Data Centers and Their Energy Consumption:
Frequently Asked Questions
Updated May 12, 2026
Congressional Research Service
https://crsreports.congress.gov
R48646
SUMMARY
Data Centers and Their Energy Consumption:
Frequently Asked Questions
In its simplest form, a data center is a physical facility that houses and runs large
computer systems. U.S. data center annual energy use in 2023 (not accounting for
cryptocurrency) was approximately 176 terawatt-hours (TWh), approximately 4.4% of
U.S. annual electricity consumption that year, according to a report by Lawrence
Berkeley National Laboratory. A data center typically contains multiple computer
servers, data storage devices, and network equipment that can provide information
technology (IT) infrastructure service for organizations to store, manage, process, and
transmit large amounts of data. Some projections show that data center energy
consumption could double or triple by 2028.
R48646
May 12, 2026
Martin C. Offutt
Analyst in Energy Policy
Ling Zhu
Specialist in Science and
Technology Policy
Ashley J. Lawson
Specialist in Energy Policy
Natalie R. Ortiz
Roughly one-half or greater of the electric power demand of data centers stems directly
Analyst in Government
Organization and
from the operation of electronic IT equipment. Much of the rest is for cooling. The
Management
operation of the IT equipment raises the temperature of the ambient room air,
necessitating a cooling strategy. Centralized cooling resources are of two types: (1) those
moving chilled air through large ductwork; or (2) those moving chilled water in a piped
cooling loop that exchanges heat with the environment. An alternative to these
centralized systems is room-scale air conditioners. One type, called computer room air conditioners (CRACs), is
common in smaller data centers. Exchanging the heat with the environment can happen faster with methods that
directly consume water. The source of the water can be the local water utility and can also be on-site reservoirs or
other colocated water resources. A study by the International Energy Agency estimates, for illustration, that a 100
megawatt U.S. data center may consume roughly 2 million liters (roughly 530,000 gallons) per day, averaged
across the various cooling strategies, with 725,000 liters (roughly 190,000 gallons) per day consumed on site, or a
little less than 40%.
Currently, there are no legally binding energy standards that apply explicitly to operation of data centers in the
private sector. For use within the federal government, the U.S. Department of Energy has published guidance on
how to optimize energy use in federal data centers. Another nonbinding program, ENERGY STAR, certifies data
centers with a focus on the building and infrastructure. Since 2012 the Department of Energy has regulated the
energy efficiency of CRACs, one type of cooling strategy.
The federal government has made some efforts to gather data using information collection methods suitable for
later scale-up. In general, before a federal agency can begin collecting information on data centers, the agency
must go through a months-long approval process under the Paperwork Reduction Act of 1995. A 2021 report by
the U.S. Energy Information Administration on a pilot study of energy use in data centers surveyed 50 facilities
and received 9 responses. Other options may include using data from private firms that maintain data sets that are
able to provide direct or proxy information on data centers.
In 2023, a letter from five Senators and three Representatives urged the U.S. Environmental Protection Agency to
use its authority under Section 114 of the Clean Air Act to implement a “mandatory disclosure regime” on
cryptocurrency mining facilities. In the 119th Congress, S. 1475, the Clean Cloud Act of 2025, introduced in the
Senate and referred to the Committee on Public Works, would amend the Clean Air Act (42 U.S.C. §§7401 et
seq.) to provide the U.S. Environmental Protection Agency and the U.S. Energy Information Administration with
authority to collect data and information on annual electricity consumption of data centers and cryptocurrency
mining facilities.
Congressional Research Service
Data Centers and Their Energy Consumption: Frequently Asked Questions
Contents
Introduction ..................................................................................................................................... 1
What is a data center? ...................................................................................................................... 1
What do data centers look like?....................................................................................................... 2
How have data centers been defined in federal law and guidance? ................................................ 2
What are the energy requirements of data centers? ......................................................................... 3
Why are data centers energy-intensive? .......................................................................................... 3
What equipment uses energy in a data center? ................................................................................ 5
What contributes to the need for cooling in data centers? ............................................................... 6
How are data centers typically cooled? ........................................................................................... 7
What are some additional data center cooling strategies? ............................................................... 8
What are some potential concerns about water consumption by data centers? ............................... 8
Which, if any, federal regulations cover the energy consumption of data centers?......................... 9
How do data centers affect electricity prices? ............................................................................... 10
How can policymakers address electricity affordability concerns?................................................ 11
Are there reports on the actual energy use of U.S. data centers? .................................................. 12
What statutory and administrative procedures apply to information collection in general? ......... 13
When collecting information about energy, what are specific considerations? ............................. 15
Figures
Figure 1. Notional Power Draws of IT Equipment and Infrastructure ............................................ 6
Contacts
Author Information........................................................................................................................ 17
Congressional Research Service
Data Centers and Their Energy Consumption: Frequently Asked Questions
Introduction
According to estimates produced by Lawrence Berkeley National Laboratory (LBNL), U.S. data
center annual energy use in 2023 (not accounting for cryptocurrency) was approximately 176
terawatt-hours (TWh), approximately 4.4% of U.S. annual electricity consumption that year.1
Some projections show that data center energy consumption could double or triple by 2028.2 Data
centers provide information technology (IT) infrastructure services for processing large amounts
of data, such as for the rapidly growing field of artificial intelligence (AI). Roughly one-half or
greater of the electric power demand of data centers stems directly from the operation of IT
equipment. Much of the rest is for cooling.
What is a data center?
In its simplest form, a data center is a physical facility that houses and runs large computer
systems. A data center typically contains multiple computer servers, data storage devices, and
network equipment that can provide IT infrastructure service for organizations to store, manage,
process, and transmit large amounts of data. An increasing number of private and public entities
have used data centers to support their expanding IT needs, particularly as data volumes continue
to grow.
Types of data centers vary based on their ownership or intended purposes. For example, a large
company may choose to build, own, and operate an on-premises data center (also known as an
“enterprise data center”) to house and manage its own IT infrastructure.3 Other organizations,
especially those lacking the space, staff, or IT resources, often choose to rent a space, equipment,
or services within a colocation data center (also known as a “managed data center”) owned and
operated by a third-party company.4 Some online service providers operate geographically
distributed and interconnected data centers and allow multiple users to remotely access
computing resources such as data processing chips, software, data storage, networks, and
applications hosted by these data centers, which are called “cloud data centers.”5 Cloud
computing service providers may also operate and maintain smaller data centers physically
located closer to end users (called “edge data centers”) to reduce network latency and data
communication delay, speed up content distribution, optimize real-time, data-intensive
workloads, and improve application performance and user experience.6
The increasing demand for data storage and processing capacities, especially for intensive
computational tasks such as AI development and deployment, has led to construction and
1 A. Shehabi et al., 2024 United States Data Center Energy Usage Report, Lawrence Berkeley National Laboratory
(LBNL), LBNL-2001637, December 2024, p. 5. While cryptocurrency is one type of service supported by data centers,
not all studies of energy consumption of data centers touch on energy usage related to cryptocurrency. The report noted
that its calculations assumed that data centers would operate consistently with how they were commissioned and
designed but that results may differ.
2 Shehabi et al., 2024 United States Data Center Energy Usage Report (LBNL report), p. 6. Does not include energy
use related to cryptocurrency.
3 Equinix, “What Is a Data Center? What Are Different Types of Data Centers?,” August 1, 2024,
https://blog.equinix.com/blog/2022/10/13/what-is-a-data-center-what-are-different-types-of-data-centers/.
