Clean Water Act Section 401: Overview and

Recent Developments

Updated February 7, 2025

Congressional Research Service

https://crsreports.congress.gov

R46615

SUMMARY

Clean Water Act Section 401: Overview and

Recent Developments

R46615

February 7, 2025

Laura Gatz

Specialist in Environmental

Congress established the Clean Water Act (CWA) to “restore and maintain the chemical,

Policy

physical, and biological integrity of the Nation’s Waters.” Under CWA Section 401, any

applicant for a federal license or permit to conduct any activity that may result in any discharge

into navigable waters (i.e., waters of the United States) shall provide the federal licensing or

Kate R. Bowers

permitting agency with a Section 401 certification. The certification, issued by the certifying

Section Research Manager

authority—usually the state in which the discharge originates, but sometimes a tribe or the U.S.

Environmental Protection Agency (EPA)—attests that the discharge will comply with applicable

provisions of certain enumerated sections of the CWA. The certifying authority may grant, grant

with conditions, deny, or waive certification of proposed federal licenses or permits. Activities

that require such federal licenses or permits include hydropower projects licensed by the Federal Energy Regulatory

Commission (FERC) and certain activities involving the discharge of dredged or fill material into waters of the United States

permitted by the U.S. Army Corps of Engineers (USACE) (e.g., pipeline projects, water resource projects, mining projects, or

other development).

Many observe that the certification authority under Section 401 has strong ramifications. If a certifying authority denies

certification, the federal license or permit is denied. If a certifying authority grants a certification with conditions, those

conditions must be included in the final license or permit. Some license and permit applicants have expressed frustration with

how some states have exercised their Section 401 authority. Key concerns include timeframes for issuing certifications, the

scope of states’ reviews, and the type of conditions that states can impose when granting a certification. Some stakeholders

have accused states of misusing Section 401 authority to block certain projects and have advocated for changes to the CWA

or implementing regulations and guidance to limit states’ Section 401 authority. Others assert that state implementation is too

lenient and may fail to block certain projects that have the potential to degrade water quality. Many states assert that Section

401 certification allows them to manage and protect the quality of waters within their states, and any efforts to limit state

Section 401 authority are contrary to the CWA’s principles of cooperative federalism.

The first Trump Administration criticized the manner in which some states exercised their Section 401 authority. In response

to an April 2019 executive order, EPA issued updated Section 401 guidance in June 2019 and published a final rule (the 2020

Rule) in July 2020 to update Section 401 regulations. The 2020 Rule went into effect in September 2020, rescinding EPA’s

2019 Guidance and replacing its existing implementing regulations for Section 401, which EPA promulgated in 1971. The

2020 Rule included numerous changes to existing regulation and practice that narrowed the authority of certifying authorities

when acting on Section 401 certification requests. Several changes addressed two broad policy issues relevant to

implementation of Section 401—certification timeframes and the scope of certifications. In addition, the 2020 Rule included

changes regarding federal review of certifications and enforcement. The 2020 Rule garnered interest from stakeholders.

Various groups, including those representing certain energy interests, generally supported the rule. Other groups, including

some states and state associations, opposed the changes. Five separate groups of states, tribes, and environmental

organizations filed lawsuits challenging the 2020 Rule.

In January 2021, President Biden issued an executive order that directed agencies to review certain agency actions from the

first Trump Administration, including the 2020 Rule. EPA’s review of the rule identified a number of concerns, prompting

the agency to issue in June 2021 a notice of intention to reconsider and revise the rule. In October 2021, a federal district

court vacated the 2020 Rule, prompting EPA to announce a temporary return to the 1971 implementing regulations. Various

states and stakeholders appealed the district court’s decision, and in April 2022, the Supreme Court temporarily reinstated the

2020 Rule. In September 2023, EPA published a new final rule (2023 Rule) to update the regulatory requirements for Section

401 certification. Similar to the 2020 Rule, the 2023 Rule includes changes to address certification timeframes and scope, as

well as enforcement and federal review. The 2023 Rule also garnered interest from a variety of stakeholders—some in

support of and some opposed to the rule—and prompted litigation.

In the 118th Congress, several legislative proposals were introduced that addressed Section 401. Some proposals in the 118th

Congress focused specifically on Section 401, and some incorporated proposed changes into broader permitting reform bills.

Congressional Research Service

Clean Water Act Section 401: Overview and Recent Developments

Contents

Background ..................................................................................................................................... 1

What Is Clean Water Act Section 401? ..................................................................................... 1

What Activities Require a Section 401 Certification?............................................................... 3

Stakeholder Interest in Section 401 ........................................................................................... 3

Actions Under the First Trump Administration ............................................................................... 4

2019 Guidance .......................................................................................................................... 5

2020 Rule .................................................................................................................................. 5

Stakeholder Views and Legal Challenges ................................................................................. 6

Actions Under the Biden Administration ........................................................................................ 8

2023 Rule ................................................................................................................................ 10

Stakeholder Views and Legal Challenges ............................................................................... 10

Policy Issues and the 2020 and 2023 Rules................................................................................... 12

Certification Timeframes ........................................................................................................ 12

“Reasonable Period of Time”............................................................................................ 12

Start of the Certification “Clock” ..................................................................................... 14

Acting on a Certification Request ..................................................................................... 15

Withdrawal and Resubmission—Waiver or Restarting the Certification “Clock”? .......... 16

Scope of 401 Certifications ..................................................................................................... 20

Scope of Section 401 Review ........................................................................................... 20

Scope of Section 401 Conditions ...................................................................................... 23

2010 EPA Guidance on the Scope of Review and Conditions .......................................... 24

Scope of Certifications in the 2020 Rule .......................................................................... 24

Scope of Certifications in the 2020 Rule .......................................................................... 25

Scope of Certifications in the 2023 Rule .......................................................................... 26

Other Selected Changes in the 2020 and 2023 Rules .............................................................. 27

Federal Review Process for Denials and Conditions ........................................................ 27

Enforcement ...................................................................................................................... 28

Treatment as a State for Tribes Under Section 401 ........................................................... 29

Congressional Interest ................................................................................................................... 29

Policy Options ............................................................................................................................... 31

Appendixes

Appendix. CWA Section 401 (33 U.S.C. §1341) .......................................................................... 34

Contacts

Author Information........................................................................................................................ 36

Congressional Research Service

Clean Water Act Section 401: Overview and Recent Developments

Background

Section 401 of the Clean Water Act (CWA) requires that any applicant for a federal license or

permit provide a certification that any discharges that may result from the licensed or permitted

activity will comply with the act, including water quality standard requirements. Disputes have

arisen over the states’ exercise of authority under Section 401. While some stakeholders argue

that states are appropriately using their Section 401 authority to manage and protect the quality of

their waters, other stakeholders, including some license and permit applicants (hereinafter

referred to as “project proponents”), have expressed frustration with how some states have

implemented this authority. Key concerns regarding implementation include the timeframes for

issuing certifications, the scope of review, and the type of conditions that certifying authorities

can impose when granting a certification.

Until 2020, the Section 401 implementing regulations in effect were those that the Environmental

Protection Agency (EPA) promulgated in 1971.1 In July 2020, EPA issued a final water quality

certification rule that went into effect on September 11, 2020 (hereinafter the 2020 Rule),

replacing the 1971 regulations.2 In January 2021, President Biden issued an executive order that

directed agencies to review certain agency actions from the first Trump Administration, including

the 2020 Rule. EPA’s review of the rule identified a number of concerns, prompting the agency to

publish in June 2021 a notice of intention to reconsider and revise the rule. Further, on October

21, 2021, the U.S. District Court for the Northern District of California issued an order remanding

and vacating EPA’s 2020 Rule, resulting in the reinstatement of the 1971 regulations.3 Various

states and industry groups appealed the district court’s vacatur order. On April 6, 2022, the

Supreme Court stayed the district court’s order, temporarily reinstating the 2020 Rule while the

appeal was pending.4 In June 2022, EPA proposed a new rule to update the regulatory

requirements for Section 401 certification, which it finalized on September 27, 2023 (hereinafter

the 2023 Rule).5 The 2023 Rule took effect on November 27, 2023, superseding the 2020 Rule.

This report provides an overview of CWA Section 401, selected policy issues, and how they were

addressed in the 2020 Rule and 2023 Rule.

What Is Clean Water Act Section 401?

Congress established the Federal Water Pollution Control Act (FWPCA), as amended by the

CWA, to “restore and maintain the chemical, physical, and biological integrity of the Nation’s

waters.”6 Under CWA Section 401 (hereinafter Section 401), any applicant for a federal license or

permit to conduct any activity that may result in any discharge into navigable waters—defined in

the statute as “waters of the United States, including the territorial seas”—shall provide the

1 EPA, “State Certification of Activities Requiring a Federal Permit or License” (hereinafter 1971 regulations), 36

Federal Register 22487, November 25, 1971. Codified at 40 C.F.R. §121.

2 EPA, “Clean Water Act Section 401 Certification Rule” (hereinafter 2020 Rule), 85 Federal Register 42210-42287,

July 13, 2020.

3 In re Clean Water Act Rulemaking, 568 F. Supp. 3d 1013 (N.D. Cal. 2021); EPA, “Clean Water Act Section 401

Water Quality Certification Improvement Rule,” 88 Federal Register 66558, 66559, September 27, 2023 (hereinafter

2023 Rule).

4 Order on Application for Stay, Louisiana v. Am. Rivers, No. 21A539 (U.S. April 6, 2022).

5 Environmental Protection Agency (EPA), “Clean Water Act Section 401 Water Quality Certification Improvement

Rule,” 87 Federal Register 35318, June 9, 2022 (hereinafter 2022 Proposed Rule); 2023 Rule.

6 CWA §101(a); 33 U.S.C. §1251(a).

Congressional Research Service

1

Clean Water Act Section 401: Overview and Recent Developments

federal licensing or permitting agency with a Section 401 certification.7 (See Appendix for the

full text of CWA Section 401.) The certification, issued by the state (or other certifying authority)

in which the discharge originates, attests that the discharge will comply with applicable

provisions of certain enumerated sections of the CWA. These include effluent (i.e., discharge)

limitations and standards of performance for new and existing discharge sources (Sections 301,

302, and 306), water quality standards and implementation plans (Section 303), and toxic

pretreatment effluent standards (Section 307).

Effluent limitations establish the levels of specific pollutants that are allowable in a discharger’s

effluent based on either the performance of technologies for a specified level of control required

by the CWA (technology-based effluent limitations) or levels necessary to attain water quality

standards in the waterbody receiving the discharge (water quality-based effluent limitations).

Water quality standards, which are developed by the state and submitted to EPA for approval,

contain three core components that specify (1) the designated uses of a waterbody (e.g.,

recreation, public water supply), (2) criteria to protect those uses (i.e., numeric concentrations of

pollutants or narrative descriptions), and (3) an antidegradation policy.8 Pretreatment standards

apply to indirect dischargers, who discharge to a publicly owned treatment works prior to

discharge into a water of the United States.9

Section 401 provides states, certain tribes, and in certain circumstances, EPA10 (hereinafter

referred to collectively as “certifying authorities”) the authority to grant, grant with conditions,

deny, or waive certification of proposed federal licenses or permits that may result in a discharge

into waters of the United States.

•

•

•

•

If a certifying authority grants the certification, the federal licensing or

permitting agency can proceed and evaluate whether the license or permit should

be issued.

If a certifying authority grants the certification with conditions, the federal

licensing or permitting agency can proceed and evaluate whether the license or

permit should be issued. Section 401 requires any conditions listed in the

certification to become a term of the federal license or permit if one is issued.

If a certifying authority denies certification, the federal licensing or permitting

agency cannot issue the license or permit.

If a certifying authority waives certification, the certification is not required for

the federal licensing or permitting agency to issue the license or permit. A waiver

may either be explicit or implicit. Specifically, the CWA provides that if the

certifying authority “fails or refuses to act on a request for certification, within a

reasonable time (which shall not exceed one year) after receipt of such request,

the certification requirements of this subsection shall be waived.”11

7 33 U.S.C. §1341. The statute defines “navigable waters” at CWA §502(7); 33 U.S.C. §1362(7), and “discharge” as a

discharge of a pollutant or pollutants at CWA §502(16); 33 U.S.C. §1362(16).

8 CWA §303(c)(2)(A), 33 U.S.C. §1313(c)(2)(A) for designated uses and criteria; CWA §§101(a) and 303(d)(4)(B), 33

U.S.C. §§1251, 1313(d)(4)(B) for antidegradation. See also 40 C.F.R. Part 131.

9 CWA §§301 and 307; 33 U.S.C. §§1311 and 1317.

10 Per CWA §518 (33 U.S.C. §1377), EPA is authorized to treat an Indian tribe as a state for certain sections of the

CWA including CWA §401 if the tribe meets certain statutory eligibility criteria. EPA acts as the certifying authority

on tribal lands where the tribe has not been granted treatment as a state, as well as on federal lands with exclusive

federal jurisdiction.

11 CWA §401(a)(1); 33 U.S.C. §1341(a)(1).

Congressional Research Service

2

Clean Water Act Section 401: Overview and Recent Developments

What Activities Require a Section 401 Certification?

Any activity that (1) requires a federal license or permit and (2) may result in a discharge into

waters of the United States requires a Section 401 certification.12 Examples include hydropower

projects requiring Federal Energy Regulatory Commission (FERC) licenses, industrial and

municipal point source discharges requiring National Pollutant Discharge Elimination System

(NPDES) permits that would be issued by EPA13 (CWA Section 402), and certain activities

involving the discharge of dredged or fill material into waters of the United States requiring U.S.

Army Corps of Engineers (USACE) permits (CWA Section 404 and Rivers and Harbors Act

Sections 9 and 10).14 Examples of activities that may require a CWA Section 404 permit include

pipeline projects, infrastructure development, water resource projects, mining projects, or

residential or commercial development. Note that such permits are required only for segments or

portions of the project that involve a discharge of dredged or fill material into federally regulated

waters (i.e., waters of the United States).

Stakeholder Interest in Section 401

Many observe that the certification authority under Section 401—which is a direct grant of

authority by Congress—has strong ramifications.15 First, if a certifying authority denies

certification, the federal license or permit is denied, which may prevent the activity, as proposed,

from taking place or lead to a modification of the activity. Second, if a certifying authority grants

a certification with conditions, those conditions are required to be included in the final federal

license or permit. Such conditions imposed by certifying authorities have, for example, limited

the time of year in which the proposed activity can occur, or required water quality monitoring or

wetland mitigation.

Some license and permit applicants (hereinafter referred to as “project proponents”) and other

stakeholders have expressed frustration with how some states have implemented this authority.16

Key concerns include the timeframes for issuing certifications, the scope of review, and the type

of conditions that certifying authorities can impose when granting a certification. Some

stakeholders have accused states of misusing Section 401 authority to block certain projects and

have advocated for changes to the CWA or implementing regulations and guidance to limit states’

authority under Section 401.17 Other stakeholders have asserted that state implementation of

12 Ibid.

13 EPA administers NPDES permits in Massachusetts, New Hampshire, New Mexico, the District of Columbia, and

certain territories and Indian lands. Because §401 covers only federally issued permits, in the 47 states that are

authorized to administer their own NPDES permits, CWA §401 certifications are not required for NPDES permits.

