Surface Transportation Reauthorization

Legislation in the 112th Congress:

Major Provisions Pending in the Senate

Robert S. Kirk, Coordinator

Specialist in Transportation Policy

William J. Mallett

Specialist in Transportation Policy

David Randall Peterman

Analyst in Transportation Policy

John Frittelli

Specialist in Transportation Policy

Linda Luther

Analyst in Environmental Policy

Brent D. Yacobucci

Section Research Manager

Mary Tiemann

Specialist in Environmental Policy

March 2, 2012

Congressional Research Service

7-5700

www.crs.gov

R42120

CRS Report for Congress

Prepared for Members and Committees of Congress

c11173008

.

Surface Transportation Reauthorization Legislation in the 112th Congress

Summary

The federal government’s highway, mass transit, and surface transportation safety programs are

periodically authorized in a multi-year surface transportation reauthorization bill. The most recent

reauthorization act, the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A

Legacy for Users (SAFETEA-LU or SAFETEA; P.L. 109-59), expired at the end of FY2009.

Since then, the surface transportation programs and activities have been funded under a series of

extension acts.

The main obstacle to passage of a new multi-year bill during the past two years has been the

disparity between projected spending and the much lower projections of the revenue flows to the

highway trust fund (HTF). Taxes on gasoline and diesel provide 90% of the revenues for the HTF,

which historically has funded the entire highway program and roughly 80% of the mass transit

program. The rates on these taxes, which are on a cents-per-gallon basis, have not been increased

since 1993. In addition, the condition of the economy and improvements in fuel economy have

held down fuel consumption and as a result are adversely affecting HTF revenues. Consequently,

authorizers face a dilemma: how to pass a bill without cutting infrastructure spending, raising the

gas tax, or increasing the budget deficit.

The Senate Environment and Public Works Committee marked up and reported favorably on the

highway provisions of S. 1813, the Moving Ahead for Progress in the 21st Century Act (MAP-21),

on November 9 2011. MAP-21 is a two-year reauthorization bill (FY2012-FY2013). As of

February 7, 2012, all committees of jurisdiction had marked up their titles. These titles were titles

were folded into Senate amendment SA 1761, “ of a perfecting nature,” to S. 1813, on March 1,

2012. To fully fund the bill, roughly $10.5 billion in new revenues or offsets (to allow for general

fund transfers) is needed beyond anticipated HTF revenues and balances. MAP-21 proposes:

•

A total Federal-Aid Highway Program authorization of $39.4 billion for FY2012

and $40.4 billion for FY2013 (reflecting rescissions), and $400 million for

research and education in each fiscal year.

•

To reduce the total number of highway programs from roughly 90 to 30. The

overall Federal-Aid Highway Program would be structured around five large

“core” programs, including a new National Freight Program. The existing Equity

Bonus Program would be discontinued.

•

To eliminate individual program formula factors. Instead, each state’s initial

amount of the bill’s authorized contract authority would be based on its share of

total apportionments and allocations during FY2005-FY2009.

•

To accelerate project completion, speed up the environmental review process and

increase the use of performance measures.

•

$10.458 billion, annually, for FY2012-FY2013, for transit programs.

The Senate Finance Committee component of MAP-21 includes provisions to provide roughly

$10.5 billion in offsets and revenue transfers to the HTF.

Congressional Research Service

.

Surface Transportation Reauthorization Legislation in the 112th Congress

Contents

Introduction...................................................................................................................................... 1

The SAFETEA Framework ............................................................................................................. 2

Highway Trust Fund .................................................................................................................. 2

Highways................................................................................................................................... 3

Underlying Highway Program Attributes............................................................................ 3

Formula and Discretionary Programs.................................................................................. 4

Transit........................................................................................................................................ 5

Safety......................................................................................................................................... 6

National Highway Traffic Safety Administration (NHTSA)............................................... 6

Federal Motor Carrier Safety Administration (FMCSA) .................................................... 7

Highway Safety Improvement Program (HSIP) ................................................................. 7

Funding Guarantees and Revenue Aligned Budget Authority (RABA) .................................... 7

Budget Control Act of 2011 (P.L. 112-25) ....................................................................................... 8

Extension Legislation ...................................................................................................................... 8

MAP-21 (S. 1813) ........................................................................................................................... 9

Overview ................................................................................................................................... 9

Highways............................................................................................................................. 9

Transit................................................................................................................................ 10

Rail .................................................................................................................................... 11

Finance Provisions: Filling the Gap............................................................................................... 11

Finance Provisions: Division D of MAP-21............................................................................ 11

Solvency Account.............................................................................................................. 13

Leaking Underground Storage Tank (LUST) Trust Fund.................................................. 13

Highways ....................................................................................................................................... 14

Highway Funding Summary.................................................................................................... 14

Ratchet Mechanism ........................................................................................................... 15

Highway Formula Distribution................................................................................................ 16

Donor-Donee Implications ................................................................................................ 17

SAFETEA’s Earmarking Legacy ...................................................................................... 17

Highway Formula Programs.................................................................................................... 18

National Highway Performance Program (NHPP; Section 1106)..................................... 18

Transportation Mobility Program (TMP; Section 1108) ................................................... 19

Congestion Mitigation and Air Quality Program (CMAQ; Section 1113)........................ 19

Highway Safety Improvement Program (HSIP; Section 1112)......................................... 19

National Freight Program (NFP; Section 1115) ................................................................ 20

Transferability Among the Core Programs (Section 1507) ............................................... 20

Other Programs........................................................................................................................ 20

Emergency Relief (ER) Program ...................................................................................... 20

Federal Lands and Tribal Transportation Programs .......................................................... 20

Territorial and Puerto Rico Highway Program.................................................................. 21

Projects of National and Regional Significance (PNRS) .................................................. 21

Transportation Infrastructure Finance and Innovation Act (TIFIA) Program ................... 21

New Freight Initiative.................................................................................................................... 22

National Freight Program.................................................................................................. 22

Congressional Research Service

.

Surface Transportation Reauthorization Legislation in the 112th Congress

Transportation Planning and Performance Management............................................................... 23

Accelerating Transportation Project Delivery ............................................................................... 25

Provisions Applicable to the Environmental Compliance Process.................................... 25

Non-environmental Provisions Accelerating Project Delivery ......................................... 28

Amendments to the CMAQ Program ............................................................................................ 29

CMAQ Distribution Limitations ............................................................................................. 30

CMAQ Suballocations............................................................................................................. 30

Alternative Fuels and Advanced Technology Vehicles.................................................................. 31

Transit ............................................................................................................................................ 32

Program Restructuring............................................................................................................. 33

New Starts Program................................................................................................................. 34

Operating Assistance ............................................................................................................... 35

Rail Provisions............................................................................................................................... 35

Intercity Passenger Rail........................................................................................................... 35

Rolling Stock Equipment Pool .......................................................................................... 36

Positive Train Control.............................................................................................................. 36

Freight Rail.............................................................................................................................. 37

Highway Safety ............................................................................................................................. 37

Commercial Trucking Safety ......................................................................................................... 38

Transportation Research and Education ........................................................................................ 39

Tables

Table 1. Short-Term Extensions of SAFETEA................................................................................ 8

Table 2. Highway Authorizations: MAP-21, as Reported ............................................................. 15

Table 3. Apportioned Programs (Contract Authority).................................................................... 17

Table 4. Proposed Annual Federal Transit Funding in Senate Bill ................................................ 32

Table 5. Highway Safety Grants to States...................................................................................... 38

Table 6. Motor Carrier Safety Grants to States.............................................................................. 38

Contacts

Author Contact Information........................................................................................................... 39

Congressional Research Service

.

Surface Transportation Reauthorization Legislation in the 112th Congress

Introduction

Surface transportation authorization acts authorize spending on federal highway and mass transit

programs, surface transportation safety and research, and some rail programs. The most recent

multi-year authorization for federal surface transportation programs, the Safe, Accountable,

Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU or SAFETEA;

P.L. 109-59), expired on September 30, 2009. Since then these programs have operated on a

series of extension acts and continuing resolutions.

The budgetary environment has changed since the passage of SAFETEA in 2005. The financial

resources available to authorizers are more constrained. The highway trust fund (HTF) has

provided most of the funding for surface transportation authorization bills since the fund was

created in 1956, but the revenues from highway taxes (mostly on gasoline and diesel fuel) that

support the HTF have declined in recent years due to the condition of the economy and

improvements in vehicle fuel efficiency. Consequently, how to pass a multi-year bill, without

cutting infrastructure spending, raising the gas tax, or increasing the budget deficit is an

underlying theme in the ongoing debate. Other issues such as alternative finance, tolling, publicprivate partnerships,1 acceleration of project delivery,2 and performance management are also

being debated in this fiscal context. In addition, the question of equity in the distribution of

federal spending among the states, which has been resolved in the past by providing large

increases in funding for all states, cannot be solved so easily given currently forecast revenues.3

For a detailed review of the underlying issues, see CRS Report R41512, Surface Transportation

Program Reauthorization Issues for the 112th Congress, coordinated by Robert S. Kirk.

On November 9, 2011, the Senate Environment and Public Works Committee (EPW) marked up

and ordered reported favorably the highway provisions of S. 1813, the Moving Ahead for

Progress in the 21st Century Act (MAP-21). By February 7, 2012, all the Senate committees of

jurisdiction had reported favorably on their bill components, which are expected to be folded into

MAP-21 by amendment. On March 1, 2012, Majority Leader, Senator Harry Reid introduced

Senate Amendment 1761 to S. 1813, “of a perfecting nature,” which adds the transit, rail,

highway safety, and other provisions to MAP-21.4 References in this report to MAP-21 are to S.

1813 as amended by SA 1761.

Following an explanation of the existing surface transportation programmatic framework, this

report tracks and analyzes the major provisions of MAP-21.

In early February 2012, the House committees of jurisdiction over surface transportation

reauthorization reported favorably on their contributions to H.R. 7, the American Energy and

Infrastructure Jobs Act (H.R. 7), which have been consolidated and made available by the House

1

CRS Report RL34567, Public-Private Partnerships (PPPs) in Highway and Transit Infrastructure Provision, by

William J. Mallett.

2

CRS Report R41947, Accelerating Highway and Transit Project Delivery: Issues and Options for Congress, by

William J. Mallett and Linda Luther.

3

CRS Report R41869, The Donor-Donee State Issue in Highway Finance, by Robert S. Kirk.

4

See, Sen. Harry Reid, "SA 1761, Amendment of a Perfecting Nature to S. 1813 to reauthorize Federal-Aid highway

and highway safety construction programs, and for other purposes,” available at

https://docs.google.com/file/d/0B23rveCvG52eWllWVTBWNWhUZ2FTbk5Tb3FGeGstZw/edit

Congressional Research Service

1

.

Surface Transportation Reauthorization Legislation in the 112th Congress

Committee on Rules.5 For a comparative summary of MAP-21 and H.R. 7, with links to statistical

resources, see CRS Report R42350, Surface Transportation Reauthorization in the 112th

Congress: Summary and Sources, coordinated by Marc Levinson.

The SAFETEA Framework

Highway Trust Fund

The highway trust fund is financed from a number of sources including sales taxes on tires,

trucks, buses, and trailers, as well as truck usage taxes, but approximately 90% of trust fund

revenue comes from excise taxes on motor fuels. The motor fuel revenue dedicated to the trust

fund is derived largely from taxes of 18.3 cents per gallon on gasoline and 24.3 cents per gallon

on diesel. The HTF consists of two separate accounts—highway and mass transit. The highway

account receives an allocation equivalent to 15.44 cents of the tax and the mass transit account

receives the revenue generated by 2.86 cents of the tax.6 Because the fuel taxes are set in terms of

cents per gallon, rather than as a percentage of the sale price, their revenues do not increase with

inflation. The fuel tax rates were last raised in 1993.

The period of sluggish economic performance that began in 2007 and the improvements in

vehicle fuel efficiency have reduced fuel tax revenues below the optimistic projections assumed

in SAFETEA. The highway account has already required three transfers from the general fund

totaling $29.7 billion,7 without which the Federal Highway Administration (FHWA) might not

have been able to pay states for work they completed.

The Congressional Budget Office (CBO), in its January 31, 2012, HTF baseline projection,

showed that the highway account is expected to have a negative balance of -$3.2 billion at the end

of FY2013.8

The CBO projections show the highway account excess of outlays over tax revenues (plus

interest) as $7 billion for FY2012 and $8.5 billion for FY2013. A gap of roughly $8 billion to $9

billion per year remains through FY2022.9 CBO projects that the mass transit account, which

received a $4.8 billion general fund transfer in FY2010, will remain above zero through FY2013

5

U.S. Congress, House Committee on Rules, Text of H.R. 7, the American Energy and Infrastructure Jobs Act of 2012,

committee print, 112th Cong., 2nd sess., February 8, 2012, Rules Committee Print 112-14 (Washington: GPO, 2012), pp.

1-847, http://docs.house.gov/billsthisweek/20120213/CPRT-112-HPRT-RU00-HR7RCP.pdf.

6

A separate 0.1 cents per gallon tax on all fuels goes into the leaking underground storage tank (LUST) trust fund.

LUST is administered by the Environmental Protection Agency. It funds leaking underground storage tank cleanup

activities. The authorization of this fund is not addressed in surface transportation legislation.

7

In late FY2008, $8 billion was transferred to carry the highway account into the 2009 fiscal year (P.L. 110-318,

September 15, 2008). In FY2009 the transfer was $7 billion (P.L. 111-46, August 7, 2009). The Surface Transportation

Extension Act of 2010 (P.L. 111-148, March 18, 2010) transferred $14.7 billion more to the highway account. The

third rescue package, P.L. 111-147, also transferred $4.8 billion to the mass transit account.

8

Information supplied by CBO as part of its January 2012 baseline, January 31,2012. According to FHWA, a working

balance of roughly $4 billion is needed to meet state requests for reimbursement of outstanding obligations in a timely

manner. Under current law, the HTF cannot incur negative balances. If the HTF resources were exhausted, spending on

programs and activities financed by the fund would continue but at a slower pace as highway taxes are collected.

9

Outlays from the highway account during FY2010-FY2011 were depressed because stimulus spending from the

general fund temporally displaced trust fund outlays.

