Military Readiness, Operations Tempo (OPTEMPO) and Personnel Tempo (PERSTEMPO): Are U.S. Forces Doing Too Much?

Congressional research reportJan 14, 1998

Ask Donna

What actually matters in this document.

Text

98-41 F

CRS Report for Congress

Received through the CRS Web

Military Readiness, Operations Tempo

(OPTEMPO) and Personnel Tempo

(PERSTEMPO): Are U.S. Forces Doing Too

Much?

January 14, 1998

(name redacted)

National Defense Fellow

Foreign Affairs and National Defense Division

Congressional Research Service ˜ The Library of Congress

Military Readiness, Operations Tempo and Personnel

Tempo: Are U.S. Forces Doing Too Much?

Summary

Are U.S. forces doing too much? Arguably. Although the armed forces of the

United States are meeting mission requirements while maintaining an acceptable level

of readiness, indications are that under the current strategy, with existing forces

postured and organized for high intensity conflict, the sustainment of both high levels

of activity and high readiness will be difficult. Whether or not U.S. forces can

continue to sustain the current level of effort is an open question. With either the

addition of new global commitments, a reduction in available forces, or a decrease in

funding, readiness may be in jeopardy. Under different strategies, readiness could be

more sustainable but the level of risk to U.S. interests may increase. Reductions in

force structure or funding without commensurate reductions in assigned missions

may, regardless of the overall strategy, jeopardize readiness and operations.

This issue is in a new context for U.S. forces: peacetime operations are larger,

longer, more intense, and more complex than ever; the stockpiled capacity of the

global-war-based force is diminished; high levels of activity may no longer equate to

high readiness; and the force structure has decreased more than the infrastructure.

With the size of current commitments larger than anticipated in the Bottom Up

Review, workloads on the smaller force are demonstrably higher. U.S. military power

designed to react to threats is now more often a proactive tool of foreign policy.

Competition for resources between new missions and standing requirements is

heightened by open-ended operations and the needs of regional commanders. It is

difficult to assess the stress in this new context as measurements of both activity and

readiness need improvement; there is no “Opportunity Cost” evaluation; and no

clear picture of what constitutes a sustainable level of effort.

Understanding the new demands is the first step toward resolution. Measures

are OPTEMPO for the rate of unit activity, and PERSTEMPO for the sum of all

individual absences and activity. Tempos are too high/low if they are causing forces

to lose their capacity to sustain operations and meet crises. Tempos affect the

dynamic relationship of budget, readiness, and force structure decisions and bear

attention in these areas: readiness, quality of life, modernization, personnel, and

retention. The most significant negative impact of tempos that are too high is the

reduction in time and resources for relevant, necessary training, the basis of readiness

and long-term effectiveness. Over time, the continual wear on personnel and their

families may result in difficulties retaining and recruiting high quality volunteers.

Areas of congressional action bearing on readiness concern the National Guard

and Reserve, military infrastructure, military end-strength, specialized units and

equipment, incentives, increased reporting to Congress by DoD, and the option of

ending operations that are not moving toward a predefined “Exit.” Oversight areas

include validating employment concepts, considering resources for training while

deployed, reviewing and setting minimum training time guidelines, prioritization of,

and early determination of, exercise requirements, determining the number and

duration of required inspections, and ascertaining and allowing appropriate “down

time” for units following deployments.

Contents

Introduction and Major Findings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

Introduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1

Major Findings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2

The nature of operations other than war has changed . . . . . . . . . . . . . 2

Forces decreased while requirements increased . . . . . . . . . . . . . . . . . . 2

High activity doesn’t always equal high readiness . . . . . . . . . . . . . . . . 2

Reductions not commensurate . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2

Current operations are larger and more extensive than expected . . . . . 2

Smaller forces and increased commitments equal higher workloads . . 3

Causes of high levels of military activity . . . . . . . . . . . . . . . . . . . . . . . 3

Useful assessments of readiness and stress needed . . . . . . . . . . . . . . . 4

Impacts and implications are significant . . . . . . . . . . . . . . . . . . . . . . . 4

Modernization Issues are Dynamic . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

Force Structure: Dangers and dynamics . . . . . . . . . . . . . . . . . . . . . . . 6

The Quadrennial Defense Review debate may help . . . . . . . . . . . . . . . 7

Background and Analysis . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

One Force, Two Strategies: The QDR and Greater Demand . . . . . . . . . . . 9

A peacetime Major Regional Contingency equivalent . . . . . . . . . . . . 10

Capacity vs Commitments: A dynamic relationship . . . . . . . . . . . . . . . . . . 14

Measuring Commitments and Capacity . . . . . . . . . . . . . . . . . . . . . . . 16

Measuring OPTEMPO/PERSTEMPO . . . . . . . . . . . . . . . . . . . . . . . . . . . 16

Why measure OPTEMPO? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17

Why measure PERSTEMPO? . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17

No single standard for PERSTEMPO exists within DoD . . . . . . . . . 18

Comparing Navy and Air Force approaches . . . . . . . . . . . . . . . . . . . 19

Navy PERSTEMPO Rules . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19

Air Force PERSTEMPO Policy . . . . . . . . . . . . . . . . . . . . . . . . . . . . 20

Measuring Readiness in OPTEMPO Terms . . . . . . . . . . . . . . . . . . . . . . . 24

NO “Opportunity Cost” evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . 24

PERSTEMPO measures cannot drive unit deployment decisions . . . 24

Readiness and OPTEMPO/PERSTEMPO . . . . . . . . . . . . . . . . . . . . 24

Unit Indicators of High Stress . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25

A New Readiness Paradigm Emerging . . . . . . . . . . . . . . . . . . . . . . . . . . . 27

Counting Capability: The Best Way to Assess Capacity . . . . . . . . . . . . . . 28

What can we do with the forces we have available? . . . . . . . . . . . . . 28

What part of our capability is not currently available? . . . . . . . . . . . . 28

Battalions, squadrons, and ships . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28

Estimating time and effort to extricate and redeploy as C-1 . . . . . . . 29

Why OPTEMPO Is High . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29

Overseas presence down = fewer forces for more tasks . . . . . . . . . . 29

The changing nature of military operations . . . . . . . . . . . . . . . . . . . . 32

Why High Optempo Is a Problem . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35

Congressional understanding key to successful innovation . . . . . . . . 36

Maintaining a Viable Force . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39

Continuity in Training . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 39

Bottom Line: Sustaining a high operational tempo difficult . . . . . . . 42

Value of Monitoring OPTEMPO/PERSTEMPO . . . . . . . . . . . . . . . . . . . 42

OPTEMPO/PERSTEMPO and the QDR . . . . . . . . . . . . . . . . . . . . . 42

Current Trends . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43

A Conceptual Framework: Decreasing Size vs Increasing Workload . . . . 44

Smaller forces, increased commitments equal higher workloads . . . . 44

What is the percentage of troops involved in current operations? . . . 47

Korea: Compounding the PERSTEMPO problem for individuals . . . 48

An example: What it takes to keep within tolerable limits . . . . . . . . . 48

“It’s NOT war” — Home Station Hurt . . . . . . . . . . . . . . . . . . . . . . . 51

Trends in retention and reenlistments . . . . . . . . . . . . . . . . . . . . . . . . 51

Pentagon Efforts: Protecting long-term military effectiveness . . . . . . . . . . 51

An example: Air Force Global Sourcing . . . . . . . . . . . . . . . . . . . . . 52

What Do the Facts Mean? Understanding the Implications . . . . . . . . . . . 54

At the individual level . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54

At the unit level . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54

At the service level . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55

At the DoD level . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55

Future Trends in OPTEMPO/PERSTEMPO . . . . . . . . . . . . . . . . . . . . . . 55

Key Issues . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 57

Overview: Areas of Congressional Concern . . . . . . . . . . . . . . . . . . . . . . . 57

Understanding the new dynamics . . . . . . . . . . . . . . . . . . . . . . . . . . . 57

Budget Implications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58

Direct and Indirect Affects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58

Direct Effects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58

Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58

Indirect Effects . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60

Summary: Budget, Readiness, Force Structure affect OPTEMPO . . 61

Readiness Implications: “Ready for what?” . . . . . . . . . . . . . . . . . . . . . . . 62

Prepare, Deploy, Recover — Paying for the cycle with readiness . . . 63

Intangibles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63

Tangibles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64

Summary: Readiness is pervasive . . . . . . . . . . . . . . . . . . . . . . . . . . . 64

Force Structure Implications . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64

The dangers and options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 64

Summary: Maintaining sustainable OPTEMPO/PERSTEMPO . . . . . 66

Options for Congress . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67

Options for Congressional Action . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67

National Guard and Reserve . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67

Infrastructure and End-Strength . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67

Incentives . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68

Expand and Increase Reporting . . . . . . . . . . . . . . . . . . . . . . . . . . . . 68

Reporting “capacity” in a high OPTEMPO environment . . . . . . . . . . 69

Supplemental Appropriations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 70

Congressional Action to End Ongoing Operations . . . . . . . . . . . . . . 70

Some key questions regarding ongoing operations . . . . . . . . . . . . . . 70

Oversight Options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71

Validating employment concepts . . . . . . . . . . . . . . . . . . . . . . . . . . . 72

“Cop on the Beat” force employment option . . . . . . . . . . . . . . . . . . 72

Increasing resources for training while deployed . . . . . . . . . . . . . . . . 72

Reviewing and setting minimum training time guidelines . . . . . . . . . . 73

Congressional action to protect the training base of U.S. forces . . . . 73

Prioritization of exercise requirements . . . . . . . . . . . . . . . . . . . . . . . 74

Reducing the number and duration of required inspections . . . . . . . . 74

Providing “down time” to units following deployments . . . . . . . . . . . 74

For Additional Reading . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 76

List of Figures

Figure 1.“Conflict Dynamics” as published in the Bottom Up Review . . . . . . . 12

Figure 2. “Conflict Dynamics” adjusted for operations 1992-1997 . . . . . . . . . 13

Figure 3. Strategy, force structure, readiness dynamic. . . . . . . . . . . . . . . . . . . 15

Figure 4. Comparison of Navy carrier versus an Air Force fighter wing . . . . . . 21

Figure 5. Additional requirements on Naval aviation units . . . . . . . . . . . . . . . . 22

Figure 6. Cyclical readiness levels of a Navy carrier deployment rotation . . . . 23

Figure 7. The number and type of exercises contribute to OPTEMPO . . . . . . . 31

Figure 8: Intensity of USAF operations is increasing . . . . . . . . . . . . . . . . . . . . 33

Figure 9. Operations involving USAF assets are becoming longer . . . . . . . . . . 34

Figure 10. As operations increase, participation in exercises decreases . . . . . . 35

Figure 11. Decreasing end-strength and increasing deployments . . . . . . . . . . . 37

Figure 12. Increasing commitment to overseas operations . . . . . . . . . . . . . . . . 38

Figure 13. Theoretical annual schedule of an Air Force squadron . . . . . . . . . . 40

Figure 14. Unplanned days reduce the number of actual training days . . . . . . . 41

Figure 15. Ship steaming days per quarter 1971-1999. . . . . . . . . . . . . . . . . . . 46

Figure 16. Number of crews required to meet requirements . . . . . . . . . . . . . . 49

Figure 17. Increase in crew requirements. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50

Figure 18. Share of the burden of current operations “Global Sourcing” . . . . . 53

List of Tables

Table 1. Service-specific Deployment Definitions and Policies . . . . . . . . . . . . 18

Table 2. Indicators of Personnel Stress . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25

Table 3. Indicators of Equipment Stress . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 27

Table 4. Force Structure Drawdown . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44

Table 5. Estimated PERSTEMPO Days Annuallya . . . . . . . . . . . . . . . . . . . . . 45

Table 6. Costs of U.S. Peacekeeping Commitments FY1992-1996 . . . . . . . . . 58

Military Readiness, Operations Tempo

(OPTEMPO), and Personnel Tempo

(PERSTEMPO): Are U.S. Forces Doing Too

Much?

Introduction and Major Findings

Introduction

In order to meet the challenges confronting the United States, the nation’s

leaders seek to strike a balance between (a) the military’s capability, as an instrument

of national power, to prepare to meet both large and small-scale challenges to vital

interests and (b) its ability to deal with important but lesser interests. With finite

resources, peacetime militaries can only sustain a finite level of activity beyond that

required to maintain military readiness and effectiveness through training, exercises,

and maintenance. In a force that is too busy, the cumulative effects of lost training

time, missed exercises, unprogrammed expenditures, and extended deployments can

degrade the overall capability of the force. In a force that is not busy enough,

however, a lack of training and experience in exercises and actual operations may also

be detrimental.

In testimony before the Congress, the Joint Chiefs assess that the armed forces

of the United States, as currently postured, are meeting mission requirements while

maintaining an acceptable level of readiness. This level of effort is not without cost.

How long U.S. forces can continue to sustain this level of effort is a question worth

asking. Reductions in force structure or funding without commensurate reductions

in assigned missions may upset the balance between readiness and current operations.

This paper will define the scope and implications of the armed service’s challenge

of sustaining the current level of operations, identify the dynamic relationship between

congressional action and military activity levels as it relates to budget, readiness, and

force structure decisions, and discuss options for Congress. Using information from

the Congressional Research Service (CRS), the Department of Defense (DoD), the

General Accounting Office (GAO), testimony before the Congress, and other sources,

this paper will examine the level of military activity, its likely repercussions, and the

relationship of this level to options for congressional action. Many CRS and GAO

reports provide detailed background information on issues related to the high

CRS-2

OPTEMPO/PERSTEMPO phenomenon. These reports will be referenced and, where

possible, summarized.1

Major Findings

The nature of operations other than war has changed. Operations other than

war (OOTW) are now larger, longer, more intense, and more complex than their

Cold-War predecessors; some are open-ended with no clear exit strategy; varied

operations run concurrently and require a broad range of capabilities. The forwarddeployed force dispositions used to support these operations are now smaller, albeit,

in most cases, better equipped.

Forces decreased while requirements increased. The cumulative effects of

the drawdown coupled with a more proactive use of the military in a greater range of

international crises has led to a sustained high level of operations. With a much

reduced force, the resultant high activity may be hampering DoD’s ability to execute

some short and long-range plans, programs, and obligations.

High activity doesn’t always equal high readiness. During the Cold War

high unit activity generally equated to high readiness. Today’s reality comprises a

smaller force structure supporting a wider variety of missions at a time when

resources are constrained. With today’s missions, high unit activity may, but does not

necessarily, equate to high readiness and may in some cases, be detrimental to

readiness for combat.

Reductions not commensurate. Operational missions increased 300 percent

during the 1989-1997 period that Army and Air Force force structure was reduced

by 45 percent each, Navy by 38 percent, and the Marines by 12 percent. During this

period, DoD infrastructure, bases for example, was reduced by 21 percent. To

increase operationally available manpower and improve efficiencies, many believe

further infrastructure cuts are necessary. The extra burdens are not evenly distributed

within and across the services. Some units may be more heavily tasked while others

remain relatively untasked. Service actions to level the load are underway.

Current operations are larger and more extensive than expected.

One Major Regional Contingency? The level of effort to support currently

ongoing operations is estimated by some senior DoD officials to be equivalent to

executing one Major Regional Contingency (MRC).2 This estimate includes forces

that have been extensively engaged in ongoing operations for four to five years,

including the National Guard and Reserve, whose support is approaching Desert

Storm levels. The percentage of deployable combat and combat support forces

1

The House National Security Committee issued a report on April 9, 1997 titled “Military

Readiness 1997: Rhetoric and Reality” which addresses issues similar to those in this report.

The House report is available on the World Wide Web at http://www.house.gov/nsc/pubs.htm

2

Deputy Under Secretary of Defense Louis Finch among others, interview with the author.

CRS-3

committed to operations is higher than the percentage of troops deployed publicized

by DoD. In its estimates, DoD quotes a percentage of the total force to indicate the

current level of effort, which, for example, equals roughly 8 percent for the Air Force.

