Joint Appendix — Boeing Co., The v. United States, (2009) (No. 1302)

Supreme Court brief2009

Ask Donna

What actually matters in this document.

Text

Nos. 09-1298 & 09-1302

™

LN THE

Supreme Court of the Ruiter Ste

‘areme Coun, U.S.

* ov 12 2010

OFFICE OF THE CLERK

GENERAL DYNAMICS CORPORATION.

Petitioner.

Vv.

UNITED STATES OF AMERICA,

Respondent.

THE BOEING COMPANY,

Petitioner,

Vv.

UNITED STATES OF AMERICA,

Respondent.

On Writ Of Certiorari To The

United States Court Of Appeals

For The Federal Circuit

JOINT APPENDIX

VOLUME I

CHARLES J. COOPER

Counsel of Record

MICHAEL W. KIRK

HOWARD C. NIELSON, JR.

DAVID LEHN

COOPER & KIRK, PLLC

1325 New Hampshire

Avenue, N.W.

Washington, DC 20036

(202) 220-9600

ccooper@cooperkirk.com

Counsel for The Boeing

Company

PETETIONS FOR CERTIORARI FILED APRIL 23, 2010

CERTIORARI GRANTED SEPTEMBER 238, 2010

PAUL M. SMITH

Counsel of Record

DAVID A. CHURCHILL

ELAINE J. GOLDENBERG

JENNER & BLOCK LLP

1099 New York Avenue. NW

Suite 900

Washington, DC 20001

(202) 639-6000

psmith@jenner.com

Counsel for General Dynamics

Corporation

59

J. MICHAEL LUTTIG

EXECUTIVE VICE PRESIDENT

& GENERAL COUNSEL

GRANT M. DIXTON

LYNDA GUILD SIMPSON

THE BOEING COMPANY

100 North Riverside

Chicago, Il. 60606

(312) 544-2800

Counsel for The Boeing

Company

NEAL KUMAR KATYAL

ACTING SOLICITOR GENERAL

Counsel of Record

TONY WEST

ASSISTANT ATTORNEY GENERAL

JEANNE E. DAVIDSON

BRYANT G. SNEE

KIRK TT. MANHARDT

PATRICIA M. MCCARTHY

ATTORNEYS

UNITED STATES DEPARTMENT

OF JUSTICE

950 Pennsylvania Avenue,

N.W.

Washington, DC 20530

(202) 514-2217

SupremeCtBriefs@usdoj.gov

PAUL L. OOSTBURG SANZ

GENERAL COUNSEL

THOMAS N. LEDVINA

WENDELL A. KJOS

ATTORNEYS

Department of the Navy

Washington, D.C. 20350

Counsel for The United States

INDEX

Volume 1

Relevant Docket Entries, McDonnell Douglas

Corp. v. United States, No. 1:91-cv-01204-

Et aR Sane aie See ae eT }

Relevant Docket Entries, McDonnel/ Douglas

Corp. v. United States, No. 1998-5096 (Fed.

+ 8 TEESE. SAPS te YER eho OES Ae ndd 2, Oe OEP 41

Relevant Docket Entries, McDonne/l/] Douglas

Corp. v. United States, No. 2002-5034 (Fed.

as, 42

Relevant Docket Entries, McDonnell] Douglas

Corp. v. United States, No. 2007-5111 (Fed.

ERSTE ive EE Oe Varo Pee eR Rr eI EEE 43

Memorandum From Eleanor Spector, Deputy

Assistant Secretary Of Defense

(Procurement), To Under Secretary Of

Defense For Acquisition (Jan. 5, 1988) ............... 44

A-12 Full Scale Engineering Development

Contract, excerpts (Jan. 13, 1998)

SET TITIEisssnhdiscicadrsehesomnnuniianlibaaiiiatianmewassdenamnionness 47

NER Te RTE ERI OEE 48

Section B — Supplies Or Services ........................ 49

Section C — Description Or Specifications

Io sctatiabeasenupmeswensougns 54

a a ee 73

ERIE a SA gre oe ena sar ON? 77

IL ceeuuiannsnnaseanpeseranenaenscens 82

Progress Payments Clause (Deviation)............. 111

Attachment 34° -- Contract Security

Classified Specification ...............cccccccceeeeeeees

Attachment 36 -— Government [Furnished

SII siccon- sch acionsideiadenta weaialediaauaunietdaiimenndeniiasseaies

Attachment 45 -— Security Implementation

SI adesieadicuhtiniietnainnapinbietbadunaiwudededamedenmtddanetinites

FAR 52.249-2 Termination For Convenience

Of The Government (Fixed-Price) (1984)..........

FAR 52.249-8 Default (Fixed-Price Supply And

NI ells

FAR 52.249-9 Default (Fixed-Price Kesearch

And Development) (1984) .0000....0..cccccccceececceees

A-12 Program Review (June 13, 1990)...................

Letter From John F. McDonnell, Chairman

And Chief Executive Officer, McDonnell

Douglas Corp., And Stanley CC. Pace,

Chairman And Chief Executive Officer,

Genera! Dynamics Corp. To H. Lawrence

Garrett, Secretary Of The Navy (June 27,

SARE ates Lk Berle SMA LON oe ARO OOmeD

The Navy's A-12 Alurcraft Program: Joint

Hearing Before Procurement & Military

Nuclear Sys. Subcomm., Research &

Development Subcomm., and

Investigations Subcomm. of the H. Comm.

on Armed Services, 10) Cong. 76°77 (Dec.

10, 1990) (Statement Of H. Lawrence

Garrett, Secretary Of The Navy).................0.....

Minutes Of A-12 Meeting With Contractors

ne tsa Sak dae se

223

227

237

TP

Minutes Of A-12 Meeting With Contractors

(Dec. 21, 1990) .....00000... OE area eee

Letter From Roger J. Witte, Vice President,

McDonnell Douglas Corp., And George

Kostohryz, Vice President, General

Dynamics Corp., To Rear Admiral W. R.

Morris, Dep't Of The Navy Wan. 2, 1991)...

Minutes Of A-12 Meeting With Contractors,

10:00 (Jan. 2. 1991)... ee. ee ee

Minutes Of A-12 Meeting With Contractors,

Ey 0, TD... cicsucveceevecescevcecguemmenssuss

Minutes Of A-12 Meeting With Contractors,

a NIL: Sil IIe cireracsiennesiuvineass meses asciaeeee

Minutes Of A-12 Meeting With Contractors,

UNNI: We IE eaitiivcs ceetscasiinnsnenanctsinscncasirwaeans

Minutes Of A-12 Meeting With Contractors,

CD Geis, BD BORD. vnicccsvcoccccveccoccccessvenccccsssssc:

Letter From Rear Admiral W. RK. Morris, Dept

Of The Navy, ‘To George Kostohryz, Vice

President, General Dynamics Corp., And

Roger J. Witte, Vice President, McDonnell

Douglas Corp. (Jan. 7, 1991) .....0000.0. ee, -

Memorandum For The Contract File, From

Rear Admiral W. R. Morris, Dep't Of The

ge a” ene ee

Memorandum From Herbert J. Lanese, Senior

Vice President, McDonnell! Douglas Corp.,

To Eleanor Spector, Deputy Assistant

Secretary Of Defense Wan. 29, 1991) 0000000...

209

272

279

240)

2YQH

301

306

313

319

ee

~*

1V

Letter From Rear Admiral W. R. Morris, Dep't

Of The Navy, To George Kostohryz, Vice

President, General Dynamics Corp., And

Roger J. Witte, Vice President, McDonnell

Douglas Corp. (Feb. 5, 1991) ...............00:cceeeeee. 339

Deferment Agreement (Feb. 5, 1991) ..........000cc00. 342

Opinion And Order (Fed. Cl. Feb. 20, 1992) .......... 349

Defendant’s Motion To Dismiss Plaintiffs’

Claims Related To “Superior Knowledge”

In Alleged Other Low Observable Weapons

Programs, excerpt page 6 (Fed. Cl. Apr. 1,

aaa mp 5 CAE REE Py Rech Ea RO A a 373

Declaration Of Peter C. Eames (Fed. Cl. Sept.

a et ne Ae Beat aR ie A ORAS One 376

Declaration Of Secretary Of The Air Force

Donald B. Rice (Fed. Cl. Nov. 20, 1992)............ 383

Order And Opinion (Fed. Cl. Nov. 23, 1992).......... 388

Volume II

Second Amended Unclassified Complaint (Fed.

Ce es ccptanusen 395

oo Se een 478

Transcript (Fed. Cl. Mar. 23, 1993).................c0008 480

OS EEO eS a nr ap ie Ee 503

Defendant’s Motion For A Protective Order

(Includes Declaration Of The Acting

Secretary Of The Air Force Michael B.

Donley) (Fed. Cl. Mar. 30, 1993) .........0.0.0....00. 504

Order (Fed. Ci. Apr. 16, 1909) ..............00....0000.02..... 524

Vv

In re United States, Order On Petition For

Writ Of Mandamus (Misc. No. 370) (Fed.

taal

Order (Fed. Cl. Apr. 30, 1903) ............0...-scccccseceseee

In re Unites States, Order On Petition For

Writ Of Mandamus (Misc. No. 374) (Fed.

I i oc sacscasassciasadesansasaiens

Order (Fed. Cl. May 7, 1993) ............ccccccccccceseeseees

Defendant’s Motion To Dismiss Plaintiffs’

“Superior Knowledge” Claims, Or In The

Alternative, For Partial Summary

Judgment, And Motion For A Protective

Order (Fed. Cl. May 27, 1993)............0.0.0.0.008.

Opinion & Order (Fed. Cl. June 21, 1993) ...........

Defendant's Supplement To Motion To

Dismiss Plaintiffs’ “Superior Knowledge”

Claims (Includes Declaration Of The

Acting Secretary Of The Air Force Merrill

A. McPeak) (Fed. Cl. July 23, 1993) 0000000000000...

Order (Fed. Cl. Aug. 11, 1993)...............ccccceeceeeees

Declaration Of Albert P. Farr III (Fed. Cl.

a

Declaration Of S. Keith Jackson, Jr. (Fed. Cl.

Ce dann

Defendant's Brief In Support Of Its Motion To

Dismiss Plaintiffs’ “Superior Knowledge”

Claims, And Response To The Court’s

Order Dated November 1, 1993, excerpt

pages 1-31 (Fed. Cl. Nov. 19, 1993) .........00000...

.. 026

.. 002

.. 022

..626

Vv)

Defendant's Opposition To Plaintiff's Motion

For Summary Judgment On Count IX, And

Motion To Dismiss Or In The Alternative

Cross Motion For Summary Judgment,

excerpt pages iii, 1-2, 12°35 (Fed. Cl. Dec.

RSIS REA IOE SDs dln preteen ts Mies Rn 735

oa Be ee ” eee meena 768

Defendant's Motion For Leave To File

Response To The Court’s Order To Show

Cause, And Response To Order To Show

Cause (Fed. Cl. Mar. 7, 1904)..............c.0...c0000 771

- Order (Fed. Cl. Apr. 28, 1994) o.ccccccccccccccscesesveseeeeee 787

ee re Ge, Tom, Te BOI oon Seciccsscssicasecodsacdasasseree 791

og ie ay Se | epee 793

Defendant's Response To Plaintiffs’ Status

Reports Concerning Superior Knowledge

And The Order Of Proof At Trial, excerpt

pages i, iv, 1-2, 12-21, and appendix (Fed.

Ra Se si iccocensscpaiaasiipllonivadeunsinercenvectia 797

Judgment (Fed. Cl. Mar. 31, 1998)...........0000....0005. 884

Volume III

Brief For Defendant-Appellant United States,

excerpt pages iil, 37-48 (Fed. Cir. June 15,

SSIS GARBER try er ve pry Oe 886

Reply/Cross-Appellee Brief For Defendant-

Appellant United States, excerpt pages 1,

18-30 (Fed. Cir. Sept. 28, 1998)......................... 904

Vil

Defendant's Statement Of Issues And Notice

Of Probable Testifying Experts For Trial,

excerpt pages 1, 15-25 (Fed. Cl. July 11,

NINN cis sealstiies hasenenntiansaunmteuscsearecapcacelmedaaaennenten

Plaintiffs’ Response To “Defendant's

Statement Of Issues And Notice Of

Probable Testifying Experts For Trial,”

excerpt pages 1-2, 14-16 (Fed. Cl. July 25,

I iasistat tieatsienhtnantidenlaenssedvereniiddudhapiaageldanceatiogns

Transcript, excerpt pages 1-2, 72:18°81:7 (Fed.

ee I os cis Seuaunsciluescseanens

Transcript excerpt pages 1-2, 53:1-58:17 (Fed.

IE Oe I hic. icine scncenesleennenipuicapientonsestens

Defendant's Notice Of An £y Parte Filing In

Connection With Plaintiffs’ 29" And 30%

Sets Of Discovery Requests (Includes

Declaration Of The Secretary Of The Air

Force F. Whitten Peters) (Fed. Cl. Feb. 7,

sR A SRST ee Aa ela acer Neko eee

Opinion And Order (Fed. C]. Mar. 1, 2001).........

Plaintiffs’ Statement Of Issues And Legal

Standards For Trial, excerpt pages 1-4

I I coe ec ecedeccacduensaens

Transcript, excerpt pages 1-2, 74:13-79:21

Sr Oe I I cca incenspsinssieceennpsenimicnauas

Defendant’s Brief Regarding Effects Of State

Secrets And Motion For Reconsideration,

excerpt pages iii, vii-viii, 1-39 (Fed. Cl.

occa sicasls sap csusncunaiaenianacmsseaticies

.. 938

..944

... 960

ooo OES

... 983

.. 994

Vill

Appendix To Defendant’s Brief Regarding

Effects Of State Secrets And Motion For

Reconsideration Volume I Of IV, excerpt

pages 2, 33-35, 37, 69, 73-74, 79 (Fed. Cl.

I a surnsnsbussandabinmnies 1063

Appendix To Defendant's Brief Regarding

Effects Of State Secrets And Motion For

Reconsideration Volume II Of IV, excerpt

pages 104-06, 172-76, 179 (Fed. Cl. Mar.

C2 5 cscpiiioumindslaitimeebasteinneennt 1079

Appendix To Defendant’s Brief Regarding

Effects Of State Secrets And Motion For

Reconsideration Volume III Of IV, excerpt

pages 208, 213-15, 217-18, 243-48, 251-53,

255, 291-95 (Fed. C). Mar. 28, 2001)............... 1095

Appendix To Defendant's Brief Regarding

Effects Of State Secrets And Motion For

Reconsideration Volume IV Of IV, excerpt

pages 307, 311, 317, 322, 336, 342-43, 351-

52, 353-64, 369-74, 685-86 (Fed. Cl. Mar.

Ne se oeak cemreuanuaeni 1124

Transcript, excerpt pages 1°3, 42:5-47:13,

54:21-63°6 (Fed. Cl. Apr. 23, 2001).........0000..... 1211

Order (Fed. Cl. Apr. 27, 2001) ...........00cccccceeeeeeeeee 1233

Transcript, excerpt pages 89, 92, 166, 191-92

SP ks NN Ws i sesicinisssveencincvsapeerescccereenss 1237

Transcript, excerpt pages 4848, 4851-59, 4868-

72 (Fed. Cl. June 15, 2001) ..........................000 1243

Judgment (Fed. Cl. Aug. 31, 2001)... 1262

Order (Fed. Cl. Oct. 4, 2001)... eee 1263

ix

Brief For Defendant-Appellee-Cross-

Appellant, excerpt pages i-1n, 16-21, 52-70

RIP, GU. I STD oo icceccscicesccevstscecsovseses 1265

Judgment (Fed. Cl. May 3, 2007) ..............cccceceeeee 1293

xX

NOTICE

The following documents have been omitted in the

printing of this Appendix. They may be found in the

No. 09-1298 Petitioner's Appendix at the following

pages:

Appendix A

McDonnell Douglas Corp. v. United States,

567 F.3d 1340 (Fed. Cir. 2009) .........000..:ccccecceeeeees la

Appendix B

McDonnell Douglas Corp. v. United States,

FO FOG. Ce. BE GD ovcictesesosnntnndcinvczecnunntananen 35a

Appendix C

McDonnell Douglas Corp. v. United States,

323 F.3d 1006 (Fed. Cir. 2003) ............cccseeeeees 178a

Appendix D

McDonnell Douglas Corp. v. United States,

OD Pee. Ga, DHE GEE vsccescvsnicsnsccconsssactanaaee 212a

Appendix E

McDonnell Douglas Corp. v. United States,

182 F.3d 1319 (Fed. Cir. 1999) ............ ce eeeeeees 250a

Appendix F

McDonnell Douglas Corp. v. United States,

4B Dad. Ch. GRD CIID vcs scvcrestiicnvmmseae 280a

Appendix G

McDonnell Douglas Corp. v. United States,

ST FOG, Co. BI CI vcevsiesesssissidinceecnee 343a

Appendix H

McDonneil Douglas Corp. v. United States,

35 Fed. Cl. 368 (1QBG) ............ccsecccccscesesecsccsesesss 382a

xl

Appendix I

McDonnell Douglas Corp. v. United States,

ES UE ID... .rccococcesovscevecorercesece 430a

Appendix J

Order denying rehearing, McDonnei/

Douglas Corp. v. United States, No. 2007-

5111 (Fed. Cir. Nov. 24, 2009) .............cccccccccce- 444a

Appendix K

Statutory and Regulatory Provisions

edo cidcnunecnncvnsccenivexevarecveceees 446a

1

Relevant Docket Entries

United States Court of Federal Claims

MCDONNELL DOUGLAS, et al v. USA

CIVIL DOCKET FOR CASE #: 1:91-cev-01204-RHH

DATE # DOCUMENT

06/07/1991 | 1 Complaint.

| 08/07/1991 Defendant’s Motion to Dismiss.

08/14/1991 Defendant's Motion for the

Designation of a Court Security

Officer and Alternate Court Security

Officers.

08/15/1991 Order.

08/22/1991 Notice of Filing of Classified

Supplement to Complaint.

09/06/1991 Hearing Transcript.

09/12/1991 Plaintiffs’ Motion for Leave to Amend

Complaint and Amended Complaint.

09/13/1991 Hearing Transcript.

09/16/1991 Plaintiffs’ Opposition to Defendant’s

Motion to Dismiss.

09/16/1991 Defendant’s Response to Plaintiffs

Motion for Leave to Amend

Complaint.

09/16/1991 Order.

DATE

10/07/1991

11/22/1991

12/04/1991

12/18/1991

12/18/1991

12/19/1991

12/20/1991

01/09/1992

01/10/1992

E:

|

2

DOCUMENT

Defendant's Reply to Plaintiffs’

Opposition to Motion to Dismiss and

Appendix.

Defendant’s Motion for Leave to File

a Supplemental Brief in Support of

Its Motion to Dismiss (Brief

Attached).

Plaintiffs’ Motion for a Protective

Order Regarding Classified

Information and Memorandum in

Support of Plaintiffs’ Motion for a

Protective Order Regarding

Classified Information.

Hearing Transcript.

Order.

Defendants’ Motion for Leave to File

Declaration of Peter Eames.

Defendant's Cross-Motion for a

Protective Order Regarding

Classified Information.

Plaintiffs’ Opposition to Defendant’s

Cross-Motion and Reply to

Defendant's Opposition to Plaintiffs’

Motion for a Protective Order

Regarding Classified Information.

Plaintiffs’ Response to Court’s Draft

of Joint Protective Order Governing

Classified Information.

3

DATE ca DOCUMENT

01/10/1992 Defendant’s Response to Court’s

Draft of Joint Protective Order

Governing Classified Information.

02/20/1992 Opinion and Order Denying

Defendant’s Motion to Dismiss.

03/20/1992 Defendant’s Answer and Affirmative

Defenses.

04/01/1992 Defendant’s Motion to Dismiss

Plaintiffs’ Claims Related to

“Superior Knowledge” in Alleged

Other Low Observable Weapons

Programs and Notice of Classified

Filing in Support Thereof.

04/09/1992 Plaintiffs’ Motion to Strike

Affirmative Defenses or for a More

Definite Statement of the Affirmative

Defense of Setoff.

04/22/1992 Defendant’s Response to Plaintiffs’

Motion to Strike Affirmative

Defenses or for a More Definite

Statement of the Affirmative Defense

of Setoff.

DATE

05/01/1992

05/01/1992

05/04/1992

03/08/1992

05/22/1992

03/22/1992

06/02/1992

06/03/1992

4

DOCUMENT

Plaintiffs Brief in Response to

Defendant's Motion to Dismiss

Plaintiffs’ Claims Related to

“Superior Knowledge” in Alleged

Other Low Observable Weapons

Programs and Notice of Filing of

Classified Appendix in Support

Thereof.

Plaintiffs Motion for Leave to

Commence Discovery on Superior

Knowledge Counts.

Hearing Transcript.

Notice of Filing of Classified Brief.

Defendant's Reply to Plaintiffs

Opposition to Defendant’s Motion to

Dismiss Plaintiffs’ Claims Related to

“Superior Knowledge” in Alleged

Other Low Observable Weapons

| Programs.

Defendant's Opposition to Plaintiff's

Motion for Leave to Commence

Discovery on Supenior Knowledge

Counts.

Plaintiffs’ Reply to Defendant’s

Opposition to Plaintiffs Motion for

Leave to Commence Discovery on

Superior Knowledge Counts.

Notice of Classified Filing.

DATE

06/08/1992

06/15/1992

06/16/1992

07/16/1992

07/24/1992

, 07/28/1992

08/06/1992

08/07/1992

08/10/1992

08/12/1992

09/08/1992

D

DOCUMENT

Hearing Transeript.

