Hydropower Licenses and Relicensing Conditions: Current Issues and Legislative Activity

Congressional research reportNov 4, 2004

Ask Donna

What actually matters in this document.

Text

Order Code IB10122

CRS Issue Brief for Congress

Received through the CRS Web

Hydropower Licenses and Relicensing Conditions:

Current Issues and Legislative Activity

Updated November 4, 2004

Kyna Powers

Resources, Science, and Industry Division

Congressional Research Service ˜ The Library of Congress

CONTENTS

SUMMARY

MOST RECENT DEVELOPMENTS

BACKGROUND AND ANALYSIS

Licensing Authority

Federal Power Act §4(e) and §18 License Conditions

License Conditions for Projects on Federal Reservations (FPA §4(e))

Fishway Provisions (FPA §18)

License Conditioning Agencies and the Relicensing Process

Pre-Application Phase

Post-Application Phase

Cost of Mandatory Conditions

Proposed Changes to the License-Conditioning Process

Hydroelectric Relicensing Legislation in the 108th Congress

Discussion

Length of Process

Environmental Issues

Effectiveness of the Integrated Licensing Process (ILP)

Participation in the Conditioning Process

Conclusion

LEGISLATION

CONGRESSIONAL HEARINGS, REPORTS, AND DOCUMENTS

Hearings

FOR ADDITIONAL READING

CRS Reports

Other Documents

IB10122

11-04-04

Hydropower Licenses and Relicensing Conditions:

Current Issues and Legislative Activity

SUMMARY

In the next ten years, more than 40% of

the nation’s non-federal hydropower projects

will require new federal licenses to continue

operating. New licenses will establish facilities’ operating parameters for the next 30 to

50 years. These operating parameters will

affect the total quantity and timing of electricity production. They will also affect flood

control, irrigation, municipal water supplies,

recreation, fish and wildlife habitat, and transportation.

Under the 1920 Federal Power Act

(FPA), the Federal Energy Regulatory Commission (FERC) has primary responsibility for

balancing multiple water uses and evaluating

licensing and relicensing applications. However, the FPA also creates a role in the licensing process for federal agencies that are responsible for managing fisheries or federal

reservations (e.g., national forests, etc.).

Specifically, sections 4(e) and 18 of the FPA

give certain federal agencies the authority to

attach conditions to FERC licenses. For

example, federal agencies may require applicants to: build fish passageways, schedule

periodic water releases for recreation, release

minimum flows of water for fish migration, or

control water release rates to reduce erosion.

Once an agency issues such conditions, FERC

must include them in any license it issues.

While these conditions often generate environmental or recreational benefits, they may

also require construction expenditures and

may increase generation costs by reducing

operational flexibility.

Reflecting recommendations by FERC

and the hydropower industry, legislation has

been passed by both chambers of the 108th

Congress, as part of various energy bills, to

alter federal agencies’ license-conditioning

Congressional Research Service

authority. On November 17, 2003, a conference agreement was reached on H.R. 6. It

passed the House the next day, but has not

passed the Senate. Other energy bills have

been introduced. One version, H.R. 4503, was

introduced in the House on June 3, 2004, and

passed the House on June 15, 2004. H.R.

4503/H.R. 6 would allow stakeholders to propose alternative license conditions and would

require federal agencies to consider alternatives proposed by license applicants, but not

any other stakeholder. The legislation would

also require an agency to accept the applicant’s proposed alternative if it found that the

alternative (1) provides for the adequate protection and utilization of the federal reservation, or will be no less protective of the fish

resource than the fishway initially prescribed,

and (2) costs less to implement, and/or will

result in improved operation of the project for

electricity production.

Response to the proposed legislation has

been mixed. While FERC and the hydropower industry generally support the legislation, some environmental organizations oppose the bills, and officials within some conditioning agencies have expressed concerns.

Opponents of the legislation argue that resource agencies are taking adequate steps to

improve the conditioning process, and that the

legislation could increase relicensing time,

weaken environmental protections, give applicants undue standing in the conditioning

process, and weaken FERC’s new Integrated

Licensing Process. On the other hand, proponents of the legislation argue that it would

create accountability on the part of conditioning agencies, decrease the cost of license

conditions without diminishing agencies’

conditioning authority, and enhance FERC’s

licensing processes.

