SUMMARY

MOST RECENT DEVELOPMENTS

BACKGROUND AND ANALYSIS

Transmission Issues

Standard Market Design

Market Transparency

Environmental Questions and Proposed Responses

Calls for Additional Electric Regulatory Reform

PUHCA

PURPA

Retail Wheeling

History of California Electricity Crisis

Price Caps

Rate Refunds

LEGISLATION

IB10006

11-18-04

Electricity: The Road Toward Restructuring

SUMMARY

The Public Utility Holding Company Act

of 1935 (PUHCA) and the Federal Power Act

(FPA) were enacted to eliminate unfair practices and other abuses by electricity and gas

holding companies by requiring federal control and regulation of interstate public utility

holding companies. Prior to PUHCA, electricity holding companies were characterized

as having excessive consumer rates, high

debt-to-equity ratios, and unreliable service.

PUHCA remained virtually unchanged for 50

years until enactment of the Public Utility

Regulatory Policies Act of 1978 (PURPA,

P.L. 95-617). PURPA was, in part, intended

to augment electric utility generation with

more efficiently produced electricity and to

provide equitable rates to electric consumers.

Utilities are required to buy all power produced by qualifying facilities (QFs) at

“avoided cost.” QFs are exempt from regulation under PUHCA and the FPA.

Electricity regulation was changed again

in 1992 with passage of the Energy Policy Act

(EPACT, P.L. 102-486). The intent of Title 7

of EPACT is to increase competition in the

electric generating sector by creating new

entities, called “exempt wholesale generators”

(EWGs), that can generate and sell electricity

at wholesale without being regulated as utilities under PUHCA. This title also provides

EWGs with a way to assure transmission of

their wholesale power to their purchasers. The

effect of this act on the electric supply system

is potentially more far-reaching than PURPA.

On April 24, 1996, the Federal Energy

Regulatory Commission (FERC) issued Orders 888 and 889. FERC believed these rules

would remedy undue discrimination in transmission services in interstate commerce and

provide an orderly and fair transition to competitive bulk power markets. Order 2000,

Congressional Research Service

issued December 20, 1999, established criteria for forming transmission organizations.

Comprehensive electricity legislation

involves three issues. The first is PUHCA

reform. Some electric utilities want PUHCA

changed so they can more easily diversify

their assets. State regulators have expressed

concerns that increased diversification could

lead to abuses, including cross-subsidization.

Consumer groups have expressed concern that

a repeal of PUHCA could exacerbate market

power abuses in a monopolistic industry

where true competition does not yet exist.

The second issue is PURPA’s mandatory

purchase requirement provisions. Many investor-owned utilities support repeal of these

provisions. They argue that their state regulators’ “misguided” implementation of PURPA

has forced them to pay contractually high

prices for power that they do not need. Opponents of this legislation argue that it would

decrease competition and impede development of renewable energy. The third is retail

wheeling. It involves allowing retail customers to choose their electric generation supplier.

Comprehensive energy legislation has

passed the House and Senate. The House

passed H.R. 6 on April 11, 2003. On July 31,

2003, the Senate suspended debate on S. 14,

inserted the text of H.R. 4 (107th Congress) as

a substitute, and passed H.R. 6. A conference

agreement was reached November 17, 2003,

and passed by the House the next day. H.R. 6

includes an electricity title that would, in part,

repeal PUHCA, would prospectively repeal

the mandatory purchase requirement under

PURPA, and would create an electric reliability organization. On June 15, 2004, H.R.

4503, a comprehensive energy policy bill,

passed the House.

˜ The Library of Congress

IB10006

11-18-04

MOST RECENT DEVELOPMENTS

On June 15, 2004, H.R. 4503, a comprehensive energy policy bill was agreed to by the

House by a vote of 244-178. Conferees on the House and Senate omnibus energy bills (H.R.

6) met on November 17, 2003, and approved a conference report with numerous electricity

provisions. The Senate conferees voted 10-3 to approve an offer to the House conferees.

The House conferees approved a counteroffer by voice vote, and the House conferees’

counteroffer was accepted by eight of the Senate conferees. The House approved the

conference report (H.Rept. 108-375) on November 18, 2003. On November 21, 2003, a

cloture motion to limit debate on H.R. 6 failed in the Senate. (See also CRS Report

RL32178, Summary of Electricity Provisions in the Conference Report on H.R. 6.)

BACKGROUND AND ANALYSIS

Historically, electricity service has been defined as a natural monopoly, meaning that

the industry has (1) an inherent tendency toward declining long-term costs, (2) high threshold

investment, and (3) technological conditions that limit the number of potential entrants. In

addition, many regulators have considered unified control of generation, transmission, and

distribution as the most efficient means of providing service. As a result, most people (about

75%) are currently served by a vertically integrated, investor-owned utility.

As the electric utility industry has evolved, however, there has been a growing belief

that the historic classification of electric utilities as natural monopolies has been overtaken

by events and that market forces can and should replace some of the traditional economic

regulatory structure. For example, the existence of utilities that do not own all of their

generating facilities, primarily cooperatives and publicly owned utilities, has provided

evidence that vertical integration has not been necessary for providing efficient electric

service. Moreover, recent changes in electric utility regulation and improved technologies

have allowed additional generating capacity to be provided by independent firms rather than

utilities.

The Public Utility Holding Company Act (PUHCA) and the Federal Power Act (FPA)

of 1935 (Title I and Title II of the Public Utility Act) established a regime of regulating

electric utilities that gave specific and separate powers to the states and the federal

government (see CRS Report RS20015). A regulatory bargain was made between the

government and utilities. In exchange for an exclusive franchise service territory, utilities

must provide electricity to all users at reasonable, regulated rates. State regulatory

commissions address intrastate utility activities, including wholesale and retail rate-making.

