Carbon Capture and Sequestration in H.R. 2454 and S. 1733

Congressional research reportNov 2, 2009

Ask Donna

What actually matters in this document.

Text

Carbon Capture and Sequestration in

H.R. 2454 and S. 1733

-name redactedSpecialist in Energy and Natural Resources Policy

-name redactedSpecialist in Environmental Policy

-name redactedSpecialist in Energy and Environmental Policy

November 2, 2009

Congressional Research Service

7-....

www.crs.gov

R40867

CRS Report for Congress

Prepared for Members and Committees of Congress

Carbon Capture and Sequestration in H.R. 2454 and S. 1733

Summary

The carbon capture and sequestration (CCS) provisions in H.R. 2454 and S. 1733 are similar

(some sections are identical), and both bills appear to share the goal of fostering the commercial

development and deployment of CCS projects as an important component of mitigating

greenhouse gas emissions. The bills call for a unified national strategy for addressing the key

legal and regulatory barriers to deployment of commercial-scale CCS. A required report detailing

a national strategy would identify barriers and gaps that could be addressed using existing federal

authority and those that would require legislation, as well as those that would be best addressed at

the state, tribal, or regional level. Both bills would also amend the Clean Air Act (CAA) and Safe

Drinking Water Act (SDWA) to require that the EPA Administrator establish a coordinated

certification and permitting process for geologic sequestration sites, taking into account all

relevant statutory authorities. The amended law would require regulation of geologic

sequestration wells, and promulgation of regulations to protect human health and the environment

by minimizing the risk of atmospheric release of carbon dioxide injected for geologic

sequestration.

Both bills contain identical provisions establishing performance standards for CO2 removal for

new coal-fired power plants. Plants covered by this section include those that have a permit

issued under the CAA, Title V, to derive at least 30% of their annual heat input from coal,

petroleum coke, or any combination of these fuels.

Both bills contain similar provisions that would create a program to accelerate the commercial

availability of CO2 capture and storage technologies and methods by awarding grants, contracts,

and financial assistance to electric utilities, academic institutions, and other eligible entities. The

bills would allow the establishment of a corporation, by referendum among power industry

organizations, that would derive revenue of approximately $1 billion per year via a “wires

charge” on electricity delivered from the combustion of fossil fuels. One possible advantage of

the program, if enacted, would be the creation of a consistent funding stream—exempt from the

annual appropriations process—for development of CCS technology over 10 years.

Both bills would also create a second program that would distribute emission allowances from the

cap-and-trade provisions to qualifying electric generating plants and industrial facilities. Although

the programs in the two bills are similar in construct and scale, S. 1733 would award allowances

to the first 20 gigawatts (Gw) of electricity generation that employs CCS technology via a

formula that provides a significant financial incentive, as much as $106 per ton of CO2 captured

for 90% capture efficiency. In contrast, H.R. 2454 would award only the first 6 Gw via the same

formula, and then employ a reverse auction scheme to allocate the rest, up to a total of 72 Gw.

Thus, S. 1733 allocates allowances to a substantially larger proportion of electricity generating

capacity in the first phase of the program, compared to H.R. 2454, at bonus allowance values that

could be significantly higher than their average market value.

A chairman’s mark to S. 1733, introduced on October 23, 2009, would add an additional incentive

for early deployment of CCS by allowing advanced distribution of emission allowances for CCS.

In contrast to H.R. 2454 and S. 1733 (as introduced), the chairman’s mark would award

allowances before the plant has actually captured any CO2. In contrast, H.R. 2454 and S. 1733 (as

introduced) would only distribute emission allowances based on the total tons of CO2 already

captured and sequestered.

Congressional Research Service

Carbon Capture and Sequestration in H.R. 2454 and S. 1733

Contents

Introduction ................................................................................................................................1

Overview of Key Similarities and Differences .............................................................................2

Summary Comparison of CCS Provisions ...................................................................................4

National Strategy ..................................................................................................................4

H.R. 2454 .......................................................................................................................4

S. 1733 ...........................................................................................................................4

Regulations for Geologic Sequestration Sites ........................................................................4

H.R. 2454 .......................................................................................................................4

S. 1733 ...........................................................................................................................5

Studies and Reports...............................................................................................................5

H.R. 2454 .......................................................................................................................5

S. 1733 ...........................................................................................................................6

Summary of Regulatory and Reporting Requirements ...........................................................6

Carbon Capture and Sequestration Demonstration and Early Deployment Program ...............7

H.R. 2454 .......................................................................................................................7

S. 1733 ...........................................................................................................................9

Performance Standards for Coal-Fueled Power Plants ......................................................... 10

H.R. 2454 ..................................................................................................................... 10

S. 1733 ......................................................................................................................... 11

Commercial Deployment of Carbon Capture and Sequestration Technologies...................... 11

H.R. 2454 ..................................................................................................................... 11

S. 1733 ......................................................................................................................... 13

Chairman’s Mark ................................................................................................................ 15

Tables

Table 1. Comparison of Parallel Sections in H.R. 2454 and S. 1733.............................................2

Table 2. Geologic Sequestration Regulatory and Reporting Requirements ...................................6

Table 3. Rate of Assessment for Coal, Natural Gas, and Oil in H.R. 2454 ....................................8

Contacts

Author Contact Information ...................................................................................................... 16

Congressional Research Service

Carbon Capture and Sequestration in H.R. 2454 and S. 1733

Introduction

This report summarizes and compares provisions for carbon capture and sequestration (CCS)

contained in H.R. 2454 and S. 1733, the two leading cap-and-trade bills aimed at reducing U.S.

emissions of greenhouse gases. CCS receives considerable attention in both bills because of its

potential for substantially reducing carbon dioxide (CO2) emissions from stationary sources, such

as coal-fired power plants, cement plants, and oil refineries, while allowing those industrial

sources to continue to operate even in a carbon-constrained environment. The goal of reduced

emissions and continued operations is particularly important for the coal industry: coal-fired

power plants generate approximately half of all the electricity in the United States, and are

responsible for over 40% of U.S. CO2 emissions from fossil fuels. Many observers consider CCS

to be an integral component of a comprehensive strategy to reduce greenhouse gas emissions

without creating a near-term disruption of the U.S. energy sector.