14 33 U.S.C. §1344; 33 U.S.C. §§401, 403.

15 EPA, Wetlands and 401 Certification: Opportunities and Guidelines for States and Eligible Indian Tribes, April

1989, p. 9, https://www.epa.gov/nscep. Deidre Duncan and Clare Ellis, “Clean Water Act Section 401: Balancing

States’ Rights and the Nation’s Need for Energy Infrastructure,” Hastings Environmental Law Journal, vol. 25, no. 2

(Summer 2019), p. 237. Jeanne Christie, The Compleat Wetlander: 401 Certification - Delivering a Big Payload for

State Rights, Clean Water, and Flood Protection, Association of State Wetland Managers, August 26, 2011.

16 See, e.g., Comments of the Association of American Railroads (May 24, 2019); Comments of the Interstate Natural

Gas Association of America (May 24, 2019). Both letters are available at EPA Clean Water Act Section 401 Water

Quality Certification Pre-Proposal Recommendations, Docket No. EPA-HQ-OW-2018-0855.

17 See, e.g., American Petroleum Institute, “API-NY Applauds Second Circuit Court Decision, Says It’s Good News for

Pipelines Across New York,” press release, February 5, 2019, https://www.api.org/news-policy-and-issues/news/2019/

02/05/apiny-applauds-second-circuit-court-decision-says-its-good-news-for-pipelines-ac. See also American Gas

Association, “EPA Proposes Updates to Certification Process for Natural Gas Infrastructure,” press release, August 9,

2019.

Congressional Research Service

3

Clean Water Act Section 401: Overview and Recent Developments

Section 401 has been too lenient in some instances and may fail to block or appropriately

condition certain projects that may lead to water quality degradation.18 Many states assert that

Section 401 certification allows them to manage and protect the quality of waters within their

states.19 They argue that any efforts to change the CWA or implementing regulations to limit state

authority under Section 401 are contrary to the principles of cooperative federalism upon which

the CWA is based.20

Actions Under the First Trump Administration

The first Trump Administration characterized some states’ uses of Section 401 authority as

misusing the CWA and directed EPA to update implementing regulations and guidance.21 EPA

finalized updated regulations in 2020 and issued updated guidance in 2019. Prior to these actions,

regulations promulgated in 1971 and interim guidance published in 2010 were in effect.22 The

1971 regulations implemented the certification provisions included in Section 21(b) of the

Federal Water Pollution Control Act (FWPCA) of 1948.23 The 1972 amendments to the FWPCA

created Section 401 and restructured the statutory framework of the statute.24 However, EPA had

not updated its 1971 implementing regulations for Section 401 to reflect the changes to the

relevant statutory text.25 EPA issued Section 401 guidance in 1989, which it updated in 2010.26

On April 10, 2019, President Trump issued Executive Order (E.O.) 13868, “Promoting Energy

Infrastructure and Economic Growth.”27 The E.O. stated that “outdated federal guidance and

regulations regarding Section 401” were “causing confusion and uncertainty and are hindering the

development of energy infrastructure.” Among other things, the E.O. directed EPA to review and

issue new guidance to supersede the existing Section 401 guidance and to revise the agency’s

existing Section 401 implementing regulations. The E.O. instructed EPA to focus on the need to

promote timely federal-state cooperation, the appropriate scope of water quality reviews, the

18 Sierra Club, “Environmental Groups Challenge Virginia’s Unlawful Approval of Fracked Gas Pipeline,” press

release, December 8, 2017, https://www.sierraclub.org/press-releases/2017/12/environmental-groups-challengevirginia-s-unlawful-approval-fracked-gas. Sierra Club, “Dereliction of Duty: WVDEP Abandons Water Quality

Review of Fracked Gas Pipeline,” press release, November 1, 2017, https://www.sierraclub.org/press-releases/2017/11/

dereliction-duty-wvdep-abandons-water-quality-review-fracked-gas-pipeline. Chesapeake Bay Foundation, “CBF

Appeals Atlantic Coast Pipeline Certification,” press release, January 22, 2018, https://www.cbf.org/news-media/

newsroom/2018/virginia/cbf-appeals-atlantic-coast-pipeline-certification.html.

19 See, e.g., Letter from Western Governors’ Association et al. to Honorable John Barrasso and Honorable Tom Carper,

November 18, 2019, https://www.acwa-us.org/wp-content/uploads/2019/11/Coalition-Letter-Clean-Water-Act-Section401-Legislation-11-18-19.pdf.

20 Ibid.

21 EPA, “EPA Issues Final Rule that Helps Ensure U.S. Energy Security and Limits Misuse of the Clean Water Act,”

press release, June 1, 2020, https://www.epa.gov/newsreleases/epa-issues-final-rule-helps-ensure-us-energy-securityand-limits-misuse-clean-water-0.

22 EPA, Clean Water Act Section 401 Water Quality Certification: A Water Quality Protection Tool for States and

Tribes, April 2010 (hereinafter 2010 Guidance).

23 2020 Rule, p. 42211.

24 Since the 1977 amendments to the FWPCA—the Clean Water Act of 1977—the statute has commonly been referred

to as the CWA.

25 2020 Rule, p. 42211.

26 EPA, Wetlands and 401 Certification: Opportunities and Guidelines for States and Eligible Indian Tribes, A-104F,

April 1989. See also 2010 Guidance. According to EPA’s 2010 Guidance, the agency “substantially updated its

handbook on CWA §401 water quality certification” reflecting “two decades of case law and state and tribal program

experience.”

27 84 Federal Register 15495, April 15, 2019.

Congressional Research Service

4

Clean Water Act Section 401: Overview and Recent Developments

types of conditions that may be appropriate to include in a certification, expectations for review

times for different types of certification requests, and the nature and scope of information states

may need to act on a certification request.

2019 Guidance

EPA has issued guidance to states to provide information on the applicability and scope of Section

401 and how states may use Section 401 to protect water quality. In accordance with E.O. 13868,

EPA released updated Section 401 guidance on June 7, 2019, and rescinded the previous 2010

Guidance.28 EPA’s stated intent in updating the guidance was to provide clarifications and

recommendations on Section 401 water quality certifications. In particular, the guidance

addressed statutory and regulatory timelines for review and action on a 401 certification, the

appropriate scope of 401 certification conditions, and information that the certifying authority

may consider in its 401 certification review. EPA changes to the 2010 Guidance reflected

different interpretations of key aspects of Section 401 implementation, including certification

review timeframes and the scope of certifications. (See discussion under “Start of the

Certification “Clock” and “Scope of 401 Certifications.”)

In the preamble to the rule EPA published in 2020 updating regulations on water quality

certification (see “2020 Rule”), EPA announced its decision to rescind the 2019 Guidance

coincident with issuing the rule.29 The agency concluded that retaining the 2019 Guidance after

issuing the rule could cause confusion.30 EPA further stated that “the final rule provides sufficient

additional specificity and clarity on the issues discussed in the 2019 Guidance to both meet the

expectations of the Executive Order and render the 2019 Guidance unnecessary.”31

2020 Rule

EPA also responded to E.O. 13868 by proposing a rule updating regulations on water quality

certification in August 2019.32 In July 2020, EPA issued a final water quality certification rule

(the 2020 Rule) that went into effect on September 11, 2020, and replaced the prior implementing

regulations from 1971.33

EPA stated in the preamble to the 2020 Rule that the rule was intended to “modernize” the

Section 401 implementing regulations and “align them with the current text and structure of the

CWA.”34 EPA also stated that the 2020 Rule provided additional regulatory procedures that “will

help promote consistent implementation of CWA section 401 and streamline federal licensing and

permitting processes, consistent with the objectives of the Executive Order.”35

The 2020 Rule included numerous changes to existing regulation and practice that narrowed the

authority of states when acting on Section 401 certification requests. Several changes addressed

28 EPA, Clean Water Act Section 401 Guidance for Federal Agencies, States and Authorized Tribes, June 7, 2019,

https://19january2021snapshot.epa.gov/sites/static/files/2019-06/documents/cwa_section_401_guidance.pdf

(hereinafter 2019 Guidance).

29 2020 Rule, p. 42214.

30 Ibid.

31 Ibid.

32 EPA, “Updating Regulations on Water Quality Certification,” 84 Federal Register 44080, August 22, 2019

(hereinafter 2019 Proposed Rule).

33

2020 Rule.

34 2020 Rule, p. 42220.

35 Ibid.

Congressional Research Service

5

Clean Water Act Section 401: Overview and Recent Developments

two broad policy issues relevant to the implementation of Section 401—certification timeframes

and the scope of certification (including both the scope of review and the scope of conditions). In

addition, the 2020 Rule included a new process for federal review of certifications and newly

authorized the federal licensing and permitting agencies as the enforcement authorities.

Stakeholder Views and Legal Challenges

Both the 2019 Proposed Rule and the 2020 Rule garnered interest from stakeholder groups. EPA

received more than 125,000 comments on the proposed rule “from a broad spectrum of interested

parties.”36 Various groups, including those representing energy interests, generally supported the

2019 Proposed Rule. Some argued, for example, that states have misused their Section 401

authorities and that the proposed changes would improve predictability and clarity, thereby

improving applicants’ ability to obtain permits for energy infrastructure projects.37 Many groups

emphasized the importance of ensuring that Section 401 certification is focused on water quality

impacts rather than non-water-quality impacts such as climate change or air emissions.38

Other groups, including many states and state associations, opposed the proposed changes. They

argued that the proposed changes raised federalism concerns, would narrow the scope of state

authority, and would substantially affect the ability of states to manage and protect their water

resources.39 Central to their concerns was the implication of the rule for the CWA’s cooperative

federalism framework.40 Specifically, they argued that CWA Section 101(b) establishes

Congress’s clear intent in establishing a system of cooperative federalism that protects “the

primary responsibilities and rights of States to prevent, reduce, and eliminate pollution” and “to

plan the development and use of land and water resources.”41 Many states view Section 401

authority as a critical tool that has helped ensure that activities associated with federally licensed

and permitted discharges will not impair water quality in their respective state. They viewed the

proposed changes as an infringement upon the authority granted to them by Congress under the

CWA.42

Various states, tribes, and environmental groups filed five lawsuits challenging the 2020 Rule.

Three suits—filed by a coalition of environmental groups, a group of 20 states and the District of

Columbia, and a group of Indian tribes and environmental organizations—were all consolidated

36 2020 Rule, p. 42213.

37 See, for example, Letter from Center for Liquefied Natural Gas to Andrew Wheeler, Administrator, EPA, October

21, 2019. See also Letter from Natural Gas Council to Andrew Wheeler, Administrator, EPA, October 21, 2019. See

also Letter from National Mining Association to Andrew Wheeler, Administrator, EPA, October 21, 2019. All three

letters are available in EPA Docket ID: EPA-HQ-OW-2019-040.

38 2020 Rule, p. 42255.

39 See, for example, Letter from Western Governors’ Association et al. to Andrew Wheeler, Administrator, EPA,

October 16, 2019. See also Letter from Maryland Department of the Environment to Andrew Wheeler, Administrator,

EPA, October 21, 2019. See also Letter from Louisiana Department of Environmental Quality to Andrew Wheeler,

Administrator, EPA, October 19, 2019. All three letters are available in EPA Docket ID: EPA-HQ-OW-2019-040.

40 Under the CWA’s cooperative federalism framework, the federal government and the states jointly administer and

enforce the statute. For example, CWA Section 303(c) requires states, territories, and authorized tribes to adopt water

quality standards for waters of the United States, subject to EPA approval (33 U.S.C. §1313(c)). CWA Section 304(a)

requires EPA to develop and publish criteria that serve as recommendations to states for use in developing their water

quality standards. States are authorized to establish water quality standards that are more stringent than EPA criteria.

Additionally, states may adopt standards for additional surface waters if their own state laws allow them to do so. EPA

and states use these water quality standards, as well as technology-based standards, when establishing permit limits for

point source dischargers under Section 402.

41 33 U.S.C. §1251(b).

42 2020 Rule, p. 42226.

Congressional Research Service

6

Clean Water Act Section 401: Overview and Recent Developments

in the U.S. District Court for the Northern District of California.43 Other environmental groups

also filed suits in the U.S. District Courts for the Eastern District of Pennsylvania and the District

of South Carolina.44 A group of eight states and several energy industry associations intervened in

the lawsuits in support of EPA.45

In general, the plaintiffs alleged that the 2020 Rule violated the Administrative Procedure Act

(APA), the CWA, and the Tenth Amendment. Among other things, they argued that the rule

unlawfully restricted powers preserved for certifying authorities under the CWA, including by

restricting the scope and process for their review of certification applications, and by excluding

certifying authorities from the enforcement of certification conditions.46 The plaintiffs also argued

that the rule impermissibly expanded federal authority, including by authorizing federal

permitting and licensing agencies to review and overrule certification decisions.47 With respect to

the 2020 Rule’s limitations on the scope of certification review, some plaintiffs alleged that the

rule deprived certifying authorities of the opportunity to consider the effects of a project as a

whole on state water quality, and that the narrowed scope of certification review contradicted

both the text of the CWA and Supreme Court precedent.48 Finally, the Suquamish Tribe argued

that EPA failed to satisfy its tribal consultation obligations during the development of the 2020

Rule as required by an executive order and EPA policy document governing consultation and

coordination with tribal governments.49

None of the three courts issued opinions on the merits of the plaintiffs’ claims. As discussed in

further detail below, all three courts remanded the 2020 Rule to EPA.50 One court vacated the

rule, which brought the 1971 implementing regulations back into effect.51 The Supreme Court

43 Complaint, Am. Rivers v. Wheeler, No. 3:20-cv-04636 (N.D. Cal. July 13, 2020), ECF No. 1; Complaint, California

v. Wheeler, No. 4:20-cv-04869 (N.D. Cal. July 21, 2020), ECF No. 1; Complaint, Suquamish Tribe v. Wheeler, No.

3:20-cv-06137 (N.D. Cal. Aug. 31, 2020), ECF No. 1; Case Management Scheduling Order, In re Clean Water Act

Rulemaking, No. 3:20-cv-04636 (N.D. Cal. Oct. 23, 2020), ECF No. 36.

44 Complaint, Del. Riverkeeper Network v. EPA, No. 2:20-cv-03412 (E.D. Pa. July 13, 2020), ECF No. 1; Complaint,

S.C. Coastal Conservation League v. Wheeler, No. 2:20-cv-03062 (D.S.C. Aug. 26, 2020), ECF No. 1.

45 Order Granting Unopposed Intervention, In re Clean Water Act Rulemaking, 3:20-cv-04636 (N.D. Cal. Nov. 23,

2020), ECF No. 39; Orders Granting Motions to Intervene, Am. Rivers v. Wheeler, No. 3:20-cv-04636 (N.D. Cal. Sept.

17 2020; Oct. 9, 2020), ECF Nos. 62, 78; Orders Granting Motions to Intervene, California v. Wheeler, No. 3:20-cv04869 (N.D. Cal. Sept. 17, 2020; Oct. 9, 2020), ECF Nos. 101, 113; Order re Motion to Dismiss and Motions to

Intervene, Del. Riverkeeper Network v. EPA, No. 2:20-cv-03412 (E.D. Pa. Dec. 18, 2020), ECF No. 47; Orders on

Motions to Intervene, S.C. Coastal Conservation League v. Wheeler, No. 2:20-cv-03062 (D.S.C. Oct. 7, 2020; Oct. 30,

2020; Jan. 13, 2021), ECF Nos. 24, 34, 49.