Calculating the Army level of effort from only those eligible to participate shows that

up to 45 percent of the “deployable active Army” may be committed to current

operations as either deployed, preparing to deploy, or recovering from deployment;

excluding soldiers assigned to Korea, the percentage is 36 percent. In contrast, as a

percentage of the Army total force of 1.1 million, the percentage of “deployed

soldiers” (excluding Korea) is 3 percent and of the active Army, the percentage is 6

percent. The Air Force requires 13 of its 20 Fighter Wing Equivalents to support

current operations or 65 percent of the combat fighter force. On an average day, 50

percent of Navy ships are out of homeport of which roughly 30 percent are deployed.

Smaller forces and increased commitments equal higher workloads.

According to the Chief of Staff of the Army, General Dennis Reimer, the Army

reduced manpower by 36 percent while increasing the number of deployed operations

by 300 percent. In testimony before the House National Security Committee in March

1997, the Army estimated that its officers and senior non-commissioned officers from

deployable units now spend 180-190 days away from home annually, while junior

soldiers spend 140-155 days away. Understanding how the Army and the other

services absorbed the increased load during the drawdown to reach today’s level of

effort is essential to planning for the future. This raises question: What has DoD

stopped doing, what is DoD doing less of, is this an increase in efficiency, and do

these reductions compromise readiness?

Causes of high levels of military activity.

Competing strategies. The current National Military Strategy was developed

prior to the current National Security Strategy of Engagement. The latter strategy

envisioned a more proactive U.S. foreign policy while the former strategy, developed

soon after the Persian Gulf War, embraced a more reactive approach with a military

force designed to defeat, in conventional combat, the greatest potential threats to U.S.

vital interests. The reality of the last five years is that the military is heavily engaged

in advancing U.S. interests without conflict while trying to fully prepare to defend

them in conflicts. The dual requirements of two strategies are taxing the force.

Operations, exercises, and military culture. Regional Commanders-in-Chief

(CINCs), tasked with the day-to-day security of U.S. interests, wield great influence

in requesting forces to support their exercises and operations. They do not, however,

have the fiscal responsibility of supplying these forces or the service responsibility of

training them. This disconnect may result in “overspending” the force. “We never

met a deployment we didn’t like” is indicative of the can-do attitude that is usually at

odds with demanding relief from excessive work. Careerism may inhibit officers from

turning down work no matter how valid the complaint. Competition for resources

within and between the services can contribute to military “volunteerism”.

Useful assessments of readiness and stress needed.

Measurements need improvement. Tempos are difficult to assess because

current systems were not designed to indicate peacetime activity; reliable indicators

CRS-4

of unit and individual activity and stress are only now being developed. Some

analysis may be misleading because averages of large groups do not adequately reflect

burdens on discrete elements. The current DoD Status of Resources and Training

System (SORTS), does not measure levels of effort required of units to attain high

readiness or the extent to which units are committed to operations; it produces only

snapshots of: personnel, training, and supply/equipment. SORTs is not predictive nor

does it reflect a unit’s capacity to “turn-up” the level of effort. Measuring both the

level of effort and the extent of a unit’s commitments would improve the assessment.

No “Opportunity Cost” evaluation. Assuming adequate funding, acceptable

readiness levels can be maintained indefinitely at a certain OPTEMPO/PERSTEMPO

levels. These levels have not yet been identified. There is no “Opportunity Cost”

system for evaluating the relative worth of DoD actions. In other words, there is no

way to know the price, in non-monetary terms, such as readiness, for current

operations. “What didn’t we do because we did Operation X?” is a question that can

now be answered only in specific instances, anecdotally and non-quantitatively.

Importance of understanding OPTEMPO/PERSTEMPO measurements.

Measuring OPTEMPO, the rate of unit activity, and PERSTEMPO, an individual’s

absences and activity level, and comparing them with other factors like readiness

levels, personnel retention statistics, and unit evaluations should indicate what level

of activity U.S. forces can sustain. Understanding OPTEMPO or PERSTEMPO does

not provide insight into the validity of either the current two-MRC strategy or the

policy of pursuing broader military engagement in the world at-large. Understanding

OPTEMPO/PERSTEMPO should, however, suggest the degree to which U.S. forces

are capable of meeting current and proposed obligations and in what areas change

and/or innovation may be required. High OPTEMPO/PERSTEMPO can be an

indicator that U.S. forces may be exceeding designed capabilities in some areas and

failing to meet planned objectives in others.

On the other hand, low

OPTEMPO/PERSTEMPO may be an indicator that a unit’s readiness might be at risk

due to insufficient training, exercises, manpower, or resources or it could indicate a

unit that is capable of contributing more to current operations.

Impacts and implications are significant.

Training: Time and resources for effective training lacking. There are

minimum resources and a minimum time required for basic military preparedness so

that units may retain the capabilities required of them. For many units, the minimums

established by their services are not currently available.

Concerns. The effects on units and personnel with current high levels of activity

are of increasing concern to defense officials and senior officers. The major concerns

voiced during testimony before the Congress are these:

! Readiness: As activity levels increase, time for realistic combat training is lost,

equipment requires more maintenance, supply stocks are diminished, and

personnel are displaced.

! Modernization: Time and money spent on operations is not available for other

priorities. The man-power intensive maintenance of aging systems, systems

CRS-5

which are under increased stress, is increasing the workload and the cost to

maintain equipment resulting in even higher activity levels.

! Quality of Life: Commanders are increasingly forced to choose between

spending scant resources on either training or “quality of life” improvements

such as base support facilities or family-oriented programs.

! Personnel: Fatigue and disillusionment may afflict some as they perceive a

future full of family separations, limited opportunities, and reduced benefits.

Reenlistments and recruitment: although both remain strong, commanders

testify that the dedicated all-volunteer force is growing weary, dampening

enthusiasm for military service. Surveys reveal that pilot retention is dropping

rapidly due to high OPTEMPO, which decreases individual flying proficiency

and increases family separations, and due to a forecast long-term hiring surge

by the Airlines. Although most pilots say they prefer military aviation, the pull

of family and a stable lifestyle is significant.

Internal DoD actions to ease the pace of activity. The Global Military Force

Policy (GMFP) is a DoD step toward managing both short-term requirements and the

long-term sustainability of U.S. forces. The policy effectively reduced commitments

for high demand units to the point where most can now accomplish their required

training. The Navy has reoriented the way it does pre-deployment training and

reorganized its force to reduce unit activity levels. The Air Force now fills its

requirements from organizations world-wide. The reserve component, mostly

through volunteers, is carrying part of the load. Such actions demonstrate the ability

of DoD to accommodate to new realities without increased spending.

Modernization Issues are Dynamic. New weapons systems and technologies

may enable DoD to posture fewer, more capable forces. In some cases, new systems

can lower the pace and the cost of operations. In theory, this effort would free forces

to train for and engage in operations other than war. In a fiscally strained

environment however, the resultant force structure may be subject to dollar-driven

cuts that could well recreate a condition the modernization sought to relieve: too few

people doing too many things. Also, better capability often creates the impression

that military forces can now do more than was previously possible. Many new

technologies complement rather than supplant older technologies. For example, the

Air Force’s new J-STARS (Joint Surveillance Target Attack Radar System) does for

the ground war what the AWACS (Airborne Warning and Control System) does for

the air war. Even these systems need to be supplemented. Due to the effect terrain

has on J-STARS in Bosnia, new unmanned aerial vehicles are working with J-STARS

to provide a more complete picture. There is no overlap and both systems are in great

demand. In operational terms, increasing capability increases mission effectiveness

but does not necessarily mean that fewer forces are required to complete a military

mission. It does mean that the forces involved can accomplish the mission with lower

risk, fewer casualties, or less collateral damage, or that they can do so more

expeditiously.

Force Structure: Dangers and dynamics. The dangers involved in not

balancing force structure with commitments are many. Too few forces prepared for

high-intensity combat could result in local defeat, higher casualties, and longer

CRS-6

conflicts. Too few forces capable of a wide range of operations results in high

OPTEMPO/PERSTEMPO for those qualified units, and missed opportunities for the

nation. Force structure options under consideration by DoD and the Congress center

on practical ways to reduce the forces required for major contingencies; to reduce the

time and effort required to prepare for them; to increase the number of units capable

of executing multiple types of non-combat operations; and to increase the

participation of the reserve components. Force structure actions benefit from taking

into account both OPTEMPO and PERSTEMPO limits, and budget and readiness

considerations. The following relationships are pertinent (assuming demand remains

constant or increases):

! As force size decreases, OPTEMPO generally increases.

! As active force size decreases in favor of the reserve components, OPTEMPO

tends to increase due to the limitations on the availability of the Guard and

Reserve.

! As the number of specialized units increases, OPTEMPO for those types of

units decreases; however, with a finite force structure, the increase in such

units is at the expense of other types of units.

! New units with missions similar to high OPTEMPO units might reduce the

latter’s overall OPTEMPO; however, recent experience with both the Joint

Stars ground surveillance aircraft and the Predator UAV suggests that this is

not inevitable.

! As new weapons and capabilities that reduce manpower and support

requirements come on line, PERSTEMPO decreases.

! As long as very high demand for deployments of military force exists, whether

for military or foreign policy purposes, efforts to reduce OPTEMPO and

PERSTEMPO will be difficult.

! Increasing the size of the National Guard and Reserve at the expense of the

active force will generally result in higher tempos, as the reserve components

are generally less available than the active force. Many defense observers see

support and specialized functions in the reserve components as a key building

block in developing the affordable force, operating at acceptable OPTEMPOs,

that is required. Some movement in this area is underway. At the same time,

there is a widely held perception that the reserve component should “never be

viewed as the key building block”3 because its near-term warfighting capability

cannot match that of the active force.

The Quadrennial Defense Review debate may help. The debate over the

Quadrennial Defense Review (QDR) will help clarify the problem and the range of

options. Real solutions may be difficult to divine as the specifics of measuring the

3

According to the planning staff of the National Guard Bureau in response to a draft of this

report.

CRS-7

workload on U.S. forces, the actual costs to the treasury, and the opportunity costs

are elusive. Although DoD is aggressively implementing management and procedural

solutions, this approach has its limits. DoD has little control over external

requirements. The quandary facing QDR planners is how to organize, train, and equip

U.S. forces to meet the requirements of both the two-MRC scenario and the

unpredictability of other operations in support of national objectives. Given current

demands, say military advocates, any decision that reduces funding, manpower, or

equipment can have immediate negative repercussions unless commensurate

reductions in unit obligations are made. Others are not convinced. Until the demand

issue is deliberated, understood, and dealt with, discussion of strategic resource

tradeoffs to balance the defense budget under the guise of the QDR may be

premature. Because DoD and the Congress are just beginning to understand the

implications of operating in the current environment, premature action may be counter

productive and may even exacerbate the current situation.

To many observers and to some in Congress, the great promise of the QDR lies

in the potential to redefine defense requirements. There is little debate in Congress

over the current stress on DoD. The debate surrounds the future posture of U.S.

forces and the resources that may be available to support them. The strategy of the

Bottom-Up review levied certain requirements on the military. If those requirements

are viewed differently in the QDR debate, U.S. forces could then be reorganized,

repostured, and possibly repositioned in such a way as to extensively mitigate the

negative aspects of current and projected demands.

Although many in Congress strongly support a “strategy-driven” approach to the

QDR, the current fiscal realities may force some “budget-driven” decisions. This

latter emphasis is viewed by many as a return to historical patterns of force

hollowness following major conflicts. In either case, it is apparent that the QDR must

deal effectively with the competing demands of increased military deployments,

reduced forces, and constrained budgets to ensure that the force is capable of meeting

the nations needs now and into the early 21st century.

CRS-8

Background and Analysis

There is little disagreement that U.S. forces are very busy. Although assessed

levels of readiness are high, there is growing concern that the current pace of

operations may not be sustainable. In addition to maintaining a robust warfighting

capability, the military is now heavily engaged in executing the National Security

Strategy of Engagement. How best to fulfill these dual requirements is the subject of

the Quadrennial Defense Review debate. Based on current requirements and

commitments, U.S. forces are under some strain; however, should requirements,

commitments, or capabilities change significantly after the QDR debate, the force

could be in a better position to meet today’s challenges or it could be in a worse

position. Congressional interest in either scenario is keen. Many views expressed in

Congress are comparable to those of Representative Sisisky and Representative

Dellums speaking to the Service Secretaries (House National Security Committee

Hearing on the FY 1998 Defense Budget, March 12, 1997).

SPENCE: Mr. Sisisky.

SISISKY: But let me tell you what the real problem is and why our concern. All

we’ve heard, we’ve heard it from the Defense Department, we’ve heard it from

you, we’ve heard it from the chiefs of staff, that we’re as ready as we’ve ever

been. Readiness, number one priority. And I believe that. But let me tell you, the

things that we’ve heard in the last few weeks is that we’re not going to be that

ready in 18 months. The morale is low.

And then I keep reading these things: two Army divisions may go, two carrier

battle groups may go, things like that, some more wings in the Air Force may go.

I saw some interesting figures yesterday...The Army across this world had 33,000

people deployed plus 100,000 deployed in regular stations. The 33 were just in

Bosnia and other places. As I understand it, only 20 percent of the Army is

combat forces. Now that may be a sliding figure. And obviously, the other people

are over there, too. But that’s 100,000. You take two divisions out of there, I

don’t know where we’d go. And I doubt very seriously whether you’d have an

Army that you’d be very proud of.

DELLUMS: The reason why I raised the issue of the Quadrennial Review to all

of you, is that if indeed the Quadrennial Review is a serious process, all of these

distinguished witnesses are an integral part of it. And (if) what is on the table is

a total re-look with potential for change, then all of these prognostications about

the future, what future are (we) talking about? You can only be extrapolating

based on present strategies, present doctrine, present force structure based on

present requirements.

If the Quadrennial Review changes all of that, then how can you predict something

you’ve not figured out as yet? We don’t have the Quadrennial Review before us.

So all these alarming statements about readiness shortfalls, modernizations

shortfalls, strategy problems, force structure implications, you can’t — you can’t

get there from here until we finally have the Quadrennial Review document before

us. That will frame the budget for fiscal year 1999.

So you cannot extrapolate based on fiscal year 1998 what’s going to happen

several years down the road...And I would caution my colleagues that talking

CRS-9

about where all these dangers are at this point is not appropriate and not relevant

until such time as we determine the Quadrennial Review. If the Quadrennial

Review simply underscores the status quo, then maybe everybody’s right. But if

it is a substantive point of departure, then everything then has to be framed in that

new paradigm, not the old paradigm.

The bottom line for Congress is how to fund, under resource-constraints, shortterm demands for military forces, long-term needs to maintain effective forces, and

commitments to service personnel. Notwithstanding substantial force cuts, the U.S.

military is by far the most capable on earth. There is a perception that threats to the

nation are much reduced from those of 1950-1990. There is also a perception that

U.S. military force can play a deterrent, decisive or a pacifying role in most conflicts.

Both views, whether right or wrong, affect the debate surrounding the Pentagon’s

budget. Unfortunately, during the transition from a high threat / low activity to a low

threat / high activity military posture, an attempt to satisfy both old and new

requirements may have occurred. As a result, some military advocates today hold that

any reduction in resources, without a commensurate reduction in commitments, will

likely result in increases in OPTEMPO/PERSTEMPO that take DoD above “the

breaking point”. General Richard E. Hawley, Commander of Air Combat Command,

summed up his analysis of the current situation:

Then, of course, there is the Quadrennial Defense Review and the potential that it

will lead to further reductions in our already heavily committed force structure. As

a primary provider of air combat forces to our joint warfighters, I advise caution

as we contemplate this course. Our nation’s strategy of global engagement is a

sound one. But it is one that is imposing heavy strains on our already

much-reduced force structure. Many of the men and women whom I meet as I

travel around Air Combat Command are tired. We are testing their commitment

to “service before self” and, so far, they have not been found wanting. But there

are limits on how much we can ask these wonderful people to give. It is my sense

that we are close to that limit. Once we cross that fine line, the exodus will be

devastating and difficult to reverse. We must find a way to keep our force

structure and our commitments in balance. I believe we can do that.4

General Hawley has taken action within his command to significantly reduce the strain

on his force through internal management practices and he has done so without

increases in either funding or resources. Time will tell if these changes are sufficient.