Congressional Research Service

2

.

Surface Transportation Reauthorization Legislation in the 112th Congress

but then fall to a negative -$0.6 billion balance by the end of FY2014. The end-of-year negative

balance falls further, to -$4.7 billion at the end of FY2015 and deepens rapidly thereafter. These

are the gaps authorizers face as they work to move reauthorization legislation.

Without an increase in the existing fuel taxes, a difficult political issue in recent years, the fuelbased trust fund taxation system will not be able to support existing or increased surface

transportation spending. The choice for policymakers, assuming no increase in fuel taxes, is

between finding new sources of revenue for transportation or settling for a smaller program.

Highways

The Federal-Aid Highway Program (Highway Program) is an umbrella term for an array of

programs administered by FHWA. Over many years, the Highway Program has retained several

defining financial and administrative attributes across the programmatic structure.

Underlying Highway Program Attributes

The Highway Program is primarily a state-run program. The state departments of transportation

(state DOTs) largely determine where and how money is spent, but have to comply with detailed

federal planning guidelines. The state DOTs let the contracts and oversee project development

and construction. Federally funded highway projects generally require states and/or local

governments to provide a designated local matching share. For most Interstate System projects

the state/local match is 10%. For other roads the state/local match is generally 20%.

Understanding the particular terminology employed by FHWA in managing the Highway

Program is important:

10

•

Distribution of funds is FHWA notification of the availability of federal funds,

usually for four years. The states do not actually receive federal money for

highway project spending up front.

•

Apportionment is the distribution of funds among the states as prescribed by a

statutory formula.

•

Allocation is an administrative distribution of funds (often for specific projects)

under programs that do not have statutory distribution formulas.

•

Reimbursement occurs once a project is approved, the work is started, costs are

incurred, and the state submits a voucher to FHWA.10 The reimbursable nature of

the highway program is designed to help prevent waste, fraud, and abuse.

•

Contract authority is a type of budget authority that is available for obligation

even without an appropriation (although appropriators must eventually provide

authority to pay the obligations, known as liquidating authority).

•

Obligation of contract authority for a project by FHWA legally commits the

federal government to reimburse the state for the federal share of a project. This

can be done prior to an appropriation.11

For many projects the vouchers are submitted when the project is completed.

Congressional Research Service

3

.

Surface Transportation Reauthorization Legislation in the 112th Congress

•

Limitation on obligations, known as ObLim or Oblimit, is used to control

annual FHWA spending in place of an appropriation. The ObLim sets a limit on

the total amount of contract authority that can be obligated in a single fiscal year.

For practical purposes, the ObLim is analogous to an appropriation.12

Formula and Discretionary Programs

There are two categories of programs: formula and discretionary. Formula program funds are

apportioned (each state receives a portion) annually among the states based on factors detailed in

authorizing legislation. All of the large highway programs are formula/apportioned programs.

Discretionary programs tend to be smaller programs allocated by FHWA or earmarked by

Congress.

The “Core” Formula Programs

Under SAFETEA, the vast majority of the federal-aid highway money for project spending is

apportioned to the state DOTs through several large “core” formula-driven programs.13 These

programs are provided with roughly 80% of SAFETEA’s contract authority14 and are the sources

of funding for most federal-aid highway projects. The core formula programs are the following:

•

Interstate Maintenance Program (IM)

•

National Highway System (NHS)

•

Surface Transportation Program (STP)15

•

Highway Bridge Program (HBP)

•

Congestion Mitigation and Air Quality Improvement (CMAQ) Program

•

Highway Safety Improvement Program (HSIP)

•

Equity Bonus Program (EB)—EB funds are distributed into the programs above

The authorization act sets the total amount for each core program and each program’s formula is

run to determine each state’s portion of each program’s authorized total (hence the budget term

“apportionment”). Historically, each federal highway formula program has had its own formula

factors based, at least in part, on the policy intent of the program.

(...continued)

For a more detailed discussion see Federal Highway Administration, Financing Federal-Aid Highways,

(Washington, 2007), pp. 9-10, http://www.fhwa.dot.gov/reports/financingfederalaid/approp.htm#b.

12

Ibid., pp. 19-22. To be contract authority the authorization must refer to Title 23, Chapter 1 of the U.S. Code, and it

must be funded out of the highway trust fund.

13

For a list of FHWA programs that receive funding (apportionments) by formula (including smaller non-“core”

formula programs), see Federal Highway Administration, Financing Federal-Aid Highways, Appendix D,

http://www.fhwa.dot.gov/reports/financingfederalaid/index.htm.

14

Includes Equity Bonus distributions to IM, NHS, STP, and HBP.

15

For a diagram of STP distribution, see FHWA, Financing Federal-Aid Highways, Appendix F,

http://www.fhwa.dot.gov/reports/financingfederalaid/appf.htm.

11

Congressional Research Service

4

.

Surface Transportation Reauthorization Legislation in the 112th Congress

Over time, the state DOTs have been given increasing flexibility to transfer funds from one

program to another (excepting HSIP). Some Highway Program funding may also be used for

transit projects. This transferability reduces the importance of funding formulas and program

eligibility distinctions. Nonetheless, some state DOTs argue that the programmatic structure

prevents them from using federal highway funds as they deem best.

The Equity Bonus Program is the largest highway program in dollar terms. Its purpose is to

guarantee each state a minimum share of funds, regardless of the funding formulas. At present,

each state must receive total formula program funding equal to at least 92% of its highway users’

tax payments to the highway account of the HTF.16 The Equity Bonus Program can be viewed as

diluting the policy rationales associated with the core program formulas.

Discretionary Programs

Several smaller discretionary programs (referred to as “allocated” programs) are also part of the

Highway Program. These programs are nominally under the control of FHWA and were designed

to allocate funds to projects chosen through competition with other projects. During SAFETEA,

most of this funding was earmarked by Congress.17

The term “program” is used very broadly. FHWA’s Financing Federal-Aid Highways listing of

allocated programs includes entries for 59 activities, some of which are clearly programmatic in

nature, mixed in with others that more resemble specific project designations, temporary pilot

programs, studies, and other narrowly directed activities that are not truly “programs.”18

Transit

The federal transit program, administered by the Federal Transit Administration (FTA) in the U.S.

Department of Transportation (DOT), is a collection of individual programs, each with different

funding amounts, distributional mechanisms, and spending eligibility rules.19 There are four main

federal transit programs in SAFETEA, together accounting for 85% of authorized transit funding.

Funding in two of these programs, the Urbanized Area Formula Program and the Fixed Guideway

(or Rail) Modernization Program, is distributed by formula. The Urbanized Area Formula

Program, which accounts for 41% of authorized transit funding in SAFETEA, provides funding

to urbanized areas with populations of 50,000 or more. Funds can be used for a broad range of

expenses including capital, planning, transit enhancements, and operations in urbanized areas

with populations of up to 200,000. Fixed Guideway Modernization Program funds, 16% of

authorized transit funding, go mainly for the replacement and rehabilitation of transit rail system

assets.

16

For a description of the complexities of the operation of the Equity Bonus Program see CRS Report R41869, The

Donor-Donee State Issue in Highway Finance, by Robert S. Kirk.

17

For a list of all allocated programs, see FHWA, Financing Federal-aid Highways, Appendix G, “Authorizations for

Allocated Programs,” http://www.fhwa.dot.gov/reports/financingfederalaid/appg.htm.

18

Ibid.

19

CRS Report RL34171, Public Transit Program Issues in Surface Transportation Reauthorization, by William J.

Mallett.

Congressional Research Service

5

.

Surface Transportation Reauthorization Legislation in the 112th Congress

The other two main transit programs, the New Starts Program and the Bus and Bus-Related

Facilities Capital Program, are both discretionary programs. New Starts funding, 18% of overall

authorized transit funding in SAFETEA, is available primarily on a competitive basis for new

fixed guideway systems and extensions. While the majority of funding from this program over

the years has gone to transit rail projects, the New Starts program has funded projects for

busways and bus rapid transit, ferries, automated guideway systems, and vintage trolleys.

Congress enacted a new “Small Starts” program in SAFETEA to fund projects with a total cost of

$250 million or less in which the federal share is $75 million or less. Small Starts projects are

funded with $200 million annually from the New Starts authorization beginning in FY2007. Bus

Program funds, 9% of authorized funding, are provided to purchase buses and bus-related

equipment, including the construction of buildings such as administrative and maintenance

facilities, transfer facilities, bus shelters, and park-and-ride stations. Until recently, these funds

were mostly earmarked in authorization and appropriations legislation. Currently, FTA allocates

these funds.

A number of smaller funding programs, including the Rural Formula Program, the Jobs Access

and Reverse Commute (JARC) program, the Elderly and Disabilities grants program, and the

New Freedom Program, together with program administration, account for the remaining 15% of

transit program funds.

Safety

Highway transportation is by far the leading cause of transportation-related fatalities and injuries

in the United States. Highway safety is primarily the responsibility of the states, controlling as

they do much of the road network and having the authority to legislate restrictions on driver

behavior. Congress has established federal highway safety programs to assist states in improving

highway safety. Three DOT agencies administer highway safety programs authorized in

SAFETEA: the National Highway Traffic Safety Administration (NHTSA), which focuses on

driver behavior and vehicle safety; the Federal Motor Carrier Safety Administration (FMCSA),

which focuses on commercial driver qualifications and commercial vehicle safety; and FHWA

through the Highway Safety Improvement Program, which focuses on the safety of roadway

design.

National Highway Traffic Safety Administration (NHTSA)

NHTSA provides grants to states to support and encourage state traffic safety efforts, regulates

motor vehicle safety, and carries out research on traffic safety. It oversees the use of federal grant

funds by requiring states to submit highway safety plans. A state’s plan must be approved by

NHTSA in order for the state to receive federal traffic safety funds. Each state’s plan must

identify the state’s primary safety problems, set goals for addressing the problems, and establish

performance measures by which progress toward those goals can be judged. NHTSA also

provides training and technical assistance to states.

NHTSA provides grants to states through one large formula program (the State and Community

Highway Safety Program, often referred to as the Section 402 program from its statutory

identification as Section 402 of Title 23) and several smaller incentive grant programs. These

programs support state efforts to improve traffic safety data collection systems, reduce speeding,

increase the use of seat belts and child restraint systems, reduce drunk and drugged driving,

reduce motorcycle crashes, reduce school bus crashes, and discourage unsafe driving behavior

Congressional Research Service

6

.

Surface Transportation Reauthorization Legislation in the 112th Congress

(including aggressive driving, fatigued driving, and distracted driving caused by the use of

electronic devices in vehicles).

Federal Motor Carrier Safety Administration (FMCSA)

FMCSA promotes the safety of commercial motor vehicle operations through regulation,

enforcement, training, and technical assistance. It also administers motor carrier safety grant

programs that assist states in ensuring the safety of truck and motor coach operations, including

inspection of vehicles and licensing of commercial drivers.

Highway Safety Improvement Program (HSIP)

HSIP, one of the core federal-aid highway funding programs, is intended to reduce traffic

fatalities and serious injuries by making improvements to the design or operation of roadways.

Each state receives funding according to a formula based on road lane-miles, vehicle miles

traveled, and traffic fatalities. Each state receives at least 0.5% of the program’s funding. HSIP

includes a dollar set-aside for the Railway-Highway Grade Crossing Hazard Elimination

Program, and there is also a dollar set-aside within the formula funds distributed to the states for

the purpose of construction and operational improvements on high-risk rural roads.

Funding Guarantees and Revenue Aligned Budget

Authority (RABA)

SAFETEA extended mechanisms that were put in place in earlier years to guarantee certain

annual funding levels below which appropriators could not constrain funding. This was done by

amending the Budget Enforcement Act of 1990 to create highway and mass transit budget

categories (“fire walls”) that protected these funds from being tapped to increase spending

elsewhere. SAFETEA also guaranteed the annual ObLim set for FY2005 through FY2009 by

amending the Balanced Budget and Emergency Deficit Control Act of 1985 to specify the

SAFETEA ObLim levels, thereby preventing appropriators from setting a lower ObLim.

Although the budget firewalls set in the Budget Enforcement Act ended in 2002, appropriators

honored those guarantees over the life of SAFETEA. The guarantees retained a second level of

protection via a change in the House rules that specified it would be out of order to consider any

bill that would set a lower level of funding than set in Section 8003 of SAFETEA. Early in the

112th Congress, however, the new Republican majority in the House eliminated the rule,

removing the last vestige of the guarantees.

RABA is a means of raising or lowering the firewall and guaranteed funding levels if any year’s

annual highway account receipts are either higher or lower than expected. Although adherence to

RABA calculations can lead to either additional funding or cuts in funding, Congress has never

allowed a negative RABA calculation to lead to a reduction in spending.20 Despite the fact that

revenues in recent years have consistently fallen below the guarantee levels, which under RABA

would have lead to funding reductions, in recent years the RABA issue has been considered a

moot point, because the HTF has been supplemented by general fund transfers. However, some

20

See CRS Report RS21164, Highway Finance: RABA's Double-edged Sword, by John W. Fischer.

Congressional Research Service

7

.

Surface Transportation Reauthorization Legislation in the 112th Congress

mechanism to bring spending into alignment with receipts might still be considered in

reauthorization.

Budget Control Act of 2011 (P.L. 112-25)

The Budget Control Act requires sequestration of certain funding authorizations in the event a

special joint committee fails to reach an agreement on spending reductions. The Budget Control

“Super Committee” announced in November 2011 that it had failed to reach such an agreement.

However, exemptions to the sequester process under the Balanced Budget and Emergency Deficit

Control Act of 1985, as amended (Codified in 2 U.S.C. Sec. 905 (j)), likely mean that

sequestration would not significantly reduce any surface transportation spending authorized for

years beyond FY2012. The surface transportation programs and activities exempted, to the extent

that their budgetary resources are subject to appropriations bill obligation limitations, are the

following:

•

Federal-Aid Highways

•

Highway Traffic Safety Grants

•

NHTSA operations and research and National Driver Register

•

Motor Carrier Safety Operations and Programs

•

Motor Carrier Safety Grants

•

Transit Formula and Bus Grants

The $739 million of annual contract authority that is typically exempt from the obligation

limitation appears to be subject to sequester. The Federal Transit Administration’s New Starts

program, which is supported with general fund revenues, also appears to be subject to sequester.