˜ The Library of Congress

IB10122

11-04-04

MOST RECENT DEVELOPMENTS

Conferees on the House and Senate comprehensive energy bills (H.R. 6) met on

November 17, 2003, and approved a conference report that contained provisions on

hydroelectric facilities. The Senate conferees voted 10-3 to approve an offer to the House

conferees. The House conferees approved a counteroffer by voice vote, and the House

conferees’ counteroffer was accepted by eight of the Senate conferees. The House approved

the conference report November 18, 2003. At the end of 2003, the Senate had not approved

the conference report. S. 2095, a shorter version of H.R. 6, was introduced in the Senate on

February 12, 2004, but a vote on this bill has not been held. Another version, H.R. 4503, was

introduced in the House on June 3, 2004. H.R. 4503 passed the House on June 15, 2004, and

has been received in the Senate. On September 9, 2004, the Department of Interior released

a proposed rule that would allow hydropower license applicants to appeal its license

conditions.

BACKGROUND AND ANALYSIS

Hydropower is one of the multiple benefits the nation’s waters provide. It accounts for

nearly 7% of all electricity produced in the United States and 15% or more of the electricity

produced in Idaho (27%), Maine (15%), Montana (34%), Oregon (43%), South Dakota

(30%), Vermont (37%), and Washington (44%).1 Hydroelectric power is generated by

releasing water through a set of turbines; thus, it does not produce air pollutants and maybe

turned on or off in a matter of minutes. By storing water behind dams and controlling water

releases, some hydropower facilities can generate electricity during periods of high energy

demand (so called peaking power).

While these facilities are important sources of clean peaking power, the construction

and management of dams are contentious because dams affect other beneficial water uses

and resources. The construction of dams alters the river by blocking downstream flows and

creating reservoirs. While reservoirs can provide recreational opportunities and habitat for

certain fish species, they increase the effort migratory fish must exert to travel up or down

river and increase the exposure of young fish to predators. Once a hydropower facility is

built, its management also affects water uses. For example, the decision of when, how, and

how much water to release from a hydroelectric facility affects flood control, irrigation,

municipal water supplies, recreation, fish and wildlife habitats, and transportation (See CRS

Report RL31536, Licensing of Non-Federal Hydroelectric Projects: Background and

Current Issues).

In order to make sure that navigable waters are managed for the public interest,

Congress oversees the construction and operation of hydroelectric facilities. Congress

directly authorizes federal hydropower projects and requires that private hydropower projects

1

Department of Energy Report DOE/EIA-0214, State Energy Data Report 1999, Table 3, “Energy

Consumption Estimates by Source,” at [http://www.eia.doe.gov/emeu/sedr/contents.html].

CRS-1

IB10122

11-04-04

obtain federal licenses.2 This issue brief summarizes federal licensing and licenseconditioning authority for non-federal projects, discusses key arguments for and against

changing the process through which federal resource agencies issue license conditions, and

reviews current legislative proposals to revise federal licensing authority.

Licensing Authority

Through the 1920 Federal Power Act (FPA) (16 U.S.C. 792), Congress created the

Federal Power Commission (FPC), later renamed the Federal Energy Regulatory

Commission (FERC), which licenses all non-federal hydropower facilities. Using this

authority, FERC granted 30 to 50 year licenses to projects located in 45 states (excluding

Delaware, Hawaii, Mississippi, North Dakota, and South Dakota which have no non-federal

dams). Many of the licenses for these projects were issued during the 1950s and 1960s, and

are now expiring. In the next 10 years, 218 projects, or about 40% of all non-federal

hydropower facilities, will need new licenses to continue operating.3

In order to help ensure that FERC licenses protect migratory fish and federally reserved

lands (e.g., lands, such as Indian reservations and national forests, that are set apart by the

federal government for a special purpose), Congress created a role in the licensing process

for certain federal agencies. The FPA requires that FERC include certain agency-established

operating conditions in its licenses. For example, section 18 of the FPA (16 U.S.C. 811)

stipulates that the Secretary of the Interior or the Secretary of Commerce may develop license

conditions that direct the applicant to construct and maintain a passageway, called a fishway,

through which fish can travel around barriers created by the dam. Furthermore, section 4(e),

authorizes certain department secretaries to develop license conditions for facilities located

in the federal reservations they manage (16 U.S.C. 797(e)). Under section 4(e), a secretary

may stipulate provisions that are necessary to maintain the reservation for its federally

designated purposes. Conditioning authority is not limited to FERC and Federal agencies.

The 1970 Federal Water Pollution Control Act, commonly known as the Clean Water Act

(CWA) (33 U.S.C. 1341) extends conditioning authority to state pollution-control agencies.

Under the CWA, a FERC-issued license must include any conditions that the state deems

necessary to maintain state-designated uses or water quality standards.

Federal Power Act §4(e) and §18 License Conditions

As noted above, sections 4(e) and 18 of the FPA grant federal agencies the authority to

issue license conditions designed to preserve or enhance federally reserved lands, and to help

fish travel around barriers created by hydropower facilities. The type of conditions issued

pursuant to FPA sections 4(e) and 18 are described below.

License Conditions for Projects on Federal Reservations (FPA §4(e)).