Hearing Transcript.

Order.

Order.

Defendant’s Motion for a Protective

Order Regarding Discovery on

“Superior Knowledge.”

Plaintiffs’ Motion for Entry of an

Order Governing Superior Knowledge

Discovery and Brief in Opposition to

Defendant's Motion for a Protective

Order Regarding Discovery on

“Superior Knowledge.”

Defendant's Reply to llaintiffs’

Opposition to Defendant's Motion for

a Protective Order Regarding

Discovery on “Superior Knowledge.”

Letter Regarding Count IX Hearing.

Hearing Transcript.

Plaintiffs’ Motion for Leave to File

Hearing Exhibits and Hearing

Exhibits.

Defendant’s First Amended Answer

and Affirmative Defenses

DATE

Q9/D9/1992

09/09/1992

09/14/1992

OY/16/1992

09/17/1992

09/17/1992

09/18/1992

09/29/1992

10/05/1992

10/08/1992

a

6

DOCUMENT

Defendants Motion for a Stay of

Discovery Regarding Superior

Knowledge.

Defendant's Motion for Leave to File |

and Defendants Supplemental Brief

Reparding Defendant's Motion for a

Protective Order

Order

Plamtiffs Opposition to Defendant ©

Motion for Leave to Pile and

Defendant’s Supplemental Brief

Reyvarding Defendants Motion for a

Protective Order.

Defendant's Motion to Certify Order

for Interlocutory Appeal.

Defendant's Motion for Leave to File

and Defendant's Supplement to

Defendant's Supplemental Brief

Regarding Defendant's Motion for a

Protective Order.

Hearing Transcript.

Plaintiff's Motion to Compel

Discovery.

Plaintiffs’ Brief in Opposition to

Government's Motion to Certify

Order for Interlocutory Appeal.

Hearing Transcript.

DATE

10/13/1992

10/14/1992

10/15/1992

10/29/1992

10/30/1992

| 11/05/1992

11/12/1992

11/13/1992

11/17/1992

| 11/20/1992

11/23/1992

11/22/1992

7

DOCUMENT

Plaintiffs’ Supplemental Brief in

Support of Motion to Compe!

Discovery.

Hearing Transcript (In Camera).

Defendant's Reply to Plaintiffs’

Opposition to Defendant's Motion to

Certify Order for Interlocutory

Appeal.

Defendant’s Response to Plaintiffs’

Supplemental! Brief in Support of

Motion to Compel Discovery.

Order.

Hearing Transcript.

Defendant’s Response to the Court s

Order of October 30, 1992.

Plaintiffs’ Motion to Compel

Discovery.

Notice of Filing of Classified

Appendix.

Plaintiffs’ Supplemental Brief

Regarding Plaintiffs’ Motion to

Compe] Discovery.

Defendant's Response to Plaintiffs

Motion to Compel of November 13,

1992.

Hearing Transcript.

DATE

11/23/1992

11/23/1992

11/23/1992

12/02/1992

01/23/1993

02/05/1993

02/08/1993

02/09/1998

02/09/1993

02/12/1993

8

DOCUMENT

Order and Opinion Denying Request

to Certify for Interlocutory Appeal.

Protective Order.

Order.

Order.

Hearing Transcript and Order that

Hearing Transcript Shall Not Be

Duplicated Except By Order of the

Court.

Stipulation and Protective Order.

' Defendant's Motion for a Protective

Order.

Plaintiffs’ Motion for Leave to File

Second Amended Unclassified

Complaint.

Defendant's Motion for a Protective

Order and Response to Plaintiffs’

Motion to Compel Responses to

Discovery Requests Withheld Under

Claim of Discovery Stay.

Plaintiffs’ Motion for an Order

Governing B-2 and F-117a Discovery.

DATE

02/17/1993

02/18/1993

02/25/1993

03/01/1993

03/03/1993

03/03/1993

03/05/1993

03/05/1993

03/08/1993

03/09/1993

02/26/1993 |

#

9

| DOCUMENT

| Plaintiffs’ Response to Defendant's

Motion for a Protective Order and

Reply to Defendant’s Response to

Plaintiffs’ Motion to Compel

Responses Withheld Under a Claim

of Discovery Stay.

Opinion and Order Denying Motion

to Dismiss and Vacating All Stays of

Discovery.

Defendant's Response to Plaintiffs’

Motion for an Order Governing B-2

and F-117a Discovery.

Hearing Transcript.

Order.

Order.

Defendant's Motion for Partial

Reconsideration of the Court’s Order

Dated March 1, 1993.

Order.

Plaintiffs’ Supplemental

Memorandum in Support of their

; Motion to Compel Production.

Defendant’s Motion for a Stay of

Court’s March 5, 1993 Order.

Order Denying Motion for a Stay.

DATE

03/09/1993

03/09/1993

A,

03/10/1993

03/10/1993

03/11/1993

03/12/1993

03/16/1993 |

03/17/1993

10

DOCUMENT

Petition for Writ of Mandamus and

Motion for a Stay Pending Resolution

of Petition for Writ of Mandamus.

Order of Court of Appeals for the

Federal Circuit.

Defendant's Second Amended

Unclassified Answer and Affirmative

Defenses.

Plaintiffs’-Respondents’ Opposition to

the Government's Motion for a Stay

Pending Resolution of the

Government's Petition for a Writ of

Mandamus.

Defendant: Petitioner's Reply to

Plaintiffs’-Respondents’ Opposition to

the Government's Motion to Stay.

Order of Court of Appeals for the

Federal Circuit.

Plaintifts’-Respondents’ Opposition to

Petition for Writ of Mandamus and

Appendix in Support Thereof {Misc.

No. 370].

Defendant-Petitioner’s Reply to

Plaintiffs’-Respondents’ Opposition to

Petition for Writ of Mandamus [Misc.

No. 370).

DATE

03/18/1993

03/18/1993

03/23/1993

03/23/1993

03/30/1993

03/30/1993

03/31/1993

04/01/1993

04/02/1993

04/03/1993

04/06/1993

04/06/1993

04/07/1993

11

DOCUMENT

Plaintiffs’-Respondents’ Sur-Reply to

Defendant-Petitioner’s Reply to

Petition for Writ of Mandamus [Misc.

No. 370].

Order.

Hearing Transcript.

Order.

Notice of Filing of Classified Ex Parte

In Camera Declaration.

Defendant's Motion for a Protective

Order.

| Order.

Defendant's Supplemental Brief in

Support of Motion for Protective

Order.

Hearing Transcript.

Defendant's Second Supplemental

Brief in Support of Motion for

Protective Order.

Defendant’s Second Supplemental

Brief in Support of Motion for a

Protective Order.

Defendant's Notice of Filing of

Classified In Camera Ex Parte

Declaration and Materials.

Order.

DATE

04/08/1993

04/09/1993

04/09/1993

04/09/1993

04/12/1993

04/13/1993

04/13/1993

04/14/1993

04/14/1993

04/15/1993

04/16/1993

12

DOCUMENT

Order.

Plaintiffs Opposition to Defendant’s

Motion for a Protective Order Barring

Access to Unnamed Classified

Programs and Notice of Filing of

Classified Appendix in Support

Thereof.

Plaintiff's Notice of Filing of

Classified Deposition Transcript.

Plaintiffs’ Motion for Leave to File an

In Camera Classified Declaration.

Order.

Defendant’s Reply to Plaintiffs

Opposition to Defendant's Motion for

a Protective Order.

Defendant's Motion for Stay of Order

Pending Interlocutory Appeal and

Motion to Certify Order for

Interlocutory Appeal.

Order Denying Motion to Stay.

Order Denying Motion to Certify for

Interlocutory Appeal.

Government's Petition for Mandamus

and Request for Stay to the Court of

Appeals for the Federa} Circuit.

Order.

DATE

04/16/1993

04/16/1993

04/20/1993

04/20/1993

04/21/1993

04/21/1993

04/22/1993

04/27/1993

04/30/1993

04/30/1993

05/05/1993

13

DOCUMENT

Plaintiffs’ Motion Requesting Record

of In Camera Proceedings.

Court of Appeals for the Federal

Circuit Order.

Court of Appeals for the Federal

Circuit Order.

Order.

Defendant's Response to the Court's

Order Dated April 16, 1993 [Mise.

No. 370].

Plaintiffs’-Respondents’ Opposition to

Petition for Writ of Mandamus and

Opposition to a Stay Pending

Resolution of Petition and Motion for

Leave to File Documents In Camera

[Mise. No. 370].

Defendant: Petitioner's Reply to

Plaintiffs’-Respondents’ Opposition to

Petition for Writ of Mandamus and

Opposition to a Stay {Misc. No. 370].

Order.

Order.

Court of Appeals for the Federal

Circuit Order.

Order.

DATE

05/07/1993

05/20/1993

05/26/1993

05/27/1993

05/27/1993

06/08/1993

06/10/1993

06/11/1993

06/11/1993

14

DOCUMENT

Order Staying Ali Discovery on Air

Force Programs.

Order.

| Plaintiffs’ Memorandum Concerning

' Continuation of Discovery on Count

IX and Notice of Filing of Classified

Appendix in Support Thereof.

Defendant's Motion to Dismiss

Plaintiffs Superior Knowledge

Claims, Or In the Alternative for

Partial Summary Judgment, and

Motion for a Protective Order and

Notice of Filing of Classified

Appendix in Support Thereof.

Defendant's Memorandum Regarding

“Superior Knowledge” Hearing on

May 28.

Plaintiffs Motion for Continuance of

Defendant’s Motion for Partial

Summary Judgment.

Hearing Transcript.

Defendant’s Response to Plaintiffs

Motion for a Continuance.

Defendant's Notice of Filing of

Classified, In Camera, Ex Parte

Appendix to Motion to Dismiss

Plaintiffs’ Superior Knowledge

Claims.

DATE

06/15/1993

06/21/1993

06/21/1993

06/23/2003

06/25/1993

07/08/1993

07/15/1993

07/19/1993

07/23/1993

07/26/1993

08/1 1/1993

10/22/1993

15

DOCUMENT

Notice of Filing of Classified

Appendix.

Order.

Opinion and Order.

Defendant’s Status Report

Concerning Count IX.

Plaintiffs Response to Status Report

re Count IX.

Order.

Defendant's Status Report

Concerning Count IX.

Order Vacating Stay of Discovery on

Superior Knowledge Claims.

Defendant’s Supplement to Motion to

Dismiss Plaintiffs Superior

Knowledge Claims.

Opinion and Order.

Order.

TRANSCRIPT of proceedings re: 28

volumes, taken at Washington, D.C.,

for dates of September 20-30, 1993,

and October 1, October 4, October 5,

and October 7, 1993.

DATE

11/01/1993

11/19/1993

11/19/1993

11/22/1993

11/29/1993

11/29/1993

11/29/1993

12/17/1993

13

14

16

21

23

16

DOCUMENT

PUBLISHED DECISION addressing

state secrets doctrine and discovery

issues, and setting concurrent Brief

deadline to November 19, 1993.

NOTICE of filing of classified, EX

PARTE materials by USA.

MEMORANDUM by USA re: motion

to dismiss “Superior Knowledge”

Claims, and response to 1I/I/93 order.

MEMORANDUM by MCDONNELL

DOUGLAS, GENERAL DYNAMICS

re: superior knowledge order by leave

of the Judge.

MOTION by MCDONNELL

DOUGLAS, GENERAL DYNAMICS

for Summary Judgment on Count IX.

PROPOSED FINDINGS of

Uncontroverted Fact by

MCDONNELL DOUGLAS,

GENERAL DYNAMICS.

Notice of filing a classified appendix

by MCDONNELL DOUGLAS,

GENERAL DYNAMICS.

RESPONSE by MCDONNELL

DOUGLAS, GENERAL DYNAMICS to

response by USA.

DATE

12/20/1993

12/23/1993

12/29/1993 |

01/03/1994

01/03/1994

01/03/1994

01/03/1994

58

64

68

17

DOCUMENT

RESPONSE by MCDONNELL

DOUGLAS, GENERAL DYNAMICS

to USA’s memorandum |i.c. motion to

dismiss “Superior Knowledge” claims}

by leave of the Judge.

ORDER entered directing the Clerk

to refuse to accept for filing any

pleadings signed by or for the current

attorney of record for the USA or the

Director of Commercial Litigation

until further direction from the court.

Attorney for defendant, Mary Sue

Mitchellson, terminated this date.

MOTION by USA For reconsideration

of order under Rule 83.2 , to Vacate

order, and for Expedited

Consideration.

Notice of filing classified materials by

USA.

CROSS MOTION to Dismiss by USA

and RESPONSE to motion for

Summary Judgment by GENERAL

DYNAMICS, MCDONNELL

DOUGLAS.

STATEMENT OF GENUINE

ISSUES by USA.

DATE

01/10/1994

01/10/1994

01/31/1994

02/01/1994

02/01/1994

02/02/1994

02/02/1994

79

57

89

90

94

18

DOCUMENT

REPLY by USA to plaintiffs’ 12/17/93

brief in response to USA'S motion to

dismiss plaintiffs’ Superior

Knowledge Claims.

ORDER granting motion to Extend

‘lime to respond to motion for

summary judgment.

Notice of filing classified appendix by

MCDONNELL DOUGLAS,

GENERAL DYNAMICS.

REPLY by MCDONNELL

DOUGLAS, GENERAL DYNAMICS

to response to cross motion.

MOTION by MCDONNELL

DOUGLAS, GENERAL DYNAMICS

for Leave to File a supplemental]

superior knowledge memorandum

regarding Northrop ATA proposal

documents.

ORDER granting [90-1] motion for

Leave to File a supplemental

superior knowledge memorandum.

SUPPLEMENTAL MEMORANDUM

by MCDONNELL DOUGLAS,

GENERAL DYNAMICS re: Northrop

ATA Proposal Documents PLACED

IN CAMERA.

DATE

02/04/1994

02/04/1994

02/10/1994

02/14/1994

02/16/1994

02/18/1994

03/07/1994

03/07/1994

118

97

102

109

113

122

14]

19

DOCUMENT

TRANSCRIPT of proceedings re: 1

volume, at Washington, D.C., for date

of February 8, 1994. Notice to parties.

ORDER entered that there is no

basis for finding that the Air Force

acted to help or hinder development

of the merits of this case, with the

Clerk directed to accept any

pleadings complying with the Rules

from the USA.

STATUS REPORT by USA.

RIEPLY by USA to response to cross:

motion.

ORDER scheduling Show Cause

Hearing for 10:00 a.m. on 3/7/94 for

USA to Show Cause why the Court

should not deem admitted plaintiffs’

superior knowledge claims, ete.

ORDER denying motion For

reconsideration of order under Rule

83.2. Order also states that the

December 23, 1993 order is now

MOO'.

Show Cause Hearing held.

MOTION by USA for Leave to File

response to order to show cause, and

response to order to show cause.

DATE

03/09/1994

03/23/1994

03/24/1994

03/28/1994

03/31/1994

(4/04/1994

04/05/1994

04/14/1994

04/18/1994

04/20/1994

163

167

189

195

20]

defendant's response to Show Cause

20)

DOCUMENT |

ORDER re: defendant's response to |

order to show cause. |

MOTION by MCDONNELL

DOUGLAS, GENERAL DYNAMICS

for Leave to File repiy, and reply to

Order on Superior Knowledpe.

ORDER entered directing plamtitfs

to designate representatives to

explore feasibility of proposal to

litigate portion of superior knowledge

case, etc.

MOTION by USA for Reconsideration

of order.

ORDER adding matters to avenda for

a show cause hearnig.

STATUS REPORT re. assertion of

privileges by USA

RESPONSE by MCDONNELI.

DOUGLAS, GENERAL DYNAMICS

to report by USA

ORDER entered re further

procedures.

STATUS REPORT regarding Count

IX by USA.

ORDER entered re’ security issues

related to Count %

|

}

DATE

04/28/1994

07/22/1994

07/28/1994

09/14/1994

09/23/1994

09/27/1994

09/26/1994

341

354

21

DOCUMENT

ORDER entered re discovery, etc.

MOTION by MCDONNELL

DOUGLAS, GENERAL DYNAMICS

for Leave to File to permit disclosure

of nonparty B-2 and F-117A

information to plaintiffs’ engineers

cleared into those programs.

| ORDER entered granting motion for

' Leave to File to permit disclosure of

| non-party B-2 and F-117A

information to plaintiffs' engineers

cleared into those programs.

MOTION by MCDONNELL

DOUGLAS, GENERAL DYNAMICS

to Compei discovery of documents

from the B-2 and F- 117A programs.

RESPONSE by USA to motion to

Compel.

TRANSCRIPT of proceedings re: ]

volume, at Washington, D.C., for date

| of September 26, 1994.

| ORDER entered that plaintiff's

motion to compel discovery is

suspended pending a review by

government counsel of the Air Force

response to plaintiff's interrogatories

and request for production.

22

—

DATE # | DOCUMENT |

10/04/1994 | 361 | STATUS REPORT by USA re: |

production of documents from the B-2 |

and F-117A programs.

10/04/1994 | 360 MOTION by MCDONNELL

DOUGLAS for entry of B-2 and F-

117A discovery order.

361 | STATUS REPORT by USA re:

| production of documents from the B-2

and F-117A programs.

10/04/1994

10/14/1994 | 364 ORDER set Evidentiary Hearing to

discuss B-2 and F-117A discovery:

10:00 a.m. on 10/17/94.

10/17/1994 | 365 TRANSCRIPT of proceedings re: 1

volume, at Washington, D.C. for date

of October 17, 1994.

11/01/1994 | 377 | (Preliminary) STATUS REPORT by

' USA re: production of documents

| from the B-2 program.

11/02/1994 | 380 ORDER entered re apparent

destruction of documents etc. (signed

| by Judge Robert H. Hodges).

11/03/1994 |

\

378 | ORDER granting motion for Leave to |

File revised preliminary status report

regarding production of B-2

, documents.

‘

DATE

11/03/1994

11/16/1994

11/16/1994

11/18/1994

12/01/1994

12/09/1994

12/16/1994

01/31/1998

385

403

400

424

‘

'

23

DOCUMENT

REVISED PRELIMINARY STATUS

REPORT regarding production of

documents from the B-2 program by

USA.

MOTION by MCDONNELL

DOUGLAS, GENERAL DYNAMICS

for Leave to File response to

defendant's status report re: the

production of B-2 documents.

STATUS REPORT by USA.

RESPONSE by MCDONNELL

DOUGLAS, GENERAL DYNAMICS

to report by USA.

ORDER granting motion for leave re:

production of B-2 documents. etc.

ORDER directing parties of Judge's

decision of agreement with Plaintiff

re: improper termination of A-12

contract for default in Count XVII.

ORDER granting motion for entry of

B-2 and F-117A discovery order.

ORDER entered that defendant will

have the opportunity at trial to

present evidence that contractor

performance was so deficient at the

time of termination.

DATE

02/07/1995

02/22/1995

03/07/1995

03/09/1998

04/07/1995 |

i

|

12/19/199%

Vi

ven

oy)

qi

449

te

or

jo

488

793

24

DOCUMENT

MOTION by MCDONNELL

DOUGLAS, GENERAL DYNAMICS

to Compel production of documents

related to classified supporting data

file UNDER SEAL IN CAMERA.

RESPONSE by USA to motion to

Compe! production of documents

related to classified supporting data.

FILED UNDER SEAL.

REPLY by MCDONNELL

DOUGLAS, GENERAL DYNAMICS

to response to motion to Compe}

production of documents related to

classified supporting data. FILED

UNDER SEAL.

ORDER directing parties of further

procedures to take if discovery cannot

be resolved.

ORDER Staying briefing schedule for

Plaintiffs summary judgment motion

and addressing other case

proceedings.

ORDER entered re further

proceedings.

ORDER set Brief [parties proposed

schedule for addressing damages)

deadline to 1/5/96.

DATE

01/05/1996

01/05/1996

01/05/1996

01/23/1996 |

01/23/1996

800

SO1

23

| DOCUMENT

MOTION by USA for entry of case

management order to address

damages aspects of this case.

MOTION by USA to Dismiss

Damages Allegations and for Entry of

a Partial Final Judgment or, in the

Alternative, for Certification for

Interlocutory Appeal.

STATUS REPORT (Proposed

Schedule for Addressing Damages) by

MCDONNELL DOUGLAS,

GENERAL DYNAMICS.

ORDER Response to motion to

Dismiss Damages Allegations and for

Entry of a Partial Final Judgment or,

in the Alternative, for Certification

for Interlocutory Appeal reset to

1/26/96 and Reply to Response to

Motion reset to 2/2/96 for motion to

Dismiss Damages Allegations and for

Entry of a Partial Final Judgment or,

in the Alternative, for Certification

for Interlocutory Appeal.

RESPONSE by USA to motion for

entry of case management order to

address damages aspects of this case.

DATE

01/26/1996

02/07/1996

02/07/1996

02/07/1996

02/29/1996

02/29/1996

803

808

809

828

26

DOCUMENT

RESPONSE by MCDONNELL

DOUGLAS, GENERAL DYNAMICS

to motion to Dismiss Damages

Allegations and for Entry of a Partial

Final Judgment or, in the

Alternative, for Certification for

Interlocutory Appeal.

REPLY by USA to response to motion

to Dismiss Damages Allegations and

for Entry of a Partial Final Judgment

or, in the Alternative, for

Certification for Interlocutory

Appeal.

| REPLY TO RESPONSE by

MCDONNELL DOUGLAS and

GENERAL DYNAMICS to response

bv USA.

ORDER re: further procedures.