State authority currently tends to be as broad and as varied as the states are diverse. At the

least, a state public utility commission will have authority over retail rates, and often over

investment and debt. At the other end of the spectrum, the state regulatory body will oversee

many facets of utility operation. Despite this diversity, the essential mission of the state

regulator in states that have not restructured is the establishment of retail electric prices. This

is accomplished through an adversarial hearing process. The central issues in such cases are

the total amount of money the utility will be permitted to collect and how the burden of the

revenue requirement will be distributed among the various customer classes (residential,

commercial, and industrial).

CRS-1

IB10006

11-18-04

Under the FPA, federal economic regulation addresses wholesale transactions and rates

for electric power flowing in interstate commerce. Federal regulation followed state

regulation and is premised on the need to fill the regulatory vacuum resulting from the

constitutional inability of states to regulate interstate commerce. In this bifurcation of

regulatory jurisdiction, federal regulation is limited and conceived to supplement state

regulation. The Federal Energy Regulatory Commission (FERC) has the principal functions

at the federal level for the economic regulation of the electricity utility industry, including

financial transactions, wholesale rate regulation, transactions involving transmission of

unbundled retail electricity, interconnection and wheeling of wholesale electricity, and

ensuring adequate and reliable service. In addition, to prevent a recurrence of the abusive

practices of the 1920s (e.g., cross-subsidization, self-dealing, pyramiding, etc.), the Securities

and Exchange Commission (SEC) regulates utilities’ corporate structure and business

ventures under PUHCA.

The electric utility industry has been in the process of transformation. During the past

two decades, there has been a major change in direction concerning generation. First,

improved technologies have reduced the cost of generating electricity as well as the size of

generating facilities. Prior preference for large-scale — often nuclear or coal-fired —

powerplants has been supplanted by a preference for small-scale production facilities that can

be brought online more quickly and cheaply, with fewer regulatory impediments. Second,

this has lowered the entry barrier to electricity generation and permitted non-utility entities

to build profitable facilities. Recent changes in electric utility regulation and improved

technologies have allowed additional generating capacity to be provided by independent

firms rather than utilities.

The oil embargoes of the 1970s created concerns about the security of the nation’s

electricity supply and led to enactment of the Public Utility Regulatory Policies Act of 1978

(PURPA, P.L. 95-617). For the first time, utilities were required to purchase power from

outside sources. The purchase price was set at the utilities’ “avoided cost,” the cost they

would have incurred to generate the additional power themselves, as determined by utility

regulators. PURPA was established in part to augment electric utility generation with more

efficiently produced electricity and to provide equitable rates to electric consumers.

In addition to PURPA, the Fuel Use Act of 1978 (FUA, P.L. 95-620) helped qualifying

facilities (QFs) become established. Under FUA, utilities were not permitted to use natural

gas to fuel new generating technology. QFs, which are by definition not utilities, were able

to take advantage of abundant natural gas as well as new generating technology, such as

combined-cycle plants that use hot gases from combustion turbines to generate additional

power. These technologies lowered the financial threshold for entrance into the electricity

generation business as well as shortened the lead time for constructing new plants. FUA was

repealed in 1987, but by this time QFs and small power producers had gained a portion of

the total electricity supply.

This influx of QF power challenged the cost-based rates that previously guided

wholesale transactions. Before implementation of PURPA, FERC approved wholesale

interstate electricity transactions based on the seller’s costs to generate and transmit the

power. As more non-utility generators entered the market in the 1980s, these cost-based

rates were challenged. Since non-utility generators typically do not have enough market

power to influence the rates they charge, FERC began approving certain wholesale

CRS-2

IB10006

11-18-04

transactions whose rates were a result of a competitive bidding process. These rates are

called market-based rates.

This first incremental change to traditional electricity regulation started a movement

towards a market-oriented approach to electricity supply. Following the enactment of

PURPA, two basic issues stimulated calls for further reform: whether to encourage nonutility

generation and whether to permit utilities to diversify into non-regulated activities.

The Energy Policy Act of 1992 (EPACT, P.L. 102-486) removed several regulatory

barriers to entry into electricity generation to increase competition of electricity supply.

Specifically, EPACT provides for the creation of entities, called “exempt wholesale

generators” (EWGs), that can generate and sell electricity at wholesale without being

regulated as utilities under PUHCA. Under EPACT, EWGs are also provided with a way to

assure transmission of their wholesale power to a wholesale purchaser. However, EPACT

does not permit FERC to mandate that utilities transmit EWG power to retail consumers

(commonly called “retail wheeling” or “retail competition”), an activity that remains under

the jurisdiction of state public utility commissions. PURPA began to shift more regulatory

responsibilities to the federal government, and EPACT continued that shift away from the

states by creating new options for utilities and regulators to meet electricity demand. (For

additional background on EPACT and PURPA, see CRS Report 98-419.)

The question now is whether further federal legislative action is desirable to encourage

competition in the electric utility sector and if so at what speed this change would occur.

Currently, 24 states and the District of Columbia have either enacted legislation or issued

regulatory orders to implement retail access. Six states, Arkansas, Montana, Nevada, New

Mexico, Oklahoma and West Virginia, have delayed implementation of retail access. The

map later in this issue brief shows the current status of each state’s restructuring efforts.

Issues discussed in this brief include repeal or alteration of both PUHCA and PURPA;

transmission access and FERC’s Orders 888, 889 and 2000; environmental impact; and

issues related to standard market design.

Transmission Issues

In addition to creating a new type of wholesale electricity generator, Exempt Wholesale

Generators (EWGs), the Energy Policy Act (EPACT) provides EWGs with a system to

assure transmission of their wholesale power to its purchaser. However, EPACT did not

solve all of the issues relating to transmission access. As a result of EPACT, on April 24,

1996, FERC issued Orders 888 and 889. In issuing its final rules, FERC concluded that

these Orders will “remedy undue discrimination in transmission services in interstate

commerce and provide an orderly and fair transition to competitive bulk power markets.”

