Summary

On April 20, 2010, an exploratory oil well in the Gulf of Mexico exploded, killing 11 people and

causing the worst oil spill in American history. The oil well was on a tract leased by BP, having

obtained a lease and the relevant permits from the federal government. Under relevant federal

law, federal actions that may have adverse environmental effects are required to be reviewed for

potential environmental harm under the National Environmental Policy Act (NEPA). This report

will review those environmental procedures. While there are additional environmental obligations

imposed on Outer Continental Shelf (OCS) drilling by other acts, this report will not review those

requirements.

Multiple environmental reviews were conducted by the Minerals Management Service (MMS) at

each stage of OCS development. (MMS was reorganized in May 2010, and the relevant office for

the environmental reviews is the Bureau of Ocean Energy Management, Regulation, and

Enforcement (BOEMRE). This report will refer to MMS for actions before the reorganization and

BOEMRE going forward.) For the particular well in question, MMS addressed the environmental

impacts on four occasions, including two full environmental impact statements, an environmental

assessment, and a categorical exclusion. The fact that MMS categorically excluded the

exploration plan from a NEPA analysis is controversial, since that is the first step in which

drilling would be conducted. It appears MMS followed its internal procedure for NEPA reviews

in the western and central areas of the Gulf of Mexico by employing a categorical exclusion for

an exploration plan. However, that procedure has never been reviewed by a court to see if it is

consistent with the law or whether an exception to the categorical exclusion may apply in this

case. Had this project occurred in a different geographical area, including the eastern area of the

Gulf of Mexico, it likely would have undergone a higher level of environmental scrutiny.

Following a White House report suggesting that BOEMRE review its NEPA exclusions,

BOEMRE announced it would not apply the categorical exclusion used in the Gulf until its

review was complete.

Congress has addressed the issue of MMS/BOEMRE categorical exclusions in proposed

legislation. In the 112th Congress, bills have been introduced that would require either a full

environmental impact statement (H.R. 52 (Connolly)), or at least an environmental assessment

(H.R. 501, §§ 208, 215 (Markey)) for exploration, development, and production plans. Both

would change the 30-day deadline for approval of exploration plans. Another proposed NEPA

change would prevent the act from applying to testing oil spill prevention, response, or mitigation

technology in Arctic waters and bar judicial review (S. 203 (Begich)). In the 111th Congress, the

Consolidated Land, Energy, and Aquatic Resources Act of 2010 (CLEAR) (H.R. 3534) would

have required certain levels of environmental reviews for exploration, development, and

production plans, and it would have changed the 30-day statutory deadline for approving

exploration plans to 90 days.

Congressional Research Service

The 2010 Oil Spill: MMS/BOEMRE and NEPA

Contents

Background and Context .............................................................................................................1

NEPA..........................................................................................................................................1

MMS/BOEMRE NEPA Reviews...........................................................................................3

The 2007-2012 Outer Continental Shelf Oil and Gas Leasing Program..................................4

The EIS for the 5-year Plan ...................................................................................................4

The EIS for 11 Gulf of Mexico Lease Sales ...........................................................................6

Adequacy of the Environmental Review of the Multiple Lease Sales ...............................8

Lease Sale 206 Environmental Assessment.......................................................................... 10

Categorical Exclusion for the Exploration Plan.................................................................... 11

Adequacy of the Environmental Review of the Exploration Plan ................................... 14

The Council on Environmental Quality Report on MMS and NEPA .............................. 16

Congressional Attention to Categorical Exclusions ........................................................ 17

Conclusion................................................................................................................................ 18

Appendixes

Appendix A. Background Facts................................................................................................. 19

Appendix B. MMS Categorical Exclusions ............................................................................... 21

Appendix C. The MMS Categorical Exclusion Review Process ................................................. 24

Contacts

Author Contact Information ...................................................................................................... 27

Congressional Research Service

The 2010 Oil Spill: MMS/BOEMRE and NEPA

Background and Context

On April 20, 2010, an exploratory oil well in the Gulf of Mexico exploded, killing 11 people and

causing the worst spill in United States history at approximately 4.1 million barrels (bbl).1 It was

capped in mid-July. The oil well was on a tract leased by BP, having obtained an oil and gas lease

and the relevant permits from the federal government. The spill was at the Mississippi Canyon

Block 252, which is one block obtained by BP under Lease Sale 206. Under applicable federal

law, federal actions that may have adverse environmental effects are required to be reviewed for

potential environmental harm under the National Environmental Policy Act (NEPA). Additional

environmental obligations are imposed by the Outer Continental Shelf Lands Act (OCSLA), 2

Endangered Species Act,3 Marine Mammal Protection Act,4 and the Coastal Zone Management

Act5 but will not be examined within this report. Rather, this report focuses on the environmental

analyses conducted by the Minerals Management Service (MMS) and their compliance with

NEPA. MMS was reorganized in May 2010,6 and the relevant successor office is the Bureau of

Ocean Energy Management, Regulation, and Enforcement (BOEMRE). This report will refer

to MMS for events prior to the reorganization.

NEPA

NEPA states that for all “major Federal actions significantly affecting the quality of the human

environment” federal agencies shall prepare a “detailed statement” of “the environmental impact

of a proposed action, any adverse environmental effects which cannot be avoided should the

proposal be implemented, [and] alternatives to the proposed action.”7 Agencies must comply to

“the fullest extent possible.”

MMS/BOEMRE of the Department of the Interior is the federal agency charged with overseeing

oil and gas exploration of the Outer Continental Shelf (OCS). MMS issued the lease to and

approved the exploration plan of BP for the oil well that caused the spill. Under NEPA

terminology, MMS/BOEMRE is the lead agency for any environmental reviews.8

1

Department of the Interior Press Release, Flow Rate Group Provides Preliminary Best Estimate Of Oil Flowing from

BP Oil Well (May 27, 2010). Available at http://www.doi.gov/news/pressreleases/Flow-Rate-Group-ProvidesPreliminary-Best-Estimate-Of-Oil-Flowing-from-BP-Oil-Well.cfm. Estimates were revised from 5,000 bbl a day to

62,000 bbl a day, decreasing toward the end of the leak to 53,000 bbl. An estimated total of 4.1 million bbl were

released into the Gulf (4.9 million bbl leaked, but 800,000 bbl captured before it leaked into the Gulf). See Official Site

of the Deepwater Horizon Unified Command, at http://www.deepwaterhorizonresponse.com/go/doc/2931/840475.

2

43 U.S.C. §§ 1331 – 1356a. For analysis of the OCSLA, see CRS Report RL33404, Offshore Oil and Gas

Development: Legal Framework, by Adam Vann.

3

16 U.S.C. §§ 1531 – 1544. See Section 1536 for consultation obligations of federal agencies.

4

16 U.S.C. §§ 1361 – 1384. See Section 1371(a)(5)(A) for incidental takes of marine mammals.

5

16 U.S.C. §§ 1451 – 1456. See Section 1456(c) for federal actions affecting coasts.

6

Secretarial Order 3299 (May 19, 2010), available at http://www.doi.gov/deepwaterhorizon/loader.cfm?csModule=

security/getfile&PageID=32475.

7

42 U.S.C. § 4332. The act also requires consideration of “(iv) the relationship between local short-term uses of man’s

environment and the maintenance and enhancement of long-term productivity, and (v) any irreversible and irretrievable

commitments of resources.”

8

As referenced above, MMS was reorganized, effective May 19, 2010. Secretary of the Interior Order No. 3299.

Congressional Research Service

1

The 2010 Oil Spill: MMS/BOEMRE and NEPA

NEPA includes three types of environmental reviews with different levels of scrutiny into the

environmental effects of an action. The goal of the reviews is for an agency to be able to

demonstrate that it has taken an appropriately hard look at the environmental consequences of its

planned activity.9 The environmental review is also supposed to involve the public. 10 The most

comprehensive review is concluded by an environmental impact statement (EIS). It is required by

NEPA for all agency actions that will significantly affect the environment. An EIS should

demonstrate that the agency considered a reasonable range of alternatives that took a hard look at

the environmental consequences of a proposed action. An EIS also requires extensive public

involvement, including a public comment period for a draft EIS and consideration of those

comments in the final document.

Where an action may not have significant effects, or when an agency is unsure of the degree to

which an action may have significant impacts, a review called an environmental assessment (EA)

is conducted. An EA also requires consideration of alternatives to the action and a review of the

effects, but it is intended to be an abbreviated review. The public comment period is limited and

could occur only upon completion of a final document.

The third type of review is for actions that agencies have pre-determined have no significant

impact, typically because an agency routinely conducts the activity. This type of review is a

categorical exclusion (CE, sometimes known as a Cat Ex). Technically, it means a formal review

is not required because the agency has already determined that the environmental consequences

of the action will not be significant.11 Agencies prepare lists of CEs and may exclude a particular

action if it is on that list. The decision to invoke a CE for a project must be documented in some

way. 12 CEs are not allowed when there are extraordinary circumstances surrounding a proposed

action, which generally include the presence of endangered species or significant resources of

some type, such as archeological sites. This is consistent with the purpose of CEs—they do not

apply when there could be a significant environmental impact.

Aside from the interpretive case law, the requirements for NEPA reviews can be found in two

places: the regulations issued by the Council on Environmental Quality (CEQ);13 and within

agency-specific regulations or guidelines. Generally speaking, the CEQ regulations provide the

foundation for NEPA compliance, while the agency guidelines provide for more specific

application to the circumstances of a particular agency. In the case of MMS/BOEMRE, NEPA

procedures are found within the Department of the Interior agency-wide NEPA guidelines in the

Departmental Manual (DM),14 as well as in MMS guidelines within the DM.15

9

Kleppe v. Sierra Club, 427 U.S. 390, 410 n.21 (1976) (the role of a court is to ensure than an agency took a “hard

look” at the environmental consequences); National Audubon Society v. Department of the Navy, 422 F.3d 174, 185

(4th Cir. 2005) (a hard look “encompasses a thorough investigation into the environmental impacts of an agency’s

action and a candid acknowledgement of the risks that those impacts entail”); Idaho Conservation League v. Mumma,

956 F.2d 1508, 1519 (9th Cir. 1992) (courts review whether an EIS “contains a reasonably thorough discussion of the

significant aspects of the probable environmental consequences”); Natural Resources Defense Council, Inc. v. Morton,

458 F.2d 827, at 838 (D.C. Cir. 1972) (an environmental review complies with NEPA “so long as the officials and

agencies have taken the ‘hard look’ at environmental consequences mandated by Congress”).