Currently, no coal-fired power plants, cement plants, oil refineries, or other large industrial

sources of CO2 in the United States are capturing and sequestering large quantities of CO2 solely

for the purpose of greenhouse gas mitigation. The CCS provisions in H.R. 2454 and S. 1733 are

likely intended to spur commercial deployment of CCS at a scale that would greatly surpass the

degree of deployment in the absence of additional federal incentives and requirements.1 Without

these incentives, some analyses have projected that low emission allowance prices combined with

high costs for installing CCS systems would preclude most additional CCS deployment.2

Many questions remain, however, about the possible consequences of accelerated CCS

development: financial, legal, regulatory, infrastructure, environmental, and public acceptance.3

Both bills attempt to some degree to address these questions, largely in parallel and similar

fashion, albeit with some important differences. Table 1 provides a snapshot comparison of the

parallel sections in H.R. 2454 and S. 1733, and the body of the report summarizes and discusses

each section in sequence.

1

Current incentives include $3.4 billion in funding for CCS research and development provided in P.L. 111-5, the

American Recovery and Reinvestment Act, existing loan guarantees and tax incentives, and the U.S. Department of

Energy (DOE) CCS research and development program. For more details on CCS funding, see CRS Report RL33801,

Carbon Capture and Sequestration (CCS), by (name redacted).

2

See, for example, U.S. Environmental Protection Agency, EPA Analysis of the American Clean Energy and Security

Act of 2009: H.R. 2454 in the 111th Congress, June 23, 2009, appendix, p. 86; or Pew Center on Global Climate

Change, In-Brief, What the Waxman-Markey Bill Does for Coal, August 2009, fig. 3, at http://www.pewclimate.org/

federal/what-waxman-markey-does-for-coal.

3

For more in-depth discussions of these topics, see CRS Report RL34621, Capturing CO2 from Coal-Fired Power

Plants: Challenges for a Comprehensive Strategy, by (name redacted) and (name redacted); CRS Report R40103,

Carbon

Control in the U.S. Electricity Sector: Key Implementation Uncertainties, by (name redacted); and CRS Report

RL34307, Regulation of Carbon Dioxide (CO2) Sequestration Pipelines: Jurisdictional Issues, by (name redacted) and

(name redacted).

Congressional Research Service

1

Carbon Capture and Sequestration in H.R. 2454 and S. 1733

Table 1. Comparison of Parallel Sections in H.R. 2454 and S. 1733

H.R. 2454

S. 1733

Comments

Title I, Subtitle B

Division A, Title I, Subtitle B

Sec. 111, National Strategy

Sec. 121, National Strategy

A comprehensive strategy to address

key legal, regulatory, and other

barriers to CCS.

Sec. 112, Regulations for Geologic

Sequestration Sites

Sec. 122, Regulations for Geologic

Sequestration Sites

Regulations under the Clean Air Act

minimizing the risk of escape of CO2

to the atmosphere; regulations under

the Safe Drinking Water Act for CO2

geologic sequestration wells.

Sec. 113, Studies and Reports

Sec. 123, Studies and Reports

A study of federal and state

environmental laws and state common

law applicable to sequestration sites.

Sec. 114, Carbon Capture and

Sequestration Demonstration and

Early Deployment Program

Sec. 125, Carbon Capture and

Sequestration Demonstration and

Early Deployment Program

A “wires charge” program that would

collect approximately $1 billion

annually to foster early deployment of

CCS technology.

Sec. 116, Performance Standards

for Coal-Fueled Power Plants

Sec. 124, Performance Standards for

Coal-Fueled Power Plants

Performance standards under the

Clean Air Act for CO2 removal for

new coal-fired power plants.

Division B, Title 1, Subtitle B

Sec. 115, Commercial

Deployment of Carbon Capture

and Sequestration Technologies

Sec. 111, Disposition of Allowances

for Global Warming Pollution

Reduction Program

A program for distributing emission

allowances to spur the commercial

development of CCS technology.

Source: CRS.

Overview of Key Similarities and Differences

The CCS provisions in H.R. 2454 and S. 1733 are very similar (some sections are identical), and

both bills appear to share the goal of fostering the commercial development and deployment of

CCS projects as an important component of mitigating greenhouse gas emissions. S. 1733 even

specifies—which H.R. 2454 does not—that Congress finds it is in the public interest to achieve

widespread commercial deployment of CCS in the United States and throughout Asia before

January 1, 2030.

Both bills would require the Environmental Protection Agency (EPA) to regulate geologic

sequestration of CO2 under both the Safe Drinking Water Act and the Clean Air Act, and would

also require that the EPA Administrator establish a coordinated certification and permitting

process for geological sequestration sites. Recognizing that these statutes do not provide for

comprehensive management of geologic sequestration issues (such as long-term liability and pore

space ownership), the House and Senate bills would direct the EPA Administrator to establish a

task force to examine broadly the federal and state legal framework for geologic sequestration

sites and activities, and to report to Congress within 18 months.

Both bills would create two separate programs that would provide financial incentives to develop

and deploy commercial-scale CCS. The “wires charge” program, which is nearly identical in both

bills and very similar to H.R. 1689, the Carbon Capture and Storage Early Deployment Act

Congressional Research Service

2

Carbon Capture and Sequestration in H.R. 2454 and S. 1733

introduced by Representative Boucher, would create an annual funding stream of approximately

$1 billion to be awarded by a private corporation to eligible projects. The allocation of

development and deployment grants and contracts would be largely independent of federal

control, once the corporation is established, leaving the program to the discretion of the electricity

generating industry for the most part.

The second program would distribute emission allowances from the cap-and-trade portions of

both bills to qualifying electric generating plants and industrial facilities. Although the programs

in the two bills are similar in construct and scale, S. 1733 would award allowances to the first 20

gigawatts (Gw) of electricity generation that employs CCS technology via a formula that provides

a significant financial incentive, as much as $106 per ton of CO2 captured for 90% capture

efficiency. In contrast, H.R. 2454 would award only the first 6 Gw via the same formula, and then

employ a reverse auction scheme to allocate the rest, up to a total of 72 Gw. Arguably the reverse

auction process would provide an allowance price closer to its true market value, and thus reflect

how the market values CCS versus other emissions reduction options, such as fuel-switching,

offsets, and others.4 If so, then S. 1733 hedges in favor of CCS as a preferred technology by

allocating allowances to a substantially larger proportion of electricity generating capacity in the

first phase of the program, at bonus allowance values that could be significantly higher than their

average market value.

