Department of Transportation Budget FY2012
Congressional research reportNov 10, 2011
Ask Donna
What actually matters in this document.
Text
Department of Transportation Budget FY2012
(name redacted)
Analyst in Transportation Policy
November 10, 2011
Congressional Research Service
7-....
www.crs.gov
R41650
CRS Report for Congress
Prepared for Members and Committees of Congress
Department of Transportation Budget FY2012
Introduction
The President’s Department of Transportation (DOT) budget request for FY2012 totaled $123.9
billion. It was divided into two parts: a “base” request of $78.6 billion, and a one-time “up-front
boost,” related to the President’s proposal for surface transportation reauthorization beginning in
FY2012, of $50 billion.
The base request was $1.7 billion (2%) more than the FY2010 enacted DOT budget of $76.9
billion. The total request is $53 billion over the FY2010 enacted level. See Table 2 for detailed
figures on the request and Congressional action.
One might ask how this increase was possible in light of the President’s stated intention to freeze
overall federal discretionary spending in FY2012 (and after) at the FY2010 level. It is possible
because most DOT funding is not discretionary funding; it comes from the Highway Trust Fund,
and is therefore categorized as mandatory funding. Thus, virtually all of the proposed increase
counted as an increase in mandatory rather than discretionary funding. Furthermore, the FY2012
DOT budget request proposed to shift funding for some accounts from the general fund to the
highway trust fund (which would be renamed the “transportation trust fund”). This had the effect
of reducing the total discretionary funding requested for DOT in FY2012 compared to the amount
provided in FY2011, all else being equal.
The FY2012 budget request was complex because it did two different things at once: it requested
funding for DOT programs for FY2012, and it restructured the major surface transportation
program accounts and funding structure. The latter changes reflected elements of the
Administration’s proposal for reauthorizing surface transportation programs for the next six years.
The changes included adding intercity rail and new transit construction programs to the programs
financed from the trust fund, and increasing the flow of revenues to the fund, although the source
of the additional revenues was not specified.
Congress had not passed an FY2012 DOT appropriations bill by the time the 2012 fiscal year
began. DOT funding is currently being provided by a continuing resolution (P.L. 112-36, the
second one passed for FY2012), which will expire on November 19, 2011.
Congressional action on FY2012 DOT appropriations was delayed due to several factors. First,
the FY2011 appropriations act for DOT and other federal agencies was not finalized until April
15, 2011.1 Second, the House-passed budget for FY2012 and subsequent 302(b) allocation of
discretionary funding for the Department of Transportation, Department of Housing and Urban
Development, and Related Agencies appropriations bill called for cuts to highway funding,
among other accounts, that were so steep that some doubted they could pass; perhaps for this
reason, action on the bill in the House was postponed. The Senate did not pass a Budget Act for
FY2012. Soon after completion of FY2011 appropriations, congressional attention was taken up
by protracted negotiations over raising the federal debt limit. These negotiations included
discussion of the overall FY2012 appropriations level. Action on raising the debt ceiling. as well
as setting an overall FY2012 appropriations level, was not concluded until August 2, 2011, with
enactment of the Budget Control Act of 2011.2
1
2
P.L. 112-10, The Department of Defense and Full-Year Continuing Appropriations Act, 2011.
P.L. 112-25
Congressional Research Service
1
Department of Transportation Budget FY2012
The Senate Committee on Appropriations reported out an FY2012 appropriations bill for the
Department of Transportation (and HUD and related agencies), S. 1596, on September 21, 2011.
This bill has been combined with two other appropriations bills (Agriculture and CommerceJustice-Science) in a “minibus” (as opposed to “omnibus”) appropriations bill, H.R. 2112. That
bill was approved by the Senate on November 1, 2011.
The House Committee on Appropriations Subcommittee on Transportation, Housing and Urban
Development, and Related Agencies approved a draft bill by voice vote on September 8, 2011.3
The unnumbered draft bill has not been taken up by the full committee. Press reports indicate that
the House and Senate are conferencing on the minibus bill.