10

40 C.F.R. § 1506.6. See California v. Block, 590 F.2d 753 (9th Cir. 1982) (informed public participation is a goal of

NEPA).

11

40 C.F.R. § 1508.4.

12

California v. Norton, 311 F.3d 1162 (9th Cir. 2002).

13

40 C.F.R. part 1500.

14

516 DM 1-15, available at http://206.131.241.18/app_DM/index.cfm?fuseaction=searchDM&keyword=

(continued...)

Congressional Research Service

2

The 2010 Oil Spill: MMS/BOEMRE and NEPA

MMS/BOEMRE NEPA Reviews

MMS/BOEMRE’s summary of its OCS program indicates there are four different stages at which

it performs an environmental review for OCS leasing. 16 The summary indicates what type of

environmental review is typically done at each stage. Those stages, and the typical environmental

reviews, are

•

develop a 5-year program—EIS;

•

plan for a specific lease sale—EIS;

•

approve the exploration plan—EA; and

•

approve development and production plan—EIS.

The four stages are based on the OCSLA. 17

Records indicate that MMS conducted four separate environmental reviews related to the oil well

known as Mississippi Canyon Block 252, including two EISs, one EA, and a CE. These four

documents relate to the first three stages described above; two reviews were conducted at the

lease sale stage, and the development and production stage had not been reached. Mississippi

Canyon Block 252 was at the exploration stage. Briefly, those four documents are as follows:

•

April 2007: MMS issued an EIS for the OCS Five Year Leasing Program, the

2007-2012 Outer Continental Shelf (OCS) Oil and Gas Leasing Program. This

document considered environmental impacts related to off shore drilling, not just

within the Gulf of Mexico, but for the two other areas in which off shore drilling

is conducted: around Alaska and along the Atlantic coast.

•

April 2007: MMS issued an EIS for the lease sale in the western and central

portion of the Gulf of Mexico.

•

October 2007: MMS issued an EA for Lease Sale 206, which included

Mississippi Canyon Block 252, finding no new significant impact. This

document was intended by MMS to supplement the other environmental reviews,

which is why instead of the accepted NEPA terminology of “finding of no

significant impact” (FONSI) it referred to no “new” significant impacts.

•

April 2009: MMS issued a CE for the exploration plan that authorized BP to

begin exploratory drilling on its site.

Additionally, two other environmental reviews were conducted that relate to drilling in the Gulf.

Both were programmatic environmental assessments, meaning they were designed to consider

broad impacts from a type of federal action and not just the impacts from one action.

Programmatic environmental reviews are viewed as an efficient way to consider impacts without

(...continued)

516%20DM%201-15.

15

516 DM 15.

16

A copy of this is available at http://www.boemre.gov/PDFs/5BOEMRE_Leasing101.pdf.

17

43 U.S.C. § 1344—5-year plan; 43 U.S.C. § 1337(a)—lease sale; 43 U.S.C. § 1340—exploration plan; and 43 U.S.C.

§ 1351—development and production.

Congressional Research Service

3

The 2010 Oil Spill: MMS/BOEMRE and NEPA

creating redundant reviews. 18 In July 2004, MMS announced completion of a programmatic EA

that evaluated potential impacts of geological and geophysical testing in the Gulf.19 That testing

included seismic testing. A different programmatic EA was announced in March 2005 for

Structure-Removal Operations in the Gulf, 20 which typically involve the use of explosives.

The 2007-2012 Outer Continental Shelf Oil and Gas Leasing

Program

In February 2006, and again in August 2006, MMS sought comments on its proposed 5-year lease

plan for 2007-2012 that would expand OCS leasing areas. The proposed plan addressed 21 OCS

areas, including two in the Gulf of Mexico. 21 An EIS for this plan was prepared, and the final 5year Plan EIS was completed in April 2007.22 The 2007-2012 OCS Oil and Gas Leasing Program

became effective on July 1, 2007. However, a federal court of appeals determined that MMS had

not complied with all of the environmental requirements, and the program was returned to MMS

for revision.23 A preliminary revised 5-year plan was announced in March 2010.24

The EIS for the 5-year Plan

The EIS for the 5-year Plan for 2007-201225 describes its scope as being regional and

programmatic, and it also describes the assumptions made when evaluating the environmental

effects of the proposed action. It divides the environmental effects based on the three

geographical areas within the 5-year Plan: Gulf of Mexico, Atlantic, and Alaska. Different

assumptions are made for each area, and the environmental effects are premised on that. One

assumption for the Gulf of Mexico is the scale of oil spills that could be expected to occur.26 The

estimates were made for potential spills during production and transportation, and do not appear

to consider oil spills at the exploration stage. A large oil spill, according to the 5-year Plan EIS,

would be one of 1,000 barrels (bbl) or greater. Based on historical modeling, MMS calculated a

probable large oil spill from a platform to be 1,500 bbl and 4,600 bbl from a pipeline. 27 The spill

from the current Mississippi Canyon exploration well is categorized as a platform-related spill,

18

40 C.F.R. § 1500.4: “Agencies shall reduce excessive paperwork by ... (i) using program, policy, or plan

environmental impact statements and tiering from statements of broad scope to those of narrower scope, to eliminate

repetitive discussions of the same issues.”

19

MMS, Geological and Geophysical Exploration for Mineral Resources on the Gulf of Mexico Outer Continental

Shelf - Final Programmatic Environmental Assessment, MMS 2004-054 (July 2004). 69 Fed. Reg. 45851 (July 30,

2004).

20

MMS, Structure-Removal Operations on the Gulf of Mexico Outer Continental Shelf Programmatic Environmental

Assessment, MMS 2005-013 (February 2005). 70 Fed. Reg. 9965 (March 1, 2005).

21

71 Fed. Reg. 50457, 50458 (Aug. 25, 2006).

22

72 Fed. Reg. 24326 (May 2, 2007).

23

Center for Biological Diversity v. U.S. Department of the Interior, 563 F.3d 466 (D.C. Cir. 2009).

24

75 Fed. Reg. 16833 (April 2, 2010). Available at http://www.boemre.gov/5-year/2007-2012FEIS.htm. On that same

date, MMS announced intent to prepare an EIS for the next 5-year plan, from 2012 to 2017. 75 Fed. Reg. 16828 (April

2, 2010).

25

MMS, Outer Continental Shelf Oil & Gas Leasing Program: 2007-2012, Final Environmental Impact Statement

MMS 2007-003 (hereinafter 5-year Plan EIS). Available at http://www.boemre.gov/5-year/2007-2012FEIS.htm.

26

5-year Plan EIS, Ch. IV, pp. IV-28 – IV-31.

27

5-year Plan EIS, Ch. IV, pp. IV-29.

Congressional Research Service

4

The 2010 Oil Spill: MMS/BOEMRE and NEPA

even though the leak occurred far below the surface of the water. The 5-year Plan EIS estimates

that the Gulf of Mexico wells would produce 4 to 8 billion bbl of oil and have nine large oil spills

(four from pipelines; four from platforms; and one from a tanker).28 These numbers are for

deepwater and near-shore drilling combined. Approximately 75% of the leasing activity is

planned for deepwater.

The programmatic environmental effects for the preferred alternative for the Gulf Coast included

impacts on the following: air and water quality; mammals and birds; fish, fisheries, and fish

habitat; sea turtles; coastal and seafloor habitats; areas of special concern; socioeconomic

impacts; archeological resources; tourism and recreation; and land use. 29 Some protected

resources in the area include the following endangered species:

•

Northern Right Whale,

•

Blue Whale,

•

Fin Whale,

•

Sei Whale,

•

Humpback Whale,

•

Sperm Whale,

•

West Indian Manatee,

•

Leatherback turtle,

•

Green turtle,

•

Hawksbill turtle,

•

Kemp’s Ridley turtle,

•

Loggerhead turtle,

•

Gulf Sturgeon,

•

Whooping crane,

•

Piping plover,

•

Alabama beach mouse,

•

Choctawhatchee beach mouse,

•

St. Andrew beach mouse, and

•

Perdido Key beach mouse.

The baseline data described above largely influence the discussion of environmental impacts

within this EIS. The data contemplate four platform spills across the entire 40-year lease term

(and not just the five years of the 5-year Plan) that would produce spills of approximately 1,500

bbl each, and only three of those spills would be in deepwater. Accordingly, the analysis of the

effects from the spills is limited to considering how a 1,500 bbl spill could affect the

28

29

5-year Plan EIS, Table IV-4.

5-year Plan EIS, Ch. IV, pp. IV-33 – IV-102.

Congressional Research Service

5

The 2010 Oil Spill: MMS/BOEMRE and NEPA

environment. There is no extrapolation or other hypothesis for what would happen if the spill

were larger. Based on the assumptions of limited spill quantities, the conclusion for the

environmental consequences tends to be in one of two camps: one, that the magnitude of harm

would depend on the timing and quantity of the oil spill (see, for example, Coastal Waters,

Marine Waters, Marine Mammals, Marine and Coastal Birds, Essential Fish Habitat, Sea Turtles);

or two, that because a deepwater spill is calculated to be at 1,500 bbl, it is unlikely to reach areas

where significant impacts could occur (see, for example, Marine and Coastal Birds, Terrestrial

Mammals, Coastal Barrier Beaches, Sea turtle nesting, Seafloor Habitat and Live Bottom and

Pinnacle Areas).