MOTION by MCDONNELL

DOUGLAS for Leave to File under

seal its memorandum on superior

knowledge discovery in response to

‘ the court's 2/7/96 Order.

STATUS REPORT (Regarding

Superior Knowledge Discovery and

the Order of Proof at Trial), by

GENERAL DYNAMICS.

DATE

02/29/1996

03/01/1996

03/18/1996

03/20/1996

03/22/1996

03/25/1996

04/02/1996

831

os)

w

=~]

841

842

os)

neN

Qi

27

DOCUMENT

ORDER granting motion for Leave to

File under seal its memorandum on

superior knowledge discovery in

response to the court's 2/7/96 Order.

' MEMORANDUM by MCDONNELL

- DOUGLAS re: superior knowledge

discovery per order with one volume

appendix filed by leave of the Judge

AND PLACED IN CAMERA.

ORDER set Evidentiary Hearing for

discovery in the B-2 program: 10:00

a.m. on 3/22/96.

RESPONSE by USA to report by

| GENERAL DYNAMICS by leave of

the Judge.

ORDER set Additional Documents

issues of burden of proof and

sequence of procedures, etc. [brief]

due: 4/1/96 for USA, 4/8/96 [response

to brief] for GENERAL DYNAMICS

and MCDONNELL DOUGLAS.

TRANSCRIPT of proceedings re: 1

volume, at Washington, D.C., for date

of March 22, 1996.

RESPONSE (filed as defendant's

supplemental brief concerning the

burden of proof, the order for

presentation of evidence at trial, and

pretrial schedule) by USA to order.

=

DATE

04/08/1996

04/08/1996

04/09/1996

04/19/1996

04/19/1996

04/19/1996

04/19/1996

05/02/1996

05/06/1991

a

859

860

S61

28

| DOCUMENT

| Petition for a Writ of Mandamus.

PUBLISHED DECISION.

RESPONSE by MCDONNELL

DOUGLAS, GENERAL DYNAMICS

to response by USA.

Additional Documentation

[supplement to memorandum in

response to the order dated April 3,

1996] by USA and placed in camera.

MEMORANDUM by USA re: order.

MOTION by MCDONNELL

DOUGLAS, GENERAL DYNAMICS

for a pretrial determination that no

loss adjustment can apply, etc.

Additional Documentation

[supplemental appendix to plaintiffs

motion for a pretrial, etc.) by

MCDONNELL DOUGLAS and

GENERAL DYNAMICS and placed

in camera.

Answer to Petition for Writ of

Mandamus.

TRANSCRIPT of proceedings re: pre-

trial conference, 1 volume, at

Washington, D.C., for date of May 3,

1996.

DATE

05/13/1996

05/16/1996

05/17/1996

05/24/1996

05/31/1996

06/05/1996

06/08/1996

!

878

879

889

894

29

DOCUMENT

ORDER directing counsel to meet no

later than May 24, 1996 to perform

tasks as outlined in said order and

directing counsel to notify court of the

results of said meeting as soon as

possible.

ORDER Clarifying case status and

court's position.

ORDER addressing case proceedings

and upcoming trial and hearing.

RESPONSE by USA to motion for a

pretrial determination that no loss

adjustment can apply, etc.

Court of Appeals for the Federal]

Circuit Order Denying Petition for

Mandamus.

Oral Argument re: motion for a

pretrial determination that no loss

adjustment can apply, etc. by

GENERAL DYNAMICS,

MCDONNELL DOUGLAS.

TRANSCRIPT of proceedings re: 1

volume, at Washington, D.C., for date

of June 5, 1996 exhibits:

DATE

06/12/1996

06/13/1996

09/25/1996

10/09/1996

10/09/1996

10/22/1996

897

902

999

1003

1006

1012

30

DOCUMENT

ORDER directing parties the only

issue for determination of damages is

incurred costs, closing discovery that

is not related to incurred costs and

directing parties al! other discovery

deadlines remain in effect unless they

are changed by agreement of counsel

or order of court and set Trial or

hearing for 9/16/96.

TRANSCRIPT of proceedings re: 1

volume, at Washington, D.C., for date

of June 12, 1996.

MOTION by MCDONNELL

DOUGLAS for Leave to File UNDER

SEAL its proposed findings of fact

and conclusions of law supporting

non-imposition of a lost ratio.

ORDER granting motion for Leave to ;

File UNDER SEAL its proposed

findings of fact and conclusions of law

supporting non-imposition of a loss

ratio.

RESPONSE by USA to Motion for

Leave to File UNDER SEAL its

proposed findings of fact and

conclusions of law supporting non-

imposition of a lost ratio.

RESPONSE by GENERAL

DYNAMICS to order.

DATE

11/26/1996

12/09/1996

12/13/1996

01/22/1997

02/05/1997

07/23/1997

08/14/1997

08/14/1997

02/20/1998

1022

1026

104]

1044

1095

1098

1099

1128

31

DOCUMENT

MOTION by GENERAL DYNAMICS

regarding preservation of record for

appeal.

MOTION by MCDONNELL

DOUGLAS, GENERAL DYNAMICS

for a determination of the balance

due plaintiffs from the government.

PUBLISHED DECISION.

PUBLISHED DECISION granting in

part, denying in part motion to

Dismiss Damages Allegations and for

Entry of a Partial Final Judgment or,

in the Alternative, for Certification

for Interlocutory Appeal.

PUBLISHED DECISION denying

motion for Summary Judgment.

TRANSCRIPT of proceedings re: 25

volumes, taken at Washington, DC,

for date of June 17 through July 14,

1997, together with cumulative

index.

Post-trial (memorandum of

contentions of fact and law) by USA.

FINDINGS OF FACT AND

CONCLUSIONS OF LAW by

MCDONNELL DOUGLAS,

GENERAL DYNAMICS.

PUBLISHED DECISION.

DATE

03/30/1998

03/31/1998

04/02/1998

05/29/1998

05/29/1998

6/27/2000

7/18/2000

7/31/2000

08/11/2000

1145

1150

1154

1159

1160

1162

32

DOCUMENT

PUBLISHED DECISION vacating

the published Opinion and Order,

vacating the judgment, and directing

Clerk to enter judgment accordingly.

JUDGMENT entered pursuant to

Rule 58 awarding plaintiffs the sum

of $1,200.132.820.00, plus statutory

interest from June 26, 1991, unti!

paid. No costs.

NOTICE OF APPEAL by USA.

NOTICE OF CROSS-APPEAL by

GENERAL DYNAMICS.

NOTICE OF CROSS-APPEAL by

MCDONNELL DOUGLAS.

Status Conference held (no reporter

requested).

NOTICE of Statement of Issues and

Notice of Probable Testifying Experts

for Trial by USA.

RESPONSE by MCDONNELL

DOUGLAS and GENERAL

DYNAMICS to notice by USA.

ORDER set hearing for 10:00 a.m.,

9/6/00.

DATE

8/11/2000

9/29/2000

11/07/2000

12/15/2000

12/19/2000

12/21/2000

01/12/2001

01/31/200)

1169

1192

1197

33

DOCUMENT

TRANSCRIPT of proceedings re:

Status Conference, 1 volume, at

Washington, D.C., for date of August

10, 2000.

TRANSCRIPT of proceedings re:

Evidentiary Hearing, 1 volume, at

Washington, D.C., for date of

September 28, 2000.

ORDER set Status Conference for

10°00 a.m., 11/16/00.

STATUS REPORT by USA.

STATUS REPORT by MCDONNELL

DOUGLAS and GENERAL

DYNAMICS.

TRANSCRIPT of proceedings, 1

volume, at Washington, D.C., for date

of December 19, 2000.

MOTION by USA to Compe!

disclosure of plaintiff's case and brief

in support, (together with separate

appendix).

RESPONSE by MCDONNELL

DOUGLAS, GENERAL DYNAMICS

to motion to Compe] disclosure of

plaintiff's case and brief in support,

filed with a (1) one volume appendix.

DATE

02/07/2001

02/09/2001

02/12/2001

02/12/2001

02/12/2001

92/15/2001

Q2/21/200)

Ht

1210

1218

1218

1215

1219

34

DOCUMENT

NOTICE of an Ibex Parte filing in

connection with Plaintiffs 29th and

40th sets of discovery requests by

USA.

KEPLY by USA to response to motion

to Extend Time within which respond

to motion to compel disclosure of

plaintiff's case.

MOTION by MCDONNELL

DOUGLAS, GENERAL DYNAMICS

to Extend Time to file bricks re’

issues to be tried (pending

determination of government's

invocation of state secrets privilege)

and for a status conference.

RESPONSE by USA to motion to

Extend Time to file briefs re’ issues

to be tried.

Binef regarding issues to be

addressed and the appropriate trial

standards to be applied at the May 1,

2001, default trial filed by USA.

ORDER Status Conference for 10:00

am., 2/23/01.

TRANSCRIPT of proceedings J

volume, at Washington, D.C., for date

of February 20, 2001. Notice to

parties.

33

DATE ue DOCUMENT

03/01/2001 | 1229 | UNPUBLISHED DECISION

reaffirming the December 13, 199@

opinion and order; and concluding

that defendant may not obtain a lost

adjustment pursuant to FAR 49.203,

_and plaintiffs may not obtain profits

pursuant to FAR 49.202.

03/07/2001 | 1236 | STATEMENT OF ISSUES AND

LEGAL STANDARDS FOR TRIAL

by MCDONNELL DOUGLAS and

GENERAL DYNAMICS

03/28/2001 | 1264 | MOTION, together with four volumes

of appendix, by USA For

reconsideration of order under Rule

83.2 and brief regarding effect of

state secrets.

03/30/2001 | 1269 | TRANSCRIPT of proceedings re:

Evidentiary Hearing, 1 volume. at

Washington, D.C., for date of March

29, 2001. .

04/10/2001 | 1277 | NOTICE of Supplemental Authority

by USA.

DATE

4/27/2001

04/30/2001

07/10/2001

07/10/2001

07/10/2001

07/11/2001

a

1284

1333

36

DOCUMENT

ORDER denying motion For

reconsideration of order under Rule

83.2. Trial of this case begins at 10:00

a.m. on May 7 and 9:00 a.m.

thereafter until June 29. The court

will not meet on May 28 or June 4°8.

The time will be evenly divided

between plaintiffs and defendant. Mr.

Lewis is excluded as an expert

witness. See Transcript of hearing on

April 23, 2001. All-other motions that

were pending and not. listed on the

: April 23 proposed agenda and status

report are moot and thereafter

denied.

TRANSCRIPT of proceedings re: Pre-

Trial Conference, 1 volume (151

pages), at Washington, 1).C., for date

of April 23, 2001.

Post-trial brief filed by

MCDONNELL DOUGLAS.

PROPOSED FINDINGS OF FACT

filed by MCDONNELL DOUGLAS.

PROPOSED FINDINGS OF FACT

AND CONCLUSIONS OF LAW filed

BY GENERAL DYNAMICS.

Post-trial brief by USA.

DATE

08/31/2001 | 1346

08/31/2001

09/17/2001

09/17/2001

10/04/2001

11/16/2001

11/21/2001

cod

1351

1353

1356

37

DOCUMENT

MOTION by MCDONNELL

~DOUGLAS, GENERAL DYNAMICS

_to Stay this Court's Judgment in

light of Defendant's recent collection

report.

JUDGMENT entered, pursuant to

| Rule 58, that the complaint is

| dismissed and judgment is entered in

favor of defendant. No costs.

MOTION by MCDONNELL

DOUGLAS (Service by hand: 9/17/01)

to Amend judgment order.

MOTION by GENERAL DYNAMICS

to Alter Judgment, and to Amend to

Court's findings.

ORDER denying motion to Alter

Judgment, motion to Amend to

Court's findings and motion to

Amend judgment order.

MOTION by MCDONNELL

DOUGLAS, GENERAL DYNAMICS

to Stay Government's collection

‘demand.

| RESPONSE by USA to motion to

Stay Government’s collection

demand.

DATE

11/26/2001

11/30/2001

11/30/2001

12/14/2001

01/09/2004

01/23/2004

1359

1360

1361

1382

may

od

DOCUMENT

ORDER re: Directing parties to agree

on a date and time to address the

Court's responsibilities in this matter

concerning the money judgment, if

the parties feel the Court has

additional responsibilities.

NOTICE OF APPEAL by GENERAL

DYNAMICS.

NOTICE OF APPEAL by

'MCDONNELL DOUGLAS

NOTICE OF CROSS-APPEAL by

USA.

MOTION tor Judgment Based Upon

Additional Findings Mandated by the

Court of Appeals and Memorandum

in Support, Together with Separately

Bound Supplemental Appendix

(Volume D by USA.

-CROSS MOTION and OPPOSITION

to Dft’s Motion for Judgment on

Partial Findings, Together with

Separately Bound Appendix Volume

by MCDONNELL DOUGLAS

CORPORATION.

DATE

1/26/2004

03/12/2004

04/16/2004

4/16/2004

1386

1393

1397

1398

——

39

DOCUMENT

REPONSE to Motion for Judgment

on Partial Findings and Motion for

Judgment on Partial Findings by

USA and CROSS MOTION for

conversion of default termination to

termination for convenience, together

with 5 separate volumes of appendix,

filed by GENERAL DYNAMICS

CORPORATION.

OPPOSITION to Plitfs’ CROSS

MOTION for Judgment and

Conversion of the Default

Termination to Termination for

Convenience and BRIEF IN REPLY

to Pitfs’ Responses to Dft’s Motion for

Judgment, Together with Four (4)

Separately Bound Appendix

Volumes, filed by USA.

REPLY to Response to Motion re

CROSS MOTION to Motion for

Judgment on Partial Findings filed

by USA filed by MCDONNELL

DOUGLAS CORPORATION.

Reply to Opposition to Motion for

Conversion of Default Termination to

Termination for Convenience, with a

(1) one volume appendix in support.

DATE

7/15/2004

7/15/2004

6/8/2006

7/6/2006

7/21/2006

03/03/2007

1408

1409

1431

1434

1438

1440

1441

40

DOCUMENT

SUPPLEMENTAL BRIEF and

PROPOSED ADDITIONAL

FINDINGS OF FACT by

MCDONNELL DOUGLAS

CORPORATION.

POINTS IN REBUTTAL to Pltfs’

Oral Argument, filed by USA.

POST ARGUMENT BRIEF, filed by

USA.

RESPONSE to MOTION to Amend

Schedule re: Order on Motion for

Extension of Time to File , filed by

MCDONNELL DOUGLAS

CORPORATION, GENERAL

DYNAMICS CORPORATION.

MOTION for Leave to File

Supplemental Brief in Reply To

Plaintiffs’ Response Brief, filed by

USA.

PUBLISHED ORDER and OPINION

granting 1382 Motion for Judgment

on Partial Findings: denying 1385

Cross Motion: denying 1386 Cross

Motion. The Clerk is directed to enter

judgment.

JUDGMENT entered, pursuant to

Rule 58, in favor of defendant. No

costs.

4]

Relevant Docket Entries

U.S. Court of Appeals for the Federal Circuit

MCDONNELL DOUGLAS CORP vy. UNITED STATES

DATE

1998-5096

DOCUMENT

6/15/1998 ! Brief of Defendant-Appellant to the Federal

8/3/1998

9/28/1998

7/1/1999

Circuit.

Brief of Plaintiffs-Cross Appellants’ to the

Federal Circuit.

Reply and Cross-Appellee Brief of

Defendant-Appellant to the Federal Circuit.

Federal Circuit Opinion.

42

Relevant Docket Entries

U.S. Court of Appeals for the Federal Circuit

MCDONNELL DOUGLAS CORP vy. UNITED STATES

DATE

3/6/2002

3/6/2002

5/24/2002

7/31/2002

8/15/2002

9/13/2002

3/17/2003

2002-5034

DOCUMENT

Brief for Plaintiff-Appellant General Dynamics

the Federal Circuit.

Brief for Plaintiff-Appe!llant McDonnell

Douglas in the Federal Circuit.

Brief for Defendant-Appellee-Cross-Appellant

United States in the Federal Circuit.

Reply/Cross-Appellee Brief for McDonnell

Douglas in the Federal Circuit.

Reply/Cross-Appellee Brief for General

Dynamics in the Federal Circuit.

Cross Reply Brief for Defendant-Appellee-Cros:

Appellant United States in the Federal Circuit!

-

Federal Circuit Opinion.

43

Relevant Docket Entries

U.S. Court of Appeals for the Federal Circuit

MCDONNELL DOUGLAS CORP v. UNITED STATES

2007-5111

DATE DOCUMENT

10/23/2007 | Brief for Plaintiff-Appellant General

Dynamics in the Federal Circuit.

10/23/2007 | Brief for Plaintiff-Appellant McDonnell

Douglas in the Federal Circuit.

02/19/2008 | Brief for Defendant-Appellee United States in

the Federal Circuit.

04/17/2008 | Reply Brief for McDonnell Douglas in the

Federal] Circuit.

12/01/2009 | Federal Circuit Opinion.

44

ASSISTANT SECRETARY OF DEFENSE

Washington, D.C. 20301-8000

5 Jan. 1988

MEMORANDUM FOR UNDER SECRETARY OF

DEFENSE FOR ACQUISITION

SUBJECT: ATA Risk Management

Subject 8118 of the FY88 DoD appropriations

act requires that, before a fixed price type contract is

used for development of a major system, the USD(A)

make a written determination that risk has been

reduced to enable realistic pricing and that the

contract type permits an equitable and sensible

allocation of program risk between the contracting

parties.

I have had two hours to review the Navy ATA

program which is employing a fixed price FSD

contract and three years of not-to-exceed (NTE)

prices for production. I, therefore, cannot give you a

firm, well-reasoned recommendation regarding the

two elements on which you must make your

determination required by Section 8118 — that

program risk has been reduced to the extent that

realistic pricing can occur or whether program risk is

equitably shared, but 1 can express some of my

observations and reservations.

The Navy has selected a source and is very

eager to sign a contract, hence their briefing may

indicate that program risk is less than it actually is.

The Navy does not consider technical} risk to be high

45

with the exception of instability of the low observable

design which has not been prototyped in a flying

model. This will be the first carrier based low

observable aircraft. First flight is scheduled for FY

90. The Navy plans to maximize use of existing

avionics though the contractor will be required to

design a new radar and conformal antennas and will

have to modify F-404 engines. Software integration

of the avionics will also be required. I cannot

effectively evaluate the technical risk involved in

these efforts in the short time available. The ceiling

price of the FSD contract is $4.8B — the target cost is

20% below that at $4.0B with a 60%/40% share from

target to ceiling making this a tightly priced FPI

contract. The Navy appears to have adequately

priced all known development costs and the in-house

Government estimate is close to the proposed price.

There is not an amount included for contingencies or

for unforeseen technical problems that inevitably

arise on major R&D programs. There is an economic

adjustment clause to cover unusual inflation. The

winning McDonnell/General Dynamics (GD) team's

price was $800M lower than the Grumman/Northrop

team's proposal. Northrop has had experience with

low observables and McDonnell/GD have not so it

could be the Northrop estimate was more realistic.

McDonnell and GD are strongly interested in

becoming involved in stealth technology so they

might be prepared to accept some risks to do so.

The FSD contract includes 3 years of

production NTE’s amounting to $4.6B for 34 aircraft

(6, 8 and 20). There is considerable risk in these

NTE prices. The prices are fixed (downward

46

negotiable only) before the aircraft has been

designed, 3 years before it will be flown and by

contractors who have no experience with the

extremely high tolerances required in the production

of low observables. Production contract warranties

require all OPEVAL — discovered specification

deficiencies to be corrected at contractor expense

although production on the first three contracts will

be substantially complete before the conclusion of

OPEVAL. Based on the above observations, I cannot

unconditionally recommend that there is an

“equitable and sensible allocation” of program risk

between the contracting parties on the ATA program.

With respect to the second determination you

are required to make, the Navy believes that the

selected team of Genera] Dynamics and McDonnell

can absorb any losses though there has not been an

economic analysis of either contractor’s capacity to

absorb a loss. The Navy does not believe there will

be a major loss.

Attached are the questions I asked and the

Navy’s responses. Their earlier responses give rise

to the concerns I’ve expressed.

/s/ Eleanor Spector

Eleanor Spector

Deputy Assistant Secretary

of Defense (Procurement)

Attachment

47

N00019-88-C-0050

FULL SCALE ENGINEERING DEVELOPMENT

N00019-88-C-0050

FOR

ADVANCED TACTICAL AIRCRAFT (ATA)

201/BRR/1105-87

Page 1 of 338 Pages

Copy: Cy206Kh-6

201/0RR/0005-88

: ow : | pe | 8000! 9 141 @imee oa ft;

\EPARTMENT OF THE SAXY © 7 7 ™

aval Air Systees Command

Washingzorc, D.C. 20361 See Section G

Alb~ 214K Ms B, Jones

Telephone: Arcs Code 202, 692- 2020 Pre-Avaréd Survev Serial Ne.

til ane aUnutsy OF COmMPRACTOS Wan simel sn een seem ene 711 bua tT Ueto

McOonnel] Dougias/McDonnell Aircraft Company/ PP ca seals ae ;

General Dynamics/Ft Worth Division —- dn uittemn er © hw

P.O. Box 748

Ft Worth, TX 76101

—_——_—-<

1S Besta ave lg Od) —

tt oe ow mee

ose coemene * Vag See

cM acim 6958 :RODRELS Sees res in Section ¢

de bee Turmewun FU Cut ' a ce Dawe ay Ot Ol be 908 =

See Section F ' See Section C

a POR Uaint Ont a Ym anh , eeets Ht Cement. 7 TT en eGual: ahGe ay, “ooodb g's O88 haaeS

_—., _ _ AA 1781804.4AZ23 003 AAAB2 0 000 )

me |) eee es 926WX0101800 $766 000,000.00 7

“ts tv NE TOR LPP ESSE AY ICES WSS Dusutets 8S ONT Gl vert POKCE 8ge faut

aes,

Pt |

| |

190 TOTA\ AMOUNT OF CONTRACT b ¢4 379 219.:

16 ~S3LE OF CONTENTS

See actached pages.