Selected Budget Issues
Comparison of FY2011 and FY2012 figures
DOT funding has typically increased from year to year. The FY2011 appropriation broke that
trend, with an overall new funding level of $72.6 billion, $4.3 billion (5.5%) less than the
comparable FY2010 level. The FY2012 budget request proposed a restructuring of DOT surface
transportation programs and a $50 billion “up-front” appropriation, on top of DOT’s requested
base FY2012 funding, to provide an immediate boost to transportation infrastructure
improvement and job creation. This up-front funding was depicted as an alternative to the typical
surface transportation reauthorization funding plan, in which funding levels gradually increase
over an authorization period of several years. This appropriation would have front-loaded a large
increase in funding in the first year of the Administration’s proposed six-year surface
transportation reauthorization plan, with funding levels for each of the subsequent five years
lower than the total for FY2012.
The Administration has not yet submitted legislation to implement their reauthorization proposal;
the existing authorization for surface transportation programs has been extended. Thus, while the
FY2011 enacted funding and the House and Senate figures for FY2012 are comparable,
comparing the surface transportation figures to those in the FY2012 budget request is complex.
This requires an unwinding of the proposed new program structures in the Administration’s
request to be able to compare the request to the existing program structure, and decisions about
how to allocate the additional $50 billion request for up-front funding between discretionary
funding and mandatory funding.
The Senate Committee on Appropriations allocated about $20 billion of the up front funding
request to discretionary funding, resulting in a discretionary budget request of $34.0 billion,
compared to enacted new funding of $17.6 billion in FY2011. The remaining $30 billion was
allocated to mandatory (trust fund) budget authority, resulting in a request for $94.4 billion, up
from $54.2 billion enacted in FY2011.
3
The text of the draft bill (http://appropriations.house.gov/UploadedFiles/FY_2012THUD.bill_xml.pdf) and of an
accompanying draft report (http://appropriations.house.gov/UploadedFiles/FY_2012THUDReport.pdf) is available at
the committee’s website.
Congressional Research Service
2
Department of Transportation Budget FY2012
Essential Air Service (EAS)
The President’s budget requested $123 million for the EAS program, a $27 million (12%)
decrease from the $150 million Congress provided in FY2011. The Senate approved $143 million
for the program for FY2012; the House Appropriations Committee THUD subcommittee draft
bill recommended $100 million. These funds are added to $50 million that is reserved for the
program each year, so the total funding proposed by the Senate for FY2011 is $193 million,
compared to a total of $200 million in FY2011 (and the same amount in FY2010).
This program seeks to preserve air service to small communities by subsidizing the cost of that
service. Supporters of the EAS program contend that preserving airline service to small
communities was a commitment Congress made when it deregulated airline service in 1978, as
anticipated reductions in air service due to deregulation were claimed to reduce economic
development opportunities in rural areas. Critics note that the subsidy cost per passenger is
relatively high, that many of the airports in the program serve few passengers, and that some of
the airports receiving EAS subsidies are little more than an hour’s drive from major airports
The costs of the program have more than doubled since FY2008. This is due to several factors.
Route reductions by airlines have resulted in an average of six new communities joining the
program each year in recent years. Also, there is a requirement that planes servicing EAS
communities must have, at a minimum, capacity to carry 15 passengers. Detractors of this
requirement note that smaller planes would be cheaper to operate and that the number of
passengers at many EAS airports could be handled by smaller planes.
The Administration proposed to limit FY2012 funding in the program to those communities
which received subsidies in FY2011 (the same proposal was made for the FY2011 budget,
seeking to limit recipients to those funded in FY2010), and to eliminate the 15-passenger aircraft
requirement. The Senate-passed bill supported both of these proposals. The House draft bill
supported the limit on new recipients.
Highway Trust Fund
Most highway and transit funding is taken from the Highway Trust Fund, whose revenues come
largely from the federal motor fuels excise tax. For several years, expenditures from the fund
have exceeded revenues; for example, in FY2010, revenues were approximately $35 billion,
while expenditures were approximately $50 billion. Congress transferred a total of $34.5 billion
from the general fund of the Treasury to the Highway Trust Fund during the period FY2008FY2010 to keep the trust fund solvent. The Congressional Budget Office projects that the trust
fund will become insolvent around the end of FY2012.