Section 4(e) of the FPA applies to hydropower facilities located on federally reserved lands

(e.g., Indian reservations and national forests, etc.). Under this section, the Secretary of the

2

Managers of federal dams may implement operational changes similar to those contained in

hydropower licenses.

3

Federal Energy Regulatory Commission, Hydroelectric Projects Under Commission License,

updated March 11, 2003, at [http://www.ferc.gov/industries/hydropower/gen-info/projlic.pdf].

CRS-2

IB10122

11-04-04

department with jurisdiction over the reserved land has the authority to issue any license

conditions necessary to maintain the reservation. Depending on the purpose of the

reservation, the agency’s conditions may address a range of goals including the preservation

or enhancement of recreation, federal lands, and aquatic habitat. Specifically, the Secretary

could require the applicant to: schedule periodic water releases for recreation (white-water

releases), release minimum quantities of water for fish migration (minimum flows), control

the rate of water release to reduce habitat disruption (ramping requirements), and limit

reservoir fluctuations to reduce erosion and maintain habitat (reservoir fluctuation limits).

The Department of the Interior reports that the Bureau of Indian Affairs, Bureau of

Reclamation, National Park Service, and Bureau of Land Management issued section 4(e)

conditions for 6% of the projects relicensed between 1995 and 2000.

Fishway Provisions (FPA §18). Under section 18 of the FPA, the Secretary of the

Interior and the Secretary of Commerce may require applicants to construct and operate a

physical structure, facility, or levee, called a fishway,4 that allows fish to pass around barriers

created by the hydropower project. Fishways provide young migratory fish with somewhat

safer passage around the dam on their way downstream. Without a fishway, migratory fish

have no alternative to the more dangerous passage over the dam via spill or through the

project’s turbines. Adult fish may also use fishways, such as fish ladders, to get past the dam

on their way upstream to spawn. Without fishways, a hydropower project may block

upstream migration. In order to preserve and enhance fish resources, the Fish and Wildlife

Service (USFWS) issued section 18 conditions for 20% of the projects relicensed between

1995 and 2000. The Department of Commerce, through the National Marine Fisheries

Service (NMFS) issued section 18 conditions for 7.6% of the projects licensed between 1995

and 2000. In some cases, the NMFS and the USFWS issued conditions for the same

projects.5

License Conditioning Agencies and the Relicensing Process

Federal resource agencies establish FPA section 4(e) and 18 license conditions by

working through and alongside FERC’s licensing processes. FERC’s regulations allow three

licensing processes: a structured process known as the Traditional Licensing Process (TLP),

a collaborative process known as the Alternative Licensing Process (ALP), and a new

licensing process, called the Integrated Licensing Process (ILP), that is both structured and

collaborative. Each of these processes has two phases: a pre-application phase led by the

applicant and a post-application analysis phase led by FERC.6 As described below,

conditioning agencies participate in both licensing phases.

4

Environmental Protection Agency, Notice of Proposed Interagency Policy on the Prescription of

Fishways under Section 18 of the Federal Power Act, 65 Fed.Reg. 80898 (December 22, 2000). See

also 16 U.S.C. §811.

5

Letter by William D. Bettenberg (Interior) to David P. Boergers (FERC), Hydroelectric Licensing

Policies, Procedures, and Regulations: Comprehensive Review, entered into FERC Docket No.

PL01-1-000 on April 16, 2001.

6

The Notice of Proposed Rulemaking is available under RM02-16-000 at [http://www.ferc.gov/

industries/hydropower/indus-act/hydro-rulemaking-nopr.pdf] on August 27, 2003. (Hereafter

referred to as FERC’s NOPR.)

CRS-3

IB10122

11-04-04

Pre-Application Phase. In order for FERC and other agencies to evaluate a project

and develop license conditions, they need information on how the project affects various

resources. FERC and conditioning agencies generally obtain this information from the

applicant who conducts studies before submitting its license application.7 Specifically,

FERC’s licensing process requires an applicant to consult with stakeholders, including

conditioning agencies, before the applicant decides which studies to undertake.

The pre-application process can be delayed when the applicant disagrees with the

conditioning agencies regarding the need for, or content of, particular studies. Agencies,

unlike FERC, do not have the authority to require applicants to conduct studies. However,

agencies’ authority to issue license conditions does provide applicants with an incentive to

resolve study disagreements. Applicants and conditioning agencies may utilize voluntary

mechanisms for resolving these study disputes. Under the ALP, for example, conditioning

agencies and applicants may use FERC’s Dispute Resolution Service (DRS). The DRS is

a FERC service that mediates license disputes. The DRS does not provide recommendations,

but it may bring in FERC experts to help clarify issues. When agencies and the applicant do

not resolve their disagreements using the DRS, the agency’s study request may be deferred

until FERC evaluates the application.