4 Stephanie Susnjara and Ian Smalley, “What Is a Data Center?,” IBM, September 4, 2024, https://www.ibm.com/think/
topics/data-centers.
5 Cisco, “What Is a Data Center?,” https://www.cisco.com/c/en/us/solutions/data-center-virtualization/what-is-a-datacenter.html#~infrastructure-evolution.
6 Susnjara and Smalley, “What Is a Data Center?”
Congressional Research Service
1
Data Centers and Their Energy Consumption: Frequently Asked Questions
operation of “hyperscale data centers” notable for their size.7 According to industry analysts, to be
considered a hyperscale data center, a facility should contain at least 5,000 computer servers and
a large scale of network equipment and occupy at least 10,000 square feet of physical space, with
an electric power rating, sometimes referred to as power draw, exceeding 100 megawatts (MW;
one megawatt is equal to 1 million watts).8 Roughly 100 MW of electric power is sufficient to
support the electricity needs of 80,000 U.S. households.9
What do data centers look like?
Data centers have architectural configurations ranging from closets, to larger rooms within a
single enterprise, to dedicated standalone structures serving the needs of multiple customers or
tenants, known as colocation. Colocation centers are touted for their flexibility in allowing
customers to specify exactly the amount of hardware and software resources they require. The
largest, or “hyperscale,” facilities occupy whole buildings or groups of buildings. When reporting
on the number of data centers, some analysts only count whole-building data centers, which
would include the hyperscale and colocation centers. The majority of computer servers are found
in these latter two types of centers—74% in 2023, according to LBNL.10
How have data centers been defined in federal law
and guidance?
The term data center has been defined in federal laws and guidance in the context of energy
consumption and federal use of data centers. For instance, Section 453(a)(1) of the Energy
Independence and Security Act of 2007 (P.L. 110-140) defines a data center as “any facility that
primarily contains electronic equipment used to process, store, and transmit digital information,
which may be (A) a free-standing structure; or (B) a facility within a larger structure, that uses
environmental control equipment to maintain the proper conditions for the operation of electronic
equipment.”11
In its guidance memorandum for federal agencies to implement the Federal Data Center
Enhancement Act of 2023 (Division D, Title LIII, of P.L. 118-31), the Office of Management and
Budget (OMB) specified that an agency data center covered in the memorandum (1) is composed
of certain types of permanent structures and operates in a fixed location; (2) houses IT equipment,
including servers and other high-performance computing devices, or data storage devices; and (3)
7 Phill Powell and Ian Smalley, “What Is a Hyperscale Data Center?,” IBM, March 21, 2024, https://www.ibm.com/
think/topics/hyperscale-data-center.
8 Powell and Smalley, “What Is a Hyperscale Data Center?” See also VIAVI Solutions, “What Is a Hyperscale Data
Center?,” https://www.viavisolutions.com/en-us/resources/learning-center/what-hyperscale-data-center.
9 This calculation assumes a continuous source of electric power generation equal to 100 megawatts (MW), operating
year-round, and that the average U.S. household consumes 10,566 kilowatt-hours (kWh) of electricity per year. The
latter figure is sourced from the U.S. Energy Information Administration (EIA), “EIA Releases Consumption and
Expenditures Data from the Residential Energy Consumption Survey,” press release, March 29, 2023,
https://www.eia.gov/pressroom/releases/press530.php.
10 Shehabi et al., 2024 United States Data Center Energy Usage Report (LBNL report), p. 37.
11 42 U.S.C. §17112(a)(1).
Congressional Research Service
2
Data Centers and Their Energy Consumption: Frequently Asked Questions
hosts information and information systems accessed by other systems or by users on other
devices.12
What are the energy requirements of data centers?
The Department of Energy (DOE) examined the nationwide energy consumption of data centers
in response to direction by Congress in the Energy Act of 2020 (Section 1003 of Division Z, P.L.
116-260). The study, performed by LBNL, found that U.S. data center annual energy use in 2023
(not accounting for cryptocurrency) was approximately 176 terawatt-hours (TWh), approximately
4.4% of U.S. annual electricity consumption that year.13 An analysis by the Electric Power
Research Institute (EPRI) similarly estimated that data centers consumed 4% of U.S. electricity in
2023.14 In a separate analysis, in 2024, EPRI estimated that AI consumed 10% to 20% of data
center energy.15
Why are data centers energy-intensive?
Roughly one-half or greater of the electric power demand of data centers stems directly from the
operation of electronic IT equipment.16 Much of the rest is for cooling. The core hardware
components of a data center include computer servers, which contain computing chips (e.g.,
central processing unit [CPU] and graphics processing unit [GPU]), memory chips, data storage
drives, and network routers and switches.17 Data from a major CPU chip manufacturer show that
its data center-level CPU series in early 2025 had an average thermal design power (TDP) rating
between 150 watts (W) and 350W.18 An advanced data center-level GPU can have a maximum
TDP rating between 350W and 700W.19 The computing chips of CPU and GPU typically
consume the most electrical power inside a server, as discussed further in “What contributes to
the need for cooling in data centers?” According to an industry report published in November
12 Office of Management and Budget (OMB), Implementation Guidance for the Federal Data Center Enhancement
Act, M-25-03, January 14, 2025, p. 2, https://bidenwhitehouse.archives.gov/wp-content/uploads/2025/01/M-2503_Implementation-Guidance-for-the-Federal-Data-Center-Enhancement-Act.pdf.
13 Shehabi et al., 2024 United States Data Center Energy Usage Report (LBNL report), p. 5.
14 See Figure ES-1 of Electric Power Research Institute (EPRI), Powering Data Centers: U.S. Energy System and
Emissions Impacts of Growing Loads, October 2024, p. 3, https://www.epri.com/research/products/
000000003002031198.
15 EPRI, Powering Data Centers, p. 7.
16 Shehabi et al., 2024 United States Data Center Energy Usage Report (LBNL report), p. 47.
17 For more information on the use of CPUs and GPUs in data centers, see CRS In Focus IF12899, Data Centers and
Cloud Computing: Information Technology Infrastructure for Artificial Intelligence, by Ling Zhu.
18 Intel, “Intel Xeon 6 Processors,” https://www.intel.com/content/www/us/en/products/details/processors/xeon.html.
Intel defines thermal design power (TDP) as “the average power, in watts, the processor dissipates when operating at
Base Frequency with all cores active, under an Intel-defined, high-complexity workload.” Intel, “11th Gen Intel®
Core™ Mobile Processor Technical Specifications,” https://edc.intel.com/preview/content/www/us/en/products/
performance/benchmarks/11th-gen-intel-core-mobile-processor-technical-specifications/.
19 See, for example, Nvidia, “NVIDIA H100 Tensor Core GPU,” https://www.nvidia.com/en-us/data-center/h100/.
Nvidia defines the term TDP differently from Intel. The TDP of an Nvidia GPU is “the maximum power that a
subsystem is allowed to draw for a ‘real world’ application, and also the maximum amount of heat generated by the
component that the cooling system can dissipate under real-world conditions.” Nvidia, GeForce GPU Power Primer,
https://www.nvidia.com/content/dam/en-zz/Solutions/GeForce/technologies/frameview/Power_Primer.pdf.
Congressional Research Service
3
Data Centers and Their Energy Consumption: Frequently Asked Questions
2024, computing power and server systems account for roughly 40% of electricity consumption
in a data center, while network and data storage equipment use about 10%.20
Each piece of the electronic IT equipment generates heat as it operates. Many chipsets incorporate
a safety mechanism called “thermal throttling” that reduces the chip performance to prevent
overheating and protect the hardware.21 Data centers require cooling systems to help dissipate the
heat and maintain optimal performance and overall system stability. The cooling systems could
account for another 38% to 40% of electricity consumption in a data center.22 (See Figure 1.)