Under Order 888, the Open Access Rule, transmission line owners are required to offer

both point-to-point and network transmission services under comparable terms and

conditions that they provide for themselves. The Rule provides a single tariff providing

minimum conditions for both network and point-to-point services and the non-price terms

and conditions for providing these services and ancillary services. This Rule also allows for

full recovery of so-called stranded costs with those costs being paid by wholesale customers

wishing to leave their current supply arrangements. The rule encourages but does not require

CRS-3

IB10006

11-18-04

creation of Independent System Operators (ISOs) to coordinate intercompany transmission

of electricity.

Order 889, the Open Access Same-time Information System (OASIS) rule, establishes

standards of conduct to ensure a level playing field. The Rule requires utilities to separate

their wholesale power marketing and transmission operation functions, but does not require

corporate unbundling or divestiture of assets. Utilities are still allowed to own transmission,

distribution, and generation facilities but must maintain separate books and records.

On December 20, 1999, FERC issued Order 2000, which described the minimum

characteristics and functions of regional transmission organizations (RTOs) (see

[http://www.ferc.gov/legal/ferc-regs/land-docs/RM99-2A.pdf]). The required characteristics

of an RTO are: the RTO must be independent from market participants; it must serve a

region of sufficient size to permit the RTO to perform effectively; an RTO will be

responsible for operational control; and it will be responsible for maintaining the short-term

reliability of the grid. The required functions of an RTO outlined in Order 2000 are: it must

administer its own transmission tariff; it must ensure the development and operation of

market mechanisms to manage congestion; it must address parallel flow issues both within

and outside its region; it will serve as supplier of last resort for all ancillary services; it must

administer an Open Access Same-time Information System; it must monitor markets to

identify design flaws and market power and propose appropriate remedial actions; it must

provide for interregional coordination; and an RTO must plan necessary transmission

additions and upgrades.

Order 2000 does not require RTO participation, set out RTO boundaries, or mandate

the acceptable RTO structure. RTOs will be able to file with FERC as an independent

system operator (ISO), a for-profit transmission company (transco), or another type of entity

that has not yet been proposed. Although RTO participation is voluntary under Order 2000,

FERC built in guidelines and safeguards to ensure independent operation of the transmission

grid. RTOs are required to conduct independent audits to ensure that owners do not exert

undue influence over RTO operation.

FERC Order 2000 required the existing ISOs to submit to FERC by January 1, 2001,

a plan to describe whether their transmission organization meets the criteria established in

the RTO rulemaking. Electric utilities not currently members of an ISO had to file plans

with FERC by October 1, 2000. The Order does not mandate RTO formation, but if an

individual utility opts not to join an RTO, the utility is required to prove why it would be

harmed by joining such an entity.

On July 12, 2001, FERC issued several orders requiring utilities to enter into talks to

form four Regional Transmission Organizations. Even though FERC Order 2000 did not set

out RTO boundaries, in effect the July 12, 2001, order does. On September 17, 2001,

FERC’s Administrative Law Judge Mediator H. Peter Young filed his report (Docket No.

RT01-99-000) that presented a blueprint for creating a single RTO in the Northeast.

FERC has granted RTO status to three entities and conditional approval to four others.

On December 20, 2001, FERC granted RTO status (Docket No. RTO1-87-000) to the

Midwest Independent Transmission System Operator (MISO). On September 18, 2002,

FERC approved the RTO West proposal. RTO West includes all, or part of, Washington,

CRS-4

IB10006

11-18-04

Idaho, Montana, Oregon, Nevada, Wyoming, Utah and a small part of northern California

near the Oregon border. FERC granted PJM RTO status on December 19, 2002. PJM

manages the grid in parts of Ohio, West Virginia, Pennsylvania, New Jersey, Delaware,

Maryland, Virginia and the District of Columbia. Other RTOs have received conditional

approval from FERC. Most recently, FERC conditionally approved the New England RTO

(ISO-NE) on March 24, 2004 (Docket Nos. RTO04-2-000, ER04-157-000,001, and EL0139-000). ISO-NE serves customers in Connecticut, Massachusetts, New Hampshire, Rhode

Island, Vermont, and portions of Maine. FERC also granted conditional approval to the

Southwest Power Pool (SPP) on February 10, 2004 (Docket Nos. RTO04-1-000 and ER0448-000). Arkansas-based SPP serves 4 million customers in all, or parts of, Arkansas,

Kansas, Louisiana, Mississippi, Missouri, New Mexico, Oklahoma, in Texas. FERC

conditionally approved SeTrans RTO and WestConnect RTO on October 10, 2002 (Docket

Nos. EL02-101-000, RTO2-1-000 and EL02-9-000). SeTrans includes utilities in Alabama,

Arkansas, Florida, Georgia, Louisiana, Mississippi, South Carolina and Texas. WestConnect

RTO will operate in parts of Arizona, Colorado, New Mexico and Utah.

In the past, utilities and some state utility commissioners have argued against large

RTOs, stating that currently the expertise is not available to integrate a large geographic

region with multiple control centers and power pools. On February 26, 2002, FERC released

a report (see [http://www.ferc.gov/legal/ferc-regs/land-docs/rtostudy_final_0226.pdf]) that

assessed the potential economic costs and benefits of RTOs. The study concluded the annual

savings from RTO formation could range from $1- $10 billion. However, the study did not

find significant differences in savings between larger and smaller RTOs. Those in favor of

large RTOs argue that the most efficient operations of the transmission system would take

place with large RTOs. On November 7, 2001, FERC issued an order (Docket No. RM0112-000) that stated FERC’s goals and process for creating Regional Transmission

Organizations.

On May 14, 1999, the U.S. Court of Appeals for the Eighth Circuit ruled in a case

between FERC and Northern States Power. The court held that the Commission overstepped

its authority when it ordered Northern States Power Company to treat wholesale customers

the same as it treats native load customers in making electricity curtailment decisions. This

decision raised federal-state jurisdictional questions, particularly a state’s right to guarantee

system reliability.