In any case, innovation in a time of resource constraints may prove to be the most

useful approach as DoD learns to operate in a high demand environment.

One Force, Two Strategies: The QDR and Greater Demand

The Quadrennial Defense Review (QDR) mandated by the 104th Congress

reviewed the structure and mission of the nation’s armed forces. The report, out in

May 1997, will, if implemented, replace the last review conducted in 1993. Then

Secretary of Defense Les Aspin’s Bottom-Up Review established the requirement to

fight two nearly-simultaneous major regional contingencies (MRC) as the overarching

4

From a speech to the Air Force Association Symposium, January 30, 1997, in Orlando,

Florida. Accessible on the World Wide Web at http://www.aef.org/ol7.html

CRS-10

requirement for the National Military Strategy. In statements before leaving office,

former Secretary of Defense Perry clearly restated the two MRC scenario as the

primary consideration for posturing the nation’s defense. In establishing a base-line

force structure capable of engaging in a two-MRC conflict, defense planners in 1993

assumed a peacetime activity level for U.S. forces that would enable the vast majority

of combat and combat-support units to quickly swing into action. The intervening

years have seen a dramatic increase in the activity of U.S. forces in non-MRC

operations while at the same time the size of the armed forces has decreased

significantly. These smaller forces are now engaging in military operations that are

larger, longer, more intense, and more complex than those anticipated in 1993. The

result is that some combat forces earmarked to transition to MRC duty in the BottomUp Review (BUR) may not be available as predicted. Further, the high activity levels

are straining some military budgets, curtailing training opportunities for deployed

units, increasing wear and tear on some equipment, and depleting some wartime

stockpiles. The task facing defense planners is how to organize, train, and equip U.S.

forces to meet the requirements of both the two-MRC scenario and the

unpredictability of other operations in support of national objectives.

With no apparent threat, the QDR debate will not necessarily reemphasize the

two-MRC scenario as the guiding principle of the National Military Strategy because

defense planners now contend with a non-Cold War National Security Strategy in

which military forces play a significant peacetime role. The BUR was completed

prior to the administration’s announcement of the National Security Strategy of

Engagement and Enlargement; therefore, the BUR force structure focused primarily

on the requirements of high-intensity combat and did not anticipate the additional

requirements which would be levied on U.S. forces (See figures 1 and 2 below).

Although its main purpose remains the defense of the nation, the military’s role as an

element of national power is expanding. Maintaining the equilibrium between an

expanded peacetime role, which may prevent conflict, and the required wartime role,

which is to win conflict quickly, is the key challenge.

A peacetime Major Regional Contingency equivalent. Figure 1, from the

Bottom Up Review, displays the anticipated “Conflict Dynamics” upon which the

current force structure was based. According to DoD officials who worked on this

analysis, the requirements for Peacekeeping/Peace Enforcement and Humanitarian

Operations were, in retrospect, understated.5 These same officials characterize DoD’s

current level of effort as equivalent to one major regional contingency (MRC). Figure

2 adjusts the original “Conflict Dynamics” based on this assessment. The original plan

was for U.S. forces to quickly win the first MRC in order to prepare for the possibility

of a second MRC occurring nearly simultaneously. The effects on U.S. forces of a

prolonged first MRC and the associated risk that would follow in the second were a

major concern. Sustained operations over the last five years, assessed as equivalent

to one MRC, are therefore, cause for concern. These same DoD officials have

testified before Congress that we may be going through an exceptional time and that

the current level of effort will probably subside. Without clear strategies for

withdrawing from operations in Northern and Southern Iraq, Macedonia, Bosnia and

5

According to Deputy Under Secretary of Defense Louis C. Finch who worked on the BUR

proposals. Interview with the author.

CRS-11

elsewhere, and with the ever-present dangers of potential flash points like Rwanda,

Zaire, the assertion of an “exceptional time” comes into question. For example, the

final withdrawal date for U.S. forces in Bosnia is not certain now and will remain so

if the prospects for renewed civil war are not reduced.6

Understanding the current and projected demand on U.S. forces is an important

early step in developing a National Military Strategy and a force structure capable of

meeting these compelling obligations. Key measures of that demand are the pace or

tempo of military operations and the demands for duty away from home that such

operations place on individual service members. It is important to measure and

understand these demands in order to make appropriate strategy, force structure, and

readiness decisions.

6

For more on the future debate over the withdrawal from Bosnia, see NATO and Bosnia: A

Looming Transatlantic Debate. CRS Report 97-480 F by (name redacted) (April 22, 1997).

Figure 1. Anticipated nature of military requirements or “Conflict Dynamics” as published in the Bottom Up

CRS-12

Review. Column one indicates the anticipated level

of peacetime activity; column two, the level of activity

associated with one MRC.

CRS-13

Figure 2. Bottom Up Review analysis of “Conflict Dynamics” adjusted for actual operations from 19921997 which may equate to 1 MRC. The “Exercises” added to each column indicate the effort required to

prepare for the missions depicted.

CRS-14

Capacity vs Commitments: A dynamic relationship

The assessment of current and projected demands enables planners to understand

the capability available for any new National Military Strategy. The strategy, once

derived, will determine the force structure required. Force structure decisions

influence readiness determinations. To preclude surprise and to react quickly to

aggression, a certain amount of the force must be in a high state of readiness. The

remaining readiness decisions are based on the projected requirements of military

plans written to implement the National Military Strategy (e.g. Days available prior

to deployment). The required readiness levels of units determine their training,

equipment, and personnel needs and priorities. It is in these areas, training,

equipment, and personnel, that high demands create the most turbulence. Therefore,

in understanding the turbulence created within the force by higher than planned levels

of activity, one can understand the impact on readiness and the efforts required to

maintain that readiness; the impact of readiness requirements on force structure

decisions; and the impact of force structure decisions on the ability of the military to

meet the requirements of the strategy. In summary, planning to execute the strategy

must account for current and projected demands on the force in order to posture a

viable military to meet the nation’s needs.

The left side of figure 3 below illustrates this sequence. The strategy, devised

to meet the challenges to national interests, is the framework for force structure

decisions; based on the force structure, readiness levels are determined that ensure the

forces can execute the strategy. This static process is typical of peacetime planning.

As long as forces maintain their required readiness levels, execution of the strategy

is assured. In a dynamic environment characterized by high demands on portions of

the force, readiness levels and a unit’s capacity to operate are constantly in flux

because units are preparing for, engaging in, and recovering from operations. In this

case, the relationship is circular in that changing readiness levels, which should

indicate a unit’s capacity to engage in operations, affect the military’s ability to

execute the strategy. To understand the extent to which the military’s ability to

execute the strategy is affected, it is important to not only know the capability of the

unit but also the unit’s capacity to engage in and sustain operations. Current

readiness measurements show a snapshot of capability. Clearer assessments of

capacity are required in a fast paced environment because, with the surplus capacity

of the Cold-War force diminished, the ability of U.S. forces to quickly “surge” up to

a high intensity level and/or their ability to sustain operations over an extended period

are important considerations. Issues surrounding readiness levels and the combat role

of the Army National Guard are key aspects of this debate.

“How busy are U.S. forces?” and “Can they do more?” or “Should they do less?”

are pertinent questions framing the current debate over the role of U.S. forces in the

world today. To answer these questions requires an understanding of the relationship

between capacity and commitments. Although capacity is beginning to stabilize

following the drawdown of U.S. forces, commitments are anticipated to fluctuate at

high levels. As commitments increase and run concurrently, there theoretically comes

a point where capacity is degraded. Finding this point in order to achieve balance

between the requirements of the National Military Strategy and the new missions

inherent in the National Security Strategy is the challenge confronting defense

planners. Further force structure cuts to combat and combat

CRS-15

Figure 3. Strategy, force structure, readiness dynamic for planning or “peacetime” and operations or

“wartime”

CRS-16

support forces engaged in current operations should be closely analyzed to ensure the

United States retains the capacity to meet probable threats and obligations.

Measuring Commitments and Capacity. The current DoD system, the Status

of Resources and Training System (SORTS), measures training, personnel, and

supplies and includes a commander’s assessment. SORTS does not measure the level

of effort required of the unit to attain high ratings or the extent to which the unit is

committed to operations. It does, however, use a “Commander’s Assessment” to

gauge the overall readiness of the unit. According to DoD officials testifying before

Congress, this assessment was used in 10 percent of SORTS reporting to increase the

readiness rating of units and it was used in a fraction of one percent of the reporting

to lower a unit’s readiness rating.7 This system, long the subject of congressional and

GAO scrutiny, reflects a snapshot of capability based on objective standards. It is not

predictive nor does it reflect a unit’s capacity to “turn-up” the level of effort.

Measurement of both the ongoing level of effort, indicated by hours and days worked

for example, and the extent of a units commitments away from home station would

improve the assessment of a unit’s capacity for increased activity.

The measurements available to indicate the activity of U.S. forces are

OPTEMPO and PERSTEMPO. Operations Tempo (OPTEMPO) is the rate of U.S.

forces involvement in all military activities. OPTEMPO in this report refers to this

general meaning of the term.

The services also use OPTEMPO as a

programming/budgeting term that indicates, for example, steaming hours for the Navy

and combat vehicle usage for the Army. The Air Force’s flying hour program is one

gauge of the “OPTEMPO” of its combat units. Further, OPTEMPO is often used to

describe only the pace of contingency deployments excluding other unit activities such

as exercises and training deployments. Units are affected in varying degrees by all

these activities and so, for OPTEMPO to be a meaningful measurement of unit

operations it should include all unit activities.

Personnel Tempo (PERSTEMPO) is a subset of OPTEMPO and is the amount

of time spent away from home, usually measured in the number of nights service

members spend away combined with all activities in which a service member is

engaged. The post-Cold War drawdown of the U.S. armed forces coupled with

increased use of the military has led to a much higher than planned rate of activity,

OPTEMPO, for many military units and significantly increased the time spent away

from home, PERSTEMPO, for the military personnel involved.

Measuring OPTEMPO/PERSTEMPO

In order to discuss policy options and implications, the general terms OPTEMPO

and PERSTEMPO will be used in this report as defined above. Service definitions

may vary; therefore, where important differences exist, they will be noted.

7

Gebicke, Mark, Director, Military Operations and Capabilities, General Accounting Office.

Testimony before the Military Readiness Subcommittee of the House National Security

Committee March 11, 1997.

CRS-17

Since measuring OPTEMPO indicates actual unit activity levels, which

encompass everything the unit does, with the purpose of gauging unit capacity to

accomplish proposed missions, the sum of all endeavors, regardless of purpose,

provides the most accurate assessment. All the services use a variety of OPTEMPO

categories to measure specific activities. These “OPTEMPO” measures do not clearly

indicate the overall pace of the unit. Naval OPTEMPO measurements provide the

clearest picture of unit activity because the ship is not only the weapon system, it also

defines the unit and provides the platform for conducting operations, training, and

exercises. Steaming hours in the Naval definition generally equates to a surface unit’s

rate of activity; however, in port activities and temporary duties away from home port

also contribute to the rate of activity and are not reflected in ship OPTEMPO.

Similarly, embarked Marine Corps units can define part of their OPTEMPO in Naval

terms. The Army and Air Force OPTEMPO considerations are less clear-cut and

therefore harder to measure. The Army refers to vehicle mileage, in budgetary terms,

as OPTEMPO. Again, this is a sub-category of a units activity, not a complete

measurement.

The scope of tempo-related problems is difficult to measure as data collection

by the services was not designed to indicate the impact of OPTEMPO/PERSTEMPO;

consequently, reliable indicators of unit and individual repercussions are only now

being developed. In addition, some data analysis may be misleading because averages

of large groups do not adequately reflect the burdens on discrete elements.

Why measure OPTEMPO? OPTEMPO measurements are important because

they aid planners in predicting requirements and managing commitments.

Understanding current and projected demands enables the military to sustain readiness

by quantifying the obligations to engage in operations, train and exercise the force,

develop personnel, and maintain and acquire the requisite equipment to do so. In

today’s resource-limited defense environment, such an understanding should

contribute to maximizing efficiency and avoiding wasteful, redundant, or potentially

damaging practices.

Why measure PERSTEMPO? In general, personnel tempo or PERSTEMPO

is the amount of time spent away from home for DoD personnel. PERSTEMPO,

which is different for each person, indicates the time spent in all professional activities

and reflects the remaining time available for personal and professional development

activities. Service members can have a high PERSTEMPO while never leaving their

home base due to, for example, extended shifts over long periods. Individual tempos

may differ from those of the unit because individuals may have official travel,

professional education, or change-of-station requirements above those required by

their unit obligations. Even so, the primary factor contributing to the significant

recent increases in PERSTEMPO is unit deployments for operations and exercises.8

8

For a thorough discussion of PERSTEMPO issues including recent data, effects on readiness,

and DoD actions to mitigate the impact of high PERSTEMPO, see U.S. General Accounting

Office. Military Readiness: A Clear Policy is Needed to Guide Management of Frequently

Deployed Units. Report Nos B-271135 and GAO/NSIAD-96-105. April 8, 1996.

CRS-18

No single standard for PERSTEMPO exists within DoD. Difficulties arise

in evaluating PERSTEMPO measurements because each service defines levels of unit

and individual activity differently and they each have a different definition of what

constitutes high activity. Deployments are also defined differently by each service; for

example, training rotations to the National Training Center do not figure in the

Army’s measurement of deployments yet they are clearly an activity that contributes

to PERSTEMPO. According to a 1996 GAO report Military Readiness: A Clear

Policy is Needed to Guide Management of Frequently Deployed Units:

It is difficult for DoD to determine the actual time that either military personnel or

their units are deployed. This information is important to planning and managing

contingency operations. Although all services now have systems to measure

PERSTEMPO, each service has different (1) definitions of what constitutes a

deployment, (2) policies or guidance for the length of time units or personnel

should be deployed, and (3) systems for tracking deployments.9 (See Table 1

below)

GAO, and others, have recommended a single formula for measuring time away from

home: one day away equals one day deployed. DoD has not established a

comprehensive definition and DoD’s management of PERSTEMPO-related issues will

continue to be difficult. Service cultures, mission characteristics, deployment

timelines, and sustainment requirements account for most of the differences in service

definitions and hamper efforts at establishing a universal definition. Even so, the

Joint Staff, at the direction of the Chairman, Joint Chiefs of Staff (CJCS), is working

toward a common definition and an accurate measurement system.

Table 1. Service-specific Deployment Definitions and Policies

Measurement

Army

Navy

Air Force

Definition of

Deployment

7 days or more

56 days or

more

1 day or more

10 days or

more away

from home

station

Policy or

regulation

limiting

deployments

No policy, but

goal of no

single

deployment

over 179 days

Yes, policy

limits

deployments to

180 days/6

months

No policy, but

maximum

desired level of

120 days per

year

No policy, but

goal of no

single

deployment

over 6 months

System

tracking

capabilities

Unit and

individual

Unit only

Major weapon

systems and

individual

Unit only

Source: GAO10

9

Ibid.

10

Ibid.

Marine Corps

CRS-19

Comparing Navy and Air Force approaches. Each service necessarily tailors

its respective forces and deployment guidelines to the requirements of the missions

it performs and the levels of readiness required of its forces. The Navy, which rotates

forces forward to overcome the lagtime involved in deploying forces to a fastbreaking crisis by sea, keeps forward-stationed forces at high readiness while units in

home-port are in varying states of readiness. The Air Force, whose forces deploy into

combat within 48 hours of notification maintains high levels of readiness across the

force. These differing requirements are reflected in the OPTEMPO and

PERSTEMPO of each service.

Navy PERSTEMPO Rules. The Navy has stringent rules regarding

PERSTEMPO but an individual measurement system is not employed. There are

three tenets of the Navy policy:

! Deployments will be no more than six months from the time they depart

homeport until the time they return to homeport.

! The turn-around ratio, that is, the number of days at home compared to the

number of days on a deployment, will not exceed 2.0/1. (Note: the Navy

defines a deployment as 56 days or more at sea.)

! 50% of a sailor’s time over the past three years must have been spent in

homeport.