While general-purpose workloads typically require only CPUs, GPUs are typically considered
better than CPUs for handling computation-intensive processes such as AI training.23 Under full
workload conditions, a GPU performing AI training tasks may operate near its maximum capacity
and draw power close to its maximum TDP over extended periods of time.
The development and deployment of state-of-the-art, large AI models may require multiple GPUs
to work concurrently by distributing large volumes of data and computational tasks across the
computing chips (known as “parallel computing”).24 A study released in December 2024 observed
that, when training a large AI model using a computer system with eight advanced GPUs for eight
hours, the GPUs were near full utilization most of the time (an average of 93%) and the median
amount of electrical power consumed by the chips was 7.92 kilowatts (kW; one kilowatt is equal
to 1,000 watts), with a total energy consumption of 62 kilowatt-hours (kWh).25
Cutting-edge chip technologies support high-speed GPU-to-GPU data communication among
hundreds of GPUs across multiple servers, enabling the creation of a massive data processing
cluster to support large-scale AI training but also further increasing these data centers’ energy
consumption. A report released in April 2025 estimated that training a specific large AI model
required a total power draw of 25.3 MW and that the power required to train these models could
double annually.26 The report stated that “[t]he rising power consumption of AI models reflects
the trend of training on increasingly larger datasets.”27 Another study released in May 2025
estimated that training another large AI model consumed 50 gigawatt-hours (GWh; one gigawatthour is equal to 1 million kilowatt-hours) of energy, “enough to power San Francisco for three
days.”28
Multiple industry reports indicate that data processing demands of AI and related remote
computing services have spurred new construction and upgrades of data centers. The computing
20 Karthik Ramachandran et al., “As Generative AI Asks for More Power, Data Centers Seek More Reliable, Cleaner
Energy Solutions,” Deloitte Center for Technology Media and Telecommunications, November 19, 2024,
https://www2.deloitte.com/us/en/insights/industry/technology/technology-media-and-telecom-predictions/2025/genaipower-consumption-creates-need-for-more-sustainable-data-centers.html.
21 Intel, “What Is Throttling and How Can It Be Resolved?,” May 25, 2023, https://www.intel.com/content/www/us/en/
support/articles/000088048/processors.html.
22 Ramachandran et al., “As Generative AI Asks for More Power, Data Centers Seek More Reliable, Cleaner Energy
Solution.”
23 Imran Latif et al., “Empirical Measurements of AI Training Power Demand on a GPU-Accelerated Node,” arXiv,
December 20, 2024, https://arxiv.org/abs/2412.08602.
24 DigitalOcean, “Multi-GPU Computing: What It Is and How It Works,” February 14, 2025,
https://www.digitalocean.com/resources/articles/multi-gpu-computing.
25 Latif et al., “Empirical Measurements of AI Training Power Demand on a GPU-Accelerated Node,” p. 10.
26 Nestor Maslej et al., The Artificial Intelligence Index Report 2025, Institute for Human-Centered Artificial
Intelligence, Stanford University, April 2025, p. 72, https://hai.stanford.edu/ai-index/2025-ai-index-report.
27 Maslej et al., AI Index Report 2025, p. 72.
28 James O’Donnell and Casey Crownhart, “We Did the Math on AI’s Energy Footprint. Here’s The Story You Haven’t
Heard,” MIT Technology Review, May 20, 2025.
Congressional Research Service
4
Data Centers and Their Energy Consumption: Frequently Asked Questions
resources hosted by these centers would, in turn, lead to increased power demand. For example,
one report estimated that the computing capacity (measured by the amount of electrical power
consumed by IT equipment) of data centers under construction in North America at the end of
2024 reached a record-high 6,350 MW, more than double the figure from a year earlier.29 Another
report indicated that new hyperscale data centers have been built with capacities from 100 MW to
1,000 MW each, “roughly equivalent to the load from 80,000 to 800,000 homes.”30
What equipment uses energy in a data center?
Data centers in whole building structures contain energy-consuming IT equipment, cooling and
air handling equipment, and backup power supplies.31 The latter may include uninterruptible
power supplies, backup diesel generators, and natural-gas-powered generators.32 Backup
strategies involving batteries consume electricity while improving the quality of the electricity by
evening out the highs and lows of the electric voltage.
For a small data center within an office or research building, the mix of energy consumption
could be roughly 50% attributable to IT physical machines and 50% attributable to cooling and
power supply, according to a large industrial and energy equipment maker.33 (See Figure 1.) In
addition, data centers include appliances and equipment for human occupants, not depicted in the
figure. Overall, the energy use within data centers is not well described nationally, as elaborated
further in “Are there reports on the actual energy use of U.S. data centers?” An expression or
metric sometimes used to describe the energy performance of data centers is power usage
effectiveness (PUE), which is the ratio of all the power used by the data center to the power used
by just the IT equipment.34 For the example just discussed, the PUE would be two (2).
Discussion of IT equipment rapidly invokes terms descriptive of nonphysical entities such as
clouds, virtual machines, architectures, nodes, and protocols not directly associated with a realworld energy-consuming process. Understanding the energy consumption necessitates discussing
hardware (i.e., physical machines) to which energy consumption can be assigned, described
below in “What contributes to the need for cooling in data centers?”
29 CBRE, “North America Data Center Trends H2 2024: Surging Demand Drives Record New Data Center
Development,” February 26, 2025, https://www.cbre.com/insights/reports/north-america-data-center-trends-h2-2024.
30 EPRI, Powering Intelligence: Analyzing Artificial Intelligence and Data Center Energy Consumption, May 28, 2024,
p. 2.
31 These non-IT components may be termed “infrastructure” for purpose of energy tracking. A. Shehabi et al., “Data
Center Growth in the United States: Decoupling the Demand for Services from Electricity Use,” Environmental
Research Letters, vol. 13 (2018), p. 124030. Whole-building data centers are described elsewhere in the present report.
32 Uninterruptible power supply (UPS) strategies range from full standby to active regeneration of the waveform of the
power supply. CyberPower, “How Does an Uninterruptible Power Supply (UPS) Work?,” September 10, 2015,
https://www.cyberpowersystems.com/blog/how-does-a-ups-work/.
33 ABB, HVAC Motors: Motors in Data Centers, https://new.abb.com/motors-generators/nema-low-voltage-ac-motors/
hvac-motors.
34 The Green Grid, PUE: A Comprehensive Examination of the Metric, White Paper #49, 2012; and N. Casale, “Data
Centers: Where and How Should PUE Be Improved?,” ASHRAE Journal, vol. 63, no. 6 (June 2021).
Congressional Research Service
5
Data Centers and Their Energy Consumption: Frequently Asked Questions
Figure 1. Notional Power Draws of IT Equipment and Infrastructure
Illustrative case with PUE = 2, consistent with data centers of <150 square feet floor space
Source: CRS, adapted from ABB, HVAC Motors: Motors in Data Centers, https://new.abb.com/motors-generators/
nema-low-voltage-ac-motors/hvac-motors.
Notes: PUE = power usage effectiveness, the ratio of all power used by a data center to that used by the
information technology (IT) equipment (i.e., by servers, data storage, and communication). The depicted PUE of
2 is typical of a small data center (i.e., one having less than 150 square feet of floor space), as reported in
A. Shehabi et al., 2024 United States Data Center Energy Usage Report, Lawrence Berkeley National Laboratory
(LBNL), LBNL-2001637, December 2024, p. 47.
