passed,

could result in funds spent by NNSA in early FY2002 being “wasted effort.”

Accordingly, the conferees instructed NNSA to minimize use of FY2002 Weapons

Activities funds for “weapon-unique investments.” They expressed particular concern

about refurbishing the W80 warhead given that DOD had not budgeted any funds to

extend the life of the air-launched cruise missile, which carries the W80, and

accordingly required advance approval by the Armed Services and Appropriations

Committees for using FY2002 funds for long-term life extension of that warhead.

Campaigns. These are “focused scientific and engineering efforts” that seek

to “develop and maintain special capabilities and tools needed for continued

certification of the stockpile ... in the absence of underground nuclear testing.” For

FY2002, there are 17 campaigns, with requests ranging from $1.3 million to $747.1

CRS-18

million. Examples (with FY2002 and FY2001 appropriations, respectively) are:

Enhanced Surveillance ($82.3 million vs. $106.7 million), which seeks to assess

lifetimes of weapons components and predict defects resulting from aging; Advanced

Design and Production Technologies ($75.5 million vs. $75.7 million), which seeks

to improve individual manufacturing processes, integrate product information, and

develop the ability to fabricate complex parts in small lots; and Tritium Readiness

($196.9 million, vs. $167.0 million), which is developing means of using a commercial

light water reactor to produce tritium, an isotope of hydrogen that is a key ingredient

in nuclear weapons. “Nuclear Weapons Stewardship R&D,” below, offers details on

key R&D programs, including some funded by Campaigns.

One campaign that has attracted much congressional interest, and the greatest

increase above the FY2002 request ($128.5 million requested, $219.0 million

appropriated), is Pit Manufacturing and Certification. Pits are the fissile cores of

nuclear warheads that trigger the thermonuclear secondary stage. The United States

has been unable to produce pits for use in stockpiled weapons since 1989, when DOE

suspended pit production at Rocky Flats Plant (CO). As a result, the United States

has been unable to make all-new nuclear warheads of existing or advanced new

designs. The campaign supports two pit projects: installation of a low-capacity pit

production facility, and supporting R&D, at Los Alamos National Laboratory; and

planning for a higher-capacity pit facility. R&D, procurement, and construction costs

for the two projects might total some $5 billion over two decades. The appropriated

amount includes $213.0 million, which NNSA told Congress in September 2001 was

the projected FY2002 cost for the program; $2.0 million for pit activities not

specifically supporting the W88 warhead for the Trident II missile; and $4.0 million

for preconceptual design activities for the higher-capacity pit facility.

In earlier action on this issue, the House Appropriations Committee

recommended the requested amount for FY2002, but asserted that DOE cannot show

“that it has a viable plan to manufacture and certify pits on the schedule dictated by

national security needs,” criticized the project as “years behind schedule and hundreds

of millions of dollars over the original cost estimate,” and stated that it will judge

NNSA’s success on how well the pit project succeeds. The Senate Appropriations

Committee recommended increasing funding by $109.2 million to $237.7 million. The

committee sought to “fully fund” all relevant activities, viewing the current schedule,

which would not certify a pit for use in the stockpile until FY2009, as “unacceptable.”

Readiness in Technical Base and Facilities (RTBF). This program

provides infrastructure and operations at the nuclear weapons complex sites. The

request included eight categories. By far the largest was Operations of Facilities

($830.4 million requested, $897.8 million appropriated). Other large categories

include Program Readiness, which supports activities occurring at multiple sites or in

multiple programs ($188.1 million requested, $192.0 million appropriated), Material

Recycle and Recovery ($101.3 million $90.3 million appropriated), and Construction

($1,447.0 million requested, $1,553.1 million appropriated). Specific RTBF items in

the final legislation include an additional $25.0 million for Pantex Plant, an additional

$10.0 million for Y-12 Plant, $10.0 million for the National Center for Combating

Terrorism at the Nevada Test Site, and $88.9 million for nuclear weapons incident

response.