Environmental groups argued that the agency failed to take a hard look at the environmental

consequences of its action. Limiting the size of a potential spill could limit the size of impacts

that are reviewed. However, the court that reviewed this matter, the D.C. Circuit Court of

Appeals, 30 has determined that challenges to the sufficiency of that NEPA process for the 5-year

plan could not be reviewed. 31 The court said that the 5-year Plan NEPA review had “not yet

reached that ‘critical stage’ where an ‘irreversible and irretrievable commitment of resources’ has

occurred that will adversely affect the environment.”32 The court suggested that the appropriate

time for such claims would be at the leasing stage. Accordingly, this ruling bars any challenge to

the 5-year Plan NEPA review.

This position is consistent with other courts that have reviewed NEPA challenges of multiple

stage administrative programs. The Second Circuit has held that a federal action, in that case an

administrative hearing involving Mobil Oil, is not subject to NEPA until that point where there

might be irreversible and irretrievable commitments of resources.33 Similarly, the D.C. Circuit

held that a Forest Service procedure for identifying areas for oil and gas leases was not ripe

because it could prove unnecessary if no leases were ever issued.34 No irreversible or irretrievable

commitment of resources had been made.

The EIS for 11 Gulf of Mexico Lease Sales

In April 2007, MMS also completed the EIS for the 11 lease sales for the Gulf of Mexico, the

Multisale EIS.35 For the lease sales, the MMS divided the Gulf of Mexico into three regions:

western (the Texas coast); central (the coasts of Louisiana, Mississippi and Alabama); and eastern

(the Florida coast). Eleven lease sales were planned for the western and central areas and none for

30

43 U.S.C. § 1349(c)(1) gives this court exclusive jurisdiction for review of OCSLA leasing program approvals. This

exclusive jurisdiction has been found to apply only to OCSLA claims and not to NEPA claims related to OCSLA

approval. See Get Out Oil, Inc. v. Andrus, 477 F. Supp. 40, 42 (C.D. Cal. 1979).

31

Center for Biological Diversity v. U.S. Department of the Interior, 563 F.3d 466 (D.C. Cir. 2009).

32

Center for Biological Diversity v. U.S. Department of the Interior, 563 F.3d 466, 480 (D.C. Cir. 2009).

33

Mobil Oil Corp. v. FTC, 562 F.2d 170, 173 (2d Cir. 1977) (finding that certain adjudicatory proceedings were not

subject to NEPA because the final order was still speculative).

34

Wyoming Outdoor Council v. U.S. Forest Service, 165 F.3d 43 (D.C. Cir. 1999). See also Conner v. Burford, 848

F.2d 1441 (9th Cir. 1988) (holding that no EIS was required where lease was issued forbidding surface occupancy (and

therefore oil drilling)).

35

MMS, Gulf of Mexico OCS Oil and Gas Lease Sales: 2007-2012; Western Planning Area Sales 204, 207, 210, 215,

and 218; Central Planning Area Sales 205, 206, 208, 213, 216, and 222; Final Environmental Impact Statement, MMS

2007-018 (April 2007) (hereinafter Multisale EIS). Available at http://www.gomr.boemre.gov/homepg/regulate/

environ/nepa/nepaprocess.html.

Congressional Research Service

6

The 2010 Oil Spill: MMS/BOEMRE and NEPA

the eastern area.36 A number of leases could be issued within each of the 11 lease sales, typically

over 300, based on the amount of resources an area is estimated to produce. For more details on

the facts underlying the western and central lease sales, see Appendix A.

The Multisale EIS evaluated the environmental impacts from routine operations as well as

accidents such as oil spills. It reviewed all of the different steps involved in extracting oil—

seismic testing, exploratory drilling, development and production, transportation, and removing

structures at the end of the lease.

Blowouts and other spills were evaluated, first, on the probability of such events occurring, and

then analyzing the probable resulting environmental effects. Like the 5-year Plan EIS, the

Multisale EIS used historical data as the basis for the size of an oil spill. According to MMS, the

most likely size of an oil spill that was greater than 1,000 bbl would be 4,600 bbl.37 However,

MMS states that large oil spills (meaning spills greater than 1,000 bbl) are “low-probability

events.”38

MMS used modeling to see how a 4,600 bbl spill would dissipate when on the surface. (Although

it studied both surface and subsurface spills, MMS noted that subsurface spills would behave the

same as surface spills once they reached the top.) MMS found that natural weathering would

dissipate 32% to 74% of the slick; between 30% and 32% would be lost to the atmosphere via

evaporation; and about 2% to 42% would be lost into the water column via natural dispersion. 39

No modeling was done on a larger spill.

The Multisale EIS did consider the possibility of a larger offshore spill for the leases, although it

did not analyze impacts from such a spill. It found that a spill larger than 10,000 bbl had greater

than a 99% chance of occurring during the 40-year period.40 A mean number of spills of that size

was estimated between 11 and 13 for that time period. 41 MMS analyzed the environmental effects

of a spill of 4,600 bbl, the “most likely size of a spill greater than 1,000 bbl.”42

In general, the probability of an offshore oil spill greater than 1,000 bbl (but not larger than 4,600

bbl) reaching an environmentally sensitive resource was found to be small, ranging from less than

0.5% (for example, reaching Gulf communities, listed beach mice, or Gulf Sturgeon habitat), but

greater for other resources (for example, the probability of such a spill reaching waters used by

coastal sea turtles ranged from 6% to 35%, while the odds of a spill reaching sea turtle nesting

and mating habitat were 4%).43 Thus, an offshore spill larger than 1,000 bbl was not found to be a

significant environmental impact.

36

Approximately 5.8 million acres located in the southeastern part of the Central Planning Area (CPA) are not included

in the lease sale area, despite being opened to leasing by the Gulf of Mexico Energy Security Act of 2006 after years of

leasing moratoria in appropriations acts. 71 Fed. Reg. 35258 (June 27, 2007).

37

Multisale EIS, p. 4-232.

38

Multisale EIS, p. 4-228. Ninety-four percent of all spills in the Gulf were found to be less than 1 bbl, contributing 5%

by volume to all spills. Multisale EIS, p. 4-235.

39

Multisale EIS, p. 4-233.

40

Multisale EIS, p. 4-75.

41

Id.

42

Multisale EIS, p. 4-232.

43

Multisale EIS, p. 4-243.

Congressional Research Service

7

The 2010 Oil Spill: MMS/BOEMRE and NEPA

The Multisale EIS includes a discussion of blowouts as a Loss of Well Control (LWC), of which a

blowout is the most severe form. Most LWC events were found to last half a day.44 Therefore,

MMS concluded impacts to marine water quality were not estimated to be significant.45 However,

it is noted that the noise from a blowout explosion could injure marine mammals, depending on

their proximity. 46

Adequacy of the Environmental Review of the Multiple Lease Sales

It could be questioned whether the review within the Multisale EIS was comprehensive enough to

satisfy a court that MMS fully complied with NEPA. The act requires “a detailed statement” on

“any adverse environmental effects which cannot be avoided should the proposal be

implemented.”47 A court could consider the adequacy of not reviewing the environmental effects

of spills over 10,000 bbl when MMS calculated a greater than 99% probability that such a spill

would occur. On the other hand, the court could find that reviewing spills of 4,600 bbl met

NEPA’s standards. There is no court decision reviewing this document.

NEPA requires an agency to consider the environmental consequences of its actions during the

development of a proposal.48 Courts apply the “rule of reason” to see if the document is

sufficient. One court described that review as finding whether an EIS “contains a reasonably

thorough discussion of the significant aspects of the probable environmental consequences.”49 In

general, courts have held that the goals of NEPA are satisfied when an EIS “sets forth sufficient

information to enable the decision-maker to consider fully the environmental factors involved.”50

In the case of OCS leases, courts have accepted that there are staged analyses with different

degrees of scrutiny matching the different OCSLA steps. In a suit challenging an EIS prepared for

one lease sale in the Arctic,51 the plaintiffs argued that the NEPA analysis was flawed because it

significantly underestimated the amount of oil that might be spilled.52 The Ninth Circuit held that

they were “least troubled by what may seem to be incomplete or speculative data at the lease sale

stage,” noting that prior to exploration “an oil spill risk analysis can never be more than

speculative.”53 The court’s comfort with the data was based on the fact that OCSLA had tiered

analyses: “the amount and specificity of information necessary to meet NEPA requirements varies

at each of OCSLA’s stages.”54 It referred to the U.S. Supreme Court decision regarding the tiered

environmental analysis of OCSLA, Secretary of the Interior v. California.55 In that case, which

44

Multisale EIS, p. 4-239.

Multisale EIS, p. 4-260.

46

Multisale EIS, p. 4-275.

47

42 U.S.C. § 4332(2)(C)(ii).

48

Kleppe v. Sierra Club, 427 U.S. 390, 410 (1976).

49

Idaho Conservation League v. Mumma, 956 F.2d 1508, 1519 (9th Cir. 1992).

50

County of Suffolk v. Dept. of the Interior, 562 F.2d 1368 (2d Cir. 1977) (holding that an EIS for OCS drilling

proposal was not inadequate).

51

The Multisale EIS for the Gulf reviewed 11 lease sales.

52

Tribal Village of Akutan v. Hodel, 869 F.2d 1185 (9th Cir. 1988).

53

Id. at 1192.

54

Id.

55

Secretary of the Interior v. California, 464 U.S. 312 (1984) (holding that an adverse effects analysis under the CZMA

was not required at the lease sale stage).

45

Congressional Research Service

8

The 2010 Oil Spill: MMS/BOEMRE and NEPA

did not consider NEPA, the Supreme Court said that a lease sale on its own “does not directly

mandate further activity that would raise an oil spill problem,” and therefore, there was no need to

perform a CZMA environmental analysis at that point.56 The Supreme Court and the Ninth Circuit

predicated their decisions on the fact that the desired environmental review could occur at a later

stage in the OCSLA process.