On October 3, 2001, the U.S. Supreme Court heard arguments in a case (New York et

al. v. Federal Energy Regulatory Commission) that challenges FERC’s authority under

Order 888 to regulate transmission for retail sales if a utility unbundles transmission from

other retail charges. In states that have opened their generation market to competition,

unbundling occurs when customers are charged separately for generation, transmission, and

distribution. Nine states, led by New York, filed suit, arguing that the Federal Power Act

gives FERC jurisdiction over wholesale sales and interstate transmission and leaves all retail

issues up to the state utility commissions. Enron argued that FERC clearly has jurisdiction

over all transmission and FERC is obligated to prevent transmission owners from

discriminating against those wishing to use the transmission lines. On March 4, 2002, the

U.S. Supreme Court ruled in favor of FERC and held that FERC has jurisdiction over

transmission including unbundled retail transactions. The ruling is available at [http://a257.

g.akamaitech.net/7/257/2422/04mar20021030/www.supremecourtus.gov/opinions/01pdf/

CRS-5

IB10006

11-18-04

00-568.pdf]. The conference report on H.R. 6, H.R. 4503, and S. 2095 would allow certain

utilities to give preferential treatment to native load customers.

Many groups assert that difficulty siting transmission lines is one reason that in the past

decade, there has been less transmission capacity added than generation capacity. H.R. 6,

as approved by the conference, H.R. 4503, and S. 2095 would provide for incentive-based

transmission rates. In addition, the conference agreement on H.R. 6, H.R. 4503, S. 2095, and

H.R. 1370 would allow transmission owners in certain instances to exercise the right of

eminent domain to site new transmission lines. (For a discussion on infrastructure

improvements, see CRS Report RL32075, Electric Reliability: Options for Electric

Transmission Infrastructure Improvements.)

S. 14, S. 475, S. 1754, S. 2014, S. 2095, S. 2236, the conference report on H.R. 6, H.R.

1370, H.R. 3004, and H.R. 4503 would provide for an Electric Reliability Organization to

prescribe and enforce mandatory reliability standards.

Standard Market Design. On July 31, 2002, FERC issued a Notice of Proposed

Rulemaking (NOPR) on standard market design (SMD) (Docket No. RM01-12-000; see

[http://www.ferc.gov/industries/electric/indus-act/smd/nopr/08-12-03-nopr.pdf]). FERC’s

stated goal of SMD requirements in conjunction with a standardized transmission service

is to create “seamless” wholesale power markets that allow sellers to transact easily across

transmission grid boundaries. The proposed rulemaking would create a new tariff under

which each transmission owner would be required to turn over operation of its transmission

system to an unaffiliated independent transmission provider (ITP). The ITP, which could be

an RTO, would provide service to all customers and run energy markets. Under the NOPR,

congestion would be managed with locational marginal pricing. The NOPR comment period

originally was 75 days (November 15, 2002), but the comment period was extended to

January 10, 2003, for the following issues:(1) market design for the Western Interconnection;

(2) transmission plan in pricing, including participant funding; (3) Regional State Advisory

Committees and state participation; (4) resource adequacy; and (5) Congestion Revenue

Rights and transition issues.

Under the NOPR, FERC asserts jurisdiction over all power transmission, including

service to bundled retail customers. Commissioners from 15 states (Alabama, Arkansas,

California, Georgia, Idaho, Kentucky, Louisiana, Mississippi, New Hampshire, North

Carolina, South Carolina, Oregon, South Dakota, Washington, and Wyoming) are planning

to fight FERC’s proposed changes on the grounds that FERC usurps state authority. On

August 15, 2002, state regulators from 22 states and the District of Columbia (Illinois,

Indiana, Iowa, Michigan, Minnesota, Missouri, Montana, North Dakota, Ohio, Oklahoma,

Texas, Wisconsin, Delaware, the District of Columbia, New Jersey, New York,

Pennsylvania, West Virginia, Connecticut, Maine, Massachusetts, New Hampshire, and

Rhode Island) released a statement that “voiced support for FERC’s ongoing effort to remedy

undue discrimination in the use of the nation’s interstate high voltage transmission system

in order to create a truly competitive bulk power market.” In general, the industry has been

in favor of FERC’s SMD proposal, but some industry groups have voiced concerns about the

implementation of SMD.

On April 28, 2003, FERC staff issued Wholesale Power Market Platform, a White

Paper that intended to clarify FERC’s SMD proposal (see [http://www.ferc.gov/industries/

CRS-6

IB10006

11-18-04

electric/indus-act/smd/white_paper.pdf]). The White Paper responds to approximately 1000

sets of formal comments submitted FERC. In the White Paper, FERC states its intention to

eliminate a proposed requirement that utilities join an Independent Transmission Provider.

Instead, the final rule will require utilities to join an RTO or ISO. In the NOPR, FERC

proposed to assert jurisdiction over the transmission component of bundled retail service.

The White Paper reverses this position and states that the final rule will not assert new FERC

jurisdiction over bundled retail sales.

Some state officials have expressed concern that the proposed rule would infringe on

state authority. FERC responded to this in the White Paper by clarifying that the Final Rule

will not include a requirement for a minimum level of resource adequacy. In addition, the

final rule will eliminate the NOPR’s requirement that Firm Transmission Rights be

auctioned. The White Paper noted that each RTO or ISO will need to have a cost recovery

policy outlined in its tariff, but each region may differ on how participant funding will be

used. In addition, FERC stated that the final rule will allow for phased-implementation to

address regional differences.

The report language that accompanied the Omnibus Appropriations Bill for FY2003

(H.Rept. 108-10) asked the Department of Energy to analyze the SMD NOPR’s impact on

wholesale electricity prices, and the safety and reliability of generation transmission

facilities. The Department of Energy (DOE) issued its report to Congress on April 30, 2003

but did not include changes from FERC’s White Paper in its analysis. DOE, in part,

quantitatively analyzed the wholesale and retail price impacts of SMD using two economic

models: General Electric’s Multi-Area Production Simulation (MAPS) and DOE’s Policy

Office Electricity Modeling System (POEMS).