Extension Legislation

SAFETEA expired on September 30, 2009. Surface transportation programs and activities have

been operating on the extension legislation set forth in Table 1.

Table 1. Short-Term Extensions of SAFETEA

Bill

Number

Time Period

in Effect

Length

Date

Enacted

Public

Law

1

H.R. 2918

10/1/2009–

10/31/2009

1 month

10/1/2009

P.L. 111-68

2

H.R. 2996

11/1/2009–

12/18/2009

48 days

10/30/2009

P.L. 111-88

3

H.R. 3326

12/19/2009–

2/28/2010

72 days

12/19/2009

P.L. 111-118

4

H.R. 4691

3/2/2010–

3/18/2010

16 days

3/2/2010

P.L. 111-144

Congressional Research Service

8

.

Surface Transportation Reauthorization Legislation in the 112th Congress

Bill

Number

Time Period

in Effect

Length

Date

Enacted

Public

Law

5

H.R. 2847

3/18/2010–

12/31/2010

9.5 months

3/18/2010

P.L. 111-147

6

H.R. 3082

1/1/2011–

3/4/2011

2 months

4 days

12/22/2010

P.L. 111-322

7

H.R. 662

3/5/2011–

9/30/2011

6 months

25 days

3/4/2011

P.L. 112-5

8

H.R. 2887

10/1/2011–

3/31/2012

6 months

9/16/2011

P.L. 112-30

Source: Public Laws in Table 1.

MAP-21 (S. 1813)

As voted out of the Environment and Public Works Committee (EPW) in the Senate, MAP-21

only included the highway portions of the surface transportation bill under EPW’s jurisdiction.21

By February 7, 2012, however, all the other Senate committees of jurisdiction had reported

favorably on their bills. The legislative language of these bills were folded into Senate

Amendment SA 1761, “of a perfecting nature,” which was proposed by Senator Harry Reid,

Majority Leader, on March 1, 2012. References to MAP-21 are to S. 1813 as amended by SA

1761.22

Overview

Highways

MAP-21 is a two year reauthorization bill that basically funds the Federal-Aid Highway Program

at the baseline level, adjusted for inflation. However, it would make substantial changes to the

structure, formulas, and funding distribution of the federal highway program.

•

A total Federal-Aid Highway Program authorization of $39.4 billion for FY2012

and $40.4 billion for FY2013 (reflecting rescissions), and $400 million for

research and education in each fiscal year.

•

In a major change, MAP-21 would eliminate all the formula factors under the

individual formula programs. Each state would be apportioned a share of the

bill’s authorized contract authority based on its share of total apportionments and

allocations during FY2005-FY2009. These state shares (guaranteed to provide a

95% return on each state’s payments to the HTF) would then be used to calculate

the MAP-21 apportionments.

21

According to the rules of the Senate, the Committee on Banking, Housing, and Urban Affairs has jurisdiction over

mass transit, the Committee on Commerce, Science, and Transportation has jurisdiction over most surface

transportation safety and research issues, and the Committee on Finance has jurisdiction over tax and revenue issues.

22

Available at https://docs.google.com/file/d/0B23rveCvG52eWllWVTBWNWhUZ2FTbk5Tb3FGeGstZw/edit

Congressional Research Service

9

.

Surface Transportation Reauthorization Legislation in the 112th Congress

•

The replacement of individual program formulas with an initial calculation across

all states based on SAFETEA share, the change in the programmatic structure,

and the broad eligibility across programs lessen the federal and congressional

influence on program direction and project selection. In the past, some Members

of Congress influenced surface transportation by pressing for changes in the

program formulas or through earmarking. MAP-21 has neither program formulas

nor congressional designation of projects.

•

National interests and needs would be increasingly driven by federal planning,

performance management, project delivery, and project eligibility requirements.

Transferability between core programs, however, would be restricted to 20% of

each formula program’s apportionment.

•

MAP-21 would reduce the number of programs by roughly two-thirds. This

would be accomplished mostly by shifting program eligibility to the core

programs. Nearly all discretionary grant programs nominally under the control of

FHWA would be eliminated.

•

The Transportation Enhancements Program (TE)23 is rolled into the CMAQ

program. The bill eliminates some controversial TE uses and, beginning in

FY2013, allows states to spend TE funds on a range of non-TE CMAQ uses if

they build up an unspent balance for one and a half years. Some TE type projects

are also made eligible for funding in other proposed programs.

•

A National Freight Program (NFP) should increase the funding of freight projects

by eliminating competition with non-freight projects, at least within the new

program.

•

The Senate bill increases The Transportation Infrastructure Finance and

Innovation Act (TIFIA) program funding nearly ten-fold. However, the bill is

generally silent on tolling of federally funded roads and bridges. Tolls often

provide the revenue streams needed for TIFIA and other alternatively financed

projects.

Transit

MAP-21 would fund the Federal Transit Administration (FTA) and its programs at the current

level. The HTF would provide 79.9% of the funding and the general fund would provide 20.1%.

MAP-21 provisions include

•

$10.458 billion annually for FY2012-FY2013, for transit programs;

•

Elimination of the Bus and Bus Facilities program;

•

Creation of the State of Good Repair (SGR) program, which would replace the

Fixed Guideway Modernization Program;

23

Transportation Enhancement (TE) activities offer funding opportunities to help expand transportation choices and

enhance the transportation experience through 12 eligible activities. Under SAFETEA the program received a 10% setaside from the Surface Transportation Program. Some eligible activities have been criticized, such as the establishment

of transportation museums and spending for historic preservation.

Congressional Research Service

10

.

Surface Transportation Reauthorization Legislation in the 112th Congress

•

Modification of the New Starts process, including the elimination of the

alternatives analysis that is currently required in addition to that required by the

National Environmental Policy Act (NEPA).

Rail

MAP-21 as amended by SA 1761, includes provisions that call for the development of a national

rail (including both passenger rail and freight), for the development of a rolling stock equipment

pool for corridor intercity passenger services, and for the implementation of positive train control.

For freight rail, the bill would amend the Railroad Rehabilitation and Improvement Financing

Program, which provides government loans for freight and passenger railroads, to accept state or

local subsidies or dedicated revenue stream as collateral. The bill would also make modest

changes to laws affecting rail freight rail enforced by the Surface Transportation Board.

Finance Provisions: Filling the Gap

In the Senate, extending the authorities for the highway trust fund and providing revenues to

support the surface transportation bills fall under the jurisdiction of the Finance Committee. The

Senate Finance Committee marked up and reported favorably the finance title to S. 1813. SA

1761 included the Finance Committee provisions with some modifications.24

Most of the provisions of the finance title are intended to close the gap between projected HTF

revenues and the total authorizations included in MAP-21.

Finance Provisions: Division D of MAP-21

The finance title of the Senate bill extends highway-related taxes, at their current rates, through

FY2015 and extends highway trust fund expenditure authority through FY2013.25

The bill includes provisions to raise revenue or provide offsets equal to roughly $10.5 billion over

ten-and-a-half fiscal years.26 Further deposits and revenues accrue in years beyond the term of

MAP-21. The deposits include

24

See, Division D—Finance, in Sen. Harry Reid, "SA 1761, Amendment of a Perfecting Nature to S. 1813 to

reauthorize Federal-Aid highway and highway safety construction programs, and for other purposes," Available at

https://docs.google.com/file/d/0B23rveCvG52eWllWVTBWNWhUZ2FTbk5Tb3FGeGstZw/edit

25

U.S. Congress, Senate Committee on Finance, Highway Investment, Job Creation, and Economic Growth Act of

2012, Report with additional views to accompany S. 2132, 112th Cong., 2nd sess., February 27, 2012, S.Rept. 112-152

(Washington: GPO, 2012), pp. 1-49. SA 1716 did not include the elimination of the cellulosic biofuel producer credit

for “black liquor” (a by-product of the kraft process for making paper), which was in the Finance Committee bill as

reported. The Joint Committee on Taxation estimates that the change would have increased revenues $1.588 billion

over FY2012-FY2016.

26

U.S. Congress, Senate Committee on Finance, Description of the Chairman’s Modification to the proposals of the

“Highway Investment, Job Creation and Economic Growth Act of 2012”, committee print, prepared by Prepared by the

Staff of the Joint Committee on Taxation, 112th Cong., 2nd sess., February 7, 2012 (Washington: GPO, 2012), pp. 1-19,

http://finance.senate.gov/legislation/details/?id=d923f3c4-5056-a032-52f9-cc852968f453. See also, at the same site,

“Description of the Chairman’s Mark of S. __, the “Highway Investment, Job Creation and Economic Growth Act of

2012, also prepared by the staff of the Joint Committee on Taxation.

Congressional Research Service

11

.

Surface Transportation Reauthorization Legislation in the 112th Congress

•

$3 billion from the Leaking Underground Storage Tank (LUST) trust fund

balance would be transferred immediately, as well as $683 million of projected

LUST fund revenues over the next 10 years;

•

$698 million (over 10 years) from the transfer of the Gas Guzzler Tax from the

general fund to the HTF;

•

$743 million (over 10 years) consequent of the revocation of passports of tax

delinquents;

•

$841 million (over 10 years) consequent of allowing the Treasury to levy up to

100% of the payment to a Medicare provider to collect unpaid taxes;

•

$4.52 billion from the transfer of future import tariffs on automotive products

(FY2012-FY2016);

•

$244 million (over 10 years) from a change in tax treatment of securities of a

controlled corporation that are exchanged for assets as part of certain types of

corporate reorganizations;

•

$25 million (over 10 years) from the clarification that the Internal Revenue

Service may levy a federal employee’s Thrift Savings Account to satisfy tax

liabilities;

•

$4.648 billion (FY2014-FY2022) from changes in treatment of Individual

Retirement Account distributions after death.

•

$1.588 billion transfer from the Treasury general fund to the HTF.

The Finance Committee also reported favorably on provisions that cost money.

•

-$353 million (over 10 years) from changing the Small Issuer Exception to

extend the special rules providing modifications to bonds issued after the date of

enactment and before January 1, 2013;

•

-$215 million (over 10 years) from providing that bonds issued after the date of

enactment and before January 1, 2013 not be treated as a tax preference for

purposes of the alternative minimum tax;

•

-$139 million from extending the parity of the monthly exclusion for employerprovided vanpool and transit pass benefits and the exclusion for employerprovided parking.

The committee reported favorably on a provision to authorize states to issue TRIP (Transportation

and Regional Infrastructure Project) bonds through state infrastructure banks. The Joint

Committee on Taxation determined the provision had no revenue effect.

By amendment, the Finance Committee approved inclusion of S. 836, the Transportation Access

for All Americans Act (as modified), which would amend the Internal Revenue Code to change

the depreciation period for long-term highway leases from 15 to 45 years. This might make

highway privatization less attractive for private-sector investors. The bill also would provide that

the amortization period of the franchise right to collect tolls be not less than the term of the lease

or 15 years, whichever is greater. The report language expresses the Finance Committee’s

concern that under current law the amortization period (15 years) for amounts paid for the right to

Congressional Research Service

12

.

Surface Transportation Reauthorization Legislation in the 112th Congress

operate and maintain the public highway and collect tolls is usually significantly shorter than the

term of lease under which the right to toll is exercised.

Also by amendment, the committee approved inclusion of S. 939, the Sustainable Water

Infrastructure Act (as modified), which would provide that the state volume cap on private

activity bonds would not apply to bonds for facilities that would provide for water and sewage

treatment, subject to the funding offset provided by extension of Section 420 of the Internal

Revenue Code through 2021.27

Solvency Account

The finance provision would establish a “solvency account” into which the Secretary of the

Treasury would transfer any excess of amounts appropriated to the HTF before October 1, 2013

under MAP-21 over the amount necessary to meet the needs of the HTF for the period ending

October 1, 2013. These amounts would then be made available for transfers to both the highway

account and the mass transit account in a manner that would assure that each account maintains a

financial cushion of $2.8 billion on September 30, 2013.

Leaking Underground Storage Tank (LUST) Trust Fund

The Senate bill proposes to draw heavily on the LUST trust fund to provide a new revenue source

for the highway trust fund. Congress established the LUST trust fund in 1986 to address a

nationwide problem of groundwater contamination caused by releases from leaking underground

storage tanks (USTs) containing petroleum.28 The LUST trust fund receives revenues primarily

from a 0.1 cent per gallon excise tax on gasoline and diesel fuels. Annual discretionary

appropriations from this trust fund support the Environmental Protection Agency (EPA) and

primarily the states administering the Leaking Underground Storage Tank (LUST) environmental

contamination investigation and cleanup program, and the UST leak prevention program

authorized in the Solid Waste Disposal Act. Historically, the states used the annual LUST trust

fund appropriation mainly to help oversee and enforce corrective actions performed by

responsible parties, and also to conduct corrective actions where no responsible party has been

identified, where a responsible party fails to comply with a cleanup order, in the event of an

emergency, and to take cost recovery actions. The Energy Policy Act of 2005 expanded state and

EPA responsibilities and authorized the use of trust fund monies for the federal UST leak

prevention and detection program as well as the LUST cleanup program.29 Of some 501,000

releases from leaking petroleum tanks reported since the beginning of the LUST program, more

than 413,000 (or 85%) have been addressed, leaving a backlog of 88,000 releases requiring

cleanup.

The LUST trust fund had an unobligated balance of $3.392 billion at the beginning of FY2012. In

FY2012, absent legislative changes, the fund is estimated to receive $117 million in interest

27

Title 26 U.S.C. Section 420, Transfers of Excess Pension Assets to Retiree Health Accounts.

Superfund Amendments and Reauthorization Act (SARA; P.L. 99-499) amended the Solid Waste Disposal Act,

Subtitle I (42 U.S.C. §6991-6991i) and authorized EPA and states to respond to spills and leaks from petroleum

underground storage tanks (USTs). SARA also amended the Internal Revenue Code of 1986 (26 U.S.C. §9508) to

create the Leaking Underground Storage Tank (LUST) Trust Fund to help EPA and states cover the costs of responding

to leaking petroleum USTs in cases where UST owners or operators do not clean up a site.