What contributes to the need for cooling in data
centers?
From an electrical engineer’s perspective, as computer chips of various types perform their
function, the impedance of the electrical pathways generates heat, both on and between chips.35
The majority of heat arises dynamically while the processers are performing useful functions.
Heat-generating activities from computation take place related to, or in support of, CPU/GPU
activity. Generally speaking, the energy consumption of a server scales according to the number
of CPUs or GPUs.36 On-chip (i.e., on the physical CPU/GPU) energy consumption includes
dynamic losses associated with the basic concept of operation of a transistor, known as
switching.37 Further losses occur associated with computing chips when they access on-chip
SRAM (static random access memory) and networking functions. Additional losses on-chip are
due to control functions (“clock”), power, and leakage current.38 Off-chip energy can be lost when
electricity moves between the computing chip (CPU/GPU) and a separate memory chip. The time
needed for very large transmission of data between separate chips, as in the last example, is
known as the memory wall or memory bottleneck.
Unlike in a desktop computer, the activity rates of chips in a data center can be extremely high,
and this activity rate increases the cooling needs as the hot equipment raises the temperature of
35 Servers, named after today’s client-server architecture, may include chips for computing, memory, and networking.
36 Shehabi et al., 2024 United States Data Center Energy Usage Report (LBNL report), p. 16.
37 Integrated circuits, also known as chips, contain billions of transistors. Heat is the movement of energy between two
bodies of different temperatures that are in thermal contact. Colloquially, heat may be referred to as a “loss” if the heat
does not provide a useful (valorized) service.
38 Leakage current is a static loss not associated with the chip’s performance of computational functions. Not all the
energy consumed by the IT equipment supports the useful computing functions of computer chips. Some energy heats
the equipment without performing a function.
Congressional Research Service
6
Data Centers and Their Energy Consumption: Frequently Asked Questions
the ambient air. The more common cooling strategies treat and condition this ambient air by
lowering its temperature and humidity.
Historically the amount of computing power per watt has improved significantly. The move to
multi-core processing at the turn of the millennium lowered the heat produced for the same
amount of computing power.39 According to Nvidia, as reported in October 2024, the prior 10
years had seen a 4,000-fold improvement in its GPU’s computational performance per watt of
power.40 More conservatively, the International Energy Agency estimates the change in AI GPU
performance per watt to have improved 100-fold or greater between 2008 and 2023.41
How are data centers typically cooled?
The operation of the IT equipment raises the temperature of the ambient room air, necessitating a
cooling strategy. Generally speaking, the cooling strategies for IT equipment differ from cooling
needed for personal comfort, with computer servers tolerant of higher temperatures but requiring
lower humidity.42 Federal guidelines and research advise using large centralized cooling resources
for data centers.43 There are two types of centralized cooling resources: (1) those moving air
through large ductwork to deliver chilled air and remove warm air; or (2) those moving water or
other heat transfer fluid through a piped cooling loop that exchanges heat with the environment.
The centralized cooling resources achieve higher efficiency at the larger scale. Those of the first
type, which moves air, can improve their energy efficiency by utilizing variable speed fans.44
Though less common, these methods can, if required, be used to heat the interior of the data
center using air-ducted or looped strategies (i.e., strategies that use heat transfer fluids).
An alternative to these centralized systems is room-scale air conditioners. One type, called
computer room air conditioners (CRACs), is common in smaller data centers.45 With CRACs, the
air is looped and filtered within the room but the heat is sent outside the building using refrigerant
or other fluid.46
The above methods rely on a sequence in which computing equipment first heats the room air,
after which the cooling system accepts heat from the room air, either moving a heated fluid
outside, where the heat is returned to the environment, or removing the air itself and replacing it
39 K. Bourzac, “Fixing AI’s Energy Crisis,” Nature, October 17, 2024.
40 K. Bourzac, “Fixing AI’s Energy Crisis.”
41 International Energy Agency (IEA), “Efficiency Improvement of AI Related Computer Chips, 2008-2023,”
October 17, 2024, https://www.iea.org/data-and-statistics/charts/efficiency-improvement-of-ai-related-computer-chips2008-2023.
42 See DOE’s proposed rule on computer room air conditioners, 65 Federal Register 48830 (August 9, 2000).
43 DOE Federal Energy Management Program (FEMP) and National Renewable Energy Laboratory (NREL), Best
Practices Guide for Energy-Efficient Data Center Design, July 2024, p. 14, https://www.energy.gov/femp/articles/bestpractices-guide-energy-efficient-data-center-design.
44 DOE FEMP, Best Practices, p. 16.
45 In DOE’s definition, CRACs are “[u]sed in computer rooms, data processing rooms, or other information
technology.” DOE FEMP, Best Practices, p. 14; and DOE, Technical Support Document: Energy Efficiency Program
for Commercial and Industrial Equipment: Certain Categories of Commercial Air Conditioning and Heating
Equipment, August 2019, p. 2-1.
46 Trane, Engineers Newsletter: Understanding the Selection of Direct Expansion (DX), vol. 52, no. 1 (March 2023),
https://www.trane.com/content/dam/Trane/Commercial/global/learning-center/engineers-newsletters/ADM-APN086EN.pdf; R. Waldron, “CRAC Units: Computer Room AC Basics,” Rasmussen Mechanical Services, January 25, 2023,
https://www.rasmech.com/blog/crac-units-computer-room-ac-basics/?srsltid=AfmBOoq5_rVIu-HmLF7BTN2i2AZ_d7bskeXWdYt4hzkS8WTuX75qFpy; and R. Schmidt and M. Iyengar, “Thermodynamics of
Information Technology Data Centers,” IBM Journal of Research and Development, vol. 53, no. 3 (August 2009).
Congressional Research Service
7
Data Centers and Their Energy Consumption: Frequently Asked Questions
with cooled return air. Exchanging the heat with the environment can happen faster with methods
that involve water.
What are some additional data center cooling
strategies?
High-performance computing (HPC)47 equipment has necessitated cooling methods that are
thermodynamically closer to the chips and intercept the energy before it has substantially raised
the room air temperature. These direct liquid cooling technologies can address the higher power
of HPC.
Another option that may be used during shoulder season (i.e., spring and fall in temperate
climates) or winter, known as free cooling, imports water chilled passively by environmental
conditions. Compared with methods involving conventional mechanical cooling that use powered
compressors, free cooling is relatively inexpensive. Optimizing the cooling of the data center will
generally involve some combination of methods.
Facilities with substantial cooling needs sometimes employ thermal storage. The National
Institutes of Health, for example, has a large chilled water storage facility at its Bethesda, MD,
campus.48 The thermal storage system operates by drawing down the chilled water reservoir
during periods of intense cooling requirements and replenishing the reservoir during off-peak
hours.
What are some potential concerns about water
consumption by data centers?
A study by the International Energy Agency estimates, for illustration, that a 100 MW U.S. data
center may consume roughly 2 million liters (roughly 530,000 gallons) per day, averaged across
the various cooling strategies, with 725,000 liters (roughly 190,000 gallons) per day consumed on
site, or a little less than 40%.49
Of the various cooling strategies to return heat to the environment, those that include cooling
towers accelerate the rate of heat transfer by spraying water onto surfaces in the cooling tower.
The water evaporates to provide cooling and must constantly be replenished. According to one
vendor, water-cooled systems may use as little as one-half the electric power of air-cooled
systems.50 The source of the cooling water can be the local water utility. A city in Oregon reported
47 The definition of high-performance computing is not rigorous but is associated with more complex tasks. See, for
example, Nvidia, “What Is High-Performance Computing?,” https://www.nvidia.com/en-us/glossary/highperformance-computing/.
