EPA’s Vessel General Permits:

Background and Issues

name redacted

Specialist in Resources and Environmental Policy

October 12, 2016

Congressional Research Service

7-....

www.crs.gov

R42142

EPA’s Vessel General Permits: Background and Issues

Summary

In November 2011 the Environmental Protection Agency (EPA) proposed two Clean Water Act

(CWA) permits to regulate certain types of vessel discharges into U.S. waters. The proposed

permits would replace a single Vessel General Permit (VGP) issued in 2008 that was due to

expire in December 2013. As proposed, the permits would apply to approximately 71,000 large

domestic and foreign vessels and perhaps as many as 138,000 small vessels. This universe of

regulated entities is diverse as well as large, consisting of tankers, freighters, barges, cruise ships

and other passenger vessels, and commercial fishing vessels. Their discharges are similarly

diverse, including among other pollutants aquatic nuisance species (ANS), nutrients, pathogens,

oil and grease, metals, and toxic chemical compounds that can have a broad array of effects on

aquatic species and human health, many of which can be harmful.

EPA proposed two permits, one for large vessels to replace the 2008 VGP, and one for smaller

vessels covered by a congressionally enacted temporary moratorium. Both were proposed well in

advance of the VGP’s expiration to provide ample time for the regulated community to prepare

for new requirements. On March 28, 2013, EPA issued a final version of the VGP for large

vessels. It took effect December 19, 2013. The permit for smaller vessels, the sVGP, was issued

on September 10, 2014, and was scheduled to take effect on December 19, 2014. However, in

December 2014, Congress passed legislation (S. 2444/P.L. 113-281) extending until December

18, 2017, the date when small vessels will need a CWA permit.

The CWA requires that all regulated discharges must meet effluent limitations representing

applicable levels of technology-based control. The 2013 VGP largely retains the current permit’s

approach of relying on best management practices to control most discharges, because EPA

concluded that it is infeasible to develop numeric effluent limits for most controlled discharges.

However, the new VGP includes for the first time numeric ballast water discharge limits, which

are consistent with standards in a 2012 Coast Guard rule and an international convention.

The 2013 VGP raises two key issues. One concerns inclusion of specific numeric ballast water

discharge limits in the permit. At issue had been whether EPA would propose more stringent

numeric limits, as some environmental groups have favored and a few states have already

adopted. A second issue concerns the role of states in regulating vessel discharges.

Environmental groups and Canadian shippers challenged the 2013 permit in federal court. In

October 2015, the court supported the environmentalists’ challenge, ruling that the permit

violated the CWA because it did not require the use of best available technology to control

discharges of invasive species from ships’ ballast water. The court remanded the permit to EPA,

but did not vacate it; the permit remains in effect until EPA issues a new permit.

Congressional interest in this topic has been evident for some time. In 2008 Congress enacted two

bills to exempt certain vessels from a CWA permit requirement, thus restricting the population of

vessels subject to the VGP. One was a permanent permit moratorium for recreational vessels of

all sizes. The other act was a temporary permit moratorium for small commercial vessels and

commercial fishing vessels, which was extended twice by Congress and would have expired

December 18, 2014, had Congress not enacted an additional three-year extension in P.L. 113-281.

In the 114th Congress, bills addressing the temporary permit moratorium for small vessels and

regulation of ballast water discharges have been introduced (S. 373/H.R. 980 and S. 371). The

Senate Commerce Committee approved S. 373 in February 2015; the committee also included

provisions of this bill in S. 2829, which the Senate passed in June 2016, and S. 1611. Further, the

House has passed H.R. 4909, which includes the text of H.R. 980 as one title of that bill.

Congressional Research Service

EPA’s Vessel General Permits: Background and Issues

Contents

Background: Clean Water Act Requirements .................................................................................. 1

The 2008 Vessel General Permit and 2011 Draft Vessel General Permits ................................ 2

The 2013 VGP for Large Vessels .................................................................................................... 4

Ballast Water Requirements ...................................................................................................... 5

Non-Ballast Water Requirements .............................................................................................. 7

Additional Requirements for Certain Vessel Classes ................................................................ 8

Economic Impacts, Benefits, and Uncertainties........................................................................ 9

Issues ............................................................................................................................................. 10

Ballast Water Standards........................................................................................................... 10

Federal Preemption and State Role ......................................................................................... 12

Legal Challenges to the VGP ........................................................................................................ 14

Congressional Interest ................................................................................................................... 15

Small Vessel Permit Moratorium ............................................................................................ 15

Ballast Water Standards Legislation........................................................................................ 16

Appendixes

Appendix A. The sVGP ................................................................................................................. 18

Appendix B. Discharges Incidental to the Normal Operation of Military Vessels ........................ 20

Contacts

Author Contact Information .......................................................................................................... 21

Congressional Research Service

EPA’s Vessel General Permits: Background and Issues

I

n November 2011 the Environmental Protection Agency (EPA) proposed two Clean Water Act

permits to regulate certain types of discharges from vessels into U.S. waters. The proposed

permits would replace a single permit issued by EPA in 2008 that was due to expire in

December 2013. As proposed, the two permits would apply to approximately 71,000 large

domestic and foreign vessels and perhaps as many as 138,000 small vessels. This universe of

regulated entities is diverse as well as large, consisting of tankers, freighters, barges, cruise ships

and other passenger vessels, and commercial fishing vessels. Their regulated discharges are

similarly diverse, including among other pollutants non-native aquatic nuisance species (ANS),

nutrients, pathogens, oil and grease, metals, and toxic chemical compounds that can have a broad

array of effects on aquatic species and human health, many of which can be harmful.

Developing and administering a regulatory program covering sources so numerous and different

from one another is more complicated than for other currently regulated sources. Because the

sources themselves are mobile and move between jurisdictions, the traditional mechanism of

regulating through state-issued permits is problematic. Many regulated vessels are small entities;

thus, the economic impacts of regulatory requirements are an important consideration. Identifying

technology-based treatment systems and management practices that can control vessel discharges

effectively and economically presents many challenges.

The two permits proposed by EPA in 2011 included one (draft VGP) for large vessels to replace

the 2008 VGP, and one for smaller vessels covered by a congressionally enacted temporary

moratorium (draft sVGP). On March 28, 2013, EPA issued a final version of the VGP for large

vessels. It became effective on December 19, 2013. The permit for smaller vessels was issued on

September 10, 2014; it was scheduled to become effective on December 19, 2014, but Congress

passed a three-year extension as part of P.L. 113-281.

This report is an overview of the revised VGP for large vessels and two key issues: inclusion of

numeric performance standards to limit ballast water discharges from vessels, and controversies

about the role of states in regulating vessel discharges. It also reviews the final sVGP for small

vessels and Congress’s recent interest in these issues.

Background: Clean Water Act Requirements

The Clean Water Act (CWA) prohibits the discharge of pollutants from a point source into the

navigable waters of the United States without a permit. Vessels are defined in the statute as point

sources. In 1973, EPA promulgated a regulation that excluded discharges incidental to the normal

operation of vessels (including ballast water, but not including vessel sewage discharges, which

are regulated under CWA Section 312) from CWA permitting requirements. This long-standing

regulation was challenged in federal district court by environmental advocacy groups who wanted

EPA to address ballast water as a source of ANS in U.S. waters. In 2005 the court found that

Congress had directly expressed its intention that discharges from vessels be regulated under the

CWA, and that the 1973 regulation contradicted that intention. In September 2006 the court

issued a final order vacating (revoking) the regulatory exclusion as of September 30, 2008, and

remanding the ruling to EPA for further proceedings. The Ninth Circuit U.S. Court of Appeals

upheld the district court’s ruling on July 23, 2008.1 On June 17, 2008, EPA proposed two CWA

general permits in response to the court’s 2006 order, one applicable to commercial vessels and

one applicable to small recreational vessels.2

1

Northwest Environmental Advocates v. U.S. Environmental Protection Agency, 537 F.3d 1006 (9 th Cir. 2008).

2

U.S. Environmental Protection Agency, “Draft National Pollutant Discharge Elimination System (NPDES) General

(continued...)

Congressional Research Service

1

EPA’s Vessel General Permits: Background and Issues

CWA permits are either individual permits issued to specific facilities or general permits. Both

types of permit are issued for a specific period of time (not to exceed five years), after which the

permit must be renewed. A general permit covers multiple facilities within a specific category

having common elements, such as similar types of operations that discharge the same types of

wastes. Because of the large number of potential sources of vessels,3 EPA believed that it made

administrative sense to use general permits, rather than individual permits. In August 2008, the

federal district court agreed to EPA’s request to delay vacating the regulatory exemption for three

months, to ensure that permits could be issued before the exemption was eliminated. EPA

finalized a Vessel General Permit for vessels subject to a permit requirement on December 18,

2008. The permit became effective on December 19, 2008. However, on the same day, the federal

district court granted an EPA motion to delay vacating the existing regulatory exclusion until

February 6, 2009. Thus, the effective date remained December 19, 2008, but regulated sources

were not required to comply with terms of the permit until February 6, 2009.