Some of the assumptions that DOE uses are an annual increase in electricity demand

of approximately 1.8% per year from 2005 to 2020; most regions are assumed to have

reserve margins of 15%; current environmental laws and regulations are assumed to apply;

generator efficiency for fossil steam plants is assumed to be 2 to 4% higher in new RTO

regions with SMD; in the non-SMD case, the models were not able to take into account

freezes on retail rates in states that are transitioning to competitive markets; in the non-SMD

case, no increase in transmission capacity is assumed. Under the SMD case, a 5% increase

in transmission capability by 2005 is assumed by DOE due to improved operational

efficiency at regional seams. In addition, DOE assumes that adopting the SMD would result

in some savings that are difficult to quantify but would be a result of the consolidation of

control areas from the current level of 150, the possible avoidance of capital cost and

software expenditures that would have been needed at existing control centers, improved

regional planning, and consistency of market design. DOE assigns a 10% savings due to

these efficiency improvements. DOE believes that the assumptions used in the models are

conservative and result in an underestimation of the net economic benefits of the SMD.

DOE calculates the median cost of FERC’s SMD rule to be about $760 million per year,

or about 21 cents per megawatt-hour. The model’s range for uncertainties is estimated to be

about $100 million. The cost varies significantly by region ranging from 47 cents per

megawatt-hour for GridFlorida to 12 cents per megawatt-hour for PJM. Regions with

existing RTOs have zero additional costs. Under the SMD case, the effects of SMD at retail

rates are influenced to a significant extent by whether the states in question have cost-ofservice regulation or competitive retail choice. DOE found that for some importing regions

CRS-7

IB10006

11-18-04

with cost-based rates, the net result could be increased costs associated with wholesale

purchases, which would be passed through to retail customers. For some exporting regions

with cost-based rates, additional utility revenues from exports are expected to lead to lower

retail prices for the region under the SMD case. In contrast, in regions in which most states

have adopted retail choice, increased electricity exports are expected to lead to higher

market-clearing prices in the short-term markets and somewhat higher consumer prices.

However in areas such as California that are projected to see increased imports, lower

wholesale prices and lower prices for consumers are expected. DOE found that the

magnitude of the projected changes, both positive and negative, decrease through 2020.

Overall, DOE projects the net benefit for all consumers is about $1 billion per year over the

first six years, after factoring in the estimated $760 million per year and RTO costs. Over the

long-term (2016-2020), the net benefit is expected to be about $700 billion per year.

However, the projected change in retail prices varies by region. The mid-Atlantic region is

expected to see a 4% decrease in retail prices, but Illinois, Wisconsin, and Arizona are

expected to have a 3 % increase in retail prices as a result of SMD.

S. 14, as introduced, would have remanded the NOPR to FERC for reconsideration.

FERC would not be able to issue an SMD rulemaking before July 1, 2005. H.R. 6, as passed

by the Senate, did not include this provision. S. 954 would require Congress to approve of

any SMD rulemaking. The conference report on H.R. 6, H.R. 4503, and S. 2095 would

remand the rulemaking to FERC. FERC would not be able to issue a similar rule before

October 2006. For additional information on Standard Market Design, see CRS Report

RS21407.

Market Transparency. Some have argued that the wholesale power markets cannot

be competitive without additional market transparency for both generation and transmission.

S. 14, S. 475, S. 2095, the conference report on H.R. 6, H.R. 1254, and H.R. 4503 would

require FERC to issue rules to establish an electronic information system to provide the

public, FERC, state commissions, buyers and sellers of wholesale electric energy, and users

of transmission services, with information on the availability and price of wholesale electric

energy and transmission services. H.R. 1272 would require participants in the electric

markets to provide FERC with records of all transmission and sale transactions.

Environmental Questions and Proposed Responses

The electric industry is a major source of air pollution as well as of greenhouse gases.

Therefore, changes underway in the industry are being closely examined for their potential

environmental effects. At issue is whether proposed legislation to restructure the industry

should include environmental protections.

The Clean Air Act regulates emissions of conventional air pollutants from electric

utilities. While it has historically focused on new construction in applying its most stringent

standards, several current and prospective regulations would significantly increase controls

on existing coal-fired facilities. These controls may diminish the attractiveness of renovating

older, more polluting facilities, but the effectiveness of the regulations in coping with a

restructured industry remains to be seen. In addition, greenhouse gas emissions are not

regulated, so any increases in carbon dioxide would not be controlled under existing

authorities.

CRS-8

IB10006

11-18-04

Thus the environmental effects of restructuring depend on whether, for conventional air

pollutants, the existing regulatory regimen will work effectively as the industry structure

changes. For some pollutants, such as sulfur oxides, a nationwide emissions “cap” seems

secure; but for others, particularly nitrogen oxides, the state-led implementation process may

have difficulty coping with regional disparities in emissions. For carbon dioxide, any controls

would be contingent on future ratification of the Kyoto Agreement to curtail emissions and

on domestic legislation.

Several bills that deal with these environmental issues have been introduced in the 108th

Congress. For a summary of these bills and legislative action, see CRS Report RL31779 and

CRS Report RS21581. In October 2003, the Senate debated and defeated an amended

version of S. 139, the Climate Stewardship Act of 2003. Senate Admt. 2028, introduced by

Senators McCain and Lieberman, would cap emissions of greenhouse gases from electricity

generation, transportation, industrial, and commercial sectors at year 2000 levels in the year

2010. The vote was 43-55. For a summary and analysis of S. 139 and similar proposals, see

CRS Report RS21637.

Calls for Additional Electric Regulatory Reform

PUHCA

One argument for additional PUHCA reform has been made by electric utilities that

want to further diversify their assets. Currently under PUHCA, a holding company can

acquire securities or utility assets only if the SEC finds that such a purchase will improve the

economic efficiency and service of an integrated public utility system. It has been argued

that reform to allow diversification would improve the risk profile of electric utilities in

much the same way as in other businesses: The risk of any one investment is diluted by the

risk associated with all investments. Utilities have also argued that diversification would

lead to better use of under-utilized resources (due to the seasonal nature of electric demand).