46 E.g., First Amended Complaint, Am. Rivers v. Wheeler, No. 3:20-cv-04636, ¶¶ 90-95 (N.D. Cal. Sept. 29, 2020),

ECF No. 75; Complaint, California v. Wheeler, No. 4:20-cv-04869, ¶¶ 1.1, 1.8-1.11 (N.D. Cal. July 21, 2020), ECF

No. 1; Complaint, Del. Riverkeeper Network v. EPA, No. 2:20-cv-03412, ¶¶ 10, 182-242, 260-63 (E.D. Pa. July 13,

2020), ECF No. 1; Complaint, S.C. Coastal Conservation League v. Wheeler, No. 2:20-cv-03062, ¶¶ 10, 14 (D.S.C.

Aug. 26, 2020), ECF No. 1.

47 E.g., First Amended Complaint, Am. Rivers v. Wheeler, ¶¶ 126-32; Complaint, Suquamish Tribe v. Wheeler, No.

3:20-cv-06137, ¶ 4 (N.D. Cal. Aug. 31, 2020), ECF No. 1; Complaint, Del. Riverkeeper Network v. EPA, ¶¶ 243-59;

Complaint, S.C. Coastal Conservation League v. Wheeler, ¶¶ 197-200.

48 E.g., Complaint, California v. Wheeler, ¶¶ 1.10-11; Complaint, S.C. Coastal Conservation League v. Wheeler, ¶¶ 1,

165.

49 Complaint, Suquamish Tribe v. Wheeler, ¶ 9. See also Executive Order 13175, “Consultation and Coordination with

Indian Tribal Governments,” 65 Federal Register 67249, November 9, 2000; EPA, EPA Policy on Consultation and

Coordination with Indian Tribes, May 4, 2011.

50 Order, S.C. Coastal Conservation League v. Wheeler, No. 2:20-cv-03062 (D.S.C. Aug. 2, 2021), ECF No. 69; Order,

Del. Riverkeeper Network v. EPA, No. 2:20-cv-03412 (E.D. Pa. Aug. 6, 2021), ECF No. 75; In re Clean Water Act

Rulemaking, 568 F. Supp. 3d 1013 (N.D. Cal. 2021).

51 In re Clean Water Act Rulemaking, 568 F. Supp. 3d 1013.

Congressional Research Service

7

Clean Water Act Section 401: Overview and Recent Developments

stayed the vacatur order pending appeal in April 2022, which brought the 2020 Rule back into

effect until it was superseded by the 2023 Rule.52

Actions Under the Biden Administration

President Biden’s actions immediately upon taking office affected the reconsideration of the 2020

Rule. On January 20, 2021, President Biden issued an executive order (E.O. 13990) that directed

the heads of all agencies to “immediately review all existing regulations, orders, guidance

documents, policies, and any other similar agency actions (agency actions) promulgated, issued,

or adopted” during the first Trump Administration “that are or may be inconsistent with, or

present obstacles to, the policy set forth” in the order.53 The executive order further stated “for

any such actions identified by the agencies, the heads of agencies shall, as appropriate and

consistent with applicable law, consider suspending, revising, or rescinding the agency actions.”54

In conjunction with the executive order, the Biden Administration included the 2020 Rule in a

fact sheet listing more than 100 agency actions that heads of agencies were to review in

accordance with the executive order.55

In June 2021, EPA issued a notice of intention to revise the 2020 Rule.56 The agency stated in a

related press release that, after determining that the rule “erodes state and Tribal authority,” it

“intends to reconsider and revise the 2020 CWA Section 401 Certification Rule to restore the

balance of state, Tribal, and federal authorities while retaining elements that support efficient and

effective implementation of Section 401.”57 EPA hosted virtual listening sessions with

stakeholders in June 2021 to gain input on potential approaches for revisions and also solicited

written pre-proposal input.58

In light of its decision to revise the rule, EPA asked courts to remand the 2020 Rule to the agency

while it developed a new regulation.59 EPA sought remand without vacatur, which would have left

the 2020 Rule in effect pending the development of a new rule. Two courts granted EPA’s motion

and remanded the rule without vacatur.60

52 Order on Application for Stay, Louisiana v. Am. Rivers, No. 21A539 (U.S. April 6, 2022).

53 Executive Order 13990, “Protecting Public Health and the Environment and Restoring Science to Tackle the Climate

Crisis,” 86 Federal Register 7037-7043, January 20, 2021.

54 Ibid.

55 The White House, “Fact Sheet: List of Agency Actions for Review,” press release, January 20, 2021,

https://www.regulations.gov/document/EPA-HQ-OPPT-2023-0496-0011.

56 EPA, “Notice of Intention to Reconsider and Revise the Clean Water Act Section 401 Certification Rule,” 86

Federal Register 29541, June 2, 2021.

57 EPA, “EPA Takes Action to Bolster State and Tribal Authority to Protect Water Resources,” press release, May 27,

2021, https://www.epa.gov/newsreleases/epa-takes-action-bolster-state-and-tribal-authority-protect-water-resources-0.

58 EPA, “Upcoming Outreach and Engagement on CWA Section 401 Certification,” https://www.epa.gov/cwa-401/

upcoming-outreach-and-engagement-cwa-section-401-certification. The administrative docket for pre-proposal input

closed on August 2, 2021.

59 Motion for Remand Without Vacatur, In re Clean Water Act Rulemaking, No. 3:20-cv-04636 (N.D. Cal. July 1,

2021), ECF No. 143; Motion for Remand Without Vacatur, Del. Riverkeeper Network v. EPA, No. 2:20-cv-03412

(E.D. Pa. July 1, 2021), ECF No. 67; Motion for Remand Without Vacatur, S.C. Coastal Conservation League v. EPA,

No. 2:20-cv-03062 (D.S.C. July 1, 2021), ECF No. 67.

60 Order, S.C. Coastal Conservation League v. Wheeler, No. 2:20-cv-03062 (D.S.C. Aug. 2, 2021), ECF No. 69; Order,

Del. Riverkeeper Network v. EPA, No. 2:20-cv-03412 (Aug. 6, 2021), ECF No. 75.

Congressional Research Service

8

Clean Water Act Section 401: Overview and Recent Developments

On October 21, 2021, the U.S. District Court for the Northern District of California granted EPA’s

motion for remand in the three consolidated cases in that court, but also vacated the rule.61 While

the court did not issue a ruling on the merits of the 2020 Rule, it identified problematic aspects of

the rule, including “substantial concerns” that EPA itself had raised in its request for remand.62 In

particular, the court noted that the rule’s revised scope of certification was “antithetical” to the

Supreme Court’s decision in PUD No. 1, and found that EPA had not “adequately explain[ed] in

the preamble how it could so radically depart from what the Supreme Court dubbed the most

reasonable interpretation of the statute.”63 According to the court, these and other factors created

“significant doubt ... that EPA correctly promulgated the rule.”64 Additionally, the court found that

vacatur would not be unduly disruptive because the rule had not yet engendered institutional

reliance, and that remand without vacatur would likely result in “significant environmental

harms.”65

After the California district court remanded and vacated the 2020 Rule, EPA updated its website

to indicate that the vacatur applied nationwide and required a temporary return to EPA’s 1971

regulations until EPA finalized a new certification rule.66 EPA also published a “questions and

answers” document in December 2021 to clarify the applicable requirements and procedures

following the vacatur.67 Among other clarifications, EPA indicated that the agency generally did

not expect to revisit certifications issued while the 2020 Rule was effective, and that pending

certification requests would be processed in accordance with the 1971 regulations.68

States and industry groups that intervened in the litigation in support of the 2020 Rule appealed

the remand and vacatur order.69 On April 6, 2022, the Supreme Court issued an unsigned order

granting an application for a stay pending the appeal in the Ninth Circuit, temporarily reinstating

the 2020 Rule. On February 21, 2023, the Ninth Circuit reversed the district court’s order.70

Holding that courts lack authority to vacate an agency’s regulation without first holding it

unlawful, the Ninth Circuit sent the case back to the district court for reconsideration of EPA’s

remand motion.71 On remand, the district court stayed the proceedings in lieu of remanding the

2020 Rule to EPA.72 On January 24, 2024, the district court dismissed the case as moot, ruling

that because the 2020 Rule was no longer in effect and had been superseded by the 2023 Rule,

there was no longer a controversy as to which effective relief could be granted.73

61 In re Clean Water Act Rulemaking, 568 F. Supp. 3d 1013 (N.D. Cal. 2021).

62 Id. at 1026.

63 Id. at 1025.

64 Id. at 1026.

65 Id. at 1027.

66 EPA, “2020 Clean Water Act Section 401 Certification Rule.”

67 EPA, Clean Water Act Section 401 Water Quality Certification Questions and Answers on the 2020 Rule Vacatur,

December 17, 2021.

68 Ibid.

69 Am. Rivers v. Am. Petroleum Inst., No. 21-16958 (9th Cir. appeal filed Nov. 22, 2021); Am. Rivers v. Nat’l

Hydropower Ass’n, No. 21-16960 (9th Cir. appeal filed Nov. 22, 2021); Am. Rivers v. Arkansas, No. 21-16961 (9th Cir.

appeal filed Nov. 22, 2021).

70 In re Clean Water Act Rulemaking, 60 F.4th 583 (9th Cir. 2023).

71 Id. at 596.

72 Order Re Renewed Motion to Remand Without Vacatur, In re Clean Water Act Rulemaking, No. 20-04636 (N.D.

Cal. June 29, 2023), ECF No. 226.

73 Order Dismissing Action as Moot and Without Prejudice, In re Clean Water Act Rulemaking, No. 23-04636 (N.D.

Cal. Jan. 24, 2024), ECF No. 237.

Congressional Research Service

9

Clean Water Act Section 401: Overview and Recent Developments

2023 Rule

In June 2022, EPA proposed a new rule to update the regulatory requirements for Section 401

certification.74 In September 2023, EPA promulgated a final water quality certification rule (the

2023 Rule) revising and replacing the 2020 Rule, which went into effect on November 27,

2023.75

In announcing the 2023 Rule, EPA stated that the rule was intended to “restore the fundamental

authority granted by Congress to states, territories, and Tribes to protect water resources” while

“advancing federally permitted projects in a transparent, timely, and predictable way.”76 The 2023

Rule retains some aspects of the 2020 Rule; returns some elements from the 1971 regulations and

practice (informed by relevant court decisions); and includes new changes to the rule that reflect

stakeholder feedback on certain aspects of the 2020 Rule. Similar to the 2020 Rule, several

aspects of the 2023 Rule focus on two broad policy issues relevant to Section 401

implementation—certification timeframes and the scope of certification (including both the scope

of review and the scope of conditions). The 2023 Rule also includes provisions regarding federal

agency review, neighboring jurisdictions, modifications, tribes applying for treatment in a similar

manner as a state, and enforcement and inspection.77

Stakeholder Views and Legal Challenges

Both the 2022 Proposed Rule and the 2023 Rule garnered interest from stakeholder groups. EPA

reviewed and considered approximately 27,000 comments on the proposed rule “from a broad

spectrum of interested parties.”78 Some stakeholders, including many states, state associations,

and environmental organizations, generally supported the 2023 Rule.79 Some emphasized their

agreement with the changes in the 2023 Rule that restored some of the state authority that had

been narrowed under the 2020 Rule.80 States further argued that their authority under Section 401,

restored by the 2023 Rule, is critical to ensure they can manage and protect their water

resources.81

Other groups, including those representing energy interests, supported some aspects of the rule

while opposing other aspects. Within similar stakeholder groups, views varied on which aspects

of the rule they supported or opposed. For example, some stakeholders supported certain

requirements, including efforts to define the elements of a complete certification request, the

process for determining the “reasonable period of time” (i.e., the timeframe in which a

EPA, “Clean Water Act Section 401 Water Quality Certification Improvement Rule,” 87 Federal Register 35318,

June 9, 2022.

75 2023 Rule.

76 EPA, “EPA Issues Final Rule to Strengthen Water Protections, Support Clear and Timely Reviews of Infrastructure

and Development Projects,” press release, September 14, 2023, https://www.epa.gov/newsreleases/epa-issues-finalrule-strengthen-water-protections-support-clear-and-timely-reviews (hereinafter EPA 2023 Press Release).

77 2023 Rule, pp. 66662-66666.

78 2023 Rule, p. 66566.

79 For example, see EPA 2023 Press Release; Waterkeeper Alliance, “EPA Restores Authority to States, Territories,

and Tribes Under CWA 401 Final Rule,” press release, September 14, 2023, https://waterkeeper.org/news/epa-restoresauthority-to-states-territories-and-tribes-under-cwa-401-final-rule/. See also EPA Docket ID: EPA–HQ–OW–2022–

0128.

80 EPA 2023 Press Release.

81 For example, see Rob Bonta, California Attorney General, “Attorney General Bonta Co-Leads Coalition to Defend

Biden Administration’s Final Rule of the Clean Water Act,” press release, January 12, 2024, https://oag.ca.gov/news/

press-releases/attorney-general-bonta-co-leads-coalition-defend-biden-administration%E2%80%99s-final.

74

Congressional Research Service

10

Clean Water Act Section 401: Overview and Recent Developments

certification decision must be made), and changes regarding pre-filing meetings.82 Other

stakeholders opposed some of those same aspects of the rule, including the approach for defining

the elements of a complete certification request and the process for determining the reasonable

period of time.83 Stakeholders that opposed the 2023 Rule, at least in some aspects, often opposed

the changes that broadened the scope of review and the scope of conditions (in comparison to the

2020 Rule) and expressed concern that certain aspects of the 2023 Rule could lead to uncertainty

or delays.84

As with the 2020 Rule, the 2023 Rule has prompted litigation. Eleven states and several industry

groups filed a lawsuit in the U.S. District Court for the Western District of Louisiana shortly after

the 2023 Rule took effect.85 Eighteen states, the District of Columbia, and several environmental

organizations have intervened in support of EPA.86

The plaintiffs allege, among other things, that the 2023 Rule exceeds the scope of EPA’s authority

under the CWA. Specifically, they argue that the rule improperly broadens the scope of

certification review beyond what is permissible under the CWA by requiring the certifying

authority to review whether the permitted activity as a whole, as opposed to the discharge from

the activity, will comply with water quality requirements.87 They also argue that the rule

improperly imposes an overly expansive definition of “water quality requirements,” broadens the

scope of effects subject to review in the certification process to include both point and nonpoint

sources, and allows for imposition of certification conditions that are unconnected to water

quality or the discharge.88 They also argue that EPA violated the APA by failing to meaningfully

respond to comments on the proposed rule or provide a reasoned explanation for changing its

position in the 2023 Rule.89 According to the plaintiffs, the 2023 Rule will cause delay,

uncertainty, and unpredictability in the certification process by allowing states and Tribes to

require additional materials as part of a certification request.90

The court has not issued a final ruling on the merits of the 2023 Rule. On March 7, 2024, the

court denied the plaintiffs’ motion for preliminary injunction, which sought to bar application of

the 2023 Rule to pending certification requests submitted after the effective date of the 2020 Rule

but before the effective date of the 2023 Rule.91

82 See comment letters in EPA Docket ID: EPA–HQ–OW–2022–0128. For example, see comments from Duke Energy;

the American Municipal Power, Inc. and Ohio Municipal Electric Association. Note these entities do not support all of

the examples provided, but support at least one of the examples mentioned.