7 52522107: >>, Sssrsi. Sh: DEST OT Im, 4584

PART t= Tul Some OUe | O28" +) = COMTBAC? = BLEUE

EF SEEN 4 MONIC ONT AL = Ban : x 0 cOnthaC? Claugt? “e]

EOS AOn tS OF SB Ovizts iin ewctea eet | i-? O60 7-11 = HBT OF DOTUMEN™S Be —18I7s ANG CT<88 aTIAc~

ZS SES VN SPE Star STETEMENT i=l [x 4 1405708 aTTacuugns . 9e}

LS sh 83 15 aD 3 OFS 3-] ORB" Ny @ OF COLET HT HTIONS ONG INST OUST IONS

= an el wl Pe a aCritt ax sj MEORERE.T 271 § PRTC ATI ONT —

Se DtLivesies oe Oe 29 5anIeNCY - So] ae = ++ G0eeO BTLTS EW SOF SIP LALAS !

P =>.TRSST 2OMu, Te F180 Sate — 6-| ; GOS Swe art TEN be Bog

o> SESS CONT WS =~ Pt agit ss =] Vive pati Sag eae! P78 anaes

— CONTAASTIN: OF 81:72 Sz 4 COL FTE Fa TOR ESS APM ICAL ~ j)¢ ee

. = -

3? z Conreacroay ESOT IerEG SSAEEMENT sC onwerin wa rT OWAED iCnerresie @ 90! reuird Im ne Ihe Goremrel, Ye

decums _ e

proved AY TS a! ond wriye We tm emg aller . ete: Om Secs! oe MemMOe

O° este" 00°00, 38 ‘yrdun O26 O0+.09- oun vigene wong > rod tae ° 2 err

. Oerlne mM Ot 1% serotes ve 12e OOG+1OO1 GF CN OFE8s MAES Os ver @FSS E6119) & E4em

teever-sran won cree Tee tne OF ORs ORIMue'1Om seen) te: Ime | ork ts teste ee ten CDOre. 2 SOON. CLECDIES G2 & MD OMS &O008 0OBD 0

somes! tne. St8e ~eroun The amy Ong Seegiinns ct Re BOF1Gd 10 Ihe | we omy OAR esIe WOM) TH C606 LOM WMMEIM ine GBRI1EG weer 14

ore thmirer tee tee ne ie ree eae BEGwm Ors 141 the | Vuln w! IMe terme Beauments jo) Ihe Geer nmen! 4 Mrenever ene oF

we, leoristeasimes, ow aehean ene, 076 16) wer Orr erwuny, "90ers OOM OPS (Ol 1S CEE COME! oes. ‘wr IME EMMI TEI es: BEtemen! 4 nm

~ a5. ov we ptteanes © Mee eretoe o, | roy

as J 1A Megamente ery ing

+4 Nae Se VC Cl S cnee Vim o Baal = erasers

. [2G— femme’ OF Clim PO al ime UF

Charles A, Anderson W. S. Ross oer“

President j : ,

oe =. & et.

5 Jan 88

St

49

SCHEDULE

SECTION B - SUPPLIES OR SERVICES

Item Supphes or Quantity Unit Total Price

Services Price

0001 ATA Aireraft XXXX XXXX $244,150,654

Initial Design

Review (IDR)

0002 ATA Aircraft XXXX XXXX $236.957,522

Preliminary

Design Review

(PDR)

0003 ATA Aircraft XNXX XXXX $504.160,441

Critical Design

Review (CDR)

0004 Data for Items NSP (See

0001. 0002, Exhibit A

0003, 0049 and and

0050 applicable

Exhibit B

Data Items)

0005 ATA Aircraft 8 XXXX XXXX

OOO5AA Same as Item ] XXXX $209.006,809

0005

0005AB Same as Item 7 3° $589.737,050

0005

0006 Special Tooling xxx XXXX $354,478,268

and Special Test

Equipment for

Items 0001

0007

0008

0009

0010

00}1

through 0005

and 0049 and

0050

DELETED

Data for Items

0005. 0006 and

0051 through

0056

DELETED

Data for Items

0051 through

0056

Project

Management

*$84,248,150

0044

0045

0046

Data for [tem

0043

Installation and

Maintenance of

High Response

40 Probe Inlet

Distortion Rakes

For Inlet

Compatibility

Measurements

Data for Item

0045

XXXX XXXX

XXXX XXXX

x*xnxee

XXXX XXAX

(1) Setof2 xxxx

rakes Rt &

Left Inlet

XXXX XXXX

NSP (See

Exhibit B)

NSP (See

Exhibit C)

NSP

NSP (See

Exhibit U)

NSP

NSP (See

Exhibit V)

rem

0047 CALS Technical xxxx XXXX $645.640

Manual Program

0048 Data for Item XXXX XNXX NSP (See

0047 Exhibit W)

0049 ATA Aircraft XXXX XXXX $286,214,572

Program

Management

Review (PMR)

0050 ATA Aircraft XXXX XXXX $182,325.015

Program

Management

Review (PMR)

0051 Phase I Test XXXX XXXX $427.683,277

0052 Phase II Test XXXX XXXX $308 .653,614

0053 Phase "Il Test XXXX XXXX $202,.462.819

0054 Phase IV Test XXXX XXXX $100.175,645

0055 Phase V Test XXXX XXXX $76,708,495

0056 Phase V1 Test XXNXX XXXN $514.271,392

0057 Training XXXX XXXX $33,422,845

Equipment for

Item 0005

0058 Interim XXXX XXXX $9,638,166

Contractor

Logistics

Support (1CLS)

for Item 0047

or

bo

‘Total Target price $4,379,219,436

*The prices shown above are the target prices. The

corresponding target cost and target profit for each item is

as follows.

Item Target Cost Target Profit

0001 $221,955,140 $22,195,514

0002 $215,415,929 21,541,593

0003 458,327,674 45,832,767

0005 726,130,782 42,613,077

0006 322,252,971 32,225,297

0022 71,388.374 7,138,838

0047 586,945 58,695

OO4A9 260,195,065 26,019,507

0050 165,730,014 16,575,001

0051 388,802,979 38,880,298

0052 280,594,195 28,059,419

0053 184.057,108 18,405,711

0054 91,068,768 9,106,877

53

0055 69,734,995 6,973,500

0056 467,519,447 46,751,945

0057 48,566,223 4,856,622

0058 8.761,969 876,197

Total $3,981,108,578 $398,110,858

The total price applicable to each item has been computed

by adding to the target cost for such Item, the

corresponding target profit set forth above for such item.

SCHEDULE

SECTION C - DESCRIPTION OR

SPECIFICATIONS OR WORK STATEMENT

Item 0001 Initial Design Review (IDR)

The IDR shall be held at the contractor’s

plant, or at other locations as he may designate, to

determine that the selected aircraft design approach

is compatible with the engineering requirements of

the contract. The IDR shal! be held within four

months after contract award to clarify and resolve

potential areas of misunderstanding, and is a means

of determining that the contractor has correctly

understood all aircraft design & test requirements.

The IDR shall be scheduled to be completed in one

session of approximately five working days.

Item 0002 Preliminary Design Review

(PDR)

The PDR shall be held at the contractor's

plant, or at other locations as may be mutually

agreed, to evaluate the progress, technical adequacy,

and risk resolution (on a technical, cost and schedule

basis of the selected design approach and determine

its compatibility with performance and engineering

requirements of the development specifications. The

PDR will be scheduled in more than one session

consistent with the completion schedule for the

individual preliminary design efforts. The length of

each individual review session’ shali be

approximately four working days. At the conclusion

of the incremental PDR’s, a_ final PDR of

approximately four working days will be held to

-_—

are)

summarize the results of the individual PDR’s.

Completion and approval by NAVAIR (AIR 05) of the

final PDR will result in authorization for the

Contractor to proceed with the design of the ATA.

Item 0008 Critical Design Review (CDR)

The CDR shall be held at the contractor's

plant or at other locations as he may designate to

determine the potential of the detailed design of the

ATA to satisfy the performance and engincering

requirements of the ATA development specifications.

The review shall be conducted when detail design

and analysis is essentially complete (90%). The CDR

will be scheduled in more than one session consistent

with the completion schedule for the individual

design efforts. The length of cach critical individual

review session shall be approximately four working

days. At the conclusion of the incremental CDR’s a

final CDR of approximately four working days will be

held to summarize the results of the individual

CDR’s. Completion and approval by NAVAIR (AIR

05) of the final CDR will result in authorization for

the Contractor to proceed with the design of the ATA

aircraft. The contractor shall furnish at CDR the

information set out in Clause “Establishment of Not-

to-Exceed prices for Option IV Items”.

REDACTED Item 0005- The

contractor shall design, develop, manufacture and

furnish eight (8) Full Scale’ Engineering

Development (FSED) aircraft and _ associated

mockups, models, and test articles in accordance

with the Detail Specification for ATA Aircraft

Weapon System, SD-574-1, including all Appendices.

56

Avionics Integration Laboratories shall also be

developed as needed to provide a_ technically

acceptable product within schedule constraints.

REDACTED The contractor shall (1) design

ATA aircraft including the F404-GE-F502 engine

through IDR, PDR and CDR in accordance with

Detail Specification, SD-574-1, including all

Appendices under Items 0001, 0002, 0003, 0049, and

0050 and (2) shall continue and complete the design

of ATA aircraft including the F404-GE-F502 engine

in accordance with Detail Specification, SD-574-1,

including all Appendices under Item 0005 to include

the design and development, fabrication and tests

necessary to:

(1) REDACTED Cause the aircraft, engine

and all other subsystems to conform to applicable

specifications required by this contract.

(2) REDACTED Develop and qualify the

F404-GE-F5D2 engine for incorporation into the ATA

aircraft weapon system.

(U) The aircraft to be furnished hereunder

shall be configured with the test instrumentation

required for tests and demonstrations to be

conducted in accordance with the requirements of

0051 through 0056. ‘Test articles shall comply with

the requirements of Detail Specification SD-574-1

and Addendum 648 to SD-8706C. The aircraft

provided hereunder are assigned BUNOs, xxxxx0

thru XxXxxx7.

57

(U) The contractor assumes the

responsibility for integrating and interfacing any

Government Furnished Equipment (GFE).

REDACTED The aircraft shall be equipped

with the F404-GE-F5D2 engines developed in

accordance with this contract. The contractor shall

perform all work necessary to integrate the engine

into the ATA aircraft and cause each to conform to

applicable specifications required by this contract.

The contractor shall perform all work necessary to

qualify the engine to:

1. REDACTED Complete Prototype

Preliminary Flight Qualification (PPFQ),

Preliminary Flight Qualification (PFQ), Limited

Production Qualification (LPQ) and Full Production

Qualification (FPQ) in accordance with the

requirements of Appendix E, Engine Model

Specification, to Detail Specification SD-574-1.

A. (JU) PPFO shall be considered

complete upon:

(1) (QU) _— Satisfactory completion of all the

tests, inspections and analysis required by Appendix

E, Engine Model Specification, to Detail Specification

SD-574-1.

(2) (U) Government approval of all

reports documenting the results of the above tests,

inspections and analysis.

(3) (U) Satisfactory Contractor

completion of corrective actions required to remedy

any safety of flight related items revealed during

development and testing of the engine.

58

(4) (U) Submittal and = approval of

corrective action plans to remedy any engine

specification non-conformance’ revealed during

development and testing of the engine.

(5) (U) Completion of at least 2100 total

hours of full scale engine running time prior to the

start of PPFQ endurance test.

B. (U) PFQ shall be considered complete

upon

(1). REDACTED Satisfactory completion of

all the tests, inspections and analysis required by

Appendix E, Engine Model Specification, to the ATA

Detail Specification, SD-574-1.

(2). (U) Government approval of all

reports documenting the results of the above test,

inspections and analysis.

(3). (U) Satisfactory Contractor

completion of corrective actions required by either

party to remedy any safety related nonconformance

revealed during development and testing of the

engine.

(4). (U) Submittal and = approval of

corrective action plans to remedy any engine

specification nonconformances’ revealed during

development and testing of the engine.

(5). (U) Completion of at least 3500 total

hours of full scale engine running time prior to the

start of PFQ endurance test.

C. (U) LPQ shall be considered complete

upon:

59

(1) REDACTED Satisfactory completion of

all the tests, inspections and analyses required by

Appendix E, Engine Model Specification, to Detail

Specification SD-574-1.

(2). (U) Government approval of all

reports documenting the results of the above tests,

inspections and analyses.

(3). (0) Submittal and = approval of

corrective action plans to remedy any engine

specification nonconformances revealed during

development and testing of the engine and full scale

development testing of the aircraft.

(4). (U) Completion of at least 4600 total

hours of full scale engine running time on a

minimum of 6 in-house test engines prior to the start

of LPQ endurance test.

D. (U) FPQ shall be considered complete

upon:

(1). (U) Notwithstanding inspection and

acceptance of aircraft containing engines hereunder,

the Contractor shall perform corrective actions

required to remedy any engine specification

nonconformance revealed by development and

testing of the engine and full scale development

flight testing of the aircraft.

(2). REDACTED Satisfactory completion of

all PFQ and LPQ requirements stated above.

(3). (U) Satisfactory completion of an

additional 1000 hours Accelerated Simulated

Mission Endurance Test (ASMET) conducted (1) in

60

accordance with paragraph 4.6.1.2 of the engine

model specification, and (2) on the same nameplate

engine used for the official LPQ ASMET with

changes only as necessary to perform routine

maintenance or update to the FPQ configuration.

(4). (U) Satisfactory completion of an

altitude performance and operability demonstration

conducted in accordance with paragraph 4.6.3 of the

engine mode) specification on an engine conforming

to the FPQ parts list.

(5). (U) Test verification (component

and/or engine) to 90% confidence of the minus three

sigma low cycle fatigue life or damage tolerance

inspection interval for each critical rotation

component and pressure vessel.

(6) (U) Accumulation of at least 9535

hours of full scale engine running time.

2. (U) Perform the work specified below. ‘The

following tasks shall be completed as a part of the

engine qualifications and integration of the engine

into the air vehicle:

(U) Task A -- The Contractor shall provide

engineering and material support at all Government

test facilities where the contractor proposes or

requires testing. The Contractor shall provide depot

and intermediate maintenance support for all

engines and exhaust systems being tested at the

government designated test facilities and the

contractor’s facility as well as provide organization

maintenance

61

wean

SCHEDULE

Final Assembly for Option Item 0301 aircraft. and

Second-Sourcing and Co-Production for the fifth lot

of production aircraft.

REDACTED Item 0006 - The

Contractor shall provide special tooling and test

equipment required hereunder, and it shall be of a

type, quantity and quality suitable for sustaining all

applicable requirements of the ATA Program under

Items 0001 through 0005 and 0049 and 0050.

REDACTED Item 001) - The Contractor

shall establish and maintain management activities

in accordance with the Project Management

Requirements for the ATA Aircraft Weapon System

to satisfactorily complete the tests required by this

contract. The program management effort shall be

established with authority delegated at appropriate

levels. Individual assignments’ within the

management organization shall facilitate single-

points-of-contact for interface with Government

Managers in a timely manner. The Contractor shall

commit such resources as are necessary to

accomplish the requirement stated herein. Program

Management shall be accomplished in accordance

with Attachment 24, the Program Management

Requirements for the ATA Aircraft Weapon System,

as revised and updated for FSD, SD-574:1,

Addendum 648 to SD-8706C, Addendum 116 to MIL-

D-8708B(AS), ILS-DS-30A-155 and Attachment 25.

62

REDACTED The contractor shall

participate in joint Navy/Contractor program level

conference and reviews as follows:

A.

1.

REDACTED Prograin Reviews

Program Reviews shall be reviews of the

current status of the contractor's overall ATTA

development program, and shall cover all

principal technical, =programinatic — and

contractual matters. Program Reviews will be

held quarterly through CDR and then three

times a year thereafter, at the prime

contractor's plant and each normally will be

three days in length. The agenda for cach

Program Review wall be jointly established by

the prime contractor and PMA-235. The first

Program Review will be held) within six

months after contract award.

REDACTED Post Award Orientation

Post Award Orientation Conferences of the

ATA shal! be conducted at) the prime

contractor's plant to clarify procedural and

administrative requirements and — resolve

potential areas of misunderstanding. The

length of the conference shall — be

approximately two working days. The first

post award orientation conference shall be

held within 45 days after contract award.

akanaeat

63

(U) Item 0045 - The Contractor shall design,

develop, install and maintain one set (eft and mght

hand inlet) of high response inlet distortion rakes for

one aircraft in order to validate and develop, if

necessary, engine/inlet compatibility. Rakes shall be

designed in accordance with Appendix E of the Detail

Specification, SD-574-1.

(U) Item 0047 - The Contractor shall

establish and provide a CALS Technical Manual

Program for Item 0005, in accordance with ILS-DS-

30A-155, Chapter 1, paragraphs 1.3.10 and 1.3.10.1.

REDACTED Item 0049 - The Program

Management Review (PMR) shall be held at the

Contractor's plant and shall review the current

status of the overall ATA development program,

addressing all principal technical, programmatic and

contractual matters. This PMR _ shall not be

considered complete until the Contractor provides

the following top level principal system installation

drawings and top level major component structural

assembly drawings evidencing 100% drawing

release:

Svstems:

(u) Fuel Subsystem

(u) —_ Electrical Subsystems

(u) Environmental Control

System

(u) Hydraulic/Pneumatic

Subsystem

Structural Assemblies:

64

{u) Forward Fuselage

(u) Centerbody

(u) Outboard Centerbody

(u) Aft Section

{u) Outer Wing

REDACTED Item 0050 - The Program

Management Review (PMR) shall be held at the

Contractor’s plant and shall review the current

status of the overall ATA development program,

addressing all principal technical, programmatic and

contractual matters. This PMR shall not be complete

until the following items are also completed:

(u) Software CDR, Build #3, as

defined in Paragraph 5.3.3 of

MIL-STD-2167.

(u) Detailed design and

analysis of FSD “0” Level Hydro-

mechanical support equipment

essentially complete (90%).

(u) LIAFTA core hardware and

software design for the initial six

(6) WRA’s.

REDACTED Item 0051 - The Contractor

shall perform Phase | of ATA design cxaminations,

tests and engineering to substantiate, assess and/or

effect compliance with design requirements in

accordance with Addendum 648 to SD-8706C. The

Contractor shall provide test articles, test hardware,

hardware support and test planning and _ shall

conduct the portion of testing in accordance with

Addendum 648 to SD-8706C required to conduct the

Critical Design Review (CDR). This includes the

65

initia] effort required to design and fabricate a full

size aircraft and cockpit mock-ups that will satisfy

the requirements for aircraft, lighting and aircrew

station mock-ups as specific in paragraph 3.3.2 of

Addendum 658 to SD-8706C. In addition, the

Contractor shall perform Phase | of ATA aircraft

demonstrations in accordance with Addendum 116 to

MIL-D-8708B (AS).

REDACTED Item 0052 - The Contractor

shall conduct Phase I! of testing in accordance with

Addendum 648 to SD-8706C and Addendum 116 to

MIL-D-8708B(AS) as required to effect the first flight

of the first ATA aircraft. The following tests shall be

completed:

(u) First major static condition

(u) - Fatigue/Static Strength

Pitch Flap

(u) Propulsion PPFQ

(u) Proof Test Control

Surfaces on Aircraft #1

(u) Crew Escape - Sled tests

(u) Canopy Pressure tests

(u) Cockpit controls/maximum

pilot effort

(u) Iron Bird Hydraulic

System Functional

(u) Static Strength MLG &

NLG

REDACTED Item 0053 - The Contractor

shall conduct Phase III of testing in accordance with

Addendum 648 to SD-8706C and Addendum 116 to

MIL-D-8708B(AS) as required for the Navy to

66

commence Sea Trials. Aircraft of Item 0005 and

certain production aircraft specified in Clause H-28

hereof shall be used for tests and demonstrations in

accordance with Addendum 116 to MIL-D-

8708B(AS). The following tests shall be completed:

(u) —_ Bird strike tests

(u) — Propulsion PFQ

(a) Clean aircraft drop tests

(u) 1G envelope (clean

aircraft)

(u) RCS Baseline static

measurement

(u) Emergency recovery device

proof test - Aircraft #8

{u) Closed loop/degraded

modes (iron bird)

REDACTED Item 0054 - The Contractor

shall conduct Phase IV of testing in accordance with

Addendum 648 to SD-8706C and Addendum 116 to

MIL-D-8708B{AS) as required through provisional

acceptance of the fourth production aircraft to be

used for tests and demonstrations in accordance with

Addendum 116 to MIL-D-8708B(AS). Aircraft of

Item 0005 and certain production aircraft specified

in Clause H-28 hereof shall be used for tests and

demonstrations in accordance with Addendum 116 to

MIL-D-8708B(AS). The following tests shall be

completed:

(u) Flight tests 100% loads

(u) Second Dynamic RCS

measurement

(u) Fatigue test - 2 lifetimes

67

(a) CBR intrusion test

(u) Drop tests Deck

Obstruction Test

REDACTED Item 0055 - The

Contrestor shall conduct Phase V of testing in

accordance with Addendum 648 to SD-8706C and

Addendum 116 to MIL-D-S8708B(AS) as required to

deliver the first ATA aircraft to the Navy for

commencement of TECHEVAL. Aijrcraft of Item

0005 and certain production aircraft specified in

Clause H-28 hereof shall be used for tests and

demonstrations in accordance with Addendum 116 to

MIL-D-8708B{AS). The following tests shall be

completed:

(u) Propulsion LPQ

(u) Repeated fatigue drops

(u) Fuel ingestion

(u) Laboratory armament

tests

(u) RCS airframe RAMS Spec

test

(u) Third Dynamic RCS

measurement

REDACTED Item 0056 - The Contractor

shall conduct Phase VI of testing in accordance with

Addendum 648 to SD-8706C and Addendum 116 to

MIL-D-8708B(AS) as required to the completion of

TECHEVAL on all TECHEVAL aircraft. Aircraft of

Item 0005 and certain production aircraft specified

in Clause H-28 hereof shall be used for tests and

demonstrations in accordance with Addendum 116 to

68

MIL-D-8708B(AS). The following tests shall be

completed:

(u) Flight Control System

Integration (iron bird)

(u) Aircraft No. 2 propulsion

tests

(u) Contractor flight tests

(u) Structural Dynamic

Service Life Effects

(u) Aireraft High Angle of

Attack

REDACTED Item 0057 - The Contractor

shall furnish Aircrew Training Devices for Item 0005

in accordance with Appendix C, (Appendix E) to ILS-

DS-30A-155, the Training System Specification,

Chapters 3.0 - 5.0, paragraphs 3.2, 4.2 and 5.2.