The 2008 Vessel General Permit and 2011 Draft Vessel

General Permits

In July 2008, Congress enacted two bills to exempt discharges incidental to the normal operation

of certain types of vessels from CWA permitting, thus restricting the population of vessels subject

to EPA regulation. The first measure, P.L. 110-288, the Clean Boating Act of 2008, exempted

discharges incidental to the normal operation of recreational vessels of all sizes from CWA

permitting requirements.4 The legislation directed EPA and the Coast Guard to create a regulatory

regime under new CWA Section 312(o); EPA is currently developing regulations for recreational

vessels, as required by the legislation.5

The second measure, P.L. 110-299, provided a two-year moratorium on CWA permitting for

certain discharges from commercial fishing vessels of all sizes and non-recreational vessels less

than 79 feet in length. This moratorium has been extended three times. First, it was extended to

December 18, 2013, by P.L. 111-215. During the moratorium, EPA was directed to study the

discharges from these vessels and submit a report to Congress.6 The 112th Congress extended the

permit moratorium for one more year, until December 18, 2014, in P.L. 112-213. And in the 113th

Congress, legislation providing an additional three-year extension, until December 18, 2017, was

enacted as part of a Coast Guard reauthorization bill (S. 2444/P.L. 113-281). Ballast water

discharges from vessels less than 79 feet in length are not affected by the moratorium (although

EPA believes that few of these smaller vessels use or discharge ballast water) and are required to

be authorized by permits. (See “Small Vessel Permit Moratorium” for discussion of legislation.)

(...continued)

Permits for Discharges Incidental to the Normal Operation of Vessels,” 73 Federal Register 34296-34304, June 17,

2008.

3

EPA estimated that the universe of vessels potentially affected by the court’s order and proposed permits could

include over 13 million recreational boats and 98,000 commercial fishing, passenger, cargo and other vessels operating

in U.S. waters.

4

The CWA defines recreational vessels to mean any vessel that is manufactured or used primarily for pleasure, or that

is leased, rented, or chartered to a person for the pleasure of that person. CWA Section 502(25); 33 U.S.C. 1362(25).

5

See http://water.epa.gov/lawsregs/lawsguidance/cwa/vessel/CBA/about.cfm.

6

U.S. Environmental Protection Agency, Study of Discharges Incidental to Normal Operation of Commercial Fishing

Vessels and Other Non-Recreational Vessels Less Than 79 Feet, August 2010, http://water.epa.gov/polwaste/npdes/

vessels/Report-to-Congress.cfm.

Congressional Research Service

2

EPA’s Vessel General Permits: Background and Issues

However, P.L. 110-288 and P.L. 110-299 did not exempt or provide a permitting moratorium for

all discharges from all types of vessels. Thus, the Vessel General Permit (VGP) finalized by EPA

in December 2008 gave permit coverage to an estimated 72,000 vessels larger than 79 feet in

length used in a transportation capacity that were not affected by the moratorium in P.L. 110-299,

including tankers, freighters, barges, and cruise ships, and it also applied to ballast water

discharges from vessels covered by the moratorium.7 It applied to pollutant discharges, including

ballast water, that are incidental to the normal operation from non-recreational vessels that are 79

feet or more in length, and to ballast water discharges from commercial vessels of less than 79

feet and commercial fishing vessels of any length. Geographically, it applied to discharges into

waters of the United States in all states and territories, extending to 3 miles from the baseline (i.e.,

shoreline).8

In the 2008 permit, EPA identified 26 types of waste streams or discharge types from the normal

operation of covered vessels (some are not applicable to all vessel types). The types of pollutant

discharges subject to the permit included ANS (also known as invasive species), nutrients,

pathogens, oil and grease, metals, and pollutants with toxic effects.

The CWA requires that all point source discharges must meet effluent limitations representing

applicable levels of technology-based control. Under the 2008 VGP, EPA concluded that, based

on available information, it was not practicable to derive numeric effluent limits to achieve

technology-based controls for many of the discharge types regulated under the permit. Thus, most

discharges covered by the 2008 VGP were controlled by specific best management practices

(BMPs), many of which were already in use.9 Some vessel categories, such as cruise ships, were

subject to more detailed requirements for discharges such as graywater (water from showers,

baths, sinks, and laundry facilities) and pool and spa water. Monitoring, recordkeeping, and

reporting requirements applied, as well.

Procedurally, vessels larger than 79 feet or more than 300 gross tons (an estimated 50,000

domestic and foreign vessels) were required to submit a Notice of Intent (NOI) to be covered by

the permit. Smaller regulated vessels were automatically covered. There were no permit fees.

Projected industry compliance costs (including paperwork requirements) ranged from a low of

$8.9 million to $23.0 million annually; they varied based on assumptions of vessel populations

affected and the number of instances in which incremental costs would be incurred.

In anticipation of the expiration of the 2008 VGP on December 18, 2013, in November 2011, EPA

proposed two Vessel General Permits, one for large vessels (draft VGP) to replace the 2008 VGP,

and one for smaller vessels to authorize discharges from vessels covered by the congressionally

enacted temporary moratorium (draft sVGP).

Both draft permits proposed to regulate discharges from 26 types of waste streams (like the 2008

VGP), plus an additional waste stream category—fish hold effluent. Pollutants in these waste

streams can include ANS, nutrients, pathogens, oil and grease, metals, and toxic chemical

compounds. Both draft permits largely retained the 2008 permit’s approach of relying on specific

behaviors or BMP techniques to control most regulated discharges, as EPA again concluded that it

is infeasible to develop numeric effluent limits for most controlled discharges covered by the

7

U.S. Environmental Protection Agency, “Final National Pollutant Discharge Elimination System (NPDES) General

Permit for Discharges Incidental to the Normal Operation of a Vessel,” 73 Federal Register 79473-79481, December

29, 2008.

8

Discharges incidental to the normal operation of military vessels are not subject to the EPA permit; see Appendix B.

9

BMPs include practices that generally are preventive in nature, such as vessel maintenance techniques or training

personnel in use of on-board equipment to minimize pollutant discharges.

Congressional Research Service

3

EPA’s Vessel General Permits: Background and Issues

permit. The draft VGP for larger vessels contained several changes that are discussed below—

notably, including for the first time numeric ballast water discharge limits, more stringent effluent

limits for oil-to-sea interfaces and exhaust gas scrubber washwater, as well as specifications to

manage fish hold effluent. Both draft permits included streamlined recordkeeping and reporting

requirements, modifying aspects of the 2008 VGP, such as allowing electronic recordkeeping and

requiring an annual report in lieu of a one-time report and annual noncompliance report.

On March 28, 2013, after reviewing over 5,500 public comments on the draft permit, EPA issued

a final permit to replace the 2008 VGP.10 Requirements of the final permit are similar to the draft

VGP. Smaller vessels continued to be covered by the congressional moratorium provided by P.L.

112-213 until December 18, 2014. If the moratorium had expired without further congressional

action, smaller vessels would have been subject to the sVGP beginning on December 19.11

However, as described below, Congress enacted an extension of the moratorium until December

18, 2017.

The following sections of this report provide an overview of EPA’s revised VGP for large vessels

and two issues of particular interest—requirements concerning ballast water management, and

federal and state roles. It reviews recent congressional interest in these topics. Appendix A

describes the sVGP for smaller vessels, now superseded by congressional action.

The 2013 VGP for Large Vessels

The 2013 final VGP applies to seven categories of vessels operating in a capacity of

transportation that have discharges incidental to their normal operations into waters subject to the

permit: commercial fishing including fish processing, freight barge, freight ship, passenger

vessel, tank barge, tank ship, and utility vessel. Freight barges (such as open and covered dry

cargo barges, 68% of total), tank barges (e.g., liquid cargo barges, 12%), and utility vessels (such

as research vessels and tug vessels, 11%) account for the majority of the 58,600 domestic vessels

eligible for coverage under the VGP. Of the 12,430 foreign vessels eligible for coverage, freight

ships (e.g., container ships) account for 66%, and tank ships (such as oil tankers) account for 28%

of the total. Like the 2008 VGP, “waters subject to the permit” means “waters of the United

States,” including the territorial seas as defined in the CWA and extending to 3 miles from the

baseline.