Under the ILP, applicants and stakeholders first try to resolve disputes through

voluntary discussions. If this voluntary process fails, then the conditioning agencies, under

the ILP, have the opportunity to initiate a “formal study dispute resolution process.” Under

the ILP, FERC becomes involved during the pre-application phase and has the final say

regarding the applicant’s study development plan. (For more information on this process see

CRS Report RL31903. Relicensing of Non-Federal Hydroelectric Projects: Summary and

Discussion of Procedural Reform Proposals)

Post-Application Phase. Once the applicant completes its studies and submits its

license application, FERC evaluates the study results and develops its license. FERC’s role

is to develop a license that balances hydropower, recreation, ecological, cultural, and other

benefits influenced by the project. This license may include conditions proposed by various

resource agencies. At present, agencies develop license conditions that may or may not

incorporate suggestions from other stakeholders. After the agency submits its conditions,

FERC must include them in its license unless FERC finds that the conditions are unrelated

to the agencies’ FPA jurisdiction. If the conditions are outside the agencies’ jurisdiction,

FERC may refuse to include them in its license. A key issue prompting legislative proposals

is that under the current processes, applicants and other stakeholders have little opportunity

to contest agencies’ conditions. In September of 2004, the Department of the Interior

released a proposed rule that would establish an administrative appeals process for license

applicants, but no other stakeholders.8

Another issue is that delay in the license-conditioning process may occur when the

agency has insufficient information to evaluate the project. Specifically, some officials

7

In some cases, FERC requests additional studies after the applicant has submitted the license

application.

8

General Printing Office, “Procedures for Review of Mandatory Conditions and Prescriptions in

FERC Hydropower Licenses.” 69 Fed. Reg. 174 (Washington, DC; Sept. 9, 2004).

CRS-4

IB10122

11-04-04

within conditioning agencies have voiced concern that applicants do not always provide

sufficient information in their license applications for agencies to develop conditions.

Insufficient information is often the result of unresolved study disputes. If a study is not

conducted during the pre-application phase, a conditioning agency may ask FERC to require

that the applicant conduct the study. The agency may also conduct the study itself, or may

issue license conditions in the absence of full information. However, conducting studies

often requires significant financial resources and the imposition of conditions without the

underlying studies may lead to litigation. Therefore, a major goal of the proposed ILP is to

resolve study disputes early in the pre-application phase.

Cost of Mandatory Conditions

Through the relicensing process, FERC and federal agencies often establish license

conditions designed to preserve and enhance the resources affected by hydropower projects.

While these conditions often generate environmental, recreational, or other benefits, they

may also require that the applicant incur costs. FERC calculated the median cost of a

license’s protection, mitigation, and enhancement measures, including state agency

conditions, as $246 per kilowatt (kW) of capacity under the TLP and as $58 per kW under

the ALP. However, these figures have been criticized by the General Accounting Office

because they are based on a sample of projects that submitted their costs to FERC and not

on a representative sample.9

License conditions may result in two types of costs: fixed capital costs such as

construction of installations, and variable costs that arise from changes in management

techniques. For example, license conditions may require applicants to purchase or construct

installations including fishways, boat ramps, and fish screens. Changing facility operations

may also decrease total hydropower production. For example, minimum flow requirements,

white water releases, or fishway releases may reduce the facility’s total generation when the

water is not released through turbines. According to FERC, conditions placed in the license

for environmental protection reduce average annual hydropower generation by 1.59%. While

these conditions may decrease total electricity generation, they may also reduce the facility

operator’s leeway to store water behind the dam for release during periods of peak demand.10

If hydropower is removed from the supply of peaking power, additional generation by other

higher cost producers may be required. At the same time, FERC estimates that efficiency

improvements made during relicensing increase capacity by an average of 4.06%.

While hydropower license conditions often generate costs, other stakeholders would

face costs if such conditions were not applied. For example, fishway requirements and

minimum flow requirements reduce the dam’s harm to migratory fish populations. Without

such requirements, Native Americans, the commercial fishing industry, and individuals who

fish for recreation would continue to pay the costs of decreased fish populations. Likewise,

constraints on reservoir height fluctuations and water release rates may reduce stream-bank

and reservoir-bank erosion. Without such conditions, taxpayers, as owners of national

9

General Accounting Office Report, GAO-01-499, Licensing Hydropower Projects: Better Time and

Cost Data Needed to Reach Informed Decisions about Process Reforms, May 2, 2001.

10

Not all dams have storage capacity. Some facilities, known as run of river projects, have little

storage, thus they depend on daily water inflows to generate hydropower.