83 Ibid.

84 See comment letters in EPA Docket ID: EPA–HQ–OW–2022–0128. For example, see comments from Duke Energy;

the American Municipal Power, Inc. and Ohio Municipal Electric Association; the Interstate Natural Gas Association

of America and the American Gas Association; and the National Association of Home Builders.

85 Louisiana v. EPA, No. 2:23-cv-01714 (W.D. La. filed Dec. 4, 2023).

86 Order Granting States’ Motion to Intervene, Louisiana v. EPA, No. 2:23-cv-01714 (W.D. La. Jan. 23, 2024), ECF

No. 51; Memorandum Order, Louisiana v. EPA, No. 2:23-cv-01714 (W.D. La. June 3, 2024), ECF No. 118.

87 Complaint, Louisiana v. EPA, No. 2:23-cv-01714, ¶¶ 114-118 (W.D. La. Dec. 4, 2023), ECF No. 1.

88 Id. ¶¶ 119-134, 146.

89

Id. ¶¶ 172-179.

90 Id. ¶¶ 105-113.

91 Memorandum Ruling and Order, Louisiana v. EPA, No. 2:23-cv-01714 (W.D. La. Mar. 7, 2024), ECF No. 91.

Congressional Research Service

11

Clean Water Act Section 401: Overview and Recent Developments

Policy Issues and the 2020 and 2023 Rules

The following sections discuss the two broad policy issues relevant to Section 401

implementation—certification timeframes and the scope of certification—as well as other

selected changes in the 2020 and 2023 Rules.

Certification Timeframes

Section 401 requires that certifying authorities act on a certification request “within a reasonable

period of time (which shall not exceed one year) after receipt of such request.”92 If a certifying

authority does not act on a certification request within that timeframe, the statute provides that the

certification requirements are waived, and the certification is not required for the federal licensing

or permitting agency to issue the license or permit.93 The 2020 and 2023 Rules addressed several

policy issues related to certification timeframes that have prompted interest among stakeholders

in recent years. These include what constitutes a “reasonable period of time,” when the

reasonable period of time begins (i.e., when the certification “clock” starts), what constitutes

“acting” on a certification request for the purposes of determining whether the certification

requirements have been waived, and under what circumstances, if any, the certification clock may

restart.

“Reasonable Period of Time”

While a full year is the “absolute maximum” amount of time in which certifying authorities must

act on a certification request, Section 401 “does not preclude a finding of waiver prior to the

passage of a full year.”94 Under the 1971 regulations, federal permitting and licensing agencies

retained the authority and discretion to establish certification timeframes (i.e., the “reasonable

period of time” certifying authorities have to act on a certification request before it is considered

waived) as long as the timeframes did not exceed one year.95 Some federal agencies have done so.

•

•

For example, EPA’s regulations specific to NPDES permits, promulgated in 1983,

established a 60-day period “unless the Regional Administrator finds that unusual

circumstances require a longer time.”96 EPA amended this regulation as a part of

the 2023 Rule to specify that state certification shall be granted or denied “within

the reasonable period of time as required under CWA section 401(a)(1),”

meaning the agency does not specify a shorter reasonable period of time than the

statutory maximum of one year.97

USACE regulations establish a 60-day period “unless the district engineer

determines a shorter or longer period is reasonable for the state to act.”98

92 CWA §401(a)(1); 33 U.S.C. §1341(a)(1).

93 Ibid.

94 Hoopa Valley Tribe v. FERC, 913 F.3d 1099, 1104 (D.C. Cir. 2019), cert. denied sub nom. Cal. Trout v. Hoopa

Valley Tribe, 140 S. Ct. 650 (2020).

95 40 C.F.R. §121.

96 EPA, “Environmental Permit Regulations: RCRA Hazardous Waste; SDWA Underground Injection Control; CWA

National Pollutant Discharge Elimination System; CWA Section 404 Dredge or Fill Programs; and CAA Prevention of

Significant Deterioration,” 48 Federal Register 14274-14275, April 1, 1983.

97 2023 Rule, p. 66666.

98 33 C.F.R. §325.2(b)(1)(ii).

Congressional Research Service

12

Clean Water Act Section 401: Overview and Recent Developments

•

FERC regulations provide a one-year period.99

In December 2018, the Assistant Secretary of the Army for Civil Works issued a regulatory policy

memorandum, which included a directive related to Section 401 certification timeframes.100 In the

memorandum, the Assistant Secretary noted that although it had been standard practice in some

USACE districts to give states an entire year to act on a Section 401 certification request, “such

an approach is inconsistent” with existing USACE regulations. He emphasized that the default

time period would be 60 days, unless the district engineer determines a longer time period is

required, as provided in USACE regulations. Further, he directed USACE to draft guidance

establishing criteria for determining the “reasonable period of time” states would be given to act

on a certification request. According to the memorandum, the reasonableness of the timeframe

could be based on the type of proposed activity or complexity of the site, but not on state

workload, resource issues, or lack of sufficient information. USACE issued the guidance in

August 2019.101

Many states have expressed opposition to any efforts to restrict certification timeframes beyond

what is established in the CWA.102 Some have asserted that such restrictions may prevent states

from complying with their own administrative requirements, preclude public input through state

review, and “intrude on the states’ primary authority to protect their water quality.”103

Reasonable Period of Time in the 2020 Rule

The 2020 Rule established that the reasonable period of time for certifying authorities to act on

certification requests shall not exceed one year from receipt.104 Although the CWA and 1971

regulations have the same timeframe, EPA noted in the 2020 Rule that some states had acted

beyond the one-year limit.105 While the 1971 regulations provided that federal licensing and

permitting agencies were authorized to determine the “reasonable period of time” certifying

authorities had to act, neither the CWA nor the 1971 regulations specified how these agencies

were to determine the reasonable period of time. The 2020 Rule specified three criteria that

federal licensing and permitting agencies should consider in making this determination.106 They

were (1) the complexity of the project, (2) the nature of any potential discharge, and (3) the

potential need for additional study or evaluation of water quality effects from the discharge.107

99 18 C.F.R. §§4.34(b)(5)(iii) and 5.23(b)(2).

100 Department of the Army, Office of the Assistant Secretary, Civil Works, Memorandum for the Chief of Engineers,

USACE Regulatory Policy Directives Memorandum on Duration of Permits and Jurisdictional Determinations,

Timeframes for Clean Water Act Section 401 Water Quality Certifications, and Application of the 404(b)(1)

Guidelines, December 13, 2018.

101 USACE, Regulatory Guidance Letter 19-02: Timeframes for Clean Water Act Section 401 Water Quality

Certifications and Clarification of Waiver Responsibility, August 7, 2019, https://usace.contentdm.oclc.org/utils/getfile/

collection/p16021coll9/id/1547.

102 For example, see Letter from Letitia James, New York Attorney General, et al. to EPA, May 24, 2019,

https://oag.ca.gov/system/files/attachments/press-docs/2019-05-24finaljoint-comments-epa-401signed.pdf.

103 Ibid., p. 9.

104 2020 Rule, p. 42285.

105

2020 Rule, p. 42243.

106 2020 Rule, p. 42286.

107 Ibid.

Congressional Research Service

13

Clean Water Act Section 401: Overview and Recent Developments

Reasonable Period of Time in the 2023 Rule

The 2023 Rule, consistent with the CWA, also provides that the reasonable period of time is not

to exceed one year.108 Departing from both the 1971 regulations and the 2020 Rule, the 2023 Rule

for the first time provides certifying authorities with a role in determining the length of the

reasonable period of time.109 The federal licensing or permitting agencies may jointly agree in

writing to the reasonable period of time under the 2023 Rule, provided that it does not exceed one

year from the date that the request for certification was received.110 If the federal agency and the

certifying authority do not agree on the reasonable period of time, the 2023 Rule establishes a sixmonth default time period.111 The 2023 Rule also includes provisions for extensions or to

accommodate certain public notice procedures or unexpected events, provided the reasonable

period of time does not exceed one year.112

Start of the Certification “Clock”

One aspect regarding certification timeframes that has been debated among stakeholders is when

the certification timeframe begins (i.e., when the “clock” starts on the “reasonable period of time”

established by federal licensing and permitting agencies). Some have argued that the clock starts

when a certifying authority receives a certification request, while others have argued that the

clock should start when it receives a certification request accompanied by a complete application

(i.e., when the state decides the application has sufficient information to make a decision).

EPA’s 2010 Guidance provided that “generally, the state or tribe’s §401 certification review

timeframe begins once a request for certification has been made to the certifying agency,

accompanied by a complete application.”113 In 2018, the U.S. Court of Appeals for the Second

Circuit held that Section 401 creates a “bright-line rule” that the timeline for certification begins

after receipt of a certification request, not when the certifying authority determines that a request

is complete.114 EPA’s 2019 Guidance stated that the 2010 Guidance inappropriately indicated that

the timeline for action begins upon receipt of a “complete application” and asserted that the CWA

provides that the timeline for action begins upon receipt of a certification request.115

Start of the Certification Clock in the 2020 Rule

The 2020 Rule clarified that the statutory timeline for certification review starts when the

certifying authority receives a certification request, which was newly defined in the rule.116 Per

the rule, a certification request is a written, signed, and dated communication that contains nine

108 2023 Rule, p. 66663.

109 Ibid.

110 Ibid.

111 Ibid.

112 Ibid.

113 2010 Guidance, pp. 15-16.

114 N.Y. State Dep’t of Env’t Conservation v. FERC, 884 F.3d 450, 455-56 (2d Cir. 2018). EPA discussed this case in

the 2020 Rule, pp. 42222-42223. The Second Circuit further held in 2021 that a certifying authority may not alter the

beginning of the certification timeline by entering into an agreement or otherwise coordinating with a certification

applicant to do so. N.Y. State Dep’t of Env’t Conservation v. FERC, 991 F.3d 439, 450 (2d Cir. 2021).

115 2019 Guidance, p. 3.

116 2020 Rule, pp. 42285-42286.

Congressional Research Service

14

Clean Water Act Section 401: Overview and Recent Developments

components specified in the rule for individual licenses or permits (or seven components

specified in the rule for general licenses or permits).117

Start of the Certification Clock in the 2023 Rule

The 2023 Rule also clarifies that the statutory timeframe for certification review starts when the

certifying authority receives a request for certification, which it also defines in the rule.118 Per the

2023 Rule, all certification requests must include a copy of the federal license or permit

application submitted to the federal agency (for individual licenses or permits) or a copy of a draft

license or permit (for general licenses or permits) as well as any readily available water qualityrelated materials that informed the development of the application. In addition, the 2023 Rule

provides that certifying authorities may define other contents required for a certification request if

they are water quality-related and identified prior to when the certification request is made. If a

certifying authority chooses not to define other required contents, the request must include the

seven default elements specified in the rule.119

Acting on a Certification Request

Section 401(a)(1) provides that if a certifying authority fails or refuses “to act” within a

reasonable period time—not to exceed one year—after receiving a certification request, the

certification requirements are waived.120 The CWA does not identify what responses constitute

action on a certification request, however. Several lawsuits involving water quality certifications

have raised the question of whether a certifying authority could be considered to have acted on a

certifying request such that the certification requirements were not waived. In particular, some

court decisions have focused on certification actions where an applicant withdrew and

resubmitted its certification request, sometimes in coordination with the certifying authority.121

Both the 2020 and 2023 Rules also set parameters around what actions a certifying authority

could take pursuant to its Section 401 authority. Additionally, as discussed below, some

legislative proposals have sought to add more clarity to the text of Section 401 regarding what

constitutes action on a certification request.

Acting on a Certification Request in the 2020 Rule

The 2020 Rule text did not specifically define what it means “to act” on a certification request.

The preamble did discuss how EPA viewed what it means to act and what it means to fail or

refuse to act.122 The preamble also stated that “consistent with the text of the CWA, under the

final rule a certifying authority may take one of four actions pursuant to its section 401 authority:

grant certification, grant certification with conditions, deny certification, or waive its opportunity

117 These components include, for example, information on the project proponent and point of contact, the applicable

federal license or permit, and the location and nature of any discharge that may result from the proposed project and the

location of receiving waters. See 2020 Rule, p. 42285.

118 2023 Rule, p. 66662.

119 Ibid. Note that if EPA is the certifying authority, the seven default elements are to be included.

120 33 U.S.C. §1341.

121 Hoopa Valley Tribe v. FERC, 913 F.3d 1099 (D.C. Cir. 2019), cert. denied sub nom. Cal. Trout v. Hoopa Valley

Tribe, 140 S. Ct. 650 (2019); N.C. Dep’t of Env’t Quality v. FERC, 3 F.4th 655, 669 (4th Cir. 2021); Turlock Irrigation

Dist. v. FERC, 36 F. 4th 1179, 1183 (D.C. Cir. 2022); Cal. State Water Res. Ctrl. Bd. v. FERC, 43 F. 4th 920 (9th Cir.

2022).

122 2020 Rule, pp. 42265-42267.

Congressional Research Service

15

Clean Water Act Section 401: Overview and Recent Developments

to provide a certification.”123 However, neither the 2020 Rule nor its preamble were explicit in

stating that those are the only means “to act” for the purposes of determining whether or not

certification requirements are waived.

Acting on a Certification Request in the 2023 Rule

The 2023 Rule clarifies in the rule text that a certifying authority may act on a certification

request in one of four ways: granting certification, granting certification with conditions, denying

certification, or expressly waiving certification.124 In the 2023 Rule preamble, EPA states that

“although the Agency has never explicitly defined ‘to act on a request for certification,’ the

interpretation taken in this final rule is consistent with prior Agency guidance and the 2020 Rule

preamble.”125 EPA also explains that it is providing clarification regarding what it means to act on

a request for certification in light of commenter input and recent case law.126

Withdrawal and Resubmission—Waiver or Restarting the Certification

“Clock”?

In cases where certifying authorities believe that more information or time is needed to review a

license or permit application before making a certification decision, they have generally taken

two approaches, as described by EPA.127 Some states have denied Section 401 certifications

“without prejudice” when they decided that they did not have enough data or information for their

analysis. In such cases, they encouraged applicants to resubmit the application. In other cases,

states have suggested that applicants withdraw and resubmit applications with the intention of

restarting the certification clock. This approach aims to provide the applicant more time to submit

additional information and the state more time to review the information and make a certification

decision. Some observers assert that restarting the clock in this manner is preferable to denying

certification based on data and information gaps.128 Others assert that restarting the clock,

particularly when it is done multiple times, results in delays that are not consistent with

congressional intent to limit the length of the certification process.129

Restarting the Certification Clock in the 2020 Rule

The 2020 Rule clarified that once a certifying authority receives a certification request, the period

of time to act on a certification request would not pause or stop for any reason.130 Specifically, the

certifying authority could not request that license or permit applicants withdraw and resubmit

their certification requests as a means to restart the certification clock.131

The 2020 Rule also established a pre-filing meeting process, which was intended to ensure that

the certifying authority received early notification of projects and could discuss informational

123 2020 Rule, p. 42249.