Waivers to this policy require approval of the Chief of Naval Operations. In 1996,

according to the Navy staff, there were only 5 waivers granted Navy-wide and these

were to take ships for required maintenance to facilities away from homeport. In

1997, there has only been one waiver, again for maintenance.

According to Navy officials who track PERSTEMPO, the Navy’s turn-around

ratio that is, the time between deployments must more than double the time spent on

the last deployment averages between 2.4-2.6 to 1 although some aviation units may

be closer to the 2.0 limit. While it is true that the turn-around ratio has diminished in

recent years, it still remains well-above the Navy goal for most units.

Individual sailors may, at times, experience higher PERSTEMPO if

reassignments occur between deployments. A sailor coming off a deployment that is

reassigned to a ship preparing for a deployment is likely to be hard pressed. The Navy

does not track individual PERSTEMPO, but, based on the rules for unit deployments,

the maximum three-year average for most sailors should be around 180 days.

Air Force PERSTEMPO Policy. The Air Force has no specific rule regarding

PERSTEMPO. Air Force policy is that, as a goal, individual PERSTEMPO should

not exceed 120 days per year. This policy is consistent with the Navy’s more

stringent 2.0:1 turnaround ratio in that 120 days away plus 240 days at home roughly

equals one calendar year (See figure 4 below). The Navy uses deployments, any

continuous sea duty that exceeds 56 days away, to measure the 2.0:1 ratio. Figure

5 shows the effect of additional activities away from home station on Navy

PERSTEMPO. The Navy policy of 50 percent of one’s time spent at home over the

three preceding years ensures that additional activities don’t take sailors beyond a

CRS-20

PERSTEMPO of 182-183 days per year. The Air Force policy of 120 days per year,

one-third lower than the Navy requirement, is based on readiness requirements.

Deployed naval forces maintain a high state of readiness while stationed in potential

hot spots. Non-deployed naval forces, their missions covered by deployed naval

forces, cycle through stages of refurbishment and retraining as they prepare for their

next deployment. Periods of unreadiness are planned into this cycle as Naval

personnel and equipment “standdown” from deployed operations. Figure 6 shows this

cycle. Air Force units, on the other hand, maintain high levels of readiness at all times

because of the potential need to deploy worldwide on short notice. This continually

higher state of readiness, compared to non-deployed naval forces, requires more

dedicated training time at home station to maintain. Therefore, the Air Force 120 day

policy affords units the time to train in order to maintain continually high readiness

ratings. The policies of both services are designed to support the nature of their

unique contributions to joint operations and are tailored to their specific needs.

CRS-21

Figure 4. Theoretical comparison of the OPTEMPO of a Navy carrier air wing versus an Air Force fighter

wing showing an equal “deployment” load. Compares a three-year Navy deployment cycle with the Air

Force policy of 120 days away per year. In both cases, the PERSTEMPO burden appears to be 360 days in

3 years as depicted in the center. Source Air Combat Command

CRS-22

Figure 5. Many Naval aviation units also train at Fallon NAS, NV beyond 6-month deployments at sea. In

this case, the depicted aviation unit's three-year PERSTEMPO is 460 days vice 360 days. Source Air

Combat Command.

CRS-23

Figure 6. Cyclical readiness levels of a Navy carrier deployment rotation. During the 460-day Navy

PERSTEMPO period in this example, readiness levels are reduced while preparing for the next deployment.

The Air Force, with a more rapid response commitment from homestation, maintains readiness at C-1/C-2

for all units. Source Air Combat Command

CRS-24

Measuring Readiness in OPTEMPO Terms

NO “Opportunity Cost” evaluation. Theoretically, assuming adequate

funding, acceptable readiness levels can be maintained indefinitely at certain

OPTEMPO and PERSTEMPO levels. These levels have not yet been identified

making it difficult to assess how long readiness can be sustained under certain

conditions. Further, there is no “Opportunity Cost” system for evaluating the relative

worth of DoD actions. In other words, there is no way to know the price, in nonmonetary terms, such as readiness, for current operations thereby making quantitative

assessments difficult. “What didn’t we do because we did Operation X?” is a question

that can now be answered only in specific instances, anecdotally and nonquantitatively.

Future readiness measurements should be able to predict, based on OPTEMPO

and PERSTEMPO, how long the current level of effort can be prudently sustained.

An effective system for estimating an acceptable OPTEMPO and PERSTEMPO limit

would be unit-specific, would be tied closely to the unit’s training program, and

would depend on several factors including personnel experience, equipment

capabilities, weapon system age, and mission type.

PERSTEMPO measures cannot drive unit deployment decisions. Any

system of measurement should account for continuous personnel rotations between

units that can exacerbate the PERSTEMPO problem. A units OPTEMPO is the

major portion of an individual’s PERSTEMPO. When individuals are reassigned,

their PERSTEMPO includes the previous unit’s deployed time. Were they to stay in

the original unit, service management practices would ensure they were given a break.

After they move, the breaks accrued by the former unit do not carry over with them.

Often times, individuals returning from a deployment will transfer to a unit preparing

to go on a deployment. Assignments to remote locations, where the PERSTEMPO

is 365 days a year, that precede or follow an assignment to a unit with a high

OPTEMPO strain individuals the most. This drain on individual readiness should be

a key concern of an effective management system. Certainly, the reverse also happens

where individuals miss deployments due to reassignments. The number of units

currently involved in operations and exercises makes the former problem more

common than the latter condition. Although it is important to identify high

PERSTEMPO individuals, units must be able to deploy with all their assigned

personnel in order to maintain the unit integrity and cohesion that are essential to

successful operations. Leaving soldiers behind because they have exceeded a

PERSTEMPO ceiling is not considered a workable alternative.

Readiness and OPTEMPO/PERSTEMPO. The important aspect of

OPTEMPO/PERSTEMPO analysis is in the indication of capacity. As noted, SORTS

reporting does not indicate capacity. Highly stressed units and individuals cannot

perform as well, or for as long, as well-rested ones. Under SORTS, a commander

assesses the unit’s ability to “go to war” today not its ability to sustain or to increase

a high level of activity. Capacity, whether a unit or an individual “probably” can do

more or whether they should rest and/or reconstitute, needs to be a part of the overall

readiness evaluation of U.S. forces because of the combination of smaller forces and

higher workloads. The current situation for many units approaches comparison to

CRS-25

combat where fresh units are rotated to the front allowing forward units the

opportunity to rest and to reconstitute.

The services are working to develop new ways to measure stress on units. Air

Force Studies and Analysis (AFSAA), working closely with highly stressed units in

the Air Force, developed the following list of personnel and equipment indicators in

order to evaluate the stress effects of sustained high workloads.

Unit Indicators of High Stress

(Acronyms are defined at the bottom of the list)

Table 2. Indicators of Personnel Stress

Level of Stress Produced

Low

Medium

High

Avg Ops TDY days per year

<90

90-120

>120

Highest TDY AFSCs in Ops

<90

90-120

>120

Avg duty week for Ops*

40-45hrs

45-55hrs

> 55hrs

Avg Mx TDY days per year

<90

90-120

>120

Highest TDY AFSCs in Mx

<90

90-120

>120

Avg duty week for Mx*

40-45hrs

45-55hrs

> 55hrs

Aircrew flying time waivers

0

<5%

>5%

* Includes work done at home such as answering emails, reading reports, etc.

Level of Stress Produced

Low

Medium

High

Statics/Demos/Capabilities per 1 PAA

<2/yr

2-5/yr

>5/yr

Major exercises participation per year

2-3

1

0

Number of personnel NMR

<10%

10-20%

>20%

Aircrew/personnel training waivers

0

<5%

>5%

Delays in upgrade training/qual.

0

<10%

>10%

Avg Specialty experience: officers

>4 yr

4-1 yr.

<1 yr

Avg Specialty experience: Ops enlisted

>4 yr

4-1 yrs

<1 yr

Avg Specialty experience: Mx enlisted

>4 yr

4-1 yrs

<1 yr

Manning of critical Ops AFSC’s

105-95%

95-85%

<85%

Manning of critical Mx AFSC’s

105-95%

95-85%

<85%

CRS-26

Balance of field grade officers assigned*

5-15%

15-25%

5<>25%

Officer Separation rates

<10%

10-20%

>20%

Enlisted Separation rates

<10%

10-20%

>20%

1st Term Reenlistment rates

>75%

75-50%

<50%

* In addition to unit leadership. This may not apply to non-flying units

Level of Stress Produced

Low

Medium

High

Career broadening assignments *

>50%

50-30%

<30%

Selection Rates for SOS

>70%

70-40%

<40%

Pursuing college degrees: enlisted **

>35%

35-25%

<25%

Pursuing advance degrees: officers ***

>50%

50-30%

<30%

Disenrollment from course work

<10%

10-25%

>25%

Field conditions &/or min per diem

TDYs

No

One

Both

* For senior Captains & Majors. Career broadening as defined by Unit leadership. That is, doing

a job in other than one’s specialty.

** Include E-4's and higher

*** % of Promotable O-3's thru O-4's w/o master’s degrees

Level of Stress Produced

Low

Medium

High

Accrued leave exceeding 60 days

0

1-25%

> 25%

Fathers missing child’s birth due to TDY

0

1-3

>3

TDY within 30 days of child’s birth

0

1-3

>3

Taking leave at a desired time period/yr *

100%

99-60%

< 60%

Working Thanksgiving or Christmas **

<20%/1

>20%/1

20%/>2

Family Maltreatment Incidents

0

1-2%

> 2%

* Given 3 “1 week” choices of leave/year, could the member take leave during one of these choices

** Includes New Years. Avg per person for an average tour length of 3 years

CRS-27

Table 3. Indicators of Equipment Stress

Level of Stress Produced

Low

Medium

High

Fix Rate (Code 3 breaks)*

>75%

75-70%

<70%

Avg Delayed Discrepancies per A/C

<30

30-35

>35

Repeat Reoccurrence Rate

<2%

2-4%

>4%

Cannibalization Rate

<8%

8-12%

>12%

NMC due to Supply

<15%

15-20%

>20%

NMC due to Maintenance

<10%

10-15%

>15%

Availability of Depot Support

<1 mos

1-2 mos

>2 mos

Delay of Major Upgrades

<3 mos

3-6 mos

>6mos

Delayed Scheduled Inspections

0

1-5

>5

Delayed Depot Inputs

0

1 A/C

>2 A/C

Spare Engines per Mobility Package

>2

1

0

* Code 3 means an aircraft is not fully mission capable

Notes:

“Ops” refers to individuals who operate or support the operation of aircraft.

“Mx” refers to maintenance personnel who prepare, repair, and maintain aircraft.

“TDY” refers to “Temporary Duty” or days away from home.

“AFSC,” Air Force Specialty Code, refers to one’s career field.

“Statics/Demos” are requirements to take airplanes to airshows and open houses

“PAA” is “primary aircraft assigned,” so that 24 PAA means that a unit owns 24

mission aircraft.

“NMR” and “NMC” stand for “Non-Mission Ready” for individuals and “NonMission Capable” for aircraft (A/C) respectively, and indicate those not available

for combat operations.

“SOS” is “Squadron Officer’s School;” the career-enhancing professional military

education for Air Force Captains.

A New Readiness Paradigm Emerging

For most units, high levels of OPTEMPO/PERSTEMPO are currently brought

about by the combination of the military drawdown and the unanticipated rise in

peacetime obligations. A DoD-wide system for measuring OPTEMPO/PERSTEMPO

was never previously undertaken. The strategic focus of the Cold War worked to

minimize the current problem. The military capacity of the Cold War era, which was

usually large enough to minimize detrimental impacts of unit operations and repetitive

personnel deployments, obviated the need to measure OPTEMPO and PERSTEMPO.

In addition, units with high deployment rates spent a significant portion of their time

away from home training and exercising their primary capabilities. The resulting

CRS-28

common understanding that high unit activity equated to high readiness reflected the

reality of the time. Today’s emerging reality reflects fewer forces engaged in a wider

variety of missions at a time when resources are constrained. With today’s missions,

high unit activity does not necessarily equate to high readiness and may, some assert,

be detrimental to readiness for combat. As understanding of current experience

increases, measurements of OPTEMPO, PERSTEMPO, and their effects, while not

yet sufficient, are improving rapidly.

Counting Capability: The Best Way to Assess Capacity

What can we do with the forces we have available? And

What part of our capability is not currently available? These are difficult

questions to answer under the current approach to understanding OPTEMPO,

PERSTEMPO, and readiness. By counting only the number of personnel deployed,

and by making distinctions between deployments, operations, exercises, and other

duties, the total effect on U.S. forces is not apparent. Any activity that takes service

members away from their units affects, to some degree, that unit’s capability. Any

sub-unit removed from a larger unit, has a significant impact on the larger unit’s

capability to execute its assigned mission.

It is important to capture the ebb and flow of U.S. capacity to execute warplans

and to sustain military strategies; a system that indicates current U.S. capacity to

perform military assignments, which is dynamic, is needed. The current system

indicates only the readiness of forces postured for static warplans and not whether

those forces can effectively sustain the planned operations. To do this, some senior

military officers interviewed for this study suggest referring to any activity that takes

a unit away from home station as an “Operation.” Since the effort that goes into

planning, executing, and returning from these events is akin to that for operations, and

since the unit is “not available” while off station, classifying activities in this way

yields meaningful data. The smallest unit that should be assessed in this way is also

the building block of military capability; the unit that can operate as an independent

entity.

Battalions, squadrons, and ships. These officers suggest counting Army

battalions and Air Force squadrons deployed to “operations” as the measure of

commitment and the indicator of capacity. The “building block” units would report

as preparing to deploy, deployed, recovering from deployment, ready, or non-mission

capable. Since the services have a finite number of battalions and squadrons, this is

a quick indicator of the “Status of the Army” or the “Status of the Air Force” and is

akin to the Navy’s daily reporting on ships. In addition, “cannabalized” units, that is,

units that were required to provide assets to another deploying unit might be listed as

“non-mission capable.”

Estimating time and effort to extricate and redeploy as C-1. One of the key

assumptions of the Bottom Up Review was that units involved in peacekeeping,

humanitarian operations and exercises could be quickly extricated and redeployed to

combat. The experience of the last five years, coupled with known limitations of

strategic lift assets, indicate that taking a unit out of Bosnia, for example, and directly

inserting it into a combat environment is not as simple as previously suggested. The

CRS-29

degradation of combat skills is the most significant limiting factor in this approach.

The time required to regain high combat status prior to re-engaging in operations

should be a key consideration in estimating U.S. capacity to execute warplans.

Therefore, counting forces off-station in terms of the smallest effective

independent combat element, that is, battalion, squadron, or ship, and realistically

evaluating the time required to return the unit to combat-ready status following its

redeployment, assuming it can be objectively and soundly done, is considered to be

an improvement over simply reporting a “snapshot” of personnel, supplies, and

training under SORTS. This approach, similar to the Navy’s, takes into account the

vagaries and uncertainties involved in fast-paced operations.

Why OPTEMPO Is High

The causes of high OPTEMPO are numerous. The drawdown of U.S. forces

and the necessary demands of maintaining a force ready to fight two Major Regional

Contingencies (MRC), which includes a demanding exercise schedule, are significant

challenges but were foreseen by defense planners. The increased length, size,

intensity, and complexity of recent military operations other than war (OOTW), and

the military’s expanded role in carrying out the National Security Strategy were

unforeseen at the time of the 1993 Bottom-Up Review and have combined to drive

OPTEMPO and PERSTEMPO well beyond envisioned levels.

Overseas presence down = fewer forces for more tasks. The reduction of

overseas presence requires fewer forward-based forces to perform more tasks thereby

raising both the workloads on the forces and the costs of the operations. CONUSbased forces must travel farther and longer to reach deployment areas. Of the 674

Army facilities closed world-wide since 1989, 593 were overseas. U.S. Air Forces

Europe (USAFE) reduced from 16 main and 37 minor operating bases to 6 and 14

bases respectively. Nine USAFE fighter wings totaling 636 aircraft were reduced to

3 wings with 168 fighters total. Commensurate personnel reductions from 62,000

down to 27,000 were made while the U.S. Army now counts only 125,000 soldiers

in Europe, Panama, and the Pacific combined. Naval and Marine Corps contributions

to ongoing operations are usually included as part of pre-planned deployments. Here

too, PERSTEMPO complications arise when forces returning from duty are quickly

returned to deployed-status for new operations.