EPA concluded that requiring all covered vessels to submit an NOI indicating coverage under the

replacement VGP would be administratively impracticable, so the permit does not require

operators of vessels smaller than 300 gross tons and with capacity to carry less than 8 cubic

meters (2,113 gallons) of ballast water to submit NOIs. Consequently, more than 10,000 vessels

would be automatically covered by the permit without submitting an NOI. This is essentially the

same approach used in the 2008 VGP. However, all covered vessels are subject to the permit’s

requirements and must complete a Permit Authorization and Record of Inspection form and

maintain that form on board at all times. The purpose of the form, according to EPA, is to confirm

10

U.S. Environmental Protection Agency, “Final National Pollutant Discharge Elimination System (NPDES) General

Permit for Discharges Incidental to the Normal Operation of a Vessel; Notice of final permit issuance,” 78 Federal

Register 21928-21945, April 12, 2013. Full text of the permit and accompanying permit fact sheet and economic

analysis are available at http://cfpub.epa.gov/npdes/vessels/vgpermit.cfm#final.

11

U.S. Environmental Protection Agency, “Final National Pollutant Discharge Elimination system (NPDES) Small

Vessel General Permit for Discharges Incidental to the Normal Operation of Vessels Less Than 79 Feet,” 79 Federal

Register 53702-53707, September 10, 2014. Full text of the sVGP and accompanying permit fact sheet and economic

and benefits analysis are available at http://water.epa.gov/polwaste/npdes/vessels/Small-Vessel-General-Permit.cfm.

Congressional Research Service

4

EPA’s Vessel General Permits: Background and Issues

that vessels owners and operators have read the terms of the VGP and understand their obligation

to comply.

As noted above, CWA permits normally are issued for a specific period of time, not to exceed five

years, with a provision for reapplying for further permit coverage prior to the expiration date.

EPA had proposed a four-year permit term for the draft VGP, as a way to ensure that the permit

keeps pace with developing technologies, especially for ballast water treatment, but the final

permit provides a five-year term, consistent with most EPA-issued CWA permits.12

The 2013 permit’s principal ballast water and non-ballast modifications of the 2008 VGP are

discussed next, along with EPA’s economic and benefits analysis.

Ballast Water Requirements

Ballast water discharge has been identified as a major pathway for the introduction of ANS. Ships

use large amounts of ballast water for stability during transport. Ballast water is often taken on in

the coastal waters in one region after ships discharge wastewater or unload cargo, and then

discharged at the next port of call, wherever more cargo is loaded, which reduces the need for

compensating ballast. Thus, the practice of taking on and discharging ballast water is essential to

the proper functioning of ships, because the water that is taken in or discharged compensates for

changes in the ship’s weight as cargo is loaded or unloaded, and as fuel and supplies are

consumed. However, ballast water discharge typically contains a variety of biological materials,

including non-native ANS that can alter aquatic ecosystems. Concern about harmful impacts of

ballast water discharge was the core of the legal challenge by environmental groups to EPA’s

1973 regulations, which ultimately led to issuance of the 2008 VGP.

The ballast water requirements of the 2008 VGP are minimal, largely requiring what current

Coast Guard rules require—primarily use of ballast water exchange, or BWE. The 2008 permit

mandates mid-ocean BWE for ships traveling outside the 200-nautical-mile exclusive economic

zone (EEZ) of the United States. This requirement already applies under a 2004 Coast Guard rule

(codified at 33 C.F.R. Part 151). EPA’s VGP also requires BWE at least 50 nautical miles from

shore for vessels engaged in Pacific nearshore voyages, which are not covered by the Coast

Guard’s mandatory exchange procedures. Further, the 2008 VGP requires vessels that declare

they have “no ballast on board” either to seal the ballast tanks to prevent any discharge or to carry

out saltwater flushing. The 2008 permit requires vessel operators to maintain a log book and

records of ballast water management and submit reports of noncompliance to EPA annually.

The 2008 VGP does not include numeric limits on living organisms or pathogenic discharges,

which some environmental groups have advocated that EPA issue. EPA explained this position in

a fact sheet accompanying the 2008 permit.13

EPA is not requiring any numeric treatment standards for the discharge of living

organisms as part of this permit issuance and is instead requiring management practices

(e.g. ballast water exchange) that decrease the risk of ANS introduction. EPA is

proposing this approach because treatment technologies that effectively reduce viable

living organisms in a manner that is safe, reliable, and demonstrated to work onboard

12

U.S. Environmental Protection Agency, 2013 Final Issuance of National Pollutant Discharge Elimination System

(NPDES) Vessel General Permit (VGP) for Discharges Incidental to the Normal Operation of Vessels, Fact Sheet,

November 30, 2011, p. 12. Hereinafter, VGP Fact Sheet.

13

U.S. Environmental Protection Agency, 2008 Final Issuance of National Pollutant Discharge Elimination System

(NPDES) Vessel General Permit (VGP) for Discharges Incidental to the Normal Operation of Vessels Fact Sheet,

December 2008, pp. 62-63.

Congressional Research Service

5

EPA’s Vessel General Permits: Background and Issues

vessels are not yet commercially available ... [R]equiring a numeric effluent limit for the

discharge of living organisms is not practicable, achievable, or available at this time....

EPA will consider establishing treatment requirements in the next generation of permits

that will provide for compliance with treatment standards that will be expressed as units

of living or viable organisms per unit of volume in ballast water discharge.

While the 2013 VGP contains a number of ballast water BMP and recordkeeping requirements

similar to the 2008 permit, the 2013 permit departs from the 2008 permit by specifying ballast

water numeric discharge limits. By replacing the non-numeric limitation for ballast water in the

2008 VGP with numeric limits, EPA expects that the changes will achieve significant reductions

in the number of living organisms discharged via ballast water into waters subject to the permit.

The VGP sets the numeric effluent limits for ballast water in terms of maximum acceptable

concentration of living organisms per cubic meter discharged, as shown in the text box below. As

discussed further below (see “Ballast Water Standards”), EPA now concludes that treatment

technologies are available to meet limits in the VGP, and the requirements are economically

practicable and economically achievable.

Ballast Water Numeric Discharge Limits in the 2013 VGP

1. For organisms greater than or equal to 50 micrometers in minimum dimension: discharge must include fewer than

10 living organisms per cubic meter of ballast water.

2. For organisms less than 50 micrometers and greater than or equal to 10 micrometers: discharge must include

fewer than 10 living organisms per milliliter (mL) of ballast water.

3. Indicator microorganisms must not exceed:

—For Toxicogenic Vibrio cholerae (serotypes O1 and O139): a concentration of less than 1 colony forming unit (cfu)

per 100 mL.

—For Escherichia coli: a concentration of fewer than 250 cfu per 100 mL.

—For intestinal enterococci: a concentration of fewer than 100 cfu per 100 mL.

The numeric limits in the VGP are identical to performance standards specified in the

International Maritime Organization’s (IMO’s) 2004 International Convention for the Control and

Management of Ships’ Ballast Water and Sediment.14 They also are the same as standards

finalized by the Coast Guard in 2012 under 33 C.F.R. Part 151 and 46 C.F.R. Part 162.15 Many

ballast water treatment systems produce or use biocides as a disinfection agent to reduce living

organisms present in the ballast water tank, but discharges of such substances may cause or

14

The IMO, a body of the United Nations, sets international maritime vessel safety and marine pollution standards.

Numeric discharge limits in the IMO ballast water convention, referred to as the D-2 standards, will enter into force 12

months after ratification by at least 30 nations, representing 35% of the world merchant shipping tonnage. As of April

2016, this convention had been ratified by 44 nations, representing 34.79% of the world merchant shipping tonnage,

but has not entered into force. The United States has not ratified the convention.

15

U.S. Department of Homeland Security, Coast Guard, “Standards for Living Organisms in Ships’ Ballast Water

Discharged in U.S. Waters; Final rule,” 77 Federal Register 17254-17320, March 23, 2012. This rule, as proposed in

2009, would have provided standards in two phases. Under that proposal, if a practicability review shows it is feasible,

more stringent Phase 2 standards would apply by January 1, 2016, to new vessels constructed after that date and

existing vessels that have not installed a ballast water management system by that date. The proposed Phase 2 standards

would set concentration limits 1,000 times more stringent than Phase 1 standards for the smallest viable organisms and

also would set limits on the discharge concentration for bacteria and viruses. However, the final Coast Guard rule

promulgated in March 2012 defers the Phase 2 standard, pending assessment of additional data on available technology

and development of a subsequent rule with an economic and environmental analysis to support a Phase 2 standard. The

Coast Guard’s authority for these rules is the Nonindigenous Aquatic Nuisance Prevention and Control Act, as

amended by the National Invasive Species Act (16 U.S.C. 4701 et seq.). The Coast Guard rule does not apply to ballast

water discharges from military vessels; see Appendix B.