Both the “wires charge” program and the emission allowance scheme focus on the CO2 capture

stage of CCS and generally presume that the technical and regulatory requirements for the

transportation and sequestration stages would be in place by the time capture technology is

installed and operational. Three nearly identical sections in H.R. 2454 and S. 1733 attempt to

address those requirements, through amendments to the Clean Air Act and Safe Drinking Water

Act, as well as through studies and reports to construct a national strategy for CCS and identify

gaps and barriers that could require additional legislation. Despite these provisions, it is not yet

clear whether all of the challenges to transportation and sequestration aspects of CCS can or will

be met in concert with the technological and financial challenges of building capture technology

that works at large power plants and other industrial sources of CO2. The promise of CCS in some

part depends on the promulgation of a CCS regulatory structure, a sufficient transportation

capacity, resolution of liability concerns about long-term CO2 storage, and public acceptance of

CCS, as well as other requirements prior to or in conjunction with the deployment of capture

technology at large commercial facilities. Given these present uncertainties, how well the

provisions in H.R. 2454 and S. 1733 would advance widespread deployment of CCS still remains

an open question.

4

What true market value means in this situation is not straightforward; nevertheless, a reverse auction would reflect

what buyers would be willing to accept as the price of an emission allowance through a competitive process, reflecting

to some degree a market-oriented notion of price.

Congressional Research Service

3

Carbon Capture and Sequestration in H.R. 2454 and S. 1733

Summary Comparison of CCS Provisions

National Strategy

H.R. 2454

Title I, § 111, of H.R. 2454 would require the Administrator of the Environmental Protection

Agency (EPA) to submit to Congress, within one year of enactment, a report detailing a unified

national strategy for addressing the key legal and regulatory barriers to deployment of

commercial-scale carbon capture and sequestration. The report is to identify barriers and gaps that

could be addressed using existing federal authority and those that would require new federal

legislation, as well as barriers and gaps that would be best addressed at the state, tribal, or

regional level. Additionally, the report is to include regulatory, legislative, or other

recommendations to address the gaps and barriers.

S. 1733

Division A, subsections 121(a) and (b) contain the same provisions as § 111 of H.R. 2454, calling

for development of a national strategy and related report to Congress. The Senate bill includes an

additional provision, subsection 121(c), which states that Congress finds that it is in the public

interest that commercial-scale CCS achieve wide deployment in the United States and throughout

Asia before 2030.

Regulations for Geologic Sequestration Sites

H.R. 2454

Section 112 of the House bill would require the EPA Administrator to promulgate regulations to

manage the geologic sequestration of CO2 under both the Clean Air Act (CAA) and the Safe

Drinking Water Act (SDWA).

Section 112(a) would amend Title VIII of CAA, adding a new § 813 to require the EPA

Administrator to establish a coordinated certification and permitting process for geologic

sequestration sites, taking into account all relevant statutory authorities. This provision would

direct the Administrator to reduce redundancy with SDWA requirements (including the current

rulemaking for geologic sequestration wells) and, to the extent practical, reduce the regulatory

burden imposed on certified sequestration entities and implementing authorities.

Within two years of enactment, the Administrator would be required to promulgate CAA

regulations to protect human health and the environment by minimizing the risk of atmospheric

release of carbon dioxide injected for geologic sequestration. The scope of the regulations would

include enhanced oil and gas recovery combined with geologic sequestration. The regulations

would have to include a process to obtain certification for geologic sequestration; requirements

for monitoring, record keeping, and reporting for injected and escaped emissions (taking into

account any requirements under § 713 regarding a greenhouse gas registry); and requirements for

public participation.

Congressional Research Service

4

Carbon Capture and Sequestration in H.R. 2454 and S. 1733

Section 112(a) further would require that, within two years of promulgation of the regulations and

every three years thereafter, the EPA Administrator report to the House Committee on Energy and

Commerce and the Senate Committee on Environment and Public Works on geologic

sequestration in the United States and elsewhere in North America. The report would include data

on injection and any emissions to the atmosphere, an evaluation of active and closed

sequestration sites, and an evaluation of the performance of federal environmental regulations and

programs for sequestration as well as recommendations for their improvement.

This provision broadens the scope of geologic sequestration regulatory authority beyond

protecting ground water under SDWA, to protecting against atmospheric releases of CO2 under

the CAA. Currently, EPA’s proposed geologic sequestration rulemaking is limited to establishing

requirements related to the protection of underground sources of drinking water under SDWA’s

underground injection control provisions (42 U.S.C. 300h et seq.).5

H.R. 2454, § 112(b), would amend SDWA by adding a new § 1421(e) to require regulation of

geologic sequestration wells. This subsection would direct the EPA Administrator to promulgate,

within one year of enactment, regulations for the development, operation, and closure of CO2

sequestration wells. The regulations would include financial responsibility requirements for

emergency and remedial response, well plugging, site closure, and post-injection care. The Safe

Drinking Water Act currently does not include explicit financial responsibility provisions, thus

limiting EPA’s ability to address this issue in its proposed rule.6

The section of SDWA that the bill would amend, § 1421, directs the EPA Administrator to

promulgate regulations for state underground injection control programs. Thus, H.R. 2454

envisions that EPA would delegate primary oversight and enforcement authority for geologic

sequestration wells to interested and qualified states.

S. 1733

Division A, §122, contains the same provisions.

Studies and Reports

H.R. 2454

Section 113(a) would direct the EPA Administrator to establish, within six months, a task force to

conduct a study examining the legal framework for geologic sequestration sites. The bill specifies

5

EPA has proposed a new class of well, Class VI, within the Underground Injection Control Program for wells used for

injection of CO2 for the purposes of CCS.