Specifically, concurrent complex operations continue to challenge the Pentagon;

among them are operations in Bosnia, extended 18 months to June 1998 and perhaps

longer, northern and southern Iraq, and counter-drug operations. At the same time,

the increased use of military forces in support of the Clinton Administration’s

National Security Policy of Engagement has contributed significantly to the increase.

For example, Partnership for Peace (PFP), the engagement of the countries of central

and eastern Europe along with those of the former Soviet Union, has entailed a

significant increase in commitments of U.S. forces to bilateral and multilateral

exercises and international events. PFP builds closer relations and the ability to work

together with NATO by committing military forces to combined exercises, military

exchanges, and international training. Events are held as far east as Kazakstan in

Central Asia to Norway in the north and Spain in the south. USAFE’s participation

in PFP in 1996 totaled over 400 such instances, up from only 65 in 1993. Army

CRS-30

forces in Europe face an even tougher PFP challenge as ground participation requires

more coordination and a greater commitment of resources. In addition, dividing units

for these small “exercises” interrupts their training schedules.

Exercises, as illustrated in Figure 7, are a key aspect of the military readiness

program and therefore, consume a large amount of time and resources. At the end

of the Cold War, the Joint Chiefs of Staff maintained a comprehensive five-year

exercise plan which, during the drawdown years, was not appreciably altered to

account for the reductions in available forces. This schedule, planned to exercise a

global-war-based force, contributed to high OPTEMPO and PERSTEMPO.

Recently, DoD has taken significant steps to lessen the strain of exercise demands by

reducing the number of exercises, combining similar exercises, and eliminating some

redundancies. Work still needs to be done on managing the force requirements of

regional Commanders-In-Chief as they plan their annual readiness exercises in order

to balance these demands with the requirements of an expanded foreign policy. While

exercises are a large part of current operations, they are within the control of DoD;

many real world operations are less so.

CRS-31

Figure 7. Combat Air Force (CAF) training exercises in the U.S. and the decreasing number of FighterWing Equivalents (FWE) on the same chart. (COPE THUNDER is held in Alaska) The number and type of

exercises contribute to OPTEMPO. Source: Air Combat Command.

CRS-32

Some critics of the President attribute the Clinton Administration’s willingness

to use military forces in an ever-widening range of operations to a combination of

available military competence and White House inexperience (the experience of

Secretaries Perry and Christopher notwithstanding). This view holds that the new

administration, beset by international crises and determined to pursue a domestic

agenda, “discovered” that the military was a highly efficient and very successful

organization that would “carry out orders.” Despite a “professed aversion” to the

military, the pace of international events, coupled with a general disinterest in them,

led to quick action to “send in the troops.” Initial successes led to even more use of

U.S. forces as the administration learned the political value of “keeping a lid on

events.”

Others see the increased use of military units in peacekeeping and humanitarian

operations as the natural outgrowth of victory in the Cold War. This view holds that

intervening to prevent or contain conflict is wiser than waiting for conflict to grow

and that the moral imperatives of preventing starvation and genocide outweigh the

actual costs. While still others see a U.S. military force that is supported more

substantially with resources than any other in the world, that does not face a large

critical threat, and see no reason to protect it from useful proactive employment.

Regardless of perspective, the military itself is also responsible for the increases.

Military culture and military imperatives are contributing factors in high levels of

OPTEMPO and PERSTEMPO.11 The statement “We never met a deployment we

didn’t like” is indicative of the military’s willingness to “fight any foe, bear any

burden”. The can-do attitude of the military culture prevents many in the services

from demanding relief from excessive tasking. Further, careerism, especially in the

command structure, may inhibit ambitious officers from turning down additional work

no matter how valid the complaint. Competition for resources within and between the

services can contribute to military “volunteerism”. The business adage, “you get what

you reward” holds true in the military and the military rewards operational success.

The need for decisive victory is an oft re-learned military lesson that compels

commanders to maintain the best capability against potential adversaries and to

engage with the most forces possible. The military culture contributes to high

OPTEMPO/PERSTEMPO. Given direction, the military culture can work to lower

it.

The changing nature of military operations. Increased use of the military in

the post-Cold War era entails more than just the number of major operations involving

U.S. forces. The nature of post-Cold War operations has changed as these efforts

tend to be larger, more intense, more complex, and of longer duration (See figures 8

through 12) In addition, many of these large, complex operations are running

concurrently in widespread locations creating new challenges for all aspects of

military operations. An internal Air Force study describes the context of the new

environment:

The increase in demand for USAF assets and personnel has come at a time when

USAF inventory, personnel, operating locations, and budgets have experienced

11

GAO Report Nos B-271135 and GAO/NSIAD-96-105. April 8, 1996. page 11

CRS-33

dramatic downsizing. The USAF aircraft inventory has declined 31 percent during

the past five years. USAF active uniformed personnel have also steadily declined

since 1990, from 535,233 to 400,409 in 1995, while personnel permanently based

overseas have decreased at a faster pace, almost 40 percent since 1990 - most of

these reductions from forces based in Europe, which have fallen from 63,000 to

27,000 in the last six years. Even with DoD wide resources falling nearly 13

percent since 1989, USAF budgets have declined nearly 22 percent over the same

period. Taken in sum, this increase in operational tempo against the backdrop of

declining inventory reveals a three-fold increase in the intensity of USAF

operations since 1989.12

Figure 8: Intensity of USAF operations is increasing due

to increased commitments and a reduced number of

aircraft..

12

Final draft of “Today’s Air Force: The Use of Air and Space Power Across the Spectrum

of Peace and Conflict” prepared by DFI International, January 1997. Includes Figures 8, 9,

and 10.

CRS-34

While the intensity and duration of events are increasing, Figures 8 and 9, the total

number of overseas events is decreasing, Figure 10, due to the inability of forces

engaged in operations to conduct large-scale exercises. This makes sense as more

forces are tied up in operations for longer periods, less time and fewer resources are

available for training exercises. Figures 11 and 12 show specific examples of these

trends.

Figure 9. Operations involving USAF assets are

becoming longer

CRS-35

Figure 10. As commitments to operations increase and

lengthen, total number of events and participation in

exercises decrease

Why High Optempo Is a Problem

The cumulative effects of the post-Cold War drawdown coupled with an

increased use of the military in a greater range of international crises has led to a

sustained high level of operations for many units and critical personnel. In the past,

large military forces provided the capacity for the U.S. to engage in operations other

than war with little degradation to readiness or effectiveness. Minor commitments

were met using a large pool of resources so that most units did not suffer the effects

of repetitive deployments or continuous interruptions to their training cycles. Now

with the capacity of the global-war-based force diminished, the continuing use of

forces dedicated to the National Military Strategy in operations other than war

(OOTW), that is, in operations other than those for which they are organized, trained,

and equipped, may be hampering DoD’s ability to execute its short and long-range

plans and programs in support of its many fixed obligations.

However important operations other than war may be to U.S. security in the

post-Cold War world, a sustained high tempo of military operations may have

detrimental affects on short-term readiness and long-term military effectiveness. For

CRS-36

example, temporary reductions in readiness, temporary loss of finely-honed combat

skills, increased depreciation rates of some military hardware, and delays in

modernization and acquisition programs can all be tied to a higher than planned rate

of activity. Units returning from deployments often require extensive periods to

recover their pre-deployment level of readiness. The 1st Armored Division, upon

completing its Implementation Force (IFOR) duties in Bosnia was put on a 100-day

recovery program by its commander.13 In this case, the ability to maneuver as a

complete unit and to coordinate its maneuvers with other large ground forces, was the

essential task in which it was the least proficient. Air Force pilots attending Red Flag

exercises following long peacekeeping deployments are showing reduced abilities

compared to their “stateside” counterparts. After each deployment, Marine

maintenance units are working significantly harder and longer to maintain their aging

equipment. This higher than planned rate of activity has interrupted and may continue

to interrupt the funding streams for other DoD programs as the Pentagon is forced

to pay for unplanned operations from existing accounts.

As the capacity to absorb these unforeseen operations is reduced, competition

for resources within DoD and within the federal budget will increase. There is

concern that long-term, the cumulative stress associated with open-ended operations

may lead to chronic and insidious problems such as declines in morale and retention.

These declines would increase costs as replacements must be recruited and trained.

For example, to replace a combat-ready pilot with 8 years experience, costs, on

average, $4.3 million and takes several years. Other problems are reductions in

overall proficiency and experience levels, delays in routine and depot maintenance,

depleted or dislocated logistics, and premature fatigue in some weapon systems.

Replacing weapon systems sooner than planned can lead to major disruptions in longterm acquisition strategies.

Congressional understanding key to successful innovation. Congress is

keenly interested in the readiness of U.S. forces, in the quality of life of U.S. military

personnel, the size and shape of the military’s forces, and in the annual review of the

defense budget. OPTEMPO/PERSTEMPO issues facing all the services have

significant implications in these areas. Congressional action on key military issues can

either positively or negatively affect the armed forces’ capacity to sustain its current

pace. A clear understanding of the new dynamics of operating the Department of

Defense with smaller forces and budgets and increasing demands is a key focus for

Congress and the debate on the Quadrennial Defense Review.14

13

From a speech by Major General Nash, commander of IFOR and the 1st Armored Division

to the NATO-Russia IFOR Lessons Learned Conference, April, 1997.

14

For a further discussion of these issues, see Goldich, Robert L. and (name redacted),

Defense Policy: Threats, Force Structure, and Budget Issues. CRS Report 96-729 F,

Updated September 9, 1996.

CRS-37

Figure 11. Decreasing end-strength and increasing deployments by personnel. Source: Air Combat

Command

CRS-38

Figure 12. Increasing commitment to overseas operations by Air Combat Command Forces. Source: Air

Combat Command

CRS-39

Maintaining a Viable Force

Continuity in Training. A key to the long-term well being of U.S. forces is

continuity of training. Too high OPTEMPO/PERSTEMPO has implications for

military effectiveness in that it interrupts individual and unit training cycles. In order

to maintain a force capable of meeting the demands of high-intensity combat, the

individual military services develop short and long-term training and exercise plans for

their forces. At the same time, they blend these requirements with their peacetime

commitments around the world. The services budget to pay for these ongoing

training and exercise activities as well as to develop and acquire modern equipment

to replace existing systems. All of these requirements are planned for and

programmed into the Defense Budget. Forces not engaged in required training,

exercises, or ongoing commitments are available and can engage in other activities

with little detrimental impact on their readiness. Unplanned operations or other

activities that repeatedly interrupt the training cycles or that reduce the time available

to maintain combat readiness, can have adverse effects. In other words, there are

minimum resources and a minimum time required for basic military preparedness so

that units may retain the capabilities required of them. For many units, the minimums

established by their services are not currently available.

A comparison of Figures 13 and 14 (below), provided by the Air Force’s Air

Combat Command (ACC), shows the effect of high activity levels on unit training

time. Figure 13 shows the planned 160 days for readiness training while currently,

there may be only 80-120 days available. Figure 14 shows the effect of unplanned

additional contingency days and exercise days. These additional contingency and

exercise days violated the Air Force’s own 120-day limit resulting in 136 days “off

station”. Figure 14 shows the added burden of inspections and local exercises which

reduces the actual training days available number to 80-120 days. “Surge days” are

those days when a unit flies almost double its daily flying load in order to “catch-up”

to either its flying-hour requirements, its training requirements, or to make up for

flying lost due to inclement weather. These days are an extra burden on maintenance

crews and minimize the time pilots have for thorough preparation and post-mission

analysis and therefore are not suitable for in-depth combat training. “Productivity

days” are days off accorded by the commander for meeting flying goals. These down

days are an important part of a unit’s rest/recovery cycle and are used as a positive

motivator by operational commanders.

CRS-40

Figure 13. Theoretical annual schedule of an Air Force F-15 squadron given a deployment commitment of

120 days per year. A comparison of figures 13 and 14, provided by the Air Force’s Air Combat Command

(ACC), shows high activity levels reducing available unit training time.

CRS-41

Figure 14. Unplanned additional contingency, exercise, inspection, and local exercise days reduce the

number of actual training days available to 80-120 days indicating that both external and internal factors

contribute to high OPTEMPO and PERSTEMPO. Source: Air Combat Command

CRS-42

Bottom Line: Sustaining a high operational tempo difficult. In theory,

peacetime militaries can only sustain a finite level of activity beyond that required to

maintain military readiness and effectiveness through training, exercises, and

maintenance. High activity beyond this sustainment level can be “surged” for short

periods with little detrimental affect; however, engaging in lengthy activities not

related to preparing themselves for their primary missions diminishes the involved

units’ capacity to fulfill their assigned responsibilities. Over time, the cumulative

affects of lost training time, missed exercises, unprogrammed expenditures, and

extended deployments degrade the overall capability of the force. In practice, U.S.

military forces, with innovation and dedication, have risen to meet these near-term

challenges; yet, there is growing concern that long-term problems may result if

today’s obstacles are a result of a fundamental mismatch of resources and

requirements.

Value of Monitoring OPTEMPO/PERSTEMPO

High OPTEMPO/PERSTEMPO then, may provide some indication that U.S.

forces may be exceeding their designed capabilities in some areas and failing to meet

their planned objectives in others. Understanding OPTEMPO/PERSTEMPO does

not provide insight into the validity of either the current two-MRC strategy or the

policy of pursuing broader military engagement in the world at-large. Understanding

OPTEMPO/PERSTEMPO may, however, indicate whether or not U.S. forces are

reasonably capable of meeting current and proposed obligations and in what areas

change and/or innovation may be required.

OPTEMPO/PERSTEMPO and the QDR. The key OPTEMPO and

PERSTEMPO-related questions in the debate on the Quadrennial Defense Review are

a) whether or not the armed forces of the United States are sufficiently structured and

prepared to meet the requirements of the National Military Strategy, b) whether or

not the current requirements levied on the armed forces are too high, resulting in

substantial implications for what the military strategy should be. Measuring

OPTEMPO and PERSTEMPO and comparing those measurements with other factors

like readiness levels, personnel retention statistics, and unit evaluations will give some

indication of what level of activity U.S. forces, as currently postured and engaged, are

capable of sustaining.

CRS-43

Current Trends15

The Chairman of the Joint Chiefs of Staff, General John Shalikashvili gave the

following testimony before the House National Security Committee in February of

1997:

One of the strategic consequences of the post Cold War period is that the U.S. has

been able to reduce military force levels. Since 1989, the active all-volunteer force

has been reduced by 700,000 people — about a third of the active force. The

Army has gone from 18 active divisions to 10, a 45 percent reduction; the Navy

from 566 ships to 352, a 38 percent decline; and the Air Force, from 36 to 20

fighter wings, down 45 percent. These are the lowest force levels since before the

Korean War. The Defense Budget has also been cut by about 40 percent since

1985. In FY98, it will represent only 3.0 percent of the Gross Domestic Product,

the lowest since before World War II.16

In addition, Marine Corps end-strength was reduced by 12 percent. Table 4

below summarizes the drawdown.

The armed forces are much smaller but are more operationally active than their

Cold War predecessors. Since the fall of the Berlin Wall in 1989, America has

committed forces to nearly 40 crises. Operational deployments increased 300 percent

over Cold War levels. At the same time, the size of the military has been reduced to

pre-World War II levels. On average, the last ten years have seen a more than onethird reduction in the size of U.S. forces. Since 1986, the Air Force alone downsized

36 percent and reduced overseas presence by 40 percent. The combined result of

smaller size and increased activity is illustrated by the following: in 1993, the Air

Force deployed 28,900 of its 441,533 personnel; by 1996, the figures rose to 63,000

of 385,000, a 118 percent increase. While this number reflects a small percentage of

the total force, it is a significant percentage of those forces capable of deploying.