Utility holding companies that have been exempt from SEC regulation argue that PUHCA

discourages diversification because the SEC could repeal exempt status if exemption would

be “detrimental to the public interest.”

For a number of years there has been significant bipartisan congressional support for

repealing much of PUHCA. Since the 1980s, the Securities and Exchange Commission has

testified before Congress that many provisions of PUHCA are no longer relevant and other

provisions are redundant with state and other federal regulations (see [http://www.sec.gov/

news/testimony/021302tsich.htm]). However, as a result of Enron’s collapse, some in

Congress have taken a somewhat different view toward significantly amending or repealing

PUHCA (see [http://www.house.gov/commerce_democrats/press/107ltr129.htm]). Even

though Enron had claimed exemption from PUHCA, on February 6, 2003, Securities and

Exchange Commission Chief Administrative Law Judge Brenda P. Murray denied Enron’s

PUHCA exemption applications of February 28, 2002, amended on May 31, 2002, and April

12, 2000 (Initial Decision Release No. 222 (File No. 3-10909) can be found at

[http://www.sec.gov/litigation/aljdec/id222bpm.htm]). In the case of Enron, PUHCA, and

many other laws, did not deter or prevent fraudulent filing of information with the SEC.

CRS-9

IB10006

11-18-04

State regulators have expressed concerns that increased diversification could lead to

abuses, including cross-subsidization: a regulated company subsidizing an unregulated

affiliate. Cross-subsidization was a major argument against the creation of EWGs and has

reemerged as an argument against further PUHCA reform. In the case of electric and gas

companies, non-utility ventures that are undertaken as a result of diversification may benefit

from the regulated utilities’ allowed rate of return. Moneymaking non-utility enterprises

would contribute to the overall financial health of a holding company. However,

unsuccessful ventures could harm the entire holding company, including utility subsidiaries.

In this situation, utilities would not be penalized for failure in terms of reduced access to new

capital, because they could increase retail rates.

Several consumer and environmental public interest groups, as well as state legislators,

have expressed concerns about PUHCA repeal. PUHCA repeal, such groups argue, could

only exacerbate market power abuses in what they see as a monopolistic industry where true

competition does not yet exist. The National Rural Electric Cooperative Association also

opposes stand-alone changes to PUHCA. (For further information on PUHCA, see CRS

Report RS20015.)

S. 14, S. 475, S. 2095, the conference agreement on H.R. 6, and H.R. 4503 would give

FERC and state commissions access to books and records.

PURPA

S. 475 and S. 688 and H.R. 1341 would prospectively repeal §210 of PURPA, the

mandatory purchase requirement provisions. S. 14, S. 2095, the conference agreement on

H.R. 6, and H.R. 4503 would also prospectively repeal §210 of PURPA but only when

certain competitive market conditions are met. Proponents of PURPA repeal — primarily

investor-owned utilities (IOUs) located in the Northeast and in California — argue that their

state regulators’ “misguided” implementation of PURPA in the early 1980s has forced them

to pay contractually high prices for power they do not need. They argue that, given the

current environment for cost-conscious competition, PURPA is outdated. The PURPA

Reform Group, which promotes IOU interests, strongly supports such bills by contending

that the current law’s mandatory purchase obligation was anti-competitive and anticonsumer.

CRS-10

IB10006

11-18-04

Status of Electric Industry Restructuring Activity as of February 2003

Source: Energy Information Administration, [http://www.eia.doe.gov/cneaf/electricity/chg_str/restructure.pdf].

1. Arizona, Connecticut, Delaware, District of Columbia, Illinois, Maine, Maryland, Massachusetts,

Michigan, New Hampshire, New Jersey, New York, Ohio, Oregon, Pennsylvania, Rhode Island, Texas,

and Virginia.

2. Arkansas, Montana, Nevada, New Mexico, and Oklahoma.

3. California.

4. Alabama, Alaska, Colorado, Florida, Georgia, Hawaii, Idaho, Indiana, Iowa, Kansas, Kentucky,

Louisiana, Minnesota, Mississippi, Missouri, Nebraska, North Carolina, North Dakota, South Carolina,

South Dakota, Tennessee, Utah, Vermont, Washington, West Virginia, Wisconsin, and Wyoming.

Opponents of these types of bills (IPPs, industrial power customers, most segments of

the natural gas industry, the renewable energy industry, and environmental groups) have

many reasons to support PURPA as it stands. Mainly, their argument is that PURPA

introduced competition in the electric generating sector and, at the same time, helped

promote wider use of cleaner, alternative fuels to generate electricity. Since the electric

generating sector is not yet fully competitive, they argue, repeal of PURPA would decrease

competition and impede the development of the renewable energy industry. Additionally,

opponents of PURPA repeal argue that it would result in less competition and greater utility

monopoly control over the electric industry. The Electric Power Supply Association (EPSA)

also wants comprehensive legislation to look at all aspects of electricity regulation. State

CRS-11

IB10006

11-18-04

regulators are concerned that this legislation would prevent them from deciding matters

currently under their jurisdiction. The National Association of Regulatory Utility

Commissioners has opposed legislation that would allow FERC to protect utilities from costs

associated with PURPA contracts.

Retail Wheeling

Some analysts believe the next logical step in restructuring is retail competition.

Encouraging competition in the electric supply system is already occurring as some states

allow generating utilities to arrange for transmission of electricity from its sources to a retail

consumer whether or not this transaction occurs within their service territory. EPACT

expressly prevents FERC from ordering retail competition (retail wheeling). Such

transactions remain under state regulatory control; FERC’s open access Orders address

wheeling at the wholesale level only. However, it is clear that FERC hopes that its Orders

will pave the way for states to permit retail customers to shop for their electricity needs

anywhere they want, rather than being limited to buying electricity from their local utility.