48 National Academies of Sciences, Engineering, and Medicine, Managing the NIH Bethesda Campus Capital Assets
for Success in a Highly Competitive Global Biomedical Research Environment (National Academies Press, 2019),
p. 42.
49 IEA, Energy and AI: World Energy Outlook Special Report, April 2025, p. 242, https://iea.blob.core.windows.net/
assets/34eac603-ecf1-464f-b813-2ecceb8f81c2/EnergyandAI.pdf. IEA assumes a load factor of 55% for the data
center’s electricity consumption. IEA further employs a water intensity factor of 0.55 liters/kWh. Noelle Walsh-Elwell,
“How Microsoft Measures Datacenter Water and Energy Use to Improve Azure Cloud Sustainability,” Microsoft Azure
Blog, April 22, 2022, https://azure.microsoft.com/en-us/blog/how-microsoft-measures-datacenter-water-and-energyuse-to-improve-azure-cloud-sustainability/.
50 ABB, HVAC Motors: Motors in Data Centers, https://ibtinc.com/wp-content/uploads/2024/05/Brochure-Motors-indata-enters.pdf.
Congressional Research Service
8
Data Centers and Their Energy Consumption: Frequently Asked Questions
that nearly 30% of the city’s water consumption was attributable to Google data centers, which
had tripled water consumption over a five-year period.51 The source of water can also be on-site
reservoirs or other colocated water resources.52 Data centers of smaller size within an office
building might only incrementally increase direct water use.
There are two principal sources of water demand from cooling towers. One of the sources of
demand is the sprayed-on cooling water just noted. Another operation, known as blowdown, uses
water to flush out hard scale that can build up on surfaces in the cooling tower when sprayed-on
water evaporates and leaves behind solid material.53 By one estimate, most of the wastewater
produced at a data center is from blowdown.54
Which, if any, federal regulations cover the energy
consumption of data centers?
DOE has published guidance on how to optimize energy use in data centers used by the federal
government.55 Currently there are no legally binding energy standards that apply explicitly to
operation of data centers in the private sector.56 The ENERGY STAR program, a voluntary
labeling program, certifies data centers with a focus on the energy efficiency of data centers’
buildings and infrastructure.57 ENERGY STAR uses a calculation method that effectively
removes the consumption of the IT equipment, attributing energy use only to that of a powered
shell (the building and its electricity).58 ENERGY STAR gives a rating based on the performance
of the powered shell of the building and rates this against that of similar buildings. The program
51 M. Rogoway, “Google’s Water Use Is Soaring in The Dalles, Records Show, with Two More Data Centers to
Come,” Oregonian, February 22, 2023. The city agreed to report “total of all water meter readings” for the operator of
the data center. Data released by the city in 2025 shows total water disposition was 355 million gallons attributed to
Google of the city’s 1.232 billion gallons (i.e., 29% was attributed to Google). April Ehrlich, “The Dalles’ Mayor
Called OPB’s Data Center Story Inaccurate. Here Are the Facts,” Oregon Public Broadcasting (OPB), January 23,
2026.
52 R. Miller, “Alligator Patrols Google’s Data Center,” DataCenter Knowledge, December 13, 2012,
https://www.datacenterknowledge.com/hyperscalers/alligator-patrols-google-s-data-center.
53 DOE FEMP, “Best Management Practice #10: Cooling Tower Management,” https://www.energy.gov/femp/bestmanagement-practice-10-cooling-tower-management.
54 DOE FEMP, “Best Management Practice #10: Cooling Tower Management,” https://www.energy.gov/femp/bestmanagement-practice-10-cooling-tower-management.
55 DOE FEMP, Best Practices.
56 Building codes and standards vary by jurisdiction. Generally, the federal government has jurisdiction over building
codes and standards for federal and military buildings; establishes national manufactured housing construction
standards; and requires buildings to comply with the Americans with Disabilities Act of 1990 (ADA; P.L. 101-336) and
the Fair Housing Act of 1968 (P.L. 90-284). For more information, see CRS Report R47665, Building Codes,
Standards, and Regulations: Frequently Asked Questions, coordinated by Linda R. Rowan.
57 For further information on ENERGY STAR, see CRS In Focus IF10753, ENERGY STAR Program, by Corrie E.
Clark.
58 ENERGY STAR, Data Center Estimates in the United States and Canada, August 2023, p. 1,
https://www.energystar.gov/sites/default/files/tools/Data_Center_Estimates_August_2018_EN%20%20508%20Blue.pdf. The whole-building certification by ENERGY STAR’s computation tool, Portfolio Manager,
takes account of electricity and natural gas used on site and calculates an energy use intensity (energy per floor area)
that includes the energy needed to generate and deliver the electricity and to deliver the natural gas.
Congressional Research Service
9
Data Centers and Their Energy Consumption: Frequently Asked Questions
has certified nearly 300 data centers, with all but one having greater than 10,000 square feet total
floor area.59
ENERGY STAR also certifies products found in data centers such as enterprise scale servers,
uninterruptible power supplies, memory storage, and networking equipment.60
Since 2012, DOE has regulated the energy efficiency of CRACs.61 The regulatory program is
authorized by the Energy Policy and Conservation Act, as amended (EPCA; 42. U.S.C. §§6291 et
seq.). The standards apply to units at the time they are shipped by manufacturers; the
manufacturer is responsible for compliance.62
How do data centers affect electricity prices?
The price (rate) that customers pay for electricity is determined primarily by two factors: the cost
of producing electricity (generation) and the cost of delivering electricity to customers through
the grid (transmission and distribution).63 Utility regulators at the state or local level approve rates
that reflect a utility’s cost for these components. Rates typically change every few years in
response to shifts in utility costs over time. For example, if a utility invests in a new power plant
or in upgrades to the grid, rates might need to change to reflect those capital investments. Utility
sales also affect rates. When sales increase, a utility earns more revenue; conversely, when sales
decrease, a utility earns less revenue. If a utility’s revenue is less than its costs, rates might need
to increase to compensate. Similarly, if a utility’s revenue exceeds its costs, regulators might
lower rates.
Data center electricity demand could potentially affect electricity rates if that demand led to a
meaningful change in the local utility’s costs or sales (or both). If a utility built new infrastructure
to accommodate data center demand, the utility might raise rates to recover the cost.
Alternatively, if a utility had sufficient existing infrastructure to accommodate data center
demand, the increased sales might lead the utility to reduce rates.
Researchers at LBNL led an analysis providing insights on the extent to which data centers and
other drivers have affected retail electricity prices.64 Their analysis focused on the years 2019
through 2025. They found that the main driver behind increases in electricity prices during this
period was utility investments in grid infrastructure, mostly in response to aging infrastructure
and resilience needs. Other key drivers included natural gas prices, recovery from natural
disasters (e.g., storms, wildfires), and state energy and environmental policies. In other words,
this analysis did not identify data centers as major influencers of electricity prices in most areas of
the country between 2019 and 2025.
59 ENERGY STAR, ENERGY STAR Certified Data Centers, https://www.energystar.gov/buildings/certified-data-
centers.
60 ENERGY STAR, “Data Center Equipment,” https://www.energystar.gov/products/data_center_equipment.
61 The Energy Policy Act of 1992 (P.L. 102-486) amended the Energy Policy and Conservation Act (42 U.S.C. §6291
et seq.) and gave DOE authority to set energy conservation standards for “commercial package air conditioning and
heating equipment.” 42 U.S.C. §§6311(8)(A) and 6313(a)(6)(A).