Unfortunately, statistics indicating the number of deployed individuals as a percentage

of those available to deploy are not tracked by DoD. However, on any given day, the

Army estimates 35,000 soldiers are deployed up from 21,500 in 1996. Other military

obligations contribute to higher PERSTEMPOs. While the average number of

15

Some have drawn an analogy between the current situation facing the U.S. military and a

major league baseball team battling in the playoffs. The games are very close, most are

extending into extra innings, some, well into the night, and the players, stressed by the travel,

the interrupted schedules and the intensity of the competition, are getting tired and may be

losing focus. Now, not knowing if they’ll be in the World Series or not, the manager is using

starting pitchers in relief on two days and even one day rest because nobody remembers who

comes in second. Should the team make it to the World Series, no one knows if they’ll be

ready...but, what’s the point of having an expensive team if you’re not going to use it?

The challenge facing QDR planners is how to rest the team, practice fundamentals,

retain enough good players to be a contender, and play a 162 game season, when revenues are

down, when free agency is tugging at the best players, when the season has been compressed,

and overseas franchises have been added to the league.

16

Statement of General John M. Shalikashvili before the House National Security Committee,

February 12, 1997.

CRS-44

steaming days per quarter has shown only a slight increase in the Navy, this result was

achieved through aggressive management and reduction of training days at sea.

Although these days are projected to remain stable, the Navy budget projects

exceeding deployed OPTEMPO limits through FY 1999 based on projections in

support of current contingencies (See Figure 15). The likely trends for all services are

upward (See “Future Trends in OPTEMPO/PERSTEMPO on page 53).

Table 4. Force Structure Drawdown

Army

Navy

Air Force

Marines

Cold War

18 Divisions

566 Ships

36 Ftr Wings

3 Divisions

1997

10 Divisions

352 Ships

20 Ftr Wings

3 Divisions

Change

-8 Divisions

-214 Ships

-16 Ftr Wings

-0 Divisions

45%

38%

45%

12%

% Decrease

Note: Marine Corps reductions occurred in manpower not in force structure.

Current pressures may be creating trends toward innovation thereby helping

DoD come to grips with the new realities of the post Cold War era. In many cases,

the pressures involved in doing more with less have led to innovations and “new

thinking” in the deployment of forces and in planning for modernization. Increased

use of reserve component forces, new training methods and priorities, cross leveling

requirements in order to “share the load” within and between the services are all

enabling DoD to meet current demands. The Air Force’s creation of an Air

Expeditionary Force and its development of a doctrine for its use are born out of the

necessity of the day. Some observers suggest that the necessity of meeting today’s

demand has accelerated reform with DoD and the military departments. Coupled with

budget-constraints, the push toward innovation in all areas may be, in the end, of

tremendous benefit to the country.

A Conceptual Framework: Decreasing Size vs Increasing Workload

Smaller forces, increased commitments equal higher workloads.

Conceptually, reducing the workforce while increasing the commitments, even with

the addition of management efficiencies, will result in higher per capita workloads.

At the point that higher workload would begin to diminish returns is generally

considered the point of maximum efficiency. According to the Chief of Staff of the

Army, General Dennis Reimer, the Army reduced manpower by 36 percent while

increasing deployed operations by 300 percent. In this case, the combination of

personnel reductions and mission increases results in a purely mathematical 625

percent increase in workload. The reduction of personnel alone, without an increase

in the workload, nets a per capita increase of 156 percent. The reduction of force

structure by 45 percent, without an increase in the workload, in both the Army and

the Air Force equals a 185 percent increase. These theoretical increases alone would

require substantial commitments to reform, restructuring, and innovation. The

addition of a significant and sustained level of operational deployments and

international exercises without additional resources compounds the dilemma. Gone

CRS-45

unchecked, such increases would be unsustainable. The difference between the

mathematically increased workload and the actual workload can be attributed to

management efficiencies, reorganizations, increasing the workload on individuals and

units, depleting surplus accounts, and other actions that ensure the services can

accomplish their requirements with the forces they have. One indication of the actual

increase in workload is PERSTEMPO. In testimony before the Congress, the Army

estimates that its officers and senior non-commissioned officers from deployable units

spend 180-190 days away from home annually, while junior soldiers spend 140-155

days away. Understanding how the Army and the other services absorbed the

increased load during the drawdown to reach today’s level of effort is essential to

planning for the future. This analysis raises the question: What has DoD stopped

doing, what is DoD doing less of, and does doing less compromise readiness?

Table 5. Estimated PERSTEMPO Days Annuallya

Army

Deployments

Only

Operational

Units:

140-155

Jr Enlisted

180-190

Sr

NCO/Officer

Target

Avg 146b

365

120-150

Air Force

Marines

<120 days

By policy,

not more

than 182183 days

All duty

Korea

Navy

except U-2 (148),

RC-135RJ (148),

A/OA-10 (146),

F-16L (136),

F-16GP (135),

HC -130 (121),

HH-60G (120)

177 Atlantic

159 Pacific

181 Cbt Spt

By policy, not

more than

120 days

TDY

365

50% over

past 3

years at

home

120

Deployments

should not

exceed 6

months

a

This table was compiled from data presented in testimony to the House National Security

Committee during hearings from February to March 1997 and from data provided by the office

of the Deputy Chief of Staff for Personnel, Headquarters, United States Air Force.

b

Based on an average turn-around ratio of 2.6-2.4:1 reported by the Navy staff

CRS-46

Figure 15. Ship steaming days per quarter deployed and non-deployed 1971-1999. Fluctuations from the

goals reflect real world operations, FY 1996-FY 1999 levels for known contingencies. Source: FY 1998/FY

1999 Department of the Navy Budget.

CRS-47

What is the percentage of troops involved in current operations? The

percentage of deployable combat and combat support forces committed to operations

may be higher than estimated by DoD. These are the forces whose readiness is

measured and reported. Many DoD officials and outside observers, however,

continue to define the size of current commitments as a percentage of DoD

endstrength. To get an accurate picture of the impact on U.S. capabilities, it is

important to exclude the portion of DoD that is not eligible or qualified to engage in

current or combat operations when gauging the importance to U.S. defense interests

of current obligations. According to GAO, quoting Army officials, only 63 percent

of 495,000 Active Army soldiers are in combat or combat support units and therefore

are eligible to deploy17. Also, calculation of this percentage should be based on the

explanation of Army operations and readiness officials who estimate that for every

unit deployed, one more is preparing to deploy, and one is recovering from

deployment. In addition, one more unit is used to provide personnel and resources to

the deploying unit. The result is that, at times, as much as a 4-1 ratio of units/soldiers

can be involved or affected by deployments. In May 1997, the Army estimated

35,800 soldiers deployed (not including those on assignment without their families to

Korea) of which, 7,500 were from the reserve components. Therefore, 63 percent of

495,000 divided into 4 x 28,300 = 36.3 percent of the Active “deployable” Army was

committed to and/or affected by deployed operations. The addition of the 27,500

soldiers deployed to Korea to the 4 x 28,300 nets a 45.1 percent of the active

“deployable Army” currently engaged in supporting operational deployments.

Whereas, 35,800 divided by the total FY98 authorized “Total Force” end-strength of

1.1 million nets a mere 3 percent and it is 6 percent of the active Army of 495,000.

Bosnia and Korea are sizable operations for the Army. U.S. Army Europe

maintains two active Army divisions. The SFOR commitment in Bosnia requires one

complete division staff and almost 8,000 soldiers. To keep this commitment, the

Army must obligate key elements of 3 divisions to the effort; more than is available

in the two stationed in Europe. As stated, when the 1st Armored Division was on a

100-day recovery program, the 1st Infantry Division was in Bosnia, and the follow-on

forces for the troops currently in Bosnia were beginning to prepare. Rotations to

Korea, in PERSTEMPO terms, that is, to keep individual PERSTEMPOs

manageable, affects enough soldiers to man 3 divisions (See “Korea” below). These

two commitments can involve a significant portion of the Army’s 10 divisions.

Regional exercises also require a significant commitment. The Army at certain times

can find itself long on commitments and short on forces.

The other services are also significantly affected by current operations. Air

Force readiness officials estimated that as of May 1996, 13 of 20 Fighter Wing

Equivalents were required to support current operations. Therefore, 65 percent of

the combat fighter force was committed in some way to ongoing missions. The Navy

and Marine Corps routinely have 30 percent of their forces “deployed” at sea with

another 20 percent of the Navy “underway” at sea which means that on any given day,

50 percent of the Navy’s ships are at sea. These rough estimates support the assertion

of some DoD officials that the level of effort for all ongoing contingencies is

17

GAO Report NSIAD-97-66. “Force Structure: Army Support Forces Can Meet TwoConflict Strategy With Some Risks.” February 28, 1997. p. 19.

CRS-48

equivalent to fighting one major regional contingency. Forces permanently stationed

overseas can, as in the case of Korea, be considered as involved in current operations.

The large number of forces involved is both problem and solution. Reducing the

number of fighter wings involved in operations would probably raise the OPTEMPO

above their 120-day ceiling, lower the readiness, and increase the time required to

recover. The services are balancing the load across the entire force which means more

forces are used to keep OPTEMPO within reasonable limits. The expeditionary Navy

and Marine Corps, which support current operations with their forward deployed

forces (e.g. in the Indian Ocean and the Mediterranean Sea), were designed to keep

OPTEMPO and PERSTEMPO within limits; however, increased activity and reduced

resources are affecting their forces too.

Korea: Compounding the PERSTEMPO problem for individuals. For the

36,000 Americans serving in Korea, roughly 95 percent do so without their families.

Assignment to Korea, with a minimum tour-length of one year, guarantees a service

member a statistical PERSTEMPO of 365 days. Selection for Korea duty is without

regard for one’s previous PERSTEMPO level. A soldier coming off the annual Army

operational average of 140-150 days per year away from home ends up with a twoyear average of 255 days away from home when returning from Korea. Assuming

that the same soldier is reassigned to an operational unit following Korea, the threeyear average would equal 218 days per year. For officers and senior NCOs, the twoyear average would be 275 and the three-year average, 245. By comparison, the

Navy policy of 50 percent of one’s time spent at home over three years results in a

182 day maximum annual average.

An example: What it takes to keep within tolerable limits. The figures below

illustrate the requirements of a high OPTEMPO environment. The Air Force’s “Rivet

Joint” electronic surveillance aircraft, which is a “Low Density/High Demand”

(LD/HD) asset, that is, an aircraft of which there are few but for which there is great

demand, has significantly increased its workload since Desert Storm. As illustrated

in the following charts, in order for the Air Force to meet its stated requirement to

keep PERSTEMPO below 120 days per year, it must increase the ratio of aircrews

to aircraft. Figure 16 shows that prior to Desert Storm, mission requirements meant

that 19 crews would keep the tempo below the threshold. At that time, the unit had

22 crews. Following Desert Storm, the increase in mission requirements raised the

number of aircrews required to maintain the PERSTEMPO threshold at or below 120

days to 26 fully-trained, mission-ready aircrews. This 27% increase in assigned

aircrews would require the Air Force to take aviators from another resource or to

train more aviators causing either a potential shortfall for the losing units in the first

case, or a reduction in aircrew experience levels in the second; either way, the move

would increase costs. In addition to adding aircrews, maintenance and support

personnel would need to be added to assist in managing the extra flying load on the

unit. This example of a unit in extremely high demand shows both the dramatic

increase in mission requirements and the significant actions required, in this instance,

to bring the workload back within tolerable levels.

CRS-49

Figure 16. Number of airborne surveillance crews required to meet requirements prior to Desert Storm.

Source, Air Force Studies and Analysis

CRS-50

Figure 17. Increase in crew requirements required to keep airborne surveillance PERSTEMPO below the

Air Force goal. Source, Air Force Studies and Analysis

CRS-51

“It’s NOT war” — Home Station Hurt. The higher than anticipated use of

U.S. forces and the associated effects are not limited to deployed units. The forces

involved in operations are not the only ones experiencing higher than normal activity

levels. Headquarters staffs are pressed, in some cases severely, by the combination

of ongoing operations and other international obligations. Headquarters personnel

deploy to many locations in support of operations leaving their colleagues

undermanned at a time when work requirements are highest. This is an example of

“home-station hurt,” a phenomenon whereby the depleted manpower at home is

forced to accomplish 100 percent of the routine tasks in addition to the ongoing

support tasks required by the deployments. This phenomenon is not limited to

headquarters and other small staffs. Bases from which troops deploy, and any units

which send personnel suffer some level of “home-station hurt.” In these cases, the

OPTEMPO and PERSTEMPO of the non-deployed personnel increases as well. The

increase, measured in longer work hours and other indicators of personnel stress,

may also have detrimental affects on unit morale and individual and unit effectiveness.

The non-deployed forces do not receive the additional pay, medals, and positive

reinforcement as their deployed counterparts yet work extended hours in support of

the same commitments and more. Further, when it’s time for those affected by

“home-station hurt” to deploy, many do so in a degraded capacity due to their already

high activity levels. This aspect of high OPTEMPO and PERSTEMPO can be a

significant factor in morale and should be considered in policy decisions affecting

OPTEMPO and PERSTEMPO.

Trends in retention and reenlistments. The trend toward greater use of

military forces has sharpened the focus on readiness and retention. Former Secretary

of Defense Perry made readiness and quality of life issues his priorities during his

tenure in order to avoid the pitfalls of a hollow force. While concerted action has

ensured at least short-term stability and an acceptable level of readiness, many

analysts point to signs of cracks at the fringes of effectiveness. In testimony before

Congress, service personnel chiefs continue to warn of impending problems with

retention and re-enlistments. Statistics show no immediate declines; still personnel

officials, who base their views on surveys of and discussions with military members,

anticipate future declines because current statistics are historical, not predictive. Air

Force pilot retention and pilot willingness to accept bonuses for continued aviation

service are both dropping. In FY97, only 32 percent of eligible Air Force aviators

accepted a pilot bonus to continue their service. Army recruiters are seeing evidence

of the public’s perception of too numerous deployments.

Pentagon Efforts: Protecting long-term military effectiveness

The Pentagon is aggressively tackling OPTEMPO issues within its purview. The

Global Military Force Policy (GMFP) established a mechanism to provide relief to

overworked units. Under this policy, Commanders-In-Chief cannot, without the

Chairman’s adjudication and the Secretary’s concurrence, use forces that have already

exceeded their time allocated to non-readiness related activities. This policy is

designed to give “Low Density/High Demand” units a break from near-continuous

operations. Although this policy has had success, it has limited application. The

policy does begin to address DoD’s chief challenge in managing OPTEMPO: How

does the Pentagon “Just Say No”?

CRS-52

An example: Air Force Global Sourcing. To reduce the excessive burden on

heavily tasked units, European-based forces for example, the Air Force uses a “Global

Sourcing” policy that fills operational requirements from organizations world-wide.

The graphs in figure 17 below show the effect of “sharing the load;” spreading

requirements over geographically-diverse units.

Both the Global Military Force Policy and the Air Force’s Global Sourcing are

examples of crisis-driven innovation in which the Pentagon finds low-cost solutions

while managing an acceptable level of risk. As high OPTEMPO levels continue, the

necessary prioritization of requirements may lead to other such innovations as senior

decision makers are forced to make choices. Monitoring the burden on units and

individuals should be an important activity while DoD undergoes these transitions.

CRS-53 TDY loads while U.S.-based and Pacific-based

Figure 18. European-based USAFE aircraft have reduced

aircraft have increased their share of the burden of current operations through “Global Sourcing.” Source:

CRS from DoD data.

CRS-54

What Do the Facts Mean? Understanding the Implications

This section explains the effects of high activity levels within the echelons of the

Department of Defense. The cause and effect relationships described below provide

an explanation of the potentially deleterious effects of excessive OPTEMPO and

PERSTEMPO. High OPTEMPO/PERSTEMPO manifests itself in different ways

depending upon the area of focus. Individuals and units face different challenges in

meeting current demands, while the services and DoD have their own unique sets of

problems and responsibilities. Increases in OPTEMPO and/or PERSTEMPO affect

each level differently as do changes in policies and procedures.