6

U.S. Environmental Protection Agency, “Federal Requirements Under the Underground Injection Control (UIC)

Program for Carbon Dioxide (CO2) Geologic Sequestration (GS) Wells; Proposed Rule,” 73 Federal Register 43520,

July 25, 2008. EPA explains in the discussion of the proposed rule that, that although the SDWA does not have explicit

provisions for financial responsibility, “EPA believes that the general authorities provided under the SDWA authority

to prevent endangerment of USDWs [underground sources of drinking water] include the authority to set standards for

financial responsibility to prevent endangerment of USDWs from improper plugging, remediation, and management of

wells after site closure. The SDWA authority does not extend to financial responsibility for activities unrelated to

protection of USDWs (e.g., risks to air, ecosystems, or public health unrelated to USDW endangerment). It also does

not cover transfer of owner or operator financial responsibility to other entities, or creation of a third party financial

mechanism where EPA is the trustee.”

Congressional Research Service

5

Carbon Capture and Sequestration in H.R. 2454 and S. 1733

a range of experts, public and private sector representatives, and other participants to be included

on the task force. The study would evaluate (1) existing federal environmental statutes, state

environmental statutes, and state common law that would apply to CO2 storage sites; (2) existing

state and federal laws that apply to harm and damage to public health or the environment at

closed sites where CO2 injection has been used for enhanced oil and gas recovery; (3) the

statutory framework, implementation issues, and financial implications for various liability

models regarding closed sequestration sites; (4) private sector mechanisms that may be available

to manage risks from closed sites; and (5) subsurface mineral rights, water rights, and property

rights issues associated with geologic sequestration. EPA would be required to report to Congress

within 18 months of enactment.

Section 113(b) would direct the EPA Administrator to establish a task force to conduct a study

examining how, and under what circumstances, the environmental statutes for which EPA has

responsibility would apply to CO2 injection and geologic sequestration activities. EPA would be

required to report to Congress within 12 months of enactment.

S. 1733

Division A, § 123, contains the same provisions for studies and reports.

Summary of Regulatory and Reporting Requirements

Table 2 identifies the schedules for completing reports and regulations required in the above

provisions.

Table 2. Geologic Sequestration Regulatory and Reporting Requirements

(summary of parallel provisions in H.R. 2454 and S. 1733)

Action Item

Description

Deadline

National Strategy: Report to

Congress

EPA, in consultation with other

federal agencies, must develop unified,

comprehensive strategy to address

key legal, regulatory, and other

barriers to commercial-scale

deployment of CCS.

1 year after enactment

Clean Air Act (CAA) Regulations

EPA must promulgate regulations to

protect human health and the

environment by minimizing the risk of

escape to the atmosphere of CO2

injected for geologic sequestration.

2 years after enactment

Geologic Sequestration Activities:

Report to Congress

EPA must deliver to the House

Committee on Energy and Commerce

and the Senate Committee on

Environment and Public Works a

report on geologic sequestration in

the United States and, as relevant,

elsewhere in North America.

2 years after promulgation of CAA

regulations (i.e., 4 years from

enactment) and every 3 years

thereafter

Congressional Research Service

6

Carbon Capture and Sequestration in H.R. 2454 and S. 1733

Action Item

Description

Deadline

Safe Drinking Water Act

Regulations

EPA must promulgate regulations for

CO2 geologic sequestration wells that

include financial responsibility

requirements.

1 year after enactment

Study of Legal Framework for

Geologic Sequestration Sites:

Report to Congress

EPA must establish a task force to

conduct a study of federal and state

environmental laws and state common

law applicable to sequestration sites

regarding risk management; federal

and state laws that apply to harm and

damage to the environment or public

health at closed sites; statutory

framework and issues for private or

public assumption of liabilities and

financial responsibilities; and mineral,

water, and property rights issues.

18 months after enactment

Environmental Statutes Study:

Report to Congress

EPA must conduct a study of how

EPA-administered statutes would

apply to CO2 injection and geologic

sequestration activities.

1 year after enactment

Source: CRS.

Carbon Capture and Sequestration Demonstration and Early

Deployment Program

H.R. 2454

Section 114 of H.R. 2454 allows for the creation of a Carbon Storage Research Corporation that

would establish and administer a program to accelerate the commercial availability of CO2

capture and storage technologies and methods by awarding grants, contracts, and financial

assistance to electric utilities, academic institutions, and other eligible entities. 7

The section would establish the corporation by a referendum among “qualified industry

organizations,” which would include the Edison Electric Institute, the American Public Power

Association, the National Rural Electric Cooperative Association, their successors, or a group of

owners or operators of distribution utilities delivering fossil fuel-based electricity who

collectively represent at least 20% of the volume of all fossil fuel-based electricity delivered by

distribution utilities to U.S. consumers. Voting rights would be based on the quantity of fossil

fuel-based electricity delivered to the consumer in the previous year or other representative

period. The corporation would be established if persons representing two-thirds of the total

quantity of fuel-based electricity delivered to retail consumers vote for approval. However, if

40% or more of state regulatory authorities submit written notices of opposition to the creation of

the corporation, it would not be established.

7

Section 114 is nearly identical to H.R. 1689, the Carbon Capture and Storage Early Deployment Act, introduced by

Rep. Boucher on March 24, 2009.

Congressional Research Service

7

Carbon Capture and Sequestration in H.R. 2454 and S. 1733

If established, the corporation would award grants, contracts, and assistance to support

commercial-scale demonstration of carbon capture or storage technology projects that encompass

coal and other fossil fuels, and are suitable for either new or retrofitted plants. The corporation

would seek to support at least five commercial-scale demonstration projects over the lifetime of

the corporation. Pilot-scale and other small-scale projects would not be eligible under the

program.

Under § 114, several entities would be eligible to receive grants, contracts, or assistance from the

corporation: distribution utilities, electric utilities and other private entities, academic institutions,

national laboratories, federal research agencies, state and tribal research agencies, nonprofit

organizations, or a consortium of two or more eligible entities. In addition, § 114 would favor

“early movers” by providing, in the form of grants, 50% of the funds raised to electric utilities

that had already committed resources to deploy large-scale electricity generation units integrated

with CCS. The section would provide grant funds to defray costs already incurred for at least five

“early movers.”

The corporation would raise funding for its program by collecting an assessment on distribution

utilities for all fossil fuel-based electricity delivered to retail customers. The assessments would

reflect the relative CO2 emission rates of different fossil fuels used to generate electricity, as

shown in Table 3.