CRS-5

IB10122

11-04-04

forests, and other owners of shoreline or river-front property may continue to pay the costs

of such erosion. Depending on the project’s characteristics, license conditions may benefit

a wide array of stakeholders that use the water for irrigation, transportation, fishing, and

boating.

Proposed Changes to the License-Conditioning Process

A number of issues emerged as the first wave of hydropower projects were relicensed

throughout the 1990s. These issues have prompted Congress to hold hearings and take other

actions to examine the licensing process. The 106th Congress directed FERC to conduct a

comprehensive review of the policies, procedures, and regulations guiding the licensing

process and report to Congress (section 603 of the Energy Act of 2000, P.L.106-469). FERC

responded in May 2001, with recommendations on how to reduce the length and expense of

obtaining a new license.11 In addition to administrative proposals, which are the subject of

CRS Report RL31903, the Section 603 Report proposed legislative changes to the relicensing

process. One class of proposals focuses on agencies’ mandatory conditioning authority. For

example, FERC suggested that Congress grant it the authority to reject or modify resource

agencies’ conditions and that Congress require agencies to better support their license

conditions. While the hydropower industry tends to support these FERC recommendations,

environmental organizations, and officials within federal and state agencies oppose these

suggestions and any other proposed reduction in current license-conditioning authority.

Opponents of FERC’s legislative proposal argue that administrative reforms, such as FERC’s

proposed rule establishing the ILP and the development of agencies’ administrative review

processes, are adequate to improve the relicensing process.

Legislative proposals incorporating some of these suggestions have been introduced in

Congress in recent years, but none has been enacted. For example, hydroelectric titles passed

both chambers during the 107th Congress. (H.R. 4, the Securing America’s Future Energy

Act, passed the House August 2, 2001 and the Energy Policy Act, also H.R. 4, passed the

Senate April 25, 2002.) Title III of each of these bills would have allowed license applicants

to propose alternatives to agencies’ mandatory conditions under the Federal Power Act.

While a compromise was not achieved at the end of the 107th Congress, this legislation is the

basis of all relicensing legislation proposed in the 108th Congress.

Hydroelectric Relicensing Legislation

in the 108th Congress

Title III of H.R. 4 (107th Congress) was incorporated into the Senate-passed energy bill,

H.R. 6 (Senate H.R. 6), in the nature of a substitute. Title III of H.R. 6 also passed the House

11

Federal Energy Regulatory Commission, Report to Congress on Hydroelectric Licensing Policies,

Procedures, and Regulations — Comprehensive Review and Recommendations Pursuant to Section

603 of the Energy Act of 2000, Section 603 Report (Washington, DC: May 2001). Available at

[http://www.ferc.gov/legal/ferc-regs/land-docs/ortc_final.pdf] on August 27, 2003.

CRS-6

IB10122

11-04-04

(House H.R. 6), though with substantive differences.12 The conference agreement on H.R.

6, which passed the House on November 18, 2003, contains similar language to the Housepassed bill. Similar language was introduced in S. 2095 on February 12, 2004, and in H.R.

4503 on June 3, 2004.

Each of these bills13 has a title that focuses on federal agencies’ license conditioning

authority under section 4(e) or 18 of the FPA. H.R. 6/S. 2095/H.R. 4503 would provide

license applicants, but not other interest groups, with the opportunity for a trial-type hearing

on facts related to agency-proposed license conditions. Furthermore, each bill would change

the license-conditioning process by allowing stakeholders, including applicants, to propose

alternative conditions. When the license applicant proposes an alternative, the conditioning

agency would be required to consider it, and to adopt the alternative if it meets certain

environmental and cost criteria. Specifically, the agency would have to accept an applicant’s

proposed alternative if it found that the alternative: 1) “provides for the adequate protection

and utilization of the reservation” (§33 (a)(2)(A) of the Federal Power Act as amended by

the conference agreement on H.R. 6), and/or “will be no less protective of the fish resources

than the fishway initially prescribed” (§33 (b)(2)(A) of the Federal Power Act as amended

by the conference agreement on H.R. 6); and 2) costs less to implement, and/or will result

in improved operation of the project for electricity production (§33 (a)(2)(B) and §33

(b)(2)(B)of the Federal Power Act as amended by the conference agreement on H.R. 6).

The House-passed conference agreement, S. 2095, and H.R. 4503 would also require

that the conditioning agency justify its decision to accept or reject the alternative after giving

equal consideration to the effect of its condition and the alternative condition on a broad

range of factors. These factors include energy supply, distribution, cost, and use; flood

control; navigation; water supply; and air quality (in addition to the preservation of other

aspects of environmental quality) (§33 (a)(3)of the Federal Power Act as amended by the

conference agreement on H.R. 6). This section of the proposed legislation differs from the

earlier Senate-passed bill, which would have required the agency to include such factors in

its justification, but not to consider them equally.