At the individual level. High PERSTEMPO means people, while generally

satisfied engaging in military operations, are not able to meet other demands and goals

such as Professional Military Education (PME), specialized training that will enable

them to advance in their careers, and important family obligations. When individuals

believe their goals and aspirations are at risk due to higher than anticipated military

requirements, their willingness to continue in military service diminishes. A sense of

satisfaction comes from being highly proficient at one’s chosen and assigned duties.

Pilots, for example, lose proficiency and motivation, when their combat skills erode

because they were engaging in peacekeeping operations. The high number of

Training Waivers, that is, authorizations to fly without completing requisite training,

granted to pilots by the Air Force is indicative of this decline in capability. In

addition, predictability in their lives is a key factor in maintaining morale regardless

of the pace of operations. Equal consideration should be given to individuals

remaining behind as their PERSTEMPO increases in order to cover the duties of

those deployed. Further, those remaining behind whose PERSTEMPO is elevated,

are often the next to deploy.

At the unit level. High unit OPTEMPO means that the basic building blocks

of military force, if engaged in other than their primary function,18 are generally not

able to conduct some or all of their mission-specific training and exercises, gunnery

qualifications, upgrading and development of combat leaders, joint training with

similar or dissimilar units, maneuver, or most of all, they may not, in some cases,

maintain a level of proficiency that ensures safe and effective military operations.

Supply and maintenance factors are a significant aspect of the units capability that is

hampered by high deployment rates. Soldiers, who may or may not take their

equipment with them on a deployment, are often required to work extensively on their

equipment upon their return further exacerbating both their PERSTEMPO and the

18

Each military unit has a primary mission that may be either combat, combat support, or may

be to support the services in other ways. In addition, some units primary functions are

directly applicable to non-combat operations, some are not. Tailoring forces for “national

security” non-combat missions is one option under review in the QDR. Using forces in other

than their primary function is possible and often beneficial to the nation, but it comes at a cost

to the postured capability. Generally, but not always, deployments for combat units degrade

proficiency levels in most key tasks. Combat support units, on the other hand, may engage

fully in their “wartime mission”. Sometimes, as in the case of preparations for Zaire, support

units may be put on short notice alert for extended periods during which time they do not

engage in productive activities.

CRS-55

units ability to organize an effective training schedule. Resupply of units may be

interrupted when supplies intended for one unit are diverted to a unit that is preparing

for a deployment. To maintain unit morale and cohesion that are essential to mission

effectiveness, units must engage in activity that is seen as important, relevant, and

conclusive. The importance, relevance, and significance of unit activity outside their

primary mission should be communicated from the highest levels. Forces returning

from the Balkans were considered by their commander to be in a high state of

personal readiness because of their experiences and to have a high espirit de corps

because of their shared challenges. Although these gains are laudable, the unit was

not considered able to maneuver with other units as required in combat scenarios

solely because of the lack of ample training while deployed.

At the service level. High OPTEMPO/PERSTEMPO and its associated

financial costs, restrict the services’ ability to organize, train, and equip U.S. forces

by extensively interrupting the planned training, exercise, and acquisition cycles with

sustained unplanned operations and significant unprogrammed costs. Short-term

surges that cause temporary interruptions are not a severe problem; however, a

continuously high demand on any military force especially in an era of shrinking

resources, will eventually degrade the skills and capabilities of that force. Services

handle unplanned operations best when provided the latitude to determine the course

of action and the additional resources required to accomplish the mission. A clear

statement of the desired outcome of committing military forces is required to establish

a definition of success. Otherwise, operations become open-ended and begin to run

concurrently, thereby causing prioritization problems for the military services in

allocating limited assets. The resulting requirement to sustain numerous ongoing

operations is a key factor in today’s high OPTEMPO environment.

At the DoD level. As the agent responsible for maintaining a viable force ready

to execute the national military strategy, DoD planners in both the Office of the

Secretary and on the Joint Staff need to monitor readiness levels and wartime

stockpiles closely to ensure the military does not drop below acceptable levels without

a conscious decision on the part of the National Command Authority to do so. The

continuing demands on U.S. forces and any resultant temporary degradation of

capability could result in a condition, in the not-too-distant future, where the desired

U.S. forces may not be available for non-critical operations. At the same time, DoD

is responsible for planning force improvements through modernization and acquisition

programs, resources for which may be put at risk by continuous unplanned

expenditures for ongoing operations.

Future Trends in OPTEMPO/PERSTEMPO

DoD and the military services have taken extensive measures to mitigate the

effects of high OPTEMPO/PERSTEMPO; however, predictions and recent

administration policy announcements portend that OPTEMPO and therefore

PERSTEMPO will remain high. For example, then-Secretary of State Warren

Christopher, just prior to his departure from the State Department, reflected on his

tenure saying that the United States would need to be more, not less, engaged in the

CRS-56

world.19 In order to meet the challenges confronting the United States, the nation’s

leaders must manage the military’s capability, as an instrument of national power, to

prepare to meet both large and small-scale challenges to vital interests and its ability

to deal with important and lesser interests without placing an inordinate burden on the

federal budget. This effort comes within fiscal constraints imposed by efforts

necessary to balance the federal budget. Efforts to reduce force structure further in

order to pay for DoD modernization should be closely examined for any negative

implications for OPTEMPO and PERSTEMPO. If commitments expand and/or force

structure is reduced, the negative aspects of the current pace of operations will be

magnified. With no increases in current commitments and with innovative leadership

and a willingness to accept increased risk, options to adjust OPTEMPO and

PERSTEMPO may well come to light.

In summary, as defined for this paper, unit OPTEMPO is the cumulative result

of operations, training events, field exercises, inspections by higher headquarters, and

other duties which demand the presence and/or attention of the unit; while individual

PERSTEMPO is the sum total of any required activity that takes a person away

overnight such as operations, deployments, training, education, conferences, or

exercises. Operating practices developed during the Cold War that today heighten

OPTEMPO and PERSTEMPO, were not previously a problem because the size of the

force meant fewer repetitive deployments for units and individuals. An

OPTEMPO/PERSTEMPO that is too high over time means that units and individuals,

even if engaging in activities that fall within their assigned responsibilities, are

diminishing their capacity to sustain high intensity operations and meet unforeseen

crises. On the other hand, low OPTEMPO/PERSTEMPO may be an indicator that

a unit’s readiness might be at risk due to insufficient training, exercises, manpower,

or resources or it could indicate a unit that is capable of contributing more to current

operations. High unplanned activity levels reduce the time available for fulfilling

requirements such as training and education, increase the rate at which supplies,

equipment, and personnel are exhausted, and limit the flexibility of forces to engage

on short-notice in higher priority operations. In addition, anecdotal evidence suggests

prolonged high PERSTEMPOs can erode morale and lead to drops in retention and

increases in family problems. The Pentagon is working aggressively to overcome the

challenges presented by high OPTEMPO; however, DoD has little control over the

number and duration of real world operations, the major cause of post-Cold War

increases in peacetime activity.

19

U.S. Secretary of State Warren Christopher in a speech at West Point, October 25, 1996 as

reported on CNN World View.

CRS-57

Key Issues

Overview: Areas of Congressional Concern

Understanding the new dynamics. The pace, scope, and intensity of DoD’s

activities has increased. The defense authorizations, appropriations, and oversight

processes are the key means Congress uses to address global demands relative to

defense resources. To meet the needs of this new era, it is important to understand

the ramifications of maintaining a much smaller, highly proficient military force;

maintaining or tailoring global commitments while withdrawing from overseas bases;

and maintaining readiness to execute major regional hostilities while meeting openended contingencies. To keep this smaller, more expeditionary force in a very active

and highly proficient state, decisions should, when possible, avoid exacerbating the

inherent problems of high OPTEMPO/PERSTEMPO. As pressure to reduce the

defense budget builds, Congress and DoD will examine various ways to reduce costs.

Because OPTEMPO and PERSTEMPO are projected to remain steady or to increase,

reductions based on an understanding of the dynamics of this new defense

environment will be pursued.

Operations and personnel tempos are directly related to budget, readiness and

force structure issues. This relationship is dynamic; further, because tempos are high,

the effects of DoD and congressional action may well be accelerated and amplified.

For units and individuals with the highest OPTEMPO/PERSTEMPO, policy changes

can have an almost immediate affect. The consequences of delayed supplemental

appropriations for operating costs, or exercise cancellations, or addition of unplanned

deployments, for example, can be magnified in the most highly stressed units.

Increased appropriations, if targeted toward replacing resources expended for

contingency operations, can have an immediate impact on reducing the affects of a

high operational tempo. Changes in force structure without assignment reductions

can dramatically increase tempos if these changes result in fewer assets available.

Decisions that reduce funding, manpower, or equipment can have immediate tempo

repercussions unless commensurate reductions in unit obligations are made.

Examples of negative effects include: delays in funding can cause significant training

problems in the last quarter of the fiscal year as money for training may no longer be

available; manpower reductions cause turbulence in the personnel system and in the

current structure, which may lead to undermanning of units, causing further training

degradation; aircraft cannibalization is an expedient when equipment and logistic

shortfalls occur, which can reduce the number of combat aircraft available and which

significantly increase the workloads of maintenance technicians. Although

cannibalization practices quickly return some aircraft back to a ready status, the

practice is not a long-term solution. Congressional actions that can enhance the

ability of units to prepare for fast-paced operations include privatization of some base

support functions that now require soldiers to perform duties away from their units;

increased allocations for mobile combat simulators that can accompany deploying

units; and improvements to some general purpose forces that can enable them to

participate more fully or more often in ongoing operations. The dynamic association

of budget, readiness, and force structure with OPTEMPO and PERSTEMPO in this

new defense environment is further outlined below.

CRS-58

Budget Implications

Direct and Indirect Affects. If defense spending is cut, resources are made

available for other functions; for example, education, welfare, transportation, medical

care, public health, and tax reductions. These are the classic decisions that the

Congress is charged to make and it has for decades treated the U.S. armed forces with

relative generosity, providing much and expecting much. In the current dynamic, the

budget has both a direct and an indirect relationship with OPTEMPO and

PERSTEMPO. Understanding this relationship will aid the Congress as it wrestles

with these decisions. Directly, as the amount of activity increases above preplanned

levels so too does the cost. If funding to cover these costs is not appropriated in a

timely manner, DoD “borrows” from other accounts until the supplemental funding

arrives. This delay can and has had repercussions for readiness. Congress has taken

action to minimize delays and now provides funding for ongoing contingencies in

regular appropriation bills, and supplemental appropriations have been timely in 1995

and 1996.20 Indirectly, budget-driven decisions can have adverse affects on

OPTEMPO and PERSTEMPO by reducing seemingly unrelated resources and

personnel, by limiting investments in modernization and acquisition, and also by

delaying action on less time-critical elements of DoD programs that may later, in a

different crisis, restrict flexibility. Indirect positive effects accrue when, for example,

congressional action frees funds and/or endstrength for use in combat and combat

support related functions. The categories of direct budget-related effects to consider

are operations, personnel, logistics, and modernization.

Table 6. Costs of U.S. International Peacekeeping Commitments

FY1992-1996

(in millions of dollars)

FY 1992

FY 1993

FY 1994

FY 1995

FY 1996

Total

Current

Year $

462.2

1,925.1

1,692.9

1,894.1

3,279.7

9,254.0

Constant

FY 1998 $

541.5

2,160.8

1,856.5

2,036.4

3,447.9

10,043.1

Note: Table compiled from incremental costs provided by DoD, Office of the Comptroller in July

1997 to Nina Serafino, Foreign Affairs and National Defense Division, CRS.

Direct Effects

Operations. Operations above preplanned budget levels will continue to be a

congressional concern as both constrained resources and unpredictable contingency

operations are expected to occur. Although estimating operational costs seems

20

For a further discussion of military contingency funding, see Serafino, Nina M. Military

Contingency Operations: Search for a New Funding Mechanism. CRS Report 95-636 F,

May 22, 1995.

CRS-59

forthright, the very nature of military budgeting makes accurate estimates difficult.21

Nevertheless, as operations increase, costs usually increase, leading to potential

problems with readiness, logistics, and personnel.

Personnel. Not surprisingly, personnel costs increase as operations increase.

The combination of temporary duty pay, family separation allowances, imminent

danger pay, bonuses and tax breaks increases personnel costs for contingency

operations, though the regular salaries of U.S. service personnel remain unchanged

whether training, fighting, or waiting. Efforts to reduce costs by limiting payments

to personnel, some argue, affect retention and reenlistments in the long-term as these

payments are often cited by service members as an important factor in mitigating the

burdens of deployments. Since DoD has come to rely on extensive use of reserve

forces in augmenting and replacing active duty forces, their use can increase personnel

costs for specific deployments. Although maintaining reserve forces in peacetime is

less expensive, the actual use of those forces in full-time operations costs more than

an equivalent use of active duty personnel. These costs reflect a fairly direct

relationship. Indirectly, if dissatisfied members leave the services, the turnover of

experienced to inexperienced individuals has many budget and readiness implications.

Recruiting and training a greater number of replacements than planned is an increased

burden tied to paying for today’s deployments. Individuals that are less experienced

are generally seen as less capable and usually require more training than their more

experienced predecessors.

Logistics. Logistics, in this case equipment, maintenance, and supplies, show

short and long-term cost implications due to higher than planned usage rates. As we

enjoy surpluses left over from the Cold War, these costs can be easily sustained and

arguably hidden. The Defense Department has taken the lessons of the hollow force

to heart and is working diligently to avoid previous mistakes; however, some

problems are inevitable. Many supply items, acquired and postured for major

conflicts and intended for one-time use, are used and then not expeditiously

restocked. Stocks of such things as Air Transportable Hospitals and kits designed to

facilitate the stationing of troops in remote locations are dwindling.22 Officers at the

Pentagon report that, in some cases, the shipping of equipment destined for prepositioning to potential hotspots overseas suffered lengthy delays. While maintenance

backlogs are generally limited, maintenance has suffered and is now robust only

through concerted effort. Depot maintenance on aircraft engines, a perennial

problem, continues to require concerted effort as the engines get older. In the longterm, maintenance costs on current equipment will rise as more and more effort is

required to maintain a combat-ready posture. In addition, suppliers of older parts may

no longer be in production. Remanufacturing parts adds to DoD’s costs.23 These

21

For more on problems associated with cost estimating, see U.S. General Accounting Office.

CONTINGENCY OPERATIONS DoD’s Reported Costs Contain Significant Inaccuracies.

Report Nos B271279 and GAO/NSIAD-96-115. May 17, 1996.

22

Interview with Lt Col Gregory Flierl, HQ USAF/XOOOR, September 9, 1996.

23

Examples taken from service testimony to the House National Security Committee, March,

1997.

CRS-60

long-term costs increase due to higher than planned activity levels and are directly

related to modernization.

Modernization. Contingency funding has a direct impact on modernization.

Budget solutions that result in delays and cuts in the acquisition of new major

weapons systems can increase overall acquisition costs and per-unit costs. They can

also contribute to sustaining rather than reducing high OPTEMPO/PERSTEMPO

levels and therefore increase operational costs. As stated, delays in modernizing

equipment, due to budget tradeoffs in DoD and Congress made for reasons sound,

clear, and otherwise, result in higher physical and monetary maintenance costs for

aging equipment. Usually, older, less sophisticated equipment means that more

equipment and more support personnel are required to meet the contingency

commander’s needs. This results in higher OPTEMPO and/or PERSTEMPO for all

involved.

Conventional wisdom holds that modernization is one area where increased

capability might lead to decreases in the amount of forces required to complete some

missions. In some areas, this may be true. Still, better capability often creates a false

impression that military forces can now do more than was previously possible because

many observers add the new capability to existing capability without subtracting the

loss of older equipment, installations, and forces. In operational terms, increasing

capability increases mission effectiveness. This does not necessarily mean that fewer

forces are required to complete a military mission. It normally means that the forces

involved can probably accomplish the mission with lower risk, fewer casualties, less

collateral damage, and that they can do so more expeditiously. For example, aircraft

that are more reliable can fly more often with less maintenance. In this case, the

operational commanders can reach their objectives more quickly but not necessarily

with fewer sorties, fewer maintenance crews, or fewer forces. In addition, if modern

equipment requires less strategic lift to deploy, the resultant free cargo capacity will

be used to get all the required support to the troops sooner, thereby speeding up

mission accomplishment. For smaller, highly proficient, and busy forces,

modernization is needed to reduce the number of units and individuals required for

current overseas commitments. Modernization should not usually be justified as a

way to increase current military obligations.