62 See CRS Report R47038, The Department of Energy’s Appliance and Equipment Standards Program, by Martin C.
Offutt.
63 U.S. Energy Information Administration (EIA), “Electricity Explained: Factors Affecting Electricity Prices,”
https://www.eia.gov/energyexplained/electricity/prices-and-factors-affecting-prices.php.
64 Ryan Wiser et al., “Retail Electricity Price Trends and Drivers: Data Update—2026 Edition,” LBNL and the Brattle
Group, April 2026, https://emp.lbl.gov/sites/default/files/2026-03/Retail%20Price%20Trends_2026%20edition.pdf.
Congressional Research Service
10
Data Centers and Their Energy Consumption: Frequently Asked Questions
The LBNL analysis further investigated the relationship between electricity demand growth
(including demand growth due to data centers) and prices. The analysis found that states with the
largest data center demand growth generally saw electricity price decreases between 2019 and
2025, though some states with relatively large data center growth saw price increases or little
change.65 One explanation for this finding may be that increased demand in some states allowed
utility costs to be spread over a larger sales volume, putting downward pressure on rates. Whether
that relationship holds in those states moving forward remains to be seen.
How can policymakers address electricity
affordability concerns?
Electricity consumers typically notice their monthly bill, not their electricity rate. Customers’
electricity bills are determined primarily as the product of electricity rates and electricity
consumption. Some policy options primarily impact rates while other options primarily impact
consumption.
State and local utility regulators can use policies to attempt to isolate the rate impact of utility
capital investment to data centers, thereby reducing any potential rate impacts for other
customers.66 This approach typically involves establishing new electricity customer classes for
data centers or other large electricity consumers with similar demand profiles. The number of
utilities with data center-specific policies is increasing as utility regulators around the country
address affordability concerns associated with data center development.67
Another set of policy options primarily impacting rates relates to infrastructure development. As
noted in the previous section, areas of the country with grid constraints due to insufficient
infrastructure are more likely to experience rate increases from new data center demand.
Electricity infrastructure is subject to a combination of federal, state, and local permitting
processes. Numerous proposals have been introduced in the 119th Congress with the goal of
speeding the pace of infrastructure development. For additional discussion, see CRS Report
R48762, Data Center Energy Infrastructure: Federal Permit Requirements, by Paul W. Parfomak
et al., and CRS Report R47627, Electricity Transmission Permitting Reform: Issues and
Legislative Proposals, by Ashley J. Lawson. Additionally, federal tax policy has historically
affected utility costs for new power plants, primarily by providing tax credits to developers of
power plants with low greenhouse gas emissions. The 119th Congress modified this policy. For
additional discussion, see CRS Insight IN12624, IRA Tax Credit Repeal in the FY2025
Reconciliation Law: Part 1, by Nicholas E. Buffie.
Policies aimed at increasing energy conservation and energy efficiency can reduce energy
consumption, thereby lowering consumers’ bills without necessarily affecting electricity rates.
Federal policy has historically promoted energy efficiency improvements through grant programs
and tax credits. States and utilities also frequently adopt policies promoting efficiency and
conservation. For additional discussion of selected federal programs, see CRS Report R46418,
65 Ryan Wiser et al., “Retail Electricity Price Trends and Drivers: Data Update—2026 Edition,” p. 47.
66 Such retail rate policies are outside federal jurisdiction, pursuant to the Federal Power Act (16 U.S.C. §§791 et seq.).
For additional discussion, see CRS In Focus IF11411, The Legal Framework of the Federal Power Act, by Adam Vann.
67 See, for example, Natalie Mims Frick and Long Lam, “Large Loads: Interconnection, Tariff Designs, and State
Actions,” LBNL and the Brattle Group, September 2025, https://www.brattle.com/wp-content/uploads/2025/09/LargeLoads-Interconnection-Tariff-Designs-and-State-Actions.pdf; and Smart Electric Power Alliance and NC Clean Energy
Technology Center, “Database of Emerging Large-Load Tariffs (DELTa),” https://sepapower.org/large-load-tariffsdatabase/.
Congressional Research Service
11
Data Centers and Their Energy Consumption: Frequently Asked Questions
The Weatherization Assistance Program Formula, by Corrie E. Clark and Lynn J. Cunningham,
and CRS Insight IN12625, IRA Tax Credit Repeal in the FY2025 Reconciliation Law: Part 2, by
Nicholas E. Buffie.68
One consideration about these policies is the time period over which they can affect customers’
bills. Energy efficiency and conservation tend to have immediate impacts—electricity
consumption decreases as soon as an efficiency or conservation measure is in place. Policies
focused on infrastructure, in contrast, could take several years to affect rates because of the time it
takes to develop new electricity infrastructure.
Are there reports on the actual energy use of U.S.
data centers?
Owing to recent interest in the energy use of data centers, the federal government has begun data
collection to assess data centers’ scope and scale and, ultimately, their impacts on energy demand
and natural resources. Congress, through oversight and legislative activity, has shown interest in
the results of data collection and in expanding the federal government’s authority to collect the
data.69 As noted, the federal government has made some efforts to gather data using information
collection methods suitable for later scale-up.70 The Energy Information Administration (EIA) has
conducted two data collection activities, but these were limited by sample size or were curtailed.
A 2021 EIA pilot study of energy use in data centers surveyed 50 facilities and received 9
responses; other responses either were not received, were incomplete, or were not facilities
matching the criteria for data centers. EIA noted significant obstacles to collecting the data.71 EIA
focused on facilities of greater than 50,000 square feet as most likely to be whole-building data
centers.72
In 2024, EIA attempted to collect information focused on cryptocurrency mining data centers.
EIA began its survey with emergency approval under a provision of the Paperwork Reduction Act
of 1995 (PRA).73 The collection was challenged in the U.S. District Court for the Western District
of Texas by a trade association focused on blockchain and cryptocurrency technologies and a
Bitcoin mining company. These plaintiffs made several allegations against the government,
including that the PRA’s emergency approval provision was improperly used by EIA, that OMB’s
conditions for approving the collection violated the PRA,74 and that OMB violated the
Administrative Procedure Act (5 U.S.C. §551 et seq.) by arbitrarily and capriciously approving an
68 CRS Insight IN12625, IRA Tax Credit Repeal in the FY2025 Reconciliation Law: Part 2, by Nicholas E. Buffie.
69 See, for example, S. 1475, Clean Cloud Act of 2025; H.R. 6984, Data Center Transparency Act; H.R. 7858, Data
Center Community Impact Act; and Letter from Sens. Warren, Whitehouse, Markey, Merkley, and Durbin and Reps.
Huffman, Tlaib, and Porter to Michael Regan, Administrator, U.S. Environmental Protection Agency, and Jennifer
Granholm, Secretary, Department of Energy, February 6, 2023. In the 118 th Congress, see S. 3732, Artificial
Intelligence Environmental Impacts Act of 2024.
70 For further discussion of federal policies on information collection, see CRS Report R48546, The Office of
Information and Regulatory Affairs (OIRA): Overview and Major Responsibilities, coordinated by Meghan M. Stuessy
and Taylor N. Riccard.
71 EIA, 2018 CBECS Data Center Pilot, p. 2.
72 EIA, 2018 CBECS Data Center Pilot, p. 3.
73 44 U.S.C. §3507(j).
74 The role of OMB in approving an agency’s information collection, including surveys, is discussed below in “What
statutory and administrative procedures apply to information collection in general?”