Congressional Research Service

6

EPA’s Vessel General Permits: Background and Issues

contribute to violation of applicable water quality standards. Thus, the VGP also includes biocide

effluent limitations to protect aquatic life. The permit sets limits of 200 micrograms per liter

(µg/l) of chlorine dioxide, 500 µg/l of peracetic acid, 100 µg/l of ozone, and 1,000 µg/l of

hydrogen peroxide.

Vessels may comply with the concentration-based numeric treatment limits in one of four ways:

(1) discharge treated ballast water meeting the applicable numeric limits (i.e., by using treatment

technology); (2) transferring the ship’s ballast water to a third party for on-shore treatment; (3)

use treated municipal/potable water as ballast water; or (4) by not discharging ballast water. EPA

estimates that approximately 2,880 domestic and 5,270 foreign vessels are potentially subject to

the ballast water standards because they operate with on-board ballast water tanks, and the agency

anticipates that about 40% of covered vessels will comply by installing a ballast water treatment

system. EPA has concluded that several treatment technologies capable of meeting the permit’s

numeric limits are commercially and economically available now for shipboard installation.

Under the VGP, new vessels constructed after December 1, 2013, must comply with the permit’s

numeric limits upon delivery. EPA determined that it would be infeasible to require all existing

vessels to be fitted with ballast water treatment systems with a one-to-two year schedule. Thus,

the permit requires existing vessels, constructed before December 1, 2013, to comply under a

staggered schedule.

Existing vessels with ballast water capacity of less than 1,500 cubic meters must

comply by the time of their first scheduled drydocking after January 1, 2016.

Existing vessels with ballast water capacity of more than 1,500 and less than

5,000 cubic meters must comply by the time of their first scheduled drydocking

after January 1, 2014.

Existing vessels with ballast water capacity greater than 5,000 cubic meters must

comply by the time of their first scheduled drydocking after January 1, 2016.

This time schedule is consistent with the timelines in the Coast Guard’s March 2012 rules,

described above. The IMO D-2 standard includes a phased schedule for similar ballast water

capacity sizes of vessels, but with slightly different implementation dates.

Certain vessel classes would not be subject to the ballast water numeric limits in the VGP. These

include vessels engaged in short-distance voyages (e.g., they travel no more than 10 nautical

miles), unmanned and unpowered barges, small inland and seagoing vessels (less than 3,000

gross tons), and existing bulk carrier vessels built before January 1, 2009, that operate solely

within the Great Lakes (commonly known as Lakers). In general, according to EPA, these vessels

face a number of challenges for managing ballast water, and in the case of existing Lakers there

currently are no available treatment systems. Thus EPA has concluded that it is more appropriate

to require these vessels to use BMPs such as avoiding discharge of ballast water in

environmentally sensitive areas, but not require compliance with numeric limits. EPA will follow

the state of technologies currently being tested for Lakers and will consider revising permit

requirements during the term of the permit if technologies become available.16

Non-Ballast Water Requirements

The 2013 VGP contains several more stringent effluent limits/BMPs than in the 2008 VGP for

certain vessel discharges. First, it requires all vessels to use “environmentally acceptable

16

VGP Fact Sheet, p. 101. Lakers built after January 1, 2009, must meet ballast water treatment limits in the permit.

Congressional Research Service

7

EPA’s Vessel General Permits: Background and Issues

lubricants” on mechanical and other equipment that operate at the sea interface, such as wire rope

or cables, unless technically infeasible. Vessel operators often use lubricants to maintain the

functionality of such equipment, which can release quantities of oil or grease to water. The permit

also requires maintenance BMPs to prevent leaks that could lead to oil discharges.

Second, the permit prescribes BMPs to reduce discharges of fish hold effluent, which was not

covered by the 2008 VGP. Commercial fishing vessels use various methods to store seafood after

it is caught. Fish hold effluent is composed of seawater, melted ice, or ice slurry that is collected

inside fish hold tanks. It contains pollutants such as biological wastes and nutrients which result

from seafood catch. In addition, because holding tanks often are cleaned or disinfected between

catches, the resulting effluent can contain organic material, oils, nutrients, and bacteria and

viruses. BMPs specified in the permit are intended to minimize the discharge of fish hold water

and ice while vessels are stationary at a pier.

Third, the VGP includes numeric limits to control discharge to water of harmful exhaust

emissions from engines that power ocean going vessels. The permit sets numeric limits and

monitoring requirements for pH, turbidity, polycyclic aromatic hydrocarbons (PAHs), and nitrates

plus nitrites. The limits are consistent with guidelines established by the IMO to implement

engine and fuel standards in Annex VI of the International Convention for the Prevention of

Pollution from Ships (MARPOL 73/78).17

The permit also includes certain administrative modifications of the 2008 VGP, which requires

owners/operators to self-inspect their vessels routinely as well as annually in more detail and keep

written records. The 2008 permit allowed use of electronic recordkeeping systems, and the 2013

permit includes provisions clarifying how such systems are to be maintained in forms as readable

and legally dependable as a paper equivalent. All vessels must report electronically, unless

specifically exempted. The 2013 VGP modifies the earlier permit’s reporting requirements by

consolidating requirements for an annual noncompliance report as part of an annual report,

instead of calling for separate reports.

Additional Requirements for Certain Vessel Classes

Under the 2008 VGP, cruise ships are subject to more detailed requirements for certain

discharges, such as graywater and pool and spa water, and additional monitoring and reporting.

These additional requirements recognize that cruise ships generate considerably more graywater

discharges than a container or cargo ship, and onboard amenities such as photo developing and

dry cleaning produce chemicals that are toxic to the aquatic environment and, thus, are not

authorized by the permit.18 The 2008 VGP includes BMPs as well as numeric effluent limits for

fecal coliform and residual chlorine in cruise ship discharges of graywater that are based on U.S.

Coast Guard rules for discharge of treated sewage or graywater in Alaska. It also includes

operational limits on cruise ship graywater discharges in nutrient-impaired waters, such as

Chesapeake Bay or Puget Sound. The 2013 VGP retains the same numeric limits for graywater

discharges, but tightens operational limits: cruise ships are prohibited from discharging graywater

within 3 nautical miles of shore (rather than 1 nautical mile from shore under the 2008 VGP)

17

MARPOL is an international treaty that regulates discharges from vessels. It includes several annexes that regulate

specific types of vessel pollution, such as oil, garbage, and plastic. In the United States, MARPOL is primarily

implemented by the Act to Prevent Pollution from Ships (33 U.S.C. 1901). The Coast Guard is the lead agency for

implementing this statute.

18

For background information, see CRS Report RL32450, Cruise Ship Pollution: Background, Laws and Regulations,

and Key Issues, by (name redacted) .

Congressional Research Service

8

EPA’s Vessel General Permits: Background and Issues

unless it has been treated to the standards specified in the permit. In general, the 2013 permit

includes the same requirements for large (more than 500 passengers) and medium cruise ships

(carrying 100 to 499 passengers), but with some flexibility for the latter category because of

differences in graywater holding capacity and operation.

The 2013 VGP also includes additional requirements for large ferries (to minimize potential

spills, drips, and leaks associated with carrying vehicles), barges (to prevent contamination of

condensation with oily or toxic materials), oil and petroleum tankers (to protect against

environmentally harmful discharges of oil during cargo loading and unloading), research vessels

(to authorize only discharges for the purpose of conducting research on the aquatic environment

or its natural resources), and emergency vessels (specifically to allow discharges incidental to the

public safety responsibilities of firefighting and similar boats).

Economic Impacts, Benefits, and Uncertainties

EPA estimates that the total annual incremental costs of implementing the VGP will range from

$7.2 million to $23.0 million (in 2010$) for domestic vessels.19 For vessels covered by this

permit, these costs would be in addition to previous costs for complying with the 2008 VGP,

described above. About 90% of the costs of the permit are associated with requirements

mandating the use of environmentally acceptable lubricants, followed by those for ballast water.

Further, EPA’s estimates of compliance costs do not include the capital costs of installing,

operating, and maintaining ballast water treatment systems, as these costs were previously

estimated by the Coast Guard in its 2009 regulatory proposal to be approximately $168 million

per year and thus represent baseline for estimating costs of the 2013 VGP.

The average per vessel compliance costs of the 2013 permit range between $51 and $7,004,

depending on the number of applicable discharge categories and existing baseline practices. Tank

ships are expected to have the highest average compliance costs, due to potential incremental

costs for oil tankers exclusively engaged in coastwise trade that may install onboard ballast water

treatment systems to comply with the 2013 permit. Overall, EPA concludes that the estimated

compliance costs generally represent a small share of per vessel operating revenue. Thus, meeting

the 2013 VGP permit requirements is economically practicable and achievable for permittees.20

The principal benefits of the VGP will be reduced risk of ANS introduction and enhanced

environmental quality from reduced pollutants, according to EPA. EPA concludes that the

permit’s ballast water management practices—including discharge standards, monitoring, and

reporting—should reduce the number of ANS invasions, thus preventing significant future

damages to fisheries, water-based recreation and tourism, biodiversity and ecosystems, threatened

and endangered species, human health, and infrastructure. However, the agency cannot quantify

these benefits.