Other courts have considered the argument that an environmental document at the lease sale stage

should have considered the potential effects of a larger spill, ultimately rejecting that claim.57 In a

dispute in the Ninth Circuit, the NEPA document had discussed impacts from spills exceeding

1,000 barrels and those exceeding 10,000 barrels for OCS drilling in the Arctic. The plaintiff

wanted consideration of spills of greater than 100,000 bbl, based on the Amoco Cadiz spill of 1.6

million barrels in 1978, and the 3.5 million bbl exploratory well blowout in the Gulf of Mexico in

Mexican waters in 1979. The district court held that plaintiff had not made its argument well,

failing to show how impacts from a 100,000 bbl spill would be different from those discussed for

a 10,000 bbl spill. Additionally, the court noted that an EIS does not have to consider every

possible impact: “The rule of reason applicable to environmental impact statements does not

require an inquiry into every conceivable situation that may occur no matter how remote or

speculative it may be.”58

The Ninth Circuit agreed with the conclusion of the district court, but for different reasons. It

found that the tiered environmental reviews under the OCSLA would mean that as drilling

became more likely, the impacts of a 100,000 bbl spill may be considered. The lease sale stage

was a preliminary stage, according to the court: “Further information about the probability and

location of a 100,000 barrel spill will become available as lessees survey their tracts, or test them,

or plan for production and development.”59

While NEPA requires consideration of a range of alternatives, it does not require consideration of

a worst case scenario, such as another 3.5 million bbl spill. 60 An earlier version of the CEQ

regulations did require such an evaluation when an agency had “incomplete or unavailable

information” regarding the effects of an action. In that case, an agency was required to “include a

worst case analysis and an indication of the probability or improbability of its occurrence.”61 In

general, courts have held that an EIS “is not required to discuss every conceivable consequence of

an agency’s actions. Under the rule of reason, the environmental impact statement is not required

to consider alternatives or consequences that are only speculative or are too remote.”62 It would

56

Secretary of the Interior v. California, 464 U.S. 312, 317 (1984).

Village of False Pass v. Watt, 565 F. Supp. 1123 (D.C. Alaska 1983), aff’d sub nom., Village of False Pass v. Clark,

733 F.2d 605 (9th Cir. 1984).

58

Village of False Pass v. Watt, 565 F. Supp. 1123, 1147 (D.C. Alaska 1983).

59

Village of False Pass v. Clark, 733 F.2d 605, 616 (9th Cir. 1984).

60

Robertson v. Methow Valley Citizens Council, 490 U.S. 332 (1989); Sierra Club v. Sigler, 695 F.2d 957 (5th Cir.

1983) (holding the Corps of Engineers did not have to consider the worst case scenario of a tanker losing all of its cargo

when considering the impacts of a dredging permit basing its holding in significant part on a now-revised CEQ

regulation).

61

40 C.F.R. § 1502.22(b) (revised in 1986). The current regulations require an agency to prepare a statement regarding

unavailable information that includes reasonably foreseeable significant adverse impacts, which is defined as including

“impacts which have catastrophic consequences, even if their probability of occurrence is low, provided that the

analysis of the impacts is supported by credible scientific evidence.”

62

Grazing Fields Farm v. Goldschmidt, 626 F.2d 1068, 1074 (1st Cir.1980).

57

Congressional Research Service

9

The 2010 Oil Spill: MMS/BOEMRE and NEPA

be up to a court to consider whether a blowout spill from Lease Sale 206 was too remote and

speculative for MMS to consider in its environmental review.

Lease Sale 206 Environmental Assessment

The third environmental review in the OCS process is the environmental assessment (EA)

prepared for Lease Sale 206 in the Gulf (Lease Sale 206 EA).63 The oil spill occurred in

Mississippi Canyon Block 252 of this lease sale. MMS prepared environmental assessments for

other particular lease sales in the western and central Gulf, such as Lease Sale 207, although a

Supplemental EIS was prepared for Lease Sale 224 in the eastern Gulf.

Typically, an EA leads to one of two conclusions: discovery of a significant impact and then

preparation of an EIS, or a finding of no significant impact (FONSI). MMS terms its EAs

differently. It issues an EA-FONNSI, meaning finding of no new significant impact, reflecting the

tiered environmental analyses for the OCS process. Lease Sale 206 EA recognizes that it “tiers off

the Multisale EIS and incorporates much of the material by reference.”64 According to MMS, new

information related to the lease sale was discovered, but did not change the conclusions reached

within the Multisale EIS.65

The EA appears to back off some of the environmental impacts considered in the EIS. It states

that because activity was overestimated, the environmental impacts “may have been

overstated.”66 While new information was considered within the EA, MMS found it supports the

conclusions made in the Multisale EIS, and so no new conclusions are made within the EA.67 The

Lease Sale 206 EA refers to the Multisale EIS review of spills greater than 1,000 bbl.68 No

reference to larger spills was found, such as a 4,600 bbl spill. In fact, oil spills were discussed in

more general terms throughout the document than in either of the EISs, which were incorporated

by reference.

No legal challenge to the Lease Sale 206 EA has been found. However, challenges to other EAs

for OCS drilling have been found for EAs issued for particular lease sales in the Arctic. Courts

have found EAs should be used in these circumstances to determine whether “the new

circumstance must present a seriously different picture of the environmental impact of the

proposed project from what was previously envisioned.”69 If those different impacts are found, an

EIS or Supplemental EIS is warranted. A federal district court considered whether a Supplemental

EIS should have been prepared three years after conclusion of a multisale EIS for the Arctic

region, instead of an EA. It found that the multisale EIS in that case had considered scenarios that

63

MMS, Proposed Gulf of Mexico OCS Oil and Gas Lease Sale 206; Central Planning Area; Environmental

Assessment, MMS 2007-059 (Oct. 2007) (hereinafter Lease 206 EA). Available at http://www.gomr.boemre.gov/PDFs/

2007/2007-059.pdf.

64

EA FONNSI, introduction.

65

EA FONNSI, p. 1.

66

Lease 206 EA, p. 14.

67

Lease 206 EA, p. 18.

68

Lease 206 EA, p. 24.

69

Sierra Club v. Froehlke, 816 F.2d 205, 210 (5th Cir. 1987); North Slope Borough v. Minerals Management Service,

No. 3:07-cv-0045-RRB, *2 (D. Alaska April 12, 2007); Oregon Natural Resources Council v. Devlin, 776 F. Supp.

1440, 1449 (D. Ore. 1991).

Congressional Research Service

10

The 2010 Oil Spill: MMS/BOEMRE and NEPA

included the new data addressed by the EA. 70 As this conclusion is fact-specific, it cannot be used

to predict whether a court may reach the same decision regarding the Lease Sale 206 EA.

Categorical Exclusion for the Exploration Plan

The final environmental document to date for the Mississippi Canyon Block 252 oil well is a

categorical exclusion for the exploration plan (EP) submitted by BP (EP CE). As discussed above,

a categorical exclusion may be used by an agency when a category of actions has been

determined to have no significant effect on the environment either individually or cumulatively.71

The CEQ regulations provide that any procedures allowing CEs must also include “extraordinary

circumstances” for when a CE would not apply.72

In 1986, MMS issued its list of categories of activities excluded from further NEPA review within

the DOI Departmental Manual.73 The list was revised in 2004. The Departmental Manual states

that a CE does not apply if “the action qualifies as an exception under Appendix 2 of 516 DM.” A

copy of the MMS categorical exclusions and the exceptions is available as Appendix B to this

report.74

MMS recorded its decision to invoke a categorical exclusion for the BP EP in a Categorical

Exclusion Review (CER) with Analysis and included reviews for specific environmental harms.

The CE process begins when a leaseholder (in this case BP) submits an exploration plan for MMS

approval. 75 MMS reviews the plan to see if it fits any of the published categorical exclusions. The

agency must also see whether any exceptions to those CEs apply. The decision must be

documented. MMS uses forms that include check lists to document the CERs.

Under 43 U.S.C. § 1340(c), MMS is required to approve an exploration plan within 30 days of

submission. The Secretary of the Interior, in testimony before the Senate Committee on

Environment and Public Works, asked Congress to extend this deadline to 90 days.76 This may

suggest that a CE for the exploration plan was invoked because MMS had only 30 days to

complete an environmental review. However, MMS prepares EAs (which require more analysis

than a CE) for exploration plans that are not in the western or central Gulf of Mexico.77

70

North Slope Borough v. Minerals Management Service, No. 3:07-cv-0045-RRB, *2 (D. Alaska April 12, 2007).

40 C.F.R. § 1508.4.

72

40 C.F.R. § 1508.4.

73

The Federal Register notice announcing these CEs refers to them as being functions transferred from the Geological

Survey (GS) and the Bureau of Land Management (BLM) to the MMS upon its establishment. 51 Fed. Reg. 1855 (Jan.

15, 1986).

74

It is also available at http://206.131.241.18/app_DM/act_getfiles.cfm?relnum=3625.

75

In practice, multiple versions of an EP may be submitted, such as an initial EP, or an amended EP. The CER for BP

shows separate reviews were conducted for archaeological resources, chemosynthetic communities, and what was

referred to as a NEPA (1) determination. Copies of these documents (either the I-EP (Initial Exploration Plan) with a

NEPA final date of April 15, 2009, or the A-EP (Amended Exploration Plan) with a NEPA final date of April 3, 2009)

are available from the author.

76

Senate EPW Hearing, Federal Response to the Recent Oil Spill in the Gulf of Mexico (May 18, 2010).

77

For example, MMS prepared an EA for an exploration plan in the Arctic that was rejected by a court and ultimately

withdrawn by the agency. Alaska Wilderness League v. Kempthorne, 548 F.3d 815 (9th Cir. 2008), withdrawn and

vacated as moot 559 F.3d 916 (9th Cir. 2009), and superseded sub nom. Alaska Wilderness League v. Salazar, 571 F.3d

859 (9th Cir. 2009) (upon rescission by MMS of the EP approval).