Indeed, who should determine the pace and boundaries of retail wheeling efforts is a

fundamental issue. Electric service is a vital component of a modern economy; thus, national

interests are at stake in what direction the restructuring debate takes. Concerns about

economic efficiency and the treatment of various participants (such as electric utilities) may

suggest to some that the federal government provide direction to current state initiatives. In

contrast, others argue that the states, which have traditionally had responsibility over retail

electricity issues, have the expertise and experience necessary to handle the situation (more

so than the federal government) and that the national interest in electricity supply is neither

threatened by state initiatives nor a justification for federal preemption of states’ rights.

Currently, retail choice is under state jurisdiction, and 24 states and the District of Columbia

have moved toward retail competition. Congress may consider whether expanding federal

jurisdiction is warranted in the continuing evolution of the electric utility industry or whether

a “wait and see” attitude toward state proceedings is more appropriate at this point. No bills

addressing retail wheeling have been introduced in the 108th Congress.

History of California Electricity Crisis

California’s experience in 2001 with a marked decrease in reliability of electricity

supply as well as retail price spikes in the San Diego region has now been replaced with

excess generating supply. The original situation was partly due to California’s restructured

electric markets and market manipulation, increased demand, generating plant outages and

lack of new transmission and generating capacity. Currently, California has more long-term

contracts than it needs to meet demand, and the contracts are locked-in at prices higher than

the current market price of electricity. On March 26, 2003, FERC ordered an estimated $3.3

billion in refunds to California for unjust and unreasonable rates that were charged between

October 2000 and June 2001.

CRS-12

IB10006

11-18-04

Price Caps

As a result of the California electricity crisis, several bills were introduced in the 107th

Congress that would have imposed wholesale price caps in California, a return to cost-ofservice wholesale rate regulation or demand-based time-of-use rates. Additional bills have

been introduced in the 108th Congress. Cost-of-service rate regulation allows for recovery

of generating costs plus a reasonable rate of return. Those in favor of price caps argue that

competition does not yet exist in California’s wholesale generating sector and wholesale

prices do not reflect what would be expected in a functional market. In addition, it is argued

that generators in California were exerting market power by intentionally withholding

generating capacity to increase wholesale prices. Those opposed to price caps, including

President Bush, argue that price caps discourage investment in new generating facilities and

would further distort the wholesale electricity market.

On June 18, 2001, FERC extended its price mitigation Order of April 26, 2001, to

include the 11 states in the Western System Coordinating Council (WSCC). FERC’s Order

(see [http://www.ferc.gov/industries/electric/indus-act/wem/2001/06-19-01.pdf]) provided

for a two-tiered rate structure for the day-ahead and hour-ahead spot market. If California

entered a Stage 1 electricity emergency (reserves fall below 7%), the spot market clearing

price for California was based on the bid from the least efficient gas-fired plant located in

California that was needed by the Independent System Operator (ISO). All sellers into the

California ISO spot market received the spot market clearing price. For sellers outside of

California, California’s spot market clearing price was the maximum price, but sellers could

bid and receive less than the spot market clearing price. Generators, but not power marketers,

had the ability to justify their cost if it exceeded the established spot market clearing price.

When operating reserves were above 7% in California, the maximum price that could be

charged was 85% of the spot market clearing price set during the most recent Stage 1

emergency. These price caps were expired in September 2002.

On July 17, 2002, FERC issued a new price mitigation order for the Western markets

(Docket Number ER02-1656-000 et al.). Unlike the order described above, the new price

mitigation plan has no end date, and went into effect October 1, 2002. Unlike the soft cap

of $91.87 per megawatt hour that has been in effect since June 2001, the plan establishes a

hard price cap of $250 per megawatt hour for spot market sales. In addition, the plan creates

an automated mitigation procedure (AMP) that will screen all bids that exceed $91.87 per

megawatt hour for possible market abuses.

Rate Refunds

Under current law, FERC may order refunds for rates found to be unjust, unreasonable,

unduly discriminatory or preferential. However, the effective date of such refunds begins a

minimum of 60 days after the original complaint is filed with FERC (16 U.S.C.8 2 4e(b)).

H.R. 964 and H.R. 1272 would allow refunds to be retroactive to the date a rate complaint

is filed with FERC. S. 723 would require FERC to order refunds of at least $8.9 billion for

unjust and unreasonable rates charged between June 1, 2000 and June 19, 2001.

CRS-13

IB10006

11-18-04

LEGISLATION

H.R. 6 (Tauzin)

Title VI, in part, provides for incentive-based transmission rates, allows transmission

owners in certain instances to exercise the right of eminent domain to site new transmission

lines, allows transmission owners that do not belong to a regional transmission organization

to preferentially serve native load customers, creates an Electric Reliability Organization, and

gives new, but limited, authority to the Federal Energy Regulatory Commission (FERC) over

municipal and cooperative transmission systems. It repeals PUHCA and gives FERC and

state public utility commissions access to books and records, prospectively repeals the

mandatory purchase requirement of the Public Utility Regulatory Policies Act of 1978 if a

competitive wholesale market exists, and requires utilities to provide real-time rates and

time-of-use metering. It establishes market transparency rules, explicitly prohibits round-trip

trading, and significantly increases criminal penalties under the Federal Power Act.

Introduced April 7, 2003; referred to multiple committees. Passed House April 11, 2003;

passed Senate July 31, 2003. Conference agreement reached on November 17, 2003.

Conference report (H.Rept. 108-375) passed by House on November 18, 2003.

H.R. 964 (Ose)

Makes electric rate refunds retroactive to the date a complaint is filed with FERC.

Introduced February 27, 2003; referred to Committee on Energy and Commerce .

H.R. 1254 (Walden)

Requires FERC to issue rules to establish an electronic information system to provide

the public, FERC, state commissions, buyers and sellers of wholesale electric energy, and

users of transmission services, with information on the availability and price of wholesale

electric energy and transmission services. Prohibits round-trip electricity trading. Increases

criminal penalties under the Federal Power Act. Introduced March 12, 2003; referred to

Committee on Energy Commerce.

H.R. 1272 (Dingell)

Prohibits fraudulent, manipulative, or deceptive acts in electric and natural gas markets.