Congressional Research Service
12
Data Centers and Their Energy Consumption: Frequently Asked Questions
information collection that did not follow the PRA’s procedures.75 The court issued a temporary
restraining order, noting the allegations of harm made by plaintiffs, including the legal penalties
for not responding to the EIA survey,76 the costs of complying with the survey, and the disclosure
of proprietary information requested by EIA through the survey.77 Following the temporary
restraining order, EIA, OMB, and plaintiffs reached and filed an agreement with the district court,
resulting in an end to EIA’s data collection and EIA agreeing to destroy any data collected up to
that point.78
S. 1475, the Clean Cloud Act of 2025, introduced in the Senate and referred to the Committee on
Environment and Public Works, would amend the Clean Air Act (42 U.S.C. §§7401 et seq.) to
provide the U.S. Environmental Protection Agency (EPA) and EIA with authority to collect data
and information on annual energy consumption of the data center or cryptocurrency mining
facility, the provider of the electricity, any power purchase agreements, and related topics.
In 2023, a letter from five Senators and three Representatives urged EPA to use its authority under
Section 114 of the Clean Air Act to implement a “mandatory disclosure regime” on
cryptocurrency mining facilities.79 The letter asserted that some such facilities would emit greater
than the 25,000-ton threshold of carbon dioxide equivalent of greenhouse gases per year
necessary to invoke Section 114, an authority that allows EPA to request information from
emission source categories for regulatory development or enforcement and for other purposes.80
What statutory and administrative procedures apply
to information collection in general?
When an executive branch agency collects information or data from the public, the agency
typically must comply with the Paperwork Reduction Act of 1995.81 The PRA governs the
collection of information.82 The purpose of the PRA is to balance the government’s need for
75 Verified Complaint for Declaratory and Injunctive Relief, Tex. Blockchain Council v. Dep’t of Energy, No. 6:24-cv-
99 (W.D. Tex., February 22, 2024), ECF No. 1.
76 Plaintiffs cited 15 U.S.C. §797(a-b) in their complaint as the legal authority for the possible imposition of these
penalties, and cited to 10 C.F.R. §207.7(c)(1) for the maximum civil penalty amount that could be imposed for a
violation. At the time of the complaint, the maximum penalty was $12,937 per violation (see 89 Federal Register
1027). The amount is adjusted for inflation pursuant to the Federal Civil Penalties Inflation Adjustment Act of 1990
(P.L. 101-410), as amended by the Federal Civil Penalties Inflation Adjustment Act Improvements Act of 2015 (P.L.
114-74, Title VII, §701 (129 Stat. 599)).
77 Order Granting Plaintiffs’ Motion for Temporary Restraining Order, Tex. Blockchain Council v. Dep’t of Energy,
No. 6:24-cv-99 (W.D. Tex., February 23, 2024), ECF No. 13.
78 Notice of Agreement, Tex. Blockchain Council v. Dep’t of Energy, No. 6:24-cv-99 (W.D. Tex., March 1, 2024),
ECF No. 24.
79 Letter from Sens. Warren, Whitehouse, Markey, Merkley, and Durbin and Reps. Huffman, Tlaib, and Porter to
Michael Regan, Administrator, U.S. Environmental Protection Agency, and Jennifer Granholm, Secretary, Department
of Energy, February 6, 2023.
80 42 U.S.C. §7414.
81 P.L. 104-13; codified at 44 U.S.C. §§3501-3521.
82 A collection of information “means the obtaining, causing to be obtained, soliciting, or requiring the disclosure to
third parties or the public, of facts or opinions by or for an agency, regardless of form or format, calling for either (i)
answers to identical questions posed to, or identical reporting or recordkeeping requirements imposed on, ten or more
persons, other than agencies, instrumentalities, or employees of the United States; or (ii) answers to questions posed to
agencies, instrumentalities, or employees of the United States which are to be used for general statistical purpose” (44
U.S.C. §3502(3)). For a more complete overview of the Paperwork Reduction Act’s (PRA’s) information collection
(continued...)
Congressional Research Service
13
Data Centers and Their Energy Consumption: Frequently Asked Questions
information with the burden imposed on the public to produce and supply that information.83
Information collections include, but are not limited to, reporting or recordkeeping requirements,
surveys, public disclosure requirements, and collections that use an electronic or paper form.84
Before an agency can collect information from the public, the PRA requires approval by OMB.85
OMB’s approval is required regardless of whether the agency’s information collection is
mandatory (e.g., required by law) or voluntary.86 Information collections conducted in association
with a rule are also subject to OMB’s approval.87
The process for obtaining approval of an information collection—known in practice as the
clearance process—includes two public notice-and-comment periods. The first period is 60
days,88 during which time agencies are required to solicit the public’s input on certain topics,
including the practical utility, or usefulness, of the information to the agency,89 and the accuracy
of the agency’s burden estimate, or the amount of time and resources that is expected to be
expended by the public to generate, provide, or maintain the information for or to an agency.90 A
subsequent notice-and-comment period of at least 30 days occurs when the agency submits the
information collection request to OMB for approval.91
After receiving the information collection request from the agency and after the 30-day public
comment period has lapsed, OMB has up to another 30 days to make a decision on whether to
approve the information collection.92 Thus, under the PRA, an agency is expected to spend at
least 90 days and up to 120 days going through the clearance process. In practice, the total
amount of time spent by an agency is often much longer because internal agency processes
extend the timeline beyond what is specified in statute.
OMB can approve an information collection for no more than three years.93 When approval of an
information collection expires, an agency that wants to continue collecting the information must
go through the clearance process again and obtain OMB’s approval.94
As mentioned above, EIA obtained approval from OMB to collect data on cryptocurrency mining
data centers under the PRA’s emergency authorization provision, which was challenged in U.S.
district court.95 This provision of the PRA permits an agency in certain specified circumstances to
requirements, see CRS In Focus IF11837, The Paperwork Reduction Act and Federal Collections of Information: A
Brief Overview, by Maeve P. Carey and Natalie R. Ortiz.
83 44 U.S.C. §3501.
84 5 C.F.R. §1320.3(c)(1).
85 44 U.S.C. §3507(a)(2).
86 5 C.F.R. §1320.3(c).
87 44 U.S.C. §3507(d). See also 5 C.F.R. §1320.11 and §1320.12.
88 44 U.S.C. §3506(c)(2)(A).
89 44 U.S.C. §3502(11).
90 44 U.S.C. §3502(2). For a more complete discussion of burden under the PRA, see CRS In Focus IF12673, Burden
and the Paperwork Reduction Act: An Overview, by Natalie R. Ortiz.
91 44 U.S.C. §3507(b).
92 44 U.S.C. §3507(c)(2).
93 44 U.S.C. §3507(g).
94 Memorandum from Cass R. Sunstein, Administrator, Office of Information and Regulatory Affairs, to the heads of
executive departments and agencies, and independent regulatory agencies, “Information Collection under the
Paperwork Reduction Act,” April 7, 2010, pp. 5-6, https://obamawhitehouse.archives.gov/sites/default/files/omb/assets/
inforeg/PRAPrimer_04072010.pdf.
95 See footnote 73 and accompanying text.
Congressional Research Service
14
Data Centers and Their Energy Consumption: Frequently Asked Questions
seek OMB’s approval to conduct an information collection on a temporary basis (not to exceed
180 days) without complying with the processes usually required under the PRA.96 In the district
court case brought against EIA, the plaintiffs alleged that EIA’s burden estimate was
underestimated and that EIA failed to take steps to minimize burden by not consulting with the
public as required by OMB in its regulations implementing the PRA.97
When collecting information about energy, what are
specific considerations?