[T]he complexity of analyzing the probability of ANS introduction and spread, the wide

range and varied nature of impacts ANS invasions can cause, and the great breadth of the

scope of this Permit prohibit EPA from developing a quantified estimate of these

benefits.21

19

EPA did not estimate compliance costs for foreign vessels subject to the VGP.

U.S. Environmental Protection Agency, Economic and Benefits Analysis of the Proposed 2013 Vessel General

Permit (VGP), October 30, 2011, p. x. EPA updated overall compliance cost estimates but did not issue a revised

economic analysis when it issued the final 2013 VGP.

21

Ibid., p. 137.

20

Congressional Research Service

9

EPA’s Vessel General Permits: Background and Issues

Likewise, EPA concludes that the permit’s controls on specific discharges, as well as its general

housekeeping requirements, can be expected to generate both monetized benefits—such as

preventing fishery closures and adverse human health impacts and increasing recreation

opportunities—and nonmonetized benefits—such as preventing further stress on biodiversity and

ecosystems. The magnitude of benefits is not calculable, according to EPA.22

EPA acknowledged significant uncertainty about several assumptions affecting estimated costs of

the VGP, including uncertainty regarding discharge control practices currently implemented and

the number of vessels expected to implement new practices. There also is uncertainty, EPA said,

about costs of certain treatment systems, such as for bilge water, and practices such as use of

environmentally acceptable lubricants, because of limited data and unknowns about applicability

to different vessels. As a result, EPA concluded that its estimates should be interpreted as

illustrative of a range of incremental costs, not as a precise account of costs that a vessel owner

may incur for any specific vessel.23

Issues

Two prominent issues raised by the 2013 VGP are questions about inclusion of specific numeric

ballast water discharge limits in the permit, and controversies about the role of states in regulating

vessel discharges.

Ballast Water Standards

Many observers expected EPA to propose numeric limits in the next iteration of the VGP after the

2008 permit, in view of the IMO and Coast Guard performance standards, which were

promulgated in 2012. At issue had been whether EPA would propose more stringent numeric

limits, as some environmental advocacy groups favor and a few states have already adopted.

Anticipating expiration of the 2008 VGP, in 2010 EPA requested two reports to advise the agency

on possible changes to the permit’s ballast water management requirements. First, EPA and the

Coast Guard jointly asked the National Research Council (NRC) of the National Academy of

Sciences to evaluate the state of the science to support a quantitative approach to setting ballast

water discharge standards, that is, specific numeric limits. The two agencies sought advice to

better understand the relationship between concentrations of living organisms in ballast water

discharges and the probability of ANS successfully establishing populations in U.S. waters, that

is, whether setting maximum permissible limits on live organisms in ballast effluent can

adequately protect against establishment of ANS in aquatic systems. The resulting NRC report

concluded that the density of organisms released in a ballast discharge is “but one of scores of

variables that can and do influence invasion outcome.”24 The NRC concluded that, while a

benchmark discharge standard that reduces the concentration of organisms below levels achieved

by open-sea BWE is an important first step, additional research is needed in order to focus on the

relationship between the quantity, quality, and frequency of release and the risk of successful

invasion by ANS.

22

Ibid., p. 145.

Ibid., p. 114.

24

National Research Council, Committee on Assessing Numeric Limits for Living Organisms in Ballast Water,

Assessing the Relationship Between Propagule Pressure and Invasion Risk in Ballast Water, June 2011, p. 5,

http://www.nap.edu/catalog.php?record_id=13184.

23

Congressional Research Service

10

EPA’s Vessel General Permits: Background and Issues

Second, EPA asked its Science Advisory Board (SAB) to provide advice on technologies and

systems to minimize the impacts of ANS in vessel ballast water discharge. EPA requested the

SAB to assess whether existing shipboard treatment technologies can reach specified

concentrations of organisms in vessel ballast water, how these technologies might be improved in

the future, and how to overcome limitations in existing data. The SAB’s overarching

recommendation in its report25 is that, rather than relying solely on numeric standards, the agency

should adopt a risk-based approach to minimize impacts of invasive species in vessel ballast

water discharge, including methods to reduce invasion events, process and environmental

monitoring, containment, and eradication. The SAB found that several existing technologies have

been demonstrated that are capable of meeting the IMO D-2/Coast Guard and more stringent

standards, but that technology is not available to reliably test for standards 100 or 1,000 times

more stringent than the IMO standard, such as the Phase 2 standard included in the 2009 Coast

Guard proposal26 or those adopted by California and New York.27 Reaching a more stringent

standard would require new treatment systems that have not been tested in order to determine

their practicality and cost, according to the SAB.

These reports clearly influenced EPA’s development of the 2011 draft VGP, which proposed to

harmonize the permit’s requirements for controlling ANS in ballast water discharge with the

numeric limits in the IMO D-2 standards/Coast Guard rule, plus continued use of BMPs. EPA

referenced both reports in explaining its conclusion that a more rapid implementation schedule

than in the IMO D-2 standard is not economically achievable at this time, nor are more stringent

numeric discharge limits practicable at this time. In particular, EPA concluded that data cited by

the California State Lands Commission to justify that state’s more stringent discharge limits “are

not adequate to determine whether any of the treatment systems can meet a significantly more

stringent limit than that proposed for this permit term.”28

Nevertheless, EPA recognized that some commenters would urge the agency to require numeric

limits more stringent than the IMO D-2/Coast Guard standards. Many environmental groups and

some states have argued, for example, that setting a higher standard will better protect water

quality from ANS invasion while also serving as incentive to industry to develop technology that

meets the standard. Thus, EPA requested public comment on the appropriateness of the proposed

ballast water controls in the draft VGP and whether to adopt alternative treatment limits (such as

the California standards), as well as whether additional management measures discussed in the

25

U.S. Environmental Protection Agency Science Advisory Board, Efficacy of Ballast Water Treatment Systems: A

Report by the EPA Science Advisory Board, EPA-SAB-11-009, July 12, 2011.

26

The March 2012 final Coast Guard rule does not include Phase 2 standards. See infra footnote 15.

27

California Public Resources Code Section 71200, enacted in 2006. In response to the law, the California State Lands

Commission promulgated standards 1,000 times more stringent than the IMO D-2/Coast Guard proposed Phase 1

standards and requiring compliance beginning January 1, 2009. California’s rules also prohibit discharge of detectable

living organisms for the largest size classes of organisms (greater than 50 micrometers in size). However, the SAB

found that it is not reasonable to assume that current ballast water management systems are able to reliably meet or

closely approach a “no detectable living organism” standard. In 2008 the New York Department of Environmental

Conservation (DEC) promulgated rules requiring existing vessels to treat ballast waters to a level 100 times more

stringent than the IMO D-2 standard in January 2013. Vessels built after that date must include technology to treat

ballast water to the same level as California’s standards. However, in February 2012, the DEC announced that it would

delay the effective date of these more stringent standards until December 19, 2013 (the day after expiration of the 2008

VGP).

28

U.S. Environmental Protection Agency, 2011 Proposed Issuance of National Pollutant Discharge Elimination

System (NPDES) Vessel General Permit (VGP) for Discharges Incidental to the Normal Operation of Vessels, Draft

Fact Sheet, November 30, 2011, p. 83.

Congressional Research Service

11

EPA’s Vessel General Permits: Background and Issues

NRC or SAB reports (such as managing ballast uptake or reducing ballast water discharge

volumes) should be incorporated in the permit.

In the 2013 final VGP, EPA retained the position taken in the 2011 draft VGP that, based on

current treatment and monitoring technologies, more stringent standards, such as California’s,

cannot be supported. EPA continues to agree with the NAS that establishing precise, quantifiable

ballast water discharge standards more stringent than the IMO D-2/Coast Guard standards is not

possible at this time. The final permit does not include additional management measures as a

general requirement. However, the 2013 permit acknowledges unique vulnerabilities of the Great

Lakes system to ANS invasion through ballast water discharges, and it includes additional

protection for these waters. It requires all vessels that operate outside the EEZ and more than 200

nm from any shore to conduct saltwater flushing of ballast tanks before entering Great Lakes

waters through the Saint Lawrence Seaway System. Also, all vessels that are equipped to carry

ballast water and that enter the Great Lakes must conduct open ocean ballast water exchange.