29

The Energy Policy Act of 2005, P.L. 109-58, Title XV, Subtitle B.

28

Congressional Research Service

13

.

Surface Transportation Reauthorization Legislation in the 112th Congress

payments on its unobligated balance and $181 million in tax receipts. For each of the past several

fiscal years, Congress has appropriated approximately $113 million from the trust fund. States

receive, as grants, a minimum of 80% of the annual appropriation. EPA uses the remainder to

carry out its responsibilities, including implementing the program on Indian lands. Partly because

of the relatively low appropriations through the history of the program, states LUST programs

have relied primarily on nonfederal fund sources, including state fees and appropriations, as well

as state insurance programs.30

Section 40302 of the Senate bill, as amended by SA 1761, would transfer $3.0 billion from the

LUST trust fund into the highway trust fund in FY2012. The Senate bill also would appropriate to

the Highway Trust Fund one-third of the future LUST trust fund receipts from the 0.1 cent-pergallon tax on gasoline and diesel fuel. The Joint Committee on Taxation projects that these future

transfers would range from $62 million to $67 million annually, and that over ten years, the

appropriations and transfers together would provide $3.685 billion to the highway trust fund.31

The LUST trust fund tax is set to expire on March 31, 2012. Section 40101 of the Senate bill, as

amended by SA 1761, would extend the tax through September 30, 2013.32

Highways

Highway Funding Summary

•

MAP-21 proposes total authorizations of $80.6 billion (after rescissions) over

two years ($39.8 billion for FY2012 and $40.8 billion for FY2013), under the

Highway and the Research titles of the bill (see Table 2).

•

To fully fund the bill, $10.5 billion in new revenues or offsets (to allow for

general fund transfers) is needed to fill a shortfall of HTF revenues and balances.

A variety of non-highway tax sources have been discussed, including oil and gas

leasing revenues, transfer of funds from other non-highway trust funds (e.g., the

Leaking Underground Storage Tank trust fund and the Land and Water

Conservation trust fund), and rescission of unspent federal funds. Using any of

these, however, would weaken the claim that road users pay the cost of the

federal highway program.

30

Annual claims against state funds typically have far exceeded revenues. State Financial Assurance Funds surveys

from 1997 through the present are available at http://www.astswmo.org/publications_tanks.htm. ASTSWMO is the

Association of State and Territorial Solid Waste Management Officials, which includes representatives of state

underground storage tank programs.

31

U.S. Congress, Estimated General Fund and trust Fund Effects of the Revenue Provisions Contained in the

Chairman's Modification to S. ____, the "Highway Investment, Job Creation and Economic Growth Act of 2012",

prepared by Joint Committee on Taxation, 112th Cong., 2nd sess., February 7, 2012, JCX-14-12 (2012).

The Senate Finance Committee Report to Accompany S. 2152 (S.Rept. 112-152), explains that,

For Federal budget scorekeeping purposes, the LUST Trust Fund tax, like other excise taxes

dedicated to trust funds, is assumed to be permanent.

32

The LUST Trust Fund financing tax was set to expire on September 30, 2011, but was extended through March 30,

2012, in the Surface and Air Transportation Programs Extension Act of 2011 (P.L. 112-30).

Congressional Research Service

14

.

Surface Transportation Reauthorization Legislation in the 112th Congress

•

The Senate bill does not reinstate the TEA-21 or SAFETEA funding firewalls or

spending guarantees.

•

MAP-21 eliminates the Equity Bonus Program. Instead the bill guarantees a state

share based on SAFETEA and a 95 cent return on each dollar that a state’s

highway users pay to the highway account of the HTF.

Table 2. Highway Authorizations: MAP-21, as Reported

(Contract authority from the Highway Account of the HTF, except as noted, in millions of $)

Program

FY2012

FY2013

Title I Federal-Aid Highways

39,143

39,806

78,949

Transportation Infrastructure Finance and Innovation

Program

1,000

1,000

2,000

Tribal Transportation Program

450

450

900

Federal Lands Transportation Program

300

300

600

Federal Lands Access Program

250

250

500

Territorial and Puerto Rico Highway Program

180

180

360

Federal Highway Administration Administrative Expenses

480

480

960

1,000

1,000

Projects of National & Regional Significance [Gen. Fund]

Total

Rescissions of funds earmarked for projects and funds

apportioned under 23 U.S.C., Chapter 1

2,391

3,054

5,445

Total Authorizations Title I

39,412

40,412

79,824

Federal-Aid Highway Program Obligation Limitation

41,564

42,227

83,791

400

400

800

39,812

40,812

80,624

Title II Research and Education

Total Authorizations

Source: Federal Highway Administration. Figures are preliminary.

Notes: FHWA also receives a permanent $100 million authorization for the Emergency Relief Program each

year. This funding is also exempt from the obligation limitation. The $1 billion authorized for Projects of National

and Regional Significance can be expended only with an appropriation.

Ratchet Mechanism

Section 4001, Highway Spending Controls, includes a provision designed to assure the solvency

of the highway account of the HTF. Referred to as the “ratchet mechanism,” it requires that

within 60 days of enactment, DOT and the Department of the Treasury estimate whether the

highway account balance will fall below $2 billion in FY2012 or $1 billion in FY2013. If either

of these conditions is expected to occur, DOT will calculate the amount to which the FY2012

ObLim would have to be reduced to prevent this occurrence and then adjust the distribution to the

states to reflect the reduction. Any withdrawn ObLim would immediately lapse and a

proportionate amount of contract authority would be rescinded. For the years after FY2012 a

similar calculation is to be made. The calculation is, however, only to be made under the yearlong appropriations bills and not under short-term continuing resolutions.

This provision appears to be related to the pending $10.5 billion HTF shortfall under MAP-21

spending levels, as it apparently commits EPW to keeping the bill’s spending within the means of

Congressional Research Service

15

.

Surface Transportation Reauthorization Legislation in the 112th Congress

the HTF. It may also increase the pressure to identify additional revenue options for the HTF to

make up the shortfall.

Implementing the ratchet mechanism, if the trigger HTF balances were to be breached, could face

resistance in Congress, given the history of negative RABA calculations. For FY2003 the RABA

calculation called for a $4.4 billion downward adjustment in the guaranteed funding levels for the

highway program. However, despite the negative RABA calculation, Congress chose to override

the reductions by drawing down the then positive balance in the HTF.33

Highway Formula Distribution

Unlike SAFETEA and earlier authorization acts, MAP-21 does not set the core programs’

authorization levels and then run the funding through their individual program formulas to

determine each state’s apportionments. Instead, MAP-21 determines the state apportionments for

all the major programs according to a single methodology, as follows:

First, each state’s “initial amount” is determined by multiplying the total amount available for

apportionment ($39.143 billion for FY2012 and $39.806 billion for FY2013) by each state’s share

of total nationwide apportionments and allocations received for FY2005-FY2009.

Second, these initial amounts are adjusted (if needed) to ensure that each state’s combined

apportionments in each year will not be less than 95% of the estimated tax payments made by its

highway users to the highway account of the HTF. Given the excess of federal highway spending

over HTF revenues for FY2005-FY2009, it is unlikely that any adjustments will have to be made,

if MAP-21, as reported, is enacted and fully funded.

Third, an amount based on each state’s CMAQ percentage of its total apportionments for

FY2009, plus 10% of the state’s Surface Transportation Program funding for FY2009 (to account

for the transfer of Transportation Enhancements to CMAQ), are set-aside for the new CMAQ

program, from the adjusted initial amount determined in the first two steps. Then the metropolitan

planning amount is determined by multiplying, the ratio of a state’s apportionment under Title 23

Section 134 for FY2009 to its total apportionments for that year, times the adjusted initial amount

calculated in the first two steps.

Fourth, the remaining amount of each state’s “initial amount” is divided among the four

remaining core programs as follows: 58% is apportioned to the National Highway Performance

Program (NHPP), 29.3% for the Transportation Mobility Program (TMP), 7% for the Highway

Safety Improvement Program (HSIP), and 5.7% for the National Freight Program (NFP).

Table 3 shows the dollar amounts of the aggregate programmatic split.

33

CRS Report RS21164, Highway Finance: RABA's Double-edged Sword, by John W. Fischer.

Congressional Research Service

16

.

Surface Transportation Reauthorization Legislation in the 112th Congress

Table 3. Apportioned Programs (Contract Authority)

(millions of $)

Program

FY2012

FY2013

Total

National Highway Performance Program

20,623

20,972

41,595

Transportation Mobility Program

10,418

10,595

21,013

Highway Safety Improvement Program

2,489

2,531

5,020

Congestion Mitigation & Air Quality Improvement Program

3,252

3,308

6,560

National Freight Program

2,027

2,061

4,088

334

339

673

39,143

39,806

78,949

Metropolitan Transportation Planning

Total

Source: Federal Highway Administration. The MAP-21programmatic split is estimated.

Donor-Donee Implications

Historically, concerns about receiving federal highway spending proportionate to the highway

taxes paid by each state’s highway users were resolved through programs such as SAFETEA’s

Equity Bonus Program, which added funds across all the formula programs to bring all states up

to a minimum percentage return on tax payments. MAP-21 has no overt equity program. MAP21’s determination of the “initial amount” for each state, based on each state’s share of total

funding during FY2005-FY2009, is designed to resolve the “donor-donee” issue up front.

Although there is an adjustment mechanism to assure that all states receive at least a 95% rate of

return on their payments to the HTF, it is unlikely that adjustments will have to be made. The

nationwide rate of return for FY2005-FY2009 was $1.23 on the dollar. Using this base level

would likely lift all donor states above the 95% level. If, however, Congress does not provide

sufficient funding for the program authorized in MAP-21, the adjustment process to guarantee a

95% return might have to be implemented. Also, some states may prefer that state return on

payments to the HTF be used to determine the “initial amount,” rather than the state share of total

FY2005-FY2009 funding, largely because of earmarking legacy issues.

SAFETEA’s Earmarking Legacy

SAFETEA included 6,372 earmarks, more than any previous surface transportation authorization

bill, valued at $24.3 billion.34 Of the $22.1 billion of highway earmarks, 67% were “below the

line,” which meant the earmarks did not bring additional money to the receiving state because the

state’s Equity Bonus distribution was reduced by a like amount. The other 33% were “above the

line” and increased the amount of funds flowing to the receiving states, in most cases increasing

those states’ shares of total highway program funding. This became an issue under the extension

legislation. Although the individual earmarks were not extended, the states that previously did

well in obtaining above-the-line earmarks benefited from a higher base amount under the

extension legislation. 35

34

“Overview of Earmarked Projects in the Conference Report,” Transportation Weekly, August 4, 2005, p. 19.

“Highway Extensions Would Extend Highway Earmarks for VIPs,” Transportation Weekly, September 23, 2009,

p. 4.

35

Congressional Research Service

17

.

Surface Transportation Reauthorization Legislation in the 112th Congress

MAP-21 is free of project earmarks. However, because under MAP-21 the apportionment

calculation to the states is based on the state share of both apportioned and allocated funding for

the SAFETEA years (FY2005-FY2009), states that did well in terms of “above the line” earmarks

under SAFETEA would receive apportionment shares under MAP-21 that reflect these increased

amounts.36 SAFETEA’s unequal distribution of earmarking both among Members of Congress

and among the states was very controversial.37 Continuing the crediting of these “above the line”

earmarks in MAP-21’s initial state share calculation could continue to favor states which fared

well during the SAFETEA earmarking process.38

Highway Formula Programs

MAP-21 reduces the number of discrete funding programs by two-thirds to roughly 30 programs.

Most of this reduction is accomplished by absorbing the programs’ eligibilities into the new core

programs discussed below. The core programs also have many areas of overlapping eligibility.

Under MAP-21, the five core programs plus metropolitan transportation planning would be

authorized at $39.143 billion for FY2012 and $39.806 billion for FY2013.

National Highway Performance Program (NHPP; Section 1106)

This program would be the largest of the programs within the restructured Federal-Aid Highway

program. The NHPP would receive $20.5 billion for FY2012 and $21 billion for FY2013. The

program would provide support for improvement of the condition and performance of the

National Highway System.39 Three SAFETEA core programs, the Interstate Maintenance

Program, the National Highway System Program, and the Highway Bridge Program’s NHS

component, would be combined to create most of NHPP. The program would include projects to

achieve national performance goals for improving infrastructure condition, safety, mobility, or

freight movement, consistent with state or metropolitan planning; construction, reconstruction, or

operational improvement of highway segments; construction, replacement, rehabilitation, and

preservation of bridges, tunnels, and ferry boats and ferry facilities; inspection costs and the

training of inspection personnel for bridges and tunnels; bicycle transportation infrastructure and

pedestrian walkways; traffic and traveler information monitoring; intelligent transportation

systems; and environmental restoration, as well as, natural habitat and wetlands mitigation within

NHS corridors. The program focus would be on system maintenance. States would not be allowed

to spend more than 40% of their three-year NHPP apportionment average on new capacity. States

would have to develop National Highway System asset management plans with performance

metrics and targets. If Interstate System and NHS bridge conditions in a state were to fall below

the minimum conditions established by the Secretary of Transportation, certain amounts of funds

would be transferred from other specified programs in the state.

36

It is possible that the state share could also be credited for appropriations earmarks obtained during FY2005-FY2009.

“TW Analysis: ‘Above-the-Line’ Highway Earmarks,” Transportation Weekly, vol. 7, no. 10 (January 17, 2006), pp.

1-10.

38

See “Senate EPW Leaders Unveil $85.3 Billion Two-Year Highway Bill With Major Program Consolidation,”

Transportation Weekly, vol. 13, no. 4 (November 7, 2011), p. 5.

39

Section 1104 redefines the National Highway System and the Interstate System. It also adds the strategic highway

network, “other connector highways” that connect arterial routes, and sets forth the rules for modifications to the

National Highway System and the Interstate System. The NHS would be expanded from roughly 160,000 to roughly

220,000 miles.

37

Congressional Research Service

18

.