The President’s budget proposed to rename the fund the Transportation Trust Fund and to increase
authorized expenditures from the Fund to $554 billion over the next six years by increasing the
funding levels of existing surface transportation programs and by adding the Federal Railroad
Administration and the Federal Transit Administration’s New Starts transit construction program
to the programs funded by the fund. This proposal reflects, in part, a recommendation of the
National Commission on Fiscal Responsibility and Reform to expand the Highway Trust Fund to
cover rail infrastructure – but the Commission also recommended increasing the gas tax by 15
Congressional Research Service
3
Department of Transportation Budget FY2012
cents per gallon by 2015, then limiting expenditures from the Fund to match its revenues.4 The
budget request does not propose an increase in the gas tax, nor does it explain how the Fund
would support the proposed higher level of expenditures; it says that the President does not
support an increase in the federal gasoline tax, but will work with Congress to find new revenue
sources.
The House draft states that it provides funding from the Highway Trust Fund at a level that the
revenues of the Fund can support in FY2012; this results in a reduction of 35% from FY2011
levels for the two largest accounts supported by the Highway Trust Fund (from $41.1 billion to
$27.0 billion for the federal-aid highway program account, and from $8.3 billion to $5.2 billion
for the transit formula and bus grant funding account).
The Senate bill’s committee report said that it recommended the levels of funding for highway
and transit that are authorized in the SAFETEA extensions; that is virtually the same level as in
FY2011 ($41.1 billion for highways and $8.4 billion for transit). The report did not address the
Highway Trust Fund’s revenue difficulties.
National Infrastructure Bank (I-Bank)
The budget proposes $5 billion for a national infrastructure bank. The bank would provide loans
or grants to finance transportation projects having national or regional significance. Such projects,
such as major bridges on the interstate highways system, are often difficult to build under the
current structure of transportation funding, because they benefit the residents of many states but
their costs fall on the residents of the state in which the project is located. In the past, such
projects have sometimes been financed through specific funding designations by Congress. The
national infrastructure bank would, according to the Administration, provide a means for such
projects to be evaluated and for the most productive projects to be selected and financed.
Legislation to implement this proposal was not enacted, and the proposal was not funded by the
House draft or the Senate-passed bill.
National Highway Traffic Safety Administration (NHTSA)
Although the budget request represented an $18 million cut in overall funding from the $878
million provided in FY2011, the request noted that, with the funding available from completion
of the $124.5 million Safety Belt Performance Grants program, the request would allow the
agency “to increase funding for all ongoing primary enforcement, safety, or rulemaking
activities.”5 The Senate-passed bill provided $800 million; the House draft recommended $731
million.
4
The National Commission on Fiscal Responsibility and Reform, “The Moment of Truth,” December 2010,
Recommendation 1.7, p. 24, http://www.fiscalcommission.gov/sites/fiscalcommission.gov/files/documents/
TheMomentofTruth12_1_2010.pdf.
5
Department of Transportation, FY2012 Budget Highlights, p. 24; available at http://www.dot.gov/budget/2012/
fy2012budgethighlights.pdf.
Congressional Research Service
4
Department of Transportation Budget FY2012
High Speed and Intercity Passenger Rail
The budget proposes $4 billion for high speed and intercity passenger rail development under a
new account, Network Development. This is described as the first year of a proposed six-year,
$53 billion program. High speed and intercity passenger rail development is seen as a way of
creating new jobs, providing a new transportation option for intercity travel, and increasing the
capacity, competitiveness, and environmental sustainability of the transportation system. To date,
Congress has provided $10.1 billion for DOT’s high speed and intercity passenger rail grant
program, beginning with $8 billion in the American Recovery and Reinvestment Act of 2009.
In common usage, references to “high speed rail” are generally taken to mean systems such as
those of Japan, France, Spain, and China, where trains travel on dedicated networks at speeds
greater than 150 mph. Perhaps because it is convenient to abbreviate references to this program
by dropping the middle phrase “and intercity passenger rail,” it is often taken to be a program
designed just to fund high speed lines similar to those in other countries. But much of the funding
in this program has gone to develop intercity passenger rail service with top speeds of 90 or 110
mph.
In its public comments the Administration has emphasized the high speed rail portion of the
program. Critics have questioned the economic efficiency of building expensive high speed rail
lines, or even of improving conventional rail lines. While grants have been awarded to 23 states,
after the elections of November 2010, the new governors of three states—Wisconsin, Ohio, and
Florida—rejected grants for rail projects for which their states had received grants totaling $3.6
billion.6 The governors said their states could not afford the costs of improving or building and
maintaining rail lines that would likely require ongoing operating support. The Administration
redistributed the grant money to the many other states pursuing passenger rail development.