Table 3. Rate of Assessment for Coal, Natural Gas, and Oil in H.R. 2454

Fuel Type

Rate of Assessment per

kilowatt hour

Coal

$0.00043

Natural Gas

$0.00022

Oil

$0.00032

Source: H.R. 2454.

The corporation would be authorized to adjust the assessments so that they generate not less than

$1.0 billion and not more than $1.1 billion per year. The authority to collect assessments would

be authorized for a 10-year period, beginning six months after enactment. The corporation would

dissolve 15 years after enactment unless extended by Congress. If assessments are collected as

specified in the legislation, the corporation would accumulate approximately $10 billion to be

awarded over 15 years.

Section 114 allows for cost recovery. The legislation would allow a distribution utility whose

transmission, delivery, or sale of electric energy are subject to any form of rate regulation the

opportunity to recover the full amount of “the prudently incurred costs” associated with

complying with § 114, consistent with state or federal laws.

Section 114 also allows for ratepayer rebates. If the corporation does not disburse or dedicate at

least 75% of the funds in a calendar year8 due to absence of qualified projects or similar

circumstances, then the corporation must reimburse the balance to the distribution utilities. In this

8

Beginning seven or more years after the corporation is established.

Congressional Research Service

8

Carbon Capture and Sequestration in H.R. 2454 and S. 1733

case, the regulatory authority that gave its approval for cost recovery could also order rebates to

ratepayers from the reimbursed pool of funds.

Section 114 also provides specific provisions for the Electric Reliability Council of Texas

(ERCOT), so that the program can work for ERCOT as well as for other regions of the country.

Within five years, the Comptroller General of the United States must prepare an analysis and

report to Congress assessing the corporation’s activities, including project selection and methods

of disbursement of assessed fees, impacts on the prospects for commercialization of carbon

capture and storage technologies, and adequacy of funding.

S. 1733

Division A, § 125, of S. 1733 is very similar to § 114 of H.R. 2454 with a few exceptions. Under

both bills, the corporation to be established would operate as a division or affiliate of the Electric

Power Research Institute (EPRI), and be managed by a board consisting of no more than 15

members drawn from the following groups:

•

investor-owned utilities;

•

utilities owned by a state agency, municipality, or Indian tribe;

•

rural electric cooperatives;

•

fossil fuel producers;

•

nonprofit environmental organizations;

•

independent generators or wholesale power providers; and

•

consumer groups.

S. 1733 adds two additional groups to the board that were not included in H.R. 2454: (1) the

National Energy Technology Laboratory of the Department of Energy, and (2) the Environmental

Protection Agency.

The entities eligible to receive grants, contracts, or assistance under the program are identical for

both bills; however, S. 1733 also requires that projects shall meet the eligibility requirements of §

780(b) of the Clean Air Act. Section 780 would be an amendment to Title VII of the Clean Air

Act, added under S. 1733, and would provide for the commercial deployment of carbon capture

and sequestration technologies. 9 Apart from these relatively minor differences, this “wires

charge” program created under S. 1733 and H.R. 2454 would be nearly identical.

One possible advantage of the program, if enacted, would be the creation of a consistent funding

stream—exempt from the annual appropriations process—for development of CCS technology

over 10 years. In contrast, funding for CCS technology from DOE, which is subject to

appropriations, has changed significantly over the past decade or more. It has increased from

approximately $1 million in FY1997 to $581 million in FY2009. Further, the American Recovery

and Reinvestment Act (ARRA, P.L. 111-5) allocated $3.4 billion to CCS to be committed by the

9

H.R. 2454 also amends Title VII of the Clean Air Act. See discussion below for a comparison.

Congressional Research Service

9

Carbon Capture and Sequestration in H.R. 2454 and S. 1733

end of FY2010, a dramatic increase over current funding levels. 10 Concerns could be raised over

the relative effectiveness of a sharp but short-lived increase in funding—provided by ARRA, for

example—versus a consistent stream of funding over a longer time period, for the purposes of

technology development.

Performance Standards for Coal-Fueled Power Plants

H.R. 2454

Title I, §116, of H.R. 2454 would amend Title VIII of the Clean Air Act by adding performance

standards for CO2 removal for new coal-fired power plants. Plants covered by this section include

those that have a permit issued under CAA Title V to derive at least 30% of their annual heat

input from coal, petroleum coke, or any combination of these fuels. The performance standards

are as follows:

•

A covered unit that is “initially permitted” on or after January 1, 2020, shall

reduce carbon dioxide emissions by 65%. The 65% reduction would result in a

level of emissions roughly equivalent to the CO2 released by a natural gas-fired

plant of modern design (a “combined cycle” plant) using no carbon controls.

However, to achieve a 65% reduction (or the 50% reduction for older plants; see

immediately below) a coal plant would have to install carbon removal

technology.

•

A covered unit that is initially permitted after January 1, 2009, and before

January 1, 2020, must achieve a 50% reduction in CO2 emissions by a

compliance date that will be determined by future developments. Specifically, the

compliance date will be the earliest of (1) four years after the date in which the

equivalent of 4 gigawatts (Gw)11 of generating capacity with commercial CCS

technology are operating in the United States and sequestering at least 12 million

tons of CO2 annually (equivalent to roughly eight medium-sized coal plants);12 or

(2) January 1, 2025 (which can be extended by the EPA Administrator by up to

18 months on a case-by-case basis).

•

Not later than 2025 and at five-year intervals thereafter, the Administrator is to

review the standards for new covered units under this section and shall reduce the

maximum CO2 emission rate for new covered units to a rate that reflects the

degree of emission limitation achievable through the application of the best

system of emission reduction that the Administrator determines has been

adequately demonstrated. The Administrator is also to publish biennial reports on

the amount of capacity with commercial CCS technology in the United States.

10

See CRS Report RL33801, Carbon Capture and Sequestration (CCS), by (name redacted), for more details on CCS

funding.

11

A gigawatt is equivalent to 1,000 megawatts or 1 million kilowatts of generating capacity. By way of comparison,

total electric generating capacity in the United States is about 1,000 gigawatts.

12

This 4 Gw of capacity must include at least 3 Gw of electric generating units, may include up to 1 Gw of industrial

applications that are capturing and sequestering at least 3 million tons of CO2 annually, and must include at least two

operating 250 megawatt (Mw) or larger generating units that sequester captured CO2 in geologic formations other than

oil and gas fields.