CRS-19

Nuclear Weapons Stewardship R&D. An important part of the stockpile

stewardship program is aimed at developing the science and technology to maintain

the nation's nuclear weapons stockpile in the absence of nuclear testing. Principal

activities are the development of computational capabilities that can simulate weapons

explosions and perform other important computations, and experimental facilities to

simulate and test various aspects of weapons behavior without resorting to a full-scale

explosion. DOE’s weapons R&D efforts are spread across all three stewardship

programs: directed stockpile work, campaigns, and readiness in technical base and

facilities (RTBF).2

For FY2002, DOE requested $2.506 billion for nuclear weapons R&D, an

increase of 6.2% above the FY2001 level. Included in the request are $738.0 million

for Advanced Simulation and Computing (ASC), $467.9 million for Inertial

Confinement Fusion (ICF) (including $245.0 million for the National Ignition Facility

(NIF)) and $379.7 million for other R&D within the Campaigns account; $305.5

million for Stockpile R&D within the Directed Stockpile Work (DSW) account; and

$614.5 million for R&D within the RTBF account. All of these amounts are above

the current year’s level except Advanced Computing, which would receive $9 million

less than FY2001.

For FY2002, increased activity is expected on assessment and certification of

selected weapons within the stockpile. Funding for advanced radiography is

scheduled to decline because of the completion of the Dual Axis Radiographic

Hydrodynamic Test (DARHT) facility at Los Alamos. Under the Advanced Scientific

Computing activity, efforts are expected to focus on developing the 30 TeraOps

supercomputer at Los Alamos National Lab and the visual interactive environment for

weapon simulation strategy that would permit researchers realtime visualization of the

output of ASC computers. Under RBTF, funding added by Congress for FY2001 in

support of pulsed power and microelectronics research at Sandia National Laboratory

would not be requested for FY2002.

For the NIF project, construction funding would increase by 24.2%. The

FY2002 request meets the requirements of the project “rebaseline” submitted to

Congress in September 2000 as a result of the large cost overrun incurred in 1999.

The FY2002 request does not make any change in the scope or mission of the facility.

Currently, first laser light is expected in June 2004 and the project is scheduled to be

completed in September 2008. In the ICF request justification, DOE noted that the

level of funding it is requesting for NIF risk reduction and technology development

activities is less than that recommended in the rebaseline. DOE states, however, that

lower funding is acceptable given the priorities of the entire stockpile stewardship

budget request for FY2002.

The House bill provided $2.44 billion for nuclear weapons R&D, 2.7% below

the request but 3.3% above the FY2001 level. The House cut $100 million from the

request for the Advance Simulation and Computing program. The noted advances

in the private sector in high performance computing technology as well as the

2

Stockpile stewardship R&D is not a separate category in the budget. The programs included

in the section were identified based on previous DOE categorizations.

CRS-20

Committee’s support of the Advanced Scientific Computing Research (ASCR)

program in the DOE Office of Science in arguing that the ASC program in DOE’s

Office of Defense Programs may need to rethink its current strategy. The House

approved full funding for NIF construction but did note its concerns about the

program. In particular, it cited a recent GAO report about the project and directed

DOE to address the GAO findings.3 The House also added $25 million to the ICF

program for work on high average power lasers. All other activities within the

weapons R&D program would be funded at full request by the House-passed bill.

The Senate approved $2.79 billion for nuclear weapons R&D, 11.3% above the

request and 18.3% above the FY2001 level. The Senate noted that while significant

progress has been made in developing the science and technology for stockpile

stewardship, the certification capability is still a long way off.