In the Full Year Continuing Appropriations Act, 2011, which was enacted after the Administration
submitted its FY2012 budget request, Congress eliminated funding for the high speed and
intercity passenger rail grant program for the balance of FY2011, and rescinded $400 million of
the unobligated portion of the $10.5 billion already appropriated. The FY2012 Senate bill
provides $100 million for the grant program. The FY2012 House draft does not include any
funding for the program.
Amtrak Funding
The budget proposed to place Amtrak funding into a new Federal Railroad Administration
account, System Preservation. This account would fund public rail asset development and
maintenance; at present, Amtrak would be the only recipient of grants, though in the future
competition for the grants is envisioned. Amtrak’s FY2012 grant request totaled $2.2 billion; it
received $1.6 billion in FY2010.7 It appears that the budget request envisioned $1.5 billion for the
program the “base” funding (comparable to the $1.5 billion Amtrak received for FY2011), and
6
Although Florida’s governor has rejected the project, the project apparently had not been officially canceled as of
February 23, 2011, and press reports indicate that efforts are being made to salvage the project.
7
Amtrak, FY2012 Grant and Legislative Request, February 7, 2011, Table 1; available at http://www.amtrak.com
(Inside Amtrak>Reports and Documents).
Congressional Research Service
5
Department of Transportation Budget FY2012
another $2.5 billion that would come from the up-front supplemental funding, for a total request
of $4 billion.8
The Senate bill would provide $1.48 billion for Amtrak; that is almost identical to the amount
provided in FY2011, but $80 million less than provided in FY2010. The House draft would
provide $1.12 billion.
Federal Transit Administration
New Starts and Small Starts (Capital Investment Grants)
FTA’s Capital Investment Grants program funds new fixed-guideway transit lines and extensions
to existing lines. It is is commonly referred to as the New Starts and Small Starts. New Starts
(major capital investment projects) include capital projects with total costs over $250 million
which are seeking federal more than $75 million in federal funding. Small Starts include capital
projects with total costs under $250 million which are seeking less than $75 million in federal
funding.
New Starts projects must go through a multi-stage process, during which they are repeatedly
evaluated by FTA. Projects must receive positive ratings to proceed to the next step. The final
step is signing of a full-funding grant agreement (FFGA) with FTA. The FFGA details how much
funding the project will receive from FTA and the steps of project development. One purpose of
the FFGA is to encourage accurate estimates of project costs; cost overruns are the responsibility
of the grantee.
The Capital Investment Grants program received $2.0 billion in FY2010; in FY2011, it received
$1.6 billion.
For FY2012, the Administration requested $3.2 billion for the New Starts program (see Table 1).
The Senate-passed bill would provide $2.0 billion, the level provided in FY2010 but $400 million
more than the amount provided in FY2011. This would cover the majority of the costs for
existing Full Funding Grant Agreements and pending Full Funding Grant Agreements. The House
draft recommended funding at approximately the FY2011 level ($1.6 billion).
Table 1. Proposed FY2012 FTA Capital Investment Projects by Category
(in millions of dollars)
Existing Full Funding Grant Agreements
$835
Pending Full Funding Grant Agreements
1,295
Recommended New Full Funding Grant Agreements
444
Recommended Small Starts Funding Agreements
181
Other Recommended New Starts/Small Starts Funding Agreements
400
Oversight
81
Total
$3,236
Source: FTA, Annual Report on New Starts Funding Recommendations, FY2012, Table 1, p. 6
(http://www.fta.dot.gov/documents/Annual_Report_main_text_FINAL_2_11_11.pdf).
8
Based on the crosswalk table in the Federal Railroad Administration’s FY2012 Budget Estimate, p. 109.
Congressional Research Service
6
Department of Transportation Budget FY2012
Bus Rapid Transit Eligibility
Bus rapid transit (BRT) is a transportation system that enables bus routes to operate at higher
capacity by adding some of the characteristics of heavy-rail transit (e.g., subways), such as
operating in dedicated lanes without having to stop at traffic signals. Supporters of BRT see it as
an way of getting the greater operating capacities of heavy rail at a lower cost. Critics of BRT
note that comprehensive BRT systems may not be much less expensive than fixed-guideway
systems, and that communities are tempted to leave out elements of a comprehensive BRT system
in order to reduce costs, which also leads to poorer performance.