124 2023 Rule, p. 66663.

125 2023 Rule, p. 66609.

126 2023 Rule, p. 66608.

127 2010 Guidance, p. 13.

128 2020 Rule, pp. 42261-42262.

129

2020 Rule, p. 42261.

130 Ibid.

131 2020 Rule, p. 42286.

Congressional Research Service

16

Clean Water Act Section 401: Overview and Recent Developments

needs with the project proponent before the statutory timeframe for review began.132 Specifically,

project proponents were required to submit a request to the certifying authority for a pre-filing

meeting at least 30 days prior to submitting a certification request.133 Per the rule, the certifying

authority had discretion as to whether to grant or respond to the meeting request.134 In the

preamble to the 2020 Rule, EPA noted that early engagement, including through a pre-filing

meeting, could help improve the quality of information provided to the certifying authority and

could reduce the need to make additional information requests of the project proponent during the

certification timeframe.135

The preamble to the 2020 Rule also stated that “if a project proponent withdraws a certification

request because the project is no longer being planned or if certain elements of the proposed

project materially change from what was originally proposed or from what is described or

analyzed in additional information submitted by the project proponent, it is EPA’s interpretation

that the certifying authority no longer has an obligation to act on that request.”136 However, the

preamble also clarified that the agency “expects that voluntary withdrawal by the project

proponent will be done sparingly and only in response to material modifications to the project or

if the project is no longer planned.”137 In such circumstances, if the project proponent wanted a

certification in the future, they would have to submit a new certification request and would, at a

minimum, have to wait 30 days before resubmitting a certification request due to the pre-filing

meeting request requirement in the rule.138

Restarting the Certification Clock in the 2023 Rule

In the preamble to the 2023 Rule, EPA states that the agency is removing the provision from the

2020 Rule that prohibited the certifying authority from asking the project proponent to withdraw

the certification request to reset the reasonable period of time.139 EPA also states that “the agency

is finalizing as proposed to take no position on the legality of withdrawing and resubmitting a

request for certification.”140

The 2023 Rule retains the 2020 Rule’s requirement for project proponents to request a pre-filing

meeting with the certifying authority at least 30 days prior to submitting a certification request.141

The certifying authority may waive or shorten the requirement under the 2023 Rule.142

EPA also notes in the 2023 Rule preamble that it would not take a position on the legality of

withdrawal and resubmission in light of the difficulty of drawing a bright line on the issue and the

fact that “the law in this area is dynamic.”143 EPA recognized, however, that “there may be

situations where withdrawing and resubmitting a request for certification is appropriate.”144 The

132 2020 Rule, p. 42241.

133 2020 Rule, p. 42285.

134 Ibid.

135 2020 Rule, p. 42242.

136 2020 Rule, pp. 42246-42247.

137 Ibid.

138 Ibid.

139 2023 Rule, p. 66590.

140 Ibid.

141 2023 Rule, p. 66662.

142

Ibid.

143 2023 Rule, p. 66584.

144 Ibid.

Congressional Research Service

17

Clean Water Act Section 401: Overview and Recent Developments

agency states that it intends to allow “certifying authorities, Federal agencies, and/or possibly

project proponents to make case-specific decisions addressing the practice.”145

Implicit and Retroactive Waivers in the Courts

Parties have disputed which actions constitute acting on a certification request for purposes of

avoiding waiver. At least one court has also been critical of the withdrawal and resubmission

approach. In January 2019, the U.S. Court of Appeals for the District of Columbia Circuit (D.C.

Circuit) held in Hoopa Valley Tribe v. FERC that withdrawing and resubmitting the same Section

401 request for the purpose of circumventing the one-year statutory deadline does not restart the

timeframe for the state’s review.146 In that case, the Hoopa Valley Tribe sought review of a FERC

order regarding PacifiCorp’s proposal to relicense some of the dams comprising the Klamath

Hydroelectric Project in California and Oregon, and to decommission others.147 Under the terms

of a 2010 settlement agreement, PacifiCorp, California, and Oregon agreed to defer Section 401’s

one-year statutory limit by withdrawing and resubmitting PacifiCorp’s water quality certification

application each year.148 The Tribe argued that California and Oregon had waived their Section

401 certification authority, and that PacifiCorp had therefore failed to diligently prosecute its

licensing application.149 The D.C. Circuit held that Section 401 imposed a clear maximum of one

year to act on a request for certification, and that the text “cannot be reasonably interpreted to

mean that the period of review for one request affects that of any other request.”150 Otherwise, the

court cautioned, “the withdrawal-and-resubmission scheme could be used to indefinitely delay

federal licensing proceedings and undermine” federal agencies’ regulatory jurisdiction.151 Some

observers asserted that the ruling could lead to an increase in certification denials in instances in

which states may consider the information insufficient for making a decision.152

By contrast, the U.S. Court of Appeals for the Fourth Circuit, in North Carolina Department of

Environmental Quality v. FERC, distinguished Hoopa Valley as “a very narrow decision flowing

from a fairly egregious set of facts,” and has expressed skepticism regarding FERC’s argument

that a certifying authority must either grant or deny certification within one year of the

certification request in order to avoid waiver.153 The Fourth Circuit explained that Section 401

specifically provides that certification is waived if a certifying authority fails or refuses to act on

a request within a year, not if the certifying authority fails or refuses to grant or deny

certification.154 The court thus suggested, but did not hold, that a certifying authority that “takes

significant and meaningful action on a certification request within a year of its filing,” but does

not grant or deny the request, would not waive certification.155

145 Ibid.

146 Hoopa Valley Tribe v. FERC, 913 F.3d 1099 (D.C. Cir. 2019), cert. denied sub nom. Cal. Trout v. Hoopa Valley

Tribe, 140 S. Ct. 650 (2019). EPA discussed the Hoopa Valley Tribe case in the 2020 Rule, pp. 42210-42223, and the

2023 Rule, p. 66584, 66590.

147 Hoopa Valley Tribe, 913 F.3d at 1100.

148 Id. at 1101.

149 Id. at 1103.

150 Id. at 1104.

151 Id.

152 2020 Rule, p. 42261.

153

3 F.4th 655, 669 (4th Cir. 2021).

154 Id. at 669-70.

155 Id.

Congressional Research Service

18

Clean Water Act Section 401: Overview and Recent Developments

The D.C. Circuit later endorsed the Fourth Circuit’s interpretation of Hoopa Valley.156 In Turlock

Irrigation District v. FERC, the D.C. Circuit considered whether the California State Water

Resources Control Board waived its certification authority in a combined licensing and

relicensing proceeding for two hydroelectric facilities in California. The board denied without

prejudice the certification requests several times because it could not conclusively determine that

certification was warranted in light of ongoing environmental reviews.157 Ultimately, the board

granted certification, but with 45 conditions.158 The license applicants argued that the state board

waived its certification authority, making the conditions “recommendations” for FERC to

consider rather than mandatory terms that must be included in their federal licenses.159 The D.C.

Circuit held that the board did not waive its certification authority because it “acted” within the

meaning of Section 401(a)(1) when it denied certification and later granted certification with

conditions.160 The court distinguished Hoopa Valley as a case where the certifying authority and

license applicant entered into an agreement whereby the state agencies repeatedly would take no

action on the certification request.161

The U.S. Court of Appeals for the Ninth Circuit has also opined on withdrawal and resubmission

following Hoopa Valley. In California State Water Resources Control Board v. FERC, the court

held that a certifying authority’s observation that an applicant would likely withdraw and

resubmit its certification requests did not constitute coordination in a withdrawal-andresubmission scheme so as to constitute waiver.162 The court did not rule on the validity of

FERC’s position—adopted after Hoopa Valley—that an applicant’s “unilateral” withdrawal and

resubmission was distinct from “coordinated” withdrawal-and-resubmission schemes in which a

certifying authority sought to avoid the one-year deadline.163 Instead, the court ruled based on its

review of emails in the record that the state water resources board simply acquiesced in the

applicant’s own decision to withdraw and resubmit its applications, and that the board thus did

not waive its certification authority.164

Courts may continue to clarify when a certifying authority has acted on a request for certification

and when it has waived its authority. Based on Hoopa Valley and subsequent rulings by the D.C.

Circuit and other courts, it appears that withdrawal and resubmission could constitute waiver

when it results from an agreement between the certifying authority and the applicant to avoid the

one-year deadline. An applicant’s unilateral withdrawal and resubmission may not form the basis

of a waiver finding if the certifying authority has taken some kind of action, such as denying an

application without prejudice, but courts have not yet defined what would count as action in that

scenario.

The D.C. Circuit has also held that a certifying authority may only waive certification by failing

or refusing to act, and may not change its position to affirmatively waive certification after

granting it. In Waterkeepers Chesapeake v. FERC, the court considered the Maryland Department

of the Environment’s certification of the Conowingo Dam.165 The state’s initial grant of

156 Turlock Irrigation Dist. v. FERC, 36 F. 4th 1179, 1183 (D.C. Cir. 2022).

157 Id. at 1181.

158 Id. at 1182.

159 Id.

160 Id. at 1183.

161 Id.

162 43 F. 4th 920 (9th Cir. 2022).

163

Id. at 932.

164 Id. at 932-933.

165 56 F.4th 45 (D.C. Cir. 2022).

Congressional Research Service

19

Clean Water Act Section 401: Overview and Recent Developments

certification in 2018 with conditions was challenged by the dam operator, resulting in a settlement

whereby the operator agreed to submit certain articles to be incorporated into FERC’s operating

license and the Maryland Department of the Environment agreed to waive certification.166 FERC

then issued a 50-year license adopting the proposed articles.167 Several environmental groups

challenged FERC’s license, arguing that Maryland could not retroactively waive its certification

authority.168 The D.C. Circuit agreed, holding that Maryland “acted” on the certification request

when it issued the certification with conditions in 2018 and that its subsequent “conditional

waiver” was neither a failure nor a refusal to act for purposes of Section 401.169 Because

Maryland’s action did not qualify as a waiver under Section 401, the court held, FERC was

prohibited from issuing a license for the dam.170

Scope of 401 Certifications

Congress has provided direction regarding the scope of what certifying authorities are to consider

in making a Section 401 certification decision. Specifically, Section 401(a)(1) authorizes

certifying authorities to certify that a discharge to navigable waters that may result from a

proposed activity will comply with specific enumerated sections of the CWA, including Sections

301, 302, 303, 306, and 307.171 Section 401(d) provides direction regarding the scope of what

conditions certifying authorities may impose in granting certifications, and directs that such

certifications

shall set forth any effluent limitations and other limitations, and monitoring requirements

necessary to assure that any applicant for a Federal license or permit will comply with any

applicable effluent limitations and other limitations, under section 301 or 302 of this Act,

standard of performance under section 306 of this Act, or prohibition, effluent standard, or

pretreatment standard under section 307 of this Act, and with any other appropriate

requirement of State law set forth in such certification, and shall become a condition on

any Federal license or permit.172

Scope of Section 401 Review

Stakeholders have debated the scope of what certifying authorities should consider when

reviewing a request for certification. Congress has held hearings during the past few Congresses

that included debate over the scope of considerations during certification.173

166 Id. at 48.

167 Id.

168 Id.

169 Id. at 49 (citing Turlock, 36 F.4th at 1183).

170 Id.

171 33 U.S.C. §1341(a)(1). CWA §§301, 302, and 306 pertain to effluent limitations and standards of performance for

new and existing discharge sources, §303 pertains to water quality standards and implementation plans, and §307

pertains to toxic pretreatment effluent standards.

172 33 U.S.C. §1341(d).

173 For example, see U.S. Congress, Senate Committee on Environment and Public Works, Hearing to Examine

Implementation of Clean Water Act Section 401 and S.3303, the Water Quality Certification Improvement Act of 2018,

115th Cong., 2nd sess., August 16, 2018, S.Hrg. 115-344; U.S. Congress, Senate Committee on Environment and Public

Works, Hearing on S. 1087, the Water Quality Certification Improvement Act of 2019, and Other Potential Reforms to

Improve Implementation of Section 401 of the Clean Water Act: State Perspectives, 116th Cong., 2nd sess., November

19, 2019, S.Hrg. 116-145; and U.S. Congress, House Transportation and Infrastructure Committee, Water Resources

and Environment Subcommittee, The Next Fifty Years of the Clean Water Act: Examining the Law and Infrastructure

Project Completion, 118th Cong., 1st sess., May 16, 2023, H.Hrg. 118-17.

Congressional Research Service

20

Clean Water Act Section 401: Overview and Recent Developments

Water Quality Impacts vs. Other Impacts

Some groups have argued that Congress intended for the review to focus on water quality impacts

and assert that, in recent years, some states have overstepped their authority by also considering

non-water-quality environmental impacts, such as greenhouse gas emissions.174 Other groups

argue that Congress intended for certifying authorities to have a significant role in ensuring that

the water quality in their states is protected, and assert that the denials that states have issued have

been well-supported and necessary to protect state water quality.175

Some states have cited projected environmental impacts other than water quality impacts in

denying certain Section 401 certification requests. In 2017, the Washington Department of

Ecology denied a permit application for a planned coal export terminal along the Columbia

River.176 In addition to finding that the applicant did not provide “reasonable assurance” that the

project would meet applicable water quality standards, the state concluded that the construction

and operation of the terminal would result in significant and unavoidable adverse impacts to

social and community resources, cultural resources, tribal resources, rail transportation, rail

safety, vehicle transportation, vessel transportation, noise and vibration, and air quality.177

Unrelated to the Section 401 certification application, a separate state agency also denied the

applicant’s request for approval of a sublease of state-owned aquatic lands on which the applicant

proposed to construct a portion of the project.178 The permit applicant challenged the denials in

both federal and state court, alleging that Washington improperly denied the permit because of an

anti-coal bias and concerns about greenhouse gas emissions, in violation of the Dormant

Commerce Clause and the foreign affairs doctrine.179 Additionally, Montana and Wyoming sought

review of Washington’s denial of the water quality certification directly in the U.S. Supreme

Court.180 The parties agreed to move for dismissal of the federal and state lawsuits after the

permit applicant filed for bankruptcy and represented that it no longer had funds to continue

174 See, for example, Letter from Interstate Natural Gas Association of America to Andrew Wheeler, Administrator,

EPA, May 24, 2019. See also Letter from Natural Gas Supply Association and Center for Liquefied Natural Gas to

Andrew Wheeler, Administrator, EPA, May 24, 2019. See also Letter from Cross-Cutting Issues Group to Andrew

Wheeler, Administrator, EPA, May 24, 2019. All three letters are available in EPA Docket ID: EPA-HQ-OW-20180855.

175 For example, see Letter from Association of State Wetland Managers to Anna Wildeman, Deputy Assistant

Administrator, EPA Office of Water, May 20, 2019. See also Letter from Western States Water Council to Andrew

Wheeler, Administrator, EPA, May 21, 2019. See also Letter from State of Washington Department of Ecology to

Andrew Wheeler, Administrator, EPA, May 24, 2019. All three letters are available in EPA Docket ID: EPA-HQ-OW2018-0855.