Indirect Effects. Budget decisions can also indirectly affect OPTEMPO and

PERSTEMPO. Significant areas to consider are: budget-driven force structure

decisions; commercial alternatives to military specific hardware; base closures and

overseas presence; privatization and outsourcing. In general, decisions that reduce

the manpower pool, that limit the availability of units and individuals, that increase

time spent away from both home-station and primary duties, and that reduce

capability adversely affect units and individuals with either a high OPTEMPO or

PERSTEMPO. Some lesser tasked or perennially untasked units (and the nation)

might actually benefit from greater activity levels, but it would be difficult to target

such units with indirect consequences of budget decisions.

Numbers, Types, and Availability. While cost-capability tradeoffs are critical

in achieving an affordable balance between the National Military Strategy and the

National Security Strategy, budget-driven reductions in the number of forces, the

types of some forces, and the availability of forces, generally will lead to increases in

CRS-61

activity levels for the remaining units. Obviously, as long as commitments remain

constant, fewer forces to draw from means a higher OPTEMPO and PERSTEMPO.

Less clear-cut are decisions affecting the types of forces involved. For example, F-16

units that are equipped with the Low Altitude Navigation and Targeting Infrared

Night (LANTIRN) capability are heavily tasked. However, other F-16 units without

LANTIRN are not as heavily tasked. Making more F-16s available does nothing to

relieve the LANTIRN units’ OPTEMPO. Making more LANTIRN-equipped units

from existing F-16 squadrons and training more LANTIRN-qualified pilots is a viable

solution. In the same vein, buying more Harm Targeting Systems (HTS) for general

purpose F-16 units will also have a dramatic downward affect on the overall

OPTEMPO of specialized F-16 units. Units equipped with HTS are in continual high

demand as they are used regularly to suppress enemy air defenses in northern and

southern Iraq, and in Bosnia. Such defensive aircraft are an important part of any

military deployment because they provide the essential protection to any cargo or

ordnance delivered from the air.

Increasing the size of the reserve components to save money will increase

tempos. Short of full mobilization, Guard and Reserve forces have limited availability.

Although these forces significantly mitigate the high OPTEMPO and PERSTEMPO

of their active-duty counterparts, their limited availability prevents their taking a

leading role in meeting contingency requirements. Although the reserve component

is less accessible than the active duty forces, the reasons for, conditions of, and laws

governing the access of the reserve component are based on the force structure

designed on an MRC concept of operations and not those of operations other than

war.24 Since maintaining these forces in peacetime is cheaper than their active duty

equivalents, posturing more units in the reserve components is an attractive budget

option. Since active-duty forces are always available and can be committed for

indefinite periods, active-duty forces are always used initially in operations. Now,

with active-duty OPTEMPO and PERSTEMPO at peacetime highs, any reduction in

active-duty force structure in favor of increased force structure in the reserve

component would cause a dramatic increase in active-duty OPTEMPO and

PERSTEMPO.

Summary: Budget, Readiness, Force Structure affect OPTEMPO. As

discussed, the fundamental relationship between budget decisions and OPTEMPO and

PERSTEMPO extends beyond simply paying for contingency operations. These issues

are inextricably tied to readiness and force structure considerations. The timing of

supplemental appropriations, the nature of DoD rescissions to offset operational

costs, and the resultant effects on short and long-term military effectiveness are key

budget considerations for readiness and force structure. In logistics, actions not taken

due to funding shortfalls normally must be accomplished eventually. Quality of life

gains and losses are potent factors in retaining skilled and experienced professional

personnel. The Chief of Staff of the Army, General Dennis Reimer, considers a

soldier’s confidence that his wife (90 percent of career soldiers are men) and family

are being adequately cared for in his absence, the primary consideration for that

soldier in retaining his commitment to the Army while on extended deployments.

24

This point was made by the National Guard in formal comments on a draft of this report by

the Deputy Director, Operations, Plans, and Programs, National Guard Bureau.

CRS-62

Modernization may be area in which the U.S. can make some gains in lowering

OPTEMPO/PERSTEMPO and the cost of operations. New technologies, may enable

DoD to posture fewer, yet more capable, forces in order to free force structure to

train for and engage in both war and Operations Other than War (OOTW). In a

fiscally constrained environment, the resultant force structure may be subject to

dollar-driven cuts, which would, in effect, recreate conditions the modernization

sought to relieve: too few people doing too many things. In addition, the great

variety of peace time operations makes it difficult to posture forces for every

contingency. The need for a wide variety of specialties is a contributing factor to

uncertainty in the ranks and overall high PERSTEMPO. The nature of OOTW often

dictates the types of forces required. Simply put, some operations still require a large

physical presence. Humanitarian relief operations, peacekeeping, and exercises with

allied nations require direct human contact and are not easily adapted to new

technologies.

The relationships between readiness, force structure and

OPTEMPO/PERSTEMPO include these key considerations and more.

Readiness Implications: “Ready for what?”

The readiness posture of U.S. forces is predicated on a clear understanding of

the mission set before them. The question “Ready for what?” is paramount.

Currently, the requirement to fight two nearly-simultaneous major regional

contingencies is the primary factor driving unit preparations. Readiness for highintensity conflict as envisioned in the two-MRC scenario demands the most exacting

standards of military units. Significant commitments of time and resources to other

operations may dull, to some degree, the combat edge acquired through realistic

training and joint exercises over the last 10 years. Testimony before the House

National Security Committee from the commanders of the services’ combat training

centers indicated that units and individuals arriving recently for training were not as

well prepared, and in many cases, did not perform as well, as units had in past years.25

Units may remain in a high state of readiness,26 as much a subjective assessment as it

is a quantifiable standard,27 as is the case today; however, the cumulative effects of

continuous activity exact a toll. The time invested in non-MRC operations, in

operations that do not contribute to a unit’s readiness, must be factored into the units

planning calendar in order for them to meet their training and exercise requirements

and thus maintain their combat skills. Note that units such as light infantry, civil

affairs, and logistic/supply units usually practice their wartime skills supporting

contingency operations; however, some other units dedicated to high or mediumintensity combat generally do not. Even so, in today’s environment, the

25

This testimony was supported by anecdotal evidence from units nationwide that appeared

in both press accounts and interviews conducted by the author.

26

Unit readiness assessments under the Status Of Resources and Training System (SORTS)

are as much a subjective assessment as they are a quantifiable standard in that the unit

commander’s assessment of the readiness level is the paramount consideration in assigning

the units overall readiness status.

27

For more information, see Gebicke, Mark—Director of Military Operations & Capabilities,

U.S. General Accounting Office testimony before the Military Readiness Subcommittee of

the House National Security Committee, March 11, 1997.

CRS-63

PERSTEMPO of units executing their primary duties in contingency operations still

demands attention. In considering OPTEMPO/PERSTEMPO factors and readiness,

it is important to keep the two-MRC requirement in mind, as it drives unit

preparations and their readiness evaluations.

Prepare, Deploy, Recover — Paying for the cycle with readiness. Not only

do the operations themselves require a time and resource commitment, preparing for

such deployments and then recovering lost combat skills, if any, afterward are factors

in the readiness equation. Preparing for an operation often means training time is

spent acquiring new skills not practicing existing ones. In addition, the recovery time

following a deployment is spent reacquiring lost skills. As discussed previously, the

nature of rotational duty for ongoing operations, such as those in South West Asia,

means that for every unit deployed, two others are in some state of preparation or

recovery. None of these units are fully engaged in training for wartime.

Intangibles. With exceptions, as OPTEMPO/PERSTEMPO increase, some

degree of readiness is lost.28 The longer the deployment, the greater the loss of

dedicated training time. The loss of dedicated training normally entails a reduction

in readiness. When training time is lost, other related factors are diminished. These

factors include the level of individual experience, the capacity to “surge” into fasterpaced operations, retention and recruitment, and morale29. For example, unit

experience levels, a significant factor in sustaining high levels of readiness, are

perishable. The levels drop as fewer members are exposed to realistic, albeit

simulated, combat scenarios and are afforded opportunities to fire their weapons. For

example, the experience levels of Air Force fighter squadrons, only six years after the

Gulf War, are dwindling. Although they are flying a great deal, pilots are

accomplishing fewer actual combat-training events than their Gulf War-era

predecessors. As these officers move into leadership positions, the impact of their

inexperience may be magnified.

In the early years of increased tempos, 1991-1994, the morale of forces involved in

contingency operations was considered by commanders to be exceptional. According

to Air Force surveys of pilots leaving the service and anecdotal evidence from the Air

Force Times, Air Force Magazine, and the authors interviews with pilots, the

significant factor in reducing morale has been the continuation of the high pace for an

extended period.

28

As noted, some combat and most combat support units perform their wartime functions

supporting contingency operations. Civil Affairs, transportation, logistics, and some infantry

skills benefit greatly from participation in contingencies. For these units, PERSTEMPO is

more of a problem than OPTEMPO.

29

The most apparent evidence to suggest a correlation between OPTEMPO and retention,

recruitment, and morale appears in surveys of pilots leaving the military services. Surveys

in 1996 and 1997 list OPTEMPO and “family, personal, or quality of life issues” as the top

two reasons pilots are leaving the Air Force in record numbers. In 1996, 34 percent and in

1997, 47 percent cited the above reasons as the major factors in their decision to resign. Navy

and Marine Corps officials attribute unplanned interruptions to the time aviators are not on

routine pre-planned deployments, i.e. at home, as the primary reasons for the significant

increase in aviators leaving the sea services.

CRS-64

Tangibles. Physical factors are also diminished through continuous involvement

in operations: weapon and vehicle maintenance, reductions in equipment service life,

and depletion of wartime stockpiles. According to the testimony of Marine Corps

generals before the House National Security Committee in March, 1997, problems of

maintenance on aging Marine helicopters is exacerbated by the pace of operations.

Based on the age of the helicopters and the slow pace of acquisition of the

replacement CV-22 Osprey (5 per year initially), regular maintenance is becoming

much more time consuming and expensive. These “readiness” factors directly relate

to budget and force structure deliberations.

Summary: Readiness is pervasive. As Congress analyzes the QDR, the

question of “What forces will we need?” will be addressed in terms of affordable force

structure. The key readiness questions that relate to OPTEMPO and PERSTEMPO

will be part of the force structure debate: “Ready for what?” “Ready by when?” The

resolution of each question will affect future OPTEMPO and PERSTEMPO levels.

Ultimately, the level of readiness required of all forces, and hence the cost, is directly

related to OPTEMPO. In other words, what level of effort will U.S. forces be

required to sustain and therefore, what strategy will they have the capacity to support

given that level of effort.

Force Structure Implications

The current debate over force structure encompasses a wide range of issues.

Many observers believe the threat to the United States no longer warrants maintaining

forces capable of fighting a two-MRC war. Many believe that DoD is already too

small for the two-MRC requirement. Some high-ranking military officials believe that

the force required to meet all current global requirements exceeds the force levels

postured in the Bottom-Up Review. Others in DoD believe current operations alone

demand commitments of forces that are equal to those required for at least one major

regional contingency. Most seem to agree that the Defense budget will remain fairly

static for the foreseeable future and that force structure decisions must be made within

those confines.

The dangers and options. The dangers involved in balancing force structure

with commitments are many. Too few forces prepared for high-intensity combat

could result in higher casualties and longer conflicts; whereas, too few forces capable

of a wide range of operations results in high OPTEMPO/PERSTEMPO for those

qualified units and missed opportunities for the nation. Excess force structure means

reduced tempos but requires resources from other national priorities. The solutions

under consideration center on ways to reduce the forces required for MRC duty; to

reduce the time and effort required to prepare for MRC duty; to increase the number

of units capable of executing multiple types of non-combat operations; and to increase

the participation of the reserve components. All potential solutions should address

whether OPTEMPO/PERSTEMPO levels remain within tolerable levels.

The Pentagon is in the process of assessing the current demand on U.S. forces

in order to develop requirements for future force structure. The balance among

various capabilities will be achieved within a framework of capacity bounded by

OPTEMPO/PERSTEMPO, budget, and readiness considerations. The following

relationships are pertinent (assuming demand remains constant or increases):

CRS-65

! As force30 size decreases, OPTEMPO increases.

! As active force size decreases in favor of the reserve components, OPTEMPO

increases due to the limitations on the availability of the Guard and Reserve.

! As the number of specialized units increases, OPTEMPO for those types of

units decreases; however, with a finite force structure, the increase in such

units is at the expense of other types. For example, the Air Force trained and

assigned more flight crews to AWACS units in order to lower the sustained

high PERSTEMPO of AWACS crews. The personnel to do this came at the

expense of other units. In this case, PERSTEMPO for the force at-large may

increase.

! New units with missions similar to high OPTEMPO units might reduce the

overall OPTEMPO. However, recent experience with both the Joint Stars

ground surveillance aircraft and the Predator UAV suggest that this is not

inevitable. In practice, the addition of new and improved surveillance

complements rather than supplements existing capability.

! As new weapons and capabilities that reduce manpower and support

requirements come on line, PERSTEMPO decreases.

! As long as excess demand for military force deployment exists, whether for

military or foreign policy purposes, efforts to reduce OPTEMPO and

PERSTEMPO will be difficult.

! With these relationships in mind, significant potential for achieving the required

balance of forces exists in the reserve components. Although increasing the

size of the Guard and Reserve at the expense of the active force will generally

result in higher tempos, and the reserve components are generally less available

than the active force, the Guard and Reserve offer significant potential in

meeting future commitments and challenges. Many defense observers see

support and specialized functions in the reserve components as a key building

block in developing the affordable force operating at acceptable OPTEMPOs

that is required for the QDR. Some movement in this area is underway. At

the same time, there is a widely held perception that the reserve component

should never be viewed as the key building block31 because its near-term

warfighting capability cannot match that of the active force.

Summary: Maintaining sustainable OPTEMPO/PERSTEMPO. Key

considerations for force structure decisions with regard to maintaining acceptable

levels of OPTEMPO/PERSTEMPO are: the reserve components make important and

valuable contributions but they are a finite resource; there is a direct correlation

between the size of the force and the sustainable level of activity; new weapons and

30

“Force” in this construction refers to combat/combat support forces that are deployable to

contingencies and/or combat theaters.

31

This point was made by the National Guard in formal comments on a draft of this report by

the Deputy Director, Operations, Plans, and Programs, National Guard Bureau

CRS-66

capabilities may free manpower that can be translated into the creation of specialized

units for non-MRC duty and without these improvements, unique units usually come

at a cost to MRC capability.

CRS-67

Options for Congress32

Congressional oversight of DoD during this period of high activity will probably

continue to focus on mission. Modernization and quality of life issues will probably

continue to remain high priorities for the Pentagon. Congressional involvement will

be important as DoD works to meet its commitments. Direct congressional action

relating to the National Guard and Reserve, military infrastructure, military endstrength, specialized units and equipment, incentives and increased reporting to

Congress by DoD are options to consider. In addition, direct action may be

contemplated to end ongoing operations when they are perceived as not closing on

a predefined “Exit Strategy” and that may be causing more harm to military

capabilities than they are benefitting U.S. interests. Internal actions within DoD that

may fall under the purview of congressional oversight include validating employment

concepts, increasing resources for training while deployed, reviewing and setting

minimum training time guidelines, prioritization of, and early determination of,

exercise requirements, reducing the number and duration of required inspections, and

providing “down time” to units following extended deployments.

Options for Congressional Action

National Guard and Reserve. Congress plays a vital role in supporting these

organizations. The debate over the relevance of Army heavy combat forces in the

National Guard will continue; the possibility of converting all or some of this

c

This text is long and has been trimmed here. Open the source document for the complete record.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.

A word about cookies

We need a few to keep you signed in and the library working. The rest help us see which pages people use and where they get stuck. They stay off unless you say yes.