The Senate bill would direct DOT to fund new bus rapid transit projects (“bus new fixed
guideway projects”) that were recommended in the FY2012 New Starts request from the FTA’s
Bus and Bus Facilities discretionary grant program rather than from the New Starts grant
program. The Bus and Bus Facilities grant program is under the same account as New Starts (both
are part of the Transit Capital Investment Program, along with a third sub-program, the Fixed
Guideway Modernization Program). The Bus program provides funding to communities to
purchase buses, rehabilitate buses, and provide related facilities (e.g., maintenance facilities,
transfer facilities, intermodal terminals, park and ride facilities, passenger shelters). Bus fixed
guideway projects are eligible for funding under the Bus program. This would have the effect of
increasing the amount of funding available for other New Starts projects, and decreasing the
amount of funding available to other bus and bus facilities projects.
New Starts Funding Share
The federal share for New Starts projects can be up to 80%. Since FY2002, DOT appropriations
acts have included a provision directing FTA not to sign any full funding grant agreements that
provide a federal share of more than 60%. This provision was again included in the Senate bill.
The draft House bill has a similar provision, except that it would lower the maximum federal
share to 50%.
Critics of this provision note that the federal share for highway projects is typically 80% and in
some cases is higher. They contend that, by providing a lower share of federal funding (and thus
requiring a higher share of local funding), this provision tilts the playing field toward highway
projects when communities are considering proposed new transportation projects. Advocates of
this provision note that the demand for New Starts funding greatly exceeds the amount that is
available, so requiring a higher local match allows FTA to support more projects with the
available funding. They also note that requiring a higher local match likely encourages
communities to scrutinize the costs and benefits of transit projects more closely.
Congressional Research Service
7
Department of Transportation Budget FY2012
Table 2. Department of Transportation FY2012 Detailed Budget Table
(in millions of current dollars)
Department of Transportation
Selected Accounts
FY2012
House
Draft
FY2010
Enacted
FY2011
Enacted
FY2012
Request
—
—
5,000
Essential Air Servicea
200
150
123
100
143
National Infrastructure Development
600
527
2,000
—
550
890
808
2,289
230
830
Operations
9,350
9,514
9,823
9,674
9,636
Facilities & Equipment
2,936
2,731
2,870
2,798
2,631
191
170
190
175
157
3,515
3,515
2,424
3,350
3,515
Total, FAA
15,992
15,929
18,656
15,997
15,938
Federal Highway Administration (FHWA)(total)
42,789
41,846
70,514
27,739
43,746
Motor Carrier Safety Operations and Programs
240
245
276
230
250
Motor Carrier Safety Grants to States
310
310
330
300
307
550
555
606
530
557
Operations and Researchb
249
246
250
232
250
Highway Traffic Safety Grants to States
620
620
550
495
550
873
878c
860
731
800
2,500
(400)e
—f
—
100
—
—
4,000
—
—
1,565
1,484
—g
1,126
1,481
—
—
4,046
—
—
4,360
1,306
8,229
1,342
1,787
Formula and bus grants
8,343
8,343
—
5,200
8,361
Capital investment grants (New Starts)
2,000
1,597
—
1,554
1,955
10,733
10,017
22,350
7,043
10,630
Maritime Administration (MARAD)
363
359
358
335
353
Assistance to small shipyards
15
10
—
National Infrastructure Bank
FY2012
Senate
—
Office of the Secretary (OST)
Total, OST
Federal Aviation Administration (FAA)
Research, Engineering, & Development
Grants-in-Aid for Airports (AIP) (limitation on
obligations)
Federal Motor Carrier Safety Administration (FMCSA)
Total, FMCSA
National Highway Traffic Safety Administration (NHTSA)
Total, NHTSA
Federal Railroad Administration (FRA)
High-speed and intercity passenger rail grant
programd
Network Development
Amtrak
System Development
Total, FRA
Federal Transit Administration (FTA)
Total, FTA
Congressional Research Service
10
8
Department of Transportation Budget FY2012
FY2010
Enacted
FY2011
Enacted
FY2012
Request
FY2012
House
Draft
FY2012
Senate
Pipeline and Hazardous Materials Safety Administration
(PHMSA)
193
202
220
183
208
Research and Innovative Technology Administration
(RITA)
13
13
18
12
16
Office of Inspector General
75
75
89
80
82
Saint Lawrence Seaway Development Corporation
32
32
34