The Senate approved an increase of $59.68 million for directed stockpile work

R&D, an additional $25.29 million for advanced radiography, an increase of $24.5

million for inertial confinement fusion, and an increase of $34.0 million for advanced

simulation and computing (ASC). The extra advanced radiography funds are to be

used for design of an advanced hydrodynamic test facility while the additional ASC

funds are for various ASC construction projects. The Senate also appropriated an

increase of $65 million above the request for construction of the microsystems and

engineering science applications project at Sandia National Laboratory. As for NIF,

the Senate approved full funding but noted that a high level of oversight and

management attention was still necessary for the project. The Senate also noted the

GAO report and expressed concern that individuals with NIF oversight responsibility

when it suffered major cost overruns, are still in that role.

In the final bill, Congress provided $2,629.0 million for nuclear weapons R&D

for FY2002, 4.9% above the request and 11.4% above the FY2001 level. Included

in the appropriation are $349.0 million for directed stockpile work R&D, $1,631.8

million for campaigns (including $506.4 million for ICF and $729.8 million for the

ASC program), and $658.1 million for R&D activities within RTBF. An additional

$25 million was provided for continued R&D and design of the advanced

hydrodynamic test facility. The ICF program was appropriated an additional $39.5

million, and the full request for NIF construction funding was provided.

Nonproliferation and National Security Programs.

DOE’s

nonproliferation and national security programs provide technical capabilities to

support U.S. efforts to prevent, detect, and counter the spread of nuclear weapons

worldwide. These nonproliferation and national security programs are included in the

newly established National Nuclear Security Administration (NNSA).

The Bush Administration’s FY2002 request for these programs was $773.7

million, a decrease of $100.5 million from FY2001. Most of the reductions would

have been Research and Development, Arms Control, and International Materials

3

For a detailed discussion of the NIF project see CRS Report RL30540, The National

Ignition Facility: Management, Technical, and Other Issues, by Richard Rowberg,

RL30540.

CRS-21

Protection, Control and Accounting (IMPCA) programs, which would have been

reduced 16%, 32% and 18% respectively. Construction of the MOX Fuel Fabrication

Facility, which is intended for disposing of U.S. surplus weapons plutonium by using

it as fuel in nuclear power reactors, would have received a large increase, from $26

million in FY2001 to $63 million in FY2002.

The House bill, H.R. 2311, restored some of the Administration’s proposed cuts,

increasing R&D $10 million to $216 million, and boosting IMPCA $51 million to

$190 million. Arms control, however, would have been reduced further under the

House bill, to $75.7 million. The total nonproliferation and national security program

funding in the House bill was $845.3 million. S. 1171, as passed by the Senate July

19, funded these programs at $880.5 million. The final bill appropriated $803.6

million.

The Conference Committee voted down a proposal by Representative Edwards

to redirect $130 million from other weapons program funding to increase nonproliferation activities in the Former Soviet Union. Promises were made to seek

funding in other appropriations bills, and during floor debate on the bill November 1

Energy and Water Development Subcommittee Chairman Callahan repeated the

promise to Representative Edwards. On November 28 the House passed H.R. 3338,

the FY2002 Defense Appropriations and Emergency Supplemental bill, without the

additional nonproliferation funding, after blocking a move to include it. However, the

Senate-passed version of H.R. 3338 contained $226 million for DOE’s Defense

Nuclear Nonproliferation programs (Division b, Chapter 5), and that funding survived

in the conference bill passed by both House and Senate December 20. Included in the

additional $226 million was $78 million for Nonproliferation and Verification R&D,

$15 million for the IPP and NCI programs within Arms Control, $120 million for

Materials Protection, Control and Accounting, $10 million for international Nuclear

Safety, and $3 million for program administration. This FY2002 funding is in addition

to the $803.6 million appropriated in the Energy and Water Development

Appropriations Act, P. L. 107-66.

Environmental Management. DOE’s Environmental Management Program

(EM) is responsible for cleaning up environmental contamination and disposing of

radioactive waste at DOE nuclear sites. DOE requested $6.33 billion for the program

for FY2002, nearly $450 million below the comparable FY2001 level. This includes

$5.74 billion for defense-related EM and $592 million for non-defense EM. The

House-passed bill included $699 million more than the request, for a total of $7.03

billion. The Senate approved $7.28 billion, nearly $950 million above the request.