Federal Preemption and State Role

Preemption of state regulatory programs with a uniform national standard has been a key issue in

dispute concerning efforts to regulate discharges from vessels, including ballast water discharges.

The CWA permits EPA to authorize qualified states to administer the act’s principal permitting

program under Section 402, and EPA has done so for 46 states. Pursuant to CWA Section

402(c)(1), after such authorization, EPA suspends issuance of permits in lieu of the state. In other

situations when EPA has issued a CWA general permit covering a similar category of

dischargers,29 the EPA general permit only applies in non-authorized states where EPA retains

permitting authority.30 In such cases, the EPA general permit typically is the model for a general

permit issued directly by the authorized state; the state-issued permit must be at least as stringent

as the EPA permit, but can be more stringent. Further, CWA Section 510 allows states to adopt

standards, discharge limitations, or other requirements more stringent than federal rules, meaning

that if a state were to assume the responsibility to issue vessel permits under the CWA, it could do

so with alternative requirements no less stringent than the federal requirements. States often want

the flexibility to require standards more stringent than federal, and this general authority in the

statute gives states the ability to tailor and strengthen their implementation of federal water

quality programs to address local conditions and circumstances.

However, because vessels are mobile and frequently travel between jurisdictions, allowing

individual states to issue CWA permits to vessels would be administratively more complex than

issuing a permit to a factory or other stationary source. Thus, both the 2008 VGP and final 2013

VGP uniquely apply to vessel discharges into U.S. waters in all states and territories, regardless of

whether a state is authorized to administer other aspects of CWA permitting.31 By preempting

states from issuing CWA permits for discharges incidental to the normal operation of vessels, the

29

For example, EPA’s Multisector General Permit (MGSP) covers stormwater discharges from approximately 4,100

industrial facilities in 29 sectors. EPA’s Pesticide General Permit (PGP), issued in October 2011, authorizes point

source discharges from the application of pesticides to U.S. waters; this permit will regulate discharges from about

365,000 pesticide applicators.

30

Idaho, Massachusetts, New Hampshire, and New Mexico, plus the District of Columbia and most of the U.S.

territories.

31

EPA explains that it may issue permits in the 46 authorized states for discharges covered by the VGP because the

discharges included in the VGP were formerly excluded from state CWA permitting programs (until the 2006 court

ruling previously described, see “Background: Clean Water Act Requirements”) and are not considered part of any

currently authorized state program. 2013 VGP Fact Sheet, pp. 15-16.

Congressional Research Service

12

EPA’s Vessel General Permits: Background and Issues

possibility of vessels being subject to potentially conflicting conditions as they move between the

waters of different states is theoretically precluded.

However, even without issuing CWA permits, a number of states are effectively requiring vessels

to meet their own discharge requirements beyond the VGP through a procedure called 401

certification. Under CWA Section 401, an applicant for a federal license or permit to conduct any

activity that may result in a discharge to waters of the United States must provide the federal

agency with a Section 401 certification. The certification, made by the state in which the

discharge originates, declares that the discharge will comply with applicable provisions of the

CWA, including state-established water quality standards. Section 401 provides states with two

distinct powers: one, the power indirectly to deny federal permits or licenses by withholding

certification; and two, the power to impose conditions upon federal permits by placing limitations

on certification. Where states impose conditions on a federal permit—such as the VGP—the

permittee must meet the additional state limitations as conditions of the federal permit. Prior to

issuance of the 2013 VGP, 25 states certified the permit with additional permit conditions

covering one or more of the 27 effluent streams. Of the 25 states, 14 certified the permit with

conditions applicable to ballast water discharges, either with specific numeric discharge

standards, or with more general language prohibiting nuisance conditions or other conditions in

order to protect state waters.32

A group of commercial shipping operators challenged the state certifications under the 2008

federal permit, contending that the shipping industry is placed in the difficult regulatory position

of being subject to a single federal permit with multiple state requirements.33 In federal court, the

vessel operators argued that EPA should have provided notice and opportunity for comment

before promulgating the final permit, which included the state certifications. They also argued

that EPA erred by failing to consider possible effects and costs of compliance with state

conditions. The court rejected the challenge, stating in its ruling that under the CWA, EPA does

not have the power to amend or reject state certifications, which must be attached to the permit.

The court wrote that petitioners do have recourse, including a challenge in state court to

certification conditions imposed by a particular state, a challenge in federal or state court if they

believe that a particular state’s law imposes an unconstitutional burden on interstate commerce, or

seeking modification of the CWA.34

States also have used their authority to issue state permits independent of the VGP. Both the

commercial shipping industry and environmental groups have challenged these state actions, on

differing grounds, but courts have generally upheld the permits. For example, a Minnesota

appellate court upheld the state’s permit despite challenges from an environmental group alleging

that the state did not perform an adequate water quality impact review before issuing the permit

and that the state failed to impose numeric limitations for ANS. Additionally, Michigan’s

permitting program and New York’s 401 certification of the 2008 federal permit were upheld after

challenges by shipping industry groups.35

The role of states in implementing the VGP is likely to remain an issue. EPA plans to provide a

clearinghouse of information and other tools to track development of each state’s 401 conditions.

32

See U.S. Environmental Protection Agency, Final 2013 VGP, Vessel General Permit for Discharges Incidental to the

Normal Operation of Vessels (VGP), March 28, 2013, Section 6, http://www.epa.gov/npdes/pubs/vgp_permit2013.pdf.

33

For comparison, 10 states certified the 2008 VGP with ballast water conditions.

34

Lake Carriers’ Association v. EPA, 652 F.3d 1, 10 (D.C. Cir 2011).

35

Mariel Yarbrough, “Ballast Water Permits Survive Challenges,” SandBar, a publication of The National Sea Grant

Law Center, vol. 8, no. 3 (2009), pp. 9-12.

Congressional Research Service

13

EPA’s Vessel General Permits: Background and Issues

Legal Challenges to the VGP

Some environmental advocacy groups criticized the 2013 final permit, asserting that it does not

include adequate requirements to stop or reduce the spread of invasive species. Challenges to the

final permit were filed by the Natural Resources Defense Council, Inc. and the Northwest

Environmental Advocates, and the National Wildlife Federation, among others, in several federal

appeals courts. All of the challenges were consolidated in the U.S. Court of Appeals for the

Second Circuit in New York.

Another party in the consolidated legal challenge to the 2013 permit is the Canadian Shipowners

Association (CSA), which asked the court to review the VGP’s January 1, 2014, deadline for

implementing best available technology for ballast water management systems. At issue is the

fact that the Coast Guard has been granting compliance extensions to its ballast water rules

because of unavailability of certified technologies.36 The association argued that the deadline in

the VGP, which does not provide for similar extensions, was not realistic—a point that EPA has

conceded. EPA officials stated in congressional hearings that enforcement action against vessels

that are unable to install Coast Guard-approved technology to meet the numerical limits in the

2013 VGP would have a low priority for the agency. In April 2014, the federal court granted

CSA’s request to stay the January 1, 2014, VGP deadline for vessels operated by CSA members,

and subsequently the court agreed to a joint request by CSA and EPA to sever the shippers’

petition for review from the environmental groups’ challenge.

In October 2015, the court ruled on the environmentalists’ challenge and found that EPA acted

arbitrarily and capriciously in issuing parts of the 2013 VGP.37 The court stated that, in choosing

the IMO standard to control ballast water discharges, EPA did not adequately explain why

standards higher/more stringent than the IMO standard should be used, given available

technology. The court noted that the Science Advisory Board’s 2011 report, discussed previously,

identified a number of technologies, including onshore treatment, that can achieve standards

higher than IMO for one or more organism sizes, which would require only “reasonable/feasible

modifications.” The court said that EPA should have adjusted its standard in light of available

technologies discussed in the SAB report, or explained why it would not do so.

The court also agreed with environmentalists that EPA’s decision to exempt Lakers built before

2009 from numeric effluent limits of the VGP was arbitrary and capricious. The court said that

EPA’s belief that there is a lack of supply of updated shipboard systems for Lakers to meet

numeric standards was not a legitimate reason to exempt pre-2009 Lakers from the 2013 VGP.

The court remanded the permit to EPA for proceedings consistent with the opinion, but allowed

the 2013 permit to remain in place until EPA issues a new VGP. The Canadian Shipowners

Association’s challenge to the 2013 VGP is in abeyance until EPA issues its response to the

October 2015 remand order.

36

Coast Guard rules require owners and operators of vessels to install treatment technologies that have been certified

by two Coast Guard-approved, third-party laboratories. Because no technological system has yet attained approval, the

Coast Guard has granted two-year extensions to nearly 350 vessels.

37

Natural Resources Defense Council et al. v. EPA, No. 13-1745, 2nd Cir., Oct. 5, 2015.