71

Congressional Research Service

11

The 2010 Oil Spill: MMS/BOEMRE and NEPA

Arguably, a 1976 U.S. Supreme Court decision supports the Secretary of the Interior’s position

that the deadline is too short.78 In that decision, Flint Ridge Development Co. v. Scenic Rivers

Association of Oklahoma, the Court held that a 30-day statutory deadline meant that the federal

agency could not complete an EIS, and therefore NEPA did not require it. The Court noted that

NEPA only required agencies to comply “to the fullest extent possible.” The Court considered the

fact that the 30-day deadline for the federal agency in Flint Ridge did not begin until the

submission was completed. The Ninth Circuit made a similar observation regarding the MMS 30day deadline for exploration plan approval, finding some flexibility in the fact that a NEPA

review could begin while the agency sought further information from an applicant. 79 However,

that Ninth Circuit decision was withdrawn and vacated. Flint Ridge could be distinguished from

the Mississippi Canyon EP in that the Flint Ridge plaintiffs sought to have a full EIS prepared,

whereas for Mississippi Canyon the argument is that a CE was not enough, leaving open the

possibility that an EA would suffice within the time frame.

According to MMS, CEs are available when “the impacts from the common operations are

expected to be negligible to non-existent based upon general information gathered during past

environmental analyses.”80 This means that based on its experience, MMS has found that those

operations have at most negligible environmental impacts, and therefore, additional review is not

required.

The CER documents from MMS do not indicate which CE was used. However, it seems likely

that MMS invoked CE 15.4(C)(10), which is a CE that applies to exploration plans:

Approval of an offshore lease or unit exploration development/production plan or a

Development Operation Coordination Document in the central or western Gulf of Mexico

(30 CFR 250.2) except those proposing facilities: (1) In areas of high seismic risk or

seismicity, relatively untested deep water, or remote areas, or (2) within the boundary of a

proposed or established marine sanctuary, and/or within or near the boundary of a proposed

or established wildlife refuge or areas of high biological sensitivity; or (3) in areas of

hazardous natural bottom conditions; or (4) utilizing new or unusual technology. 81

This CE appears to have been created in 1978 in guidelines for MMS’s predecessor. It is the only

CE that makes specific reference to an OCS area, or, in fact, contains any geographical

restriction. It excludes two of the four stages of OCSLA actions from further NEPA review. It

excludes both exploration plans in the western and central Gulf of Mexico and development and

production plans in those areas. In contrast, the other CEs exclude what appear to be more

general, administrative activities such as “issuance and modification of regulations, Orders,

Standards, Notices to Lessees and Operators, Guidelines, and field rules” (C)(1); “approval of

unitization agreements, pooling, or communitization agreements” (C)(4); and “approval of

suspension of operations and suspensions of productions” (C)(6).

78

Flint Ridge Development Co. v. Scenic Rivers Association of Oklahoma, 426 U.S. 776 (1976) (holding that 30 days

after filing was not enough time to complete a NEPA review and therefore one was not required).

79

Alaska Wilderness League v. Kempthorne, 548 F.3d 815 (9th Cir. 2008), withdrawn and vacated as moot, 559 F.3d

916 (9th Cir. 2009), and superseded sub nom. Alaska Wilderness League v. Salazar, 571 F.3d 859 (9th Cir. 2009) (upon

rescission by MMS of the EP approval).

80

MMS, Discussion of Categorical Exclusion Reviews (undated). A copy of this document is included as Appendix C.

81

516 DM 15.4(C)(10).

Congressional Research Service

12

The 2010 Oil Spill: MMS/BOEMRE and NEPA

The CE for Gulf plans could be based on the OCSLA amendments of 1978.82 Those amendments

address certain NEPA requirements, giving exemptions to activities in the Gulf of Mexico. The

relevant section of that law, Section 25 (codified at 43 U.S.C. § 1351(e)(1)), states that “at least

once the Secretary shall declare the approval of a development and production plan in any area or

region ... of the outer Continental Shelf, other than the Gulf of Mexico, to be a major Federal

action.”83 While this language contains some ambiguity as to whether the “at least once”

requirement must be used by the Secretary for all development plans or on a plan-by-plan basis,

this suggests that approval of a development and production plan in the Gulf of Mexico might

never need to be declared a major federal action (key words in NEPA to mandate preparation of

an EIS).84 No similar statutory reference to exploration plans exists, but this may be the

foundation for excluding Gulf of Mexico plans from environmental analyses at certain stages.

BP discussed a Worst Case Scenario Response in its initial EP for Mississippi Canyon Block 252,

indicating it considered a potential large-scale spill. The EP states that for exploratory wells A and

B at Block 252, the worst case scenario would be a blowout at the exploratory stage, leading to a

spill of 162,000 bbl85 of crude oil a day.86 The EP indicates that BP’s regional oil spill response

plan for a worst case scenario had been approved by MMS.87 There is no indication that MMS

conducted a NEPA review for approving the regional oil spill response plan (OSRP). This

suggests that the methods for responding to a massive spill—such as in situ burning, or chemical

dispersant—were not scrutinized for environmental impacts other than within the Multisale EIS

and the Lease Sale 206 EA, and those documents considered much smaller leaks.

Despite referring to a blowout in the context of a response plan, no blowout scenario was

included in the EP. This appears to be based on MMS policy for the area. Section 2.7 of the EP

states: “A scenario for a potential blowout of the well from which BP would expect to have the

highest volume of liquid hydrocarbons is not required for the operations proposed in this EP.”88

While MMS regulations require disclosure of a blowout scenario in EPs,89 MMS provided an

82

P.L. 95-372, § 25, 92 Stat. 659 (1978).

The legislative history for this amendment does not discuss why the Gulf was excepted from this provision.

However, the Conference Report suggests that the exception was for efficiency: “to limit bureaucratic redtape and

otherwise minimize delays in the search for and production of oil and gas” which had been “going on for a number of

years” in the Gulf. H. Rep. 95-1474, at 115 (Aug. 10, 1978). The Gulf exclusion was within the Senate language, while

the House had no exclusion. Id.

84

As referenced earlier in this report, MMS policy is that development and production plans undergo a full EIS.

However, the MMS allows a CE for development and production plans in the western and central areas of the Gulf of

Mexico, essentially exempting those plans from that policy. Because it was still in exploration, the Mississippi Canyon

Block had not reached the stage of development and production. It is not known whether MMS would have issued a CE

for that plan as well.

85

The EP does not indicate the measure of the spill (either in bbl or gallons). The data given here are based on the fact

that the Regional Oil Spill Response Plan (OSRP) by BP reports the worst case scenario for an exploratory well in

barrels per day. See Regional Oil Spill Response Plan, Appx. H (Rev. 6/30/09), available at

http://info.publicintelligence.net/BPGoMspillresponseplan.pdf. The data in the EP for worst case discharge do not

match that in the OSRP. The OSRP estimates a 250,000 bbl per day spill from MC 462 as the worst case discharge

from an exploratory well. It does not have any reference to MC 252. See OSRP Quick Guide Table 1 for a list of

production facilities. The EP estimates the daily volume as 300,000 bbl for MC 727, and 162,000 bbl for MC 252. MC

727 is not referenced in OSRP Table 1.

86

EP, § 7.1.

87

EP, § 7.1.

83

88

BP, Initial Exploration Plan, Mississippi Canyon Block 252, OCS-G 32306 (received by MMS Feb. 23, 2009)

(hereinafter EP). A copy of this document is available from the author.

89

30 C.F.R. § 250.213(g). A lawsuit challenging the DOI’s issuance of the Notice was filed in federal court. Gulf

(continued...)

Congressional Research Service

13

The 2010 Oil Spill: MMS/BOEMRE and NEPA

exception in a 2008 Notice to Lessees. The exception exempts OCS actions in the Gulf from

blowout scenario requirements under certain conditions.90 On June 18, 2010, this exception was

revoked by another Notice. The 2010 Notice to Lessees expressly rescinds portions of the 2008

Notice; lessees not already having approved Applications for Permit to Drill are required to

submit blowout scenarios and worst case discharge scenarios.91

Even if a blowout scenario was not prepared, it seems there would be significant amounts of oil

released if the worst case scenario of a blowout occurred, oil at quantities greater than considered

in the Multisale EIS or the Lease Sale 206 EA. However, because a CE was used for the EP,

instead of an EIS or an EA, a review of the environmental impacts for a spill of this size was not

conducted. They were not considered within the previous EISs or the EA either.

Adequacy of the Environmental Review of the Exploration Plan

No court has reviewed this categorical exclusion (516 DM 15.4(C)(10)), either to determine

whether on its face it meets the standards for a CE—actions that either individually or

cumulatively are found not to have a significant effect on the environment—or as it has been

applied to any exploration or development plan. However, the Ninth Circuit considered whether

MMS had properly used a different CE in California when approving lease suspensions. The

court found the use of that CE was not adequately justified by MMS.92 In that case 36 lease

suspensions were sought nearly 30 years after a large oil spill near Santa Barbara. Under the

OCLSA, MMS may suspend the term of a lease when a lessee is not able to begin production

within the term of the lease, thus avoiding expiration of the lease.93 The court found that there

was no documentation of the CE, and that some exceptions to a CE could have applied that MMS

did not consider. Accordingly, the court remanded the NEPA review to MMS.

It is possible a court may find that exceptions to CEs apply in the case of the EP CE, in which

case the BP CE would be invalid. (The exceptions are included as part of Appendix B.) One

exception that may apply addresses effects on ESA-listed species, meaning a CE could not be

used if an action may “have adverse effects on species listed or proposed to be listed on the List

of Endangered or Threatened Species, or have adverse effects on designated Critical Habitat for

these species.”94 All of the environmental documents address the effects of an oil spill on listed

species and the critical habitat of the Gulf Sturgeon. For example, the Lease Sale 206 EA states

that over the 40-year term of the lease, 119 loggerhead, 10 leatherback, 1 hawksbill, 13 Kemp’s

(...continued)

Restoration Network v. Salazar, No. 2:10-cv-01497 (E.D. La. filed May 18, 2010).