Congressional Research Service

10

Carbon Capture and Sequestration in H.R. 2454 and S. 1733

The use of the term “initially permitted” is important in the implementation of this section. A new

power plant that has received a permit that is still subject to administrative or legal review is

considered to be “initially permitted.” If a proposed new coal plant has been “initially permitted”

prior to January 1, 2009, it will not fall under the requirements of this section to eventually install

carbon controls.

S. 1733

Division A, Section 124, of S. 1733 contains a nearly identical provision. Probably the most

important change relates to units that are initially permitted after January 1, 2009, and before

January 1, 2020. In H.R. 2454, this class of plants must achieve a 50% reduction in carbon

dioxide emissions by a compliance date that can be triggered by market developments, but

normally is no later than January 1, 2025. In S. 1733 this date is January 1, 2020.

As noted above, the compliance deadline date can be earlier than 2020 if certain market

developments occur. In H.R. 2454 these criteria include installation of the equivalent of at least 4

Gw of generating capacity with carbon capture and sequestration equipment. In the chairman’s

mark of S. 1733 this is put at 10 Gw, but the breakdown of the target between power plants and

industrial plants still adds to 4 Gw. The chairman’s mark also clarifies that in determining

whether the target has been met, only the treated capacity of retrofitted power plants should be

counted toward the target.

Commercial Deployment of Carbon Capture and Sequestration

Technologies

H.R. 2454

Section 115 of H.R. 2454 would amend Title VII of the Clean Air Act (and create § 786) to

require that not later than two years after the date of enactment, the EPA Administrator is to

promulgate regulations providing for the distribution of emission allowances to support the

commercial deployment of carbon capture and sequestration technologies in both electric power

generation and industrial operations. Eligibility for emission allowances requires an owner or

operator to implement carbon capture and sequestration technology at:

•

an electric generating unit that has a nameplate capacity of 200 megawatts or

more, and derives at least 50% of its annual fuel input from coal, petroleum coke,

or any combination of these two fuels, and which will achieve at least a 50%

reduction in carbon dioxide emissions annually produced by the unit; and

•

an industrial source that, absent carbon capture and sequestration, would emit

more than 50,000 tons per year of CO2, and upon implementation will achieve at

least a 50% reduction in annual CO2 emissions from an emission point.13

13

During markup of H.R. 2454, an amendment was successfully offered to replace the word “source” with the words

“emission point” regarding eligibility for emission allowances at an industrial facility. The change in wording could

affect the eligibility for industrial sources that employ CCS technology at some but not all emission points in the

facility.

Congressional Research Service

11

Carbon Capture and Sequestration in H.R. 2454 and S. 1733

Eligibility for emission allowances requires that the owner or operator geologically sequester

captured CO2 or convert it to a stable form that can be safely and permanently sequestered.

Section 115 would distribute emission allowances to electric generating units in two phases.

Phase I applies to the first 6 Gw of electric generating units, measured in cumulative generating

capacity of such units. Under Phase I, eligible projects would receive allowances equal to the

number of tons of carbon dioxide captured and sequestered, multiplied by a bonus allowance

value, divided by the average fair market value of an emission allowance in the prior year.14 The

Administrator would establish a bonus allowance value for each rate of carbon capture and

sequestration—compared to how much would otherwise be emitted—from a minimum of $50 per

ton for a 50% rate to a maximum of $90 per ton for an 85% rate.15 This section provides an

incentive for “early movers.” Under Phase I distribution to electric generating units, the bonus

allowance value is increased by $10—of the otherwise applicable bonus value—if the generating

unit achieves a 50% capture rate before January 1, 2017.

Allowances would be distributed under Phase II after the 6 Gw threshold is achieved. Phase II

would distribute emission allowances by reverse auction. At each reverse auction, the EPA

Administrator would select bids from eligible projects—each bid submitted would include the

total quantity of CO2 to be sequestered over 10 years and the desired CO2 sequestration incentive

per ton—and begin with the project proposing the lowest level of CO2 incentive per ton.16

If the Administrator determines that reverse auctions are not efficient or cost-effective for

deploying commercial-scale capture and sequestration technologies, the Administrator may

prescribe an alternative distribution method. In an alternative distribution method, the

Administrator would divide emission allowances into multiple “tranches,” each supporting the

deployment of a specified quantity of cumulative electric generating capacity utilizing CCS

technology. Each tranche would support no more than 6 Gw of electric generating capacity, and

would be distributed on a first-come, first-serve basis. For each tranche, the Administrator would

establish a sliding scale that would provide higher bonus allowance values for projects achieving

higher rates of capture and sequestration. For each successive tranche, the Administrator would

establish a bonus allowance value that is lower than the rate established for the previous tranche.

Limitations

Under both Phase I and Phase II, the EPA Administrator would reduce or adjust the bonus

allowance values for projects that sequester CO2 in geological formations for the purposes of

enhanced hydrocarbon recovery.17 By reducing the bonus allowance value for these projects, the

14

Or, expressed as a formula: Allowances = (# tons of CO2 captured and sequestered) x (bonus allowance value) /

(average fair market value for an allowance in prior calendar year).

15

For example, if an eligible facility could capture 1 million tons of CO2 per year at a 85% capture rate, then it could

receive 1 million allowances if the fair market value was $90 per ton in the prior year; 2 million allowances if the fair

market value was $45 per ton in the prior year; or 6 million allowances if the fair market value was $15 per ton in the

prior year.

16

For example, if two eligible projects submitted bids to sequester 10 million tons of CO2 over 10 years, and project A

proposed a $50 per ton incentive, while project B proposed a $40 per ton incentive, the Administrator would

presumably first select project B, if each project was otherwise equally qualified.

17

Enhanced hydrocarbon recovery, also known as enhanced oil recovery (EOR), is a technique whereby CO2 in

injected into the subsurface to improve the recovery of oil (or gas) that might otherwise not be recoverable using

conventional oilfield techniques.

Congressional Research Service

12

Carbon Capture and Sequestration in H.R. 2454 and S. 1733

Administrator would take into account the lower net costs for an enhanced hydrocarbon recovery

project. The lower net costs would presumably result from income to the project provided via sale

of the recovered hydrocarbons.