176 Letter from Maia D. Bellon, Director, Washington Department of Ecology, to Kristin Gaines, Millennium Bulk

Terminals-Longview, LLC, September 26, 2017, https://ecology.wa.gov/DOE/files/83/8349469b-a94f-492b-accad8277e1ad237.pdf.

177 Ibid. See also Millennium Bulk Terminals – Longview Final SEPA Environmental Impact Statement S.6 (April

2017), https://apps.ecology.wa.gov/publications/documents/1706013.pdf.

178 See Nw. Alloys, Inc. v. Wash. Dep’t of Nat. Res., 447 P.3d 620, 626-27 (Wash. Ct. App. 2019); Millennium Bulk

Terminals-Longview, LLC v. Washington, No. 52215-2-II, 2020 WL 1651475 (Wash. Ct. App. March 17, 2020).

Cowlitz County, Washington State Department of Ecology, Millennium Bulk Terminals – Longview Final SEPA

Environmental Impact Statement (April 2017), https://apps.ecology.wa.gov/publications/documents/1706013.pdf.

179 See Brief for the United States as Amicus Curiae, Montana v. Washington, No. 22O152, at 4-7 (U.S. May 25,

2021).

180 Montana v. Washington, No. 22O152, Bill of Complaint ¶ 44 (U.S. Jan. 21, 2020). The Supreme Court has original

and exclusive jurisdiction to adjudicate disputes between two or more states. U.S. CONST. art. III, §2, cl. 2; 28 U.S.C.

§1251(a).

Congressional Research Service

21

Clean Water Act Section 401: Overview and Recent Developments

operation of the terminal site.181 The Supreme Court also declined to hear Montana and

Wyoming’s complaint.182

The New York State Department of Environmental Conservation (NYSDEC) also denied a series

of Section 401 water quality certification applications for the construction of a natural gas

pipeline in Raritan Bay.183 Most recently, the Department denied an application based on the

project proponent’s failure to demonstrate that the project would comply with applicable water

quality standards.184 The denial letter also included a qualitative assessment of the greenhouse gas

emissions and climate impacts associated with the project in light of the state’s newly enacted

Climate Leadership and Community Protection Act (Climate Act), which requires a 40%

reduction in statewide greenhouse gas emissions.185 The Department found that the project would

result in greenhouse gas emissions from the full lifecycle of natural gas that would be transported

through the pipeline; could delay the state’s transition away from natural gas and other fossil

fuels; and would be inconsistent with the statewide greenhouse gas emission limits and other

requirements established in the Climate Act.186 While the Department noted that the denial did not

rest solely on the determination that the project was “inconsistent with the energy and climate

policies, laws, and goals” of the state, it noted that “the State should not sacrifice its water quality,

sensitive habitats, and important biological resources for a project that would have adverse

climate impacts and one that runs counter to the State’s policy to significantly reduce GHGs by

transitioning away from the use of natural gas to produce electricity.”187 Unlike in Washington,

the project proponent has not filed a lawsuit challenging the Raritan Bay certification denials.

Impacts from the “Activity” vs. Impacts from the “Discharge”

Stakeholders have also debated whether the scope of a certifying authority’s review should

consider the impacts of the “activity” (i.e., the impacts from the permitted activity as a whole,

including the point source discharge as well as nonpoint source impacts from the activity) or

more narrowly consider the impacts from the point source discharge. For example, permitted or

licensed activities that involved clearing of trees along the shoreline could result in increased

water temperatures or increased sediment runoff. Looking at the impacts of the “activity” would

allow a certifying authority to consider those water quality-related impacts, while looking at the

impacts of the point source discharge would exclude those impacts from the scope. The debate

over whether the activity or the point source discharge is the appropriate scope of review has also

come up in the context of the scope of conditions on certification, discussed below.

181 See Order, Lighthouse Res., Inc. v. Inslee, No. 19-35415 (9th Cir. Mar. 23, 2021), ECF No. 93; Agreed Order of

Dismissal, Lighthouse Res. Inc. v. Inslee, No. 3:18-cv-05005-RJB (W.D. Wash. Apr. 27, 2021), ECF No. 352; Agreed

Order of Dismissal, Millennium Bulk Terminals-Longview, LLC v. Wash. State Dep’t of Ecology, No. 18-2-994-08

(Wash. Super. Ct. May 10, 2021).

182 Montana v. Washington, motion for leave to file a bill of complaint petition denied, 141 S. Ct. 2848 (U.S. June 28,

2021) (mem.).

183 See Letter from Daniel Whitehead, Director, Division of Environmental Permits, to Joseph Dean, May 15, 2019,

https://extapps.dec.ny.gov/docs/administration_pdf/nodtgp.pdf; Letter from Daniel Whitehead to Joseph Dean,

Transcontinental Gas Pipe Line Company, LLC, May 15, 2020, https://extapps.dec.ny.gov/docs/

permits_ej_operations_pdf/nesewqcdenial05152020.pdf.

184 Letter from Daniel Whitehead to Joseph Dean, May 15, 2020, pp. 3-13, https://extapps.dec.ny.gov/docs/

permits_ej_operations_pdf/nesewqcdenial05152020.pdf.

185

Ibid., p. 14.

186 Ibid.

187 Ibid., p. 16.

Congressional Research Service

22

Clean Water Act Section 401: Overview and Recent Developments

Scope of Section 401 Conditions

Stakeholders have also debated the scope of what certifying authorities may impose as conditions

when granting a certification. Some observers assert that conditions should be limited to ensuring

compliance with the enumerated sections listed in Section 401(d) or state requirements that are

water-quality specific. Other observers argue that the phrase “any other appropriate requirement

of State law” provides authority to consider conditions that are broader, as long as they relate to

water quality.188

The Supreme Court weighed in on one aspect of the scope of Section 401 in 1994. In a 7-2

decision in PUD No. 1 of Jefferson County v. Washington Department of Ecology, the Court

upheld a state condition that imposed a minimum stream flow requirement to protect a steelhead

and salmon fishery in a Section 401 certification for a hydroelectric project.189 In rejecting the

petitioner’s claim that the state’s authority to impose conditions under Section 401 should be

limited to addressing only “discharges” that may result from the proposed project, the Court held

that a “reasonable read” of Section 401 authorizes the state to place certification conditions on the

“activity as a whole once the threshold condition, the existence of a discharge, is satisfied.”190 The

Court arrived at this conclusion by analyzing the different terms used in Section 401(a) and

401(d), noting that while Section 401(a) requires certifying authorities to certify that a discharge

will comply with relevant provisions of the CWA, Section 401(d) provides that a certification

may include conditions or limitations “to assure that any applicant” will comply with the CWA

and appropriate state law requirements.191 Additionally, the Court noted that this was consistent

with EPA’s implementing regulations in effect at the time, which interpreted Section 401 as

requiring the certifying authority to find that “there is a reasonable assurance that the activity will

be conducted in a manner which will not violate applicable water quality standards.”192

The Court further cautioned, however, that certifying authorities do not have unlimited authority

to place restrictions on an activity as a whole, but instead may ensure only that a project complies

with the enumerated provisions of the CWA and any other appropriate state law requirement.193

The Court did not reach the issue of “what additional state laws, if any, might be incorporated” by

the reference to “any other appropriate requirement of State law,” but held that, “at a minimum,

limitations pursuant to state water quality standards adopted pursuant to [CWA] § 303 are

‘appropriate’ requirements of state law.”194 The Court ultimately concluded that a certifying

authority may place minimum stream flow requirements in its certification to enforce a

designated use contained in a state water quality standard, reasoning that “[i]n many cases, water

quantity is closely related to water quality; a sufficient lowering of the water quantity in a body of

water could destroy all of its designated uses, be it for drinking water, recreation, navigation or, as

here, as a fishery.”195

188 2020 Rule, pp. 42254-42256.

189 PUD No. 1 of Jefferson County v. Wash. Dep’t of Ecology, 511 U.S. 700 (1994). The parties in that case did not

dispute that state certification was required under Section 401. In a later case, the Supreme Court unanimously held that

the flow of water through a dam constitutes a “discharge” for purposes of triggering Section 401. S.D. Warren Co. v.

Me. Bd. of Env’tl Prot., 547 U.S. 370 (2006).

190 PUD No. 1 of Jefferson County, 511 U.S. at 711-12.

191 Id. at 711.

192 Id. at 712 (quoting 40 C.F.R. §121.2(a)(3) (1993)).

193

Id. at 712.

194 Id. at 713.

195 Id. at 719.

Congressional Research Service

23

Clean Water Act Section 401: Overview and Recent Developments

2010 EPA Guidance on the Scope of Review and Conditions

EPA’s rescinded 2010 Guidance provided that “an applicant must demonstrate that the proposed

activity and discharge will not violate or interfere with the attainment of any limitations or

standards identified in §401(a) and (d).”196 Further, it specified that these CWA subsections

include the enumerated sections of the act and “any other appropriate requirement of State law set

forth in such certification.”197 EPA’s 2010 Guidance also supported interpreting the scope of what

states may impose as conditions in a manner that allowed consideration of concerns relating to

water quality. Specifically, the 2010 Guidance provided that “[u]nder CWA §401(d) the water

quality concerns to consider, and the range of potential conditions available to address those

concerns, extend to any provision of state or tribal law relating to the aquatic resource.”198 It

further provided that “considerations can be quite broad so long as they relate to water quality.”199

Relevant considerations identified in the 2010 Guidance included state and tribal laws protecting

threatened and endangered species, “particularly where the species plays a role in maintaining

water quality or if their presence is an aspect of a designated use”; state and tribal wildlife laws

“addressing habitat characteristics necessary for species identified in a waterbody’s designated

use”; and state and tribal laws protecting the cultural or religious value of waters.200

When EPA updated its guidance in 2019 to respond to E.O. 13868, the agency recommended that

the scope of a certification review and related decision “be limited to an evaluation of potential

water quality impacts.”201 Also, EPA more narrowly recommended that conditions “be limited to

ensuring compliance with the enumerated provisions of the CWA and other appropriate state or

tribal water quality requirements.”202

Scope of Certifications in the 2020 Rule

CWA Section 401 requires that the certifying authority certify that “any such discharge will

comply with the applicable provisions of [CWA] sections 301, 302, 303, 306, and 307.”203 The

2020 Rule limited the scope of a Section 401 certification to assuring that a discharge from a

federally licensed or permitted activity would comply with “water quality requirements.”204 The

rule also newly defined the term water quality requirements in a manner that limited the scope of

water quality impacts that states may consider in their certification review, as well as the scope of

conditions the state may impose. Specifically, the rule defined “water quality requirements” as

“applicable provisions of §§301, 302, 303, 306, and 307 of the Clean Water Act, and state or

tribal regulatory requirements for point source discharges into waters of the United States”

(emphasis added).205

Under 1971 regulations and practice, the scope of certification included assuring that the

activity—which encompasses the project as a whole as well as the discharge—would comply

with water quality requirements, which was neither defined explicitly in Section 401 nor the

196 2010 Guidance, p. 18.

197 Ibid.

198 2010 Guidance, p. 23.

199 Ibid.

200 2010 Guidance, p. 21.

201 2019 Guidance, p. 4.

202 Ibid.

203

33 U.S.C. §1341.

204 2020 Rule, p. 42285.

205 2020 Rule, p. 42285.

Congressional Research Service

24

Clean Water Act Section 401: Overview and Recent Developments

regulations.206 In addition, as EPA acknowledged in the 2020 Rule’s preamble, the agency

“previously suggested that the scope of section 401 may extend to nonpoint source discharges to

non-federal waters” (i.e., waters that are not waters of the United States) “once the requirement

for the section 401 certification is triggered.”207

The Supreme Court addressed one aspect of what activities trigger Section 401 in 2006. In S.D.

Warren Co. v. Maine Board of Environmental Protection, the Court considered the meaning of the

term “discharge” as used in Section 401(a)(1), which establishes the scope of the certification

requirement as applying to any application for a federal license or permit to conduct “any activity

... which may result in any discharge into the navigable waters.”208 Ruling that the flow of water

through a dam constitutes a “discharge” sufficient to trigger Section 401, the Court unanimously

held that the term means a “flowing or issuing out,” and is broader than “discharge of a pollutant”

or “discharge of pollutants.”209 The Court did not discuss, however, whether a discharge must be

from a point source to trigger Section 401, or whether a discharge from a dam is a point source

discharge more specifically.

Scope of Certifications in the 2020 Rule

The 2020 Rule limited the application of Section 401 to point source discharges into waters of the

United States.210 This change meant that any consideration of water quality impacts from the

project as a whole (other than the point source discharge itself) was excluded from the scope of

the certifying authority’s review and consideration of conditions. For example, the certifying

authority was no longer able to address water quality-related impacts from the project that were

tangential to the discharge. Stakeholders asserted that such water quality impacts could include

increased water withdrawals, groundwater pollution, increased erosion and sedimentation,

increases in impervious surfaces (resulting in reduced stormwater infiltration), disconnected

ecosystems, and harm to endangered species.211

In addition, the changes in the 2020 Rule meant that the scope of the certifying authority’s review

and consideration of conditions could not include impacts to nonfederal waters. Some

stakeholders expressed particular concern about this change in light of the final rule EPA and

USACE published under the first Trump Administration on April 21, 2020, which narrowed the

scope of waters that were defined as “waters of the United States” (WOTUS) under the CWA.212

The changes in the 2020 Rule also narrowed the scope of review and conditions to focus on water

quality requirements, specifically excluding consideration of other non-water-quality impacts. In

the preamble to the 2020 Rule, EPA stated that the agency was “aware of circumstances in which

some States have denied certifications on grounds that are unrelated to water quality requirements

206 EPA Office of Water, Clean Water Act Section 401 Certification Rule Public Webinar, June 17, 2020,

https://19january2021snapshot.epa.gov/cwa-401/public-webinar-clean-water-act-section-401-certification-rule_.html.

207 2020 Rule, pp. 42234-42235.

208 547 U.S. 370 (2006).

209 Id. at 375-76.

210 2020 Rule, p. 42234.

211 2020 Rule, p. 42252.

212 USACE and EPA, “The Navigable Waters Protection Rule: Definition of ‘Waters of the United States,’” 85 Federal

Register 22250, April 21, 2020. The definition of WOTUS has changed following the issuance of the Navigable Waters

Protection Rule. The Biden Administration issued a rule redefining WOTUS in January 2023 and a conforming rule

amending it in September 2023 to respond to the Supreme Court’s decision in Sackett v. EPA, 598 U.S. 651 (2023). For

more information, see CRS Report R47408, Waters of the United States (WOTUS): Frequently Asked Questions About

the Scope of the Clean Water Act, by Kate R. Bowers and Laura Gatz.