REDACTED The Contractor shall also

furnish a suite of Maintenance Training devices in

accordance with Appendix C (Appendix F) to ILS-DS-

30A-155, the Training System Specification,

Chapters 3.0 - 5.0, paragraphs 3.3, 4.3 and 5.3.

REDACTED The Contractor shall

continue to establish and conduct the Aircrew and

Maintenance Training Curricula, Design,

Development and Implementation programs and

Evaluation, Maintenance and Revision Programs

defined in Item 0022.

REDACTED Item 0058 - The Contractor

shall perform Interim Contractor Logistics Support

(ICLS) for {tem 0057 in accordance with paragraph

69

1.2.2 of Appendices C and D to Appendix C of ILS-

DS-30A-155.

REDACTED Option Items 0101, 0201,

0302, 0401. The Contractor shall fabricate, assemble

and delivery ATA aircraft in accordance with SD-

574-1 and Appendices thereto. Sustaining Tooling

Support for Production, such as the costs of

maintenance and refurbishment due to normal wear

and tear, methods improvements, quality assurance

and calibration, subcontractor production non-

recurring, establishment of dual final assembly and

co-production capability , and establishment and

qualification of vendor second sources shall be

included in the respective option prices. For Option

Item 0101 the contractor shall implement the process

described in the clause entitled “Dual Sourcing and

Co-Production Capability”. Under Option Item 0101,

the avionics system shall be tested in accordance

with paragraphs 4.1, 4.3, 4.4 and 4.5 of Appendix D

to Detail Specification, SD-574-1. Under Option

Items 0201 and 0301 the avionics systems shall be

tested in accordance with paragraphs 4.1, 4.4 and 4.5

of Appendix D to Detail Specification, SD-574-1.

Under Option Item 0401 the avionics system shall be

tested in accordance with paragraphs 4.1, 4.4 and 4.5

of Appendix D to Detail Specification, SD-574-1, for

all CI’s and paragraphs 4.3 and 4.5 (equivalent) of

Appendix D to Detail Specification, SD-574-1, for

second-sourced CI’s.

REDACTED Production aircraft shall

have the following alternate mission equipment

attached at delivery.

70

Per

Aircraft

Qty

6 BRU-32/A Bomb Rack

4 ALE-39 Chaff Dispenser

1 Fuel Probe (IFR) Tip

2 sets Survival Kit Components

1 Radar Altimeter

1 X-Band Beacon

2 LAU-127 Missile Launcher

6 Tandem Adapter

12 DAC 4010 Rack

REDACTED The following alternate mission

equipment shall be shipped separately:

Qty Per

Aircraft

1 1 BRU-32/A Bomb

Rack

1 1 Chal Adapter

1 l Lode 14 Rack

71

1 4 Primary Auxihary

Fuel Tank

1 4 Secondary

Auxiliary Fuel

Tank

1 12 Mod 28-200 Refuel

Store

1 12 D-704 (or

equivalent Refue)

Store)

1 1 External Pylon

1 l 400 Gallon Tank

l 2 BRU-41 Rack

l 2 BRU-42 Rack

12 10 ‘LAU-117 Missile

Launcher

2 5 Lau-115 Missile

Launcher

REDACTED The engines’ delivered

integrated with the ATA aircraft hereunder shall

conform to both (a) the requirements of Engine

model Specification Appendix E to SD-574-1 and b)

the drawings depicting the parts comprising the

parts list as modified by Class I and Class II changes

for the engine configuration which successfully

72

completes Limited Production Qualification (LPQ) or

Full model specification noncompliance found during

flight tests. If the obligation to conform to any such

drawing conflicts with the obligation to conform to

the specification requirements, the specification

requirements. shall prevail; however, a_ part

appearing on such parts list may not be changed in

any manner from the version depicted on its

applicable drawings in order to conform to

specification requirements unless the change is

approved under the Configuration Control Procedure

described in special provision H-36.

(U) The engines shall be acceptance tested

in accordance with the engine model specification

Appendix E to SD-574-1.

(U) The contractor shall maintain a quality

assurance program in accordance with MIL-Q-

9858A, Amendment 2. Additionally the contractor

shall provide and maintain a corrective action and

disposition system for nonconforming material in

accordance with MIL-STD-1520A with Notice 1 and

a supplier quality assurance program in accordance

with MIL-STD-1535A for all supplies and services

provided under this contract.

73

SCHEDULE

SPECIAL SECURITY REQUIREMENTS FOR

COMPARTMENTED CONTRACTS

1. [REDACTED] GENERAL. This

contract pertains to a program, part of which

is compartmented, and which contains

Sensitive Compartmented Information (SC])

and Special Access Program (SAP)

information. Access to SCI and SAP

information under this contract is limited to

those personnel who have been propcrly

briefed in accordance with the Program

Security Manual (PSM) and have executed a

Program Indoctrination Agreement. The

contractor shall provide and maintain a secure

control system within an approved program

facility in accordance with the requirements

and restrictions of (1) this clause: (2) the

Program Security Manual (PSM):

(3) attachment 34, Contract Security

Classification Specification (DD-254) and

attachment thereto: and (4) attachment 45:

Security Implementation Plan. Clarification

of security requirements and restrictions will

be provided upon request by the Program

Security Officer (PSO).

2. {REDACTED) PROGRAM

SECURITY OFFICER/ASSISTANT

PROGRAM SECURITY OFFICERS.

[REDACTED] responsibility has been

assigned to the PSO, NAVAL AIR SYSTEMS

74

COMMAND (NAVAIRSYSCOM). The PSO is

the US Navy official responsible for all aspects

of security for the BRAVERY program. The

PSO is aided by Assistant Program Security

Officers (APSO), who will enforce the security

policies and procedures of the program.

3. (U) PROGRAM SECURITY

COORDINATOR. The Contractor shall

designate with the approva! of the PSO, a

Program Security Coordinator (PSC) who,

assisted by a staff assigned for these functions,

shall be assigned the responsibility for

assuring compliance with the provisions of

this CLAUSE, the DD 254, and the PSM made

a part of this contract by reference, and with

any clarification of security requirements and

restrictions provided by the PSO.

4. (U) SECURITY VIOLATIONS.

Security is a material part of this contract. A

violation of any of the requirements and

restrictions of this clause, and of any PSM

which may be incorporated by reference in this

contract, may result in debriefing and removal

from access to the classified/compartmented

portion of the program, and may also be

grounds for termination of the contract for

default. Further, any unauthorized disclosure

of the classified information pertaining to this

contract or program could seriously affect the

national defense of the United States, and

such revelation would be subject to federal

prosecution under the Espionage Laws (Title

75

18, United States Code, Section 793, 794 and

798).

5. {REDACTED] CONTRACTOR

PROGRAM FACILITY. ‘The PSO shail, with

PSC, inspect the contractor's facility to ensure

compliance, storage capability, and adequate

safeguarding of all program material. Under

no circumstances will storage of, or work on

compartmented program materia) be

performed in other than the approved program

facility.

6. (U) PUBLIC DISCLOSURE. Public

disclosure or conformation of any subject

matter relative to this contract is not

authorized without first obtaining written

approval from the PSO and the PCO.

7 (U) INVOICE/VOUCHER

SUBMISSION. See Section G.

8. [REDACTED] DD 254. The DD 254

and the contract number for the BRAVERY

program are unclassified and may be shown to

DEFINVSERV inspectors when requested, but

inspectors are not to be allowed access to the

contract or the BRAVERY program facility. If

they insist, the DEFINVSERYV inspectors are

to be told to contact [REDACTED] PSO, on

(202) 692-2020. The PSO shall also be notified

immediately by telephone, 1n order that

appropriate action can be taken.

[{-2

76

7. (UW) WAIVER OF CONTRACT OR

SECURITY REQUIREMENTS. Any conflict

which may exist between this clause and the

VSM or instructions from the PSO or PCO

shall immediately be brought to the attention

of the PCO. Resolution shall be authorized by

the PCO in writing.

8. (U) CORRESPONDENCE. Mailing of

correspondence will be in accordance with the

yuidance contained in attachment 45, Security

lnplementation Plan.

(J) CERTIFICATION OF INDIRECT

COSTS (APR 1986) (DOD FAR SUP

52.942-7003)

(a) (U) The Contractor shall certify any

proposal to establish or modify billing rates or

to establish final indirect costs rates in the

form set forth in paragraph (b) of this clause.

The certificate shall be signed on behalf of the

Contractor by an individual of the Contractor's

organization at a level) no lower than a vice

president or chief financial offer of the

business segment of the Contractor that

submits the proposal. The Contractor

understands that if the Contractor fails to

submit a certificate as required herein,

payments on account of indirect cost shall be

at rates unilaterally established by the

Governinent.

H-7

77

SCHEDULE

(U) ALLOTMENT OF FUNDS

APPLICABLE TO FSED ITEMS

(a) (U) The supplies and services

to be furnished under the basic contract

FSED Items shall be funded by the

Government on an installment basis.

This financing arrangement is

necessitated by the unavailability for

obligation, at the outset of this contract,

of sufficient funds to cover the total

target values or ceiling price of the basic

FSED contract line items.

(b) (U) The Contractor agrees that

the Government’s obligation of funds in

the amounts and by the dates set forth

below will permit compliance with the

contract. The Contractor acknowledges

that the terms and conditions for the

performance of this contract have been

established on the basis that the

Contractor’s termination liability will

not exceed the amount set forth below

by the dates set forth opposite said

amounts. Nothing herein — shall

authorize nor require the Contractor to

incur costs, plus a reasonable allowance

for profit, in excess of the total amount

obligated at any given time. The

Contractor may request the

Government, but the Government shall

78

not be obligated, to provide funds at a

more rapid rate than described herein.

The Contractor shall not be entitled to

reimbursement of costs incurred by the

Contractor through progress payments

when the Contractor exceeds the

amount of obligation specified herein.

However, when amounts are obligated,

any costs incurred by the Contractor

prior to such obligation shall be

allowable to the same extent as if such

costs had been incurred after such

amounts had been obligated.

REDACTED

Date by Which

Installment Amt. of

Will be | Obligation (Not

Installment Obligated cumulative)

1 Date of | $150,000,000.00

Contract.

2 14 Jan 1988 $616,000,000.00

3 01 Nov 1988 | $286,000,000.00

|

4 | 07 Jan 1989 $861,300,000.00

5 01 Nov 1989 $350.000,000.00

6 07 Jan 1990 $1,050,000,000.00

~)

10

11

79

01 Nov 1990 $185,000,000.00

07 Jan 1991 $553,200,000.00

01 Nov 1991 $55.900,000.00

07 Jan 1992 $167,600,000.00

01 Nov 1992 $104,219,436.00

(c) (U) In the event the

Government fails to obligate any

specified installment by the time

specified, the Contractor will continue

performance of the contract only to the

extent that he shall not be required to

incur obligations (termination liability)

beyond that amount already obligated

by the Government. If the Government

fails to obligate any funds at the time

specified and there are not previously

obligated funds remaining, the

Contractor shall notify the Contracting

()fficer. After receipt of this

notification, the Contracting Officer has

thirty (30) days to provide additional

funds or must issue a stop work order

not to exceed a period of thirty (30)

days. If the Contracting Officer issues a

stop work order and then funds the

contract during the work stop period,

the target values and ceiling price,

delivery schedules, and terms and

80

conditions of this contract shall be

equitably adjusted, to the extent that it

can be demonstrated by the Contractor

that such failure to obligate funds

affected contract cost and/or

performance. The Government's total

obligation for payment (including

termination settlement expenses) under

this contract shall not exceed the total

amount obligated at the time of

termination.

(qd) (U) Change Orders issued

pursuant to the “Changes” clause of the

contract shall set forth funds estimated

at the time to be sufficient to perform

the change unless otherwise agreed to

by the parties. Pending any equitable

adjustment pursuant to said clause, the

funds set forth in the change order shall

be added to the then established

amount of installment funds set forth in

paragraph (b) above.

(c) (U) Nothing contained in this

clause shall affect the right of the

Government to terminate this contract

pursuant to either the “Default” or

“Termination for the Convenience of the

Government” clauses.

(f) (U) The Government may

obligate funds at a more rapid rate than

set forth above without affecting any

other term or condition of this contract.

$1

(g) (U) If Congress appropriates

funds which require’ incremental!

funding for all or any party of Option |,

a clause similar to this “Allotment of

Funds” clause will apply to that

incremental funding portion of Option I.

(END OF CLAUSE)

82

SCHEDULE

electronic systems with advanced technology, and

provide maximum commonality with the Advanced

Tactical Fighter (ATF) program. Therefore, any

features in accordance with the Joint Integrated

Avionics Working Group (JIAWIG) common avionics

baseline (CAB-1) definitions that can be incorporated

in the baseline design to ease or make less expensive

the transition during P3I should be emphasized. The

CAB-1 documents are available separately from the

Program Office.

(END OF CLAUSE)

H-28 (REDACTED) Government Property for the

Performance of this Contract (Fixed-Price)

(Apr 1985) (NAVAIR 52.245-9500)

(a) (U) Definition. Government production

and research property, as the term is used herein,

shall consist of special tooling to which the

Government has title or the right to acquire title,

Government-owned special test equipment and

Government-owned facilities as each term is defined

respectively in FAR 45.101 and 45.301.

83

(b) (U) Authorization to Use Government

Production and Research Property. Material. and

Agency Peculiar Property Currently Covered by

Government Contracts Without Rental Charge in

Performing this Contract. Government production

and research property, material, and agency peculiar

property covered by the following listed Government

contracts on the effective date of this contract is

hereby authorized for use on a rent-free, non-

interference basis in the performance of this contract

and sub-contracts of any tier issued hereunder

(except for Items identified as Foreign Military Sales

(FMS) Items in Section B):

(b)(1) (REDACTED) For McDonnell Aircraft

Company and Subcontractors

F33657-76-A-0053 N00383-84-G-4510

F33657-77-C-0027

F33657-78-C-0513

F33657-82-C-0067

F42600-80-C-5225

F42600-81-C-5482

F42600-82-D-4980

F42600-83-C-4577

N00019-82-G-0101

N00383-75-A-6333

N00383-77-A-7500

N00383-78-A-8504

N00383-81-G-1500

N00383-83-G-3500

F33657-78-C-0645

F09603-75-A-0164

F09603-76-A-1729

F09603-77-C-0743

F09603-78-G-1129

F09603-80-C-0229

F09603-80-C-1472

F09603-S0-G-0001

F09603-80-G-0285

F09603-81-G-1045

F33615-79-C-3627

F33615-84-C-3015

F33657-76-C-0464

F33657-78-C-0527

F33657-78-G-0007

F33657-79-C-0779

F33657-81-G-2168

F33657-83-C-0043

F33657-84-C-2002

F33657-84-C-2228

N00383-81-G-1500

N00019-78-C-0526

N00019-81-C-0157

N00019-81-G-0509

N00019-82-C-0501

N00019-83-C-0272

N00019-83-C-0336

N00019-83-G-0277

N00019-84-C-0063

N00019-84-C-0200

N00019-84-H-0418

N00019-85-C-0003

N00019-83-G-5300

N00019-76-C-0666

N00019-79-G-0008

N00019-80-G-0101

N00019-82-C-0359

N00019-83-C-0119

N00019-85-C-0109

N61339-82-C-0022

F33657-77-A-0001

84

F33657-80-C-0056

F33657-81-G-2169

¥33657-83-C-2133

F33657-84-C-2131

F33657-85-C-2086

N00383-83-G-3500

N00019-86-C-0173

N00019-8i-G 0455

N00019-82-C-0440

N00019-82-G-0475

N00019-83-C-0335

N00019-83-C-0431

N00019-83-G-0412

N00019-84-C-0116

N00019-84-C-0270

N00019-85-C-0002

N00019-85-G-0076

N62269-84-C-0111

N00019-79-C-0165

N00019-80-C-0655

N00019-81-C-0497

N00019-82-G-0460

N00019-83-C-0267

N00383-84-G-4510

F33615-78-C-3601

N61339-76-C-0063

85

(U) McDonnell Aircraft and Subcontractor Facilities

Contracts:

Vendor

Allied-Bendix Teterboro NJ

Brunswick Prod Marion VA

Cleveland Pn Co Cleveland

OH

Cleveland Pn Co Tullahoma

TN

GE Aircraft E] Binghamton

NY

GE Armament Sys

Burlington VT

Hamilton-Sta Windsor

Locks CT

Honeywell Ind St. Louis Pk

MN

Honeywell Ind St. Louis Pk

MN

Hughes Aircraft Culver

City CA

Hughes Aircraft Culver

City CA

Hughes Aircraft Culver

City CA

Hughes Aircraft Culver

City CA

Hughes Aircraft Tucson AZ

Martin Marietta Orlando

FL

Facility

Contract No.

DAAHO1-86-E-0001

F33657-72-C-0078

F33657-78-L-0113

N0Q0019-84-E-9017

F33657-80-E-0297

DAAA09-86-E-0007

N00019-86-E-9005

DAAAO9-76-E-0030

N00024-82-E-5429

DAAHO1-86-E-A001

N00030-85-E-0122

NAS3-19569-F

NAS5-26229

F33657-81-E-2096

DAAH01-85-E-A001

Exp.

Date

0191

0787

1088

0290

Martin Marietta Orlando

FL

86

MDAC Huntington Beach

CA

MDC St. Louis MO

MDC St. Louis MO

MDC Tulsa OK

Northrop Corp Hawthorne

CA

Pacific Clark-Aiken

E! Segundo CA

Sanders Associates

Manchester NH

Tico Titusville FL

F09306-83-C-3990

NAS7-527F

N00019-83-E-9030

N00019-83-L-9032

F33657-72-L-0647

N00030-85-E-0135

F33657-81-E-2181

N00019-84-E-9015

DAAHO1-74-C-2721

N00019-82-E-9013

World Aerospace

Minneapolis MN

F61546-80-C-0014

DAAH01-83-D-A006

DAAH01-85-C-A050

DAAH0O1-85-C-A095

P0111-4927-A101

F61546-83-C-0001

F41606-83-A-0002

F41608-76-A-0003

F33657-78-G-0004

DAAD07-85-C-0009

F41608-86-D-0023

F41608-81-G-0024

F41608-80-G-0028

F41608-78-G-0032

(b)(2) (REDACTED) For General Dynamics:

F33657-83-C-0340

F04606-78-C-0358

F08635-82-C-0366

F33657-81-C-0432

F04606-78-A-0541

F33657-74-C-0591

F'33657-78-C-0669

F04606-83-C-0795

F33615-83-C-1029

F04606-78-C-1042

AF33657-13403

F04606-82-C-1408

NAS 3-16080F

NAS 3-16090

87

F41608-84-G-0036

F41608-85-G-0044

F41608-81-G-0046

F19628-83-C-0054

1°04606-84-D-0065

DSA500-77-A-0069

F04606-85-D-0073

I'33657-82-D-0079

F26600-79-C-0098

F04606-80-C-0099

F08635-78-C-0103

F04606-80-D-0112

¥'04606-82-D-0125

F04606-83-C-0126

N00019-85-C-0146

F04606-82-C-0156

F41608-82-D-0157

F33657-80-D-0169

F33657-86-C-0171

F30602-83-C-0178

F33657-76-C-0191

F33657-84-C-0192

F33657-76-C-0197

F'33657-80-L-0242

F33657-84-C-0247

F33657-84-C-0249

DAAK40-79-C-0263

F30602-80-C-0270

Contract No.