90

MMS, Notice to Lessee 2008-G04 (May 1, 2008). Available at http://www.gomr.mms.gov/homepg/regulate/regs/

ntls/2008NTLs/08-g04.pdf. Under this Notice, a blowout scenario is only required for OCS drilling if 1) Florida is an

affected state; 2) the activity occurs within protective zones of Flower Garden Banks or Stetson Bank; 3) activity

includes installation of surface facility at greater than 400 meters; 4) initial Development Operations Coordination

Documents (DOCDs) and supplemental DOCDs with new multiwell structures if either Texas or Louisiana is an

affected state; and 5) initial EPs if Texas is an affected state. Notice 2008 G-4, p. 6.

91

MMS, Notice to Lessee No. 2010-N06. Available at http://www.doi.gov/deepwaterhorizon/loader.cfm?csModule=

security/getfile&PageID=35724.

92

California v. Norton, 311 F.3d 1162 (9th Cir. 2002).

93

43 U.S.C. § 1334(a)(1).

94

516 DM Appx. 2, exception 2.8.

Congressional Research Service

14

The 2010 Oil Spill: MMS/BOEMRE and NEPA

ridley, and 38 green turtles will be killed.95 It is possible a court could find that these effects could

be considered “adverse.” Another exception to the CEs addresses actions when the impacts

cannot be known, perhaps due to the fact that the harm depends on the scale, timing, and location

of an oil spill: “2.4 - Have highly uncertain and potentially significant environmental effects or

involve unique or unknown environmental risks.”

Even if the exceptions do not apply, MMS may be required to explain in the CE why they do not.

Under accepted law, if there is substantial evidence that an exception may apply, an agency must

document why an exception to a CE does not apply in order to support the CE.96 While the CER

documents specifically address exceptions regarding archeological resources and chemosynthetic

communities, finding that neither exception applies, there is no explicit reference to any other

exception.

The fact that this project was in the Gulf of Mexico made a difference in the type of review MMS

conducted. Arguably, a heightened level of review might have reached a different conclusion as to

the probable environmental impacts. If the EP had been in the Arctic, the CE for the Gulf plans

would not apply and consideration of a blowout scenario also would have been required. Instead,

EAs are used, which must sufficiently analyze the environmental impacts of the action. When the

Ninth Circuit reviewed an EA for an exploration plan in the Beaufort Sea in the Arctic

(hereinafter the Beaufort Sea EP), it found that an EA was not adequate.97 The BP EP and the

Beaufort Sea EP are factually similar in that they result from a nearly identical set of tiered NEPA

analyses. The Beaufort Sea EP also came after an EIS for a 5-year plan (for 2002-2007), an EIS

for the multiple lease sale, and a series of EAs for particular lease sales. Like the EP CE,

endangered species were present at the planned drilling site. In the case of the Beaufort Sea EP

the court indicated experts expressed concern that the exploration plan could have significant

impacts on polar bears and whales. An EA-FONNSI was issued, meaning no new significant

impacts were found. The court held that the Beaufort Sea EA did not indicate MMS took a “hard

look” at the environmental impacts of the exploration plan since substantial questions remained

regarding the harm to wildlife and the people in the area.98 MMS revoked its approval of the EP.99

The EP CE, perhaps, could be justified as a fourth environmental review, implying that all of the

environmental impacts had been considered in the earlier, more expansive documents.

Technically, however, that is not how a CE is intended to be applied. The NEPA regulations do

not provide that CEs may be used to exclude reviews on the basis that previous analyses already

considered impacts. A CE is supposed to be invoked because the project would not have any

impacts. NEPA allows tiered environmental reviews100 when the impacts have already been

considered.

Additionally, this rationale runs counter to the OCSLA staging justification used by courts as to

why environmental reviews at the lease sale stage or earlier did not need to be in depth. Those

95

96

Lease 206 EA, p. 41.

Jones v. Gordon, 792 F.2d 821 (9th Cir. 1986).

97

Alaska Wilderness League v. Kempthorne, 548 F.3d 815 (9th Cir. 2008), vacated as moot, 571 F.3d 859 (9th Cir.

2009) (upon rescission by MMS of the EP approval).

98

Alaska Wilderness League v. Kempthorne, 548 F.3d 815, 825 (9th Cir. 2008), vacated as moot, 571 F.3d 859 (9th Cir.

2009).

99

See Alaska Wilderness League v. Kempthorne, 571 F.3d 859 (9th Cir. 2009).

100

40 C.F.R. § 1500.4(i).

Congressional Research Service

15

The 2010 Oil Spill: MMS/BOEMRE and NEPA

courts held that a more intense environmental review was not needed at the early stages of the

OCSLA because it would occur when actual drilling was imminent.101 For example, the

justification used by the District Court of Alaska for why a 100,000 bbl spill did not have to be

analyzed may not apply when a CE is used at the exploration stage instead of a more in-depth

analysis: “Congress has decided to allow key decisions having serious environmental

consequences to be made at the exploration and production and development stages instead of

requiring all decisions to be made at the pre-leasing and leasing stages.”102

The Ninth Circuit’s rationale for why a larger oil spill was not examined at the lease sale stage

was that environmentally significant activities did not occur then. A more thorough review would

be conducted later

by purchasing a lease, lessees acquire no right to do anything more. Under the plain language

of OCSLA, the purchase of a lease entails no right to proceed with full exploration,

development, or production ... the lessee acquires only a priority in submitting plans to

conduct those activities. If these plans, when ultimately submitted, are disapproved, no

further exploration or development is permitted.103

If no review were conducted later, this justification may not seem to be supportable. The Ninth

Circuit had suggested in another case that the exploration stage was where a spill analysis would

be most appropriate.104

The U.S. Supreme Court also emphasized the importance of administrative review of the postlease actions: “an OCS lease authorizes the holder to engage only in preliminary exploration;

further administrative approval is required before full exploration or development may begin.”105

It could be argued that the EP CE is the inverse result of what is supposed to happen with tiered

environmental reviews. Instead of the process described by the courts where the environmental

review becomes more exacting as the drilling becomes imminent, the opposite has happened and

no additional environmental analysis was conducted.

The Council on Environmental Quality Report on MMS and NEPA

In August 2010, CEQ issued a report on MMS/BOEMRE and its NEPA procedures for OCS

drilling.106 The report recommends that BOEMRE policies could be revised to reflect the

purposes of NEPA more closely. Many of the recommendations address issues discussed within

this report. For example, CEQ recommends that BOEMRE seek a statutory revision to OCSLA to

extend the 30-day limit for considering EPs.

101

Center for Biological Diversity v. U.S. Department of the Interior, 563 F.3d 466, 480 (D.C. Cir. 2009).

Village of False Pass v. Watt, 565 F. Supp. 1123 (D.C. Alaska 1983).

103

Village of False Pass v. Clark, 733 F.2d 605, 608 (9th Cir. 1984).

104

Tribal Village of Akutan v. Hodel, 869 F.2d 1185, 1192 (9th Cir. 1988).

105

Secretary of the Interior v. California, 464 U.S. 312, 321 (1984).

106

CEQ, Report Regarding the Minerals Management Service’s National Environmental Policy Act Policies, Practices,

and Procedures as They Relate to Outer Continental Shelf Oil and Gas Exploration and Development (Aug. 16, 2010)

(hereinafter CEQ Report). Available at http://www.whitehouse.gov/sites/default/files/microsites/ceq/20100816-ceqmms-ocs-nepa.pdf.

102

Congressional Research Service

16

The 2010 Oil Spill: MMS/BOEMRE and NEPA

It also questions the propriety of allowing CEs for exploration and drilling and production plans.

For one thing, it suggests that those CEs were developed before OCS activities were conducted at

such depths, saying that there is a “progressively more complex environment” for deepwater

operations than there was at the time of the CEs’ creation. According to an MMS report, drilling

at 1,000 feet began in the late 1970s, although drilling at 3,000 to 5,000 feet did not occur until

the late 1990s.107

Another point the CEQ Report makes is that BOEMRE should review how it perceives

“extraordinary circumstances.” Under NEPA practice, finding an extraordinary circumstance

indicates that a CE should not be used. The CEQ Report suggests that MMS was not properly

evaluating those factors, stating that BOEMRE “intends to review its interpretation of the

threshold requirement of ‘extraordinary circumstances.’”108

Additionally, the CEQ Report points to the lack of consideration of massive oil spills in any of the

environmental documents. While MMS found that a large spill had a low probability, the report

still recommends that the agency consider reasonably foreseeable impacts associated with a

catastrophic spill, despite the predicted low risk. The reasonably foreseeable impacts would

include cumulative impacts. The cumulative impacts analysis for other Gulf projects should be

different following the 4.1 million bbl spill.

On the same day as the CEQ Report was issued, the Department of the Interior announced it was

not going to use certain CEs until it completed a review of all its CEs for OCS exploration and

drilling activities.109 The directive specifically prohibits using the CE that allows exclusion of

exploration and development and production plans in the western and central Gulf (516 DM

15.4(C)(10)) if the project involves a subsea blowout preventer.

Congressional Attention to Categorical Exclusions

Congress has also focused on the use of CEs for exploration and development in the Gulf. Two

House bills would eliminate the use of CEs for exploration, development, and production plans.

H.R. 52 (Connolly) would require an EIS for those plans. It states that exploration, development,

and production plans are “major federal actions significantly affecting the quality of the human

environment.” It would also eliminate the 30-day deadline for agency response to

exploration plans.

H.R. 501 (Markey) is similar. It would require either an EA or an EIS for those three types of

plans. Section 215(3) of H.R. 501 addresses development and production plans. Section 208(g) of

H.R. 501 addresses exploration plans, extending the approval time for those plans from 30 to 90

days. In addition, it would require those plans to demonstrate the use of best available technology,

including for blowout prevention. The bill would also put into law exceptional circumstances for

when a plan can be rejected by the agency.

A third bill of the 112th Congress comes from the Senate. S. 203 (Begich) would prevent NEPA

from applying to tests of technology for spill prevention, recovery, and mitigation in Arctic

107

MMS, Deepwater Gulf of Mexico 2008: America’s Offshore Energy Future, Appx. A (CS Report MMS 2008-013).