Surface Transportation Reauthorization Legislation in the 112th Congress

Transportation Mobility Program (TMP; Section 1108)

This program would assist states and localities in improving the conditions and performance of

federal-aid highways and of bridges on any public road. Essentially, it would replace SAFETEA’s

Surface Transportation Program, less its 10% Transportation Enhancement (TE) set-aside and the

off-NHS system component of the Highway Bridge Program. The TE shifts to the enhanced

CMAQ program. TE type projects, however, also maintain TMP eligibility. The authorization for

TMP is roughly $10.5 billion annually for FY2012 and FY2013.

TMP funds would be eligible for transit uses, carpool programs, traveler information, congestion

pricing, transportation planning, transportation enhancement activities, recreational trails,

ferryboats and ferry facilities, border infrastructure projects, scenic roads, truck parking facilities,

safe routes to school projects, as well as eligibilities from discontinued SAFETEA programs.

TMP funds would also be eligible for state participation in natural habitat and wetlands mitigation

efforts related to projects under Title 23 U.S.C., including statewide and regional natural habitat

and wetlands conservation and mitigation plans. Improvement to a freight railroad, marine

highway, or intermodal facility would be eligible under specified conditions. TMP funds could be

used for maintenance and improvement of all public roads within 10 miles of international

borders on which federally owned vehicles comprise more than 50% of the traffic. States would

be subject to penalties if the total deck area of deficient bridges increased for the two most recent

years.

TMP funds are to be sub-apportioned within states. Fifty percent of each state’s apportionment is

to be apportioned within the state based on the relative share of a state’s population residing

within three categories of areas: (1) urbanized areas with urbanized area populations over

200,000; (2) areas within the state other than urban areas with populations above 5,000; and

(3) other areas in the state. The other 50% could be apportioned to any area in the state.

The Appalachian Development Highway System (ADHS) program would be eliminated but its

routes and access roads would be eligible under TMP. This change would give states more

flexibility to determine spending on the ADHS.

Congestion Mitigation and Air Quality Program (CMAQ; Section 1113)

CMAQ as it exists under SAFETEA would be expanded, in part, by absorbing the eligibilities of

discontinued programs including Transportation Enhancements, Safe Routes to Schools, and

Recreational Trails. Under MAP-21, CMAQ would receive roughly $3.3 billion annually for

FY2012 and FY2013 (under SAFETEA, CMAQ received $1.7 billion for FY2009). The

expanded program would include expanded eligibilities under CMAQ ranging from turning lanes

to demand shifting projects such as telecommuting, ridesharing, and road pricing. For further

discussion of CMAQ, see the “Amendments to the CMAQ Program” section of this report.

Highway Safety Improvement Program (HSIP; Section 1112)

HSIP would remain largely as it is under SAFETEA. It would continue to support projects that

improve the safety of road infrastructure by correcting or improving hazardous road locations,

such as dangerous intersections, or road improvements such as adding rumble strips. HSIP would

be funded at roughly $2.5 billion annually for FY2012 and FY2013. The High Risk Rural Roads

program set-aside would be abolished, although its project eligibilities would be retained. The

Congressional Research Service

19

.

Surface Transportation Reauthorization Legislation in the 112th Congress

Rail-Highway Grade Crossing Program would also be abolished but its eligibility under HSIP

would also be retained.

National Freight Program (NFP; Section 1115)

The NFP would be an entirely new program intended to improve the condition and performance

of a newly designated national freight network. The program would be funded at roughly $2

billion annually for FY2012 and FY2013. This program is discussed in detail in the “New Freight

Initiative” discussion in this report.

Transferability Among the Core Programs (Section 1507)

MAP-21 would reduce from 50% to 20% the maximum percentage of funding that a state can

transfer from any one of its apportioned (mostly core formula) programs to another. Section 1507

of the bill would, however, prohibit the transfer of any TMP funding suballocated by population.

The restriction on transfers among programs may be less limiting than it appears, as the core

programs under MAP-21 would have many areas of overlapping eligibility, potentially reducing

the need for inter-program transfers by the states.

Other Programs

Emergency Relief (ER) Program

Section 1107 would clarify eligibility criteria regarding roads and bridges damaged by natural

disasters or catastrophic failures from an external cause, but that already were closed to traffic or

were already scheduled for the construction phase in the approved statewide transportation

improvement plan at the time of the disaster. It would also reiterate that ER funds can only be

used on federal-aid highways. The $100 million ceiling on a single natural disaster or a single

catastrophic failure in a single state would be eliminated. Section 1506 allows the 180-day

emergency period during which the federal government pays 100% of repair costs to be adjusted

for time lost due to lack of access to damaged facilities. Also, 100% federal share may be allowed

at the discretion of the Secretary of Transportation if the cost to repair exceeds the annual state

apportionment under 23 U.S.C. 104.

Federal Lands and Tribal Transportation Programs

Section 1116 of MAP-21 would restructure the Federal Lands Highways Programs (Public Lands

Highways, Indian Reservation Roads, Park Roads and Parkways, and Refuge Roads) by creating

the Federal Lands and Tribal Transportation Program. The new program would have three main

components: the Tribal Transportation Program; the Federal Lands Transportation Program; and

the Federal Lands Access Program. MAP-21 proposes to fund the Tribal Transportation Program

at $450 million annually. Funding for other federal lands programs would be $550 million

annually. Among the changes in the Tribal Transportation Program is a new statutory formula for

distributing funds among tribes based on road mileage and tribal population. Funding from the

Federal Lands Access Program would be allocated among the states by a formula that takes into

account the amount of federal land, the number of recreational visitors, the number of miles of

federal roads, and the number of federally owned bridges.

Congressional Research Service

20

.

Surface Transportation Reauthorization Legislation in the 112th Congress

Territorial and Puerto Rico Highway Program

Section 1114 would combine the Puerto Rico and Territorial Highway (THP) programs, funding

them at $180 million annually for FY2012 and FY2013. The THP would receive a 25% set-aside

each year, amounting to $45 million annually for Guam, American Samoa, the Northern

Marianas, and the U.S. Virgin Islands. Puerto Rico would receive a 75% per year set-aside, or

$135 million annually. Puerto Rico’s set-aside is limited to certain program eligibilities: 50% for

purposes under NHPP, 25% for purposes under HSIP, and the remainder for purposes eligible

under 23 U.S.C. Chapter 1 (Highways).

Projects of National and Regional Significance (PNRS)

Section 1118 establishes a program similar to the program of the same name in SAFETEA.

Budget authority, not contract authority, of $1 billion is provided for FY2013. This program

would require an appropriation before funds could be made available. The purpose of this

discretionary program is to fund critical high-cost surface transportation infrastructure projects

that are difficult to complete with existing funding but would generate national and regional

economic benefits and increase global competitiveness, reduce congestion, improve roadways

vital to national energy security, improve the movement of freight and people, and improve

transportation safety. No later than three years after the date of enactment, the Government

Accountability Office (GAO) is to report on the process of selection, the factors that went into the

selection, and the justification under these factors for the selection of each project.

Transportation Infrastructure Finance and Innovation Act (TIFIA) Program

An existing federal program for providing credit assistance to large transportation projects is the

TIFIA program. TIFIA stands for the Transportation Infrastructure Finance and Innovation Act,

enacted in 1998 as part of the Transportation Equity Act for the 21st Century (TEA-21) as

amended (P.L. 105-178; P.L. 105-206). Currently, TIFIA provides federal credit assistance, up to

a maximum of 33% of project costs, in the form of secured loans, loan guarantees, and lines of

credit. Loans must be repaid with a dedicated revenue stream, typically a project-related user fee.

MAP-21 proposes several significant changes to TIFIA. Perhaps most importantly, the bill

proposes to greatly enlarge the TIFIA program by authorizing $1 billion annually, up from the

$122 million annually in SAFETEA. These funds would be available to pay the administrative

and subsidy costs of the program. Administrative costs would be capped at 1% of this amount,

leaving about $990 million to pay loan subsidy costs. Assuming an average subsidy cost of 10%,

this may provide DOT with the capacity to make loans totaling $9.9 billion per year. At the same

time, MAP-21 also proposes to increase the share of project costs that TIFIA may provide from

33% to 49%, potentially lowering the share of nonfederal resources leveraged with federal loans.

Another significant change from current law proposed by MAP-21 is to allow credit assistance to

be provided for a program of projects secured by a common security pledge. This would be

accomplished through a “master credit agreement.” Currently, TIFIA only allows the Secretary to

enter into agreements on a project by project basis. The Los Angeles County Metropolitan

Congressional Research Service

21

.

Surface Transportation Reauthorization Legislation in the 112th Congress

Transportation Authority (Metro), for one, has sought this change to accelerate the financing of

12 transit projects (known as the 30/10 Initiative).40

The existing TIFIA threshold for eligible projects of $50 million generally or $15 million for

intelligent transportation system projects remains, except that MAP-21 proposes a threshold of

$25 million for projects in rural areas.41 Rural areas are defined as urbanized areas of 200,000

population or less or nonurbanized areas. Additionally, whereas loans for urban projects must

charge interest not less than the Treasury rate, rural projects are to be offered loans that are half

the Treasury rate. Furthermore, 10% of TIFIA funds made available in MAP-21 are set-aside for

rural projects.

Currently, projects seeking TIFIA assistance are evaluated on eight criteria.42 These criteria would

be abolished, and projects and programs of projects would be evaluated solely on their eligibility

on a first-come, first-served basis. Once funding is exhausted for a year, a project sponsor could

enter into a master credit agreement for future credit assistance or it could decide to pay its own

credit subsidy to permit an immediate loan. MAP-21 would permit the payment of the credit

subsidy from federal surface transportation apportionments. Alternatively, if not all TIFIA

funding is used it may be apportioned to the states for the purposes of the Transportation Mobility

Program.

New Freight Initiative

There is no separate federal freight transportation program in SAFETEA, only a loose collection

of freight-related programs that are embedded in a larger surface transportation program aimed at

supporting both passenger and freight mobility. Most of the freight-related funding authorized by

SAFETEA is provided to the states through the regular highway programs, such as the Surface

Transportation Program (STP). SAFETEA specifically dedicates minor funding to freight

transportation improvements, leaving state DOTs and metropolitan planning organizations to

make most decisions about the priority to be accorded freight. A large, well-defined federal

freight program would be a significant departure from SAFETEA.43

National Freight Program

The Senate bill (S. 1813, Section 1115) proposes a new core program intended to direct funds to

infrastructure segments that are particularly critical to freight movement. The Secretary of

Transportation would designate such segments, based primarily on freight volume and in

consultation with shippers and carriers, as the “primary freight network” (PFN), consisting of

27,000 centerline miles of existing roadways. (For comparison, the existing Interstate Highway

40

Los Angeles County Metropolitan Transportation Authority (Metro), Metro’s 30/10 Initiative,

http://libraryarchives.metro.net/DB_Attachments/100524_30_10_Initiative.pdf.

41

The law also provides eligibility for projects that are 33.3% of the amount of federal highway assistance apportioned

in the most recent fiscal year to the state in which the project is located. This is unchanged in MAP-21.

42

These are the amount of private participation; environmental impact; national or regional significance; project

acceleration; credit worthiness; use of new technologies; reduced federal grant assistance; and consumption of budget

authority.

43

For further discussion of issues related to freight in the reauthorization debate, see CRS Report R40629, Freight

Issues in Surface Transportation Reauthorization, by John Frittelli and William J. Mallett.

Congressional Research Service

22

.

Surface Transportation Reauthorization Legislation in the 112th Congress

System consists of approximately 47,000 centerline miles.) Through a formula allocation, states

would be guided to spend their freight program apportionment on the PFN first before spending

funds on other freight-related infrastructure. The Secretary of Transportation could designate up

to an additional 3,000 centerline miles of existing or planned roads as part of the PFN based on

their future importance to freight movement. Every decade, the Secretary of Transportation would

re-designate the PFN based on the same process.

States would be able to designate “critical rural freight corridors” based on the density of truck

traffic if the roadway connects the PFN or Interstate System with sufficiently busy freight

terminals. States would be able to spend a maximum of 20% of their freight program apportioned

funds on these roads.

The critical rural freight corridors, portions of the Interstate System not designated as the PFN,

and the PFN would be designated as the “national freight network (NFM).”44 States could spend

freight program funds on non-Interstate highways or transit system projects if those projects

would improve freight flows on nearby or parallel interstate highways more cost-effectively than

improving an Interstate segment. States could also spend up to a maximum of 10% of their freight

program apportionment for public or private freight rail or maritime projects, but only if the

Secretary of Transportation determines that a project would make significant improvement to

freight flow, that the public benefit exceeds the federal cost, and that the project provides a better

return than a highway project on the PFN.

Creating a specific funding program for freight movement, as well as requiring states to develop

performance measures, will likely elevate consideration of freight needs in the project selection

process. The designation of a PFN consisting of about 30,000 miles of highway would

concentrate funds on segments most critical to freight movement. The U.S. DOT has estimated

that on 4,700 miles highways with volume exceeding 8,500 trucks per day, trucks have to travel

below the speed limit during rush hours due to congestion, and that on 3,700 additional miles of

highway trucks experience stop-and-go conditions during rush hours.45 Most of these congested

segments are at urban interchanges.46 Because the freight program would rely on apportioned

funds, states could still be reluctant to address bottlenecks that are costly to alleviate with projects

that primarily benefit through trucks (as opposed to trucks serving local shippers). Programs such

as TIFIA, Projects of National and Regional Significance (PNRS), and CMAQ may be more

suitable to funding these types of projects under MAP-21.

Transportation Planning and

Performance Management

MAP-21 would make substantial changes to transportation planning requirements at the national,

state, and local levels. Arguably the biggest change is a requirement for the use of performance

44

The PFN and NFN should not be confused with the existing “National Network” comprising roughly 200,000 miles

of highways designated as safely accommodating large combination trucks.

45

U.S. Department of Transportation, Federal Highway Administration, Office of Freight Management and Operations,

Freight Facts and Figures 2010, based on data from the Freight Analysis Framework, version 3.1, 2010.

46

American Transportation Research Institute, Bottleneck Analysis of Freight Significant Highway Locations,

http://www.atri-online.org.

Congressional Research Service

23

.

