Defense Primer: Procurement
Overview
While procurement implies a process of obtaining goods or
services, the word also refers to a specific title and to
associated accounts within the typically annual National
Defense Authorization Act (NDAA) and Department of
Defense Appropriations Act.
Appropriations for Procurement
The Department of Defense (DOD), which is “using a
secondary Department of War designation,”
under Executive Order 14347 dated September 5, 2025,
procurement appropriations title provides funds for
nonconstruction-related investment costs—the costs to
acquire capital assets, such as an F-35 Joint Strike Fighter
aircraft or a Virginia-class submarine. Investment costs are
distinguished from expenses—the costs of resources
consumed in operating the department, such as food and
fuel. DOD uses procurement appropriations to obtain
various categories of materiel, including
• new military hardware (e.g., aircraft, ships, armored
vehicles, radios, and satellites);
• upgrades to existing equipment, including service life
extension or remanufacturing programs;
• weapons and ammunition (e.g., air-to-air missiles and
rifle rounds); and
• spares and repair parts.
Procurement funding provided to the department in a given
fiscal year (FY) can usually be obligated over a period of
three years. The most prominent exception is Navy
Shipbuilding and Conversion funding, which is available
for five years. Congress enacted FY2025 appropriations for
DOD through two short-term continuing resolutions (CRs)
and one full-year CR (P.L. 118-83; P.L. 118-158; and P.L.
119-4 ). In total, these CRs provided $167.5 billion for
procurement accounts. (See Table 1).
NDAA and Defense Appropriations
in one fiscal year. In other words, the total funding
necessary to acquire a useable end-item is approved by
Congress in a single fiscal year, even though related work
may span many years.
Table 1. Selected Funding for DOD Procurement
Accounts in the Full-Year Continuing Appropriations
and Extensions Act, 2025 (P.L. 119-4)
Account (Acronym)
$ (billions)
Aircraft Procurement, Army
$3.5
Missile Procurement, Army
$6.0
Procurement of Weapons and Tracked
Combat Vehicles, Army
$3.7
Procurement of Ammunition, Army
$2.9
Other Procurement, Army
$8.7
Aircraft Procurement, Navy
$15.9
Weapons Procurement, Navy
$6.3
Procurement of Ammunition, Navy and Marine
Corps
$1.6
Other Procurement, Navy
$15.1
Procurement, Marine Corps
$3.8
Aircraft Procurement, Air Force
$19.9
Missile Procurement, Air Force
$4.3
Procurement of Ammunition, Air Force
$0.6
Other Procurement, Air Force
$31.0
Procurement, Space Force
$3.9
Procurement, Defense-Wide
$5.7
Defense Production Act (DPA) Purchases
$0.5
National Guard and Reserve Equipment
$0.9
Shipbuilding and Conversion, Navy (SCN)
$33.3
TOTAL
$167.6
CRS In Focus IF10516, Defense Primer: Navigating the NDAA
CRS In Focus IF10515, Defense Primer: The NDAA Process
CRS In Focus IF10514, Defense Primer: Defense Appropriations
Process
How is DOD Procurement Funded?
In general, Congress appropriates money for defense
procurement under a policy of full funding, which requires
funding the entire procurement cost of end-items (e.g.,
AIM-9 Sidewinder missiles or KC-46A refueling tankers)
Source: CRS analysis of Division A, Title IV, Sections 1403-1404 of
the Full Year Continuing Appropriations and Extensions Act, 2025
(P.L. 119-4). The FY2025 reconciliation act ( P.L. 119-21) specified
funds for appropriation that could be used for DOD procurement
but did not specify funds for appropriation by typical title names,
(including procurement) so these figures are not included in this
chart.
Note: Figures rounded.
https://crsreports.congress.gov
Defense Primer: Procurement
Exceptions to Full Funding
•
Incremental Funding. In rare cases, programs have
been procured using incremental funding, a funding
policy typically associated with research and
development activities. Under incremental funding, a
system’s cost is phased over two or more fiscal years.
Incremental funding has principally been used to
procure certain ships and submarines (e.g., Virginiaand Columbia-class submarines) but is typically
avoided as a funding mechanism for procurement.
• Multiyear Procurement. Under 10 U.S.C. §3501,
Congress sometimes authorizes multiyear procurement
(MYP) for programs. MYP can achieve savings by
committing to buy items from a contractor over multiple
years for a reduced price per unit. Qualifying for MYP
requires a program to prove that it will achieve
substantial savings throughout its annual buys, receive
sufficient and stable funding, and procure items unlikely
to substantially change over the multiyear period.