F33657-81-C-2012

F33657-82-C-2034

33657-82-C-2038

F33657-82-G-2084

F33657-82-G-2085

F33657-82-C-2120

F33615-78-C-3022

F33615-83-C-3227

F33615-80-C-3239

F09603-83-D-3573

F'41608-86-M-3846

F42600-83-D-4006

F42600-83-D-4008

F42600-83-C-4010

F42600-83-C-4011

F42600-84-C-4196

F42600-82-C-4580

F42600-85-D-4599

I'42600-85-D-4600

F42600-85-D-4601

F42600-85-D-4910

F33615-83-C-5079

F33615°81-C-5122

F33615-73-C-5178

F'42600-82-C-5730

F'42600-82-C-7509

NAS 3-22337

F33657-75-C-0310

(REDACTED) General Dynamics Facilities Contract:

Exp. Date

88

F33657-82-E-2124 7/89

(b)(3) (REDACTED) For McDonnell! Aircraft

and General Dynamics: Subject to the provisions of

paragraphs b(i) and (2) above, any of the

aforementioned items of special tooling and/or

special test equipment presently in the possession of

the Contractor and/or subcontractors may be

modified as necessary for the performance of this

contract subject to the approval of the requiring

contract PCO. It is, however, hereby provided that

such modification shall not interfere with the proper

performance of work under the contract{s) for which

they were originally produced, acquired or furnished

and that the Contractor shall return the modified

equipment to its original configuration after use. .

In addition, each Contractor may use, on a

rent-free, non-interference basis, any of the other

Contractor's Government-furnished property under

this clause at the St. Louis, Missouri, Fort Worth

Texas or Tulsa, Oklahoma locations.

(b)(4) (REDACTED) For General Electric:

Evandale: F33657-73-L-0248

Lynn, Mass: N00019-76-C-0261

N00019-78-C-0063

N00019-79-C-0152

N00019-80-C-0021

N00019-81-C-0050

N00019-81-E-9003

N00019-82-C-0042

N00019-83-C-0086

89

N00019-83-C-0150

NOO0019-83-C-0156

N00019-84-C-0140

NO00019-84-C-0136

N00019°84°C-0137

N00019 85-C-0129

N00019 85 C0160

N00019-85-C-0162

N00019-86-C-0048

N00019-86-C-0195

N00019-86-C-0166

N00019°85-C-0459 and

successor contracts

(REDACTED) Kor General] electric

Subcontractors:

American Welding & Mfg. Co.,

Warren, OH P33657-71-C-0122

Arkwin Industries Inc. B33657-71-C-0625

Bendix Corp., Energy Controls

Div. F33657-79-C-0020

Chandler Evans Corp. F33657-68-C-1332

Kang Fifth Wheel co. P33657-70-C-0952

Reeder & Kline Machine 1° 33657-84--2157

TRW, Inc... Minerva OH 33657-70-C-0272

Sundstrand *33657-70-C-O0819

(b)(5) (U) Consideration has been provided for

all prime and subcontractor facilities usape, as

identified above, on a rent-free, non-interference

basis. However, notwithstanding paragraph (1)

hereof, complete definition of Government production

91)

and research property Gn particular, facilities)

cannot be determined until subcontracting decisions

have been completed by the Contractor. It is

understood and agreed that subcontractor

determinations for facilities use on a rent free, non

interference basis in the performance of this contract

will be rendered on the premise that if such

Government production and research property can

be made available on a rent free, non iunterfercnce

basis, it will be identified and added to this section at

the time of subcontract definitization without further

consideration being required.

(-) (U) Authorization to Use Government

Production and Research Property and Agenevy

Peculiar Property to be Provided Under this Contract

Without Rental Charge in Performing this Contract

(This paragraph does not cover such property in

possession of the Contractor or his subcontractors on

the date of award of this contract.)

(1) (U) Subject to the provisions of the

Government Property clause of this contract,

the Government hereby agrees to provide

hereunder the Government production and

research property and agency peculiar

property identified in (c)€2) through (¢)(5) to

the Contractor. The Contractor is hereby

authorized to use, on a rent-free basis, said

property im the performance of this contract

(except for Items identified as Foreasgn Military

Sales (MS) Items in Seetion B).

91

(2) (U) Special Tooling (as defined in FAR

45.101):

Special Tooling acquired under Item 0006

which may have becn upgraded under Option

Item 0102.

(3) (U) Special Test Equipment (as defined in

FAR 45.101):

Special Test Equipment acquired under Item

0006 which may have upgraded under Option

Item 0102.

(4) (U) Facilities (as defined in FAR 45.301):

NONE

(These facilities shall, when proven, become

accountable under and be subject to that facilities

contract, if anv, in effect between the Government

and the Contractor or any of his subcontractors at

the plant where they are to be located during

performance of this contract.)

(5) (U) Agenev Peculiar Property (as defined in

FAR 45.301 and DOD FAR (Supplement

45.301):

(a) (REDACTED)“For demonstrations under

Items 0051 through 0046. 0203, 0332, and

0405, the Government will furnish: eight (8)

ATA Aircraft, which have been provisionally

accepted under Item 0005, to perform flight

demonstrations; and four (4) ATA Aircraft

92

delivered under Item 0101. to perform

production flight demonstrations. These

aircraft shall be provided on the dates listed

below:

Aircraft Number Need Date

Item 0005: 1 July 1990

2 August 1990

3 September 1990

4 October 1990

5 November 1990

6 December 1990

January 1991

~]

8 February 1991

Item 0101: 1 Julv 1991

2 September 1991

3 November 1991

4 January 1992

For purpose of this paragraph (5)a) and

notwithstanding the provisions of FAR 52.245-2(a)

(4), if the aircraft listed above are not delhvered to

the Contractor by the “need dates” listed above and

such late delivery is attributable to the Contractor's

delav in tendering the aircraft for acceptance as set

out in Section F hereof, an equitable adjustment

shall not be made.

(REDACTED) Spare, repair and@/or replacement

parts for the aircraft designated above and for

support equipment may be drawn from current

production assets (for replacement of assets removed

from aircraft for repair, maintenance or testing

93

purposes) and returned on a “payback” basis (in the

same conditions as furnished, normal wear and tear

excepted, and in a timely manner). The Contractor

may use GFP assets 1n conjunction with, or mn place

of, production assets when authorized by the PCO. If

any of these production/GFP assets are used in the

designated aircraft. the Contractor shall provide a

brief written report stating parts employed,

circumstances necessitating use, and the status of

the “payback” part. This report shall be provided to

the ACO, PMA, and PCO within two (2) weeks of the

conclusion of demonstrations under Item 0001

through 0056 and 0203.

(>) (U) Aircrew protective and flight safety

equipment as necessary to support production

acceptance flights or test flights associated

with the performance of this contract as

itemized below:

Total Estimated

Qty per Qty for FSD

Pilot including

Equipment or B/N* 10% spares

Oxygen mask &

Regulator 1 26

Life Preserver Unit l 26

Parachute Harness 1 26

Anti-g suit } 26

Aviator’s gloves l pr 26 pr

Helmet | 26

Mask & attaching

pieces 1 26

94

Boots 1 pr 26 pr

Flight suits 2 52

Exposure suits 1 26

Sunglasses 1 pr 26 pr

Socks 1 pr 26 pr

* Per pilot quantities will remain unchanged

throughout the production program.

(c) (U) Chase and Target aircraft as required

in performance of this contract as follows:

Chase &

Target A/C Requirement

Location atv Dates

MDC Tulsa i 5/1990

throughout the

program

NATC, Pax River Average: 6** 5/1990 - 1/1993

Peak: _iie

NWC, China - i 11/1990 -

Lake 6/1993

* To be maintained and operated by the

Contractor: must be two seat configuration.

** To be maintained and operated by the

Government.

(REDACTED) Definition of Chase and Target

Aircraft: Aircraft can be subsonic, must be

95

compatible with the Model 21 in regard to

endurance, and must have secure voice

communication capability; target aircraft must

include a minimum of one each F/A-18, A-4, A-7 and

A°6.

(d) (U) All Support Equipment, Technical Data

or other Equipment listed in Attachment 36 to

this Contract.

(U) The following terms and conditions shall be

applicable to the agency peculiar property, if any,

identified above:

(A) (U) each item of agency peculiar property

shall be identified by its Federal Item

Identification number and Government

Nomenclature;

(B) (U) the agency peculiar property shall be

accounted for under this contract: and

(C) (U) upon completion or termination of this

contract, the Contractor shal] request and

comply with disposition instructions from the

Contracting Officer.

(d) (U) Government Material and Agencv Peculiar

Property to be Furnished Under this Contract. (This

paragraph covers Government-owned material and

agency peculiar property furnished to the Contractor

for (A) consumption in the course of manufacture,

testing, development. etc., or (B) incorporation in

items to be delivered under this contract, e.g.,

96

Master Government-Furnished Equipment List

(MGFEL)).

(1) (U) Subject to the provisions of the

Government Property clause of this contract, the

Government hereby agrees to provide hereunder

the Government-owned agency pecuhar Property

and material identified in (d) (2) and (d) (3) to the

Contractor. The Contractor is hereby authorized,

as appropriate, (A) to consume the material

identified in ‘d) (3) in performing this contract or

(B) to incorporate such material and agency

peculiar property in articles under this contract.

(2) (U) Material (as defined in FAR 45.301):

(a) (REDACTED) Fuel (Fleet Common) while

ATA is being supported under this contract.

See the clause entitled “Government

Furnished Petroleum, Oil and Lubricants.”

(b) (U) Material items identified in Appendix | to

Detail Specification SD-574-1. Delivery dates

to the Contractor shall be derived from the

aircraft delivery schedule in Section F hereof.

using Installation Lead Time C(ILT) contained

in the above identified document.

(U) Requisitioning Documentation. If material is

identified above, the requisitioning documentation

for the above material shall be prepared by the

Contractor in accordance with the “Military

Standard Requisitioning and Issue Procedure

(MILSTRIP) for Defense Contractors”, DOD FAR

97

Supplement Appendix H. Upon completion or

termination of this contract, the Contractor shall

request and comply with the disposition instructions

from the Contracting Officer.

(3) (U) Agenev Peculiar Property (as defined in

FAR 45.301 and DOD FAR Supplement

45.301: NONE

(U) The terms and conditions made applicable to

agency peculiar property in (c) (5) shall be applicable

to the agency peculiar property, if any. identified

above.

(e) (U) Government Installations to be Made

Available Under this Contract. (This paragraph

covers Government installations, or portions thereof,

to be made available to a contractor but not

transferred to his possession ~- for example, test

centers, wind tunnels, aircraft fields. as well as

buildings, furniture. or equipment. Instructions may

be needed to establish ground rules or plans

governing availability of installations.)

(1) (U) The Government hereby agrees to make

available hereunder on a_ rent-free, non-

interference basis for performing the contract

Items in Section B- the Government

installations, or portion thereof, identified in

(e) (2) in accordance with standard operating

procedures and priorities unless otherwise

specified in the Schedule. Although not

“Government-furnished property” under this

contract, the provisions of paragraph (a) of the

98

Government Property clause of this contract

shall apply to these installations.

(2) (REDACTED) Installations:

(a) (REDACTED) The Navel Air Test Center,

NAS Patuxent River Maryland shall be the

principal test site and the Naval Weapons

Center, China Lake, Cahfornia shall be the

secondary test site for the ATA FSD Flight

Test Program. The facilities and resources of

the principal and secondary test sites (the

host) shall be provided to the Contractor

within the existing capabilities and resources

available at the test sites during the FSD

program. The responsibility to provide

resources beyond those specified herein shall

be borne by the contractor (the tenant).

Detailed Host/Tenant Agreements and Site

Activation Plans between both the principal

and secondary test sites and the contractor

shall be prepared in accordance with

NAVAIRINST 4000.15A and will be utilized to

define the specific resources available to the

contractor at each test site.

(b) (REDACTED) The contractor shall have

use of work spaces at both the Naval Air Test

Center and Naval Weapons Center for which

the minimum square footage is_ specified

below. Program plans for ATA FSD effort

include construction of new hangar spaces at

both test sites. In the event that construction

of the hangar facilities is not complete by the

99

scheduled arrival dates, adequate interim

facilities will be provided to the contractor

until the new construction is completed at

which time the contractor will be moved into

the new spaces. The contractor shall plan for

and execute an orderly transition into the new

spaces at such time as they become available

such that no impact on the flight test program

shall occur. Host facilities and services will be

made available to support the move. The

contractor shall supply and install special!

laboratory and test equipment to be listed in

his Site Activation Plan for each of the test

sites. Physical security of all contractor

assigned spaces shall be the responsibility of

the contractor.

NATC (sq ft) NWC (sq ft

Office and Computer 9,000 2,000

Space

Warchouse and 5,000 1,100

Storage Space

Laboratory Space 12,000 3,800

Aircraft Shop Areas 7,500 3,500

Project Hangar Space 26.000 10.400

59,500 20,800

In addition, the Government will furnish at

the above installation:

(a) Necessary fuel trucks

(b) Electricity

(c) Water

(d) Gas

100

{e) Compressed Air

(f) Sewer

(zg) Fire Protection

(h) Security

(i) Telephone service, excluding toll calls

{}) Maintenance space and shop usage

{k) Hangar space

(1) Al) additional services, facilities and

equipment

Host/Tenant

usage

subsequent FRD’s.

Agreements

documented in

and

(c) (U) Additional Government installations to

be provided hereunder on a rent-free non

interference basis, along with requirement

dates for all installations are listed below:

NOMENCLA-

TURE

AMES

RESEARCH

CENTER (ARC)

NASA LANGLE ¥

RESEARCH

CENTER (LRC)

NTF

NEED DATES

FROM/TO

06-01-88/06-30-88

08-01-88/09- 15-88

01-01-89/02-15-89

05-01-89/06-15-S9

08-01-89/09-15-89

01-01-90/02-15-90

04-01-91/04-30-9)

01-01-90/02-14-90

UTILIZATION

WIND

TUNNEL

WIND

TUNNEL

(LRC) SPIN

(LRC) 30X60

(LRC) TDT

ARNOLD

ENGINEERING

DEVELOPMENT

CENTER

LEWIS

RESEARCH

CENTER (LERC)

(6x9 ft. icing

tunne]) NAEC

LAKEHURST, N-J.

101

10-01-§8/12-15°88

00-01-90/00-02-90

00-02-90/00-03-90

09-01-90/10-15- 90

08-01-88/09- 15°85

INTERMITTENT

TO 10-15°88

08-01-89/08-31-59

09-01-88/10-15-88

09-01-§9/09- 30-59

05-01-90/05- 31-90

02-01-88/03-15° 88

07-01-88/08-15-88

09-0) -88/} 1-30-88

3°01-89/G3°31-89

07-01-89/07-31-89

09-01-89/

INTERMITTENT

TO 01-31-90

10-01-90/10-31-90

09-01-88/10-31-88

10-01-90/03-31-91

02-01-91/10-31-91

PWT 16T

WIND

TUNNEL

WIND

TUNNEL

FLIGHT TEST

BARRICADE

IEENGAGE-

MENT

NATC (PAX)

NAVY WEAPON

CENTER (CHINA

LAKE)

NADC

TRENTON, NJ.

NAPC

102

01-01-93/06-01 93

06-01-90/04- 30-93

01-01-90/04-30°93

06-01-88/07-31-8S

06-01-89/07-31°89

03-01-91/03°31°91

01-01°92/03-31-°92

1 1-01-89/01-31-90

06-0) -90/10-31°95

Q7-01-89/07 31°59

Q7 U1-89/06- 30°90

STRUCTUR:

AL

DYNAMICS

FLIGHT TEST

SURV/

VUI iN :

BALLISTICS

SLED TEST

FLIGHT TEST

EJIECTION

TOWER

TESTS

PROPUL:

SION ‘TESTS

103

NOMENCLA-

TURE NEED DATES

US. ARMY 09-01-88/10-31-88

PROVIDING

GROUNDS

(MUBWAY. UT)

AF- EWES 06-0) -&8/05-31-89

RATSCAT RAMS | 12°-15-87/07-31-5#

05-01-88/08-3)-88

APPROPRIATE

SIGNATURE

TEST FACILITY AS REQUIRED

EDWARDS AFB 10-01-99/) 9-31-92

EGLIN AFB 10-01-°92/12°31-92

UTILIZATION

SURV/VULN

CR

SIMULATION

SIGNATURE

TEST

FLIGHT TEST

CROSS WINDS

CLIMATIC

TEST

(3) (U) All government-furnished Search and

Rescue Aireraft, test equipment,

stations, and Special Flight

ground

Test

Instrumentation (SFTI), as identified in

Addendum 116 to MIL-D-87088.

(4) (U) Aircrew and maintenance trainer facilities

including air conditioning, heating,

adequate electric power and = yrounding,

hyhting,

and

(f)

104

raised Noormny (aircrew only), on the dates

provided below.

Traimer Suite Need Date

Site #] duly 1992

Site #2 Mareh 1995

Site #3 duly 1995

(U) Bailed Property to be Used Under this

Contract. (This paragraph wall not obviate the need

to set forth om this contract the terms of the project

agreement as required by the pertinent bailment

agreement )

(1) (U) The bailed property identified in) ©2) is

hereby authorized for use on a rent free basis in

the performance of this contract. Although not

“Governmentfurnished property) under this

contract, the provisions of paragraph Gio) of the

Government Property clause of this contract shall

apply to this barled property

(2) (LI) Pailoent

Agreement

Under Which

Description Serial Number Accountable

NONE

(3) (0) The bailed property identified in () €2) 1s

furnished “as is” and the Government makes no

representations or warranties with respect to

such property, including the suitabibty of such

property for the intended use.

105

{g) (U) Notwithstanding any provision to the

contrary in any contract with the United States

Government and in order to ensure compliance with

22 U.S.C. 2761fe), rent-free use of any property

identified above (other than that property identified

in paragraph (d)) in the performance of work under

this contract to satisfy an obligation that implements

a sale of goods or services, or both, to a foreign

government or international organization (if called

for under this contract) is expressly prohibited.

Further, this contract shall in no event be construed

to authorize rent-free use of any property identified

above in the performance of direct commercial! sales

to a foreign government. or __ international

organization.

(h) (U) Installation Cost. The price of this contract

constitutes full compensation to the Contractor for

all costs to be incurred under this contract for the

adaptation and installation of the property identified

in this clause.

G) (U) Installation. Government production and

rescarch property. other than foundations and

similar improvements necessary for the installation

of special tooling, special test equipment, and plant

equipment, as defined in FAR 45.101, shall not be

installed or constructed on land not owned by the

government in such fashion as to be non-severabile

unless authority is granted by the Contracting

Officer cognizant of the contract under which the

property is provided in accordance with FAR 45.309.

106

(j) (U) Limitation. This clause does not authorize the

Contractor to acquire any property for the

Government.

(k) (U) The Contractor represents that the price and

delivery schedule of this contract have been

established in reliance on the Government granting

the authorization in (b), (c), (d), fe) and (f) and that

no charge has been included in this contract for use

of the property as authorized above.

(1) (U) Whenever the Contracting Officer authorizes

or makes available the use. on a rent-free basis, of

additional Government production and _ research

property or other Government property in_ the

performance of this contract or subcontracts of any

tier under this contract, the contract will be

equitably adjusted in accordance with the procedures

provided for in the Changes clause.

(m) (U) If the Government production and research

property or other Government property authorized or

made available above is decreased by the

Government, the Contractor will be entitled to an

equitable adjustment to the terms of this contract in

accordance with the procedures provided for in the

Changes clause hereof as a result of such decrease:

provided, however, that if any such decrease is due to

the failure of the Contractor or his subcontractors of

any tier under this contract to fulfill their respective

obligations either with respect to the Government

property or with respect to the work such property is

to be used to perform, the Contracting Officer will

107

take such circumstances into account in establishing

the equitable adjustment.

H-29

(END OF CLAUSE)

(U) GOVERNEMENT-FURNISHED

PETROLEUM. OIL. AND LUBRICANTS

(a) (REDACTED) The petroleum, oil and

lubricant items necessary for use in the

performance of this contract set forth below

and in SD-574-1, Appendix E, shall be

furnished by the Government to. the

Contractor subject to the provisions of this

clause and the “Government Property for the

Performance of this Contract” clause for use at

Contractor designated plants at Tulsa,

Oklahoma: St. Louis, Missouri; Forth Worth,

Texas: Lynn, Massachusetts: Evandale, Ohio;

or Trenton, New Jersey, as applicable, and for

use at the Government installations listed in

Clause H-28.

Aviation Turbine Fuel, commercial Grade JP-4

Type MIL-T-5624L, NSN 9130-00-256-8613

Aviation Turbine Fuel, Commercial Grade JI’

5 Type MIL-T-5624L,. NSN 9130-00-273-2379

Aviation Turbine Lubricating O11 Type MIL-L-

23699 NSN 9150-00-681-5999

Aviation Turbine Lubricating Oil, Grade 1010,

Type MIL-L-6081, NSN 9150-00-231-6676

108

(b) (U) In the event a situation or condition

arises whereby the Government is unable to

furnish the petroleum, oil, or lubricant items

in a timely manner so that a delay in the

performance of the contract is threatened, it is

agreed that the Contractor shall, with the

approval of the Administrative Contracting

Officer, procure the necessary petroleum, oil.

and lubricant items to prevent delay in

performance of the contract. The Contractor

may either receive reimbursement in kind, or

be entitled to an equitable adjustment to all

relevant terms of the contract in accordance

with the procedures provided for in the

“changes” clause to take into account the

contractors having provided such _ fuel,

petroleum or lubricant.

(REDACTED) Estimated quantities of

Aviation Turbine Fuel, MIL-T-5624L are as

follows:

Quantity in Barrel's

FSD 425.000*

Lot 1 2.640

Lot 2 3,520

Lot 3 8.800

Lot 4 15,840

(c) (U) The Contractor shall comply with MIL-

STD-1518A, dated ?0 February 1974.