Surface Transportation Reauthorization Legislation in the 112th Congress

management throughout the planning process (Subtitle B, “Performance Management”), an idea

that has gained wide currency over the past few years.47 MAP-21 proposes that state and

metropolitan planning include performance measures and targets. Although the bill includes a set

of five national goals (Section 1203),48 for the most part the specific performance measures would

be developed and performance targets set by the states and metropolitan planning organizations

(MPOs) themselves. The consequences for failing to meet the targets are relatively mild, typically

requiring a remedial plan of action on the part of the state or MPO.

At the national level, as part of the new National Freight Program discussed earlier, MAP-21

would require the development of a national freight strategic plan by DOT (Section 1115).

Among other things, the plan would have to establish “quantifiable performance measures for

freight movement on the primary freight network.” In order to obligate funding from the new

freight program, moreover, each state would be required to set performance targets for freight

movement. If a state were to fail to make significant progress toward meeting its performance

targets it would be required to submit a freight performance improvement plan to the Secretary of

Transportation.

As part of the new National Highway Performance Program (Section 1106), each state would be

required to develop a risk-based asset management plan that includes performance targets and an

investment strategy. A state that fails to make significant progress toward achieving its targets

would have to submit a description of actions it will undertake to achieve them. As part of the

planning, the Secretary would have to, among other things, set minimum standards for the

condition of pavement on the Interstate System and the condition of bridges on the NHS. If the

condition of Interstates and NHS bridges were to fall below that minimum, a state could be

required to redirect its federal apportionments to bring those facilities up to par.

In some respects, MAP-21 would leave state planning requirements as they are. Each state would

still be required to develop a statewide transportation plan and a statewide transportation

improvement program. However, there are some changes (Section 1202). Statewide plans and

improvement programs would have to incorporate metropolitan transportation plans and

transportation improvement programs without change. Currently, statewide plans need only to be

developed in cooperation with the MPO. Similarly, MAP-21 would require states to develop their

plans in cooperation with nonmetropolitan areas, a stronger requirement than the current need for

“consultation.”

As with many other elements of MAP-21’s planning provisions, states would be required to

incorporate a performance-based approach into transportation planning. Performance measures

and targets would have to be coordinated with those developed in other planning efforts, such as

the national freight strategic plan. The performance plan would have to include a financial plan.

In terms of metropolitan transportation planning (Section 1201), MAP-21 proposes to create two

tiers of MPOs, Tier I in areas with populations of 1 million or more and Tier II in areas of less

than 1 million. Tier I and Tier II MPOs would have to meet certain, but presumably different,

minimum technical requirements having to do with modeling, data, staffing, and other planning

47

See, for example, American Association of State Highway and Transportation Officials, AASHTO Authorization

Policy, Topic I: Performance Management, Washington, DC, http://www.transportation.org/sites/policy_docs/docs/

i.pdf.

48

These are safety; infrastructure condition; system reliability; freight movement and economic vitality; and

environmental sustainability.

Congressional Research Service

24

.

Surface Transportation Reauthorization Legislation in the 112th Congress

elements. The Secretary would be required to issue regulations establishing these minimum

requirements one year from the date of enactment. For Tier I MPOs, MAP-21 will require

performance-based planning and targets, elements that will be evaluated by DOT as part of an

MPO’s certification. According to MAP-21, requirements for Tier II MPOs will be more at the

discretion of the Secretary and may include performance measures. MAP-21 also includes

provisions for the optional development of multiple scenarios, sometimes known as blueprint

planning. MAP-21 provides that both Tier I and Tier II MPOs are allowed to select projects from

their TIPs in consultation with state, as is the case now, but MAP-21 adds that it must also be

done with the concurrence of the facility owner.

As part of the rewriting of the metropolitan planning provisions, MAP-21 proposes to require the

designation of MPOs only in urbanized areas of 200,000 population or more, up from 50,000 or

more as required in current law. Nevertheless, MPOs in urbanized areas of less than 200,000

could be designated by agreement between the governor and local officials, although these MPOs

would have to meet the minimum technical requirements as determined by the Secretary for Tier

II MPOs. Existing MPOs in areas under 200,000 population, unless reaffirmed by the MPO and

governor, and approved by the Secretary, are to be terminated three years after regulations are

promulgated for Tier II MPOs.

One other intent of MAP-21 appears to be consolidating metropolitan planning within a single

MPO in each urban region. However, the proposed legislation provides that more than one MPO

can co-exist if the governor and an existing MPO decide that it is appropriate for an area.

Accelerating Transportation Project Delivery

Budgetary pressures at all levels of government have increased concern about using resources for

transportation projects as effectively as possible. The speed with which transportation projects are

delivered, and the role the federal government plays in the project delivery process, have received

particular attention. See CRS Report R41947, Accelerating Highway and Transit Project

Delivery: Issues and Options for Congress, by William J. Mallett and Linda Luther.

Similar to previous transportation reauthorization legislation, MAP-21 includes provisions

intended to expedite overall transportation project development (under its Subtitle C,

“Acceleration of Project Delivery”). Like TEA-21 and SAFETEA before it, these provision in

MAP-21 focus primarily on elements of the environmental compliance process, particularly

activities required pursuant to the National Environmental Policy Act of 1969 (NEPA, 42 U.S.C.

§4321 et seq.). MAP-21 also includes non-environmental provisions, such as requirements

applicable to contracting procedures and relocation assistance.

Provisions Applicable to the Environmental Compliance Process

The environment-related provisions in MAP-21 apply to activities associated with the

environmental review phase of transportation project development. The “environmental review

process” is the phase in overall project development in which applicable state, tribal, and federal

environmental compliance requirements, including those established under NEPA, are identified

and documented. Compliance with those requirements may require input or cooperation from

federal, state, or tribal agencies. Before final design activities, property acquisition, purchase of

Congressional Research Service

25

.

Surface Transportation Reauthorization Legislation in the 112th Congress

construction materials or rolling stock, or project construction can proceed, FHWA or FTA must

ensure that the environmental review process for that project is complete.

Depending on project-specific impacts, various environmental requirements may apply to a given

transportation project, but NEPA will always apply to federal-aid highway and transit projects.

Broadly, NEPA requires federal agencies to consider the environmental impacts of an action

before proceeding with it. To ensure environmental impacts are indeed considered, NEPA requires

that an environmental impact statement (EIS) be prepared for all major federal actions

“significantly” affecting the environment. If the significance of a project’s environmental impacts

is unclear, an environmental assessment (EA) must be prepared to make that determination.

Projects that do not individually or cumulatively have significant environment impacts are

categorically excluded from the requirement to prepare an EIS or EA. Hence, they are referred to

as categorical exclusions (CEs). DOT’s NEPA regulations list two groups of actions that are

generally CEs—those that require no additional DOT approval and those that may be processed

as CEs when appropriately documented and approved by DOT.49 Since 1998, approximately 90%

of highway projects approved annually by FHWA were processed as CEs and approximately 6%

required an EA.50 While such projects may have “no significant environmental impact under

NEPA,” they may still be subject to other environmental requirements pursuant to the National

Historic Preservation Act, the Clean Water Act, the Endangered Species Act, or other laws.

Efforts to expedite overall project delivery in MAP-21 focus primarily on elements of the NEPA

process. The most significant changes to the environmental review process are those that would

be established under Section 1313, “Accelerated Decisionmaking,” and Section 1316, “Review of

Federal Project and Program Delivery.” Under Section 1313, MAP-21 would amend existing

environmental review procedures to establish new requirements applicable to “issue resolution.”51

The provisions would establish criteria intended to ensure that all parties to the environmental

review process are on schedule to meet project deadlines and to resolve disputes that may delay

completion of that process or result in denial of any approval required under applicable law.52

Under Section 1313, MAP-21 would also establish “financial transfer provisions” applicable to

an agency that fails to issue or deny a permit, license, or other approval required under any

federal law. Under certain conditions, the applicable office of the head of the agency responsible

for the delay would be required to transfer $10,000 or $20,000, once a week,53 to the agency or

divisions charged with rendering a decision regarding an application. A transfer would be

required on the later of 180 days after an application for a permit, license, or approval is

49

Actions requiring no additional approval from DOT are listed under 23 C.F.R.§771.117(c). They include projects

such as emergency repairs from a natural disaster or catastrophic failure and landscaping activities. Actions that require

some level of DOT approved are listed under 23 C.F.R. §771.117(d). These projects have a higher potential for

impacts, but still generally meet the CE criteria because environmental impacts are minor They include projects such as

modernization of a highway by resurfacing, rehabilitation, reconstruction, adding shoulders, or adding auxiliary lanes

(e.g., parking, weaving, turning, climbing).

50

See “FHWA Projects by Class of Action” at http://www.environment.fhwa.dot.gov/strmlng/projectgraphs.asp/.

51

Pursuant to requirements applicable to “Efficient environmental reviews for project decisionmaking,” established

under 23 USC §139(h).

52

Under Section 1313, “all parties” refers to the project sponsor, lead agencies, resource agencies and any relevant

state agencies.

53

For an individual project, the total amount transferred cannot exceed 1% of annual funds made available for the

applicable agency office; the total amount transferred cannot exceed 5% of an agency’s annual funds.

Congressional Research Service

26

.

Surface Transportation Reauthorization Legislation in the 112th Congress

complete; or 180 days after a final project decision is made, pursuant to NEPA. The transfer

would not be required if the delay is of no fault of the agency.

Agencies responsible for issuing approvals or permits for DOT projects will depend on the

impacts of that project, but may include EPA, the U.S. Army Corps of Engineers, or the

Department of the Interior’s U.S. Fish and Wildlife Service. A given divisional, regional, or local

program office within one of these agencies may process hundreds of permit applications

annually for a range of regulated activities—for projects beyond those applicable to transportation

project development (e.g., private land development, mining operations, oil and gas development,

cattle grazing,). Agency under-staffing or lack of funds is sometimes cited as a cause of delay in

issuing necessary approvals or permits. A requirement to redirect limited agency funds for the

purpose of expediting a single transportation project approval may have the unintended affect of

slowing other applications being processed by that office.

Under Section 1316, MAP-21 would require DOT to prepare assessments that compare the

completion times of CEs, EAs, and EISs initiated after calendar year 2005 to those initiated

during a period prior to calendar year 2005; and to compare the completion times of CEs, EAs,

and EISs initiated during the period beginning on January 1, 2005 and ending on the date of

enactment of MAP-21 to those initiated after MAP-21’s enactment. DOT would be required to

report this information to Congress within one year after enactment. No specific funding is

authorized to complete the required assessments.

Determining the time it takes to complete the various NEPA documents, as directed under Section

1316, will likely be challenging. Information indicating when individual EIS preparation begins

and ends is available, but is not necessarily an accurate reflection of the time it takes to complete

the NEPA process. Little or no data are available for projects processed with EAs or CEs. State

DOTs generally do not attempt to track the time it takes to complete the NEPA process or any

other environmental compliance obligations. Also, NEPA compliance fits into the overall project

delivery process as a subset of one or more major elements of project development. Extracting

accurate information about the time it takes to complete activities specific to the NEPA process

may not be possible. To meet Congress’s directive, DOT may require states to begin tracking this

information and report it to DOT. Such a requirement would be an addition to the existing

environmental clearance process.

MAP-21 provisions applicable to CEs generally involve directives to DOT to change existing

regulatory requirements applicable to such projects. The most significant provisions applicable to

CEs, “Programmatic Agreements and Additional Categorical Exclusions” (Section 1310), would

direct DOT to survey state agencies for suggested new CEs. From those suggestions, DOT would

be required to promulgate regulations adding projects to the existing regulatory list of CEs. Also,

DOT would be directed to change existing CE regulations by moving specific projects listed as

those that require documentation and approval from DOT to the list of projects for which no

additional DOT approval is required (i.e., to move certain projects from 23 C.F.R.§771.117(d) to

§771.117(c)). Other CE-related provisions would specify DOT agency roles in meeting NEPA

compliance requirements for multimodal projects (Section 1306) and direct DOT to promulgate

regulations specifying criteria under which specific projects located solely within the right-ofway of an existing highway may be designated as categorical exclusions (Section 1309).

Provisions that would continue or amend environment-related programs or procedures established

under SAFETEA, include the following:

Congressional Research Service

27

.

Surface Transportation Reauthorization Legislation in the 112th Congress

•

Assistance to Affected State and Federal Agencies—would continue to

authorize the use of federal transportation funds for dedicated staff at a federal

agency that would support activities that directly contribute to expediting and

improving transportation project planning and delivery. However, under this

section, before DOT funding approval, the agency receiving DOT funds and the

state (e.g., project sponsor) would have to enter into a memorandum of

understanding establishing project priorities to be addressed by using those funds

(Section 1305).

•

State Assumption of Responsibilities for Categorical Exclusions—would

amend existing requirements to include a “sovereign immunity” provision

requiring states that consent to assume DOT’s role in implementing and

enforcing requirements applicable to CE determinations to accept the jurisdiction

of federal courts; states would be allowed to use apportioned transportation funds

for attorneys’ fees directly attributable to activities associated with projects

implemented under this section (Section 1307).

•

Surface Transportation Project Delivery Program—would make permanent

the “surface transportation project delivery pilot program” that allowed five

specific states to assume federal responsibilities for environmental reviews

required under NEPA or any other federal law. Under the new program, any state

could participate and DOT would be required to make certain determinations

regarding a state’s ability to implement the program. Provisions similar to those

under Section 1307 regarding sovereign immunity and legal fees are also

included (Section 1308).

•

Additional environment-specific provisions under MAP-21’s Subtitle C generally

identify certain activities as being of importance to Congress, reinforce the

importance of activities DOT is currently implementing, or clarify existing

requirements applicable to NEPA compliance.54

Non-environmental Provisions Accelerating Project Delivery

Outside of the environmental review process, MAP-21 would make three main changes to

existing law in an attempt to speed project delivery. First, in Section 1303, MAP-21 would add

specific authority for state DOTs to enter into construction manager/general contractor (CM/GC)

contracts. According to FHWA, CM/GC contracts occupy a middle ground between the

traditional design-bid-build construction method and the more innovative design-build method in

which a single contractor is responsible for all the design and construction work.55 With a CM/GC

contract, a state DOT employs a general contractor to provide advice during the design phase. If

agreement can be reached on price and other details, the same firm may then be employed to

build the project. With intimate knowledge of the project, it is believed the contractor is able to

enter into such an agreement and can begin construction tasks before the design work is complete,

thereby accelerating the delivery of the project.