Congressional Research Service

14

EPA’s Vessel General Permits: Background and Issues

Congressional Interest

Congressional interest in this topic has been evident for some time—as reflected in the bills

enacted in 2008 and described previously to exempt certain vessels from a CWA permit

requirement.

Small Vessel Permit Moratorium

As discussed above, a permit moratorium for small non-recreational vessels and commercial

fishing vessels enacted in 2008 was temporary, but was extended twice by Congress until

December 18, 2014. The sVGP was to apply to these vessels, if the moratorium had expired

without congressional action.

Several bills that included provisions to make that moratorium permanent were introduced in the

113th Congress. These bills included H.R. 3464, which the House passed in May 2014 as a

provision of H.R. 4005; S. 2094, approved by the Senate Commerce and Transportation

Committee in July 2014; and S. 2963, approved by the Senate Environment and Public Works

Committee in December 2014. Supporters of proposals in these bills argued that small vessels

covered by the current moratorium—commercial fishing vessels and other small non-recreational

vessels—contribute little pollution and are not sources of invasive species, so a permanent permit

exemption is appropriate. Others disagree with this view and argued that because of

environmental concerns over vessel discharges, a permanent permit moratorium is inappropriate.

Other legislation, to provide a one-year extension of the permit moratorium, also was introduced

(H.R. 5769 and S. 2943). The House passed H.R. 5769 on December 3, 2014. Some supporters of

the approach in these bills said that a short-term extension would allow for comprehensive

congressional attention to a number of vessel issues, including ballast water standards, in the

114th Congress.

As the date for the expiration of the moratorium approached, on December 10, 2014, the Senate

and House passed legislation (S. 2444/P.L. 113-281) that includes a three-year extension of the

small vessel moratorium, until December 18, 2017. (See Appendix A for details of the sVGP that

would have become effective without this congressional action.)

Ballast water discharges from vessels less than 79 feet in length are not affected by the

moratorium and are required to be authorized by permits. According to EPA, owners and

operators of small vessels that discharge ballast water can seek coverage either under the general

permit for large vessels, requiring compliance with numeric standards (see “Ballast Water

Requirements” above), or the general permit for small vessels, which took effect December 18,

2014. As described in Appendix A, the sVGP prescribes best management practices (BMPs) for

ballast water discharges, not numeric standards.

In the 114th Congress, several bills that would make the existing temporary permit moratorium for

small vessels permanent have been introduced. These bills are S. 371, a bill that only addresses

the permit moratorium, and S. 373/H.R. 980, bills that also address ballast water standards, as

described next. The Senate Commerce, Science, and Transportation Committee approved S. 373

in February 2015, and it later included the text of the bill as titles of S. 2829, the Maritime

Administration Authorization and Enhancement Act for Fiscal Year 2017, which the Senate

passed by voice vote on June 29, 2016, and S. 1611, Coast Guard Authorization Act of 2015.

Congressional Research Service

15

EPA’s Vessel General Permits: Background and Issues

Ballast Water Standards Legislation

Legislation addressing regulation and management of ballast water discharges that can contribute

aquatic invasive species into U.S. waters has been introduced in Congress a number of times

since 2000. In the 112th Congress, two House Transportation and Infrastructure Committee

subcommittees held a hearing that focused on how best to address invasive species problems.

Since then, several legislative proposals have sought to harmonize ballast water management

requirements in a single authority to be implemented by the Coast Guard, including provisions of

H.R. 2838, which the House passed in 2011.This legislation would establish a single federal

ballast water management standard (i.e., the IMO D-2/Coast Guard numeric standard described

previously). The legislation would supersede existing state standards or permits for any discharge

incidental to the normal operation of a commercial vessel, although states could develop a ballast

water inspection and enforcement program. It also would supersede EPA’s ballast water

management requirements under the CWA. Upon enactment of the legislation, state 401

certifications for ballast water discharge in the 2008 VGP would expire. The Coast Guard would

have the primary role for enforcing the ballast water performance standard.

In December 2012, Congress enacted H.R. 2838 with a number of modifications (P.L. 112-213).

First, as noted previously, it extended for one additional year the moratorium on CWA permit

requirements for small vessels that was first enacted in P.L. 110-299. Second, it deleted all of the

comprehensive ballast water management requirements in the House-passed bill.

In the 113th Congress, similar legislation to establish nationally uniform ballast water discharge

standards (S. 2094) was approved by the Senate Commerce, Science, and Transportation

Committee in July 2014, but no further action occurred.

In the 114th Congress, legislation addressing ballast water standards similar to S. 2094 has been

introduced: S. 373 and H.R. 980.38 As noted above, these bills also would make permanent the

existing temporary permit moratorium for small non-recreational vessels and commercial fishing

vessels.

The Senate Commerce Subcommittee on Oceans, Atmosphere, Fisheries, and Coast Guard held a

hearing on issues concerning regulation and management of discharges incidental to the normal

operation of vessels on February 4, 2015. Maritime industry witnesses discussed the overlapping

Coast Guard and EPA regulatory requirements, and they also discussed concerns with additional

state-imposed requirements. Two weeks later, the full committee approved S. 373, the Vessel

Incidental Discharge Act. As approved, the bill is similar to the legislation that the committee

approved in the 113th Congress, with some amendments. The amended bill would allow a state to

adopt or enforce a more stringent ballast water performance standard if the Coast Guard

determines that compliance with the state standard is achievable and is consistent with obligations

under relevant international treaties or agreements. A second amendment would require vessels to

conduct saltwater flushing of ballast water tanks prior to entering the Great Lakes (as they are

required to do under the 2012 Coast Guard rule). As described above, the Commerce Committee

subsequently included the text of S. 373 as titles of S. 2829, the Maritime Administration

Authorization and Enhancement Act for Fiscal Year 2017, which the Senate passed by voice vote

on June 29, 2016, and S. 1611, the Coast Guard Authorization Act of 2015.

Further, on May 18, the House passed H.R. 4909, the National Defense Authorization Act for

FY2017. Title XXXVI of this bill, as passed, is identical to the text of H.R. 980. In the Statement

38

For additional discussion of the legislation, see CRS Report R44181, The Vessel Incidental Discharge Act:

Background and Issues, by (name redacted) .

Congressional Research Service

16

EPA’s Vessel General Permits: Background and Issues

of Administration Policy on H.R. 4909, the Administration indicated that it objects to this title of

the bill.39 The Senate-passed companion bill to H.R. 4909 (S. 2943) does not contain similar

provisions.

39

Executive Office of the President, Office of Management and Budget, Statement of Administration Policy, H.R.

4909, National Defense Authorization Act for Fiscal Year 2017, May 16, 2016.

Congressional Research Service

17

EPA’s Vessel General Permits: Background and Issues

Appendix A. The sVGP

On September 10, 2014, EPA issued notice of final permit issuance of the sVGP for small vessels.

This general permit was scheduled to become effective on December 19, 2014, unless the existing

temporary permit moratorium were extended by congressional action—as in S. 2444, passed by

Congress on December 10 (see “Small Vessel Permit Moratorium”). By announcing this final

permit more than three months ahead of the effective date, EPA intended to give affected vessel

owners and operators sufficient lead time to meet the permit’s requirements.

The 2014 sVGP was to apply to non-military, non-recreational vessels operating in a capacity of

transportation that are less than 79 feet in length. EPA estimated that approximately 115,000 to

138,000 domestic and 156 foreign vessels were potentially subject to the sVGP. They include

various types of commercial fishing vessels, tugs and towing vessels, water taxis and small

ferries, tour boats, and various other types of vessels used for non-recreational purposes.

Approximately 68,000 are commercial fishing vessels, comprising the largest category, which

includes vessels involved in fish catching, fish processing, and charter fishing. The second-largest

category is “unspecified” vessels (totaling 27,000), followed by passenger vessels (21,000), such

as charter fishing vessels and harbor cruise vessels.40

These vessels were excluded from the 2008 VGP by the initial moratorium in P.L. 110-299, which

Congress subsequently extended—most recently to December 18, 2017, in S. 2444.

The sVGP would have regulated several categories of discharges, including fuel management,

engine and oil control, solid and liquid waste management, vessel hull maintenance, graywater,

fish hold effluent, and ballast water. It prescribed BMPs such as preventive maintenance of

engines and fuel tanks to minimize the occurrence of leaks and spills that could release fuel or oil

to receiving waters, and the minimization of graywater discharges that may contain soaps and

detergents or nutrients into sensitive water bodies and confined waters. Most of the practices are

already widely implemented by vessels subject to the draft sVGP, according to EPA.