The bills also differ from the Senate-passed bill by establishing a system for reviewing

the agency’s condition when it rejects the applicant’s alternative. Specifically, the Housepassed conference agreement states that FERC could refer the agency’s decision to its

Dispute Resolution Service (DRS). Unlike the DRS’ mediation role under the alternative

licensing process (ALP), the proposed legislation would require the DRS to review the facts

and issue a non-binding advisory. The Secretary of the conditioning agency would then

reconsider his or her decision and may or may not accept the advisory.

Discussion

Response to the relicensing legislation in the 108th Congress is mixed. FERC and the

hydroelectric industry support the hydropower relicensing legislation, but some

12

“A bill to enhance energy conservation and research and development, to provide for security and

diversity in the energy supply for the American people, and for other purposes.”

13

Two additional bills, H.R. 1013 and S. 14 (§511) were introduced in the 108th Congress and

contain hydropower licensing titles that are identical to those in the House-passed bill.

CRS-7

IB10122

11-04-04

environmental organizations and some officials within relevant government agencies have

expressed concerns. While the National Hydropower Association is more supportive of the

House-passed conference agreement than the Senate-passed bill, some environmental

organizations view the Senate-passed bill as a modest improvement over the House-passed

bill. According to FERC, the House-passed bills would provide accountability by making

agencies justify their conditions in light of the proposed alternatives and the conditions’

effects on multiple resources. The hydropower industry argues that this legislation would

decrease the cost of license conditions. On the other hand, environmental organizations and

officials within conditioning agencies have expressed concerns that the legislation would

further increase the length of the relicensing process, diminish environmental protection,

reduce the effectiveness of FERC’s new ILP, and give license applicants more authority in

the license conditioning process than other stakeholders. These issues are discussed below.

Length of Process. If enacted, any of the bills would add additional steps to the

licensing process. Specifically, they would require that federal agencies determine whether

or not a proposed alternative meets the environmental and cost criteria described above, and

determine how the alternative and agencies’ conditions affect energy supply, distribution,

cost, and use; flood control; navigation; water supply; and air quality (in addition to the

preservation of other aspects of environmental quality). The House-passed conference

agreement, S. 2095, or H.R. 4503 would also allow license applicants to initiate a trial-type

hearing on issues of material fact. Both of these provisions could add an undetermined

amount of time to the licensing process. The legislation passed in the House and included

in the conference agreement, would also establish a 90-day process for the DRS and FERC

to review the agency’s conditions. This provision was not included in the Senate-passed

H.R. 6.

From the perspective expressed by industry and FERC, the House-passed bill would

most improve the license conditions, thus justifying additional process time. Furthermore,

supporters of the legislation argue that additional procedure on the front end could decrease

delays at the end of the process. However, some environmental organizations, such as the

Hydropower Reform Coalition, argue that the administrative hearings called for in the

House-passed bill could take up to ten years. Furthermore, some opponents of the legislation

argue that new administrative appeals processes and FERC’s July 2003 rule establishing the

ILP will sufficiently improve the relicensing process.

Environmental Issues. Under the FPA, Congress granted FERC the authority to

issue hydropower licenses, but gave federal land and water management agencies the

responsibility for protecting federal reservations and maintaining fish resources. When

issuing license conditions to fulfill their responsibilities under sections 4(e) and 18 of the

FPA, conditioning agencies are not currently required to solicit stakeholder

recommendations. Under the House and Senate-passed bills, the agency “must consider” the

alternative conditions offered by the license applicant. After such consideration, the agency

would not be required to accept the alternative if it found that the proposal does not meet

specified environmental and cost criteria (e.g., the proposed alternative does not adequately

protect the resource).

Although federal conditioning agencies could reject an alternative condition that did not

meet either bills’ environmental and cost criteria, environmental organizations are concerned

that the House-passed bill and conference agreement would distract agencies from their focus

CRS-8

IB10122

11-04-04

on protecting fish and federal reservations. These opponents argue that the bill would require

conditioning agencies to expand their focus to give equal consideration to the conditions’

effects on energy supply, distribution, cost, and use; flood control; navigation; water supply;

and air quality (in addition to the preservation of other aspects of environmental quality).

They further argue that the agencies do not have adequate resources to conduct these

additional studies. However, supporters of the bills argue that requiring agencies to balance

the multiple effects of their conditions would help ensure that license conditions are

established in the public interest.