32
34
Surface Transportation Board
28
29
30
28
29
Appropriation (discretionary funding)
21,877
17,612
33,951
16,747
19,807
Limitations on obligations (mandatory funding)
54,244
54,249
94,432
36,685
54,199
Exempt contract authority (mandatory funding)
739
739
739
739
739
76,860
72,600
129,122
54,171
72,985
—
—
—
—
1,900
21,877
17,612
33,950
16,747
18,046
-422
-3,886
-57
-54
-139
21,455
13,726
33,893
16,693
17,907
Department of Transportation
Selected Accounts
DOT Totals
Total non-emergency budgetary resources, DOTh
Emergency appropriations
Total non-emergency discretionary funding
Rescissions
Net new discretionary budget authority
Source: FY2010 enacted figures from the CSBA tables in H.Rept. 111-564 and S.Rept. 111-230; FY2012 figures
taken from the CSBA table in S.Rept. 112-83, except numbers for the House draft bill taken from the text of the
text of the draft bill and draft committee report and a summary table published on the House Appropriations
Committee site (http://appropriations.house.gov/).
Notes: Subtotals may not add due to omission of some accounts. Subtotals and totals may differ from those in
the source documents due to treatment of rescissions, offsetting collections, etc. The figures in this table reflect
new budget authority made available for the fiscal year. For budgetary calculation purposes, the source
documents may subtract rescissions of prior year funding or contract authority, or offsetting collections, in
calculating subtotals and totals.
a.
These figures include the $50 million in mandatory funding received by the Essential Air Service each year.
The FY2012 request also counts $22 million in unobligated balances from previous years, for a total of $195
million.
b.
Includes National Driver Register Modernization funding.
c.
Reduced to $796 million for budget purposes by a $76 million rescission of contract authority.
d.
FY2012 base figure is calculated by CRS.
e.
No new funding for FY2011; rescinded $400 million from previous years’ appropriations.
f.
The Administration requested $4 billion for a proposed new Network Development program, which would
have included the High Speed and Intercity Passenger Rail Grant Program, and would have been funded
largely from the $50 billion “up front” increment.
g.
The Administration requested $4 billion for a proposed new System Development program, which have
included grants to Amtrak, and would have been funded largely from the $50 billion “up front” increment.
h.
Figures reflect budgetary resources, except DOT FY2012 request reflects budget authority; DOT FY2012
budget requests $123.9 billion in budgetary resources, $128.6 billion in budget authority.
Congressional Research Service
9
Department of Transportation Budget FY2012
Author Contact Information
(name redacted)
Analyst in Transportation Policy
/redacted/@crs.loc.gov, 7-....
Congressional Research Service
10
EveryCRSReport.com
The Congressional Research Service (CRS) is a federal legislative branch agency, housed inside the
Library of Congress, charged with providing the United States Congress non-partisan advice on
issues that may come before Congress.
EveryCRSReport.com republishes CRS reports that are available to all Congressional staff. The
reports are not classified, and Members of Congress routinely make individual reports available to
the public.
Prior to our republication, we redacted names, phone numbers and email addresses of analysts
who produced the reports. We also added this page to the report. We have not intentionally made
any other changes to any report published on EveryCRSReport.com.
CRS reports, as a work of the United States government, are not subject to copyright protection in
the United States. Any CRS report may be reproduced and distributed in its entirety without
permission from CRS. However, as a CRS report may include copyrighted images or material from a
third party, you may need to obtain permission of the copyright holder if you wish to copy or
otherwise use copyrighted material.
Information in a CRS report should not be relied upon for purposes other than public
understanding of information that has been provided by CRS to members of Congress in
connection with CRS' institutional role.
EveryCRSReport.com is not a government website and is not affiliated with CRS. We do not claim
copyright on any CRS report we have republished.
This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.