54

These provisions include Sections 1301, project Delivery Initiative; Section 1302, Clarified Eligibility for Early

Acquisition Activities Prior to Completion; Section 1303, Efficiencies in Contracting; Section 1304, Innovative project

Delivery Methods; Section 1311, Accelerated Decisionmaking in Environmental Reviews; Section 1312, Memoranda

of Agency Agreements for Early Coordination; and Section 1314, Environmental procedures Initiative.

55

Federal Highway Administration, “Every Day Counts Initiative: Accelerated Project Delivery Methods,”

http://www.fhwa.dot.gov/everydaycounts/projects/methods/index.cfm.

Congressional Research Service

28

.

Surface Transportation Reauthorization Legislation in the 112th Congress

Second, MAP-21 would increase the federal funding share (normally 90% for Interstate Highway

projects and 80% for other projects) by 5% on highway projects that demonstrate some kind of

innovative project delivery method or technology (Section 1304). This applies to projects funded

from the National Highway Performance Program, the Transportation Mobility Program, and the

National Freight Program (the increased federal share is limited to 10% of a state’s

apportionments under these programs). Examples of innovations listed in MAP-21 include

prefabricated bridge elements, digital 3-dimensional modeling technologies, and design-build and

CM/GC contracting methods.

Third, MAP-21, in Section 1315, would create a pilot program, limited to not more than five

states, permitting advance payment of moving costs for people and businesses forced to relocate

because of a highway project.56 These advanced payments may be combined with payments to

compensate for the acquisition of real property. Currently, moving costs are reimbursable.

Presumably, this “Alternative Relocation Payment Demonstration Program” is intended to speed

the removal of people from the project right-of-way. However, it is a relatively minor change

compared with other suggested alternatives to laws governing the acquisition of property and

relocation of those displaced. For example, state transportation officials have recommended

allowing states to substitute their own property acquisition and relocation laws if they meet

federal requirements.57

Amendments to the CMAQ Program

Under Section 1113 of MAP-21, the Congestion Mitigation and Air Quality Improvement

Program (CMAQ) would be essentially re-written. 58 The CMAQ program was established to

provide funds for projects and programs which may reduce the emissions of transportation-related

pollutants that may cause an area within a state to exceed certain air quality standards.

Under the Clean Air Act, the Environmental Protection Agency (EPA) was directed to set air

quality standards for certain pollutants. Of relevance to transportation planning agencies were the

resulting National Ambient Air Quality Standards (NAAQS) established for ozone, carbon

monoxide, and particulate matter (distinguished as coarse and fine particulate, referred to as PM10

and PM2.5, respectively).59 A geographic area that meets or exceeds NAAQS for a particular

pollutant is considered to be in “attainment”; an area that does not meet a standard is in

“nonattainment.” A “maintenance” area is one that was previously in nonattainment, but is

currently attaining the NAAQS subject to a maintenance plan. The CMAQ program was

established to provide funds particularly for projects in nonattainment and maintenance areas.60

56

Uniform Relocation Assistance And Real Property Acquisition Policies Act of 1970 (42 U.S.C. 4601 et seq.).

American Association of State Highway and Transportation Officials, AASHTO Authorization Policy, Topic IV:

Project and Program Development and Delivery, Washington, DC, http://www.transportation.org/sites/policy_docs/

docs/iv.pdf.

58

Established under 23 U.S.C. §149.

59

“Mobile sources,” such as cars, trucks, buses, and other vehicles, are considered significant sources of these

pollutants. NAAQS have also been established for lead and sulfur dioxide, but mobile sources are not significant

sources of those pollutants.

60

The Clean Air Act Amendments of 1990 directed EPA to establish the NAAQS. In the year following year, CMAQ

was established under provisions in the Intermodal Surface Transportation Efficiency Act of 1991 (ISTEA). The

program was amended and program funding was reauthorized in both TEA-21 in 1998 and SAFETEA in 2005.

57

Congressional Research Service

29

.

Surface Transportation Reauthorization Legislation in the 112th Congress

Under MAP-21, CMAQ program goals, criteria specifying project eligibility, and requirements

regarding partnerships with private entities would be largely unchanged. However, proposed

amendments to the CMAQ program would significantly change how program funding levels are

established and how those funds would be apportioned to and distributed within individual states.

Since the early 1990s Congress authorized specific annual CMAQ program funding levels. Those

funds have been apportioned to each state according to a formula based on the state’s population

and regional pollution levels (e.g., depending on an area’s level of nonattainment for a particular

pollutant). 61 MAP-21’s CMAQ apportionment for FYs 2012 and 2013 would not be a specific

dollar amount. Instead, as discussed in “Highway Formula Distribution,” CMAQ funds

apportioned to each state would be tied to the amount of CMAQ funds apportioned to that state in

FY2009 plus 10% of the apportioned amount to STP funds for that year. CMAQ funds

apportioned to each state would then be distributed within each state based on certain limitations

and suballocations established under the new CMAQ program.

CMAQ Distribution Limitations

Of the CMAQ apportioned funds, a state would be required to reserve the amount attributable to

the 10% of previously-apportioned STP funds for any of the following projects or activities:

•

transportation enhancements62

•

the recreational trails program63

•

specific activities associated with planning, designing or constructing

“boulevards, main streets, and other roadways”64

•

projects that involve “providing transportation choices,” such as on-road and offroad trail facilities for pedestrians, bicyclists, and other nonmotorized forms of

transportation65

CMAQ Suballocations

Of the remaining CMAQ funds apportioned to each state, half would be “suballocated” for

projects within each designated nonattainment or maintenance area. Those funds would be

distributed in accordance with a formula developed by the state. However, that formula would

have to be approved by DOT and be weighted by population and the severity of pollution in each

nonattainment or maintenance area (in accordance with factors established in MAP-21).66 Also,

half of the suballocated funds would have to be obligated based on the population of areas in

61

In accordance with calculations applicable to CMAQ program apportionments, under 23 U.S.C. §104(b)(2).

As defined under 23 U.S.C. §101(35); for more information about potentially eligible projects, see FHWA’s

“Transportation Enhancement Activities” web page at http://www.fhwa.dot.gov/environment/te/.

63

Established under 23 U.S.C. §206; for more information about potentially eligible projects, see FHWA’s

“Recreational Trails Program” web page at http://www.fhwa.dot.gov/environment/rectrails/.

64

See MAP-21’s proposed amendment to CMAQ §149(l)(2)(D).

65

See MAP-21’s proposed amendment to CMAQ §149(l)(2)(E).

66

The calculation and distribution of these suballocated funds are largely similar to the current apportionment formula

applicable to CMAQ funding allocations specified under 23 U.S.C. §104(b)(2)(B). In MAP-21, relevant suballocation

requirements would be established under the proposed amendment to CMAQ §149(j).

62

Congressional Research Service

30

.

Surface Transportation Reauthorization Legislation in the 112th Congress

nonattainment or maintenance areas for fine particulates. Further, 30% of the suballocated funds

would have to be set aside to purchase low-emissions construction equipment and vehicles.67

The remaining CMAQ funds apportioned to a state (e.g., not suballocated or reserved) would be

available to the state for eligible projects in any nonattainment or maintenance areas. States in

attainment for NAAQS may use its apportioned funds for CMAQ-eligible projects.

Additional provisions in MAP-21 may significantly change how the CMAQ program is

implemented in individual states. Those provisions include the following:

•

Proposed Section 149(f), Priority Considerations. In nonattainment or

maintenance areas for fine particulates, PM2.5, states and MPOs would be

directed to prioritize CMAQ fund distribution for projects proven to reduce those

pollutants, including diesel retrofits.

•

Proposed Section 149(h), Evaluation and Assessment of Projects. DOT and

EPA would be directed to develop a table illustrating the cost-effectiveness of a

range of projects. States and MPOs would be required to consider this

information in developing performance plans for CMAQ-funded projects.

•

Proposed Section 149(i), Optional Programmatic Eligibility. Technical

assessment of a selected program or projects, conducted at the discretion of

MPOs, would be allowed to demonstrate emissions reductions. Those data could

be used to show that similar projects meet CMAQ eligibility requirements.

•

Proposed Section 149(k), Performance Plan. Requires MPOs to prepare

performance plans for CMAQ-funded projects.

Alternative Fuels and Advanced Technology

Vehicles

Current laws provide incentives to promote the use of alternative fuels and advanced technology

vehicles. These incentives include tax credits for the purchase of plug-in vehicles and for the

production of biofuels from cellulose. (Other credits, including a credit of 45 cents per gallon to

blend ethanol into gasoline and a credit for the purchase of alternative fuel vehicles, have expired

or are set to expire at the end of 2011.) Non-tax incentives include credits automakers receive

under the Corporate Average Fuel Economy (CAFE) program for the production and sale of

alternative fuel vehicles.

Various highway programs also provide non-tax incentives. For example, SAFETEA allowed

states to allow low-emission and energy-efficient vehicles to travel in high occupancy vehicle

(HOV) lanes, although this authority expired at the end of FY2009. MAP-21 would extend this

authority indefinitely. However, MAP-21, Section 1510, would also limit states’ authority to

exempt these vehicles if the HOV lanes become “degraded” to the point that vehicles fall below

67

Federal support for construction equipment diesel engine replacement and upgrades is currently limited to equipment

that is strictly off-road, and sponsors need to verify that the equipment will be used on such project in EPA-designated

nonattainment areas for the vast majority of its useful life. MAP-21, Section 1511, appears to require only 80 hours of

use on a covered project in a nonattainment area.

Congressional Research Service

31

.

Surface Transportation Reauthorization Legislation in the 112th Congress

minimum average speed—generally 45 mph—over 90% of the time during peak travel hours.

Under current law, states must limit exemptions if the exempted vehicles cause the degradation,

while MAP-21 would require states to limit access regardless of the cause of the degradation.

To support the expansion of electric vehicle infrastructure, MAP-21, Section 1509, would allow

highway funds to be used for new charging stations at existing or new parking facilities funded

through the law.

Transit

The Senate’s transit program provisions are contained in the Federal Public Transportation Act

(FPTA) of 2012 and the revenue provisions are in the Highway Investment, Job Creation and

Economic Growth Act of 2012. Neither of these bills has been formally introduced and, hence,

both are unnumbered. These bills are folded into MAP-21, by amendment, in SA 1761.68

The proposed Senate bill would authorize $10.458 billion for federal transit programs annually

for FY2012 and FY2013, the current funding level, with $8.361 billion coming from the Mass

Transit Account of the Highway Trust Fund and $2.098 billion from the general fund (see Table

4).69

Table 4. Proposed Annual Federal Transit Funding in Senate Bill

Authorizations for FY2012 and FY2013

Mass Transit Account

Administration

Planning Programs

$108,350,000

$144,850,000

Emergency Relief

Urbanized Area Formula

Program

Clean Fuels Program

General Fund

such sums as are necessary

$4,756,161,500

$65,150,000

Capital Investment Grants

$1,955,000,000

Elderly and Disabled

$248,600,000

Nonurbanized Area

Formula Program

$591,190,000

Research, Development,

Demonstration, and

Deployment Projects

$34,000,000

68

See Division B—Public Transportation in Sen. Harry Reid, "SA 1761, Amendment of a Perfecting Nature to S. 1813

to reauthorize Federal-Aid highway and highway safety construction programs, and for other purposes," Available at

https://docs.google.com/file/d/0B23rveCvG52eWllWVTBWNWhUZ2FTbk5Tb3FGeGstZw/edit

69

Senate Committee on Banking, Housing, and Urban Affairs, “Federal Public Transportation Act of 2012, Bill

Highlights,” http://banking.senate.gov/public/_files/Transit_Bill_Summary_and_Funding_Chart.pdf.

Congressional Research Service

32

.

Surface Transportation Reauthorization Legislation in the 112th Congress

Mass Transit Account

Transit Cooperative

Research Program

$6,500,000

Technical Assistance and

Standards Development

$4,500,000

National Transit Institute

$5,000,000

Paul S. Sarbanes Transit in

Parks Program

General Fund

$26,900,000

Workforce Development

and Human Resource

Programs

$2,000,000

National Transit Database

$3,850,000

State of Good Repair

$1,987,263,500

Fixed Guideway SGR

$1,874,763,500

$7,463,000

Fixed Guideway SGR

Discretionary

$7,463,000

Motorbus SGR

$112,500,000

Growing States and High

Density Formula

$11,500,000

Total

$8,360,565,000

$2,097,713,000

Source: Senate Committee on Banking, Housing, and Urban Affairs, “Federal Public

Transportation Act of 2012, Bill Highlights,” http://banking.senate.gov/public/_files/

Transit_Bill_Summary_and_Funding_Chart.pdf.

Program Restructuring

The FPTA contains some significant restructuring of the federal transit program. The existing

Fixed Guideway (Rail) Modernization Program would be replaced with a new State of Good

Repair (SGR) Grant Program. This proposed program has three components:

•

The High Intensity Fixed Guideway SGR Formula Program would distribute

funding by formula for the maintenance, repair, and replacement of fixed

guideway public transit defined as: using and occupying a separate right of-way

for the exclusive use of public transportation; rail; using a fixed catenary system;

a passenger ferry system; or a bus rapid transit system. The facility must be at

least seven years old. Funding for this program comes from the Mass Transit

Account of the Highway Trust Fund, and would be distributed by a new formula

that uses vehicle miles and route miles.

•

The Fixed Guideway SGR Grant Program would distribute competitive grants

for the upkeep of fixed guideway systems. Funding for this program would come

from the general fund.

•

The High Intensity Motorbus SGR program would distribute funds by formula

for public transportation provided on a facility with access for other highoccupancy vehicles. The facility must be at least seven years old. Funding comes

Congressional Research Service

33

.

Surface Transportation Reauthorization Legislation in the 112th Congress

from the mass transit account, and would be distributed by a formula that uses

fixed-guideway motor bus vehicle miles and route miles.

Another major change in the FPTA from current law is the elimination of the heavily earmarked

discretionary Bus and Bus-Related Facilities program. It appears that some of the funding for this

program, currently almost $1 billion per year, is added to some of the other formula programs,

particularly the Urbanized Area and Non-Urbanized Area Formula programs.