Section 115 of H.R. 2454 also contains several provisions that limit the number of allowances and

the total cumulative electric generating capacity eligible for allowances. Under § 115, no more

than 72 Gw of total cumulative generating capacity may receive allowances, including industrial

applications measured under an equivalent metric determined by the EPA Administrator. In

addition, a qualifying project, either an electricity generating plant or industrial facility, would be

eligible to receive allowances only for the first 10 years of operation. H.R. 2454 also limits the

total percentage of emission allowances made available under the bill for CCS to 1.75% for years

2014 through 2017, 4.75% for years 2018 through 2019, and 5% for years 2020 through 2050.

These annual allocation percentages are established in § 782(f) of the Clean Air Act, as amended

by H.R. 2454.

Section 115 would allocate the bulk of emission allowances to electricity generating units and

limit the amount of emission allowances available to industrial sources. The Administrator would

not distribute more than 15% of the allocated allowances under § 782(f) to eligible industrial

sources.18 The allowances may be distributed to eligible industrial sources using a reverse auction

method or an incentive schedule, similar to the Phase II methods described for electric generating

units. Industrial facilities are specifically excluded if they produce a liquid transportation fuel

from a solid fossil-based feedstock, such as coal.

S. 1733

Under Subtitle B of Division B of S. 1733, § 111 allows for the disposition of emission

allowances for the global warming pollution reduction program. Similar to § 115 of H.R. 2454,

this section of S. 1733 would amend Title VII of the Clean Air Act and add § 780 (equivalent to

§ 786 created in H.R. 2454), which would distribute emission allowances to electricity generating

plants and industrial facilities to foster the deployment of CCS technologies. The goal, scope, and

structure of the program in Division B, § 111, of S. 1733 are very similar to those of the program

created under § 115 of H.R. 2454, with several important distinctions.

As with H.R. 2454, S. 1733 would distribute allowances for the first 72 Gw of total cumulative

generating capacity to employ CCS, including industrial applications, and would distribute them

as a similar percentage of the total pool of available allowances: 1.75% for years 2014 through

2017, 4.75% for years 2018 through 2019, and 5% for years 2020 through 2050.19 S. 1733 would

also distribute allowances in two phases; however, it would distribute allowances to the first 20

Gw of generating capacity in Phase I, instead of 6 Gw as proposed in Phase I of H.R. 2454.

Phase I of S. 1733 would distribute allowances in two 10-Gw tranches according to the same

formula20 described in H.R. 2454:

18

For example, industrial sources would be eligible to receive 15% of 1.75% of total allowances in years 2014 through

2017, or 0.26% of the total allowances under § 782(f) of the Clean Air Act, as amended by H.R. 2454.

19

These annual allocation percentages are established in § 721(a) of the Clean Air Act as amended by S. 1733;

equivalent to §782(f) of the Clean Air Act as amended by H.R. 2454.

20

Allowances = (# tons of CO2 captured and sequestered) x (bonus allowance value) / (average fair market value for an

allowance in prior calendar year).

Congressional Research Service

13

Carbon Capture and Sequestration in H.R. 2454 and S. 1733

•

First tranche—10 Gw for eligible projects achieving 50% or more reduction in

CO2 emissions through the use of CCS technology, with bonus allowance values

ranging from $50 per ton for 50% capture to $96 per ton for 90% capture (versus

$90 per ton for 85% capture in H.R. 2454).

•

Second tranche—10 Gw for eligible projects achieving 50% or more reduction in

CO2 emissions with a maximum bonus allowance value of $85 per ton for 90%

capture.

Similar to H.R. 2454, “early mover” projects would receive an additional $10 per ton if they

commenced operations by January 1, 2017, which would apply to all 20 Gw of Phase I in S.

1733. In contrast, the “early mover” bonus would apply to only 6 Gw in H.R. 2454.

As in H.R. 2454, allowances would be distributed under Phase II by reverse auction. In S. 1733,

similar to H.R. 2454, the EPA Administrator may establish reverse auctions for no more than five

different project categories, defined based on (1) coal type, (2) capture technology, (3) geological

formation type, (4) new versus retrofit, and (5) other factors or any combination of categories 1-4.

In S. 1733, the Administrator would establish a separate reverse auction, to be held annually, for

projects at industrial sources. Industrial sources would not be allowed to participate in other

auctions. A requirement to segregate industrial sources from electricity generating sources is not

specified in H.R. 2454.

In parallel to H.R. 2454, the Administrator may prescribe an alternative distribution method under

S. 1733 if it is determined that reverse auctions are not efficient or cost-effective. Under both

H.R. 2454 and S. 1733, the Administrator would divide the emission allowances into a series of

multiple tranches, each supporting the deployment of a specific quantity of cumulative electricity

generating capacity. Under S. 1733, each tranche would support 10 Gw of generation capacity. In

contrast, under H.R. 2454 each tranche would support 6 Gw.

Limitations

As with H.R. 2454, no more than 15% of the total emission allowances allocated for CCS in S.

1733 would be distributed to eligible industrial sources in any vintage year. In addition, S. 1733

prohibits the distribution of allowances to industrial sources under the first tranche of Phase 1

(i.e., the first 10 gigawatts of generating capacity), but does allow industrial projects to receive

allowances under the second tranche of Phase I and thereafter. Under H.R. 2454, projects at

industrial sources would be eligible to receive allowances in Phase II, after the allowances for the

first 6 gigawatts of generating capacity have been distributed.

S. 1733 also contains a provision for certification of qualifying projects that is not included in

H.R. 2454. Under S. 1733, qualifying projects that are eligible to receive allowances under either

Phase I (the first 20 Gw) or the alternative distribution method of Phase II may request a

certification from the EPA Administrator that the project is eligible to receive emission

allowances. A project that successfully bids under the reverse auction method of Phase II does not

have an option; it would be required to request a certification from the Administrator. The process

of obtaining a certification is apparently a more formal requirement for eligibility that leads to a

reservation of a portion of emission allowances allocated for the deployment of CCS technology.

In addition to applying for a certification, a qualifying project would need to document several

items in order for the Administrator to make a determination of eligibility:

Congressional Research Service

14

Carbon Capture and Sequestration in H.R. 2454 and S. 1733

•

technical information regarding CCS technology to be used, coal type, geological

formation type, and other relevant design criteria;

•

the annual CO2 reductions projected for the first 10 years of commercial

operation; and

•

a demonstration by the owner and operator that they are committed to

constructing and operating the project along a timeline of reasonable capture and

sequestration milestones.