(END OF CLAUSE)

109

H-30 (U) SPECIAL INSTRUCTIONS PERTAINING

TO CERTAIN GOVERNMENT

FURNISHED PROPERTY

(U) The Government will furnish to the

Contractor for use in the performance of this

contract, subject to and in accordance with the

provisions of the clause entitled “Government

Property for the Performance of this

Contract,” the following:

AIRCRAFT LOG BOOK

BINDERS AND SEPARATION

PAGES

ENGINE LOG BOOK BINDERS

AND SEPARATION PAGES

(U) The Administrative Contracting Officer

(ACO) shall insure that aircraft and engine log

book binders and _ separation pages. are

available for at least ninety (90) days prior to

the delivery of the aircraft and/or engine for

which they are associated.

(REDACTED) In the event an aircraft or

engine log book binder and separation pages is

not available at that time, the ACO shall

contact Naval Weapons Engineering Support

Activity, Washington D.C. 20734. Attn ESA-

203 to furnish as required.

(END OF CLAUSE)

110

H-31 (REDACTED) PROCEDURE FOR

OBTAINING CONTROLLED MATERIALS

(MAY 1986) (NAVATR 52.212-9500)

(U) Increasing scarcity of production materials

demands that the following procedures be

adhered to in complying with the

requirements of the clause of this contract

entitled “Defense Priority and Allocation

Requirements”. Nonconformance with these

procedures may cause delays in obtaining

needed materials --

(a) (U)’ The priority rating must appear on

all subcontracts and purchase orders.

(b) (U) Adequate delivery Jead time must

be allowed in placing subcontracts and

purchase orders.

(c) (U) The Contractor shall use his best

efforts to obtain a satisfactory delivery

schedule from his subcontractors prior to

referral to the Government for assistance.

Such referral, if required, shall be made to

the Administrative Contracting Officer of

the cognizant contract administration

office.

11li

PART II - CONTRACT CLAUSES

PROGRESS PAYMENTS (APR 1984) (DEVIATION)

(FAR 52.232-16)

Progress payments shall be made to the

Contractor when requested as work progresses,

but not more frequently than monthly in amounts

approved by the Contracting Officer, under the

following conditions:

(a) Computation of amounts

(1) Unless the Contractor requests a

smaller amount, each progress payment

shall be computed as

(i) 75 percent of the Contractor's

cumulative total costs under. this

contract, as shown’ by _ records

maintained by the Contractor for the

purpose of obtaining payment under

Government contracts, plus

(ii) progress payments to

subcontractors (see paragraph ())

below), all less the sum of all previous

progress payments made by the

Government under this contract. Cost

of money that would be allowable under

31.205-10 of the Federal Acquisition

Regulation shall be deemed an incurred

cost for progress payment purposes.

112

(2) The following conditions apply to the

timing of including costs in_ progress

payment requests:

(i) The costs of supplies and services

purchased by the Contractor directly for

this contract may be included only after

payment by cash, check, or other form of

actual payment.

(i) Costs for the following may be

included when incurred, even if before

payment, when the Contractor is not

delinquent in payment of the costs of

contract performance in the ordinary

course of business:

(A) Materials issued from the

Contractor’s stores inventory and

placed in the production process for

use on this contract.

(B) Direct labor. direct travel, and

other direct in-house costs.

(C) Properly allocable and allowable

indirect costs.

(iii) Accrued costs of Contractor

contributions under employee pension,

profit sharing, and stock ownership

plans shall be excluded until actually

paid unless —

113

(A) The Contractor's practice is to

contribute to the plans quarterly or

more frequently; and

(B) The contribution does not

remain unpaid 30 days after the end

of the applicable quartcr or shorter

payment period (any contributions

remaining unpaid shall be excluded

from the Contractor’s total costs for

progress payments until paid).

Giv) If the contract is subject to

the special transition method

authorized in Cost Accounting

Standard (CAS) 410, Allocation of

Business Unit General and

Administrative Expense to Final

Cost Objective, General and

Administrative expenses (G&A)

shall not be included in progress

payment requests until the

suspense account prescribed in

CAS 410 is less than —

(A) Five million dollars: or

(B) The value of the work-in-process

inventories under contracts entered

into after the suspense account was

established (only a pro rata share of

the G&A allocable to the excess of

the inventory over the suspense

account value is includable in

114

progress payment requests under

this contract).

(3) The Contractor shall not include the

following in total costs for progress

payment purposes in subparagraph (a)(1){i)

above:

(i) Costs that are not reasonable,

allocable to this contract, and consistent

with sound and generally accepted

accounting principles and practices.

(ii) Costs incurred by subcontractors or

suppliers.

(iii) Costs ordinarily capitalized and

subject to depreciation or amortization

except for the properly depreciated or

amortized portion of such costs.

(iv) Payments made or amounts

payable to subcontractors or suppliers,

except for —

(A) Completed work, including

partial deliveries, to which the

Contractor has acquired title: and

(B) Work under cost-reimbursement

or time-and-material subcontracts to

which the Contractor has acquired

title.

115

(4) The amount of unliquidated progress

payments may exceed neither (i) the

progress payments made against

incomplete work (including allowable

unliquidated progress payments to

subcontractors) nor (ii) the value. for

progress payment purposes, of the

incomplete work. Incomplete work shall be

considered to be the supplies and services

required by this contract, for which

dehvery and invoicing by the Contractor

and acceptance by the Government are

incomplete.

(5) The total amount of progress payments

shall not exceed 75 percent of the total

contract price.

(6) If a progress payment or the

unliquidated progress payments exceed the

amounts permitted by subparagraphs (a)(4)

or (a)(5) above, the Contractor shall repay

the ‘mount of such excess to the

Government on demand.

(b) Liquidation. Except as provided in the

Termination for Convenience of the

Government clause, all progress payments

shall be hquidated by deducting from any

payment under this contract, other than

advance or progress payments, the

unliquidated progress payments, or 75 percent

of the amount invoiced, whichever is less. The

Contractor shal) repay to the Government any

116

amounts required by a_ retroactive price

reduction, after computing hquidations and

payments on past invoices at the reduced

prices and adjusting the unliquidated progress

payments accordingly. The Government

reserves the right to unilaterally change from

the ordinary liquidation rate to an alternate

rate when deemed appropnate for proper

contract financing.

(c) Reduction or suspension. The Contracting

Officer may reduce or suspend progress

payments, increase the rate of liquidation, or

take a combination of these actions, after

finding on substantial evidence any of the

following conditions:

(1) The Contractor failed to comply with

any material requirement of this contract

(which includes paragraphs (f) and (g)

below).

(2) Performance of this contract is

endangered by the Contractor's 4) failure

to make progress or fii) unsatisfactory

financial condition.

(3) Inventory allocated to this contract

substantially exceeds reasonable

requirements.

(4) The Contractor is delinquent in

payment of the costs of performing this

contract in the ordinary course of business.

117

(5) The unliquidated progress payments

exceed the fair value of the work

accomplished on the undelivered portion of

this contract.

(6) ‘The Contractor is realizing less profit

than that reflected in the establishment of

any alternate hquidation rate in

paragraph (b) above, and that rate is less

than the progress payment rate stated in

subparagraph (a)Q) above.

(d) Title. (1) Title to the property described in

this paragraph (dd) shall vest in the

Government. Vestiture shall be immediately

upon the date of this contract, for property

acquired or produced before that date.

Otherwise. vestiture shall oceur when the

property 1s or should have been allocable or

properly chargeable to this contract.

(2) “Property,” as used in this clause,

includes all of the below-described items

acquired or produced by the Contractor

that are or should be allocable or properly

chargeable to this contract under sound

and generally accepted = accounting

principles and practices.

G) Parts, materials, inventories, and

work in process;

Gi) Special tooling and special test

equipment to which the Government is

118

to acquire tithe under any other clause

of this contract.

(in) Nondurable G.e., noneapital) tools,

jigs, dies, fixtures, molds, patterns,

taps, gauges, test equipment, and other

similar manufacturing aids, title to

which would not be obtained as special

tooling under subparagraph Gi) above.

and

Gv) Drawings and technical data, to the

extent the Contractor or subcontractors

are required to dehver them to the

Government by other clauses of this

contract.

(3) Although tithe to property is im the

Government under this clause, other

applicable clauses of this contract, e.g, the

termination or special tooling clauses, shall

determine the handhng and disposition of

the property

(4) The Contractor may sell any scrap

resulting from production under this

contract without requesting the

Contracting Officer's approval, but the

proceeds shall be credited agaist the costs

of performance.

(5) ‘To acquire for its own use or dispose of

property to which title is vested in the

Government under this clause, — the

(e)

119

Contractor must obtain the Contracting

Officer's advance approval! of the action and

the terms. The Contractor shall (i) exclude

the allocable costs of the property from the

costs of contract performance, and (ii)

repay to the Government any amount of

unliquidated progress payments allocable

to the property. Repayment may be by

cash or credit memorandum.

(6) When the Contractor completes all of

the obligations under this contract.

including liquidation of all progress

payments, title shall vest in the Contractor

for all property (or the proceeds thereof)

not-

(i) Delivered to, and accepted by. the

Government under this contract; or

Gi) Incorporated in supplies delivered

to, and accepted by, the Government

under this contract and to which title is

vested in the Government under this

clause.

(7) The terms of this contract concerning

lability for Government-furnished

property shall not apply to property to

which the Government acquired title solely

under this clause.

Risk of loss. Before deliverv to and

acceptance by the Government, the Contractor

120

shall bear the risk of loss for property, the title

to which vests in the Government under this

clause, except to the extent the Government

expressly assumes the risk. The Contractor

shall repay the Government in amount equal

to the unliquidated progress payments that

are based on costs allocable to property that is

damaged, lost, stolen, or destroyed.

(f) Control of costs and property. The

Contract shall maintain an accounting system

and controls adequate for the proper

administration of this clause.

(g) Reports and access to records. The

Contractor shall promptly furnish reports,

certificates, financial statements, and other

pertinent information reasonably requested by

the Contracting Officer for the administration

of this clause. Also, the Contractor shall give

the Government reasonable opportunity to

examine and verify the Contractor's books,

records, and accounts.

(h) Special terms regarding default. If this

contract is terminated under the Default

clause, 4) the Contractor shall, on demand,

repay to the Government the amount of

unliquidated progress payments and (ii) title

shall vest in the Contractor, on full liquidation

of progress payments, for all property for

which the Government elects not to require

delivery under the Default clause. The

12]

Government shal! be hable for no payment

except as provided by the Default clause.

(i) Reservations of rights. (1) No payment or

vesting of title under this clause shall (i)

excuse the Contractor from performance of

obligations under this contract or (ii)

constitute a waiver of any of the rights or

remedies of the parties under the contract.

(FAR 52.232-16) (DEVIATION)

(2) The Government's rights and remedies

under this clause (i) shall not be exclusive

but rather shal! be in addition to any other

rights and remedies provided by law or this

contract and fii) shall not be affected by

delayed, partial, or omitted exercise of any

right, remedy, power, or privilege, nor shall

such exercise or any single exercise

preclude or impair any further exercise

under this clause or the exercise, of any

other right. power, or privilege of the

Government.

(j) Progress payments to subcontractors. The

amounts mentioned in (a)(1)(ii) above shall be

all progress payments to subcontractors or

divisions, if the following conditions are met:

(1) The amounts included are limited to @)

the unliquidated remainder of progress

payments made plus (i) for small business

concerns any unpaid — subcontractor

122

ae

requests for progress payments that the

Contractor has approved for current

payment in the ordinary course of business.

(2) The subcontract or interdivisional

order is expected to involve a mnimum of

approximately 6 months between the

beginning of work and the first delivery, or,

if the subcontractor is a small business

concern, 4 months.

(3) The terms of the subcontract or

interdivisional order concerning progress

payments-

(i) Are substantially similar to the

terms of the clause at 42.232-16

Progress Payments, of the Federal

Acquisition Regulation ‘or that clause

with its Alternate 1 for = any

subcontractor that is a small business

concern):

(ii) Are at least as favorable to the

Government as the terms of this clause:

Gii) Are not more favorable to the

subcontractor or division than the terms

of this clause are to the Contractor:

(iv) Are in conformance with the

requirements of paragraph 32.404(e) of

the Federal Acquisition Regulation: and

123

(v) Subordinate all subcontractor rights

concerning property to which the

Government has title under’ the

subcontract to the Government's right

to require delivery of the property to the

Government if (A) the Contractor

defaults or (B) the subcontractor

becomes bankrupt or insolvent.

(4) The progress payment rate in the

subcontract is the customary rate used by

the Contracting Agency, depending on

whether the subcontractor is or is not a

small business concern.

(5) The parties agree concerning any

proceeds received by the Government for

property to which title has vested in the

Government under the subcontract terms,

that the proceeds shall be applied to

reducing any unhquidated _ progress

payments by the Government to the

Contractor under this contract.

(6) If no unliquidated progress payments

to the Contractor remain, but there are

unliquidated progress payments that the

Contractor has made to any subcontractor,

the Contractor shall be subrogated to all

the rights the Government obtained

through the terms required by this clause

to be in any subcontract, as if all such

rights had been assigned and transferred

to the Contractor.

124

(7) The Contractor shall pay the

subcontractor’s progress payment request

under subdivision (j)(1)(ii) above, within a

reasonable time after receiving’ the

Government progress payment covering

those amounts.

(8) To facilitate small business

participation in subcontracting under this

contract, the Contractor agrees to provide

progress payments to smalj business

concerns, in conformity with the standards

for customary progress payments stated in

Subpart 32.5 of the Federal Acquisition

Regulation. The Contractor further agrees

that the need for such progress payments

shall not be considered as a handicap or

adverse factor in the award = of

subcontracts.

INVOICES (OCT 1982) (DOD FAR SUP 52.232-

7000)

(a) An invoice is a written request for

payment under the contract for supplies

delivered or for services rendered. In order to

be proper, an invoice must include as

applicable the following:

(1) invoice date:

(2) name of contractor:

125

(3) contract number (including order

number, if any), contract line item number,

contract description of supplies or services,

quantity, contract unit of measure and unit

price, and extended total:

(4) shipment number and date of shipment

(bill of lading number and weight of

shipment will be shown for shipments on

Government bills of lading):

(5) name and address to which payment is

to be sent (which must be the same as that

in the contract or on a proper notice of

assignment):

(G) name (where practicable), title, phone

number and mailing address of person to

be notified in event of a defective invoice;

and

(7) any other information — or

documentation required by other provisions

of the contract (such as evidence of

shipment).

Invoices shall be prepared and submitted

in quadruplicate (one copy shall be marked

“original’) unless otherwise specified.

(b) For purposes of determining if interest

begins to accrue under the Prompt Payment

Act (Public Law 97-177):

126

{1) a proper invoice will be deemed to have

been received when it is received by the

office designated in the contract for receipt

of invoices and acceptance of the supplies

delivered or services rendered has

occurred;

(2) payment shall be considered made on

the date on which a check for such

payment is dated:

(3) payment terms (e.g., “net 20”) offered

by the Contractor will not be deemed a

“required payment date;” and

(4) the following periods of time will not be

included

(i) after receipt of an improper invoice

and prior to notice of any defect or

impropriety, but not to exceed 15 days

(or any lesser period established by this

contract); and

(ii) between the date of a notice of any

defect or impropriety and the date a

proper invoice is received. When the

notice is in writing, it shall be

considered made on the date shown on

the notice.

FLEXIBLE PROGRESS PAYMENTS (MAY 1985)

(DOD FAR SUP 52.232-7004)

127

This contract is subject to flexible progress

payment procedures. The progress payment rate

of this contract is %, and this percentage

applies in lieu of the uniform standard progress

payment rate and liquidation rate of the

“Progress Payments” clause. The progress

payment rate of this contract was determined by

the DOD Cash Flow Computer Model, dated

using twenty-five percent (25%) as the targeted

rate for the contractor's investment (as a

weighted average of costs) in its work in process

inventory over the life of the contract.

{f actual and projected cash flow data generated

during performance of this contract reveal that the

progress payment rate will result in an investment

in work in process inventory by the contractor in

excess of twenty seven percent (27%), or less than

twenty three percent (23%), the progress payment

rate shall be redetermined by using the DOD Cash

Flow Computer Model. Unless it contained an error,

the version of the DOD Cash Flow Computer Model

that was used initially in this contract will be used

for any redetermination permitted by the clause. In

no event will the progress payment rate be less than

the uniform standard progress payment rate that

would have applied to this contract absent flexible

progress payment procedures, and in no event will

the progress payment rate be greater than one

hundred percent (100%).

As of the date of execution of this contract, the

initial progress payment rate has not been

determined. However, the price of this contract is

128

based on flexible progress payments. Promptly

upon contract award, the Contractor shall provide

data supporting flexible progress payments

percentage calculation. The flexible progress

payments percentage shall be calculated, agreed

upon between the parties and inserted by

bilateral modification within 60 days after

Contractor provides the data as above. Failure to

agree shall be considered a dispute within the

meaning of the “Disputes” clause hereof. Pending

the above, the Contractor shall invoice based on

standard progress payments of General Provision

52.232-16.

ORDER OF PRECEDENCE (CONTRACT) (APR

1985) (NAVAIR 52.290-9500)

Inn the event of an inconsistency in this

contract unless otherwise provided herein, the

inconsistency shall be resolved by _ giving

precedence in the following order: (a) the

Schedule (excluding the Specifications); (b)

contract clauses; {c) the other provisions of the

contract whether incorporated by reference or

otherwise: and (d) the Specifications.

SUBCONTRACTING (APR 1985) (NAVAIR 52.244-

9501)

The Contractor shall not acquire any of the

completed articles described herein, except spare

parts, from any other party, either by subcontract

or otherwise without the prior wntten consent of

the Contracting Officer.

eR

201 ool J/ARR / 1144 ~ 27

COUPUTER NO gen FF

CIO 5/ OF COPY: wou COP'ES

(Las?, RST, oy

WA. Cre Lose | ft (aA ic o4.9

|

Nase, | Leveuar | Boo | = séATE

l

|

'

at

St -

wu corer ws Ls Eee ry + ——

Cob) a fet” ARTEL boo Bi Se

heres Clher as Cucezeresties at et 3

, poalietiieny, i Ey — TA 6

Tah Cr a en eye _ %

cen rites —— it 40 om

‘ —=-=n o peep

eas tina gras oT Cer.

Gir 0 cis &- Malle ff - ~ i 747

APP. 25,509

THE CLASS FIED MATERAL OE SCA BED ABOVE pap EE mA SaONCE wt

WAS TROTED HA

COPARTMENT OF THE MAY a Pon AAS CD #FORSUTION OPNAY INSTRUCTION

CIVIDUAL AUTHORING CERTRUSTION WOTNES Banc OFF AL

OATI OF CESTRUCTION

SUBJECT

Aiacumen 7 24 :

ORIGINATOR CONTROL KO ( Se)

130

NAVAL AIR SYSTEMS COMMAND

DEPARTMENT OF THE NAVY

CONTRACT SECURITY CLASSIFICATION

SPECIFICATION

DD FORM 254

FOR THE

ATA

AIRCRAFT WEAPON SYSTEM

01 DECEMBER 1987

ATTACHMENT 34 [REDACTED]

[REDACTED] | 201/BRR/1144-87

13 TOTAL PAGES

[REDACTED] COPY OF COPIES

13]

bbe att atet oF Oar ten er ee ee ee es .

* . . . . **

COeTHLE BEC UENTT Cadre e tee OF egies atom sounee gr tlg ne Pym « 3 cre"

© tenteer* secese ge eters rr a

one oe) ee we ae ** tees “SOIC mee Come e th 1

9 °@° Oe et mee te een om eee oor we ew 8;

. . = -* A ~d

. “7 + tt! «wee * * —

Kote eee weee hin wiG.An. “7 OE 2 les. - a 4} Otc 8?

eet fee wety wes cee we . oeneee i eee Coie

+ 088 oe ; if i

| Boece l ee eiled

. Cet. OG eee samoes oreeere ' ‘es

| ot

© tes @ tecascemee® ~s0e0 - ee nT) ee

° oo em mans te sisceted - ——

+06 eee Hee te set meee or te tome. oreo

ee ee ee a)... . een ny Oe

|.”

™. -

ee ee ee _ —- were te fee of ——<+ aoe

w/A | w/a

Fe me A ee ame terme Tae Rememmnrie w FAL meee en a ee

| ““———2 =o ee Ore er ere *

|

wa n/a

_ ~~ i wee wm ee ee oer ee | mer ere eee ee ee ° ees oe ‘= — ” ,

ML Seu DeDTwac “UV usrOT

~-—1* ‘ © e racemes om — tte — Rie oa 0%) @on &

eee i et ems tee Hh

6 Oe ete cen s 6 Mie OIEE SOSm MD Sup HTH as srseme ears © om sage em soee: aes’ Shee, Thee oot soe

1 = eee are eee Om ere,

OCT *) ee ewtete seesvae ll tee eleersesetiad “l-

0 besees +e Bescon creme Ges o oom | errs Te) ret) fee) ‘ 1 >

Om ow? quae due | a5 a |

. lx

Oe ee | | 4

ee en Ft ° lll | |

a en nn ee ,

ee ee ee | ] | om te lanemwes

—_—— ie « oe Ow ewes ee = Ge = | |

6 § er eee Ocede «ant owt & 6105s | Delcam ip eames Come =e 5

ee me ens me Pe ee ee ee

rene) ee 7 ee

o reer + OO Or ew ree Bete ; ‘ 4

; SL —- 90. meee ee ‘ gry [77 9

nr eet ree Hee Ce ee ewe \; ‘

” mee aes nee wets (OOOH Eh. Sow FEO tome tHe

to oes ee ves

© +0006 ee <> camews cama @ +o:+ came (5 os 6 6 tee Hs tere +t Corre + Cee? om

ee ee ee ee a ee eee -— —— a nn se oe came ap oe cm

a tne

+" ise — ) ey

hes ° Loan =

; TSE UF

SER ee ce ee ime te os ne Oe tem ees te ee tieewene Cow cee ame Fe tem ate me timee Oe mee ae

— ee ee ee re, loemew @ ‘ — —— & owe me = meee me ere

—— eo ome

eam Teer

i—_-* Te eee ieee) ee eee ee

@ Oe Ed

APP. 25,51 |

2C1/ERR/) 144-87

(4 f 43 Pe

a ee er rr! oe re co “—* ~ —— er oe ome

~* — ——_———— oo ee re ree oe ee ——*

~— Oe ee ee et me meer oe OU 1?