Another significant change is to combine the Formula Grants for Elderly Individuals and

Individuals with Disabilities Program and the New Freedom Program, which provides formula

funding for the disabled, into a single program to be called Formula Grants for Enhanced

Mobility of Seniors and Individuals with Disabilities.

The current Jobs Access and Reverse Commute program is shifted to be part of the Urbanized and

Non-Urbanized Area Formula programs. The renamed Access to Jobs program requires that

recipients spend at least 3% of their Urbanized Area apportionments on projects that are designed

to help low income individuals travel to and from jobs. Under the Non-Urbanized Area program,

Access to Jobs is an eligible expense.

The Senate bill also creates two new programs that mirror existing highway programs. These are

the Appalachian Development Public Transportation Assistance Program, with $20 million set

aside from the Non-Urbanized Area funds, and the Public Transportation Emergency Relief

Program. This emergency relief program, akin to the existing Highway Emergency Relief

Program, provides funding for capital and operating costs in the event of a natural or man-made

disaster. The bill authorizes such sums as may be necessary to carry out this new program.

As is currently the case, funds from the Non-Urbanized Area Formula Program are also set aside

for transit on Indian reservations. This legislation would double the amount set aside from $15

million to $30 million annually. Of the $30 million, $20 million would be distributed by formula

and $10 million competitively.

New Starts Program

The bill would make substantial changes to the New Starts program. It would allow New Starts

program funds for substantial investments in existing fixed guideway systems that add capacity

and functionality. These types of projects are termed “core capacity improvement projects.” It

also authorizes the evaluation and funding of a program of interrelated projects.

The bill also attempts to simplify the New Starts process by reducing the number of major stages

from four to three. The new stages are termed project development (PD), engineering, and

construction.70 To enter the project development phase, the applicant must apply in writing to the

Secretary of Transportation and initiate the NEPA process. (For more on the NEPA process, see

Accelerating Transportation Project Delivery above.) The bill would eliminate the alternatives

analysis separate from the alternatives analysis in NEPA as currently required by law. Along with

the NEPA work, during PD the project sponsor will have to develop the information needed by

70

Currently, the New Starts process involves four major phases: planning and alternatives analysis; preliminary

engineering; final design; and construction. For more information, see CRS Report R41442, Public Transit New Starts

Program: Issues and Options for Congress, by William J. Mallett.

Congressional Research Service

34

.

Surface Transportation Reauthorization Legislation in the 112th Congress

the Secretary to review the project justification and the local financial commitment. Generally,

the project applicant has two years to compete PD.

The project is permitted to enter into the Engineering Phase once the NEPA process is concluded

with a Record of Decision (ROD), a Finding of No Significant Impact (FONSI), or a Categorical

Exclusion, the project is selected as the locally preferred alternative, the project is adopted into

the metropolitan plan, and is justified on its merits. After Engineering, if successful, a project will

then be eligible to enter into a full funding grant agreement with the Secretary for federal funding

assistance and to move into the construction phase of the project.

The Senate bill also tries to advance projects more quickly using special warrants for projects of

which the federal share is $100 million or less or 50% or less of the total project cost. But the bill

eliminates the Small Starts program that provided dedicated funding to projects requesting $75

million or less in federal assistance and costing in total $250 million or less. The act also creates a

pilot program for expedited project delivery for three projects, as the bill states, “to demonstrate

whether innovative project development and delivery procurement methods or innovative

financing arrangements can expedite project delivery for certain meritorious new fixed guideway

capital projects and core capacity improvement projects.”

Operating Assistance

For the most part, the Senate bill would maintain the prohibition on the use of federal funds for

operating expenses in urbanized areas of 200,000 or more people. However, it adds some

exceptions to this general prohibition. For small bus transit systems in urbanized areas of 200,000

or more people, those operating 75 or fewer buses in peak service would be allowed to use up to

50% of their Urbanized Area apportionments for operating expenses. For transit systems

operating 76 to 100 buses in peak service the allowable amount would be 25% of their Urbanized

Area apportionment. In addition, the bill would allow the use of Urbanized Area formula funds

for operating expenses in urbanized areas of 200,000 or more people with high unemployment

rates for up to three years. The maximum allowable amount would be 25% of an area’s

apportionment in the first year and 20% for years two and three.

Rail Provisions

MAP-21, as amended by SA 1761, adds a title concerning passenger and freight rail (Title VI, of

the Senate bill is the National Rail System Preservation, Expansion, and Development Act of

2012), which pertains to both passenger (intercity and commuter) and freight rail.71

Intercity Passenger Rail

Section 36101 calls for development of a national rail plan, including passenger and freight, to

guide future investments and illustrate on a map priority routes to be served. It also calls for DOT,

71

See Division C, Title VI, in Sen. Harry Reid, "SA 1761, Amendment of a Perfecting Nature to S. 1813 to reauthorize

Federal-Aid highway and highway safety construction programs, and for other purposes," Available at

https://docs.google.com/file/d/0B23rveCvG52eWllWVTBWNWhUZ2FTbk5Tb3FGeGstZw/edit

Congressional Research Service

35

.

Surface Transportation Reauthorization Legislation in the 112th Congress

in coordination with states and others, to develop regional rail plans, excluding the Amtrakowned Northeast Corridor (NEC), to refine the national plan with respect to each region. The

regional plans would include maps identifying rail alignments and station stops, among other

things. Finally, states may also create state rail plans that further refine the appropriate regional

plan with respect to a state. These plans would be relevant to the approval process for federal

capital grants for intercity passenger service.

Regarding the NEC, the bill makes amendments to the NEC advisory commission created by the

Passenger Rail Investment and Improvement Act of 2008 (P.L. 110-432) and requires Amtrak to

submit a new plan for high-speed service (200 mph or greater) in the corridor.

The bill requires DOT, within one year of enactment, to develop guidance on how to better

measure train delays, including automatic measurement. It requires DOT to conduct a data needs

assessment to support development of intercity passenger rail, including cost-benefit analysis and

modeling of estimated ridership. Within two years, DOT is required to survey and report on track

access arrangements for intercity passenger rail operating on other railroads’ tracks and the

processes for resolving disputes over that access.

Rolling Stock Equipment Pool

The bill furthers development of an equipment pool of standardized cars for corridor intercity

passenger services (with endpoints less than 750 miles apart) by creating a corporate or

cooperative entity that is controlled by Amtrak and states funding corridor services. The entity

would serve as the equipment supplier and manager of the standardized cars to be used in corridor

service. The bill also amends the capital grant program for corridor passenger service to include

Amtrak, not just states, as an eligible recipient.72 The intent of the equipment pool is to achieve

economies of scale in car production and maintenance but a drawback is that it could discourage

innovation in car design.

Implementation of positive train control (discussed below) could have a significant impact on

domestic car design. Federal Railroad Administration (FRA) regulations require passenger cars be

designed to limit damage in a collision. This requirement distinguishes U.S. from foreign

passenger cars whose rail systems put more emphasis on crash avoidance than crash survival. As

a result, U.S. cars are much heavier due to more robust bulkhead requirements. However, the

implementation of positive train control (a crash avoidance system) could lead the FRA to modify

its requirements to be more in line with foreign requirements. Notwithstanding “Buy America”

requirements, this has the potential to facilitate a global market for passenger car equipment.

Positive Train Control

The bill allows DOT to extend the deadline beyond December 31, 2015, for implementing

positive train control (PTC) technology, upon application by a railroad, if it is determined to be

infeasible. DOT could extend the deadline by one year increments but not beyond December 31,

72

49 U.S.C. 24401.

Congressional Research Service

36

.

Surface Transportation Reauthorization Legislation in the 112th Congress

2018. The bill also makes PTC implementation an eligible use of RRIF funding (see below) and

requires a joint DOT/FCC study of the spectrum needs for PTC.

Congress mandated PTC in 200873 in response to a deadly collision between a commuter and

freight train in the Los Angeles area and releases of poisonous chemicals from rail tank cars after

derailments in other parts of the country. Passenger railroads (intercity and commuter) and freight

railroads on routes carrying toxic-by-inhalation products are required to install PTC. PTC relies

on radio signaling between devices along the track and in the locomotive that is supposed to

override human error in train control. Railroads and others have objected to PTC has a high-cost

remedy for relatively rare types of train accidents. Lack of adequate spectrum to carry the radio

signals has been raised as an obstacle to implementation in urban areas.

Freight Rail

Section 36401 amends a federal grant program, created in SAFETEA-LU, for relocating railroad

lines having adverse affects on traffic flow or economic development to include the lateral or

vertical relocation (e.g. an overpass or underpass) of a road, not just the rail line.74 Section 36408

amends the Railroad Rehabilitation and Improvement Financing (RRIF) Program, a government

loan program for freight and passenger railroads, to accept as collateral a state or local subsidy or

dedicated revenue stream. It also expands eligible uses of a RRIF loan to include pre-construction

activities such as preliminary engineering, environmental review, and permitting.

The bill makes some modest changes to areas of the freight railroad industry regulated by the

Surface Transportation Board (STB). It raises the ceiling on the maximum total dollar value of

freight charges that shippers (railroad customers) can bring before the STB under its simplified

rate case procedures, from $1 million to $1.5 million in rate relief under the “three-benchmark”

procedure, and from $5 million to $10 million under the “simplified stand-alone-cost”

procedure.75 The bill imposes shorter procedural deadlines for rate relief cases brought under the

more complex “stand-alone cost” methodology. The STB would be required to study whether to

incorporate railroad asset replacement costs in its annual examination of railroad revenue

adequacy, a change advocated by railroads but rejected by the STB in 2008.76 The bill requires the

STB to compile and report on its website railroad service complaints and conduct a review of the

agency’s staffing needs.

Highway Safety

Highway safety programs are the responsibility of the National Highway Transportation Safety

Administration (NHTSA). The Senate highway safety bill (Division C, Title I of S. 1813 as

amended by SA 1761) would retain most of the existing NHTSA grant programs and would

create another: an incentive grant program to encourage states to make texting while driving, and

73

The Rail Safety Improvement Act of 2008 (P.L. 110-432), see section 104.

This grant program is codified at 49 U.S.C. 20154.

75

See Ex Parte No. 646 (Sub-No. 1), available on the STB’s website, for further information on these rate case

procedures.

76

See the filings and decisions issued under Ex Parte No. 679.

74

Congressional Research Service

37

.

Surface Transportation Reauthorization Legislation in the 112th Congress

the use of a cell phone by drivers under age 18, primary traffic offenses.77 It would promote

greater awareness of motor vehicle defect reporting, and would increase the maximum civil

penalty for violations of vehicle safety defect rules from $15 million to $230 million. And it

would require, beginning with model year 2015, that passenger motor vehicles be equipped with

event data recorders.78

Table 5. Highway Safety Grants to States

($ in millions)

FY2011

FY2012

FY2013

Current

$620

$550

—

Senate MAP-21

—

682

691

Commercial Trucking Safety

Significant provisions in the commercial motor vehicle safety title of SA 1761 include79

•

the creation of a clearinghouse of drug and alcohol test results by commercial

drivers in order to prevent drivers who have failed a test from avoiding penalties

by switching employers;

•

an increase in DOT’s ability to act against “reincarnated carriers”—carriers

whose operations have been suspended due to safety violations which then

resume operations under a new name; and

•

requiring that electronic on-board recorders be used on all trucks and buses (in

interstate commerce) to improve compliance with hours-of-service regulations.

•

promoting motorcoach safety by requiring DOT to assign a simple safety rating

to each commercial motorcoach operator, and requiring that rating to be

displayed at all points of sale for the motorcoach operator’s services.

Table 6. Motor Carrier Safety Grants to States

($ in millions)

FY2011

FY2012

FY2013

Current

$310

$307

—

Senate MAP-21

—

310

315

77

At the beginning of 2012, in 32 states, the District of Columbia, and Guam, texting while driving was a primary

offense, and 30 states and the District of Columbia had some version of cell phone use by drivers under 18 or novice

drivers as a primary offense. See http://www.ghsa.org/html/stateinfo/laws/cellphone_laws.html.

78

See Division C, in, Sen. Harry Reid, "SA 1761, Amendment of a Perfecting Nature to S. 1813 to reauthorize FederalAid highway and highway safety construction programs, and for other purposes," Available at

https://docs.google.com/file/d/0B23rveCvG52eWllWVTBWNWhUZ2FTbk5Tb3FGeGstZw/edit

79

Ibid. Title II.

Congressional Research Service

38

.

Surface Transportation Reauthorization Legislation in the 112th Congress

Transportation Research and Education

MAP-21 would authorize $400 million for each of FY2012 and FY2013 for transportation

research and education. It would direct the Secretary of Transportation to carry out a technology

deployment program, including establishing a competitive grant program to accelerate ITS

deployment. It would authorize the Secretary to conduct prize competitions to promote surface

transportation innovations. It would direct DOT to conduct studies on improving many aspects of

transportation, including safety, lifecycle cost analysis, reducing congestion, assessing

infrastructure investment needs, and options for financing. It would authorize 35 grants to be

awarded on a competitive basis annually to university transportation centers for transportation

research.80

Author Contact Information

Robert S. Kirk, Coordinator

Specialist in Transportation Policy

rkirk@crs.loc.gov, 7-7769

Linda Luther

Analyst in Environmental Policy

lluther@crs.loc.gov, 7-6852

William J. Mallett

Specialist in Transportation Policy

wmallett@crs.loc.gov, 7-2216

Brent D. Yacobucci

Section Research Manager

byacobucci@crs.loc.gov, 7-9662

David Randall Peterman

Analyst in Transportation Policy

dpeterman@crs.loc.gov, 7-3267

Mary Tiemann

Specialist in Environmental Policy

mtiemann@crs.loc.gov, 7-5937

John Frittelli

Specialist in Transportation Policy

jfrittelli@crs.loc.gov, 7-7033

80

There are 60 university transportation centers: Research and Innovative Technology Administration, U.S. DOT,

University Transportation Centers Program 2011 Grant Solicitation, July 26, 2011, p. 5 (http://utc.dot.gov/about/

grants_competitions/2011/grant_solicitation/pdf/entire.pdf).

Congressional Research Service

39

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.