EPA concluded that few vessels covered by the sVGP are affected by ballast water management

requirements, because vessels less than 100 feet long typically do not load and discharge ballast

or rely on ballast for stability. However, for vessels less than 79 feet long that do use ballast as a

stability enhancer, the sVGP prescribed BMPs, because in EPA’s view, no existing treatment

systems are believed to have been developed for vessels with these small amounts of ballast

water. Appropriate ballast water management BMPs include avoiding or minimizing ballast water

uptake in areas with a high potential to contain harmful organisms and only discharging the

minimal amounts of ballast water necessary in U.S. coastal and inland waters.

Because of the large universe of vessels covered by the sVGP, EPA determined that requiring all

of these vessels to submit an NOI would be an extremely large administrative burden. Further,

requiring an NOI for these vessels would be of little value, because of the limited range of

discharge types and the reduced likelihood that they will introduce significant quantities of toxic

and conventional pollutants to waterways.41 However, like the VGP, EPA would have required all

vessel operators covered by the permit to comply with its requirements, including signing an

40

As previously described, Congress permanently exempted recreational vessels of all size from CWA permit

requirements in P.L. 110-288 (see “The 2008 Vessel General Permit and 2011 Draft Vessel General Permits”).

41

U.S. Environmental Protection Agency, 2014 Final Issuance of National Pollutant Discharge Eliminations System

(NPDES) Small Vessel General Permit (sVGP) for Discharges Incidental to the Normal Operation of Vessels Less than

79 Feet (sVGP) Fact Sheet, p. 14.

Congressional Research Service

18

EPA’s Vessel General Permits: Background and Issues

sVGP Permit Authorization and Record of Inspection form and maintaining that form onboard at

all times. The terms of the sVGP would expire five years after the permit’s effective date.

EPA made several changes in the 2014 sVGP, compared with the 2011 draft permit. For example,

the final permit added a condition that accumulated bilgewater must be removed, to the extent

practicable, prior to transporting a vessel from one waterbody to another over land.

Overall, EPA estimated that the sVGP requirements could result in total annual costs for domestic

vessels ranging between $7.1 million and $16.9 million (in 2010 dollars), in the aggregate.42

Approximately 35% of these costs were associated with vessel hull maintenance, 25% with

recordkeeping and inspection, and 25% with engine and oil control BMPs. The average cost per

vessel was estimated to range from $17 per year (for vessels that already implement control

practices) to $133 per year. The estimated range depended on the number of applicable discharge

categories and baseline practices.

EPA lacks data to quantify the environmental benefits of the sVGP, but qualitatively, the agency

expected that reducing discharges incidental to the operation of small non-recreational vessels

would have two broad categories of benefits: enhanced environmental quality from reduced loads

of pollutants, and reduced risk of introducing and spreading invasive species.

As it did with the VGP, EPA acknowledged uncertainties about impacts of the sVGP, largely due

to limitations of data regarding financial and operational characteristics of affected firms and

compliance costs that firms may incur. Particularly for the smaller vessels covered by the sVGP,

EPA said that uncertainty exists for the revenue data for firms and also on the number of firms

that have vessels that could incur cost impacts. For example, EPA assumed the same range of cost

per vessel for all industry sectors, based on the best and worst case scenarios, but the agency

recognized that this simplifying assumption may be inaccurate, because some vessels may

already be implementing discharge control practices and would therefore not incur additional

costs. Despite uncertainties, EPA concluded that it is “unlikely that a significant number of firms

in the commercial fishing industry incurring material economic impacts as a result of complying

with the sVGP.” The permit was expected to have some effect on small firms, because of the very

large number of small operators, but “the exact impacts on the profitability of these small

businesses are difficult to quantify ... due to limitations of the data.”43

42

EPA did not estimate the compliance costs for foreign vessels, because their costs are not expected to have a direct

impact on U.S. firms. U.S. Environmental Protection Agency, Economic and Benefits Analysis of the Final 2014 Small

Vessel General Permit (sVGP), August 2014, p. 17.

43

Ibid., pp. 84-85.

Congressional Research Service

19

EPA’s Vessel General Permits: Background and Issues

Appendix B. Discharges Incidental to the Normal

Operation of Military Vessels

As noted in the text of this report, discharges incidental to the normal operation of military

vessels are not subject to EPA’s VGP or the 2012 Coast Guard rule concerning ballast water

discharges. Instead, such discharges are subject to separate regulatory requirements, pursuant to

CWA Section 312(n), which Congress added to the act in 1996 (Section 325 of P.L. 104-106).

Section 312(n) requires EPA and the Department of Defense (DOD) jointly to promulgate

uniform national discharges standards (UNDS) for certain discharges incidental to the normal

operation of a vessel of the Armed Forces, unless the Secretary of Defense finds that compliance

with UNDS would not be in the national security interests of the United States. Once finalized,

the standards will be applicable to discharges from U.S. Armed Forces vessels operating in the

navigable waters of the United States, the territorial seas, and the contiguous zone.

Since enactment of these provisions, EPA and DOD have been working through a multi-stage

rulemaking process to develop the required standards. This process has already been underway

for 20 years and is likely to extend for an unknown number of additional years. First, in Phase I,

the agencies promulgated regulations in 1999 identifying 25 discharges for which it is

“reasonable and practicable” to require a marine pollution control device (MPCD). Phase I also

identified 14 discharges as not requiring control with a MPCD. These 1999 regulations are

codified at 40 C.F.R. Part 1700.

During Phase II, EPA and DOD are proposing discharge performance standards for the 25

categories of discharges identified in the 1999 rule. Phase II is occurring in three separate

rulemakings. The first set of performance standards, which addressed 11 discharges, was

published in 2014,44 and the second set of performance standards, addressing another 11

discharges, was published in October 2016.45 The third set of performance standards, which will

address the final three discharges identified in the 1999 rule—all of which involve ballast

discharges—will be published separately in a future rule.

Phase III of the UNDS rulemaking will be a DOD-only rule. It will require DOD, in consultation

with EPA and the Coast Guard, to promulgate regulations governing the design, construction,

installation, and use of MPCDs necessary to meet the performance standards covered by Phase II.

Similar to Phase II, Phase III will be promulgated in three batches. CWA Section 312(n) requires

DOD to promulgate the Phase III standards within one year of finalization of the Phase II

standards, and these regulations are to become effective upon promulgation, unless DOD

specifies another effective date.

EPA and DOD estimate that the universe of Armed Forces vessels affected by the UNDS

rulemaking is about 6,230 ships of the U.S. Navy, Army, Marine Corps, Air Force, and Military

Sealift Command. Approximately 18% of the total (1,090 vessels, including aircraft carriers,

auxiliary ships, patrol ships, and submarines) are larger than 79 feet in length. The remaining

5,140 ships, including a variety of self-propelled boats, are less than 79 feet in length. According

44

Environmental Protection Agency and Department of Defense, “Uniform National Discharge Standards for Vessels

of the Armed Forces—Phase II, Proposed rule,” 79 Federal Register 6117-6135, February 3, 2014. These proposed

standards have not been finalized.

45

Environmental Protection Agency and Department of Defense, “Uniform National Discharge Standards for Vessels

of the Armed Forced—Phase II Batch Two, Proposed rule,” 81 Federal Register 69753-69772, October 7, 2016. The

public comment on this proposal closes on December 6, 2016.

Congressional Research Service

20

EPA’s Vessel General Permits: Background and Issues

to EPA and DOD, in developing the Phase II discharge performance standards, the agencies are

referencing the 2013 VGP and the 2014 sVGP as the baseline for each comparable discharge

incidental to the normal operation of a vessel of the Armed Forces.46

Author Contact Information

(name redacted)

Specialist in Resources and Environmental Policy

[redacted]@crs.loc.gov, 7-....

46

Ibid., pp. 69755-69756.

Congressional Research Service

21

EveryCRSReport.com

The Congressional Research Service (CRS) is a federal legislative branch agency, housed inside the

Library of Congress, charged with providing the United States Congress non-partisan advice on

issues that may come before Congress.

EveryCRSReport.com republishes CRS reports that are available to all Congressional staff. The

reports are not classified, and Members of Congress routinely make individual reports available to

the public.

Prior to our republication, we redacted names, phone numbers and email addresses of analysts

who produced the reports. We also added this page to the report. We have not intentionally made

any other changes to any report published on EveryCRSReport.com.

CRS reports, as a work of the United States government, are not subject to copyright protection in

the United States. Any CRS report may be reproduced and distributed in its entirety without

permission from CRS. However, as a CRS report may include copyrighted images or material from a

third party, you may need to obtain permission of the copyright holder if you wish to copy or

otherwise use copyrighted material.

Information in a CRS report should not be relied upon for purposes other than public

understanding of information that has been provided by CRS to members of Congress in

connection with CRS' institutional role.

EveryCRSReport.com is not a government website and is not affiliated with CRS. We do not claim

copyright on any CRS report we have republished.