“r

P49

—-_-* 6 tet ee ee ee ee et) eee Geter ee oe @ ee, 60d * 8 awww

~~ —— er at Oe et ee ——*

~ eee oF ee ee

ee Ot Cee ee eee ee ee he ee ee ee eer ee ee ee free re — ——w* - -

OO ee ee — — ne om meee os © — re

~ — eee me ere eee ee Chee ieee ee te ee renee me tee meme at _— re!

—_—— © —_ me ee eens ett et sre Ree Fe Nee Geen) memes ater mee fe te

— te ae weer em +e oe oe = ~ — & Oeeeee he ee eee me oF —— oe =

—— tor

1 tore & om ade eed

OC ——— 70.

ee ee ee i eel

rom & ee —_ tom

@-* « ee ee Oe —— a ee ee rrr en

) re Oe wee ee wt et wee ow we Em ee oO- rd

ee ier or, aap Sap . e* * 7 ~~ © . — —— ow Ee]

toe ae RE RL YOU: BOL2 E/N «10896999, (EFT s019) ~88279:

Ce mee ete ee et er ree et Bee tee Oe ee ~~

——— ee eer ee fer e ee ~~ ot he er

CD eet ee of ee OF Fie Ot ie ere OE em See ree mee tH mm

& semeer+, - “+ @ eee ee - ~* bad

Tie ee rage 4 ee rps, tat Wert ich rep es Bw 8! Moy ue a8

pakerne, oveeieephap ad esha ska abcd st dered boseb ett Yh AT RORTRPR Lita EnAgE dS!

pare. S140, ef Gob $226.220, indvecetel Security Begvierion(15P) ond Serston 1, Pere. any

Cf Ded S22 Liem, Induarrial becveicy Manuel fon safeguarding <leseifled tnferastion, se

authorized vy SEOMNINST 05460.3, dtd 76 June 1981. A BRAVERY Program becuctcy Mens

(R754) hae bead provided, os referenced te Bloch 14 stove, for cowrrector clessl?icaries

an¢ security guitence. ACCeee até Coetrel Over thie cencrect te ee~omtecered by BAVer

al@ SYSTIMS CONCML (Bavalrerscno) Security eogniaetce and coecry) ever (hie contact

le the cospeasibility ef coe Program Secectty Officer (PSO). A finel Department of

Defense SiLULT of TOP SECOLT socceity tieerente te cequtred fer acceos Le Hiegi ee

informacton. Tach parecn granced scceas to either SECRET ec TOP SI CALT/CObtw Ph eregie®

information will be cequired CO enecute oo Indoctrination egreazen:. vhirh ie claseltced

& prepublicetion and/or presentations teriev te Ceq iret ptier te che vee ef ary

tnfcrmatieoe Weich fe either SECRET or TOP SLOMET/CODDWORD channe.e. Le each sone

sporovel o-4t be ebte neé from Che COVISGNT Precres Faneger. The request gust be

subeicted from the persone wow beetr et to Bare the publ icectoe of presentacten, via whe

fectlicy Comerol Officer (100), to the PSO. Comp tence wich TOWLST Security heqeite-

eerte Vill be os formatced tm the attached TEST SECLRIGY PEQUIRIMETS. The tee

i. oer

ee oe es ee

= Oe eee HO

i —_— , —s te — oe _~.

= cas. = oa —_ -— oe quasdeoas @rcewees av - ———— ot ee ——

—* eee -— or ew oe ee

eit te ws euatee, ——_——— oe ee ww

Qo! =

=* * emo thee Mmmm Vat Presrep Security Officer

y= - et ed ——_—_

ow a -_—_

| —amse =

cof rm me . — Oe Oe ae ae —

Or eee -_—

Ct ft mrrree Oe -—e + eons —_ Re

te ate OOO —. ate _ nm t—-— oe

©

~ tard ae anere

r

4

. . 38 —r-

“ae —e_r .

a 701 /hR /, 144-87

“4 APP 24,512 feye & of (3 Paget.

Ee -

{ ©@:

E90 eetc

[REDACTED]

[REDACTED] A special security restrictions clause is

contained in Section H of the contract and applies to

the handling of classified information under this

contract, compartmented or otherwise.

[REDACTED] Security guidelines are contained in

the Bravery Program Security Manual that has been

previously provided.

[REDACTED] Material not properly falling under

this special access compartmented program shal] be

handled in accordance with the instructions provided

by the Bravery Program Security Officer.

(U) The guidance contained herein and in the

Program Security manual and the Program Security

Guidelines will be utilized in conjunction with any

further guidance provided by the Bravery Program

Manager and the Bravery Program Security Officer.

[REDACTED] No external distribution of any

documents will be made without the expheit written

approval of the Program Manager. All documents,

working papers, and copies of deliverables will be

returned to the Program Manager upon completion

of this contract. The contractor is not authorized to

retain any Bravery Program related documentation

upon completion of this contract. All Government

furnished documents will be returned to the

appropriate Government source upon completion of

this contract.

134

(U) All subcontracting by the prime contractor

involving classified information and/or hardware

which requires attendent DD-254’s, will be reviewed

by the Program Security Officer, prior to issuance.

(U) Program documents and materials will only be

stored in facilities specifically approved by the

Program Security Officer.

[REDACTED] Tests will be conducted in such a

manner as to insure maximum security for the

Bravery Project and test sites will be approved by

the Program Security Officer.

(U) Items 11K and 14: All material generated under

this contract shall perpetuate the classification

downgrading and declassification of the source

material. Newly generated materia!, no source

documents, shall contain the following downgrading

statement:

[REDACTED]

[REDACTED] Final classification review and

determination will be the responsibility of the

Bravery Program Manager.

[REDACTED] All contractors participating in the

Bravery Program must possess, or be eligible to

possess, a Department of Defense Facility Security

Clearance in accordance with Section Ill, paragraphs

21 and 22. of the Industrial Security Manual, DoD

5220.22-M. The Bravery Program Security Officer is

the approving authority for Bravery access of a

135

contractor's facility, and conducts security review for

Bravery personnel accesses.

[REDACTED] SECTION 15-REMARKS

CONTINUED

[REDACTED) 201/BRR/1 144-87 Page 1 of 2

[REDACTED] [REDACTED] [REDACTED]

[REDACTED] APP.25,513 [REDACTED]

[REDACTED] TEMPEST security requirements, (see

enclosure 1), are imposed if any electrical processing

of classified information is required in contract

performance. Support in complying with this

requirement is available upon request from the

(REDACTED) Program Security Officer.

[REDACTED]

SECTION 15-REMARKS CONTINUED

Page 2 of 2

[REDACTED]

[REDACTED]

136

ATTACHMENT 36

GOVERNMENT FURNISHED PROPERTY

FSD AND LOTS 1-4

SECTION 1: GOVERNMENT FURNISHED

INFORMATION

SECTION 2: LAND BASE

EQUIPMENT

(SECURE VOICE

COMMUNICATION)

SECTION 3: ORDNANCE

SECTION 4: SUPPORT EQUIPMENT

LOTS 2 THRU 4

SECTION 5: SUPPORT EQUIPMENT

FSD & LOT 1

137

Section 1: GOVERNMENT FURNISHED

INFORMATION (U)

NOMENCLATURE NEED DATE

NWC-1432 A-GE/AGM-65E 1-15-88

Laser Maverick Weapon

System Integration

Requirements and

Development Specification

dated 23 Oct 1983 (or

latest revision)

NWC- 1433 A-GE/AGM-65F 1-15-88

Design Infrared Maverick

Weapon

System Integration

Requirements and

Development Specification

dated 26 Oct 1983

NWC-1434 A-GE/Harpoon 1-15-88

Block 1C Weapon System

Integration Requirements

and Development Specification

dated 24 Oct 1983 (or latest

revision)

NWC-1497 A-6E/Post Launch 1-15-88

Controlled Weapon System

Integration Requirements

and Development Specification

dated 9 Jan 1984 (or latest

revision)

SWLA DWG 185474 Basic 12-15-87

NOMENCLATURE

Interface Requirement

System/Rev E (or latest

revision)

A-6E Navy Training Plan

(NTP) 1 + Revisions

NOMENCLATURE

A-6E Squadron Manning

Document (10 Aircraft -

if available) 1 - Revision

A-6F Navy Training Plan

(NTP) 1 = Revisions

On-the-job Training

Handbook for Preliminary

Squadron Manpower

Document Development

(OJT PSQMD) 1 +

Revisions

Tech Pubs required for

Support Equipment

being furnished by the

Government

Tech Pubs required for

Common Support Equipment

being procured as CFE by

the Contractor for FSD

and Lot 1

Tech Pubs required for

NEED DATE

Jan 88

NEED DATE

Jan 88

Jan 88

dan 88

Jan 88 (Program

Go-Ahead) thru

end of OPEVAL

Jan 88 (Program

Go-Ahead) thru

end of OPEVAL

Jan 88 (Program

139

NOMENCLATURE NEED DATE

Airborne GFE Equipment Go-Ahead) thru

being furnished by end of OPEVAL

the Government for FSD

and Lot 1

Tech Pubs required for Jan 88 (Program

Airborne GFE Equipment Go-Ahead) thru

being procured as CFE by end of OPEVAL

the Contractor for FSD

and Lot 1

NOMENCLATURE NEED DATE

Interface and Integration 2nd Qtr Cy 88

data for the following

weapons:

(a) Advanced Air-to- Air

Missile (AAAM)

(b) Advanced Interdiction

Weapon System (AIWS)

(c) IREDACTED]

(d) Standoff Land Attack

Missile (SLAM)

(e) Store Dispenser (SUU-25)

(f) Advanced Anti-Radiation

Missile (AdARM)

Including, but not limited

to:

(a) Interface Control

Documents

Interface Requirements

Specifications

140

NOMENCLATURE

(c) Prime Item Development

Specifications

(d) System Segment

Specifications

NEED DATE

14]

EvbY-SLL-LO-SS9E

NSN

qiun Sutasag ZN T-OOTSVZLTET

LO81-0€6-00-026F

y] odoosai0g “yaS

‘palaay MA ‘IOJOVALT,

LI9P-880-10-0€LT

6PL9-€ZT-00-0ELT

NSN

WUOLVIONANON ‘ON LUVd

JOIJUOD UOISOLIOY “41e9 LfZOLYS9

(ZH OOF ‘09 10d6S¢E89 12

LTLI-8€T-10-0¢99 ‘OG) 89g

ISLVAL

OGLL-PIP-00-OPLL BUIMOL O/V

dung puey pap ‘qtuyp eases LL-OOLSVOES

(A/AIGT ATH) Guog ‘y0Up) ISTO OOESVLIS

NGWON ‘ON LUVd

‘syasse [ood aseq aaryoodsat ay} UOT] SISeq papaau

Sv uv UO JUSUIUABAOLT) 943 Aq paptaoid aq ][IM qusaudinbs qoddns Surmorjoy ayy,

yddliS NOWWOO

Ja LUOddNS :¢ worIsag

sa - LNAWNd1

142

GESE-8P6-00-OELT

oLVP-LEO-1LO-SZ99

CvGP-STT-TO-SS9F

9PVTL-GOT-LO-OE€LT

9696 -6P0-T0-CE6P

NSN

(V9

OLY) IE 10S ‘1oydepy

SUL], “TaJOUlOJDATJOY

WU] BTAIag ZN

NOLOZ ‘PAH puey “your

POFNSVNV

‘S[ISSTI. 6-INIV ‘39S 389,

GLGLOST

bO-ZOST

L-OOISVZLLET

OOLSV8ZIl

OOTSV8SO0l

‘ON LUVd

LY MIGD/IVOW OL UVIl

666b-V0Z-LO-SZ99

ssedwog

OSLL-bLb-00-OPLI

‘qlugQ suiduing

LT9b-880-TO-OELL

(GaLOVaay)

90€9-Z£0-00-S099

BUIMO], O/Y ‘Papaoy AA “tO}OVAL,

€TL9-860-10-0ZE

dung pury pAp ‘yup aotarag

£0T-TOO-POVOOLE

T06-€SST6SZS

1oywVAqipey

aSLVL

100-SZ061d

oTyneapay

TT-OOTSVOE9

143

9L66-TP6-00-021S

9166-LP¥6-00-081S

LITVG6-tT-00-08LT

99ZL-260-10-0Z6F

L661-ZST-00-026P

SOLS-80G-10-061P

UNL JUL[BAG ‘Iaydepy

unr) JULTBaS

uo1aluy s4eUINaU

asoding Y[NW-AT[Od

j009 bry ‘yup dnayey pinty

WMI SULT 3G 982],

(OS-HN) 9999/57 BTTQOW] O/V

8SE96G

C66

OS-€0E00-S1Z

AOWT002

OOLSV8LI

L-OOTSVt09T

144

9Z89-621-00-08LT

COLO-OTT-10-066P

729°8-ZE8-00-0ELT

86hS-PP6-00-0ELL

Z6V9-8P L-O0-OFLL

CSST-PLI-TO-O&Ll

TE09-EL9-00-OPLT

POSP-FSL-00-OPLT

OLEL-ZLG-00-OELT

6L89-9Z9-00-0&LT

OO0ES-E9T-10-OELT

Z2909-096-00-SZ299

9EZ0-1TZ0-T0-€299

DAPI] “Ig pAH ‘SL

(puvy]) [ISIC “410g PAH-S.L

(VLIOUUV)

AAV eTISsIP puw quog []wuUg

ywag (yy ‘yaodsurisy “appeag

(OLZ Olay) UOd LAA PIAS

(4/86h-NdvV)

aindupy $9101g aZulg

Ivay ‘Iaadepy YEg-o19V

quoly ‘1aydepy yeg-o1ay

qeloiny “UMOpaly,

Wog “opurypAg aly

qvas uolpaly - ulg ‘Aoy

MUOSLIT LF *10399}J8q YRIT

JOPOULY[N A]

L-OOOTPEV89

L-OOOLPPV89

T£#6LV99

I-TPLZTLVP9

THPLIIT VES

[-cdedqvilitVVr9o

1-LIGVILVFS

L-OSLGPLLIV PS

C1OlVvtg

TCO8VO09

C66ES

VSl6r

d'TX9-092

9920-800-T0-0821

pCph-LbO-LO-Ee6V

Pe LG-GLT-10-026F

o6es-vl [-10-026F

96 18-G20-10-026F

e16e-00T-1 0-OfL1

145

£6Z-860-10-08LT

Z0SZ-690-t 0-ogLt

EGOs-Z1I-l 0-Octl

egtg-Orl-10-068P

e1g¢-8F0-10-026P

6Z0¢-F90-10-026F

OGGP-ZLI-10-026¥

qpesodTy ‘uMo(] ALL

(qjoor- Adv) syquiassy PUBIS

WwaySAS a[iSSu

6-INTV - 8°. ‘1a}depy

yoasoig XY - soy, ‘“WAePpy

yoooig] - S29], ‘yaydepy

yuasey “AW TSIN ‘Aa([OAL

Ha

pro dva\ - Zunsiop “AEP

$3103 a[AUls - AayjolL

AL-N1V

‘aTpeag ayisst|l - ydpy

unt)

[Bag “Ssed pint ‘Bay ‘ALA

guyees HURL ‘qag 1eydepy

yeag ulg “Xt NAVIN

sey ‘-snquiod pub oxo, ‘PU

ere

Loot-Lg00eLare

LooL-0z00eLar+

(ool -6TooeLar+

ZO0OT-9O00S 1adbe

1001 -poooe. are

Logt-gooueL are

TOOT-LTOOSFAPL

cool -gooogrdre

LOOT-ZLO0ZtLaPe

1008-34

No

>

_

SCLS-OFT-TO-OFGF

C00Z-LE0-00-ET1S

G8S$8-9OC-00-Csg9g

PLOO-ShSI-00-CR9G

LLOG-ZE1L-LO-OZ6P

IECh-FET-00-C899

OZTO-€90-10-026F

C8SS-826-00-Ce99

ETL9-860-LO-03EP

0602-88T-00-0Z26P

GS16-L10-10-0GLF

WaIsig Suriyivaig

SND (QIK 3UC[_ 49Mod

OINSSILY Aly ASSY adey

BULVIPU] [vig sseig adey

[BOLIQA[|Y Wswely Furnvepy

: DAL], ‘ASSY JOPYUT

OFvYvay] Ulgey “194sa J,

AQUAaTLISOY FuLdg 19389],

aTpNVApAPY ‘wu surdungd

SUIZNT IW] “eS 189],

[GOW “Puod ‘puy ay “OV

‘ yA

(ANV'T) L-¥V8-2

yA

SVTosbhcsoTin

SVLO8resoTIIN

c00-1STYCW

L-T-8Fesoo0ly

L-VNVOV'I

0UTHddd

L00-ێ06Td

VoPAMVNYV

OOOUSG

ls

Is

147

LI9b-880-10-0€L1

61 1S-888-00-0€6¥7

OLEL-GLS-00-0ELL

6L89-969-00-0EL1

P86<6-IVL-LO-O€LT

690S-096-00-SZ99

LIv6-€Et-00-08L1

99ZL-260- 10-0264

L661-ZS1-00-026P

6ESE-8V6-00-0ELT

1L€G8-690-10-OPLT

9PLL-GOL-TO-O8LT

dung puey pApy ‘yup aolAaag

(9 NOd) 491!0984¢

yesoiry “UMOPAT

310g “W@pulfAg sty

(€A/6LZ-S1'1H)

Ajquiassy Zurqty soyouy

IUOSBI} ‘1Op~a\acy YL]

asoding [ON W-A[ [OC

[009 bry] ‘qu dnayep pint.

(PSINNMV/NV)

qInoaty SULLA] Ia 4say,

(WP9 O49Y) IPG YO ‘saydupy

(AO) BUIMOT, O/Y ‘a0PRAL,

NOWLOZ ‘PAH pury ‘your

I-T£80TVT9

CTOlVI9

1d08 109g

T-OOTSVPES

VSI6P

0S-€0600-S1Z

IWT100Z

OOTSV8LTI

¢LS9ScI

[-OOLSVZ8I1

OOLSVBZLL

YaATe LNAXONLVd LY GD/HIVOW OL UVITNOd LNANd INO LYOddNs

148

&SU6-880-10-08L1

ESLE-OVL-10--0Z8F

GLZ0-€91-T0-081¢

OSGb-ZLL-10-0Z6P

96C9-63Z1-00-0€L1L

SOLO-OTT-T0-0Z6F

E866-TPT-T0-O&LT

18Z2-TPI-T0-06L1

682Z-TPT-10-0€L1

O8@Z-TPT-10-0€2LT

O8ES-€26-00-SE8Z

86VS-bP6-00-0E82LT

S88I-PLI-10-O€8LT

L€09-S$19-00-0PLI

VO8P-PSL-00-0VLT

LGE8-L60-00-SZ 19

dpy Yona aytsst popiny

unr

[89g ‘ssaiq pny ‘day ‘ara

Jiedayy ajyisodwoy - JAS [OO],

SEL) SNQWOD 2 dIxO] ‘puy

UPL “Wo PAH ‘SL

(PUeT) [OSI “WOg PAY ‘SL

(SL2-SITH) Sunsioy ‘purg

(82Z-M'TH) Assy youey

(LLZ-M'TH) 3urystop ‘purg

(9L6-SITH) 4unsioy ‘pueg

(PUBT) JIUF JOMOT 1OSsaidwoy

yeag [gy ‘yaodsurizy, ‘arperg

(A/960-N dV)

Jaydepy so10jg asus

ivay ‘aojdepy yeg-o1sy

july ‘soidepy yec-o1sy

(423U8H) VL-TW dda

OZGSV68ZL

LOOT-LTOO9FCEL

LOOT-ZZLOTIGb2

TO08-G2

[-OOOTPSV89

L-OOO LLP YS89

T-SVHTOLVE9

[-Ed LOLy¢eo

6-6ATOTVE9

é6-TATOT Vey

THO6VP9

T-IfL3LVP9

T-2dEQbLLVb9

T-LIGPVITVb9

I-9TQvITVP9

(H-OOTSVPES

Lt-OOLSVOE9

149

OS1L-VIb-00-0VLI

8SVS-OV1L-10-OVZP

$00Z-L£0-00-S1 TY

€1LL9-860-10-0¢¢C0

O60L-8E L-00-0¢6P

8SZ0-9V L-10-0Z6P

LSZ0-9PL-10-0Z6P

8SLZ-VG1-10-026P

VLZO-E9L-10-CZ6V

6816-L10-1T0-021P

90L0-800-T0-O€8LT

Sumo,

V/V “pa[eeyu MA “1099C1],

WwaysAg AUIY ZRII

IIS] [LQOJ ‘UB[d 4OMOg

oneapAy qrug Suiduing

BULZN A 99/5] “FAS ISAT,

dof 2249-98 A ayue

This text is long and has been trimmed here. Open the source document for the complete record.

This is a copy of a public record, reproduced as it was published. It is not legal advice, and it may not be the version a court would rely on. Check the official source before you cite it.