Provides for audit trails. Increases criminal and civil penalties under the Federal Power Act.

Makes electric rate refunds retroactive to the date a complaint is filed with FERC. Requires

FERC to review all market-based rates on annual basis. Introduced March 13, 2003; referred

to Committee on Energy and Commerce.

H.R. 1338 (Shadegg)

Amends the Federal Power Act to provide for federal and state coordination of

permitting for electric transmission facilities. Introduced March 18, 2003; referred to

Committee on Energy and Commerce.

H.R. 1341 (Stearns)

Prospectively repeals §210 of PURPA. Introduced March 1 18, 2003; referred to

Committee on Energy and Commerce.

H.R. 1370 (Wynn)

Establishes an Electric Reliability Organization.

In some instances, allows

transmission companies to exercise the right of eminent domain to acquire transmission

CRS-14

IB10006

11-18-04

rights-of-way. Exempts regional transmission organizations from PUHCA. Introduced

March 19, 2003; referred to Committees on Energy, and Commerce and Ways and Means.

H.R. 1627 (Pickering)

Repeals PUHCA and gives FERC and state utility commissions access to books and

records. Introduced April 3, 2003; referred to Committee on Energy and Commerce.

H.R. 3004 (Dingell)

Creates an Electric Reliability Organization. Introduced September 4, 2003; referred

to Committee on Energy and Commerce.

H.R. 3506 (Filner)

Amends the Federal Power Act to allow a state to regulate wholesale sales of electricity

that is generated, transmitted, and distributed within that state. Introduced November 18,

2003; referred to Committee on Energy and Commerce.

H.R. 4503 (Barton)

Omnibus energy bill. Introduced June 3, 2004; referred to Committees on Energy and

Commerce, Science, Ways and Means, Transportation and Infrastructure, Financial Services,

Agriculture, and Budget. Passed House on June 15, 2004.

S. 14 (Domenici)

Comprehensive energy policy legislation. In part, creates an Electric Reliability

Organization. Remands the Standard Market Design NOPR to FERC and not allow FERC

to issue a final rule before July 1, 2005. Gives FERC additional authority to assure that

municipalities and coops charge transmission rates that are comparable to the rates the

municipalities and coops charge themselves (so-called FERC-Lite.) Requires FERC to issue

a rule on transmission pricing. Repeals §210 of PURPA when independently administered,

auction-based day ahead and real time markets exist. Requires utilities to offer time-of-use

rates and net-metering. Repeals PUHCA and gives FERC and state utility commissions

access to books and records. Requires FERC to establish an electronic information system

to provide market transparency. Prohibits slamming and cramming. Introduced April 30,

2003. On July 31, 2003, the Senate suspended debate on S. 14, and inserted the text of H.R.

4 from the 107th Congress as a substitute and passed H.R. 6.

S. 475 (Thomas)

Establishes an Electric Reliability Organization. Repeals PUHCA and gives FERC and

state utility commissions access to books and records. Prospectively repeals §210 of

PURPA. Requires FERC to issue rules to establish an electronic information system to

provide the public, FERC, state commissions, buyers and sellers of wholesale electric

energy, and users of transmission services, with information on the availability and price of

wholesale electric energy and transmission services. Prohibits round-trip trading. Makes

electric rate refunds retroactive to the date a complaint is filed with FERC. Introduced

February 27, 2003; referred to Committee on Energy and Natural Resources.

S. 681 (Cantwell)

Requires FERC to revoke market-based rates upon determination that effective

competition does not exist. Introduced March 21, 2003; referred to Committee on Energy

and Natural Resources.

CRS-15

IB10006

11-18-04

S. 688 (Graham)

Prospective repeal of §210 to of PURPA. Introduced March 21, 2003; referred to

Committee on Energy and Natural Resources.

S. 716 (Landrieu)

Establishes participant funding for transmission facilities. Requires FERC to establish

technical standards and procedures for transmission interconnection. Requires cooperative

and municipal utilities to provide transmission services with rates and conditions that are

comparable to what the cooperative or municipality charges itself. Introduced March 26,

2003; referred to Committee on Energy and Natural Resources.

S. 723 (Boxer)

Requires FERC to order refunds of at least $8.9 billion for unjust and unreasonable rates

charged between June 1, 2000 and June 19, 2001. Introduced March 26, 2003; referred to

Committee on Energy and Natural Resources.

S. 954 (Shelby)

Allows states to regulate bundled retail sales, including the transmission component.

Holders of existing wholesale contractual obligation would have preferential rights to

transmission capacity. Requires participant funding for certain new transmission facilities.

Congress would be required to approve any Standard Market Design proposed by FERC.

Introduced April 30, 2003; referred to Committee on Energy and Natural Resources.

S. 1754 (Jeffords)

In part, creates an Electric Reliability Organization. Allows for interstate compacts for

regional transmission planning. Establishes an Electricity Outage Investigation Board.

Creates a System Benefits Trust Fund Board. Allows for net metering and requires FERC

to promulgate interconnection standards. Introduced October 17, 2003; referred to

Committee on Energy and Natural Resources.

S. 2014 (Cantwell)

Creates an Electric Reliability Organization. Introduced January 21, 2004; referred to

Committee on Energy and Natural Resources.

S. 2015 (Cantwell)

Prohibits energy market manipulation. Introduced January 21, 2004; referred to

Committee on Energy and Natural Resources.

S. 2095 (Domenici)

Comprehensive energy legislation. Title XII is nearly identical to the electricity

provisions in the conference report to H.R. 6. In S. 2095, the third-party finance provision

which allows Western Area and Southwestern Power Marketing Administrations to go to

third parties to finance future expansions to the electricity grid, has been delayed to FY2005

as compared to FY2004 in H.R. 6 to avoid a Budget Act Point of Order on FY2004 spending.

Introduced February 12, 2004.

S. 2236 (Cantwell)

Creates an Electric Reliability Organization. Introduced March 25, 2004; placed on

Senate Legislative Calendar under General Orders. Calendar No. 465.

CRS-16

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.