The enacted bill provides $7.14 billion, $170 million above the FY2001 level and

$803 million above the request.

The FY2002 EM budget request was based on the program’s accelerated

cleanup strategy, which attempts to maximize the number of sites that can be

completely cleaned up by the end of FY2006. DOE managers contend that substantial

long-term savings can be gained by focusing on completing work at those sites,

allowing the earliest possible termination of infrastructure costs. Major sites

scheduled for shutdown during that period are included in the “defense facilities

closure projects” account, for which $1.05 billion was requested, about $30 million

below the FY2001 level; the House voted to boost that amount by about $40 million

CRS-22

and the Senate by $30 million, and the enacted bill provides the higher House level.

The largest facilities under that account are the Rocky Flats site in Colorado and the

Fernald site in Ohio.

Another $912 million was requested for “site/project completion,” for cleanup

activities to be finished by 2006 at DOE sites that will remain in operation. The House

voted $1.04 billion for that program, while the Senate approved $1 billion. The final

bill provides the Senate-passed level, specifying an additional $77.3 million for

cleanup projects at the Savannah River Site in South Carolina, the Hanford Site in

Washington, and other DOE locations.

Despite the 2006 cleanup goal, the bulk of EM’s funding is in the defense and

non-defense “post-2006 completion” accounts, plus a separate account for the Office

of River Protection that handles high-level waste disposal at Hanford. This category

includes cleanup projects that are expected to continue significantly after 2006. The

Administration sought $2.92 billion for post-2006 completion, nearly $300 million

below the FY2001 level; the House bill would have provided $3.39 billion and the

Senate $3.59 billion. The enacted measure adds $389.5 million to the budget request

for projects at the Idaho National Engineering and Environmental Laboratory,

Savannah River, Hanford, and other sites, for a total of $3.57 billion. The final bill

also provides $1.033 billion for the Office of River Protection, $221 million above the

request.

Civilian Nuclear Waste. DOE requested $445 million for the civilian nuclear

waste program in FY2002 – more than $50 million (14%) above the FY2001 base

appropriation of $391 million. The House voted to cut the request by $2 million.

However, the Senate voted to cut the program to $275 million, a move that drew

controversy during floor debate. The final bill provides $375 million for the program.

As required by the Nuclear Waste Policy Act, DOE is studying Yucca Mountain,

Nevada, as the potential site for a national waste repository, currently scheduled to

open in 2010. In recommending deep cuts in the waste program, the Senate

Appropriations Committee contended in its report that DOE had spent $8 billion on

waste site studies without showing that Yucca Mountain would be suitable. The

Senate Committee report described a number of potential problems with Yucca

Mountain and recommended that DOE not issue a recommendation to build a

repository at the site until completing work on key technical issues. Senate Energy

and Water Subcommittee Chairman Harry Reid of Nevada strongly opposes using

Yucca Mountain as a national nuclear waste repository.

The Senate Appropriations Committee’s recommended funding cut for the

nuclear waste program drew significant opposition on the Senate floor. Senator

Murkowski warned that the reduction would delay the program by several years and

force layoffs of 650 federal and contractor personnel working on the Yucca Mountain

project. In response to such criticism, Senator Reid added a Sense of the Senate

resolution to the Energy and Water Appropriations bill that urged Senate conferees

to “ensure that the levels of funding included in the Senate bill for the Yucca

Mountain program are increased to an amount closer to that included in the Housepassed version. . . .”

CRS-23

Even with the funding increase sought by the Bush Administration, the next

several program milestones would have been pushed back, according to the budget

request. A final Environmental Impact Statement (FEIS) for the proposed Yucca

Mountain repository and the accompanying site recommendation by the Secretary of

Energy will be delayed from FY2001 to FY2002, and perhaps further, according to

recent press reports.4 If the site is recommended by the Secretary and approved by

the President, a license application to the Nuclear Regulatory Commission (NRC)

would not be submitted until FY2003, rather than FY2002 as previously planned.