CEQ Report, at 31.

109

BOEMRE Directive, Use of Categorical Exclusions in Gulf of Mexico Region (Aug. 16, 2010). Available at

http://www.doi.gov/news/pressreleases/loader.cfm?csModule=security/getfile&PageID=42011.

108

Congressional Research Service

17

The 2010 Oil Spill: MMS/BOEMRE and NEPA

waters. It does this by declaring that such testing is not a major federal action. The bill also

provides that the agency decision regarding this exclusion is exempt from judicial review.

In the 111th Congress, three bills were proposed by the House to restrict the use of CEs. H.R.

3534 (Rahall), the Consolidated Land, Energy, and Aquatic Resources Act of 2010 (CLEAR),

would have required BOEMRE approval of exploration, development, and production plans to

include either an EA or an EIS, effectively eliminating the CE for those plans.110 CLEAR would

have amended the requirement for approval of EPs from 30 days to 90 days.111 H.R. 5506

(Connolly) would have gone further than H.R. 3534 by requiring an EIS (and not an EA) for

those plans’ approval. It would have removed the 30-day deadline. H.R. 5572 (Buchanan) states

that the Department of the Interior could not exempt any OCS activity from legal requirements.

Conclusion

The exploration well blowout in the Gulf of Mexico appears to have major, and potentially

catastrophic, environmental effects. None of the environmental reviews under NEPA considered

an oil spill of this magnitude. However, it is unclear whether that violates NEPA, which has no

requirement for analysis of a worst case scenario. The use of a categorical exclusion at the

exploration stage appears to be procedurally correct under MMS policy, provided there were no

applicable exceptions. However, the legality of that CE has never been examined by a court,

which could consider whether an exemption from a NEPA review at the point where drilling is

imminent violates NEPA either because extraordinary circumstances existed in the case, or

because, in general, the tiered OCSLA process envisioned more scrutiny of environmental

consequences after the lease stage. BOEMRE has indicated it will take a closer look at its CEs

and how they are applied.

110

111

H.R. 3534, § 208(f).

H.R. 3534, § 208(b)(2).

Congressional Research Service

18

The 2010 Oil Spill: MMS/BOEMRE and NEPA

Appendix A. Background Facts

Source: MMS, Gulf of Mexico OCS Oil and Gas Lease Sales: Final Environmental Impact

Statement (MMS 2007-018) (April 2007).

Duration of Gulf of Mexico OCS Oil and Gas Activity—40 years (p. 4-5):

•

Exploratory drilling activity can take place over an 8-year period, beginning

within one year after the lease sale.

•

Development activity takes place over a 39-year period, beginning with the

installation of the first production platform and ending with the drilling of the last

development wells.

•

Production of oil and gas begins by the third year after the lease sale and

continues through the 40th year.

•

Final abandonment and removal activities occur in the 40th year.

Amount of oil and gas expected to be produced (p. 4-5):

Western Gulf:

•

Oil = 242-423 million bbl

•

Gas = 1.644-2,647 trillion cubic feet

Central Gulf:

•

Oil = 776-1,292 million bbl

•

Gas = 3.236-5.229 trillion cubic feet

Amount of seismic testing expected (p. 4-7):

•

Western Gulf—400-800 blocks

•

Central Gulf—1,000-2,000 blocks

Number of exploration and delineation wells from this lease sale expected during 40-year

period (p. 4-10):

•

Western Gulf—42-66

•

Central Gulf—65-96

Number of development wells from this lease sale anticipated during 40-year period

(p. 4-13):

•

Western Gulf—155-221

•

Central Gulf—330-468

Congressional Research Service

19

The 2010 Oil Spill: MMS/BOEMRE and NEPA

Number of loss of well control events (including blowouts) from this lease sale estimated

during 40-year period (p. 4-250):

•

Western Gulf—1-2

•

Central Gulf—2-3

Number of offshore oil spills estimated from this lease sale during 40-year period (p. 4-241):

•

Western Gulf—800-1,500 spills/ 400-21,000 bbl of oil

•

Central Gulf—2,700-4,500 spills/ 5,500-26,500 bbl of oil

Natural seeps of oil, annual average (1990-1999) (Table 4-12):

•

Western Gulf—490,000 bbl

•

Eastern Gulf112—490,000 bbl

Probability of spills greater than 10,000 bbl occurring (Table 4-15):

Western Gulf:

•

Mean number of spills from all sources (facilities, pipelines, shuttle tankers)—3

•

Probability of occurrence—92%-96%

Central Gulf:

•

Mean number of spills from all sources (facilities, pipelines, shuttle tankers)—9

•

Probability of occurrence—99+%

Historical data on offshore spills greater than 10,000 bbl in the Gulf of Mexico from 19851999 (Table 4-16):

112

•

From pipelines: 2 spills; 30,000 bbl spilled in total

•

From platforms: 0 spills

Data not available for Central Gulf.

Congressional Research Service

20

The 2010 Oil Spill: MMS/BOEMRE and NEPA

Appendix B. MMS Categorical Exclusions

Source: 516 DM

15.4 Categorical Exclusions. In addition to the actions listed in the Departmental categorical

exclusions outlined in Appendix 1 of 516 DM 2, many of which the MMS also performs, the

following MMS actions are designated categorical exclusions unless the action qualifies as an

exception under Appendix 2 of 516 DM 2:

A. General.

(1) Inventory, data, and information collection, including the conduct of environmental

monitoring and nondestructive research programs.

(2) Actions for which MMS has concurrence or co-approval with another Bureau if the action is a

categorical exclusion for that Bureau.

B. Internal Program Initiatives.

(1) All resource evaluation activities including surveying, mapping, and geophysical surveying

which do not use solid or liquid explosives.

(2) Collection of geologic data and samples including geologic, paleontologic, mineralogic,

geochemical, and geophysical investigations which does not involve drilling beyond 50 feet of

consolidated rock or beyond 300 feet of unconsolidated rock, including contracts therefor.

(3) Acquisition of existing geological or geophysical data from otherwise private exploration

ventures.

(4) Well logging, digital modeling. inventory of existing wells, and installation of recording

devices in wells.

(5) Establishment and installation of any research/monitoring devices.

(6) Test or exploration drilling and downhole testing included in a project previously subject to

the NEPA process.

(7) Insignificant revisions to the approved 5-year leasing program.

(8) Prelease planning steps such as the Call for Information and Area Identification.

C. Permit and Regulatory Functions.

(1) Issuance and modification of regulations, Orders, Standards, Notices to Lessees and

Operators. Guidelines and field rules for which the impacts are limited to administrative,

economic, or technological effects and the environmental impacts are minimal.

(2) Approval of production measurement methods, facilities, and procedures.

(3) Approval of off-lease storage in existing facilities.

Congressional Research Service

21

The 2010 Oil Spill: MMS/BOEMRE and NEPA

(4) Approval of unitization agreements, pooling, or communitization agreements.

(5) Approval of commingling of production.

(6) Approval of suspensions of operations and suspensions of production.

(7) Approval of lease consolidation applications, lease assignments or transfers, operating rights,

operating agreements, lease extensions, lease relinquishments, and bond terminations.

(8) Administration decisions and actions and record keeping such as:

(a) Approval of applications for pricing determinations under the Natural Gas Policy Act.

(b) Approval of underground gas storage agreements from a presently or formerly productive

reservoir.

(c) Issuance of paying well determinations and participating area approvals.

(d) Issuance of drainage determinations.

(9) Approval of offshore geological and geophysical mineral exploration activities, except when

the proposed activity includes the drilling of deep stratigraphic test holes or uses solid or liquid

explosives.

(10) Approval of an offshore lease or unit exploration. development/production plan or a

Development Operation Coordination Document in the central or western Gulf of Mexico (30

CFR 250.2) except those proposing facilities: (1) In areas of high seismic risk or seismicity,

relatively untested deep water, or remote areas, or (2) within the boundary of a proposed or

established marine sanctuary, and/or within or near the boundary of a proposed or established

wildlife refuge or areas of high biological sensitivity; or (3) in areas of hazardous natural bottom

conditions; or (4) utilizing new or unusual technology.

(11) Approval of minor revisions of or minor variances from activities described in an approved

offshore exploration or development/production plan, including pipeline applications.

(12) Approval of an Application for Permit to Drill (APD) an offshore oil and gas exploration or

development well, when said well and appropriate mitigation measures are described in an

approved exploration plan, development plan, production plan, or Development Operations

Coordination Document.

(13) Preliminary activities conducted on a lease prior to approval of an exploration or

development/production plan or a Development Operations Coordination Plan. These are

activities such as geological, geophysical, and other surveys necessary to develop a

comprehensive exploration plan, development/production plan, or Development Operations

Coordination Plan.

(14) Approval of Sundry Notices and Reports on Wells.

(15) Rights-of-ways, easements, temporary use permits, and any revisions thereto that do not

result in a new pipeline corridor to shore.

Congressional Research Service

22

The 2010 Oil Spill: MMS/BOEMRE and NEPA

D. Royalty Functions. All functions of the Associate Director for Royalty Management including,

but not limited to, such activities as: approval of royalty payment procedures, including royalty

oil contracts; and determinations concerning royalty quantities and values, such as audits, royalty

reductions, collection procedures, reporting procedures, and any actions taken with regard to

royalty collections (including similar actions relating to net profit and windfall profit taxes).

Exceptions To Categorical Exclusions

516 DM 2 Appendix 2

The following exceptions apply to individual actions within categorical exclusions (CX).

Environmental documents must be prepared for actions which may:

2.1 Have significant adverse effects on public health or safety.

2.2 Have adverse effects on such unique geographic characteristics as historic or cultural

resources, park, recreation or refuge lands, wilderness areas, wild or scenic rivers, sole or

principal drinking water aquifers, prime farmlands, wetlands, floodplains or ecologically

significant or critical areas, including those listed on the Department’s National Register of

Natural Landmarks.

2.3 Have highly controversial environmental effects.

2.4 Have highly uncertain and potentially significant environmental effects or involve unique

or unknown environmental risks.