Examples include ships (e.g., Virginia-class submarines
and DDG-51 Arleigh Burke-class destroyers); aircraft
(e.g., UH-60 Black Hawk helicopters, MV-22 Osprey
tilt-rotor aircraft, and C-130J Super Hercules cargo
planes); and munitions (e.g., M142 High Mobility
Artillery Rocket Systems, or HIMARS, and MGM–140
Army Tactical Missile Systems, or ATACMS)).
• Advance Procurement. Programs receive advance
procurement funds for components of a unit that need to
be purchased long before the unit itself is purchased.
Advance procurement requires a separate initial
contract, and its authority is provided in an
appropriations act. For programs using MYP, advance
procurement may also be used to achieve economic
order quantity, which is defined as buying enough of an
item to minimize the total cost.
When Does a Program Enter
Procurement?
A program that produces a major capability (e.g., an aircraft
carrier) typically enters procurement after it receives
Milestone C approval in the Defense Acquisition System.
Prior to procurement, programs are considered to be in
development and are generally funded through Research,
Development, Test and Evaluation (RDT&E)
appropriations. Some programs may receive procurement
funds before a formal Milestone C approval.
How Else Does DOD Purchase Goods
and Services? How Does Procurement
Relate to Defense Contracting?
Congress typically authorizes and appropriates procurement
funding to DOD for nonconstruction investments. DOD
may use funding other than procurement to purchase
services (e.g., research, architectural design, or cleaning
services) and smaller goods (e.g., gauze or light bulbs)
because DOD identifies such purchases as expenses rather
than investments and funds them in other parts of its
budget.
DOD purchases goods and services from the private sector
through contracts and accounts for expenditures as contract
obligations. These individual activities—most of which are
too granular to be captured in appropriations data—are
tracked at the level of obligations. Obligation is the term
used when agencies enter into contracts, employ personnel,
or otherwise commit to spending money.
Considerations for Congress
Congress may face several questions relevant to DOD
procurement, including
• Does Congress have adequate information to exercise
oversight of exceptions to full funding policies (e.g.,
incremental funding and multiyear procurement)?
• How might the delineation between procurement and
RDT&E funding impact development of new
capabilities? Is Milestone C approval the appropriate
time for a program to move from RDT&E funding to
procurement funding?
• What demand signal do procurement appropriations
timelines send to the defense industrial base?
Relevant Statutes
Title 10, Part IV, of the U.S. Code—Service, Supply, and
Procurement.
CRS Products
For information on the full funding policy in DOD
procurement, see CRS Report RL31404, Defense Procurement:
Full Funding Policy—Background, Issues, and Options for Congress
For information on special cases of procurement, see CRS
Report R41909, Multiyear Procurement (MYP) and Block Buy
Contracting in Defense Acquisition: Background and Issues for
Congress
For general information on defense procurement and contract
acquisition, see CRS In Focus IF10600, Defense Primer:
Department of Defense Contractors and CRS Report R44010,
Defense Acquisitions: How and Where DOD Spends Its Contracting
Dollars
Other Resources
DOD Comptroller, Defense Budget Materials,
https://comptroller.war.gov/budget-materials/
DOD 7000.14-R, “Financial Management Regulation,” Budget
Formulation and Presentation: Procurement Appropriations, vol. 2B,
Ch. 4, November 2017, https://comptroller.war.gov/Portals/45/
documents/fmr/Volume_02b.pdf
Alexandra G. Neenan, Analyst in U.S. Defense Policy
IF10599
https://crsreports.congress.gov
Defense Primer: Procurement
Disclaimer
This document was prepared by the Congressional Research Service (CRS). CRS serves as nonpartisan shared staff to
congressional committees and Members of Congress. It operates solely at the behest of and under the direction of Congress.
Information in a CRS Report should not be relied upon for purposes other than public understanding of information that has
been provided by CRS to Members of Congress in connection with CRS’s institutional role. CRS Reports, as a work of the
United States Government, are not subject to copyright protection in the United States. Any CRS Report may be
reproduced and distributed in its entirety without permission from CRS. However, as a CRS Report may include
copyrighted images or material from a third party, you may need to obtain the permission of the copyright holder if you
wish to copy or otherwise use copyrighted material.
https://crsreports.congress.gov | IF10599 · VERSION 16 · UPDATED