While the equal consideration clause may expand the agencies’ focus, the effect of this

language on the conditions designed to protect fish and federally reserved lands would

depend on how the agencies interpret the phrase “no less protective of fish resources,” and

the phrase “adequate protection and utilization of the reservation.” Environmental

organizations are concerned that the language contained in the conference agreement, “no

less protective of the fish resource than the fishway14 initially prescribed,” could open the

door for applicants to propose non-fishway alternatives to fishway conditions.15 For

example, environmental organizations are concerned that the legislation would allow the

applicant to propose maintaining fish populations by stocking the river with hatchery fish or

through other mechanisms that do not move native fish. Environmental organizations

generally find these other mechanisms to be less successful than fishways in maintaining

migratory fish populations. However, industry representatives argue that such concerns

regarding the effectiveness of alternative conditions are unwarranted.

Specifically,

proponents of the legislation point out that it preserves agencies’ authority to reject

alternatives which are “less protective of the fish resources than the agencies’ alternative.”

Therefore, the applicant’s ability to substitute other mechanisms for fishways, would depend

on the agency’s determination of the protectiveness of the alternative.

Effectiveness of the Integrated Licensing Process (ILP). Environmental

organizations and some officials within conditioning agencies also assert that proposed

legislation, namely the House-passed bill, could weaken the new Integrated Licensing

Process by reducing the incentives for applicants to engage actively in early consultations

with resource agencies. Specifically, opponents of the legislation argue that license

applicants would be less willing to consult and negotiate with resource agencies if the

agencies do not have the authority to issue final license conditions. Conversely, FERC and

the hydropower industry argue that this legislation would not reduce agencies’ conditioning

authority, and thus would not alter an applicant’s incentive to negotiate with agencies. (For

more information on the ILP, see CRS Report RL31536, Licensing of Non-Federal

Hydroelectric Projects: Background and Current Issues.)

Participation in the Conditioning Process.

Under current law, the

recommendations of industry and non-industry stakeholders are given similar weight in

agencies’ conditioning process. A key concern of environmentalists and other nonutility

stakeholder groups is that the bills would increase the applicant’s input relative to other

14

See footnote 4.

15

See the Hydropower Reform Coalition’s press release regarding the energy bill at

[http://www.amrivers.org/index.php?module=HyperContent&func=display&cid=963], available on

March 9, 2004. The Coalition’s line by line critique is no longer available online.

CRS-9

IB10122

11-04-04

stakeholders. Specifically, the House-passed conference agreement, S. 2095, and H.R. 4503

entitle license applicants, but not other stakeholders, to “a determination on the record, after

opportunity for an agency trial-type hearing on any disputed issues of material fact.”

Furthermore, either bill would require that agencies consider the applicant’s alternative

conditions but not the conditions offered by “other interested parties.”16 Some non-industry

stakeholders would prefer to see this section expanded to require that agencies consider

alternatives offered by any stakeholder. However, some officials within conditioning

agencies are concerned that they may have insufficient resources to consider all industryproposed alternatives let alone other stakeholder-proposed alternatives.

The bills state that the agency shall accept the applicant’s alternative if it meets the bills’

environmental and cost requirements. Therefore, opponents are concerned that the

legislation would require the conditioning agency to accept a proposed alternative condition

with little regard for its effect on other water resource uses (e.g., recreation, flood control,

irrigation, etc.). However, FERC and the hydropower industry point out that FERC already

has the responsibility to balance multiple water uses, and that the bill could decrease the cost

of meeting agencies’ section 4(e) and 18 objectives.17

Conclusion

Enactment of H.R. 6, S. 2095, or H.R. 4503 would affect the conditioning process in

a number of ways. Any versions of the bills would allow stakeholders to offer alternative

license conditions. The House-passed bill and the conference agreement would also create

a mechanism for reviewing the decision of conditioning agencies and would entitle license

applicants to a trial-type hearing on facts related to the agency’s conditions. These changes

could lengthen the conditioning process. H.R. 6, S. 2095, or H.R. 4503 could also increase

the influence of applicants relative to other stakeholders. The effect of these bills on fish

resources and on federal reservations is unclear and would depend on how conditioning

agencies interpret the terms “adequate protection and utilization of the reservation” and “no

less protective of the fish resources.” The effect of the House-passed conference agreement

and S. 2095 on other resources could depend on how the agencies balance their obligation

to accept the applicant’s alternative (i.e., if it meets the two criteria) relative to their

responsibility to justify the conditions they select based on equal consideration of multiple

effects. It appears that these issues could lead to further review.

16

U.S. Congress, House, Energy and Commerce Committee, Subcommittee on Energy and

Commerce, testimony of Leon Szeptycki, General Council of Trout Unlimited, on the Role of the

Federal Government in Licensing Hydropower Dams, hearing, March 12, 2003.

17

U.S. Congress, House, Energy and Commerce Committee, Subcommittee on Energy and

Commerce, testimony of J. Mark Robinson, Director, Office of Energy Products, Federal Energy

Regulatory Commission, hearing, March 12, 2003.