Congressional Research Service

25

Clean Water Act Section 401: Overview and Recent Developments

and that are beyond the scope of CWA section 401.”213 EPA then referenced, as an example, the

certification denial letter from the state of New York to the Millennium Pipeline Company, which

considered among other things FERC’s failure to consider or quantify the effects of downstream

greenhouse gas emissions in its environmental review of the project.214 The preamble also stated

that the agency is aware that some certifications have included conditions that may be unrelated

to water quality, including requirements for recreational trails, public access for recreation, or

one-time and recurring payments to state agencies for improvements unrelated to the proposed

project.215 EPA emphasized that the 2020 Rule clarified that the scope of the certification review

and the scope of conditions that were appropriate for inclusion in a certification were limited to

ensuring that the discharge from a federally licensed or permitted activity would comply with

water quality requirements, as newly defined in the rule.

Scope of Certifications in the 2023 Rule

The 2023 Rule clarifies that the scope of Section 401 reviews includes evaluating whether the

activity will comply with applicable water quality requirements.216 The 2023 Rule also clarifies

that the certifying authority’s review is limited to the water quality-related impacts from the

federally licensed permit or activity, including the activity’s construction and operation. The rule

also defines water quality requirements to mean “any limitation, standard, or other requirement

under sections 301, 302, 303, 306, and 307” of the CWA and “any Federal and state or Tribal laws

or regulations implementing those sections, and any other water quality-related requirement of

state or Tribal law.”217 Thus, while the 2023 Rule clarifies that the scope of the review may only

consider water quality-related impacts, certifying authorities are able to consider a broader range

of water quality-related impacts than under the 2020 Rule. These include water quality-related

impacts from the activity (e.g., both point source and nonpoint source impacts) as well as impacts

to nonfederal waters. In the preamble to the 2023 Rule, EPA states that “the best reading of

section 401 is that it authorizes a state or Tribe to apply state law or Tribal law to all impacted

state or Tribal waters.”218 EPA also reasons that, while the 401 certification requirement is

triggered by a potential discharge into navigable waters (i.e. WOTUS),

water quality impacts from the activity could occur in state or Tribal waters beyond those

navigable waters. Allowing states or authorized Tribes to apply state or Tribal law to all

potentially affected state or Tribal waters is supported by CWA section 510, which—

“[e]xcept as expressly provided” in the CWA—preserves a state’s or authorized Tribe’s

authority and jurisdiction to protect its waters from pollution.219

The 2023 Rule also clarifies that the scope of conditions is the same as the scope of review.

Certifying authorities are to impose conditions “necessary to assure that the activity will comply

with applicable water quality requirements.220

213 2020 Rule, p. 42256.

214 Ibid.

215 2020 Rule, p. 42257.

216 2023 Rule, p. 66662.

217 Ibid.

218

2023 Rule, p. 66605.

219 Ibid.

220 2023 Rule, pp. 66592, 66662.

Congressional Research Service

26

Clean Water Act Section 401: Overview and Recent Developments

Other Selected Changes in the 2020 and 2023 Rules

The 2020 and 2023 Rules included a number of changes from the 1971 regulations in addition to

those addressing certification timeframes and the scope of certification. Some of these changes

formalized current practice, clarified timelines around specific requirements and practice, or

included more detail and explanation of processes. Others represented more substantive changes

from the 1971 regulations and practice, including a new federal review process for denials and

conditions, a new interpretation of enforcement roles, and a new provision to allow Tribes to

obtain treatment as a state for Section 401-related purposes.

Federal Review Process for Denials and Conditions

The 2020 Rule addressed the role of federal licensing and permitting agencies in the certification

process, including those agencies’ authority to review certification decisions. Courts have held

that federal licensing and permitting agencies may not change or reject conditions imposed by

certifying authorities, including by imposing more stringent alternative conditions.221 Courts have

held, however, that the licensing or permitting agency must determine whether the certifying

authority has met the facial requirements of Section 401 before issuing a license or permit.222

The 2020 Rule required a certifying authority to provide written reasons for the denial or

conditions, along with specified supporting information to the federal licensing or permitting

agency.223 The 2020 Rule also newly required the federal permitting or licensing agency to

determine whether the state denial or certification conditions complied with the procedural

requirements of Section 401 and the 2020 Rule. If the federal permitting or licensing agency

determined that a certification denial did not include three elements as required in the rule, the

federal agency was required to determine that the certifying authority “fail[ed] or refuse[d] to act”

and therefore waived certification.224 Similarly, federal licensing and permitting agencies were

required to determine whether certification conditions included the two minimum elements

required by the 2020 Rule.225 If the federal agency determined that certification conditions did not

include the two elements, they similarly were required to determine that the certifying authority

“fail[ed] or refuse[d] to act” and the deficient certification condition would be waived. The

preamble to the 2020 Rule clarified that the federal agency review was “procedural in nature and

does not extend to substantive evaluations” of certifications, conditions, and denials.226

221 Sierra Club v. U.S. Army Corps of Eng’rs, 909 F.3d 635, 648 (4th Cir. 2018); City of Tacoma v. FERC, 460 F.3d 53,

67 (D.C. Cir. 2006); Am. Rivers, Inc. v. FERC, 129 F.3d 99, 107 (2d Cir. 1997); U.S. Dep’t of Interior v. FERC, 952

F.2d 538, 548 (D.C. Cir. 1992); Roosevelt Campobello Inter. Park v. EPA, 684 F.2d 1041, 1056 (1st Cir. 1982).

222 City of Tacoma, 460 F.3d at 67-68; Am. Rivers, Inc., 129 F.3d at 110-11; Keating v. FERC, 927 F.2d 616, 622-23,

625 (D.C. Cir. 1997).

223 2020 Rule, p. 42286.

224 Ibid. These three elements for denial of an individual license or permit are “(i) the specific water quality

requirements with which the discharge will not comply; (ii) a statement explaining why the discharge will not comply

with the identified water quality requirements; and (iii) if the denial is due to insufficient information, the denial must

describe the specific water quality data or information, if any, that would be needed to assure that the discharge from

the proposed project will comply with water quality requirements.” The rule listed similar elements for denial of a

general license or permit.

225 2020 Rule, p. 42286. These two elements for conditions on an individual license or permit are “(i) a statement

explaining why the condition is necessary to assure that the discharge from the proposed project will comply with water

quality requirements; and (ii) a citation to federal, state, or tribal law that authorizes the condition.” The rule listed

similar elements for conditions on a general license or permit.

226 2020 Rule, p. 42267.

Congressional Research Service

27

Clean Water Act Section 401: Overview and Recent Developments

The 2023 Rule limits federal agency review to verifying whether (1) the appropriate certifying

authority issued the decision; (2) the certifying authority confirmed it complied with its public

notice procedures; and (3) the certifying authority acted on the request for the certification within

the reasonable period of time.227 As discussed above, the 2023 Rule also newly clarifies what it

means “to act” on a request for certification.228 It also specifies information that should be

included in each written decision.229

Enforcement

The 2020 Rule also newly provided that the federal licensing or permitting agency (rather than

the certifying authority) would be responsible for enforcing certification conditions incorporated

into a federal license or permit.230 The preamble to the 2020 Rule stated that “the CWA does not

provide independent authority for certifying authorities to enforce the conditions that are included

in a certification under federal law.”231 Accordingly, it stated that EPA “is interpreting the CWA to

clarify that this enforcement role is reserved to the federal agency issuing the federal license or

permit.”232 This differs from 1971 regulations and practice, which did not expressly clarify

enforcement roles. According to an EPA webinar and the 2010 Guidance, depending on the state,

both the certifying authorities and the federal agencies played a role in enforcement under the

1971 regulations and in practice.233 EPA expressly declined to opine in the 2020 Rule on whether

the CWA authorizes citizen suits to enforce certification conditions pursuant to Section 505 of the

statute.234

In commenting on the proposed rule, some commenters agreed with this enforcement

approach.235 Others asserted that states and tribes should be allowed to independently enforce

their certification conditions.236 Some argued that the restriction on enforcement authority would

run afoul of Section 510 of the CWA, which reserves state and local governments’ authority to

enforce “any standard or limitation respecting discharges of pollutants” and “any requirement

respecting control or abatement of pollution” that is equally or more stringent than required under

the CWA, unless expressly provided for in the statute.237 EPA explained in the 2020 Rule

preamble that states may enforce certification conditions under state law (where state authority is

not preempted by federal law), and asserted that the rule therefore did not implicate Section

510.238 Some also argued that states and tribes, rather than the federal agency, have the technical

knowledge and capacity to conduct inspections and enforce certification conditions; and some

federal agencies noted that it could be challenging to enforce certain certification conditions.239

227 2023 Rule, p. 66663.

228 Ibid.

229 Ibid.

230 2020 Rule, p. 42275.

231 Ibid.

232 Ibid.

233 EPA Office of Water, Clean Water Act Section 401 Certification Rule Public Webinar, June 17, 2020,

https://19january2021snapshot.epa.gov/cwa-401/public-webinar-clean-water-act-section-401-certification-rule_.html.

See also 2010 Guidance, pp. 32-33.

234 2020 Rule, p. 42277.

235 2020 Rule, p. 42275.

236 Ibid.

237

2020 Rule, pp. 42275-42276. See also 33 U.S.C. §1370.

238 2020 Rule, p. 42276.

239 Ibid.

Congressional Research Service

28

Clean Water Act Section 401: Overview and Recent Developments

EPA responded that federal agencies remained free to consult with certifying authorities, and that

the rule’s limitations on the scope of certification and the new requirements for certifications with

conditions would provide sufficient clarity to enable federal agencies to effectively enforce

conditions.240

The 2023 Rule does not include regulatory text on enforcement. In the preamble, EPA states that

it is not finalizing any regulatory text on enforcement and is removing the 2020 Rule’s provision

because the provision “introduced ambiguity into the Agency’s longstanding position that nothing

in section 401 precludes states from enforcing certification conditions when authorized under

state law.”241 EPA also discusses a number of concerns identified by stakeholders regarding 401

enforcement.242 EPA notes in that discussion that stakeholders generally agreed that federal

agencies could enforce certification conditions but expressed concerns that the 2020 Rule

prevented states and Tribes from exercising their independent enforcement authority.243 Some of

these stakeholders raised concerns over federal agencies’ willingness or capacity to enforce

certifications and their conditions.244

Treatment as a State for Tribes Under Section 401

The CWA, like several other federal environmental laws, authorizes federally recognized Tribes

to be treated as states under certain circumstances. The 2023 Rule includes provisions for Tribes

to obtain treatment as a state (TAS) status for purposes of Section 401 certification or to obtain

TAS to act as a neighboring jurisdiction under Section 401(a)(2).245 Prior to this rule, Tribes did

not have this option unless they also applied for TAS for water quality standards under Section

303(c).246

Congressional Interest

Many Members have shown interest in Section 401 implementation in the past few Congresses.

Congress has held hearings that have included a discussion of Section 401, and some Members

have introduced legislation that either focused specifically on Section 401 or would amend

Section 401 within broader permitting reform bills.

In the 116th Congress, the Senate Committee on Environment and Public Works held a legislative

hearing on potential reforms to Section 401, including legislation introduced by the committee

chairman (S. 1087).247 S. 1087 and H.R. 2205, identical bills titled the Water Quality Certification

Improvement Act of 2019, would have amended Section 401. These bills were reintroduced in the

117th Congress (S. 1761, H.R. 3422) as the Water Quality Certification Improvement Act of 2021

240 Ibid.

241 2023 Rule, p. 66634.

242 2023 Rule, p. 66633.

243 Ibid.

244 Ibid.

245 2023 Rule, pp. 66651-66654, 66663-66664.

246 EPA, Clean Water Section 401 Water Quality Certification Improvement Rule Fact Sheet, September 2023, p. 4,

https://www.epa.gov/system/files/documents/2023-09/

Overview%20Fact%20Sheet%20on%20the%20Final%202023%20Rule_508.pdf.

247 U.S. Congress, Senate Committee on Environment and Public Works, Hearing on S. 1087, the Water Quality

Certification Improvement Act of 2019, and Other Potential Reforms to Improve Implementation of Section 401 of the

Clean Water Act: State Perspectives, 116th Cong., 2nd sess., November 19, 2019, S.Hrg. 116-145. The committee also

held a hearing on the same issue and introduced similar legislation (identical bills—S. 3303 and H.R. 6889) in the 115th

Congress.

Congressional Research Service

29

Clean Water Act Section 401: Overview and Recent Developments

and in the 118th Congress (S. 3082) as the Water Quality Certification Improvement Act of 2023.

The proposed changes would have narrowed the scope of water quality impacts that certifying

authorities may consider in their certification review, narrowed the scope of conditions certifying

authorities may impose, established a time limit for certifying authorities to request additional

information, and required certifying authorities to provide a written explanation of their

certification decision.

During the 2019 hearing on Section 401 reform, Members in the 116th Congress debated whether

proposed Section 401 reforms—whether through legislation such as the Water Quality

Certification Improvement Act of 2019 (S. 1087) or the 2019 Proposed Rule—were necessary.

Some Members argued that while the majority of states carry out their Section 401 certifications

in a responsible way, some are abusing their authority under the provision to block critical energy

infrastructure projects.248 Two state witnesses (the governors of Wyoming and Oklahoma) pointed

to examples, such as the state of Washington’s certification denial for the Millennium coal export

terminal, of states considering impacts beyond the scope of water quality in their certification

review.249 They indicated support for the proposed Section 401 reforms—in particular, the

reforms that would clarify the scope of reviews, clarify timelines, and require that certifying

authorities provide a clear basis for any certification denials.250

In contrast, some Members argued that states are appropriately using Section 401 authority to

protect the waters in their states. They criticized the proposed Section 401 reforms as

unnecessary, inappropriately restrictive regarding what activities and impacts a state can review

and the timeframes in which they can review them, and counter to the principle of cooperative

federalism.251 A state witness—a Senior Assistant Attorney General from Washington—similarly

criticized the proposed Section 401 reforms.252 She further argued that states have largely

demonstrated a fair and successful implementation of Section 401, and that efforts to reform

Section 401 appear to be based on disagreement with a few state decisions.253

In the 118th Congress, in addition to the 2023 Water Quality Certification Improvement Act, some

Members of Congress introduced other legislation involving Section 401. Several of these bills

were broader permitting reform bills that included proposed changes to Section 401.

•

•

Lower Energy Costs Act (H.R. 1 and S. 947, related bills) would have addressed

a broad range of changes to permitting and environmental review processes,

including to Section 401 certifications. Among other changes, the bills include a

provision titled “Water Quality Certification and Energy Project Improvement”

that would have narrowed the scope of certification reviews, as discussed below

under H.R. 1152. The House passed H.R. 1.

Promoting Interagency Coordination for Review of Natural Gas Pipelines Act

(H.R. 1115) would have provided that a Section 401 certification is not required

for applicants for gas pipeline projects. Instead, the bill would have required that

FERC incorporate Section 401 certification into its National Environmental

Policy Act (NEPA) review.

248 S.Hrg. 116-145, pp. 1, 111-112, 114-115.

249 S.Hrg. 116-145, pp. 6 and 20.

250 S.Hrg. 116-145, pp. 7 and 20.

251

S.Hrg. 116-145, pp. 3, 80, 109-110, 112-113, 200.