2.5 Establish a precedent for future action or represent a decision in principle about future

actions with potentially significant environmental effects.

2.6 Be directly related to other actions with individually insignificant but cumulatively

significant environmental effects.

2.7 Have adverse effects on properties listed or eligible for listing on the National Register of

Historic Places.

2.8 Have adverse effects on species listed or proposed to be listed on the List of Endangered

or Threatened Species, or have adverse effects on designated Critical Habitat for these

species.

2.9 Require compliance with Executive Order 11988 (Floodplain Management), Executive

Order 11990 (Protection of Wetlands), or the Fish and Wildlife Coordination Act.

2.10 Threaten to violate a Federal, State, local or tribal law or requirement imposed for the

protection of the environment.

Congressional Research Service

23

The 2010 Oil Spill: MMS/BOEMRE and NEPA

Appendix C. The MMS Categorical Exclusion

Review Process

Source: Minerals Management Service

A more detailed discussion of Categorical Exclusion Reviews (CERs) and the NEPA process for

review of Industry Submittals follows:

Descriptions for the “NEPA Determination Type” field under FastFacts?

The NEPA Determination Type is identified in a NEPA Determination Type Review at the

very beginning of the Categorical Exclusion Review (CER) process and it establishes the level of

NEPA analyses that should be conducted for a particular proposal. Based upon details about the

proposed action, policy, and programmatic NEPA analyses, the NEPA Determination Type could

be one of the following:

•

CER with no further Analyses; i.e., finalize the CER with no additional

reviews/conditions of approval (COAs)

•

CER with Analyses; i.e., continue processing/review under a CER with the

applicable protected resource reviews assigned; or

•

Prepare an Environmental Assessment (EA) or an Environmental Impact

Statement (EIS)

When it’s a categorical exclusion [review] with analysis, what kind of analysis is it?

Though not a document in the same sense as an EA or EIS, the CERs ultimately consist of a

series of procedures and activity-specific reviews that are conducted and compiled so that MMS

is assured that the activity can remain Categorically-Excluded from review under an EA or EIS.

The CERs are completely digital and therefore, stored within TIMS as part of the Administrative

Record along with all documentation related to the proposed action (in this case, the EPs on

MC252) and all associated surveys/reports. Even though central and western Gulf of Mexico

drilling and production activities are Categorically-Excluded from any additional review, MMS

GOMR prepares CERs on each proposal to ensure that “extraordinary circumstances” do not

exist and to ensure that the agency has the ability to consider the best-available data/technology

on a case-by-case basis, which in turn affords real-time adaptive management of assessment

triggers, reviewing standards, and conditions of approval/mitigation.

When an exception criteria [now called an “extraordinary circumstance”] is identified

during analysis, what exactly does that mean?

An “extraordinary circumstance” (EC) is an identified condition that could exist within an action

that could be Categorically-Excluded from additional NEPA analysis. MMS has 12 ECs identified

under 43 CFR § 46.215 (see last page) that it reviews the proposed action against to determine if

any of the activities proposed by the operator may “trigger” or cause an EC condition to occur. If

an EC is identified for a proposal that cannot be avoided (either in the NEPA Determination

Review or protected resource reviews), an EA must be prepared. The EA, in turn, could result in a

Finding of Significant Impact (FOSI), which would then require preparation of an EIS.

Congressional Research Service

24

The 2010 Oil Spill: MMS/BOEMRE and NEPA

Detailed Discussion:

The DOI and MMS can categorically-exclude (CatEx) certain actions from further NEPA

analyses if it is determined that they would not have a significant effect on the environment

(individually or cumulatively). The MMS CatEx list is currently found in the Departmental

Manual (see 516DM15.4) and it not only contains administrative actions, but also common OCS

operations. The impacts from the common operations are expected to be negligible to nonexistent based upon general information gathered during past environmental analyses about the

type of activities, the area of the proposed action, programmatic NEPA analyses (Program/Sale

EISs/EAs), and the past actions as conducted and observed. The specific MMS operational CatEx

corresponding to the submittal of an Exploration Plan (EP) is below:

MMS Categorical Exclusion

under 516 DM 15.4

C. Permit and Regulatory Functions.

10. Approval of an offshore lease or unit exploration plan (EP), development/production plan (DPP), or a

Development Operation Coordination Document (DOCD) in the central or western Gulf of Mexico (30CFR250.2)

except those proposing facilities:

In areas of high seismic risk or seismicity, relatively untested deep water, or remote areas, or

within the boundary of a proposed or established marine sanctuary, and/or within or near the boundary of a

proposed or established wildlife refuge or areas of high biological sensitivity; or

in areas of hazardous natural bottom conditions; or

utilizing new or unusual technology.

Since the CatEx list is based upon general/historical information and generalized/programmatic

information, GOMR goes the extra step and prepares a Categorical Exclusion Review (CER) for

each action to determine if site-specific details of the proposed operations will not result in an

Extraordinary Circumstance (EC), which would require that an EA be prepared. Coordinators in

GOMR’s Environmental Compliance Section (ECS) follow a set of submittal-specific SOPs and

utilize a detailed GIS application, PMT GIS, that addresses the activity being proposed and

compares information with established business rules/EC triggers based upon the specific

resources to determine if the action should be reviewed under an Environmental Assessment (EA)

and which, if any, protected resource reviews should be assigned for the CER/EA.

When the NEPA coordinator is finished following the SOP, their NEPA Determination Review

and associated PMT GIS report will identify the Initial NEPA Determination Type, which could

include the following:

•

CER with no further Analyses; i.e., finalize the CER with no additional

reviews/conditions of approval (COAs)

•

CER with Analyses; i.e., continue processing/review under a CER with the

applicable protected resource reviews assigned; or

•

Prepare an EA/EIS.

Congressional Research Service

25

The 2010 Oil Spill: MMS/BOEMRE and NEPA

All of the applicable information related to the NEPA Determination and/or any resource reviews

is recorded in the Technical Information Management System (TIMS) and the PMT GIS Report is

attached in the respective NEPA Determination Type Review. A copy of the plan/application is

provided to the NEPA Decision Maker for a concurrence review of the TIMS information and

PMT GIS Report. If the Decision Maker concurs with the coordinator, NEPA Determination

Type is also recorded in TIMS for the specified submittal. If the Chief has any questions about

the NEPA determination type, the information will be reviewed together until a decision can be

made.

Once concurrence is given, all necessary reviews are assigned to resource specialists (i.e., marine

archaeologists, benthic biologists, meteorologists, oceanographers, etc.) and tracked in TIMS.

The SME informs the NEPA Coordinator if additional information or a clarification is required

and/or when the review is completed. The completed review will note one of the following:

•

The proposed action will have no impact on the protected resource.

•

The proposed action requires a condition of approval (COA) to ensure that an

extraordinary circumstance (EC) will not be met/triggered.

•

The proposed action may cause a significant impact and an EA is recommended.

When all of the applicable reviews are completed, the SME’s conclusions, and any suggested

conditions of approval/mitigation (if necessary), are recorded in TIMS and compiled by the NEPA

Coordinator for presentation to the NEPA Decision Maker. The NEPA decision maker will review

the findings and choose from the following Final NEPA Actions:

•

CER Approved; (Action can be CatExed with no COAs—an EC will not be

triggered/occur); or

•

CER Approved; (Action can be CatExed with COAs—to ensure that an EC will

not be triggered/occur);

•

Prepare an EA/EIS.

43 CFR § 46.215 Categorical Exclusions: Extraordinary circumstances

Extraordinary circumstances (see paragraph 46.205(c)) exist for individual actions within

categorical exclusions that may meet any of the criteria listed in paragraphs (a) through (l) of this

section. Applicability of extraordinary circumstances to categorical exclusions is determined by

the Responsible Official.

•

Have significant impacts on public health or safety.

•

Have significant impacts on such natural resources and unique geographic

characteristics as historic or cultural resources; park, recreation or refuge lands;

wilderness areas; wild or scenic rivers; national natural landmarks; sole or

principal drinking water aquifers; prime farmlands; wetlands (EO 11990);

floodplains (EO 11988); national monuments; migratory birds; and other

ecologically significant or critical areas.

•

Have highly controversial environmental effects or involve unresolved conflicts

concerning alternative uses of available resources [NEPA section 102(2)(E)].

Congressional Research Service

26

The 2010 Oil Spill: MMS/BOEMRE and NEPA

•

Have highly uncertain and potentially significant environmental effects or

involve unique or unknown environmental risks.

•

Establish a precedent for future action or represent a decision in principle about

future actions with potentially significant environmental effects.

•

Have a direct relationship to other actions with individually insignificant but

cumulatively significant environmental effects.

•

Have significant impacts on properties listed, or eligible for listing, on the

National Register of Historic Places as determined by the bureau.

•

Have significant impacts on species listed, or proposed to be listed, on the List of

Endangered or Threatened Species or have significant impacts on designated

Critical Habitat for these species.

•

Violate a Federal law, or a State, local, or tribal law or requirement imposed for

the protection of the environment.

•

Have a disproportionately high and adverse effect on low income or minority

populations (EO 12898).

•

Limit access to and ceremonial use of Indian sacred sites on Federal lands by

Indian religious practitioners or significantly adversely affect the physical

integrity of such sacred sites (EO 13007).

Contribute to the introduction, continued existence, or spread of noxious weeds or non-native

invasive species known to occur in the area or actions that may promote the introduction, growth,

or expansion of the range of such species (Federal Noxious Weed Control Act and EO

13112).Contribute to the introduction, continued existence, or spread of noxious weeds or nonnative invasive species known to occur in the area or actions that may promote the introduction,

growth, or expansion of the range of such species (Federal Noxious Weed Control Act and EO

13112).

Author Contact Information

Kristina Alexander

Legislative Attorney

kalexander@crs.loc.gov, 7-8597

Congressional Research Service

27

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.

The 2010 Oil Spill: MMS/BOEMRE and NEPA · R41265 | Frix