CRS-10

IB10122

11-04-04

LEGISLATION

H.R. 6 (Tauzin)

Language in Title III, Section 13001 is identical to H.R. 1013. Introduced April 7,

2003; referred to the House Energy and Commerce Committee. Introduced in the Senate

April 7, 2003; referred to multiple committees. Passed House April 11, 2003; passed Senate

July 31, 2003. Conference agreement reached on November 17, 2003. Conference report

passed by House on November 18, 2003.

H.R. 1013 (Radanovich)

Establishes new requirements for federal agencies that set conditions or fishway

prescriptions for hydroelectric licenses under sections 4(e) and 18 of the Federal Power Act.

Allows license applicants to initiate a trial-type hearing on factual issues related to the

agency’s conditions. Requires federal agencies to consider alternative conditions proposed

by the license applicant and accept the proposed alternative if it (1) provides for the adequate

protection and utilization of the reservation, or will be “no less protective of the fish

resources than the fishway initially prescribed” and (2) will either cost less, and/or will

improve the project’s operational efficiency. Requires the agency to justify its decision to

accept or to reject the alternative after giving equal consideration to both conditions’ effects

on a broad range of factors. Establishes a system for reviewing an agency’s decision when

it rejects the applicant’s alternative. Introduced February 27, 2003; referred to House

Committee on Energy and Commerce, Subcommittee on Energy and Air Quality.

H.R. 4503 (Barton)

Section 231 is identical to H.R. 1013 and Title III, Section 13001 of the House-passed

bill, H.R. 6. Introduced June 3, 2004. Passed by the House June 15, 2004 and received by

the Senate June 17, 2004.

S. 14 (Domenici)

Section 511 is identical to H.R. 1013 and Title III, Section 13001 of the House-passed

bill, H.R. 6. Introduced April 30, 2003; returned to the Senate’s Legislative Calendar on July

31, 2003. In lieu of S. 14, the Senate passed H.R. 6, as amended, with language from H.R.

4 of the 107th Congress in the nature of a substitute. Title III of this Senate-passed bill

establishes new requirements for federal agencies that set conditions or fishway prescriptions

for hydroelectric licenses under sections 4(e) and 18 of the Federal Power Act. It requires

federal agencies to consider alternative conditions proposed by the license applicant and

accept the proposed alternative if it (1) provides for the adequate protection and utilization

of the reservation, or will be “no less protective of the fish resources than the fishway

initially prescribed” and (2) will either cost less, and/or will improve the project’s operational

efficiency as compared to the condition initially deemed necessary by the Secretary. Title

III requires the agency to explain the basis for its decision to accept or to reject the alternative

and to describe both conditions’ effects on a broad range of factors.

S. 2095 (Domenici)

Section 231 of Title II is identical to Title III Section 13001 of H.R. 6. Introduced

February 12, 2004.

CRS-11

IB10122

11-04-04

CONGRESSIONAL HEARINGS, REPORTS, AND DOCUMENTS

Hearings

U.S. Congress. House. Committee on Energy and Commerce. Subcommittee on Energy

and Air Quality. Hearing, March 12, 2003, on comprehensive energy policy at

[http://energycommerce.House.gov/108/Hearings/03122003hearing819/hearing.htm].

U.S. Congress. House. Committee on Energy and Commerce. Subcommittee on Energy and

Air Quality. Hydroelectric Relicensing and Nuclear Energy. Hearing, June 27, 2001.

107th Congress, 1st session. 185p. (H.Rept. 107-55)

U.S. Congress. Senate. Committee on Energy and Natural Resources. National Energy

Issues. Hearing, July 19, 2001. 107th Congress, 1st session. 202 p.(S.Rept. 107-144)

FOR ADDITIONAL READING

CRS Reports

CRS Report RL31536. Licensing of Non-Federal Hydroelectric Projects: Background and

Current Issues.

CRS Report RL31903. Relicensing of Non-Federal Hydroelectric Projects: Summary and

Discussion of Procedural Reform Proposals.

Other Documents

Federal Energy Regulatory Commission. Hydroelectric License Regulations under the

Federal Power Act: Notice Requesting Comments and Establishing Public Forums and

Procedures and Schedule, FERC Docket No. RM02-16-000 (Washington, DC:

September 12, 2002)

Federal Energy Regulatory Commission. Notice Requesting Comments and Establishing

Public Forums and Procedures and Schedule pursuant to (18 CFR Parts 4 and 16),

Docket No. RM02-16-000 (Washington, DC: February 20, 2003).

[http://www.ferc.gov/industries/hydropower/indus-act/hydro-rulemaking-nopr.pdf]

CRS-12

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.