252 S.Hrg. 116-145, p. 28.

253 S.Hrg. 116-145, pp. 28-29.

Congressional Research Service

30

Clean Water Act Section 401: Overview and Recent Developments

•

•

•

•

The Water Quality Certification and Energy Project Improvement Act of 2023

(H.R. 1152) would have narrowed the scope of certification reviews to focus on

the discharge and would have specified that the scope of reviews and conditions

should be based only on the enumerated sections of the CWA and requirements

of state law implementing water quality criteria under Section 303. It also would

have limited “acting on” a request to granting or denying it, required certifying

authorities to identify all materials or information necessary to make a

certification decision within 90 days of receiving a request for certification, and

required that such authorities publish requirements for their certifications.

The Limit, Save, Grow Act of 2023 (H.R. 2811) would have addressed a broad

range of changes to permitting and environmental review processes, including to

Section 401 certifications. The bill included a provision titled “Promoting

Interagency Coordination for Review of Natural Gas Pipelines” that would have

included changes discussed above under H.R. 1115. It also included a provision

titled “Water Quality Certification and Energy Project Improvement” that would

have narrowed the scope of certification reviews, as discussed above under H.R.

1152.The House passed H.R. 2811.

H.Amdt. 579 to the Department of the Interior, Environment, and Related

Agencies Appropriations Act, 2024, would have prohibited funding for the

implementation and enforcement of the 2023 Rule. The amendment was agreed

to by voice vote in the House.

The RESTART Act (S. 1449) would have made a broad range of changes to

permitting and environmental review processes, including amendments to several

CWA provisions. The bill would have amended Section 401 to narrow state

authority with regard to the certification process. For example, it would have

narrowed the scope of review to consideration of certain enumerated sections of

the CWA as well as any applicable state or tribal regulatory requirements for

point source discharges into WOTUS. It would also have provided that licensing

and permitting agencies establish the reasonable period of time, either

categorically or on a case-by-case basis, and would have authorized such

agencies to enforce certification conditions. In addition, the bill would have

provided that a certifying authority’s decision to waive a certification would not

be subject to judicial review and would have set a timeline for further agency

action in instances where a federal court remands or vacates a certification. It

also would have defined what it means for a certifying authority to act.

Policy Options

Stakeholders continue to debate how CWA Section 401 should be implemented. Much of the

debate about Section 401 implementation centers on the appropriate balance of “cooperative

federalism” between federal agencies’ and states’ authorities. CWA Section 101(b) provides that

“it is the policy of the Congress to recognize, preserve, and protect the primary responsibilities

and rights of States to prevent, reduce, and eliminate pollution, to plan the development and use

(including restoration, preservation, and enhancement) of land and water resources, and to consult

with the Administrator in the exercise of his authority under this Act.” States and others who

opposed the changes to the Section 401 implementing regulations included in the 2020 Rule

argued that the changes undermined the CWA’s structure of cooperative federalism. Some

asserted that the rule inappropriately limited certifying authorities’ ability to protect their own

water resources. During the first Trump Administration, EPA argued that the 2020 Rule was

Congressional Research Service

31

Clean Water Act Section 401: Overview and Recent Developments

consistent with its role, established by Congress, to administer the CWA, which includes ensuring

“that there are sufficient authorities and limitations in place for States and Tribes to effectively

implement CWA programs within the scope that Congress established.”254 Many states supported

the broader authority returned to states under the 2023 Rule, and argued that the 2023 Rule

appropriately restored the state role in protecting and managing their own water resources.255

On its own, as discussed, the 2020 Rule included numerous changes to regulation and practice

that narrowed the authority of states when acting on Section 401 certification requests. The 2023

Rule returned some of that authority to states. However, recent legal and regulatory developments

pertaining to the scope of the CWA have also affected and may continue to affect states’ use of

their Section 401 certification authority. Notably, the Navigable Waters Protection Rule, which

EPA and USACE promulgated in April 2020, narrowed the definition of “waters of the United

States,” thereby reducing the number of waters and wetlands that fall under the jurisdiction of the

CWA. Like the 2020 Rule, the Navigable Waters Protection Rule was superseded by a new rule

redefining WOTUS (the 2023 WOTUS Rule).256

In June 2023, the Supreme Court decided Sackett v. EPA, adopting a narrower approach to CWA

jurisdiction and rejecting elements of the jurisdictional test that were present in the 2023 WOTUS

Rule.257 In its ruling, the Court construed the scope of what is considered WOTUS more narrowly

than the existing or previous regulatory interpretations. The USACE and EPA then issued a new

rule amending the 2023 WOTUS Rule to conform the regulatory definition to the Court’s

decision in Sackett.258 The 2023 WOTUS Rule, as amended by the conforming rule, remains

subject to litigation.259 Because Section 401 certifications are triggered by a potential discharge to

WOTUS (from an activity requiring a federal permit or license), a narrower interpretation of

WOTUS implies that Section 401 certifications may be triggered less often. A narrower scope of

WOTUS, if combined with a narrower scope for 401 certification reviews (such as any effort to

limit the scope of reviews to discharges or to limit reviews only to the effects on WOTUS), could

potentially widen the regulatory gap for nonfederal waters in some states and prevent states from

weighing in on some federal activities that may affect waters within their states. Some have

expressed concerns that this may impair states’ ability to protect their water resources.260 Others

assert that while states should have authority to manage and protect their waters, federal agencies

should maintain some authority over projects in the national interest.261

In the 119th Congress, Members may consider introducing legislation to amend Section 401 to

clarify congressional intent regarding some of the policy issues discussed in this report,

particularly regarding the certification timeframes, the scope of certification reviews and

254 2020 Rule, p. 42226.

255 EPA 2023 Press Release.

256 USACE and EPA, “Revised Definition of ‘Waters of the United States,’” 88 Federal Register 3004, January 18,

2023 (hereinafter 2023 WOTUS Rule).

257 598 U.S. 651 (2023).

258 USACE and EPA, “Revised Definition of ‘Waters of the United States’; Conforming,” 88 Federal Register 61964,

September 8, 2023.

259 Texas v. EPA, No. 3:23-cv-00017 (S.D. Tex. filed Jan. 18, 2023); West Virginia v. EPA, No. 3:23-cv-00032

(D.N.D. filed Feb. 16, 2023); Kentucky v. EPA, No. 3:23-cv-00007 (E.D. Ky. filed Feb. 22, 2023).

260 For example, see 2023 Rule, p. 66598. See also Movant-Intervenor States’ Motion to Intervene, p. 5, Louisiana v.

EPA, No. 2:23-cv-01714 (W.D. La. Jan. 12, 2024), ECF No. 40.

261 For example, see H. Hrg 118-69, pp. 1-2. See also American Gas Association, “AGA Joins Comments Aug. 8, 2022

Urging EPA to Clarify Regulations Governing State Clean Water Act 401 Water Quality Certifications,” press release,

August 2022, https://www.aga.org/research-policy/resource-library/aga-joins-comments-aug-8-2022-urging-epa-toclarify-regulations-governing-state-clean-water-act-401-water-quality-certifications/.

Congressional Research Service

32

Clean Water Act Section 401: Overview and Recent Developments

conditions, and the roles of certifying authorities and federal licensing or permitting agencies

(e.g., enforcement roles and roles in establishing the reasonable period of time). As has been

considered in recent sessions of Congress, this legislation could be freestanding or it could be

included as part of broader permitting reform legislation. Alternatively, Congress may consider

overseeing implementation of the 2023 Rule to distinguish between aspects of the rule that may

be working well and any potential areas that might benefit from clarification or other changes. In

selecting policy options, Congress may consider the interaction between recent and any future

changes to the definition of WOTUS and the indirect impact it may have on Section 401

certifications.

Congressional Research Service

33

Clean Water Act Section 401: Overview and Recent Developments

Appendix. CWA Section 401 (33 U.S.C. §1341)

Section 401. (a)(1) Any applicant for a Federal license or permit to conduct any activity

including, but not limited to, the construction or operation of facilities, which may result in any

discharge into the navigable waters, shall provide the licensing or permitting agency a

certification from the State in which the discharge originates or will originate, or, if appropriate,

from the interstate water pollution control agency having jurisdiction over the navigable waters at

the point where the discharge originates or will originate, that any such discharge will comply

with the applicable provisions of Sections 301, 302, 303, 306, and 307 of this act. In the case of

any such activity for which there is not an applicable effluent limitation or other limitation under

Sections 301(b) and 302, and there is not an applicable standard under Sections 306 and 307, the

State shall so certify, except that any such certification shall not be deemed to satisfy Section

511(c) of this act. Such State or interstate agency shall establish procedures for public notice in

the case of all applications for certification by it and, to the extent it deems appropriate,

procedures for public hearings in connection with specific applications. In any case where a State

or interstate agency has no authority to give such a certification, such certification shall be from

the Administrator. If the State, interstate agency, or Administrator, as the case may be, fails or

refuses to act on a request for certification, within a reasonable period of time (which shall not

exceed one year) after receipt of such request, the certification requirements of this subsection

shall be waived with respect to such Federal application. No license or permit shall be granted

until the certification required by this section has been obtained or has been waived as provided in

the preceding sentence. No license or permit shall be granted if certification has been denied by

the State, interstate agency, or the Administrator, as the case may be.

(2) Upon receipt of such application and certification the licensing or permitting agency shall

immediately notify the Administrator of such application and certification. Whenever such a

discharge may affect, as determined by the Administrator, the quality of the waters of any other

State, the Administrator within thirty days of the date of notice of application for such Federal

license or permit shall so notify such other State, the licensing or permitting agency, and the

applicant. If, within sixty days after receipt of such notification, such other State determines that

such discharge will affect the quality of its waters so as to violate any water quality requirement

in such State, and within such sixty-day period notifies the Administrator and the licensing or

permitting agency in writing of its objection to the issuance of such license or permit and requests

a public hearing on such objection, the licensing or permitting agency shall hold such a hearing.

The Administrator shall at such hearing submit his evaluation and recommendations with respect

to any such objection to the licensing or permitting agency. Such agency, based upon the

recommendations of such State, the Administrator, and upon any additional evidence, if any,

presented to the agency at the hearing, shall condition such license or permit in such manner as

may be necessary to insure compliance with applicable water quality requirements. If the

imposition of conditions cannot insure such compliance such agency shall not issue such license

or permit.

(3) The certification obtained pursuant to paragraph (1) of this subsection with respect to the

construction of any facility shall fulfill the requirements of this subsection with respect to

certification in connection with any other Federal license or permit required for the operation of

such facility unless, after notice to the certifying State, agency, or Administrator, as the case may

be, which shall be given by the Federal agency to whom application is made for such operating

license or permit, the State, or if appropriate, the interstate agency or the Administrator, notifies

such agency within sixty days after receipt of such notice that there is no longer reasonable

assurance that there will be compliance with the applicable provisions of Sections 301, 302, 303,

306, and 307 of this act because of changes since the construction license or permit certification

Congressional Research Service

34

Clean Water Act Section 401: Overview and Recent Developments

was issued in (A) the construction or operation of the facility, (B) the characteristics of the waters

into which such discharge is made, (C) the water quality criteria applicable to such waters or (D)

applicable effluent limitations or other requirements. This paragraph shall be inapplicable in any

case where the applicant for such operating license or permit has failed to provide the certifying

State, or, if appropriate, the interstate agency or the Administrator, with notice of any proposed

changes in the construction or operation of the facility with respect to which a construction

license or permit has been granted, which changes may result in violation of Section 301, 302,

303, 306, or 307 of this act.

(4) Prior to the initial operation of any federally licensed or permitted facility or activity which

may result in any discharge into the navigable waters and with respect to which a certification has

been obtained pursuant to paragraph (1) of this subsection, which facility or activity is not subject

to a Federal operating license or permit, the licensee or permittee shall provide an opportunity for

such certifying State, or, if appropriate, the interstate agency or the Administrator to review the

manner in which the facility or activity shall be operated or conducted for the purposes of

assuring that applicable effluent limitations or other limitations or other applicable water quality

requirements will not be violated. Upon notification by the certifying State, or if appropriate, the

interstate agency or the Administrator that the operation of any such federally licensed or

permitted facility or activity will violate applicable effluent limitations or other limitations or

other water quality requirements such Federal agency may, after public hearing, suspend such

license or permit. If such license or permit is suspended, it shall remain suspended until

notification is received from the certifying State, agency, or Administrator, as the case may be,

that there is reasonable assurance that such facility or activity will not violate the applicable

provisions of Section 301, 302, 303, 306, or 307 of this act.

(5) Any Federal license or permit with respect to which a certification has been obtained under

paragraph (1) of this subsection may be suspended or revoked by the Federal agency issuing such

license or permit upon the entering of a judgment under this act that such facility or activity has

been operated in violation of the applicable provisions of Section 301, 302, 303, 306, or 307 of

this act.

(6) Except with respect to a permit issued under Section 402 of this act, in any case where

actual construction of a facility has been lawfully commenced prior to April 3, 1970, no

certification shall be required under this subsection for a license or permit issued after April 3,

1970, to operate such facility, except that any such license or permit issued without certification

shall terminate April 3, 1973, unless prior to such termination date the person having such license

or permit submits to the Federal agency which issued such license or permit a certification and

otherwise meets the requirements of this section.

(b) Nothing in this section shall be construed to limit the authority of any department or agency

pursuant to any other provision of law to require compliance with any applicable water quality

requirements. The Administrator shall, upon the request of any Federal department or agency, or

State or interstate agency, or applicant, provide, for the purpose of this section, any relevant

information on applicable effluent limitations, or other limitations, standards, regulations, or

requirements, or water quality criteria, and shall, when requested by any such department or

agency or State or interstate agency, or applicant, comment on any methods to comply with such

limitations, standards, regulations, requirements, or criteria.

(c) In order to implement the provisions of this section, the Secretary of the Army, acting through

the Chief of Engineers, is authorized, if he deems it to be in the public interest, to permit the use

of spoil disposal areas under his jurisdiction by Federal licensees or permittees, and to make an

appropriate charge for such use. Moneys received from such licensees or permittees shall be

deposited in the Treasury as miscellaneous receipts.

Congressional Research Service

35

Clean Water Act Section 401: Overview and Recent Developments

(d) Any certification provided under this section shall set forth any effluent limitations and other

limitations, and monitoring requirements necessary to assure that any applicant for a Federal

license or permit will comply with any applicable effluent limitations and other limitations, under

Section 301 or 302 of this act, standard of performance under Section 306 of this act, or

prohibition, effluent standard, or pretreatment standard under Section 307 of this act, and with

any other appropriate requirement of State law set forth in such certification, and shall become a

condition on any Federal license or permit subject to the provisions of this section.

Author Information

Laura Gatz

Specialist in Environmental Policy

Kate R. Bowers

Section Research Manager

Disclaimer

This document was prepared by the Congressional Research Service (CRS). CRS serves as nonpartisan

shared staff to congressional committees and Members of Congress. It operates solely at the behest of and

under the direction of Congress. Information in a CRS Report should not be relied upon for purposes other

than public understanding of information that has been provided by CRS to Members of Congress in

connection with CRS’s institutional role. CRS Reports, as a work of the United States Government, are not

subject to copyright protection in the United States. Any CRS Report may be reproduced and distributed in

its entirety without permission from CRS. However, as a CRS Report may include copyrighted images or

material from a third party, you may need to obtain the permission of the copyright holder if you wish to

copy or otherwise use copyrighted material.

Congressional Research Service

R46615 · VERSION 7 · UPDATED

36