Energy and Water Conferees directed DOE to submit the site recommendation and

FEIS by February 28, 2002, and to begin terminating Yucca Mountain activities if the

findings were negative.

Funding for the program comes from two sources. Under the FY2002 budget

request, $135 million was to be provided from the Nuclear Waste Fund, which

consists of fees paid by nuclear utilities, and $310 million from the defense nuclear

waste disposal account, which pays for disposal of high-level waste generated by the

nuclear weapons program. The House bill provided the full request for the defense

account and cut $2 million from the Nuclear Waste Fund appropriation. The Senate

would have provided $25 million from the Nuclear Waste Fund and $250 million from

the defense account. The final bill provides $95 million from the Nuclear Waste Fund

and $280 million from the defense account.

The 2010 target for opening a permanent repository is 12 years later than the

Nuclear Waste Policy Act deadline of January 31, 1998, for DOE to begin taking

waste from nuclear plant sites. Nuclear utilities and state utility regulators, upset over

DOE’s failure to meet the 1998 disposal deadline, have won two federal court

decisions upholding the Department’s obligation to meet the deadline and to

compensate utilities for any resulting damages. Utilities have also won several cases

in the U.S. Court of Federal Claims, although specific damages have not yet been

determined. In August 2000, a U.S. appeals court ruled that utilities could sue DOE

for damages without first pursuing administrative remedies.

Power Marketing Administrations. DOE’s four Power Marketing

Administrations (PMAs) developed out of the construction of dams and multipurpose water projects during the 1930s that are operated by the Bureau of

Reclamation and the Army Corps of Engineers. The original intention behind these

projects was conservation and management of water resources, including irrigation,

flood control, recreation and other objectives. However, many of these facilities

generated electricity for project needs. The PMAs were established to market the

excess power; they are the Bonneville Power Administration (BPA), Southeastern

Power Administration (SEPA), Southwestern Power Administration (SWPA), and

Western Area Power Administration (WAPA).

The power is sold at wholesale to electric utilities and federal agencies "at the

lowest possible rates ... consistent with sound business practice," and priority on PMA

power is extended to "preference customers," which include municipal utilities, co-ops

4

Hiruo, Elaine. “Bechtel SAIC, DOE Negotiating How Long Any Yucca Mt. Application

Should Be Delayed.” Platts NuclearFuel. October 15, 2001. p. 1.

CRS-24

and other "public" bodies. The PMAs do not own the generating facilities, but they

generally do own transmission facilities, except for Southeastern. The PMAs are

responsible for covering their expenses and repaying debt and the federal investment

in the generating facilities.

The 104th Congress debated sale of the PMAs and did, in 1995, authorize

divestiture of one PMA, the Alaska Power Administration. There has been no press

to dispose of the remaining PMAs, and none seems likely given the broader

uncertainties governing electric utility restructuring.

The Administration's request for SEPA, SWPA, and WAPA for FY2002 was

$205.1 million, a very slight increase over the FY2001 appropriation of $200.1

million. The House-passed H.R. 2311 increased the Western PMA by $2.7 million

to $172.2 million, bringing the total PMA budget to $207.8 million. The Senate

approved $205.1 million, consistent with the request. The conferees settled on

$207.5, a very slight reduction from the House-approved level. The conferees

stipulated that not less than $200,000 would be provided to WAPA to conduct a

technical analysis of the costs and feasibility of transmission expansion methods and

technologies.

BPA receives no annual appropriation, but funds some of its activities from a

permanent borrowing authority, currently $3.75 billion. For FY2002 BPA plans to

borrow $374.5 million, to be used for transmission system construction, system

replacement, energy resources, fish and wildlife, and capital equipment programs.