In addition to documenting this information, the qualifying project must demonstrate its

commitment to the project by taking at least one of three qualifying actions:

•

execution of a commitment by lenders or other appropriate entities to finance the

project;

•

commitment of the owner or operator to execute a surety bond; or

•

an authorization by a state regulatory authority to allow cost recovery from the

retail customers for the costs of the project.

For projects that elect not to request certification (Phase I or alternative distribution projects

under Phase II are not required to, although they may), the Administrator would make a separate

determination of whether the project satisfies eligibility requirements. That determination would

occur at a time when the emission allowances are actually distributed. As with H.R. 2454,

emission allowances under S. 1733 would be distributed on an annual basis, based on the total

tons of CO2 the project actually captures and sequesters in each of the first 10 years of operation.

Although emission allowances may be reserved in advance, based on the issuance of a

certification or other determination of eligibility, they would not be actually distributed until after

the CO2 has been already captured and sequestered.

Chairman’s Mark

On October 23, 2009, Senator Boxer released the chairman’s mark to S. 1733, which contained a

new provision to the emission allowance distribution program for CCS.21 The new provision

would allow for advanced distribution of allowances under Phase I of the program, thus providing

an opportunity for fossil fuel fired electricity plants and industrial facilities to receive allowances

before the plants have actually captured and sequestered any CO2. This approach differs from the

allowance distribution scheme in H.R. 2454 and S. 1733 (as introduced), which would distribute

emission allowances based on the total tons of CO2 actually captured and sequestered. Similar to

H.R. 2454 and S. 1733 (as introduced), the chairman’s mark would require that plants have at

least a 50% capture rate before they would qualify for allowances.

Under the new provision, 70% of the number of emission allowances reserved under the first

tranche of Phase I would be eligible for advanced distribution, and 50% of the second tranche

would also be eligible. The amount of allowances eligible for advanced distribution would total

12 Gw of the 20 Gw of generating capacity, or 60% of the total, available under Phase I of S.

1733. By comparison, H.R. 2454 would provide only half that amount (6 Gw) in total for Phase I,

21

Available on the Senate Environment and Public Works Committee website at http://epw.senate.gov/public/

index.cfm?FuseAction=Files.View&FileStore_id=ee5c67bb-a5a7-453d-a4e0-4c8f2908c0cf.

Congressional Research Service

15

Carbon Capture and Sequestration in H.R. 2454 and S. 1733

and would require that the plants have commenced operations and actually be capturing CO2

before receiving any allowances. The provision in the chairman’s mark of S. 1733 could be seen

as an additional incentive to “early movers” to build CCS-ready facilities or retrofit existing

plants. The requirements for when to provide the advanced distribution are somewhat vague,

however, allowing the EPA Administrator discretion to pick a time prior to the plant’s operational

phase that would “ensure expeditious deployment” of CCS technology.

Some may view the new provision as providing access to emission allowances before the plant

owner or operator has made an iron-clad commitment to building and operating a CCS unit. In

part, the chairman’s mark addresses that concern by specifying that advanced allowances would

be limited to only cover costs for retrofitting an existing plant for CCS and to cover the difference

in costs between building a new electric generating unit with CCS versus a new plant without

CCS. The bill assigns responsibility for the necessary cost estimates—for both the retrofit and the

new plant costs—to the organization requesting the advanced appropriations. The advanced

allowances would be distributed using the cost estimates provided by the requesting organization.

In addition, certification would be required for a plant to receive advanced allowances. As one of

the criteria for obtaining certification, the chairman’s mark adds an additional qualifying action to

the list of qualifying actions in S. 1733 that would demonstrate a commitment to construct and

operate a CCS project: an authorization from a state legislature to allow cost recovery for the

CCS project. Thus, a project could receive authorization either from a state regulatory authority

for cost recovery, or from a state legislature, as one necessary step to obtaining certification.

The advanced allowance scheme provides a new incentive for power plants and industrial

facilities to make a commitment to building CCS that is not present in H.R. 2454 or in S. 1733 (as

introduced). It is likely to accelerate early deployment of CCS by making up to 12 Gw eligible for

advanced allowances, compared to H.R. 2454, which provides for only 6 Gw in Phase I. How

much more electricity generating capacity will employ CCS as a result of the advanced allowance

provision is difficult to predict, and would depend, in part, on other factors such as the ratio of the

value of bonus allowances established in legislation versus the market price of allowances. The

long-term deployment of CCS would also depend on how well the hoped-for “learning-by-doing”

gains in efficiency and knowledge accrue from demonstration projects and the experience gained

through early deployment at a commercial scale.

Author Contact Information

(name redacted)

Specialist in Energy and Natural Resources Policy

[redacted]@crs.loc.gov, 7-....

(name redacted)

Specialist in Energy and Environmental Policy

[redacted]@crs.loc.gov, 7-....

(name redacted)

Specialist in Environmental Policy

[redacted]@crs.loc.gov, 7-....

Congressional Research Service

16

EveryCRSReport.com

The Congressional Research Service (CRS) is a federal legislative branch agency, housed inside the

Library of Congress, charged with providing the United States Congress non-partisan advice on

issues that may come before Congress.

EveryCRSReport.com republishes CRS reports that are available to all Congressional staff. The

reports are not classified, and Members of Congress routinely make individual reports available to

the public.

Prior to our republication, we redacted names, phone numbers and email addresses of analysts

who produced the reports. We also added this page to the report. We have not intentionally made

any other changes to any report published on EveryCRSReport.com.

CRS reports, as a work of the United States government, are not subject to copyright protection in

the United States. Any CRS report may be reproduced and distributed in its entirety without

permission from CRS. However, as a CRS report may include copyrighted images or material from a

third party, you may need to obtain permission of the copyright holder if you wish to copy or

otherwise use copyrighted material.

Information in a CRS report should not be relied upon for purposes other than public

understanding of information that has been provided by CRS to members of Congress in

connection with CRS' institutional role.

EveryCRSReport.com is not a government website and is not affiliated with CRS. We do not claim

copyright on any CRS report we have republished.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.