There may be additional considerations beyond the PRA when it comes to the collection of
information on data centers’ energy use. For example, the Energy Supply and Environmental
Coordination Act of 1974 (ESECA; P.L. 93-319) includes an enforcement provision that imposes
civil monetary penalties on business entities that do not report energy information sought under
the information collection authorities of the Federal Energy Administrator.98 The possibility of
these civil monetary policies were part of the case brought against EIA when it attempted to
survey cryptomining facilities in 2024, as discussed above.99 The administrator’s information
collection authority contained in ESECA is “in addition to, independent of, not limited by, and not
in limitation of, any other authority of the Federal Energy Administrator.” Thus, while providing
information is anticipated to impose some cost under the PRA because of its conceptualization of
paperwork burden, additional costs are also possible for those that might be subject to reporting
energy information under ESECA. Other laws establishing an agency’s information collection
authority might also have an enforcement mechanism, which might be viewed as increasing the
stakes around collecting information in these circumstances.
In developing legislation addressing the collection of information about energy usage, Congress
may also give further consideration to which entities would be providing information. For
example, private firms maintain data sets that can provide direct or proxy information on data
centers. Cushman & Wakefield, a real estate firm with a specialty in data centers, and Baxtel, a
real estate and marketing firm that provides specialized services for data center owners, issue
reports on the population of data centers and their electric power requirements in the United
States. Obtaining data from these private firms may be one option.
Another option may be to obtain data from primary sources. While EIA previously attempted to
collect data directly from cryptomining facilities, the Clean Cloud Act of 2025 would require the
collection of information from three different sources: data centers, cryptomining facilities, and
the electric utilities that serve data centers and cryptomining facilities. Academic research has
found differences in the accuracy and reliability of data centers’ energy consumption estimates
because of differences in the methods used by the different sources of the estimates.100 The
96 44 U.S.C. §3507(j). While statute permits an agency to avoid the clearance process for emergency processing and
authorization, OMB’s regulations implementing the PRA state that an agency shall “set forth in the Federal Register”
the notice typically required unless waived or modified (5 C.F.R. §1320.13(d)). While statute permits OMB to provide
emergency authorization of an information collection for a maximum of 180 days, OMB’s regulations state that its
approval is valid for a maximum of 90 days (5 C.F.R. §1320.13(f)).
97 See the requirements for consult at 5 C.F.R. §1320.13(c).
98 15 U.S.C. §797 (P.L. 93-319, §12 (88 Stat. 264)). The functions of the Federal Energy Administrator were
transferred to the U.S. Energy Information Administration when EIA was established in 1977. For additional
information, see CRS Report R46524, The U.S. Energy Information Administration, coordinated by Ashley J. Lawson.
99 See footnote 73 and accompanying text.
100 David Mytton and Masaō Ashtine, “Sources of Data Center Energy Estimates: A Comprehensive Review,” Joule,
vol. 6, no. 9 (September 2022), pp. 2032-2056.
Congressional Research Service
15
Data Centers and Their Energy Consumption: Frequently Asked Questions
authors of the study find that these estimates are then used by others in subsequent research, and
the authors argue that these data quality issues could undermine the research that subsequently
uses these estimates.101
One possible policy implication that follows from the aforementioned study is that how
information is collected could have consequences for the subsequent uses of that information,
including the extent to which it can be used as an authoritative source to inform federal energy
policy or regulation. In other words, how statute directs the collection of information on data
centers’ energy use, or how an agency designs its collection of information on such energy use,
may influence the extent to which such collected data can then be used to reliably serve certain
purposes. The data, for example, may be not be generalizable, may be incomplete (e.g., certain
information is missing or underreported), inaccurate (e.g., certain information is underestimated
or overestimated), or otherwise limited in its usefulness because of circumstances that occurred
during data collection.
The use of data collected by federal agencies on energy use is not necessarily without
consequence or significance. The Clean Cloud Act of 2025 would establish that the information
collected under it shall be used for fee setting. Additionally, compliance with a certain provision
of the Clean Cloud Act of 2025 is to be monitored by the EPA, in conjunction with EIA, using
“the best available data,” including the information collected under the bill.
The Clean Cloud Act of 2025 would also require certain data collected under it to be made
publicly available. Some researchers argue that it is insufficient and possibly ineffective for
policymakers to establish data policy regimes that are primarily concerned with information
disclosure (e.g., making certain data from regulated entities publicly available in databases,
repositories, or similar searchable publications and websites).102 Instead, it is argued that
policymakers should focus on the broader goals of a “data stewardship” regime. Data stewardship
would aim to maximize data quality and usability—alongside information disclosure and making
data publicly available—by ensuring the reliability, accuracy, and fairness of data collected, so
that the data can serve regulatory needs and the various ends and goals of stakeholders and data
users.103
Another potential consideration is that the Information Quality Act (IQA) required OMB to
develop government-wide guidelines for information and data quality.104 In implementing the
IQA, OMB acknowledged that certain information developed or made publicly available by
agencies should be held to a higher quality standard because it is more important and influential,
and that increasing data quality has costs and benefits.105
101 See also the discussion about data gaps and analytical errors in research on the environmental impacts of
information technology (IT) in Jonathan Koomey and Eric Masanet, “Does Not Compute: Avoiding Pitfalls Assessing
the Internet’s Energy and Carbon Impacts,” Joule, vol. 5 no. 7 (July 2021), p. 1626. These authors argue, “A recurrent
theme is that well-intentioned research often overestimates IT’s electricity use and climate impacts, sometimes by
orders of magnitude. These results then become ‘factoids’ that spread quickly as people share them and the media
report them” (p. 1625).
102 Nathan Cortez, “Regulation by Database,” University of Colorado Law Review, vol. 89, no. 1 (2018), pp. 28-37.
Hereinafter cited as “Cortez, “Regulation by Database.”
103 Cortez, “Regulation by Database,” pp. 69-91.
104 P.L. 106-554, Appendix C, §515 (114 Stat. 2763A-153).
105 OMB, “Guidelines for Ensuring and Maximizing the Quality, Objectivity, Utility, and Integrity of Information
Disseminated by Federal Agencies; Republication,” 67 Federal Register 8452-8453, February 22, 2002,
https://www.federalregister.gov/documents/2002/02/22/R2-59/guidelines-for-ensuring-and-maximizing-the-qualityobjectivity-utility-and-integrity-of-information.
Congressional Research Service
16
Data Centers and Their Energy Consumption: Frequently Asked Questions
Author Information
Martin C. Offutt
Analyst in Energy Policy
Ashley J. Lawson
Specialist in Energy Policy
Ling Zhu
Specialist in Science and Technology Policy
Natalie R. Ortiz
Analyst in Government Organization and
Management
Acknowledgments
Mari Lee prepared the graphic.
Disclaimer
This document was prepared by the Congressional Research Service (CRS). CRS serves as nonpartisan
shared staff to congressional committees and Members of Congress. It operates solely at the behest of and
under the direction of Congress. Information in a CRS Report should not be relied upon for purposes other
than public understanding of information that has been provided by CRS to Members of Congress in
connection with CRS’s institutional role. CRS Reports, as a work of the United States Government, are not
subject to copyright protection in the United States. Any CRS Report may be reproduced and distributed in
its entirety without permission from CRS. However, as a CRS Report may include copyrighted images or
material from a third party, you may need to obtain the permission of the copyright holder if you wish to
copy or otherwise use copyrighted material.
Congressional Research Service
R48646 · VERSION 8 · UPDATED
17