BPA also requested an additional $2 billion in permanent borrowing authority “to

address critical infrastructure needs.” The Senate bill included the additional $2 billion

for the permanent authority, but the House Appropriations Committee said it did not

have enough information to approve the increase. No increase in permanent

borrowing authority was included in the final bill.

Beginning with FY2001, the PMAs were authorized to use power revenues from

their customers to fund power purchases to supplement federal generation.

Previously, under the Purchase Power and Wheeling Program (PPW), the PMAs used

appropriated funds for these purchases. One probable reason for the change was that

the money appropriated to the PMAs under PPW was repaid to the Treasury rather

than to DOE. This meant that the PPW appropriation was fully scored against the

caps on discretionary domestic spending with which DOE must comply. The House

and Senate continued to favor this approach for FY2002.

Federal Energy Regulatory Commission (FERC). The appropriations

provisions for FERC are generally not controversial, since the agency receives in fees

the entire cost of operations. In the version of H.R. 2311 reported out by the House

Appropriations Committee, however, was a provision prohibiting FERC from using

funds to authorize construction of the Gulfstream Natural Gas Project, which would

pipe natural gas from the Gulf of Mexico from Mobile, AL, to Florida. When the bill

came up on the floor of the House June 28, an amendment by Representative Davis

of Florida to strike the prohibiting language was defeated by a vote of 210 to 213.

The provision does not appear in S. 1171 as reported by the Appropriations

Committee July 12.

CRS-25

Title IV: Independent Agencies

Independent agencies that receive funding from the Energy and Water

Development bill include the Nuclear Regulatory Commission (NRC), the

Appalachian Regional Commission (ARC), and the Denali Commission.

Table 7. Energy and Water Development Appropriations

Title IV: Independent Agencies

(in millions of dollars)

Program

FY2001

FY2002

Request

House

H.R.2311

Senate

S.1171

Conf.

Appalachian Regional

Commission

66.3

66.3

71.3

66.3

71.3

Nuclear Regulatory

Commission

(Revenues)

Net NRC*

481.9

(448.0)

33.9

506.9

(463.2)

43.7

516.9

(473.5)

43.4

511.9

(468.2)

48.7

516.9

(473.5)

43.4

Defense Nuclear Facilities

Safety Board

18.5

18.5

18.5

18.5

18.5

Nuclear Waste Technical

Review Board

2.9

3.1

3.1

3.5

3.1

Denali Commission

30.0

29.9

--

40.0

38.0

Delta Regional Authority

20.0

20.0

--

20.0

10.0

Total

171.9

181.7

136.5

197.0

184.5

*Includes appropriations from the Nuclear Waste Fund, and excludes the NRC Inspector General’s Office

Key Policy Issues — Independent Agencies

Nuclear Regulatory Commission.. The Nuclear Regulatory Commission

(NRC) requested a total budget of $513.1 million for FY2002, including $6.2 million

for the NRC inspector general’s office. The funding request provided an increase of

$25.8 million from FY2001, including a boost of nearly $700,000 for the inspector

general’s office. Major activities conducted by NRC include safety regulation and

licensing of commercial nuclear reactors, licensing of nuclear waste facilities, and

oversight of nuclear materials users.

The House-passed bill added $10 million to the NRC budget request to help

cover the anticipated costs of reviewing new reactor designs and applications for early

site permits for potential new reactors. According to the House Appropriations

Committee report, “Industry has recently indicated intent to submit at least one early

site permit application . . . in fiscal year 2002, and several firms have already initiated

CRS-26

preliminary discussions with the NRC regarding new reactor designs.” Following the

House action, the Senate also provided a $10 million increase from the budget request

to cover the costs of new license reviews, design certifications, and site permits. The

enacted Energy and Water bill provides the $516.9 million approved by both Houses.

The House approved NRC’s requested increase for the NRC inspector general’s

office, but the Senate voted to hold the office to the FY2001 level of $5.5 million.

The final bill includes the higher House figure, bringing total NRC funding to $523.1

million.

The House and Senate Appropriations Committees sharply criticized NRC in

1998 for allegedly failing to overhaul its regulatory system in line with improvements

in nuclear industry safety. The committees contended, among other problems, that

NRC’s regional offices were inconsistent with one another, that NRC was

inappropriately interfering with nuclear plant management, and that numerous NRC

review processes were outdated and unnecessary. But the panels praised NRC for

changing its regulatory process during the FY2000 budget cycle, and have continued

supporting the agency’s regulatory initiatives. On the other hand, industry critics have

raised concerns that NRC’s new procedures may result in relaxed safety oversight.

For most of the past decade, NRC’s budget has been offset 100% by fees on

nuclear power plants and other licensed activities, including the DOE nuclear waste

program. The nuclear power industry had long contended that the fee structure

required nuclear reactor owners to pay for a number of NRC programs, such as

foreign nuclear safety efforts, from which they did not directly benefit. To account

for that concern, the FY2001 Energy and Water Appropriations Bill included an NRC

proposal to phase down the agency’s fee recovery to 90% during the subsequent 5

years – two percentage points per year. As a result, 96% of the FY2002 NRC

appropriation – minus $23.7 million transferred from the Nuclear Waste Fund to pay

for licensing activities involving the proposed Yucca Mountain, Nevada, nuclear

waste repository – is to be offset by fees on licensees. However, the bill approved by

the Senate would have required that fees cover only half of the $10 million added to

the NRC request to pay for reviews of new licenses, permits, and certifications. The

Energy and Water Conferees did not go along with the Senate position, so the

enacted bill requires that fees recover 96% of the additional $10 million, as with the

rest of the NRC budget.

For Additional Reading

CRS Issue Briefs

CRS Issue Brief IB88090. Nuclear Energy Policy

CRS Issue Brief IB92059. Civilian Nuclear Waste Disposal.

CRS Issue Brief IB10041. Renewable Energy: Tax Credit, Budget, and Electricity

Restructuring Issues

CRS Issue Brief IB10019. Western Water Issues.

CRS-27

CRS Reports

CRS Report RL30307. Department of Energy Programs: Programs and

Reorganization Proposals.

CRS Report 96-212. Civilian Nuclear Spent Fuel Temporary Storage Options.

CRS Report RL30445. Department of Energy Research and Development Budget for

FY2001: Description and Analysis.

CRS Report RS20702. South Florida Ecosystem Restoration and the Comprehensive

Everglades Restoration Plan.

CRS Report RL30928. Army Corps of Engineers: Reform Issues for the 107th

Congress.

CRS Report RS20569. Water Resource Issues in the 107th Congress.

CRS Report RS20866. The Civil Works Program of the Army Corps of Engineers:

A Primer.

EveryCRSReport.com

The Congressional Research Service (CRS) is a federal legislative branch agency, housed inside the

Library of Congress, charged with providing the United States Congress non-partisan advice on

issues that may come before Congress.

EveryCRSReport.com republishes CRS reports that are available to all Congressional staff. The

reports are not classified, and Members of Congress routinely make individual reports available to

the public.

Prior to our republication, we redacted names, phone numbers and email addresses of analysts

who produced the reports. We also added this page to the report. We have not intentionally made

any other changes to any report published on EveryCRSReport.com.

CRS reports, as a work of the United States government, are not subject to copyright protection in

the United States. Any CRS report may be reproduced and distributed in its entirety without

permission from CRS. However, as a CRS report may include copyrighted images or material from a

third party, you may need to obtain permission of the copyright holder if you wish to copy or

otherwise use copyrighted material.

Information in a CRS report should not be relied upon for purposes other than public

understanding of information that has been provided by CRS to members of Congress in

connection with CRS' institutional role.

EveryCRSReport.com is not a government website and is not affiliated with CRS. We do not claim

copyright on any CRS report we have republished.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.